1 Batu plonos Rp 52,400.00 / m3
2 Batu belah 10/15 Rp 61,400.00 / m3
3 Batu pecah 2/3 Rp 99,200.00 / m3
4 Sirtu Rp 42,400.00 / m3
5 Tanah Urug Rp 35,100.00 / m3
6 Pasir Urug Rp 36,300.00 / m3
7 Pasir Pasang / Beton Rp 48,400.00 / m3
8 Kapur Pasang Rp 151,300.00 / m3
9 Portland Cement Rp 690.00 / kg
10 Batu Bata Rp 220.00 / bj
11 Paku kait Rp 310.00 / bh
12 Paku Usuk / Reng Rp 8,000.00 / kg
13 Bendrat Rp 8,500.00 / kg
14 Besi Beton Rp 6,500.00 / kg
15 Cat Minyak / Kayu Rp 27,300.00 / kg
16 Cat Tembok Rp 9,400.00 / m3
17 Plamir tembok Rp 6,100.00 / kg
18 Genteng press morando natural Rp 1,500.00 / bh
19 Kerpus genteng press Morando natural Rp 5,000.00 / bh
20 Kayu tahun Rp 666,000.00 / m3
21 Kayu Kruing Rp 1,876,000.00 / m3
22 Kayu bengkirai Rp 254,000.00 / m3
23 Multiplek 9 mm Rp 90,200.00 / lbr
24 Triplex 9 mm Rp 33,200.00 / lbr
25 Kaca bening 5 mm Rp 49,900.00 / m2
26 Kaca bening 3 mm Rp 33,900.00 / m2
27 Cat meni Rp 9,000.00 / kg
28 Besi Begel/ mur / plat Rp 6,100.00 / kg
29 Sloot pintu Rp 60,000.00 / bh
30 Engsel jendela Rp 4,000.00 / bh
31 Engsel pintu Rp 7,000.00 / bh
32 Grendel pintu/ tanam Rp 25,000.00 / ps
33 Angkur Rp 500.00 / bh
34 Kait Angin Rp 4,500.00 / bh
35 Handle jendela Rp 3,000.00 / bh
36 Keramik 30/30 Rp 27,800.00 / m2
37 Eternit polos 1 m x 1 m Rp 4,300.00 / lbr
38 Eternit asbes 1 m x 3 m Rp 36,300.00 / lbr

II. UPAH TENAGA KERJA


1 Tukang Rp 22,900.00 ho
2 Kepala tukang Rp 25,100.00 ho
3 Pekerja Rp 17,400.00 ho
4 Mandor Rp 22,900.00 ho
HARGA
NO URAIAN SATUAN
Rp.
ANALISA HARGA SATUAN PEKERJAAN
NO KETERANGAN SAT INDEKS HARGA (Rp.) ALAT (Rp.) UPAH (Rp.) BAHAN (Rp.) JUMLAH
1 2 3 4 5 6 = (4x5) 7 = (4x5) 8 = (4x5) 9 = (6+7+8)
1 1M3 MENGANGKUT DAN PEMBUANGAN TANAH
1 Pekerja org 0.6000 - - -
2 Alat bantu ls 1.0000 1,000.00 1,000.00 1,000.00
Total Rp. 1,000.00 - - 1,000.00
Total Harga Rp. 1,000.00
2 1M3 PEKERJAAN ANTI RAYAP - - - -
1 Bahan Anti Rayap ls 0.3300 40,000.00 13,200.00 13,200.00
2 Pekerja org 0.0300 - - -
3 Tukang batu org 0.0500 - - -
4 Alat bantu ls 1.0000 1,000.00 1,000.00 1,000.00
Total Rp. 1,000.00 - 13,200.00 1,000.00
Total Harga Rp. 14,200.00
3 1 m' PENGUKURAN DAN PASANG BOUWPLANK - - - -
1 Kayu Meranti (Klas III) m3 0.0087 25,000.00 217.50 217.50
2 Paku kg 0.0200 - - -
3 Pekerja org 0.0800 - - -
4 Tukang Kayu org 0.1443 - - -
5 Alat bantu ls 1.0000 1,000.00 1,000.00 1,000.00
Total Rp. 1,000.00 - 217.50 1,000.00
Total Harga Rp. 1,217.50
4 1 M3 GALIAN TANAH BIASA - - - -
1 Pekerja org 0.2750 - - -
2 Alat bantu org 1.0000 1,000.00 1,000.00 1,000.00
Total 1,000.00 - 1,000.00
Total Harga 1,000.00
5 1 M3 URUGAN PONDASI DIHITUNG 1/4 DARI GALIAN - - - -
1 Pekerja org 0.2500 - - -
Total Rp. - - - -
Total Harga Rp. -
6 1 M3 URUGAN PASIR URUG - - - -
1 Pasir Urug m3 1.2000 61,400.00 73,680.00 73,680.00
2 Pekerja org 0.2500 - - -
Total Rp. - - 73,680.00 73,680.00
Total Harga Rp. 73,680.00
7 1 M3 PASANGAN BATU KALI - - - -
1 Batu Belah m3 1.1000 36,300.00 39,930.00 39,930.00
2 PC zak 2.5000 220.00 550.00 550.00
3 Pasir Pasang m3 0.4000 99,200.00 39,680.00 39,680.00
4 Pekerja org 0.5000 - - -
5 Tukang batu org 0.5000 - - -
Total Rp. - - 80,160.00 80,160.00
Total Harga Rp. 80,160.00
8 1 M3 PASANGAN BATU KOSONG - - - -
1 Batu Belah m3 1.1500 36,300.00 41,745.00 41,745.00
2 Pasir Urug m3 0.3650 61,400.00 22,411.00 22,411.00
3 Pekerja org 0.4250 - - -
4 Tukang batu org 0.4000 - - -
Total Rp. - - 64,156.00 64,156.00
Total Harga Rp. 64,156.00
9 1 M3 COR BETON SITE MIX K-1175 - - - -
1 PC zak 6.4000 220.00 1,408.00 1,408.00
2 Pasir Beton m3 0.5400 42,400.00 22,896.00 22,896.00
3 Batu Split m3 0.8300 48,400.00 40,172.00 40,172.00
4 Peralatan ls 1.0000 1,000.00 1,000.00 1,000.00
5 Pekerja org 2.2000 - - -
6 Tukang Batu org 0.9000 - - -
Total Rp. 1,000.00 - 64,476.00 65,476.00
Total Harga Rp. 65,476.00
10 1 Kg BESI BETON TERPASANG U 24 - - - -
1 Besi Beton Rata-rata kg 1.0500 - - -
2 Kawat Beton kg 0.0100 - - -
3 Peralatan Spencer ls 1.0000 100.00 100.00 100.00
4 Pekerja org 0.0100 - - -
5 Tukang Besi org 0.0100 - - -
Total Rp. 100.00 - - 100.00
Total Harga Rp. 100.00
11 1 m2 BEKESTING DENGAN KAYU TAHUN - - - -
1 Papan Bekesting ( dihitung 2x Pakai ) m3 0.0180 4,300.00 77.40 77.40
2 Kayu 5/7 ( dihitung 2x pakai ) m3 0.0020 4,300.00 8.60 8.60
3 Paku kg 0.4000 - - -
4 Pekerja org 0.0800 - - -
5 Tukang kayu org 0.1000 - - -
Total Rp. - - 86.00 86.00
Total Harga Rp. 86.00
NO KETERANGAN SAT INDEKS HARGA (Rp.) ALAT (Rp.) UPAH (Rp.) BAHAN (Rp.) JUMLAH
1 2 3 4 5 6 = (4x5) 7 = (4x5) 8 = (4x5) 9 = (6+7+8)
12 1 M2 PASANGAN BATA MERAH - - - -
1 Bata merah kw I bh 70.0000 151,300.00 10,591,000.00 10,591,000.00
2 PC zak 0.2400 220.00 52.80 52.80
3 Pasir pasang m3 0.0400 99,200.00 3,968.00 3,968.00
4 Pekerja org 0.0800 - - -
5 Tukang batu org 0.1000 - - -
Total Rp. - - 10,595,020.80 10,595,020.80
Total Harga Rp. 10,595,020.80
13 1 M2 PLESTERAN DINDING 1:5 - - - -
1 PC zak 0.1400 220.00 30.80 30.80
2 Pasir pasang m3 0.0190 99,200.00 1,884.80 1,884.80
3 Pekerja org 0.1603 - - -
4 Tukang batu org 0.2000 - - -
Total Rp. - - 1,915.60 1,915.60
Total Harga Rp. 1,915.60
14 1 M2 PAS Ornamen Tiang dg Bata 1 : 5 diplester - - - -
1 Bata Merah kw I bh 70.0000 151,300.00 10,591,000.00 10,591,000.00
2 PC zak 0.3000 220.00 66.00 66.00
3 Pasir pasang m3 0.0600 99,200.00 5,952.00 5,952.00
4 Pekerja org 0.1000 - - -
5 Tukang batu org 0.1500 - - -
Total Rp. - - 10,597,018.00 10,597,018.00
Total Harga Rp. 10,597,018.00
15 1 M2 PENGECATAN DINDING DAN PLAFOND ( 3X ) - - - -
1 Cat tembok kg 0.2000 1,500.00 300.00 300.00
2 Plamur tembok kg 0.1000 9,400.00 940.00 940.00
3 Roll cat bh 0.0100 5,000.00 50.00 50.00
4 Steger werk ls 1.0000 150.00 150.00 150.00
5 Ampelas lbr 0.5000 33,200.00 16,600.00 16,600.00
6 Pekerja org 0.0450 - - -
7 Tukang cat org 0.1100 - - -
Total Rp. 16,800.00 - 1,240.00 18,040.00
Total Harga Rp. 18,040.00
16 1M2 PASANGAN LANTAI KERAMIK 30 x 30 DN PUTIH - - - -
1 Keramik 30x30 m2 1.0000 - - -
2 PC zak 0.1400 220.00 30.80 30.80
3 Pasir Pasang m3 0.0250 99,200.00 2,480.00 2,480.00
4 Semen Warna kg 0.0130 310.00 4.03 4.03
5 Pekerja org 0.1000 - - -
6 Tukang batu org 0.1500 - - -
7 Alat bantu (pemotong keramik) ls 0.5000 1,000.00 500.00 500.00
Total Rp. 500.00 - 2,514.83 3,014.83
Total Harga Rp. 3,014.83
17 1M2 PASANGAN LANTAI KERAMIK 20x20 DN PUTIH - - - -
1 Keramik 20x20 m2 1.0000 - - -
2 PC zak 0.1400 220.00 30.80 30.80
3 Pasir Pasang m3 0.0250 99,200.00 2,480.00 2,480.00
4 Semen Warna kg 0.0130 310.00 4.03 4.03
5 Pekerja org 0.1000 - - -
6 Tukang batu org 0.1500 - - -
7 Alat bantu (pemotong keramik) ls 1.0000 1,000.00 1,000.00 1,000.00
Total Rp. 1,000.00 - 2,514.83 3,514.83
Total Harga Rp. 3,514.83
18 1 M2 RABAT BETON 6 CM - - - -
1 PC zak 0.2700 220.00 - 59.40 59.40
2 Pasir beton m3 0.0350 42,400.00 - 1,484.00 1,484.00
3 Batu Koral m3 0.0400 35,100.00 - 1,404.00 1,404.00
4 Pekerja org 0.0800 - - - -
5 Tukang batu org 0.1500 - - - -
Total Rp. - - 2,947.40 2,947.40
Total Harga Rp. 2,947.40
19 1 bh PONDASI UMPAK KOLOM - - -
1 Batu belah m3 0.3200 36,300.00 - - 11,616.00 11,616.00
2 PC zak 1.1000 220.00 - - 242.00 242.00
3 Pasir pasang m3 0.1450 99,200.00 - - 14,384.00 14,384.00
4 Pekerja org 0.4500 - - - - -
5 Tukang batu org 0.4500 - - - - -
Total Rp. - - 26,242.00 26,242.00
Total Harga Rp. 26,242.00
20 1 M3 KUDA-KUDA KAYU KRUING - - - -
1 Kayu Kruing m3 1.1000 25,000.00 27,500.00 27,500.00
2 Paku 8 s/d 12 cm kg 4.5000 - - -
3 Besi Beugel + baut kg 10.0000 - - -
4 Residu anti rayap kg 8.0000 - - -
5 Pekerja org 2.0000 - - -
6 Tukang kayu org 3.5000 - - -
Total Rp. - - 27,500.00 27,500.00
Total Harga Rp. 27,500.00

NO KETERANGAN SAT INDEKS HARGA (Rp.) ALAT (Rp.) UPAH (Rp.) BAHAN (Rp.) JUMLAH
1 2 3 4 5 6 = (4x5) 7 = (4x5) 8 = (4x5) 9 = (6+7+8)
21 1 M3 GORDING KAYU KRUING - - - -
1 Kayu Kruing 5/10 m3 0.0125 25,000.00 312.50 312.50
2 Paku kg 0.2500 - - -
3 Residu anti rayap kg 0.5000 - - -
4 Pekerja org 0.0500 - - -
5 Tukang kayu org 0.1500 - - -
Total Rp. - - 312.50 312.50
Total Harga Rp. 312.50
22 1 M2 PENUTUP ATAP - - - -
1 Atap genteng soka bh 25.0000 - - -
2 Pekerja org 0.0800 - - -
3 Tukang kayu org 0.0500 - - -
Total Rp. - - - -
Total Harga Rp. -
23 1 M' PEKERJAAN NOK / BUBUNGAN - - - -
1 Genteng bubungan bh 0.6900 - - -
2 Papan bubungan m' 1.0000 - - -
3 Pekerja org 0.1000 - - -
4 Tukang kayu org 0.0100 - - -
Total Rp. - - - -
Total Harga Rp. -
24 1 M' PEKERJAAN LISPLANK KAYU KRUING - - - -
1 Papan Ky. Kruing 3/30 m3 0.0100 25,000.00 250.00 250.00
2 Paku kg 0.0100 - - -
3 Pekerja org 0.6880 - - -
4 Tukang kayu org 0.1250 - - -
Total Rp. - - 250.00 250.00
Total Harga Rp. 250.00
25 1 M3 PEK. KONSOL KAYU KRUING - - - -
1 Balok Ky. Kruing m3 1.1000 25,000.00 27,500.00 27,500.00
2 Paku 8 s/d 12 cm kg 4.5000 - - -
3 Besi beugel + baut kg 10.0000 - - -
4 Residu anti rayap kg 8.0000 - - -
5 Pekerja org 3.0000 - - -
6 Tukang kayu org 5.0000 - - -
Total Rp. - - 27,500.00 27,500.00
Total Harga Rp. 27,500.00
26 1 M2 PENGECATAN KAYU 3X BERIKUT MENI - - - -
1 Meni kayu kg 0.1700 49,900.00 8,483.00 8,483.00
2 Plamur kayu kg 0.0900 6,100.00 549.00 549.00
3 Cat kayu kg 0.2200 33,900.00 7,458.00 7,458.00
4 Ampelas kayu lbr 0.4000 33,200.00 13,280.00 13,280.00
5 Thiner ltr 0.1500 90,200.00 13,530.00 13,530.00
6 Kuas 3" bh 0.0500 254,000.00 12,700.00 12,700.00
7 Pekerja org 0.0750 - - -
8 Tukang cat org 0.1500 - - -
Total Rp. 25,980.00 - 30,020.00 56,000.00
Total Harga Rp. 56,000.00
27 1 M2 PASANG RANGKA PLAFOND KY. KRUING - - - -
1 Kayu kaso 5/7 m3 0.0102 25,000.00 255.00 255.00
2 Kaso 5/10 m3 - 25,000.00 - -
3 Kayu 4/6 m3 - 25,000.00 - -
4 Paku kg 0.0200 - - -
5 Pekerja org 0.0800 - - -
6 Tukang kayu org 0.1000 - - -
Total Rp. - - 255.00 255.00
Total Harga Rp. 255.00
28 1 M2 PASANG PLAFOND ETERNIT 1X1M - - - -
1 Eternit 1x1 m lbr 1.0000 22,900.00 22,900.00 22,900.00
2 Paku kg 0.0100 - - -
3 Pekerja org 0.0500 - - -
4 Tukang kayu org 0.0800 - - -
Total Rp. - - 22,900.00 22,900.00
Total Harga Rp. 22,900.00
29 1 UNIT KUSEN TYPE J2 KAYU KKRUING - - - -
1 Balok Ky. Kruing 6/12 m3 0.1420 25,000.00 3,550.00 3,550.00
2 Kayu papan 2/10 m3 0.0230 25,000.00 575.00 575.00
3 Engsel bh 4.0000 - - -
4 Pengkait angin bh 4.0000 - - -
5 Kaca 5 mm m2 2.4150 - - -
6 Paku kg 0.1000 - - -
7 Angkur kg 6.0000 - - -
8 Grendel bh 2.0000 - - -
9 Alat bantu ls 1.0000 1,000.00 1,000.00 1,000.00
10 Pekerja org 2.5000 - - -
11 Tukang kayu org 3.5000 - - -
Total Rp. 1,000.00 - 4,125.00 5,125.00
Total Harga Rp. 5,125.00

NO KETERANGAN SAT INDEKS HARGA (Rp.) ALAT (Rp.) UPAH (Rp.) BAHAN (Rp.) JUMLAH
1 2 3 4 5 6 = (4x5) 7 = (4x5) 8 = (4x5) 9 = (6+7+8)
30 1 UNIT KUSEN TYPE J1 KAYU KRUING - - - -
1 Balok 6/12 m3 0.1300 25,000.00 3,250.00 3,250.00
2 Kayu papan 2/10 m3 0.0045 25,000.00 112.50 112.50
3 Engsel bh 4.0000 - - -
4 Pengait angin bh 4.0000 - - -
5 Kaca 5 mm m2 0.8400 - - -
6 Paku kg 0.8000 - - -
7 Angkur kg 4.0000 - - -
8 Grendel bh 8.0000 - - -
9 Alat bantu ls 0.9000 1,000.00 900.00 900.00
10 Pekerja org 2.2500 - - -
11 Tukang kayu org 3.0000 - - -
Total Rp. 900.00 - 3,362.50 4,262.50
Total Harga Rp. 4,262.50
31 1 UNIT KUSEN TYPE P2 KAYU KRUING - - - -
1 Balok 6/12 m3 0.0900 25,000.00 2,250.00 2,250.00
2 Pintu panil m2 3.3600 525,000.00 1,764,000.00 1,764,000.00
3 Engsel bh 6.0000 - - -
4 Kunci pintu bh 1.0000 - - -
5 Paku kg 0.1250 - - -
6 Angkur kg 6.0000 - - -
7 Grendel bh 2.0000 - - -
8 Alat bantu ls 1.0000 1,000.00 1,000.00 1,000.00
9 Pekerja org 3.2500 - - -
10 Tukang kayu org 4.5000 - - -
Total Rp. 1,000.00 - 1,766,250.00 1,767,250.00
Total Harga Rp. 1,767,250.00
32 1 UNIT KUSEN TYPE P1 KAYU KRUING - - - -
1 Balok 6/12 m3 0.0650 25,000.00 1,625.00 1,625.00
2 Pintu panil m2 1.6800 525,000.00 882,000.00 882,000.00
3 Engsel bh 3.0000 - - -
4 Kunci pintu bh 1.0000 - - -
5 Paku kg 0.1000 - - -
6 Angkur kg 6.0000 - - -
7 Grendel bh 2.0000 - - -
8 Alat bantu ls 0.6500 1,000.00 650.00 650.00
9 Pekerja org 1.2500 - - -
10 Tukang kayu org 2.2500 - - -
Total Rp. 650.00 - 883,625.00 884,275.00
Total Harga Rp. 884,275.00
33 1 UNIT KUSEN BV KAYU KRUING - - - -
1 Balok 6/15 m3 0.0360 25,000.00 900.00 900.00
2 Kayu 2/10 m3 0.0096 25,000.00 240.00 240.00
3 Paku kg 0.1000 - - -
4 Angkur kg 4.0000 - - -
5 Alat Bantu ls 0.7500 1,000.00 750.00 750.00
6 Pekerja org 1.7500 - - -
7 Tukang kayu org 2.7500 - - -
Total Rp. 750.00 - 1,140.00 1,890.00
Total Harga Rp. 1,890.00
34 1 UNIT KUSEN VA KAYU KRUING - - - -
1 Balok 6/15 m3 0.2400 25,000.00 6,000.00 6,000.00
2 Rangka jendela 2/10 m2 0.0056 25,000.00 140.00 140.00
3 Kaca m2 0.1600 - - -
4 Paku kg 0.1000 - - -
5 Angkur kg 4.0000 - - -
6 Alat bantu ls 0.7500 1,000.00 750.00 750.00
7 Pekerja org 1.7500 - - -
8 Tukang kayu org 2.7500 - - -
Total 750.00 - 6,140.00 6,890.00
Total Harga 6,890.00
35 1 M' PAS. SALURAN PINGGIR BANGUNAN - - - -
1 Buis beton 1/2 dia 20 bh 1.0500 8,500.00 8,925.00 8,925.00
2 PC zak 0.2000 220.00 44.00 44.00
3 Pasir pasang m3 0.0500 99,200.00 4,960.00 4,960.00
4 Pekerja org 0.1200 - - -
5 Tukang batu org 0.2500 - - -
Total Rp. - - 13,929.00 13,929.00
Total Harga Rp. 13,929.00
36 1 M2 PERATAAN TANAH - - - -
1 Pekerja org 0.0715 - - -
2 Tukang batu org 0.0116 - - -
Total Rp. - - - -
Total Harga Rp. -
NO KETERANGAN SAT INDEKS HARGA (Rp.) ALAT (Rp.) UPAH (Rp.) BAHAN (Rp.) JUMLAH
1 2 3 4 5 6 = (4x5) 7 = (4x5) 8 = (4x5) 9 = (6+7+8)
37 1 UNIT PASANG KLOSET JONGKOK - - - -
1 Kloset jongkok bh 1.0000 - - -
2 PC zak 0.4000 220.00 88.00 88.00
3 Pasir pasang m3 0.0500 99,200.00 4,960.00 4,960.00
4 Semen warna kg 0.3000 310.00 93.00 93.00
5 Pekerja org 0.3000 - - -
6 Tukang batu org 0.6118 - - -
7 Alat bantu (pemotong keramik) ls 1.0000 80,000.00 80,000.00 80,000.00
Total Rp. 80,000.00 - 5,141.00 85,141.00
Total Harga Rp. 85,141.00
38 1 UNIT PASANG BAK KAMAR MANDI ( AIR ) - - - -
1 Bak air mandi bh 1.0000 - - -
2 PC zak 1.5000 220.00 330.00 330.00
3 Pasir pasang m3 0.2500 99,200.00 24,800.00 24,800.00
4 Semen warna kg 1.0000 310.00 310.00 310.00
5 Bata merah kw 1 bh 70.0000 151,300.00 10,591,000.00 10,591,000.00
6 Pekerja org 0.7000 - - -
7 Tukang batu org 1.5000 - - -
8 Alat bantu (pemotong keramik) ls 1.0000 80,000.00 80,000.00 80,000.00
Total Rp. 80,000.00 - 10,616,440.00 10,696,440.00
Total Harga Rp. 10,696,440.00
39 1 M2 PERKERASAN TANAH - - - -
1 PC zak 0.0010 220.00 0.22 0.22
2 Alat bantu ls 1.0000 25,000.00 25,000.00 25,000.00
3 Pasir pasang m3 0.1300 99,200.00 12,896.00 12,896.00
4 Pekerja org 0.2000 - - -
5 Tukang batu org 0.2000 - - -
Total Rp. 25,000.00 - 12,896.22 37,896.22
Total Harga Rp. 37,896.22
40 1 BOUVENLIGHT TYPE 2 - - - -
1 Kayu kruing m3 0.0308 25,000.00 770.00 770.00
2 Paku seng kg 0.0300 - - -
3 Pekerja org 0.7500 - - -
4 Tukang kayu org 0.5000 - - -
Total Rp. - - 770.00 770.00
Total Harga Rp. 770.00
41 1 M PASANG PIPA 1/2" - - - -
1 Pipa paralon 1/2" m' 1.2000 - - -
2 Perlengkapan (35%) kg 1.0000 10,000.00 10,000.00 10,000.00
3 Pekerja org 0.0360 - - -
4 Tukang batu org 0.0600 - - -
Total Rp. 10,000.00 - - 10,000.00
Total Harga Rp. 10,000.00
42 1 M PASANG PIPA 4" - - - -
1 Pipa paralon 4" m' 1.2000 - - -
2 Perlengkapan (35%) kg 1.0000 35,000.00 35,000.00 35,000.00
3 Pekerja org 0.0360 - - -
4 Tukang batu org 0.0600 - - -
Total Rp. 35,000.00 - - 35,000.00
Total Harga Rp. 35,000.00
43 1 UNIT ANGIN-ANGIN KAYU KRUING - - - -
1 Kayu Kruing m3 0.0736 25,000.00 1,840.00 1,840.00
2 Paku kg 0.0500 - - -
3 Angkur kg 6.0000 - - -
4 Alat Bantu ls 0.7000 50,000.00 35,000.00 35,000.00
5 Pekerja org 0.7500 - - -
6 Tukang kayu org 0.5000 - - -
Total Rp. 35,000.00 - 1,840.00 36,840.00
Total Harga Rp. 36,840.00
44 1 M2 PEMBERSIHAN LOKASI - - - -
1 Pekerja org 0.0800 - - -
Total Rp. - - - -
Total Harga Rp. -
45 1 M' LIST PLAFOND KAYU KRUING - - - -
1 Kayu kRUING m3 0.0022 25,000.00 55.00 55.00
2 Paku seng kg 0.0200 - - -
3 Pekerja org 0.0200 - - -
4 Tukang kayu org 0.0050 - - -
5 Kepala Tukang kayu org 0.2500 - - -
Total Rp. - - 55.00 55.00
Total Harga Rp. 55.00
DAFTAR HARGA SATUAN PEKERJAAN

NO URAIAN HARGA SATUAN

2 1 m2 PEKERJAAN ANTI RAYAP Rp. 14,200.00


3 1 m' PENGUKURAN DAN PASANG BUOWPLANK Rp. 1,217.50
4 1 m3 GALIAN TANAH BIASA Rp. 1,000.00
5 1 m3 URUGAN KEMBALI PONDASI Rp. -
6 1 m3 URUGAN PASIR URUG Rp. 73,680.00
7 1 m3 PASANGAN BATU KALI 1:5 Rp. 80,160.00
8 1 m3 PASANGAN BATU KOSONG Rp. 64,156.00
9 1 m3 COR BETON SITE MAX K-175 Rp. 65,476.00
10 1kg BESI BETON TERPASANG U 24 Rp. 100.00
11 1 m2 BEKESTING DENGAN KAYU MERANTI Rp. 86.00
12 1 m2 PASANGAN BATA MERAH Rp. 10,595,020.80
13 1 m2 PLESTERAN DINDING Rp. 1,915.60
14 1 m2 PASANGAN ORNAMEN TIANG Rp. 10,597,018.00
15 1 m2 PENGECATAN DINDING DAN PLAFOND Rp. 18,040.00
16 1 m2 PAS. LANTAI KERAMIK 30/30 Rp. 3,014.83
17 1 m2 PAS. LANTAI KERAMIK 20/20 Rp. 3,514.83
18 1 m3 RABAT BETON 6 CM Rp. 2,947.40
19 buah PONDASI UMPAK KOLOM Rp. 26,242.00
20 1 m3 KUDA-KUDA KAYU KRUING Rp. 27,500.00
21 1 m3 GORDING KAYU KRUING Rp. 312.50
22 1 m2 PENUTUP ATAP Rp. -
23 1 m' PEK. NOK/BUBUNGAN Rp. -
24 1 m2 LISPLANK KAYU KRUING Rp. 250.00
25 1 m3 PEK. KONSOL KAYU KRUING Rp. 27,500.00
26 1 m2 PENGECATAN KAYU 3X BERIKUT MENI Rp. 56,000.00
27 1 m3 PAS. RANGKA PLAFOND Rp. 255.00
28 1 m2 PAS. PLAFOND ETERNIT 1x1 M Rp. 22,900.00
29 1 unit KUSEN TYPE J2 KAYU KRUING Rp. 5,125.00
30 1 unit KUSEN TYPE J1 KAYU KRUING Rp. 4,262.50
31 1 unit KUSEN TYPE P2 KAYU KRUING Rp. 1,767,250.00
32 1 unit KUSEN TYPE P1 KAYU KRUING Rp. 884,275.00
33 1 unit KUSEN KAYU TYPE BV KAYU KRUING Rp. 1,890.00
34 1 unit KUSEN KAYU TYPE VA KAYU KRUINGI Rp. 6,890.00
35 1 m' PAS. SALURAN PINGGIR BANGUNAN Rp. 13,929.00
36 1 m2 PERATAAN TANAH Rp. -
37 1 unit PAS. KLOSET JONGKOK Rp. 85,141.00
38 1 unit PAS. BAK KAMAR MANDI (AIR) Rp. 10,696,440.00
39 1 m2 PERKERASAN TANAH Rp. 37,896.22
40 1 unit BOUVEN LIGHT TYPE 2 Rp. 770.00
41 1 m' PAS. PIPA 1/2 " Rp. 10,000.00
42 1 m' PAS. PIPA 4" Rp. 35,000.00
43 1 unit ANGIN - ANGIN KAYU KRUING Rp. 36,840.00
44 1 m2 PEMBERSIHAN LOKASI Rp. -
45 1 m' LIST PLAFOND KAYU KRUING Rp. 55.00
RENCANA ANGGARAN BIAYA (RAB)

Proyek : Rehabilitasi Gedung Majlis Ta'lim IPHI Kecamatan Rembang


Pekerjaan : Rehabilitasi Gedung Majlis Ta'lim IPHI Kecamatan Rembang
Tahun Anggaran : 2009
Lokasi : Desa Losari, Kecamatan Rembang, Kabupaten Purbalingga, Jawa Tengah

HARGA SAT JUMLAH HARGA


NO URAIAN PEKERJAAN VOLUME ANALIS
( Rp. ) ( Rp. )

I PEKERJAAN BONGKARAN
2
1. Bongkaran lantai keramik 15.00 m L8 39,190.00 587,850.00
2
2. Bongkaran dinding tembok 5.00 m L9 48,197.50 240,987.50

II PEKERJAAN PERSIAPAN
1. Pembersihan Lokasi 0.10 ls Taksir 500,000.00 50,000.00
2. Uitset dan bouwplank 0.10 ls Taksir 1,250,000.00 125,000.00
3. Papan nama Proyek 0.10 Unit Taksir 150,000.00 15,000.00
4. IMB -
5. Brak Kerja 0.10 ls Taksir 750,000.00 75,000.00
6. Administrasi dan Dokumentasi 0.10 ls Taksir 950,000.00 95,000.00

III PEKERJAAN TANAH


3
1. Galian Tanah 4.00 m A.5 81,245.00 324,980.00
3
2. Urugan tanah kembali 2.00 m 1/4 A.5 18,811.25 37,622.50
3
3. Urugan sirtu bawah pondasi 0.50 m A.17 127,009.00 63,504.50

IV PEKERJAAN PASANGAN
1. Pasangan Batu Belah 1 : 3 : 10 1.00 m3 G. 32a 258,520.30 258,520.30
2. Pasangan Batu Bata 1 : 3 : 10 1.00 m3 G. 33p 319,205.80 319,205.80
3. Plesteran 1 : 3 : 10 20.00 m2 G. 50c 13,906.70 278,134.00
4. Sponengan Sudut dan Kusen 5.00 m Taksir 2,500.00 12,500.00

V. PEKERJAAN BETON
1. Beton foot plat 0.010 m3 Sup. Vc 4,689,064.00 46,890.64
2. Beton sloof struktur 0.010 m3 Sup. Vc 2,689,064.00 26,890.64
3. Beton kolom struktur 0.010 m3 Sup. Va 4,096,275.00 40,962.75
4. Beton kolom praktis 0.010 m3 Sup. Vc 3,689,064.00 36,890.64
5. Beton sloof praktis 0.010 m3 Sup. Vc 3,689,064.00 36,890.64
6. Beton kolom selasar 0.010 m3 Sup. Vc 3,689,064.00 36,890.64
7. Beton plat 0.010 m3 Sup. Vb 6,811,085.00 68,110.85
8. Beton balok spanduk 0.050 m3 Sup. Vc 3,689,064.00 184,453.20
9. Beton ring balk 0.050 m3 Sup. Vc 3,689,064.00 184,453.20
10.Beton balok latiu/seklet 0.050 m3 Sup. Vc 3,689,064.00 184,453.20
11.Balok konsol 0.020 m3 Sup. Vb 6,811,085.00 136,221.70

VI. PEKERJAAN ATAP


1. Kuda-kuda, nok, jurai dan gording rangka kayu kruing 0.300 m3 F. 22b 2,913,300.00 873,990.00
2. Pasang usuk/reng kayu kruing 5.000 m2 F. 16b 31,146.50 155,732.50
3. Pasang atap genteng press Marando standart 25.000 m2 H. 2 33,250.00 831,250.00
4. Pasang bubungan genteng press Morando standart 5.000 m H. 6 26,250.00 131,250.00
5. Pasang papan suri-suri kayu kruing 5.000 m H. 21b 12,876.06 64,380.30
6. Pasang listplank 2/25 kayu kruing 8.000 m2 F. 21b 81,992.60 655,940.80

VII. PEKERJAAN LANTAI


2
1. Lantai keramik putih 30/30 20.00 m Sup. IIIa 48,195.88 963,917.60

VIII. PEKERJAAN PLAFOND


2
1. Pasang plafond Eternit ky kruing 20.00 m Sub. VII 36,675.30 733,506.00
2. Lis tepi plafond 80.00 m Taksir 2,500.00 200,000.00

IX. PEKERJAAN LISTRIK


1. Pasang titik instalasi 6.0 titik Taksir 50,000.00 300,000.00
2. Lampu TL 20 watt armatur seng tunggal 2.0 bh Taksir 80,000.00 160,000.00
3. Lampu pijar 25 watt 2.0 bh Taksir 4,000.00 8,000.00
4. Saklar tunggal 2.0 bh Taksir 10,000.00 20,000.00
5. Saklar ganda 2.0 bh Taksir 15,000.00 30,000.00
6. Stop kontak 2.0 bh Taksir 15,000.00 30,000.00
7. Penangkal petir - unit Taksir 1,750,000.00 -

HARGA SAT JUMLAH HARGA


NO URAIAN PEKERJAAN VOLUME ANALIS
NO URAIAN PEKERJAAN VOLUME ANALIS
( Rp. ) ( Rp. )
XI. PEKERJAAN CAT
2
1. Cat tembok 100.000 m K6+23a 8,450.40 845,040.00
2
2. Cat kayu 15.000 m K9+23+30 18,586.00 278,790.00
2
3. Cat plafond 100.000 m K6+23b 8,016.00 801,600.00

JUMLAH
PPN 10 %
TOTAL
DIBULATKAN

Losari, 12 Mei 2009


Majlis Ta'lim IPHI
Kecamatan Rembang
Ketua

H.M. Abdulloh Paryadi, B.A.


JUMLAH BIAYA
( Rp. )

828,837.50

360,000.00

426,107.00

868,360.10

983,108.10

2,712,543.60

963,917.60

933,506.00

548,000.00

JUMLAH BIAYA
( Rp. )

1,925,430.00

10,549,809.90

10,549,809.90
10,549,000.00

Mei 2009

Rembang

loh Paryadi, B.A.


REKAPITULASI RENCANA ANGGARAN DAN BIAYA

Proyek : Rehabilitasi Gedung Majlis Ta'lim IPHI Kecamatan Rembang


Pekerjaan : Rehabilitasi Gedung Majlis Ta'lim IPHI Kecamatan Rembang
Tahun Anggaran : 2009
Lokasi : Desa Losari, Kecamatan Rembang, Kabupaten Purbalingga, Jawa Tengah

NO URAIAN JUMLAH
I Pekerjaan Bongkaran Rp. 828,837.50
II Pekerjaan Persiapan Rp. 360,000.00
III Pekerjaan Tanah Rp. 426,107.00
IV Pekerjaan Pasangan Rp. 868,360.10
V Pekerjaan Beton Rp. 983,108.10
VI Pekerjaan Atap Rp. 2,712,543.60
VII Pekerjaan Lantai Rp. 963,917.60
VIII Pekerjaan Plafond Rp. 933,506.00
IX Pekerjaan Listrik Rp. 548,000.00
X Pekerjaan Cat Rp. 1,925,430.00

JUMLAH Rp. 10,549,809.90


PPN 10 % Rp.
JUMLAH TOTAL Rp. 10,549,809.90
DIBULATKAN Rp. 10,549,000.00

TERBILANG : SEPULUH JUTA LIMARATUS EMPATPULUH


SEMBILAN RUPIAH

Losari, 12 Mei 2009


Majlis Ta’lim IPHI
Kecamatan Rembang
Ketua

H.M. Abdulloh Paryadi, BA.