TOTAL
NO URAIAN PEKERJAAN
(Rp)
TOTAL PEKERJAAN Rp -
PPN 10o/o Rp -
TOTAL + PPN lOO/o Rp -
PEMBULATAN Rp !
o
REKAPITULASI BOQ
PROYEK : Pembangunan Hotel Domestik Terminal 3 BSH
LOKASI : Bandara Soekarno-Hatta
l PEKERJAAN PERSIAPAN Rp
II PEKERJAAN STRUKTUR Rp
V PEKERJAAN ELEKTRONIKA Rp
VI PEKERJAAN MEKANIKAL Rp
TOTAL Rp
L
REKAPITULASI BILL OF QUANTITY IBOQI
PROYEK : Airport Hotel T3 Ultimate lnternational Bandara Soekarno - Hatta
LOKASI : Tangerihg, Banten
PEKERJAAI{ : STRUKTUR, ARSITEKTUR
TAIIUN :2A17
TOTAL HARGA
NO URAIAN PEKERJAAN
tRpl
A AREA DOMESTIK
A.1 PERSIAPAN
L2 PEKERJAAN STRUKTUR
l. PEKERJAAN TANAH Rp
ll. PEKERJAAN PONDASI
ll.1 . Pondasi Tiang Pancang Rp
11.2. Pekerjaan Pile Cap Rp
A3 PEKERJAAN ARSITEKTUR
t. GROUND FLOOR PLAN ( EL r 0.00 ) Rp
il. UPPER GROUND FLOOR PLAN ( EL +3.75 ) Rp
ilt. LOBBY FLooR PLAN ( EL +7.50 ) Rp
IV MEZZANINE FLooR PLAN ( EL +11.25 ) Rp
1ST FLooR PLAN ( EL +16.00 ) Rp
V 2ND FLOOR PLAN ( EL +1e.75 ) Rp
VI 3RD FLooR PLAN ( EL +23.50 ) Rp
vlll. ROOF PLAN Rp
IK EXPANTION JOINT Rp
X. FASAD Rp
xl. ATAP Rp
xt. CONNECTING BRIDGE Rp
*
PEKERJAAN PERSIAPAN
PROYEK : Pembangunan Hotel Domestik Terminal 3 Ultimate
LOKASI : Bandara Soekarno-Hatta
NO URAI,AN PEKERJAAN SATUAN VOLUME HARGA SATUAN (Rp) JUMI.AH HARGA (Rp)
I PEKERJAAN PERSIAPAN
1 )enoukuran dan Pemasanoan Bouwolank m 2.000.00 Ro
2 Paoan Nama Provek unit 1,00 Ro
3 Sewa Direksi Keet MK + lenskap Fumiture m2 120,00 Ro
4 Paoar Provek m 1.200,00 RP
5 Provisional Sump sum 1.00 Ro
Ro
o
BILL OF QUANTITY IBOQI
PROYEK : Pembangunan Hotel Domestik Terminal 3 Ultimate
LOKASI : Tanger?hg, Banten
PEKERJAATI : SITUKIUT
PEKER.JAAN STRUKTUR
Sub Total Rp
2 P3
a Lantai Kerja F'c 10 Mpa t = 5 cm m3 13,31
b Bekisting Batako m2 238,69
G Pembesian
Besi dia.22 Kg 20.466,32
Besi dia. 13 Kg 1.733,91
d Beton F'c 35 Mpa m3 161 ,1 1
3 P1
a Lantai Kerja F'c 10 Mpa t = 5 cm m3 9,73
b Beksting Batako m2 174,42
c Pembesian
Besi dia.22 Kg 14.956,16
Besi dia. 13 Kg 1.267 ,Ag
d Beton F'c 35 Mpa m3 117,73
I P5
a Lantai Kerja F'c 10 Mpa t = 5 cm m3 4,17
b Bekisting Batako m2 99,96
G Pembesian
Besi dia.22 Kg 6.265,44
Besi dia. 13 Ks 723,60
d Beton F'c 35 Mpa m3 42,94
5 P6
Lantai Kerja F'c 10 Mpa t = 5 cm m3
Ll20
BOQ STRUKTUR
q
BILL OF OUANTITY {BOQI
PROYEK : Pembangunan Hotel Domestik Terminal 3 Ultimate
LOKASI : Tangerohg, Banten
PEKERJAAN : StruKtur
6 P7
a Lantai Kerja F'c 10 Mpa t = 5 cm m3 10,74
b Bekisting Batako m2 129,52
c Pembesian
Besi dia.22 Kg 16.820,95
Besi dia, 13 Kg 938,60
d Beton F'c 35 Mpa m3 149,72
Sub Total Ro
JUMLAH SUB TOTAL II.2 Rp
2 Tlebeam TB2
a. Lantai Kerja F'c 10 Mpa t = 5 cm m3 49,42
b. Bekisting Batako m2 1.103,98
c. Pembesian
Besi dia. 10 Kg 1 1.279,56
Besi dia. 16 Kg 5.439,52
Besi dia. 25 Kg 40.111,03
d. Beton F'c 35 Mpa m3 220,80
3 Tiebeam TBg
a. Lantai Kerja F'c 10 Mpa t = 5 cm m3 5,27
b. Bekisting Batako m2 120,65
c. Pembesian
Besi dia. 10 Kg 1.217 ,53
Besi dia. 16 Kg 724,94
Besi dia. 25 Kg 4.753,56
d. Beton F'c 35 Mpa m3 22,12
1 Tlebeam TB4
€. Lantai Kerja F'c 10 Mpa t = 5 cm m3 14,14
b. Bekisting Batako m2 339,26
c. Pembesian
Besi dia. 10 Kg 3.464,19
Besi dia. 16 Kg 1.919,34
Besi dia. 25 Kg 11.032,27
d. Beton Fc 35 Mpa m3 73,51
B. Pekedaan Kdom
Top PC ({.05} sld Lt Upper Ground {+3,70}
I Kolom Ki 800xE00
a. Multiplek I mm m2 228,00
2l20
BOQ STRUKTUR
$
BILL OF. QUANTITY (BOQI
PROYEK : Pembangunan Hotel Domestik Terminal 3 Ultimate
LOKASI : Tangerdtrg, Banten
PEKERJAAT{ : StrUKtUr
b. Pembesian
Besi dia. 13 Kg 6.495,1 1
2 Kolom Kl 6fi1x1000
a. Bekisting Multiplek I mm m2 '180,00
b. Pembesian
Besi dia. 13 Kg 6.497,92
Besi dia. 25 Kg 1 5.501 ,12
G. Beton F'c 35 Mpa m3 33,75
3 Kolom K2 {fi10x{000
a. Bekisting Multiplek 9 mm m2 240,00
b. Pembesian
Besi dia. 13 Kg 8.365,09
Besi dia. 25 Kg 16.534,53
c. Beton F'c 35 Mpa m3 60,00
I Kolom K2 900x900
a. Bekistins Multiplek I mm m2 607.50
b. Pembesian
Besi dia. 13 Kg 16.984,81
Besi dia. 25 Ks 36.169,29
c. Beton F'c 35 Mpa m3 136,69
5 Kolom K3 9fiIx900
a. Bekisting Multiplek 9 mm m2 109,00
b. Pembesian
Besi dia. 13 Kg 3.821,36
Besi dia. 25 Ks 7.349,69
c. Beton F'c 35 Mpa m3 24,30
6 Kolom K4 8fi1x800
a- Bekisting Multiplek 9 mm m2 24,0O
b. Pembesian
Besi dia. 13 Kg 682,84
Besi dia. 25 Kg 1.377,99
c. Beton F'c 35 Mpa m3 4,90
2 S02 t= 220 mm
a. Lantai kerja fc' 10 Mpa m3 63,43
b. Bekisting Multiplek 12 mm m2 62,30
G. Besi dia. 13 Kg 56.062,37
d. Beton F'c 35 Mpa m3 279,09
3 l20
BOQ STRUKTUR
+
BILL OF OUANTITY {BOQI
PROYEK : Pembangunan Hotel Domestik Terminal 3 Ultimate
LOKASI : Tangerzrg, Banten
PEKERJAAN : StrUKtUr
2 Balok 82
a. Bekisting Multiplek 9 mm m2 412,11
b. Pembesian
Besi dia. 10 Kg 3.622,76
Besi dia. 16 Kg 1 .699,32
Besi dia. 25 Kg 12.903,15
G. Beton F'c 35 Mpa m3 59,33
3 Balok 83
a. Bekisting Multiplek I mm m2 707,29
b. Pembesian
Besi dia. 10 Kg 6.119,49
Besi dia. 16 Kg 1.457 ,94
Besi dia. 25 Kg 17.994,M
c. Beton F'c 35 Mpa m3 105,39
1 Balok 84
a. Bekisting Multiplek I mm m2 539,1 0
b. Pembesian
Besi dia. 10 Kg 4.661,43
Besi dia. 16 Ks 1.506,31
Besi dia. 25 Kg 14.469,09
G. Beton F'c 35 Mpa m3 99,56
5 Balolt 85
a. Bekisting Multiplek 9 mm m2 26,16
b. Pembesian
Besi dia. 10 Kg 22A,52
Besi dia, 16 Kg 60,41
Besi dia. 25 Kg 690,84
c. Beton F'c 35 Mpa m3 3,1 1
B. Pekerfaan Kolom
Lt Upper Ground (+3.70) sld Lt I t+7.45)
I Kdom Kl 800x800
a. Bekisting Multiplek g mm m2 228,O9
b. Pembesian
Besi dia. 13 Kg 6.495,1 1
2 Kdom K{ 6fi1x1000
a. Bekisting Multiplek g mm m2 180,00
b. Pembesian
Besi dia. 13 Kg 6.487,92
Besi dia, 25 Kg 1 5.501 ,12
c. Beton F'c 35 Mpa m3 33,75
3 Kolom K2 {000x{0fi1
a. Bekisting Multiplek 9 mm m2 240,00
b. Pembesian
Besi dia. 13 Kg 8.365,09
Besi dia. 25 Kg 16.534,53
c. Beton F'c 35 Mpa m3 60,00
4l20
BOQ STRUKTUR
s
BILL OF QUANTFY IBOQI
PROYEK : Pembangunan Hotel Domestik Terminal 3 Ultimate
LOKASI : Tangerzhg, Banten
PEKERJAAN : StrUKtUr
I Kolom K2 9tXlx900
a, Bekisting Multiplek I mm m2 607,50
b. Pembesian
Besi dia. 13 Kg 16.994,91
Besi dia. 25 Kg 36.169,29
c. Beton F'c 35 Mpa m3 136,69
5 Kcilom K3 9fi1x900
a. Bekisting Multiplek 9 mm m2 109,00
b. Pembesian
Besi dia. 13 Kg 3.821,36
Besi dia. 25 Kg 7.348,68
c. Beton Fc 35 Mpa m3 24,30
Kolom K4 8{Xlx800
a. Bekisting Multiplek 9 mm m2 24,00
b. Pembesian
Besi dia. 13 Ks 682,&l
Besi dia. 25 Kg 1.377,99
c. Beton F'c 35 Mpa m3 4,90
2 Balolt 82
a. Bekisting Multiplek 9 mm m2 97,96
b. Pembesian
Besi dia. 10 Kg 881,61
Besi dia. 16 Kg 262,66
Besi dia. 19 Kg 1.520,92
G. Beton F'c 35 Mpa m3 11,14
3 Balok 83
Gl. Bekisting Multiplek 9 mm m2 646,46
b. Pembesian
Besi dia. 10 Kg 5.595,60
Besi dia. 16 Kg 1.326,61
Besi dia. 25 Kg 16.463,05
c. Beton F'c 35 Mpa m3 97,37
I Balok B4
a. Bekisting Multiplek I mm m2 657,59
b. Pembesian
Besi dia. 10 Kg 5.689,91
dia. 16 Kg 2.084,60
s l20
BOQ STRUKTUR
$
BILL OF OUANTITY IBOAI
PROYEK : Pembangunan Hotel Domestik Terminal 3 Ultimate
LOKASI : Tangerorg, Banten
PEKERJAAIU : StrUKtUr
5 Balok 85
a. Bekisting Multiplek 9 mm m2 26,1 6
b. Pembesian
Besi dia. 10 KE 228,52
Besi dia. 16 Kg 60,41
Besi dia. 25 Kg 690,84
c. Beton F'c 35 Mpa m3 3,1 1
6 Balok BG
cl.Bekisting Multiplek I mm m2 169,40
b. Pembesian
Besi dia. 10 Kg 1.491 ,91
Besi dia. 16 Kg 365,73
Besi dia. 25 Kg 4.406,31
c. Beton F'c 35 Mpa m3 25,09
7 Balolt 87
a- Bekistino Multiplek I mm m2 270.60
b. Pembesian
Besi dia. 10 Kg 2.337,99
Besi dia. 16 Kg 1.097,1g
Besi dia. 25 Kg 6.951,62
c. Beton F'c 35 Mpa m3 40,92
I Balok 88
a. Bekisting Multiplek I mm mZ 257,60
b. Pembesian
Besi dia. 10 Kg 2.337,99
Besi dia. 16 Kg 930,95
Besi dia. 25 Kg 7.941 ,11
c. Beton F'c 35 Mpa m3 46,90
I Balolt B9
d. Bekisting Multiplek I mm m2 341,60
b. Pembesian
Besi dia. 10 Kg 3.577,25
Besi dia. 16 Kg 930,95
Besi dia. 25 Kg 12.974,59
c. Beton Fc 35 Mpa m3 67,90
B. Pekerfaan Kolom
Lt I (+7.45) srd Lt Mezzanlne (+11.20)
I Kcilom Kt 800x800
a. Bekisting Multiplek g mm m2 228,00
b. Pembesian
Besi dia. 13 Kg 6.495,1 1
2 Kolom K{ 600x{000
4.. Bekisting Multiplek I mrn m2 180,00
b. Pembesian
Besi dia. 13 Kg 6.497,92
Besi dia. 25 Ks 15.501 ,12
c. Beton F'c 35 Mpa m3 33,75
3 Kcilom K2 1000x10fi1
6/zo
BOQ STRUKTUR
$
BILL OF QUANTITY,,(BOQI
PROYEK : Pembangunan Hotel Domestik Terminal 3 Ultimate
LOKASI : Tangerf,trg, Banten
PEKERJAAT{ : Struktur
I Kdom K2 9filx900
a. Bekisting Muttiplek g mm m2 607,50
b. Pembesian
Besi dia. 13 Kg 16.984,9.|
Besi dia. 25 Kg 36.169,28
G. Beton F'c 35 Mpa m3 136,69
5 Kolom K3 900x900
a. Bekistins Multiplek 9 mm m2 109,00
b. Pembesian
Besi dia. 13 Kg 3.821,36
Besi dia. 25 Ks 7.349,69
c. Beton F'c 35 Mpa m3 24,30
6 Kcilom K4 8tXtx800
cl. Bekisting Multiplek I mm mZ 24,00
b. Pembesian
Besi dia. 13 Kg 682,64
Besi dia. 25 Kg 1.377 ,gg
c. Beton F'c 35 Mpa m3 4,80
2 S03 t= 130 mm
cl. Bekisting Multiplek 12 mm m2 3.759,74
b. Besi dia. 13 Kg 11 1.996,33
c. Beton F'c 35 Mpa m3 499,64
2 Balolr 84
Cl. Bekisting Multiplek 9 rnm m2 343,33
b. Pembesian
Besi dia. 10 Kg 2.972,43
Besi dia. 16 Kg 696,05
Besi dia. 25 Kg 8.697,94
G. Beton F'c 35 Mpa m3 51,92
3 Balolt 85
Bekisting Multiplek I mm m2 26,
7l20
BOQ STRUKI'UR
$
BILL OF OUANTITY {BOAI
PROYEK : Pembangunan Hotel Domestik Termina! 3 Ultimate
LOKASI : Tangerdtrg, Banten
PEKERJAAT{ : StrUKtUr
b. Pembesian
Besi dia, 10 Kg 228,52
Besi dia. 16 Kg 60,41
Besi dia. 25 Kg 690,84
c. Beton F'c 35 Mpa m3 3,1 1
1 Balok BG
a. Bekisting Multiplek 9 mm m2 169,40
b. Pembesian
Besi dia. 10 Kg 1.491 ,91
Besi dia. 16 Kg 365,73
Besi dia. 25 Kg 4.406,31
c. Beton F'c 35 Mpa m3 25,08
5 Balok 87
a. Bekisting Multiplek I mm m2 390,32
b. Pembesian
Besi dia. 10 Kg 3.366,58
Besi dia. 16 Kg 1.592,62
Besi dia. 25 Kg 10.002,84
c. Beton F'c 35 Mpa m3 59,02
6 Balok B8
a. Bekisting Multiplek I mm m2 117,76
b. Pembesian
Besi dia. 10 Ks 1.012,76
Besi dia. 16 Kg 425,59
Besi dia. 25 Kg 3.254,90
c. Beton F'c 35 Mpa m3 21,4
7 Balok BS
a. m2 95,40
b. Pembesian
Besi dia. 10 Ks 894,31
Besi dia. 16 Kg 232,74
Besi dia. 25 Kg 3.218,64
G. Beton F'c 35 Mpa m3 16,99
Balok 810
a. Bekisting Multiplek g rnm m2 24,80
b. Pembesian
Besi dia. 10 Kg 228,14
Besi dia. 16 Kg 66,50
Besi dia. 19 Kg 420,45
c. Beton F'c 35 Mpa m3 2,82
B. Pekerjaan Kolom
Lt llezzanlne [+t1.2{ll sld Lt 2 (+15.951
{ Kolom Kl 8tXlx800
a. Bekisting Multiplek g mm m2 364,50
b. Pembesian
Besi dia. 13 Kg 10.190,89
Besi dia. 25 Ks 1 5.501 ,12
c. Beton F'c 35 Mpa m3 82,01
2 Kdom Kl 600x{000
a. Bekieting Multiplek I mm m2 96,00
b. Pembesian
Besi dia. 13 Kg 3.460,17
dia. 25 Kg 8.267,27
8 l20
BOQ STRUKTUR
a
BILL OE OUANTITY {BOOI
PROYEK : Pembangunan Hotel Domestik Terminal 3 Ultimate
LOKASI : Tangerohg, Banten
PEKERJAAN : StrUKtUr
3 Kctom K21fi10x10fi1
c. Bekisting Multiplek I mm m2 240,00
b. Pembesian
Besi dia. 13 Kg 8.365,09
Besi dia. 25 Kg 16.534,53
c. Beton F'c 35 Mpa m3 60,00
1 Kolom K2 900x900
a. Bekisting Multiplek I mm m2 121,5A
b. Pembesian
Besi dia. 13 Kg 3.396,9€i
Besi dia. 25 Kg 7.233,96
c. Beton F'c 35 Mpa m3 27,U
5 Kolom K3 9{Xlx9{t0
a. Bekisting Multiplek I mm m2 121,50
b. Pembesian
Besi dia. 13 Kg 4.299,03
Besi dia. 25 Ks 8.267,27
c. Beton F'c 35 Mpa m3 27,34
6 Kdom K4 800x800
a. Bekisting Multiplek 9 mm m2 24,O0
b. Pembesian
Besi dia. 13 Kg 682,64
Besi dia. 25 Kg 1.377,99
c. Beton F'c 35 Mpa m3 4,90
2 S02 t =130 mm
a. Bekisting Multiplek 12 mm mZ 2.208,57
b. Besi dia. 13 Kg 65.807,09
G. Beton F'c 35 Mpa m3 287,11
2 Balolt B4
a. Bekisting Multiplek I mm m2 220,90
b. Pembesian
Besi dia. 10 Kg 1.904,92
Besi dia. 15 Kg 797,96
Besi dia. 25 Kg 6.614,95
c. Beton F'c 35 Mpa m3 40,20
sl20
BOQ STRUKTUR
N
BILL OF QUANTITY {BOOI
PROYEK : Pembangunan Hotel Domestik Terminal 3 Ultimate
LOKAS! : Tangerahg, Banten
PEKERJAAI{ : StrUktur
3 Balolt B7
a. Bekisting Multiplek 9 mm m2 501 ,1 g
b. Pembesian
Besi dia. 10 Kg 4.362,95
Besi dia. 16 Kg 2.A32,13
Besi dia. 25 Kg 13.354,12
G. Beton Fc 35 Mpa m3 75,79
1 Balok B8
a. Bekisting Multiplek I mm m2 253,92
b. Pembesian
Besi dia. 10 Kg 2.200,84
Besi dia. 16 Kg 917,65
Besi dia. 25 Kg 6.724,67
G. Beton F'c 35 Mpa m3 46,23
5 Balok 89
€1. Bekisting Multiplek I mm m2 373,M
b. Pembesian
Besi dia. 10 Kg 3.728,96
Besi dia. 16 Kg 1.01 0,75
Besi dia. 25 Kg 14.665,64
G. Beton F'c 35 Mpa m3 60,73
6 Balok B{0
a. Bekisting Multiplek I mm m2 409,20
b. Pembesian
Besi dia. 10 Kg 3.676,97
Besi dia. 16 Kg 1.097,19
Besi dia. 19 Kg 6.296,92
c. Beton F'c 35 Mpa m3 46,53
7 Balolt B{ {
cl. Bekisting Multiplek I mm m2 169,40
b. Pembesian
Besi dia. 10 Kg 1.491 ,gl
Besi dia. 16 Kg 365,73
Besi dia. 25 Kg 3.930,57
c. Beton Fc 35 Mpa m3 25,09
8 Balolt Bl2
a. Bekisting Multiplek g mm m2 180,40
b. Pembesian
Besi dia. 10 Kg 1.559,66
Besi dia. 16 Kg 731,46
Besi dia. 25 Kg 4.157,14
c. Beton F'c 35 Mpa m3 27,29
I Ealok Bl3
a. Bekisting Multiplek 9 mm m2 99,36
b. Pembesian
Besi dia. 10 Ks 997,74
Besi dia. 16 Kg 359,09
Besi dia. 19 Kg 2.827,42
c. Beton Fc 35 Mpa m3 19,09
B. Pekerfaan Kolom
LT, 2 {+{5,95} #d LT.3 t+{9.70}
I Kolom K{ 900x900
Lo/20
BOQ STRUKTUR
$
BILL OF QUANTITY IBOQI
PROYEK : Pembangunan Hotel Domestik Terminal 3 Ultimate
LOKASI : Tangerihg, Banten
PEKERJAAN : StrUKtUr
2 Kolom K2 9filx900
a. Bekisting Multiplek I mm m2 121,5A
b. Pembesian
Besi dia. 13 Kg 3.396,96
Besi dia. 25 Kg 7.233,86
G. Beton F'c 35 Mpa m3 54,68
3 Kolom K3 900x900
a. Bekisting Multiplek I mm m2 216,00
b. Pembesian
Besi dia. 13 Kg 7.642,71
Besi dia. 25 Kg 14.697,36
c. Beton F'c 35 Mpa m3 49,60
I Kdom K3 Efilx800
a. Bekisting Multiplek I mm m2 96,00
b. Pembesian
Besi dia. 13 Ks 2.73A,57
Besi dia. 25 Kg 5.51 1,51
c. Beton F'c 35 Mpa m3 19,20
2 Balok Bl2
a. Bekisting Multiplek 9 mm m2 604,99
b. Pembesian
Besi dia. 10 Kg 5.211,U
Besi dia. 16 Kg 2.186,41
Besi dia. 25 Kg 14.351 ,35
c. Beton F'c 35 Mpa m3 11 0,15
3 Balolt B{4
ct.Bekisting Multiplek I mm mZ 204,60
b. Pembesian
Besi dia. 10 Kg 1.939,49
Besi dia. 16 Kg 549,60
Besi dia. 19 Kg 3.149,46
G. F'c 35 Mpa m3 23,27
LLl20
BOQ STRUKTUR
N
BtLt oF ouANTlTY {BOOI
PROYEK : Pembangunan Hotel Domestik Terminal 3 Ultimate
LOKASI : Tangerztrg, Banten
PEKERJAAN : Struktur
I Balok 816
cl. Bekisting Multiplek 9 mm m2 330,48
b. Pembesian
Besi dia. 10 Kg 2.933,20
Besi dia. 16 Kg 1.427,O2
Besi dia. 25 Ks 8.079,91
G. Beton F'c 35 Mpa m3 48,93
5 Balolt 817
a. Bekisting Multiplek I mm m2 132,48
b. Pembesian
Besi dia. 10 Kg 1.1 93,66
Besi dia. 16 Kg 239,39
Besi dia. 25 Kg 3.395,37
c. Beton Fc 35 Mpa m3 24,12
2 Kcilom K3 600x800
a. Bekisting Multiplek I mrn m2 199,00
b. Pembesian
Besi dia. 13 Kg 7.135,25
Besi dia. 25 Kg 10.334,08
c. Beton F'c 35 Mpa m3 32,40
3 Kolom K4 8tXlx800
a. Bekisting Multiplek I mm m2 192,00
b. Pembesian
Besi dia. 13 Kg 5.461,14
Besi dia. 25 Kg 9.195,95
c. Beton F'c 35 Mpa m3 38,40
I Kdom K6 600xE00
a. Bekisting Multiplek 9 mm m2 84,00
b. Pembesian
Besi dia. 13 Kg 3.098,98
Besi dia. 25 Kg 4.592,93
c. Beton F'c 35 Mpa m3 14,40
L2l20
BOQ STRUKTUR
s
BILL OF OUANTITY {BOQI
PROYEK : Pembangunan Hotel Domestik Terminal 3 Ultimate
LOKASI : Tanger?rg, Banten
PEKERJAAI{ : StrUKtUr
2 Balolt B12
a. Bekisting Multiplek 9 mm m2 604,99
b. Pembesian
Besi dia. 10 Ks 5.211,34
Besi dia. 16 Kg 2.1 96,41
3 Balolt B{4
cl. Bekisting Multiplek 9 mm m2 204,60
b. Pembesian
Besi dia. 10 Kg 1.939,49
Besi dia. 16 Kg 549,60
Besi dia. 19 Kg 3.149,46
c. Beton F'c 35 Mpa m3 23,27
1 Balok BtG
a. Bekisting Multiplek 9 mm m2 330,48
b. Pembesian
Besi dia. 10 Kg 2.933,20
Besi dia. 16 Kg 1.427,02
Besi dia. 25 Kg 8.079,91
G. Beton F'c 35 Mpa m3 49,93
5 Balolt Btz
a. Bekisting Multiplek I mm m2 132,49
b. Pembesian
Besi dia. 10 Kg 1.183,66
Besi dia. 15 Kg 239,39
Besi dia. 25 Kg 3.395,37
c. Beton F'c 35 Mpa m3 24,12
B. Pekeriaan Kolom
Lt 4 (+23.45) sld (+27.29;
I Kolom Kt 800x800
a- Bekisting Multiplek I mm mZ 1.594.00
b. Pembesian
Besi dia. 13 Kg 39.399,26
Besi dia. 25 Kg 16.534,53
c. Beton F'c 35 Mpa m3 576,00
2 Kolom K3 6fitx800
a. Bekisting Multiplek 9 mm m2 31,50
b. Pembesian
Besi dia. 13 Kg 915,61
Besi dia. 25 Kg 1.722,35
c. Beton F'c 35 Mpa m3 5,40
3 Kolom K6 600x800
a. Bekisting Multiplek I mm m2 252,00
b. Pembesian
Besi dia. 13 Kg 5.352,79
BeEi dia.25 Kg 13.779,79
G. Beton F'c 35 Mpa m3 43,2A
c. Slab lantai
L3l20
BOQ STRUKTUR
s
BILL OF QUANTITY {BOQI
PROYEK : Pembangunan Hotel Domestik Terminal 3 Ultimate
LOKASI : Tanger?hg, Banten
PEKERJAAI{ : Struktur
1 SO4 t =130 mm
a. Bekisting Multiplek 12 mm m2 1.g7g,gg
b. Besi dia. 10 Kg 55.993,86
G. Beton F'c 35 Mpa m3 244,26
2 Balolr B{2
a. Bekisting Multiplek 9 mm m2 604,99
b. Pembesian
Besi dia. 10 Kg 5.211,U
Besi dia. 16 Kg 2.196,41
Besi dia. 25 Kg 14.351 ,35
c. Beton F'c 35 Mpa m3 11 0,15
3 Balolr BlSs
a. Bekisting Multiplek I mm m2 257,29
b. Pembesian
Besi dia. 10 Kg 2.310,73
Besi dia. 16 Kg 1.276,73
Besi dia. 25 Kg g.g1g,g4
c. Beton F'c 35 Mpa m3 36,1 0
3 Balolt Bt4
a. Bekisting Multiplek I mm m2 204,60
b. Pembesian
Besi dia. 10 Kg 1.939,49
Besi dia. 16 Kg 549,60
Besi dia. 19 Kg 3.149,46
c. Beton F'c 35 Mpa m3 23,27
1 Balok 816
a- Bekisting Multiplek g mm m2 254,1 0
b. Pembesian
Besi dia. 10 Kg 2.222,72
Besi dia. 16 Kg 1 .097,19
Besi dia. 25 Kg 5.995,96
c. Beton Fc 35 Mpa m3 37,62
5 Balok tslE
a- Bekisting Multiplek I mm m2 76,39
b. Pembesian
Besi dia. 10 Kg 710,49
Besi dia. 16 Ks 329,92
Besi dia. 25 Kg 2.095,59
c. Beton Fc 35 Mpa m3 1 1,31
6 Balolt Btg
a. Bekisting Multiplek g mm m2 132,49
Pembesian
L4l20
BOQ STRUKTUR
$
BILL OF QUAI{TIry IBOOI
PROYEK : Pembangunan Hotel Domestik Terminal 3 Ultimate
LOKASI : Tangerdtrg, Banten
PEKERJAAN : StruKtUr
B. PekerJaan Kolom
Lt Atap 1+27.201s/d Lt Dak Atap (+30.7)
t Kolom K4 4fi1x400
a. Bekisting Multiplek 9 mm m2 60,00
b. Pembesian
Besi dia, 10 Kg 627,80
Besi dia.22 Kg 1.706,77
c. Beton F'c 35 Mpa m3 6,00
2 Balolt B{5
a. Bekisting Multiplek 9 mm m2 1,06
b. Pembesian
Besi dia. 10 Kg 33,64
Besi dia. 13 Kg 273,60
Besi dia. 16 Kg 411,52
c. Beton F'c 35 Mpa m3 1,06
3 Balolt BtE
a. Bekisting Multiplek I mm m2 19,17
b. Pembesian
Besi dia. 10 Kg 70,79
Besi dia. 13 Kg 360,59
Besi dia. 16 Kg 396,74
c. Beton F'c 35 Mpa m3 1,53
Lsl20
BOQ STRUKTUR
$
BILL OF OUANTITY {BOQI
PROYEK : Pembangunan Hotel Domestik Terminal 3 Ultimate
LOKASI : Tangerntrg, Banten
PEKERJAAIU : StrUKtUr
B. Type ll
Lt Ground (-{1.05} std Lt 4 (23.45}
1 PekerJaan Plat Tangga
Beton F'c 35 Mpa m3 7,39
b Bekisting Multiplek I mm m2 49,20
c Pembesian Kg 2.027,75
3
a Beton F'c 35 Mpa m3 9,09
b Bekisting Multiplek I mm m2 30,59
c Pembesian Kg 923,26
c. Type lll
Lt Ground fi1.05) sld Lt 4 (23.45)
I Pekerlaan Plat Tangga
a Beton F'c 35 Mpa m3 a,17
b Bekisting Multiplek 9 mm m2 54,46
c Pernbesian Kg 2.397,75
D. Type lV
Lt Ground (-0.05) sld Lt Upper Ground (+3,70)
{ Pekerlaan Plat Tangga
a Beton F'c 35 Mpa m3 1 ,10
L6l20
BOQ STRUKTUR
s
BILL OF OUANTITY (BOQI
PROYEK : Pembangunan Hotel Domestik Terminal 3 Ultimate
LOKASI : Tangerohg, Banten
PEKERJAAN : StruktUr
E. T1rye V
Lt Upper Ground (+3.701 sld Lt{ fr.45l
I Pekerlaan Plat Tangga
CI Beton Fc 35 Mpa m3 1,89
b Bekisting Multiplek I mm m2 12,61
G Pembesian Kg 440,50
2
Beton F'c 35 Mpa m3 1,75
b Bekisting Multiplek 9 mm m2 11,67
G Pembesian Kg 390, 1 5
3
a Beton F'c 35 Mpa m3 2,00
b Bekisting Multiplek 9 mm m2 6,95
c Pembesian Kg 258,61
Rp
ll.3.l3
a- Bekisting Multiplek 15 mm Slab m2 2.457,00
b. Pembesian Kg 329.729,40
c. Beton F'c 35 Mpa m3 1.002,46
d. Waterproofing lntegrat m3 729,00
e Expose Beton m2 2.457,00
Rp
SUB TOTAL II.3 Rp
L7 l20
BOQ STRUKTUR
p
BILL OF QUANTITY IBOQI
PROYEK : Pembangunan Hotel Domestik Terminal 3 Ultimate
LOKASI : Tangerdrg, Banten
PEKERJAAI{ : Struktur
B PEKERJAAN PONDASI
PekerJaan Plle Cap
Lantai Kerja F'c 10 Mpa t = 5 cm m3 4,03
b Bekisting Batako m2 104,97
c Pembesian Kg 5.406,79
d Beton F'c 35 Mpa m3 44,96
D Tlebeam G{ 400x7fil
a. Lantai Kerja F'c 10 Mpa t = 5 cm m3 3,65
b. Bekisting Batako m2 106,75
c. Pembesian Kg 9.456,64
d. Beton F'c 35 Mpa m3 13,99
Pekerlaan Balok
1 Balok 300x600
a. Lantai Kerja F'c 10 Mpa t = 5 cm m3 3,65
b. Bekisting Batako m2 106,75
C. Pembesian Kg 5.220,92
L8l20
BOQ STRUKTUR
a
BILL OF QUANTITY {BOQI
PROYEK : Pembangunan Hotel Domestik Terminal 3 Ultimate
LOKASI : Tanger?tr9, Banten
PEKERJAAN : Struktur
2 Balok 400x700
a. Lantai Kerja F'c 10 Mpa t = 5 cm m3 3,65
b. Bekisting Batako m2 106,75
C. Pembesian Kg 9.456,64
d. Beton F'c 35 Mpa m3 13,98
F Pekeriaan Kolom
Kolom K{ 800x800
Gl. Bekisting Multiplek 9 mm Kolom m2 201,60
b. Pembesian Kg 1 1.001,42
c. Beton F'c 35 Mpa m3 40,32
A PEKERJAAN TANAH
1 Pekerjaan Galian Tanah rn3 114,92
2 Pekerjaan Urugan GWT m3 19,14
B PEKERJAAN PONDASI
PekerJaan Tlang Pancang
1 Pengadaan Tiang Pancang Square 45 x 45 cm (top) m' 49,00
2 Pengadaan Tiang Parcang Square 45 x 45 cm (bottom) mt 72,00
3 Pengadaan Tiang Pancang Square 45 x 45 cm (Middle) m' 49,00
4 Pemancangan Tiang Pancang Square 45 x 45 cm m' 1 68,00
5 Penyambungan Tiang Pancang (Las) m' 21,60
6 Bobok Tiang Pancang TK 6,00
Pekerlaan Dlndlng
a. Bekisting Multiplek 15 mm Slab m2 177,31
b. Pembesian
Besi dia.22 Kg 9.092,26
Le l20
BOQ STRUKTUR
s
BILL OF QUANTITY {BOQI
PROYEK : Pembangunan Hotel Domestik Terminal 3 Ultimate
LOKASI : Tangerihg, Banten
PEKERJAAN : StruktUr
Pekerfaan Balok
cl. Bekisting Multiplek I mm m2 4,24
b. Pembesian
Besi dia. 19 Kg 194,76
G. Beton F'c 35 Mpa m3 0,53
Pekerlaan Dalt
cl. Bekisting Multiplek 12 mm m2 97,66
b. Pembesian
Besi dia. 19 Kg 5.412,93
c. Beton F'c 35 Mpa m3 12,70
A PEKERJAAN TANAH
1 Pekerjaan Galian Tanah Sumpit m3 38,1 5
2 Pekerjaan Urugan Sumpit m3 6,36
Pelterlaan Lantal
a- Lantai Kerja F'c 10 Mpa t = 5 cm m3 0,45
b. Pembesian
Besi dia.22 Kg 102,69
c. Beton F'c 35 Mpa m3 2,25
Pekedaan Dinding
a. Bekisting Multiplek 15 mm Slab mZ 52,90
b. Pembesian
Besi dia.22 Kg 531,40
c. Beton F'c 35 Mpa m3 5,28
m3 '12,23
TOTAL II Rp -
20l20
BOQ STRUKI'UR
s
BILL OF QUANTITY (BOQI
PROYEK : Pembangunan Hotel Domestik Terminal 3 Ultimate
LOKASI : Tangerang, Banten
PEKERJAAN : ArSitektur
a. cm m2 3.292.87
b. Pekeriaan Beton Kolom Praktis include dindina
c. include dindina
d. Pekeriaan Plesteran + Acian Dindino m2 6.009.81
+ m2 120.38
t. Pekeriaan Acian Beton m2 253.77
g. Pasangan Dinding Homogeneous Tile 30 x 60 cm, Polished m2 455,55
h. x m2 180.25
i. Pasanoan Dindino Granit. Pola Bv lnterior m2 32.28
mZ 233.01
Roofmesh M4 + Paku
k. Pekeriaan Cat Dinding Acrilyc Emulsion, Cat lnterior m2 4.850,94
T'
- m2 1.300.01
2 Lantai
I Pekeriaan Plafond
v
tebal 9 m2
dengan Rangka Metal Furing termasuk gantunoan
b. Pekeriaan Plafond Calcium iilicate tebal 3 mm,
I
m2 231 .65
C
Sub Total
4 Pekeriaan Partisi
h,
--
1 Finish Cat Duco
lnsulasi Rockwool Tahan Api
Hardware & Accessories
g. Pintu Besi Type PB - 1, Ukuran 160 x220 cm Unit 4.00
Kusen Besi dari Besi Canal C 100 Finish Cat Duco
Daun Pintu Double Plat Besi tebal 1.5mm, Besi Siku L 40.40.4
Finish Cat Duco
Hardware & Accessories
h. Pintu Besi Type PB - 2, Ukuran 90 x220 cm Unit 3.00
Kusen Besi dari Besi Canal C 100 Finish Cat Duco
Daun Pintu Double Plat Besi tebal 1.Smm, Besi Siku L 40.40.4
Finish Cat Duco
Hardware & Accessories
i. Pintu dan Jendala Kayu + Kaca Type PJ - 1. Ukuran 183.5 x220 cm Unit 6,00
Kusen Kayu Solid 6114
Daun Pintu Kayu t,40mm Finish Melamik
Daun Jendala Kaca tebal 6mm
Hardware & Accessories
j. Jendela Kaca Type J - 1, Ukuran 200 x 130 cm Unit 2.00
Kusen Kayu Solid 6114
Daun Jendala Kaca tebal 6mm
k. Jendela Kaca Type J - 2. Ukuran 400 x 130 cm Unit 1,00
Kusen Kayu Solid 6114
Daun Jendala Kaca tebal 6mm
l. Jendela Kaca Type J - 3, Ukuran 120 x 95 cm Unit 1 .00
Kusen Kayu Solid 6114
Daun Jendala Kaca tebal 6mm
Meja Counter , ru.t
BILL OF QUANTITY (BOQ)
PROYEK : Pembangunan Hotel Domestik Terminal 3 Ultimate
LOKASI : Tangemhg, Banten
PEKERJAAN : ArSitEktur
Sub Total
6.A Pekerjaan Tangga Type 1, Dari Ground Floor Plan ke Upper Ground Floor Plan
Sub Total 6. A
Sub Total 6. B
Sub Total 6. C
6.D
Sub Total 6. D
& Escalator
1 Pasang Closet Duduk Type CW 914 J + Eco Washer, Ex. TOTO Unit 6,00
Closet Body : CW 914 J, Tank Trim : TX 296 CWS
Stop Valve : TX 277 S, Seat & Cover : TC 281 SJ
Floor Flage W/ Seal Gasket & Caps : T 53 P 100 & TSU 01 W.12
Eco Washer : TCW 03 SL
2 Pasang Washtafel Type LW 899 CJ , Ex. TOTO Unit 7,00
I Lavatory : LW 889 CJ, Lavatory Faucet : TX 126 LE
U P - Trap : THX 1 A - 5N, Stop Valve : TX 277 S (P )
3 Pasang Urinal Type UW MT JNM , Ex. TOTO Unit 6,00
Wall Huns Urinal : UW 447 JNM
Flush Valve & lnlet Spud : TX 501 U & T 62 - 16
Wall Flase M Seal Gasket : T 64 CW
4 Pasang Urinal Partrtion Type A 100 , Ex. TOTO Unit 4,00
5 Pasang Paper Holder Type YH 116 , Ex. TOTO Set 6,00
6 Pasang Floor Drain Type TX I BN, Ex. TOTO Set 16,00
7 Pasang Double Robe Hook Type TS 118 WSB , Ex. TOTO Set 13,00
I Pasang Sink Janitor Type SK 322 E, Ex. TOTO Unit 1 ,00
Service Sink : SK 322 E
lNaste Fitting W / Cash lron S - Trap : T 37 SE
9 Pasang Shower Fixed Head Type TX 422 SC, Ex. TOTO Set 7,00
10 Pasang Kran Shower Type TX 468 SEGBR, Ex. TOTO Set 7,0a
11 Pasang Soap Holder Type S 156 N, Ex. TOTO Set 7,00
12 Pasang Kran Dinding Type T 23 BQ 13 N, Ex. TOTO Set 7,00
13 Pasang Handryer Type TYC 322 WF, Ex. TOTO Unit 2,00
14 Pasans Cermin Wastafel tebal 5mm (dibeveD. 330 x 105 cm Unit 1 .00
15 Pasang Cermin Wastafel tebal 5mm (dibevel),260 x 105 cm Unit 1 .00
16 Pasangan Meia Beton Wastafel, finish Granit m' 7.50
17 Pekerjaan Top Dinding Belakang Closet dan Urinal , finish Granit m2 2.14
18 Pasangan Grill Stainless Steel m2 5.67
19 Pasangan Piiakan Stainless Steel Set 6,00
Saniter t
Sub
1-
^
2 Peker aan Lantai
a m2 3.501 .00
b. Pasangan Lantai Homogenious Tile 40 x 40 cm, Polished ( 12) m2 190,04
c. x cm L3 m2 144.58
d. Pasanoan Lantai Homooenious Tile 60 x 60 cm. Polished ( L4 ) m2 386.63
e. x m2 24.57
t. Pekeriaan Lantai Homooenious Tile 80 x 80 cm. Polished m2 767.20
s. Pekeriaan Finishing Lantai ( L6 ) Bv lnterior
tebal 4mm mZ 201 .61
i. Pasanoan Plint Lantai
Pasangan Plint Lantai Homogenues mt 261 ,98
Plint Lantai Keramik m' 29.80
Lantai -
3 Pekeriaan Plafond
a. m2 1.984.74
Metal termasuk
b. Pekeriaan Plafond Gypsum Board tebal 9 mm, m2 675.39
termasuk Akses
c. Pekerjaan Plafond Calcium Silicate tebal 3 mm, mZ 127.33
-
d. Pekerjaan Plafond Aluminium Strip m2 289.39
e. mZ 800.23
firterior
g. Pekerjaan List plafond Alumunuim, Wall Angel m' 748.44
m2 3.587.69
Plafond
4 ran Partisi
Louver Kayu
Hardware & Accessories
-,- b. Pintu Kayu Type P - 4, Ukuran 160 x 220 cm Unit 3.00
- Kusen Kavu Solid 6114
Daun Pintu Kayu t. 40mm, Panel Teak Plywood t. 6mm
Bagian Luar & Dalam Finish Melamik
Kaca Clear 5 mm
Hardware & Accessories
c. Pintu Kayu Type P - 5, Ukuran 160 x220 cm Unit 1.00
Kusen Kayu Solid 6114
Daun Pintu Kavu t. 40mm, Panel Teak Plywood t. 6mm
Bagian Luar Finish Melamik, Bagian Dalam Plywood 6mm Lapis Stainlees Steel
Kaca Clear 5 mm
Hardware & Accessories
d. Pintu Kavu Type P - 6. Ukuran 1 10 x 220 cm Unit 1 ,00
Kusen Kayu Solid 6114
Daun Pintu Kayu t. 40mm. Panel Teak Plvwood t. 6mm
Bagian Luar & Bagian Dalam Finish Melamik
Hardware & Accessories
e. Pintu Kayu Type P - 8, Ukuran 160 x 240 cm Unit 3,00
Kusen Kayu Solid 6114
Daun Pintu Kayu t. 40mm, Panel Teak Plvwood t. 6mm
Detail lnterior
Kaca Clear 5 mm
^-
I ,
Hardware & Accessories
Pintu Besi Tahan Api Type FD - 1, Ukuran 120 x220 cm
f Unit 6.00
Kusen Besi dari Besi Canal C 100 Finish Cat Duco
Daun Pintu Double Plat Besi tebal 1.5mm, Besi Siku L 40.40.4
Finish Cat Duco
lnsulasi Rockwool Tahan Api
Hardware & Accessories
g. Pintu Besi Type PB - 2, Ukuran 90 x22A cm Unit 1 ,00
Kusen Besi dari Besi Canal C 100 Finish Cat Duco
Daun Pintu Double Plat Besi tebal 1.5mm. Besi Siku L 40.40.4
Finbh Cat Duco
Hardware & Accessories
h. Pintu Type PR - 12, Ukuran 90 x 240 cm Bv lnterior
Kusen Kayu Solid 6114
Daun Pintu Kayu t. 40mm, Panel Teak Plywood t.6mm
Bagian Luar dan Basian Dalam Finish Melamik
Hardware & Accessories
i. Jendela Kaca Type JA - 1 , Ukuran 255 x 130 cm Unit 4,00
Kusen Aluminuim 50x100mm tebal 1.2 mm, Finish Powder Coating
Daun Jendala Frame Aluminuim + Kaca Clear tebal 6mm
Hardware & Accessories
j. Jendela Kaca Type JA - 2, Ukuran 400 x 160 cm Unit 4.00
Kusen Aluminuim 5Ox100mm tebal 1 .2 mm, Finish Powder Coatinq
Daun Jendala Frame Aluminuim + Kaca Clear tebal 6mm
Hardware & Accessories
k. Jendela Kaca Type B - 1, Ukuran225 x 60 cm Unit 3,00
Kusen Aluminuim 50x100mm tebal 1 .2 mm, Finish Powder Coatins
Daun Jenclala Frame Alumlnulm + Kaca Clear tebal 6mm
Hardware & Accessories
&,
BILL OF QUANTITY (BOQI
PROYEK : Pembangunan Hotel Domestik Terminal 3 Ultimate
LOKASI : Tangemhg, Banten
PEKERJAAN : ArcitEKtUT
Sub Total 6. A
6.B Pekeriaan Tanoqa Tvpe 2.Dan Uoper Ground Floor Plan ke Lobbv Floor Plan
Sub Total 6. B
6.C Pekeriaan Tanooa Tvoe 3. Dari Uooer Ground Floor Plan ke Lobbv Floor P an
Sub Total 6. C
Sub Total 6. D
^tr
r 1 Pekeriaan Screedins Lantai m2 30,55
2 Pasanoan Lantai Homooenous Tile 60 X 60cm Unpolised m2 26.04
3 Pasangan Stepnozing s Tile 10 X 60 cm m' 45.15
4 Pekeriaan Raillins Tanssa dan Raitins Void m' 48.29
. Handrail bahan Kavu Jafr @ 3" Finish Melamik &
Plat Stanless Steel
. Tiano Raillinq bahan Plat Stainless Steel
. Parapet Kaca Tempred 10 mm
. Plin Stainless Steel Hairline
5 Cover Bawah Escalator, Bahan Stainless Steel m2 28,53
6 Pekeriaan Acian Halus, Plafond Beton Expose mZ 19,35
7 Pekeriaan Cat Plafond Acrilyc Emulsion. Cat lnterior m2 19.35
Sub Total 6. E
6.F
Sub Total 6. F
1 Pasang Closet Duduk Type CW 914 J + Eco Washer, Ex. TOTO Unit 6,00
Closet Body : CW 914 J, Tank Trim : TX 296 CWS
Stop Valve : TX 277 S, Seat & Cover : TC 281 SJ
Floor Flage Wl Seal Gasket & Caps : T 53 P 100 & TSU 01 W.12
Eco Washer : TCW 03 SL
3 Pasang Washtafel Type LW 899 CJ , Ex. TOTO Unit 5,00
Lavatory : LW 889 CJ. Lavatorv Faucet : TX 126 LE
P - Trap : THX 1 A - 5N, StopValve : TX 277 S (f )
4 Pasang Urinal Type UW UT JNM , Ex. TOTO Unit 4,00
Wall Huns Urinal : UW 447 JNM
Flush Valve & lnlet Spud : TX 501 U & T 62 - 16
Wall Flaoe W Seal Gasket : T 64 CW
5 Pasang Urinal Partition Type A 100 , Ex. TOTO Unit 3,00
b
s l3L BOQ ARSITEKTUR
HLL OF qUANTTTY (BOQI
PROYEK : Pembangunan Hotel Domestik Terminal 3 Ultimate
LOKASI : Tangemhg, Banten
PEKERJAAN : AnsiteKtur
Sub Total 7. A
+ Unit 7,00
Sub Total 7. B
7.C u
] Pekeriaan Lantai
4 Pekeriaan Partisi
e m' 348.45
Rock Wool Fire Protection
f. mZ 151 ,24
Kaca Clear 5 mm
Hardware & Accessories
Louver Kayu
Hardware & Accessories
Kaca Clear 5 mm
Hardware & Accessories
e. Pintu Besi Tahan Api Type FD - 1 , Ukuran 12A x22A cm Unit 5,00
Kusen Besi dari Besi Canal C 100 Finish Cat Duco
Daun Pintu Double Plat Besi tebal 1.5mm. Besi Siku L 40.40.4
Daun Pintu Double Plat Besi tebal 1.Smm. Besi Siku L 40.40.4
Finish Cat Duco
Hardware & Accessories
Unit 1 .00
Kusen Aluminuim ( Back Mu on ), Finish Powder Coatins
mm
Jendela Kaca Tempered T : 8 mm
Hardware & Accessories
m Unit 1,00
Ranoka Kusen Mullion & Transom Aluminium Finish Powder Coatino
Unit 1.00
Ranoka Kusen Mullion & Transom Aluminium Finish Powder Coatino
Panel Kaca -aminated 6+6mm
r^ t.
Panel Kaca Laminated 6+6mm
u. Unit 1.00
Rangka Kusen Mullion & Transom Aluminium Finish Powder Coating
x. Cover m2 274.42
Alumunium Panel tebal 0.5 mm fin PVDF thickness 4mm.
Holow 40x40 tebal 1.2 mm bracket siku
Sub Total 6. A
6.8 Pekeriaan Tanoga Tvpe 2, Dari Lobby Floor Plan ke Mezzanine Floor Plan
Sub Total 6. B
6.C Pekeriaan Tangga Type 3, Dari Lobby Floor Plan ke Mezzanine Floor Plan
6.D Pekeriaan Tangsa Tvpe 7, Dari Lobbv Floor Plan ke Mezzanine Floor Plan
Sub Total 6. D
1 Pasang Closet Duduk Type CW 914 J + Eco Washer, Ex. TOTO Unit 6,00
Closet Body : CW 914 J, Tank Trim : TX 296 CWS
Stop Valve : TX 277 S, Seat & Cover : TC 281 SJ
Floor Flase W/ Seal Gasket & Caps : T 53 P 100 & TSU 01 W.12
Eco Washer : TCW 03 SL
t3l3t BOQ ARSITEKTUR
v
BILL OF QUANTITY (BOQI
PROYEK : Pembangunan Hotel Domestik Terminal 3 Ultimate
LOKASI : Tangemrg, Banten
PEKERJAAN : ArSiteKtUr
mZ 20,E7
type Kliplock Hiten t=0,5 mm
2 lnsulasi atap, Material dari : Rockwool thickness 50mm mZ 24.87
^-. Aluminium foil double side, Roofmesh M4
Kaca + mm mZ 26,00
- mm mt 11,90
5 Gutter Stainless Steel Hairline mt 11,90
Roof Drain 4" Set 2.00
c.
1 Lantai m2 1.287,65
2 Lantai Membrane tebal 4mm m2 1.435,27
Set 20,00
a. Bata mZ 2.360.22
include dindino
c. Pekerjaan Beton Ring Balok Praktis include dindino
d. Plesteran + Acian m2 4.232.01
e. Pekeriaan Plesteran + Acian Dindino Trasram m2 88,86
t. Pekeriaan Acian Beton m2 319.77
2 Pekeriaan Lantai
3 Pekeriaan Plafond
4 Pekeriaan Partisi
Partisi
v
tslsL BOQ ARSITEKTUR
BILL OF QUANTITY (BOQI
PROYEK : Pembangunan Hotel Domestik Terminal 3 Ultimate
LOKASI : Tangerang, Banten
PEKERJAAN : ArsiteKtur
i. Pintu Besi Tahan Api Type FD - 1, Ukuran 120 x220 cm Unit 6.00
Kusen Besi dari Besi Canal C 100 Finish Cat Duco
Daun Pintu Double Plat Besi tebal 1.5mm, Besi Siku L 40.40.4
Finish Cat Duco
lnsulasi Rockwool Tahan Api
Hardware & Accessories
Unit 1,00
Kusen Aluminuim 50x100mm tebal .2 Finish
Pintu Pane iluminium + Kaca Clear tebal 6mm
Daun Jendala Frame Aluminuim + Kaca Clear tebal 6mm
Hardware & Accessories
Unit 1.00
Kusen Aluminuim 50x100mm tebal 1 .2 mm. Finish Powder Coatins
Pintu Frameless Tempered 12mm
Daun Jendala Kaca tebal 8mm
Hardware & Accessories
x cm Unit 1.00
Kusen Aluminuim ( Back Mullion ). Finish Powder Coatino
Kaca Laminated 5+5mm
6.A Pekeriaan Tangga Type 1 , Dari Mezzanine Floor Plan ke 1st Floor Plan
Sub Total 6. A
6.8 Pekeriaan Tangga Type 2, Dan Mezzanine Floor Plan ke 1st Floor Plan
Sub Total 6- B
6.C Pekeriaan Tangga Type 3, Dari Mezzanine Floor Plan ke 1st Floor Plan
Sub Total 6. C
7 Fixture
1 Pasang Closet Ducluk Type CW 914 J + Eco Washer, Ex. TOTO Unit 6.00
Closet Bodv : CW 914 J, Tank Trim : TX 296 CWS
Stoo Valve : TX 277 S. Seat & Cover : TC 281 SJ
Floor Flase W Seal Gasket & Caps : T 53 P 100 & TSU 01 W.12
Eco Washer : TCW 03 SL
3 Pasang Washtafel Type LW 899 CJ , Ex. TOTO Unit 5,00
Lavatory : LW 889 CJ, Lavatory Faucet : TX 126 LE
f- P - Trap : THX 1 A - 5N. StopValve : TX 277 S ( )A )
4 Pasang Urinal Type UW M7 JNM , Ex.TOTO Unit 4,00
Wall Huns Urinal : UW 447 JNM
Flush Valve & lnlet Spud : TX 501 U & T 62 - 16
Wall Flaoe M Seal Gasket : T 64 CW
5 Pasang Urinal Partition Type A 100 , Ex. TOTO Unit 3,00
6 Pasang Paper Holcler Type Yfl 116 , Ex. TOTO Set 6,00
7 Pasang Floor Drain Type TX 1 EN, Ex. TOTO Set 7,00
I Pasang Double Robe Hook Type TS 118 WSE , Ex. TOTO Set 6,00
I Pasang Sink Janitor Type SK 3ZZ E, Ex. TOTO Unit 1,00
Service Sink : SK 322 E
Waste Fittino W/ Cash lron S - Trap : T 37 SE
10 Pasang Kran Dinding Type T 23 BQ 13 N, Ex. TOTO Set 1,00
11 Pasans Cermin Wastafel tebal Smm (dibevel), 60 x 105 cm Unit 6.00
12 Pasansan Meia Beton Wastafel. finish Granit m' 7.70
13 Pekeriaan Top Dinding Belakang Closet dan Urinal , finish Granit m2 1.53
Sub Total 7. A
Sub Total 7. B
Sub
3 Pekeriaan Plafond
r
- Sub Total Pekeriaan Plafond
4 Pekeriaan Partisi
mt 131.30
Rock Wool Fire Protection
Sub Total
x cm Unit 3.00
Kusen Kayu Solid 6114
t.
Bagian Luar & Dalam Finish Melamik
Kaca Clear 5 mm
Hardware & Accessories
20l3L BOQ ARSITEKTUR V
BrLt oF gUANTTTY (BOQI
PROYEK : Pembangunan Hotel Domestik Terminal 3 Ultimate
LOKASI : Tangemhg, Banten
PEKERJAAN : ArSiteKtur
q. Pintu Besi Tahan Api Tvpe FD - 1. Ukuran 120 x220 cm Unit 6.00
Kusen Besi dari Besi Canal C 100 Finish Cat Duco
Daun Pintu Double Plat Besi tebal 1.5mm, Besi Siku L 4O.4O.4
Finish Cat Duco
lnsulasi Rockwool Tahan Api
Hardware & Accessories
2L/st
BOQ ARSITEKTUR
BILL OF QUANTIW (BOQT
PROYEK : Pembangunan Hote! Domestik Terminal 3 Ultimate
LOKASI : Tangemrg, Banten
PEKERJAAN : Arsitektur
6,A Pekeriaan Tanqsa Tvpe 1 . Dari 1st Floor Plan ke 2nd Floor Plan
6.8 Pekerjaan Tangga Type 2, Dari 1st Floor Plan ke 2nd Floor Plan
Sub Total 6. B
6.C Pekerjaan Tangga Type 3, Dari lst Floor Plan ke 2nd Floor Plan
& Escalator -
1 Pasang Gloset Duduk Type CW 914 J + Eco Washer, Ex. TOTO Unit 3,00
Closet Bodv : CW 914 J. Tank Trim : TX 296 CWS
Stop Valve : TX 277 S, Seat & Cover : TC 281 SJ
Floor Flaoe W/ Seal Gasket & Caps : T 53 P 100 & TSU 01 W.12
t-
- Eco Washer :TCW 03 SL
3 Pasang Washtafel Type LW E99 CJ , Ex. TOTO Unit 3,00
Lavatorv : LW 889 CJ. Lavatory Faucet : TX 126 LE
P - Trao : THX 1 A - 5N. StopValve : TX 277 S ()e )
4 Pasang Urinal Type UW MT JNM , Ex. TOTO Unit 2,00
Wall Huns Urinal : UW 447 JNM
Flush Valve & lnlet Spud : TX 501 U & T 62 - 16
Wall Flage M Seal Gasket : T 64 GW
5 Pasang Urinal Partition Type A 100 , Ex. TOTO Unit 1,00
6 Pasang Paper Holder Type YH 116 , Ex. TOTO Set 3,00
7 Pasang Floor Drain Type TX 1 BN, Ex. TOTO Set 9,00
I Pasang Double Robe Hook Type TS 118 WSE , EX.TOTO Set 8,00
9 Pasang Shower Fixed Head Type TX 422, SC, Ex. TOTO Unit 5,00
10 Pasang Kran Shower Type TX 468 SECBR, Ex. TOTO Unit 5,00
11 Pasang Soap Holder Type S 155 N, Ex. TOTO Unit 5,00
12 Pasang l-landryer Type TYC 322 WF, Ex. TOTO Set 2,00
13 Pasano Cermin Wastafel tebal Smm (dibeveD. 60 x 105 cm Unit 3,00
14 Pasangan Meia Beton Wastafel, finish Granit m' 4.70
Sub Total 7. A
SubTotal 7-B
-
aan Saniter Fixturc
Sub Total 8. A
f^-.
Sub Total 8. B
a. cm m2 3.433.02
b. Pekeriaan Beton Kolom Praktis include dindino
c. Pekeriaan Beton Ring Balok Praktis include dindino
+ m2 5.112.49
e. Pekeriaan Plesteran + Acian Dindino Trasram m2 522,35
f. Pekeriaan Ac m2 54.67
q. Pasansan Dindins Granit. Pola By lnterior m2 32.82
h. Pekeriaan Cat Dinding Acrilyc Emulsion, Cat lnterior m2 623.52
m2 383.94
i. Pekeriaan Finishins Dindins Guest Room Bv lnterior
k. Pekeriaan Finishing Dinding Toilet Guest Room By lnterior
Lantai mt 62,97
Pasansan Plint Lantai Keramik m' 29,47
3 Pekeriaan Plafond
m2 69.42
dengan Rangka Metal Furing termasuk gantungan
b. Acian Plafond mZ 23.11
c. Pekeriaan Fin lnterior
d. Pekerjaan List plafond Alumunuim, Wall Angel m' 71 .96
e. Cat mZ 92.53
\ e. Pintu Besi Tahan Api Type FD - 1, Ukuran 12O x22O cm Unit 6.00
Kusen Besi dari Besi Canal C 100 Finish Cat Duco
- Daun Pintu Double Plat Besi tebal 1.Smm, Besi Siku L 40.40.4
Finish Cat Duco
lnsulasi Rockwool Tahan Api
Hardware & Accessories
6.A Pekeriaan Tanooa Tvpe 1 . Dari Znd Floor Plan ke 3rd Floor Plan
Sub Total 6. A
6.B
Sub Total 6. B
Pekeriaan Tanosa Tvpe 3, Dari 2nd Floor Plan ke 3rd Floor Plan
-c
- 1 Pekeriaan Screedins Lantai m2 26.64
2 Pasangan Lantai Keramik Tile uk. 30 x 30 cffi, Unpolished mZ 23,89
3 Pasangan Stepnozing Tile uk. 10 x 30 cm m' 27.5A
4 Pekeriaan Raillino Tansoa mt 8.40
. Railling besi bahan pipa besi hitam dia.2" (hand rail)
. Raillins besi bahan besi Baia T 10 x 50 mm (tiano)
. Railling besi bahan pipa besi hitam dia. 1" (pembagi)
. Base plate + baut angkur
. Finishing pengecatan
5 Pekeriaan Acian Halus. Plafond Beton Exoose m2 38,06
6 Pekerjaan Cat Plafond Acrilyc Emulsion, Cat lnterior mZ 38.06
Sub Total 6. C
Sub &
Sub
I Pekeriaan Atap
Sub Iotal Pr -
2 Pekeriaan Lantai
3 Pekeriaan Plafond
4 Pekeriaan Partisi
t. Pintu Besi Tahan Api Tvpe FD - 1. Ukuran 120 x 224 cm Unit 6.00
Kusen Besi dari Besi Canal C 100 Finish Cat Duco
Daun Pintu Double Plat Besi tebal 1.Smm, Besi Siku L 40.40.4
Finish Cat Duco
lnsulasi Rockwool Tahan Api
Hardware & Accessories
U
- h. Pintu Kavu Tyne SH - 2. Ukuran 140 x 225 cm Unit 25.00
Kusen Kayu Solid 6114
Daun Pintu Panel Teak Plwvood t. 6mm
Baqian Luar & Dalam Finish Melamik
Hardware & Accessories
2 Pekeriaan Lantai
3 Pekeriaan Plafond
Daun Pintu Double Plat Besi tebal 1.Smm. Besi Siku L 40.40.4
.-.
Hardware & Accessories
b. Pintu Besi Type PB - 2, Ukuran 90 x22O cm Unit 2.00
- Kusen Besi dari Besi Ganal C 100 Finish Cat Duco
Daun Pintu Double Plat Besi tebal 1.5mm. Besi Siku L 40.40.4
Finish Cat Duco
Hardware & Accessories
c. Pintu Besi Tahan Api Type FD - 1, Ukuran 120 x 220 cm Unit 1 ,00
Kusen Besi dari Besi Canal C 100 Finish Gat Duco
Daun Pintu Double Plat Besi tebal 1.Smm. Besi Siku L 40.40.4
5 Pekeriaan Atap
lll.l 0 FASAD
1 Gurtain Wall Type CW - 12 mZ 5.886,80
- Rangka Kusen Mullion & Transom Aluminium Finish Powder Coatin
- Panel Kaca Laminated 6+6mm
2 Tali Air Parapet Fasad m' 2.976,00
lll.l I ATAP
^-, Atap Elv 11,25 m
1 Dinding Parapet Plester Topping ACP mt 201 ,30
- 2 Screed m2 1.790,00
3 Waterprofing m2 1.790,00
Atap Elv 16 m
4 Dinding Parapet Plester Topping ACP m' 140,80
5 Screed m2 1.285.00
6 Waterprofing m2 1.285,00
1 Pekeriaan lantai
2 Pelreriaan Railling
3 Pekeriaan Plafon
4 Fasade
a. - Rangka Kusen Mullion & Transom Aluminium Finish Powder Coatine m2 147,06
Panel Kaca Laminated 6+6mm
t\ PEKERJAAN ELEKTRIKAL
A MVMDP . A IAIS.TYPE}
e lneomina Cuhicle larcliri dani' rrnit
Vanrrm (lireuit Rraakar A3O A+ ltiotarizer{
3 Dhase rnsulated busbar
Line differential relav. Directional relav- Over Current Relav- Earth Fault Relav
3 nh CT l.)iaital lUa-terina
Potentialtransformer 20 kV/l00 Volt {3. 2-windino
3 ohase Lamo lndicator
Farthino switch fJisconnectino Switch
Shrrnt Trin Coil + Arry Contan
Dilenokaoi denoan orotocol communication
3 ohase Fuse
M\IMDP . B
a Outgoing Gubicle tercliri clari : nnit
Vacum Circuit Breaker 630 A+ Motorized
Line differential relav. Directional relav- Over Current Relav. Earth Fault Relav
NO VOLUME UNIT
Ro. Ro.
Pekerjaan Pengadaan, Pemasangan dan Pengujian lnstalasi Kabel Feeder Tegangan menengah lengkap dengan
schoon kabel, clamp Kabel, dan materal bantu lainnya sesuai dengan gamhar rencana dan spesifikasi Teknis.
tv- 2
Pekerjaan Pengadaan, Pemasangan dan Pengujian lnstalasi BUSDUCT Tegangan rendah lengkap dengan material
banfu dan asesoris lainnva sesuai denoan oambar rencana dan soesifikasi Teknis
A m
- TFI-Rrrv
+ m
c_
ance Test : 8 oro13 hari (Ro 1 OO0 O00lhari) lrrt
e Proiect 'fi orol5 hari (Rn 1 fX)fl (Xlf|/hari) 1 lat
-. Site Trainino (SD : 10 Oro/ 5 hari (Rp. 500.000lhari)
ffi
a
- NYY 4Cx24O mmZ + BC 2O mmZ dari LVMDP-A Ke DB GF m
- f{YY AC v 74tl mm? + BC ?D mm? dari I VMDP-B ke [lB GF m
m
-NYY4Cx16mmz+BC MmZ dari DB GF Ke PP CllU m
-NYY4CxBmm2+BC mm2 dari PP CW ke TRANSFFR PTJMP DtrTY 3A m
- hIYY 4C x 6 mm2 + BC 6 mm2 dari PP CW ke TRANSFER PUMP STANDBY m
-NYY4CxEmm?+tsC mmz CIaTi PP CW Ke GWT AIR tsERSIH DUTY m
-NYY4Cx15mm2+BC mm2 dari DB LIGHTING ke BYPASS UPS ?(l m
1 m
m
mm2daTi DB LIGHTING Ke BYPASS UPS m
-NYY4Cx15mmz+tsC Mrn2 daTi BYPASS UPS Ke PP UPS {3 m
-NYY4CxGmm2+BC mmz dariPP UPS Ke LP-GF.UPS DOM 3 m
m
-NYY4Cx6mm2+BC mm2 dari PP SUMPIT Ke LCP SUMPIT m
- NYY 4 x 1C x 3OO mm2 + 7A MmZ dari LVMDP-A Ke PP HYDRANT 295 m
m
-FRC4Cx6mm2+BC Mmz claTi PP HYDRANT Ke JOCKEY PUMP m
- FRC 2Y3Cr24O mm2 + fY 1C x24O dari PP HYDRANT ke ELECTRIC PUMP 227 m
- NYY 4C x24O mm2 + BC 12O mm? dari LVMDP-A ke DB Liohtino
- NYY 4Cx24O mm2 + BC 2(} mmz clari LVMDP-B ke DB Liohfino
m
m
-NYY4Cx35mm2+BC mm2 dari DB Liohtino ke LP-GF.DOM
NYY4Cx4mm2tBC, mmz dari PP ELEKTRONIKA ke SERVER FA "tt1 m
m
E
^-, NYY 4C X 5 MMZ + BC 5 MM2 dari PP-EXHAUST FAN RETAIL Ke EF LB 9
NYY 4C x 6 mm2 + BC 6 mm2 dari PP-EXHAUST FAN RETAIL ke EF L8.10
o m
m
N\ f 4C x 6 mm2 + BC 6 mm2 dari PP-EXHAUST FAN RETAIL ke EF L8.11 m
m
NYY ,(i v 6 mm2 + BC fi mm2 dari PP IIPS GF ke L P-MZ UPS D m
- N\ry 4C x 10 mm2 + BC 1O mm2 dari SDB LIGHTING GF ke LP-ltlZ.D m
NYY 4C x 5 mm2 + BC 6 mm2 dari Dts- GF & B ke PP GONIPLA llllz- m
- NYY
NYY
4C
4C
y 4 mm?
x 6 mm2
+ BC
+ BC
tl mm2
6 mm2
dari tlB-lst B ka MCB Bax-S{
dari DB Liohtino ke LP-2.DOM
m
m
- NYY 4C x 6 mm? + EC 6 mmz dari PP UFS ke LP-z UPS.EPM m
- NYY 4C r 5 mm2 + BC 5 mm2 dari DB GF ke PP POOL
'rl
- NYY 4C x 6 mmz + BC 6 mm2 dari PP. POOL ke POOL PUMP.I m
- IIYY 4C x 6 mm2 + BC 6 mm2 dari PP. POOL ke POOL PUMP.2 m
- NYY 4C x 6 mmz + EIC 6 mmz dari PP. POOL ke DOSING PUMP m
BOQ EEKTRIKAL v
BILL OF OUANTITY (BOOI
PROYEK : Pembangunan Hotel Domestik Terminal S Ultimate
LOKASI : Tangerang, Banten
PEKERJAAN : Elekfrikal
- -NYY4Cx4mmz+
- NYY ACv 4 mm2 +
mmz dari DB-3rd.B ke MCB Box-32
mmz dari DB-3rd.B ke MCB Box-33
m
m
+ m
m
NYY4Cx4mmz+ mmz dari DB-3rd-B ke MCts Bor-35 m
- NYY ACx 4 mm2 * mmZ dari DB-3rd B ke MCB Box-37 32 m
htYYaCv4mm?+B{ m
- NYY lf- v L mrn? + mm2 dari DB.3rd-B ke MCB Box-3Sl m
- NYY &,x 4 mm2 + mm2 dari DB-3rd B ke MCB Box-4O I m
- htYY ACv 4 mm? + mm2 dari D&'3rd.B ke MCB Box-41 m
m
mm? dari DB-3rd-B ke MCB Box-43
-NYY 4Cx4 mmz+ mm2 dari DB-3rd.B ke MCB Ftr:x-4r' toa m
-f{YY4Cx4mm2+ mmZ dari DB-3td-B ke MCB Box-45 m
- NIYY 4Cv 4 mm2 + mmz dari DB-3rd.B ke MCB Box-46 m
m
4Cx4 mm2 +
- NYY mmzclari Dts-3rd.ts ke MCB Box-48 128 m
-NYYACx4mm2+ mm2 dari DB€rd.B ke MCB Box-49 1; m
- NYY 4Cv 4 mm? + m
- NYY l?.Y 4 mm? + F m
-NYY4CxEmmz+ mmZ dari SDB Liohtino ke LP-3 EDM 98 m
-NYY4CxBmm2+ mmz dari PP UPS Ke LP.3 UPS.DOM m
h )of Floor
12O mm2 dari LVMDP-A ke DB-RF m
- NYY 4Cx24O mmz + 12O mm2 dari LVMDP-B ke D&'RF m
-NIYY2v{4x{Cx + m
tn
-NYY4Cx1Ommz+ mm2 PP.AC ROOF Ke VRF OU LTl E 71 m
-NYY4Cx1Omm2* Mmz PP.AG ROOF Ke VRF.OU.LT2.E m
m
- N\^f 4C x 10 mm2 + MMz PP-AC ROOF Ke VRF OU LT1 D m
-NYY4Cx1Omm2+ mmz PP.AC ROOF Ke VRF.OU.LT3.D m
m
-NYY4Cx1Omm2+ m,m.? PP.AC ROOF Ke VRF.OU.LT2-D 5t m
mmz FF-AC FkOCTF h lrftF.OU.LT2.F m
-NYY4CxlOmm2+ MmZ PP'AC F(OOF Ke VRF.OU.LTI.C m
-NYY4CxSmmz+ MMz PP.AC ROOF Ke VRF.OU.LTI.G m
{
B|LL OF QUANTITY (BqQt
PROYEK : Pembangunan Hotel Domestik Terminal 3 Ultimate
LOKASI : Tangerang, Banten
PEKERJAAN : Elektrikal
HARGA SATUAN
NO URAIAN PEKERJAAN VOLUME UNIT
Flo- Fln
tv.2.4
hh
bh
bh
3. Groundino Bodv tsC 12O mm untuk Trafo- Enclosure Trafo L , MVMDP. Server m
b Penqadaan dan Pemasansan Groundinq Ruanq Panel Per lantai elektrikal & Elelffonika :
1. Panel Box Groundino 40O<3@ denoan cu bars 250x4$5 bh
m
.:
':
I
dan Rendah
-t
proteksa, komponen panel. busbar. measurement. termasuk koneks
tv. I
-36U|ZZU
V, J unase, 3U l1z, 63 l(A (tsreaKng (;apacfiy) type test form 4ts lengl(ap dengan peralatan incoming ACB,
Outgoing MCCB, Digital Metering, dan koneksi ke Grounding System sesuaidengan SpesifikasiTeknis dan Gambar 1 set
Perencanaan,
-. SAT dan test comisionino Site Proiect : €i oro/ 5 hari (Ro 1 nri) 1
lot
tv- .2 Floor
rrnit
PPCW 1 unit
PP-UPS unit
1 unit
- DB.LIGHTING 1 unit
. LP.GF.DOM lrnil
1 rrnit
- PP HYDRANT 1 unit
1v.3.3
unit
Page 6 of 10
BILL OF QUANTITY (BOQI
PROYEK : Pembangunan Hotel Domestik Terminal 3 Ultimate
LOKASI : Tangerang, Banten
PEKERJAAN : Elektrikal
NO VOLUME UNIT
Ro. Ro.
tv.3.4
PP I(I,I'H 1 llnif
pp Kl^,t-{ 2 unit
t P IJPS Lobbv t}oM 1 unit
PP EXHAUST FAN RETAIL unit
I P-l ahhv n()i, rrnit
PP FSKAI ATOR 1 unit
MCB Box 3( unit
HARGA SATUAN
NO VOLUME UNIT
Fln- Fln-
IVr 5
A lnsfallas,i Panaranaan Korklor - {st Flrror
LamDu flourn Lioht 20 W LED
l-amou Down Liotf 20 W LED WIH BACKUP BATTERY
Lamou TL 1xIE W tsALK
Lamou TL 1x18 W BALK WITH BACKUP BATIERY
Lampu EXT TL lxgw 3 bh
Saklar Tungoal I bh
Saklar Ganda
\ Saldar Hotel
SocketouUet 164 22 bh
Socket oufiet ac 2 bh
hh
lnstalasi Socket Outlet hh
HARGA SATUAN
NO URAIAN PEKERJAAN VOLUME UNIT
Fln- Fln-
Socketouflet 15A 22 bh
Socket outlet ac bh
bh
lnsblasi Socket Outlet 24 bh
7
lnslallaqi Fenaranoan Korirlor - 3rd Floor
Lamou TL LED 1x18 W BALK 1
Lamou TL LED 1x18 W BALK WITH BACKUP BATTERY 5 bh
Lamou EXIT TL 1x3W bh
Lamou Down Lioht 20 W LED B bh
Lampu Down Liqht 20 W LED WIH BACKUP BATTERY 5 bh
Lamou TLD Ir1E W Cove Lamo bh
Saklar Tunooal bh
Saklar Hotel 5 bh
Socketouffet 164 22 bh
bh
hh
lnshlasi Socket Outlet 23 bh
NO VOLUME UNIT
Ro- Ro-
M.s.5
Kahal I anldan ?flO mm 51 m
Kahal I adder 3OO mm tYl
Kahal Trav {lY'l mm m
Kahal Trav 2fl0 mm 91 m
ffi
::,.1 I .' i: :
4:i;j4d!r
tv6 { unit
tv6? Katral nonohantar NYA 12O mm lenokao Accessories 9l I m
l nanohantar nanurunan )
IVAS rrnif
oetir denoan tahanan maksimum 1 Ohm
tv6d Penohantar NYA 12O mm2 rino di ahs lenokan denoan alat bantu m
rv.6.5 m
TTE.
.@
=._-':.!rE-1-
trt tr r:,.:;;';l'.rt:,':l'
Gn!!r;;!irli;
ffi
1 I'r.,.r.t,i.tll l:t::.i.,.rt'-rir;tl:,i:it;:i..i:!tt:..irtir:Il.:1:. ,
q
o
V PEKERJAAN ELEKTRONIKA
FRC 3x2.5 mm2 dalam PVC Conduit dia. 3 / 4" 107 titik
- lnstalasi Outlet lntercom denqan kabel ITC/FRD
I 4 x 0.6 mm2 dalam PVC Conduit dia. @2A mm I titik
- v.1,4
a
Lantai Lobbv Floor
Penqadaan dan pemasanqan Peralatan Fire Alarm
- Smoke Detector 16 buah
44
- Heat Detector (Type Fixed Temperatur) 1 buah
- Manual Push Button c I w outlet intercom 4 buah
- Alarm Bell 4 buah
- lndicator Lamp 4 buah
- LCFA-LBF 1 buah
- Telenon Pemadam 4 buah
- Multi Purpose Fire Extinguisher + box kaca 4 buah
Page 2
B|LL OF QUANTTTY (BOg)
PROYEK : Pembangunan Hotel Domestik Terminal 3 Ultimate
LOKASI : Tanger?trg, Banten
PEKERJAAN : Elektronika - Tata Suara
h Fire Stair
5.T.SUARA Page 2 of ?
BILL OF QUANTITY (BOQ)
PROYEK : Pembangunan Hotel Domestik Terminal 3 Ultimate
LOKASI : Tanger?tr9, Banten
PEKERJAAN : Elektronika -Telepon
+
B|LL OF QUANTTTY (FOQ)
PROYEK : Pembangunan Hotel Domestik Terminal 3 Ultimate
LOKASI : Tangerorg, Banten
PEKERJAAN : Elektronika -Telepon
*
o
T.TELEPONN Page 2 of 2
BILL OF QUANTITY (BOQI
PROYEK : Pembangunan Hotel Domestik Terminal 3 Ultimate
LOKASI : Tangeratrg, Banten
PEKERJAAN : Elektronika-CCTV
Ith.
- Lantai Roof Floor
Dome PTZ Camera 2 MP 3 bh
lnstalasi CCTV, UTP Cable Cat 6 3 ttk
8.CCTV Page 1 of 1
B|LL qF OUANTTTY (BOO)
PROYEK : Pembangunan Hotel Domestik Terminal 3 Ultimate
LOKASI : Tanger?tr9, Banten
PEKERJAAN : Elektronika - Kabel Data
10.MATV Page 1 of 1 ,
*'
BILL OF QUANTITY (BOQ}
PROYEK : Pembangunan Hotel Domestik Terminal 3 Ultimate
LOKASI : Tangerang, Banten
PEKERJAAN : Elektronika - Access Card
w
1
I DDC-ATAP 1 set
ir;;;-.a-lr!;ii..;!r.
ffi
ffi
- lot
::| :: .;i]l.1.'1'.'1;..,;l.:.:,,.'1]',;l.l1].i;..,1l,l:i.:.;..:,'..;:
:;;:::iz,l:.1, 1: :,,:':':., r: rl i '"' r l'r ':. ;,,:,':':', I
-. SAT dan test comisioning Site Proiect : 6 orsl 5 hari (Rp. 1.000.000/hari) 1 lot
Orol 5 hari (Rp. 1 lot
I
'
rlr'
l
:.f
I
v.11.6 FAT, SAT, ST & COMISSIONING
- -. Workshop / Factorv Acceptance Test : 8 ors/ 3 hari (Rp. 1.000.000/hari) 1 lot
-. SAT dan test comisioning Site Project : 6 org/ 5 hari (Rp. 1.000.000/hari) 1 lot
-. Site Trainins (ST) : 10 Ors/ 5 hari (Rp. 500.000/hari) 1 lot
v.12.1 Utama
1 J9821A Aruba 5406R zl2 switch unit - 1
4
-
6 Cable Management pcs 4
7 UPS 1OK/A with Back-up Bactery lSmenit unit 1
t
f
."{
iir.4
Material {!DR.}
F v.12.7
1
Lantai Znd floor
Access Switch 4 Port unit
..-.-.*.:-
, :
2
, ' r:'
]:l
rl
,,t,.,;,.tl..t',. ' t,.'.',",,', l
I::
i ,'
l,t
VI PEKERJAA MEKANIKAL
vl.1 PEKERJAAN GONDOI.^A
Blok stop
6 Kabel Power
I NYYHY 4x2.5 mm2 mtr 50
7 Peralatan Banfu lot
- ( termasuk mobil roof beam with sharino, sear trulv 1 ton)
1
d.
Head : 1 10 meter
Dava : 150 HP
Putaran : 2900 mm
fvne : Horizontal Solit Case - ULFM
B unit
ULFM Standard
Head 1 10 meter
Dava 90 HP
Putaran : 2900 mm
Tvne ' Horizonfal Solit Case - tJl Fn
Head 1 10 meter
Dava 10I(Vv
Putaran : 2500 rom
1 unit
D Material bantu 1 lot
vt.2.2
dia . 65 mm 1 buah
dia. 150 mm buah
E Check Valve
dia. 65 mm 1 buah
2 buah
F
2 buah
4 buah
dia. 65 mm 1 buah
dia. 150 mm buah
H Valve dia 150 1 buah
I Main Control Valve ( MCV / MAV ) uk. 150 mm 1 buah
J 5 buah
K Material banfu ( flange,fittings,support etc. 1 lot
1 set
. ,r,ffi-t=B-ffi
A set
Fire Hose dia x m
Hose Nozzle 2.5"
B Pillar Hvdrant two wav 4" x2.5" x2.5" 4 set
C 1 set
D dan
dia. 150 mm 368 71 meter
dia. 65 mm 25.95 meter
E Accessories
Gate valve dia 150 mm 1 buah
F lot
t, iK,- _ES,. f. 5"'s
it{+ii;*tliiii#.:'::i-*ril,i!rr$iiiii$i
iUilri2aiEiilij$jillliiiliEiilEd! i W*ffi.,iffi
Yt.2.4
dia. 40 mm 4 meter
lndicatino Lamp
Alarm Bell
c lot
E!,"}s[!|,_",,,9-Emr
lf :f :l:i}:i:illail!'l}it9i1,l:i'1.4:ll,r":ri.-$
i{r:f i
.li
)1titl:Xi-r{.t;U:r!}-:.iilii.t\ii:i3i':r!i1$ii7y,1i;:{
:r1,.7;.ii:i:i lY.iiiiiiLii\ii:lilil.9llt,/;. ;..,ti:t#
',-W.,i,.ffi,ffi.t
e )H 40
dia mm1 126 meter
dia. 65 mm 54 meter
dia.40 mm 2 meter
1 lot
ffi*ffiffiffi
c
a {40
dia. 80 mm 17 meter
mm 87 meter
dia. mm 21 meter
Alarm Bell
ffi 1 lot
v
BILL OF QUANTITY (BOQI
PROYEK : Pembangunan Hotel Domesffk Termlnal 3 Ulfrmate
LOKASI : Tangerang, Banten
PEKERJAAN : Mekanlkal - Pemadam kebakaran
b + buah
d 1 lot
,ffi,,{W-,.tffiffi, i,-ffi.ffi.tffi$
b 208 buah
c Branch Control Valve dia. 100 mm 1 unit
d PRV Set Dia 150 mm 1 unit
e Pioa Drain GIP SCH 40 3: meter
dia.32
f Material bantu ( flanoe.fittinos.suooort etc. ) lot
o buah
h buah
ffi
iiii:fiJiiiiiritii lffi ffi*ffii. ffi.
M
BLL OF QUANTTTY (BOQ)
PROYEK : Pembangunan Hotel Domestilr Terminal 3 Ulfrmate
LOKASI : Tangerang, Banten
PEKERJAAN : Mekanikal - Pemadam kebakaran
e
dia. 1 mm 9r i5 meter
dia. 80 mm I 3 meter
dia.65 mm 35 meter
dia. 50 mm 25 meter
dia. 40 mm 152.25 meter
e. mm 30.45 meter
I
^-. lia.2 mm 87 .97 meter
D Lantai Mezzanine
Penoat
b I ) buah
c 1 unit
1 lot
B 'ioa
- Diame 0 meter
18 meter
E lot
ffi t-s,,',:--ffi,ffi,,r.
,iii{itgjEsiii?il* ilii:lhi'til
l rirllliritiiillittlitii.lti
ffi
v|.2.9 F|RE SUPPRESSION SYSTEM (ACTIVE FIREI
1
Unit
Unit
1n" 360"Discharse Nozzle. Brass 2 Unit
- 1-1n" 360"Discharqe Nozzle. Brass Unit
Releasino Control Panel clw Batteries 1 Unit
Photoelectric Smoke Detector cAr Base 3 Unit
Manual Release Station 1 Unit
Manual Abort Station 1 Unit
Fire Alarm Bell Unit
Horn-Strobe Lisht Unit
Evacuate Area lmmediatelv Sion 1 Unit
Gas Discharoe Sion 1 Unit
B SERVER ROOM
420 lb Cylinder clw 306 lbs NOVEC 1230 Agent, Accessories and
1 Unit
Discharoe Pressrrre Switch 1 Unit
3/8" 360oDischaroe Nozzle. Brass Unit
1 -1 12" 360"Discharqe Nozzle. Brass 1 Unit
2" 360"Discharoe Nozzle. Brass 1 Unit
Releasino Control Panel clw Batteries 6 Unit
Photoelecfuic Smoke Detector cAlr Base 2 Unit
Manual Release Station Unit
Manual Abort Station Unit
Fire Alarm Bell 2 Unit
Horn-Strobe Lisht 2 Unit
Evacuate Area lmmediatelv Sion 2 Unit
r- Gas Discharoe Sion 2 Unit
A Peralatan Utama
Pengadaan dan pemasangan instalasi peralatan utama lenekap dengan isolasi, pipa. tray
support. instalasi kabel listrik dan peralatan bantu sesuai soesifikasi tata udara.
I Exhaust Fan
Pengadaan & Pemasanean fan lengkap dengan kabel kontrol. eanfungan unit
support, accessoriess, insulation dan perAlatan banfu sesuai spesifikasi tata udara.
a EF. SC 1 unit
Service R.Wet+Drv+Bottle
Kapasitas Total : 1200 CFM
Speed I45O RPM
Daya input 1,5 KW
Tipe Fan Axial Duct
Ext. Static Pressure * 0.18 hrch.WG
d M. GS 1 unit
Service General Storase
Kapasitas Total * 9OO CFM
Speed 1450 RPM
Daya input : 1,2 KW
Tipe Fan Axial Duct
Ext. Static Pressure t 0.18 Inch.WG
e EF.RP I unit
^-. Service R. Pompa
I Kapasitas Total + 5OO CFM
Speed : 1450 RPM
- Daya input 112 KW
Tipe Fan Axial Duct
Ext. Static Pressure + 0.l8Inch.WG
f IF.RP I unit
Service R. Pompa
Kapasitas Total :t 500 CFM
Speed 1450 RPM
Daya input : *12 KW
Tipe Fan Axial Duct
Ext. Static Pressure : * 0.18 krch.WG
I EF-TI.1-T.1.4 l1 unit
Service R. Toilet
Kapasitas Total : * 100 CFM
Speed 1450 RPM
Daya input 0,3 KW
Tipe Fan Axial Duct
Ext. Statie Pressure * 0.18 Inch.WG
I EF-T1 1l unit
Service R. Toilet
Kapasitas Total + 400 CFM
Speed : 1450 RPM
k EF-T2.1-T2.4 l0 unit
Service R. Toilet
Kapasitas Total + 1OO CFM
Soeed 1450 RPM
Dava inout 03 KW
Tipe Fan : Axial Duct
Ext. Static Pressure + 0.18Inch.WG
I EF-T2 1 unit
Service : R. Toilet
Kaoasitas Total * 400 CEM
Speed 1450 RPM
Daya input 0,5 KW
Tioe Fan Axial Duct
Ext. Static Pressure * 0.18Inch.WG
c GF.IU.C.OI I tunit
Kapasitas Total 45.000 BTUIH
Daya input 0.45 KW
Tipe Indoor Split Duct
Liquid & gas dia. 9.52mm & 5.88 mm + isolasi
Termasuk remote kontrol, kabel kontrol, ganfungan unit indoor,
refrigerant, accessoriess, insulators, insulation, ongkos Dasang. drain pioe.
, Volume Damper,Pipa Refrigerant menuiu Branch Connection Outdoor \lRF
d
GF.ru.D-}L /GF.IU.A{z t GF.ttJ.D-03 / GF.rU.D-04 t / cF.ru.D-}s / /GF.IU.D-O10 I
9 unit
GF.ru,D-tt I / cF.ru.D-Lz I / GF.ru.D-l3
- Kapasitas Total 13.500 BTU/H
- Daya input :0.050 KW
Tipe Indoor Celling Cassete
Liquid & gas : dia. 6.35 mm & 12.7 mm + isolasi
Termasuk remote kontrol, kabel kontrol, ganfungan unit indoor,
refrigerant, accessoriess, insulators, insulation, ongkos Dasang. drain pioe^
, Pipa Refrigerant menuju Branch Connection Outdoor \IRF
i GF.IU.E.O5 5 unit
Kapasitas Total 18.000 BTU/r{
Daya input : 0.050 KW
1. TATA UDARA Page 2 of 12
RENCANA ANGGARAN BIAYA (RABT
PROYEK : Pembangunan Hotel tlomestik Terminal3 Ultimate
LOKASI : Tangerang, Banten
PEKERJAAN : Mekanlkal - Tata Udara
GF,ru,F47 1 unit
Kapasitas Total 9.OOO BTUIH
Daya input : 0.015 KW
Tipe Indoor Celling Cassete
Liquid & gas dia. 6.35 mm & 12.7 mm + isolasi
Termasuk remote konfrol, kabel kontrol, ganfungan unit indoor,
refrigerant, accessoriess, insulators, insulation, ongkos pasanq. drain pipe.
, Pipa Refrigerant menuiu Branch Connection Outdoor \IRF
I
^-. Tipe Indoor
Liquid & sas
Floor Standing
dia.9.52 mm & 15.88 mm *
isolasi
Termasuk remote kontrol, kabel kontrol, gantungan unit indoor,
- refrigerant, accessoriess, insulators, insulation, ongkos pasang, drain pipe,
, Pipa Refrigerant menuiu Branch Connection Outdoor VRF
Pengadaan dan pemasangan Pipa Refrigerant lengkap densan Isolasi Liquid & Gas
dilengkapi dengan steel bracket, hanger, clamps, fitting dan accessories.
A Peralatan Utama
-a- Pengadaan dan pemasangan instalasi peralatan utama lengkap dengan isolasi. pipa. hay
supoort- instalasi kabel lishik dan oeralatan bantu sesuai soesifikasi tBta udara.
-v I Exhaust X'an
Pensadaan & Pemasanean fan lenskap densan kabel konhol. sanfungan unit
suooort. accessoriess. insulation dan oerlatan bantu sesuai soesifikasitata udara.
a EF - Kitchen /IF - Kitchsn 1 unit
Service Kitchen
Kanasitas Total * 6000 cFM
Speed : 1450 RPM
Daya input * Z)KW
Ext. Static Pressure *O.2Inch.WG
Tipe Fan : Axial Duct
b EF-T3 1 unit
Service Toilet
Kapasitas Total : + 400 CFM
c EF-T3.1-T3.4 4 unit
Service Toilet
Kapasitas Total * 100 CFM
--. Speed : 1450 RPM
I Daya input * 0.4 KW
Ext. Static Pressure * 0.2 Inch.WG
- Tipe Fan Axial Duct
d EF-T4 I unit
Service Toilet
Kapasitas Total : * 300 CFM
Speed I45O RPM
Daya input * 0.4 KW
Ext. Static Pressure * 0.2Inch,WG
Tipe Fan Axial Duct
f EF. T5 I unit
Service Toilet
Kapasitas Total + 600 CFM
Spesd 1450 RPM
Daya input * 0.5 KW
Ext. Static Pressure * 0.2Inch.WG
Tipe Fan :Axial Duct
g
EF-T6 I unit
Service Toilet
Kapasitas Total + 3OO CEM
Soeed : 1450 RPM
Dava inout * 0.4 KW
Ext. Static Pressure * O.2Inch.WG
Tioe Fan Axial Duct
Service Toilet
Kaoasitas Total + 3500 cEM
Speed I45O RPM
Dava input + 0.4 KW
Ext. Static Pressure *A.2Inch.WG
I IF - Kitchen 1 unit
Service Kitchen
Kapasitas Total : + 6000 CFM
SDeed I45O RPM
Daya input + 22KW
Ext. Static Pressure * O.2Inch.WG
Tipe Fan :Axial Duct
Penqadaan dan pemasans&n Pipa Refriserant lenskap dengan Isolasi Liquid & Gas
dilenskaoi dencan steel bracket- hanser- clamos- fittins dan accessories.
I
^-. - Dia 15.88 mm & 28.58 mm
Suoolv Air Difftrser (SAD). 350 x 300 mm- 450 CFM 2 unit
Supply Air Diffuser (SAD), 300 x 300 mm, 300 CFM tt7 unit
Supply Air Diffuser (SAD), 200 x 150 ffiffi, 200 CFM 4t unit
Flexible Duct 350 x 300 mm 3 Meter
Flexible Duct 300 x 300 mm 175.5 Meter
Flexible Duct 200 x 150 mm 61,5 Meter
Exhaust Air Grille (EAG), 300 x 250 mm, 300 CFM 2 unit
Wall Grille + Volume Damper (VD),300 x 300 mm For Smoke Stop Lobby 2 Set
Wall Grille + Volume Damper (VD). 500 x 300 mm For Fire Stair 2 Set
Fushible Link 27 unit
ffi.,l,H,$ffi, ffi
Lantai LOBBY
I-/.4.3
--A Perdatan Utama
Pengadaan dan pemasangan instalasi peralatan utama lenskao densan isolasi. nioa^ hav
support, instalasi kabel listrik dan peralatan bantu sesuai spesifikasi tata udara.
I Exhaust Fan
Pensadaan & Pemas&ngan fan lenekap dengan kabel kontrol. qantunsan unit
support, accessoriess, insulation dan perlatan bantu sesuai spesifikasi tata udara.
a EF-T7 1 unit
Service Toilet
Kapasitas Total : * 500 CEM
Speed 1450 RPM
Daya input :* 0.3 KW
Ext. Statie Pressure +0.2Inch.WG
Tipe Fan : Axial Duct
c EF.T8 1 unit
Service Toilet
Kapasitas Total + 3OO CFM
Speed I45O RPM
Daya input :+ 0.3KW
1. TATA UDARA Page 6 of 12
&
RENCANA ANGGARAN BIAYA (RABI
PROYEK : Pembangunan Hotel Domestik Terminal 3 Uttimate
LOKASI : Tangerang, Banten
PEKERJAAN : Mekanlkal - Tata Udara
d EF-T8.1-T8.3 3 unit
Service Toilet
Kapasitas Total :+ 100 CEM
Soeed I45O RPM
Dava input +KW
Ext. Static Pressure + 0.2Inch.WG
Tioe Fan Axial Duct
Pemasanqan AC \IRF
^-. Pengadaan dan pemasangan Pipa Refrieerant lengkap densan Isolasi Liquid
dilengkapi dengan steel bracket, hanger, clamps, fitting dan accessories.
& Gas
Supplv Air Dfftrser (SAD), 350 x 300 mm,450 CFM tt2 unit
Suoolv Air Diftrser (SAD)- 300 x 300 mm. 300 CFM 117 unit
Flexible Duct. 350x300 168 meter
Flexible Duct, 300x300 175^5 meter
Exhaust Air Grille GAG). 300 x 250 mm. 300 CFM 2 unit
43 unit
ffi
.r':rr+;in]!i jln;id* i;!!:l.i j;.:!i1t
;.:1; !:,::i!,;,T. :.!ii:,a: :'j'.:i\rtti!.ir,
r4n ji4Aiiijtiil&iiilsEill ffi
nr.4.4 Lantai Mezzanine
A Peralatan Utama
Penqadaan dan oemasansan instalasi oeralatan utama lenekao densan isolasi- oioa- trav
suooort" instalasi kabel listrik dan peralatan banfu sesuai spesifikasi tata udara.
I Exhaust f,'an
Pensadaan & Pemas&nsan fan lenskao denqan kabel kontrol- sanfunsan unit
suooort. accessoriess. insulation dan perlatan banfu sesuai spesifikasitata udara.
c EF.TIO 1 unit
Service Toilet
Kapasitas Total : + 300 CFM
Soeed 1450 RPM
Daya input * 0.3 KW
Ext. Static Pressure * O.ZInch.WG
Tipe Fan : Axial Duct
B Pemasanean AC VRF'
Termasuk remote konhol. kabel kontrol. qanfunsan unit indoor.
refrigerant, accessoriess, insulators, insulation, ongkos pasang, drain pipe,
. Volume DamperPioa Refrieerant menuiu Branch Connection \lRF
b ru.B.1.I\42 I Unit
Kaoasitas Total 67 50 BTU/I{
Daya input 0,025 KW
Tipe Indoor Split Wall
c I{J.8.2-3.T\IIZ 2 Unit
Kapasitas Total 13,500 BTU/H
Daya input 0,025 KW
Tipe Indoor Split Wsll
d w.8.4-9.lvIZ 6 Unit
Kapasitas Total 13.500 BTUIH
Daya input 0,025 KW
Tipe Indoor Celling Mounted \lRV / \IRF/\IRF
1. TATA UDARA Page 8 of 12
tu
RENCANA ANGGARAN BIAYA IRABI
PROYEK : Pembangunan Hotel t),omestik Terminal 3 Ultimate
LOKASI : Tangerang, Banten
PEKERJAAN : Mekanikal - Tata Udara
b tvIZ.OU.A 1 unit
Kapasitas :225.A00 BTUIH
Tvoe Multi
Dava input 17 KW
d OU.G.FF 1 unit
Kapasitas : 324.000 BTUIH
Tvoe Multi
^-. Daya input :25 KW
Tvoe Multi
Daya input 36 KW
Exhaust Air Grille (EAG), 300 x 250 mm, 300 CFM 2 unit
ExhaustAir Grille (EAG),200 x 200 mm, 100 CFM 8 unit
Wall Grille + Volume Damper (\lD), 300 x 300 mm For Smoke Stop Lobby I unit
+ unit
ffi ffi
1
,ffi.,,{irffi',
IV.4-6 Lantai 1
A Peralatan Utama
I Exhaust fan
I
^-. Ext. Static Pressure
Tipe Fan
0.78 Pa
: Cellins Fan
I Exhaust fan
a EF - Toilet.2 5l unit
Service Toilet Kamar
Kapasitas Total + lOO CFM
Speed I45O RPM
Dala input r 0,05 Kw
Ext. Statie Pressure 0.78
Tipe Fan Axial Wall wl insect screen
r^-.
Iluctine Supply densan isolasi luar 1 inch dan dalam I inch
Ducting PIR 300 x 150 mm 30 m
- Ducting PIR 275 x 200 mm 153 m
- - Ducting PIR 225 x 150 mm 23 m
Diffuser dan Grille :
Supply Air Dfftrser (SAD), 400 x 100 mm, 300 CEM 51 unit
Supply Air Diffuser (SAD), 300 x 300 mm. 200 CFM 8 unit
Wall Grille + Volume Damper (VD), 300 x 300 mm For Smoke Stop Lobbv 3 Set
+ Volume 500 x 300 mm For Fire Stair 3 Set
1,,,Ib-ffi,.-,- ffi,,iltH,'e.ffi
IV4.8 Lantai 3
A Peralatan Utama
I Exhaust fan
a EF - 1.r 51 unit
Service Room
Kapasitas Total * IOO CEM
Speed : 1450 RPM
Daya input 0.1 Kw
Ext. Static Pressure 0.78 Pa
Tipe Fan Axial Wall il insect screen
Wall Grille + Volume Damper (\lD), 300 x 300 mm For Smoke Stop Lobbv 3 Set
Grille + Volume 500 x 300 mm For Fire Stair 3 Set
b \TRF.OU.LID /L3D /LzD /L3E /L2E ILIE ILIA IL2A IL3A I unit
Kapasitas : 135.000 BTUIH
Type Outdoor Multi \lRF I \lRV
Daya input :18KW
Termasuk Panel Kontrol + Ongkos Pasang * Accessories dll nya
a Pomoa Transtur (TP-O1 & TP-O2) Dari GWT ke Roof Tank 1 set
Kaoasitas : 13 LUDetik
Head : 43 meter
Dava :9KW
Putaran 2900 rpm
Tioe Centrifuoal Pumo Packaoe
terdiri dari2 oomoa lenokao denoan oenokabelan. oanel kontrol
dan accessories ( 1 DLrty 1 Standby )
b Pomoa Transfer ffP-03 & TP-04) Dari Roof Tank ke Tanki Air Panas 1 set
l(aoasitas 4 LUDetik
Head 13 meter
Dava 1 }(VV
Putaran : 29OO rom
Tipe : Centrifugal Pump Packase
-. terdiri dari2 pompa lenokap denqan penqkabelan, panel kontrol
dan accessories ( 1 DutY 1 Standbv )
-
c Pomoa Booster Air Bersih (BP-O1. BP-02. BP-O3 ) 1 set
Kaoasitas : 19 LUDetik
head : 26 meter
daya : 7,5 K\Al
Putaran 29ffi rpm
Tipe Centrifuoal Pumo Packaoe
Terdiri dari 3 unit oumo lenokao denoan Dressure tank.oenokabelan. oanel
kontol dan accessories ( 2 Duty, 1 Standby )
vt.3.2
A PERAI.ATAN UTAMA
Pekerjaan Peralatan Utama, berikut Tanki Air Panas
,Header Pipa, valve,aksesoris kabel power ke panel pompa lengkap dengan
material bantu lainnya.
k
RENCANA ANGGARAN BIAYA (RAB}
PROYEK : Pembangunan Hotel Domestik Terminal 3 Ulfimate
LOKASI : Tangerang, Banten
PEKERJAAN : Mekanlltal - Plumblng
l(apasitas : 3.5 M3
Lenokao Tanooa. Base Plate. Manhole. lnleUOutlet. ventino
Level switch + kabel, level indicator, dan aksesoris pendukungnya
o Panel Control untuk Pompa Transfer ffP-01 & TP-02) 1 set included
Panel Control untuk Pompa Transfer (TP-03 & TP-04) dan Pompa Penguras GWT (DP-
h 01) 2 set included
i Panel Control untuk Pomoa Sump Pit 1 set included
i Panel Contol untuk Pompa Sirkulasi (PS-01 & PS-02) 2 set included
k Panel Control untuk Pomoa Retum (BP-04 & BP{s) 1 set included
a Pompa Filter ( PF - 01 , PF - 02 ) 1 bh
l(apasitas :2lps
head : 10 meter
daya 1 l(Vv
Putaran 29@ rom
Terdiri dari2 unit pump lenqkap denoan oenokabelan. panel
kontrol dan accessories ( 1 Dutv 1 Standbv )
b Balancing Tank 1 bh
Type : FRP
lGpasitas : 2 M3
Lengkap Tangga, Base Plate, Manhole, lnleUOutlet. ventinq
Level switch + kabel, leve! indicator, dan aksesoris pendukunqnya
c Panel Control untuk Pompa Fitter Kolam Renang (TF-01 & TF-02) 1 set lncluded
- Dia. 150 mm 5 bh
- Dia. 1ffi mm 2 bh
- Dia. 80 mm 3 bh
- Dia. 50 mm I bh
2 Check Valve
- Dia- 150 mm 2 bh
- Dia. 1ff) mm 1 bh
- Dia. 80 mm
r.-
^-r
3
- Dia. 50 mm
Flexsible Joint
3
7
bh
bh
- Dia. 150 mm 4 bh
- Dia. 80 mm 6 bh
- Dia. 50 mm 12 bh
4 Strainer
2 bh
- Dia. 80 mm 3 bh
- Dia. 50 mm 2 bh
5 Fmt Valve
- Dia. 80 mm 1 bh
6
1 bh
1 bh
I Level Switch lenqkap acessories lainnya 1 unit
I Pressure switch 1 bh
10 Material banfu, fitting,flange,gasket and bolhs 1 lot
i AIr Berslh
Pipa mengsunakan PPR PN-10 /PN-16
I lengkap elbow, reducer, T-Way, dll
Distibusi Air diameter mm 100 m
-1.11.2 - Distribusi Air Bersih , diameter 80 mm (Transfer Pool) 92 m
1.3 - Disfibusi Air Bersih , diameter 80 mm (Booster) 12 m
1.4 - Distribusi Air Bersih , diameter 65 mm (Gravitasi) 459 m
k Air Panas
Pipa menggunakan PPR PN-16 + lsolasi Jacketins 10 mm
2. Plumbing Page 3 of 8
&.
RENCANA ANGGARAN BIAYA (RABI
PROYEK : Pembangunan Hotel Domesfik Terminal 3 Ultimate
LOKASI : Tangerang, Banten
PEKERJAAN : Mekanlkal - Plumblng
B Lantai UpperGround
21 Pengadaan dan pemasangan Pipa PPR - PN 10
dan accessories (Pipa Air Bersih).
- dia. 15 mm 98 m
- dia. 20 mm 18 m
- dia. 25 mm 19 m
- dia. 40 mm 28 m
- dia. 5O mm 103 m
- dia. 65 mm 12 m
- dia. 8O mm 15 m
- Fittinqs.support dan material bantu lainnya. 1 lot
c Lantal I
3.1 Pensadaan dan pemasansan Pim PPR - PN 10
dan accessories (Pipa Air Bersih).
- dia. 15 mm 382 m
- dia. 25 mm 25 m
- dia. 32 mm 25 m
- dia. 40 mm 47 m
- dia. 65 mm 96 m
- dia. 8O mm 69 m
- Fittinqs.support dan material bantu lainnya. 1 lot
D Lantai Mezzanine
4.1 Pengadaan dan pemasangan Pipa PPR - PN 10
dan accessories (Pipa Air Bersih).
- dia. 15 mm 112 m
- dia. 25 mm 1m m
- dia. 32 mm 6 m
- dla. 4O mm 23 m
- Fittings,support dan material bantu lainnya. 1 lot
RENCANA ANGGARAN BIAYA (RABI
PROYEK : Pembangunan Hotel Domestik Terminal 3 Ulffmate
LOKASI : Tangerang, Banten
PEKERJAAN : Mekanlkal - Plumblng
E Lantal 2
5.1 Pengadaan dan pemasangan Pipa PPR - PN 10
dan accessories (Pipa Air Bersih).
- dia. 15 mm 379 m
- dia. 25 mm 25 m
- dia. 32mm 25 m
- dia. 40 mm 47 m
- dia. 65 mm 96 m
- dia. 80 mm 69 m
- Fittinqs.support dan material bantu lainnva. 1 lot
G tantai 4
7.1 Pengadaan dan pemasangan Pipa PPR - PN 10
dan accessories (Pipa Air Bersih).
- dia. 15 mm 379 m
- dia. 25 mm 25 m
- dia. 32 mm 25 m
- dia. 40 mm 47 m
- dia. 65 mm 96 m
- dia. 80 mm 69 m
^-. - Fittings,supprt dan material bantu lainnya. 1 lot
H Lantai Atap
8.1 Pensadaan dan pemasanqan Pipa PPR - PN 10
dan accessories (Pipa Air Bersih).
- dia. 5O mm 7 m
- dia. 80 mm 16 m
- dia. 100 mm 17 m
- Pipa Header 8O mm 5 m
- Pipa Header 100 mm 3 m
- Pipa Header 200 mm 8 m
- Fittings,support dan material bantu lainnva. 1 lot
B Lantai UpperGround
21 + 1 mm
dan
- dia. 40 mm 84 m
- dia. 50 mm 4 m
- Fittinos.suooort dan material bantu lainnva. 1 lot
2.2
^-. Gate Vafue
- Dia. 40 mm 1 bh
!t'- - Material bantu .connector .reducer
- dll 1 lot
c Lantal 2
3.1 Penqadaan dan pemasansan Pipa PPR - PN 16 + lsolasi Jacketinq 10 mm
dan accessories (Pipa Air Bersih).
- dia. 15 mm 212 m
- dia. 25 mm 42 m
- dia. 50 mm 227 m
- Fittings.support dan material bantu lainnya. 1 lot
D Lantal 3
4.1 Penoadaan dan Demasanoan Pioa PPR - PN 16 + lsolasi Jacketino mm
dan accessories (Pip-a Air Bersih).
212 m
- dia. 25 mm 42 m
m
- Fittinos.support dan material bantu lainnva. 1 lot
E Lantai 4
5.1 + 10 mm
mm 212 m
- dia. 25 mm 42 m
- dia. 50 mm 227 m
- Fittings,support dan material bantu lainnya. 1 lot
F
6.1 dan + lsolasi 10 mm
- dia. 50 mm 15 m
- dia. 10O mm 22 m
- pipa header 100 mm 6 m
- pipa heder 150 mm 5 m
- Fittings,support dan material bantu lainnya.
Gate Vafue
- Dia. 1@ mm 1 bh
2. Plumbing Page 5 of 8
RENCATTA ANGGARAN BIAYA (RABT
PROYEK : Pembangunan Hotel Domesffk Termlnal 3 Ultimate
LOKASI : Tangerang, Banten
PEKERJAAN : Mekanikal - Plumblng
- Dia. mm I bh
A asar
1.1 Penoadaan dan Demasanoan Pioa PVC Class AW
& Fittino (Pioa Air Kotor. Air Bekas)
Penoadaan dan Demasanoan Pioa PVC Class D
B Lantai UpperGround
2.1 Penoar
'Kotor. Air Bekas)
Pensadaan dan oemasanoan Pipa PVC Class D
& Fittinq (Pipa Vent )
c t-antai 1
3.1 Pengadaan dan pemasangan Pipa PVC Class AW
'Kotor, Air Bekas)
aan dan pemasanqan Pipa PVC Class D
& Fittinq (Pipa Vent )
D Lantal Mezzanine
4.1 Penoadaan dan pemasanqan Pipa PVC Class AW
& Fittins (Pipa Air Kotor, Air Bekas)
Penoadaan dan pemasanqan Pipa PVC Class D
& Fittino (Pioa Vent )
- bh
E Lantai 2
Penoadaan dan pemasanqan Pipa PVC Class AW
& Fittino (Pioa Air Kotor. Air Bekas)
Penoadaan dan Demasanoan Pioa PVC Class D
& Fittins (Pipa Vent )
F Lantal 3
Penoadaan dan oemasanqan PiDa PVC Class AW
& Fittino (Pioa Air Kotor. Air Bekas)
Penoadaan dan pemasanqan Pipa PVC Class D
& Ftttins (Pipa Vent )
2. Plumbing Page 8 of 8
RENCANA AIIGGARAN BIAYA (RABI
PROYEK : Penrbangunan tlotel Dornestik Terminal 3 Ultimate
LOKASI : Tangerang, Banten
PEKERJAAN : Mekanikal - Transportasi dalam gedung
- SAT dan test comisionino Site Proiect : 6 oro/ 5 hari (Ro. l.O00-fiD/hari) lot
-- Site Trainino (Sfl : 10 Orc/ 5 hari (Ro. 5fi).0fi)lhari) lot 1