Departemen Industrial Plant LAPORAN KERJA Nama : Meita Sukma Listiyana


Bulan : 20 Agustus / 19 September Jabatan : PPCP 84

TTD
JAM KATEGORI
TGL URAIAN PEKERJAAN ATS
M P KS K S C B LSG

1 2 3 4 5 6 7 8 9 10

20
21 08.00 17.00 OUTBOND TIBA DI YONIF 320
22 08.00 17.00 OUTBOND (PENGJATRI, PBB, DASAR TAKTIK, REVIEW DAY 1)
23 08.00 17.00 OUTBOND (PBB, TEAM WORK, BDM, REVIEW DAY 2)
24 08.00 17.00 OUTBOND (PBB, MOUNTAINERING, PKT/PKM, CARAKA MALAM)
25 08.00 17.00 OUTBOND (PBB, SIMULASI TEMPUR, PROXY WAR, DASAR INTELIJEN)
26 08.00 17.00 OUTBOND (PBB, ASSERTIVE, PRIBADI KREATIF, PBB, REVIEW)
27 08.00 17.00 OUTBOND (UPACARA PENUTUPAN)
28
29 08.00 17.00 MATERI INDOOR CSR, GCG, DEPT SHE, WIKA VALUES, DOP 2 DAN 3, HUMAS
30 08.00 17.00 KUNJUNGAN PABRIK
31
1
2 08.00 17.00 MATERI INDOOR ETIKET, SEJARAH WIKA, DPPU, RENSTRA, SEKAR WIKA
3 08.00 17.00 MATERI INDOOR DEPT. HC, MBTI
4 08.00 17.00 MATERI INDOOR KEUANGAN, SMW, PENGARAHAN DIREKSI, KOKAR WIKA
5 08.00 17.00 MATERI INDOOR DOP 1, KUNJUNGAN PPROYEK UIII
6 08.00 17.00 MATERI INDOOR PERJAANAN KARIR DAN TES AKHIR
7
8
9 08.00 17.00 PENEMPATAN DAN PENGENALAN DI DEPARTEMEN INDUSTRIAL PLANT
10 08.00 17.00 MATERI SINGLE LINE DIAGRAM DAN GENERATOR
11 08.00 17.00 MATERI GENERATOR
12 8:00 17.00 MATERI SPECIFICATION GENERATOR DAN CURVA GENERATOR
13 8:00 17.00 MATERI GENERATOR SIZING DAN EMERGENCY GENERATOR
14
15
16 08.00 17.00 MATERI EMERGENCY GENERATOR SIZING
17 08.00 17.00 MATERI TRANSFORMATOR
18 08.00 17.00 PRESENTASI MATERI GENERATOR
19 08.00 17.00 MATERI VECTOR GROUP OF TRANSFORMER
CATATAN :
1. 6. Arti Singkatan-Singkatan : Dinilai oleh atasan langsung Jakarta, …………………………………….
2. M = Masuk Diisi dengan sebenarnya
3. P = Pulang oleh pegawai/pejabat ybs.
KS = Kurang Sekali
4. K = Kurang
S = Sedang ………………………………………………………… ………………………………………..
5. C = Cukup Meita Sukma Listiyana
PT WIJAYA KARYA
Departemen Industrial Plant LAPORAN KERJA Nama : Meita Sukma Listiyana
Bulan : 20 September / 19 Oktober Jabatan : PPCP 84

TTD
JAM KATEGORI
TGL URAIAN PEKERJAAN ATS
M P KS K S C B LSG

1 2 3 4 5 6 7 8 9 10

20 08.00 17.00 INSULASI IP (INGREES OF PROTECTION)


21
22
23 08.00 17.00 SPESIFIKASI DAN DATASHEET TRANSFORMER
24 08.00 17.00 MOTOR LISTRIK DAN JENISNYA
25 08.00 17.00 PRESENTASI MATERI TRANSFORMER
26 08.00 17.00 METODE STARTING DAN SPESIFIKASI MOTOR LISTRIK
27 08.00 17.00 PRESENTASI MOTOR LISTRIK
28
29
30 08.00 17.00 PROTECTION SYSTEM DAN PROTECTION DEVICE
1 08.00 17.00 PRESENTASI MATERI PROTECTION DEVICE
2 08.00 17.00 LOADLIST
3 08.00 17.00 PERHITUNGAN LOADLIST
4 08.00 17.00 PRESENTASI LOADLIST
5
6
7 08.00 17.00 CABLE SIZING
8 08.00 17.00 PRESENTASI CABLE SIZING
9 08.00 17.00 SWITCHGEAR
10 08.00 17.00 MOTOR CONTROL CENTRE
11 08.00 17.00 BUSBAR SIZING
12
13
14 08.00 17.00 SPESIFIKASI DAN DATASHEET SWITCHGEAR DAN MCC
15 08.00 17.00 PENGAJUAN JUDUL MAKALAH
16 08.00 17.00 SINGLE LINE DIAGRAM (SLD)
17 08.00 17.00 KONSULTASI JUDUL MAKALAH
18 08.00 17.00 JENIS KONFIGURASI JARINGAN LISTRIK
19
CATATAN :
1. 6. Arti Singkatan-Singkatan : Dinilai oleh atasan langsung Jakarta, 19 Oktober 2019
2. M = Masuk Diisi dengan sebenarnya
3. P = Pulang oleh pegawai/pejabat ybs.
KS = Kurang Sekali
4. K = Kurang
S = Sedang Thomas Antonius Purba Meita Sukma Listiyana
5. C = Cukup
PT WIJAYA KARYA
Departemen Industrial Plant LAPORAN KERJA Nama : Meita Sukma Listiyana
Bulan : 20 Oktober / 19 November Jabatan : PPCP 84

TTD
JAM KATEGORI
TGL URAIAN PEKERJAAN ATS
M P KS K S C B LSG

1 2 3 4 5 6 7 8 9 10

20
21 08.00 17.00 INSTALLATION SWITCHGEAR DAN MCC
22 08.00 17.00 PRESENTASI SWITCHGEAR DAN MCC
23 08.00 17.00 SINGLE LINE DIAGRAM (SLD)
24 08.00 17.00 WIRING DIAGRAM
25 08.00 17.00 PLANT DISTRIBUTION SYSTEM
26
27
28 08.00 17.00 SIMBOL PADA SLD
29 08.00 17.00 PRESENTASI ELECTRICAL DIAGRAM (SLD & WIRING DIAGRAM)
30 08.00 17.00 MACAM-MACAM LAMPU
31 08.00 17.00 MACAM FIXTURE
1 08.00 17.00 PERHITUNGAN MENGGUNAKAN APLIKASI DIALUX
2
3
4 08.00 17.00 MACAM GROUNDING
5 08.00 17.00 PRESENTASI LIGHTING
6 08.00 17.00 MEDIA GROUNDING
7 08.00 17.00 LIGHTING
8 08.00 17.00 PRESENTASI GROUNDING AND LIGHTNING
9
10
11 08.00 17.00 GLADI RESIK FORUM ENGINEERING
12 08.00 17.00 PANITIA FORUM ENGINEERING
13 08.00 17.00 PANITIA FORUM ENGINEERING
14 08.00 17.00 KONSULTASI MAKALAH HALFCHECK
15 08.00 17.00 KONSULTASI PRESENTASI HALFCHECK
16
17
18 08.00 17.00 MATERI UPS
19 08.00 17.00 PRESENTASI MAKALAH KE MENTOR
CATATAN :
1. 6. Arti Singkatan-Singkatan : Dinilai oleh atasan langsung Jakarta, 19 November 2019
2. M = Masuk Diisi dengan sebenarnya
3. P = Pulang oleh pegawai/pejabat ybs.
KS = Kurang Sekali
4. K = Kurang
S = Sedang Thomas Antonius Purba Meita Sukma Listiyana
5. C = Cukup
PT WIJAYA KARYA
Departemen Industrial Plant LAPORAN KERJA Nama : Meita Sukma Listiyana
Bulan : 20 November / 19 Desember Jabatan : PPCP 84

TTD
JAM KATEGORI
TGL URAIAN PEKERJAAN ATS
M P KS K S C B LSG

1 2 3 4 5 6 7 8 9 10

20 08.00 17.00 PERBAIKAN PRESENTASI HALFCHECK


21 08.00 17.00 PEMBAGIAN ZONA HAZARDOUS AREA
22 08.00 17.00 PERSIAPAN HALFCHECK
23
24
25 08.00 17.00 HALFCHECK HARI I
26 08.00 17.00 HALFCHECK HARI II
27 08.00 17.00 HALFCHECK HARI III
28 08.00 17.00 TIPE PROTEKSI HAZARDOUS AREA
29 08.00 17.00 PRESENTASI HAZARDOUS AREA
30
1
2 08.00 17.00 MATERI CATHODIC PROTECTION
3 08.00 17.00 PRESENTASI CATHODIC PROTECTION
4 08.00 17.00 MATERI ETAP
5 08.00 17.00 MATERI ETAP
6 08.00 17.00 MATERI ETAP
7
8
9 08.00 17.00 MEMBUAT SIMULASI ETAP
10 08.00 17.00 MEMBUAT SIMULASI ETAP
11 08.00 17.00 MEMBUAT SIMULASI ETAP
12 08.00 17.00 MEMBUAT SIMULASI ETAP
13 08.00 17.00 INPUT PARAMETER UNTUK SIMULASI ETAP
14
15
16 08.00 17.00 INPUT PARAMETER UNTUK SIMULASI ETAP
17 08.00 17.00 INPUT PARAMETER UNTUK SIMULASI ETAP
18 08.00 17.00 INPUT PARAMETER UNTUK SIMULASI ETAP
19 08.00 17.00 INPUT PARAMETER UNTUK SIMULASI ETAP
CATATAN :
1. 6. Arti Singkatan-Singkatan : Dinilai oleh atasan langsung Jakarta, 19 Desember 2019
2. M = Masuk Diisi dengan sebenarnya
3. P = Pulang oleh pegawai/pejabat ybs.
KS = Kurang Sekali
4. K = Kurang
S = Sedang Thomas Antonius Purba Meita Sukma Listiyana
5. C = Cukup
PT WIJAYA KARYA
Departemen Industrial Plant LAPORAN KERJA Nama : Meita Sukma Listiyana
Bulan : 20 Desember / 19 Januari Jabatan : PPCP 84

TTD
JAM KATEGORI
TGL URAIAN PEKERJAAN ATS
M P KS K S C B LSG

1 2 3 4 5 6 7 8 9 10

20 08.00 17.00 PERBAIKAN SIMULASI ETAP


21
22
23 08.00 17.00 PERBAIKAN DAN RUNNING SIMULASI ETAP
24 08.00 17.00 LIBUR CUTI BERSAMA NATAL
25 08.00 17.00 LIBUR HARI NATAL
26 08.00 17.00 LIBUR HARI NATAL
27 08.00 17.00 LIBUR HARI NATAL
28
29
30 08.00 17.00 BAB IV PEMBAHASAN
31 08.00 17.00 BAB IV PEMBAHASAN
1 08.00 17.00 BAB IV PEMBAHASAN
2 08.00 17.00 BAB V KESIMPULAN
3 08.00 17.00 MEMBUAT PRESENTASI FINAL CHECK
4
5
6 08.00 17.00 MEMBUAT PRESENTASI FINAL CHECK
7 08.00 17.00 PERBAIKAN PRESENTASI FINAL CHECK
8 08.00 17.00 SIMULASI PRESENTASI FINAL CHECK KE MENTOR
9 08.00 17.00 KALKULASI CAPASITOR BANK
10 08.00 17.00 PENAMBAHAN CAPASITOR BANK PADA SIMULASI ETAP
11
12
13 08.00 17.00 PERBAIKAN BAB IV PEMBAHASAN
14 08.00 17.00 PERBAIKAN PRESENTASI FINAL CHECK
15 08.00 17.00 REVIEW PRESENTASI FINAL CHECK
16 08.00 17.00 REVIEW PRESENTASI FINAL CHECK
17 08.00 17.00 PERBAIKAN BAB IV PEMBAHASAN
18
19
CATATAN :
1. 6. Arti Singkatan-Singkatan : Dinilai oleh atasan langsung Jakarta, 19 Januari 2019
2. M = Masuk Diisi dengan sebenarnya
3. P = Pulang oleh pegawai/pejabat ybs.
KS = Kurang Sekali
4. K = Kurang
S = Sedang Thomas Antonius Purba Meita Sukma Listiyana
5. C = Cukup
PT WIJAYA KARYA
Departemen Industrial Plant LAPORAN KERJA Nama : Rizal Akbar Fauzany
Bulan : 20 Januari / 19 Februari Jabatan : PPCP 84

TTD
JAM KATEGORI
TGL URAIAN PEKERJAAN ATS
M P KS K S C B LSG

1 2 3 4 5 6 7 8 9 10

20 08.00 17.00 BUILDING AND ROOM LIST UNTUK LIGHTING CALCULATION


21 08.00 17.00 PERBAIKAN PRESENTASI FINAL CHECK
22 08.00 17.00 BAB 5 MANAJEMEN RISIKO
23 08.00 17.00 BAB 6 RENCANA TINDAK LANJUT MANAJEMEN RISIKO
24 08.00 17.00 BAB 6 SISTEM MAJANEMEN WIKA
25
26
27 08.00 17.00 PENERAPAN ACE
28 08.00 17.00 PRESENTASI PENERAPAN ACE
29 08.00 17.00 KELENGKAPAN MAKALAH FINAL CHECK (FORM PENILAIAN DAN EVALUASI 3 BULAN)
30 08.00 17.00 KELENGKAPAN MAKALAH FINAL CHECK (DAFTAR ISI)
31 08.00 17.00 PENGUMPULAN MAKALAH FINAL CHECK KE HC DAN PENGUJI
1
2
3 08.00 17.00 SIMULASI PRESENTASI FINALCHECK (ELECTRICAL ENGINEER)
4 08.00 17.00 PERBAIKAN MAKALAH DAN PRESENTASI FINAL CHECK
5 08.00 17.00 REVIEW MAKALAH DENGAN PENGUJI I
6 08.00 17.00 PRESENTASI FINAL CHECK
7 08.00 17.00 REVISI MAKALAH FINAL CHECK
8
9
10 08.00 17.00 REVISI MAKALAH FINAL CHECK
11 08.00 17.00 REVISI MAKALAH FINAL CHECK
12 08.00 17.00 REVISI MAKALAH FINAL CHECK
13 08.00 17.00 REVISI MAKALAH FINAL CHECK
14 08.00 17.00 REVISI DAN PENGUMPULAN MAKALAH FINAL CHECK
15
16
17 08.00 17.00 PERSIAPAN DOKUMEN PROTEKSI KATODIK UNTUK TENDER 2020
18 08.00 17.00 PERSIAPAN DOKUMEN PROTEKSI PETIR DAN PENTANAHAN UNTUK TENDER 2020
19 08.00 17.00 PERSIAPAN DOKUMEN HAZARDOUS AREA UNTUK TENDER 2020
CATATAN :
1. 6. Arti Singkatan-Singkatan : Dinilai oleh atasan langsung Jakarta, 19 Februari 2019
2. M = Masuk Diisi dengan sebenarnya
3. P = Pulang oleh pegawai/pejabat ybs.
KS = Kurang Sekali
4. K = Kurang
S = Sedang Thomas Antonius Purba Rizal Akbar Fauzany
5. C = Cukup
PT WIJAYA KARYA
Departemen Industrial Plant LAPORAN KERJA Nama : Meita Sukma Listiyana
Bulan : 20 / 19 Jabatan : PPCP 84

TTD
JAM KATEGORI
TGL URAIAN PEKERJAAN ATS
M P KS K S C B LSG

1 2 3 4 5 6 7 8 9 10

20 08.00 17.00
21 08.00 17.00
22 08.00 17.00
23 08.00 17.00
24 08.00 17.00
25 08.00 17.00
26 08.00 17.00
27 08.00 17.00
28 08.00 17.00
29 08.00 17.00
30 08.00 17.00
31 08.00 17.00
1 08.00 17.00
2 08.00 17.00
3 08.00 17.00
4 08.00 17.00
5 08.00 17.00
6 08.00 17.00
7 08.00 17.00
8 08.00 17.00
9 08.00 17.00
10 08.00 17.00
11 08.00 17.00
12 08.00 17.00
13 08.00 17.00
14 08.00 17.00
15 08.00 17.00
16 08.00 17.00
17 08.00 17.00
18 08.00 17.00
19 08.00 17.00
CATATAN :
1. 6. Arti Singkatan-Singkatan : Dinilai oleh atasan langsung Jakarta, 19 __ 2019
2. M = Masuk Diisi dengan sebenarnya
3. P = Pulang oleh pegawai/pejabat ybs.
KS = Kurang Sekali
4. K = Kurang
S = Sedang Thomas Antonius Purba Meita Sukma Listiyana
5. C = Cukup

Anda mungkin juga menyukai