REKAPITULASI RENCANA ANGGARAN BIAYA

PEKERJAAAN PEMBANGUNAN GEDUNG NEW HSSE DAN FIRE STATION


PERTAMINA RU-V BALIKPAPAN

TOTAL
NO URAIAN PEKERJAAN
(RP.)

I PEKERJAAN SIPIL & STRUKTUR


II PEKERJAAN ARSITEKTUR
III PEKERJAAN LANSKAP
IV PEKERJAAN INTERIOR
V PEKERJAAN MEKANIKAL & PLUMBING
VI PEKERJAAN ELEKTRIKAL
VII PEKERJAAN FIRE PROTECTION
VIII PEKERJAAN SISTEM KEAMANAN
IX PEKERJAAN TELEKOMUNIKASI & IT
TOTAL

TOTAL BIAYA PEKERJAAN DIBULATKAN (TANPA PAJAK)


Terbilang :

10% KEUNTUNGAN DAN RESIKO


TOTAL BIAYA TERMASUK KEUNTUNGAN DAN RESIKO
10% PPN
TOTAL BIAYA TERMASUK KEUNTUNGAN DAN RESIKO +PPN
TOTAL BIAYA PEKERJAAN KESELURUHAN DIBULATKAN
Terbilang :
REKAPITULASI RENCANA ANGGARAN BIAYA
PEKERJAAAN PEMBANGUNAN GEDUNG NEW HSSE DAN FIRE STATION
PERTAMINA RU-V BALIKPAPAN
SUB PEKERJAAN : SIPIL & STRUKTUR

TOTAL
NO URAIAN PEKERJAAN
(RP.)

A PEKERJAAN PERSIAPAN
B PEKERJAAN ENGINEERING
C PEKERJAAN TANAH
D PEKERJAAN TIANG PANCANG BETON
E PEKERJAAN PONDASI BATU KALI
F PEKERJAAN BETON LANTAI KERJA K-125
G PEKERJAAN BETON BERTULANG K-250
H PEKERJAAN BETON BERTULANG K-300
I PEKERJAAN BETON BERTULANG K-350
J PEKERJAAN PEMBESIAN DOWEL
K PEKERJAAN BAJA

SUB TOTAL

REKAPITULASI RENCANA ANGGARAN BIAYA


PEKERJAAAN PEMBANGUNAN GEDUNG NEW HSSE DAN FIRE STATION
PERTAMINA RU-V BALIKPAPAN
SUB PEKERJAAN : SIPIL & STRUKTUR
BREAKDOWN PER SUB BANGUNAN
TOTAL
NO URAIAN PEKERJAAN
(RP.)

I PEKERJAAN PERSIAPAN
II PEKERJAAN ENGINEERING
III PEKERJAAN GEDUNG NEW HSSE OFFICE
IV PEKERJAAN GEDUNG FIRE STATION
V PEKERJAAN BANGUNAN RESERVOIR
VI PEKERJAAN BANGUNAN RUMAH GENSET
VII PEKERJAAN PERKERASAN JALAN DAN DRAINASE
VIII PEKERJAAN BANGUNAN JEMBATAN PIPA
IX PEKERJAAN BANGUNAN CHECK POINT

SUB TOTAL -
Terbilang :
REKAPITULASI RENCANA ANGGARAN BIAYA
PEKERJAAAN PEMBANGUNAN GEDUNG NEW HSSE DAN FIRE STATION
PERTAMINA RU-V BALIKPAPAN
SUB PEKERJAAN : ARSITEKTUR

TOTAL
NO URAIAN PEKERJAAN
(RP.)

A PEKERJAAN DINDING & PLESTERAN


B PEKERJAAN FINISHING ATAP DAK
C PEKERJAAN KUSEN PINTU/JENDELA
D PEKERJAAN LANTAI
E PEKERJAAN PENGECATAN
F PEKERJAAN PENUTUP ATAP
G PEKERJAAN PLAFOND
H PEKERJAAN RAILING
I PEKERJAAN LAIN LAIN

SUB TOTAL

REKAPITULASI RENCANA ANGGARAN BIAYA


PEKERJAAAN PEMBANGUNAN GEDUNG NEW HSSE DAN FIRE STATION
PERTAMINA RU-V BALIKPAPAN
SUB PEKERJAAN : ARSITEKTUR
BREAKDOWN PER SUB BANGUNAN
TOTAL
NO URAIAN PEKERJAAN
(RP.)

I PEKERJAAN GEDUNG NEW HSSE OFFICE


II PEKERJAAN GEDUNG FIRE STATION
III PEKERJAAN BANGUNAN RESERVOIR
IV PEKERJAAN BANGUNAN CHECK POINT

SUB TOTAL
Terbilang :
REKAPITULASI RENCANA ANGGARAN BIAYA
PEKERJAAAN PEMBANGUNAN GEDUNG NEW HSSE DAN FIRE STATION
PERTAMINA RU-V BALIKPAPAN
SUB PEKERJAAN : LANSKAP

TOTAL
NO URAIAN PEKERJAAN
(RP.)

A PEKERJAAN PERSIAPAN
B PEKERJAAN TANAH
C PEKERJAAN PENANAMAN
D PEKERJAAN PERKERASAN
E PEKERJAAN SIPIL/STRUKTUR
F PEKERJAAN ARSITEKTURAL
G PEKERJAAN FURNITURE
H PEKERJAAN PAGAR KELILING

SUB TOTAL

REKAPITULASI RENCANA ANGGARAN BIAYA


PEKERJAAAN PEMBANGUNAN GEDUNG NEW HSSE DAN FIRE STATION
PERTAMINA RU-V BALIKPAPAN
SUB PEKERJAAN : LANSKAP
BREAKDOWN PER SUB BANGUNAN
TOTAL
NO URAIAN PEKERJAAN
(RP.)

I PEKERJAAN KAWASAN
II PEKERJAAN POS JAGA 1
III PEKERJAAN TOILET POS JAGA 1
IV PEKERJAAN ORNAMEN GERBANG POS JAGA 1
V PEKERJAAN POS JAGA 2
VI PEKERJAAN FURNITURE
VII PEKERJAAN PAGAR KELILING

SUB TOTAL
Terbilang :
REKAPITULASI RENCANA ANGGARAN BIAYA
PEKERJAAAN PEMBANGUNAN GEDUNG NEW HSSE DAN FIRE STATION
PERTAMINA RU-V BALIKPAPAN
SUB PEKERJAAN : INTERIOR

TOTAL
NO URAIAN PEKERJAAN
(RP.)

A PEKERJAAN DINDING & FINISHING DINDING


B PEKERJAAN FINISHING LANTAI
C PEKERJAAN PLAFOND
D PEKERJAAN PINTU & JENDELA
E PEKERJAAN SANITAIR
F PEKERJAAN FURNITUR
G PEKERJAAN LAMPU, TITIK OUTLET, STOP KONTAK & SAKLAR
H LAIN-LAIN

SUB TOTAL

REKAPITULASI RENCANA ANGGARAN BIAYA


PEKERJAAAN PEMBANGUNAN GEDUNG NEW HSSE DAN FIRE STATION
PERTAMINA RU-V BALIKPAPAN
SUB PEKERJAAN : INTERIOR
BREAKDOWN PER SUB BANGUNAN
TOTAL
NO URAIAN PEKERJAAN
(RP.)

I PEKERJAAN GEDUNG NEW HSSE OFFICE


II PEKERJAAN GEDUNG FIRE STATION

SUB TOTAL
Terbilang :
REKAPITULASI RENCANA ANGGARAN BIAYA
PEKERJAAAN PEMBANGUNAN GEDUNG NEW HSSE DAN FIRE STATION
PERTAMINA RU-V BALIKPAPAN
SUB PEKERJAAN : MEKANIKAL & PLUMBING

TOTAL
NO URAIAN PEKERJAAN
(RP.)

A PEKERJAAN AIR CONDITIONING


B PEKERJAAN PLUMBING (AIR BERSIH)
C PEKERJAAN PLUMBING (AIR KOTOR)
D PEKERJAAN PLUMBING (AIR BEKAS)
E PEKERJAAN PLUMBING (LANSKAP)

SUB TOTAL
Terbilang :
REKAPITULASI RENCANA ANGGARAN BIAYA
PEKERJAAAN PEMBANGUNAN GEDUNG NEW HSSE DAN FIRE STATION
PERTAMINA RU-V BALIKPAPAN
SUB PEKERJAAN : ELEKTRIKAL

TOTAL
NO URAIAN PEKERJAAN
(RP.)

A PEKERJAAN PENYAMBUNGAN DAYA DARI KILANG 6.6 KV


B PEKERJAAN PANEL - PANEL DISTRIBUSI.
C PEKERJAAN KABEL FEEDER DAN KABEL TRAY
D PEKERJAAN INSTALASI PENERANGAN DAN OUTLET DAYA
E PEKERJAAN PENANGKAL PETIR
F PEKERJAAN PHOTO VOLTAIC
G PEKERJAAN GENERATOR SET
H PEKERJAAN INSTALASI PENERANGAN UNTUK KEBUTUHAN LANSKAP
I TESTING DAN COMMISSIONING

SUB TOTAL
Terbilang :
REKAPITULASI RENCANA ANGGARAN BIAYA
PEKERJAAAN PEMBANGUNAN GEDUNG NEW HSSE DAN FIRE STATION
PERTAMINA RU-V BALIKPAPAN
SUB PEKERJAAN : FIRE PROTECTION

TOTAL
NO URAIAN PEKERJAAN
(RP.)

A PEKERJAAN PILLAR HYDRANT


B PEKERJAAN FIRE HOSE CABINET (INDOOR)
C PEKERJAAN FIRE HOSE CABINET (OUTDOOR)
D PEKERJAAN SPRINKLE
E PEKERJAAN FIRE EXTINGUISHER

SUB TOTAL
Terbilang :
REKAPITULASI RENCANA ANGGARAN BIAYA
PEKERJAAAN PEMBANGUNAN GEDUNG NEW HSSE DAN FIRE STATION
PERTAMINA RU-V BALIKPAPAN
SUB PEKERJAAN : SISTEM KEAMANAN

TOTAL
NO URAIAN PEKERJAAN
(RP.)

A PEKERJAAN PAGING SYSTEM WORK / PUBLIC ADDRESS


B PEKERJAAN SISTEM FIRE ALARM
C PEKERJAAN SISTEM CCTV (CLOSE CIRCUIT TELEVISION)
D PEKERJAAN ACCESS CONTROL SYSTEM
E PEKERJAAN SECURITY GATE

SUB TOTAL
Terbilang :
REKAPITULASI RENCANA ANGGARAN BIAYA
PEKERJAAAN PEMBANGUNAN GEDUNG NEW HSSE DAN FIRE STATION
PERTAMINA RU-V BALIKPAPAN
SUB PEKERJAAN : TELEKOMUNIKASI & IT

TOTAL
NO URAIAN PEKERJAAN
(RP.)

A PEKERJAAN STRUCTURE CABLING SYSTEM


B PEKERJAAN HORIZONTAL CABLING SYSTEM
C PEKERJAAN IP TELEPHONY SYSTEM
D PEKERJAAN IP MATV (MASTER AERIAL TELEVISION)

SUB TOTAL
Terbilang :
PART 2 C - LAMPIRAN 2.1
TEMPLATE UNTUK REKAPITULASI BIAYA PROYEK

REKAPITULASI BIAYA PROYEK


PEKERJAAN SITE OFFICE, HSSE OFFICE & NEW LABORATORY PROYEK RDMP RU V-BALIKPAPAN

No. Description (Rp)

I PEKERJAAAN PEMBANGUNAN GEDUNG NEW HSSE DAN FIRE STATION

II PEKERJAAAN PEMBANGUNAN GEDUNG SUB FIRE STATION

III PEKERJAAAN PEMBANGUNAN GEDUNG PARKIR DI AREA NEW HSSE OFFICE

IV PEKERJAAN PEMBANGUNAN NEW SITE OFFICE

V PEKERJAAN MODIFIKASI GEDUNG EX-SITE OFFICE RU-V

VI PEMBANGUNAN GEDUNG LABORATORIUM

TOTAL

GRAND TOTAL

DIBULATKAN

Terbilang :
PART 2 C ‐ LAMPIRAN 2.2
TEMPLATE UNTUK BREAKDOWN DARI BIAYA PROYEK

PEKERJAAAN PEMBANGUNAN GEDUNG NEW HSSE DAN FIRE STATION


PERTAMINA RU-V BALIKPAPAN
SUB PEKERJAAN : SIPIL & STRUKTUR

NO. URAIAN PEKERJAAN SATUAN TOTAL BIAYA


VOLUME
(1) (3)
(4)
I PEKERJAAN PERSIAPAN
1 Mobilisasi & Demobilisasi ls 1.00
2 Stakeout & Positioning ls 1.00
3 Fasilitas Sementara ls
1.00
4 Safety HSE ls 1.00
II PEKERJAAN ENGINEERING
1 Engineering ls 1.00
2 Pek. Soil Boring, Soil Investigation, Lab Test dan Report (kedalaman 30 m) titik 2.00
3 Survey dan Report GPR lot 1.00
III PEKERJAAN GEDUNG NEW HSSE OFFICE
A PEKERJAAN TANAH
3
1 Pekerjaan galian sementara (untuk pondasi, sloof, dll) m 711.98
2 Pekerjaan urugan kembali (backfill) m3 311.80
3 Pekerjaan buangan sisa galian ke disposal m3 400.19
B PEKERJAAN TIANG PANCANG BETON
1 Pengadaan Concrete Spun Pile Ø500 t=90mm m' 2,060.00
2 Handling & Positioning m' 2,060.00
3 Pemancangan m' 2,060.00
4 Penyambungan Tiang nos 103.00
5 Pemotongan Tiang nos 103.00
C PEKERJAAN PONDASI BATU KALI
1 Pondasi Batu kali - Pasir urug m3 11.90
3
2 Pondasi Batu kali - Anstamping m 47.60
3 Pondasi Batu kali - Pas. Batu Kali m3 99.96
D PEKERJAAN BETON LANTAI KERJA K-125
1 Lantai kerja, K.125 m3 138.34
E PEKERJAAN BETON BERTULANG K-350
1 Beton bertulang K. 350, Pengisi Tiang m3 9.94
2 Beton bertulang K. 350, Pile Cap m3 140.20
3 Beton bertulang K. 350, Pondasi Beton Bertulang (P4, P5&P6) m3 2.72
4 Beton bertulang K. 350, Sloof m3 90.67
5 Beton bertulang K. 350, Kolom K.1 & K.1A m3 177.43
6 Beton bertulang K. 350, Kolom K.2 m3 3.31
7 Beton bertulang K. 350, Pelat Lt. dasar m3 644.42
8 Beton bertulang K. 350, Balok elv. +4.150 m3 269.58
9 Beton bertulang K. 350, Balok elv. +8.350 m3 233.12
10 Beton bertulang K. 350, Balok elv. +12.600 m3 130.11
11 Beton bertulang K. 350, Balok elv. +14.600 m3 3.64
3
12 Beton bertulang K. 350, Pelat lantai elv. +4.150 m 121.12
13 Beton bertulang K. 350, Pelat lantai elv. +8.350 m3 205.73
14 Beton bertulang K. 350, Pelat lantai elv. +12.600 m3 188.10
15 Beton bertulang K. 350, Pelat dak elv. +14.600 m3 2.88
16 Beton bertulang K. 350, Tangga Tipe 1 m3 41.18
3
17 Beton bertulang K. 350, Tangga Tipe 2 m 10.04
18 Beton bertulang K. 350, Tangga Tipe 3 m3 6.26
19 Beton bertulang K. 350, Tangga Tipe 4 m3 6.08
20 Beton bertulang K. 350, Tangga Tipe 5 m3 22.44
F PEKERJAAN PEMBESIAN DOWEL
1 Dowel ∅33mm-300 kg 4,243.84
2 Tie Bar ∅16mm-700 kg 523.74
IV PEKERJAAN GEDUNG FIRE STATION
A PEKERJAAN TANAH
3
1 Pekerjaan galian sementara (untuk pondasi, sloof, dll) m 58.05
2 Pekerjaan urugan kembali (backfill) m3 44.46
3 Pekerjaan buangan sisa galian ke disposal m3 13.59
B PEKERJAAN TIANG PANCANG BETON
1 Pengadaan Concrete Spun Pile Ø500 t=90mm m' 860.00
2 Handling & Positioning m' 860.00
3 Pemancangan m' 860.00
4 Penyambungan Tiang nos 43.00
5 Pemotongan Tiang nos 43.00
C PEKERJAAN PONDASI BATU KALI
1 Pondasi Batu kali - Pasir urug m3 0.87
3
2 Pondasi Batu kali - Anstamping m 3.49
3 Pondasi Batu kali - Pas. Batu Kali m3 7.34
D PEKERJAAN BETON LANTAI KERJA K-125
1 Lantai kerja, K.125 m3 184.05
E PEKERJAAN BETON BERTULANG K-350
1 Beton bertulang K. 350, Pengisi Tiang m3 4.15
2 Beton bertulang K. 350, Pile Cap m3 23.95
3 Beton bertulang K. 350, Sloof m3 96.12
4 Beton bertulang K. 350, Kolom K.1 & K.1A m3 140.71
5 Beton bertulang K. 350, Pelat Lt. dasar m3 373.69
6 Beton bertulang K. 350, Tangga m3 24.07
7 Beton bertulang K. 350, Balok elv. +4.150 m3 35.69
8 Beton bertulang K. 350, Balok elv. +8.350 m 3
58.81
9 Beton bertulang K. 350, Balok elv.+12.98, elv.+14.975 & elv.+16.800 m3 3.28
3
10 Beton bertulang K. 350, Pelat lantai elv. +4.150 m 20.24
11 Beton bertulang K. 350, Pelat lantai elv. +8.350 m3 19.16
F PEKERJAAN BAJA
1 Pekerjaan Struktur Baja kg 5,111.90
2 Sambungan Baja kg 153.36
G PEKERJAAN PEMBESIAN DOWEL
1 Dowel ∅33mm-300 kg 897.13
2 Tie Bar ∅16mm-700 kg 375.45
V PEKERJAAN BANGUNAN RESERVOIR
A PEKERJAAN TANAH
1 Pekerjaan galian sementara (untuk pondasi, sloof, dll) m3 13.99
2 Pekerjaan urugan kembali (backfill) m3 12.06
3 Pekerjaan buangan sisa galian ke disposal m3 1.93
B PEKERJAAN BETON LANTAI KERJA K-125
1 Lantai kerja, K.125 m 3
0.24
C PEKERJAAN BETON BERTULANG K-350
NO. URAIAN PEKERJAAN SATUAN TOTAL BIAYA
VOLUME
(1) (3)
(4)
1 Beton bertulang K. 350, Pondasi m3 1.93
2 Beton bertulang K. 350, Sloof m3 4.01
3 Beton bertulang K. 350, Kolom m3 2.27
4 Beton bertulang K. 350, Balok m3 14.69
5 Beton bertulang K. 350, Dinding m3 172.20
6 Beton bertulang K. 350, Pelat Lt. dasar m3 126.90
7 Beton bertulang K. 350, Pelat dak m3 5.06
VI PEKERJAAN BANGUNAN RUMAH GENSET
A PEKERJAAN TANAH
3
1 Pekerjaan galian sementara (untuk pondasi, sloof, dll) m 12.95
2 Pekerjaan urugan kembali (backfill) m3 11.47
3 Pekerjaan buangan sisa galian ke disposal m3 1.48
NO. URAIAN PEKERJAAN SATUAN TOTAL BIAYA
VOLUME
(1) (3)
(4)
B PEKERJAAN BETON LANTAI KERJA K-125
1 Lantai kerja, K.125 m3 5.70
C PEKERJAAN BETON BERTULANG K-350
NO. URAIAN PEKERJAAN SATUAN TOTAL BIAYA
VOLUME
(1) (3)
(4)
1 Beton bertulang K. 350, Pondasi m3 1.48
2 Beton bertulang K. 350, Sloof m3 7.54
3 Beton bertulang K. 350, Kolom m3 3.65
4 Beton bertulang K. 350, Balok m3 10.73
5 Beton bertulang K. 350, Pelat Lt. dasar m3 11.88
6 Beton bertulang K. 350, Pelat dak m3 12.96
VII PEKERJAAN PERKERASAN JALAN DAN DRAINASE
A PEKERJAAN TANAH
1 Pekerjaan galian sementara (drainase) m3 449.95
2 Pekerjaan urugan kembali (backfill) m3 134.81
3 Pekerjaan buangan sisa galian ke disposal m3 315.15
B PEKERJAAN BETON LANTAI KERJA K-125
1 Lantai kerja, K.125 m3 20.10
C PEKERJAAN BETON BERTULANG K-300
1 Beton bertulang K. 300, Perkerasan Jalan m3 3,816.00
D PEKERJAAN BETON BERTULANG K-250
1 Beton bertulang K. 250, Drainase m3 180.63
VIII PEKERJAAN BANGUNAN JEMBATAN PIPA
A PEKERJAAN TANAH
1 Pekerjaan galian sementara (untuk pondasi, sloof, dll) m3 17.60
2 Pekerjaan urugan kembali (backfill) m3 12.41
3 Pekerjaan buangan sisa galian ke disposal m3 5.19
B PEKERJAAN BETON LANTAI KERJA K-125
3
1 Lantai kerja, K.125 m 0.43
C PEKERJAAN BETON BERTULANG K-350
1 Beton bertulang K. 350, Pondasi m3 4.25
2 Beton bertulang K. 350, Pedestal m3 3.69
D PEKERJAAN BAJA
1 Pekerjaan Struktur Baja kg 5,614.34
2 Pekerjaan Sambungan Baja kg 168.43
3 Anchor M12 buah 16.00
IX PEKERJAAN BANGUNAN CHECK POINT
A PEKERJAAN TANAH
1 Pekerjaan galian sementara (untuk pondasi, sloof, dll) m3 84.59
2 Pekerjaan urugan kembali (backfill) m3 73.97
3 Pekerjaan buangan sisa galian ke disposal m3 10.62
B PEKERJAAN BETON LANTAI KERJA K-125
NO. URAIAN PEKERJAAN SATUAN TOTAL BIAYA
VOLUME
(1) (3)
(4)
1 Lantai kerja, K.125 m3 1.35
C PEKERJAAN BETON BERTULANG K-350
1 Beton bertulang K. 350, Pondasi m3 10.51
2 Beton bertulang K. 350, Sloof m3 13.38
3 Beton bertulang K. 350, Kolom m3 18.62
4 Beton bertulang K. 350, Balok m3 54.56
5 Beton bertulang K. 350, Pelat Lt. Dasar m3 42.24
3
6 Beton bertulang K. 350, Pelat Elv. +5.000 & Elv. +8.500 m 14.68
7 Beton bertulang K. 350, Tangga m3 3.36
X PEKERJAAN GERBANG 1
A PEKERJAAN TANAH
1 Pekerjaan galian sementara (untuk pondasi, sloof, dll) m3 141.11
2 Pekerjaan urugan kembali (backfill) m3 15.30
3 Pekerjaan buangan sisa galian ke disposal m3 125.80
B PEKERJAAN BETON LANTAI KERJA K-125
1 Lantai kerja, K.125 m3 3.73
C PEKERJAAN BETON BERTULANG K-350
1 Beton bertulang K. 350, Pondasi m3 23.60
3
2 Beton bertulang K. 350, Sloof m 1.68
3 Beton bertulang K. 350, Kolom m3 41.26
4 Beton bertulang K. 350, Balok m3 1.00
5 Beton bertulang K. 350, Pelat Lt. Dasar m3 3.76
6 Beton bertulang K. 350, Pelat Elv. +6.700 m3 1.40
D PEKERJAAN BAJA
1 Pekerjaan Struktur Baja kg 1,628.64
XI PEKERJAAN GERBANG 2
A PEKERJAAN TANAH
1 Pekerjaan galian sementara (untuk pondasi, sloof, dll) m3 28.08
2 Pekerjaan urugan kembali (backfill) m3 20.96
3 Pekerjaan buangan sisa galian ke disposal m3
7.12
B PEKERJAAN BETON LANTAI KERJA K-125
1 Lantai kerja, K.125 m3 1.36
NO. URAIAN PEKERJAAN SATUAN TOTAL BIAYA
VOLUME
(1) (3)
(4)
C PEKERJAAN BETON BERTULANG K-350
1 Beton bertulang K. 350, Pondasi m3 7.13
2 Beton bertulang K. 350, Kolom m3 4.33
3 Beton bertulang K. 350, Balok m3 0.96
4 Beton bertulang K. 350, Pelat Lt. Dasar m3
1.54
5 Beton bertulang K. 350, Pelat Elv. +4.800 m3 1.23
D PEKERJAAN BAJA
1 Pekerjaan Struktur Baja kg 983.92
TOTAL SUB PEKERJAAN SIPIL & STRUKTUR
PEKERJAAAN PEMBANGUNAN GEDUNG NEW HSSE DAN FIRE STATION
PERTAMINA RU-V BALIKPAPAN
SUB PEKERJAAN : ARSITEKTUR

NO. URAIAN PEKERJAAN SATUAN TOTAL BIAYA


PERALATAN
VOLUME
(3)
(1) (4) (10) = (4) x (7)
I PEKERJAAN GEDUNG NEW HSSE OFFICE
A PEKERJAAN DINDING & PLESTERAN SUB TOTAL
LANTAI 1
1 Pekerjaan Pemasangan 1m2 Dinding Bata ringan 10 cm Bata Campuran 1SP:3PP m2
1,937.32

2 Pekerjaan Kolom Praktis 11X11cm, besi utama 4 Dia 13mm sengkang dia 10mm jarak 15c m' 490.00
3 Pekerjaan Plesteran Dinding mortar instant m2 3,819.20
4 Pekerjaan Plesteran 1 : 3 Kolom Praktis m2 147.00
5 Acian dinding m2 3,819.20
6 Acian Kolom Praktis m2 147.00
7 Pekerjaan meja beton wastafel dan sink m3 0.45

LANTAI 2
1 Pekerjaan Pemasangan 1m2 Dinding Bata ringan 10 cm Bata Campuran 1SP:3PP m2 1,305.60
2 Pekerjaan Kolom Praktis 11X11cm, besi Utama 4 Dia 13mm sengkang dia 10mm jarak 15 m' 395.50
3 Pekerjaan Plesteran Dinding mortar instant m2 2,611.20
4 Pekerjaan Plesteran 1 : 3 Kolom Praktis m2 118.65
5 Acian dinding m2 2,611.20
6 Acian Kolom Praktis m2 237.30
7 Pekerjaan meja beton wastafel dan sink m3 0.45

LANTAI 3
1 Pekerjaan Pemasangan 1m2 Dinding Bata ringan 10 cm Bata Campuran 1SP:3PP m2 985.60
2 Pekerjaan Kolom Praktis 11X11cm, besi Utama 4 Dia 13mm sengkang dia 10mm jarak 15 m' 353.50
3 Pekerjaan Plesteran Dinding mortar instant m2 1,971.20
4 Pekerjaan Plesteran 1 : 3 Kolom Praktis m2 106.05
5 Acian dinding m2 1,971.20
6 Acian Kolom Praktis m2 106.05
7 Pekerjaan meja beton wastafel dan sink m3 0.58
B PEKERJAAN KUSEN PINTU/JENDELA
LANTAI 1
1 Pekerjaan Pemasangan Pintu Umum double swing 1 bh 7.00
2 Pekerjaan Pemasangan Pintu Umum Single swing 1 bh 3.00
3 Pekerjaan Pemasangan Pintu Service Single Swing 1 bh 4.00
4 Pekerjaan Pemasangan Pintu Service Double Swing 1 bh 2.00
5 Pekerjaan Pemasangan Pintu Toilet bh 4.00
6 Pekerjaan Pemasangan Pintu Janitor bh
7 Pekerjaan Pemasangan Pintu Besi bh
8 Pekerjaan Pemasangan Pintu Darurat bh
9 Pekerjaan Pemasangan Jendela tipe 10 bh
10 Pekerjaan Pemasangan Jendela tipe 11 bh
LANTAI 2
1 Pekerjaan Pemasangan Pintu Darurat bh 1.00
2 Pekerjaan Pemasangan Pintu Umum double swing 1 bh 2.00
3 Pekerjaan Pemasangan Pintu Umum Single swing 1 bh 2.00
4 Pekerjaan Pemasangan Pintu Service Single Swing 1 bh 1.00
5 Pekerjaan Pemasangan Pintu Toilet bh 4.00
6 Pekerjaan Pemasangan Pintu Janitor bh 1.00
7 Pekerjaan Dinding Kaca m2 518.40
LANTAI 3
1 Pekerjaan Pemasangan Pintu Darurat bh 1.00
2 Pekerjaan Pemasangan Pintu Umum Single Swing 1 bh -
3 Pekerjaan Pemasangan Pintu Service Single Swing 1 bh -
4 Pekerjaan Pemasangan Pintu Toilet bh 7.00
5 Pekerjaan Pemasangan Pintu Janitor bh -
Façade
1 Jendela Fasade Tampak Timur bh 2.00
2 Jendela Fasade Tampak Barat bh 5.00
3 Jendela Fasade Tampak Utara bh 4.00
4 Jendela Fasade Tampak Selatan bh 13.00
C PEKERJAAN LANTAI
LANTAI 1
1 Pekerjaan Lantai Floor Hardener m2 1,360.00
2 Pekerjaan Lantai Homogenous Tile 30X60 m2 12.60
3 Pekerjaan Lantai Homogenous Tile 30X60 Stair Nosing m' 42.00
LANTAI 2
1 Pekerjaan Lantai Floor Hardener m2 158.00
2 Pekerjaan Lantai Homogenous Tile 30X60 m2 12.60
3 Pekerjaan Lantai Homogenous Tile 30X60 Stair Nosing m' 42.00
LANTAI 3
1 Pekerjaan Lantai Floor Hardener m2 717.00
2
2 Pekerjaan Lantai Homogenous Tile 30X60 m 12.60
3 Pekerjaan Lantai Homogenous Tile 30X60 Stair Nosing m' 42.00

D PEKERJAAN PENGECATAN
LANTAI 1
1 Pekerjaan pengecatan dinding Exterior Weathershield m2 719.20
LANTAI 2
1 Pekerjaan pengecatan dinding Exterior Weathershield m2 329.60
LANTAI 3
1 Pekerjaan pengecatan dinding Exterior Weathershield m2 154.00
E PEKERJAAN FINISHING ATAP DAK
1 Pekerjaan Waterproof m2 132.00
F PEKERJAAN RAILING
1 Railing BSP 2'' m' 141.00
2
2 Pekerjaan Pemasangan 1m2 Dinding Bata ringan 10 cm Bata Campuran 1SP:3PP m 5.00
3 Pekerjaan Plesteran Dinding mortar instant m2 10.00
2
4 Acian dinding m 10.00
5 Pengecatan dindind railing m2 10.00
G PEKERJAAN LAIN LAIN
1 Pekerjaan Roof Drain bh 18.00
2 Pekerjaan 1 m' Talang Tegak ø 4" Panjang 4m m' 12.00
3 Pekerjaan Elbow PVC, Ø 4" Klass AW m' 24.00
4 Sign Board / Papan Nama Huruf Timbul Stainless SS201 Hairline, 0.8mm ls
NO. URAIAN PEKERJAAN SATUAN TOTAL BIAYA
PERALATAN
VOLUME
(3)
(1) (4) (10) = (4) x (7)

II PEKERJAAN GEDUNG FIRE STATION


A PEKERJAAN DINDING & PLESTERAN
Lantai 1
1 Pekerjaan Pemasangan 1m2 Dinding Bata ringan 10 cm Bata Campuran 1SP:3PP m2 147.20
2 Pekerjaan Kolom Praktis 11X11cm, besi Utama 4 Dia 13mm sengkang dia 10mm jarak 15 m' 35.00
3 Pekerjaan Plesteran Dinding mortar instant m2 294.40
4 Pekerjaan Plesteran 1 : 3 Kolom Praktis m2 6.93
5 Acian dinding m2 120.32
6 Acian kolom praktis m2 6.93
7 Pekerjaan meja beton wastafel dan sink m3
Lantai 2
NO. URAIAN PEKERJAAN SATUAN TOTAL BIAYA
PERALATAN
VOLUME
(3)
(1) (4) (10) = (4) x (7)
1 Pekerjaan Pemasangan 1m2 Dinding Bata ringan 10 cm Bata Campuran 1SP:3PP m2 244.80
2 Pekerjaan Kolom Praktis 11X11cm, besi Utama 4 Dia 13mm sengkang dia 10mm jarak 15 m' 101.50
3 Pekerjaan Plesteran Dinding mortar instant m2 489.60
NO. URAIAN PEKERJAAN SATUAN TOTAL BIAYA
PERALATAN
VOLUME
(3)
(1) (4) (10) = (4) x (7)
4 Pekerjaan Plesteran 1 : 3 Kolom Praktis m2 10.78
5 Acian dinding m2 489.60
6 Acian kolom praktis m2 10.78
7 Pekerjaan meja beton wastafel dan sink m3 0.12
Lantai 3
1 Pekerjaan Pemasangan 1m2 Dinding Bata ringan 10 cm Bata Campuran 1SP:3PP m2 20.80
2 Pekerjaan Kolom Praktis 11X11cm, besi Utama 4 Dia 13mm sengkang dia 10mm jarak 15 m' 42.00
3 Pekerjaan Plesteran Dinding mortar instant m2 41.60
4 Pekerjaan Plesteran 1 : 3 Kolom Praktis m2 11.17
5 Acian dinding m2 41.60
6 Acian kolom praktis m2 11.17
7 Pekerjaan meja beton wastafel dan sink m3 -

B PEKERJAAN KUSEN PINTU/JENDELA


1 Pekerjaan Pemasangan Pintu Umum double swing 1 bh -
2 Pekerjaan Pemasangan Pintu Umum Single swing 1 bh 1.00
3 Pekerjaan Pemasangan Pintu SERVICE Double swing 1 bh -
4 Pekerjaan Pemasangan Pintu Toilet bh 4.00
5 Pekerjaan Pemasangan Pintu Janitor bh -
6 Pekerjaan Pemasangan Pintu Besi bh -
7 Pekerjaan Pemasangan Jendela tipe 1 bh -
8 Pekerjaan Pemasangan Jendela tipe 2 bh -
9 Pekerjaan Pemasangan Jendela tipe 3 bh -
10 Pekerjaan Pemasangan Jendela tipe 4 bh -
11 Pekerjaan Pemasangan Jendela tipe 5 bh -
12 Pekerjaan Pemasangan Jendela tipe 6 bh -
13 Pekerjaan Pemasangan Jendela tipe 7 bh -
14 Pekerjaan Pemasangan Jendela tipe 8 bh -
15 Pekerjaan Pemasangan Jendela tipe 9 bh -
16 Pekerjaan Pemasangan Bouvenlight 1 bh -
17 Pekerjaan Pemasangan Bouvenlight 2 bh -
18 Pekerjaan Pemasangan Bouvenlight 3 bh -
19 Pekerjaan Pemasangan Bouvenlight 4 bh -
20 Pekerjaan Pemasangan Bouvenlight 5 bh -
21 Pekerjaan Pemasangan Bouvenlight Wiremesh bh -
C PEKERJAAN LANTAI
Lantai 1
NO. URAIAN PEKERJAAN SATUAN TOTAL BIAYA
PERALATAN
VOLUME
(3)
(1) (4) (10) = (4) x (7)
1 Pekerjaan Lantai Floor Hardener m2 103.00
2 Pekerjaan Lantai Homogenous Tile 30X60 m2 10.50
3 Pekerjaan Lantai Homogenous Tile 30X60 (Stair Nosing) m' 35.00
Lantai 2
1 Pekerjaan Lantai Floor Hardener m2 -
2 Pekerjaan Lantai Homogenous Tile 30X60 m2 10.50
3 Pekerjaan Lantai Homogenous Tile 30X60 (Stair Nosing) m' 35.00
Lantai3
1 Pekerjaan Lantai Floor Hardener m2 -
2 Pekerjaan Lantai Homogenous Tile 30X60 m2 10.50
3 Pekerjaan Lantai Homogenous Tile 30X60 (Stair Nosing) m' 35.00

D PEKERJAAN PENGECATAN
1 Pekerjaan pengecatan dinding Exterior Weathershield m2 282.24
E PEKERJAAN PENUTUP ATAP
1 Pekerjaan penutup atap zincalum +Powder Coating m2 2,128.16
2 Pekerjaan pemasangan insulasi atap Rock Wool m2 2,128.16
F PEKERJAAN RAILING
1 Railing BSP m' 24.00
2 Pekerjaan Pemasangan 1m2 Dinding Bata ringan 10 cm Bata Campuran 1SP:3PP 3.20
3 Pekerjaan Plesteran Dinding mortar instant m2 6.40
4 Acian dinding m2 6.40
5 Pengecatan dinding Railing 6.40
6 Railing BSP Luncur m' 15.60
G PEKERJAAN LAIN LAIN
1 Pekerjaan Roof Drain bh
18.00
2 Pekerjaan 1 m' Talang Tegak ø 4" Pjg 4 m Ex-Rucika m" 18.00
3 Pekerjaan Elbow PVC, Ø 4" Klass AW (RUCIKA) m" 72.00
4 Pekerjaan 1 m' Talang Datar Ex-Rucika m" 92.00
III PEKERJAAN BANGUNAN RESERVOIR
RUANG POMPA DAN PENAMPUNGAN AIR TAWAR
A PEKERJAAN DINDING & PLESTERAN
NO. URAIAN PEKERJAAN SATUAN TOTAL BIAYA
PERALATAN
VOLUME
(3)
(1) (4) (10) = (4) x (7)
1 Pekerjaan Pemasangan 1m2 Dinding Bata ringan 10 cm Bata Campuran 1SP:3PP m2 33.50
2 Pekerjaan Kolom Praktis 11X11cm, besi Utama 4 Dia 13mm sengkang dia 10mm jarak 15 m' 24.00
3 Pekerjaan Plesteran Dinding mortar instant m2 67.00
4 Pekerjaan Plesteran 1 : 3 Kolom Praktis m2 14.40
5 Acian dinding m2
24.00
6 Acian Kolom Praktis m2 14.40
7 Pekerjaan Keramik Diniding 30X30 m2 760.00
8 Pekerjaan Finishing Waterproofing m2 985.63
B PEKERJAAN KUSEN PINTU/JENDELA
1 Pekerjaan Pemasangan Pintu Besi bh 2.00
2 Pekerjaan Pemasangan Jalusi 1 bh 2.00
3 Pekerjaan Pemasangan Jalusi 2 bh 2.00
C PEKERJAAN LANTAI
1 Pekerjaan Lantai Floor Hardener m2 56.00
2 Pekerjaan Lantai Keramik 30X30 Antislip m2 225.53
D PEKERJAAN PENGECATAN
1 Pekerjaan pengecatan dinding Interior m2 84.00
2 Pekerjaan pengecatan dinding Exterior Weathershield m2 332.00
E PEKERJAAN PENUTUP ATAP
1 Pekerjaan Finishing Dak Waterproofing m2 352.00
IV PEKERJAAN BANGUNAN CHECK POINT
A PEKERJAAN DINDING & PLESTERAN
LANTAI 1
1 Pekerjaan Pemasangan 1m2 Dinding Bata ringan 10 cm Bata Campuran 1SP:3PP m2 302.70
2 Pekerjaan Kolom Praktis 11X11cm, besi Utama 4 Dia 13mm sengkang dia 10mm jarak 15 m' 40.00
3 Pekerjaan Plesteran Dinding mortar instant m2 605.40
NO. URAIAN PEKERJAAN SATUAN TOTAL BIAYA
PERALATAN
VOLUME
(3)
(1) (4) (10) = (4) x (7)
4 Pekerjaan Plesteran 1 : 3 Kolom Praktis m2 17.60
5 Acian dinding m2
605.40
6 Acian kolom praktis m2
17.60
B PEKERJAAN KUSEN PINTU/JENDELA
LANTAI 1
1 Pekerjaan Pemasangan Pintu Umum double swing 1 bh 2.00
2 Pekerjaan Pemasangan Jendela tipe 1 bh 2.00
3 Pekerjaan Pemasangan Jendela tipe 2 bh 2.00
NO. URAIAN PEKERJAAN SATUAN TOTAL BIAYA
PERALATAN
VOLUME
(3)
(1) (4) (10) = (4) x (7)
C PEKERJAAN LANTAI
NO. URAIAN PEKERJAAN SATUAN TOTAL BIAYA
PERALATAN
VOLUME
(3)
(1) (4) (10) = (4) x (7)
LANTAI 1

1 Pekerjaan Lantai Floor Hardener m2 90

2 Pekerjaan Lantai Homogenous Tile 60X60 Unpolished m2 41.76


NO. URAIAN PEKERJAAN SATUAN TOTAL BIAYA
PERALATAN
VOLUME
(3)
(1) (4) (10) = (4) x (7)
3 Pekerjaan Lantai Homogenous Tile 30X60 Unpolished m2 113.76
4 Pekerjaan Lantai Homogenous Tile 30X60 (Stair Nosing) m' 23.343
D PEKERJAAN PLAFOND
1 Pekerjaan Plafon Gypsum Board m2 41.76
2 Pekerjaan Plafond Kalsiboard m2 92.16
E PEKERJAAN PENGECATAN

1 Pekerjaan pengecatan dinding Exterior Weathershield m2 605.4


2 Pekerjaan pengecatan plafon Gypsum Board m2 41.76
3 Pekerjaan Pengecatan plafond Kalsiboard m2 92.16
NO. URAIAN PEKERJAAN SATUAN TOTAL BIAYA
PERALATAN
VOLUME
(3)
(1) (4) (10) = (4) x (7)
F PEKERJAAN PENUTUP ATAP
1 Pekerjaan Finishing Dak Waterproofing m2 128
G PEKERJAAN RAILING
1 Railing BSP m' 80
2 Pekerjaan Pemasangan 1m2 Dinding Bata Ringan 10 cm Bata Campuran 1SP:3PP m2 8
3 Pekerjaan Plesteran Dinding mortar instant m2 16
4 Acian dinding m2 16
5 Pengecatan dinding Railing m2 16
H PEKERJAAN LAIN LAIN
1 Pekerjaan Roof Drain bh 4
2 Pekerjaan 1 m' Talang Tegak ø 4" m" 4
3 Pekerjaan Elbow PVC, Ø 4" Klass AW m" 16
4 Pekerjaan Car Stopper bh -
5 Pekerjaan 1 m' Talang Datar m" 56
TOTAL SUB PEKERJAAN ARSITEKTUR
PEKERJAAAN PEMBANGUNAN GEDUNG NEW HSSE DAN FIRE STATION
PERTAMINA RU-V BALIKPAPAN
SUB PEKERJAAN : TELEKOMUNIKASI & IT

NO. URAIAN PEKERJAAN SATUAN VOLUME


(1) (2) (3) (4)
A PEKERJAAN STRUCTURE CABLING SYSTEM
1 VERTICAL CABLING SYSTEM
Distribution Switch 16 Port SFP+ unit 3.00
Transceiver, SFP+, 10GbE, LR, SMF Third Party Support
unit 3.00

- From Distribution Switch To Server Exsisting m 50.00


FO SM 4 Core (Horizontal Cabling System)
- From Distribution Switch To Access Switch on Wallmount A m 50.00

FO SM 4 Core (Vertical Cabling System)


- From Distribution Switch To Access Switch on Wallmount B m 150.00
FO SM 4 Core (Vertical Cabling System)
- From Distribution Switch To Access Switch on Wallmount C m 150.00
FO SM 4 Core (Vertical Cabling System)
- From Distribution Switch To Access Switch on Wallmount D m 150.00
FO SM 4 Core (Vertical Cabling System)
Jumlah VERTICAL CABLING SYSTEM
B PEKERJAAN HORIZONTAL CABLING SYSTEM
1 WALLMOUNT A
A ACCESS SWITCH
Ethernet
### Routing Switch 48 GigE PoE 370W, 4 x 10 G SFP, unit 3.00
LAN Basecompliant). (EU power cord).
Ethernet
### Routing Switch 24 GigE PoE 370W, 4 x 10 G SFP, unit 3.00
LAN Basecompliant). (EU power cord).
Ethernet
### Routing Switch 48 GigE, 4 x 10 G SFP, LAN Base unit 3.00
Ethernet
### Routing Switch 24 GigE, 4 x 10 G SFP, LAN Base unit 3.00
SSC Stack
### Cable, 1.5m (5ft) for Ethernet Routing Switch unit 3.00
Support with Acess series switches.
Transceiver,
### SFP+, 10GbE, LR, SMF Third Party Support unit 3.00
B WIRELESS
AP 802.11n/ac
### Dual 3x3:3 Radio Integrated Antenna AP unit 3.00
AP-Flat
### Surface Wall/Ceiling Black AP Basic Flat Surface unit 3.00
Mount Kit, Blank Patch Panel Category 6 SL
C CABLING SYSTEM ACC
Blank
###
Patch Panel Category 6 SL Unit 3.00
4 Pair,
###Category 6 SL Series Modular Jack ( Blue ) unit 3.00
4 Pair,
###Category 6 SL Series Modular Jack ( Red ) pcs 3.00
BS Shuttered
### Faceplate - 2 Port pcs 6.00
BS Shuttered
### Faceplate - 1 Port unit 3.00
Category
### 6 UTP Patch Cords, Stranded, 4ft ( Blue ) unit 3.00
Category
### 6 UTP Patch Cords, Stranded, 7ftm ( Red ) unit 3.00
D MATERIAL SUPPORT
1 RACK SYSTEM
19"Wallmounted
a 12 RU Double door unit 1.00
Opticb Terminal Box 8 Port unit 1.00
Patch
c Cords SC-LC unit 1.00
2 INSTALLATION COST
Installation
a Rack unit 3.00
Installation
b ,Pulling Cable Data titik 3.00
Installation
c ,Pulling Cable Wifi titik 3.00
Installation
d ,Pulling Cable HRVGA titik 3.00
Jumlah HORIZONTAL CABLING SYSTEM WALLMOUNT A
2 WALLMOUNT B
A ACCESS SWITCH
Ethernet
### Routing Switch 48 GigE PoE 370W, 4 x 10 G SFP, unit 3.00
LAN Basecompliant). (EU power cord).
Ethernet
### Routing Switch 24 GigE PoE 370W, 4 x 10 G SFP, unit 3.00
LAN Basecompliant). (EU power cord).
Ethernet
### Routing Switch 48 GigE, 4 x 10 G SFP, LAN Base unit 3.00
Ethernet
### Routing Switch 24 GigE, 4 x 10 G SFP, LAN Base unit 3.00
SSC Stack
### Cable, 1.5m (5ft) for Ethernet Routing Switch unit 3.00
Support with Acess series switches.
Transceiver,
### SFP+, 10GbE, LR, SMF Third Party Support unit 3.00
B WIRELESS
AP 802.11n/ac
### Dual 3x3:3 Radio Integrated Antenna AP unit 3.00
AP-Flat
### Surface Wall/Ceiling Black AP Basic Flat Surface unit 3.00
Mount Kit, Blank Patch Panel Category 6 SL
C CABLING SYSTEM ACC
Blank
###
Patch Panel Category 6 SL Unit 6.00
4 Pair,
###Category 6 SL Series Modular Jack ( Blue ) unit 6.00
4 Pair,
###Category 6 SL Series Modular Jack ( Red ) pcs 3.00
BS Shuttered
### Faceplate - 2 Port pcs 3.00
BS Shuttered
### Faceplate - 1 Port unit 3.00
Category
### 6 UTP Patch Cords, Stranded, 4ft ( Blue ) unit 3.00
Category
### 6 UTP Patch Cords, Stranded, 7ftm ( Red ) unit 3.00
D MATERIAL SUPPORT
1 RACK SYSTEM
19"Wallmounted
a 12 RU Double door unit 3.00
Opticb Terminal Box 8 Port unit 3.00
Patch
c Cords SC-LC unit 3.00
2 INSTALLATION COST
Installation
a Rack unit 3.00
Installation
b ,Pulling Cable Data titik 3.00
Installation
c ,Pulling Cable Wifi titik 3.00
Installation
d ,Pulling Cable HRVGA titik 3.00
Jumlah HORIZONTAL CABLING SYSTEM WALLMOUNT B
3 WALLMOUNT C
A ACCESS SWITCH
Ethernet
### Routing Switch 48 GigE PoE 370W, 4 x 10 G SFP, unit 1.00

LAN Basecompliant). (EU power cord).


Ethernet
### Routing Switch 24 GigE PoE 370W, 4 x 10 G SFP, unit 1.00
LAN Basecompliant). (EU power cord).
NO. URAIAN PEKERJAAN SATUAN VOLUME
(1) (2) (3) (4)
Ethernet
### Routing Switch 48 GigE, 4 x 10 G SFP, LAN Base unit 1.00
Ethernet
### Routing Switch 24 GigE, 4 x 10 G SFP, LAN Base unit 1.00
SSC Stack
### Cable, 1.5m (5ft) for Ethernet Routing Switch unit 1.00
Support with Acess series switches.
Transceiver,
### SFP+, 10GbE, LR, SMF Third Party Support unit 1.00
B WIRELESS
AP 802.11n/ac
### Dual 3x3:3 Radio Integrated Antenna AP unit 3.00
AP-Flat
### Surface Wall/Ceiling Black AP Basic Flat Surface unit 3.00
Mount Kit, Blank Patch Panel Category 6 SL
C CABLING SYSTEM ACC
Blank
###
Patch Panel Category 6 SL Unit 3.00
4 Pair,
###Category 6 SL Series Modular Jack ( Blue ) unit 3.00
NO. URAIAN PEKERJAAN SATUAN VOLUME
(1) (2) (3) (4)
4 Pair,
###Category 6 SL Series Modular Jack ( Red ) pcs 3.00
BS Shuttered
### Faceplate - 2 Port pcs 3.00
BS Shuttered
### Faceplate - 1 Port unit 3.00
NO. URAIAN PEKERJAAN SATUAN VOLUME
(1) (2) (3) (4)
Category
### 6 UTP Patch Cords, Stranded, 4ft ( Blue ) unit 3.00
Category
### 6 UTP Patch Cords, Stranded, 7ftm ( Red ) unit 3.00
D MATERIAL SUPPORT

1 RACK SYSTEM
19"Wallmounted
a 12 RU Double door unit 1.00
Opticb Terminal Box 8 Port unit 1.00
Patch
c Cords SC-LC unit 1.00
2 INSTALLATION COST
Installation
a Rack unit 1.00
Installation
b ,Pulling Cable Data titik 4.00
Installation
c ,Pulling Cable Wifi titik 4.00
Installation
d ,Pulling Cable HRVGA titik 4.00
Jumlah HORIZONTAL CABLING SYSTEM WALLMOUNT C
4 WALLMOUNT D
A ACCESS SWITCH
Ethernet
### Routing Switch 48 GigE PoE 370W, 4 x 10 G SFP, unit 1.00
LAN Basecompliant). (EU power cord).
Ethernet
### Routing Switch 24 GigE PoE 370W, 4 x 10 G SFP, unit 1.00
LAN Basecompliant). (EU power cord).
Ethernet
### Routing Switch 48 GigE, 4 x 10 G SFP, LAN Base unit 1.00
Ethernet
### Routing Switch 24 GigE,4 x 10 G SFP, LAN Base unit 1.00
SSC Stack
### Cable, 1.5m (5ft) for Ethernet Routing Switch unit 1.00
Support with Acess series switches.
Transceiver,
### SFP+, 10GbE, LR, SMF Third Party Support unit 1.00
B WIRELESS
AP 802.11n/ac
### Dual 3x3:3 Radio Integrated Antenna AP unit 1.00
AP-Flat
### Surface Wall/Ceiling Black AP Basic Flat Surface unit 1.00
Mount Kit, Blank Patch Panel Category 6 SL
C CABLING SYSTEM ACC
Blank
###
Patch Panel Category 6 SL Unit 1.00
4 Pair,
###Category 6 SL Series Modular Jack ( Blue ) unit 1.00
4 Pair,
###Category 6 SL Series Modular Jack ( Red ) pcs 3.00
BS Shuttered
### Faceplate - 2 Port pcs 3.00
BS Shuttered
### Faceplate - 1 Port unit 1.00
Category
### 6 UTP Patch Cords, Stranded, 4ft ( Blue ) unit 1.00
Category
### 6 UTP Patch Cords, Stranded, 7ftm ( Red ) unit 1.00
NO. URAIAN PEKERJAAN SATUAN VOLUME
(1) (2) (3) (4)
D MATERIAL SUPPORT
1 RACK SYSTEM
19"Wallmounted
a 12 RU Double door unit 1.00
Opticb Terminal Box 8 Port unit 1.00
Patch
c Cords SC-LC unit 1.00
2 INSTALLATION COST
Installation
a Rack unit 1.00
Installation
b ,Pulling Cable Data titik 1.00
Installation
c ,Pulling Cable Wifi titik 1.00
Installation
d ,Pulling Cable HRVGA titik 1.00
Jumlah HORIZONTAL CABLING SYSTEM WALLMOUNT D
C PEKERJAAN IP TELEPHONY SYSTEM
1 IP PABX
IP PABX (Kapasitas 300 ext), including: lot 1.00
IP OFFICE SERVER EDITION MODEL
minimum 10 lic IPO-SELECT 10 SIP TRUNK 1 PLDS LIC:CU
minimum 228 lic IPO-SELECT 10 IP ENDPOINT 1 PLDS LIC:CU
minimum 2 unit R220 II XL SERVER IP OFFICE SERVER EDITION EXPANSION
minimjm 2 lic ASBCE R7 STANDARD SERVICES SESSION IPO LICENSE 1-500
IPO-SELECT 10 SERVER EDITION PLDS LIC:DS
ASBCE CORE PORTWELL CAD FOR IPO
IP PHONE 96XX REPLACEMENT LINE CORD
ASBCE R7 SYSTEM SOFTWARE USB
IP OFFICE/IP OFFICE SELECT R10 LINUX INSTALLATION DVD
MAINTENANCE COMPREHENSIVE SUPPORT MODEL
SECURE ACCESS LINK POLICY SERVER DOWNLOADABLE R1.5 LIC:DS
POWER CORD EUROPE

Jumlah III.A IP PABX

2 WALLMOUNT A
IP Phone
a. 1600 Series unit 20.00
NO. URAIAN PEKERJAAN SATUAN VOLUME
(1) (2) (3) (4)
Standard
b. license Phone unit -
Installation
c. ,Pulling Cable Voice titik 20.00

Jumlah III.B IP TELEPHONY SYSTEM WALLMOUNT A

3 WALLMOUNT B
IP Phone
a. 1600 Series unit 17.00
Standard
b. license Phone unit 4.00
Installation
c. ,Pulling Cable Voice titik 21.00

Jumlah III.C IP TELEPHONY SYSTEM WALLMOUNT B

4 WALLMOUNT C
IP Phone
a. 1600 Series unit 23.00
Standard
b. license Phone unit 28.00
Installation
c. ,Pulling Cable Voice titik 51.00

Jumlah III.C IP TELEPHONY SYSTEM WALLMOUNT C

5 WALLMOUNT D
IP Phone
a. 1600 Series unit 4.00
Standard
b. license Phone unit 10.00
Installation
c. ,Pulling Cable Voice titik 14.00
Jumlah III.C IP TELEPHONY SYSTEM WALLMOUNT D
D PEKERJAAN IP MATV (MASTER AERIAL TELEVISION)
1 IP MATV EQUIPMENT
NO. URAIAN PEKERJAAN SATUAN VOLUME
(1) (2) (3) (4)
IP TV Management System (IMS) unit 1.00
IMS Server unit 1.00
OEM 8 input HDMI IP Encoder unit 1.00
OEM 8 tuner input DVB-S2 IRD unit 1.00
TR6015 HD Transcoder unit 1.00
Digital Signage unit 1.00
Media Streaming Server unit 1.00
User License unit 1.00
NO. URAIAN PEKERJAAN SATUAN VOLUME
(1) (2) (3) (4)
IP TV Set Top Box (STB) unit 1.00
NO. URAIAN PEKERJAAN SATUAN VOLUME
(1) (2) (3) (4)
Parabola Antenna disc accessories
unit 1.00
Jumlah IV.A IP MATV EQUIPMENT

2 IP MATV SYSTEM INSTALATION


NO. URAIAN PEKERJAAN SATUAN VOLUME
(1) (2) (3) (4)
WALLMOUNT
A A ttk 1.00
Installation ,Pulling Cable IPTV

WALLMOUNT
B B ttk 1.00
Installation ,Pulling Cable IPTV
WALLMOUNT
C C ttk 1.00
Installation ,Pulling Cable IPTV

WALLMOUNT
D D ttk 1.00
Installation ,Pulling Cable IPTV
Jumlah IV.B IP MATV SISTEM INSTALATION
NO. URAIAN PEKERJAAN SATUAN VOLUME
(1) (2) (3) (4)
TOTAL SUB PEKERJAAN TELEKOMUNIKASI & IT
PEKERJAAAN PEMBANGUNAN GEDUNG NEW HSSE DAN FIRE STATION
PERTAMINA RU-V BALIKPAPAN
SUB PEKERJAAN : SISTEM KEAMANAN

NO. URAIAN PEKERJAAN SATUAN VOLUME


(1) (2) (3) (4)

A PEKERJAAN PAGING SYSTEM WORK / PUBLIC ADDRESS


1 MAIN EQUIPMENT
Evacuation System

a Paging Microphone, lengkap dengan Chime Gong Unit 2.00


b Mixer Controller Built in 240Watt c/w Message manager Unit 2.00
c Power Amplifier 480 Watt Unit 2.00

d BGM Source USB/SD/ MP3/AM/FM Tuners Unit 2.00


e Emergency Power Amplifier 240 Watt Unit 2.00
f Graphic Equalizer Unit 2.00
g Zone Selector/Routter Unit 2.00
h Cabinet Rack Unit 2.00
i MDF,cable distribusi dll set 1.00
j Test and commissioning lot 1.00
Jumlah
2 INSTALLATION AND FIXTURES
LANTAI DASAR NEW HSSE
a Terminal Boxes (TB-TS) Unit 1.00
Equipment installation, lengkap dng kabel, konduit dan accessories
b - Fedder cable dari MDF-TS to STB-A, NYMHY 6 x 3 x 2, 5mm2 dlm konduit m' 950.00
c - Fedder cable dari MDF-TS to STB-A, FRC cable 2x1,5mm2 dlm konduit m' 950.00
d - Ceiling Speaker Installation, NYMHY cable 2 x 1, 5mm2 In Pipe Conduit Titik 4.00
e - Wall Speaker Installation, FRC cable 2 x 1, 5mm2 In Pipe Conduit Titik 7.00
Fixtures and armatures
f Ceiling Speaker 1,5 - 3 Watt Unit 4.00
g Wall Speaker 10 Watt Unit 7.00
h Volume Control Unit 1.00
Jumlah INSTALATION & FIXTURE LANTAI DASAR
3 INSTALLATION AND FIXTURES
LANTAI 2 NEW HSSE
a Terminal Boxes (TB-TS) Unit 1.00
Equipment installation, lengkap dng kabel, konduit dan accessories
b - Fedder cable dari MDF-TS to STB-B, NYMHY 6 x 3 x 2, 5mm2 dlm konduit m' 900.00
c - Fedder cable dari MDF-TS to STB-B, FRC cable 2x1,5mm2 dlm konduit m' 900.00
d - Ceiling Speaker Installation, NYMHY cable 2 x 1, 5mm2 In Pipe Conduit Titik 13.00
e - Wall Speaker Installation, FRC cable 2 x 1, 5mm2 In Pipe Conduit Titik 13.00
Fixtures and armatures
f Ceiling Speaker 1,5 - 3 Watt Unit 13.00
g Wall Speaker 10 Watt Unit -
h Volume Control Unit 1.00
Jumlah
4 INSTALLATION AND FIXTURES
LANTAI 3 NEW HSSE
a Terminal Boxes (TB-TS) Unit 1.00
Equipment installation, lengkap dng kabel, konduit dan accessories
b - Fedder cable dari MDF-TS to STB-B, NYMHY 6 x 3 x 2, 5mm2 dlm konduit m' 950.00
c - Fedder cable dari MDF-TS to STB-B, FRC cable 2x1,5mm2 dlm konduit m' 950.00
d - Ceiling Speaker Installation, NYMHY cable 2 x 1, 5mm2 In Pipe Conduit Titik 22.00
e - Wall Speaker Installation, FRC cable 2 x 1, 5mm2 In Pipe Conduit Titik -
Fixtures and armatures
f Ceiling Speaker 1,5 - 3 Watt Unit 22.00
g Wall Speaker 10 Watt Unit -
h Volume Control Unit 1.00
Jumlah
5 INSTALLATION AND FIXTURES
LANTAI 1, 2 DAN 3 FIRE STATION
a Terminal Boxes (TB-TS) Unit 1.00
Equipment installation, lengkap dng kabel, konduit dan accessories
b - Fedder cable dari MDF-TS to STB-B, NYMHY 6 x 3 x 2, 5mm2 dlm konduit m' 900.00
c - Fedder cable dari MDF-TS to STB-B, FRC cable 2x1,5mm2 dlm konduit m' 900.00
d - Ceiling Speaker Installation, NYMHY cable 2 x 1, 5mm2 In Pipe Conduit Titik 10.00
e - Wall Speaker Installation, FRC cable 2 x 1, 5mm2 In Pipe Conduit Titik 2.00
Fixtures and armatures
f Ceiling Speaker 1,5 - 3 Watt Unit 10.00
g Wall Speaker 10 Watt Unit 2
h Volume Control Unit 1
Jumlah
B PEKERJAAN SISTEM FIRE ALARM
1 MAIN EQUIPMENT
a Master/ Main Control Fire Alarm (MCFA) Type Unit 3.00
Type : Fully Adderssible
Capacity : 3 Loop
Micro Computer PC-Based.
Complete with :
- Fire Alarm Display Panel
- Rectifier, Main Bell and also Other Aksesoris
- Lightning Arester
- Lead Acid Rechargeable Dan Power Supply
b Announciator Unit 6.00
c Main Equipment Fire Alarm Installation from MCFA to:
- to Annunciator The installation uses STP AWG 18 m 700.00
+ NYM 3X2,5mm PVC Conduit Ø 20 mm
Grounding Work
- Cable BCC 6mm2 set 2.00
- Cable BCC 25mm2 (Riser Grounding) set 2.00
d Test and commissioning set 1.00
Jumlah
2 FEEDER CABLE INSTALATION
a Installation from MCFA Loop 1 to Terminal Box TB-FA.LT 1 m
Shielded Twisted AWG 18 + NYM 3X2,5mm PVC Conduit Ø 20 mm
b Installation from TB-FA.LT 1 to TB-FA.LT 2 m
NO. URAIAN PEKERJAAN SATUAN VOLUME
(1) (2) (3) (4)

Shielded Twisted AWG 18 + NYM 3X2,5mm PVC Conduit Ø 20 mm


c Installation from TB-FA.LT 2 to TB-FA.LT 3 m
Shielded Twisted AWG 18 + NYM 3X2,5mm PVC Conduit Ø 20 mm
d Installation from TB-FA.LT 3 back to MCFA LT 1 m
Shielded Twisted AWG 18 + NYM 3X2,5mm PVC Conduit Ø 20 mm
e Installation from MCFA Loop 2 to TB FA LT 1 Fire Station m
Shielded Twisted AWG 18 + NYM 3X2,5mm PVC Conduit Ø 20 mm
Jumlah
3 INSTALLATION AND FIXTURES WORK
LANTAI DASAR NEW HSSE
Terminal Box Fire Alarm ( TB-FA ) LT. 1 , unit 2.00
- Conventional Interface Modules For Detector unit 2.00
NO. URAIAN PEKERJAAN SATUAN VOLUME
(1) (2) (3) (4)

- Signaling Device Interface Modules For Sounder Red with LED unit 2.00
Equipment installation complete with cable NYA 2X1,5 mm ,
conduit and accessories in Conduit Ø 20 mm
NO. URAIAN PEKERJAAN SATUAN VOLUME
(1) (2) (3) (4)

- Smoke Detector Installation titik 40.00


- Heat or ROR Detector Installation titik 16.00
- Manual Push Button Break Glass Installation titik 4.00
- Indicating Sounder Red with LED Installation titik 4.00
- Flow Switch Installation titik 40.00
Fixtures and armatures
- Smoke Detector unit 40.00
- Heat or ROR Detector unit 16.00
- Manual Break Glass Push Button unit 4.00
- Indicating Sounder Red with LED unit 4.00
- Flow Switch unit 40.00
- EOL unit 40.00
Jumlah
4 INSTALLATION AND FIXTURES WORK
LANTAI 2 NEW HSSE
Terminal Box Fire Alarm ( TB-FA ) LT. 2 , unit 2.00
- Conventional Interface Modules For Detector unit 2.00
- Signaling Device Interface Modules For Sounder Red with LED unit 2.00
Equipment installation complete with cable NYA 2X1,5 mm ,
conduit and accessories in Conduit Ø 20 mm
- Smoke Detector Installation titik 33.00
- Heat or ROR Detector Installation titik 10.00
- Manual Push Button Break GlassInstallation titik 3.00
- Indicating Sounder Red with LED Installation titik 33.00
- Flow Switch Installation titik 33.00
Fixtures and armatures
- Smoke Detector unit 33.00
- Heat or ROR Detector unit 10.00
- Manual Break Glass Push Button unit 3.00
- Indicating Sounder Red with LED unit 3.00
- Flow Switch unit 33.00
- EOL unit 33.00

Jumlah
5 INSTALLATION AND FIXTURES WORK
LANTAI 3 NEW HSSE
Terminal Box Fire Alarm ( TB-FA ) LT. 3 , unit 3.00
NO. URAIAN PEKERJAAN SATUAN VOLUME
(1) (2) (3) (4)

- Conventional Interface Modules For Detector unit 3.00


- Signaling Device Interface Modules For Sounder Red with LED unit 3.00
Equipment installation complete with cable NYA 2X1,5 mm ,
conduit and accessories in Conduit Ø 20 mm
- Smoke Detector Installation titik 77.00
- Heat or ROR Detector Installation titik 8.00
- Manual Push Button Break Glass Installation titik 3.00
- Indicating Sounder Red with LED Installation titik 3.00
- Flow Switch Installation titik 77.00
Fixtures and armatures
- Smoke Detector unit 77.00
- Heat or ROR Detector unit 8.00
- Manual Break Glass Push Button unit 3.00
- Indicating Sounder Red with LED unit 3.00
- Flow Switch unit 77.00
- EOL unit 77.00
Jumlah
6 INSTALLATION AND FIXTURES WORK
LANTAI 1 FIRE STATION
Terminal Box Fire Alarm ( TB-FA ) LT. 1 FS , unit 1.00
- Conventional Interface Modules For Detector unit 1.00
- Signaling Device Interface Modules For Sounder Red with LED unit 1.00
Equipment installation complete with cable NYA 2X1,5 mm ,
conduit and accessories in Conduit Ø 20 mm
- Smoke Detector Installation titik 19.00
- Heat or ROR Detector Installation titik 10.00
- Manual Push Button Break Glass Installation titik 1.00
- Indicating Sounder Red with LED Installation titik 1.00
- Flow Switch Installation titik 10.00
Fixtures and armatures
- Smoke Detector unit 19.00
- Heat or ROR Detector unit 19.00
NO. URAIAN PEKERJAAN SATUAN VOLUME
(1) (2) (3) (4)

- Manual Break Glass Push Button unit 1.00


- Indicating Sounder Red with LED unit 1.00
- Flow Switch unit 19.00
- EOL unit 19.00
Jumlah

7 INSTALLATION AND FIXTURES WORK


LANTAI 2 & 3 FIRE STATION
Terminal Box Fire Alarm ( TB-FA ) LT. 2 FS , unit 2.00
- Conventional Interface Modules For Detector unit
- Signaling Device Interface Modules For Sounder Red with LED unit
Equipment installation complete with cable NYA 2X1,5 mm ,
conduit and accessories in Conduit Ø 20 mm
- Smoke Detector Installation titik 24.00
- Heat or ROR Detector Installation titik 24.00
- Manual Push Button Break Glass Installation titik 2.00
- Indicating Sounder Red with LED Installation titik 2.00
- Flow Switch Installation titik 2.00
Fixtures and armatures
- Smoke Detector unit 24.00
- Heat or ROR Detector unit 24.00
- Manual Break Glass Push Button unit 2.00
- Indicating Sounder Red with LED unit 2.00
- Flow Switch unit 24.00
- EOL unit 24.00
Jumlah
C PEKERJAAN SISTEM CCTV (CLOSE CIRCUIT TELEVISION)
NO. URAIAN PEKERJAAN SATUAN VOLUME
(1) (2) (3) (4)

1 MAIN EQUIPMENT CCTV


Digital Video Recorder 16CH unit 2.00
HDMI/VGA output, Included HDD 4 TB
Installation & testing Commissioning set 1.00
Accomodation & Transportation set 1.00
TV LED 32" + VGA cable +bracket unit 2.00
Jumlah
2 CCTV EQUIPMENT & INSTALATION
NO. URAIAN PEKERJAAN SATUAN VOLUME
(1) (2) (3) (4)

WALLMOUNT A (LANTAI 1 New HSSE)


NO. URAIAN PEKERJAAN SATUAN VOLUME
(1) (2) (3) (4)

a IP Camera Fix Dome Indoor Camera unit 5.00

b Installation ,Pulling Cable CCTV titik 9.00

WALLMOUNT B (LANTAI 2 NEW HSSE)


NO. URAIAN PEKERJAAN SATUAN VOLUME
(1) (2) (3) (4)

a IP Camera Fix Dome Indoor Camera unit 9.00


b Installation ,Pulling Cable CCTV titik 9.00
WALLMOUNT C (LANTAI 3 NEW HSSE)
a IP Camera Fix Dome Indoor Camera unit 4.00
b Installation ,Pulling Cable CCTV titik 4.00
WALLMOUNT D (LANTAI 1, 2, 3 FIRE STATION)

a IP Camera Fix Dome Indoor Camera unit 33.00


b Installation ,Pulling Cable CCTV titik 33.00
Jumlah
NO. URAIAN PEKERJAAN SATUAN VOLUME
(1) (2) (3) (4)

D PEKERJAAN ACCESS CONTROL SYSTEM


1 WALLMOUNT A (LANTAI DASAR)
IP Finger Print unit 3.00
Power Supply + Battery back up unit 3.00
IP Acces Card unit 3.00
Electromagnetic Lock unit 3.00
Material Accessories set 3.00
Installation & testing Commissioning set 3.00
Accomodation & Transportation set 1.00
Jumlah
2 WALLMOUNT B (LANTAI 2)
IP Finger Print unit 3.00
Power Supply + Battery back up unit 3.00
IP Acces Card unit 3.00
Electromagnetic Lock unit 3.00
Material Accessories set 3.00
Installation & testing Commissioning set 3.00
Accomodation & Transportation set 1.00
Jumlah
3 WALLMOUNT C (LANTAI 3)
IP Finger Print unit 3.00
Power Supply + Battery back up unit 3.00
IP Acces Card unit 3.00
Electromagnetic Lock unit 3.00

Material Accessories set 3.00

Installation & testing Commissioning set 3.00


Accomodation & Transportation set 1.00
Jumlah
4 WALLMOUNT D (LANTAI 1, 2, 3 Fire Station)
IP Finger Print unit 3.00
Power Supply + Battery back up unit 3.00
IP Acces Card unit 3.00
Electromagnetic Lock unit 3.00
Material Accessories set 3.00

Installation & testing Commissioning set 3.00


Accomodation & Transportation set 1.00

Jumlah

E PEKERJAAN SECURITY GATE


1 FRONT GATE
Turnstile Gate Set 1.00
Metal Detector Set 1.00
Car Barrier Set 1.00

Jumlah
TOTAL SUB PEKERJAAN SISTEM KEAMANAN
PEKERJAAAN PEMBANGUNAN GEDUNG NEW HSSE DAN FIRE STATION
PERTAMINA RU-V BALIKPAPAN
SUB PEKERJAAN : FIRE PROTECTION

NO. URAIAN PEKERJAAN SATUAN VOLUME


(1) (2) (3) (4)

PEKERJAAN SISTEM PEMADAM KEBAKARAN


Pengadaan dan pemasangan sistem pemadam kebakaran yang terdiri dari Pillar Hydrant, Fire Hose Cabinet, Sprinkle dan Fire Ext
A PEKERJAAN PILLAR HYDRANT
Brand Harrington / 2 way pillar hydrant Unit 1

Model Hydrant Storz


Type Storz Adapter 2,5" Storz x 2,5" NH Female w/ (2) set Screwa with Storz Cap/cable Dark Anodized
B PEKERJAAN FIRE HOSE CABINET (INDOOR)

Lantai 2
Brand
Model Box Hydrant Lot 2
Type Mild Steel (1,2mm)+ Kaca
Dimensi 125 (h) x 75 (w) x 18 (t)
Paint Finish Stoving / Powder Coating
Accessories
- Fire Hose 1,5" x 30 m 12Bar
- Gate Valve CD 1,5" 10 Bar
- Seamless Nozzle 1,5: 10 Bar
- Hore Rack 1,5"
- Landing Valve CD 2,5" 10 Bar
Lantai 3
Brand
Model Box Hydrant Lot 2
Type Mild Steel (1,2mm)+ Kaca
Dimensi 125 (h) x 75 (w) x 18 (t)
Paint Finish Stoving / Powder Coating
Accessories
- Fire Hose 1,5" x 30 m 12Bar
- Gate Valve CD 1,5" 10 Bar
- Seamless Nozzle 1,5: 10 Bar
- Hore Rack 1,5"
- Landing Valve CD 2,5" 10 Bar
Lantai 4
Brand
Model Box Hydrant Lot 2
Type Mild Steel (1,2mm)+ Kaca
Dimensi 125 (h) x 75 (w) x 18 (t)
Paint Finish Stoving / Powder Coating
Accessories
- Fire Hose 1,5" x 30 m 12Bar
- Gate Valve CD 1,5" 10 Bar
- Seamless Nozzle 1,5: 10 Bar
- Hore Rack 1,5"
- Landing Valve CD 2,5" 10 Bar
C PEKERJAAN FIRE HOSE CABINET (OUTDOOR)
Model Box Hydrant Lot 2
Type Mild Steel (1,2mm)+ Kaca
Dimensi 125 (h) x 75 (w) x 18 (t)
Paint Finish Stoving / Powder Coating
Accessories
- Fire Hose 1,5" x 30 m 12Bar
- Seamless Nozzle 1,5: 10 Bar
- Hore Rack 1,5"
D PEKERJAAN SPRINKLE
Lantai 1
Pasangan Katup Pengendali
- Gate Valve ø 80 mm Bh 2
- Strainer Bh 2
- PRV ø 65 mm Bh 2
Head Sprinkle
Brand
Type Head Pendant Bh 115
Connect Thread ¾"
Temperature 141°C
Material Brass Alloy
Lantai 2
Pasangan Katup Pengendali
- Gate Valve ø 80 mm Bh 2
- Strainer Bh 2
- PRV ø 65 mm Bh 2
Head Sprinkle
Brand
Type Head Pendant Bh 84
Connect Thread ¾"
Temperature 141°C
Material Brass Alloy
Lantai 3
Pasangan Katup Pengendali
- Gate Valve ø 80 mm Bh 2
- Strainer Bh 2
- PRV ø 65 mm Bh 2
Head Sprinkle
Brand
Type Head Pendant Bh 176
Connect Thread ¾"
Temperature 141°C
Material Brass Alloy

Lantai 4
Pasangan Katup Pengendali
- Gate Valve ø 80 mm Bh 0
- Strainer Bh 0
NO. URAIAN PEKERJAAN SATUAN VOLUME
(1) (2) (3) (4)

- PRV ø 65 mm Bh 0
Head Sprinkle
Brand
Type Head Pendant Bh 0
Connect Thread ¾"
Temperature 141°C
Material Brass Alloy
E PEKERJAAN FIRE EXTINGUISHER
Lantai 1
Brand
Model EED-4 Bh 2
Type Stored Pressure Type
NO. URAIAN PEKERJAAN SATUAN VOLUME
(1) (2) (3) (4)

Extuingisher ABC Dry Powder


Propellant Dry Nitrogen (N2)
Capacity 4 Kg
NO. URAIAN PEKERJAAN SATUAN VOLUME
(1) (2) (3) (4)

Mounting Plastic Vehicle Bracket


Lantai 2
Brand
Model EED-4 Bh 2
Type Stored Pressure Type
Extuingisher ABC Dry Powder
Propellant Dry Nitrogen (N2)
Capacity 4 Kg
Mounting Plastic Vehicle Bracket
Lantai 3
Brand
Model EED-4 Bh 2
Type Stored Pressure Type
Extuingisher ABC Dry Powder
Propellant Dry Nitrogen (N2)
Capacity 4 Kg
Mounting Plastic Vehicle Bracket
Lantai 4
Brand
Model EED-4 Bh 0
Type Stored Pressure Type
Extuingisher ABC Dry Powder
Propellant Dry Nitrogen (N2)
Capacity 4 Kg
Mounting Plastic Vehicle Bracket
TOTAL SUB PEKERJAAN FIRE PROTECTION
PEKERJAAAN PEMBANGUNAN GEDUNG NEW HSSE DAN FIRE STATION
PERTAMINA RU-V BALIKPAPAN
SUB PEKERJAAN : ELEKTRIKAL

NO. URAIAN PEKERJAAN SATUAN VOLUME


TOTAL BIAYA
BAHAN
(1) (2) (3) (4) (9) = (4) x (6)

A PEKERJAAN PENYAMBUNGAN DAYA DARI KILANG 6.6 KV SUB TOTAL


1 Biaya penyambungan ls 1.00
2 Panel TM Incoming (IM) LBS 630A ls 1.00

3 Panel TM Outgoing (QM) LBS 630A ls 1.00


4 Panel LA (Lightning Arester) ls 1.00
5 Kabel tegangan Menengah ls 1.00

- Dari Kilang ke MV-MDP :


N2XSEFGbY 3x70 mm2 m 1,000.00
(termasuk penanaman kabel di tanah)
- MV-MDP ke Transformator
N2XSY 3x70 mm2 m 500.00
- Grounding TM m 200.00
6 Transformator 250 kVA beserta kelengkapannya set 1.00
Type kering Cast resin, dengan fan booster
Termasuk grounding trafo
7 Kabel tegangan rendah
Dari Trafo ke LV-MDP, NYY 4 x 240 mm2 m 200.00
Dari Genset (PCG) ke LV-MDP, NYY 4 x 240 mm2 m 200.00
Jumlah
B PEKERJAAN PANEL - PANEL DISTRIBUSI.
1 Panel LV-MDP
1 MCB 4P 400 A, 36 kA, Fixed bh 2
▪ Indication Contacts
▪ Instantaneous Voltage Release
▪ Motor Electric
▪ Shunt Trip
▪ Interlocking System (Cable)
2 Automatic Source Change Over set 1
lengkap dengan motor mechanism, plate dengan interloking,
electronic interlocking unit (IVE), Auxilary switch,
downstream coupling accessories,
kabel IVE, Auxilary control plate (ACP) dan BA control unit
2 MCCB 3P, 250A, 36kA, Incoming Photo Voltaic bh 1
4 MCCB 3P, 250A, 36kA, Coupling bh 2
5 MCCB 3P, 250A, 36kA, bh 5
7 MCCB 3P, 100A, 36kA, bh 13
8 MCB 1P, 16A, 4.5kA, (Control) bh 1
9 Current Transformer 1250/5A, 10 VA Cl.1, bh 1
10 Power Meter (kWh meter) bh 1
14 Pilot Lamp LED AC 220 V (R,O,G) bh 2
15 Box ( 200 H x 160 W x 90 D ) cm bh 1
16 Busbar Tembaga (Cu) dan instalasi set 2
17 Alat bantu dan material lain set 1
18 Pemasangan dan perkabelan set 1
19 Grounding system, batang tembaga diameter 1", 6m set 1
Jumlah
2 Panel PP/LP - A1 (Lantai 1)
1 Panel box (H) 800 x (W) 600 x (D) 300 mm bh 1
2 MCCB in 3 fasa, 100AF/100AT, 25kA bh 1
3 MCB out 3 fasa, 63A, 10kA bh 0
4 MCB out 3 fasa, 25A, 10kA bh 2
5 MCB out 1 fasa, 6A/10A/16A, 6kA bh 28
6 MCB out 1 fasa, 6A, 4.5kA (for control) bh 0
7 Pilot Lamp LED AC 220 V (R,O,G) bh 1
8 Power Meter (kWh meter) bh 1
9 CT Measurement bh 1
10 Bus bar tembaga dan instalasi bh 1
11 Alat bantu, dan material lain ls 1
12 Pemasangan dan perkabelan ls 1
Jumlah
3 Panel PP/LP - A2 (Lantai 1)
1 Panel box (H) 800 x (W) 600 x (D) 300 mm bh 1
2 MCCB in 3 fasa, 100AF/100AT, 25kA bh 1
3 MCB out 3 fasa, 40A, 10kA bh 1
4 MCB out 3 fasa, 25A, 10kA bh 2
5 MCB out 1 fasa, 6A/10A/16A, 6kA bh 37
6 MCB out 1 fasa, 6A, 4.5kA (for control) bh 0
7 Pilot Lamp LED AC 220 V (R,O,G) bh 1
8 Power Meter (kWh meter) bh 1
9 CT Measurement bh 1
10 Bus bar tembaga dan instalasi bh 1
11 Alat bantu, dan material lain ls 1
12 Pemasangan dan perkabelan ls 1
Jumlah
4 Panel PP/LP - A3 (Lantai 1)
1 Panel box (H) 800 x (W) 600 x (D) 300 mm bh 1
2 MCCB in 3 fasa, 100AF/100AT, 25kA bh 1
3 MCB out 3 fasa, 16A, 10kA bh 1
4 MCB out 3 fasa, 25A, 10kA bh 2
5 MCB out 1 fasa, 6A/10A/16A, 6kA bh 18
6 MCB out 1 fasa, 6A, 4.5kA (for control) bh 0
7 Pilot Lamp LED AC 220 V (R,O,G) bh 1
8 Power Meter (kWh meter) bh 1
9 CT Measurement bh 1
10 Bus bar tembaga dan instalasi bh 1
11 Alat bantu, dan material lain ls 1
12 Pemasangan dan perkabelan ls 1
Jumlah
5 Panel PP/LP - B1 (Lantai 2)
1 Panel box (H) 800 x (W) 600 x (D) 300 mm bh 1
NO. URAIAN PEKERJAAN SATUAN VOLUME
TOTAL BIAYA
BAHAN
(1) (2) (3) (4) (9) = (4) x (6)

2 MCCB in 3 fasa, 100AF/100AT, 25kA bh 1


3 MCB out 3 fasa, 63A, 10kA bh 0
4 MCB out 3 fasa, 25A, 10kA bh 2
5 MCB out 1 fasa, 6A/10A/16A, 6kA bh 12
6 MCB out 1 fasa, 6A, 4.5kA (for control) bh 0
7 Pilot Lamp LED AC 220 V (R,O,G) bh 1
8 Power Meter (kWh meter) bh 1
9 CT Measurement bh 1
10 Bus bar tembaga dan instalasi bh 1
11 Alat bantu, dan material lain ls 1
12 Pemasangan dan perkabelan ls 1
Jumlah
NO. URAIAN PEKERJAAN SATUAN VOLUME
TOTAL BIAYA
BAHAN
(1) (2) (3) (4) (9) = (4) x (6)

6 Panel PP/LP - B2 (Lantai 2)


1 Panel box (H) 800 x (W) 600 x (D) 300 mm bh 1
2 MCCB in 3 fasa, 100AF/100AT, 25kA bh 1
NO. URAIAN PEKERJAAN SATUAN VOLUME
TOTAL BIAYA
BAHAN
(1) (2) (3) (4) (9) = (4) x (6)

3 MCB out 3 fasa, 63A, 10kA bh 0


4 MCB out 3 fasa, 25A, 10kA bh 3
5 MCB out 1 fasa, 6A/10A/16A, 6kA bh 30
6 MCB out 1 fasa, 6A, 4.5kA (for control) bh 0
7 Pilot Lamp LED AC 220 V (R,O,G) bh 1
8 Power Meter (kWh meter) bh 1
9 CT Measurement bh 1
10 Bus bar tembaga dan instalasi bh 1
11 Alat bantu, dan material lain ls 1
12 Pemasangan dan perkabelan ls 1
Jumlah
7 Panel PP/LP - B3 (Lantai 2)
1 Panel box (H) 800 x (W) 600 x (D) 300 mm bh 1
2 MCCB in 3 fasa, 100AF/100AT, 25kA bh 1
3 MCB out 3 fasa, 16A, 10kA bh 2
4 MCB out 3 fasa, 25A, 10kA bh 1
5 MCB out 1 fasa, 6A/10A/16A, 6kA bh 18
6 MCB out 1 fasa, 6A, 4.5kA (for control) bh 0
7 Pilot Lamp LED AC 220 V (R,O,G) bh 1
8 Power Meter (kWh meter) bh 1
9 CT Measurement bh 1
10 Bus bar tembaga dan instalasi bh 1
11 Alat bantu, dan material lain ls 1
12 Pemasangan dan perkabelan ls 1
Jumlah
8 Panel PP/LP - C1 (Lantai 3)
1 Panel box (H) 800 x (W) 600 x (D) 300 mm bh 1
2 MCCB in 3 fasa, 100AF/100AT, 25kA bh 1
3 MCB out 3 fasa, 40A, 10kA bh 1
4 MCB out 3 fasa, 25A, 10kA bh 2
5 MCB out 1 fasa, 6A/10A/16A, 6kA bh 35
6 MCB out 1 fasa, 6A, 4.5kA (for control) bh 0
7 Pilot Lamp LED AC 220 V (R,O,G) bh 0
8 Power Meter (kWh meter) bh 1
9 CT Measurement bh 1
10 Bus bar tembaga dan instalasi bh 1
11 Alat bantu, dan material lain ls 1
NO. URAIAN PEKERJAAN SATUAN VOLUME
TOTAL BIAYA
BAHAN
(1) (2) (3) (4) (9) = (4) x (6)

12 Pemasangan dan perkabelan ls 1


Jumlah
9 Panel PP/LP - C2 (Lantai 3)
1 Panel box (H) 800 x (W) 600 x (D) 300 mm bh 1
2 MCCB in 3 fasa, 100AF/100AT, 25kA bh 1
3 MCB out 3 fasa, 63A, 10kA bh 0
4 MCB out 3 fasa, 25A, 10kA bh 3
5 MCB out 1 fasa, 6A/10A/16A, 6kA bh 31
6 MCB out 1 fasa, 6A, 4.5kA (for control) bh 0
7 Pilot Lamp LED AC 220 V (R,O,G) bh 1
8 Power Meter (kWh meter) bh 1
9 Bus bar tembaga dan instalasi bh 1
S, Linearity/repeatability : ±1%, stainless steel sen 10 Alat bantu, dan material lain ls 1
11 Pemasangan dan perkabelan ls 1
Jumlah
10 Panel PP/LP - D (Lantai 1 FIRE STATION)
1 Panel box (H) 800 x (W) 600 x (D) 300 mm bh 1
2 MCCB in 3 fasa, 100AF/100AT, 25kA bh 1
3 MCB out 3 fasa, 63A, 10kA bh 0
4 MCB out 3 fasa, 25A, 10kA bh 2
5 MCB out 1 fasa, 6A/10A/16A, 6kA bh 18
6 MCB out 1 fasa, 6A, 4.5kA (for control) bh 0
7 Pilot Lamp LED AC 220 V (R,O,G) bh 1
8 Power Meter (kWh meter) bh 1
9 CT Measurement bh 1
10 Bus bar tembaga dan instalasi bh 1
11 Alat bantu, dan material lain ls 1
12 Pemasangan dan perkabelan ls 1

Jumlah
11 Panel PP/LP - E (Lantai 2 FIRE STATION)
1 Panel box (H) 800 x (W) 600 x (D) 300 mm bh 1
NO. URAIAN PEKERJAAN SATUAN VOLUME
TOTAL BIAYA
BAHAN
(1) (2) (3) (4) (9) = (4) x (6)

2 MCCB in 3 fasa, 100AF/100AT, 25kA bh 1


3 MCB out 3 fasa, 16A, 10kA bh 2
4 MCB out 3 fasa, 25A, 10kA bh 1
5 MCB out 1 fasa, 6A/10A/16A, 6kA bh 19
6 MCB out 1 fasa, 6A, 4.5kA (for control) bh 0

7 Pilot Lamp LED AC 220 V (R,O,G) bh 1


8 Power Meter (kWh meter) bh 1
9 CT Measurement bh 1
10 Bus bar tembaga dan instalasi bh 1
11 Alat bantu, dan material lain ls 1
12 Pemasangan dan perkabelan ls 1
Jumlah
12 Panel PP/LP - F (Lantai 3 FIRE STATION)
1 Panel box (H) 800 x (W) 600 x (D) 300 mm bh 1
2 MCCB in 3 fasa, 100AF/100AT, 25kA bh 1
3 MCB out 3 fasa,16A, 10kA bh 2
4 MCB out 3 fasa, 25A, 10kA bh 1
5 MCB out 1 fasa, 6A/10A/16A, 6kA bh 18
6 MCB out 1 fasa, 6A, 4.5kA (for control) bh 0
7 Pilot Lamp LED AC 220 V (R,O,G) bh 1
8 Power Meter (kWh meter) bh 1
9 CT Measurement bh 1
10 Bus bar tembaga dan instalasi bh 1
11 Alat bantu, dan material lain ls 1
12 Pemasangan dan perkabelan ls 1
Jumlah
NO. URAIAN PEKERJAAN SATUAN VOLUME
TOTAL BIAYA
BAHAN
(1) (2) (3) (4) (9) = (4) x (6)

13 Panel SDP-ACH (Chiller New HSSE)


1 Panel Listrik Freestanding 1.8mx0.8mx0.8m bh 1
2 MCCB in 3 fasa, 400AF/320AT, 36kA bh 0
3 MCB out 3 fasa, 250AF, 36kA bh 1
4 MCB out 3 fasa, 25A, 10kA bh 5
4 MCB out 3 fasa, 250A, 10kA bh 1
5 MCB out 1 fasa, 6A/10A/16A, 6kA bh 6
6 MCB out 1 fasa, 6A, 4.5kA (for control) bh 0
NO. URAIAN PEKERJAAN SATUAN VOLUME
TOTAL BIAYA
BAHAN
(1) (2) (3) (4) (9) = (4) x (6)

7 Pilot Lamp LED AC 220 V (R,O,G) bh 1


NO. URAIAN PEKERJAAN SATUAN VOLUME
TOTAL BIAYA
BAHAN
(1) (2) (3) (4) (9) = (4) x (6)

8 Power Meter (kWh meter) bh 1

9 CT Measurement bh 1

10 Bus bar tembaga dan instalasi bh 1


NO. URAIAN PEKERJAAN SATUAN VOLUME
TOTAL BIAYA
BAHAN
(1) (2) (3) (4) (9) = (4) x (6)

11 Alat bantu, dan material lain ls 1


12 Pemasangan dan perkabelan ls 1
14 Panel LP-OL (Penerangan Luar)
1 Panel box (H) 800 x (W) 600 x (D) 300 mm bh 1
2 MCCB in 3 fasa, 100AF/100AT, 25kA bh 0
3 MCB out 3 fasa, 63A, 10kA bh 0

4 MCB out 3 fasa, 25A, 10kA bh 1


5 MCB out 1 fasa, 6A/10A/16A, 6kA bh 9
6 MCB out 1 fasa, 6A, 4.5kA (for control) bh 0
NO. URAIAN PEKERJAAN SATUAN VOLUME
TOTAL BIAYA
BAHAN
(1) (2) (3) (4) (9) = (4) x (6)

7 Pilot Lamp LED AC 220 V (R,O,G) bh 1


8 Power Meter (kWh meter) bh 1
9 CT Measurement bh 1
10 Timer bh 1
11 Bus bar tembaga dan instalasi bh 1
12 Alat bantu, dan material lain ls 1
13 Pemasangan dan perkabelan ls 1
Jumlah
15 UPS dan Panel UPS
1 Panel box (H) 800 x (W) 600 x (D) 300 mm bh No Drwg
2 MCCB in 3 fasa, 100AF/100AT, 25kA bh No Drwg
3 MCB out 1 fasa, 6A/10A/16A, 6kA bh No Drwg
4 MCB out 1 fasa, 6A, 4.5kA (for control) bh No Drwg
5 Pilot Lamp LED AC 220 V (R,O,G) bh No Drwg
6 Batery UPS Kapasitas 10 kVA, Back up time 15 menit bh No Drwg
6 Inverter dan peralatan kontrol inlne bh No Drwg
7 Power Meter (kWh meter) bh No Drwg
8 Bus bar tembaga dan instalasi bh No Drwg
9 Alat bantu, dan material lain ls No Drwg
10 Pemasangan dan perkabelan ls No Drwg
Jumlah
C PEKERJAAN KABEL FEEDER DAN KABEL TRAY
Pengadaan dan pemasangan kabel fedeer dari LV-MDP ke :
1 PP/LP-A1- NYY 4 x 25 mm2 + NYA 16 mm2 m 60

2 PP/LP-A2 - NYY 4 x 25 mm2 + NYA 16 mm2 m 56

3 PP/LP-A3 - NYY 4 x 25 mm2 + NYA 16 mm2 m 44


4 PP/LP-B1 - NYY 4 x 25 mm2 + NYA 16 mm2 m 70
5 PP/LP-B2 - NYY 4 x 25 mm2 + NYA 16 mm2 m 66
6 PP/LP-B3 - NYY 4 x 25 mm2 + NYA 16 mm2 m 54
7 PP/LP-C1 - NYY 4 x 25 mm2 + NYA 16 mm2 m 80
8 PP/LP-C2 - NYY 4 x 25 mm2 + NYA 16 mm2 m 76
9 SDP-ACA - NYY 4 x 70 mm2 + NYA 35 mm2 m 100
10 LP-OL - NYY 4 x 25 mm2 + NYA 16 mm2 m 120
11 SDP-PARK - NYFGbY 4 x 120 mm2 m 150

12 SDP-FS - NYY 4 x 50 mm2 + NYA 25 mm2 m 180


Pengadaan dan pemasangan kabel fedeer dari SDP-FS ke :

13 PP/LP-D - NYY 4 x 25 mm2 + NYA 16 mm2 m 120

14 PP/LP-E - NYY 4 x 16 mm2 + NYA 10 mm2 m 140


15 PP/LP-F - NYY 4 x 16 mm2 + NYA 10 mm2 m 90
Pengadaan dan pemasangan kabel dari panel ke unit
16 Dari SDP-ACH ke Outdoor Unit AC 3 Ph, m 150
NYY 4 x 50 mm2+NYA 25mm2
Cable Tray
Pengadaan dan pemasangan Kabel Tray, hotdip galvanize, comlete with cover
Tidak termasuk cable tray electronic
Lantai 1 (DWG-A-EL-2-0002)
Cable tray 300x50 m 40
Cable tray 200x50 m 329
Cable tray fitting 300/200 ea 186
Lantai 2 (DWG-A-EL-2-0010)
Cable tray 300x50 m 64
Cable tray 200x50 m 124
Cable tray fitting 300/200 ea 95
Lantai 3 (DWG-A-EL-2-0011)
Cable tray 300x50 m 80
Cable tray 200x50 m 104
Cable tray fitting 300/200 ea 93

Lantai 1 Firestation (DWG-A-EL-2-0012)


Cable tray 300x50 m 32
Cable tray 200x50 m 87

Cable tray fitting 300/200 ea 61


Lantai 2 Firestation (DWG-A-EL-2-0013)
Cable tray 300x50 m 28

Cable tray fitting 300/200 ea 15


Lantai 3 Firestation (DWG-A-EL-2-0014)
Cable tray 300x50 m 24
Cable tray fitting 300/200 ea 13
Jumlah
D PEKERJAAN INSTALASI PENERANGAN DAN OUTLET DAYA
Lantai 1 (DWG-A-EL-2-0003,009)
1 Ceiling Recessed, Cover Mirror Louvre TL Type LED 2x22W/B40 bh 83
2 Lampu balk V-Shove TL LED 22W, Daylight bh 61
3 Wall Mounted GMS Type LED 1x22W/840. Cover Acrylic Sealer IP 54 bh 2
4 Ceiling Reccessed Cover Miror Louvre, TL LED 22W bh 8
5 Ceiling Recessed, Downlight LED 15W/840 Radius 150 mm bh 30
6 Ceiling Recessed, Downlight LED 7W/840 Radius 100 mm bh 14
7 Lampu High Bay Widebeam LED 80W bh 52
8 Lampu Baret Bulat LED 11 W bh 47
9 Exhaust 30W bh 0
10 Outlet Daya 1 Fasa, 10A Dinding dengan Child Protection bh 143
11 Outlet Daya 1 Fasa, 10A lantai Pada Box Outlet lantai bh 11
12 Saklar Tunggal bh 21
13 Saklar Double bh 32
14 Saklar Hotel bh 0
15 Lampu Emergency EXIT TL 10W Kapasitas Min 2 Jam untuk non mainte bh 2
16 Lampu dengan batery Emergensi, Kapasitas 2 Jam untuk Lampu TL 36 bh 2
Lantai 2 (DWG-A-EL-2-0004)
1 Ceiling Recessed, Cover Mirror Louvre TL Type LED 2x22W/B40 bh 42
2 Lampu balk V-Shove TL LED 22W, Daylight bh 42
NO. URAIAN PEKERJAAN SATUAN VOLUME
TOTAL BIAYA
BAHAN
(1) (2) (3) (4) (9) = (4) x (6)

3 Wall Mounted GMS Type LED 1x22W/840. Cover Acrylic Sealer IP 54 bh 4


4 Ceiling Reccessed Cover Miror Louvre, TL LED 22W bh 17
5 Ceiling Recessed, Downlight LED 15W/840 Radius 150 mm bh 41
6 Ceiling Recessed, Downlight LED 7W/840 Radius 100 mm bh 14
7 Lampu High Bay Widebeam LED 80W bh 5
8 Lampu Baret Bulat LED 11 W bh 0
9 Exhaust 30W bh 0
10 Outlet Daya 1 Fasa, 10A Dinding dengan Child Protection bh 41
11 Outlet Daya 1 Fasa, 10A lantai Pada Box Outlet lantai bh 30
12 Saklar Tunggal bh 20
13 Saklar Double bh 16
14 Saklar Hotel bh 2
NO. URAIAN PEKERJAAN SATUAN VOLUME
TOTAL BIAYA
BAHAN
(1) (2) (3) (4) (9) = (4) x (6)

15 Lampu Emergency EXIT TL 10W Kapasitas Min 2 Jam untuk non mainte bh 2
16 Lampu dengan batery Emergensi, Kapasitas 2 Jam untuk Lampu TL 36 bh 2
NO. URAIAN PEKERJAAN SATUAN VOLUME
TOTAL BIAYA
BAHAN
(1) (2) (3) (4) (9) = (4) x (6)

Lantai 3 (DWG-A-EL-2-0005,0010)
1 Ceiling Recessed, Cover Mirror Louvre TL Type LED 2x22W/B40 bh 79
2 Lampu balk V-Shove TL LED 22W, Daylight bh 1
3 Wall Mounted GMS Type LED 1x22W/840. Cover Acrylic Sealer IP 54 bh 1
4 Ceiling Reccessed Cover Miror Louvre, TL LED 22W bh 11
5 Ceiling Recessed, Downlight LED 15W/840 Radius 150 mm bh 72
6 Ceiling Recessed, Downlight LED 7W/840 Radius 100 mm bh 9
7 Lampu High Bay Widebeam LED 80W bh 0
8 Lampu Baret Bulat LED 11 W bh 0
9 Exhaust 30W bh 35
10 Outlet Daya 1 Fasa, 10A Dinding dengan Child Protection bh 60
11 Outlet Daya 1 Fasa, 10A lantai Pada Box Outlet lantai bh 55
12 Saklar Tunggal bh 20
13 Saklar Double bh 11
14 Saklar Hotel bh 0
15 Lampu Emergency EXIT TL 10W Kapasitas Min 2 Jam untuk non mainte bh 2
16 Lampu dengan batery Emergensi, Kapasitas 2 Jam untuk Lampu TL 36 bh 2
Lantai 1 Firestation (DWG-A-EL-2-0006)
1 Ceiling Recessed, Cover Mirror Louvre TL Type LED 2x22W/B40 bh 0
2 Lampu balk V-Shove TL LED 22W, Daylight bh 4
3 Wall Mounted GMS Type LED 1x22W/840. Cover Acrylic Sealer IP 54 bh 0
4 Ceiling Reccessed Cover Miror Louvre, TL LED 22W bh 0
5 Ceiling Recessed, Downlight LED 15W/840 Radius 150 mm bh 13
6 Ceiling Recessed, Downlight LED 7W/840 Radius 100 mm bh 0
7 Lampu High Bay Widebeam LED 80W bh 62
8 Lampu Baret Bulat LED 11 W bh 10
9 Exhaust 30W bh 0
10 Outlet Daya 1 Fasa, 10A Dinding dengan Child Protection bh 6
11 Outlet Daya 1 Fasa, 10A lantai Pada Box Outlet lantai bh 0
12 Saklar Tunggal bh 4
13 Saklar Double bh 19
14 Saklar Hotel bh 0
15 Lampu Emergency EXIT TL 10W Kapasitas Min 2 Jam untuk non mainte bh 2
16 Lampu dengan batery Emergensi, Kapasitas 2 Jam untuk Lampu TL 36 bh 2
Lantai 2 Firestation (DWG-A-EL-2-0007, 0013)
1 Ceiling Recessed, Cover Mirror Louvre TL Type LED 2x22W/B40 bh 10
2 Lampu balk V-Shove TL LED 22W, Daylight bh 0
3 Wall Mounted GMS Type LED 1x22W/840. Cover Acrylic Sealer IP 54 bh 0
4 Ceiling Reccessed Cover Miror Louvre, TL LED 22W bh 0
5 Ceiling Recessed, Downlight LED 15W/840 Radius 150 mm bh 12
6 Ceiling Recessed, Downlight LED 7W/840 Radius 100 mm bh 12
7 Lampu High Bay Widebeam LED 80W bh 0
8 Lampu Baret Bulat LED 11 W bh 0
9 Exhaust 30W bh 0
10 Outlet Daya 1 Fasa, 10A Dinding dengan Child Protection bh 11
11 Outlet Daya 1 Fasa, 10A lantai Pada Box Outlet lantai bh 5
12 Saklar Tunggal bh 2
13 Saklar Double bh 5
14 Saklar Hotel bh 0
15 Lampu Emergency EXIT TL 10W Kapasitas Min 2 Jam untuk non mainte bh 2
16 Lampu dengan batery Emergensi, Kapasitas 2 Jam untuk Lampu TL 36 bh 2
Lantai 3 Firestation (DWG-A-EL-2-0008,0014)
1 Ceiling Recessed, Cover Mirror Louvre TL Type LED 2x22W/B40 bh 16
2 Lampu balk V-Shove TL LED 22W, Daylight bh 0
3 Wall Mounted GMS Type LED 1x22W/840. Cover Acrylic Sealer IP 54 bh 0
4 Ceiling Reccessed Cover Miror Louvre, TL LED 22W bh 0
5 Ceiling Recessed, Downlight LED 15W/840 Radius 150 mm bh 4
6 Ceiling Recessed, Downlight LED 7W/840 Radius 100 mm bh 0
7 Lampu High Bay Widebeam LED 80W bh 0
8 Lampu Baret Bulat LED 11 W bh 0
9 Exhaust 30W bh 0
10 Outlet Daya 1 Fasa, 10A Dinding dengan Child Protection bh 8
11 Outlet Daya 1 Fasa, 10A lantai Pada Box Outlet lantai bh 0
12 Saklar Tunggal bh 0
13 Saklar Double bh 4
14 Saklar Hotel bh 0
15 Lampu Emergency EXIT TL 10W Kapasitas Min 2 Jam untuk non mainte bh 0
16 Lampu dengan batery Emergensi, Kapasitas 2 Jam untuk Lampu TL 36 bh 0
E PEKERJAAN PENANGKAL PETIR
1 Lightning Protection Radius proteksi min = 30 m, type unit 1
upper streamer leader, non radioactive
2 Air Termination tinggi 1 meter, tembaga bh 15
3 Kabel down conductor NYY 1 x 70 mm2, lengkap dengan klem, mtr 150
4 Ring Grounding system, BC 70mm2 mtr 578
5 Pertanahan 6m dan bak kontrol ls 10
6 Obstraction Lamp 100 Watt ls 1
F PEKERJAAN PHOTO VOLTAIC
1 Panel Photvoltaic 250 Wp, luas 1,6 m2 per panel unit 144
Efesiensi 16 %, Lengkap dudukan dan terminasi
2 Inverter 5.000 Watt Grid Tie, 3 fasa, lengkap kabel kontrol, unit 2
MCB pengaman
4 Perkabelan dari PV unit ke inverter m 300
Kabel NYY 3x6mm2
5 Panel Listrik, 10 MCB incoming dan 1 MCCB outgoing unit 3

Type outdoor lengkap dudukan.


6 Kabel daya NYY 4 x 240 mm2 dari Panel PLTS di atap m 25
LV-MDP di lantai dasar.
G PEKERJAAN GENERATOR SET
Harga satuan pekerjaan sudah termasuk pengadaan unit Genset diatas pondasi berikut setting dan level
hingga pekerjaan yang dinyatakan tercapai dengan baik.
Pekerjaan harus dilaksanakan sesuai gambar dan spesifikasi teknik
G1 PEKERJAAN PERSIAPAN
1 Alokasi biaya untuk penyediaan 1 set peralatan bengkel
(standart tool equipment) lot 1
2 Alokasi biaya untuk pelatihan staff tehnik pemilik lot 1
3 Akomodasi, mobilisasi, dan demobilisasi lot 1
4 Peralatan dan Perlengkapan Safety lot 1
Jumlah
G2 PERALATAN UTAMA
1 Diesel Generating Set Unit 1
Tegangan : 380 V / 220 V
Kecepatan Putaran : 1500 rpm (50Hz)
IP : 21
Insulation : Class H
Power Factor : 0.8
Kapasitas : 250 kVA (Prime)
Exciter
Voltage Regulator : With in 0.25% from no load to full load
2 PKG ( Panel Kontrol Genset ) Unit 1
L/D AMF & Synchonizing
- Start/ Stop
- On/ Off
- Synchronizing
- Load sharing
- Load Shading
3 Silent Package Unit 1
4 Pemipaan Knalpot Genset (Exhaust System) Black Steel dia. 10 " Pipe Unit 1
lengkap dengan jacketing (Rockwool dan aluminium sheet)
5 Exhaust Sound Attenuator m3
6 Exhaust Louvre m2
NO. URAIAN PEKERJAAN SATUAN VOLUME
TOTAL BIAYA
BAHAN
(1) (2) (3) (4) (9) = (4) x (6)

Jumlah
G3 INSTALASI RUANG GENERATOR SET
Pengadaan dan pemasangan instalasi ruang Generator Set sesuai dengan spesifikasi teknis dan gamb
1 Intake Sound Attenuator m3 24
2 Intake Louvre m3 12
3 Isolasi Rockwool density 80 Kg/m³,Thickness 50 mm lengkap dng rangka m 18
besi, glass clothes, kawat ayam, spindle pin 65 mm, dan kelengkapannya
4 Kabel Ladder
400 x 100 m 15
600 x 100 m 12
5 Kabel Kontrol dari PKG ke Genset, PUTR, PUTM lot 20
6 Grounding lengkap dg Steek Tembaga 1" 3 Bh dan Klem nya unit 1
Kabel Bc Ø 70 mm2
Jumlah
G4 INSTALASI PIPA BAHAN BAKAR (Sistem Otomatis)
Pengadaan dan pemasangan instalasi Pipa Bahan Bakar lengkap
dengan tanki, pompa, valve serta kelengkapan lainnya.
1 Daily Tank Kap. 400 liter lengkap dengan valve, pengontrol bahan bakar, unit 1
dudukan tanki serta kelengkapan lainnya.
2 Weekly Tank Kap. 5.000 liter lengkap dengan valve, pengontrol bahan unit 1
bakar, dudukan tanki serta kelengkapan lainnya.
3 Pipa Bahan Bakar Black steel Pipe,ASTM A53,SCH 40 lengkap dengan lot 1
Valve, fitting dan accessories lainnya.
Pipa Solar dari Weekly Tank ke Daily Tank R. Genset
4 Pipa Bahan Bakar Black steel Pipe,ASTM A53,SCH 40 lengkap dengan lot 1
Valve, fitting dan accessories lainnya.
Pipa supply Solar dari Daily tank ke Genset
5 Pipa Bahan Bakar Black steel Pipe,ASTM A53,SCH 40 lengkap dengan lot 1
Valve, fitting dan accessories lainnya.
- Pipa Return Solar dari Pompa Solar
6 Pompa Bahan Bakar (fuel Pump) set 1
Type : Gear Pump
Kapasit : 50 lpm ; 20 M 2,2 KW
Operasi: -
1 Set : 2 Unit
7 Pompa Solar Portable set 1
8 Kabel Power & Kabel Kontrol Pompa Bahan Bakar lot 1
9 Meteran solar untuk pengisian bahan bakar + kalibrasi metrologi bh 1
10 Pengisian Ulang Bahan Bakar setelah Testing commisioning TOTAL SUB PEKERJAAN
lot ELEKTRIKAL
1
( 5400 Liter)
Jumlah CHECK

H PEKERJAAN INSTALASI PENERANGAN UNTUK KEBUTUHAN LANSKAP


Pekerjaan penerangan untuk kebutuhan lanskap meliputi instalasi
penerangan untuk Outdoor Lighting (lampu jalan, lampu taman & lampu sorot),
fikasi , pada penempatan tertentu mempergunakadan Exterior Building (lampu downlight, uplight, dan LED strip light)

H1 INSTALASI PENERANGAN OUTDOOR (LAMPU JALAN)


Lampu jalan HPLN 125W unit 6
Saklar otomatis lampu jalan unit 1
Tiang lampu 9m unit 6
Titik instalasi penerangan, NYM 3 x 2,5 mm2 dalam konduit titik 6

H2 INSTALASI PENERANGAN OUTDOOR (LAMPU TAMAN)


Lampu Taman Big Cessna unit 4
Saklar otomatis lampu jalan unit 1
Tiang Lampu 2.5m unit 4
Titik instalasi penerangan, NYM 3 x 2,5 mm2 dalam konduit titik 4

H3 INSTALASI PENERANGAN EXTERIOR


Lampu Down Light 18W unit 2
Lampu Up Light 18W unit 2
LED Strip Light Merah meter 1
LED Strip Light Kuning meter 1
Titik instalasi penerangan, NYM 3 x 2,5 mm2 dalam konduit titik 4

H4 INSTALASI PENERANGAN OUTDOOR (LAMPU UPLIGHT)


Lampu Sorot ARC HPLN 125 Watt bh 12
Saklar otomatis bh 1
Titik instalasi penerangan, NYM 3 x 2,5 mm2 dalam konduit titik 12

H5 INSTALASI PENERANGAN POS JAGA


Ceiling Reccessed Cover Miror Louvre, TL LED 2x22W bh 4
Lampu Up Light 18W bh 4
LED Strip Light Merah m 2
Saklar tunggal, inc instalasi bh 2
Saklar double, inc instalasi bh 4
Instalasi stop kontak bh 4
Titik instalasi penerangan, NYM 3 x 2,5 mm2 dalam konduit titik 16
Jumlah

I TESTING DAN COMMISSIONING


1 Alokasi biaya untuk testing commissioning pemasangan & pengoperasian lot 1
pekerjaan yang lengkap dan sesuai termasuk penyediaan semua alat,
material dan tenaga kerja yang diperlukan
2 Factory Acceptence Test lot 1
3 Alokasi biaya untuk penyediaan buku panduan operasi dan perawatan lot 1
termasuk petunjuk mengatasi kerusakan, lengkap dng brosur - brosur,
TOTAL SUB PEKERJAAN ELECTRICAL
PEKERJAAAN PEMBANGUNAN GEDUNG NEW HSSE DAN FIRE STATION
PERTAMINA RU-V BALIKPAPAN
SUB PEKERJAAN : MEKANIKAL & PLUMBING

NO. URAIAN PEKERJAAN SATUAN


VOLUME
(1) (2) (3)
(4)
A PEKERJAAN AIR CONDITIONING
Penyediaan dan pemasangan unit Chiller dengan Instalasi ducting &
1 pengkabelanya bracket lengkap dengan drain pan tambahan , accessories dan
PERALATAN UTAMA
semua material bantu yang diperlukan sesuai dengan spesifikasi teknik serta
a petunjuk
Chiller pabrik. 3 unit lot
3.00
Model Water Screw Chiller
Type TRANE
No. of unit 1 s/d 2 (2 Run, 1 Standby)

Cooling Capacity 80 TR (280kW) untuk 1 unit Chiller ( 3 x 80 TR)


Refrigerant R134a
Lengkap dengan vibration mounting, pengadaan dan pemasangan konekting, material bantu dan accessories pendukung lainnya.
b Squence control Lot 3.00
c Kabel-kabel kontrol dan power dari squence control ke Chiller Lot 3.00
d Pemasangan, Setting & levelling unit Chiller diatas pondasi (3 unit) Lot 3.00
e Pompa (PCP) 3 unit Lot 3.00
Model
Tipe Single Stage In-Line Pump
No. of Unit 1 s/d 2 (2 Run, 1 Standby)
Capacity 400 GPM
Head 15 m
Rated Power 7,5 kW
Accessories
1 Flexible Connection : 6" ( 1 bh) Lot 1.00
Model
Type : Flange dari Malleable Iron
Beloww dari Reinforced Synthetice Rubber
Tekanan Kerja : 150 Psi
Brand :
2 Pressure Gauge ( 1 bh) Lot 1.00
Model
Capacity : 10 Kg/cm
Diameter : 5"
Accuracy Range : 1%
Brand
Dilengkapi dengan Snubber dan Shut Off Cock
3 Strainer with 16-20 mesh screen: 6" ( 1 bh) Lot 1.00
Model
Type : Cast Iron Body, And Flanged
Stainless Steel Screen, Flanged Cap,
Lengkap dengan Blow Off Plug
Tekanan Kerja : 150 Psi
Brand :
4 Gate Valve : 6" ( 1 bh) Lot 1.00
Model :
Type : Butterfly Valve Cast Iron Type
End Flanger Gear Rod Manual
Tekanan Kerja : 150 Psi
Brand
Setiap Gate Valve harus dilengkapi dengan alve Indicator
5 Flow Switch ( 1 bh) Lot 1.00
Model
Type
Temperature : 200 F
Tekanan Kerja : 400 Psi (Max)
Flow Range : 1-3 Fps
Brand
Microprocessor control monitor,display flow rate/total highly accuracy : ±1.5º/FS, Linearity/repeatability : ±1%, stainless steel sensor
6 Check Valve : 6" ( 1 bh) Lot 1.00
Model
Type : Check Valve Cast Iron Body Type
End Flanged
Tekanan Kerja : 150 Psi
Brand
Lengkap dengan base plate, panel kontrol, kabel kontrol, mounting/isolator type, dan assesoris lainnya sesuai spesifikasi teknis dan gambar.
f. Pompa (SCP) 3 unit Lot 3.00
Model
Tipe Single Stage In-Line Pump
No. of Unit 1 s/d 3 (3 Run, 0 Standby)
Capacity 400 GPM
Head 30 m
Rated Power 15 kW
Accessories
1 Flexible Connection : 6" (1 bh) Lot 1.00
Model
Type : Flange dari Malleable Iron
Beloww dari Reinforced Synthetice Rubber
Tekanan Kerja : 150 Psi
Brand :
2 Pressure Gauge (1 bh) Lot 1.00
Model
Capacity : 10 Kg/cm
Diameter : 5"
Accuracy Range : 1%
Brand
Dilengkapi dengan Snubber dan Shut Off Cock
3 Strainer : 6" (1 bh) Lot 1.00
Model
Type : Cast Iron Body, And Flanged
Stainless Steel Screen, Flanged Cap,
Lengkap dengan Blow Off Plug
Tekanan Kerja : 150 Psi
Brand :
NO. URAIAN PEKERJAAN SATUAN
VOLUME
(1) (2) (3)
(4)
4 Gate Valve : 6" (1 bh) Lot 1.00
Model :
Type : Butterfly Valve Cast Iron Type
End Flanger Gear Rod Manual
Tekanan Kerja : 150 Psi
Brand
Setiap Gate Valve harus dilengkapi dengan valve Indicator
5 Flow Switch (1 bh) Lot 1.00
Model
Type
Temperature : 200 F
Tekanan Kerja : 400 Psi (Max)
NO. URAIAN PEKERJAAN SATUAN
VOLUME
(1) (2) (3)
(4)
Flow Range : 1-3 Fps
Brand
Microprocessor control monitor,display flow rate/total highly accuracy : ±1.5º/FS, Linearity/repeatability : ±1%, stainless steel sensor
NO. URAIAN PEKERJAAN SATUAN
VOLUME
(1) (2) (3)
(4)
6 Check Valve : 6" (1 bh) Lot 1.00
Model
Type : Check Valve Cast Iron Body Type
End Flanged
Tekanan Kerja : 150 Psi
Brand
Lengkap dengan base plate, panel kontrol, kabel kontrol, mounting/isolator type, dan assesoris lainnya sesuai spesifikasi teknis dan gambar.
g. Pump Dry Cooler CT (PDCU) Lot 1.00
Model
Tipe Single Stage In-Line Pump
No. of Unit 1 s/d 3 (3 Run, 0 Standby) (3 Unit)
Capacity 450 GPM
Head 22 m
Rated Power 11 kW
Accessories
1 Flexible Connection : 6" (1 bh) Lot 1.00
Model
Type : Flange dari Malleable Iron
Beloww dari Reinforced Synthetice Rubber
Tekanan Kerja : 150 Psi
Brand :
2 Pressure Gauge (1 bh) Lot 1.00
Model
Capacity : 10 Kg/cm
Diameter : 5"
Accuracy Range : 1%
Brand
Dilengkapi dengan Snubber dan Shut Off Cock
3 Strainer : 6" (1 bh) Lot 1.00
Model
Type : Cast Iron Body, And Flanged
Stainless Steel Screen, Flanged Cap,
Lengkap dengan Blow Off Plug
Tekanan Kerja : 150 Psi
Brand :
4 Gate Valve : 6" (1 bh) Lot 1.00
Model :
NO. URAIAN PEKERJAAN SATUAN
VOLUME
(1) (2) (3)
(4)
Type : Butterfly Valve Cast Iron Type
End Flanger Gear Rod Manual
Tekanan Kerja : 150 Psi
Brand
Setiap Gate Valve harus dilengkapi dengan alve Indicator
5 Flow Switch (1 bh) Lot 1.00
Model
Type
Temperature : 200 F
Tekanan Kerja : 400 Psi (Max)
Flow Range : 1-3 Fps
Brand
Microprocessor control monitor,display flow rate/total highly accuracy : ±1.5º/FS, Linearity/repeatability : ±1%, stainless steel sen
6 Check Valve : 6" (1 bh) Lot 1.00
Model
Type : Check Valve Cast Iron Body Type
End Flanged
Tekanan Kerja : 150 Psi
Brand
Lengkap dengan base plate, panel kontrol, kabel kontrol, mounting/isolator type, dan assesoris lainnya sesuai spesifikasi teknis dan gambar.
h. Air Cooled-Dry Cooling Tower Lot 1.00
Model
Tipe Square Cross Up Air Flow
No. of Unit 1 s/d 2 (2 Run) (2 unit)
Capacity 175 TR
Ambient Temp. 35o CDB / 30o CWB
Water Flow 480 GPM
Material
Casing Mild Steel
Coil Cooper Alloy
Lengkap dengan base plate, panel kontrol, kabel kontrol, mounting/isolator type, dan assesoris lainnya sesuai spesifikasi teknis dan gambar.
i. Fan Coil Unit
NO. URAIAN PEKERJAAN SATUAN
VOLUME
(1) (2) (3)
(4)
Lengkap dengan spring mounting, thermostat + kabel kontrol, drain pan, filter udara, hanger dan asesoris lainnya
Lantai 1
Type HWP 290 CKTD (4 unit) Lot 4.00
Capacity 8 TR
Gate Valve dia 1 ¼" (2 bh)

2-Way Valve dia 1 ¼" (1 bh)


Strainer (1 bh)
Thermo Well (1 bh)
Pressure Gauge (1 bh)

Ducting Supply
2250 cfm 24"x16" m 700.00
1500 cfm 18"x16" m 700.00
750 cfm 14"x12" m 700.00
375 cfm 10"x10" m 700.00
Diffuser Unit 4.00

Ducting Return
24"x16" m 700.00
18"x16" m 700.00
14"x12" m 700.00
10"x10" m 700.00
Diffuser Unit 4.00
Fresh Air Duct
10"x10" m
Diffuser Unit
NO. URAIAN PEKERJAAN SATUAN
VOLUME
(1) (2) (3)
(4)
Lantai 2
Type HWP 370 CKTD (5 unit) Lot
5.00
Capacity 10 TR
Gate Valve dia 1 ¼" (2 bh)
2-Way Valve dia 1 ¼" (1 bh)
Strainer (1 bh)
Thermo Well (1 bh)
Pressure Gauge (1 bh)
NO. URAIAN PEKERJAAN SATUAN
VOLUME
(1) (2) (3)
(4)
Ducting Supply
NO. URAIAN PEKERJAAN SATUAN
VOLUME
(1) (2) (3)
(4)
2250 cfm 24"x16" m
850.00
1500 cfm 18"x16" m
850.00
750 cfm 14"x12" m 850.00
NO. URAIAN PEKERJAAN SATUAN
VOLUME
(1) (2) (3)
(4)
375 cfm 10"x10" m 850.00
Diffuser Unit
5.00
Ducting Return
24"x16" m 850.00
18"x16" m 850.00
14"x12" m
850.00
10"x10" m 850.00
Diffuser Unit 5.00
Fresh Air Duct
NO. URAIAN PEKERJAAN SATUAN
VOLUME
(1) (2) (3)
(4)
10"x10" m 650.00
Diffuser Unit 3.00
Type HWP 290 CKTD (3 unit) Lot 3.00
Capacity 8 TR
Gate Valve dia 1 ¼" (2 bh)
2-Way Valve dia 1 ¼" (1 bh)
Strainer (1 bh)
Thermo Well (1 bh)
Pressure Gauge (1 bh)
Ducting Supply
2250 cfm 24"x16" m 850.00
1500 cfm 18"x16" m 850.00
750 cfm 14"x12" m 850.00
375 cfm 10"x10" m 850.00
Diffuser Unit 3.00
Ducting Return
24"x16" m 850.00
18"x16" m 850.00
14"x12" m 850.00
10"x10" m 850.00
Diffuser Unit 3.00
Fresh Air Duct
10"x10" m 850.00
Diffuser Unit

3.00
Lantai 3

Type HWP 370 CKTD (4 unit) Lot 4.00


Capacity 10 TR
Gate Valve dia 1 ¼" (2 bh)
2-Way Valve dia 1 ¼" (1 bh)
Strainer (1 bh)
Thermo Well (1 bh)
Pressure Gauge (1 bh)
Ducting Supply
2250 cfm 24"x16" m
850.00
1500 cfm 18"x16" m 850.00
750 cfm 14"x12" m
850.00
375 cfm 10"x10" m
850.00
Diffuser Unit 4.00
Ducting Return
24"x16" m 850.00
18"x16" m 850.00
14"x12" m 850.00
10"x10" m 850.00
Diffuser Unit 4.00
Fresh Air Duct
10"x10" m 850.00
Diffuser Unit 4.00
Lantai 4
Type HWP 290 CKTD ( 5 unit) Lot 5.00
Capacity 8 TR
Gate Valve dia 1 ¼" (2 bh)
2-Way Valve dia 1 ¼" (1 bh)
Strainer (1 bh)
Thermo Well (1 bh)
Pressure Gauge (1 bh)
Ducting Supply
2250 cfm 24"x16" m 650.00
1500 cfm 18"x16" m 650.00
750 cfm 14"x12" m 650.00
375 cfm 10"x10" m 650.00
Diffuser Unit

5.00
Ducting Return
24"x16" m 650.00
18"x16" m

650.00
14"x12" m 650.00
10"x10" m 650.00
Diffuser Unit 5.00
Fresh Air Duct
10"x10" m 650.00
j. Fan
Lantai 1
Exhaust Air Fan ( 3 unit)
Type : Low Noise Cabinet Lot 3.00
Model : Wall Mounted
Aliran Udara : 500 CFM
Daya : 45-55
Lantai 2 1 Unit
Type : Low Noise Cabinet Lot 1.00
Model : Wall Mounted
Aliran Udara : 500 CFM
Daya : 45-55
Voltage : 220V/50Hz
Lantai 3 1 Unit
Type : Low Noise Cabinet Lot 1.00
Model : Wall Mounted
Aliran Udara : 500 CFM
Daya : 45-55
a. Pemipaan
a.a Pipa untuk Chiller
- Type : Galvanis Medium Class (BS 1387)
NO. URAIAN PEKERJAAN SATUAN
VOLUME
(1) (2) (3)
(4)
10 TR 1 1/4" m 450.00
8 TR 1 1/2" m 450.00
6 TR 1 1/4" m 450.00
- Header (8) m 450.00
- Header (6) m 450.00
Header dibutuhkan 2 Bh dengan panjang sama
a.b. Pipa untuk Condensor
- Type : Galvanis Medium Class (BS 1387)
- 8" m 450.00
- Header (8) m 450.00
- Header (6) m 450.00
- Header dibutuhkan 2 Bh dengan panjang sama
NO. URAIAN PEKERJAAN SATUAN
VOLUME
(1) (2) (3)
(4)
3 VALVE & ACCESSORIES
a. Chiller
NO. URAIAN PEKERJAAN SATUAN
VOLUME
(1) (2) (3)
(4)
a.a. Flexible Connection 6" (2 bh) Lot 2.00
Model
Type : Flange dari Malleable Iron
Beloow dari Reinforced Synthetice Rubber
Tekanan Kerja : 150 Psi
Brand :
a.b. Flexible Connection 8" (2 bh) Lot 2.00
Model
Type : Flange dari Malleable Iron
Beloow dari Reinforced Synthetice Rubber
Tekanan Kerja : 150 Psi
Brand :
a.c. Pressure Gauge (4 bh) Lot 4.00
Model :
Capacity : 10 Kg/cm
Diameter : 5"
Accuracy Range : 1%
Brand :
Dilengkapi dengan Snubber dan Shut Off Cock
a.d. Gate Valve 6" (2 bh) Lot 2.00
Model
Type : Butterfly Valve Cast Iron Type
End Flanger Gear Rod Manual
Tekanan Kerja : 150 Psi
Brand :
Setiap Gate Valve harus dilengkapi dengan alve Indicator
a.e. Gate Valve 8" (2 bh) Lot 2.00
Model
Type : Butterfly Valve Cast Iron Type
End Flanger Gear Rod Manual
Tekanan Kerja : 150 Psi
Brand
Setiap Gate Valve harus dilengkapi dengan alve Indicator
b. Air Cooled-Dry Cooling Tower
b.a. Flexible Connection 8" (2 bh) Lot 2.00
Model
Type : Flange dari Malleable Iron
Beloow dari Reinforced Synthetice Rubber
Tekanan Kerja : 150 Psi
Brand
b.b. Gate Valve 8" (2 bh) Lot 2.00
Model
Type : Flange dari Malleable Iron
Beloow dari Reinforced Synthetice Rubber
Tekanan Kerja : 150 Psi
Brand
Setiap Gate Valve harus dilengkapi dengan alve Indicator
b.c. Flow Switch (3 bh) Lot 3.00
Model
Type
Temperature : 200 oF
Tekanan Kerja : 400 Psi (Max)
Flow Range : 1-3 Fps
Brand
Microprocessor control monitor,display flow
rate/total highly accuracy : ±1.5º/FS,
Linearity/repeatability : ±1%, stainless steel sensor
c. Pompa Chiller
c.a Flexible Connection 6" (6 bh) Lot 6.00
Model
Type : Flange dari Malleable Iron
Beloow dari Reinforced Synthetice Rubber
Tekanan Kerja : 150 Psi
Brand
c.b. Pressure Gauge (6 bh) Lot 6.00
Model
Capacity : 10 Kg/cm
Diameter : 5"
Accuracy Range : 1%
Brand
Dilengkapi dengan Snubber dan Shut Off Cock
c.c. Strainer 6" (3 bh) Lot 3.00
Model
Type : Cast Iron Body, And Flanged
Stainless Steel Screen, Flanged Cap,
Lengkap dengan Blow Off Plug
Tekanan Kerja : 150 Psi
Brand
c.d. Gate Valve 6" (6 bh) Lot 6.00
Model
Type : Butterfly Valve Cast Iron Type
End Flanger Gear Rod Manual
Tekanan Kerja : 150 Psi
Brand
Setiap Gate Valve harus dilengkapi dengan Valve
Indicator
c.e. Flow Switch (3 bh) Lot 3.00
Model
Type
Temperature : 200 oF
Tekanan Kerja : 400 Psi (Max)
Flow Range : 1-3 Fps
Brand
Microprocessor control monitor,display flow
rate/total highly accuracy : ±1.5º/FS,
Linearity/repeatability : ±1%, stainless steel sensor
c.f. Check Valve 6" (3 bh) Lot 3.00
Model
Type : Check Valve Cast Iron Body Type
End Flanged
Tekanan Kerja : 150 Psi
Brand
d. Pompa Cooling Tower
d.a. Flexible Connection 8" (6 bh) Lot 6.00
Model
Type : Flange dari Malleable Iron
Beloow dari Reinforced Synthetice Rubber
Tekanan Kerja : 150 Psi
Brand
d.b. Gate Valve 6" (6 bh) Lot 6.00
Model
Type : Butterfly Valve Cast Iron Type
End Flanger Gear Rod Manual
Tekanan Kerja : 150 Psi
Brand
Setiap Gate Valve harus dilengkapi dengan alve Indicator
d.c. Strainer 6" (3 bh) Lot 3.00
Model
Type : Cast Iron Body, And Flanged
Stainless Steel Screen, Flanged Cap,
Lengkap dengan Blow Off Plug
Tekanan Kerja : 150 Psi
Brand
NO. URAIAN PEKERJAAN SATUAN
VOLUME
(1) (2) (3)
(4)
4 EXPANTION TANK & ACCESSORIES
a. Make-Up Water Tank
Model Lot 1.00
Kapasitas : 6,5 m3
Type
Lengkap tangga, baseplate, manhole, inlet-outlet,
venting, level swicth+kabel, level indicator dan
asesoris lainnya.
b. Automatic Air Vent
Model Lot 1.00
Brand
Matrial
Body : Cast Iron, Float Valve dari Stainless Steel
Valve Mounting : Synthetic Rubber
Automatic Air Vent harus dipasang lengkap dengan drain
B PEKERJAAN PLUMBING (AIR BERSIH)
Pengadaan dan pemasangan pipa PPR PN 10 (Distribusi Horisontal), sesuai spesifikasi, pada penempatan tertentu mempergunakan sambungan solven
1 PERALATAN UTAMA
Pipa Air Bersih
Lantai 1
Pipa PPR PN 10
- dia 40 mm m 550.00
- dia 25 mm m 550.00
- dia 20 mm m 550.00
- dia 15 mm m 550.00
Lantai2
Pipa PPR PN 10
- dia 40 mm m 400.00
- dia 25 mm m 400.00
- dia 20 mm m 400.00
- dia 15 mm m 400.00
Lantai3
Pipa PPR PN 10
- dia 40 mm m 400.00
- dia 25 mm m 400.00
- dia 20 mm m 400.00
- dia 15 mm m 400.00

Package Bosting Pump (3 unit) lot 3.00


Kapasitas 50 GPM
Head 28 m
Speed 2900 RPM
Power 1,5 kW
Operation Alternate, Sequence
2 operation
1 standby
C PEKERJAAN PLUMBING (AIR KOTOR)
Pengadaan dan pemasangan Pipa Air Kotor dan Air Buangan (pipa PVC klass 10 kg/cm²) , sesuai dengan spesifikasi , pada penempatan tertentu mempergunaka
1 PERALATAN UTAMA
Pipa Air Kotor
Lantai1
PVC Klass 10 kg/cm2
- dia 100 mm m 450.00
Lantai2
PVC Klass 10 kg/cm2
- dia 100 mm m 450.00
Lantai3
PVC Klass 10 kg/cm2
- dia 100 mm m 450.00
D PEKERJAAN PLUMBING (AIR BEKAS)
Lantai1
PVC Klass 10 kg/cm2
- dia 75 mm m 375.00
- dia 50 mm m 375.00
- dia 40 mm m 375.00
Lantai2
PVC Klass 10 kg/cm2
- dia 75 mm m 375.00
- dia 50 mm m 375.00
- dia 40 mm m 375.00
Lantai3
PVC Klass 10 kg/cm2
- dia 75 mm m 375.00
- dia 50 mm m 375.00
- dia 40 mm m 375.00
POMPA AIR PEMBILAS
Package Bosting Pump 3 unit lot 3.00
Kapasitas 50 GPM
Head 28 m
Speed 2900 RPM
Power 1,1 kW
Operation Alternate, Sequence
2 operation
1 standby
E PEKERJAAN LANSKAP
instalasi pipa pos jaga (security) (PVC) 15 mm, air bersih m 300.00
instalasi pipa pos jaga (security) (PVC) 40 mm, air kotor m 300.00

TOTAL SUB PEKERJAAN MEKANIKAL & PLUMBING


PEKERJAAAN PEMBANGUNAN GEDUNG NEW HSSE DAN FIRE STATION
PERTAMINA RU-V BALIKPAPAN
SUB PEKERJAAN : INTERIOR

NO. URAIAN PEKERJAAN SATUAN


VOL
(1) (2) (3) (4)
I PEKERJAAN GEDUNG NEW HSSE OFFICE
LANTAI 1
A PEKERJAAN DINDING & FINISHING DINDING
D1 Dinding interior bata /aac plester aci-halus , fin acrylic wall paint warna broken m2
white D1
1,987.20
D2 Dinding interior bata /aac plester aci-halus , fin vinyl wall covering m2 492.80
D3 Dinding partisi gypsum rangka hollow 40x40 fin. Acrylic wall paint , warna broken m2 140.80
white
D5 partisi kaca framless tempered 12mm penuh dari lantai sampai plafond, U channel m2 6.40
ukuran 20x20m tebal 2mm anodized +sealant
D6 Dinding interior fin. Homogenous tile 600x600 cm dengan ketinggian 2 m dari m2 160.00
lantai. Diatas 2.00m fin acrylic wall paint
D8 Dinding kaca tempered 5mm frame alumulian fin powder coating detail lihat m2 87.68
arsitektur
D10 Kolom dengan treatment khusus furniture melekat m2 32.00
D11 Treatment khusus: backdrop ruang rapat m2 1.00
B PEKERJAAN FINISHING LANTAI
Tipe 1 Concrete floor, finish floor hardener trowel, coating epoxy, plint acrylic wall point t m2 1,360.00
= 15 cm
Tipe 2 Homogenous tile anti slip 600x600 unpolished, plint dari material serupa t=10 cm m2 724.00
Tipe 3 Homogenous tile anti slip 600x600 industrial collection plinth dari material serupa m2 34.00
t=10 cm
Tipe 4 Keramik 300x300 unpolished anti slip untuk anak tangga dilengkapi step nosing m2 13.00
C PEKERJAAN PLAFOND
Tipe C0 Bare concrete fin acrylic wall paint m2 1,360.00
Tipe C1 Plafond Gypsum board+GRC rangka metal furing . Fin acrylic ceiling point m2 498.00
C2 Plafond Gypsum rangka metal furing dengan variasi estesis. Fin acrylic ceiling paint m2 226.00
D PEKERJAAN PINTU & JENDELA
Pekerjaan Pintu
P2 Pintu interior ganda, rangka alumunium fin MDF dengan kaca intip unit 6.00
P3 Pintu interior rangka Alumunium fin MDF tanpa lubang intip unit 4.00
P3J Pintu interior rangka Alumunium fin MDF dengan Jendela unit 12.00
P4 Pintu toilet dan area basah rangka alumunium lapis HPL lengkap dengan engsel dan unit 1.00
pengunci
P5 Pintu toilet difabel unit 2.00
P7 Pintu ruang utilitas - tahan api unit 1.00
Pekerjaan Jendela
Tipe J1 Jendela kaca tunggal tempered 5 mm. kusen alum 4" fin. Powder Coating unit 1.00
Tipe J2 Jendela kaca tempered 5mm, kusen alum. 4" fin powder coating unit 5.00
Tipe J4 Jendela 4 kaca tempered 5mm, kusen alum fin powder coating unit 1.00
E PEKERJAAN SANITAIR
1 Pas. Closet duduk tipe CW660J/SW660J (putih) unit 2.00
2 Pas. Jet washer, Min Water Pressure: 0.05 MPa unit 2.00
Max Water Pressure: 0.4 MPa
3 Pas. Wastafel
Flow LWLpm
Rate: 4.0 523 J (WHITE)+ kran type TX 116 LESD, wastafel top counter unit 3.00
include faucet, komplit dengan fitting
4 Top table marmer t=mm type Servigiante, berikut rangka siku unit 2.00
5 Pas. Urinoir tipe Moslem type termasuk aksesoris, unit 2.00
6 Pas. Sekat urinoir, keramik unit 2.00
7 Pas. Floordrain tipe TX1BN, ex. Toto unit 5.00
8 Pemasangan Kaca cermin 5mm unit 2.00
9 Pemasangan sink tap (janitor) unit 1.00
10 Area wudhu unit 3.00
F PEKERJAAN FURNITUR
Pekerjaan Furniture Melekat
1 Pekerjaan Backdrop unit 1.00
2 Pekerjaan Pembungkus Kolom unit 32.00
Pekerjaan Furniture Lepas/ Pabrikan
1 Meja rapat modulor: 'Dynamic Conference' flip table type B with modesty unit 23.00
perforated 1200(w)x600(d)x730(h) ex Primaloka
2 Kursi rapat: - midback, fiberflex seat & back plates ex. Primaloka (FL-KR-01) puskodal unit 46.00
G PEKERJAAN LAMPU, TITIK OUTLET, STOP KONTAK & SAKLAR
1 Pasang Lampu RM-300-M5 buah -
2 Pasang Lampu RD 150 Kaca buah -
3 Pasang Lampu RD 150 E27 buah -
4 Pasang saklar tunggal buah -
5 Pasang saklar ganda buah -
6 Pasang stop kontak buah -
LANTAI 2
A PEKERJAAN DINDING & FINISHING DINDING
D1 Dinding interior bata /aac plester aci-halus , fin acrylic wall paint warna broken white m2 1,004.80
D2 Dinding interior bata /aac plester aci-halus , fin vinyl wall covering m2 1,062.40
D4 Dinding partisi gypsum rangka hollow 40x40 fin. fin vinyl wall covering m2 9.60
D5 partisi kaca framless tempered 12mm penuh dari lantai sampai plafond, U channel m2 214.40
ukuran 20x20m tebal 2mm anodized +sealant
D6 Dinding interior fin. Homogenous tile 600x600 cm dengan ketinggian 2 m dari m2 112.00
lantai. Diatas 2.00m fin acrylic wall paint
D7 Dinding parapet t =100cm railing solid wood t=1cm m2 83.20
D8 Dinding kaca tempered 5mm frame alumulian fin powder coating detail lihat m2 50.00
arsitektur
D10 Kolom dengan treatment khusus furniture melekat m2 72.00

B PEKERJAAN FINISHING LANTAI


Tipe 1 Concrete floor, finish floor hardener trowel, coating epoxy, plint acrylic wall point t m2 202.00
= 15 cm
Tipe 2 Homogenous tile anti slip 600x600 unpolished, plint dari material serupa t=10 cm m2 286.00
Tipe 3 Homogenous tile anti slip 600x600 industrial collection plinth dari material serupa m2 607.50
t=10 cm
Tipe 4 Keramik 300x300 unpolished anti slip untuk anak tangga dilengkapi step nosing m2 103.00
Tipe 5 Homogenous tile 600x600 tipe eksklusif plinth dari material yang sama t=10 cm m2 6.00

C PEKERJAAN PLAFOND
Tipe C0 Bare concrete fin acrylic wall paint m2 690.00
Tipe C1 Plafond Gypsum board+GRC rangka metal furing . Fin acrylic ceiling point m2 751.50
C2 Plafond Gypsum rangka metal furing dengan variasi estesis. Fin acrylic ceiling paint m2 280.00
D PEKERJAAN PINTU & JENDELA
Pekerjaan Pintu
P1 Pintu Interior, rangka alumunium fin MDF dengan kaca intip unit 4.00
P2 Pintu interior ganda, rangka alumunium fin MDF dengan kaca intip unit 2.00
P4 Pintu toilet dan area basah rangka alumunium lapis HPL lengkap dengan engsel dan unit 1.00
pengunci
P6 Pintu kaca frameless dengan engsel pivot unit 17.00
P7 Pintu ruang utilitas - tahan api unit 1.00
P8 Pintu Shaft unit 2.00
P9 Pintu gudang ganda, rangka alumunium fin. MDF tanpa lubang intip unit 1.00
Pekerjaan jendela
J2 Jendela kaca tempered 5mm, kusen alum. 4" fin powder coating unit 3.00
E PEKERJAAN SANITAIR
NO. URAIAN PEKERJAAN SATUAN
VOL
(1) (2) (3) (4)
1 Pas. Closet duduk (putih), unit 3.00
2 Pas. Jet washer, Min Water Pressure: 0.05 MPa unit 3.00
Max Water Pressure: 0.4 MPa
3 Pas. Wastafel
Flow 'single
Rate: 4.0 Lpmbowl, top counter' putih, (T: 160 mm, Diameter: 430 mm) + unit 3.00
kran , komplit dengan asesoris & fitting
4 Pas. Urinoir tipe Moslem type termasuk aksesoris, unit 2.00
5 Pas. Sekat urinoir keramik putih unit 3.00
6 Pas. Kran air unit 13.00
7 Pas. Floordrain SS kotak unit 13.00
8 Area Wudhu m2 -
F PEKERJAAN FURNITUR
Pekerjaan Furniture Melekat
1 Pekerjaan dinding kaca tempered tebal 8mm m2 225.00
2 Pekerjaan Backdrop tipe FM-BD-01 unit -
NO. URAIAN PEKERJAAN SATUAN
VOL
(1) (2) (3) (4)
3 Pekerjaan pelapisan kolom type FM-KL-01 unit 72.00
Pekerjaan Furniture Lepas/ Pabrikan
1 Credenza: Credenza 1500(w)x400(d)X730(d), DDD HPL unit 4.00
NO. URAIAN PEKERJAAN SATUAN
VOL
(1) (2) (3) (4)
2 Lemari : cabinet 2200DD 0500(d)x900(w)x2200(h) unit 31.00
3 Meja tamu: Cubic corner table 600(w)x600(l)X400(h)mm, verchromed unit 8.00
4 Meja diskusi bundar/ meja teras: Canteen table round type CF D 36"x29"(h)HPL w/o unit 4.00
wing
5 Meja interogasi/ wawancara: single pole D. 0900 X 730(H) HPL unit 3.00
6 Meja perpustakaan: double pole Rectangular 1200(W) X 1200(D) X 730(H) HPL unit 9.00
7 Meja manager, SM: Freestanding , 900x1800; 600x1200 unit 8.00
8 Meja Kerja Staff/ WS Pengawas: Freestanding DS 600x1200; 500X900 unit 14.00
9 WS Sekretaris 2P: Workstation DS 2P 600x1200; 500x900 unit
10 WS: workstatio 6p 600x1000 unit 1.00
11 Kursi tunggu:(w)x535(d)x840(h)- verchrome local fabric unit 28.00
12 Kursi sekretaris & staff: fixed seat with knob tension, ergo arm, mesh mid back unit 6.00
fabric seat ex. Primaloka
13 Kursi Manager&Senior Manager: high back chair w/ headrest, fiberflex, seat depth unit 3.00
adjustment, chrome base& swing plats
14 Kursi diskusi non formal: Fabric - Chromium unit 1.00
G PEKERJAAN LAMPU, TITIK OUTLET, STOP KONTAK & SAKLAR
1 Pasang Lampu RM-300-M5 buah -
2 Pasang Lampu RD 150 Kaca buah -
3 Pasang Lampu RD 150 E27 buah -
4 Pasang Lampu Electhica 400 LED buah -
5 Pasang saklar tunggal buah -
6 Pasang saklar ganda buah -
7 Pasang stop kontak buah -
LANTAI 3
A PEKERJAAN DINDING & FINISHING DINDING
D1 Dinding interior bata /aac plester aci-halus , fin acrylic wall paint warna broken white m2 48.00
D2 Dinding interior bata /aac plester aci-halus , fin vinyl wall covering m2 1,110.40
D3 Dinding partisi gypsum rangka hollow 40x40 fin. Acrylic wall paint , warna broken m2 -
white
D4 Dinding partisi gypsum rangka hollow 40x40 fin. fin vinyl wall covering m2 128.00
D5 partisi kaca framless tempered 12mm penuh dari lantai sampai plafond, U channel m2 432.00
ukuran 20x20m tebal 2mm anodized +sealant
D6 Dinding interior fin. Homogenous tile 600x600 cm dengan ketinggian 2 m dari m2 224.00
lantai. Diatas 2.00m fin acrylic wall paint
D8 Dinding kaca tempered 5mm frame alumulian fin powder coating detail lihat m2 486.40
arsitektur
B PEKERJAAN FINISHING LANTAI
Tipe 2 Homogenous tile anti slip 600x600 unpolished, plint dari material serupa t=10 cm m2 64.00
Tipe 3 Homogenous tile anti slip 600x600 industrial collection plinth dari material serupa t=1 m2 1,090.00
Tipe 5 Homogenous tile 600x600 tipe eksklusif plinth dari material yang sama t=10 cm m2 160.00
C PEKERJAAN PLAFOND
Tipe C1 Plafond Gypsum board+GRC rangka metal furing . Fin acrylic ceiling point m2 900.00
Tipe C2 Plafond Gypsum rangka metal furing dengan variasi estesis. Fin acrylic ceiling paint m2 312.00
NO. URAIAN PEKERJAAN SATUAN
VOL
(1) (2) (3) (4)

D PEKERJAAN PINTU & JENDELA


Pekerjaan Pintu
P1 Pintu Interior, rangka alumunium fin MDF dengan kaca intip unit 7.00
P2 Pintu interior ganda, rangka alumunium fin MDF dengan kaca intip unit 1.00
P4 Pintu toilet dan area basah rangka alumunium lapis HPL lengkap dengan engsel dan unit 1.00
pengunci
P5 Pintu toilet difabel unit 1.00
P6 Pintu kaca frameless dengan engsel pivot unit 24.00
P7 Pintu ruang utilitas - tahan api unit 1.00
P8 Pintu Shaft unit 1.00

E PEKERJAAN SANITAIR
1 Pas. Closet duduk (putih), unit 5.00
2 Pas. Jet washer , Min Water Pressure: 0.05 Mpa unit 5.00
Max Water Pressure: 0.4 Mpa
Flow Rate: 4.0 Lpm
3 Pas. Wastafel 'single bowl, top counter' putih, (T: 160 mm, Diameter: 430 mm) + unit 6.00
kran , komplit dengan asesoris & fitting
4 Pas. Urinoir tipe Moslem type termasuk aksesoris, unit 3.00
5 Pas. Sekat urinoir keramik unit 3.00
6 Pas. Kran air unit 10.00
7 Pas. Floordrain SS kotak unit 10.00
8 Area wudhu unit 7.00
9 Top table marmer t=8mm type Servigiante, berikut rangka siku unit 2.00
10 Pemasangan portable grease trap, termasuk basket, pipa & fitting units unit 1.00
11 Pemasangan Kaca cermin 5mm, unit 3.00
12 Pemasangan sink tap (janitor) unit
1.00
13 Keran cuci piring "Metal Handle Sink Tap With Hose Coupling' unit 1.00
F PEKERJAAN FURNITUR
Pekerjaan Furniture Melekat
1 Pekerjaan dinding kaca tempered tebal 8mm m2
486.40
2 Pekerjaan Backdrop tipe FM-BD-01 unit 2.00
3 Pekerjaan Pembungkus Kolom type FM-KL-01 unit 61.00
NO. URAIAN PEKERJAAN SATUAN
VOL
(1) (2) (3) (4)
4 Pekerjaan backdrop area ganti sepatu musholla unit 1.00
Pekerjaan Furniture Lepas/ Pabrikan
1 Credenza: Credenza 900(w)x400(d)X730(d), DD HPL unit 1.00
2 Lemari : cabinet 2200DD 0500(d)x900(w)x2200(h) unit 21.00
3 Meja rapat modulor: 'Dynamic Conference' flip table type B with modesty unit
perforated 1200(w)x600(d)x730(h)
30.00
4 Meja tamu: Cubic corner table 600(w)x600(l)X400(h)mm, verchromed unit 2.00
5 Meja interogasi/ wawancara: single pole D. 0900 X 730(H) HPL unit 11.00
6 Meja manager, SM: Freestanding , 900x1800; 600x1200 unit 4.00
7 Meja Kerja Staff/ WS Pengawas: Freestanding 600x1200; 500X900 unit 57.00
8 WS Sekretaris 2P: Workstation 2P 600x1200; 500x900 unit 8.00
9 WS: workstation 3p 600x1000 unit 8.00
10 WS: workstation 6p 600x1000 unit 4.00
11 Kursi rapat: alumunium, adjustable seat with lateral tension, ergo arm, mesh high unit 48.00
12 back, fabric seat
Kursi tunggu: (w)x535(d)x840(h)- verchrome local fabric- unit 15.00
13 Kursi sekretaris & staff: fixed seat with knob tension, ergo arm, mesh mid back unit 8.00
14 fabric seat ex. Primaloka
Kursi Manager&Senior Manager: high back chair w/ headrest, fiberflex, seat depth unit 4.00
adjustment, chrome base&
15 Kursi hadap: cantilever, swingchrome
fiberflex, platse , arm PP unit 3.00
16 Kursi diskusi non formal: Fabric - Chromium ex. Primaloka unit 3.00
G PEKERJAAN LAMPU, TITIK OUTLET, STOP KONTAK & SAKLAR
1 Pasang Lampu RM-300-M5 buah -
2 Pasang Lampu RD 150 Kaca buah -
3 Pasang Lampu RD 150 E27 buah -
4 Pasang Lampu Electhica 400 LED buah -
5 Pasang saklar tunggal buah -
6 Pasang saklar ganda buah -
7 Pasang stop kontak buah -
NO. URAIAN PEKERJAAN SATUAN
VOL
(1) (2) (3) (4)
II PEKERJAAN GEDUNG FIRE STATION
LANTAI 1
A PEKERJAAN LAMPU, TITIK OUTLET, STOP KONTAK & SAKLAR
1 Pasang Lampu Artolite RM-300-M5 buah -
2 Pasang Lampu Artolite RD 150 E27 buah -
3 Pasang saklar tunggal buah -
4 Pasang saklar ganda buah -
5 Pasang stop kontak buah -
NO. URAIAN PEKERJAAN SATUAN
VOL
(1) (2) (3) (4)
A PEKERJAAN DINDING & FINISHING DINDING
NO. URAIAN PEKERJAAN SATUAN
VOL
(1) (2) (3) (4)
D1 Dinding interior bata /aac plester aci-halus , fin acrylic wall paint warna broken white m2
147.20
D8 Dinding kaca tempered 5mm frame alumulian fin powder coating detail lihat m2
arsitektur
33.92
B PEKERJAAN PINTU & JENDELA
NO. URAIAN PEKERJAAN SATUAN
VOL
(1) (2) (3) (4)
Pekerjaan Pintu
P9 Pintu gudang ganda, rangka alumunium fin. MDF tanpa lubang intip unit
3.00
Pekerjaan jendela
J2 Jendela kaca tempered 5mm, kusen alum. 4" fin powder coating unit 2.00
C PEKERJAAN FINISHING LANTAI
Tipe 1 Concrete floor, finish floor hardener trowel, coating epoxy, plint acrylic wall point t m2
= 15 cm
33.60
D PEKERJAAN PLAFOND
Tipe C0 Bare concrete fin acrylic wall paint m2 46.00
LANTAI 2
NO. URAIAN PEKERJAAN SATUAN
VOL
(1) (2) (3) (4)
B PEKERJAAN DINDING & FINISHING DINDING
D1 Dinding interior bata /aac plester aci-halus , fin acrylic wall paint warna broken white m2 38.40
D2 Dinding interior bata /aac plester aci-halus , fin vinyl wall covering m2 188.80
D6 Dinding interior fin. Homogenous tile 600x600 cm dengan ketinggian 2 m dari m2 53.12
D7 lantai. Diatas 2.00m fin acrylic wall paint m2
Dinding parapet t =100cm railing solid wood t=1cm 64.00
D8 Dinding kaca tempered 5mm frame alumulian fin powder coating detail lihat arsitektur m2 113.92
D10 Kolom dengan treatment khusus furniture melekat m2 9.60
C PEKERJAAN FINISHING LANTAI
Tipe 2 Homogenous tile anti slip 600x600 unpolished, plint dari material serupa t=10 cm m2 32.50
Tipe 3 Homogenous tile anti slip 600x600 industrial collection plinth dari material serupa t=1 m2 99.50
D PEKERJAAN PLAFOND
Tipe C1 Plafond Gypsum board+GRC rangka metal furing . Fin acrylic ceiling point m2 132.00

E PEKERJAAN PINTU & JENDELA


Pekerjaan Pintu
P2 Pintu interior ganda, rangka alumunium fin MDF dengan kaca intip unit 1.00
P4 Pintu toilet dan area basah rangka alumunium lapis HPL lengkap dengan engsel dan pe unit 1.00
P8 Pintu Shaft unit 1.00
Pekerjaan jendela
Tipe J2 Jendela kaca tempered 5mm, kusen alum. 4" fin powder coating unit 2.00
F PEKERJAAN SANITAIR
1 Pas. Closet duduk tipe CW660J/SW660J (putih), unit 2.00
2 Pas. Jet washer, Min Water Pressure: 0.05 MPa unit
Max Water Pressure: 0.4 MPa
Flow Rate: 4.0 Lpm
2.00
3 Pas. Wastafel 'single bowl, top counter' putih, (T: 160 mm, Diameter: 430 mm) + unit
kran , komplit dengan asesoris & fitting
2.00
4 Top table marmer t=mm type Servigiante, berikut rangka siku unit
5 Pas. Urinoir tipe Moslem type termasuk aksesoris, unit 2.00
6 Pas. Sekat urinoir keramik putih unit
7 Pas. Floordrain SS kotak unit
8 Pemasangan Kaca cermin 5mm, unit
9 Pas. Kran air unit 4.00
G PEKERJAAN FURNITUR
Pekerjaan Furniture Lepas/ Pabrikan
1 Meja rapat modulor: 'Dynamic Conference' flip table type B with modesty unit
perforated 1200(w)x600(d)x730(h)
6.00
2 Meja Kerja Staff/ WS Pengawas: Freestanding 600x1200; 500X900 unit 3.00
3 Kursi rapat: alumunium, adjustable seat with lateral tension, ergo arm, mesh high unit
back, fabric seat
12.00
4 Kursi sekretaris & staff: fixed seat with knob tension, ergo arm, mesh mid back unit
fabric seat ex. Primaloka
3.00
H PEKERJAAN LAMPU, TITIK OUTLET, STOP KONTAK & SAKLAR
1 Pasang Lampu Artolite RM-300-M5 buah -
2 Pasang Lampu Artolite RD 150 Kaca buah -
3 Pasang Lampu Artolite RD 150 E27 buah -
4 Pasang saklar tunggal buah -
5 Pasang saklar ganda buah -
6 Pasang stop kontak buah -
LANTAI 3
A PEKERJAAN DINDING & FINISHING DINDING
D1 Dinding interior bata /aac plester aci-halus , fin acrylic wall paint warna broken white m2 8.00
D2 Dinding interior bata /aac plester aci-halus , fin vinyl wall covering m2 41.60
D7 Dinding parapet t =100cm railing solid wood t=1cm m2 112.00
D8 Dinding kaca tempered 5mm frame alumulian fin powder coating detail lihat arsitektur m2 148.80
D10 Kolom dengan treatment khusus furniture melekat m2 25.60
B PEKERJAAN FINISHING LANTAI
Tipe 3 Homogenous tile anti slip 600x600 industrial collection plinth dari material serupa t=1 m2 131.50
Tipe 4 Keramik 300x300 unpolished anti slip untuk anak tangga dilengkapi step nosing m2 35.50
C PEKERJAAN PLAFOND
C1 Plafond Gypsum board+GRC rangka metal furing . Fin acrylic ceiling point m2 131.50

D PEKERJAAN PINTU & JENDELA


Pekerjaan Pintu
1 Pintu 1 (P1) double: panel HPL 40mm lapis HPL wood grain, edging PVC + kaca unit
t=6mm + sandblast sticker, hardware door closer tipe tempel , lengkap dengan 1.00
rubber seal keliling, lockcase silinder dan handle

E PEKERJAAN FURNITUR
Pekerjaan Furniture Lepas/ Pabrikan
1 Loker 1830x380x380 terbuat dari baja, 3 pintu dengan ventilasi, 3 cam lock system, unit
cat: degreasing, posphating, rush, protection, fin. Powder coating
-
F PEKERJAAN LAMPU, TITIK OUTLET, STOP KONTAK & SAKLAR -
1 Pasang Lampu Artolite RM-300-M5 buah -
2 Pasang Lampu Artolite RD 150 Kaca buah -
3 Pasang saklar ganda buah -
4 Pasang stop kontak buah -
TOTAL SUB PEKERJAAN INTERIOR
PEKERJAAAN PEMBANGUNAN GEDUNG NEW HSSE DAN FIRE STATION
PERTAMINA RU-V BALIKPAPAN
SUB PEKERJAAN : LANSKAP

NO. URAIAN PEKERJAAN SATUAN


VOLUME
(1) (3)
(4)
I PEKERJAAN KAWASAN
A PEKERJAAN PERSIAPAN
1 Pekerjaan Pembersihan m2 6,698.00
2 Pekerjaan Pengukuran dan Pasang Marka m'

B PEKERJAAN TANAH
1 Pekerjaan Top Soil m3 669.80
2 Pekerjaan Fill m3 -

3 Pembuangan Tanah m3 669.80


C PEKERJAAN PENANAMAN
1 Mimosops elengi, T 2.5-3 m dia btg 0.06-0.08 m pohon 25.00
2 Terminalia mantaly, T 2.5-3 m dia btg 0.06-0.08 m pohon 37.00
3 Vernonia elliptica, T 30cm daun dia tajuk 25cm m2 12.52
4 Axonophus compressus, T 0.7-1 cm dia btg 2-3cm m2 4,134.00
D PEKERJAAN PERKERASAN
1 Perkerasan Paving Block 10x20x8 m2 482.23
2 Perkerasan Andesit m2 1,324.61
3 Pekerasan Kansteen m'
II PEKERJAAN POS JAGA 1
A PEKERJAAN SIPIL/STRUKTUR
1 Pekerjaan galian sementara (untuk pondasi, sloof, dll) m3 15.73
2 Pekerjaan urugan kembali (backfill) m3 1.12
3 Pekerjaan buangan sisa galian ke disposal m3 14.62
1 Lantai kerja, K.125 m3 2.16
1 Beton bertulang K. 350, Pondasi m3 22.48
2 Beton bertulang K. 350, Kolom m3 41.26
3 Beton bertulang K. 350, Balok m3 1.13
4 Beton bertulang K. 350, Slab m3 5.16
5 Pengadaan & Pemasangan Bondek m3 12.25
6 Pekerjaan Struktur Baja kg 1,628.64
7 Pekerjaan Sambungan Baja kg 814.32
B PEKERJAAN ARSITEKTURAL
1 Pekerjaan Dinding Bata Merah Campuran 1SP:5PP m2 59.15
2 Pekerjaan Plesteran Dinding m2 118.30
3 Pekerjaan Acian Dinding m2 118.30
4 Pekerjaan Lantai m2 11.69
5 Pekerjaan Pengecatan Dinding m2 118.30
6 Pekerjaan Plafond m2 11.69
7 Pekerjaan Atap ACP m2 18.69
8 Pekerjaan Atap Zincalum m2
9 Pekerjaan Kusen dan Daun Pintu bh 2.00
10 Pekerjaan Kusen Jendela 1 bh 1.00
11 Pekerjaan Kusen Jendela 2 bh 2.00
12 Pekerjaan Kusen Jendela 3 bh 1.00
13 Pekerjaan Pagar m2 71.16
III PEKERJAAN TOILET POS JAGA 1
A PEKERJAAN ARSITEKTURAL
1 Pekerjaan Dinding Trasram m2 295.75
2 Pekerjaan Plesteran Dinding m2 118.30
3 Pekerjaan Acian Dinding m2 118.30
4 Pekerjaan Keramik Dinding m2 118.30
5 Pekerjaan Meja Beton Washtafel bh 1.00
6 Pekerjaan Lantai m2 11.69
7 Pekerjaan Pengecatan Dinding m2 118.30
8 Pekerjaan Pintu Toilet bh 1.00
9 Pekerjaan Closet bh 1.00
10 Pekerjaan Washtafel bh 1.00
IV PEKERJAAN ORNAMEN GERBANG POS JAGA 1
A PEKERJAAN SIPIL/STRUKTUR
1 Pekerjaan Galian Sementara (untuk pondasi, sloof, dll) m3 11.07
2 Pekerjaan Urugan Kembali (backfill) m3 6.27
3 Pekerjaan Buangan Sisa Galian ke disposal m3 4.80
4 Pekerjaan Pondasi Kolom Penyangga m3 4.27
5 Pekerjaan Kolom Penyangga (Beton bertulang K. 350, Kolom K1) m3 41.26
B PEKERJAAN ARSITEKTURAL
1 Pekerjaan Pengecatan Kolom Warna Merah m2 180.36
2 Pekerjaan Pengecatan Dinding m2 360.72
3 Pekerjaan GRC m2 71.40
4 Pekerjaan Dinding m2 45.00
5 Pekerjaan Plesteran Dinding m2 90.00
6 Pekerjaan Acian Dinding m2 90.00
7 Pekerjaan Kolom Praktis (Beton bertulang K. 350, Kolom K2) m3 0.75
8 Pekerjaan Panel ACP Gerbang m2 90.00
V PEKERJAAN POS JAGA 2
A PEKERJAAN SIPIL/STRUKTUR
1 Pekerjaan galian sementara (untuk pondasi, sloof, dll) m3 28.08
2 Pekerjaan urugan kembali (backfill) m3 20.96
3 Pekerjaan buangan sisa galian ke disposal m3 7.12
4 Lantai kerja, K.125 m3 1.36
5 Beton bertulang K. 350, Pondasi m3 7.13
6 Beton bertulang K. 350, Kolom m3 4.33
7 Beton bertulang K. 350, Balok m3 0.96
8 Beton bertulang K. 350, Slab m3 2.77
9 Pengadaan & Pemasangan Bondek m3 21.06
10 Pekerjaan Struktur Baja kg 983.92
11 Pekerjaan Sambungan Baja kg 98.39
B PEKERJAAN ARSITEKTURAL
1 Pekerjaan Lantai m2 7.50
2 Pekerjaan Dinding m2 34.28
3 Pekerjaan Plesteran Dinding m2 68.56
4 Pekerjaan Acian Dinding m2 68.56
5 Pekerjaan Pengecatan Dinding m2 68.56
NO. URAIAN PEKERJAAN SATUAN
VOLUME
(1) (3)
(4)
6 Pekerjaan Plafond m2 7.50
7 Pekerjaan Atap ACP m2 42.00
8 Pekerjaan Atap Zincalum m2 42.00
9 Pekerjaan Pemasangan Pintu bh 1.00
10 Pekerjaan Kusen Jendela 1 bh 1.00
11 Pekerjaan Kusen Jendela 2 bh 1.00
12 Pekerjaan Kusen Jendela 3 bh -
1 Pekerjaan Pagar m2 -
VI PEKERJAAN FURNITURE
1 Meja UNO UOD 1035 bh -
2 Kursi bh -
VII PEKERJAAN PAGAR KELILING
NO. URAIAN PEKERJAAN SATUAN
VOLUME
(1) (3)
(4)
1 Pagar Keliling m' -
2 Sloof Pagar Keliling m3 -
3 Pondasi Pagar keliling m3 -
NO. URAIAN PEKERJAAN SATUAN
VOLUME
(1) (3)
(4)
TOTAL SUB PEKERJAAN LANSKAP
PART 2 C ‐ LAMPIRAN 2.6
TEMPLATE UNTUK BREAKDOWN DARI BIAYA PROYEK

PEKERJAAN MODIFIKASI GEDUNG EX-SITE OFFICE RU-V


PERTAMINA RU-V BALIKPAPAN
SUB PEKERJAAN : SIPIL & STRUKTUR

NO. URAIAN PEKERJAAN SATUAN


VOLUME
(1) (3) (4)
I PEKERJAAN PERSIAPAN
1 Mobilisasi & Demobilisasi ls 1.00
2 Stakeout & Positioning ls 1.00
3 Fasilitas Sementara ls 1.00
4 Safety HSE ls 1.00
II PEKERJAAN ENGINEERING
1 Engineering ls 1.00
III PEKERJAAN MODIFIKASI EX. SITE OFFICE
A PEKERJAAN TANAH
1 Pekerjaan galian sementara (untuk pondasi, sloof, dll) m3 600.06
2 Pekerjaan urugan kembali (backfill) m3 248.88
3 Pekerjaan buangan sisa galian ke disposal m3 351.17
B PEKERJAAN BETON LANTAI KERJA K-125
1 Lantai kerja, K.125 m3 10.50
C PEKERJAAN BETON BERTULANG K-350
1 Beton bertulang K. 350, Pondasi Selasar m3 2.71
2 Beton bertulang K. 350, Pondasi R. Tunggu m3 5.02
3 Beton bertulang K. 350, Pondasi R. Identifikasi Personal m3 5.02
4 Beton bertulang K. 350, Sloof m3 9.30
3
5 Beton bertulang K. 350, Kolom m 14.03

6 Beton bertulang K. 350, Balok m3 52.85


7 Beton bertulang K. 350, Pelat Lantai m3 36.78
3
8 Beton bertulang K. 350, Tangga m 20.46
D PEKERJAAN BAJA
1 Pekerjaan Struktur Atap Baja kg 25,289.87
2 Pekerjaan Struktur Baja Kanopi kg 1,256.92
3 Pekerjaan Struktur Baja Selasar kg 4,027.58
4 Pekerjaan Struktur Baja Tangga kg 1,085.33
5 Pekerjaan Sambungan Baja kg 949.79
IV PEKERJAAN DRAINASE
A PEKERJAAN TANAH
1 Pekerjaan galian sementara (untuk pondasi, sloof, dll) m3 229.80
2 Pekerjaan urugan kembali (backfill) m3 68.94
3 Pekerjaan buangan sisa galian ke disposal m3 160.86
B PEKERJAAN BETON LANTAI KERJA K-125
4 Lantai kerja, K.125 m3 11.49
C PEKERJAAN BETON BERTULANG K-250
5 Beton bertulang K. 250, Drainase m3 406.75
V PEKERJAAN SEPTICK TANK
A PEKERJAAN TANAH
1 Pekerjaan galian sementara m3 363.58
2 Pekerjaan urugan kembali (backfill) m3 64.23
3 Pekerjaan buangan sisa galian ke disposal m3 299.35
B PEKERJAAN BETON LANTAI KERJA K-125
4 Lantai kerja, K.125 m3 5.00
C PEKERJAAN BETON BERTULANG K-250
3
5 Beton bertulang K. 250, Drainase m 43.74

TOTAL SUB PEKERJAAN SIPIL & STRUKTUR


PEKERJAAN MODIFIKASI GEDUNG EX-SITE OFFICE RU-V
PERTAMINA RU-V BALIKPAPAN
SUB PEKERJAAN : ARSITEKTUR

NO. URAIAN PEKERJAAN SATUAN VOLUME

(1) (3) (4)


I PEKERJAAN MODIFIKASI EX-SITE OFFICE RU-V
A PEKERJAAN DINDING & PLESTERAN
1 Light Brick T=100mm m2 1571.45
2 Plesteran Mortar Instan
MU 380 : Perekat Bata Ringan m2 1571.45
MU 301 : Plesteran m2 3297.41
MU 250: Acian Plesteran m2 3297.41
B FINISHING LANTAI
Homogenous tile 600x300 mm, Unpolished m2 36.24
Homogenous tile 600x300 mm (Step nosing) m2 38.22
Concrete Floor, finish floor hardener trowel, coating epoxy (area pergudangan) m2 141
C PENUTUP ATAP DAN TALANG
Penutup atap metal isofire Roof Fono, steel sheet 0.6/0.6 mm m2 1226.58
Pemasangan insulasi atap Rock Wool m2 1226.58
PVC Room Drain Ø 4" bh 24
Pipa Air Hujan DRP m' 111.52
Pipa air hujan, PVC Ø 4" Class AW m' 200
Elbow PVC, Ø 4" Class AW bh 72
D CAT DAN LAPISAN KHUSUS
1 Pengecatan Dinding Luar
Undercoat Primer m2 3946.18
Top Coat - Weathercoat m2 3946.18
Cat Besi m2 39.18
E PINTU DAN JENDELA
1 Pintu umum (frame door) bh 8
2 Pintu Kaca frameless bh 2
3 Pintu service/utilitas (R Panel Pergudangan workshop) bh 5
4 Pintu masuk toilet bh 2
5 Pintu Besi (R. Genset, R Chiller, R Trafo) bh 1
6 Pintu Darurat (steel fire door) bh 2
7 Pintu Shaft bh 8
8 Pintu masuk Janitor bh 2
F RAILING
Railing BSP Tubular Steel Galvanized Dia. 8 cm m' 134.82

TOTAL SUB PEKERJAAN ARSITEKTUR


PEKERJAAN MODIFIKASI GEDUNG EX-SITE OFFICE RU-V
PERTAMINA RU-V BALIKPAPAN
SUB PEKERJAAN : LANSKAP

NO. URAIAN PEKERJAAN SATUAN


VOLUME
(1) (3) (4)
A PEKERJAAN PERSIAPAN
1 Pekerjaan Pembersihan m2 291.84
2 Pekerjaan Pengukuran dan Pasang Marka m' 137.20
B PEKERJAAN TANAH
1 Pekerjaan Cut m3 291.84
2 Pekerjaan Fill m3 175.10
3 Pembuangan Tanah m3 116.74
C PEKERJAAN PENANAMAN
1 Terminalia mantaly, T 2.5-3 m dia btg 0.06-0.08 m pohon 7.00
2 Spathiphyllum wallisii,T 30cm daun dia tajuk 30 cm m2 14.33
3 Zephyrantes candida, T 20cm daun dia tajuk 25cm m2 4.66
4 Axonophus compressus, T 0.7-1 cm dia btg 2-3cm m2 164.39
D PEKERJAAN PERKERASAN
1 Perkerasan Andesit m2 9.90
2 Lantai Kayu m2 34.80
3 Pekerjaan Sloof m 18.08
4 Pekerjaan Bangku Taman Tipe 1 bh 5.00
5 Pekerjaan Bangku taman Tipe 2 bh 2.00
E PEKERJAAN ARSITEKTURAL
1 Pekerjaan Dinding Bak Tanaman m2 3.60
2 Pekerjaan Acian m2 2.52
3 Pekerjaan Cat Eksterior m2 2.52
4 Pekerjaan Kolam m2 3.23
TOTAL SUB PEKERJAAN LANSKAP
PEKERJAAN MODIFIKASI GEDUNG EX-SITE OFFICE RU-V
PERTAMINA RU-V BALIKPAPAN
SUB PEKERJAAN : INTERIOR

NO. URAIAN PEKERJAAN SATUAN


VOL
(1) (2) (3) (4)
I PEKERJAAN MODIFIKASI EX-SITE OFFICE RU-V
LANTAI 1
A PEKERJAAN DINDING & FINISHING DINDING
D1 Finishing acrylic wall paint warna broken white m2 761.60
D2 Finishing vinyl wall covering m2 1,009.53
D3 Dinding partisi gypsum rangka hollow 40x40 fin. fin vinyl wall covering m2 9.60
D4 Dinding partisi gypsum rangka hollow 40x40 fin. fin vinyl wall covering m2 484.00
D5 partisi kaca framless tempered 12mm penuh dari lantai sampai plafond, U channel ukuran 20x2 m2 165.20
D6 Finishing Homogenous tile 600x600 cm dengan ketinggian 2 m dari lantai. Diatas 2.00m fin acrylic m2 391.20
D8 Dinding kaca tempered 5mm frame alumulian fin powder coating detail lihat arsitektur m2 483.20
B PEKERJAAN FINISHING LANTAI
2 Homogenous tile anti slip 600x600 unpolished, plint dari material serupa t=10 cm m2 63.36
3 Homogenous tile anti slip 600x600 industrial collection plinth dari material serupa t=10 cm m2 1,403.41
4 Keramik 300x300 unpolished anti slip untuk anak tangga dilengkapi step nosing m2 47.52
5 Homogenous tile 600x600 tipe eksklusif plinth dari material yang sama t=10 cm m2 106.86
C PEKERJAAN PLAFOND
C0 Bare concrete fin acrylic wall paint m2 22.00
C1 Plafond Gypsum board+GRC rangka metal furing . Fin acrylic ceiling point m2 1,176.63
C2 Plafond Gypsum rangka metal furing dengan variasi estesis. Fin acrylic ceiling paint m2 375.00
D PEKERJAAN PINTU & JENDELA
P1 Pintu Interior, rangka alumunium fin MDF dengan kaca intip unit 13.00
P2 Pintu interior ganda, rangka alumunium fin MDF dengan kaca intip unit 4.00
P4 Pintu toilet dan area basah rangka alumunium lapis HPL lengkap dengan engsel dan pengunci unit 4.00
P6 Pintu kaca frameless dengan engsel pivot unit 2.00
P10 Pintu tangga kebakaran unit 8.00
P11 Pintu frameless - double dengan engsel pivot unit 2.00
E PEKERJAAN SANITAIR
1 Pas. Closet duduk tipe CW660J/SW660J (putih) unit 6.00
2 Pas. Jet washer unit 6.00
Min Water Pressure: 0.05 MPa
3 Pas. MaxWastafel 'single bowl,
Water Pressure: 0.4top
MPacounter' putih, (T: 160 mm, Diameter: 430 mm) + kran , komp unit 8.00
4 Top table
Flow marmer
Rate: t=mm type Servigiante, berikut rangka siku
4.0 Lpm unit 4.00
5 Pemasangan portable grease trap, termasuk basket, pipa & fitting units unit 1.00
6 Pas. Urinoir tipe Moslem type termasuk aksesoris, unit 6.00
7 Pas. Sekat urinoir keramik unit 6.00
8 Pas. Floordrain SS kotak unit 13.00
9 Pemasangan Kaca cermin 5mm unit 4.00
10 Pemasangan sink tap tipe TX130 (janitor) unit 6.00
11 Keran cuci piring tipe T26-13 unit 1.00
12 shower set lengkap dengan pemasangan unit 6.00
F PEKERJAAN FURNITUR
Pekerjaan Furniture Melekat
1 Partisi kaca frameless tempered 12mm, t= 2600mm, clear cannal 20x20 t=2mm anodized + sea m2 314.08
2 Meja Resepsionis type FM-RC-02 unit 1.00
3 Pekerjaan Pembungkus Kolom type FM-KL-01 unit 4.00
Pekerjaan Furniture Lepas/ Pabrikan
1 Credenza: Credenza 900(w)x400(d)X730(d), DD HPL unit 14.00
2 Credenza: Credenza 1500(w)x400(d)X730(d), DDD HPL unit 4.00
3 Loker 1830x380x380 terbuat dari baja, 3 pintu dengan ventilasi, 3 cam lock system, cat: degr unit 9.00
4 Meja rapat modulor: 'Dynamic Conference' flip table type B with modesty perforated 1200 unit 66.00
5 Meja tamu: Cubic corner table 600(w)x600(l)X400(h)mm, verchromed unit 4.00
6 Meja direktur, manager, SM: Freestanding Marfis, 900x1800; 600x1200 (Untuk Dokter di Poli unit -
7 Meja Kerja Staff/ WS Pengawas: Freestanding 600x1200; 500X900 unit 2.00
8 WS Sekretaris 2P: Workstation 2P 600x1200; 500x900 unit -
9 WS Sekretaris 4P: Workstation 4P 600x1200; 500x900 unit -
10 Kursi rapat: alumunium, adjustable seat with lateral tension, ergo arm, mesh high back, fabri unit 44.00
11 Kursi tamu: Cubic sofa 1 seater - local fabric +verchromed unit 16.00
12 Kursi tunggu: (w)x535(d)x840(h)- verchrome local fabric- unit 15.00
13 Kursi sekretaris & staff: fixed seat with knob tension, ergo arm, mesh mid back fabric seat e unit 43.00
14 Kursi Manager&Senior Manager: high back chair w/ headrest, fiberflex, seat depth adjustme unit -
15 Kursi hadap: cantilever, fiberflex, chrome , arm PP unit 158.00
LANTAI 2
A PEKERJAAN DINDING & FINISHING DINDING
2 Homogenous tile anti slip 600x600 unpolished, plint dari material serupa t=10 cm m2 43.56
3 Homogenous tile anti slip 600x600 industrial collection plinth dari material serupa t=10 cm m2 1,139.95
4 Keramik 300x300 unpolished anti slip untuk anak tangga dilengkapi step nosing m2 90.41
5 Homogenous tile 600x600 tipe eksklusif plinth dari material yang sama t=10 cm m2 198.00
B PEKERJAAN FINISHING LANTAI
2 Homogenous tile anti slip 600x600 unpolished, plint dari material serupa t=10 cm m2 87.12
3 Homogenous tile anti slip 600x600 industrial collection plinth dari material serupa t=10 cm m2 1,139.95
4 Keramik 300x300 unpolished anti slip untuk anak tangga dilengkapi step nosing m2 79.32
5 Homogenous tile 600x600 tipe eksklusif plinth dari material yang sama t=10 cm m2 182.16
C PEKERJAAN PLAFOND
C0 Bare concrete fin acrylic wall paint m2 22.00
C1 Plafond Gypsum board+GRC rangka metal furing . Fin acrylic ceiling point m2 609.10
C2 Plafond Gypsum rangka metal furing dengan variasi estesis. Fin acrylic ceiling paint m2 439.01
D PEKERJAAN PINTU & JENDELA
Pekerjaan Pintu
P1 Pintu Interior, rangka alumunium fin MDF dengan kaca intip unit 2.00
P2 Pintu interior ganda, rangka alumunium fin MDF dengan kaca intip unit 4.00
P3 Pintu interior rangka Alumunium fin MDF tanpa lubang intip unit 1.00
P4 Pintu toilet dan area basah rangka alumunium lapis HPL lengkap dengan engsel dan pengunci unit 2.00
P10 PintuPintu kaca double-frameless, tempered 12mm, hardware floorhinge ex Dorma BTS 75 asesor unit 9.00
P11 PintuPintu 6 (P6), Pintu kaca frameless, floorhinge ex Dorma BTS 85, handle hollow S/S 20x40mm h unit 1.00
E PEKERJAAN SANITAIR
1 Pas. Closet duduk tipe CW660J/SW660J (putih), unit 5.00
2 Pas. Jet washer unit
Min Water Pressure: 0.05 MPa
Max Water Pressure: 0.4 MPa
Flow Rate: 4.0 Lpm
5.00
3 Pas. Wastafel 'single bowl, top counter' putih, (T: 160 mm, Diameter: 430 mm) + kran , komp unit 5.00
4 Pas. Urinoir tipe Moslem type termasuk aksesoris, unit 3.00
5 Pas. Sekat urinoir keramik unit 4.00
6 Pas. Kran air unit 3.00
7 Pas. Floordrain SS kotak unit 9.00
8 Top table marmer t=8mm type Servigiante, berikut rangka siku unit 2.00
F PEKERJAAN FURNITUR
Pekerjaan Furniture Melekat
1 Partisi kaca frameless tempered 12mm, t= 2600mm, clear cannal 20x20 t=2mm anodized + sea m2 43.56
2 Pekerjaan Backdrop tipe FM-BD-01 unit 1.00
3 Pekerjaan Pembungkus Kolom type FM-KL-01 unit 4.00
Pekerjaan Furniture Lepas/ Pabrikan
1 Credenza: Credenza 900(w)x400(d)X730(d), DD HPL unit 4.00
2 Credenza: Credenza 1500(w)x400(d)X730(d), DDD HPL unit 2.00
3 Loker 1830x380x380 terbuat dari baja, 3 pintu dengan ventilasi, 3 cam lock system, cat: degr unit -
4 Meja rapat modulor: 'Dynamic Conference' flip table type B with modesty perforated 1200 unit 102.00
5 Meja tamu: Cubic corner table 600(w)x600(l)X400(h)mm, verchromed unit -
6 Meja direktur, manager, SM: Freestanding Marfis, 900x1800; 600x1200 (Untuk Dokter di Poli unit 9.00
7 Meja Kerja Staff/ WS Pengawas: Freestanding 600x1200; 500X900 unit 221.00
8 WS Sekretaris 2P: Workstation 2P 600x1200; 500x900 unit -
9 WS Sekretaris 4P: Workstation 4P 600x1200; 500x900 unit -
10 Kursi rapat: alumunium, adjustable seat with lateral tension, ergo arm, mesh high back, fabri unit 204.00
NO. URAIAN PEKERJAAN SATUAN
VOL
(1) (2) (3) (4)
11 Kursi tamu: Cubic sofa 1 seater - local fabric +verchromed unit -
12 Kursi tunggu: (w)x535(d)x840(h)- verchrome local fabric- unit 16.00
NO. URAIAN PEKERJAAN SATUAN
VOL
(1) (2) (3) (4)
13 Kursi sekretaris & staff: fixed seat with knob tension, ergo arm, mesh mid back fabric seat e unit 221.00
14 Kursi Manager&Senior Manager: high back chair w/ headrest, fiberflex, seat depth adjustme unit 11.00
15 Kursi hadap: cantilever, fiberflex, chrome , arm PP unit -

II PEKERJAAN MUSHOLLA
A PEKERJAAN DINDING & FINISHING DINDING
D1 Dinding interior bata /aac plester aci-halus , fin acrylic wall paint warna broken white m2 46.00
NO. URAIAN PEKERJAAN SATUAN
VOL
(1) (2) (3) (4)
D2 Dinding interior bata /aac plester aci-halus , fin vinyl wall covering m2 166.80
D6 Dinding interior fin. Homogenous tile 600x600 cm dengan ketinggian 2 m dari lantai. Diatas 2.00m m2 200.80
B PEKERJAAN FINISHING LANTAI
1 Homogenous tile anti slip 600x600 unpolished, plint dari material serupa t=10 cm m2 231.66
2 Homogenous Tile anti-slip 600 x 600-unpolished . m2
-
NO. URAIAN PEKERJAAN SATUAN
VOL
(1) (2) (3) (4)
3 Plinth lantai t=10cm, plywood 12mm cover S/S hairline type plate m2 -
C PEKERJAAN PLAFOND
1 Plafond Gypsum rangka metal furing dengan variasi estesis. Fin acrylic ceiling paint m2 231.66
2 Pas. Plafond Gypsumboard tebal 9mm rangka metal hollow 40x40mm, dengan variasi drop ceilingm2 -
3 Pengecatan plafond, m2 231.66
D PEKERJAAN PINTU & JENDELA
1 Pintu 1 (P1) double: panel HPL 40mm lapis HPL, edging PVC + kaca t=6mm + sandblast sticker, unit 3.00
2 Pintu 4 (P4), Pintu Toilet dan area basah rangka alumunium lapis HPL lengkap dengan engse unit 4.00
E PEKERJAAN SANITAIR
1 Pas. Closet duduk tipe CW660J/SW660J (putih) unit 2.00
2 Pas. Jet washer tipe THX20MCRB unit 2.00
3 Pas. Wastafel LW 523 J (WHITE)+ kran type TX 116 LESD, wastafel top counter include faucet unit 2.00
4 Top table marmer t=mm type Servigiante, berikut rangka siku unit 2.00
5 Pas. Urinoir tipe U57 M Moslem type termasuk aksesoris, unit 1.00
6 Pas. Floordrain tipe TX1BN, ex. Toto unit 2.00
7 Pemasangan Kaca cermin 5mm unit 2.00
8 Pemasangan sink tap tipe TX130 (janitor) unit 11.00
9 Area wudhu m2 25.00
F PEKERJAAN FURNITUR
A Pekerjaan Furniture Melekat
1 Pekerjaan Pembungkus Kolom type FM-KL-01 unit 7.00
TOTAL SUB PEKERJAAN INTERIOR
PEKERJAAN MODIFIKASI GEDUNG EX-SITE OFFICE RU-V
PERTAMINA RU-V BALIKPAPAN
SUB PEKERJAAN : MEKANIKAL & PLUMBING

NO. URAIAN PEKERJAAN SATUAN VOLUME

(1) (2) (3) (4)


A PEKERJAAN AIR CONDITIONING
Penyediaan dan pemasangan unit Chiller dan AC split duct VRF system dengan Instalasi ducting &pengkabelannya, bracket lengkap dg drain pan tambahan , accessories & semua material bantu yg diperlukan sesuai spesifikasi tekni

a. Fan Coil Unit Unitary DX / ac split / VRV


Lengkap dengan spring mounting, thermostat + kabel kontrol, drain pan, filter udara, hanger dan asesoris lainnya
Lt. 1
Type HWP 290 CKTD (11 unit) lot 1
Capacity 8 TR
Gate Valve dia 1 ¼" ( 2bh)
2-Way Valve dia 1 ¼" (1 bh)
Strainer (1 bh)
Thermo Well (1 bh)
Pressure Gauge (1 bh)

Ducting Supply
2250 cfm 24"x16" m 65
1500 cfm 18"x16" m 56
750 cfm 14"x12" m 75
375 cfm 10"x10" m 84
Diffuser Unit 41

Ducting Return
24"x16" m 22
18"x16" m 37
14"x12" m 30
10"x10" m 30
Diffuser Unit 29

Fresh Air Duct


10"x10" m
Diffuser Unit 6

Lt.2
Type HWP 370 CKTD (10 unit) lot 1
Capacity 10 TR
Gate Valve dia 1 ¼" ( 2bh)
2-Way Valve dia 1 ¼" (1 bh)
Strainer (1 bh)
Thermo Well (1 bh)
Pressure Gauge (1 bh)

Ducting Supply
2250 cfm 24"x16" m 28
1500 cfm 18"x16" m 38
750 cfm 14"x12" m 43
375 cfm 10"x10" m 77
Diffuser Unit 53

Ducting Return
24"x16" m 0
18"x16" m 0
14"x12" m 0
10"x10" m 34
Diffuser Unit 12

Fresh Air Duct


10"x10" m 0
Diffuser Unit 0
b. O/U air cooled (17 unit) lot 1

c. Fan
Lt. 1
Exhaust Air Fan (3 unit)
Type : EF-25 ASB - E lot 1
Model : Wall Mounted
Aliran Udara : 700 CFM
Daya : 45-55
Lt. 2
Type : EF-25 ASB - E (1 unit)
Model : Wall Mounted
Aliran Udara : 500 CFM lot 1
Daya : 45-55
Voltage : 220V/50Hz
B PEKERJAAN PLUMBING (AIR BERSIH)
Pengadaan dan pemasangan pipa PPR PN 10 (Distribusi Horisontal), sesuai spesifikasi, pada penempatan terten
PERALATAN UTAMA
a. Pipa Air Bersih
Lt. 1
Pipa PPR PN 10
- dia 32 mm m 75
- dia 25 mm m 13.2
- dia 20 mm m 34
- dia 15 mm m 39.6
Lt.2
Pipa PPR PN 10

- dia 32 mm m 75
- dia 25 mm m 13.2
- dia 20 mm m 34
- dia 15 mm m 39.6
POMPA AIR BERSIH
Package Bosting Pump 3 unit Lot 1
Kapasitas 50 GPM
Head 28 m
Speed 2900 RPM
Power 500 watt
Operation Alternate, Sequence
2 operation
1 standby
C PEKERJAAN PLUMBING (AIR KOTOR)
Pengadaan dan pemasangan Pipa Air Kotor (pipa PVC klass 10 kg/cm²) , sesuai dengan spesifikasi , p
PERALATAN UTAMA
Lt.1
PVC Klass 10 kg/cm2
- dia 125 mm m 19.8
- dia 100 mm m 33
- dia 50 mm m 23.1
Lt.2
NO. URAIAN PEKERJAAN SATUAN VOLUME

(1) (2) (3) (4)


PVC Klass 10 kg/cm2
- dia 125 mm m 9.2
NO. URAIAN PEKERJAAN SATUAN VOLUME

(1) (2) (3) (4)


- dia 100 mm m 19.8
- dia 50 mm m 13.2
D PEKERJAAN PLUMBING (AIR BEKAS)
Pengadaan dan pemasangan Pipa Air Bekas (pipa PVC klass 10 kg/cm²) , sesuai dengan spesifikasi , pada penempatan tertentu mempergunakan sambungan solvent cement, lengkap dengan hanger, support, klem dan accessories lainnnya.
PERALATAN UTAMA
Lt.1
PVC Klass 10 kg/cm2
NO. URAIAN PEKERJAAN SATUAN VOLUME

(1) (2) (3) (4)


- dia 125 mm m 0
- dia 100 mm m 33
- dia 50 mm m 56.1
Lt.2
PVC Klass 10 kg/cm2
NO. URAIAN PEKERJAAN SATUAN VOLUME

(1) (2) (3) (4)


- dia 125 mm m 4
- dia 100 mm m 13.2
- dia 50 mm m 39.6
` POMPA AIR PEMBILAS
Package Bosting Pump 3 unit lot 1
Kapasitas 50 GPM
Head 28 m
Speed 2900 RPM
Power 1,1 kW
Operation Alternate, Sequence
2 operation
1 standby
E PEKERJAAN MEKANIKAL PLUMBING (LANDSCAPE & POS JAGA)
Pompa Air kolam unit 1
instalasi pipa pos jaga (security) (PVC) 15 mm, air bersih m 300
instalasi pipa pos jaga (security) (PVC) 40 mm, air kotor m 300
TOTAL SUB PEKERJAAN MEKANIKAL & PLUMBING
PEKERJAAN MODIFIKASI GEDUNG EX-SITE OFFICE RU-V
PERTAMINA RU-V BALIKPAPAN
SUB PEKERJAAN : ELEKTRIKAL

NO. URAIAN PEKERJAAN SATUAN VOL

(1) (2) (3) (4)


A PENYAMBUNGAN DAYA LS
an Instalasi ducting &pengkabelannya, bracket lengkap dg drain pan tambahan , accessories & semua material bantu yg diperlukan sesuai spesifikasi tekni
B PEKERJAAN PANEL - PANEL DISTRIBUSI.
1 Panel PP/LP - E (Lantai 1)
er udara, hanger dan asesoris lainnya 1 Panel Listrik Freestanding 1.8mx0.8mx0.8m bh 1.00
3 MCB out 3 fasa, 160AF, 36kA bh 1.00
4 MCB out 3 fasa, 25A, 10kA bh 3.00
5 MCB out 1 fasa, 6A/10A/16A, 6kA bh 62.00
6 MCB out 1 fasa, 6A, 4.5kA (for control) bh 1.00
7 Pilot Lamp LED AC 220 V (R,O,G) bh 1.00
8 Power Meter (kWh meter) bh 1.00
9 CT Measurement bh 1.00
10 Bus bar tembaga dan instalasi bh 1.00
11 Alat bantu, dan material lain bh 1.00
12 Pemasangan dan perkabelan bh 1.00
Jumlah
2 Panel PP/LP - F (Lantai 2)
1 Panel Listrik Freestanding 1.8mx0.8mx0.8m bh 1.00
3 MCB out 3 fasa, 160AF, 36kA bh 1.00
4 MCB out 3 fasa, 25A, 10kA bh 3.00

5 MCB out 1 fasa, 6A/10A/16A, 6kA bh 64.00


6 MCB out 1 fasa, 6A, 4.5kA (for control) bh 1.00
7 Pilot Lamp LED AC 220 V (R,O,G) bh 1.00
8 Power Meter (kWh meter) bh 1.00
9 CT Measurement bh 1.00
10 Bus bar tembaga dan instalasi bh 1.00
11 Alat bantu, dan material lain bh 1.00
12 Pemasangan dan perkabelan bh 1.00
Jumlah
3 Panel SDP-ACB (Chiller Existing Site Office)
1 Panel Listrik Freestanding 1.8mx0.8mx0.8m bh 1.00
3 MCB out 3 fasa, 250AF, 36kA bh 1.00
4 MCB out 3 fasa, 25A, 10kA bh 5.00
5 MCB out 1 fasa, 6A/10A/16A, 6kA bh 0.00
6 MCB out 1 fasa, 6A, 4.5kA (for control) bh 0.00
7 Pilot Lamp LED AC 220 V (R,O,G) bh 1.00
8 Power Meter (kWh meter) bh 1.00
9 CT Measurement bh 1.00
10 Bus bar tembaga dan instalasi bh 1.00
11 Alat bantu, dan material lain bh 1.00
12 Pemasangan dan perkabelan bh 1.00
Jumlah
C PEKERJAAN KABEL FEEDER DAN KABEL TRAY
Pengadaan dan pemasangan kabel fedeer dari LV-MDP ke :
1 PP/LP-E - NYY 4 x 25 mm2 + NYA 16 mm2 m 200.00
2 PP/LP-F - NYY 4 x 25 mm2 + NYA 16 mm2 m 200.00
3 SDP-ACB - NYY 4 x 70 mm2 + NYA 35 mm2 m 200.00
Pengadaan dan pemasangan kabel dari panel ke unit
4 Dari SDP-ACA ke Outdoor Unit AC 3 Ph, m 200.00
NYY 4 x 50 mm2+NYA 25mm2

Pengadaan dan pemasangan kabel tray arus kuat


5 Lantai 1, Kabel tray Lebar 30 cm, tinggi 5 cm, galvanized m 300.00
6 Lantai 1 Kabel tray Fitting 30cm, tinggi 5 cm, galvanized bh 101.00
7 Lantai 2, Kabel tray Lebar 30 cm, tinggi 5 cm, galvanized m 200.00
8 Lantai 2 Kabel tray Fitting 30cm, tinggi 5 cm, galvanized bh 68.00
D PEKERJAAN INSTALASI PENERANGAN DAN OUTLET DAYA
1 Terhubung ke PP/LP-E (Lantai 1)
1 Ceiling Recessed, Cover Mirror Louvre TL Type LED 2x22W/B40 bh 60.00
2 Lampu balk V-Shove TL LED 22W, Daylight bh 17.00
3 Lampu balk Basic Batten TL LED 22W,Daylight bh 3.00
4 Wall Mounted GMS Type LED 1x22W/840. Cover Acrylic Sealer IP bh 3.00
5 Lampu High Bay Widebeam LED 80W bh 16.00
6 Ceiling Recessed, Downlight LED 15W/840 Radius 150 mm bh 59.00
7 Ceiling Recessed, Downlight LED 7W/840 Radius 100 mm bh 18.00
8 Ceiling Recessed Adjustable Downlight LED 7W/840 Radius 100 m bh 8.00
9 Outlet Daya 1 Fasa, 10A Dinding dengan Child Protection bh 42.00
10 Outlet Daya 1 Fasa, 10A lantai Pada Box Outlet lantai bh 138.00
11 Saklar Tunggal bh 19.00
12 Saklar Double bh 18.00
13 Saklar Hotel bh 2.00
14 Lampu Emergency EXIT TL 10W Kapasitas Min 2 Jam untuk non ma bh 2.00
15 Lampu dengan batery Emergensi, Kapasitas 2 Jam untuk Lampu T bh 2.00
2 Terhubung ke PP/LP-F
pesifikasi, pada penempatan terten 1 Ceiling Recessed, Cover Mirror Louvre TL Type LED 2x22W/B40 bh 98.00
2 Lampu balk V-Shove TL LED 22W, Daylight bh -
3 Lampu balk Basic Batten TL LED 22W,Daylight bh -
4 Wall Mounted GMS Type LED 1x22W/840. Cover Acrylic Sealer IP bh 1.00
5 Lampu High Bay Widebeam LED 80W bh -
6 Ceiling Recessed, Downlight LED 15W/840 Radius 150 mm bh 49.00
7 Ceiling Recessed, Downlight LED 7W/840 Radius 100 mm bh 8.00
8 Ceiling Recessed Adjustable Downlight LED 7W/840 Radius 100 m bh 5.00
9 Outlet Daya 1 Fasa, 10A Dinding dengan Child Protection bh 24.00
10 Outlet Daya 1 Fasa, 10A lantai Pada Box Outlet lantai bh 185.00
11 Saklar Tunggal bh

10.00
12 Saklar Double bh 14.00
13 Saklar Hotel bh -
14 Lampu Emergency EXIT TL 10W Kapasitas Min 2 Jam untuk non ma bh 2.00
15 Lampu dengan batery Emergensi, Kapasitas 2 Jam untuk Lampu T bh 2.00

E PEKERJAAN PENANGKAL PETIR


1 Lightning Protection Radius proteksi min = 30 m, type unit 24
upper streamer leader, non radioactive
2 Air Termination tinggi 1 meter, tembaga bh 24
3 Kabel down conductor NYY 1 x 70 mm2, lengkap dengan klem, m 20
4 Ring Grounding system, BC 50mm2 m 177.6
5 Pertanahan 6m dan bak kontrol ls 1
6 Obstraction Lamp 100 Watt ls 1
F PEKERJAAN INSTALASI PENERANGAN UNTUK KEBUTUHAN LANSKAP
Pekerjaan penerangan untuk kebutuhan lanskap meliputi instalasi
penerangan untuk Outdoor Lighting (lampu taman, lampu uplight dan
lampu striplight)
F1 INSTALASI PENERANGAN OUTDOOR
Lampu taman Big Cessna bh 10
Saklar otomatis bh 3
Tiang lampu taman bh 10
NO. URAIAN PEKERJAAN SATUAN VOL

(1) (2) (3) (4)


Lampu sorot ARC HPLN 125W untul lampu sorot pohon bh 4
Lampu LED strip light m 30
NO. URAIAN PEKERJAAN SATUAN VOL

(1) (2) (3) (4)


Titik instalasi penerangan luar, NYM 3x2.5mm2 dalam konduit titik 10
TOTAL SUB PEKERJAAN ELEKTRIKAL
PEKERJAAN MODIFIKASI GEDUNG EX-SITE OFFICE RU-V
PERTAMINA RU-V BALIKPAPAN
SUB PEKERJAAN : FIRE PROTECTION

NO. URAIAN PEKERJAAN SATUAN VOLUME

(1) (2) (3) (4)


I PEKERJAAN SISTEM PEMADAM KEBAKARAN
yg diperlukan sesuai spesifikasi tekniPengadaan dan pemasangan sistem pemadam kebakaran yang terdiri dari Pillar Hydrant, Fire Hose Cabinet, Sprinkle dan Fire
A PEKERJAAN PILLAR HYDRANT
Brand Harrington Unit 2
Model Hydrant Storz
Type Storz Adapter 2,5" Storz x 2,5" NH Female w/ (2) set Screwa with Storz Cap/cable Dark Anodized
B PEKERJAAN FIRE HOSE CABINET (INDOOR)
Lt.1
Model Box Hydrant Lot 1
Type Mild Steel (1,2mm)+ Kaca
Dimensi 125 (h) x 75 (w) x 18 (t)
Paint Finish Stoving / Powder Coating
Accessories
- Fire Hose 1,5" x 30 m 12Bar
- Gate Valve CD 1,5" 10 Bar
- Seamless Nozzle 1,5: 10 Bar
- Hore Rack 1,5"
- Landing Valve CD 2,5" 10 Bar
Lt.2
Model Box Hydrant Lot 1

Type Mild Steel (1,2mm)+ Kaca


Dimensi 125 (h) x 75 (w) x 18 (t)
Paint Finish Stoving / Powder Coating
Accessories
- Fire Hose 1,5" x 30 m 12Bar
- Gate Valve CD 1,5" 10 Bar
- Seamless Nozzle 1,5: 10 Bar
- Hore Rack 1,5"
- Landing Valve CD 2,5" 10 Bar
C PEKERJAAN FIRE HOSE CABINET (OUTDOOR)
Model Box Hydrant Lot 1
Type Mild Steel (1,2mm)+ Kaca
Dimensi 125 (h) x 75 (w) x 18 (t)
Paint Finish Stoving / Powder Coating
Accessories
- Fire Hose 1,5" x 30 m 12Bar
- Seamless Nozzle 1,5: 10 Bar
- Hore Rack 1,5"
D PEKERJAAN SPRINKLE
Lt.1
Pasangan Katup Pengendali
- Gate Valve ø 80 mm Bh 4
- Strainer Bh 4
- PRV ø 65 mm Bh 4
Head Sprinkle
Brand
Type Head Pendant Bh 104
Lt.2
Pasangan Katup Pengendali
- Gate Valve ø 80 mm Bh 4
- Strainer Bh 4
- PRV ø 65 mm Bh 4
Head Sprinkle
Brand
Type Head Pendant Bh 97
E PEKERJAAN FIRE EXTINGUISHER
Lt.1
Model EED-4 Bh 16
Type Stored Pressure Type
Extuingisher ABC Dry Powder
Propellant Dry Nitrogen (N2)
Capacity 4 Kg
Mounting Plastic Vehicle Bracket
Lt.2
Model EED-4 Bh 12
Type Stored Pressure Type
Extuingisher ABC Dry Powder
Propellant Dry Nitrogen (N2)
Capacity 4 Kg
Mounting Plastic Vehicle Bracket
POMPA
a. Electric Fire Pump NFPA 20 Standard (Packaged) Set 1
Model Horizontal Split Case
Type 4LR-11
Kapasitas 750 USgpm x 85 Meter
Daya 75 kW
Putaran 2970 Rpm
Diesel Fire Pump NFPA 20 Standard (packaged)
Model Horizontal Split Case
Type 4LR-11
Kapasitas 750 USgpm x 85 Meter
Daya 68 kW
Putaran 3000 Rpm
b. Jockey Fire Pump Set 1
Model Vertical Multistage Pump

Type 4LR-11
Kapasitas 10.5 USgpm x 95 Bar
Daya 1,5 kW
Putaran 2900 Rpm
F PEKERJAAN FIRE SUPPRESSION
FIRE SUPPRESION (dan aksesories kelengkapannya) Set 1
beserta aksesoris kelengkapannya

G PEKERJAAN AKSESORIS
Packing seal + 10% lot 1
Mur / baut + 10% lot 1
Jasa katodik/anodik pipa lot 1
Pipa hydrant 6 in m 603
TOTAL SUB PEKERJAAN FIRE PROTECTION
PEKERJAAN MODIFIKASI GEDUNG EX-SITE OFFICE RU-V
PERTAMINA RU-V BALIKPAPAN
SUB PEKERJAAN : SISTEM KEAMANAN

NO. URAIAN PEKERJAAN SATUAN VOLUME

(1) (2) (3) (4)

A PEKERJAAN PAGING SYSTEM WORK / PUBLIC ADDRESS


1 INSTALLATION AND FIXTURES
LANTAI DASAR
1 Terminal Boxes (TB-TS) Unit 1.00
Equipment installation, lengkap dng kabel, konduit dan accessories
2 - Fedder cable dari MDF-TS to STB-A, NYMHY 6 x 3 x 2, 5mm2 dlm konduit m' 50.00
3 - Fedder cable dari MDF-TS to STB-A, FRC cable 2x1,5mm2 dlm konduit m' 50.00
4 - Ceiling Speaker Installation, NYMHY cable 2 x 1, 5mm2 In Pipe Conduit Titik 18.00
5 - Wall Speaker Installation, FRC cable 2 x 1, 5mm2 In Pipe Conduit Titik -
Fixtures and armatures
6 Ceiling Speaker 1,5 - 3 Watt Unit 18.00
7 Wall Speaker 10 Watt Unit -
8 Volume Control Unit 1.00
Jumlah
2 INSTALLATION AND FIXTURES
LANTAI 2
1 Terminal Boxes (TB-TS) Unit
Equipment installation, lengkap dng kabel, konduit dan accessories
2 - Fedder cable dari MDF-TS to STB-B, NYMHY 6 x 3 x 2, 5mm2 dlm konduit m' 50.00

3 - Fedder cable dari MDF-TS to STB-B, FRC cable 2x1,5mm2 dlm konduit m' 50.00
4 - Ceiling Speaker Installation, NYMHY cable 2 x 1, 5mm2 In Pipe Conduit Titik 12.00
5 - Wall Speaker Installation, FRC cable 2 x 1, 5mm2 In Pipe Conduit Titik 5.00
Fixtures and armatures
6 Ceiling Speaker 1,5 - 3 Watt Unit 12.00
7 Wall Speaker 10 Watt Unit 5.00
8 Volume Control Unit 1.00
Jumlah
B PEKERJAAN SISTEM FIRE ALARM
1 FEEDER CABLE INSTALATION
1 Installation from MCFA Loop 2 to Terminal Box TB-FA.LT 1 (Existing SO) m 150.00
Shielded Twisted AWG 18 + NYM 3X2,5mm PVC Conduit Ø 20 mm
2 Installation from TB-FA.LT 1 to TB-FA.LT 2 (Existing SO) m 50.00
Shielded Twisted AWG 18 + NYM 3X2,5mm PVC Conduit Ø 20 mm
3 Installation from TB-FA.LT 2 to Back to MCFA LT 1 (New Site Office) m 80.00
Shielded Twisted AWG 18 + NYM 3X2,5mm PVC Conduit Ø 20 mm
Jumlah
2 INSTALLATION AND FIXTURES WORK
LANTAI DASAR
Terminal Box Fire Alarm ( TB-FA ) LT. 1 , unit 1.00
- Conventional Interface Modules For Detector unit 1.00
- Signaling Device Interface Modules For Sounder Red with LED unit 1.00
Equipment installation complete with cable NYA 2X1,5 mm ,
conduit and accessories in Conduit Ø 20 mm
- Smoke Detector Installation titik 21.00
- Heat or ROR Detector Installation titik 17.00
- Manual Push Button Break Glass Installation titik 1.00
- Indicating Sounder Red with LED Installation titik 1.00
- Flow Switch Installation titik 1.00
Fixtures and armatures
- Smoke Detector unit 21.00
- Heat or ROR Detector unit 17.00
- Manual Break Glass Push Button unit 1.00
- Indicating Sounder Red with LED unit 1.00
- Flow Switch unit 1.00
- EOL unit 1.00
Jumlah
3 INSTALLATION AND FIXTURES WORK
LANTAI 2
Terminal Box Fire Alarm ( TB-FA ) LT. 2 , unit 1.00
- Conventional Interface Modules For Detector unit 1.00
- Signaling Device Interface Modules For Sounder Red with LED unit 1.00
Equipment installation complete with cable NYA 2X1,5 mm ,
conduit and accessories in Conduit Ø 20 mm
- Smoke Detector Installation titik 22.00
- Heat or ROR Detector Installation titik 20.00
- Manual Push Button Break Glass Installation titik 1.00
- Indicating Sounder Red with LED Installation titik 1.00
- Flow Switch Installation titik 1.00
Fixtures and armatures
- Smoke Detector unit 22.00
- Heat or ROR Detector unit 20.00
- Manual Break Glass Push Button unit 1.00
- Indicating Sounder Red with LED unit 1.00
- Flow Switch unit 1.00
- EOL unit 1.00
Jumlah
C PEKERJAAN SISTEM CCTV (CLOSE CIRCUIT TELEVISION)
1 CCTV EQUIPMENT & INSTALATION
WALLMOUNT A (LANTAI DASAR)
1 IP Camera Fix Dome Indoor Camera unit 5.00
2 Installation ,Pulling Cable CCTV titik 5.00
WALLMOUNT B (LANTAI 2)
1 IP Camera Fix Dome Indoor Camera unit 5.00
2 Installation ,Pulling Cable CCTV titik 5.00

D PEKERJAAN ACCESS CONTROL SYSTEM


1 WALLMOUNT E (LANTAI 1)
IP Finger Print unit 1.00
Power Supply + Battery back up unit 1.00
IP Acces Card unit 1.00
Electromagnetic Lock unit 1.00
Material Accessories set 1.00
Installation & testing Commissioning set 1.00
Accomodation & Transportation set 1.00
Jumlah
2 WALLMOUNT F (LANTAI 2)
IP Finger Print unit 1.00
Power Supply + Battery back up unit 1.00
IP Acces Card unit 1.00
Electromagnetic Lock unit 1.00
Material Accessories set 1.00
Installation & testing Commissioning set 1.00
Accomodation & Transportation set 1.00
Jumlah
TOTAL SUB PEKERJAAN SISTEM KEAMANAN
PEKERJAAN MODIFIKASI GEDUNG EX-SITE OFFICE RU-V
PERTAMINA RU-V BALIKPAPAN
SUB PEKERJAAN : TELEKOMUNIKASI & IT

NO. URAIAN PEKERJAAN SATUAN


VOLUME
(1) (2) (3) (4)

A PEKERJAAN STRUCTURE CABLING SYSTEM


VERTICAL CABLING SYSTEM
- From Distribution Switch To Access Switch on Wallmount D m 15.00
FO SM 4 Core (Vertical Cabling System)
- From Distribution Switch To Access Switch on Wallmount E m 15.00
FO SM 4 Core (Vertical Cabling System)
B PEKERJAAN HORIZONTAL CABLING SYSTEM
1 WALLMOUNT E (Lantai 1)
A ACCESS SWITCH
1 Ethernet Routing Switch 48 GigE PoE 370W, 4 x 10 G SFP, unit 1.00
LAN Basecompliant). (EU power cord).
2 Ethernet Routing Switch 24 GigE PoE 370W, 4 x 10 G SFP, unit 1.00
LAN Basecompliant). (EU power cord).
3 Ethernet Routing Switch 48 GigE, 4 x 10 G SFP, LAN Base unit 1.00
4 Ethernet Routing Switch 24 GigE, 4 x 10 G SFP, LAN Base unit 1.00
5 SSC Stack Cable, 1.5m (5ft) for Ethernet Routing Switch unit 1.00
Support with Acess series switches.
6 Transceiver, SFP+, 10GbE, LR, SMF Third Party Support unit 1.00
B WIRELESS

1 AP 802.11n/ac Dual 3x3:3 Radio Integrated Antenna AP unit 1.00


2 AP-Flat Surface Wall/Ceiling Black AP Basic Flat Surface unit 1.00
Mount Kit, Blank Patch Panel Category 6 SL
C CABLING SYSTEM ACC
1 Blank Patch Panel Category 6 SL Unit 1.00
2 4 Pair, Category 6 SL Series Modular Jack ( Blue ) unit 138.00
3 4 Pair, Category 6 SL Series Modular Jack ( Red ) unit 4.00
4 BS Shuttered Faceplate - 2 Port pcs 138.00
5 BS Shuttered Faceplate - 1 Port pcs 4.00
6 Category 6 UTP Patch Cords, Stranded, 4ft ( Blue ) unit 1.00
7 Category 6 UTP Patch Cords, Stranded, 7ftm ( Red ) unit 1.00
D MATERIAL SUPPORT
1 RACK SYSTEM
a 19"Wallmounted 12 RU Double door unit 1.00
b Optic Terminal Box 8 Port unit 1.00
c Patch Cords SC-LC unit 1.00
2 INSTALLATION COST
a Installation Rack unit 1.00
b Installation ,Pulling Cable Data titik 142.00
c Installation ,Pulling Cable Wifi titik 1.00
d Installation ,Pulling Cable HRVGA titik 1.00
Jumlah
2 WALLMOUNT F (Lantai 2)
A ACCESS SWITCH
1 Ethernet Routing Switch 48 GigE PoE 370W, 4 x 10 G SFP, unit 1.00
LAN Basecompliant). (EU power cord).
2 Ethernet Routing Switch 24 GigE PoE 370W, 4 x 10 G SFP, unit 1.00
LAN Basecompliant). (EU power cord).
3 Ethernet Routing Switch 48 GigE, 4 x 10 G SFP, LAN Base unit 1.00
4 Ethernet Routing Switch 24 GigE, 4 x 10 G SFP, LAN Base unit 1.00
5 SSC Stack Cable, 1.5m (5ft) for Ethernet Routing Switch unit 1.00
Support with Acess series switches.
6 Transceiver, SFP+, 10GbE, LR, SMF Third Party Support unit 1.00
B WIRELESS
1 AP 802.11n/ac Dual 3x3:3 Radio Integrated Antenna AP unit 1.00
2 AP-Flat Surface Wall/Ceiling Black AP Basic Flat Surface unit 1.00
Mount Kit, Blank Patch Panel Category 6 SL
C CABLING SYSTEM ACC
1 Blank Patch Panel Category 6 SL Unit 1.00
2 4 Pair, Category 6 SL Series Modular Jack ( Blue ) unit 159.00
3 4 Pair, Category 6 SL Series Modular Jack ( Red ) unit 2.00
4 BS Shuttered Faceplate - 2 Port pcs 159.00
5 BS Shuttered Faceplate - 1 Port pcs 2.00
6 Category 6 UTP Patch Cords, Stranded, 4ft ( Blue ) unit 1.00
7 Category 6 UTP Patch Cords, Stranded, 7ftm ( Red ) unit 1.00
D MATERIAL SUPPORT
1 RACK SYSTEM
a 19"Wallmounted 12 RU Double door unit 1.00
b Optic Terminal Box 8 Port unit 1.00
c Patch Cords SC-LC unit 1.00
2 INSTALLATION COST
a Installation Rack unit 1.00
b Installation ,Pulling Cable Data titik 161.00
c Installation ,Pulling Cable Wifi titik -
d Installation ,Pulling Cable HRVGA titik 1.00
Jumlah
C PEKERJAAN IP TELEPHONY SYSTEM
1 WALLMOUNT E (Lantai 1)
a. IP Phone 1600 Series unit 1.00
b. Standard license Phone unit 1.00
c. Installation ,Pulling Cable Voice titik 54.00
Jumlah
2 WALLMOUNT F (Lantai 2)
a. IP Phone 1600 Series unit 1.00
b. Standard license Phone unit

1.00
c. Installation ,Pulling Cable Voice titik 57.00
Jumlah
D PEKERJAAN IP MATV (MASTER AERIAL TELEVISION)
1 IP MATV SYSTEM INSTALATION
A WALLMOUNT E ttk 1.00
Installation ,Pulling Cable IPTV
B WALLMOUNT F ttk 1.00
Installation ,Pulling Cable IPTV
TOTAL SUB PEKERJAAN TELEKOMUNIKASI & IT
PEKERJAAAN PEMBANGUNAN GEDUNG PARKIR DI AREA NEW HSSE OFFICE
PERTAMINA RU-V BALIKPAPAN
SUB PEKERJAAN : ARSITEKTUR

NO. URAIAN PEKERJAAN SATUAN


VOLUME
(1) (3) (4)
A FINISHING LANTAI

1 Homogenous tile 600x600mm m2 42.2


2 Homogenous unpolished 300x300 m2 2.4
3 Concrete Floor ( hardener trowel ,coating epoxy) m2 1,174.9
4 Homogenous unpolished 300x600 m2 17.5
5 Homogenous unpolished 300x600 ( Stair nosing) m2 31.0

B DINDING DAN FINISHING DINDING


LANTAI 2
1 Light Brick T=100mm + Mortar Instan m2 508.7
2 Plesteran Mortar Instan m2 1,002.8
3 Mortar Instan
MU 360 : Perekat Bata Ringan m2 508.7
MU 301 : Plesteran m2 508.7
MU 250 : Acian Plesteran m2 508.7
4 Homogenous unpolished 300x300 ( Dinding) m2 25.6

C PENUTUP ATAP & TALANG


1 Penutup Atap Dak Beton (Waterproof Sikalastic-560) m² 1,136.9
2 Penutup Atap Zincalum m² 636.0
3 Talang FRP t=3mm m 126.0
4 PVC Roof Drain dia 4" bh 18.0
5 Pipa Air Hujan PVC dia 4" klass AW m² 185.7
6 Elbow PVC dia 4" klass AW bh 99.0

D CAT PELAPIS KHUSUS


1 Pengcatan dinding Dalam m² 47.7
2 Mowilex Undercoat Primer m² 47.7
3 Top Coat Mowilex Emulsion m² 47.7
4 Pengcatan dinding Luar m² 856.6
5 Mowilex Undercoat Primer m² 856.6
6 Top Coat Mowilex Wathercoat m² 856.6
7 Cat Besi Railling m 319.7
8 Waterproofing coating : cement based Brushood Flex m² 1,136.9

F PINTU DAN JENDELA


Pintu
Hardware pitu umum ( frame door)
1 Handleset stainles steel Griff 8420.025.SI bh 42.0
2 Lock Case Griff 2110.00.SS bh 30.0
3 Double Cylinder Griff 3301.60 bh 42.0
4 Hinges Griff 1901-SS ( 3 pcs/door) bh 129.0
5 Door Stopper Griff bh 43.0
6 Door Closer 980 Series bh 43.0
7 Kusen aluminium 4" Natural T = 12mm 18 Micron m 163.7
8 Daun Pintu Kusen Alumunium 4" Natural T = 12mm 18 Micron m 1,701.6
9 Laminated Glass t=8 mm Sunergy Cool (eksterior) m2 59.3
10 Pull Handle Griff 2310-F1 bh 1.0
Jendela
1 Kusen aluminium 4" x1.75x1.35 mm Finish powder coating m 1,350.0
2 Tempered Glass t=5mm Frame coating wall (interior) m2 5.5

G PLAFOND
1 Kalsibord m2 2.4
2 Finishing cat weathershield m2 2.4

H TANGGA DAN TANGGA DARURAT


1 Railling BSP Tubular Steel Galvanize dia 8cm m 20.4
2 Floor Drain bh 1.0
3 Floor Drain Fiorentino bh 1.0
4 Closet Duduk bh 1.0
5 Jet Washer bh 1.0
6 Soap Holder bh 1.0
7 Paper Holder + aksesoris bh 1.0
8 Roob Hook bh 1.0
9 Shower bh 1.0
10 Kaca Cermin bh 1.0
I LAIN-LAIN
1 Car Stooper bh 48.0
TOTAL SUB PEKERJAAN ARSITEKTUR
PEKERJAAAN PEMBANGUNAN GEDUNG PARKIR DI AREA NEW HSSE OFFICE
PERTAMINA RU-V BALIKPAPAN
SUB PEKERJAAN : MEKANIKAL & PLUMBING

NO. URAIAN PEKERJAAN SATUAN VOLUME

(1) (2) (3) (4)


A PEKERJAAN PLUMBING (AIR BERSIH)
Pengadaan dan pemasangan pipa PPR PN 10 (Distribusi Horisontal), sesuai spesifikasi, pada penempatan tertentu mempe
PERALATAN UTAMA
Pipa Air Bersih
Lt. 1
Pipa PPR PN 10
- dia 40 mm (4.2 m) lot 1
- dia 25 mm (13.09 m ) lot 1
- dia 20 mm (6.63 m) lot 1
- dia 15 mm (3.80 m) lot 1
Lt.2
Pipa PPR PN 10
- dia 40 mm (8.4 m) lot 1
- dia 25 mm (13.09 m ) lot 1
- dia 20 mm (6.63 m) lot 1
- dia 15 mm (3.80 m) lot 1
POMPA AIR BERSIH
Package Bosting Pump 3 unit lot 1
Kapasitas 50 GPM
Head 28 m
Speed 2900 RPM
Power 500 watt
Operation Alternate, Sequence
2 operation
1 standby
B PEKERJAAN PLUMBING (AIR KOTOR)
Pengadaan dan pemasangan Pipa Air Kotor dan Air Buangan (pipa PVC klass 10 kg/cm²) , sesuai dengan spesifikasi , pad
PERALATAN UTAMA
Pipa Air Kotor
Lt.1
PVC Klass 10 kg/cm2
- dia 100 mm (4.2 m) lot 1
Lt.2
PVC Klass 10 kg/cm2
- dia 100 mm (8.4 m) lot 1
C PEKERJAAN PLUMBING (AIR BEKAS)
Lt.1
PVC Klass 10 kg/cm2
- dia 75 mm (6.63 m) lot 1
- dia 50 mm (3.80 m) lot 1
- dia 40 mm (4.07 m) lot 1
Lt.2
PVC Klass 10 kg/cm2
- dia 75 mm (6.63 m) lot 1
- dia 50 mm (3.80 m) lot 1
- dia 40 mm (4.07 m) lot 1
` POMPA AIR PEMBILAS
Package Bosting Pump 3 unit lot 1
Kapasitas 50 GPM
Head 28 m
Speed 2900 RPM
Power 500 watt
Operation Alternate, Sequence
2 operation
1 standby
D PEKERJAAN AC SPLIT
AC Split Unit 1
Kapasitas 1.5 pK
Power 1,1 kW
E PEKERJAAN SEPTIC TANK (BIOPORI)
SEPTICTANK (BIOPORI) kap 6 ornag ukuran 90 x 90 x 110 Unit 1
TOTAL SUB PEKERJAAN MEKANIKAL & PLUMBING
PEKERJAAAN PEMBANGUNAN GEDUNG PARKIR DI AREA NEW HSSE OFFICE
PERTAMINA RU-V BALIKPAPAN
SUB PEKERJAAN : ELEKTRIKAL & ELEKTRONIKA

NO. URAIAN PEKERJAAN SATUAN VOLUME

(1) (2) (3) (4)


A PEKERJAAN PENYAMBUNGAN DAYA 0
B PEKERJAAN PANEL - PANEL DISTRIBUSI.
1 Panel PP/LP - S1 (Lantai 1)
1 Panel box (H) 800 x (W) 600 x (D) 300 mm bh 1
2 MCB out 3 fasa, 25A, 10kA bh 1
3 MCB out 1 fasa, 6A/10A/16A, 6kA bh 12
4 MCB out 1 fasa, 6A, 4.5kA (for control) bh
5 Pilot Lamp LED AC 220 V (R,O,G) bh 1
6 Power Meter (kWh meter) bh 1
7 CT Measurement bh 1
8 Bus bar tembaga dan instalasi bh 1
9 Alat bantu, dan material lain bh 1
10 Pemasangan dan perkabelan bh 1
Jumlah
2 Panel PP/LP - S2 (Lantai 2)
1 Panel box (H) 800 x (W) 600 x (D) 300 mm bh 1
2 MCCB in 3 fasa, 100AF/100AT, 25kA bh 1
3 MCB out 1 fasa, 6A/10A/16A, 6kA bh 9
4 MCB out 1 fasa, 6A, 4.5kA (for control) bh
5 Pilot Lamp LED AC 220 V (R,O,G) bh 1
6 Power Meter (kWh meter) bh 1
7 CT Measurement bh 1
8 Bus bar tembaga dan instalasi bh 1
9 Alat bantu, dan material lain bh 1
10 Pemasangan dan perkabelan bh 1
Jumlah
C PEKERJAAN KABEL FEEDER DAN KABEL TRAY
Pengadaan dan pemasangan kabel fedeer dari LV-MDP ke :
1 PP/LP-S1 - NYY 4 x 50 mm2 + NYA 25 mm2 m 300
Pengadaan dan pemasangan kabel fedeer dari PP/LP-S1 ke :
2 PP/LP-S2 - NYY 4 x 16 mm2 + NYA 10 mm2 m 50
D PEKERJAAN INSTALASI PENERANGAN DAN OUTLET DAYA
1 Terhubung ke PP/LP-GP (Lantai 1) dan Terhubung ke PP/LP-GP Lantai 2
1 Ceiling Reccessed Cover Miror Louvre, TL LED 2x22W bh 1
2 Lampu BALK V-Shave TL LED 22W bh 141
5 Lampu down light RD150 Lampu LED 7Watt bh 2
10 Saklar tunggal bh 3
11 Saklar double bh 9
13 Titik instalasi penerangan, NYM 3 x 2,5 mm2 dalam konduit ttk 156
15 Outlet daya 1 fasa dinding, inc instalasi bh 3
E PEKERJAAN PENANGKAL PETIR
1 Lightning Protection Radius proteksi min = 30 m, type unit N/A Drawing
upper streamer leader, non radioactive
2 Air Termination tinggi 1 meter, tembaga bh N/A Drawing
3 Kabel down conductor NYY 1 x 70 mm2, lengkap dengan klem, mtr N/A Drawing
4 Ring Grounding system, BC 70mm2 m N/A Drawing
5 Pertanahan 6m dan bak kontrol ls N/A Drawing
6 Obstraction Lamp 100 Watt ls N/A Drawing
TOTAL SUB PEKERJAAN ELEKTRIKAL & ELEKTRONIKA
PEKERJAAAN PEMBANGUNAN GEDUNG PARKIR DI AREA NEW HSSE OFFICE
PERTAMINA RU-V BALIKPAPAN
SUB PEKERJAAN : SISTEM KEAMANAN

NO. URAIAN PEKERJAAN SATUAN VOLUME

(1) (2) (3) (4)

A PEKERJAAN PAGING SYSTEM WORK / PUBLIC ADDRESS


1 MAIN EQUIPMENT
Evacuation System
a Paging Microphone, lengkap dengan Chime Gong Unit 1.00
b Mixer Controller Built in 240Watt c/w Message manager Unit 1.00
c Power Amplifier 480 Watt Unit 1.00
d BGM Source USB/SD/ MP3/AM/FM Tuners Unit 1.00
e Emergency Power Amplifier 240 Watt Unit 1.00
f Graphic Equalizer Unit 1.00
g Zone Selector/Routter Unit 1.00
h Cabinet Rack Unit 1.00
i MDF,cable distribusi dll set 1.00
j Test and commissioning lot 1.00
Jumlah MAIN EQUIPMENT
2 INSTALLATION AND FIXTURES
LANTAI 1 DAN 2
a Terminal Boxes (TB-TS) Unit 1.00
Equipment installation, lengkap dng kabel, konduit dan accessories
b - Fedder cable dari MDF-TS to STB-A, NYMHY 6 x 3 x 2, 5mm2 dlm konduit m' 400.00
c - Fedder cable dari MDF-TS to STB-A, FRC cable 2x1,5mm2 dlm konduit m' 400.00
d - Ceiling Speaker Installation, NYMHY cable 2 x 1, 5mm2 In Pipe Conduit Titik 1.00
e - Wall Speaker Installation, FRC cable 2 x 1, 5mm2 In Pipe Conduit Titik 18.00
Fixtures and armatures
f Ceiling Speaker 1,5 - 3 Watt Unit 1.00
g Wall Speaker 10 Watt Unit 18.00
h Volume Control Unit -
Jumlah INSTALATION & FIXTURE LANTAI DASAR
B PEKERJAAN SISTEM FIRE ALARM
1 FEEDER CABLE INSTALATION
a Installation from MCFA Loop 3 to Terminal Box TB-FA.LT 1 (Gedung Parkir) m 300.00
Shielded Twisted AWG 18 + NYM 3X2,5mm PVC Conduit Ø 20 mm
b Installation from TB-FA.LT 1 to Back to MCFA LT 1 (New Site Office) m 400.00
Shielded Twisted AWG 18 + NYM 3X2,5mm PVC Conduit Ø 20 mm
Jumlah FEEDER CABLE INSTALATION
2 INSTALLATION AND FIXTURES WORK
LANTAI DASAR
Terminal Box Fire Alarm ( TB-FA ) LT. 1 , unit 1.00
- Conventional Interface Modules For Detector unit 1.00
- Signaling Device Interface Modules For Sounder Red with LED unit 1.00
Equipment installation complete with cable NYA 2X1,5 mm ,
conduit and accessories in Conduit Ø 20 mm
- Smoke Detector Installation titik 1.00
- Heat or ROR Detector Installation titik 26.00
- Manual Push Button Break Glass Installation titik 1.00
- Indicating Sounder Red with LED Installation titik 1.00
- Flow Switch Installation titik 1.00
Fixtures and armatures
- Smoke Detector unit 1.00
- Heat or ROR Detector unit 26.00
- Manual Break Glass Push Button unit 1.00
- Indicating Sounder Red with LED unit 1.00
- Flow Switch unit 1.00
- EOL unit 1.00
Jumlah INSTALATION & FIXTURE WORK LANTAI DASAR
C PEKERJAAN SISTEM CCTV (CLOSE CIRCUIT TELEVISION)
1 CCTV EQUIPMENT & INSTALATION
WALLMOUNT GP (LANTAI DASAR)
a IP Camera Fix Dome Indoor Camera unit 6.00
b Installation ,Pulling Cable CCTV titik 6.00
Jumlah MAIN EQUIPMENT CCTV

TOTAL SUB PEKERJAAN SISTEM KEAMANAN


PART 2 C ‐ LAMPIRAN 2.3
TEMPLATE UNTUK BREAKDOWN DARI BIAYA PROYEK

PEKERJAAAN PEMBANGUNAN GEDUNG SUB FIRE STATION


PERTAMINA RU-V BALIKPAPAN
SUB PEKERJAAN : SIPIL & STRUKTUR

NO. URAIAN PEKERJAAN SATUAN


VOLUME
(1) (3) (4)
I PEKERJAAN PERSIAPAN
1 Mobilisasi & Demobilisasi ls 1.00
2 Stakeout & Positioning ls
1.00
3 Fasilitas Sementara ls 1.00
4 Safety HSE ls 1.00
II PEKERJAAN ENGINEERING
1 Engineering ls 1.00
III PEKERJAAN SIPIL & STRUKTUR
A PEKERJAAN TANAH
1 Pekerjaan galian sementara (untuk pondasi, sloof, dll) m3 360.87
2 Pekerjaan urugan kembali (backfill) m3 346.15
3 Pekerjaan buangan sisa galian ke disposal m3 14.72
B PEKERJAAN TIANG PANCANG BETON
1 Pengadaan Concrete Spun Pile Ø400 t=75mm m' 192.00
2 Handling & Positioning m' 192.00
3 Pemancangan m' 192.00
4 Penyambungan Tiang nos 12.00
5 Pemotongan Tiang nos
12.00
C PEKERJAAN PONDASI BATU KALI
1 Pondasi Batu kali - Pasir urug m3 2.16
2 Pondasi Batu kali - Anstamping m3 7.73
3 Pondasi Batu kali - Pas. Batu Kali m3 30.93
D PEKERJAAN BETON LANTAI KERJA K-125
1 Lantai kerja, K.125 m3 40.00
E PEKERJAAN BETON BERTULANG K-350
1 Beton bertulang K. 350, Pile Cap m3 5.38
2 Beton bertulang K. 350, Pondasi Tangga m3 1.35
3 Beton bertulang K. 350, Pengisi Tiang m3 1.16
4 Beton bertulang K. 350, Sloof m3 25.02
5 Beton bertulang K. 350, Kolom m3
9.46
6 Beton bertulang K. 350, Pelat Lt. dasar m3 88.00
7 Beton bertulang K. 350, Balok m3 51.61
8 Beton bertulang K. 350, Pelat dak m3 27.69
9 Beton bertulang K. 350, Tangga m3 8.95
F PEKERJAAN PEMBESIAN DOWEL
1 Dowel ∅33mm-300 kg
757.97
2 Tie Bar ∅16mm-700 kg
208.71
G PEKERJAAN BAJA
1 Pekerjaan Baja (Rangka Atap) kg 8,030.80
TOTAL SUB PEKERJAAN SIPIL & STRUKTUR
PEKERJAAAN PEMBANGUNAN GEDUNG SUB FIRE STATION
PERTAMINA RU-V BALIKPAPAN
SUB PEKERJAAN : ARSITEKTUR

NO. URAIAN PEKERJAAN SATUAN VOLUME

(1) (3) (4)


I PEKERJAAN GEDUNG SUB FIRE STATION
A PEKERJAAN DINDING & PLESTERAN
LANTAI 1

1 Pekerjaan Pemasangan 1m2 Dinding Bata ringan 10 cm Bata Campuran 1SP:3PP m2 538.25
2 Pekerjaan Kolom Praktis 11X11cm, besi Utama 4 Dia 13mm sengkang dia 10mm jarak 15cm m' 126
3 Pekerjaan Plesteran Dinding mortar instant m2 1076.5
4 Pekerjaan Plesteran 1 : 3 Kolom Praktis m2 26.95
5 Acian dinding m2 1124.5
6 Acian Kolom Praktis m2 26.95
7 Pekerjaan meja beton wastafel dan sink m3 0.6
LANTAI 2
1 Pekerjaan Pemasangan 1m2 Dinding Bata ringan 10 cm Bata Campuran 1SP:3PP m2 251.9063
2 Pekerjaan Kolom Praktis 11X11cm, besi Utama 4 Dia 13mm sengkang dia 10mm jarak 15cm m' 77
3 Pekerjaan Plesteran Dinding mortar instant m2 527.8125
4 Pekerjaan Plesteran 1 : 3 Kolom Praktis m2 17
5 Acian dinding m2 527.8125
6 Acian Kolom Praktis m2 17
B PEKERJAAN KUSEN PINTU/JENDELA
LANTAI 1
1 Pekerjaan Pemasangan Pintu Umum double swing 1 bh 1
2 Pekerjaan Pemasangan Pintu Umum Single swing 1 bh 1
3 Pekerjaan Pemasangan Pintu Toilet bh 1
4 Pekerjaan Pemasangan Jendela tipe 1 bh 2
5 Pekerjaan Pemasangan Jendela tipe 2 bh 2
6 Pekerjaan Pemasangan Jendela tipe 3 bh 2
7 Pekerjaan Kusen Bouvenlight Kaca bh 1
8 Pekerjaan Kusen Bouvenlight Wiremesh bh 1
LANTAI 2
1 Pekerjaan Pemasangan Pintu Umum Single swing 1 bh 1
C PEKERJAAN LANTAI
LANTAI 1
1 Pekerjaan Lantai Floor Hardener m2 446.97
2 Pekerjaan Lantai Tangga Homogenous Tile 60x30 m2 21.6975
3 Pekerjaan Lantai Homogenous Tile 30x60 (Stair Nosing) m2 10.89
D PEKERJAAN PENGECATAN
LANTAI 1
1 Pekerjaan pengecatan dinding Exterior Weathershield m2 538.25
2 Pekerjaan Pengecatan Dinding Tangga Interior m2 45
LANTAI 2
1 Pekerjaan pengecatan dinding Exterior Weathershield m2 238.3063
RAILING
1 Pekerjaan pengecatan railling m2 88
E PEKERJAAN FINISHING ATAP DAK
1 Pekerjaan Waterproof Sikalastic-560 m2 340
2 Pekerjaan penutup atap zincalum +Powder Coating m2 498
3 Pekerjaan pemasangan insulasi atap m2 498
F PEKERJAAN RAILING
1 Railing BSP m' 44
2 Pekerjaan Pemasangan 1m2 Dinding Bata ringan 10 cm Bata Campuran 1SP:3PP m2 44
3 Pekerjaan Plesteran Dinding mortar instant m2 88
4 Acian dinding m2 88
5 Railing BSP Luncur m' 9.8
G PEKERJAAN LAIN LAIN
1 Pekerjaan Roof Drain bh 8
2 Pekerjaan 1 m' Talang Tegak ø 4" Pjg 4 m Ex-Rucika m" 27
3 Pekerjaan 1 m' Talang Datar Ex-Rucika m" 20
4 Pekerjaan Elbow PVC, Ø 4" Klass AW bh 20
5 Sign Board / Papan Nama Huruf Timbul Stainless SS201 Hairline, 0.8mm ls 1
TOTAL SUB PEKERJAAN ARSITEKTUR
PEKERJAAAN PEMBANGUNAN GEDUNG SUB FIRE STATION
PERTAMINA RU-V BALIKPAPAN
SUB PEKERJAAN : TELEKOMUNIKASI & IT

NO. URAIAN PEKERJAAN SATUAN VOLUME

(1) (2) (3) (4)

A PEKERJAAN STRUCTURE CABLING SYSTEM


VERTICAL CABLING SYSTEM

- From Distribution Switch To Access Switch on Wallmount SFS m 600


FO SM 4 Core (Vertical Cabling System)
B PEKERJAAN HORIZONTAL CABLING SYSTEM
1 WALLMOUNT SFS (Lantai 1)
ACCESS SWITCH
a Ethernet Routing Switch 48 GigE PoE 370W, 4 x 10 G SFP, unit 1.00
LAN Basecompliant). (EU power cord).
b Ethernet Routing Switch 24 GigE PoE 370W, 4 x 10 G SFP, unit 1.00
LAN Basecompliant). (EU power cord).
c Ethernet Routing Switch 48 GigE, 4 x 10 G SFP, LAN Base unit 1.00
d Ethernet Routing Switch 24 GigE, 4 x 10 G SFP, LAN Base unit 1.00
e SSC Stack Cable, 1.5m (5ft) for Ethernet Routing Switch unit 1
Support with Acess series switches.
f Transceiver, SFP+, 10GbE, LR, SMF Third Party Support unit 1
WIRELESS
a AP 802.11n/ac Dual 3x3:3 Radio Integrated Antenna AP unit 1
b AP-Flat Surface Wall/Ceiling Black AP Basic Flat Surface unit 1
Mount Kit, Blank Patch Panel Category 6 SL
CABLING SYSTEM ACC
a Blank Patch Panel Category 6 SL Unit 3
b 4 Pair, Category 6 SL Series Modular Jack ( Blue ) unit 3
c 4 Pair, Category 6 SL Series Modular Jack ( Red ) pcs 3
d BS Shuttered Faceplate - 2 Port pcs 4
e BS Shuttered Faceplate - 1 Port unit 4
f Category 6 UTP Patch Cords, Stranded, 4ft ( Blue ) unit 4
g Category 6 UTP Patch Cords, Stranded, 7ftm ( Red ) unit 4
MATERIAL SUPPORT
1 RACK SYSTEM
a 19"Wallmounted 12 RU Double door unit 2
b Optic Terminal Box 8 Port unit 2
c Patch Cords SC-LC unit 2
2 INSTALLATION COST
a Installation Rack unit 4
b Installation ,Pulling Cable Data titik 4
c Installation ,Pulling Cable Wifi titik 4
d Installation ,Pulling Cable HRVGA titik 4
Jumlah HORIZONTAL CABLING SYSTEM WALLMOUNT SFS
C PEKERJAAN IP TELEPHONY SYSTEM
1 WALLMOUNT SFS (Lantai 1)
a. IP Phone 1600 Series unit 2
b. Standard license Phone unit 2
c. Installation ,Pulling Cable Voice titik 4
D PEKERJAAN IP MATV (MASTER AERIAL TELEVISION)
1 IP MATV SYSTEM INSTALATION
A WALLMOUNT SFS ttk 4
Installation ,Pulling Cable IPTV
PEKERJAAAN PEMBANGUNAN GEDUNG SUB FIRE STATION
PERTAMINA RU-V BALIKPAPAN
SUB PEKERJAAN : SISTEM KEAMANAN

NO. URAIAN PEKERJAAN SATUAN VOLUME

(1) (2) (3) (4)

A PEKERJAAN PAGING SYSTEM WORK / PUBLIC ADDRESS


1 INSTALLATION AND FIXTURES

LANTAI 1 DAN 2
a Terminal Boxes (TB-TS) Unit 2.00
Equipment installation, lengkap dng kabel, konduit dan accessories
b - Fedder cable dari MDF-TS to STB-A, NYMHY 6 x 3 x 2, 5mm2 dlm konduit m' 60.00
c - Fedder cable dari MDF-TS to STB-A, FRC cable 2x1,5mm2 dlm konduit m' 60.00
d - Ceiling Speaker Installation, NYMHY cable 2 x 1, 5mm2 In Pipe Conduit Titik 4.00
e - Wall Speaker Installation, FRC cable 2 x 1, 5mm2 In Pipe Conduit Titik 4.00
Fixtures and armatures
f Ceiling Speaker 1,5 - 3 Watt Unit 4.00
g Wall Speaker 10 Watt Unit 4.00
h Volume Control Unit 4.00
Jumlah I.A INSTALATION & FIXTURE LANTAI 1 DAN 2
B PEKERJAAN SISTEM FIRE ALARM
1 FEEDER CABLE INSTALATION
a Installation from MCFA Loop 2 to Terminal Box TB-FA.LT 1 (Existing SO) m 50.00
Shielded Twisted AWG 18 + NYM 3X2,5mm PVC Conduit Ø 20 mm
b Installation from TB-FA.LT 2 to Back to MCFA LT 1 (New Site Office) m 75.00
Shielded Twisted AWG 18 + NYM 3X2,5mm PVC Conduit Ø 20 mm
Jumlah FEEDER CABLE INSTALATION
2 INSTALLATION AND FIXTURES WORK
LANTAI DASAR
Terminal Box Fire Alarm ( TB-FA ) LT. 1 , unit 2.00
- Conventional Interface Modules For Detector unit 2.00
- Signaling Device Interface Modules For Sounder Red with LED unit 2.00
Equipment installation complete with cable NYA 2X1,5 mm ,
conduit and accessories in Conduit Ø 20 mm
- Smoke Detector Installation titik 8.00
- Heat or ROR Detector Installation titik 4.00
- Manual Push Button Break Glass Installation titik 2.00
- Indicating Sounder Red with LED Installation titik 2.00
- Flow Switch Installation titik 2.00
Fixtures and armatures
- Smoke Detector unit 4.00
- Heat or ROR Detector unit 4.00
- Manual Break Glass Push Button unit 4.00
- Indicating Sounder Red with LED unit 4.00
- Flow Switch unit 2.00
- EOL unit 2.00
Jumlah INSTALATION & FIXTURE WORK LANTAI DASAR
C PEKERJAAN SISTEM CCTV (CLOSE CIRCUIT TELEVISION)
1 CCTV EQUIPMENT & INSTALATION
WALLMOUNT A (LANTAI DASAR)
a IP Camera Fix Dome Indoor Camera unit 6.00
b Installation ,Pulling Cable CCTV titik 100.00
Jumlah MAIN EQUIPMENT CCTV
D PEKERJAAN ACCESS CONTROL SYSTEM
1 WALLMOUNT E (LANTAI 1)
IP Finger Print unit 1.00
Power Supply + Battery back up unit 1.00
IP Acces Card unit 1.00
Electromagnetic Lock unit 1.00
Material Accessories set 1.00
Installation & testing Commissioning set 1.00
Accomodation & Transportation set 1.00
Jumlah ACCESS CONTROL SYSTEM LANTAI 1
PEKERJAAAN PEMBANGUNAN GEDUNG SUB FIRE STATION
PERTAMINA RU-V BALIKPAPAN
SUB PEKERJAAN : FIRE PROTECTION

NO. URAIAN PEKERJAAN SATUAN VOLUME

(1) (2) (3) (4)


I PEKERJAAN SISTEM PEMADAM KEBAKARAN
Pengadaan dan pemasangan sistem pemadam kebakaran yang terdiri dari Pillar Hydrant, Fire Hose Cabinet, Sprinkle dan Fir
A PEKERJAAN PILLAR HYDRANT

Brand Harrington Unit 2


Model Hydrant Storz
Type Storz Adapter 2,5" Storz x 2,5" NH Female w/ (2) set Screwa with Storz Cap/cable Dark Anodized
B PEKERJAAN FIRE HOSE CABINET (INDOOR)
Lt.1
Brand
Model Box Hydrant Lot 1
Type Mild Steel (1,2mm)+ Kaca
Dimensi 125 (h) x 75 (w) x 18 (t)
Paint Finish Stoving / Powder Coating
Accessories
- Fire Hose 1,5" x 30 m 12Bar
- Gate Valve CD 1,5" 10 Bar
- Seamless Nozzle 1,5: 10 Bar
- Hore Rack 1,5"
- Landing Valve CD 2,5" 10 Bar
Lt.2
Brand
Model Box Hydrant Lot 1
Type Mild Steel (1,2mm)+ Kaca
Dimensi 125 (h) x 75 (w) x 18 (t)
Paint Finish Stoving / Powder Coating
Accessories
- Fire Hose 1,5" x 30 m 12Bar
- Gate Valve CD 1,5" 10 Bar
- Seamless Nozzle 1,5: 10 Bar
- Hore Rack 1,5"
- Landing Valve CD 2,5" 10 Bar
C PEKERJAAN FIRE HOSE CABINET (OUTDOOR)
Model Box Hydrant Lot 1
Type Mild Steel (1,2mm)+ Kaca
Dimensi 125 (h) x 75 (w) x 18 (t)
Paint Finish Stoving / Powder Coating
Accessories
- Fire Hose 1,5" x 30 m 12Bar
- Seamless Nozzle 1,5: 10 Bar
- Hore Rack 1,5"
D PEKERJAAN SPRINKLE
Lt.1
Pasangan Katup Pengendali
- Gate Valve ø 80 mm Bh 2
- Strainer Bh 2
- PRV ø 65 mm Bh 4
Head Sprinkle
Brand
Type Head Pendant Bh 1
Connect Thread ¾"
Temperature 141°C
Material Brass Alloy
Lt.2
Pasangan Katup Pengendali
- Gate Valve ø 80 mm Bh 1
- Strainer Bh 1
- PRV ø 65 mm Bh 1
Head Sprinkle
Brand
Type Head Pendant Bh 2
Connect Thread ¾"

Temperature 141°C
Material Brass Alloy

E PEKERJAAN FIRE EXTINGUISHER


Lt.1
Brand
Model EED-4 Bh 2
Type Stored Pressure Type
Extuingisher ABC Dry Powder
Propellant Dry Nitrogen (N2)
Capacity 4 Kg
Mounting Plastic Vehicle Bracket
Lt.2
Brand
Model EED-4 Bh 2
Type Stored Pressure Type
Extuingisher ABC Dry Powder
Propellant Dry Nitrogen (N2)
Capacity 4 Kg
Mounting Plastic Vehicle Bracket
PEKERJAAAN PEMBANGUNAN GEDUNG SUB FIRE STATION
PERTAMINA RU-V BALIKPAPAN
SUB PEKERJAAN : ELEKTRIKAL

NO. URAIAN PEKERJAAN SATUAN VOLUME

(1) (2) (3) (4)


A PENYAMBUNGAN DAYA 0
B PEKERJAAN PANEL - PANEL DISTRIBUSI.
1 Panel PP/LP - S1 (Lantai 1)

a Panel box (H) 800 x (W) 600 x (D) 300 mm bh 2


b MCCB in 3 fasa, 100AF/100AT, 25kA bh 4
c MCB out 3 fasa, 63A, 10kA bh 4
d MCB out 3 fasa, 25A, 10kA bh 4
e MCB out 1 fasa, 6A/10A/16A, 6kA bh 4
f MCB out 1 fasa, 6A, 4.5kA (for control) bh 4
g Pilot Lamp LED AC 220 V (R,O,G) bh 2
h Power Meter (kWh meter) bh 2
i CT Measurement bh 1
j Bus bar tembaga dan instalasi bh 2
k Alat bantu, dan material lain bh 2
l Pemasangan dan perkabelan bh 2
Jumlah
Panel PP/LP - S2 (Lantai 2)
a Panel box (H) 800 x (W) 600 x (D) 300 mm bh 2
b MCCB in 3 fasa, 100AF/100AT, 25kA bh 4
c MCB out 3 fasa, 63A, 10kA bh 4
d MCB out 3 fasa, 25A, 10kA bh 4
e MCB out 1 fasa, 6A/10A/16A, 6kA bh 4
f MCB out 1 fasa, 6A, 4.5kA (for control) bh 4
g Pilot Lamp LED AC 220 V (R,O,G) bh 4
h Power Meter (kWh meter) bh 1
i CT Measurement bh 1
j Bus bar tembaga dan instalasi bh 1
k Alat bantu, dan material lain bh 1
l Pemasangan dan perkabelan bh 1
Jumlah
C PEKERJAAN KABEL FEEDER DAN KABEL TRAY
Pengadaan dan pemasangan kabel fedeer dari LV-MDP ke :
a PP/LP-S1 - NYY 4 x 50 mm2 + NYA 25 mm2 m 300
Pengadaan dan pemasangan kabel fedeer dari PP/LP-S1 ke :
a PP/LP-S2 - NYY 4 x 16 mm2 + NYA 10 mm2 m 300
Jumlah III.PEKERJAAN PANEL KABEL FEEDER DAN KABEL TRAY
D PEKERJAAN INSTALASI PENERANGAN DAN OUTLET DAYA
1 Terhubung ke PP/LP-S1 (Lantai 1) dan Terhubung ke PP/LP-S2
a Ceiling Reccessed Cover Miror Louvre, TL LED 2x22W bh 8
b Lampu BALK V-Shave TL LED 22W bh 8
c Lampu BALK GMS Dinding TL LED 22W bh 8
d Lampu down light RD150 Lampu LED 15Watt bh 8
e Lampu down light RD150 Lampu LED 7Watt bh 8
f Saklar tunggal bh 4
g Saklar double bh 4
h Titik instalasi penerangan, NYM 3 x 2,5 mm2 dalam konduit ttk 4
i Outlet daya 1 fasa dinding, inc instalasi bh 2
E PEKERJAAN PENANGKAL PETIR
a Lightning Protection Radius proteksi min = 30 m, type unit 1
upper streamer leader, non radioactive
b Air Termination tinggi 1 meter, tembaga bh 2
c Kabel down conductor NYY 1 x 70 mm2, lengkap dengan klem, mtr 300
d Ring Grounding system, BC 70mm2 m 150
e Pertanahan 6m dan bak kontrol ls 1
f Obstraction Lamp 100 Watt ls 1
PEKERJAAAN PEMBANGUNAN GEDUNG SUB FIRE STATION
PERTAMINA RU-V BALIKPAPAN
SUB PEKERJAAN : MEKANIKAL & PLUMBING

NO. URAIAN PEKERJAAN SATUAN VOLUME

(1) (2) (3) (4)


A PEKERJAAN AIR CONDITIONING
Penyediaan dan pemasangan unit AC split dengan Instalasi ducting &pengkabelanya bracket lengkap dengan drain
PERALATAN UTAMA

a. Air Cooled-Dry Cooling Tower


Model 2 unit
Tipe Square Cross Up Air Flow Lot 2
No. of Unit 1 s/d 2 (2 Run)
Capacity 175 TR
Ambient Temp. 35o CDB / 30o CWB
Water Flow 480 GPM
Material
Casing Mild Steel
Coil Cooper Alloy
Lengkap dengan base plate, panel kontrol, kabel kontrol, mounting/isolator type,
dan assesoris lainnya sesuai spesifikasi teknis dan gambar.
b. Fan Coil Unit
Lengkap dengan spring mounting, thermostat + kabel kontrol, drain pan, filter
udara, hanger dan asesoris lainnya
Lt. 1 4 unit
Type HWP 290 CKTD Lot 4
Capacity 8 TR
Gate Valve dia 1 ¼" Bh 4
2-Way Valve dia 1 ¼" Bh 4
Strainer Bh 2
Thermo Well Bh 2
Pressure Gauge Bh 3
Ducting Supply
2250 cfm 24"x16" m 40
1500 cfm 18"x16" m 35
750 cfm 14"x12" m 35
375 cfm 10"x10" m 35
Diffuser Unit 2
Ducting Return
24"x16" m 30
18"x16" m 35
14"x12" m 35
10"x10" m 35
Diffuser Unit 2
Fresh Air Duct
10"x10" m 35
Diffuser Unit 2

Lt.2 5 unit
Type HWP 370 CKTD Lot 5
Capacity 10 TR
Gate Valve dia 1 ¼" Bh 2
2-Way Valve dia 1 ¼" Bh 2
Strainer Bh 1
Thermo Well Bh 2
Pressure Gauge Bh 2
Ducting Supply
2250 cfm 24"x16" m 40
1500 cfm 18"x16" m 35
750 cfm 14"x12" m 35
375 cfm 10"x10" m 35
Diffuser Unit 2
Ducting Return
24"x16" m 40
18"x16" m 35
14"x12" m 35
10"x10" m 35
Diffuser Unit 2
Fresh Air Duct

10"x10" m 35
Diffuser Unit 2

c. Fan
Lt. 1 3 unit
Exhaust Air Fan
Type : EF-25 ASB - E Lot 3
Model : Wall Mounted
Aliran Udara : 500 CFM
Daya : 45-55
Lt. 2 1 unit
Type : EF-25 ASB - E
Model : Wall Mounted
Aliran Udara : 500 CFM Lot 1
Daya : 45-55
Voltage : 220V/50Hz
INSTALASI
VALVE & ACCESSORIES
a. Air Cooled-Dry Cooling Tower
b.a. Flexible Connection 8" (2 bh)
Model Lot 2
Type : Flange dari Malleable Iron
Beloow dari Reinforced Synthetice Rubber
Tekanan Kerja : 150 Psi
Brand

b.b. Gate Valve 8"(2 bh)


Model Lot 2
Type : Flange dari Malleable Iron
Beloow dari Reinforced Synthetice Rubber
Tekanan Kerja : 150 Psi
Brand
Setiap Gate Valve harus dilengkapi dengan alve Indicator
NO. URAIAN PEKERJAAN SATUAN VOLUME

(1) (2) (3) (4)


B PEKERJAAN PLUMBING (AIR BERSIH)
Pengadaan dan pemasangan pipa PPR PN 10 (Distribusi Horisontal), sesuai
spesifikasi, pada penempatan tertentu mempergunakan
PERALATAN UTAMA sambungan solvent
cement, lengkap dengan hanger, support, klem dan accessories lainnya.
a. Pipa Air Bersih
Lt. 1
Pipa PPR PN 10
- dia 50 mm m 30
- dia 25 mm m 30
- dia 20 mm m 30
- dia 15 mm m 82
Lt.2
Pipa PPR PN 10
- dia 50 mm m 0
- dia 25 mm m 0
- dia 20 mm m 0
- dia 15 mm m 0
POMPA AIR BERSIH
Package Bosting Pump 3 unit lot 3
Kapasitas 50 GPM
Head 28 m
Speed 2900 RPM
Power 500 watt
Operation Alternate, Sequence
2 operation
1 standby
C PEKERJAAN PLUMBING (AIR KOTOR)
Pengadaan dan pemasangan Pipa Air Kotor (pipa PVC klass 10 kg/cm²) , sesuai
dengan spesifikasi , pada penempatan tertentu
PERALATAN mempergunakan sambungan
UTAMA
solvent cement, lengkap dengan hanger, support, klem dan accessories lainnnya.
Lt.1 PVC Klass 10 kg/cm2
- dia 100 mm m 30
- dia 125 mm m 59
Lt.2
PVC Klass 10 kg/cm2
- dia 100 mm m 30
D PEKERJAAN PLUMBING (AIR BEKAS)
Pengadaan dan pemasangan Pipa Air Bekas (pipa PVC klass 10 kg/cm²) , sesuai
dengan spesifikasi , pada penempatan tertentu
PERALATAN mempergunakan sambungan
UTAMA
solvent cement, lengkap dengan hanger, support, klem dan accessories lainnnya.
Lt.1
PVC Klass 10 kg/cm2
- dia 75 mm m 50
- dia 50 mm m 50
- dia 40 mm m 50
Lt.2
PVC Klass 10 kg/cm2
- dia 75 mm m 50
- dia 50 mm m 50
- dia 40 mm m 50
` POMPA AIR PEMBILAS
Package Bosting Pump 3 unit lot 3
Kapasitas 50 GPM
Head 28 m
Speed 2900 RPM
Power 1,1 kW
Operation Alternate, Sequence
2 operation
1 standby
PEKERJAAAN PEMBANGUNAN GEDUNG SUB FIRE STATION
PERTAMINA RU-V BALIKPAPAN
SUB PEKERJAAN : INTERIOR

NO. URAIAN PEKERJAAN SATUAN


VOL
(1) (2) (3) (4)
LANTAI 1
A PEKERJAAN DINDING & FINISHING DINDING
1 Dinding Toilet Finishing Homogenous unpolished 600x600mm m2
47.60
2 Kubikal toilet 'tempered painted glass' 10mm m2 11.20
3 Dinding finishing vinyl wall covering m2 -
4 Pengecatan dinding dalam, m2
587.85
B PEKERJAAN FINISHING LANTAI
1 Homogenous Tile anti-slip 600 x 600-unpolished . m2 125.01
C PEKERJAAN PLAFOND
1 Pas. Plafond Gypsumboard tebal 9mm rangka metal hollow m2 48.10
40x40mm,
2 Pengecatan plafond, m2
467.50
D PEKERJAAN PINTU & JENDELA
1 Pintu 1 (P1) single panel HPL 40mm lapis HPL , edging PVC + kaca unit
-
t=6mm + sandblast sticker, hardware door closer tipe tempel,
2 Pintu 1 (P1)
lockcase, double: panel HPL 40mm lapis HPL wood grain,
silinder unit -
edging PVC + kaca t=6mm + sandblast sticker, hardware door
3 Pintu 5 (P5), Pintu Toilet
closer tipe tempel difabel
, lengkap dengan rubber seal keliling, lockcase unit -
4 silinder dan ,handle
Pintu 1 (P1) Pintu Interior, rangka alumunium fin MDF dengan unit 1.00
kaca intip
5 Pintu 3 (P3), Pintu interior rangka Alumunium fin MDF tanpa luban unit 2.00
6 Pintu 4 (P4), Pintu toilet dan area basah rangka alumunium lapis unit
4.00
HPL lengkap dengan engsel dan pengunci
7 Pintu 12 (P12), Pintu lain lain fin. Lihat Arsitektur unit 7.00
8 Jendela 2 (J2), Jendela kaca tempered 5mm, kusen alum. 4" fin unit 1.00
powder coating
E PEKERJAAN SANITAIR
1 Pas. Closet duduk tipe CW660J/SW660J (putih) unit 2.00
2 Pas. Jet washer unit
Min Water Pressure: 0.05 MPa 1.00
3 Pas.
MaxWastafel 'single bowl,
Water Pressure: 0.4top
MPacounter' putih, (T: 160 mm, unit 2.00
Diameter:
Flow 4304.0
Rate: mm)Lpm+ kran , komplit dengan asesoris & fitting
4 Top table marmer t=mm type Servigiante, berikut rangka siku unit
1.00
5 Pas. Urinoir tipe Moslem type termasuk aksesoris, unit 2.00
6 Pas. Sekat urinoir keramik unit 2.00
7 Pas. Floordrain SS kotak unit 2.00
8 Area wudhu unit
1.00
9 Pas. Kran air unit
10.00
F PEKERJAAN LAMPU, TITIK OUTLET, STOP KONTAK & SAKLAR
1 Pasang Lampu RM-300-M5 buah 5.00
2 Pasang Lampu heavy duty tipe Explosion Pro AX buah 5.00
3 Pasang Lampu RD 150 E27 buah 3.00
4 Pasang Lampu Electhica 400 LED buah 3.00
5 Pasang saklar tunggal buah
6.00
6 Pasang stop kontak buah
10.00
LANTAI 2
A PEKERJAAN DINDING & FINISHING DINDING
1 Pengecatan dinding dalam m2 93.38
B PEKERJAAN FINISHING LANTAI
1 Homogenous Tile 600x600mm Industrial Collection, m2 125.01
C PEKERJAAN PLAFOND
1 Pas. Plafond Gypsumboard tebal 9mm rangka metal hollow m2 -
40x40mm,
2 Pas. Plafond Gypsumboard tebal 9mm rangka metal hollow m2 98.21
40x40mm, dengan variasi drop ceiling
3 Pengecatan plafond, m2 98.21
D PEKERJAAN PINTU & JENDELA
1 Pintu 1 (P1) single panel HPL 40mm lapis HPL , edging PVC + kaca unit 0
t=6mm + sandblast sticker, hardware door closer tipe tempel,
2 Pintu 1 (P1)
lockcase, , Pintu Interior, rangka alumunium fin MDF dengan
silinder unit 3.00
kaca intip
3 Pintu 12 (P12) Pintu lain lain fin. Lihat Arsitektur unit 1.00
4 Jendela 2 (J2) Jendela kaca tempered 5mm, kusen alum. 4" fin unit 1.00
powder coating
E PEKERJAAN FURNITUR
Pekerjaan Furniture Melekat
1 Partisi kaca frameless tempered 12mm, t= 2600mm, clear cannal m2 328.20
20x20 t=2mm anodized + sealant keliling
Pekerjaan Furniture Lepas/ Pabrikan
1 Loker 1830x380x380 terbuat dari baja, 3 pintu dengan ventilasi, unit 8.00
3 cam lock system, cat: degreasing, posphating, rush, protection,
2 Meja rapat modulor:
fin. Powder coating 'Dynamic Conference' flip table type B with unit 1.00
modesty perforated 1200(w)x600(d)x730(h)
3 Meja manager, SM: Freestanding , 900x1800; 600x1200 unit 1.00
4 Meja Kerja Staff/ WS Pengawas: Freestanding DS 600x1200; unit 6.00
500X900
5 Kursi sekretaris & staff: fixed seat with knob tension, ergo arm, unit
10.00
mesh mid back fabric seat ex. Primaloka
6 Kursi Direktur/ Project Coord: hi-back w/ headrest, leather unit
upholstered, loop arms w/ leather&inner back, polished base in
castors, slim cushion
3.00
7 Kursi hadap: cantilever, fiberflex, chrome , arm PP unit 2.00
8 Kursi rapat: alumunium, adjustable seat with lateral tension, unit
ergo arm, mesh high back, fabric seat ex. Primaloka
8.00
F PEKERJAAN LAMPU, TITIK OUTLET, STOP KONTAK & SAKLAR
1 Pasang Lampu RM-300-M5 buah 5.00
2 Pasang Lampu heavy duty tipe Explosion Pro AX buah 2.00
3 Pasang saklar tunggal buah 5.00
4 Pasang stop kontak buah 4.00