ENGINEERING ESTIMATE

(EE)

KEGIATAN : PEMBANGUNAN POLSEK DISTRIK WEB

PEKERJAAN : PERENCANAAN POLSEK DISTRIK WEB

LOKASI : KAMPUNG UBRUB DISTRIK WEB

KABUPATEN : KEEROM

INSTANSI : KEPOLISIAN REPUBLIK INDONESIA DAERAH PAPUA

SUMBER DANA : DANA ALOKASI KHUSUS (DAK)

NILAI PAGU : Rp. 2.210.000.000,- (DUA MILIAR DUA RATUS SEPULUH JU


TAHUN ANGGARAN
2020
STIMATE

ONESIA DAERAH PAPUA

LIAR DUA RATUS SEPULUH JUTA RUPIAH RUPIAH)


ARAN
ENGINEERING ESTIMATE
(EE)

PROGRAM : PENINGKATAN SARANA DAN PRASARANA KOPERASI DAN UKM


KEGIATAN : PEMBANGUNAN POLSEK DISTRIK WEB
PEKERJAAN : PERENCANAAN POLSEK DISTRIK WEB
LOKASI : KAMPUNG UBRUB DISTRIK WEB
KABUPATEN : KEEROM

INSTANSI : KEPOLISIAN REPUBLIK INDONESIA DAERAH PAPUA

SUMBER DANA : DANA ALOKASI KHUSUS (DAK)


NILAI PAGU : Rp. 2.210.000.000,- (DUA MILIAR DUA RATUS SEPULUH JUTA RUPIAH RUPIAH)
TAHUN ANGGARAN : 2020

R E KAPI T U LAS I
A. PEKERJAAN PENDAHULUAN

B. PEMBANGUNAN POLSEK WEB

I. PEKERJAAN TANAH

II. PEKERJAAN PONDASI

III. PEKERJAAN STRUKTUR BETON

IV. PEKERJAAN KAYU

V. PEKERJAAN ATAP DAN PLAFOND

VI PEKERJAAN PENGECATAN

VII PEKERJAAN INSTALASI LISTRIK

VIII PEKERJAAN KUNCI DAN PENGGANTUNG

IX PEKERJAAN SANITASI DAN PLUMBING

D. PEKERJAAN AKHIR

A. REAL COST

B. PPN 10 % = A x 10%

C. TOTAL COST =A+B

D. DIBULATKAN

 TERBILANG :   DUA MILIAR DUA RATUS SEPULUH JUTA RUPI

KEEROM,
DI BUAT OLEH
KONSULTAN PERENCANA
DIREKTUR
###

ENGINEERING ESTIMATE
(EE)

SARANA DAN PRASARANA KOPERASI DAN UKM


AN POLSEK DISTRIK WEB
N POLSEK DISTRIK WEB
RUB DISTRIK WEB

EPUBLIK INDONESIA DAERAH PAPUA

SI KHUSUS (DAK)
00,- (DUA MILIAR DUA RATUS SEPULUH JUTA RUPIAH RUPIAH)

R E KAPI T U LAS I
Rp 60,864,800.00

Rp 1,919,311,564.09

Rp 86,005,552.00

Rp 233,228,268.00

Rp 1,130,509,725.55

Rp 182,244,285.73

Rp 135,259,237.52

Rp 76,434,057.30

Rp 57,922,500.00

Rp 17,707,938.00

Rp 59,718,530.52

Rp 29,000,000.00

Rp 2,009,176,364.09###

Rp 200,917,636.41###

Rp 2,210,094,000.50###

Rp ###
2,210,000,000.00

 DUA MILIAR DUA RATUS SEPULUH JUTA RUPIAH  ###

###

KEEROM, 2020 ###


DI BUAT OLEH ###
KONSULTAN PERENCANA ###
###
###
###
###
###
###
DIREKTUR ###
###
DAFTAR KUANTITAS DAN HARGA

KEGIATAN : PEMBANGUNAN POLSEK DISTRIK WEB


PEKERJAAN : PERENCANAAN POLSEK DISTRIK WEB
LOKASI : KAMPUNG UBRUB DISTRIK WEB
KABUPATEN : KEEROM
INSTANSI : KEPOLISIAN REPUBLIK INDONESIA DAERAH PAPUA
SUMBER DANA : DANA ALOKASI KHUSUS (DAK)
NILAI PAGU : Rp. 2.210.000.000,- (DUA MILIAR DUA RATUS SEPULUH JUTA RUPIAH RUPIAH)
TAHUN ANGGARAN : 2020

HARGA SATUAN
NO URAIAN PEKERJAAN SAT VOLUME
( Rp )

A. PEKERJAAN PENDAHULUAN

1 Pembuatan Direksi Keet Ls 1.00 Rp 20,000,000.00

2 Membersihkan lapangan dan perataan M2 368.00 Rp 28,000.00

3 Pengukuran Dan Pemasangan Bowplank M' 218.00 Rp 135,600.00

4 Pembuatan Papan Proyek Ls 1.00 Rp 1,000,000.00

B. PEMBANGUNAN POLSEK WEB

I. PEKERJAAN TANAH

1 Pek. Galian Tanah Pondasi M3 182.40 Rp 70,400.00

2 Urugan Tanah Kembali M3 60.80 Rp 33,740.00

3 Urugan Tanah Peninggi Lantai M3 57.00 Rp 1,247,600.00

II. PEKERJAAN PONDASI

1 Pek. Pondasi Batu Kali 1 : 4 M3 75.24 Rp 2,553,800.00

2 Pek. Batu Kosong M3 25.65 Rp 1,518,400.00

3 Pas. Urugan Pasir Bawah Pondasi M3 1.71 Rp 1,247,600.00

III. PEKERJAAN STRUKTUR BETON

1 Pek. Sloof (25 x 20 ) K.175 M3 8.55 Rp 9,042,642.86

2 Pek. Kolom (20x20 ) K 175 M3 8.32 Rp 13,170,923.46

3 Pek. Ring Balok ( 20x 15 ) K 175 M3 3.08 Rp 9,042,642.86

4 Pas. Dinding Batako Pas. 1/2 Batu M2 492.29 Rp 393,900.00

5 Pas. Dinding Beton (10 Cm) K.175 M3 6.00 Rp 13,180,860.93

6 Pek. Plesteran Camp 1 : 3 M2 6.84 Rp 165,390.00

7 Pek. Acian Dinding M2 342.00 Rp 74,680.00

8 Pek. Lantai Rabat Beton Camp. 1 : 2 : 3 M3 32.10 Rp 9,171,997.99

9 Pek. Plat Kanopi (7 Cm) K.175 M3 3.15 Rp 9,171,997.99

10 Pek.Keranik Pada lantai KM/WC 20 X 20 M2 24.25 Rp 634,670.00

11 Pek.Keranik Pada lantai 40 x 40 M2 321.00 Rp 864,193.43


IV. PEKERJAAN KAYU

1 Pek. Kuda-kuda, Skor Angin Kayu 5/10 Ky.Kls 1 M3 5.50 Rp 9,212,000.00

2 Pek. Balok Gording Kayu 5/10 Ky. Kls. 1 M3 1.85 Rp 7,711,000.00

3 Pek. Kusen Pintu dan Jendela Ky. Kls I M3 1.40 Rp 11,246,250.00

4 Pek Daun Pintu M2 15.00 Rp 1,087,500.00

6 Pek Pintu Sel Tralis besi 20 mm Ls 3.00 Rp 10,000,000.00

7 Pek Pintu Tralis Besi Gudang Senjata 20 mm Ls 1.00 Rp 10,000,000.00

8 Pek Daun Jendela Bh 28.00 Rp 1,087,500.00

9 Pas. Daun Pintu KM/WC Bh 3.00 Rp 1,087,500.00

10 Pek. Ventilasi M2 3.65 Rp 3,183,800.00

V. PEKERJAAN ATAP DAN PLAFOND

1 Pek. Atap Spandek Aluminium M2 54.38 Rp 256,750.00

1 Pek. Nok Atap Aluminium M' 19.52 Rp 427,750.00

2 Pas. List Plank 2 x 2/20 M' 79.00 Rp 85,400.00

3 Pek. Dak Beton Ruang Sel (10 Cm) K.175 M3 3.00 Rp 9,591,365.64

4 Pek.Tralis Besi Tempat Jemur' Ls 1.00 Rp 10,000,000.00

5 Rangka Plafond Balok 5/5 Ky. Kls 2 M3 329.28 Rp 165,000.00

6 Pek. Plafont Triplex T.6mm M2 114.33 Rp 114,535.00

VI PEKERJAAN PENGECATAN

1 Pek. Cat Dinding M2 171.00 Rp 73,500.00

2 Cat Kilap List Plank M2 5.00 Rp 73,500.00

3 Pek. Pengecetan Kusen, Pintu & Jendela M2 91.71 Rp 90,000.00

4 Pek. Pengecetan tralis besi M2 91.71 Rp 378,630.00

5 Pek. Pengecetan Plafont M2 228.00 Rp 90,000.00

VII PEKERJAAN INSTALASI LISTRIK

1 Pas. Lampu TL 40 Watt Ttk 45.00 Rp 996,500.00

2 Pas. Saklar Tunggal Ttk 25.00 Rp 52,500.00

3 Pas. Saklar Ganda Ttk 6.00 Rp 7,500.00

4 Pas. Stop Kontak Ttk 15.00 Rp 781,500.00

VIII PEKERJAAN KUNCI DAN PENGGANTUNG

1 Pas. Kunci Tanam Biasa Psg 17.00 Rp 405,180.00

2 Pas. Kunci Tanam Kamar Mandi Psg 3.00 Rp 357,600.00

3 Pas. Engsel Pintu Bh 50.00 Rp 85,545.00

4 Pas. Engsel Jendela Bh 56.00 Rp 60,030.00

5 Pas. Grendel Pintu dan Jendela Bh 28.00 Rp 75,291.00

6 Pas. Tralis besi Jendela Bh 28.00 Rp 903,630.00


7 Pas. Tralis Pintu Bh 2.00 Rp 903,630.00

8 Pas. Ventilasi Tralis Sel Bh 6.00 Rp 378,630.00


IX PEKERJAAN SANITASI DAN PLUMBING

1 Pas. Kloset Jongkok Bh 4.00 Rp 1,265,400.00

2 Pas. Kloset Duduk Bh 1.00 Rp 995,200.00

3 Pas. Bak beton Bh 0.14 Rp 9,171,997.99

4 Pas. Bak Fiberglass Bh 1.00 Rp 995,200.00

5 Pas. Kran Air 1/2" Bh 5.00 Rp 81,575.00

6 Pas. Pipa PVC 1/2" Bh 8.00 Rp 37,345.50

7 Pas. Pipa PVC 3" M' 20.00 Rp 143,618.50

8 Pas. Pipa PVC 4" M' 20.00 Rp 245,724.00

9 2 Unit Septic Tank + Peresapan Unit 2.00 Rp 14,673,565.47

10 Saluran Drainase M' 34.29 Rp 393,900.00

C. PEKERJAAN AKHIR

1 Pek. Permbersihan akhir Ls 1.00 Rp 10,000,000.00

2 Laporan Ls 1.00 Rp 10,000,000.00

3 As Buld Drawing Dan Back Up Data Ls 1.00 Rp 9,000,000.00


AR KUANTITAS DAN HARGA
NAMA PEKERJAAN

EPUBLIK INDONESIA DAERAH PAPUA

.000,- (DUA MILIAR DUA RATUS SEPULUH JUTA RUPIAH RUPIAH)

###
JUMLAH HARGA
( Rp )

Rp 20,000,000.00

Rp 10,304,000.00

Rp 29,560,800.00

Rp 1,000,000.00

Rp 60,864,800.00

Rp 12,840,960.00

Rp 2,051,392.00

Rp 71,113,200.00

Rp 86,005,552.00

Rp 192,147,912.00

Rp 38,946,960.00

Rp 2,133,396.00

Rp 233,228,268.00

Rp 77,314,596.43

Rp 109,582,083.17

Rp 27,833,254.72

Rp 193,913,031.00

Rp 79,085,165.56

Rp 1,131,267.60

Rp 25,540,560.00

Rp 294,421,135.35

Rp 28,891,793.66

Rp 15,390,747.50

Rp 277,406,090.57
Rp 1,130,509,725.55

Rp 50,664,157.60

Rp 14,226,795.00

Rp 15,723,382.13

Rp 16,312,500.00

Rp 30,000,000.00

Rp 10,000,000.00

Rp 30,450,000.00

Rp 3,262,500.00

Rp 11,604,951.00

Rp 182,244,285.73

Rp 13,960,781.25

Rp 8,351,391.00

Rp 6,746,600.00

Rp 28,774,096.93

Rp 10,000,000.00

Rp 54,331,200.00

Rp 13,095,168.33

Rp 135,259,237.52

Rp 12,568,500.00

Rp 367,500.00

Rp 8,253,900.00

Rp 34,724,157.30

Rp 20,520,000.00

Rp 76,434,057.30

Rp 44,842,500.00

Rp 1,312,500.00

Rp 45,000.00

Rp 11,722,500.00

Rp 57,922,500.00

Rp 6,888,060.00

Rp 1,072,800.00

Rp 4,277,250.00

Rp 3,361,680.00

Rp 2,108,148.00

Rp 25,301,640.00
Rp 1,807,260.00

Rp 2,271,780.00

Rp 17,707,938.00
Rp 5,061,600.00

Rp 995,200.00

Rp 1,320,767.71

Rp 995,200.00

Rp 407,875.00

Rp 298,764.00

Rp 2,872,370.00

Rp 4,914,480.00

Rp 29,347,130.95

Rp 13,505,142.86

Rp 59,718,530.52

10,000,000.00

10,000,000.00

9,000,000.00

Rp 29,000,000.00
ANALISA HARGA SATUAN
STANDAR NASIONAL INDONESIA
(SNI)
PEKERJAAN PENDAHULUAN

HARGA SATUAN
NO. URAIAN PEKERJAAN KUANTITAS SATUAN
( Rp )

1 1M' Pengukuran dan pemasangan bowplank


- Kayu Kls II 0.0120 M3 5,000,000.00
- Paku Biasa 0.0200 Kg 45,000.00
- Kayu Papan 3/20 0.0070 M3 5,000,000.00
- Tukang kayu 0.1000 Oh 210,000.00
- Pekerja 0.1000 Oh 150,000.00
- Kepala Tukang 0.0100 Oh 240,000.00
- Mandor 0.0050 Oh 260,000.00

2 1M2 Membersihkan lapangan dan perataan


- Pekerja 0.1000 Oh 150,000.00
- Mandor 0.0500 Oh 260,000.00

PEKERJAAN TANAH

HARGA SATUAN
NO. URAIAN PEKERJAAN KUANTITAS SATUAN
( Rp )
1M3 Galian Tanah Biasa sedalam 1M SNI 2835:2008 (6.1)
1
- Pekerja 0.4000 Oh 150,000.00
- Mandor 0.0400 Oh 260,000.00

1M3 Urugan kembali SNI 2835:2008 (6.9)


2
- Pekerja 0.1920 Oh 150,000.00
- Mandor 0.0190 Oh 260,000.00

1M3 Pemadatan Tanah SNI 2835:2008 (6.10)


3
- Pekerja 0.5000 Oh 150,000.00
- Mandor 0.0500 Oh 260,000.00

1M3 Urugan Pasir SNI 2835:2008 (6.11)


4
- Pasir Urug 1.2000 M3 1,000,000.00
- Pekerja 0.3000 Oh 150,000.00
- Mandor 0.0100 Oh 260,000.00

1M3 Urugan tanah SNI 2835:2008 (6.15)


5
- Tanah subur 1.2000 M3 1,000,000.00
- Pekerja 0.3000 Oh 150,000.00
- Mandor 0.0100 Oh 260,000.00

PEKERJAAN PONDASI

1 1M3 Pasang Pondasi Batu Kali 1 : 5


- Batu belah 15/20 Cm 1.0000 M3 1,000,000.00
- Semen Pc 136.0000 Kg 4,800.00
HARGA SATUAN
NO. URAIAN PEKERJAAN KUANTITAS SATUAN
( Rp )
- Pasir Pasang 0.5200 M3 1,000,000.00
- Pekerja 1.5000 Oh 150,000.00
- Tukang Batu 0.6000 Oh 210,000.00
- Kepala Tukang 0.0600 Oh 240,000.00
- Mandor 0.0600 Oh 260,000.00

1M3 Pasang Pondasi Batu Kosong SNI 2836:2008 (6.9)


2
- Batu belah 15/20 Cm 1.1000 M3 1,000,000.00
- Pasir Urug 0.2000 M3 1,000,000.00
- Pekerja 0.7800 Oh 150,000.00
- Tukang Batu 0.3900 Oh 210,000.00
- Kepala Tukang 0.0390 Oh 240,000.00
- Mandor 0.0390 Oh 260,000.00
HARGA SATUAN
NO. URAIAN PEKERJAAN KUANTITAS SATUAN
( Rp )

PEKERJAAN DINDING

1 1M2 Pasangan Bataco Tebal 1/2 bata 1 : 4


- Batu Bataco 17.0000 Bh 12,000.00
- Semen Pc 12.5000 Kg 4,800.00
- Pasir Pasang 0.0250 M3 1,000,000.00
- Pekerja 0.5000 Oh 150,000.00
- Tukang Batu 0.1000 Oh 210,000.00
- Kepala Tukang 0.0100 Oh 240,000.00
- Mandor 0.0250 Oh 260,000.00

2 1 m3 Pasang Dinding Batu Batu Belah 1 : 3


- Batu Belah 15/20 Cm 1.2000 Bh 1,000,000.00
- Portland Sement 202.0000 Kg 4,800.00
- Pasir Pasang 0.4850 M³ 1,000,000.00
- Pekerja 1.5000 Oh 150,000.00
- Tukang batu 0.6000 Oh 210,000.00
- Kepala tukang 0.0600 Oh 240,000.00
- Mandor 0.0750 Oh 260,000.00

PEKERJAAN PLESTERAN

1 1M2 Plesteran 1 : 1 Tebal 15 mm


- Semen Pc 12.9200 Kg 4,800.00
- Pasir Pasang 0.0130 M3 1,000,000.00
- Pekerja 0.2000 Oh 150,000.00
- Tukang Batu 0.1500 Oh 210,000.00
- Kepala Tukang 0.0150 Oh 240,000.00
- Mandor 0.0100 Oh 260,000.00

2 1M2 Plesteran 1 : 2 Tebal 15 mm


- Semen Pc 6.4800 Kg 4,800.00
- Pasir Pasang 0.0190 M3 1,000,000.00
- Pekerja 0.2000 Oh 150,000.00
- Tukang Batu 0.1500 Oh 210,000.00
- Kepala Tukang 0.0150 Oh 240,000.00
- Mandor 0.0100 Oh 260,000.00

3 1M2 Plesteran 1 : 3 Tebal 20 mm


- Semen Pc 10.8000 Kg 4,800.00
- Pasir Pasang 0.0260 M3 1,000,000.00
- Pekerja 0.2500 Oh 150,000.00
- Tukang Batu 0.2000 Oh 210,000.00
- Kepala Tukang 0.0200 Oh 240,000.00
- Mandor 0.0125 Oh 260,000.00

4 1M2 Plesteran 1 : 3 Tebal 25 mm


- Semen Pc 11.7500 Kg 4,800.00
- Pasir Pasang 0.0350 M3 1,000,000.00
- Pekerja 0.3000 Oh 150,000.00
- Tukang Batu 0.2000 Oh 210,000.00
HARGA SATUAN
NO. URAIAN PEKERJAAN KUANTITAS SATUAN
( Rp )
- Kepala Tukang 0.0200 Oh 240,000.00
- Mandor 0.0230 Oh 260,000.00

5 1M2 Plesteran 1 : 4 Tebal 15 mm - SNI. 03-2837-2008 (6.15)


- Semen Pc 5.2000 Kg 4,800.00
- Pasir Pasang 0.0200 M3 1,000,000.00
- Pekerja 0.2000 Oh 150,000.00
- Tukang Batu 0.1500 Oh 210,000.00
- Kepala Tukang 0.0150 Oh 240,000.00
- Mandor 0.0100 Oh 260,000.00
HARGA SATUAN
NO. URAIAN PEKERJAAN KUANTITAS SATUAN
( Rp )
6 1M2 Plesteran 1 : 4 Tebal 20 mm
- Semen Pc 8.6800 Kg 4,800.00
- Pasir Pasang 0.0280 M3 1,000,000.00
- Pekerja 0.2500 Oh 150,000.00
- Tukang Batu 0.2000 Oh 210,000.00
- Kepala Tukang 0.0200 Oh 240,000.00
- Mandor 0.0125 Oh 260,000.00

7 1M2 Plesteran 1 : 5 Tebal 15 mm


- Semen Pc 4.3200 Kg 4,800.00
- Pasir Pasang 0.0220 M3 1,000,000.00
- Pekerja 0.2000 Oh 150,000.00
- Tukang Batu 0.1500 Oh 210,000.00
- Kepala Tukang 0.0150 Oh 240,000.00
- Mandor 0.0100 Oh 260,000.00

8 1M2 Plesteran Beton 1 : 2 Tebal 15 mm


- Semen Pc 9.3000 Kg 4,800.00
- Pasir Pasang 0.0180 M3 1,000,000.00
- Pekerja 0.2600 Oh 150,000.00
- Tukang Batu 0.2000 Oh 210,000.00
- Kepala Tukang 0.0200 Oh 240,000.00
- Mandor 0.0130 Oh 260,000.00

9 1 m2 Acian - SNI. 03-2837-2008 (6.27)


- Portland Cement (PC) 3.2500 kg 4,800.00
- Pekerja 0.1500 org 210,000.00
- Tukang Batu 0.1000 org 240,000.00
- Kepala Tukang 0.0100 org 150,000.00
- Mandor 0.0080 org 260,000.00

PEKERJAAN KAYU

1 MEMBUAT DAN MEMASANG 1 M3 KUSEN PINTU DAN KUSEN JENDELA. KAYU KELAS II - SNI 3434:2008
- Kayu Kls1, Balok 1.2000 M3 5,000,000.00
Paku Campur 1.2500 Kg 45,000.00
- Pekerja 6.0000 Oh 150,000.00
- Tukang Kayu 18.0000 Oh 210,000.00
- Kepala Tukang 1.8000 Oh 240,000.00
- Mandor 0.3000 Oh 260,000.00

2 MEMBUAT DAN MEMASANG 1 M2 DAUN PINTU PANEL. KAYU - SNI 3434:2008 (6.5)
- Kayu Kls1, Papan 0.0400 M3 5,000,000.00
- Lem Kayu 0.5000 Kg 45,000.00
- Pekerja 1.0000 Oh 150,000.00
- Tukang Kayu 3.0000 Oh 210,000.00
- Kepala Tukang 0.3000 Oh 240,000.00
- Mandor 0.0500 Oh 260,000.00

4 1M2 Pasang Pintu Tripleks Rangkap, Rangka Kayu Kls1 - SNI 3434:2008 (6.11)
HARGA SATUAN
NO. URAIAN PEKERJAAN KUANTITAS SATUAN
( Rp )
- Kayu Kls1, Papan 0.0196 M3 5,000,000.00
- Paku Biasa 1/2"- 1" 0.0300 Kg 45,000.00
- Lem Kayu 0.3000 Ltr 72,000.00
- Tripleks 3 mm 1.0000 Lbr 209,000.00
- Pekerja 0.6000 Oh 150,000.00
- Tukang Kayu 2.0000 Oh 210,000.00
- Kepala Tukang 0.2000 Oh 240,000.00
- Mandor 0.0300 Oh 260,000.00

5 1M2 Pasang Pintu Tripleks Rangkap, Lapis Seng Plat Rangka Kayu Kls1
Kayu Kls1, Papan 0.0196 M3 5,000,000.00
Paku Biasa 1/2"- 1" 0.0300 Kg 45,000.00
Lem Kayu 0.3000 Ltr 72,000.00
Tripleks 3 mm 1.0000 Lbr 209,000.00
Seng Plat 1.0000 Lbr 80,000.00
Pekerja 0.6000 Oh 150,000.00
Tukang Kayu 2.0000 Oh 210,000.00
Kepala Tukang 0.2000 Oh 240,000.00
Mandor 0.0300 Oh 260,000.00
HARGA SATUAN
NO. URAIAN PEKERJAAN KUANTITAS SATUAN
( Rp )

6 1M2 Pasang Jalusi Mati Kusen kayu Klas 1


- Kayu Kls1, Papan 0.0600 M3 5,000,000.00
- Paku Biasa 1/2"- 1" 0.1500 Kg 45,000.00
- Pekerja 0.5000 Oh 150,000.00
- Tukang Kayu 2.0000 Oh 210,000.00
- Kepala Tukang 0.2000 Oh 240,000.00
- Mandor 0.0250 Oh 260,000.00

7 1M3 Pasang Konstruksi Kuda-kuda Kayu Klas 1 - SNI 3434:2008 (6.13)


- Kayu Kls1, Balok 1.1000 M3 5,000,000.00
- Paku biasa 5.6000 Kg 45,000.00
- Pekerja 4.0000 Oh 150,000.00
- Tukang Kayu 12.0000 Oh 210,000.00
- Kepala Tukang 1.2000 Oh 240,000.00
- Mandor 0.2000 Oh 260,000.00

8 MEMASANG 1 M3 KONSTRUKSI GORDENG. KAYU - SNI 3434:2008 (6.15)


Kayu Kls1, Balok 1.1000 M3 5,000,000.00
Paku biasa 3.0000 Kg 45,000.00
Pekerja 2.4000 Oh 150,000.00
Tukang Kayu 7.2000 Oh 210,000.00
Kepala Tukang 0.7200 Oh 240,000.00
Mandor 0.1200 Oh 260,000.00

9 1M2 Pasang Kaso+Reng Genteng Multyroof Kayu Klas 1


- Kayu Balok Kaso - Kaso 5/7 0.0140 M3 5,000,000.00
- Kayu Balok Kaso - Kaso 3/4 0.0070 M3 5,000,000.00
- Paku biasa 5 cm - 10 cm 0.2500 Kg 45,000.00
- Pekerja 0.1000 Oh 150,000.00
- Tukang Kayu 0.1000 Oh 210,000.00
- Kepala Tukang 0.0100 Oh 240,000.00
- Mandor 0.0050 Oh 260,000.00

10 1 m2 Pasang rangka langit-langit (60 x 120) cm


- Kayu Kls1, Balok 0.0120 M3 5,000,000.00
- Paku biasa 0.1000 Kg 45,000.00
- Pekerja 0.1500 Oh 150,000.00
- Tukang Kayu 0.2500 Oh 210,000.00
- Kepala Tukang 0.0250 Oh 240,000.00
- Mandor 0.0750 Oh 260,000.00

11 1 m2 langit-langit Tripleks(60 x 120) cm Tebal 3 mm


Tripleks 3mm 0.3750 Lbr 209,000.00
Paku Campur 0.0300 Kg 45,000.00
Pekerja 0.0700 Oh 150,000.00
Tukang Kayu 0.1000 Oh 210,000.00
Kepala Tukang 0.0100 Oh 240,000.00
Mandor 0.0035 Oh 260,000.00

12 1M' Listplank Ukuran 1 x (2x20) cm Kayu Klas 1 - SNI 3434:2008 (6.21)


HARGA SATUAN
NO. URAIAN PEKERJAAN KUANTITAS SATUAN
( Rp )
- Kayu Kls1, Papan 0.0086 M3 5,000,000.00
- Paku biasa 0.0600 Kg 45,000.00
- Pekerja 0.1000 Oh 150,000.00
- Tukang Kayu 0.1000 Oh 210,000.00
- Kepala Tukang 0.0100 Oh 240,000.00
- Mandor 0.0050 Oh 260,000.00

14 1 m' Mengerjakan papan ruiter


Kayu papan 0.0036 m3 5,000,000.00
Paku biasa 0.0200 Kg 45,000.00
Pekerja 0.0280 Oh 150,000.00
Tukang Kayu 0.0800 Oh 210,000.00
Kepala Tukang 0.0080 Oh 240,000.00
Mandor 0.0014 Oh 260,000.00

1 M3 Pek. Gelagar Induk


- Kayu Klas I, Balok 1.1000 m3 5,000,000.00
- Paku Biasa 2" - 5" 0.1000 Kg 45,000.00
- Pekerja 5.0000 Oh 150,000.00
- Tukang Kayu 10.0000 Oh 210,000.00
- Kepala Tukang 1.2500 Oh 240,000.00
- Mandor 0.0750 Oh 260,000.00

1 M3 Pek. Gelagar Lantai


- Kayu Klas I, Balok 1.1000 m3 5,000,000.00
- Paku Biasa 2" - 5" 0.1000 Kg 45,000.00
- Pekerja 10.0000 Oh 150,000.00
- Tukang Kayu 7.5000 Oh 210,000.00
- Kepala Tukang 1.2500 Oh 240,000.00
- Mandor 0.0750 Oh 260,000.00

15 1 M² Pasang Lantai Dari Papan


- Kayu, papan 0.0070 M³ 5,000,000.00
- Paku Campur 0.1000 Kg 45,000.00
- Pekerja 0.6000 Oh 150,000.00
- Tukang kayu 1.8000 Oh 210,000.00
- Kepala tukang 0.1800 Oh 240,000.00
- Mandor 0.0300 Oh 260,000.00

15 1 M² Pasang Dinding Papan Lapis Tripleks + Rangka


- Papan kelas I 0.0200 M3 6,250,000.00
- Tripleks 3mm 0.3360 Lbr 80,000.00
- Balok 5/10 0.0150 M3 6,250,000.00
- Paku Campur 0.2000 Kg 45,000.00
- Pekerja 0.2800 Oh 150,000.00
- Tukang kayu 1.2000 Oh 210,000.00
- Kepala tukang 0.0800 Oh 240,000.00
- Mandor 0.0400 Oh 260,000.00
HARGA SATUAN
NO. URAIAN PEKERJAAN KUANTITAS SATUAN
( Rp )
15 1 M² Pasang Dinding Double Tripleks + Rangka 5/10
- Tripleks 3mm 0.7600 Lbr 80,000.00
- Balok 5/10 0.0150 M3 6,250,000.00
- Paku Biasa 2" - 5" 0.2000 Kg 45,000.00
- Pekerja 0.2800 Oh 150,000.00
- Tukang kayu 1.2000 Oh 210,000.00
- Kepala tukang 0.0800 Oh 240,000.00
- Mandor 0.0140 Oh 260,000.00

16 1 M² Pasang plint papan


- Kayu, papan 0.0096 M³ 5,000,000.00
- Paku Campur 0.010 Kg 45,000.00
- Pekerja 0.040 Oh 150,000.00
- Tukang kayu 0.800 Oh 210,000.00
- Kepala tukang 0.080 Oh 240,000.00
- Mandor 0.040 Oh 260,000.00

17 1 M² Pasang les dinding papan


- Kayu, papan 0.0024 M³ 5,000,000.00
- Paku Campur 0.010 Kg 45,000.00
- Pekerja 0.040 Oh 150,000.00
- Tukang kayu 0.800 Oh 210,000.00
- Kepala tukang 0.080 Oh 240,000.00
- Mandor 0.040 Oh 260,000.00

18 1 M² Pasang dinding pemisah double Tripleks, rangka kayu :


- Kayu Balok 0.0195 M³ 5,000,000.00
- Paku Campur 0.100 Kg 45,000.00
- Tripleks 3 mm 1.440 M2 209,000.00
- Pekerja 0.600 Oh 150,000.00
- Tukang kayu 1.200 Oh 210,000.00
- Kepala tukang 0.180 Oh 240,000.00
- Mandor 0.030 Oh 260,000.00

19 1 m2 Pasang dinding pemisah teakwood rangkap


Kayu balok 0.0195 m3 5,000,000.00
Teak wood 3 mm 0.8600 lbr 209,000.00
Paku biasa 0.1500 kg 45,000.00
Pekerja 0.1500 Oh 150,000.00
Tukang kayu 0.4500 Oh 210,000.00
Kepala tukang 0.0450 Oh 240,000.00
Mandor 0.0075 Oh 260,000.00

20 1 M3 Kolom Kayu
Kayu Balok 1.1000 M3 5,000,000.00
Paku Biasa 0.1000 Kg 45,000.00
Pekerja 2.0000 Oh 150,000.00
Tukang Kayu 1.0000 Oh 210,000.00
Kepala Tukang Kayu 1.5000 Oh 240,000.00
Mandor 0.2500 Oh 260,000.00

21 1 M3 Meja dan Kursi Kayu


Kayu Balok 1.1000 M3 5,000,000.00
HARGA SATUAN
NO. URAIAN PEKERJAAN KUANTITAS SATUAN
( Rp )
Paku Biasa 0.2000 Kg 45,000.00
Besi Polos 1.0000 M' 180,000.00
Pekerja 1.5000 Oh 150,000.00
Tukang Kayu 0.8000 Oh 210,000.00
Kepala Tukang Kayu 1.0000 Oh 240,000.00
Mandor 0.2500 Oh 260,000.00
HARGA SATUAN
NO. URAIAN PEKERJAAN KUANTITAS SATUAN
( Rp )
22 1M3 PAS. RING BALK KAYU 5/10
Kayu Balok 1.1000 M3 5,000,000.00
Paku Biasa 1.0000 Kg 45,000.00
Pekerja 2.0000 Oh 150,000.00
Tukang Kayu 1.0000 Oh 210,000.00
Kepala Tukang Kayu 1.5000 Oh 240,000.00
Mandor 0.2500 Oh 260,000.00

23 1M2 PAS. REALING TERAS KAYU 5/10


Kayu Balok 0.0100 M3 5,000,000.00
Paku Biasa 0.2000 Kg 45,000.00
Pekerja 0.2000 Oh 150,000.00
Tukang Kayu 0.5000 Oh 210,000.00
Kepala Tukang Kayu 0.0500 Oh 240,000.00
Mandor 0.0200 Oh 260,000.00

PEKERJAAN BETON

1 1M3 Membuat beton tumbuk 1 : 3 : 5


- Semen 215.0000 Kg 4,800.00
- Pasir Beton 0.5200 M3 1,000,000.00
- Kerikil 0.8700 M3 1,500,000.00
- Pekerja 1.6500 Oh 150,000.00
- Tukang Batu 0.2500 Oh 210,000.00
- Kepala Tukang 0.0250 Oh 240,000.00
- Mandor 0.0800 Oh 260,000.00

2 1Kg Pembesian dengan besi Polos - SNI 7394:2008 (6.17)


- Besi Beton 1.0500 Kg 28,583.18
- Kawat Beton 0.0150 Kg 155,000.00
- Pekerja 0.0070 Oh 150,000.00
- Tukang Besi 0.0070 Oh 210,000.00
- Kepala Tukang 0.0007 Oh 240,000.00
- Mandor 0.0004 Oh 260,000.00

4 1 M2 Pasang Bekisting untuk Kolom - SNI 7394:2008 (6.22)


- Kayu 0.0450 M3 5,000,000.00
- Paku Biasa 0.3000 Kg 45,000.00
- Pekerja 0.5200 Oh 150,000.00
- Tukang Kayu 0.2600 Oh 210,000.00
- Kepala Tukang 0.0260 Oh 240,000.00
- Mandor 0.0260 Oh 260,000.00

5 MEMASANG 1 M2 BEKISTING UNTUK SLOOF SNI - 7394:2008 (6.21)


- Kayu Papan 0.0200 M3 5,000,000.00
- Paku Biasa 0.2000 Kg 45,000.00
- Pekerja 0.1000 Oh 150,000.00
- Tukang Kayu 0.2500 Oh 210,000.00
- Kepala Tukang 0.0250 Oh 240,000.00
- Mandor 0.0050 Oh 260,000.00
HARGA SATUAN
NO. URAIAN PEKERJAAN KUANTITAS SATUAN
( Rp )
6 MEMASANG 1 M2 BEKISTING UNTUK LANTAI - SNI 7394:2008 (6.24)
- Kayu Papan 0.0400 M3 5,000,000.00
- Paku Biasa 0.4000 Kg 45,000.00
- Kayu balok 0.0150 M3 5,000,000.00
- Pekerja 0.6600 Oh 150,000.00
- Tukang Kayu 0.3300 Oh 210,000.00
- Kepala Tukang 0.0330 Oh 240,000.00
- Mandor 0.0330 Oh 260,000.00
HARGA SATUAN
NO. URAIAN PEKERJAAN KUANTITAS SATUAN
( Rp )
7 MEMASANG 1 M2 BEKISTING UNTUK DINDING
- Kayu Papan 0.0300 M³ 5,000,000.00
- Paku biasa 2' - 5" 0.4000 Kg 45,000.00
- Kayu balok 0.0200 M³ 5,000,000.00
- Pekerja 0.3200 Oh 150,000.00
- Tukang Kayu 0.3300 Oh 210,000.00
- Kepala tukang 0.0330 Oh 240,000.00
- Mandor 0.0060 Oh 260,000.00

8 Membuat 1 M3 beton dengan mutu K 175 - SNI 7394:2008 (6.5)


- Semen 300.0000 Kg 4,800.00
- Pasir beton 0.4530 M3 1,000,000.00
- Kerikil 0.7620 M3 1,500,000.00
- Pekerja 1.6500 Oh 150,000.00
- Tukang Batu 0.2750 Oh 210,000.00
- Kepala Tukang 0.0280 Oh 240,000.00
- Mandor 0.0830 Oh 260,000.00

9 MEMBUAT 1 M3 SLOOF BETON (12/15) CM SNI 7394:2008 (6.30a)


- Beton K-150 1.0000 M3 3,369,550.00
- Pembesian Polos 109.1707 Kg 35,129.33
- Bekisting Sloof 10.0000 M2 183,800.00

10 MEMBUAT 1 M3 DINDING BETON TEBAL = 12 CM SNI 7394:2008 (6.32b)


- Beton K-175 1.0000 M3 3,369,550.00
- Pembesian Polos 178.1500 Kg 35,129.33
- Bekisting Dinding 9.0000 M2 394,780.00

10 MEMBUAT 1 M3 MEJA BETON = 10 CM SNI 7394:2008 (6.32b)


- Beton K-175 1.0000 M3 3,369,550.00
- Pembesian Polos 41.1000 Kg 35,129.33
- Bekisting Lantai 10.0000 M2 477,800.00

11 MEMBUAT 1 M3 PLAT BETON TEBAL = 10 CM


- Beton K-175 1.0000 M3 3,369,550.00
- Pembesian Polos 52.7949 Kg 35,129.33
- Bekisting Dinding 10.0000 M2 394,780.00

12 MEMBUAT 1 M3 PLAT LANTAI BETON TEBAL = 15 CM


- Beton K-175 1.0000 M3 3,369,550.00
- Pembesian Polos 52.7949 Kg 35,129.33

13 MEMBUAT 1 M3 KOLOM BETON (12/12) CM SNI 7394:2008 (6.30a)


- Beton K-175 1.0000 M3 3,369,550.00
- Pembesian Polos 276.2667 Kg 35,129.33
- Bekisting Kolom 10.0000 M2 384,100.00

16 MEMBUAT 1 M3 KOLOM BETON (40/40) CM


- Beton K-175 1.0000 M3 3,369,550.00
- Pembesian Polos 115.0000 Kg 35,129.33
- Bekisting Kolom 15.0000 M2 384,100.00

19 MEMBUAT 1 M3 RING BALOK BETON (12/15) CM SNI 7394:2008 (6.36)


- Beton K-175 1.0000 M3 3,369,550.00
- Pembesian Polos 109.1707 Kg 35,129.33
ALISA HARGA SATUAN
DAR NASIONAL INDONESIA

JUMLAH HARGA
( Rp )

60,000.00
900.00
35,000.00
21,000.00
15,000.00
2,400.00
1,300.00
135,600.00

15,000.00
13,000.00
28,000.00

JUMLAH HARGA
( Rp )
SNI 2835:2008 (6.1)

60,000.00
10,400.00
70,400.00
6.9)

28,800.00
4,940.00
33,740.00
(6.10)

75,000.00
13,000.00
88,000.00
1)

1,200,000.00
45,000.00
2,600.00
1,247,600.00
5)

1,200,000.00
45,000.00
2,600.00
1,247,600.00

1,000,000.00
652,800.00
JUMLAH HARGA
( Rp )
520,000.00
225,000.00
126,000.00
14,400.00
15,600.00
2,553,800.00
NI 2836:2008 (6.9)

1,100,000.00
200,000.00
117,000.00
81,900.00
9,360.00
10,140.00
1,518,400.00
JUMLAH HARGA
( Rp )

1:4
204,000.00
60,000.00
25,000.00
75,000.00
21,000.00
2,400.00
6,500.00
393,900.00
h 1:3
1,200,000.00
969,600.00
485,000.00
225,000.00
126,000.00
14,400.00
19,500.00
3,039,500.00

62,016.00
13,000.00
30,000.00
31,500.00
3,600.00
2,600.00
142,716.00

31,104.00
19,000.00
30,000.00
31,500.00
3,600.00
2,600.00
117,804.00

51,840.00
26,000.00
37,500.00
42,000.00
4,800.00
3,250.00
165,390.00

56,400.00
35,000.00
45,000.00
42,000.00
JUMLAH HARGA
( Rp )
4,800.00
5,980.00
189,180.00
I. 03-2837-2008 (6.15)
24,960.00
20,000.00
30,000.00
31,500.00
3,600.00
2,600.00
112,660.00
JUMLAH HARGA
( Rp )

41,664.00
28,000.00
37,500.00
42,000.00
4,800.00
3,250.00
157,214.00

20,736.00
22,000.00
30,000.00
31,500.00
3,600.00
2,600.00
110,436.00
m
44,640.00
18,000.00
39,000.00
42,000.00
4,800.00
3,380.00
151,820.00

15,600.00
31,500.00
24,000.00
1,500.00
2,080.00
74,680.00

USEN PINTU DAN KUSEN JENDELA. KAYU KELAS II - SNI 3434:2008 (6.2)
6,000,000.00
56,250.00
900,000.00
3,780,000.00
432,000.00
78,000.00
11,246,250.00
AUN PINTU PANEL. KAYU - SNI 3434:2008 (6.5)
200,000.00
22,500.00
150,000.00
630,000.00
72,000.00
13,000.00
1,087,500.00

Rangka Kayu Kls1 - SNI 3434:2008 (6.11)


JUMLAH HARGA
( Rp )
98,000.00
1,350.00
21,600.00
209,000.00
90,000.00
420,000.00
48,000.00
7,800.00
895,750.00

Lapis Seng Plat Rangka Kayu Kls1


98,000.00
1,350.00
21,600.00
209,000.00
80,000.00
90,000.00
420,000.00
48,000.00
7,800.00
975,750.00
JUMLAH HARGA
( Rp )

Klas 1
300,000.00
6,750.00
75,000.00
420,000.00
48,000.00
6,500.00
856,250.00

5,500,000.00
252,000.00
600,000.00
2,520,000.00
288,000.00
52,000.00
9,212,000.00

5,500,000.00
135,000.00
360,000.00
1,512,000.00
172,800.00
31,200.00
7,711,000.00

70,000.00
35,000.00
11,250.00
15,000.00
21,000.00
2,400.00
1,300.00
155,950.00

60,000.00
4,500.00
22,500.00
52,500.00
6,000.00
19,500.00
165,000.00
m Tebal 3 mm
78,375.00
1,350.00
10,500.00
21,000.00
2,400.00
910.00
114,535.00
JUMLAH HARGA
( Rp )
43,000.00
2,700.00
15,000.00
21,000.00
2,400.00
1,300.00
85,400.00

18,000.00
900.00
4,200.00
16,800.00
1,920.00
364.00
42,184.00
85,400.00

5,500,000.00
4,500.00
750,000.00
2,100,000.00
300,000.00
19,500.00
8,674,000.00

5,500,000.00
4,500.00
1,500,000.00
1,575,000.00
300,000.00
19,500.00
8,899,000.00

35,000.00
4,500.00
90,000.00
378,000.00
43,200.00
7,800.00
558,500.00

125,000.00
26,880.00
93,750.00
9,000.00
42,000.00
252,000.00
19,200.00
10,400.00
578,230.00
JUMLAH HARGA
( Rp )

60,800.00
93,750.00
9,000.00
42,000.00
252,000.00
19,200.00
3,640.00
480,390.00

48,000.00
450.00
6,000.00
168,000.00
19,200.00
10,400.00
252,050.00

12,000.00
450.00
6,000.00
168,000.00
19,200.00
10,400.00
216,050.00

97,500.00
4,500.00
300,960.00
90,000.00
252,000.00
43,200.00
7,800.00
795,960.00
ood rangkap
97,500.00
179,740.00
6,750.00
22,500.00
94,500.00
10,800.00
1,950.00
413,740.00

5,500,000.00
4,500.00
300,000.00
210,000.00
360,000.00
65,000.00
6,439,500.00

5,500,000.00
JUMLAH HARGA
( Rp )
9,000.00
180,000.00
225,000.00
168,000.00
240,000.00
65,000.00
6,387,000.00
JUMLAH HARGA
( Rp )

5,500,000.00
45,000.00
300,000.00
210,000.00
360,000.00
65,000.00
6,480,000.00

50,000.00
9,000.00
30,000.00
105,000.00
12,000.00
5,200.00
211,200.00

1,032,000.00
520,000.00
1,305,000.00
247,500.00
52,500.00
6,000.00
20,800.00
3,183,800.00

30,012.33
2,325.00
1,050.00
1,470.00
168.00
104.00
35,129.33

225,000.00
13,500.00
78,000.00
54,600.00
6,240.00
6,760.00
384,100.00

100,000.00
9,000.00
15,000.00
52,500.00
6,000.00
1,300.00
183,800.00
JUMLAH HARGA
( Rp )

200,000.00
18,000.00
75,000.00
99,000.00
69,300.00
7,920.00
8,580.00
477,800.00
JUMLAH HARGA
( Rp )

150,000.00
18,000.00
100,000.00
48,000.00
69,300.00
7,920.00
1,560.00
394,780.00

1,440,000.00
453,000.00
1,143,000.00
247,500.00
57,750.00
6,720.00
21,580.00
3,369,550.00

3,369,550.00
3,835,092.86
1,838,000.00
9,042,642.86

3,369,550.00
6,258,290.93
3,553,020.00
13,180,860.93

3,369,550.00
1,443,815.64
4,778,000.00
9,591,365.64

3,369,550.00
1,854,647.99
3,947,800.00
9,171,997.99

3,369,550.00
1,854,647.99
5,224,197.99

3,369,550.00
9,705,064.12
3,841,000.00
16,915,614.12

3,369,550.00
4,039,873.46
5,761,500.00
13,170,923.46

3,369,550.00
3,835,092.86
BIAYA UPAH DAN MATERIAL

KEGIATAN : PEMBANGUNAN POLSEK DISTRIK WEB


PEKERJAAN : PERENCANAAN POLSEK DISTRIK WEB
LOKASI : KAMPUNG UBRUB DISTRIK WEB
KABUPATEN : KEEROM
INSTANSI : KEPOLISIAN REPUBLIK INDONESIA DAERAH PAPUA
SUMBER DANA : DANA ALOKASI KHUSUS (DAK)
NILAI PAGU : Rp. 2.210.000.000,- (DUA MILIAR DUA RATUS SEPULUH JUTA RUPIAH RUPIAH)
TAHUN ANGGARAN : 2020

DAFTAR HARGA UPAH

NO URAIAN SAT U P A H

1 Mandor O/H Rp 260,000.00


2 Kepala Tukang O/H Rp 240,000.00
3 Tukang Kayu O/H Rp 210,000.00
4 Tukang Batu O/H Rp 210,000.00
5 Tukang Besi O/H Rp 210,000.00
6 Tukang Listrik O/H Rp 210,000.00
7 Tukang Cat O/H Rp 210,000.00
8 Tukang Pipa O/H Rp 210,000.00
9 Tukang Las O/H Rp 210,000.00
10 Pekerja O/H Rp 150,000.00
11 Buruh Terampil O/H Rp 150,000.00
12 Buruh Tidak Terampil O/H Rp 130,000.00
13 Sopir Truck O/H Rp 200,000.00
14 Sopir Personil O/H Rp 200,000.00
15 Mekanik O/H Rp 250,000.00
16 Pembantu Mekanik O/H Rp 125,000.00
17 Operator Terampil O/H Rp 250,000.00
18 Pembantu Operator O/H Rp 140,000.00

HARGA KEEROM
No BAHAN MATERIAL LOKAL SAT. BERAT(Kg) HARGA KEEROM (Rp)
(Rp)

1 Alat bantu Ls Rp 500,000.00 Rp 500,000.00


2 Pasir Pasang / Cor M3 Rp 1,000,000.00 1400 Rp 1,000,000.00
3 Sirtu M3 Rp 1,000,000.00 Rp 1,000,000.00
4 Kerikil / Batu Pecah 2/3 M3 Rp 1,500,000.00 1350 Rp 1,500,000.00
5 Batu Pecah 3/5 M3 Rp 1,500,000.00 1350 Rp 1,500,000.00
6 Kerikil / Batu Pecah 5/7 M 3
Rp 1,500,000.00 1350 Rp 1,500,000.00
7 Batu Kali / Gunung M3 Rp 1,000,000.00 Rp 1,000,000.00
8 Kayu Papan M 3
Rp 6,250,000.00 Rp 6,250,000.00
9 Kayu Balok M3 Rp 5,000,000.00 Rp 5,000,000.00
10 Kayu Bakar M3 Rp 350,000.00 Rp 350,000.00
11 Kayu Steger/Perancah M 3
Rp 3,250,000.00 Rp 3,250,000.00
12 Material Timbunan Biasa M3 Rp 250,000.00 Rp 250,000.00
13 Minyak Tanah Ltr Rp 120,000.00 Rp - Rp 120,000.00
14 Minyak Solar Ltr Rp 120,000.00 Rp - Rp 120,000.00
15 Minyak Pelumas Ltr Rp 60,000.00 Rp - Rp 60,000.00
16 Premium/ Bensin Ltr Rp 15,000.00 Rp - Rp 15,000.00
HARGA
NO JENIS MATERIAL SAT. BERAT (Kg) HARGA KEEROM(Rp)
KEEROM(Rp)

1 2 3 4 5 6 7

1 Amplas Kayu Lbr Rp 10,000.00 0.02 Rp - Rp 10,000.00


2 Amplas Besi Lbr Rp 12,000.00 0.02 Rp - Rp 12,000.00
3 Bak Cuci Stainless 1 Lubang Bh Rp 770,000.00 10.00 Rp - Rp 770,000.00
4 Bak Mandi Fiberglass Bh Rp 2,015,000.00 7.00 Rp - Rp 2,015,000.00
5 Baja Strip 30.3 Kg Rp 38,000.00 1.00 Rp - Rp 38,000.00
6 Bata Merah Bh 1.90 Rp -
7 Batu Batako Bh Rp 12,000.00 7.80 Rp - Rp 12,000.00
8 Baut Mur Panjang 30 Cm Bh Rp 32,000.00 0.70 Rp - Rp 32,000.00
9 Besi Beton Ø 10 mm Btg Rp 180,000.00 6.28 Rp - Rp 180,000.00
10 Besi Beton Ø 12 mm Btg Rp 210,000.00 8.87 Rp - Rp 210,000.00
11 Besi Beton Ø 16 mm Btg Rp 258,000.00 18.96 Rp - Rp 258,000.00
12 Besi Beton Ø 6 mm Btg Rp 132,000.00 2.45 Rp - Rp 132,000.00
13 Besi Beton Ø 8 mm Btg Rp 150,000.00 4.32 Rp - Rp 150,000.00
14 Besi beton Polos Kg Rp 216,000.00 1.00 Rp - Rp 216,000.00
15 Besi Siku 40.40.4 - 6m' Btg Rp 600,000.00 14.52 Rp - Rp 600,000.00
16 Besi Siku 50.50.4 - 6m' Btg Rp 1,180,000.00 22.62 Rp - Rp 1,180,000.00
17 Bolam Pijar 40 Watt Bh Rp 30,500.00 0.25 Rp - Rp 30,500.00
18 Cat Meni Kayu ltr Rp 110,000.00 1.00 Rp - Rp 110,000.00
19 Cat Meni Besi ltr Rp 125,000.00 1.00 Rp - Rp 125,000.00
20 Cat Kilap klg Rp 110,000.00 1.00 Rp - Rp 110,000.00
21 Cat Besi kg Rp 130,000.00 1.00 Rp - Rp 130,000.00
22 Cat Tembok Klg Rp 585,000.00 25.00 Rp - Rp 585,000.00
23 Cermin 5 mm M2 Rp 750,000.00 10.00 Rp - Rp 750,000.00
24 Dempul Besi & Kayu Kg Rp 105,000.00 1.00 Rp - Rp 105,000.00
25 Engsel Angin Lipat Psg Rp 35,000.00 0.25 Rp - Rp 35,000.00
26 Engsel Angin Biasa Psg Rp 37,000.00 0.03 Rp - Rp 37,000.00
27 Engsel Jendela Set Rp 35,000.00 0.25 Rp - Rp 35,000.00
28 Engsel Pintu Set Rp 48,000.00 0.25 Rp - Rp 48,000.00
29 Fitting Bh Rp 38,000.00 0.03 Rp - Rp 38,000.00
30 Floor Drain Bh Rp 45,000.00 0.15 Rp - Rp 45,000.00
31 Genteng Multi Roof Lbr Rp 141,135.00 2.35 Rp - Rp 141,135.00
32 Grendel Jendela Psg Rp 52,000.00 0.07 Rp - Rp 52,000.00
33 Grendel Pintu Psg Rp 55,000.00 0.07 Rp - Rp 55,000.00
34 Kabel NYM 2,5x2 Roll Rp 1,262,000.00 1.00 Rp - Rp 1,262,000.00
35 Kaca Buram 3 mm M2 Rp 345,000.00 8.25 Rp - Rp 345,000.00
36 Kaca Buram 5 mm M2 Rp 445,000.00 10.25 Rp - Rp 445,000.00
37 Kaca Nako 7 Klip Zet Rp 450,000.00 8.50 Rp - Rp 450,000.00
38 Kaca Nako 8 Klip Zet Rp 480,000.00 9.00 Rp - Rp 480,000.00
39 Kaca Polos 3 mm M2 Rp 260,000.00 15.00 Rp - Rp 260,000.00
40 Kaca Polos 5 mm M2 Rp 385,000.00 10.25 Rp - Rp 385,000.00
41 Kaca Rayben 5 mm M2 Rp 480,000.00 10.12 Rp - Rp 480,000.00
42 Kait Angin Psg Rp 65,000.00 0.45 Rp - Rp 65,000.00
43 Kawat Ikat Kg Rp 155,000.00 1.00 Rp - Rp 155,000.00
44 Kawat Duri m' Rp 55,000.00 15.00 Rp - Rp 55,000.00
45 Kawat Harmonika m' Rp 55,000.00 5.00 Rp - Rp 55,000.00
46 Kayu Profil Untuk List Plafond Btg Rp 35,000.00 7.00 Rp - Rp 35,000.00
47 Kloset Jongkok Set Rp 360,000.00 8.00 Rp - Rp 360,000.00
48 Kloset DuduK Bh Rp 1,350,000.00 15.00 Rp - Rp 1,350,000.00
49 Kuas Bh Rp 45,000.00 0.25 Rp - Rp 45,000.00
50 Kunci Tanam Antik (Royal Besar) Set Rp 255,000.00 0.85 Rp - Rp 255,000.00
51 Kunci Tanam Biasa Set Rp 250,000.00 0.85 Rp - Rp 250,000.00
52 Kunci Tanam U/ Kamar Mandi Set Rp 250,000.00 0.85 Rp - Rp 250,000.00
53 Kunci Gembok Bh Rp 80,000.00 0.25 Rp - Rp 80,000.00
54 Lampu Pijar 40 watt Bh Rp 38,000.00 0.25 Rp - Rp 38,000.00
55 Lampu Tanam/ Down Light Bh Rp - 0.25 Rp - Rp -
56 Lampu TL 1 x 10 Watt Set Rp - 1.00 Rp - Rp -
57 Lampu TL 1 x 20 Watt Bh Rp 135,000.00 1.50 Rp - Rp 135,000.00
58 Lampu TL 1 x 40 Watt Bh Rp 280,000.00 2.00 Rp - Rp 280,000.00
59 Lampu XL 20 Watt Set Rp 70,000.00 0.25 Rp - Rp 70,000.00
60 Lampu XL 18 Watt Set Rp - 0.25 Rp - Rp -
61 Lat Kayu Klg Rp 72,000.00 1.00 Rp - Rp 72,000.00
62 Lem Aibon Klg Rp 96,000.00 1.00 Rp - Rp 96,000.00
63 Lem Kayu Klg Rp 72,000.00 1.00 Rp - Rp 72,000.00
64 Minyak Bekesting / Oli Kotor Kg Rp - 1.00 Rp - Rp -
65 Minyak Cat Ltr Rp 75,000.00 1.00 Rp - Rp 75,000.00
66 Nok Multi Roof m' Rp 105,000.00 1.50 Rp - Rp 105,000.00
67 Paku Biasa Kg Rp 45,000.00 1.00 Rp - Rp 45,000.00
68 Paku Seng Kg Rp 59,000.00 1.00 Rp - Rp 59,000.00
69 Paku Skrup Dos Rp 35,000.00 0.50 Rp - Rp 35,000.00
70 Paku Tripleks Kg Rp 46,000.00 1.00 Rp - Rp 46,000.00
71 Penampungan Air Fiber 550 ltr Unit Rp 5,000,000.00 15.00 Rp - Rp 5,000,000.00
HARGA
NO JENIS MATERIAL SAT. BERAT (Kg) HARGA KEEROM(Rp)
KEEROM(Rp)

72 Pipa Gip 1" Btg Rp 225,000.00 2.33 Rp - Rp 225,000.00


73 Pipa Gip 1,5" Btg Rp 415,000.00 2.66 Rp - Rp 415,000.00
74 Pipa Gip 1/2" Btg Rp 190,000.00 1.65 Rp - Rp 190,000.00
75 Pipa Gip 2" Btg Rp 460,000.00 3.33 Rp - Rp 460,000.00
76 Pipa Gip 3/4" Btg Rp 250,000.00 2.00 Rp - Rp 250,000.00
77 Pipa PVC 1" Btg Rp 60,000.00 1.55 Rp - Rp 60,000.00
78 Pipa PVC 1/2" Btg Rp 45,000.00 0.45 Rp - Rp 45,000.00
79 Pipa PVC 2" Btg Rp 125,000.00 2.60 Rp - Rp 125,000.00
HARGA
NO JENIS MATERIAL SAT. BERAT (Kg) HARGA KEEROM(Rp)
KEEROM(Rp)

80 Pipa PVC 3" Btg Rp 255,000.00 3.67 Rp - Rp 255,000.00


81 Pipa PVC 3/4" Btg Rp 65,000.00 2.30 Rp - Rp 65,000.00
82 Pipa PVC 4" Btg Rp 480,000.00 4.68 Rp - Rp 480,000.00
83 Plamur Besi & Tembok Kg Rp 255,000.00 1.00 Rp - Rp 255,000.00
84 Politur Ltr Rp 85,000.00 1.00 Rp - Rp 85,000.00
85 Sakelar Ganda Bh Rp 65,000.00 0.03 Rp - Rp 65,000.00
86 Sakelar Tunggal Bh Rp 55,000.00 0.25 Rp - Rp 55,000.00
87 Seal Tip Bh Rp 15,000.00 0.02 Rp - Rp 15,000.00
88 Sekring Box Bh Rp 135,000.00 0.05 Rp - Rp 135,000.00
89 Sekring Otomatis Bh Rp 120,000.00 1.00 Rp - Rp 120,000.00
90 Semen PC kg Rp 4,800.00 1.00 Rp - Rp 4,800.00
91 Semen Warna kg Rp 38,000.00 1.00 Rp - Rp 38,000.00
92 Seng Gelombang Alumunium Lbr Rp 390,000.00 3.12 Rp - Rp 390,000.00
93 Seng Gelombang BJLS 20 Lbr Rp 120,000.00 4.20 Rp - Rp 120,000.00
94 Seng Gelombang BJLS 30 Lbr Rp 150,000.00 5.65 Rp - Rp 150,000.00
95 Seng Plat Alumunium Lbr Rp 340,000.00 2.20 Rp - Rp 340,000.00
96 Seng Plat BJLS 20 Lbr Rp 80,000.00 4.20 Rp - Rp 80,000.00
97 Seng Plat BJLS 30 Lbr Rp 340,000.00 5.45 Rp - Rp 340,000.00
98 Stop Kontak Bh Rp 65,000.00 0.03 Rp - Rp 65,000.00
99 Kran Air BH Rp 55,000.00 0.80 Rp - Rp 55,000.00
100 Teak Oil Ltr Rp 85,000.00 1.00 Rp - Rp 85,000.00
101 Teakwood 3 mm Lbr Rp 209,000.00 3.75 Rp - Rp 209,000.00
102 Tegel Keramik 10 x 20 (1 Dos 50 Bh Dos Rp 82,500.00 8.00 Rp - Rp 82,500.00
103 Tegel Keramik 20 x 20 (1 Dos 25 Bh Dos Rp 275,000.00 15.00 Rp - Rp 275,000.00
104 Tegel Keramik 30 x 30 (1 Dos 12 Bh Dos Rp 114,000.00 18.00 Rp - Rp 114,000.00
105 Tegel Keramik 40 x 40 (1 Dos 7 Bh) Dos Rp 585,000.00 30.00 Rp - Rp 585,000.00
106 Tripleks 3 mm Lbr Rp 80,000.00 3.75 Rp - Rp 80,000.00
107 Tripleks 6 mm Lbr Rp 180,000.00 8.80 Rp - Rp 180,000.00
108 Urinoir Bh Rp 1,260,000.00 15.00 Rp - Rp 1,260,000.00
109 Vernis Kg Rp 90,000.00 1.00 Rp - Rp 90,000.00
110 Wastafel Stainless Set Rp 2,200,000.00 15.00 Rp - Rp 2,200,000.00
AYA UPAH DAN MATERIAL

U P A H

KET.
KET.

8
KET.
KET.
PEMERINTAH KABUPATEN TOLIKARA
0
0

HARGA PERKIRAAN SENDIRI


)H P S (

PROGRAM :
PENINGKATAN EFESIENSI PERDAGANGAN DALAM NEGERI

PEKERJAAN :
PEMBANGUNAN RUMAH TOKO DISTRIK KARUBAGA

SUMBER DANA :
DANA BAGI HASIL ( D B H )

LOKASI :
DISTRIK KARUBAGA - KABUPATEN TOLIKARA

KABUPATEN TOLIKARA TAHUN ANGGARAN 2016


No Nama Pekerjaan Jml P L T M M2

as 228

Galian Tanah 1 228 1 0.8

Timbunan Peninggi Lantai 0.25 228

Pas. Batu Kosong 171 1 0.15

Pas. Urukan Pasir Bawah Pondasi 171 0.1 0.1

Pond. Batu Kali 171 0.55 0.8

3 Pek. Lantai dan dinding bata


LANTAI 228 0.1 22.8
teras depan 15 0.1 1.5
teras keliling 78 0.1 7.8
321 32.1
LANTAI WC 24.25
acian lantai 1 32.1 0.02 0.642
Pas. Dinding Bata 146 4 584
dinding beton 1 15 0.1 4 6

pek Bak Setl 2 1.2 0.6 0.1 0.144


Rabat Lantai 321 1 0.1

4 Pek. Kolom 20x20 cm 52 0.2 0.2 4


Pek. Sloof 25x20 171 0.25 0.2
5 Pek. Ringbalk 20x 15 cm 171 0.12 0.15

6 Pek. PLESTERAN DINDING 2 171 0.02 6.84

7 acian dinding 2 171 342

9 Pek. Plafont Triplex T. 6 mm 321 2.88 111.4583


2 8.28 2.88 2.875
114.3333
plafon beton 5 6 0.1 3
rangka plafond 329.28

10 Pekerjaan Kuda-kuda
Kuda-Kuda 1 6 46.3 0.05 0.1
Kuda-Kuda 2 5 36.8 0.05 0.1
Kuda-Kuda 3 1 41.8 0.05 0.1
balok crosing 4 3 0.05 0.1
balok apit
k4 3 53.96 0.05 0.1
k5 10 39.94 0.05 0.1
11 k6 2 11.54 0.05 0.1

11 Pek. Gording 69 0.05 0.1


62 0.05 0.1
55 0.05 0.1
48 0.05 0.1
41 0.05 0.1
34 0.05 0.1
27 0.05 0.1
20 0.05 0.1
13 0.05 0.1

369
Pek. Gording 9 0.05 0.1
7 0.05 0.1
5 0.05 0.1
4.5 0.05 0.1

12 Pek. Listplank 2 70 0.2 0.02


1 9 0.2 0.02
79
158
13 Pek Atap 2 7.5 14.5 54.38
1 19.8 14.5 143.55
1 12.2 6.1 37.21
1 5 8.2 20.50
1 2.6 10.6 13.78

plat kanopi 1 5 6.3 0.1 3.15

14 Pas. Nok Atap 1 65.08 0.3 19.524


15 Pek. Kusen
Kusen Pintu 1 2 5 0.05 0.1
12 4.4 0.05 0.1
3 3.9 0.05 0.1

Kusen Jendela 13 6.6 0.05 0.1


2 5.16 0.05 0.1
ventilasi 7 2.3 0.05 0.1
81 0.9 0.05 0.1

trali jendela 4 8.45

atap trali jemuran 1 5 1.5

16 Pek. Daun Pintu


Pek. Daun Pintu 1 2 2.6 1.7 8.84
Pek. Daun Pintu 2 12 0.9 2.6 28.08
Pek. Daun Pintu 3 3 0.9 2.1 1.89
pek daun jendela 13 1.8 1.5 35.1
73.91
pekerjaan pitu besi 2 1.5 2.6 7.8

17 Pek.Drainase keliling 1 39 0.6 23.4


rabat drainase 39 0.35 0.05 0.6825
34.28571

1.4 19.6

0.52
M3

0.00

182.40
7.30
189.70
57

25.65

1.71

75.24

48
5.5 4 3
11 7.25 6 24.25
WC 28.8

492.29

32.1
3.0464 4.1888 1.3432 11.6725 0.3162 20.5671
8.32
8.55 41.1342
3.078
J1 J2 Pintu 1 pintu 2 pintu 3 V1 V2 V3
1.35 2.7 4.42 2.34 1.89 0.495 0.35 0.045
2.7 37.8 8.84 30.42 5.67 1.98 0.7 3.6 91.71

5 7.2
329.28
0.01
34.4
1.389
0.92
0.209
0.06 5 5
2 4.15 8.3
0.8094 2 8.2 16.4
1.997 2 1.25 2.5
0.1154 2 2.5 5
5.4998
0.345 2.5 2.5
0.31 39.7
0.275
0.24
0.205
0.17
0.135
0.1
0.065
1.845
92.25
0.045 0.09225 0.02
0.035
0.025
0.0225
0.1275

1.9725

0.56
0.036
0.596

108.75
143.55
37.21
20.5
13.78
323.79
0.05
0.264
0.0585

0.429 13 6.6
0.0516 2 5.16
0.0805 7 2.3
0.3645 81 0.9 3.645
1.3981 103 14.96 1540.88

33.8

7.5

0
0
0
TABEL
Ø PEMBESIAN
kg/m'

6 mm - 12 m 0.22
8 mm - 12 m 0.39
10 mm - 12 m 0.62
12 mm - 12 m 0.89
14 mm - 12 m 1.04
16 mm - 12 m 1.58
19 mm - 12 m 2.23
TABEL
PEMBESIAN LONJOR

2.66
4.73
7.44
10.65
12.50
18.96
26.71
ANALISA KOEFISIEN BESI
BESI BERAT (Kg/m) PANJANG ( m) BERAT (11m) HARGA SATUAN (Rp) per kg

16 1.578 11 17.358
12 0.888 11 9.768
10 0.617 11 6.787
8 0.395 11 4.345
6 0.222 11 2.442

Cor Beton Sloof 20 / 25


BESI POKOK = : 12 mm
BEGEL : 8 mm
SELIMUT BETON 0.03 m
TINGGI BETON 25 cm
LEBAR BETON 20 cm

PERHITUNGAN BESI BEGEL 8 mm


a. LUAS DIMENSI 0.20 X 0.250 = 0.050 m2
b PANJANG DARI 1M3 =1 m3 : (luas dimensi) = 20.000 m'
c. SELIMUT BETON = 0.030 m'

PANJANG I BUAH BEUGEL = 0.724 m'


JRK ANTAR BEUGEL = 0.150 m'
JML BUGEL YANG DI BUTUHKAN / 1M3 = 133.333 bh
PANJANG TOTAL BEUGEL = 96.533 m
TOTAL BERAT BEUGEL = 38.131 kg

PERHITUNGAN TULANGAN POKOK 12 mm


JUMLAH BESI = 4.000 bh
PANJANG BESI /m3 = 80.000 m
TOTAL BERAT BESI = 71.040 kg

PERHITUNGAN BEKISTING
LUAS BEKISTING/M3 = 10.000 m2
JADI 1 M3 BETON MEMBUTUHKAN:
BESI POKOK Æ 10 71.04 Kg
BEGEL Æ 8 38.13 Kg 109.17
BEKISTING 10.00 m2
Cor Ring Balok 15 / 15
BESI POKOK = : 10 mm
BEGEL : 6 mm
SELIMUT BETON 0.02 m
TINGGI BETON 15 cm
LEBAR BETON 15 cm

PERHITUNGAN BESI BEGEL 6 mm


` LUAS DIMENSI 0.15 X 0.15 = 0.023 m2
PANJANG DARI 1M3 = 44.444 m'
SELIMUT BETON = 0.020 m'

PANJANG I BUAH BEUGEL = 0.408 m'


JRK ANTAR BEUGEL = 0.150 m'
JML BUGEL YANG DI BUTUHKAN / 1M3 = 296.296 bh
PANJANG TOTAL BEUGEL = 120.889 m
TOTAL BERAT BEUGEL = 26.837 kg

PERHITUNGAN TULANGAN POKOK 10 mm


JUMLAH BESI = 4.000 bh
PANJANG BESI /m3 = 177.778 m
TOTAL BERAT BESI = 109.689 kg

PERHITUNGAN BEKISTING
LUAS BEKISTING/M3 = 13.333 m2
JADI 1 M3 BETON MEMBUTUHKAN:
BESI POKOK 109.69 Kg
BEGEL 26.84 Kg 136.5262
BEKISTING 13.00 m2

Cor Kolom 12 / 120


BESI POKOK = : 12 mm
BEGEL : 6 mm
SELIMUT BETON 0.02 m
TINGGI BETON 120 cm
LEBAR BETON 12 cm

PERHITUNGAN BESI BEGEL 8 mm


` LUAS DIMENSI 0.12 X 1.20 = 0.144 m2
PANJANG DARI 1M3 = 6.944 m'
SELIMUT BETON = 0.020 m'

PANJANG I BUAH BEUGEL = 2.448 m'


JRK ANTAR BEUGEL = 0.100 m'
JML BUGEL YANG DI BUTUHKAN / 1M3 = 69.444 bh
PANJANG TOTAL BEUGEL = 170.000 m
TOTAL BERAT BEUGEL = 67.150 kg

PERHITUNGAN TULANGAN POKOK 10 mm


JUMLAH BESI = 18.000 bh
PANJANG BESI /m3 = 125.000 m
TOTAL BERAT BESI = 111.000 kg

PERHITUNGAN BEKISTING
LUAS BEKISTING/M3 = 9.167 m2
JADI 1 M3 BETON MEMBUTUHKAN:
BESI POKOK 111.00 Kg
BEGEL 67.15 Kg 178.150
BEKISTING 9.00 m2
Cor Kolom 12 / 12
BESI POKOK = : 12 mm
BEGEL : 6 mm
SELIMUT BETON 0.02 m
TINGGI BETON 12 cm
LEBAR BETON 12 cm

PERHITUNGAN BESI BEGEL 6 mm


` LUAS DIMENSI 0.12 X 0.120 = 0.014 m2
PANJANG DARI 1M3 = 69.444 m'
SELIMUT BETON = 0.020 m'

PANJANG I BUAH BEUGEL = 0.288 m'


JRK ANTAR BEUGEL = 0.150 m'
JML BUGEL YANG DI BUTUHKAN / 1M3 = 462.963 bh
PANJANG TOTAL BEUGEL = 133.333 m
TOTAL BERAT BEUGEL = 29.600 kg

PERHITUNGAN TULANGAN POKOK 12 mm


JUMLAH BESI = 4.000 bh
PANJANG BESI /m3 = 277.778 m
TOTAL BERAT BESI = 246.667 kg

PERHITUNGAN BEKISTING
LUAS BEKISTING/M3 = 16.667 m2
JADI 1 M3 BETON MEMBUTUHKAN:
BESI POKOK 246.67 Kg
BEGEL 29.60 Kg 276.2667
BEKISTING 16.00 m2
Cor dinding beton 10 / 100 Cm2
BESI POKOK = : 10 mm
BEGEL : 8 mm
SELIMUT BETON 0.02 m
TINGGI BETON 100 cm
LEBAR BETON 10 cm

PERHITUNGAN BESI BEGEL 8 mm


` LUAS DIMENSI 0.10 X 1.000 = 0.100 m2
PANJANG DARI 1M3 = 10.000 m'
SELIMUT BETON = 0.020 m'

PANJANG I BUAH BEUGEL = 2.024 m'


JRK ANTAR BEUGEL = 0.150 m'
JML BUGEL YANG DI BUTUHKAN / 1M3 = 66.667 bh
PANJANG TOTAL BEUGEL = 134.933 m
TOTAL BERAT BEUGEL = 53.299 kg

PERHITUNGAN TULANGAN POKOK 10 mm


JUMLAH BESI = 13.333 bh
PANJANG BESI /m3 = 133.333 m
TOTAL BERAT BESI = 82.267 kg

PERHITUNGAN BEKISTING
LUAS BEKISTING/M3 = 11.000 m2
JADI 1 M3 BETON MEMBUTUHKAN:
BESI POKOK 82.27 Kg
BEGEL 53.30 Kg 135.5653
BEKISTING 11.00 m2

Cor dinding beton 12 / 100


BESI POKOK = : 10 mm
BEGEL : 10 mm
SELIMUT BETON 0.03 m
TINGGI BETON 650 cm
LEBAR BETON 100 cm

PERHITUNGAN BESI BEGEL 10 mm


` LUAS DIMENSI 0.10 X 650.000 = 65.000 m2
PANJANG DARI 1M3 = 0.015 m'
SELIMUT BETON = 0.030 m'

PANJANG I BUAH BEUGEL = 1,300.040 m'


JRK ANTAR BEUGEL = 0.150 m'
JML BUGEL YANG DI BUTUHKAN / 1M3 = 0.103 bh
PANJANG TOTAL BEUGEL = 133.337 m
TOTAL BERAT BEUGEL = 52.668 kg

PERHITUNGAN TULANGAN POKOK 10 mm


JUMLAH BESI = 13.333 bh
PANJANG BESI /m3 = 0.205 m
TOTAL BERAT BESI = 0.127 kg

PERHITUNGAN BEKISTING
LUAS BEKISTING/M3 = 10.002 m2
JADI 1 M3 BETON MEMBUTUHKAN:
BESI POKOK 0.13 Kg
BEGEL 52.67 Kg 52.79
BEKISTING 10.00 m2