Anda di halaman 1dari 10

Jenis Pekerjaan = Booring HDD 1m' Pipa HDPE ND dia.

630
Kuantitas = 1 m'
Harga =
No Uraian Kode Satuan
A TENAGA
Operator Alat HDD 180 HP L.01 OH
Operator Digitrac per meter L.02 OH
Engineering OH
Kepala Tukang OH
Tukang Pipa OH
Pekerja OH
JUMLAH TENAGA KERJA
B BAHAN
Pemakaian material Bentonite zak
Pemakaian material Polymer kg
Pemakaian material Konsioner Beton liter
Pemakaian air bersih dalam tangki mixing HDD sebanyak m³
JUMLAH HARGA BAHAN
C PERALATAN
Mesin HDD 180 HP per meter Unit
Tangki mixing HDD sebanyak 2000 Liter Unit
Mesin Las Pipa Unit
Mesin Genset Unit
Water Pump Unit
Peralatan bantu (Kunci, Tackel, dll) Ls
JUMLAH PERALATAN

D Jumlah (A+B+C)
E Overhead & Profit ( _-%) 15 % x D
F Harga Satuan Pekerjaan (D+E)
G Pembulatan

Jenis Pekerjaan = Pengadaan dan Pemasangan 1 m pipa H


Kuantitas = 1 m'
Harga =
No Uraian Kode Satuan
A TENAGA
Pekerja L.01 OH
Tukang pipa L.02 OH
Mandor L.04 OH
JUMLAH TENAGA KERJA
B BAHAN
PIPA HDPE PE 100 SDR 17/PN 10 S-8 630 mm m'
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T hari
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit ( _-%) 15 % x D
F Harga Satuan Pekerjaan (D+E)
G Pembulatan

Jenis Pekerjaan = Pengadaan dan Pemasangan PipaPipa S


Kuantitas = 1 m'
Harga =
No Uraian Kode Satuan
A TENAGA
Pekerja L.01 OH
Tukang pipa L.02 OH
Mandor L.04 OH
JUMLAH TENAGA KERJA
B BAHAN
PIPA Standar ASTM A53-A SCH. 20 800 mm m'
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T hari
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit ( _-%) _%xD
F Harga Satuan Pekerjaan (D+E)
G Pembulatan

Jenis Pekerjaan = Pengadaan dan PemasanganB


Kuantitas = 1 Buah
Harga =
No Uraian Kode Satuan
A TENAGA
Pekerja L.01 OH
Tukang pipa L.02 OH
Mandor L.04 OH
JUMLAH TENAGA KERJA
B BAHAN
Bend HDPE S-8 (SDR.17/PN.10) OD 630 x 45° Unit
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit ( _-%) _%xD
F Harga Satuan Pekerjaan (D+E)
G Pembulatan

Jenis Pekerjaan = Pengadaan dan Pemasangan Stube Flan


Kuantitas = 1 Buah
Harga =
No Uraian Kode Satuan
A TENAGA
Pekerja L.01 OH
Tukang pipa L.02 OH
Mandor L.04 OH
JUMLAH TENAGA KERJA
B BAHAN
Flange HDPE Ø 600 mm Unit
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit ( _-%) 15 % x D
F Harga Satuan Pekerjaan (D+E)
G Pembulatan

Jenis Pekerjaan = Penyambungan 1 Titik Pipa H


Kuantitas = 1 Titik
Harga =
No Uraian Kode Satuan
A TENAGA
Operator L.01 OH
Pembantu Operator L.02 OH
Mandor L.04 OH
JUMLAH TENAGA KERJA
B BAHAN
Solar Non Subsidi Liter
JUMLAH HARGA BAHAN
C PERALATAN
Computerized Automatic Butt Fusion Welder hari
Genset hari
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit ( _-%) _%xD
F Harga Satuan Pekerjaan (D+E)
G Pembulatan

Jenis Pekerjaan = Crossing (Sungai dan Jalan Raya) HDD 1m


Kuantitas = 1 m'
Harga =
No Uraian Kode Satuan
A TENAGA
Operator Alat HDD 180 HP per meter L.01 OH
Operator Digitrac per meter L.02 OH
Engineering OH
Kepala Tukang OH
Tukang Pipa OH
Pekerja OH
JUMLAH TENAGA KERJA
B BAHAN
Pemakaian material Bentonite zak
Pemakaian material Polymer kg
Pemakaian material Konsioner Beton liter
Pemakaian air bersih dalam tangki mixing HDD sebanyak m³
JUMLAH HARGA BAHAN
C PERALATAN
Mesin HDD 180 HP per meter Unit
Tangki mixing HDD sebanyak 2000 Liter Unit
Mesin Las Pipa Unit
Mesin Genset Unit
Water Pump Unit
Peralatan bantu (Kunci, Tackel, dll) Unit
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit ( _-%) 15% x D
F Harga Satuan Pekerjaan (D+E)
G Pembulatan
DD 1m' Pipa HDPE ND dia. 630 mm

Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

0.4444 275,000.00 122,210.00


0.4444 225,000.00 99,990.00
0.4444 300,000.00 133,320.00
0.8888 125,000.00 111,100.00
0.8888 110,000.00 97,768.00
3.5552 100,000.00 355,520.00
JUMLAH TENAGA KERJA 919,908.00

0.4444 315,000.00 139,986.00


0.6666 450,000.00 299,970.00
0.432 60,000.00 25,920.00
2.16 5,000.00 10,800.00
JUMLAH HARGA BAHAN 476,676.00

0.19998 16,450,000.00 3,289,671.00


0.6666 500,000.00 333,300.00
0.3 2,200,000.00 660,000.00
0.3 64,153.93 19,246.18
0.4444 64,463.50 28,647.58
0.4444 45,000.00 19,998.00
JUMLAH PERALATAN 4,350,862.76

5,747,446.76
862,117.01
6,609,563.77
6,609,500.00

n dan Pemasangan 1 m pipa HDPE PN 10 ND Ø 600 mm

Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

0.512 100,000.00 51,200.00


0.256 110,000.00 28,160.00
0.051 150,000.00 7,650.00
JUMLAH TENAGA KERJA 87,010.00

1 4,960,800.00 4,960,800.00 4,960,800.00


JUMLAH HARGA BAHAN 4,960,800.00 pipa 29,764,800,000.00
terpasang 2,906,900,000.00
0.307 25,000.00 7,675.00 sambung 45,081,800.00
JUMLAH HARGA ALAT 7,675.00
5,055,485.00
758,322.75 32,716,781,800.00
5,813,807.75 20.06
5,813,800.00 5,813,800.00

n dan Pemasangan PipaPipa Steel Ø 800 mm SCH 20

Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

2.327 100,000.00 232,700.00


1.163 110,000.00 127,930.00
0.233 150,000.00 34,950.00
JUMLAH TENAGA KERJA 395,580.00

1 5,686,620.17 5,686,620.17
JUMLAH HARGA BAHAN 5,686,620.17

0 25,000.00 0.00
JUMLAH HARGA ALAT 0.00

6,082,200.17
912,330.03
6,994,530.20
6,994,500.00

Pengadaan dan PemasanganBend HDPE ND Ø 600 mm 45°

Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1.096 100,000.00 109,600.00


0.548 110,000.00 60,280.00
0.11 150,000.00 16,500.00
JUMLAH TENAGA KERJA 186,380.00

1 14,276,000.00 14,276,000.00
JUMLAH HARGA BAHAN 14,276,000.00

JUMLAH HARGA ALAT

14,462,380.00
2,169,357.00
16,631,737.00
16,631,700.00

n dan Pemasangan Stube Flange HDPE Ø 600 mm


Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1.096 100,000.00 109,600.00


0.548 110,000.00 60,280.00
0.11 150,000.00 16,500.00
JUMLAH TENAGA KERJA 186,380.00

1 16,535,680.00 16,535,680.00
JUMLAH HARGA BAHAN 16,535,680.00

JUMLAH HARGA ALAT

16,722,060.00
2,508,309.00
19,230,369.00
19,230,300.00

Penyambungan 1 Titik Pipa HDPE Ø 600 mm

Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

0.004 135,000.00 540.00


0.0002 100,000.00 20.00
0.001 150,000.00 150.00
JUMLAH TENAGA KERJA 710.00

0.5233 12,000.00 6,279.60


JUMLAH HARGA BAHAN 6,279.60

0.156 2,200,000.00 343,200.00


0.307 64,153.93 19,695.26
JUMLAH HARGA ALAT 362,895.26

369,884.86
55,482.73
425,367.58
425,300.00

ungai dan Jalan Raya) HDD 1m' Pipa HDPE dia. 630 mm

Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

0.800 275,000.00 219,978.00


0.800 225,000.00 179,982.00
0.800 300,000.00 239,976.00
1.600 125,000.00 199,980.00
1.600 110,000.00 175,982.40
6.399 100,000.00 639,936.00
JUMLAH TENAGA KERJA 1,655,834.40

0.672 315,000.00 211,658.83


1.512 450,000.00 680,331.96
0.605 60,000.00 36,284.37
3.024 5,000.00 15,118.49
JUMLAH HARGA BAHAN 943,393.65

0.504 16,450,000.00 8,289,970.92


1.008 500,000.00 503,949.60
0.500 2,200,000.00 1,100,000.00
0.500 64,153.93 32,076.96
0.672 64,463.50 43,315.14
0.672 40,000.00 26,877.31
JUMLAH HARGA ALAT 9,996,189.93

12,595,417.98
1,889,312.70
14,484,730.68
14,484,700.00
29,764,800,000.00
2,906,900,000.00
45,081,800.00
32,716,781,800.00
14.04