Anda di halaman 1dari 142

DAFTAR HARGA SATUAN

PEKERJAAN
UPAH DAN BAHAN
TAHUN ANGGARAN 2013

KOTA BOGOR

PEMERINTAH KOTA BOGOR


DINAS PENGAWASAN BANGUNAN DAN PERMUKIMAN
Jl. Pengadilan No. 8A Telp. (0251) 313922, 320803 Bogor Fax 322001

DAFTAR UPAH PEKERJA


BANGUNAN

DAFTAR UPAH PEKERJA BANGUNAN


KOTA BOGOR
TAHUN ANGGARAN 2013
NO

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17

JENIS PEKERJA BANGUNAN

PEKERJA
TUKANG BATU/GALI
KEPALA TUKANG BATU
TUKANG KAYU
KEPALA TUKANG KAYU
TUKANG CAT / PELITUR
KEPALA TUKANG CAT / PELITUR
TUKANG BESI BETON
KEPALA TUKANG BESI BETON
TUKANG BESI PROFIL
KEPALA TUKANG BESI PROFIL
MANDOR
OPERATOR ALAT BESAR
PEMBANTU OPERATOR / MEKANIK
SUPIR TRUK
KENEK TRUK
PENJAGA MALAM

HARGA UPAH
Rp.

SATUAN WAKTU

40,000.00
55,000.00
70,000.00
55,000.00
70,000.00
55,000.00
70,000.00
55,000.00
70,000.00
60,000.00
75,000.00
80,000.00
80,000.00
50,000.00
70,000.00
45,000.00
55,000.00

1 ORANG/ HR/ 8 JAM


1 ORANG/ HR/ 8 JAM
1 ORANG/ HR/ 8 JAM
1 ORANG/ HR/ 8 JAM
1 ORANG/ HR/ 8 JAM
1 ORANG/ HR/ 8 JAM
1 ORANG/ HR/ 8 JAM
1 ORANG/ HR/ 8 JAM
1 ORANG/ HR/ 8 JAM
1 ORANG/ HR/ 8 JAM
1 ORANG/ HR/ 8 JAM
1 ORANG/ HR/ 8 JAM
1 ORANG/ HR/ 8 JAM
1 ORANG/ HR/ 8 JAM
1 ORANG/ HR/ 8 JAM
1 ORANG/ HR/ 8 JAM
1 ORANG/ HR/ 8 JAM

Bogor,
Nopember 2012
Kepala Dinas Pengawasan Bangunan dan Permukiman
Kota Bogor

Ir. Hj. Erna Hernawati, MM


Pembina Tk.I
NIP. 19621208 199202 2 004

Harsat Upah Hal 1

DAFTAR HARGA BAHAN


BANGUNAN

DAFTAR HARGA BAHAN BANGUNAN


KOTA BOGOR
TAHUN ANGGARAN 2013
NO

JENIS BAHAN BANGUNAN

SATUAN

A
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61

AGREGAT KASAR, BAHAN PEREKAT & BAHAN JADINYA


Abu Batu
Bata Merah Bakar Kelas I
Bata Merah Bakar Kelas II
Bata Merah Oven ( Klingker )
Batako Besar 8 x 20 x 30
Batako kecil 8 x 10 x 20
Batu Belah Pondasi
Batu Bronjol ( Untuk Bronjong )
Batu Gosok ( Apung )
Batu Gunung ( Quarry )
Batu Koral Beton Kali
Batu Pecah Mesin 0,5-1 cm (abu batu)
Batu Pecah Mesin 1/2
Batu Pecah Mesin 2/3
Batu Pecah Mesin 3/5
Batu Pecah Mesin 5/7
Batu Pecah Tersaring Bergradasi
Batu Pinggir Beton 10 x 20 x 35
Batu Pinggir Beton 15 x 35 x 50 ( K -225 )
Batu Sikat Koral
Batu Telor
Batu Tempel Hitam
Bibit Tanaman
Con Blok 8 x 20 x 40
Grass Blok 20 x 20
Grass Blok 30 x 30
Hollow Block 10
Hollow Block 15
Hollow Block 20
Kanstin / Kerb Beton Pracetak P = 60 cm
Kanstin / Kerb Beton Pracetak P = 50 cm
Kanstin Paving Blok
Kapur Pasang/ kapur tembok
Kapur Sirih
Pasir Beton
Pasir Pasang Kali
Pasir Teras
Pasir Urug
Patok Hm
Paving Blok Natural 6 cm
Paving Blok Natural 8 cm
Paving Blok Warna 6 cm
Paving Blok Warna 8 cm
Readymix Beton K 175, tanpa pompa ( selang )
Readymix Beton K 225, tanpa pompa ( selang )
Readymix Beton K 250, tanpa pompa ( selang )
Readymix Beton K 300, tanpa pompa ( selang )
Readymix Beton K 350, tanpa pompa ( selang )
Roster Beton 20 x 20
Roster Beton 30 x 30
Semen PC / 50 kg
Semen Putih
Semen Warna
Semen Merah
Sirtu
Tanah Liat
Tanah Urug
Terawang/roster 5X11X24
Terawang/roster 12X11X24
Urugan Pilihan
Air

m
bh
bh
bh
bh
bh
m
m
kg
m
m
m
m
m
m
m
m
bh
bh
m
m
m
btg
bh
bh
bh
bh
bh
bh
bh
bh
m1
m
kg
m
m
m
m
bh
m
m
m
m
m
m
m
m
m
bh
bh
zak
kg
kg
m
m
m
m
bh
bh
m
m3

HARGA SATUAN
Rp.
4

155,000.00
600.00
500.00
1,150.00
1,400.00
650.00
140,000.00
145,000.00
15,600.00
109,800.00
130,000.00
185,000.00
230,000.00
178,500.00
200,000.00
160,000.00
140,000.00
12,700.00
45,000.00
40,500.00
105,000.00
85,000.00
19,620.00
8,500.00
4,200.00
9,500.00
3,600.00
4,200.00
4,800.00
62,000.00
50,000.00
25,000.00
330,000.00
7,500.00
185,000.00
180,000.00
105,000.00
155,000.00
89,100.00
103,000.00
120,000.00
118,000.00
139,000.00
660,000.00
693,000.00
726,000.00
759,000.00
792,000.00
2,100.00
7,000.00
63,000.00
1,825.00
2,200.00
130,000.00
130,000.00
23,000.00
63,000.00
5,500.00
8,500.00
112,860.00
1,250.00

Harsat Bahan Hal 2

B
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108

BAHAN FINISHING LABURAN, PENGISI DAN ALATNYA


Ampelas
Bahan Plitur Kripik ( Sirlak India )
Cat Besi/ Kayu Glotek
Cat Besi Duco Danaglos/ICI
Cat Bron
Cat Dasar ICI untuk Interior ( 2 Pelapis )
Cat Kayu Seiv
Cat Marka / Spotlight
Cat Primer Marka
Cat Tahan Asam
Cat Tembok ICI Eksterior
Cat Tembok ICI Eksterior ( BETON )
Cat Tembok ICI Interior ( PLAFOND DAN DINDING )
Cat Tembok Sanlex
Cat Tembok Vinilex
Cat Tembok Vinilex
Dempul Duco
Dempul Halus / Imfra ( Wood Filler )
Dempul Kayu Cap Kucing
Dempul Lilin
Dempul Plastik
Dempul Plitur
Kape Kayu
Kape Tembok
Karung Plastik
Kumpon
Kwas 1 1/2"
Kwas 3"
Melamik
Meni Kayu / Besi
Oker
Oten (Pewarna Plitur )
Oyan
Pelapis Alkali ICI ( Cat Dasar Beton Ekterior )
Pengawetan Kayu
Pengopenan Kayu
Plamir Tembok
Plincote
Rool Cat Tembok
Sincromat
Soligneum 1 blek
Spirtus
Terpentin
Tiner A
Tiner B
Water Profing Emulsion
Water Profing Membrance

lbr
kg
kg
kg
kg
lt
kg
kg
kg
kg
lt
lt
lt
kg
kg
gln
kg
kg
kg
kg
kg
kg
bh
bh
bh
kg
bh
bh
kg
kg
kg
bks
bks
lt
m
m
kg
kg
bh
kg
5 lt
lt
lt
lt
lt
kg
ml

2,500.00
87,200.00
36,500.00
84,000.00
48,800.00
31,000.00
47,200.00
66,600.00
66,600.00
26,400.00
54,000.00
72,000.00
54,000.00
12,200.00
18,000.00
90,000.00
30,900.00
28,800.00
24,400.00
24,000.00
26,900.00
26,400.00
4,800.00
4,800.00
1,000.00
32,600.00
7,500.00
10,900.00
37,500.00
16,000.00
21,100.00
3,700.00
2,000.00
25,300.00
261,400.00
435,600.00
12,400.00
19,200.00
16,000.00
32,600.00
28,000.00
4,000.00
5,000.00
14,900.00
16,300.00
42,500.00
79,900.00

C
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131

BAHAN KAYU BERIKUT BAHAN JADINYA


Bambu Gombong
Bambu 5 s.d 7
Bambu 7 s.d 10
Dolken 5 s/d 7
Dolken 7 s/d 10
Kayu Albasia
Kayu Balok Borneo Super
Kayu Balok Kamper Banjar
Kayu Balok Kamper Medan (kruing)
Kayu Balok Kamper Samarinda
Kayu Balok Rasamala
Kayu Hutan Kelas I ( Segeng, Mahoni, Laban )
Kayu Jati Jabar dia. 40 cm kebawah
Kayu Jati Jabar Tua dia. 40 cm
Kayu Jati Jateng Tua dia. 40 cm
Kayu Jati Jateng Tua Lepas Mata dari dia. 80 cm ke atas
Kayu Jati Jatim Tua dia. 40 cm
Kayu Kamper Singkil / Kapur (K. Samarinda Klas II)
Kayu Papan Borneo Super
Kayu Papan Kamper Banjar
Kayu Papan Kamper Medan (Kruing)
Kayu Papan Kamper Samarinda
Kayu Papan Untuk Bekisting

bt
bt
bt
bt
bt
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m

10,200.00
14,600.00
36,300.00
15,400.00
20,600.00
1,375,000.00
3,004,400.00
4,125,000.00
3,520,000.00
5,940,000.00
2,178,000.00
2,500,000.00
5,854,500.00
6,534,000.00
13,503,600.00
24,865,500.00
13,503,600.00
3,833,300.00
3,135,000.00
4,290,000.00
3,740,000.00
5,940,000.00
2,530,000.00

Harsat Bahan Hal 3

132
133
134
135
136
136
137
137
138
138
139
139

Kayu Reng 2/3 Borneo Super


Kayu Reng 2/3 Kamper Banjar
Kayu Reng 3/4 Kamper Banjar

Kayu Terentang
List profil kamper 1 cm
List profil kamper 2 cm
List profil kamper 4 cm
List profil kamper 5 cm
List profil kamper 10 cm
Pegangan Tangga profil Jati
Pegangan Tangga profil Kamper

m'
m'
m'
bh
m
m'
m'
m'
m'
m'
m'
m'

2,200.00
3,000.00
6,000.00
5,000.00
2,400,000.00
2,200.00
3,700.00
8,300.00
12,400.00
25,900.00
143,400.00
41,600.00

D
140
141
142
143
144
145
146
147
148
149

BAHAN PENUTUP RANGKA PLAFOND


Acustik Amstrong 60 x 120
Bahan plafond Enternit 4 mm
Bahan plafond Asbes Semen 5 mm
Bahan plafond hardpleks 5 mm 120 x 240
Gypsum 120 x 240 t = 9 mm ex DN
Gypsum 120 x 240 t = 9 mm ex Luar
GRC 4 mm
GRC 6 mm
GRC 9 mm
List profil gypsum

lbr
lbr
m
lbr
lbr
lbr
lbr
lbr
lbr
m'

123,500.00
14,600.00
18,600.00
60,300.00
69,200.00
66,800.00
50,000.00
90,000.00
125,000.00
4,500.00

E
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173

BAHAN KAYU LAPIS


Bilik Bambu ( dengan kulit )
Bilik Bambu ( tanpa kulit )
Bilik Bambu Hitam Variasi
Formika 120 x 240
Formika Ukuran Pintu
Jabar Wood 4 mm
Melamin 4 mm 120 x 240
Melamin TOK 4 mm
Multiplek 12 mm 120 x 240
Multiplek 18 mm 120 x 240
Multiplek 9 mm 120 x 240
Play Wood 18 mm 120 x 240
Supercon
Tacon ( tahan bakar )
Teak Wood 3 mm 120 x 240
Teak Wood 3 mm 120 x 240 Ukuran Pintu
Teak Wood 4 mm 120 x 240
Teak Wood ukuran Pintu 4 mm
Triplek 3 mm 120 x 240
Triplek 4 mm 120 x 240
Triplek 4 mm Ukuran Pintu
Triplek 6 mm 120 x 240
Triplek 9 mm 120 x 240
Wall Paper ( kls menengah )

m
m
m
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
m
m
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
m

15,400.00
10,500.00
21,800.00
161,200.00
121,600.00
80,500.00
79,900.00
131,600.00
196,800.00
258,000.00
150,700.00
334,000.00
52,300.00
121,900.00
123,400.00
94,400.00
139,700.00
111,400.00
45,000.00
61,000.00
49,400.00
113,800.00
169,900.00
25,500.00

F
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
193
194

BAHAN LANTAI DAN PELAPIS DINDING


Bata Karawang
Bata pelapis dinding
Batu paras
Batu teraso
Campuran untuk Kedap Air (AM)
Granit Alam DN Ukuran Besar
Granit Alam DN Ukuran Kecil
Granit Alam LN Ukuran Besar
Granit Alam LN Ukuran Kecil
Granito Tile Essenza 60 x 60 Polis
Granito Tile Essenza 60 x 60 Unpolis
Granito Tile Essenza Ukuran 40 x 40 Polis
Granito Tile Essenza Ukuran 40 x 40 Unpolis
Karpet Kelas Baik LN
Karpet Kelas Sedang LN
Keramik 10 x 20 KW I DN Putih / Polos Mulia
Keramik 10 x 20 KW I DN Putih / Polos Roman
Keramik 10 x 20 KW I DN Corak / Warna / Anti Slip Mulia
Keramik 10 x 20 KW I DN Corak / Warna / Anti Slip Roman
Keramik 20 x 20 (KM) KW I DN Corak / Warna / Anti Slip Mulia
Keramik 20 x 20 (KM) KW I DN Corak / Warna / Anti Slip Roman

bh
bh
bh
kg
ltr
m
m
m
m
m
m
m
m
m
m
bh
bh
bh
bh
bh
bh

7,300.00
1,200.00
1,500.00
8,500.00
34,300.00
1,974,800.00
1,669,800.00
1,974,800.00
1,350,400.00
420,000.00
335,000.00
275,400.00
187,600.00
294,000.00
116,200.00
800.00
1,000.00
900.00
1,100.00
1,800.00
2,200.00

Formite/penjaga jarak bekisting/spacer

Harsat Bahan Hal 4

1
195
196
197
198
199
200
201
202
203
204
205
206
207
208
209
203
204
205
206
207
208
209
210
211
212
213
214
215
216
217
218
219
220
221
222
223
224
225
226
227
228
229
230
231
232
233
234
235
236
237
238
239
240
241
242
243
244
245
246
247
248
249
250
251
252
253
254
255
256
257
258
259

2
Keramik 20 x 20 (KM) KWI DN Putih Polos Mulia
Keramik 20 x 20 (KM) KWI DN Putih Polos Roman
Keramik 20 x 25 Dinding KM KWI DN Corak Mulia
Keramik 20 x 25 Dinding KM KWI DN Corak Roman
Keramik 30 x 30 KW I DN putih polos Mulia
Keramik 30 x 30 KW I DN putih polos Roman
Keramik 30 x 30 KW I DN Warna/Corak ( ANTI SLIP ) Mulia
Keramik 30 x 30 KW I DN Warna/Corak ( ANTI SLIP ) Roman
Keramik 33 x 33 KW I DN putih polos Mulia
Keramik 33 x 33 KW I DN putih polos Roman
Keramik 33 x 33 KW I DN Corak / Warna / Mulia
Keramik 33 x 33 KW I DN Corak / Warna / Roman
Keramik 10 x 33 ,Variasi/border
Keramik artistik ukuran (10 x 20) cm
Keramik artistik ukuran (5 x 20) cm
Marmer Alam Lampung Ukuran Besar
Marmer Alam Lampung Ukuran Kecil
Marmer Alam Citatah Ukuran Besar
Marmer Alam Citatah Ukuran Kecil
Marmer Sintetis
Mozaik 30x30
Mozaik 10x20
Plint ubin PC abu-abu ukuran (15 x 20) cm
Plint ubin PC abu-abu ukuran (10 x 30) cm
Plint ubin PC abu-abu ukuran (10 x 40) cm
Plint ubin PC warna ukuran (10 x 20) cm
Plint ubin PC warna ukuran (10 x 30) cm
Plint ubin PC warna ukuran (10 x 40) cm
Plint ubin teraso ukuran (10 x 30) cm
Plint ubin teraso ukuran (10 x 40) cm
Plint ubin granit ukuran (10 x 40) cm
Plint ubin granit ukuran (10 x 30) cm
Plint ubin teralux kerang ukuran (10 x 40) cm
Plint ubin teralux kerang ukuran (10 x 30) cm
Plint ubin teralux marmer ukuran (10 x 60) cm
Plint ubin teralux marmer ukuran (10 x 40) cm
Plint ubin teralux marmer ukuran (10 x 30) cm
Plint Vinyl karet ukuran (15 x 30) cm dengan perekat
Plint kayu kelas II tebal 2Cm, Lebar 10 Cm
Plint Keramik
Plint Keramik (10 x 10)
Plint Keramik (5 x 20)
Plint Internal Cove (5x5x20)
Poslin 11 x 11 Khusus DN
Poslin 11 x 11 Standar DN
Poslin 10 x 20 Standar DN
Poslin 20 x 20 Standar DN
Stairnosing fiber
Stairnosing keramik 10/20
Taraso Kerang 30 x 30
Taraso Kerang 40 x 40
Tegel Badak PC 30 x 30
Tegel PC 20 x 20
Tegel PC 30 x 30
Tegel PC 40 x 40
Tegel Wafel PC 20 x 20
Tegel Wafel Warna 20 x 20
Tegel Warna 20 x 20
Tegel Warna 30 x 30
Tegel Warna 40 x 40
Ubin teralux ukuran (40 x 40) cm
Ubin teralux ukuran (30 x 30) cm
Ubin teralux marmer ukuran (60 x 60) cm
Ubin teralux marmer ukuran (40 x 40) cm
Ubin teralux marmer ukuran (30 x 30) cm
Bahan teraso cor
Underlayer / Pelapis bawah karpet
Parquet kayu
Gymfloor
Vinyl Lantai standar
Vinyl karet
Floor hardener

3
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
m
m
m
m
m
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
m3
bh
bh
bh
bh
bh
bh
bh
bh
m'
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
m
m
m
m
bh
kg

4
1,500.00
2,000.00
2,500.00
3,200.00
3,000.00
4,100.00
3,000.00
5,900.00
3,500.00
4,800.00
3,800.00
7,000.00
1,400.00
8,300.00
16,600.00
305,000.00
203,300.00
522,800.00
351,400.00
135,100.00
4,500.00
3,000.00
2,340.00
3,900.00
5,850.00
2,500.00
2,750.00
3,250.00
3,000.00
3,500.00
4,000.00
7,500.00
10,000.00
6,500.00
25,000.00
17,500.00
15,000.00
55,000.00
7,750,000.00
1,760.00
880.00
1,760.00
6,500.00
700.00
600.00
900.00
1,800.00
20,400.00
9,200.00
2,500.00
4,800.00
2,400.00
1,700.00
2,500.00
3,300.00
1,800.00
2,100.00
2,100.00
3,100.00
4,000.00
20,000.00
13,750.00
500,000.00
250,000.00
135,000.00
450,000.00
85,000.00
125,000.00
230,000.00
2,500.00
17,000.00
29,000.00

Harsat Bahan Hal 5

1
G
260
261
262
263
264
265
266
267
268
269
270
271
272
273
274
275
276
277
278
279
280
281
282
283
284
285
286
287
288
289
290
291
292
293
294
295
296
297
298
299
300
301
302
303
304
305
306
307
308
309
310
311
312
313
314
315
316
317
318
319
320
321
322
323
324
325
326
327
328
329
330
331

2
BAHAN SALURAN AIR KOTOR / BERSIH
Buis Beton 100 cm ( 0.50 m )
Buis Beton 20 cm ( 1 m' )
Buis Beton 30 cm ( 1 m' )
Buis Beton 40 cm ( 1 m' )
Buis Beton 50 cm ( 1 m' )
Buis Beton 60 cm ( 1 m' )
Buis Beton 80 cm ( 0.50 m )
Buis Tanah 10 cm ( 0.50 m )
Buis Tanah 15 cm ( 0.50 m )
Buis Tanah 20 cm ( 0.50 m )
Buis Tanah 25 cm ( 0.50 m )
Grafel U 20 cm'
Grafel U 30 cm'
Grafel U 40 cm'
Ground Reservoir 100 m3
Ground Reservoir 1000 m3
Ground Reservoir 200 m3
Ground Reservoir 300 m3
Ground Reservoir 50 m3
Ground Reservoir 500 m3
Injuk
Pipa PVC Diameter 20 mm
Pipa PVC Diameter 25 mm
Pipa PVC Diameter 32 mm
Pipa PVC Diameter 40 mm
Pipa PVC Diameter 50 mm
Pipa PVC Diameter 63 mm
Pipa PVC Diameter 75 mm
Pipa PVC Diameter 90 mm
Pipa PVC Diameter 110 mm
Pipa PVC Diameter 140 mm
Pipa PVC Diameter 160 mm
Pipa PVC Diameter 200 mm
Pipa PVC Diameter 225 mm
Pipa PVC Diameter 250 mm
Pipa PVC Diameter 315 mm
Pipa PVC Diameter 355 mm
Pipa PVC Diameter 400 mm
Pipa PVC Diameter 500 mm
Pipa PVC Diameter 630 mm
Beton Box Culvert Pracetak 40-40-100 cm Heavy Duty
Beton Box Culvert Pracetak 50-50-100 cm Heavy Duty
Beton Box Culvert Pracetak 60-60-100 cm Heavy Duty
Beton Box Culvert Pracetak 80-80-100 cm Heavy Duty
Beton Box Culvert Pracetak 100-100-100 cm Heavy Duty
Beton Box Culvert Pracetak 120-120-100 cm Heavy Duty
Beton Box Culvert Pracetak 140-140-100 cm Heavy Duty
Beton Box Culvert Pracetak 150-150-100 cm Heavy Duty
Beton Box Culvert Pracetak 40-40-100 cm Light Duty
Beton Box Culvert Pracetak 50-50-100 cm Light Duty
Beton Box Culvert Pracetak 60-60-100 cm Light Duty
Beton Box Culvert Pracetak 80-80-100 cm Light Duty
Beton Box Culvert Pracetak 100-100-100 cm Light Duty
Beton Box Culvert Pracetak 120-120-100 cm Light Duty
Beton Box Culvert Pracetak 140-140-100 cm Light Duty
Beton Box Culvert Pracetak 150-150-100 cm Light Duty
Beton Saluran U-Ditch Pracetak 40-40-120 cm
Beton Saluran U-Ditch Pracetak 50-50-120 cm
Beton Saluran U-Ditch Pracetak 60-60-120 cm
Beton Saluran U-Ditch Pracetak 80-80-120 cm
Beton Saluran U-Ditch Pracetak 100-100-120 cm
Beton Saluran U-Ditch Pracetak 120-120-120 cm
Beton Saluran U-Ditch Pracetak 140-140-120 cm
Beton Saluran U-Ditch Pracetak 160-160-120 cm
Cover Saluran Terbuka Heavy Duty 40-60 cm
Cover Saluran Terbuka Heavy Duty 50-60 cm
Cover Saluran Terbuka Heavy Duty 60-60 cm
Cover Saluran Terbuka Heavy Duty 80-60 cm
Cover Saluran Terbuka Heavy Duty 100-60 cm
Cover Saluran Terbuka Heavy Duty 120-60 cm
Cover Saluran Terbuka Heavy Duty 140-60 cm
Cover Saluran Terbuka Heavy Duty 160-60 cm

unit
m1
m1
m1
unit
unit
unit
unit
unit
unit
unit
m1
m1
m1
unit
unit
unit
unit
unit
unit
kg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit

404,800.00
41,200.00
50,600.00
56,100.00
67,100.00
117,100.00
189,800.00
7,300.00
11,400.00
13,600.00
18,600.00
23,900.00
29,700.00
55,000.00
294,683,400.00
1,956,570,000.00
582,978,000.00
798,600,000.00
84,515,900.00
1,086,096,000.00
5,500.00
14,600.00
19,200.00
39,000.00
56,800.00
101,900.00
119,400.00
190,500.00
247,600.00
327,500.00
658,900.00
694,800.00
1,221,900.00
1,661,100.00
1,880,800.00
2,938,900.00
4,272,600.00
5,031,200.00
8,864,500.00
14,135,300.00
676,800.00
778,000.00
1,018,400.00
1,878,600.00
2,289,700.00
2,922,200.00
3,889,900.00
4,459,200.00
537,700.00
683,100.00
855,800.00
1,218,200.00
1,815,300.00
2,587,000.00
3,655,900.00
3,959,500.00
375,800.00
518,100.00
620,400.00
966,300.00
1,424,500.00
2,068,300.00
2,561,700.00
3,175,200.00
113,900.00
158,200.00
196,100.00
265,700.00
335,300.00
398,500.00
563,000.00
714,800.00

Harsat Bahan Hal 6

332
333
334
335
336
337
338
339

Cover Saluran Terbuka Light Duty 40-60 cm


Cover Saluran Terbuka Light Duty 50-60 cm
Cover Saluran Terbuka Light Duty 60-60 cm
Cover Saluran Terbuka Light Duty 80-60 cm
Cover Saluran Terbuka Light Duty 100-60 cm
Cover Saluran Terbuka Light Duty 120-60 cm
Cover Saluran Terbuka Light Duty 140-60 cm
Cover Saluran Terbuka Light Duty 160-60 cm

H
340
341
342
343
344
345
346
347
348
349
350
351
352
353
354
355
356
357
358
359
360
361
362
363
364
365
366
367
368
369
370
371
372

BAHAN FASILITAS PENGAIRAN


Karet Penyekat Air/Rubber Water Stop Lebar 150 cm
Karet Penyekat Air/Rubber Water Stop Lebar 225 cm
Plat Karet untuk Perletakan Jembatan Type 4 Kx
Penutup Sambungan/Joint Sealer tebal 25
Pengisi Sambungan/Joint Sealer tebal 10
Pengisi Sambungan/Joint Sealer tebal 20
Mistar Ukur Panjang 0,50 -1,00 Meter
Mistar Ukur Panjang 1,00 -1,50 Meter
Mistar Ukur Panjang 1,50 -2,00 Meter
Mistar Ukur Panjang 2,00 -3,00 Meter
Mistar Ukur Panjang 3,00 -4,00 Meter
Papan Nama Bendung
Papan Nama Saluran
Papan Nama Bendung/Nomenklatur
Papan Eksploitasi
Papan Operasi Bendung
Kotak Baja untuk menyimpan data
Plat Tanda Muka Air/Peil Schal
Patok Hektometer (Pengairan)
Pintu Angkat type IB = 0,30 Meter
Pintu Angkat type IB = 0,40 Meter
Pintu Angkat type IB = 0,50 Meter
Pintu Angkat type IIB = 0,30 Meter
Pintu Angkat type IIB = 0,40 Meter
Pintu Angkat type IIB = 0,50 Meter
Pintu Sorong Baja type 1A ukuran (B=0,30-0,60)&(H=0,30-0,60)
Pintu Sorong Baja type 2A ukuran (B=0,60-0,80)&(H=0,30-1,00)
Pintu Sorong Baja type 3A ukuran (B=0,80-1,20)&(H=0,40-1,50)
Pintu Sorong Baja type 4A ukuran (B=1,00-1,00)&(H=0,50-2,00)
Pintu Sorong Baja type 5A ukuran (B=1,00-1,50)&(H=0,70-0,90)
Pintu Sorong Baja type 6A ukuran (B=1,60-2,00)&(H=0,90-1,35)
Pintu Sorong Baja type 7A ukuran (B=2,10-2,50)&(H=1,35-1,70)
Pintu Sorong Baja type dua Draadstang Ulir dengan 3 stel roda gigi
b = 1,00 M ; H = 1,60 M
Pintu Sorong Baja type dua Draadstang Ulir dengan 3 stel roda gigi
b = 1,20 M ; H = 1,70 M
Pintu Sorong Baja type dua Draadstang Ulir dengan 3 stel roda gigi
b = 1,50 M ; H = 1,80 M
Pintu Sorong Baja type dua Draadstang Ulir dengan 3 stel roda gigi
b = 2,00 M ; H = 2,00 M

373
374
375

I
376
377
378
379
380
381
382
383
384
385
386
387
388
389
390
391
392
393
394
395

unit
unit
unit
unit
unit
unit
unit
unit

88,600.00
113,900.00
139,200.00
170,800.00
259,400.00
291,000.00
442,800.00
638,900.00

m
m
m
m
m
m
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh

109,600.00
146,600.00
237,600.00
128,100.00
128,100.00
165,000.00
111,400.00
111,400.00
222,700.00
445,300.00
556,600.00
407,800.00
108,600.00
685,700.00
679,100.00
679,100.00
135,800.00
135,800.00
109,100.00
679,100.00
814,900.00
1,222,400.00
951,000.00
121,200.00
1,492,100.00
3,018,800.00
2,516,400.00
3,018,800.00
3,522,600.00
4,025,000.00
4,528,800.00
5,031,200.00

bh

20,124,800.00

bh

20,124,800.00

bh

25,155,900.00

bh

35,218,300.00

m'

40,000.00
11,000.00
11,000.00
12,000.00
12,000.00
14,000.00
10,300.00
12,300.00
10,300.00
11,000.00
10,300.00
10,300.00
22,000.00
20,000.00
151,100.00
21,795.45
32,340.91
42,909.09
32,340.91
403,700.00
20,000.00

BAHAN LOGAM DAN BAHAN JADINYA


Aluminium strip
Baja Konstruksi U-39 / U-32
Baja Tulangan Beton
Besi Beton U-24 Rata - Rata
Besi Beton U-39 / U-32 Rata - Rata
Besi Galvanisir
Besi Profil DN SII
Besi Profil Ex LN
Besi C Lip Chanel
Besi L 30.30.3
Besi Strip
Besi angkur

kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg

Besi scuare tube


Besi lis kaca (1 x 1) cm

m'
m'

Bondek
Daun Jendela Alumunium Natural ( Tanpa Kaca dan accessories )
Daun Jendela Alumunium Warna ( Tanpa Kaca dan accessories )
Daun Pintu Alumunium Natural ( tanpa kaca dan accessories )
Daun Pintu Alumunium Warna ( tanpa kaca dan accessories )
Handle Alumunium ( Tarikan Pintu Alumunium )
Besi Hollow Block 20 X 20

m
m
m
m
m
bh

Harsat Bahan Hal 7

396
397
398
399
400
401
402
403
404
405
406
407
408
409
410
411
412
413
414
415
416
417
418
419
420
421
422
423
424
425
426
427
428
429
430
431
432
433
434
435
436
437
438
439
440
441
442
443
444
445
446
447
448
449
450
451
452
453
454
455
456

Besi Hollow Block 40 X 40


IWF Ex DN SII
IWF Ex Jepang
Folding Gate
Kait Angin alumunium
Karet Asisoris Kusen / Pintu Alumunium
Kawat Beton
Kawat Bronjong 3 mm
Kawat Bronjong 4 mm
Kawat Duri
Kawat Harmonika 2 cm
Kawat Harmonika 4 cm
Kawat Kasa 1 x 1 cm ( Putih )
Kawat Las Listrik
Kawat Nyamuk
Kawat Pengikat
Kawat Tembaga
Kusen Alumunium Natural 1.3 mm t=1,3 mm ( 4 " )
Kusen Alumunium Warna 1.3 mm t=1,3 mm ( 4 " )
Lem Fox
Lem Kuning (aibond)
Ongkos Galfanis Besi
Pagar BRC Lengkap Tiang ( Tanpa Pondasi )
Plat Alumunium 0.1 mm
Plat Alumunium 0.2 mm
Plat Alumunium 0.3 mm
Plat Alumunium 0.4 mm
Plat Alumunium 0.5 mm
Plat Alumunium 0.6 mm
Plat Besi 10 mm Ke atas
Plat Besi 2 mm s/d 5 mm
Plat Besi 6 mm s/d 10 mm
Plat Besi Tipis 0.5 mm
Plat Besi Tipis 1 mm
Plat Besi Tipis 10 mm ke atas
Plat Besi Tipis 2 - 5 mm
Plat Besi Tipis 6 - 10 mm
Plat Srip 2 x 30 mm ( 6 m1)
Plat Srip 3 x 30 mm ( 6 m1)
Pintu gulung
Pintu lipat
Profil Aluminium
Profil Kaca
Ram Ayam
Ram Kawat 1 x 1 cm
Ram Nyamuk Aluminium
Ram Nyamuk Hijau
Rooling Door Aluminium
Seng Plat BJLS 28 (80 X 180 )
Seng Plat BJLS 30 (80 X 180 )
Seng Plat BJLS 30 dia. 60 cm ( 100 m1 )
Seng Plat BJLS 30 dia. 90 cm ( 100 m1 )
Sealant
Skrup fixer
Storox-100
Sunscreen aluminium
Timah
Venetions blinds dan vertical blinds (tirai)
Timah Hitam
Wiremesh M6
Wiremesh M8

J
457
458
459
460
461
462
463
464
465
466

BAHAN KACA
Glass Blead
Glass Block DN 20 x 20 ( Kedawung )
Glass Block DN 20 x 20 Ex LN
Kaca 6 mm Gravver
Kaca Patri EX Luar negeri terpasang
Kaca Patri Lokal Terpasang ( ASAHI )
Kaca Polos 2 mm ( ASAHI )
Kaca Polos 3 mm ( ASAHI )
Kaca Polos 5 mm ( ASAHI )
Kaca Rayband 12 mm ( ASAHI )

kg
kg
m
ps
m1
kg
kg
kg
m1
m
m
m
kg
m
m1
kg
m1
m1
kg
kg
kg
m
m
m
m
m
m
m
kg
kg
kg
kg
kg
kg
kg
kg
bt
bt
cm
m
m'
m'
m
m
m
m
m
lbr
lbr
rool
rool
tube
bh
kg
m
kg
m
kg
m
m

25,000.00
11,000.00
13,200.00
400,000.00
111,900.00
6,300.00
10,700.00
19,800.00
19,800.00
3,000.00
23,300.00
34,900.00
29,100.00
18,400.00
27,000.00
900.00
30,500.00
108,200.00
143,000.00
24,000.00
29,100.00
5,500.00
130,700.00
50,100.00
82,100.00
105,200.00
128,600.00
151,300.00
175,300.00
11,100.00
11,100.00
11,100.00
14,400.00
13,400.00
12,000.00
12,000.00
12,000.00
28,400.00
36,300.00
4,500.00
450,000.00
85,000.00
4,500.00
9,800.00
11,400.00
20,100.00
13,100.00
600,000.00
61,000.00
46,600.00
1,582,700.00
2,279,700.00
25,000.00
3,000.00
25,000.00
350,000.00
40,700.00
275,000.00
35,600.00
35,300.00
43,500.00

kg
bh
bh
m
m
m
m
m
m
m

22,000.00
23,000.00
88,600.00
1,306,800.00
3,746,200.00
1,379,400.00
43,600.00
63,400.00
93,600.00
292,900.00

Harsat Bahan Hal 8

467
468
469

Kaca Rayband 5 mm ( ASAHI )


Kaca Rayband 8 mm ( ASAHI )
Thermo Plastik

m
m
kg

94,400.00
481,100.00
34,700.00

K
470
471
472
473
474
475
476
477
478
479
480
481
482
483

BAHAN PAKU DAN MUR BAUT


Besi Beugel kuda - kuda
Duk Angker
Mur Baut Biasa dia.19 s/d 16 (5 cm)
Mur Baut dia.19 / panjang 60 cm
Mur Baut HTB dia. 19 s/d 16 (5 cm)
Paku 1 cm s/d 3 cm
Paku 4 cm s/d 7 cm
Paku 8 cm s/d 12 cm
Paku Beton 2 cm s/d 5 cm
Paku Cacing
Paku Kait Lengkap
Paku Skrup
Paku Skrup 1 cm 2,5 cm
Piser dia. 12 s/d 20 cm

kg
kg
bh
bh
bh
kg
kg
kg
bh
kg
bh
kg
bh
bh

12,100.00
18,000.00
5,900.00
53,900.00
9,900.00
11,000.00
10,000.00
10,000.00
2,500.00
46,500.00
800.00
13,650.00
190.00
4,800.00

L
484
485
486
487
488
489
490
491
492
493
494
495
496
497
498
499
500
501
502
503
504
505
506
507
508
509
510
511
512
513
514
515
516
517
518
519
520
521
522
523
524
525
526
527
528
529
530
531
532
533
534
535

BAHAN PERPIPAAN
Besi Pipa Hitam 1" t=2 mm
Besi Pipa Hitam 2" t=2 mm
Besi Pipa Hitam 3" t=2 mm
Besi Pipa Hitam 4" t=2 mm
Besi Pipa Hitam 6" t=2 mm
Besi Pipa untuk Hydrant BSP 1"
Besi Pipa untuk Hydrant BSP 1,25"
Besi Pipa untuk Hydrant BSP 1,5"
Besi Pipa untuk Hydrant BSP 2"
Besi Pipa untuk Hydrant BSP 2,5"
Besi Pipa untuk Hydrant BSP 3"
Besi Pipa untuk Hydrant BSP 4"
Besi Pipa untuk Hydrant BSP 6"
Lem Paralon
Macam2 Sambungan GIP 1/2"
Macam2 Sambungan GIP 3/4"
Macam2 Sambungan GIP 1"
Macam2 Sambungan GIP 1 1/4"
Macam2 Sambungan GIP 1 1/2"
Macam2 Sambungan GIP 1 3/4"
Macam2 Sambungan GIP 2"
Macam2 Sambungan GIP 2 1/2"
Macam2 Sambungan GIP 3"
Macam2 Sambungan GIP 4"
Macam2 Sambungan Paralon 1/2"
Macam2 Sambungan Paralon 3/4"
Macam2 Sambungan Paralon 1"
Macam2 Sambungan Paralon 1 1/4"
Macam2 Sambungan Paralon 1 1/2"
Macam2 Sambungan Paralon 1 3/4"
Macam2 Sambungan Paralon 2"
Macam2 Sambungan Paralon 2 1/2"
Macam2 Sambungan Paralon 3"
Macam2 Sambungan Paralon 4"
Penyekat Poslin Urinoir TOTO
Pipa GIP Medium A 1/2" ( 6 m1 )
Pipa GIP Medium A 3/4" ( 6 m1 )
Pipa GIP Medium A 1" ( 6 m1 )
Pipa GIP Medium A 1 1/4" ( 6 m1 )
Pipa GIP Medium A 1 1/2" ( 6 m1 )
Pipa GIP Medium A 1 3/4"( 6 m1 )
Pipa GIP Medium A 2" ( 6 m1 )
Pipa GIP Medium A 2 1/2" ( 6 m1 )
Pipa GIP Medium A 3" ( 6 m1 )
Pipa GIP Medium A 4" ( 6 m1 )
Pipa PVC MASPION ABU 1 1/2" (AW)
Pipa PVC MASPION ABU 1 1/4" (AW)
Pipa PVC MASPION ABU 1" (AW)
Pipa PVC MASPION ABU 1/2" (AW)
Pipa PVC MASPION ABU 2 1/2" (AW)
Pipa PVC MASPION ABU 2" (AW)
Pipa PVC MASPION ABU 3" (AW)

1.
bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
tb
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
lbr
bh
bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
bt

108,200.00
217,800.00
393,500.00
519,900.00
726,000.00
162,700.00
223,700.00
246,900.00
346,400.00
505,100.00
657,100.00
936,600.00
1,576,900.00
6,300.00
6,100.00
7,300.00
12,000.00
18,200.00
20,400.00
24,900.00
41,600.00
53,000.00
71,800.00
113,300.00
2,600.00
2,800.00
3,200.00
7,200.00
7,300.00
8,300.00
14,600.00
21,800.00
29,100.00
36,300.00
436,300.00
108,200.00
126,800.00
184,500.00
259,700.00
286,800.00
363,800.00
382,400.00
538,200.00
716,900.00
955,800.00
52,800.00
40,000.00
28,500.00
18,400.00
106,300.00
76,700.00
151,300.00

Harsat Bahan Hal 9

536
537
538
539
540
541
542
543
544
545
546
547
548
549
550
551

Pipa PVC MASPION ABU 3/4" (AW)


Pipa PVC MASPION ABU 4" (AW)
Pipa PVC 4" berlobang jenis AW
Pipa PVC RUCIKA type AW 1 1/2"
Pipa PVC RUCIKA type AW 1 1/4"
Pipa PVC RUCIKA type AW 1"
Pipa PVC RUCIKA type AW 1/2"
Pipa PVC RUCIKA type AW 2 1/2"
Pipa PVC RUCIKA type AW 2"
Pipa PVC RUCIKA type AW 3"
Pipa PVC RUCIKA type AW 3/4"
Pipa PVC RUCIKA type AW 4"
Pipa PVC RUCIKA type AW 6"
Pipa PVC RUCIKA type AW 8"
Sambungan Pipa PVC Jenis AW 4 " TY
Solatip Leideng

bt
bt
m1
bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
bh
gl

22,400.00
211,500.00
35,300.00
86,300.00
70,300.00
52,800.00
25,600.00
148,600.00
118,200.00
218,900.00
44,000.00
335,500.00
638,900.00
926,400.00
87,200.00
3,700.00

M
552
553
554
555
556
557
558
559
560
561
562
563
564
565
566
567
568
569
570
571
572
573
574
575
576
577
578
579
580
581
582
583
584
585
586
587

BAHAN SANITAIR
Stop Kran 3/4 " KIT
Stop Kran 1 " KIT
Stop Kran 1 1/2 " KIT
Stop Kran 2 " KIT
Stop Kran 2 1/2" KIT
Stop Kran 3 " KIT
Check Valve 1/2 "
Double Neple 1/2 "
Water Mur 1/2 "
Gate Walve 1/2 "
Saringan Air Lt KM Stainless Steel
Apooer Bath Tube
Kran stain less Lokal Kait
Shower Dengan Tiang
Shower Tanpa Tiang
Kran Tembok Sun Eui dia. 1/2 "
Kran Tembok ITAP dia. 1/2 "
Kran Bebek Sun Eui 1/2 "
Kran Bebek ITAP 1/2 "
Kran Panas Dingin San Eui Standard
Bath Cape Washteren
Tempat Sabun Poslin
Wastafel Lengkap TOTO LW 230
Wastafel Lengkap INA
Closet Jongkok Poslin warna TOTO
Closet Jongkok Standard Putih Poslin TOTO
Closet Jongkok Lengkap Sistem Jet TOTO
Closet Duduk Warna Standard TOTO C 240 Lengkap
Wastafel Bulat Warna Standard Lengkap
Closet Duduk Warna Standard lengkap INA
Urinoir Lengkap TOTO Warna Standard lengkap
Penyekat Poslin Urinoar TOTO
Kitchen Zink Stainless Standard Lokal ( 1 Lobang )
Kitchen Zink Stainless Non Standard Franke ( 1 Lobang )
Kitchen Zink Stainless Non Standard Franke ( 2 Lobang )
Sealtipe

bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
unit
bh
unit
unit
unit
unit
unit
unit
unit
bh
unit
lbr
bh
bh
bh
bh

94,400.00
130,700.00
226,600.00
313,700.00
784,100.00
888,700.00
78,500.00
29,100.00
45,600.00
58,100.00
58,100.00
284,600.00
49,700.00
196,100.00
108,900.00
87,200.00
34,900.00
156,900.00
52,300.00
217,800.00
2,368,300.00
50,100.00
1,134,100.00
750,000.00
217,800.00
191,700.00
1,986,400.00
1,876,000.00
1,283,600.00
1,430,300.00
1,938,500.00
523,500.00
409,200.00
1,252,800.00
1,873,100.00
750.00

N
588
589
590
591
592
593
594
595
596
597
598
599
600
601
602
603
604

BAHAN PENUTUP ATAP


Atap Plastik Gelombang 80 x 180
Aluminium foile
Atap Aluminium Natural USR 26 ( JAINDO )
Atap Aluminium Warna USR 26 ( JAINDO )
Atap Asbes Gel. Besar 4 mm 80 x 180
Atap Asbes Gel. Kecil 5 mm 80 x 180
Atap Fiber Glass Tebal 80 x 180 (gelombang)
Atap Fiber Glass Tipis 80 x 180 (gelombang)
Atap Seng Gelombang 3 mm 80 x 180
Atap Seng Gelombang 5 mm 80 x 180
Atap Genteng Beton Warna 14,5/m2
Atap Genteng Plentong pres Bakar KW 1
Atap Genteng Plentong pres Molen Oven Jatiwangi
Atap Genteng Plentong pres Molen Oven KW1
Atap Genteng Flam pres Molen Oven Jatiwangi
Atap Genteng Kodok
Atap Tegola Kubota, lengkap

lbr
m
m
m
lbr
lbr
lbr
lbr
lbr
lbr
m
bh
bh
bh
bh
bh
m

22,400.00
8,800.00
154,000.00
177,600.00
76,400.00
106,000.00
82,100.00
40,700.00
50,900.00
77,000.00
94,600.00
1,300.00
1,700.00
1,500.00
1,700.00
1,400.00
537,300.00

Harsat Bahan Hal 10

605
606
607
608
609
610
611
612
613
614
615
616
617
618
619
620
621
622
623
624
625
626
627
628
629
630

Atap Tegola Kwalitas Sedang


Bubung Genteng pres Bulat Ex Jatiwangi
Bubung Murando Glasur
Bubung Murando Natural
Bubungan Genteng Keramik
Bubungan Genteng Kodok
Genteng Beton Warna
Genteng Beton Natural
Genteng Bubungan Beton
Genteng Bubungan Ex Jatiwangi Segi Tiga
Genteng Keramik Glasur Premium 14,5 / m2
Genteng Keramik Glasur Special 14,5 / m2
Genteng Keramik Glasur Standard 14,5 / m2
Genteng Keramik Natural Intan 14,5 / m2
Genteng Metal ( Rainbow Roof )
Genteng Metal Hana
Genteng Murando Glasur 1m2 = 18 bh
Genteng Murando Glasur 1m2 = 20 bh
Genteng Murando Natural 1m2 = 20 bh
Nok Atas Metal ( Rainbow Roof )
Nok Atas Metal Hana
Nok Pinggir Hana
Nok Pinggir Metal ( Rainbow Roof )
Sirap Kelas I ( 80 / m2 )
Wall Flashing ( Rainbow Roof )
Wall Flashing Hana

m
bh
bh
bh
bh
bh
m
m
bh
bh
m
m
m
m
m
m
bh
bh
bh
m1
m1
m1
m1
bh
m1
m1

297,700.00
6,300.00
8,300.00
6,300.00
7,300.00
4,000.00
92,500.00
79,800.00
9,900.00
4,400.00
145,000.00
128,800.00
121,600.00
108,200.00
237,900.00
171,400.00
5,900.00
3,200.00
3,200.00
154,800.00
83,200.00
104,900.00
107,200.00
1,100.00
107,100.00
83,200.00

O
631
632
633
634
635
636
637
638
639
640
641
642
643
644

BAHAN MEKANIKAL
AC Split 1 PK Setara TOSHIBA
AC Split 2 PK Setara TOSHIBA
AC Split 3 PK Setara TOSHIBA
Diesel Pump kap. 750 gln / menit 120 m1 ( 105 kW )
Down Light +SL 25 W
Electrical Pump kap. 750 gln / menit 120 m1 ( 90 kW )
Exhouse Fan H 100 W 40 x 40 cm
Exhouse Fan H 360 W 60 x 60 cm
Exhouse Fan H 380 W CFM 55 x 55 cm
Fire House 1.5 x 30 m + nose
Hydran Box dalam Gedung (lengkap)
Jockey Pump kap. 80 gln / menit 100 m1 ( 18,6 kW )
Mesin AC Split DAIKIN ( Indoor / Outdoor Unit )
Presure Tank kap. 500 liter lengkap

unit
unit
unit
unit
bh
unit
unit
unit
unit
unit
unit
unit
unit
unit

4,743,200.00
21,642,100.00
30,310,500.00
623,267,400.00
127,800.00
249,307,000.00
952,300.00
5,366,400.00
6,050,000.00
5,198,200.00
6,461,400.00
72,714,500.00
1,980,000.00
36,445,200.00

P
645
646
647
648
649
650
651
652
653
654
655
656
657
658
659
660
661
662
663
664
665
666
667
668
669
670
671
672
673

BAHAN ELEKTRIKAL
Kabel NYA 1x 1.5 Prima (1 rol = 50 m')
Kabel NYA 1x 2.5 Prima (1 rol = 50 m')
Kabel NYM 2 x 1.5 Prima (1 rol = 50 m')
Kabel NYM 3 x 1.5 Prima (1 rol = 50 m')
Kabel NYM 2 x 2.5 Prima (1 rol = 50 m')
Kabel NYM 3 x 2.5 Prima (1 rol = 50 m')
Kabel NYM 4 x 2.5 Prima (1 rol = 50 m')
Kabel NYM 2 x 4 Prima (1 rol = 50 m')
Kabel NYM 3 x 4 Prima (1 rol = 50 m')
Kabel NYM 4 x 4 Prima (1 rol = 50 m')
Kabel NYM 2 x 6 Supreme (1 rol = 50 m')
Kabel NYM 3 x 6 Supreme (1 rol = 50 m')
Kabel NYM 4 x 6 Supreme (1 rol = 50 m')
Kabel NYM 2 x 10 Supreme (1 rol = 50 m')
Kabel NYM 3 x 10 Supreme (1 rol = 50 m')
Kabel NYM 4 x 10 Supreme (1 rol = 50 m')
Kabel NYM 4 x 16 Supreme (1 rol = 50 m')
Kabel NYY 2 x 4 Supreme (1 rol = 50 m')
Kabel NYY 3 x 4 Supreme (1 rol = 50 m')
Kabel NYY 4 x 4 Supreme (1 rol = 50 m')
Kabel NYY 2 x 6 Supreme (1 rol = 50 m')
Kabel NYY 3 x 6 Supreme (1 rol = 50 m')
Kabel NYY 4 x 6 Supreme (1 rol = 50 m')
Kabel NYY 2 x 10 Supreme (1 rol = 50 m')
Kabel NYY 3 x 10 Supreme (1 rol = 50 m')
Kabel NYY 4 x 10 Supreme (1 rol = 50 m')
Kabel NYY 4 x 16 Supreme (1 rol = 50 m')
NSFB FUJI EA - 100 A
NSFB FUJI EA - 150 A

1.5
ROLL
ROLL
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
bh
bh

84,300.00
125,800.00
3,200.00
6,700.00
4,300.00
7,300.00
6,300.00
5,300.00
12,000.00
16,700.00
9,500.00
12,500.00
16,700.00
15,700.00
20,800.00
22,900.00
31,300.00
9,500.00
12,500.00
20,800.00
9,400.00
15,700.00
19,400.00
16,700.00
22,800.00
28,100.00
44,600.00
884,000.00
2,090,900.00

Harsat Bahan Hal 11

674
675
676
677
678
679
680
681
682
683
684
685
686
687
688
689
690
691
692
693
694
695
696
697
698
699
700
701
702
703
704
705
706
707
708

Rumah Panel 30 x 60 cm (kosong)


Skring Kas 2 grop Biasa
Skring Kas 3 grop Biasa
Skring Kas 5 grop Biasa
MCB 1 PAS
MCB 3 PAS
Tahanan 50 A Merk Fuji
Saklar Broko Tunggal Standard ( 1 Phase )
Saklar Broko Seri Standard ( 1 Phase )
Stop Kontak Broko Standard ( 1 Phase )
Stop Kontak Broko 3 Phase ( Out Bow )
Stop Kontak Broko 3 Phase ( In Bow )
Stop Kontak Handle 3 Phase
Instalasi Titik Lampu / Stop Kontak ( Upah dan Alat )
Lampu pijar 25 Watt s/d 100 Watt
Lampu Neon TL Philip 20 W
Lampu Neon TL Philip 40 W
Trapo TL 20 W ( Philip )
Trapo TL 40 W ( Philip )
Trapo TL 20 W ( Sinar )
Trapo TL 40 W ( Sinar )
Stater Neon Philip
Stater Neon Biasa
Rumah TL In Bow / Out Bow 2 x 20 W ( Kosongan )
Down Light + SL 25 W
Lampu SL Philip 25 W
Lampu Sirkel TL 20 W Lengkap
Lampu Mercuri 80 W
Lampu Taman + Tiang + Lampu 1 Buah
Lampu Baret 30 cm + Neon
Lampu Neon Arcrilik 2 x 40 W lengkap
Jarum Penangkal Petir 16
Kawat BC ( Tembaga )
Pentanahan Penangkal Petir
Pentanahan Panel

Q
709
710
711
712
713
714
715
716
717
718
719
720
721
722
723
724
725
726
727
728
729
730
731
732
733
734
735
736
737
738
739
740

BAHAN ALAT PENGANTUNG DAN KUNCI


Door Closer Kelas Rendah
Door Closer Kelas Standard ( Kelas Baik )
Door Closer Kelas Standard ( Kelas Sedang )
Engsel Harmonika
Engsel Jendela Unilon
Engsel Patrun
Engsel Pintu Unilon Standard
Espangolet
Grendel 15 cm
Grendel 5 cm
Hak Angin Jendela Antik
Hak Angin Kait Jendela Biasa
Hak Angin Sendok Stainless / Kuningan
Kunci 2 Slaag Ancor Asli
Kunci 2 Slaag ISO
Kunci 2 Slaag Kuda Terbang
Kunci 2 Slaag ROYAL
Kunci 2 Slaag Silinder SEIS Asli type 210 s/d type 226
Kunci 2 Slaag Silinder Utama Standard
Kunci Gembok Besar
Kunci KM Bulat ALFA
Kunci KM Bulat Kualitas Biasa
Kunci Silinder ALFA untuk Pintu Alumunium
Nako Lengkap Tralis 1 Daun
Rel Henderson Lengkap
Rel Maraton I Pintu
Seng BJLS 30 lebar 60cm (1 rol 50 m' )
Seng BJLS 30 lebar 90cm (1 rol 50 m' )
Sloot Jendela Tunggal
Sloot Pintu berikut Rantai
Tarikan Almari Rata - rata
Tarikan Pintu Alumunium

R
741
742

BAHAN PENGIKAT UNTUK KONTRUKSI JALAN


Aspal ( ESO ) 1 Drum 155 Kg
Aspal Curah/ Aspal Bitumen

unt
unt
unt
unt
bh
bh
bh
bh
bh
bh
bh
bh
bh
ttk
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
kg
ttk
ttk

155,400.00
190,000.00
227,300.00
477,800.00
48,000.00
60,300.00
538,200.00
18,200.00
21,800.00
20,400.00
84,300.00
143,400.00
84,100.00
156,460.00
8,300.00
21,800.00
26,200.00
30,500.00
36,300.00
25,500.00
30,100.00
5,100.00
2,700.00
108,100.00
299,200.00
130,700.00
65,400.00
108,200.00
299,200.00
203,300.00
740,600.00
95,600.00
40,700.00
421,100.00
181,500.00

unt
unt
unt
m1
ps
ps
ps
ps
bh
bh
ps
ps
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
dn
bh
unt
m1
m1
bh
bh
bh
bh

202,600.00
597,500.00
418,700.00
12,400.00
12,000.00
7,300.00
17,200.00
40,700.00
36,300.00
3,700.00
23,300.00
5,100.00
28,500.00
129,800.00
181,500.00
82,800.00
120,600.00
267,500.00
538,700.00
65,400.00
84,300.00
43,600.00
314,400.00
24,000.00
836,300.00
180,100.00
32,300.00
46,700.00
9,500.00
28,500.00
12,400.00
377,300.00

kg
kg

8,300.00
10,800.00

Harsat Bahan Hal 12

743
744
745
746
747
748
749

Aspal RC 70 ( Cilacap )
Asphal Concrete Base (ATB) / AC-Base
Asphal Concrete Base Course (ATB) / AC-BC
Asphal Concrete Wearing Course (Laston) / AC-WC
Hot Roller Sheet (Lataston) / HRS
Lapis`Aspal Resap Pengikat / Prime Coat
Lapis`Aspal Perekat ? Tack Coat

kg
ton
ton
ton
ton
ton
ton

6,900.00
765,400.00
778,000.00
797,000.00
1,200,000.00
5,600.00
5,600.00

S
750
751
752
753
754
755
756
757
758
759
760

BAHAN PENGHISAP AIR SUMUR DALAM


Deep Well dengan kelengkapannya kap. 150 liter/menit
Gear Pump kap. 60 liter/menit
Hand Oil Pump
Mesin Pompa Air 100 W - Sanyo
Mesin Pompa Air 150 W - Sanyo
Pompa Dragon Asli
Pompa Dragon Tegal
Pompa Kodok
Pompa Submersible kap. 150 liter/menit 3 kW
Pompa Zet pump 250 W - Sanyo
Pompa Zet pump 450 W - Sanyo

unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit

220,000,000.00
16,450,000.00
4,961,000.00
1,095,100.00
1,891,300.00
836,400.00
274,900.00
191,300.00
34,267,200.00
5,808,000.00
9,438,000.00

T
761
762
763
764
765
766

BAHAN PENAMPUNG AIR


Tangki Air Fiber Glass 0.5 m3 ( Excel )
Tangki Air Fiber Glass 1 m3 ( Excel )
Tangki Air Fiber Glass 2 m3 ( Excel )
Bak KM Fiber 60 x 60
Bak Taraso WC 40 x 40
Bak KM Taraso 60 x 60

bh
bh
bh
bh
bh
bh

716,800.00
1,134,400.00
2,268,100.00
227,300.00
48,000.00
143,500.00

1 watt
m
m
m
m
ttk
m
spl
spl
spl
1 watt
unit
unit
ttk

900.00
28,400.00
25,500.00
32,000.00
28,400.00
268,700.00
1,400.00
108,900.00
238,200.00
82,700.00
600.00
7,260,000.00
798,600.00
399,300.00

U
767
768
769
770
771
772
773
774
775
776
777
778
779
780

BIAYA QUALITY CONTROL, IZIN-IZIN, PENGUKURAN


BIASA DAN BIAYA PENYAMBUNGAN
Penyambungan Listrik PLN
IMB Bertingkat Rata-rata (Rumah / Kantor)
IMB Tidak Bertingkat Rata-rata (Rumah / Kantor)
IMB Bertingkat Rata-rata (Usaha)
IMB Tidak Bertingkat Rata-rata (Usaha)
Sondir Rata-rata
Pengukuran Site + Patok
Biaya Test Jalan (quqlity control)
Biaya Test 1 macam Beton
Biaya pengujian bahan agregat
bIaya pengujian listrik + ganbar + travfo dan adm
Ijin Sumur Artesis Lengkap
Penyambungan PDAM untuk Rumah
Geolistrik

V
781
782
783
784
785
786
787
788
789
790
791
792
793
794

ALAT TUKANG.
Alat-alat bantu
Cangkul
Karbit
Kawat Las Listrik
Linggis
Palu 0,5 kg
Pengki
Rool Meter 30 meter ( Bahan Plastik )
Rool Meter 5 meter ( Bahan Besi )
Sekop
Selang Plastik untuk Water Pas dia. 0.5 cm
Singkup
Tali Rami
Water Pas Alumuniumm 60 cm

bh
bh
kg
kg
bh
bh
bh
bh
bh
bh
bh
bh
rool
bh

38,500.00
27,500.00
5,900.00
10,700.00
27,500.00
19,300.00
13,800.00
82,500.00
16,500.00
27,500.00
1,600.00
27,500.00
7,300.00
33,000.00

STANDARD RATA - RATA SEWA ALAT BESAR , ALAT MEKANIK


TRUK, KENDARAAN RODA 4 & LAINNYA
Alat Penggetar Beton 4 HP
Asphal Finisher
Asphal Mixing Plant
Buldozer 110 HP
Compresor 210 m3
Compresor Blower
Compresor Jack Hammer
Crane 10 - 15 ton
Dump Truck 5 Ton

/jam
/jam
/jam
/jam
/jam
/jam
/jam
/jam
/jam

36,900.00
112,200.00
770,000.00
198,000.00
89,700.00
89,700.00
89,700.00
110,000.00
104,500.00

W
795
796
797
798
799
800
801
802
803

Harsat Bahan Hal 13

1
804
805
806
807
808
809
810
811
812
813
814
815
816
817
818
819
820
821
822
823
824
825
826
827
828
829
830
831
832
833
834

X
1
2
3
4
5
6
7
8
9
10
11
12
13
14

Exavator Backhoe 5 jam/hari


Jack Hammer
Mesin Gilas 3 roda 8 Ton s/d 12 ton
Mesin Gilas bergetar 6 Ton s/d 7 ton
Mesin Gilas bergetar 1 Ton
Mesin Gilas roda karet 8 - 15 Ton
Mesin Gilas Tandem 8 - 15 Ton
Mesin Penyaring 80 HP
Mesin Penyemprot aspal 200 ltr
Mesin Pompa Air 3 "
Motor Grader 100 HP
Pemecah 30 t/j 185 HP
Pengaduk Beton 125 ltr/6 HP
Pengaduk Beton 250 ltr/10 HP
Pengaduk Beton 500 ltr/20 HP
Plat Bed Truck
Pompa Air (50 mm) 30 m3/jam
Stamper 4 HP
Truck bak terbuka
Truck Fuso
Truck Tangki Air 115 HP
Vibro Roller
Whell Loader 115 HP
Pheumatic Drill Hammer
Ship Foot Roller
Grass Cutter
Mobilisasi dan Demobilisasi
Mesin Gilas 3 Roda di Wilayah Kota Bogor
Mobilisasi dan Demobilisasi
Back Hoe Roda Karet di Wilayah Kota Bogor
Mobilisasi dan Demobilisasi
Excavator di Wilayah Kota Bogor
Mobilisasi dan Demobilisasi
Dozer di Wilayah Kota Bogor
Mobilisasi dan Demobilisasi Alat Berat
Hotmix di wilayah Kota Bogor terdiri atas :
Penyediaan Acces Road Alat - alat Berat dari AMP ke Lokasi Proyek
yang berada di wilayah Kota Bogor
Penyediaan Acces Road Dump Truck Hotmix dari AMP ke Lokasi Proyek
Pengiriman Alat Asphalt Finisher / Mesin Penghampar Hotmix
Pengiriman Alat Mesin Gilas Roda Karet / Tire Roller
Pengiriman Alat Mesin Gilas Tandem / Tandem Roller
Pengiriman Alat Mesin Penyemprot Aspal
Pengiriman Alat Mesin Compressor
Demobilisasi Alat Berat setelah pekerjaan Overlay
Pemberesan kembali Areal lapangan setelah pekerjaan Overlay
Pengambilan Contoh Uji Ketebalan Hotmix (Core Drill)
Test Laboratorium Ekstraksi Kadar Mutu Aspal Hotmix
BAHAN BAKAR DAN PELUMAS
Minyak Tanah
Kayu Bakar Dari Kayu Karet
Bahan Bakar Residu
Minyak Solar
Bensin Premium
Plus Oil
Oli Mesran 40 SAE
Elpiji / botol
Asitilin / botol
Angin ( 02 ) / botol
Kawat Las Listrik
Karbit
Kapur Bakar
Minyak Pelumas Oli

/jam
/jam
/jam
/jam
/jam
/jam
/jam
/jam
/jam
/jam
/jam
/jam
/jam
/jam
/jam
/jam
/jam
/jam
/jam
/jam
/jam
/jam
/jam
/jam
/jam
/jam
/paket

275,000.00
89,700.00
93,500.00
93,500.00
71,500.00
93,500.00
104,500.00
220,000.00
104,500.00
36,900.00
192,500.00
385,000.00
36,900.00
49,500.00
69,300.00
104,500.00
36,900.00
31,900.00
104,500.00
104,500.00
93,500.00
93,500.00
104,500.00
99,000.00
176,000.00
19,300.00
632,500.00

/paket

1,320,000.00

/paket

5,500,000.00

/paket

5,500,000.00

/paket

10,450,000.00

lt
m
lt
lt
lt
lt
lt
15 kg
15.1 kg
btl
kg
kg
m
lt

3,300.00
66,000.00
2,200.00
5,500.00
6,000.00
1,500.00
36,300.00
79,900.00
94,400.00
54,300.00
18,200.00
8,800.00
1,102,100.00
36,300.00

Bogor,
Nopember 2012
Kepala Dinas Pengawasan Bangunan dan Permukiman
Kota Bogor

Ir. Hj. Erna Hernawati, MM


Pembina Tk.I
NIP. 19621208 199202 2 004

Harsat Bahan Hal 14

ANALISA HARGA
SATUAN PEKERJAAN

ANALISA HARGA SATUAN PEKERJAAN


KOTA BOGOR
TAHUN ANGGARAN 2013
NO.
1
A
A001

KEBUTUHAN
2
PEKERJAAN PERSIAPAN
Mengukur kembali 1 m2 Site
Tenaga kerja

A002

Tenaga kerja
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Membuat 1 m2 Los kerja / Gudang

Bahan

A004

Tenaga kerja
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Membuat 1 m2 Kantor Direksi

Bahan

A005

Tenaga kerja
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Membuat 1 m2 Papan Nama Proyek

Bahan

A006

A 007

A 008

A 009

INDEKS
4
5

SAT
6

JUMLAH
7=(4x6)

Tukang Batu
Pekerja
Peralatan

0.010
0.020
0.500

org
org
lot

55,000.00
40,000.00
1,350.00

550.00
800.00
675.00
2,025.00
202.50
2,227.50
2,220.00

Kayu Borneo Super


Paku 5 - 7
Ongkos Pasang

0.010
0.038
0.155

m
kg
ls

3,004,400.00
10,000.00
30,424.00

30,044.00
380.00
4,715.72
35,139.72
3,513.97
38,653.69
38,650.00

Kayu Borneo Super


Paku 5 - 7
Seng Glb BJLS 30
Triplex 3 mm
PC (50 kg)
Peralatan
Ongkos Pasang

0.100
0.250
1.100
0.500
0.100
0.025
0.125

m
kg
lbr
lbr
zak
lot
ls

3,004,400.00
10,000.00
46,600.00
45,000.00
63,000.00
383,000.00
392,575.00

300,440.00
2,500.00
51,260.00
22,500.00
6,300.00
9,575.00
49,071.88
441,646.88
44,164.69
485,811.56
485,810.00

0.100
0.250
1.100
0.500
0.100
0.250
70.000
0.020
0.150

m
kg
lbr
lbr
zak
m
bh
lot
ls

3,004,400.00
10,000.00
61,000.00
45,000.00
63,000.00
180,000.00
500.00
478,840.00
488,416.80

300,440.00
2,500.00
67,100.00
22,500.00
6,300.00
45,000.00
35,000.00
9,576.80
73,262.52
561,679.32
56,167.93
617,847.25
617,840.00

0.065
1.000
0.250
1.000
0.125
0.125

m
m
kg
kg
ls
ls

3,004,400.00
61,000.00
10,000.00
47,200.00
305,986.00
344,234.25

195,286.00
61,000.00
2,500.00
47,200.00
38,248.25
43,029.28
387,263.53
38,726.35
425,989.88
425,980.00

1.430
0.036
0.200
1.800
0.200

lbr
m
kg
m
ls

61,000.00
3,004,400.00
10,000.00
47,200.00
282,348.40

87,230.00
108,158.40
2,000.00
84,960.00
56,469.68
338,818.08
33,881.81
372,699.89
372,690.00

0.2000
0.0090

org
org

40,000.00
80,000.00

8,000.00
720.00
8,720.00
872.00
9,592.00
9,590.00

0.1000
0.0090

org
org

40,000.00
80,000.00

4,000.00
720.00
4,720.00
472.00
5,192.00
5,190.00

0.0500
0.0250

org
org

40,000.00
80,000.00

2,000.00
2,000.00
4,000.00
400.00
4,400.00
4,400.00

Jumlah
Biaya tak terduga dan Keuntungan
Jumlah
Dibulatkan
Memasang 1 m1 bouplank
Bahan

A003

Kayu Borneo Super


Paku 5 - 7
Seng Glb BJLS 28 ( 80 x 180 cm )
Triplex 3 mm
PC (50 kg)
Pasir pasang
Bata merah
Peralatan
Ongkos Pasang

Kayu Borneo Super


Triplex 4 mm
Paku 5 - 7
Cat Minyak
Penulisan
Ongkos Pasang

Tenaga kerja
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Mengerjakan 1 m2 Pagar Pengaman Proyek
Seng Glb BJLS 28 ( 80 x 180 )
Kayu Borneo Super
Bahan
Paku 5 - 7
Pengecatan cat minyak 2x bag. luar
Tenaga kerja
Ongkos Pasang
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Membongkar 1 m2 Dinding bata
(Jika bongkaran di pakai lagi )
Pekerja
Tenaga kerja
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Membongkar 1 m2 Dinding bata
(Jika bongkaran tidak di pakai lagi )
Pekerja
Tenaga kerja
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Membongkar 1 m2 Plesteran dinding
Pekerja
Tenaga kerja
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan

Analisa SNI Hal 15

1
A 010

2
Membongkar 1 m2 Genteng/Sirap
(Jika bongkaran di pakai lagi )
Tenaga kerja

A 011

A 013

A 014

A 015

A 016

A 017

A 018

7=(4x6)

0.0400
0.0100

org
org

40,000.00
80,000.00

1,600.00
800.00
2,400.00
240.00
2,640.00
2,640.00

Pekerja
Mandor

0.0200
0.0100

org
org

40,000.00
80,000.00

800.00
800.00
1,600.00
160.00
1,760.00
1,760.00

4.0000
6.0000
0.6000
0.2000

org
org
org
org

40,000.00
55,000.00
70,000.00
80,000.00

160,000.00
330,000.00
42,000.00
16,000.00
548,000.00
54,800.00
602,800.00
602,800.00

4.0000
3.0000
0.2000

org
org
org

40,000.00
55,000.00
80,000.00

160,000.00
165,000.00
16,000.00
341,000.00
34,100.00
375,100.00
375,100.00

0.1000
0.2500
0.0025
0.0050

org
org
org
org

40,000.00
55,000.00
70,000.00
80,000.00

4,000.00
13,750.00
175.00
400.00
18,325.00
1,832.50
20,157.50
20,150.00

0.1250
0.0050

org
org

40,000.00
80,000.00

5,000.00
400.00
5,400.00
540.00
5,940.00
5,940.00

0.2000
0.0500
0.0050
0.0100

org
org
org
org

40,000.00
55,000.00
70,000.00
80,000.00

8,000.00
2,750.00
350.00
800.00
11,900.00
1,190.00
13,090.00
13,090.00

0.1000
0.0250
0.0025
0.0050

org
org
org
org

40,000.00
55,000.00
70,000.00
80,000.00

4,000.00
1,375.00
175.00
400.00
5,950.00
595.00
6,545.00
6,540.00

Pekerja
Mandor

6.6670
0.3330

org
org

40,000.00
80,000.00

266,680.00
26,640.00
293,320.00
29,332.00
322,652.00
322,650.00

Pekerja
Mandor

0.1000
0.0050

org
org

40,000.00
80,000.00

4,000.00
400.00
4,400.00
440.00
4,840.00
4,840.00

0.750
0.025

OH
OH

40,000.00
80,000.00

30,000.00
2,000.00
32,000.00
3,200.00
35,200.00
35,200.00

Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Membersihkan 1 m2 lokasi kegiatan
Tenaga kerja

B
B001

Pekerja
Mandor

Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Membongkar 1 m3 Kuda-kuda, Gording/Balok
(Jika bongkaran di pakai lagi )
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Membongkar 1 m3 Kuda-kuda, Gording/Balok
(Jika bongkaran tidak di pakai lagi )
Pekerja
Tenaga kerja
Tukang batu
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Membongkar 1 m2 Plafond
(Jika bongkaran di pakai lagi )
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Membongkar 1 m2 Plafond
(Jika bongkaran tidak di pakai lagi )
Pekerja
Tenaga kerja
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Membongkar 1 m2 Rangka Atap/Reng kaso
(Jika bongkaran di pakai lagi )
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Membongkar 1 m2 Rangka Atap/Reng kaso
(Jika bongkaran tidak di pakai lagi )
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Membongkar 1 m3 Beton bertulang
Tenaga kerja

A 018

Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Membongkar 1 m2 Genteng/Sirap
(Jika bongkaran tidak di pakai lagi )
Tenaga kerja

A 012

Jumlah
Overhead + Profit
Jumlah
Dibulatkan
PEKERJAAN TANAH (SNI 2835:2008)
Menggali 1 m3 tanah biasa sedalam 1 meter
Pekerja
Tenaga kerja
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan

Analisa SNI Hal 16

1
B002

B003

B004

B005

B006

B007

B008

B009

B010

B011

B012

B013

B014

2
3
Menggali 1 m3 tanah biasa sedalam 2 meter
Pekerja
Tenaga kerja
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Menggali 1 m3 tanah biasa sedalam 3 meter
Pekerja
Tenaga kerja
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Menggali 1 m3 tanah biasa sedalam 4 meter
Pekerja
Tenaga kerja
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Menggali 1 m3 tanah biasa sedalam 5 meter
Pekerja
Tenaga kerja
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Menggali 1 m3 tanah keras sedalam 1 meter
Pekerja
Tenaga kerja
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Menggali 1 m3 tanah cadas sedalam 1 meter
Pekerja
Tenaga kerja
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Menggali 1 m3 tanah lumpur sedalam 1 meter
Pekerja
Tenaga kerja
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Mengerjakan 1 m2 stripping tebing setinggi 1 meter
Pekerja
Tenaga kerja
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Membuang 1 m3 tanah sejauh 15 meter
Pekerja
Tenaga kerja
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Mengurug kembali 1 m3 galian
Pekerja
Tenaga kerja
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memadatkan 1 m3 tanah (per 20 cm)
Pekerja
Tenaga kerja
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Mengurug 1 m3 pasir urug
Bahan
Pasir Urug
Pekerja
Tenaga kerja
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m3 Lapisan pudel campuran 1 KP : 3 PP : 7 TL untuk stabilisasi tanah
Kapur Padam
Bahan
Pasir Pasang
Tanah liat
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan

7=(4x6)

0.900
0.045

OH
OH

40,000.00
80,000.00

36,000.00
3,600.00
39,600.00
3,960.00
43,560.00
43,560.00

1.050
0.067

OH
OH

40,000.00
80,000.00

42,000.00
5,360.00
47,360.00
4,736.00
52,096.00
52,090.00

1.200
0.089

OH
OH

40,000.00
80,000.00

48,000.00
7,120.00
55,120.00
5,512.00
60,632.00
60,630.00

1.350
0.105

OH
OH

40,000.00
80,000.00

54,000.00
8,400.00
62,400.00
6,240.00
68,640.00
68,640.00

1.000
0.032

OH
OH

40,000.00
80,000.00

40,000.00
2,560.00
42,560.00
4,256.00
46,816.00
46,810.00

1.500
0.060

OH
OH

40,000.00
80,000.00

60,000.00
4,800.00
64,800.00
6,480.00
71,280.00
71,280.00

1.200
0.045

OH
OH

40,000.00
80,000.00

48,000.00
3,600.00
51,600.00
5,160.00
56,760.00
56,760.00

0.050
0.005

OH
OH

40,000.00
80,000.00

2,000.00
400.00
2,400.00
240.00
2,640.00
2,640.00

0.330
0.010

OH
OH

40,000.00
80,000.00

13,200.00
800.00
14,000.00
1,400.00
15,400.00
15,400.00

0.250
0.008

OH
OH

40,000.00
80,000.00

10,000.00
666.67
10,666.67
1,066.67
11,733.33
11,730.00

0.500
0.050

OH
OH

40,000.00
80,000.00

20,000.00
4,000.00
24,000.00
2,400.00
26,400.00
26,400.00

1.200
0.300
0.010

m
OH
OH

155,000.00
40,000.00
80,000.00

186,000.00
12,000.00
800.00
198,800.00
19,880.00
218,680.00
218,680.00

0.135
0.400
0.948
0.800
0.400
0.040
0.080

m
m
m
OH
OH
OH
OH

330,000.00
180,000.00
23,000.00
40,000.00
55,000.00
70,000.00
80,000.00

44,550.00
72,000.00
21,804.00
32,000.00
22,000.00
2,800.00
6,400.00
201,554.00
20,155.40
221,709.40
221,700.00
Analisa SNI Hal 17

1
B015

B016

B017

B018

B019

B020

B021

C
C001

C002

2
3
Memasang 1 m3 Lapisan pudel campuran 1 KP : 5 TL untuk stabilisasi tanah
Kapur Padam
Bahan
Tanah liat
Pekerja
Tukangk batu
Tenaga kerja
Kep.tukang batu
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 lapisan ijuk tebal 10 cm , untuk bidang resapan
Bahan
Injuk
Pekerja
Tenaga kerja
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Mengurug 1 m3 sirtu padat untuk peninggian lantai bangunan
Bahan
Sirtu ( Membeli Sirtu )
Tukang Gali
Tenaga kerja
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Membuat 1 m2 jalan sementara tebal 20 cm
Batu Belah
Bahan
Kerikil
Pasir Pasang
Pekerja
Tenaga kerja
Mandor
Alat Bantu ( Pek. Pemadatan Tanah 1 m2 )
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Menggali 1 m3 tanah untuk sumuran maksimum 10 m
Pekerja
Tenaga kerja
Mandor
Alat Bantu
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Mengurug 1 m3 tanah pakai alat besar, tanah dari luar dipadatkan (5000m3)
Pek. Galian ( 10 org ) 50 %
Pek. Galian tanah berbatu ( 10 org ) 50 %
Pek. Grading Plant ( 10 org ) 50 %
Beli Tanah + Angkut Max 10 Km
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1m2 cerucuk dolken
Bahan
Dolken dia 5 -7 cm
Pekerja
Tenaga kerja
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
PEKERJAAN PONDASI (SNI 2836:2008)
Memasang 1 m3 pondasi batu belah, campuran 1 PC : 3 PP
Batu belah 15 cm/20cm
Bahan
Portland Cement
Pasir Pasang
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m3 pondasi batu belah, campuran 1 PC : 4 PP
Batu belah 15 cm/20cm
Bahan
Portland Cement
Pasir Pasang
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan

7=(4x6)

0.248
1.240
0.800
0.400
0.040
0.080

m
m
OH
OH
OH
OH

330,000.00
23,000.00
40,000.00
55,000.00
70,000.00
80,000.00

81,840.00
28,520.00
32,000.00
22,000.00
2,800.00
6,400.00
173,560.00
17,356.00
190,916.00
190,910.00

6.000
0.150
0.015

kg
org
org

5,500.00
40,000.00
80,000.00

33,000.00
6,000.00
1,200.00
40,200.00
4,020.00
44,220.00
44,220.00

1.200
0.250
0.025

m
org
org

130,000.00
55,000.00
80,000.00

156,000.00
13,750.00
2,000.00
171,750.00
17,175.00
188,925.00
188,920.00

0.250
0.030
0.050
0.500
0.100
0.060

m
m
m
org
org
lot

140,000.00
130,000.00
180,000.00
40,000.00
80,000.00
75,900.00

35,000.00
3,900.00
9,000.00
20,000.00
8,000.00
4,554.00
80,454.00
8,045.40
88,499.40
88,490.00

1.150
0.025
0.200

org
org
lot

40,000.00
80,000.00
48,000.00

46,000.00
2,000.00
9,600.00
57,600.00
5,760.00
63,360.00
63,360.00

0.600
0.600
5.000
1.200

m
m
m
m

16,000.00
21,280.00
12,000.00
63,000.00

4,800.00
6,384.00
30,000.00
75,600.00
116,784.00
11,678.40
128,462.40
128,460.00

3.000
0.100
0.010

btg
org
org

14,600.00
40,000.00
80,000.00

43,800.00
4,000.00
800.00
48,600.00
4,860.00
53,460.00
53,460.00

1.200
202.000
0.485
1.500
0.750
0.075
0.075

m
kg
m
OH
OH
OH
OH

140,000.00
1,260.00
180,000.00
40,000.00
55,000.00
70,000.00
80,000.00

168,000.00
254,520.00
87,300.00
60,000.00
41,250.00
5,250.00
6,000.00
622,320.00
62,232.00
684,552.00
684,550.00

1.200
163.000
0.520
1.500
0.750
0.075
0.075

m
kg
m
OH
OH
OH
OH

140,000.00
1,260.00
180,000.00
40,000.00
55,000.00
70,000.00
80,000.00

168,000.00
205,380.00
93,600.00
60,000.00
41,250.00
5,250.00
6,000.00
579,480.00
57,948.00
637,428.00
637,420.00

Analisa SNI Hal 18

1
C003

C004

C005

C006

C007

C008

C009

2
3
Memasang 1 m3 pondasi batu belah, campuran 1 PC : 5 PP
Batu belah 15 cm/20cm
Bahan
Portland Cement
Pasir Pasang
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m3 pondasi batu belah, campuran 1 PC : 6 PP
Batu belah 15 cm/20cm
Bahan
Portland Cement
Pasir Pasang
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m3 pondasi batu belah, campuran 1 PC : 8 PP
Batu belah 15 cm/20cm
Bahan
Portland Cement
Pasir Pasang
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m3 pondasi batu belah, campuran 1 KP : 1 SM : 2 PP
Batu belah 15 cm/20cm
Kapur Padam
Bahan
Semen Merah
Pasir Pasang
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m3 pondasi batu belah, campuran 1 PC : 3 KP : 10 PP
Batu belah 15 cm/20cm
Portland Cement
Bahan
Kapur Padam
Pasir Pasang
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m3 pondasi batu belah, campuran PC : 1 KP : 4 PP
Batu belah 15 cm/20cm
Portland Cement
Bahan
Kapur Padam
Pasir Pasang
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m3 batu kosong (anstamping)
Batu belah 15 cm/20cm
Bahan
Pasir Urug
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan

7=(4x6)

1.200
136.000
0.544
1.500
0.750
0.075
0.075

m
kg
m
OH
OH
OH
OH

140,000.00
1,260.00
180,000.00
40,000.00
55,000.00
70,000.00
80,000.00

168,000.00
171,360.00
97,920.00
60,000.00
41,250.00
5,250.00
6,000.00
549,780.00
54,978.00
604,758.00
604,750.00

1.200
117.000
0.561
1.500
0.750
0.075
0.075

m
kg
m
OH
OH
OH
OH

140,000.00
1,260.00
180,000.00
40,000.00
55,000.00
70,000.00
80,000.00

168,000.00
147,420.00
100,980.00
60,000.00
41,250.00
5,250.00
6,000.00
528,900.00
52,890.00
581,790.00
581,790.00

1.200
91.000
0.584
1.500
0.750
0.075
0.075

m
kg
m
OH
OH
OH
OH

140,000.00
1,260.00
180,000.00
40,000.00
55,000.00
70,000.00
80,000.00

168,000.00
114,660.00
105,120.00
60,000.00
41,250.00
5,250.00
6,000.00
500,280.00
50,028.00
550,308.00
550,300.00

1.208
0.170
0.170
0.340
1.500
0.750
0.075
0.075

m
m
m
m
OH
OH
OH
OH

140,000.00
330,000.00
130,000.00
180,000.00
40,000.00
55,000.00
70,000.00
80,000.00

169,120.00
56,100.00
22,100.00
61,200.00
60,000.00
41,250.00
5,250.00
6,000.00
421,020.00
42,102.00
463,122.00
463,120.00

1.200
61.000
0.147
0.492
1.500
0.750
0.075
0.075

m
kg
m
m
OH
OH
OH
OH

140,000.00
1,260.00
330,000.00
180,000.00
40,000.00
55,000.00
70,000.00
80,000.00

168,000.00
76,860.00
48,510.00
88,560.00
60,000.00
41,250.00
5,250.00
6,000.00
494,430.00
49,443.00
543,873.00
543,870.00

1.200
41.000
0.131
0.523
1.500
0.750
0.075
0.075

m
kg
m
m
OH
OH
OH
OH

140,000.00
1,260.00
330,000.00
180,000.00
40,000.00
55,000.00
70,000.00
80,000.00

168,000.00
51,660.00
43,230.00
94,140.00
60,000.00
41,250.00
5,250.00
6,000.00
469,530.00
46,953.00
516,483.00
516,480.00

1.200
0.432
0.780
0.390
0.039
0.039

m
m
OH
OH
OH
OH

140,000.00
155,000.00
40,000.00
55,000.00
70,000.00
80,000.00

168,000.00
66,960.00
31,200.00
21,450.00
2,730.00
3,120.00
293,460.00
29,346.00
322,806.00
322,800.00

Analisa SNI Hal 19

1
C010

C011

C012

C013

C014

D
D001

D002

2
3
4
Memasang 1 m3 pondasi siklop, 60% beton campuran 1 PC : 2 PB : 3 KR dan 40% batu belah
Batu belah 15 cm/20cm
0.480
Portland Cement
194.000
Pasir Beton
0.312
Bahan
Kerikil (Batu Pecah 1/2)
0.468
Besi Beton
126.000
Kawat Beton
1.800
Pekerja
0.340
Tukang batu
0.850
Tenaga kerja
Kepala tukang
0.085
Mandor
0.170
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m3 pondasi sumuran, diameter 100 cm
Batu belah 15 cm/20cm
0.450
Portland Cement
194.000
Bahan
Pasir Beton
0.312
Kerikil (Batu Pecah 1/2)
0.468
Pekerja
2.400
Tukang batu
0.800
Tenaga kerja
Kepala tukang
0.080
Mandor
0.119
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m3 pondasi batu belah, campuran 1 PC : 4 PP, pakai muka batu + siaran
Batu belah 15 cm/20cm
1.500
Bahan
Portland Cement
163.000
Pasir Pasang
0.520
Pekerja
1.500
Tukang batu
0.750
Tenaga kerja
Kepala tukang
0.075
Mandor
0.075
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 batu tempel + siaran
Batu tempel
1.100
Bahan
Portland Cement
6.000
Pasir Pasang
0.031
Pekerja
0.187
Tukang batu
0.225
Tenaga kerja
Kepala tukang
0.037
Mandor
0.034
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m3 batu bronjong
Batu kali
1.200
Bahan
Kawat bronjong 3 mm
6.500
Pekerja
1.500
Tenaga kerja
Tukang batu
0.200
Mandor
0.020
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
PEKERJAAN BETON (SNI 7394:2008)
Membuat 1 m3 lantai kerja 1PC : 3 PS : 5 KR
PC (50 kg)
197.800
Bahan
Pasir beton
0.550
Split Pecah mesin 2/3
0.930
Pekerja
2.000
Tukang batu
0.500
Tenaga kerja
Kepala tukang
0.050
Mandor
0.010
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Membuat 1 m3 beton mutu fc = 7,4 MPa (K 100), slump (12 2) cm, w/c = 0,87
PC (50 kg)
247.00
Pasir beton
869.00
Bahan
Split Pecah mesin 2/3
999.00
Air
215.00
Pekerja
1.650
Tukang batu
0.275
Tenaga kerja
Kepala tukang
0.028
Mandor
0.083
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Bobot isi pasir = 1.400 kg/m3, Bobot isi kerikil = 1.350 kg/m3, Bukling factor pasir = 20 %

7=(4x6)

m
kg
m
m
kg
kg
OH
OH
OH
OH

140,000.00
1,260.00
185,000.00
230,000.00
11,000.00
10,700.00
40,000.00
55,000.00
70,000.00
80,000.00

67,200.00
244,440.00
57,720.00
107,640.00
1,386,000.00
19,260.00
13,600.00
46,750.00
5,950.00
13,600.00
1,962,160.00
196,216.00
2,158,376.00
2,158,370.00

m
kg
m
m
OH
OH
OH
OH

140,000.00
1,260.00
185,000.00
230,000.00
40,000.00
55,000.00
70,000.00
80,000.00

63,000.00
244,440.00
57,720.00
107,640.00
96,000.00
44,000.00
5,600.00
9,520.00
627,920.00
62,792.00
690,712.00
690,710.00

m
kg
m
OH
OH
OH
OH

140,000.00
1,260.00
180,000.00
40,000.00
55,000.00
70,000.00
80,000.00

210,000.00
205,380.00
93,600.00
60,000.00
41,250.00
5,250.00
6,000.00
621,480.00
62,148.00
683,628.00
683,620.00

m
kg
m
OH
OH
OH
OH

85,000.00
1,260.00
180,000.00
40,000.00
55,000.00
70,000.00
80,000.00

93,500.00
7,560.00
5,580.00
7,480.00
12,375.00
2,590.00
2,720.00
131,805.00
13,180.50
144,985.50
144,980.00

m
kg
OH
OH
OH

109,800.00
19,800.00
40,000.00
55,000.00
80,000.00

131,760.00
128,700.00
60,000.00
11,000.00
1,600.00
333,060.00
33,306.00
366,366.00
366,360.00

kg
m
m
HO
HO
HO
HO

1,260.00
185,000.00
178,500.00
40,000.00
55,000.00
70,000.00
80,000.00

249,228.00
101,750.00
166,005.00
80,000.00
27,500.00
3,500.00
800.00
628,783.00
62,878.30
691,661.30
691,660.00

kg
kg
kg
ltr
HO
HO
HO
HO

1,260.00
132.14
132.22
12.50
40,000.00
55,000.00
70,000.00
80,000.00

311,220.00
114,832.14
132,090.00
2,687.50
66,000.00
15,125.00
1,960.00
6,640.00
650,554.64
65,055.46
715,610.11
715,610.00

Analisa SNI Hal 20

1
D003

D004

D005

D006

D007

D008

D009

2
3
4
Membuat 1 m3 beton mutu fc = 9,8 MPa (K 125), slump (12 2) cm, w/c = 0,78
PC (50 kg)
276.00
Pasir beton
828.00
Bahan
Split Pecah mesin 2/3
1,012.00
Air
215.000
Pekerja
1.650
Tukang batu
0.275
Tenaga kerja
Kepala tukang
0.028
Mandor
0.083
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Membuat 1 m3 beton mutu fc = 12,2 MPa (K 150), slump (12 2) cm, w/c = 0,72
PC (50 kg)
299.00
Pasir beton
799.00
Bahan
Split Pecah mesin 2/3
1,017.00
Air
215.00
Pekerja
1.650
Tukang batu
0.275
Tenaga kerja
Kepala tukang
0.028
Mandor
0.083
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Membuat 1 m3 lantai kerja beton mutu fc = 7,4 MPa (K 100), slump (3-6) cm, w/c = 0,87
PC (50 kg)
230.00
Pasir beton
893.00
Bahan
Split Pecah mesin 2/3
1,017.00
Air
200.00
Pekerja
1.200
Tukang batu
0.200
Tenaga kerja
Kepala tukang
0.020
Mandor
0.060
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Membuat 1 m3 beton mutu fc = 14,5 MPa (K 175), slump (12 2) cm, w/c = 0,66
PC (50 kg)
326.00
Pasir beton
760.00
Bahan
Split Pecah mesin 2/3
1,029.00
Air
215.00
Pekerja
1.650
Tukang batu
0.275
Tenaga kerja
Kepala tukang
0.028
Mandor
0.083
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Membuat 1 m3 beton mutu fc = 16,9 MPa (K 200), slump (12 2) cm, w/c = 0,61
PC (50 kg)
352.00
Pasir beton
731.00
Bahan
Split Pecah mesin 2/3
1,031.00
Air
215.00
Pekerja
1.650
Tukang batu
0.275
Tenaga kerja
Kepala tukang
0.028
Mandor
0.083
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Membuat 1 m3 beton mutu fc = 19,3 MPa (K 225), slump (12 2) cm, w/c = 0,58
PC (50 kg)
371.00
Pasir beton
698.00
Bahan
Split Pecah mesin 2/3
1,047.00
Air
215.00
Pekerja
1.650
Tukang batu
0.275
Tenaga kerja
Kepala tukang
0.028
Mandor
0.083
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Membuat 1 m3 beton mutu fc = 21,7 MPa (K 250), slump (12 2) cm, w/c = 0,56
PC (50 kg)
384.00
Pasir beton
692.00
Bahan
Split Pecah mesin 2/3
1,039.00
Air
215.00
Pekerja
1.650
Tukang batu
0.275
Tenaga kerja
Kepala tukang
0.028
Mandor
0.083
Jumlah
Overhead + Profit
Jumlah
Dibulatkan

7=(4x6)

kg
kg
kg
ltr
HO
HO
HO
HO

1,260.00
132.14
132.22
12.50
40,000.00
55,000.00
70,000.00
80,000.00

347,760.00
109,414.29
133,808.89
2,687.50
66,000.00
15,125.00
1,960.00
6,640.00
683,395.67
68,339.57
751,735.24
751,730.00

kg
kg
kg
ltr
HO
HO
HO
HO

1,260.00
132.14
132.22
12.50
40,000.00
55,000.00
70,000.00
80,000.00

376,740.00
105,582.14
134,470.00
2,687.50
66,000.00
15,125.00
1,960.00
6,640.00
709,204.64
70,920.46
780,125.11
780,120.00

kg
kg
kg
ltr
HO
HO
HO
HO

1,260.00
132.14
132.22
12.50
40,000.00
55,000.00
70,000.00
80,000.00

289,800.00
118,003.57
134,470.00
2,500.00
48,000.00
11,000.00
1,400.00
4,800.00
609,973.57
60,997.36
670,970.93
670,970.00

kg
kg
kg
ltr
HO
HO
HO
HO

1,260.00
132.14
132.22
12.50
40,000.00
55,000.00
70,000.00
80,000.00

410,760.00
100,428.57
136,056.67
2,687.50
66,000.00
15,125.00
1,960.00
6,640.00
739,657.74
73,965.77
813,623.51
813,620.00

kg
kg
kg
ltr
HO
HO
HO
HO

1,260.00
132.14
132.22
12.50
40,000.00
55,000.00
70,000.00
80,000.00

443,520.00
96,596.43
136,321.11
2,687.50
66,000.00
15,125.00
1,960.00
6,640.00
768,850.04
76,885.00
845,735.04
845,730.00

kg
kg
kg
ltr
HO
HO
HO
HO

1,260.00
132.14
132.22
12.50
40,000.00
55,000.00
70,000.00
80,000.00

467,460.00
92,235.71
138,436.67
2,687.50
66,000.00
15,125.00
1,960.00
6,640.00
790,544.88
79,054.49
869,599.37
869,590.00

kg
kg
kg
ltr
HO
HO
HO
HO

1,260.00
132.14
132.22
12.50
40,000.00
55,000.00
70,000.00
80,000.00

483,840.00
91,442.86
137,378.89
2,687.50
66,000.00
15,125.00
1,960.00
6,640.00
805,074.25
80,507.42
885,581.67
885,580.00

Analisa SNI Hal 21

1
D010

D011

D012

D013

D014

D015

D016

D017

2
3
Membuat 1 m3 beton mutu fc = 24,0 MPa (K 275), slump (12 2) cm, w/c = 0,53
PC (50 kg)
Pasir beton
Bahan
Split Pecah mesin 2/3
Air
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Membuat 1 m3 beton mutu fc = 26,4 MPa (K 300), slump (12 2) cm, w/c = 0,52
PC (50 kg)
Pasir beton
Bahan
Split Pecah mesin 2/3
Air
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Membuat 1 m3 beton mutu fc = 28,8 MPa (K 325), slump (12 2) cm, w/c = 0,49
PC (50 kg)
Pasir beton
Bahan
Split Pecah mesin 2/3
Air
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Membuat 1 m3 beton mutu fc = 28,8 MPa (K 350), slump (12 2) cm, w/c = 0,49
PC (50 kg)
Pasir beton
Bahan
Split Pecah mesin 2/3
Air
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Membuat 1 m3 cor beton mutu K-175 (Ready Mix) Min. 6 m3 + slang
Bahan
Adukan K-175 Ready Mix
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Peralatan
Alat bantu Slab + selang
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Membuat 1 m3 cor beton mutu K-225 (Ready Mix) Min. 6 m3 + slang
Bahan
Adukan K-225 Ready Mix
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Peralatan
Alat bantu Slab + selang
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Membuat 1 m3 cor beton mutu K-250 (Ready Mix) Min. 6 m3 + slang
Bahan
Adukan K-250 Ready Mix
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Peralatan
Alat bantu Slab + selang
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Membuat 1 m3 cor beton mutu K-300 (Ready Mix) Min. 6 m3 + slang
Bahan
Adukan K-300 Ready Mix
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Peralatan
Alat bantu Slab + selang
Jumlah
Overhead + Profit
Jumlah
Dibulatkan

7=(4x6)

406.00
684.00
1,026.00
215.00
1.650
0.275
0.028
0.083

kg
kg
kg
ltr
HO
HO
HO
HO

1,260.00
132.14
132.22
12.50
40,000.00
55,000.00
70,000.00
80,000.00

511,560.00
90,385.71
135,660.00
2,687.50
66,000.00
15,125.00
1,960.00
6,640.00
830,018.21
83,001.82
913,020.04
913,020.00

413.00
681.00
1,021.00
215.00
1.650
0.275
0.028
0.083

kg
kg
kg
ltr
HO
HO
HO
HO

1,260.00
132.14
132.22
12.50
40,000.00
55,000.00
70,000.00
80,000.00

520,380.00
89,989.29
134,998.89
2,687.50
66,000.00
15,125.00
1,960.00
6,640.00
837,780.67
83,778.07
921,558.74
921,550.00

439.00
670.00
1,006.00
215.00
2.100
0.350
0.035
0.105

kg
kg
kg
ltr
HO
HO
HO
HO

1,260.00
132.14
132.22
12.50
40,000.00
55,000.00
70,000.00
80,000.00

553,140.00
88,535.71
133,015.56
2,687.50
84,000.00
19,250.00
2,450.00
8,400.00
891,478.77
89,147.88
980,626.65
980,620.00

448.00
667.00
1,000.00
215.00
2.100
0.350
0.035
0.105

kg
kg
kg
ltr
HO
HO
HO
HO

1,260.00
132.14
132.22
12.50
40,000.00
55,000.00
70,000.00
80,000.00

564,480.00
88,139.29
132,222.22
2,687.50
84,000.00
19,250.00
2,450.00
8,400.00
901,629.01
90,162.90
991,791.91
991,790.00

1.00
2.100
0.350
0.035
0.105
0.045

m3
HO
HO
HO
HO
lot

660,000.00
40,000.00
55,000.00
70,000.00
80,000.00
774,100.00

660,000.00
84,000.00
19,250.00
2,450.00
8,400.00
34,834.50
808,934.50
80,893.45
889,827.95
889,820.00

1.00
2.100
0.350
0.035
0.105
0.045

m3
HO
HO
HO
HO
lot

693,000.00
40,000.00
55,000.00
70,000.00
80,000.00
807,100.00

693,000.00
84,000.00
19,250.00
2,450.00
8,400.00
36,319.50
843,419.50
84,341.95
927,761.45
927,760.00

1.00
2.100
0.350
0.035
0.105
0.045

m3
HO
HO
HO
HO
lot

726,000.00
40,000.00
55,000.00
70,000.00
80,000.00
840,100.00

726,000.00
84,000.00
19,250.00
2,450.00
8,400.00
37,804.50
877,904.50
87,790.45
965,694.95
965,690.00

1.00
2.100
0.350
0.035
0.105
0.045

m3
HO
HO
HO
HO
lot

759,000.00
40,000.00
55,000.00
70,000.00
80,000.00
873,100.00

759,000.00
84,000.00
19,250.00
2,450.00
8,400.00
39,289.50
912,389.50
91,238.95
1,003,628.45
1,003,620.00

Analisa SNI Hal 22

1
D018

D019

D020

D021

D022

D023

D024

D025

2
3
Membuat 1 m3 cor beton mutu K-350 (Ready Mix) Min. 6 m3 + slang
Bahan
Adukan K-350 Ready Mix
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Peralatan
Alat bantu Slab + selang
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Membuat 1 m3 beton kedap air dengan strorox 100
PC (50 kg)
Pasir beton
Bahan
Split Pecah mesin 2/3
Storox-100
Air
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m PVC Waterstop lebar 150 mm
Bahan
Waterstop lebar 150 mm
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m PVC Waterstop lebar 200 mm
Bahan
Waterstop lebar 200 mm
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Membuat 1 m PVC Waterstop lebar 230 mm 320 mm
Bahan
Waterstop lebar 230 mm - 320 mm
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Pembesian 10 kg dengan besi polos atau besi ulir
Besi beton (polos/ulir)
Bahan
Kawat beton
Pekerja
Tukang besi
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 10 kg kabel presstressed polos/strands
Besi beton (polos/ulir)
Bahan
Kawat beton
Pekerja
Tukang besi
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 Kg jaring kawat baja/wire mesh
Jaring kawat baja dilas
Bahan
Kawat beton
Pekerja
Tukang besi
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan

7=(4x6)

1.00
2.100
0.350
0.035
0.105
0.045

m3
HO
HO
HO
HO
lot

792,000.00
40,000.00
55,000.00
70,000.00
80,000.00
906,100.00

792,000.00
84,000.00
19,250.00
2,450.00
8,400.00
40,774.50
946,874.50
94,687.45
1,041,561.95
1,041,560.00

400.00
0.480
0.800
1.200
210.00
2.100
0.350
0.035
0.105

kg
m
m
kg
ltr
HO
HO
HO
HO

1,260.00
185,000.00
178,500.00
25,000.00
12.50
40,000.00
55,000.00
70,000.00
80,000.00

504,000.00
88,800.00
142,800.00
30,000.00
2,625.00
84,000.00
19,250.00
2,450.00
8,400.00
882,325.00
88,232.50
970,557.50
970,550.00

1.050
0.060
0.030
0.003
0.003

m'
HO
HO
HO
HO

109,816.67
40,000.00
55,000.00
70,000.00
80,000.00

115,307.50
2,400.00
1,650.00
210.00
240.00
119,807.50
11,980.75
131,788.25
131,780.00

1.050
0.070
0.035
0.004
0.004

m'
HO
HO
HO
HO

203,650.00
40,000.00
55,000.00
70,000.00
80,000.00

213,832.50
2,800.00
1,925.00
280.00
320.00
219,157.50
21,915.75
241,073.25
241,070.00

1.050
0.080
0.040
0.004
0.004

m'
HO
HO
HO
HO

313,466.67
40,000.00
55,000.00
70,000.00
80,000.00

329,140.00
3,200.00
2,200.00
280.00
320.00
335,140.00
33,514.00
368,654.00
368,650.00

10.500
0.150
0.070
0.070
0.007
0.004

kg
kg
HO
HO
HO
HO

11,000.00
10,700.00
40,000.00
55,000.00
70,000.00
80,000.00

115,500.00
1,605.00
2,800.00
3,850.00
490.00
320.00
124,565.00
12,456.50
137,021.50
137,020.00

10.500
0.100
0.050
0.050
0.005
0.003

kg
kg
HO
HO
HO
HO

11,000.00
10,700.00
40,000.00
55,000.00
70,000.00
80,000.00

115,500.00
1,070.00
2,000.00
2,750.00
350.00
240.00
121,910.00
12,191.00
134,101.00
134,100.00

1.020
0.050
0.025
0.025
0.002
0.001

kg
kg
HO
HO
HO
HO

35,300.00
10,700.00
40,000.00
55,000.00
70,000.00
80,000.00

36,006.00
535.00
1,000.00
1,375.00
140.00
80.00
39,136.00
3,913.60
43,049.60
43,040.00

Analisa SNI Hal 23

1
D026

D027

D028

D029

D030

D031

2
3
Memasang 1 m2 bekisting untuk pondasi
Kayu kelas III
Bahan
Paku 5-10 cm
Minyak bekisting
Pekerja
Tukang kayu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 bekisting untuk sloof
Kayu kelas III
Bahan
Paku 5-10 cm
Minyak bekisting
Pekerja
Tukang kayu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 bekisting untuk kolom
Kayu kelas III
Paku 5-10 cm
Minyak bekisting
Bahan
Balok kayu kelas II
Plywood tebal 9 mm
Dolken kayu galam (8-10 cm) pj. 4 m
Pekerja
Tukang kayu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 bekisting untuk balok
Kayu kelas III
Paku 5-12 cm
Minyak bekisting
Bahan
Balok kayu kelas II
Plywood tebal 9 mm
Dolken kayu galam (8-10 cm) pj. 4 m
Pekerja
Tukang kayu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 bekisting untuk plat lantai
Kayu kelas III
Paku 5-12 cm
Minyak bekisting
Bahan
Balok kayu kelas II
Plywood tebal 9 mm
Dolken kayu galam (8-10 cm) pj. 4 m
Pekerja
Tukang kayu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 bekisting untuk dinding
Kayu kelas III
Paku 5-12 cm
Minyak bekisting
Bahan
Balok kayu kelas II
Plywood tebal 9 mm
Dolken kayu galam (8-10 cm) pj. 4 m
Formite/penjaga jarak bekisting/spacer
Pekerja
Tukang kayu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan

7=(4x6)

0.040
0.300
0.100
0.520
0.260
0.026
0.026

m
kg
ltr
HO
HO
HO
HO

2,400,000.00
10,000.00
36,300.00
40,000.00
55,000.00
70,000.00
80,000.00

96,000.00
3,000.00
3,630.00
20,800.00
14,300.00
1,820.00
2,080.00
141,630.00
14,163.00
155,793.00
155,790.00

0.045
0.300
0.100
0.520
0.260
0.026
0.026

m
kg
ltr
HO
HO
HO
HO

2,400,000.00
10,000.00
36,300.00
40,000.00
55,000.00
70,000.00
80,000.00

108,000.00
3,000.00
3,630.00
20,800.00
14,300.00
1,820.00
2,080.00
42,630.00
196,260.00
238,890.00
238,890.00

0.040
0.400
0.200
0.015
0.350
2.000
0.660
0.330
0.033
0.033

m
kg
ltr
m
lbr
bt
HO
HO
HO
HO

2,400,000.00
10,000.00
36,300.00
3,004,400.00
150,700.00
15,400.00
40,000.00
55,000.00
70,000.00
80,000.00

96,000.00
4,000.00
7,260.00
45,066.00
52,745.00
30,800.00
26,400.00
18,150.00
2,310.00
2,640.00
285,371.00
28,537.10
313,908.10
313,900.00

0.040
0.400
0.200
0.018
0.350
2.000
0.660
0.330
0.033
0.033

m
kg
ltr
m
lbr
bt
HO
HO
HO
HO

2,400,000.00
10,000.00
36,300.00
3,004,400.00
150,700.00
15,400.00
40,000.00
55,000.00
70,000.00
80,000.00

96,000.00
4,000.00
7,260.00
54,079.20
52,745.00
30,800.00
26,400.00
18,150.00
2,310.00
2,640.00
294,384.20
29,438.42
323,822.62
323,820.00

0.040
0.400
0.200
0.015
0.350
6.000
0.660
0.330
0.033
0.033

m
kg
ltr
m
lbr
bt
HO
HO
HO
HO

2,400,000.00
10,000.00
36,300.00
3,004,400.00
150,700.00
15,400.00
40,000.00
55,000.00
70,000.00
80,000.00

96,000.00
4,000.00
7,260.00
45,066.00
52,745.00
92,400.00
26,400.00
18,150.00
2,310.00
2,640.00
346,971.00
34,697.10
381,668.10
381,660.00

0.040
0.400
0.200
0.020
0.350
3.000
4.000
0.660
0.330
0.033
0.033

m
kg
ltr
m
lbr
bt
bh
HO
HO
HO
HO

2,400,000.00
10,000.00
36,300.00
3,004,400.00
150,700.00
15,400.00
5,000.00
40,000.00
55,000.00
70,000.00
80,000.00

96,000.00
4,000.00
7,260.00
60,088.00
52,745.00
46,200.00
20,000.00
26,400.00
18,150.00
2,310.00
2,640.00
335,793.00
33,579.30
369,372.30
369,370.00

Analisa SNI Hal 24

1
D032

2
Memasang 1 m2 bekisting untuk tangga

Bahan

Tenaga kerja

D033

D034

D035

D036

3
Kayu kelas III
Paku 5-12 cm
Minyak bekisting
Balok kayu kelas II
Plywood tebal 9 mm
Dolken kayu galam (8-10 cm) pj. 4 m
Pekerja
Tukang kayu
Kepala tukang
Mandor

Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 jembatan untuk pengecoran beton
Kayu kelas III
Bahan
Paku 5-12 cm
Dolken kayu galam (8-10 cm) pj. 4 m
Pekerja
Tukang kayu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Membuat 1 m3 pondasi beton bertulang (150 kg besi + bekisting)
Kayu kelas III
Paku 5-12 cm
Minyak bekisting
Besi beton polos
Bahan
Kawat beton
Portland Cement
Pasir Beton
Split Pecah mesin 2/3
Pekerja
Tukang batu
Tukang kayu
Tenaga kerja
Tukang besi
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Membuat 1 m3 sloof beton bertulang (200 kg besi + bekisting)
Kayu kelas III
Paku 5-12 cm
Minyak bekisting
Besi beton polos
Bahan
Kawat beton
Portland Cement
Pasir Beton
Split Pecah mesin 2/3
Pekerja
Tukang batu
Tukang kayu
Tenaga kerja
Tukang besi
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Membuat 1 m3 kolom beton bertulang (300 kg besi + bekisting)
Kayu kelas III
Paku 5-12 cm
Minyak bekisting
Besi beton polos
Kawat beton
Bahan
Portland Cement
Pasir Beton
Split Pecah mesin 2/3
Balok kayu kelas II
Plywood tebal 9 mm
Dolken kayu galam (8-10 cm) pj. 4 m
Pekerja
Tukang batu
Tukang kayu
Tenaga kerja
Tukang besi
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan

7=(4x6)

0.030
0.400
0.150
0.015
0.350
2.000
0.660
0.330
0.033
0.033

m
kg
ltr
m
lbr
bt
HO
HO
HO
HO

2,400,000.00
10,000.00
36,300.00
3,004,400.00
150,700.00
15,400.00
40,000.00
55,000.00
70,000.00
80,000.00

72,000.00
4,000.00
5,445.00
45,066.00
52,745.00
30,800.00
26,400.00
18,150.00
2,310.00
2,640.00
259,556.00
25,955.60
285,511.60
285,510.00

0.0264
0.600
0.500
0.150
0.050
0.005
0.008

m
kg
bt
HO
HO
HO
HO

2,400,000.00
10,000.00
15,400.00
40,000.00
55,000.00
70,000.00
80,000.00

63,360.00
6,000.00
7,700.00
6,000.00
2,750.00
350.00
640.00
86,800.00
8,680.00
95,480.00
95,480.00

0.200
1.500
0.400
157.500
2.250
336.000
0.540
0.810
5.300
0.275
1.300
1.050
0.262
0.265

m
kg
ltr
kg
kg
kg
m
m
HO
HO
HO
HO
HO
HO

2,400,000.00
10,000.00
36,300.00
12,000.00
10,700.00
1,260.00
185,000.00
178,500.00
40,000.00
55,000.00
55,000.00
55,000.00
70,000.00
80,000.00

480,000.00
15,000.00
14,520.00
1,890,000.00
24,075.00
423,360.00
99,900.00
144,585.00
212,000.00
15,125.00
71,500.00
57,750.00
18,340.00
21,200.00
3,487,355.00
348,735.50
3,836,090.50
3,836,090.00

0.270
2.000
0.600
210.000
3.000
336.000
0.540
0.810
5.650
0.275
1.560
1.400
0.323
0.283

m
kg
ltr
kg
kg
kg
m
m
HO
HO
HO
HO
HO
HO

2,400,000.00
10,000.00
36,300.00
12,000.00
10,700.00
1,260.00
185,000.00
178,500.00
40,000.00
55,000.00
55,000.00
55,000.00
70,000.00
80,000.00

648,000.00
20,000.00
21,780.00
2,520,000.00
32,100.00
423,360.00
99,900.00
144,585.00
226,000.00
15,125.00
85,800.00
77,000.00
22,610.00
22,640.00
4,358,900.00
435,890.00
4,794,790.00
4,794,790.00

0.400
4.000
2.000
315.000
4.500
336.000
0.540
0.810
0.150
3.500
20.000
7.050
0.275
1.650
2.100
0.403
0.353

m
kg
ltr
kg
kg
kg
m
m
m
lbr
bt
HO
HO
HO
HO
HO
HO

2,400,000.00
10,000.00
36,300.00
12,000.00
10,700.00
1,260.00
185,000.00
178,500.00
3,004,400.00
150,700.00
15,400.00
40,000.00
55,000.00
55,000.00
55,000.00
70,000.00
80,000.00

960,000.00
40,000.00
72,600.00
3,780,000.00
48,150.00
423,360.00
99,900.00
144,585.00
450,660.00
527,450.00
308,000.00
282,000.00
15,125.00
90,750.00
115,500.00
28,210.00
28,240.00
7,414,530.00
741,453.00
8,155,983.00
8,155,980.00

Analisa SNI Hal 25

1
D037

D038

D039

D040

2
3
Membuat 1 m3 balok beton bertulang (200 kg besi + bekisting)
Kayu kelas III
Paku 5-12 cm
Minyak bekisting
Besi beton polos
Kawat beton
Bahan
Portland Cement
Pasir Beton
Split Pecah mesin 2/3
Balok kayu kelas II
Plywood tebal 9 mm
Dolken kayu galam (8-10 cm) pj. 4 m
Pekerja
Tukang batu
Tukang kayu
Tenaga kerja
Tukang besi
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Membuat 1 m3 plat beton bertulang (150 kg besi + bekisting)
Kayu kelas III
Paku 5-12 cm
Minyak bekisting
Besi beton polos
Kawat beton
Bahan
Portland Cement
Pasir Beton
Split Pecah mesin 2/3
Balok kayu kelas II
Plywood tebal 9 mm
Dolken kayu galam (8-10 cm) pj. 4 m
Pekerja
Tukang batu
Tukang kayu
Tenaga kerja
Tukang besi
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Membuat 1 m3 dinding beton bertulang (150 kg besi + bekisting)
Kayu kelas III
Paku 5-12 cm
Minyak bekisting
Besi beton polos
Kawat beton
Bahan
Portland Cement
Pasir Beton
Split Pecah mesin 2/3
Balok kayu kelas II
Plywood tebal 9 mm
Dolken kayu galam (8-10 cm) pj. 4 m
Pekerja
Tukang batu
Tukang kayu
Tenaga kerja
Tukang besi
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Membuat 1 m3 dinding beton bertulang (200 kg besi + bekisting)
Kayu kelas III
Paku 5-12 cm
Minyak bekisting
Besi beton polos
Kawat beton
Bahan
Portland Cement
Pasir Beton
Split Pecah mesin 2/3
Balok kayu kelas II
Plywood tebal 9 mm
Dolken kayu galam (8-10 cm) pj. 4 m
Pekerja
Tukang batu
Tukang kayu
Tenaga kerja
Tukang besi
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan

7=(4x6)

0.320
3.200
1.600
210.000
3.000
336.000
0.540
0.810
0.140
2.800
16.000
6.350
0.275
1.650
1.400
0.333
0.318

m
kg
ltr
kg
kg
kg
m
m
m
lbr
bt
HO
HO
HO
HO
HO
HO

2,400,000.00
10,000.00
36,300.00
12,000.00
10,700.00
1,260.00
185,000.00
178,500.00
3,004,400.00
150,700.00
15,400.00
40,000.00
55,000.00
55,000.00
55,000.00
70,000.00
80,000.00

768,000.00
32,000.00
58,080.00
2,520,000.00
32,100.00
423,360.00
99,900.00
144,585.00
420,616.00
421,960.00
246,400.00
254,000.00
15,125.00
90,750.00
77,000.00
23,310.00
25,440.00
5,652,626.00
565,262.60
6,217,888.60
6,217,880.00

0.320
3.200
1.600
157.500
2.250
336.000
0.540
0.810
0.120
2.800
32.000
5.300
0.275
1.300
1.050
0.265
0.265

m
kg
ltr
kg
kg
kg
m
m
m
lbr
bt
HO
HO
HO
HO
HO
HO

2,400,000.00
10,000.00
36,300.00
12,000.00
10,700.00
1,260.00
185,000.00
178,500.00
3,004,400.00
150,700.00
15,400.00
40,000.00
55,000.00
55,000.00
55,000.00
70,000.00
80,000.00

768,000.00
32,000.00
58,080.00
1,890,000.00
24,075.00
423,360.00
99,900.00
144,585.00
360,528.00
421,960.00
492,800.00
212,000.00
15,125.00
71,500.00
57,750.00
18,550.00
21,200.00
5,111,413.00
511,141.30
5,622,554.30
5,622,550.00

0.240
3.200
1.600
157.500
2.250
336.000
0.540
0.810
0.160
2.800
24.000
5.300
0.275
1.300
1.050
0.262
0.265

m
kg
ltr
kg
kg
kg
m
m
m
lbr
bt
HO
HO
HO
HO
HO
HO

2,400,000.00
10,000.00
36,300.00
12,000.00
10,700.00
1,260.00
185,000.00
178,500.00
3,004,400.00
150,700.00
15,400.00
40,000.00
55,000.00
55,000.00
55,000.00
70,000.00
80,000.00

576,000.00
32,000.00
58,080.00
1,890,000.00
24,075.00
423,360.00
99,900.00
144,585.00
480,704.00
421,960.00
369,600.00
212,000.00
15,125.00
71,500.00
57,750.00
18,340.00
21,200.00
4,916,179.00
491,617.90
5,407,796.90
5,407,790.00

0.250
3.000
1.200
210.000
3.000
336.000
0.540
0.810
0.105
2.500
14.000
5.650
0.275
1.560
1.400
0.323
0.283

m
kg
ltr
kg
kg
kg
m
m
m
lbr
bt
HO
HO
HO
HO
HO
HO

2,400,000.00
10,000.00
36,300.00
12,000.00
10,700.00
1,260.00
185,000.00
178,500.00
3,004,400.00
150,700.00
15,400.00
40,000.00
55,000.00
55,000.00
55,000.00
70,000.00
80,000.00

600,000.00
30,000.00
43,560.00
2,520,000.00
32,100.00
423,360.00
99,900.00
144,585.00
315,462.00
376,750.00
215,600.00
226,000.00
15,125.00
85,800.00
77,000.00
22,610.00
22,640.00
5,250,492.00
525,049.20
5,775,541.20
5,775,540.00

Analisa SNI Hal 26

1
D041

D042

E
E001

E002

E003

E004

E005

2
3
4
5
Membuat 1 m kolom praktis beton bertulang (11 x 11) cm
Kayu kelas III
0.002
m
Paku 5-12 cm
0.010
kg
Besi beton polos
3.000
kg
Bahan
Kawat beton
0.045
kg
Portland Cement
4.000
kg
Pasir Beton
0.006
m
Split Pecah mesin 2/3
0.009
m
Pekerja
0.180
HO
Tukang batu
0.020
HO
Tukang kayu
0.020
HO
Tenaga kerja
Tukang besi
0.020
HO
Kepala tukang
0.006
HO
Mandor
0.009
HO
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Membuat 1 m ring balok beton bertulang (10 x 15) cm
Kayu kelas III
0.003
m
Paku 5-12 cm
0.020
kg
Besi beton polos
3.600
kg
Bahan
Kawat beton
0.050
kg
Portland Cement
5.500
kg
Pasir Beton
0.009
m
Split Pecah mesin 2/3
0.015
m
Pekerja
0.297
HO
Tukang batu
0.033
HO
Tukang kayu
0.033
HO
Tenaga kerja
Tukang besi
0.033
HO
Kepala tukang
0.010
HO
Mandor
0.015
HO
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
PEKERJAAN DINDING (SNI 6897:2008)
Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal 1 bata, campuran spesi 1 PC : 2 PP
Bata Merah
140.000
bh
Bahan
Portland Cement
43.500
kg
Pasir Pasang
0.080
m
Pekerja
0.600
HO
Tukang batu
0.200
HO
Tenaga kerja
Kepala tukang
0.020
HO
Mandor
0.030
HO
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal 1 bata, campuran spesi 1 PC : 3 PP
Bata Merah
140.000
bh
Bahan
Portland Cement
32.950
kg
Pasir Pasang
0.091
m
Pekerja
0.600
HO
Tukang batu
0.200
HO
Tenaga kerja
Kepala tukang
0.020
HO
Mandor
0.030
HO
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal 1 bata, campuran spesi 1 PC : 4 PP
Bata Merah
140.000
bh
Bahan
Portland Cement
26.550
kg
Pasir Pasang
0.093
m
Pekerja
0.600
HO
Tukang batu
0.200
HO
Tenaga kerja
Kepala tukang
0.020
HO
Mandor
0.030
HO
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal 1 bata, campuran spesi 1 PC : 5 PP
Bata Merah
140.000
bh
Bahan
Portland Cement
22.200
kg
Pasir Pasang
0.102
m
Pekerja
0.600
HO
Tukang batu
0.200
HO
Tenaga kerja
Kepala tukang
0.020
HO
Mandor
0.030
HO
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal 1 bata, campuran spesi 1 PC : 6 PP
Bata Merah
140.000
bh
Bahan
Portland Cement
18.500
kg
Pasir Pasang
0.112
m
Pekerja
0.600
HO
Tukang batu
0.200
HO
Tenaga kerja
Kepala tukang
0.020
HO
Mandor
0.030
HO
Jumlah
Overhead + Profit
Jumlah
Dibulatkan

7=(4x6)

2,400,000.00
10,000.00
12,000.00
10,700.00
1,260.00
185,000.00
178,500.00
40,000.00
55,000.00
55,000.00
55,000.00
70,000.00
80,000.00

4,800.00
100.00
36,000.00
481.50
5,040.00
1,110.00
1,606.50
7,200.00
1,100.00
1,100.00
1,100.00
420.00
720.00
60,778.00
6,077.80
66,855.80
66,850.00

2,400,000.00
10,000.00
12,000.00
10,700.00
1,260.00
185,000.00
178,500.00
40,000.00
55,000.00
55,000.00
55,000.00
70,000.00
80,000.00

7,200.00
200.00
43,200.00
535.00
6,930.00
1,665.00
2,677.50
11,880.00
1,815.00
1,815.00
1,815.00
700.00
1,200.00
81,632.50
8,163.25
89,795.75
89,790.00

600.00
1,260.00
180,000.00
40,000.00
55,000.00
70,000.00
80,000.00

84,000.00
54,810.00
14,400.00
24,000.00
11,000.00
1,400.00
2,400.00
192,010.00
19,201.00
211,211.00
211,210.00

600.00
1,260.00
180,000.00
40,000.00
55,000.00
70,000.00
80,000.00

84,000.00
41,517.00
16,380.00
24,000.00
11,000.00
1,400.00
2,400.00
180,697.00
18,069.70
198,766.70
198,760.00

600.00
1,260.00
180,000.00
40,000.00
55,000.00
70,000.00
80,000.00

84,000.00
33,453.00
16,740.00
24,000.00
11,000.00
1,400.00
2,400.00
172,993.00
17,299.30
190,292.30
190,290.00

600.00
1,260.00
180,000.00
40,000.00
55,000.00
70,000.00
80,000.00

84,000.00
27,972.00
18,360.00
24,000.00
11,000.00
1,400.00
2,400.00
169,132.00
16,913.20
186,045.20
186,040.00

600.00
1,260.00
180,000.00
40,000.00
55,000.00
70,000.00
80,000.00

84,000.00
23,310.00
20,160.00
24,000.00
11,000.00
1,400.00
2,400.00
166,270.00
16,627.00
182,897.00
182,890.00

Analisa SNI Hal 27

1
E006

E007

E008

E009

E010

E011

E012

E013

2
3
4
5
Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal 1 bata, campuran spesi 1 PC : 10 PP
Bata Merah
140.000
bh
Bahan
Portland Cement
10.080
kg
Pasir Pasang
0.0925
m
Pekerja
0.600
HO
Tukang batu
0.200
HO
Tenaga kerja
Kepala tukang
0.020
HO
Mandor
0.030
HO
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal bata, campuran spesi 1 PC : 2 PP
Bata Merah
70.000
bh
Bahan
Portland Cement
18.950
kg
Pasir Pasang
0.038
m
Pekerja
0.300
HO
Tukang batu
0.100
HO
Tenaga kerja
Kepala tukang
0.010
HO
Mandor
0.015
HO
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal bata, campuran spesi 1 PC : 3 PP
Bata Merah
70.000
bh
Bahan
Portland Cement
14.370
kg
Pasir Pasang
0.040
m
Pekerja
0.300
HO
Tukang batu
0.100
HO
Tenaga kerja
Kepala tukang
0.010
HO
Mandor
0.015
HO
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal bata, campuran spesi 1 PC : 4 PP
Bata Merah
70.000
bh
Bahan
Portland Cement
11.500
kg
Pasir Pasang
0.043
m
Pekerja
0.300
HO
Tukang batu
0.100
HO
Tenaga kerja
Kepala tukang
0.010
HO
Mandor
0.015
HO
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal bata, campuran spesi 1 PC : 5 PP
Bata Merah
70.000
bh
Bahan
Portland Cement
9.680
kg
Pasir Pasang
0.045
m
Pekerja
0.300
HO
Tukang batu
0.100
HO
Tenaga kerja
Kepala tukang
0.010
HO
Mandor
0.015
HO
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal bata, campuran spesi 1 PC : 6 PP
Bata Merah
70.000
bh
Bahan
Portland Cement
8.320
kg
Pasir Pasang
0.049
m
Pekerja
0.300
HO
Tukang batu
0.100
HO
Tenaga kerja
Kepala tukang
0.010
HO
Mandor
0.015
HO
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal bata, campuran spesi 1 PC : 8 PP
Bata Merah
70.000
bh
Bahan
Portland Cement
6.500
kg
Pasir Pasang
0.050
m
Pekerja
0.300
HO
Tukang batu
0.100
HO
Tenaga kerja
Kepala tukang
0.010
HO
Mandor
0.015
HO
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal bata, campuran spesi 1 PC : 3 KP : 10 PP
Bata Merah
70.000
bh
Bahan
Portland Cement
4.500
kg
Pasir Pasang
0.050
m
Pekerja
0.300
HO
Tukang batu
0.100
HO
Tenaga kerja
Kepala tukang
0.010
HO
Mandor
0.015
HO
Jumlah
Overhead + Profit
Jumlah
Dibulatkan

7=(4x6)

600.00
1,260.00
180,000.00
40,000.00
55,000.00
70,000.00
80,000.00

84,000.00
12,700.80
16,650.00
24,000.00
11,000.00
1,400.00
2,400.00
152,150.80
15,215.08
167,365.88
167,360.00

600.00
1,260.00
180,000.00
40,000.00
55,000.00
70,000.00
80,000.00

42,000.00
23,877.00
6,840.00
12,000.00
5,500.00
700.00
1,200.00
92,117.00
9,211.70
101,328.70
101,320.00

600.00
1,260.00
180,000.00
40,000.00
55,000.00
70,000.00
80,000.00

42,000.00
18,106.20
7,200.00
12,000.00
5,500.00
700.00
1,200.00
86,706.20
8,670.62
95,376.82
95,370.00

600.00
1,260.00
180,000.00
40,000.00
55,000.00
70,000.00
80,000.00

42,000.00
14,490.00
7,740.00
12,000.00
5,500.00
700.00
1,200.00
83,630.00
8,363.00
91,993.00
91,990.00

600.00
1,260.00
180,000.00
40,000.00
55,000.00
70,000.00
80,000.00

42,000.00
12,196.80
8,100.00
12,000.00
5,500.00
700.00
1,200.00
81,696.80
8,169.68
89,866.48
89,860.00

600.00
1,260.00
180,000.00
40,000.00
55,000.00
70,000.00
80,000.00

42,000.00
10,483.20
8,820.00
12,000.00
5,500.00
700.00
1,200.00
80,703.20
8,070.32
88,773.52
88,770.00

600.00
1,260.00
180,000.00
40,000.00
55,000.00
70,000.00
80,000.00

42,000.00
8,190.00
9,000.00
12,000.00
5,500.00
700.00
1,200.00
78,590.00
7,859.00
86,449.00
86,440.00

600.00
1,260.00
180,000.00
40,000.00
55,000.00
70,000.00
80,000.00

42,000.00
5,670.00
9,000.00
12,000.00
5,500.00
700.00
1,200.00
76,070.00
7,607.00
83,677.00
83,670.00

Analisa SNI Hal 28

1
E014

E015

E016

E017

E018

E019

E020

2
3
4
5
Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal bata, campuran spesi 1 KP : 1 SM : 1 PP
Bata Merah
70.000
bh
Semen Merah
0.018
m
Bahan
Pasir Pasang
0.018
m
Kapur Padam
0.018
m
Pekerja
0.300
HO
Tukang batu
0.100
HO
Tenaga kerja
Kepala tukang
0.010
HO
Mandor
0.015
HO
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal bata, campuran spesi 1 KP : 1 SM : 2 PP
Bata Merah
70.000
bh
Semen Merah
0.014
m
Bahan
Pasir pasang
0.028
m
Kapur Padam
0.014
m
Pekerja
0.300
HO
Tukang batu
0.100
HO
Tenaga kerja
Kepala tukang
0.010
HO
Mandor
0.015
HO
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 dinding HB/CB 20 , campuran spesi 1 PC : 3 PP
Hollow Block 20
12.500
bh
Portland Cement
20.320
kg
Bahan
Pasir Pasang
0.728
m
Besi angkur 8 mm
0.280
kg
Pekerja
0.350
HO
Tukang batu
0.150
HO
Tenaga kerja
Kepala tukang
0.015
HO
Mandor
0.018
HO
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 dinding HB/CB 20 , campuran spesi 1 PC : 4 PP
Hollow Block 20
12.500
bh
Portland Cement
24.260
kg
Bahan
Pasir Pasang
0.772
m
Besi angkur 8 mm
0.280
kg
Pekerja
0.350
HO
Tukang batu
0.150
HO
Tenaga kerja
Kepala tukang
0.015
HO
Mandor
0.018
HO
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 dinding HB/CB 15, campuran spesi 1 PC : 3 PP
Hollow Block 15
12.500
bh
Portland Cement
22.740
kg
Bahan
Pasir Pasang
0.550
m
0.280
kg
Besi angkur 8 mm
Pekerja
0.350
HO
Tukang batu
0.150
HO
Tenaga kerja
Kepala tukang
0.015
HO
Mandor
0.018
HO
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 dinding HB/CB 15, campuran spesi 1 PC : 4 PP
Hollow Block 15
12.500
bh
Portland Cement
18.200
kg
Bahan
Pasir Pasang
0.582
m
Besi angkur 8 mm
0.280
kg
Pekerja
0.320
HO
Tukang batu
0.120
HO
Tenaga kerja
Kepala tukang
0.012
HO
Mandor
0.016
HO
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 dinding HB/CB 10, campuran spesi 1 PC : 3 PP
Hollow Block 10
12.500
bh
Portland Cement
15.160
kg
Bahan
Pasir Pasang
0.363
m
Besi angkur 8 mm
0.280
kg
Pekerja
0.300
HO
Tukang batu
0.100
HO
Tenaga kerja
Kepala tukang
0.010
HO
Mandor
0.015
HO
Jumlah
Overhead + Profit
Jumlah
Dibulatkan

7=(4x6)

600.00
130,000.00
180,000.00
330,000.00
40,000.00
55,000.00
70,000.00
80,000.00

42,000.00
2,340.00
3,240.00
5,940.00
12,000.00
5,500.00
700.00
1,200.00
72,920.00
7,292.00
80,212.00
80,210.00

600.00
130,000.00
180,000.00
330,000.00
40,000.00
55,000.00
70,000.00
80,000.00

42,000.00
1,820.00
5,040.00
4,620.00
12,000.00
5,500.00
700.00
1,200.00
72,880.00
7,288.00
80,168.00
80,160.00

3,600.00
1,260.00
180,000.00
10,300.00
40,000.00
55,000.00
70,000.00
80,000.00

45,000.00
25,603.20
131,040.00
2,884.00
14,000.00
8,250.00
1,050.00
1,440.00
229,267.20
22,926.72
252,193.92
252,190.00

3,600.00
1,260.00
180,000.00
10,300.00
40,000.00
55,000.00
70,000.00
80,000.00

45,000.00
30,567.60
138,960.00
2,884.00
14,000.00
8,250.00
1,050.00
1,440.00
242,151.60
24,215.16
266,366.76
266,360.00

3,600.00
1,260.00
180,000.00
10,300.00
40,000.00
55,000.00
70,000.00
80,000.00

45,000.00
28,652.40
99,000.00
2,884.00
14,000.00
8,250.00
1,050.00
1,440.00
200,276.40
20,027.64
220,304.04
220,300.00

3,600.00
1,260.00
180,000.00
10,300.00
40,000.00
55,000.00
70,000.00
80,000.00

45,000.00
22,932.00
104,760.00
2,884.00
12,800.00
6,600.00
840.00
1,280.00
197,096.00
19,709.60
216,805.60
216,800.00

3,600.00
1,260.00
180,000.00
10,300.00
40,000.00
55,000.00
70,000.00
80,000.00

45,000.00
19,101.60
65,340.00
2,884.00
12,000.00
5,500.00
700.00
1,200.00
151,725.60
15,172.56
166,898.16
166,890.00

Analisa SNI Hal 29

1
E021

E022

E023

E024

E025

E026

E027

2
3
4
5
Memasang 1 m2 dinding HB/CB 10, campuran spesi 1 PC : 4 PP
Hollow Block 10
12.500
bh
Portland Cement
12.130
kg
Bahan
Pasir Pasang
0.388
m
Besi angkur 8 mm
0.280
kg
Pekerja
0.300
HO
Tukang batu
0.100
HO
Tenaga kerja
Kepala tukang
0.010
HO
Mandor
0.015
HO
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 dinding terawang (roster) ukuran (12 x 11 x 24) cm, campuran spesi 1 PC : 3 PP
Terawang (roster)
30.000
bh
Bahan
Portland Cement
14.000
kg
Pasir Pasang
0.032
m
Pekerja
0.300
HO
Tukang batu
0.100
HO
Tenaga kerja
Kepala tukang
0.010
HO
Mandor
0.015
HO
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 dinding terawang (roster) ukuran (12 x 11 x 24) cm, campuran spesi 1 PC : 4 PP
Terawang (roster)
30.000
bh
Bahan
Portland Cement
11.000
kg
Pasir Pasang
0.035
m
Pekerja
0.300
HO
Tukang batu
0.100
HO
Tenaga kerja
Kepala tukang
0.010
HO
Mandor
0.015
HO
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 dinding bata berongga ekspose ukuran (5 x 11 x 24) cm, campuran spesi 1 PC : 3 PP
Terawang (roster)
70.000
bh
Bahan
Portland Cement
14.000
kg
Pasir Pasang
0.032
m
Pekerja
0.300
HO
Tukang batu
0.100
HO
Tenaga kerja
Kepala tukang
0.010
HO
Mandor
0.015
HO
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 dinding batako kecil tras ukuran (8 x 10 x 20) cm, campuran spesi 1 PC : 4 PP
Batako 8X10X20
30.000
bh
Bahan
Portland Cement
9.000
kg
Pasir Pasang
0.022
m
Pekerja
0.120
HO
Tukang batu
0.092
HO
Tenaga kerja
Kepala tukang
0.360
HO
Mandor
0.018
HO
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 dinding batako besar pres ukuran (8 x 20 x30) cm, campuran spesi 1 PC : 4 PP
Batako 8X20X30
11.000
bh
Bahan
Portland Cement
9.000
kg
Pasir Pasang
0.032
m
Pekerja
0.300
HO
Tukang batu
0.100
HO
Tenaga kerja
Kepala tukang
0.010
HO
Mandor
0.015
HO
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Membuat 1 UNIT Septictank 2,5 X 1,5 X 2 M + rembesannya ( kantor tipe besar)
Galian tanah
7.5000
m
Pasir urug
0.3570
m
Lantai kerja
3.7500
m
Pas. bata 1 PC : 2 PS + Plesteran
25.0000
m
Plat beton penutup & balok
0.5000
m
Pipa PVC 4" jenis AW + sambungan
9.0000
m1
Sat. Pekerjaan
Pipa GIP 1 1/2"
2.0000
m1
Galian tanah untuk rembesan
5.6250
m
Pas. injuk
9.0000
kg
Urugan kerikil 3,5 cm
1.7500
m
Pipa PVC 4" berlobang jenis AW
6.0000
m1
Urugan kembali perataan tanah
1.8750
m
Tambahan upah
0.0850
ls
Jumlah
Overhead + Profit
Jumlah
Dibulatkan

7=(4x6)

3,600.00
1,260.00
180,000.00
10,300.00
40,000.00
55,000.00
70,000.00
80,000.00

45,000.00
15,283.80
69,840.00
2,884.00
12,000.00
5,500.00
700.00
1,200.00
152,407.80
15,240.78
167,648.58
167,640.00

8,500.00
1,260.00
180,000.00
40,000.00
55,000.00
70,000.00
80,000.00

255,000.00
17,640.00
5,760.00
12,000.00
5,500.00
700.00
1,200.00
297,800.00
29,780.00
327,580.00
327,580.00

8,500.00
1,260.00
180,000.00
40,000.00
55,000.00
70,000.00
80,000.00

255,000.00
13,860.00
6,300.00
12,000.00
5,500.00
700.00
1,200.00
294,560.00
29,456.00
324,016.00
324,010.00

5,500.00
1,260.00
180,000.00
40,000.00
55,000.00
70,000.00
80,000.00

385,000.00
17,640.00
5,760.00
12,000.00
5,500.00
700.00
1,200.00
427,800.00
42,780.00
470,580.00
470,580.00

650.00
1,260.00
180,000.00
40,000.00
55,000.00
70,000.00
80,000.00

19,500.00
11,340.00
3,960.00
4,800.00
5,060.00
25,200.00
1,440.00
71,300.00
7,130.00
78,430.00
78,430.00

1,400.00
1,260.00
180,000.00
40,000.00
55,000.00
70,000.00
80,000.00

15,400.00
11,340.00
5,760.00
12,000.00
5,500.00
700.00
1,200.00
51,900.00
5,190.00
57,090.00
57,090.00

39,600.00
155,000.00
628,783.00
92,117.00
5,111,413.00
35,250.00
47,800.00
39,600.00
39,600.00
200,000.00
35,250.00
10,666.67
9,142,402.75

297,000.00
55,335.00
2,357,936.25
2,302,925.00
2,555,706.50
317,250.00
95,600.00
222,750.00
356,400.00
350,000.00
211,500.00
20,000.00
777,104.23
9,919,506.98
991,950.70
10,911,457.68
10,911,450.00

Analisa SNI Hal 30

1
E028

E029

F
F001

F002

F003

F004

F005

F006

2
3
Membuat 1 UNIT Septictank 2 X 1,5 X 1,5 M + rembesannya ( kantor tipe kecil)
Galian tanah
Pasir urug
Lantai kerja
Pas. bata 1 PC : 2 PS + Plesteran
Plat beton penutup & balok
Pipa PVC 4" jenis AW + sambungan
Sat. Pekerjaan
Pipa GIP 1 1/2"
Galian tanah untuk rembesan
Pas. injuk
Urugan kerikil 3,5 cm
Pipa PVC 4" berlobang jenis AW
Urugan kembali perataan tanah
Tambahan upah
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Membuat 1 UNIT Septictank 1,5 X 1 X 1,5 M + rembesannya ( rumah kapasitas kecil)
Galian tanah
Pasir urug
Lantai kerja
Pas. bata 1 PC : 2 PS + Plesteran
Plat beton penutup & balok
Pipa PVC 4" jenis AW + sambungan
Sat. Pekerjaan
Pipa GIP 1 1/2"
Galian tanah untuk rembesan
Pas. injuk
Urugan kerikil 3,5 cm
Pipa PVC 4" berlobang jenis AW
Urugan kembali perataan tanah
Tambahan upah
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
PEKERJAAN PENGECATAN (SNI 2407:2008)
Mengecat 1 m2 Beton ICI Eksterior
Cat tembok ICI
Alkali ICI sebelum pengecatan
Bahan
Rol cat
Ampelas
Pekerja
Tukang cat
Tenaga kerja
Kepala tukang
Mandor
Alat
Steger Werk
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Mengecat 1 m2 Plafond dan Dinding Interior ICI
Cat tembok ICI
Cat dasar sebelum pengecatan
Bahan
Rol cat
Ampelas
Pekerja
Tukang cat
Tenaga kerja
Kepala tukang
Mandor
Alat
Steger Werk
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Mengecat 1 m2 Dinding Vinilex (3X)
Cat tembok Vinilex
Plamir tembok
Bahan
Rol cat
Ampelas
Pekerja
Tukang cat
Tenaga kerja
Kepala tukang
Mandor
Alat
Steger Werk
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Mengecat 1 m2 Dinding Lama Vinilex (2X)
Mengecat 1 m2 Dinding Vinilex (3X)
Dibulatkan
Mengecat 1 m2 Plafond Vinilex (3X)
Cat tembok Vinilex
Plamir tembok
Bahan
Rol cat
Ampelas
Pekerja
Tukang cat
Tenaga kerja
Kepala tukang
Mandor
Alat
Steger Werk
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Mengecat 1 m2 Plafond Lama Vinilex (2X)
Mengecat 1 m2 Plafond Vinilex (3X)

7=(4x6)

4.5000
0.2142
2.2500
15.0000
0.3000
5.4000
1.2000
3.3750
5.4000
1.0500
9.0000
1.1250
0.0920

m
m
m
m
m
m1
btg
m
kg
m
m1
m
ls

39,600.00
155,000.00
628,783.00
92,117.00
5,111,413.00
38,775.00
47,800.00
39,600.00
39,600.00
200,000.00
35,250.00
10,666.67
5,694,826.65

178,200.00
33,201.00
1,414,761.75
1,381,755.00
1,533,423.90
209,385.00
57,360.00
133,650.00
213,840.00
210,000.00
317,250.00
12,000.00
523,924.05
6,218,750.70
621,875.07
6,840,625.77
6,840,620.00

2.2500
0.1071
1.1250
7.5000
0.1500
9.0000
0.6000
1.6875
2.7000
0.5250
9.0000
0.5625
0.0650

m
m
m
m
m
m1
btg
m
kg
m
m1
m
ls

39,600.00
155,000.00
628,783.00
92,117.00
5,111,413.00
38,775.00
47,800.00
39,600.00
39,600.00
200,000.00
35,250.00
10,666.67
3,250,320.83

89,100.00
16,600.50
707,380.88
690,877.50
766,711.95
348,975.00
28,680.00
66,825.00
106,920.00
105,000.00
317,250.00
6,000.00
211,270.85
3,461,591.68
346,159.17
3,807,750.85
3,807,750.00

0.2500
0.1250
0.0100
0.5000
0.1600
0.2800
0.0300
0.0100
0.0250

lt
lt
bh
lbr
HO
HO
HO
HO
lot

72,000.00
25,300.00
16,000.00
2,500.00
40,000.00
55,000.00
70,000.00
80,000.00
47,272.50

18,000.00
3,162.50
160.00
1,250.00
6,400.00
15,400.00
2,100.00
800.00
1,181.81
48,454.31
4,845.43
53,299.74
53,290.00

0.2500
0.1250
0.0100
0.5000
0.2000
0.3000
0.0300
0.0100
0.0250

lt
lt
bh
lbr
HO
HO
HO
HO
lot

72,000.00
31,000.00
16,000.00
2,500.00
40,000.00
55,000.00
70,000.00
80,000.00
50,685.00

18,000.00
3,875.00
160.00
1,250.00
8,000.00
16,500.00
2,100.00
800.00
1,267.13
51,952.13
5,195.21
57,147.34
57,140.00

0.1750
0.1600
0.0100
0.5000
0.1600
0.2800
0.0300
0.0100
0.0450

kg
kg
bh
lbr
HO
HO
HO
HO
lot

18,000.00
12,400.00
16,000.00
2,500.00
40,000.00
55,000.00
70,000.00
80,000.00
31,244.00

3,150.00
1,984.00
160.00
1,250.00
6,400.00
15,400.00
2,100.00
800.00
1,405.98
32,649.98
3,265.00
35,914.98
35,910.00

35,910.00

23,940.00
23,940.00

kg
kg
bh
lbr
HO
HO
HO
HO
lot

18,000.00
12,400.00
16,000.00
2,500.00
40,000.00
55,000.00
70,000.00
80,000.00
31,694.00

3,600.00
1,984.00
160.00
1,250.00
6,400.00
15,400.00
2,100.00
800.00
1,347.00
33,041.00
3,304.10
36,345.09
36,340.00

36,340.00

24,226.67

2/3

0.2000
0.1600
0.0100
0.5000
0.1600
0.2800
0.0300
0.0100
0.0425

2/3

Analisa SNI Hal 31

1
F007

2
Dibulatkan
Mengecat 1 m2 Dinding Sanlex (3X)
Bahan

Tenaga kerja

F008

F009

F010

F011

F012

F013

F014

Cat tembok Sanlex


Plamir tembok
Rol cat
Ampelas
Pekerja
Tukang cat
Kepala tukang
Mandor
Steger Werk

Alat
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Mengecat 1 m2 Dinding Lama Sanlex (2X)
Mengecat 1 m2 Dinding Sanlex (3X)
Dibulatkan
Mengecat 1 m2 Plafond Sanlex (3X)
Cat tembok Sanlex
Plamir tembok
Bahan
Rol cat
Ampelas
Pekerja
Tukang cat
Tenaga kerja
Kepala tukang
Mandor
Alat
Steger Werk
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Mengecat 1 m2 Plafond Lama Sanlex (2X)
Mengecat 1 m2 Plafond Sanlex (3X)
Dibulatkan
Mengecat 1 m2 Kayu (3X) Glotex berikut Meni
Meni kayu
Plamir kayu
Cat kayu merk GLOTEK
Bahan
Amplas kayu
Minyak cat terpentin
Kwas 3"
Pekerja
Tukang cat
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Mengecat 1 m2 Kayu Lama (2X) Glotex
Mengecat 1 m2 Kayu (3X) Glotex berikut Meni
Dibulatkan
Mengecat 1 m2 Besi (3X) Glotex
Meni besi
Cat besi merk Glotek
Bahan
Amplas besi
Minyak cat thiner B
Kwas 3"
Pekerja
Tukang cat
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Mengecat 1 m2 Plituran Bangunan (Biasa)
Dempul plitur (dempul kasar)
Wood Filer (INFRA)
Oker putih
Oker warna
Bahan
Batu Apung (gosok)
Sirlak ex India
Kwas 3"
Spirtus
Ampelas kayu
Pekerja
Tukang cat
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan

0.1750
0.1600
0.0100
0.5000
0.1040
0.1820
0.0195
0.0100
0.0450

7=(4x6)
24,220.00

kg
kg
bh
lbr
HO
HO
HO
HO
lot

12,200.00
12,400.00
16,000.00
2,500.00
40,000.00
55,000.00
70,000.00
80,000.00
21,864.00

2,135.00
1,984.00
160.00
1,250.00
4,160.00
10,010.00
1,365.00
800.00
983.88
22,847.88
2,284.79
25,132.67
25,130.00

25,130.00

16,753.33
16,750.00

kg
kg
bh
lbr
HO
HO
HO
HO
lot

12,200.00
12,400.00
16,000.00
2,500.00
40,000.00
55,000.00
70,000.00
80,000.00
22,929.00

2,440.00
1,984.00
160.00
1,250.00
4,160.00
10,010.00
1,365.00
1,560.00
974.48
23,903.48
2,390.35
26,293.83
26,290.00

26,290.00

17,526.67
17,520.00

kg
kg
kg
lbr
ltr
bh
HO
HO
HO
HO

16,000.00
24,400.00
36,500.00
2,500.00
5,000.00
10,900.00
40,000.00
55,000.00
70,000.00
80,000.00

2,672.00
2,025.20
7,300.00
1,000.00
750.00
545.00
8,000.00
16,500.00
2,100.00
800.00
41,692.20
4,169.22
45,861.42
45,860.00

45,860.00

30,573.33
30,570.00

0.1670
0.2000
0.4000
0.1500
0.0500
0.2000
0.3000
0.0300
0.0100

kg
kg
lbr
ltr
bh
HO
HO
HO
HO

16,000.00
36,500.00
2,500.00
16,300.00
10,900.00
40,000.00
55,000.00
70,000.00
80,000.00

2,672.00
7,300.00
1,000.00
2,445.00
545.00
8,000.00
16,500.00
2,100.00
800.00
41,362.00
4,136.20
45,498.20
45,490.00

0.0300
0.2000
0.0200
0.0100
0.1000
0.2000
0.0100
0.2000
0.1000
0.2500
0.2850
0.0400
0.0200

kg
kg
kg
kg
kg
kg
bh
ltr
lbr
HO
HO
HO
HO

26,400.00
28,800.00
21,100.00
21,100.00
15,600.00
87,200.00
10,900.00
4,000.00
2,500.00
40,000.00
55,000.00
70,000.00
80,000.00

792.00
5,760.00
422.00
211.00
1,560.00
17,440.00
109.00
800.00
250.00
10,000.00
15,675.00
2,800.00
1,600.00
57,419.00
5,741.90
63,160.90
63,160.00

2/3

0.2000
0.1600
0.0100
0.5000
0.1040
0.1820
0.0195
0.0195
0.0425

2/3

0.1670
0.0830
0.2000
0.4000
0.1500
0.0500
0.2000
0.3000
0.0300
0.0100

2/3

Analisa SNI Hal 32

1
F015

2
Mengecat 1 m2 Plituran Meubulair

Bahan

Tenaga kerja

G
G001

G002

G003

G004

G005

G006

3
Dempul plitur (dempul kasar)
Wood Filer (INFRA)
Melamik
Oker putih
Oker warna
Batu Apung (gosok)
Sirlak ex India
Kwas 3"
Spirtus
Ampelas kayu
Pekerja
Tukang cat
Kepala tukang
Mandor

Jumlah
Overhead + Profit
Jumlah
Dibulatkan
PEKERJAAN PENUTUP LANTAI DAN DINDING (SNI 7395:2008)
Memasang 1 m2 lantai ubin PC abu-abu ukuran (40 x 40) cm
Ubin abu-abu
Bahan
Portland Cement
Pasir Pasang
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 lantai ubin PC abu-abu ukuran (30 x 30) cm
Ubin abu-abu
Bahan
Portland Cement
Pasir Pasang
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 lantai ubin PC abu-abu ukuran (20 x 20) cm
Ubin abu-abu
Bahan
Portland Cement
Pasir Pasang
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 lantai ubin warna ukuran (40 x 40) cm
Ubin warna
Portland Cement
Bahan
Pasir Pasang
Semen Warna
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 lantai ubin warna ukuran (30 x 30) cm
Ubin warna
Portland Cement
Bahan
Pasir Pasang
Semen Warna
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 lantai ubin warna ukuran (20 x 20) cm
Ubin warna
Portland Cement
Bahan
Pasir Pasang
Semen Warna
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan

7=(4x6)

0.0300
0.2000
0.3500
0.0200
0.0100
0.1000
0.2000
0.0100
0.2000
0.1000
0.2500
0.2850
0.0400
0.0200

kg
kg
kg
kg
kg
kg
kg
bh
ltr
lbr
HO
HO
HO
HO

26,400.00
28,800.00
37,500.00
21,100.00
21,100.00
15,600.00
87,200.00
10,900.00
4,000.00
2,500.00
40,000.00
55,000.00
70,000.00
80,000.00

792.00
5,760.00
13,125.00
422.00
211.00
1,560.00
17,440.00
109.00
800.00
250.00
10,000.00
15,675.00
2,800.00
1,600.00
70,544.00
7,054.40
77,598.40
77,590.00

6.630
9.800
0.045
0.250
0.125
0.013
0.013

bh
kg
m
HO
HO
HO
HO

3,300.00
1,260.00
180,000.00
40,000.00
55,000.00
70,000.00
80,000.00

21,879.00
12,348.00
8,100.00
10,000.00
6,875.00
910.00
1,040.00
61,152.00
6,115.20
67,267.20
67,260.00

11.870
10.000
0.045
0.250
0.125
0.013
0.013

bh
kg
m
HO
HO
HO
HO

2,500.00
1,260.00
180,000.00
40,000.00
55,000.00
70,000.00
80,000.00

29,675.00
12,600.00
8,100.00
10,000.00
6,875.00
910.00
1,040.00
69,200.00
6,920.00
76,120.00
76,120.00

26.500
10.400
0.045
0.270
0.135
0.014
0.014

bh
kg
m
HO
HO
HO
HO

1,700.00
1,260.00
180,000.00
40,000.00
55,000.00
70,000.00
80,000.00

45,050.00
13,104.00
8,100.00
10,800.00
7,425.00
980.00
1,120.00
86,579.00
8,657.90
95,236.90
95,230.00

6.630
9.800
0.045
1.300
0.250
0.125
0.013
0.013

bh
kg
m
kg
HO
HO
HO
HO

4,000.00
1,260.00
180,000.00
2,200.00
40,000.00
55,000.00
70,000.00
80,000.00

26,520.00
12,348.00
8,100.00
2,860.00
10,000.00
6,875.00
910.00
1,040.00
68,653.00
6,865.30
75,518.30
75,510.00

11.870
10.000
0.045
1.500
0.260
0.130
0.013
0.013

bh
kg
m
kg
HO
HO
HO
HO

3,100.00
1,260.00
180,000.00
2,200.00
40,000.00
55,000.00
70,000.00
80,000.00

36,797.00
12,600.00
8,100.00
3,300.00
10,400.00
7,150.00
910.00
1,040.00
80,297.00
8,029.70
88,326.70
88,320.00

26.500
10.400
0.045
1.620
0.270
0.135
0.014
0.014

bh
kg
m
kg
HO
HO
HO
HO

2,100.00
1,260.00
180,000.00
2,200.00
40,000.00
55,000.00
70,000.00
80,000.00

55,650.00
13,104.00
8,100.00
3,564.00
10,800.00
7,425.00
980.00
1,120.00
100,743.00
10,074.30
110,817.30
110,810.00

Analisa SNI Hal 33

1
G007

G008

G009

G010

G011

G012

G013

2
3
Memasang 1 m2 lantai ubin teraso ukuran (40 x 40) cm
Ubin teraso
Portland Cement
Bahan
Pasir Pasang
Semen Warna
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Keterangan: Harga Bahan sudah termasuk ongkos poles
Memasang 1 m2 lantai ubin teraso ukuran (30 x 30) cm
Ubin teraso
Portland Cement
Bahan
Pasir Pasang
Semen Warna
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Keterangan: Harga Bahan sudah termasuk ongkos poles
Memasang 1 m2 lantai ubin granit ukuran (40 x 40) cm
Ubin granit
Portland Cement
Bahan
Pasir Pasang
Semen Warna
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 lantai ubin granit ukuran (30 x 30) cm
Ubin granit
Portland Cement
Bahan
Pasir Pasang
Semen Warna
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 lantai ubin teralux ukuran (40 x 40) cm
Ubin teralux kerang
Portland Cement
Bahan
Pasir Pasang
Semen Warna
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 lantai ubin teralux ukuran (30 x 30) cm
Ubin teralux kerang
Portland Cement
Bahan
Pasir Pasang
Semen Warna
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 lantai ubin teralux marmer ukuran (60 x 60) cm
Ubin teralux marmer
Portland Cement
Bahan
Pasir Pasang
Semen Warna
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan

7=(4x6)

6.630
9.800
0.045
1.300
0.250
0.125
0.013
0.013

bh
kg
m
kg
HO
HO
HO
HO

4,800.00
1,260.00
180,000.00
2,200.00
40,000.00
55,000.00
70,000.00
80,000.00

31,824.00
12,348.00
8,100.00
2,860.00
10,000.00
6,875.00
910.00
1,040.00
73,957.00
7,395.70
81,352.70
81,350.00

11.870
10.000
0.045
1.500
0.260
0.130
0.013
0.013

bh
kg
m
kg
HO
HO
HO
HO

2,500.00
1,260.00
180,000.00
2,200.00
40,000.00
55,000.00
70,000.00
80,000.00

29,675.00
12,600.00
8,100.00
3,300.00
10,400.00
7,150.00
910.00
1,040.00
73,175.00
7,317.50
80,492.50
80,490.00

6.630
9.800
0.045
1.300
0.250
0.125
0.013
0.013

bh
kg
m
kg
HO
HO
HO
HO

297,858.22
1,260.00
180,000.00
2,200.00
40,000.00
55,000.00
70,000.00
80,000.00

1,974,800.00
12,348.00
8,100.00
2,860.00
10,000.00
6,875.00
910.00
1,040.00
2,016,933.00
201,693.30
2,218,626.30
2,218,620.00

11.870
10.000
0.045
1.500
0.260
0.130
0.013
0.013

bh
kg
m
kg
HO
HO
HO
HO

140,673.97
1,260.00
180,000.00
2,200.00
40,000.00
55,000.00
70,000.00
80,000.00

1,669,800.00
12,600.00
8,100.00
3,300.00
10,400.00
7,150.00
910.00
1,040.00
1,713,300.00
171,330.00
1,884,630.00
1,884,630.00

6.630
9.800
0.045
1.300
0.250
0.125
0.013
0.013

bh
kg
m
kg
HO
HO
HO
HO

20,000.00
1,260.00
180,000.00
2,200.00
40,000.00
55,000.00
70,000.00
80,000.00

132,600.00
12,348.00
8,100.00
2,860.00
10,000.00
6,875.00
910.00
1,040.00
174,733.00
17,473.30
192,206.30
192,200.00

11.870
10.000
0.045
1.500
0.260
0.130
0.013
0.013

bh
kg
m
kg
HO
HO
HO
HO

13,750.00
1,260.00
180,000.00
2,200.00
40,000.00
55,000.00
70,000.00
80,000.00

163,212.50
12,600.00
8,100.00
3,300.00
10,400.00
7,150.00
910.00
1,040.00
206,712.50
20,671.25
227,383.75
227,380.00

3.100
9.600
0.045
1.500
0.240
0.120
0.012
0.012

bh
kg
m
kg
HO
HO
HO
HO

500,000.00
1,260.00
180,000.00
2,200.00
40,000.00
55,000.00
70,000.00
80,000.00

1,550,000.00
12,096.00
8,100.00
3,300.00
9,600.00
6,600.00
840.00
960.00
1,591,496.00
159,149.60
1,750,645.60
1,750,640.00

Analisa SNI Hal 34

1
G014

G015

G016

G017

G018

G019

G020

2
3
Memasang 1 m2 lantai ubin teralux marmer ukuran (40 x 40) cm
Ubin teralux marmer
Portland Cement
Bahan
Pasir Pasang
Semen Warna
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 lantai ubin teralux marmer ukuran (30 x 30) cm
Ubin teralux marmer
Portland Cement
Bahan
Pasir Pasang
Semen Warna
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m plint ubin PC abu-abu ukuran (15 x 20) cm
Plin ubin
Bahan
Portland Cement
Pasir Pasang
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m plint ubin PC abu-abu ukuran (10 x 30) cm
Plin ubin
Bahan
Portland Cement
Pasir Pasang
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m plint ubin PC abu-abu ukuran (10 x 40) cm
Plin ubin
Bahan
Portland Cement
Pasir Pasang
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m plint ubin PC warna ukuran (10 x 20) cm
Plin ubin PC warna
Portland Cement
Bahan
Pasir Pasang
Semen Warna
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m plint ubin PC warna ukuran (10 x 30) cm
Plin ubin PC warna
Portland Cement
Bahan
Pasir Pasang
Semen Warna
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan

7=(4x6)

6.630
9.800
0.045
1.300
0.250
0.125
0.013
0.013

bh
kg
m
kg
HO
HO
HO
HO

250,000.00
1,260.00
180,000.00
2,200.00
40,000.00
55,000.00
70,000.00
80,000.00

1,657,500.00
12,348.00
8,100.00
2,860.00
10,000.00
6,875.00
910.00
1,040.00
1,699,633.00
169,963.30
1,869,596.30
1,869,590.00

11.870
10.000
0.045
1.500
0.260
0.130
0.013
0.013

bh
kg
m
kg
HO
HO
HO
HO

135,000.00
1,260.00
180,000.00
2,200.00
40,000.00
55,000.00
70,000.00
80,000.00

1,602,450.00
12,600.00
8,100.00
3,300.00
10,400.00
7,150.00
910.00
1,040.00
1,645,950.00
164,595.00
1,810,545.00
1,810,540.00

5.300
1.650
0.004
0.090
0.090
0.009
0.005

bh
kg
m
HO
HO
HO
HO

2,340.00
1,260.00
180,000.00
40,000.00
55,000.00
70,000.00
80,000.00

12,402.00
2,079.00
720.00
3,600.00
4,950.00
630.00
400.00
24,781.00
2,478.10
27,259.10
27,250.00

3.500
1.240
0.003
0.090
0.090
0.009
0.005

bh
kg
m
HO
HO
HO
HO

3,900.00
1,260.00
180,000.00
40,000.00
55,000.00
70,000.00
80,000.00

13,650.00
1,562.40
540.00
3,600.00
4,950.00
630.00
400.00
25,332.40
2,533.24
27,865.64
27,860.00

2.650
1.240
0.003
0.090
0.090
0.009
0.005

bh
kg
m
HO
HO
HO
HO

5,850.00
1,260.00
180,000.00
40,000.00
55,000.00
70,000.00
80,000.00

15,502.50
1,562.40
540.00
3,600.00
4,950.00
630.00
400.00
27,184.90
2,718.49
29,903.39
29,900.00

5.300
1.140
0.003
0.100
0.090
0.090
0.009
0.005

bh
kg
m
kg
HO
HO
HO
HO

2,500.00
1,260.00
180,000.00
2,200.00
40,000.00
55,000.00
70,000.00
80,000.00

13,250.00
1,436.40
540.00
220.00
3,600.00
4,950.00
630.00
400.00
25,026.40
2,502.64
27,529.04
27,520.00

3.530
1.140
0.003
0.100
0.090
0.090
0.009
0.005

bh
kg
m
kg
HO
HO
HO
HO

2,750.00
1,260.00
180,000.00
2,200.00
40,000.00
55,000.00
70,000.00
80,000.00

9,707.50
1,436.40
540.00
220.00
3,600.00
4,950.00
630.00
400.00
21,483.90
2,148.39
23,632.29
23,630.00

Analisa SNI Hal 35

1
G021

G022

G023

G024

G025

G026

G027

2
3
Memasang 1 m plint ubin PC warna ukuran (10 x 40) cm
Plin ubin PC warna
Portland Cement
Bahan
Pasir Pasang
Semen Warna
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m plint ubin teraso ukuran (10 x 30) cm
Plin ubin teraso
Portland Cement
Bahan
Pasir Pasang
Semen Warna
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m plint ubin teraso ukuran (10 x 40) cm
Plin ubin teraso
Portland Cement
Bahan
Pasir Pasang
Semen Warna
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m plint ubin granit ukuran (10 x 40) cm
Plin ubin teraso
Portland Cement
Bahan
Pasir Pasang
Semen Warna
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m plint ubin granit ukuran (10 x 30) cm
Plin ubin teraso
Portland Cement
Bahan
Pasir Pasang
Semen Warna
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m plint ubin teralux kerang ukuran (10 x 40) cm
Plin ubin teralux kerang
Portland Cement
Bahan
Pasir Pasang
Semen Warna
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m plint ubin teralux kerang ukuran (10 x 30) cm
Plin ubin teralux kerang
Portland Cement
Bahan
Pasir Pasang
Semen Warna
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan

7=(4x6)

2.650
1.140
0.003
0.100
0.090
0.090
0.009
0.005

bh
kg
m
kg
HO
HO
HO
HO

3,250.00
1,260.00
180,000.00
2,200.00
40,000.00
55,000.00
70,000.00
80,000.00

8,612.50
1,436.40
540.00
220.00
3,600.00
4,950.00
630.00
400.00
20,388.90
2,038.89
22,427.79
22,420.00

3.530
1.140
0.003
0.100
0.090
0.090
0.009
0.005

bh
kg
m
kg
HO
HO
HO
HO

3,000.00
1,260.00
180,000.00
2,200.00
40,000.00
55,000.00
70,000.00
80,000.00

10,590.00
1,436.40
540.00
220.00
3,600.00
4,950.00
630.00
400.00
22,366.40
2,236.64
24,603.04
24,600.00

2.650
1.140
0.003
0.100
0.090
0.090
0.009
0.005

bh
kg
m
kg
HO
HO
HO
HO

3,500.00
1,260.00
180,000.00
2,200.00
40,000.00
55,000.00
70,000.00
80,000.00

9,275.00
1,436.40
540.00
220.00
3,600.00
4,950.00
630.00
400.00
21,051.40
2,105.14
23,156.54
23,150.00

2.650
1.140
0.003
0.100
0.090
0.090
0.009
0.005

bh
kg
m
kg
HO
HO
HO
HO

4,000.00
1,260.00
180,000.00
2,200.00
40,000.00
55,000.00
70,000.00
80,000.00

10,600.00
1,436.40
540.00
220.00
3,600.00
4,950.00
630.00
400.00
22,376.40
2,237.64
24,614.04
24,610.00

3.530
1.140
0.003
0.100
0.090
0.090
0.009
0.005

bh
kg
m
kg
HO
HO
HO
HO

7,500.00
1,260.00
180,000.00
2,200.00
40,000.00
55,000.00
70,000.00
80,000.00

26,475.00
1,436.40
540.00
220.00
3,600.00
4,950.00
630.00
400.00
38,251.40
3,825.14
42,076.54
42,070.00

2.650
1.140
0.003
0.100
0.090
0.090
0.009
0.005

bh
kg
m
kg
HO
HO
HO
HO

10,000.00
1,260.00
180,000.00
2,200.00
40,000.00
55,000.00
70,000.00
80,000.00

26,500.00
1,436.40
540.00
220.00
3,600.00
4,950.00
630.00
400.00
38,276.40
3,827.64
42,104.04
42,100.00

3.530
1.140
0.003
0.100
0.090
0.090
0.009
0.005

bh
kg
m
kg
HO
HO
HO
HO

6,500.00
1,260.00
180,000.00
2,200.00
40,000.00
55,000.00
70,000.00
80,000.00

22,945.00
1,436.40
540.00
220.00
3,600.00
4,950.00
630.00
400.00
34,721.40
3,472.14
38,193.54
38,190.00

Analisa SNI Hal 36

1
G028

G029

G030

G031

G032

G033

G034

2
3
Memasang 1 m plint ubin teralux marmer ukuran (10 x 60) cm
Plin ubin teralux marmer
Portland Cement
Bahan
Pasir Pasang
Semen Warna
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m plint ubin teralux marmer ukuran (10 x 40) cm
Plin ubin teralux marmer
Portland Cement
Bahan
Pasir Pasang
Semen Warna
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m plint ubin teralux marmer ukuran (10 x 30) cm
Plin ubin teralux marmer
Portland Cement
Bahan
Pasir Pasang
Semen Warna
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 lantai teraso cor ditempat, tebal 3 cm
Bahan
Bahan teraso cor
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 lantai keramik artistik ukuran (10 x 20) cm
Ubin keramik artistik
Portland Cement
Bahan
Pasir Pasang
Semen Warna
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 lantai keramik artistik ukuran (10 x 10) cm atau (5 x 20) cm
Ubin keramik artistik
Portland Cement
Bahan
Pasir Pasang
Semen Warna
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 lantai keramik ukuran (33 x 33) cm DN Putih setara Mulya
Ubin keramik
Portland Cement
Bahan
Pasir Pasang
Semen Warna
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan

7=(4x6)

1.700
1.140
0.003
0.100
0.090
0.090
0.009
0.005

bh
kg
m
kg
HO
HO
HO
HO

25,000.00
1,260.00
180,000.00
2,200.00
40,000.00
55,000.00
70,000.00
80,000.00

42,500.00
1,436.40
540.00
220.00
3,600.00
4,950.00
630.00
400.00
54,276.40
5,427.64
59,704.04
59,700.00

2.650
1.140
0.003
0.100
0.090
0.090
0.009
0.005

bh
kg
m
kg
HO
HO
HO
HO

17,500.00
1,260.00
180,000.00
2,200.00
40,000.00
55,000.00
70,000.00
80,000.00

46,375.00
1,436.40
540.00
220.00
3,600.00
4,950.00
630.00
400.00
58,151.40
5,815.14
63,966.54
63,960.00

3.530
1.140
0.003
0.100
0.090
0.090
0.009
0.005

bh
kg
m
kg
HO
HO
HO
HO

15,000.00
1,260.00
180,000.00
2,200.00
40,000.00
55,000.00
70,000.00
80,000.00

52,950.00
1,436.40
540.00
220.00
3,600.00
4,950.00
630.00
400.00
64,726.40
6,472.64
71,199.04
71,190.00

0.036
0.360
0.180
0.018
0.018

bh
HO
HO
HO
HO

450,000.00
40,000.00
55,000.00
70,000.00
80,000.00

16,200.00
14,400.00
9,900.00
1,260.00
1,440.00
43,200.00
4,320.00
47,520.00
47,520.00

53.000
8.190
0.045
2.750
0.700
0.350
0.035
0.035

bh
kg
m
kg
HO
HO
HO
HO

8,300.00
1,260.00
180,000.00
2,200.00
40,000.00
55,000.00
70,000.00
80,000.00

439,900.00
10,319.40
8,100.00
6,050.00
28,000.00
19,250.00
2,450.00
2,800.00
516,869.40
51,686.94
568,556.34
568,550.00

106.000
8.190
0.045
3.200
0.700
0.350
0.035
0.035

bh
kg
m
kg
HO
HO
HO
HO

16,600.00
1,260.00
180,000.00
2,200.00
40,000.00
55,000.00
70,000.00
80,000.00

1,759,600.00
10,319.40
8,100.00
7,040.00
28,000.00
19,250.00
2,450.00
2,800.00
1,837,559.40
183,755.94
2,021,315.34
2,021,310.00

10.000
8.190
0.045
1.620
0.700
0.350
0.035
0.035

bh
kg
m
kg
HO
HO
HO
HO

3,500.00
1,260.00
180,000.00
2,200.00
40,000.00
55,000.00
70,000.00
80,000.00

35,000.00
10,319.40
8,100.00
3,564.00
28,000.00
19,250.00
2,450.00
2,800.00
109,483.40
10,948.34
120,431.74
120,430.00

Analisa SNI Hal 37

1
G035

G036

G037

G038

G039

G040

G041

2
3
4
Memasang 1 m2 lantai keramik ukuran (30 x 30) cm DN Putih setara Mulya
Ubin keramik
11.870
Portland Cement
10.000
Bahan
Pasir Pasang
0.045
Semen Warna
1.500
Pekerja
0.700
Tukang batu
0.350
Tenaga kerja
Kepala tukang
0.035
Mandor
0.035
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 lantai keramik ukuran (20 x 20) cm DN Putih setara Mulya
Ubin keramik
26.500
Portland Cement
10.400
Bahan
Pasir Pasang
0.045
Semen Warna
1.630
Pekerja
0.700
Tukang batu
0.350
Tenaga kerja
Kepala tukang
0.035
Mandor
0.035
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 lantai keramik ukuran (10 x 33) cm, variasi/border
Ubin keramik
33.000
Portland Cement
9.800
Bahan
Pasir Pasang
0.045
Semen Warna
4.370
Pekerja
1.050
Tukang batu
0.525
Tenaga kerja
Kepala tukang
0.530
Mandor
0.530
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 lantai keramik ukuran (33 x 33) cm DN bercorak/berwarna setara Mulya
Ubin keramik
10.000
Portland Cement
8.190
Bahan
Pasir Pasang
0.045
Semen Warna
1.620
Pekerja
0.700
Tukang batu
0.350
Tenaga kerja
Kepala tukang
0.035
Mandor
0.035
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 lantai keramik ukuran (30 x 30) cm DN bercorak/berwarna setara Mulya
Ubin keramik
11.870
Portland Cement
10.000
Bahan
Pasir Pasang
0.045
Semen Warna
1.500
Pekerja
0.700
Tukang batu
0.350
Tenaga kerja
Kepala tukang
0.035
Mandor
0.035
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 lantai keramik ukuran (20 x 20) cm DN bercorak/berwarna setara Mulya
Ubin keramik
26.500
Portland Cement
10.400
Bahan
Pasir Pasang
0.045
Semen Warna
1.630
Pekerja
0.700
Tukang batu
0.350
Tenaga kerja
Kepala tukang
0.035
Mandor
0.035
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 lantai keramik ukuran (33 x 33) cm DN Putih setara Roman
Ubin keramik
10.000
Portland Cement
8.190
Bahan
Pasir Pasang
0.045
Semen Warna
1.620
Pekerja
0.700
Tukang batu
0.350
Tenaga kerja
Kepala tukang
0.035
Mandor
0.035
Jumlah
Overhead + Profit
Jumlah
Dibulatkan

7=(4x6)

bh
kg
m
kg
HO
HO
HO
HO

3,000.00
1,260.00
180,000.00
2,200.00
40,000.00
55,000.00
70,000.00
80,000.00

35,610.00
12,600.00
8,100.00
3,300.00
28,000.00
19,250.00
2,450.00
2,800.00
112,110.00
11,211.00
123,321.00
123,320.00

bh
kg
m
kg
HO
HO
HO
HO

1,500.00
1,260.00
180,000.00
2,200.00
40,000.00
55,000.00
70,000.00
80,000.00

39,750.00
13,104.00
8,100.00
3,586.00
28,000.00
19,250.00
2,450.00
2,800.00
117,040.00
11,704.00
128,744.00
128,740.00

bh
kg
m
kg
HO
HO
HO
HO

1,400.00
1,260.00
180,000.00
2,200.00
40,000.00
55,000.00
70,000.00
80,000.00

46,200.00
12,348.00
8,100.00
9,614.00
42,000.00
28,875.00
37,100.00
42,400.00
226,637.00
22,663.70
249,300.70
249,300.00

bh
kg
m
kg
HO
HO
HO
HO

3,800.00
1,260.00
180,000.00
2,200.00
40,000.00
55,000.00
70,000.00
80,000.00

38,000.00
10,319.40
8,100.00
3,564.00
28,000.00
19,250.00
2,450.00
2,800.00
112,483.40
11,248.34
123,731.74
123,730.00

bh
kg
m
kg
HO
HO
HO
HO

3,000.00
1,260.00
180,000.00
2,200.00
40,000.00
55,000.00
70,000.00
80,000.00

35,610.00
12,600.00
8,100.00
3,300.00
28,000.00
19,250.00
2,450.00
2,800.00
112,110.00
11,211.00
123,321.00
123,320.00

bh
kg
m
kg
HO
HO
HO
HO

1,800.00
1,260.00
180,000.00
2,200.00
40,000.00
55,000.00
70,000.00
80,000.00

47,700.00
13,104.00
8,100.00
3,586.00
28,000.00
19,250.00
2,450.00
2,800.00
124,990.00
12,499.00
137,489.00
137,480.00

bh
kg
m
kg
HO
HO
HO
HO

7,000.00
1,260.00
180,000.00
2,200.00
40,000.00
55,000.00
70,000.00
80,000.00

70,000.00
10,319.40
8,100.00
3,564.00
28,000.00
19,250.00
2,450.00
2,800.00
144,483.40
14,448.34
158,931.74
158,930.00

Analisa SNI Hal 38

1
G042

G043

G044

G045

G046

G047

G048

2
3
4
Memasang 1 m2 lantai keramik ukuran (30 x 30) cm DN Putih setara Roman
Ubin keramik
11.870
Portland Cement
10.000
Bahan
Pasir Pasang
0.045
Semen Warna
1.500
Pekerja
0.700
Tukang batu
0.350
Tenaga kerja
Kepala tukang
0.035
Mandor
0.035
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 lantai keramik ukuran (20 x 20) cm DN Putih setara Roman
Ubin keramik
26.500
Portland Cement
10.400
Bahan
Pasir Pasang
0.045
Semen Warna
1.630
Pekerja
0.700
Tukang batu
0.350
Tenaga kerja
Kepala tukang
0.035
Mandor
0.035
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 lantai keramik ukuran (33 x 33) cm DN bercorak/berwarna setara Roman
Ubin keramik
10.000
Portland Cement
8.190
Bahan
Pasir Pasang
0.045
Semen Warna
1.620
Pekerja
0.700
Tukang batu
0.350
Tenaga kerja
Kepala tukang
0.035
Mandor
0.035
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 lantai keramik ukuran (30 x 30) cm DN bercorak/berwarna setara Roman
Ubin keramik
11.870
Portland Cement
10.000
Bahan
Pasir Pasang
0.045
Semen Warna
1.500
Pekerja
0.700
Tukang batu
0.350
Tenaga kerja
Kepala tukang
0.035
Mandor
0.035
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 lantai keramik ukuran (20 x 20) cm DN bercorak/berwarna setara Roman
Ubin keramik
26.500
Portland Cement
10.400
Bahan
Pasir Pasang
0.045
Semen Warna
1.630
Pekerja
0.700
Tukang batu
0.350
Tenaga kerja
Kepala tukang
0.035
Mandor
0.035
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 lantai mosaik ukuran (30 x 30) cm, campuran spesi 1 PC : 3 PP
Mozaik
11.870
Portland Cement
14.150
Bahan
Pasir Pasang
0.039
Semen Warna
2.000
Pekerja
0.700
Tukang batu
0.350
Tenaga kerja
Kepala tukang
0.035
Mandor
0.035
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m plint keramik ukuran (10 x 20) cm
Mozaik
5.300
Portland Cement
1.140
Bahan
Pasir Pasang
0.003
Semen Warna
0.025
Pekerja
0.090
Tukang batu
0.090
Tenaga kerja
Kepala tukang
0.009
Mandor
0.005
Jumlah
Overhead + Profit
Jumlah
Dibulatkan

7=(4x6)

bh
kg
m
kg
HO
HO
HO
HO

4,100.00
1,260.00
180,000.00
2,200.00
40,000.00
55,000.00
70,000.00
80,000.00

48,667.00
12,600.00
8,100.00
3,300.00
28,000.00
19,250.00
2,450.00
2,800.00
125,167.00
12,516.70
137,683.70
137,680.00

bh
kg
m
kg
HO
HO
HO
HO

2,000.00
1,260.00
180,000.00
2,200.00
40,000.00
55,000.00
70,000.00
80,000.00

53,000.00
13,104.00
8,100.00
3,586.00
28,000.00
19,250.00
2,450.00
2,800.00
130,290.00
13,029.00
143,319.00
143,310.00

bh
kg
m
kg
HO
HO
HO
HO

3,800.00
1,260.00
180,000.00
2,200.00
40,000.00
55,000.00
70,000.00
80,000.00

38,000.00
10,319.40
8,100.00
3,564.00
28,000.00
19,250.00
2,450.00
2,800.00
112,483.40
11,248.34
123,731.74
123,730.00

bh
kg
m
kg
HO
HO
HO
HO

5,900.00
1,260.00
180,000.00
2,200.00
40,000.00
55,000.00
70,000.00
80,000.00

70,033.00
12,600.00
8,100.00
3,300.00
28,000.00
19,250.00
2,450.00
2,800.00
146,533.00
14,653.30
161,186.30
161,180.00

bh
kg
m
kg
HO
HO
HO
HO

2,200.00
1,260.00
180,000.00
2,200.00
40,000.00
55,000.00
70,000.00
80,000.00

58,300.00
13,104.00
8,100.00
3,586.00
28,000.00
19,250.00
2,450.00
2,800.00
135,590.00
13,559.00
149,149.00
149,140.00

bh
kg
m
kg
HO
HO
HO
HO

4,500.00
1,260.00
180,000.00
2,200.00
40,000.00
55,000.00
70,000.00
80,000.00

53,415.00
17,829.00
7,020.00
4,400.00
28,000.00
19,250.00
2,450.00
2,800.00
135,164.00
13,516.40
148,680.40
148,680.00

bh
kg
m
kg
HO
HO
HO
HO

1,760.00
1,260.00
180,000.00
2,200.00
40,000.00
55,000.00
70,000.00
80,000.00

9,328.00
1,436.40
540.00
55.00
3,600.00
4,950.00
630.00
400.00
20,939.40
2,093.94
23,033.34
23,030.00

Analisa SNI Hal 39

1
G049

G050

G051

G052

G053

G054

G055

G056

2
3
Memasang 1 m plint keramik ukuran (10 x 10) cm
Plin Keramik
Portland Cement
Bahan
Pasir Pasang
Semen Warna
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m plint keramik ukuran (5 x 20) cm
Plin Keramik
Portland Cement
Bahan
Pasir Pasang
Semen Warna
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m plint internal cove artistik ukuran (5 x 5 x 20) cm
Internal cove
Portland Cement
Bahan
Pasir Pasang
Semen Warna
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 lantai marmer ukuran (100 x 100) cm
marmer
Portland Cement
Bahan
Pasir Pasang
Semen Warna
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 lantai karpet
Karpet
Bahan
Lem
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 underlayer / Pelapis bawah karpet
Underlayer / rubber corrugated
Bahan
Lem
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 lantai parquet kayu
Parquet
Bahan
Lem
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 lantai kayu (gymfloor)
Gymfloor
Bahan
Lem
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan

7=(4x6)

10.600
1.140
0.003
0.050
0.090
0.090
0.009
0.005

bh
kg
m
kg
HO
HO
HO
HO

880.00
1,260.00
180,000.00
2,200.00
40,000.00
55,000.00
70,000.00
80,000.00

9,328.00
1,436.40
540.00
110.00
3,600.00
4,950.00
630.00
400.00
20,994.40
2,099.44
23,093.84
23,090.00

5.300
0.057
0.0015
0.013
0.090
0.090
0.009
0.005

bh
kg
m
kg
HO
HO
HO
HO

1,760.00
1,260.00
180,000.00
2,200.00
40,000.00
55,000.00
70,000.00
80,000.00

9,328.00
71.82
270.00
28.60
3,600.00
4,950.00
630.00
400.00
19,278.42
1,927.84
21,206.26
21,200.00

5.300
1.140
0.003
0.100
0.750
0.750
0.075
0.038

bh
kg
m
kg
HO
HO
HO
HO

6,500.00
1,260.00
180,000.00
2,200.00
40,000.00
55,000.00
70,000.00
80,000.00

34,450.00
1,436.40
540.00
220.00
30,000.00
41,250.00
5,250.00
3,040.00
116,186.40
11,618.64
127,805.04
127,800.00

1.060
9.190
0.045
0.650
0.700
0.350
0.035
0.035

bh
kg
m
kg
HO
HO
HO
HO

522,800.00
1,260.00
180,000.00
2,200.00
40,000.00
55,000.00
70,000.00
80,000.00

554,168.00
11,579.40
8,100.00
1,430.00
28,000.00
19,250.00
2,450.00
2,800.00
627,777.40
62,777.74
690,555.14
690,550.00

1.050
0.350
0.170
0.170
0.017
0.009

m2
kg
HO
HO
HO
HO

116,200.00
29,100.00
40,000.00
55,000.00
70,000.00
80,000.00

122,010.00
10,185.00
6,800.00
9,350.00
1,190.00
720.00
150,255.00
15,025.50
165,280.50
165,280.00

1.050
0.350
0.120
0.120
0.012
0.006

m2
kg
HO
HO
HO
HO

85,000.00
29,100.00
40,000.00
55,000.00
70,000.00
80,000.00

89,250.00
10,185.00
4,800.00
6,600.00
840.00
480.00
112,155.00
11,215.50
123,370.50
123,370.00

1.050
0.600
0.700
0.350
0.035
0.035

m2
kg
HO
HO
HO
HO

125,000.00
29,100.00
40,000.00
55,000.00
70,000.00
80,000.00

131,250.00
17,460.00
28,000.00
19,250.00
2,450.00
2,800.00
201,210.00
20,121.00
221,331.00
221,330.00

1.050
0.600
0.700
0.350
0.035
0.035

m2
kg
HO
HO
HO
HO

230,000.00
29,100.00
40,000.00
55,000.00
70,000.00
80,000.00

241,500.00
17,460.00
28,000.00
19,250.00
2,450.00
2,800.00
311,460.00
31,146.00
342,606.00
342,600.00

Analisa SNI Hal 40

1
G057

G058

G059

G060

G061

G062

G063

2
3
Memasang 1 m2 dinding porselen ukuran (11 x 11) cm
Porselin
Portland Cement
Bahan
Pasir Pasang
Semen Warna
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 dinding porselin ukuran (10 x 20) cm
Porselin
Portland Cement
Bahan
Pasir Pasang
Semen Warna
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 dinding porselin ukuran (20 x 20) cm
Porselin
Portland Cement
Bahan
Pasir Pasang
Semen Warna
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 dinding keramik artistik ukuran (10 x 20) cm
Keramik artistik
Portland Cement
Bahan
Pasir Pasang
Semen Warna
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 dinding keramik artistik ukuran (5 x 20) cm
Keramik artistik
Portland Cement
Bahan
Pasir Pasang
Semen Warna
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 dinding keramik ukuran (10 x 20) cm, DN Putih setara Mulya
Keramik
Portland Cement
Bahan
Pasir Pasang
Semen Warna
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 dinding keramik ukuran (20 x 20) cm, DN Putih setara Mulya
Keramik
Portland Cement
Bahan
Pasir Pasang
Semen Warna
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan

7=(4x6)

86.000
9.300
0.018
2.750
0.900
0.450
0.045
0.045

m2
kg
m
kg
HO
HO
HO
HO

600.00
1,260.00
180,000.00
2,200.00
40,000.00
55,000.00
70,000.00
80,000.00

51,600.00
11,718.00
3,240.00
6,050.00
36,000.00
24,750.00
3,150.00
3,600.00
140,108.00
14,010.80
154,118.80
154,110.00

53.000
9.300
0.018
2.750
0.900
0.450
0.045
0.045

m2
kg
m
kg
HO
HO
HO
HO

900.00
1,260.00
180,000.00
2,200.00
40,000.00
55,000.00
70,000.00
80,000.00

47,700.00
11,718.00
3,240.00
6,050.00
36,000.00
24,750.00
3,150.00
3,600.00
136,208.00
13,620.80
149,828.80
149,820.00

26.500
9.300
0.018
2.750
0.900
0.450
0.045
0.045

m2
kg
m
kg
HO
HO
HO
HO

1,800.00
1,260.00
180,000.00
2,200.00
40,000.00
55,000.00
70,000.00
80,000.00

47,700.00
11,718.00
3,240.00
6,050.00
36,000.00
24,750.00
3,150.00
3,600.00
136,208.00
13,620.80
149,828.80
149,820.00

53.000
9.300
0.018
2.750
0.900
0.450
0.045
0.045

m2
kg
m
kg
HO
HO
HO
HO

8,300.00
1,260.00
180,000.00
2,200.00
40,000.00
55,000.00
70,000.00
80,000.00

439,900.00
11,718.00
3,240.00
6,050.00
36,000.00
24,750.00
3,150.00
3,600.00
528,408.00
52,840.80
581,248.80
581,240.00

106.000
9.300
0.018
2.750
0.900
0.450
0.045
0.045

m2
kg
m
kg
HO
HO
HO
HO

16,600.00
1,260.00
180,000.00
2,200.00
40,000.00
55,000.00
70,000.00
80,000.00

1,759,600.00
11,718.00
3,240.00
6,050.00
36,000.00
24,750.00
3,150.00
3,600.00
1,848,108.00
184,810.80
2,032,918.80
2,032,910.00

53.000
9.300
0.018
2.750
0.900
0.450
0.045
0.045

m2
kg
m
kg
HO
HO
HO
HO

800.00
1,260.00
180,000.00
2,200.00
40,000.00
55,000.00
70,000.00
80,000.00

42,400.00
11,718.00
3,240.00
6,050.00
36,000.00
24,750.00
3,150.00
3,600.00
130,908.00
13,090.80
143,998.80
143,990.00

26.500
9.300
0.018
1.940
0.900
0.450
0.045
0.045

m2
kg
m
kg
HO
HO
HO
HO

1,500.00
1,260.00
180,000.00
2,200.00
40,000.00
55,000.00
70,000.00
80,000.00

39,750.00
11,718.00
3,240.00
4,268.00
36,000.00
24,750.00
3,150.00
3,600.00
126,476.00
12,647.60
139,123.60
139,120.00

Analisa SNI Hal 41

1
G064

G065

G066

G067

G068

G069

G070

2
3
4
Memasang 1 m2 dinding keramik ukuran (10 x 20) cm, DN bercorak/berwarna setara Mulya
Keramik
53.000
Portland Cement
9.300
Bahan
Pasir Pasang
0.018
Semen Warna
2.750
Pekerja
0.900
Tukang batu
0.450
Tenaga kerja
Kepala tukang
0.045
Mandor
0.045
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 dinding keramik ukuran (20 x 20) cm, DN bercorak/berwarna setara Mulya
Keramik
26.500
Portland Cement
9.300
Bahan
Pasir Pasang
0.018
Semen Warna
1.940
Pekerja
0.900
Tukang batu
0.450
Tenaga kerja
Kepala tukang
0.045
Mandor
0.045
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 dinding keramik ukuran (10 x 20) cm, DN Putih setara Roman
Keramik
53.000
Portland Cement
9.300
Bahan
Pasir Pasang
0.018
Semen Warna
2.750
Pekerja
0.900
Tukang batu
0.450
Tenaga kerja
Kepala tukang
0.045
Mandor
0.045
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 dinding keramik ukuran (20 x 20) cm, DN Putih setara Roman
Keramik
26.500
Portland Cement
9.300
Bahan
Pasir Pasang
0.018
Semen Warna
1.940
Pekerja
0.900
Tukang batu
0.450
Tenaga kerja
Kepala tukang
0.045
Mandor
0.045
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 dinding keramik ukuran (10 x 20) cm, DN bercorak/berwarna setara Roman
Keramik
53.000
Portland Cement
9.300
Bahan
Pasir Pasang
0.018
Semen Warna
2.750
Pekerja
0.900
Tukang batu
0.450
Tenaga kerja
Kepala tukang
0.045
Mandor
0.045
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 dinding keramik ukuran (20 x 20) cm, DN bercorak/berwarna setara Roman
Keramik
26.500
Portland Cement
9.300
Bahan
Pasir Pasang
0.018
Semen Warna
1.940
Pekerja
0.900
Tukang batu
0.450
Tenaga kerja
Kepala tukang
0.045
Mandor
0.045
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 dinding marmer ukuran (100 x 100) cm
Marmer
1.060
Paku 12 cm
3.003
Bahan
Portland Cement
12.440
Pasir Pasang
0.025
Semen Warna
0.650
Pekerja
0.900
Tukang batu
0.450
Tenaga kerja
Kepala tukang
0.045
Mandor
0.045
Jumlah
Overhead + Profit
Jumlah
Dibulatkan

7=(4x6)

m2
kg
m
kg
HO
HO
HO
HO

900.00
1,260.00
180,000.00
2,200.00
40,000.00
55,000.00
70,000.00
80,000.00

47,700.00
11,718.00
3,240.00
6,050.00
36,000.00
24,750.00
3,150.00
3,600.00
136,208.00
13,620.80
149,828.80
149,820.00

m2
kg
m
kg
HO
HO
HO
HO

1,800.00
1,260.00
180,000.00
2,200.00
40,000.00
55,000.00
70,000.00
80,000.00

47,700.00
11,718.00
3,240.00
4,268.00
36,000.00
24,750.00
3,150.00
3,600.00
134,426.00
13,442.60
147,868.60
147,860.00

m2
kg
m
kg
HO
HO
HO
HO

1,000.00
1,260.00
180,000.00
2,200.00
40,000.00
55,000.00
70,000.00
80,000.00

53,000.00
11,718.00
3,240.00
6,050.00
36,000.00
24,750.00
3,150.00
3,600.00
141,508.00
14,150.80
155,658.80
155,650.00

m2
kg
m
kg
HO
HO
HO
HO

2,000.00
1,260.00
180,000.00
2,200.00
40,000.00
55,000.00
70,000.00
80,000.00

53,000.00
11,718.00
3,240.00
4,268.00
36,000.00
24,750.00
3,150.00
3,600.00
139,726.00
13,972.60
153,698.60
153,690.00

m2
kg
m
kg
HO
HO
HO
HO

1,100.00
1,260.00
180,000.00
2,200.00
40,000.00
55,000.00
70,000.00
80,000.00

58,300.00
11,718.00
3,240.00
6,050.00
36,000.00
24,750.00
3,150.00
3,600.00
146,808.00
14,680.80
161,488.80
161,480.00

m2
kg
m
kg
HO
HO
HO
HO

2,200.00
1,260.00
180,000.00
2,200.00
40,000.00
55,000.00
70,000.00
80,000.00

58,300.00
11,718.00
3,240.00
4,268.00
36,000.00
24,750.00
3,150.00
3,600.00
145,026.00
14,502.60
159,528.60
159,520.00

m2
kg
kg
m
kg
HO
HO
HO
HO

522,800.00
10,000.00
1,260.00
180,000.00
2,200.00
40,000.00
55,000.00
70,000.00
80,000.00

554,168.00
30,030.00
15,674.40
4,500.00
1,430.00
36,000.00
24,750.00
3,150.00
3,600.00
673,302.40
67,330.24
740,632.64
740,630.00

Analisa SNI Hal 42

1
G071

G072

G073

G074

G075

G076

F077

G078

2
3
Memasang 1 m2 dinding bata pelapis ukuran (3 x 7 x 24) cm
Bata pelapis dinding
Portland Cement
Bahan
Pasir Pasang
Semen Warna
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 dinding batu paras
Batu paras
Bahan
Portland Cement
Pasir Pasang
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 dinding batu tempel hitam
Batu tempel hitam
Bahan
Portland Cement
Pasir Pasang
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 lantai Vinyl ukuran (30 x 30) cm KL. I
Vinyl
Bahan
Lem vinyl
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 wall paper, lebar 50 cm
Wall paper
Bahan
Lem
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 floor hardener
Bahan
Floor hardener
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m plint Vinyl karet ukuran (15 x 30) cm dengan perekat
Vinyl karet
Bahan
Lem vinyl
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m plint kayu kelas II tebal 2Cm, Lebar 10 Cm
Papan kayu kelas II
Bahan
Paku /skrup 5 cm
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan

7=(4x6)

63.000
12.440
0.025
2.750
1.000
0.500
0.050
0.050

m2
kg
m
kg
HO
HO
HO
HO

1,200.00
1,260.00
180,000.00
2,200.00
40,000.00
55,000.00
70,000.00
80,000.00

75,600.00
15,674.40
4,500.00
6,050.00
40,000.00
27,500.00
3,500.00
4,000.00
176,824.40
17,682.44
194,506.84
194,500.00

1.100
11.750
0.035
1.000
0.500
0.050
0.050

m2
kg
m
HO
HO
HO
HO

1,500.00
1,260.00
180,000.00
40,000.00
55,000.00
70,000.00
80,000.00

1,650.00
14,805.00
6,300.00
40,000.00
27,500.00
3,500.00
4,000.00
97,755.00
9,775.50
107,530.50
107,530.00

1.100
11.750
0.035
0.700
0.350
0.035
0.035

m2
kg
m
HO
HO
HO
HO

85,000.00
1,260.00
180,000.00
40,000.00
55,000.00
70,000.00
80,000.00

93,500.00
14,805.00
6,300.00
28,000.00
19,250.00
2,450.00
2,800.00
167,105.00
16,710.50
183,815.50
183,810.00

11.870
0.350
0.150
0.150
0.015
0.008

bh
kg
HO
HO
HO
HO

2,500.00
29,100.00
40,000.00
55,000.00
70,000.00
80,000.00

29,675.00
10,185.00
6,000.00
8,250.00
1,050.00
640.00
55,800.00
5,580.00
61,380.00
61,380.00

2.200
0.250
0.350
0.175
0.017
0.002

bh
kg
HO
HO
HO
HO

25,500.00
29,100.00
40,000.00
55,000.00
70,000.00
80,000.00

56,100.00
7,275.00
14,000.00
9,625.00
1,190.00
160.00
88,350.00
8,835.00
97,185.00
97,180.00

5.000
0.120
0.120
0.012
0.006

kg
HO
HO
HO
HO

29,000.00
40,000.00
55,000.00
70,000.00
80,000.00

145,000.00
4,800.00
6,600.00
840.00
480.00
157,720.00
15,772.00
173,492.00
173,490.00

1.760
0.080
0.080
0.080
0.008
0.004

bh
kg
HO
HO
HO
HO

55,000.00
29,100.00
40,000.00
55,000.00
70,000.00
80,000.00

96,800.00
2,328.00
3,200.00
4,400.00
560.00
320.00
107,608.00
10,760.80
118,368.80
118,360.00

0.003
0.050
0.120
0.120
0.012
0.005

m3
kg
HO
HO
HO
HO

7,750,000.00
10,000.00
40,000.00
55,000.00
70,000.00
80,000.00

23,250.00
500.00
4,800.00
6,600.00
840.00
400.00
36,390.00
3,639.00
40,029.00
40,020.00

Analisa SNI Hal 43

1
H
H001

H002

H003

H004

H005

H006

H007

H008

2
PEKERJAAN PLESTERAN (SNI 2837:2008)
Membuat 1 m2 plesteran 1 PC : 1 PP, tebal 15 mm
Portland Cement
Bahan
Pasir Pasang
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Membuat 1 m2 plesteran 1 PC : 2 PP, tebal 15 mm
Portland Cement
Bahan
Pasir Pasang
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Membuat 1 m2 plesteran 1 PC : 3 PP, tebal 15 mm
Portland Cement
Bahan
Pasir Pasang
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Membuat 1 m2 plesteran 1 PC : 4 PP, tebal 15 mm
Portland Cement
Bahan
Pasir Pasang
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Membuat 1 m2 plesteran 1 PC : 5 PP, tebal 15 mm
Portland Cement
Bahan
Pasir Pasang
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Membuat 1 m2 plesteran 1 PC : 6 PP, tebal 15 mm
Portland Cement
Bahan
Pasir Pasang
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Membuat 1 m2 plesteran 1 PC : 7 PP, tebal 15 mm
Portland Cement
Bahan
Pasir Pasang
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Membuat 1 m2 plesteran 1 PC : 8 PP, tebal 15 mm
Portland Cement
Bahan
Pasir Pasang
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan

7=(4x6)

15.504
0.016
0.300
0.150
0.015
0.015

kg
m3
HO
HO
HO
HO

1,260.00
180,000.00
40,000.00
55,000.00
70,000.00
80,000.00

19,535.04
2,880.00
12,000.00
8,250.00
1,050.00
1,200.00
44,915.04
4,491.50
49,406.54
49,400.00

10.224
0.020
0.300
0.150
0.015
0.015

kg
m3
HO
HO
HO
HO

1,260.00
180,000.00
40,000.00
55,000.00
70,000.00
80,000.00

12,882.24
3,600.00
12,000.00
8,250.00
1,050.00
1,200.00
38,982.24
3,898.22
42,880.46
42,880.00

7.775
0.023
0.300
0.150
0.015
0.015

kg
m3
HO
HO
HO
HO

1,260.00
180,000.00
40,000.00
55,000.00
70,000.00
80,000.00

9,796.50
4,140.00
12,000.00
8,250.00
1,050.00
1,200.00
36,436.50
3,643.65
40,080.15
40,080.00

6.240
0.024
0.300
0.150
0.015
0.015

kg
m3
HO
HO
HO
HO

1,260.00
180,000.00
40,000.00
55,000.00
70,000.00
80,000.00

7,862.40
4,320.00
12,000.00
8,250.00
1,050.00
1,200.00
34,682.40
3,468.24
38,150.64
38,150.00

5.184
0.026
0.300
0.150
0.015
0.015

kg
m3
HO
HO
HO
HO

1,260.00
180,000.00
40,000.00
55,000.00
70,000.00
80,000.00

6,531.84
4,680.00
12,000.00
8,250.00
1,050.00
1,200.00
33,711.84
3,371.18
37,083.02
37,080.00

4.416
0.027
0.300
0.150
0.015
0.015

kg
m3
HO
HO
HO
HO

1,260.00
180,000.00
40,000.00
55,000.00
70,000.00
80,000.00

5,564.16
4,860.00
12,000.00
8,250.00
1,050.00
1,200.00
32,924.16
3,292.42
36,216.58
36,210.00

3.936
0.028
0.300
0.150
0.015
0.015

kg
m3
HO
HO
HO
HO

1,260.00
180,000.00
40,000.00
55,000.00
70,000.00
80,000.00

4,959.36
5,040.00
12,000.00
8,250.00
1,050.00
1,200.00
32,499.36
3,249.94
35,749.30
35,740.00

3.456
0.029
0.300
0.150
0.015
0.015

kg
m3
HO
HO
HO
HO

1,260.00
180,000.00
40,000.00
55,000.00
70,000.00
80,000.00

4,354.56
5,220.00
12,000.00
8,250.00
1,050.00
1,200.00
32,074.56
3,207.46
35,282.02
35,280.00

Analisa SNI Hal 44

1
H009

H010

H011

H012

H013

H014

H015

H016

2
Membuat 1 m2 plesteran 1 PC : KP : 3 PP, tebal 15 mm
Portland Cement
Bahan
Kapur Padam
Pasir Pasang
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Membuat 1 m2 plesteran 1 PC : 2 KP : 8 PP, tebal 15 mm
Portland Cement
Bahan
Kapur Padam
Pasir Pasang
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Membuat 1 m2 plesteran 1 SM : 1 KP : 1 PP, tebal 15 mm
Semen Merah
Bahan
Kapur Padam
Pasir Pasang
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Membuat 1 m2 plesteran 1 SM : 1 KP : 2 PP, tebal 15 mm
Semen Merah
Bahan
Kapur Padam
Pasir Pasang
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Membuat 1 m2 plesteran 1 PC : 2 PP, tebal 20 mm
Portland Cement
Bahan
Pasir Pasang
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Membuat 1 m2 plesteran 1 PC : 3 PP, tebal 20 mm
Portland Cement
Bahan
Pasir Pasang
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Membuat 1 m2 plesteran 1 PC : 4 PP, tebal 20 mm
Portland Cement
Bahan
Pasir Pasang
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Membuat 1 m2 plesteran 1 PC : 5 PP, tebal 20 mm
Portland Cement
Bahan
Pasir Pasang
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan

7=(4x6)

5.760
0.003
0.013
0.360
0.120
0.012
0.018

kg
m3
m3
HO
HO
HO
HO

1,260.00
330,000.00
180,000.00
40,000.00
55,000.00
70,000.00
80,000.00

7,257.60
990.00
2,340.00
14,400.00
6,600.00
840.00
1,440.00
25,620.00
2,562.00
28,182.00
28,180.00

3.000
0.005
0.020
0.360
0.120
0.012
0.018

kg
m3
m3
HO
HO
HO
HO

1,260.00
330,000.00
180,000.00
40,000.00
55,000.00
70,000.00
80,000.00

3,780.00
1,650.00
3,600.00
14,400.00
6,600.00
840.00
1,440.00
32,310.00
3,231.00
35,541.00
35,540.00

0.009
0.009
0.009
0.360
0.120
0.012
0.018

m3
m3
m3
HO
HO
HO
HO

130,000.00
330,000.00
180,000.00
40,000.00
55,000.00
70,000.00
80,000.00

1,170.00
2,970.00
1,620.00
14,400.00
6,600.00
840.00
1,440.00
29,040.00
2,904.00
31,944.00
31,940.00

0.007
0.007
0.015
0.360
0.120
0.012
0.018

m3
m3
m3
HO
HO
HO
HO

130,000.00
330,000.00
180,000.00
40,000.00
55,000.00
70,000.00
80,000.00

910.00
2,310.00
2,700.00
14,400.00
6,600.00
840.00
1,440.00
29,200.00
2,920.00
32,120.00
32,120.00

13.632
0.027
0.400
0.200
0.020
0.022

m3
m3
HO
HO
HO
HO

1,260.00
180,000.00
40,000.00
55,000.00
70,000.00
80,000.00

17,176.32
4,860.00
16,000.00
11,000.00
1,400.00
1,760.00
52,196.32
5,219.63
57,415.95
57,410.00

10.368
0.031
0.260
0.200
0.020
0.013

kg
m3
HO
HO
HO
HO

1,260.00
180,000.00
40,000.00
55,000.00
70,000.00
80,000.00

13,063.68
5,580.00
10,400.00
11,000.00
1,400.00
1,040.00
42,483.68
4,248.37
46,732.05
46,730.00

8.320
0.032
0.400
0.200
0.020
0.022

kg
m3
HO
HO
HO
HO

1,260.00
180,000.00
40,000.00
55,000.00
70,000.00
80,000.00

10,483.20
5,760.00
16,000.00
11,000.00
1,400.00
1,760.00
46,403.20
4,640.32
51,043.52
51,040.00

6.912
0.035
0.400
0.200
0.020
0.022

kg
m3
HO
HO
HO
HO

1,260.00
180,000.00
40,000.00
55,000.00
70,000.00
80,000.00

8,709.12
6,300.00
16,000.00
11,000.00
1,400.00
1,760.00
45,169.12
4,516.91
49,686.03
49,680.00

Analisa SNI Hal 45

1
H017

H018

H019

H020

H021

H022

H023

H024

H025

2
3
Membuat 1 m2 plesteran 1 PC : 6 PP, tebal 20 mm
Portland Cement
Bahan
Pasir Pasang
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Membuat 1 m2 plesteran 1 SM : 1 KP : 2 PP, tebal 20 mm
Semen Merah
Bahan
Kapur Padam
Pasir Pasang
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Membuat 1 m2 Berapen 1 PC : 5 PP, tebal 15 mm
Portland Cement
Bahan
Pasir Pasang
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Membuat 1 m Plesteran Skoning lebar 10 mm 1 PC : 2 PP.
Portland Cement
Bahan
Pasir Pasang
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Membuat 1 m2 Plesteran Granit , 1 PC : 2 Granit, tebal 10 mm
Portland Cement
Bahan
Batu granit
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Membuat 1 m2 Plesteran Teraso , 1 PC : 2 Batu Teraso, tebal 10 mm
Portland Cement
Bahan
Batu teraso
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Membuat 1 m2 Plesteran Ciprat / Kamprotan 1 PC : 2 PP
Portland Cement
Bahan
Pasir Pasang
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Membuat 1 m2 finishing siar pasangan dinding bata merah (=20 m)
Bahan
Portland Cement
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Membuat 1 m2 finishing siar pasangan dinding conblock ekspose (=8 m)
Bahan
Portland Cement
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan

7=(4x6)

5.888
0.036
0.400
0.200
0.020
0.022

kg
m3
HO
HO
HO
HO

1,260.00
180,000.00
40,000.00
55,000.00
70,000.00
80,000.00

7,418.88
6,480.00
16,000.00
11,000.00
1,400.00
1,760.00
44,058.88
4,405.89
48,464.77
48,460.00

0.009
0.009
0.180
0.440
0.220
0.022
0.022

m3
m3
m3
HO
HO
HO
HO

130,000.00
330,000.00
180,000.00
40,000.00
55,000.00
70,000.00
80,000.00

1,170.00
2,970.00
32,400.00
17,600.00
12,100.00
1,540.00
1,760.00
69,540.00
6,954.00
76,494.00
76,490.00

5.184
0.026
0.150
0.075
0.008
0.008

kg
m3
HO
HO
HO
HO

1,260.00
180,000.00
40,000.00
55,000.00
70,000.00
80,000.00

6,531.84
4,680.00
6,000.00
4,125.00
560.00
640.00
22,536.84
2,253.68
24,790.52
24,790.00

0.500
0.013
0.080
0.400
0.040
0.004

kg
m3
HO
HO
HO
HO

1,260.00
180,000.00
40,000.00
55,000.00
70,000.00
80,000.00

630.00
2,340.00
3,200.00
22,000.00
2,800.00
320.00
31,290.00
3,129.00
34,419.00
34,410.00

10.000
15.000
0.450
0.250
0.023
0.023

kg
kg
HO
HO
HO
HO

1,260.00
1,669.80
40,000.00
55,000.00
70,000.00
80,000.00

12,600.00
25,047.00
18,000.00
13,750.00
1,610.00
1,840.00
72,847.00
7,284.70
80,131.70
80,130.00

10.000
15.000
0.450
0.250
0.023
0.023

kg
kg
HO
HO
HO
HO

1,260.00
8,500.00
40,000.00
55,000.00
70,000.00
80,000.00

12,600.00
127,500.00
18,000.00
13,750.00
1,610.00
1,840.00
175,300.00
17,530.00
192,830.00
192,830.00

4.320
0.006
0.300
0.100
0.010
0.015

kg
m3
HO
HO
HO
HO

1,260.00
180,000.00
40,000.00
55,000.00
70,000.00
80,000.00

5,443.20
1,080.00
12,000.00
5,500.00
700.00
1,200.00
25,923.20
2,592.32
28,515.52
28,510.00

3.108
0.150
0.075
0.008
0.008

m3
HO
HO
HO
HO

1,260.00
40,000.00
55,000.00
70,000.00
80,000.00

3,916.08
6,000.00
4,125.00
560.00
640.00
15,241.08
1,524.11
16,765.19
16,760.00

1.600
0.070
0.035
0.004
0.004

kg
HO
HO
HO
HO

1,260.00
40,000.00
55,000.00
70,000.00
80,000.00

2,016.00
2,800.00
1,925.00
280.00
320.00
7,341.00
734.10
8,075.10
8,070.00
Analisa SNI Hal 46

1
H026

H027

I
I001

I002

I003

I004

I005

I006

2
3
4
Membuat 1 m2 finishing siar pasangan batu kali adukan 1 PC : 2 PP
Bahan
Portland Cement
6.340
Pasir Pasang
0.012
Pekerja
0.300
Tukang batu
0.150
Tenaga kerja
Kepala tukang
0.015
Mandor
0.015
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Membuat 1 m2 acian
Bahan
Portland Cement
3.250
Pekerja
0.200
Tukang batu
0.100
Tenaga kerja
Kepala tukang
0.010
Mandor
0.010
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
PEKERJAAN KAYU (SNI 3434:2008)
Membuat dan memasang 1 m3 kusen pintu dan kusen jendela, kayu kelas I
Balok Kayu
1.100
Bahan
Paku 10 cm
1.250
Lem kayu
1.000
Pekerja
7.000
Tukang Kayu
21.000
Tenaga kerja
Kepala tukang
2.100
Mandor
0.350
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Membuat dan memasang 1 m3 kusen pintu dan kusen jendela, kayu kelas II atau III
Balok Kayu
1.200
Bahan
Paku 10 cm
1.250
Lem kayu
1.000
Pekerja
6.000
Tukang Kayu
18.000
Tenaga kerja
Kepala tukang
1.800
Mandor
0.300
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Membuat dan memasang 1 m2 pintu klamp standar, kayu kelas II
Papan Kayu
0.040
Bahan
Paku 5-7 cm
0.050
Pekerja
0.350
Tukang Kayu
1.050
Tenaga kerja
Kepala tukang
0.105
Mandor
0.018
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Membuat dan memasang 1 m2 pintu klamp sederhana, kayu kelas III untuk gudang sementara
Papan Kayu
0.040
Bahan
Paku 5-7 cm
0.050
Pekerja
0.350
Tukang Kayu
1.050
Tenaga kerja
Kepala tukang
0.105
Mandor
0.018
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Membuat dan memasang 1 m2 daun pintu panel, kayu kelas I atau II
Papan Kayu
0.040
Bahan
Lem kayu
0.500
Pekerja
1.000
Tukang Kayu
3.000
Tenaga kerja
Kepala tukang
0.300
Mandor
0.050
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Membuat dan memasang 1 m2 pintu dan jendela kaca, kayu kelas I atau II
Papan Kayu
0.040
Bahan
Lem kayu
0.300
Pekerja
0.800
Tukang Kayu
2.400
Tenaga kerja
Kepala tukang
0.240
Mandor
0.240
Jumlah
Overhead + Profit
Jumlah
Dibulatkan

7=(4x6)

kg
m3
HO
HO
HO
HO

1,260.00
180,000.00
40,000.00
55,000.00
70,000.00
80,000.00

7,988.40
2,160.00
12,000.00
8,250.00
1,050.00
1,200.00
32,648.40
3,264.84
35,913.24
35,910.00

m3
HO
HO
HO
HO

1,260.00
40,000.00
55,000.00
70,000.00
80,000.00

4,095.00
8,000.00
5,500.00
700.00
800.00
19,095.00
1,909.50
21,004.50
21,000.00

m3
kg
kg
HO
HO
HO
HO

4,125,000.00
10,000.00
24,000.00
40,000.00
55,000.00
70,000.00
80,000.00

4,537,500.00
12,500.00
24,000.00
280,000.00
1,155,000.00
147,000.00
28,000.00
6,184,000.00
618,400.00
6,802,400.00
6,802,400.00

m3
kg
kg
HO
HO
HO
HO

3,004,400.00
10,000.00
24,000.00
40,000.00
55,000.00
70,000.00
80,000.00

3,605,280.00
12,500.00
24,000.00
240,000.00
990,000.00
126,000.00
24,000.00
5,021,780.00
502,178.00
5,523,958.00
5,523,950.00

m3
kg
HO
HO
HO
HO

4,290,000.00
10,000.00
40,000.00
55,000.00
70,000.00
80,000.00

171,600.00
500.00
14,000.00
57,750.00
7,350.00
1,440.00
252,640.00
25,264.00
277,904.00
277,900.00

m3
kg
HO
HO
HO
HO

3,135,000.00
10,000.00
40,000.00
55,000.00
70,000.00
80,000.00

125,400.00
500.00
14,000.00
57,750.00
7,350.00
1,440.00
206,440.00
20,644.00
227,084.00
227,080.00

m3
kg
HO
HO
HO
HO

4,290,000.00
24,000.00
40,000.00
55,000.00
70,000.00
80,000.00

171,600.00
12,000.00
40,000.00
165,000.00
21,000.00
4,000.00
413,600.00
41,360.00
454,960.00
454,960.00

m3
kg
HO
HO
HO
HO

4,290,000.00
24,000.00
40,000.00
55,000.00
70,000.00
80,000.00

171,600.00
7,200.00
32,000.00
132,000.00
16,800.00
19,200.00
378,800.00
37,880.00
416,680.00
416,680.00

Analisa SNI Hal 47

1
I007

I008

I009

I010

I011

I012

I013

I014

2
3
4
5
Membuat dan memasang 1 m2 pintu dan jendela jalusi, kayu kelas I atau II
Papan Kayu
0.064
m3
Bahan
Lem kayu
0.500
kg
Pekerja
1.000
HO
Tukang Kayu
3.000
HO
Tenaga kerja
Kepala tukang
0.300
HO
Mandor
0.050
HO
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Membuat 1 m2 daun pintu kayu lapis (plywood) rangkap, rangka tertutup kayu kelas II (lebar sampai 90 cm)
Papan Kayu
0.025
m3
Paku 1 cm - 2,5 cm
0.030
kg
Bahan
Lem kayu
0.500
kg
Plywood tebal 4 mm (uk. 90X220) cm
1.000
lbr
Pekerja
0.700
HO
Tukang Kayu
2.100
HO
Tenaga kerja
Kepala tukang
0.210
HO
Mandor
0.035
HO
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Membuat 1 m2 daun plywood rangkap, rangka ekspose kayu kelas I atau II
Papan Kayu
0.0256
m3
Paku 1 cm - 2,5 cm
0.030
kg
Bahan
Lem kayu
0.500
kg
Plywood tebal 4 mm (uk. 90X220) cm
1.000
lbr
Pekerja
0.800
HO
Tukang Kayu
2.400
HO
Tenaga kerja
Kepala tukang
0.240
HO
Mandor
0.040
HO
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 jalusi kusen, kayu kelas I atau II
Papan Kayu
0.060
m3
Bahan
Paku 1 cm - 2,5 cm
0.150
kg
Pekerja
0.670
HO
Tukang Kayu
2.000
HO
Tenaga kerja
Kepala tukang
0.200
HO
Mandor
0.335
HO
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 teakwood rangkap, rangka ekspose kayu kelas I
Papan Kayu
0.025
m3
Paku 1 cm - 2,5 cm
0.030
kg
Bahan
Lem kayu
0.300
kg
Teakwood tebal 4 mm (uk. 90X220) cm
1.000
lbr
Pekerja
0.800
HO
Tukang Kayu
2.400
HO
Tenaga kerja
Kepala tukang
0.240
HO
Mandor
0.040
HO
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 teakwood rangkap lapis formika, rangka ekspose kayu kelas II
Papan Kayu
0.025
m3
Paku 1 cm - 2,5 cm
0.030
kg
Bahan
Lem kayu
0.800
kg
Teakwood tebal 4 mm (uk. 90X220) cm
1.000
lbr
Pekerja
0.850
HO
Tukang Kayu
2.550
HO
Tenaga kerja
Kepala tukang
0.255
HO
Mandor
0.043
HO
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m3 konstruksi kuda-kuda konvesional kayu kelas I, II dan III
Balok Kayu
1.100
m3
Bahan
Besi strip tebal 5 mm
15.000
kg
Paku 12 cm
5.600
kg
Pekerja
4.000
HO
Tukang Kayu
12.000
HO
Tenaga kerja
Kepala tukang
1.200
HO
Mandor
0.200
HO
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m3 konstruksi kuda-kuda ekspose kayu kelas I
Balok Kayu
1.200
m3
Bahan
Besi strip tebal 5 mm
15.000
kg
Paku 12 cm
3.000
kg
Pekerja
2.400
HO
Tukang Kayu
7.200
HO
Tenaga kerja
Kepala tukang
0.720
HO
Mandor
0.120
HO
Jumlah
Overhead + Profit
Jumlah
Dibulatkan

7=(4x6)

4,290,000.00
24,000.00
40,000.00
55,000.00
70,000.00
80,000.00

274,560.00
12,000.00
40,000.00
165,000.00
21,000.00
4,000.00
516,560.00
51,656.00
568,216.00
568,210.00

4,290,000.00
11,000.00
24,000.00
334,000.00
40,000.00
55,000.00
70,000.00
80,000.00

107,250.00
330.00
12,000.00
334,000.00
28,000.00
115,500.00
14,700.00
2,800.00
614,580.00
61,458.00
676,038.00
676,030.00

5,940,000.00
11,000.00
24,000.00
334,000.00
40,000.00
55,000.00
70,000.00
80,000.00

152,064.00
330.00
12,000.00
334,000.00
32,000.00
132,000.00
16,800.00
3,200.00
682,394.00
68,239.40
750,633.40
750,630.00

5,940,000.00
11,000.00
40,000.00
55,000.00
70,000.00
80,000.00

356,400.00
1,650.00
26,800.00
110,000.00
14,000.00
26,800.00
535,650.00
53,565.00
589,215.00
589,210.00

5,940,000.00
11,000.00
24,000.00
94,400.00
40,000.00
55,000.00
70,000.00
80,000.00

148,500.00
330.00
7,200.00
94,400.00
32,000.00
132,000.00
16,800.00
3,200.00
434,430.00
43,443.00
477,873.00
477,870.00

4,125,000.00
11,000.00
24,000.00
94,400.00
40,000.00
55,000.00
70,000.00
80,000.00

103,125.00
330.00
19,200.00
94,400.00
34,000.00
140,250.00
17,850.00
3,440.00
412,595.00
41,259.50
453,854.50
453,850.00

4,125,000.00
10,300.00
10,000.00
40,000.00
55,000.00
70,000.00
80,000.00

4,537,500.00
154,500.00
56,000.00
160,000.00
660,000.00
84,000.00
16,000.00
5,668,000.00
566,800.00
6,234,800.00
6,234,800.00

5,940,000.00
10,300.00
10,000.00
40,000.00
55,000.00
70,000.00
80,000.00

7,128,000.00
154,500.00
30,000.00
96,000.00
396,000.00
50,400.00
9,600.00
7,864,500.00
786,450.00
8,650,950.00
8,650,950.00
Analisa SNI Hal 48

1
I015

I016

I017

I018

I019

I020

I021

I022

2
3
Memasang 1 m3 konstruksi gordeng, kayu kelas II
Balok Kayu
Bahan
Besi strip tebal 5 mm
Paku 12 cm
Pekerja
Tukang Kayu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 rangka atap genteng keramik, kayu kelas II
Balok Kayu
Bahan
Besi strip tebal 5 mm
Paku 5 -10 cm
Pekerja
Tukang Kayu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 rangka atap genteng beton, kayu kelas II
Balok Kayu
Bahan
Paku 5 -10 cm
Pekerja
Tukang Kayu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 rangka atap sirap, kayu kelas II
Balok Kayu
Bahan
Paku 5 -10 cm
Pekerja
Tukang Kayu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 rangka langit-langit (50X100) cm, kayu kelas II atau III
Balok Kayu
Bahan
Paku 7-10 cm
Pekerja
Tukang Kayu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 rangka langit-langit (60X60) cm, kayu kelas II atau III
Balok Kayu
Bahan
Paku 7-10 cm
Pekerja
Tukang Kayu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m' lisplank ukuran (3X20) cm, kayu kelas I atau II
Balok Kayu
Bahan
Paku 5-7 cm
Pekerja
Tukang Kayu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m' lisplank ukuran (3X30) cm, kayu kelas I atau II
Balok Kayu
Bahan
Paku 5-7 cm
Pekerja
Tukang Kayu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan

7=(4x6)

1.100
15.000
3.000
2.400
7.200
0.720
0.120

m3
kg
kg
HO
HO
HO
HO

4,125,000.00
10,300.00
10,000.00
40,000.00
55,000.00
70,000.00
80,000.00

4,537,500.00
154,500.00
30,000.00
96,000.00
396,000.00
50,400.00
9,600.00
5,274,000.00
527,400.00
5,801,400.00
5,801,400.00

0.014
0.0036
0.250
0.100
0.100
0.010
0.005

m3
kg
kg
HO
HO
HO
HO

4,125,000.00
10,300.00
10,000.00
40,000.00
55,000.00
70,000.00
80,000.00

57,750.00
37.08
2,500.00
4,000.00
5,500.00
700.00
400.00
70,887.08
7,088.71
77,975.79
77,970.00

0.014
0.0072
0.250
0.100
0.100
0.005

m3
kg
HO
HO
HO
HO

4,125,000.00
10,000.00
40,000.00
55,000.00
70,000.00
80,000.00

57,750.00
72.00
10,000.00
5,500.00
7,000.00
400.00
80,722.00
8,072.20
88,794.20
88,790.00

0.165
0.200
0.120
0.120
0.012
0.006

m3
kg
HO
HO
HO
HO

4,125,000.00
10,000.00
40,000.00
55,000.00
70,000.00
80,000.00

680,625.00
2,000.00
4,800.00
6,600.00
840.00
480.00
695,345.00
69,534.50
764,879.50
764,870.00

0.0154
0.100
0.150
0.300
0.030
0.075

m3
kg
HO
HO
HO
HO

3,004,400.00
10,000.00
40,000.00
55,000.00
70,000.00
80,000.00

46,267.76
1,000.00
6,000.00
16,500.00
2,100.00
6,000.00
77,867.76
7,786.78
85,654.54
85,650.00

0.0163
0.250
0.200
0.300
0.030
0.010

m3
kg
HO
HO
HO
HO

3,004,400.00
10,000.00
40,000.00
55,000.00
70,000.00
80,000.00

48,971.72
2,500.00
8,000.00
16,500.00
2,100.00
800.00
78,871.72
7,887.17
86,758.89
86,750.00

0.0108
0.100
0.100
0.200
0.020
0.005

m3
kg
HO
HO
HO
HO

5,940,000.00
10,000.00
40,000.00
55,000.00
70,000.00
80,000.00

64,152.00
1,000.00
4,000.00
11,000.00
1,400.00
400.00
81,952.00
8,195.20
90,147.20
90,140.00

0.0110
0.050
0.100
0.200
0.020
0.005

m3
kg
HO
HO
HO
HO

5,940,000.00
10,000.00
40,000.00
55,000.00
70,000.00
80,000.00

65,340.00
500.00
4,000.00
11,000.00
1,400.00
400.00
82,640.00
8,264.00
90,904.00
90,900.00

Analisa SNI Hal 49

1
I023

I024

I025

I026

I027

I028

J
J001

J002

2
3
Memasang 1 m2 rangka dinding pemisah (60X120) cm, kayu kelas I atau II
Balok Kayu
Bahan
Paku 5-7 cm
Pekerja
Tukang Kayu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 dinding pemisah tekwood rangkap, kayu kelas II
Balok Kayu uk. (6X12) cm
Paku 5-10 cm
Bahan
Teakwood tebal 4 mm uk.120X240 cm
Lem Kayu
Pekerja
Tukang Kayu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 dinding pemisah plywood rangkap, kayu kelas II
Balok Kayu uk. (6X12) cm
Paku 5-10 cm
Bahan
Plywood tebal 4 mm uk.120X240 cm
Lem Kayu
Pekerja
Tukang Kayu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 dinding lambriziring papan kayu kayu kelas I
Papan Kayu
Bahan
Paku 5-10 cm
Paku skrup
Pekerja
Tukang Kayu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 dinding lambriziring dari plywood ukuran (120 X240) cm
Plywood tebal 4 mm
Bahan
Paku 1 - 2,5 cm
Pekerja
Tukang Kayu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 dinding bilik, rangka kayu kelas III atau IV
Bilik bambu
Kaso-kaso (5-7) cm
Bahan
Paku
List kayu 2/4
Pekerja
Tukang Kayu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
PEKERJAAN BESI DAN ALUMINIUM (SNI 7393:2008)
Memasang 1 kg besi profil
Bahan
Besi profil
Pekerja
Tukang las konstruksi
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 kg rangka kuda-kuda baja IWF
Bahan
Besi baja IWF
Pekerja
Tukang las konstruksi
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan

7=(4x6)

0.028
0.150
0.150
0.450
0.045
0.008

m3
kg
HO
HO
HO
HO

5,940,000.00
10,000.00
40,000.00
55,000.00
70,000.00
80,000.00

166,320.00
1,500.00
6,000.00
24,750.00
3,150.00
640.00
202,360.00
20,236.00
222,596.00
222,590.00

0.028
0.150
0.860
0.560
0.200
0.600
0.060
0.010

m3
kg
lbr
kg
HO
HO
HO
HO

4,125,000.00
10,000.00
139,700.00
24,000.00
40,000.00
55,000.00
70,000.00
80,000.00

115,500.00
1,500.00
120,142.00
13,440.00
8,000.00
33,000.00
4,200.00
800.00
296,582.00
29,658.20
326,240.20
326,240.00

0.028
0.150
0.860
0.560
0.200
0.600
0.060
0.010

m3
kg
lbr
kg
HO
HO
HO
HO

4,125,000.00
10,000.00
334,000.00
24,000.00
40,000.00
55,000.00
70,000.00
80,000.00

115,500.00
1,500.00
287,240.00
13,440.00
8,000.00
33,000.00
4,200.00
800.00
463,680.00
46,368.00
510,048.00
510,040.00

0.007
0.100
0.150
0.600
1.800
0.180
0.030

m3
kg
kg
HO
HO
HO
HO

5,940,000.00
10,000.00
13,650.00
40,000.00
55,000.00
70,000.00
80,000.00

41,580.00
1,000.00
2,047.50
24,000.00
99,000.00
12,600.00
2,400.00
182,627.50
18,262.75
200,890.25
200,890.00

0.400
0.050
0.025
0.075
0.008
0.001

lbr
kg
HO
HO
HO
HO

334,000.00
11,000.00
40,000.00
55,000.00
70,000.00
80,000.00

133,600.00
550.00
1,000.00
4,125.00
560.00
80.00
139,915.00
13,991.50
153,906.50
153,900.00

1.500
0.014
0.012
0.003
0.100
0.050
0.005
0.005

m2
m3
kg
m3
HO
HO
HO
HO

15,400.00
3,004,400.00
10,000.00
3,700.00
40,000.00
55,000.00
70,000.00
80,000.00

23,100.00
42,061.60
120.00
11.10
4,000.00
2,750.00
350.00
400.00
72,792.70
7,279.27
80,071.97
80,070.00

1.150
0.060
0.060
0.006
0.003

kg
HO
HO
HO
HO

10,300.00
40,000.00
60,000.00
75,000.00
80,000.00

11,845.00
2,400.00
3,600.00
450.00
240.00
18,535.00
1,853.50
20,388.50
20,380.00

1.150
0.060
0.060
0.006
0.003

kg
HO
HO
HO
HO

11,000.00
40,000.00
60,000.00
75,000.00
80,000.00

12,650.00
2,400.00
3,600.00
450.00
240.00
19,340.00
1,934.00
21,274.00
21,270.00

Analisa SNI Hal 50

1
J003

2
Mengerjakan 100 kg pekerjaan perakitan
Bahan

Tenaga kerja

J004

J005

J006

J007

J008

J009

J010

3
Solar
Minyak pelumas
Pekerja
Tukang las konstruksi
Kepala tukang
Mandor
Sewa alat

Alat
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Membuat 1 m2 pintu besi plat baja tebal 2 mm rangkap, rangka baja siku
Besi siku L 30.30.3
Bahan
Besi plat baja
Kawat las
Pekerja
Tukang las konstruksi
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Mengerjakan 10 cm pengelasan dengan las listrik
Kawat las listrik
Bahan
Solar
Minyak pelumas
Pekerja
Tukang las konstruksi
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Membuat 1 m2 rangka jendela besi scuare tube (25 x 5) cm
Besi scuare tube
Bahan
Besi lis kaca (1 x 1) cm
Pintu gulung besi
Pekerja
Tukang las biasa
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 pintu rolling door besi
Bahan
Pintu gulung besi
Pekerja
Tukang las biasa
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 pintu lipat (Folding door) bahan plastik/PVC
Bahan
Pintu lipat
Pekerja
Tukang
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 sunscreen alluminium
Bahan
Sunscreen alluminium
Pekerja
Tukang
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 rolling door alluminium
Bahan
Rolling door alluminium
Pekerja
Tukang
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan

7=(4x6)

1.000
0.100
0.100
0.100
0.001
0.005
0.800

ltr
ltr
HO
HO
HO
HO
jam

5,500.00
36,300.00
40,000.00
60,000.00
75,000.00
80,000.00
19,605.00

5,500.00
3,630.00
4,000.00
6,000.00
75.00
400.00
15,684.00
26,159.00
2,615.90
28,774.90
28,770.00

15.000
32.800
0.050
1.050
1.050
0.105
0.052

kg
kg
kg
HO
HO
HO
HO

11,000.00
11,100.00
18,400.00
40,000.00
60,000.00
75,000.00
80,000.00

165,000.00
364,080.00
920.00
42,000.00
63,000.00
7,875.00
4,160.00
647,035.00
64,703.50
711,738.50
711,730.00

0.400
0.300
0.040
0.040
0.002
0.002
0.170

kg
ltr
ltr
HO
HO
HO
HO

18,400.00
5,500.00
36,300.00
40,000.00
60,000.00
75,000.00
80,000.00

7,360.00
1,650.00
1,452.00
1,600.00
120.00
150.00
13,600.00
16,922.00
1,692.20
18,614.20
18,610.00

4.760
4.522
20.000
0.650
0.650
0.065
0.032

m'
m'
cm
HO
HO
HO
HO

22,000.00
20,000.00
4,500.00
40,000.00
60,000.00
75,000.00
80,000.00

104,720.00
90,440.00
90,000.00
26,000.00
39,000.00
4,875.00
2,560.00
162,435.00
16,243.50
178,678.50
178,670.00

1.000
1.200
1.200
0.120
0.006

m2
HO
HO
HO
HO

4,500.00
40,000.00
60,000.00
75,000.00
80,000.00

4,500.00
48,000.00
72,000.00
9,000.00
480.00
133,980.00
13,398.00
147,378.00
147,370.00

1.000
0.440
0.440
0.044
0.220

m2
HO
HO
HO
HO

450,000.00
40,000.00
60,000.00
75,000.00
80,000.00

450,000.00
17,600.00
26,400.00
3,300.00
17,600.00
514,900.00
51,490.00
566,390.00
566,390.00

1.000
0.088
0.800
0.080
0.004

m2
HO
HO
HO
HO

350,000.00
40,000.00
60,000.00
75,000.00
80,000.00

350,000.00
3,520.00
48,000.00
6,000.00
320.00
407,840.00
40,784.00
448,624.00
448,620.00

1.000
1.000
1.000
0.100
0.050

m2
HO
HO
HO
HO

600,000.00
40,000.00
60,000.00
75,000.00
80,000.00

600,000.00
40,000.00
60,000.00
7,500.00
4,000.00
711,500.00
71,150.00
782,650.00
782,650.00

Analisa SNI Hal 51

1
J011

2
Memasang 1 m kusen pintu alluminium
Bahan

Tenaga kerja

J012

J013

J014

J015

J016

J017

J018

3
Profil alluminium
Skrup fixer
Sealant
Pekerja
Tukang khusus alluminium
Kepala tukang
Mandor

Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 pintu alluminium strip lebar 8 cm
Profil alluminium
Bahan
Alluminium strip
Pekerja
Tukang khusus alluminium
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 pintu kaca rangka alluminium
Pintu alluminium
Bahan
Profil kaca
Sealant
Pekerja
Tukang khusus alluminium
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 venetions blinds dan Vertical blinds
Bahan
Venetions blinds dan vertical blinds (tirai)
Pekerja
Tukang
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 terali besi strip (2 x 3) mm
Besi strip
Bahan
Pengelasan
Pekerja
Tukang las
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 kawat nyamuk
Kawat nyamuk
Bahan
Pengelasan
Baja strip (0,2X2)cm
Pekerja
Tukang las
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 jendela nako & tralis
Jendela nako (rangka + kaca 5 mm)
Bahan
Paku skrup 1 cm 2,5 cm
Besi strip
Pekerja
Tukang
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m talang datar/ jurai seng bjls 28 lebar 90 cm
Seng plat
Bahan
Paku 1 cm 2,5 cm
Papan kayu kelas II atau III
Pekerja
Tukang
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan

7=(4x6)

1.100
2.000
0.060
0.043
0.043
0.0043
0.0021

m'
bh
tube
HO
HO
HO
HO

85,000.00
3,000.00
25,000.00
40,000.00
60,000.00
75,000.00
80,000.00

93,500.00
6,000.00
1,500.00
1,720.00
2,580.00
322.50
168.00
105,790.50
10,579.05
116,369.55
116,360.00

4.400
14.600
0.085
0.085
0.0085
0.0042

m'
m'
HO
HO
HO
HO

85,000.00
40,000.00
40,000.00
60,000.00
75,000.00
80,000.00

374,000.00
584,000.00
3,400.00
5,100.00
637.50
336.00
593,473.50
59,347.35
652,820.85
652,820.00

4.400
4.500
0.270
0.085
0.085
0.009
0.005

m'
m'
tube
HO
HO
HO
HO

42,909.09
4,500.00
25,000.00
40,000.00
60,000.00
75,000.00
80,000.00

188,800.00
20,250.00
6,750.00
3,400.00
5,100.00
675.00
400.00
225,375.00
22,537.50
247,912.50
247,910.00

1.000
0.350
0.350
0.035
0.018

m2
HO
HO
HO
HO

275,000.00
40,000.00
60,000.00
75,000.00
80,000.00

275,000.00
14,000.00
21,000.00
2,625.00
1,440.00
314,065.00
31,406.50
345,471.50
345,470.00

6.177
27.080
1.670
1.670
0.167
0.083

kg
cm
HO
HO
HO
HO

10,300.00
1,692.20
40,000.00
60,000.00
75,000.00
80,000.00

1.100
11.110
1.716
0.100
0.100
0.010
0.005

m2
cm
kg
HO
HO
HO
HO

27,000.00
1,692.20
10,300.00
40,000.00
60,000.00
75,000.00
80,000.00

29,700.00
18,800.34
17,674.80
4,000.00
6,000.00
750.00
400.00
77,325.14
7,732.51
85,057.66
85,050.00

1.100
10.000
7.000
0.200
0.200
0.020
0.001

m2
bh
m'
HO
HO
HO
HO

24,000.00
190.00
4,733.33
40,000.00
60,000.00
75,000.00
80,000.00

26,400.00
1,900.00
33,133.33
8,000.00
12,000.00
1,500.00
80.00
83,013.33
8,301.33
91,314.67
91,310.00

1.050
0.015
0.019
0.200
0.100
0.250
0.010

m'
kg
m3
HO
HO
HO
HO

25,888.89
11,000.00
2,400,000.00
40,000.00
60,000.00
75,000.00
80,000.00

27,183.33
165.00
45,600.00
8,000.00
6,000.00
18,750.00
800.00
106,498.33
10,649.83
117,148.17
117,140.00

45,824.78
66,800.00
100,200.00
12,525.00
6,640.00
231,989.78
23,198.98
255,188.75
255,180.00

Analisa SNI Hal 52

1
J019

J020

2
3
Memasang 1 m talang lingkaran D-15 cm, seng plat bjls 30 lebar 45 cm
Seng plat
Bahan
Paku 1 cm 2,5 cm
Besi strip
Pekerja
Tukang
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan

K
K001

K002

K003

K004

K005

K006

1.050
0.010
0.500
0.150
0.300
0.030
0.008

7=(4x6)

m
kg
kg
HO
HO
HO
HO

12,944.44
11,000.00
10,300.00
40,000.00
60,000.00
75,000.00
80,000.00

13,591.67
110.00
5,150.00
6,000.00
18,000.00
2,250.00
640.00
45,741.67
4,574.17
50,315.83
50,310.00

m2

176,000.00

176,000.00
176,000.00
17,600.00
193,600.00
193,600.00

m2

195,000.00

195,000.00
195,000.00
19,500.00
214,500.00
214,500.00

m2
kg
HO
HO
HO
HO

18,600.00
11,000.00
40,000.00
55,000.00
70,000.00
80,000.00

20,460.00
110.00
1,200.00
3,850.00
490.00
320.00
26,430.00
2,643.00
29,073.00
29,070.00

lbr
kg
HO
HO
HO
HO

15,437.50
11,000.00
40,000.00
55,000.00
70,000.00
80,000.00

185,250.00
550.00
4,800.00
6,600.00
840.00
480.00
198,520.00
19,852.00
218,372.00
218,370.00

lbr
kg
HO
HO
HO
HO

30,875.00
11,000.00
40,000.00
55,000.00
70,000.00
80,000.00

179,075.00
550.00
4,000.00
5,500.00
700.00
400.00
190,225.00
19,022.50
209,247.50
209,240.00

lbr
kg
HO
HO
HO
HO

123,500.00
11,000.00
40,000.00
55,000.00
70,000.00
80,000.00

185,250.00
550.00
4,000.00
5,500.00
700.00
400.00
196,400.00
19,640.00
216,040.00
216,040.00

lbr
kg
HO
HO
HO
HO

61,000.00
11,000.00
40,000.00
55,000.00
70,000.00
80,000.00

22,875.00
330.00
4,000.00
5,500.00
700.00
400.00
33,805.00
3,380.50
37,185.50
37,180.00

m3
kg
HO
HO
HO
HO

4,290,000.00
11,000.00
40,000.00
55,000.00
70,000.00
80,000.00

64,350.00
110.00
3,200.00
4,400.00
5,600.00
3,200.00
80,860.00
8,086.00
88,946.00
88,940.00

Memasang 1 M2 atap baja ringan Setara Maxitop Bluescope lysaght bentang max. 8m + rangka dan reng

Bahan dan Upah


Jumlah
Overhead + Profit
Jumlah
Dibulatkan
J021

1.000

Memasang 1 M2 atap baja ringan Setara Smarttruss Bluescope lysaght bentang lebih dari 8m + rangka dan reng

Bahan dan Upah


1.000
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
PEKERJAAN LANGIT-LANGIT (SNI 2839:2008)
Memasang 1 m2 langit-langit asbes semen, tebal 4 mm, 5 mm, dan 6 mm
Asbes semen
1.100
Bahan
Paku tripleks
0.010
Pekerja
0.030
Tukang kayu
0.070
Tenaga kerja
Kepala tukang
0.007
Mandor
0.004
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 langit-langit akustik ukuran (30 x 30) cm
Akustik
12.000
Bahan
Paku tripleks
0.050
Pekerja
0.120
Tukang kayu
0.120
Tenaga kerja
Kepala tukang
0.012
Mandor
0.006
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 langit-langit akustik ukuran (30 x 60) cm
Akustik
5.800
Bahan
Paku tripleks
0.050
Pekerja
0.100
Tukang kayu
0.100
Tenaga kerja
Kepala tukang
0.010
Mandor
0.005
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 langit-langit akustik ukuran (60 x 120) cm
Akustik
1.500
Bahan
Paku tripleks
0.050
Pekerja
0.100
Tukang kayu
0.100
Tenaga kerja
Kepala tukang
0.010
Mandor
0.005
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 langit-langit tripleks ukuran (120 x 240) cm, tebal 3 mm, 4 mm dan 6 mm
Tripleks
0.375
Bahan
Paku tripleks
0.030
Pekerja
0.100
Tukang kayu
0.100
Tenaga kerja
Kepala tukang
0.010
Mandor
0.005
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 langit-langit lambriziring kayu, tebal 9 mm
Kayu papan
0.015
Bahan
Paku tripleks
0.010
Pekerja
0.080
Tukang kayu
0.080
Tenaga kerja
Kepala tukang
0.080
Mandor
0.040
Jumlah
Overhead + Profit
Jumlah
Dibulatkan

Analisa SNI Hal 53

1
K007

K008

K009

K010

K011

K012

K013

K014

2
3
Memasang 1 m2 langit-langit gypsum board ukuran (1200x2400x9) mm
Gypsum board
Bahan
Paku skrup
Pekerja
Tukang kayu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m list plafond gypsum profil
List gypsum profil
Bahan
Tepung gypsum
Pekerja
Tukang kayu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 langit-langit GRC board ukuran (1200x2400x4) mm
Gypsum board
Bahan
Paku skrup
Pekerja
Tukang kayu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 langit-langit GRC board ukuran (1200x2400x6) mm
Gypsum board
Bahan
Paku skrup
Pekerja
Tukang kayu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 langit-langit GRC board ukuran (1200x2400x9) mm
Gypsum board
Bahan
Paku skrup
Pekerja
Tukang kayu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 langit-langit akustik ukuran (60 x 120) cm + rangka alluminium
Profil Alluminium "T"
Kawat diameter 4 mm
Bahan
Ramset
Akustik 60 cm x 120 cm
Pekerja
Tukang besi
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m list langit-langit kayu profil
List kayu profil
Bahan
Paku
Pekerja
Tukang kayu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 rangka langit-langit uk. 1 m x 1 m, kayu kelas II
Kayu gergajian kelas II, balok
Bahan
Paku berbagai ukuran (4 - 7 cm)
Pekerja
Tukang kayu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan

7=(4x6)

0.364
0.110
0.100
0.050
0.005
0.005

lbr
kg
HO
HO
HO
HO

69,200.00
13,650.00
40,000.00
55,000.00
70,000.00
80,000.00

25,188.80
1,501.50
4,000.00
2,750.00
350.00
400.00
34,190.30
3,419.03
37,609.33
37,600.00

1.050
0.150
0.060
0.060
0.006
0.003

m'
kg
HO
HO
HO
HO

4,500.00
36.50
40,000.00
55,000.00
70,000.00
80,000.00

4,725.00
5.48
2,400.00
3,300.00
420.00
240.00
11,090.48
1,109.05
12,199.52
12,190.00

0.364
0.110
0.100
0.050
0.005
0.005

lbr
kg
HO
HO
HO
HO

50,000.00
13,650.00
40,000.00
55,000.00
70,000.00
80,000.00

18,200.00
1,501.50
4,000.00
2,750.00
350.00
400.00
27,201.50
2,720.15
29,921.65
29,920.00

0.364
0.110
0.100
0.050
0.005
0.005

lbr
kg
HO
HO
HO
HO

90,000.00
13,650.00
40,000.00
55,000.00
70,000.00
80,000.00

32,760.00
1,501.50
4,000.00
2,750.00
350.00
400.00
41,761.50
4,176.15
45,937.65
45,930.00

0.364
0.110
0.100
0.050
0.005
0.005

lbr
kg
HO
HO
HO
HO

125,000.00
13,650.00
40,000.00
55,000.00
70,000.00
80,000.00

45,500.00
1,501.50
4,000.00
2,750.00
350.00
400.00
54,501.50
5,450.15
59,951.65
59,950.00

3.600
0.150
1.050
1.500
0.500
0.500
0.050
0.025

m'
kg
bh
lbr
HO
HO
HO
HO

85,000.00
19,800.00
9,800.00
123,500.00
40,000.00
55,000.00
70,000.00
80,000.00

306,000.00
2,970.00
10,290.00
185,250.00
20,000.00
27,500.00
3,500.00
2,000.00
557,510.00
55,751.00
613,261.00
613,260.00

1.050
0.010
0.050
0.050
0.005
0.003

m'
kg
HO
HO
HO
HO

12,400.00
10,000.00
40,000.00
55,000.00
70,000.00
80,000.00

13,020.00
100.00
2,000.00
2,750.00
350.00
240.00
18,460.00
1,846.00
20,306.00
20,300.00

0.0120
0.1000
0.1500
0.2500
0.0250
0.0750

m
kg
HO
HO
HO
HO

3,004,400.00
10,000.00
40,000.00
55,000.00
70,000.00
80,000.00

36,052.80
1,000.00
6,000.00
13,750.00
1,750.00
6,000.00
64,552.80
6,455.28
71,008.08
71,000.00

Analisa SNI Hal 54

1
K015

K016

K017

K018

K019

K020

K021

K022

2
3
Memasang 1 m2 rangka langit-langit uk. 30 cm x 60 cm, kayu kelas II
Kayu gergajian kelas II, balok
Bahan
Paku berbagai ukuran (4 - 7 cm)
Pekerja
Tukang kayu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 rangka langit-langit uk. 30 cm x 30 cm, kayu kelas II
Kayu gergajian kelas II, balok
Bahan
Paku berbagai ukuran (4 - 7 cm)
Pekerja
Tukang kayu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 rangka langit-langit uk. 60 cm x 60 cm, besi hollow
Besi hollow 40x40 mm
Bahan
Besi hollow 20x20 mm
Paku skrup
Pekerja
Tukang kayu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m1 lisplank uk. 3 cm x 20 cm, kayu kamper Samarinda
Kayu papan kamper
Bahan
Paku berbagai ukuran (4 - 7 cm)
Pekerja
Tukang kayu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan

Memasang 1 m1 lisplank uk. 3 cm x 30 cm, kayu kamper Samarinda


Kayu papan kamper
Bahan
Paku berbagai ukuran (4 - 7 cm)
Pekerja
Tukang kayu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m1 lisplank 2 x (3 cm x 20 cm), kayu kamper Samarinda
Kayu papan kamper
Bahan
Paku berbagai ukuran (4 - 7 cm)
Pekerja
Tukang kayu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m1 lisplank GRC uk. 4 mm x 20 cm
GRC 4 mm
Bahan
Paku berbagai ukuran (1 - 3 cm)
Pekerja
Tukang kayu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m1 lisplank GRC uk. 6 mm x 20 cm
GRC 4 mm
Bahan
Paku berbagai ukuran (1 - 3 cm)
Pekerja
Tukang kayu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan

7=(4x6)

0.0230
0.1500
0.2000
0.3000
0.0300
0.0100

m
kg
HO
HO
HO
HO

3,004,400.00
10,000.00
40,000.00
55,000.00
70,000.00
80,000.00

69,101.20
1,500.00
8,000.00
16,500.00
2,100.00
800.00
98,001.20
9,800.12
107,801.32
107,800.00

0.0270
0.2000
0.2500
0.3500
0.0350
0.0125

m'
kg
HO
HO
HO
HO

3,004,400.00
10,000.00
40,000.00
55,000.00
70,000.00
80,000.00

81,118.80
2,000.00
10,000.00
19,250.00
2,450.00
1,000.00
115,818.80
11,581.88
127,400.68
127,400.00

1.6500
2.3000
30.0000
0.1500
0.2500
0.0250
0.0075

m'
m'
bh
HO
HO
HO
HO

20,000.00
25,000.00
190.00
40,000.00
55,000.00
70,000.00
80,000.00

33,000.00
57,500.00
5,700.00
6,000.00
13,750.00
1,750.00
600.00
118,300.00
11,830.00
130,130.00
130,130.00

0.0072
0.0500
0.1000
0.2000
0.0200
0.0050

m
kg
HO
HO
HO
HO

5,940,000.00
10,000.00
40,000.00
55,000.00
70,000.00
80,000.00

42,768.00
500.00
4,000.00
11,000.00
1,400.00
400.00
60,068.00
6,006.80
66,074.80
66,070.00

0.0110
0.0500
0.1100
0.2200
0.0220
0.0050

m
kg
HO
HO
HO
HO

5,940,000.00
10,000.00
40,000.00
55,000.00
70,000.00
80,000.00

65,340.00
500.00
4,400.00
12,100.00
1,540.00
400.00
84,280.00
8,428.00
92,708.00
92,700.00

0.0110
0.0500
0.1100
0.2200
0.0220
0.0050

m
kg
HO
HO
HO
HO

5,940,000.00
10,000.00
40,000.00
55,000.00
70,000.00
80,000.00

65,340.00
500.00
4,400.00
12,100.00
1,540.00
400.00
84,280.00
8,428.00
92,708.00
92,700.00

0.0760
0.0500
0.1100
0.2200
0.0220
0.0050

lbr
kg
HO
HO
HO
HO

50,000.00
11,000.00
40,000.00
55,000.00
70,000.00
80,000.00

3,800.00
550.00
4,400.00
12,100.00
1,540.00
400.00
22,790.00
2,279.00
25,069.00
25,060.00

0.0760
0.0500
0.1100
0.2200
0.0220
0.0050

lbr
kg
HO
HO
HO
HO

90,000.00
11,000.00
40,000.00
55,000.00
70,000.00
80,000.00

6,840.00
550.00
4,400.00
12,100.00
1,540.00
400.00
25,830.00
2,583.00
28,413.00
28,410.00

Analisa SNI Hal 55

1
K023

K024

L
L001

L002

L003

L004

L005

L006

L007

2
3
Memasang 1 m1 lisplank GRC uk. 4 mm x 30 cm
GRC 4 mm
Bahan
Paku berbagai ukuran (1 - 3 cm)
Pekerja
Tukang kayu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m1 lisplank GRC uk. 6 mm x 30 cm
GRC 4 mm
Bahan
Paku berbagai ukuran (1 - 3 cm)
Pekerja
Tukang kayu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
PEKERJAAN PENUTUP ATAP
Memasang 1 m2 penutup atap Sirap (4 lapis) + rangka atap
Kayu kaso 5/7 kamper Banjar
Reng kayu 2/3 kamper Banjar
Bahan
Atap sirap 4 lapis
Paku 5 s.d. 7 cm
Pekerja
Tukang kayu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 penutup atap genteng plentong
Bahan
Atap Genteng Plentong pres Bakar KW 1
Pekerja
Tukang kayu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 penutup atap genteng kodok
Bahan
Atap Genteng Kodok
Pekerja
Tukang kayu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 penutup atap genteng beton
Bahan
Atap Genteng Beton
Pekerja
Tukang kayu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 penutup atap genteng murando glazur
Bahan
Atap Genteng Murando glazur
Pekerja
Tukang kayu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 penutup atap genteng murando natural
Bahan
Atap Genteng Murando glazur
Pekerja
Tukang kayu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 penutup atap genteng metal (Rainbow Roof)
Bahan
Atap Genteng Metal
Pekerja
Tukang kayu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan

7=(4x6)

0.1150
0.0500
0.1100
0.2200
0.0220
0.0050

lbr
kg
HO
HO
HO
HO

50,000.00
11,000.00
40,000.00
55,000.00
70,000.00
80,000.00

5,750.00
550.00
4,400.00
12,100.00
1,540.00
400.00
24,740.00
2,474.00
27,214.00
27,210.00

0.1150
0.0500
0.1100
0.2200
0.0220
0.0050

lbr
kg
HO
HO
HO
HO

90,000.00
11,000.00
40,000.00
55,000.00
70,000.00
80,000.00

10,350.00
550.00
4,400.00
12,100.00
1,540.00
400.00
29,340.00
2,934.00
32,274.00
32,270.00

0.0110
4.0000
80.0000
0.2500
0.1500
0.1500
0.0100
0.0050

m
m1
bh
kg
org
org
org
org

4,125,000.00
3,000.00
1,100.00
10,000.00
40,000.00
55,000.00
70,000.00
80,000.00

45,375.00
12,000.00
88,000.00
2,500.00
6,000.00
8,250.00
700.00
400.00
163,225.00
16,322.50
179,547.50
179,540.00

25.000
0.060
0.006
0.120
0.006

bh
org
org
org
org

1,300.00
40,000.00
55,000.00
70,000.00
80,000.00

32,500.00
2,400.00
330.00
8,400.00
480.00
44,110.00
4,411.00
48,521.00
48,520.00

25.000
0.060
0.006
0.120
0.006

bh
org
org
org
org

1,400.00
40,000.00
55,000.00
70,000.00
80,000.00

35,000.00
2,400.00
330.00
8,400.00
480.00
46,610.00
4,661.00
51,271.00
51,270.00

14.500
0.010
0.010
0.200
0.010

bh
org
org
org
org

6,524.14
40,000.00
55,000.00
70,000.00
80,000.00

94,600.00
400.00
550.00
14,000.00
800.00
110,350.00
11,035.00
121,385.00
121,380.00

18.000
0.010
0.010
0.200
0.010

bh
org
org
org
org

5,900.00
40,000.00
55,000.00
70,000.00
80,000.00

106,200.00
400.00
550.00
14,000.00
800.00
121,950.00
12,195.00
134,145.00
134,140.00

20.000
0.010
0.010
0.200
0.010

bh
org
org
org
org

3,200.00
40,000.00
55,000.00
70,000.00
80,000.00

64,000.00
400.00
550.00
14,000.00
800.00
79,750.00
7,975.00
87,725.00
87,720.00

1.100
0.010
0.010
0.200
0.010

m2
org
org
org
org

237,900.00
40,000.00
55,000.00
70,000.00
80,000.00

261,690.00
400.00
550.00
14,000.00
800.00
277,440.00
27,744.00
305,184.00
305,180.00

Analisa SNI Hal 56

1
L008

L009

L010

L011

L012

L013

L014

L015

2
3
Memasang 1 m2 penutup atap genteng metal (Hana)
Bahan
Atap Genteng Metal
Pekerja
Tukang kayu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan

Memasang 1 m2 penutup atap genteng asbes gelombang


Atap Genteng Asbes gelombang
Bahan
Paku sekrup 3,5"/Kait
Pekerja
Tukang kayu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 penutup atap genteng seng gelombang
Bahan
Atap Genteng Seng gelombang
Paku sekrup 3,5"/Kait
Pekerja
Tukang kayu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m' bubungan atap genteng plentong
Genteng bubungan genteng ex Jatiwangi
Bahan
PC (50 kg)
Pasir pasang
Pekerja
Tukang kayu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m' bubungan atap genteng kodok
Bahan
Bubungan Genteng Kodok
PC (50 kg)
Pasir pasang
Pekerja
Tukang kayu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m' bubungan atap genteng beton
Bahan
Bubungan Genteng Beton
PC (50 kg)
Pasir pasang
Pekerja
Tukang kayu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m' bubungan atap genteng murando glazur
Bubungan Genteng Murando glazur
Bahan
PC (50 kg)
Pasir pasang
Pekerja
Tukang kayu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m' bubungan atap genteng murando natural
Bubungan Genteng Murando glazur
Bahan
PC (50 kg)
Pasir pasang
Pekerja
Tukang kayu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan

7=(4x6)

1.100
0.010
0.010
0.200
0.010

m2
org
org
org
org

171,400.00
40,000.00
55,000.00
70,000.00
80,000.00

188,540.00
400.00
550.00
14,000.00
800.00
204,290.00
20,429.00
224,719.00
224,710.00

0.5000
2.0000
0.1400
0.0670
0.0070
0.0070

lbr
bh
org
org
org
org

76,400.00
800.00
40,000.00
55,000.00
70,000.00
80,000.00

38,200.00
1,600.00
5,600.00
3,685.00
490.00
560.00
50,135.00
5,013.50
55,148.50
55,140.00

0.5000
4.0000
0.1500
0.1500
0.0100
0.0050

lbr
bh
org
org
org
org

50,900.00
800.00
40,000.00
55,000.00
70,000.00
80,000.00

25,450.00
3,200.00
6,000.00
8,250.00
700.00
400.00
44,000.00
4,400.00
48,400.00
48,400.00

4.0000
6.5200
0.2100
0.1500
0.2000
0.0100
0.0050

bh
kg
m3
org
org
org
org

6,300.00
1,260.00
180,000.00
40,000.00
55,000.00
70,000.00
80,000.00

25,200.00
8,215.20
37,800.00
6,000.00
11,000.00
700.00
400.00
89,315.20
8,931.52
98,246.72
98,240.00

4.0000
6.5200
0.2100
0.1500
0.2000
0.0100
0.0050

bh
kg
m3
org
org
org
org

4,000.00
1,260.00
180,000.00
40,000.00
55,000.00
70,000.00
80,000.00

16,000.00
8,215.20
37,800.00
6,000.00
11,000.00
700.00
400.00
80,115.20
8,011.52
88,126.72
88,120.00

3.0000
6.5200
0.2100
0.1500
0.2000
0.0100
0.0050

bh
kg
m3
org
org
org
org

9,900.00
1,260.00
180,000.00
40,000.00
55,000.00
70,000.00
80,000.00

29,700.00
8,215.20
37,800.00
6,000.00
11,000.00
700.00
400.00
93,815.20
9,381.52
103,196.72
103,190.00

5.0000
6.5200
0.2100
0.1500
0.2000
0.0100
0.0050

bh
kg
m3
org
org
org
org

8,300.00
1,260.00
180,000.00
40,000.00
55,000.00
70,000.00
80,000.00

41,500.00
8,215.20
37,800.00
6,000.00
11,000.00
700.00
400.00
105,615.20
10,561.52
116,176.72
116,170.00

5.0000
6.5200
0.2100
0.1500
0.2000
0.0100
0.0050

bh
kg
m3
org
org
org
org

6,300.00
1,260.00
180,000.00
40,000.00
55,000.00
70,000.00
80,000.00

31,500.00
8,215.20
37,800.00
6,000.00
11,000.00
700.00
400.00
95,615.20
9,561.52
105,176.72
105,170.00

Analisa SNI Hal 57

1
L016

L017

L018

L019

M
M001

M002

N
N001

N002

N003

2
3
Memasang 1 m' bubungan atap genteng metal (Rainbow Roof)
Bahan
Bubungan Genteng metal
Paku sekrup 3,5"/Kait
Pekerja
Tukang kayu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m' bubungan atap genteng metal (Hana)
Bahan
Bubungan Genteng metal
Paku sekrup 3,5"/Kait
Pekerja
Tukang kayu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m' bubungan atap genteng asbes gelombang
Bubungan Genteng Asbes gelombang
Bahan
Paku sekrup 3,5"/Kait
Pekerja
Tukang kayu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m' bubungan atap genteng seng gelombang
Bubungan Genteng seng gelombang
Bahan
Paku sekrup 3,5"/Kait
Pekerja
Tukang kayu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
PEKERJAAN PAGAR
Memasang 1 m2 pagar depan tralis (standar)
Bouplank
Galian Tanah
Urugan Pasir 10 cm'
Pasang Aanstamping
Pekerjaan
Pas.Batu Belah 1 pc : 4 psr
Plesteran & Acian 1 pc : 4 psr
Beton Tulang ( 100 kg/m3 )
Pagar Tralis
Pengecatan
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 pagar samping/belakang
Galian Tanah
Urugan Pasir 10 cm'
Pasang Aanstamping
Pas.Batu Belah 1 pc : 4 psr
Pekerjaan
Pas.bata + plesteran 1 : 4
Beton Tulang ( 100 kg/m3 )
Besi Siku
Kawat Duri
Pengecatan
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
PEKERJAAN KUNCI/ALAT GANTUNG & KACA
Memasang 1 buah kunci tanam 2 Slaag Ancor Asli
Bahan
Kunci 2 Slaag Ancor Asli
Tenaga kerja
Tukang kayu
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 buah kunci tanam 2 Slaag ISO
Bahan
Kunci 2 Slaag ISO
Tenaga kerja
Tukang kayu
Jumlah
Overhead + Profit
Jumlah
Dibulatkan

Memasang 1 buah kunci tanam 2 Slaag Kuda Terbang


Bahan
Kunci 2 Slaag Kuda Terbang
Tenaga kerja
Tukang kayu
Jumlah
Overhead + Profit
Jumlah
Dibulatkan

7=(4x6)

1.0500
4.0000
0.1500
0.2000
0.0100
0.0050

m'
bh
org
org
org
org

154,800.00
800.00
40,000.00
55,000.00
70,000.00
80,000.00

162,540.00
3,200.00
6,000.00
11,000.00
700.00
400.00
183,840.00
18,384.00
202,224.00
202,220.00

0.2500
2.0000
0.1500
0.2000
0.0100
0.0050

m'
bh
org
org
org
org

83,200.00
800.00
40,000.00
55,000.00
70,000.00
80,000.00

20,800.00
1,600.00
6,000.00
11,000.00
700.00
400.00
40,500.00
4,050.00
44,550.00
44,550.00

0.2500
2.0000
0.1400
0.0670
0.0070
0.0070

m'
bh
org
org
org
org

76,400.00
800.00
40,000.00
55,000.00
70,000.00
80,000.00

19,100.00
1,600.00
5,600.00
3,685.00
490.00
560.00
31,035.00
3,103.50
34,138.50
34,130.00

0.2500
2.0000
0.1400
0.0670
0.0070
0.0070

m'
bh
org
org
org
org

50,900.00
800.00
40,000.00
55,000.00
70,000.00
80,000.00

12,725.00
1,600.00
5,600.00
3,685.00
490.00
560.00
24,660.00
2,466.00
27,126.00
27,120.00

1.0000
0.4500
0.0800
0.1200
0.2000
0.4100
0.0563
1.5000
1.0000

m1
m
m
m
m
m
m
m'
m

35,139.72
32,000.00
198,800.00
293,460.00
579,480.00
53,777.40
650,554.64
130,700.00
41,362.00

35,139.72
14,400.00
15,904.00
35,215.20
115,896.00
22,048.73
36,593.70
196,050.00
41,362.00
512,609.35
51,260.94
563,870.29
563,870.00

0.4500
0.0800
0.1200
0.2000
1.8000
0.0563
1.0000
3.0000
1.0000

m
m
m
m
m
m
kg
m1
m

32,000.00
198,800.00
293,460.00
579,480.00
130,033.20
650,554.64
11,000.00
3,000.00
41,362.00

14,400.00
15,904.00
35,215.20
115,896.00
234,059.76
36,593.70
11,000.00
9,000.00
41,362.00
513,430.66
51,343.07
564,773.72
564,770.00

1.000
0.5000

bh
org

129,800.00
55,000.00

129,800.00
27,500.00
157,300.00
15,730.00
173,030.00
173,030.00

1.000
0.5000

bh
org

181,500.00
55,000.00

181,500.00
27,500.00
209,000.00
20,900.00
229,900.00
229,900.00

1.000
0.5000

bh
org

82,800.00
55,000.00

82,800.00
27,500.00
110,300.00
11,030.00
121,330.00
121,330.00
Analisa SNI Hal 58

1
N004

N005

N006

N007

N008

N009

N010

N011

N012

N013

N014

N015

2
3
Memasang 1 buah kunci tanam 2 Slaag ROYAL
Bahan
Kunci 2 Slaag ROYAL
Tenaga kerja
Tukang kayu
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 buah kunci tanam 2 Slaag Silinder SEIS Asli type 210 s/d type 226
Bahan
Kunci 2 Slaag Silinder SEIS
Tenaga kerja
Tukang kayu
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 buah kunci tanam 2 Slaag Silinder Utama Standard
Bahan
Kunci 2 Slaag Silinder Utama Standard
Tenaga kerja
Tukang kayu
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 buah Kunci Gembok Besar
Bahan
Kunci Gembok Besar
Tenaga kerja
Tukang kayu
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 buah Kunci KM Bulat ALFA
Bahan
Kunci KM Bulat ALFA
Tenaga kerja
Tukang kayu
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 buah Kunci KM Bulat Kualitas Biasa
Bahan
Kunci KM Bulat Kualitas Biasa
Tenaga kerja
Tukang kayu
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 buah Kunci Silinder ALFA untuk Pintu Alumunium
Bahan
Kunci Silinder ALFA
Tenaga kerja
Tukang kayu
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 buah Engsel Pintu Unilon Standard
Bahan
Engsel Pintu Unilon Standard
Tenaga kerja
Tukang kayu
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 buah Engsel Jendela Unilon
Bahan
Engsel Jendela Unilon
Tenaga kerja
Tukang kayu
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 Kaca Polos tebal 3 mm
Bahan
Kaca Polos tebal 3 mm
Pekerja
Tenaga kerja
Tukang kayu
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 Kaca Polos tebal 5 mm
Bahan
Kaca Polos tebal 5 mm
Pekerja
Tenaga kerja
Tukang kayu
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 Kaca Rayband tebal 5 mm
Bahan
Kaca Polos tebal 5 mm
Pekerja
Tenaga kerja
Tukang kayu
Jumlah
Overhead + Profit
Jumlah
Dibulatkan

7=(4x6)

1.000
0.5000

bh
org

120,600.00
55,000.00

120,600.00
27,500.00
148,100.00
14,810.00
162,910.00
162,910.00

1.000
0.5000

bh
org

267,500.00
55,000.00

267,500.00
27,500.00
295,000.00
29,500.00
324,500.00
324,500.00

1.000
0.5000

bh
org

538,700.00
55,000.00

538,700.00
27,500.00
566,200.00
56,620.00
622,820.00
622,820.00

1.000
0.5000

bh
org

65,400.00
55,000.00

65,400.00
27,500.00
92,900.00
9,290.00
102,190.00
102,190.00

1.000
0.5000

bh
org

84,300.00
55,000.00

84,300.00
27,500.00
111,800.00
11,180.00
122,980.00
122,980.00

1.000
0.5000

bh
org

43,600.00
55,000.00

43,600.00
27,500.00
71,100.00
7,110.00
78,210.00
78,210.00

1.000
0.5000

bh
org

314,400.00
55,000.00

314,400.00
27,500.00
341,900.00
34,190.00
376,090.00
376,090.00

1.000
0.1500

bh
org

17,200.00
55,000.00

17,200.00
8,250.00
25,450.00
2,545.00
27,995.00
27,990.00

1.000
0.1500

bh
org

12,000.00
55,000.00

12,000.00
8,250.00
20,250.00
2,025.00
22,275.00
22,270.00

1.000
0.1500
0.1500

bh
org
org

63,400.00
40,000.00
55,000.00

63,400.00
6,000.00
8,250.00
77,650.00
7,765.00
85,415.00
85,410.00

1.000
0.1500
0.2000

bh
org
org

93,600.00
40,000.00
55,000.00

93,600.00
6,000.00
11,000.00
110,600.00
11,060.00
121,660.00
121,660.00

1.000
0.1500
0.2000

bh
org
org

94,400.00
40,000.00
55,000.00

94,400.00
6,000.00
11,000.00
111,400.00
11,140.00
122,540.00
122,540.00

Analisa SNI Hal 59

1
O
O 001

2
PEKERJAAN SANITAIR
Memasang 1 buah Wastafel
Bahan

Tenaga kerja

O 002

O 003

O 004

O 005

O 006

O 007

O 008

Wastafel Lengkap INA


Semen Portland
Pasir Pasang
Pekerja
Tukang batu
Kepala tukang
Mandor

Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 buah Bak KM Fiber 60 x 60
Bahan
Bak KM Fiber 60 x 60
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 buah Bank mandi bata merah volume 0,3 m3
Bata Merah
Bahan
PC (50 kg)
Pasir pasang
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 buah Closet Jongkok Standard Putih Poslin TOTO
Bahan
Closet Jongkok TOTO
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 buah Urinoir Lengkap TOTO Warna Standard lengkap
Urinoir Lengkap TOTO Warna Standard
Bahan
PC (50 kg)
Pasir pasang
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m' pipa galvanis 1/2"
Pipa galvanis 1/2"
Bahan
Perlengkapan (dari harga pipa)
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m' pipa galvanis 3/4"
Pipa galvanis 3/4"
Bahan
Perlengkapan (dari harga pipa)
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m' pipa galvanis 1"
Pipa galvanis 1"
Bahan
Perlengkapan (dari harga pipa)
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan

7=(4x6)

1.0000
6.0000
0.0100
1.2000
1.4500
0.1500
0.1000

umit
kg
m
org
org
org
org

750,000.00
1,260.00
180,000.00
40,000.00
55,000.00
70,000.00
80,000.00

750,000.00
7,560.00
1,800.00
48,000.00
79,750.00
10,500.00
8,000.00
905,610.00
90,561.00
996,171.00
996,170.00

1.0000
2.1000
0.7500
0.0700
0.1100

bh
org
org
org
org

227,300.00
40,000.00
55,000.00
70,000.00
80,000.00

227,300.00
84,000.00
41,250.00
4,900.00
8,800.00
366,250.00
36,625.00
402,875.00
402,870.00

200.0000
144.0000
0.3000
6.0000
3.0000
0.3000
0.3000

bh
kg
m
org
org
org
org

600.00
1,260.00
180,000.00
40,000.00
55,000.00
70,000.00
80,000.00

120,000.00
181,440.00
54,000.00
240,000.00
165,000.00
21,000.00
24,000.00
805,440.00
80,544.00
885,984.00
885,980.00

1.0000
1.0000
1.5000
0.1500
0.1600

unit
org
org
org
org

217,800.00
40,000.00
55,000.00
70,000.00
80,000.00

217,800.00
40,000.00
82,500.00
10,500.00
12,800.00
363,600.00
36,360.00
399,960.00
399,960.00

1.0000
6.0000
0.0100
1.0000
1.0000
0.1000
0.1100

unit
zak
m
org
org
org
org

1,938,500.00
1,260.00
180,000.00
40,000.00
55,000.00
70,000.00
80,000.00

1,938,500.00
7,560.00
1,800.00
40,000.00
55,000.00
7,000.00
8,800.00
2,058,660.00
205,866.00
2,264,526.00
2,264,520.00

1.2000
35.0000
0.0540
0.0900
0.0090
0.0270

m'
%
Oh
Oh
Oh
Oh

18,033.33
18,033.33
40,000.00
55,000.00
70,000.00
80,000.00

21,640.00
6,311.67
2,160.00
4,950.00
630.00
2,160.00
37,851.67
3,785.17
41,636.83
41,630.00

1.2000
35.0000
0.0540
0.0900
0.0090
0.0270

m'
%
Oh
Oh
Oh
Oh

21,133.33
21,133.33
40,000.00
55,000.00
70,000.00
80,000.00

25,360.00
7,396.67
2,160.00
4,950.00
630.00
2,160.00
42,656.67
4,265.67
46,922.33
46,920.00

1.2000
35.0000
0.0540
0.0900
0.0090
0.0270

m'
%
Oh
Oh
Oh
Oh

30,750.00
30,750.00
40,000.00
55,000.00
70,000.00
80,000.00

36,900.00
10,762.50
2,160.00
4,950.00
630.00
2,160.00
57,562.50
5,756.25
63,318.75
63,310.00

Analisa SNI Hal 60

1
O 009

2
Memasang 1 m' pipa galvanis 11/2"
Bahan

Tenaga kerja

O 010

Tenaga kerja

Tenaga kerja

Tenaga kerja

Tenaga kerja

Tenaga kerja

O 015

Tenaga kerja

47,800.00
47,800.00
40,000.00
55,000.00
70,000.00
80,000.00

57,360.00
16,730.00
2,160.00
4,950.00
630.00
2,160.00
83,990.00
8,399.00
92,389.00
92,380.00

Pipa galvanis 2"


Perlengkapan (dari harga pipa)
Pekerja
Tukang batu
Kepala tukang
Mandor

1.2000
35.0000
0.0540
0.0900
0.0090
0.0270

m'
%
Oh
Oh
Oh
Oh

63,733.33
63,733.33
40,000.00
55,000.00
70,000.00
80,000.00

76,480.00
22,306.67
2,160.00
4,950.00
630.00
2,160.00
108,686.67
10,868.67
119,555.33
119,550.00

Pipa galvanis 4"


Perlengkapan (dari harga pipa)
Pekerja
Tukang batu
Kepala tukang
Mandor

1.2000
35.0000
0.0540
0.0900
0.0090
0.0270

m'
%
Oh
Oh
Oh
Oh

159,300.00
159,300.00
40,000.00
55,000.00
70,000.00
80,000.00

191,160.00
55,755.00
2,160.00
4,950.00
630.00
2,160.00
256,815.00
25,681.50
282,496.50
282,490.00

PVC tipe AW 1/2"


Perlengkapan (dari harga pipa)
Pekerja
Tukang batu
Kepala tukang
Mandor

1.2000
35.0000
0.0540
0.0900
0.0090
0.0270

m'
%
Oh
Oh
Oh
Oh

4,600.00
4,600.00
40,000.00
55,000.00
70,000.00
80,000.00

5,520.00
1,610.00
2,160.00
4,950.00
630.00
2,160.00
17,030.00
1,703.00
18,733.00
18,730.00

PVC tipe AWs 3/4"


Perlengkapan (dari harga pipa)
Pekerja
Tukang batu
Kepala tukang
Mandor

1.2000
35.0000
0.0540
0.0900
0.0090
0.0270

m'
%
Oh
Oh
Oh
Oh

5,600.00
5,600.00
40,000.00
55,000.00
70,000.00
80,000.00

6,720.00
1,960.00
2,160.00
4,950.00
630.00
2,160.00
18,580.00
1,858.00
20,438.00
20,430.00

PVC tipe AW 1"


Perlengkapan (dari harga pipa)
Pekerja
Tukang batu
Kepala tukang
Mandor

1.2000
35.0000
0.0540
0.0900
0.0090
0.0270

m'
%
Oh
Oh
Oh
Oh

7,125.00
7,125.00
40,000.00
55,000.00
70,000.00
80,000.00

8,550.00
2,493.75
2,160.00
4,950.00
630.00
2,160.00
20,943.75
2,094.38
23,038.13
23,030.00

PVC tipe AW 11/2"


Perlengkapan (dari harga pipa)
Pekerja
Tukang batu
Kepala tukang
Mandor

1.2000
35.0000
0.0540
0.0900
0.0090
0.0270

m'
%
Oh
Oh
Oh
Oh

13,200.00
13,200.00
40,000.00
55,000.00
70,000.00
80,000.00

15,840.00
4,620.00
2,160.00
4,950.00
630.00
2,160.00
30,360.00
3,036.00
33,396.00
33,390.00

PVC tipe AW 2"


Perlengkapan (dari harga pipa)
Pekerja
Tukang batu
Kepala tukang
Mandor

1.2000
35.0000
0.0540
0.0900
0.0090
0.0270

m'
%
Oh
Oh
Oh
Oh

19,175.00
19,175.00
40,000.00
55,000.00
70,000.00
80,000.00

23,010.00
6,711.25
2,160.00
4,950.00
630.00
2,160.00
39,621.25
3,962.13
43,583.38
43,580.00

PVC tipe AW 4"


Perlengkapan (dari harga pipa)
Pekerja
Tukang batu
Kepala tukang
Mandor

1.2000
35.0000
0.0540
0.0900
0.0090
0.0270

m'
%
Oh
Oh
Oh
Oh

52,875.00
52,875.00
40,000.00
55,000.00
70,000.00
80,000.00

63,450.00
18,506.25
2,160.00
4,950.00
630.00
2,160.00
91,856.25
9,185.63
101,041.88

Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m' PVC tipe AW 2"
Bahan

Tenaga kerja

O 017

m'
%
Oh
Oh
Oh
Oh

Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m' PVC tipe AW 11/2"
Bahan

O 016

1.2000
35.0000
0.0540
0.0900
0.0090
0.0270

Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m' PVC tipe AW 1"
Bahan

Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m' PVC tipe AW 4"
Bahan

Tenaga kerja
Jumlah
Overhead + Profit
Jumlah

7=(4x6)

Pipa galvanis 11/2"


Perlengkapan (dari harga pipa)
Pekerja
Tukang batu
Kepala tukang
Mandor

Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m' PVC tipe AW 3/4"
Bahan

O 014

Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m' pipa PVC tipe AW 1/2"
Bahan

O 013

Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m' pipa galvanis 4"
Bahan

O 012

Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m' pipa galvanis 2"
Bahan

O 011

Analisa SNI Hal 61

1
O 018

2
Dibulatkan
Memasang 1 bh kran air 3/4" atau 1/2"
Bahan

Tenaga kerja

O 019

Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 bh floor drain
Bahan
Tenaga kerja

P
P 001

Tenaga kerja

P 003

P 004

P 005

P 006

7=(4x6)
101,040.00

Kran air 3/4" atau 1/2"


Sealtape
Pekerja
Tukang batu
Kepala tukang
Mandor

1.0000
0.0250
0.0100
0.1000
0.0100
0.0050

bh
bh
Oh
Oh
Oh
Oh

94,400.00
750.00
40,000.00
55,000.00
70,000.00
80,000.00

94,400.00
0.19
400.00
5,500.00
700.00
400.00
101,400.19
10,140.02
111,540.21
111,540.00

Floor drain
Pekerja
Tukang batu
Kepala tukang
Mandor

1.0000
0.0100
0.1000
0.0100
0.0050

bh
Oh
Oh
Oh
Oh

58,100.00
40,000.00
55,000.00
70,000.00
80,000.00

58,100.00
400.00
5,500.00
700.00
400.00
65,100.00
6,510.00
71,610.00
71,610.00

Kabel NYA 3x2,5 mm2


Pipa konduit uPVC 20 mm
Fitting, kotak sambung, klem & alat bantu lain
Pekerja
Tukang batu
Kepala tukang
Mandor

10.000
10.000
1.0000
0.1100
0.1100
0.0110
0.0110

m'
m'
ls
Oh
Oh
Oh
Oh

7,300.00
4,750.00
9,640.00
40,000.00
55,000.00
70,000.00
80,000.00

73,000.00
47,500.00
9,640.00
4,400.00
6,050.00
770.00
880.00
142,240.00
14,224.00
156,464.00
156,460.00

1.000
1.000
0.1100
0.1100
0.0110
0.0110

bh
ls
Oh
Oh
Oh
Oh

18,200.00
1,820.00
40,000.00
55,000.00
70,000.00
80,000.00

18,200.00
1,820.00
4,400.00
6,050.00
770.00
880.00
32,120.00
3,212.00
35,332.00
35,330.00

1.000
1.000
0.1100
0.1100
0.0110
0.0110

bh
ls
Oh
Oh
Oh
Oh

21,800.00
2,180.00
40,000.00
55,000.00
70,000.00
80,000.00

21,800.00
2,180.00
4,400.00
6,050.00
770.00
880.00
36,080.00
3,608.00
39,688.00
39,680.00

1.000
1.000
0.1100
0.1100
0.0110
0.0110

bh
ls
Oh
Oh
Oh
Oh

20,400.00
2,040.00
40,000.00
55,000.00
70,000.00
80,000.00

20,400.00
2,040.00
4,400.00
6,050.00
770.00
880.00
34,540.00
3,454.00
37,994.00
37,990.00

1.000
1.000
0.1100
0.1100
0.0110
0.0110

bh
ls
Oh
Oh
Oh
Oh

84,300.00
8,430.00
40,000.00
55,000.00
70,000.00
80,000.00

84,300.00
8,430.00
4,400.00
6,050.00
770.00
880.00
104,830.00
10,483.00
115,313.00
115,310.00

1.000
1.000
0.1100
0.1100
0.0110
0.0110

bh
ls
Oh
Oh
Oh
Oh

8,300.00
830.00
40,000.00
55,000.00
70,000.00
80,000.00

8,300.00
830.00
4,400.00
6,050.00
770.00
880.00
21,230.00
2,123.00
23,353.00
23,350.00

Jumlah
Overhead + Profit
Jumlah
Dibulatkan
PEKERJAAN ELEKTRIKAL
Memasang 1 Titik Instalasi Penerangan
Bahan

P 002

Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 Bh Saklar Tunggal, 10 A, 250 VAC
Saklar tunggal, 10 A, 250 VAC
Bahan
Kotak sambung & alat bantu lainnya
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 Bh Saklar Ganda, 10 A, 250 VAC
Saklar ganda, 10 A, 250 VAC
Bahan
Kotak sambung & alat bantu lainnya
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 Bh Stop Kontak, 1 Phase, 10 A, 250 VAC
Stop Kontak, 1 Phase, 10 A, 250 VAC
Bahan
Kotak sambung & alat bantu lainnya
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 Bh Stop Kontak, 3 Phase, 10 A, 250 VAC
Stop Kontak, 3 Phase, 10 A, 250 VAC
Bahan
Kotak sambung & alat bantu lainnya
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 Bh Lampu Pijar (25 - 100 Watt)
Lampu Pijar (25 - 100 Watt)
Bahan
Kotak sambung & alat bantu lainnya
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan

Analisa SNI Hal 62

1
P 007

P 008

P 009

P 010

P 011

Q
Q 001

Q 002

2
3
Memasang 1 Bh Lampu V - Shape 1x20 W
Lampu TL 20 W
Travo
Bahan
Starter
Rumah TL In Bow / Out Bow 1 x 20 W
Kotak sambung & alat bantu lainnya
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 Bh Lampu V - Shape 2x20 W
Lampu TL 20 W
Travo
Bahan
Starter
Rumah TL In Bow / Out Bow 1 x 20 W
Kotak sambung & alat bantu lainnya
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 Bh Lampu V - Shape 1x40 W
Lampu TL 40 W
Travo
Bahan
Starter
Rumah TL In Bow / Out Bow 1 x 40 W
Kotak sambung & alat bantu lainnya
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 Bh Lampu V - Shape 2x40 Watt
Lampu TL 40 W
Travo
Bahan
Starter
Rumah TL In Bow / Out Bow 2 x 40 W
Kotak sambung & alat bantu lainnya
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 Bh Lampu Down light + SL 25 Watt
Down light + SL 25 Watt
Bahan
Kotak sambung & alat bantu lainnya
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
PEKERJAAN JALAN LINGKUNGAN DAN DRAINASE
1 M2 PEMBERSIHAN DAMIJA
Grass Cutter
Bahan
Alat Bantu
Pekerja
Tenaga Kerja
Mandor
Jumlah

7=(4x6)

1.000
1.000
1.000
1.000
1.000
0.1100
0.1100
0.0110
0.0110

bh
bh
bh
bh
ls
Oh
Oh
Oh
Oh

21,800.00
30,500.00
5,100.00
75,670.00
13,307.00
40,000.00
55,000.00
70,000.00
80,000.00

21,800.00
30,500.00
5,100.00
75,670.00
13,307.00
4,400.00
6,050.00
770.00
880.00
158,477.00
15,847.70
174,324.70
174,320.00

2.000
2.000
2.000
1.000
1.000
0.1100
0.1100
0.0110
0.0110

bh
bh
bh
bh
ls
Oh
Oh
Oh
Oh

21,800.00
30,500.00
5,100.00
108,100.00
22,290.00
40,000.00
55,000.00
70,000.00
80,000.00

43,600.00
61,000.00
10,200.00
108,100.00
22,290.00
4,400.00
6,050.00
770.00
880.00
257,290.00
25,729.00
283,019.00
283,010.00

1.000
1.000
1.000
1.000
1.000
0.1100
0.1100
0.0110
0.0110

bh
bh
bh
bh
ls
Oh
Oh
Oh
Oh

26,200.00
30,500.00
5,100.00
75,670.00
13,747.00
40,000.00
55,000.00
70,000.00
80,000.00

26,200.00
30,500.00
5,100.00
75,670.00
13,747.00
4,400.00
6,050.00
770.00
880.00
163,317.00
16,331.70
179,648.70
179,640.00

2.000
2.000
2.000
1.000
1.000
0.1100
0.1100
0.0110
0.0110

bh
bh
bh
bh
ls
Oh
Oh
Oh
Oh

26,200.00
30,500.00
5,100.00
108,100.00
23,170.00
40,000.00
55,000.00
70,000.00
80,000.00

52,400.00
61,000.00
10,200.00
108,100.00
23,170.00
4,400.00
6,050.00
770.00
880.00
266,970.00
26,697.00
293,667.00
293,660.00

1.000
1.000
0.1100
0.1100
0.0110
0.0110

bh
ls
Oh
Oh
Oh
Oh

299,200.00
29,920.00
40,000.00
55,000.00
70,000.00
80,000.00

299,200.00
29,920.00
4,400.00
6,050.00
770.00
880.00
341,220.00
34,122.00
375,342.00
375,340.00

0.0200

org

19,300.00

386.00

0.0008
0.0200

set
m

38,500.00
40,000.00

30.80
800.00

0.0020

org

80,000.00

160.00
1,376.80

Overhead + Profit
Jumlah

137.68
1,514.48

Dibulatkan
1 M2 PAS. ONDERLAG BATU BELAH T = 20 CM

1,510.00

Pasir Pasang
Batu Belah + Batu Kancing/Tepi
Peralatan

0.1500
0.2500
0.3200

m
m
lot

180,000.00
145,000.00
38,500.00

27,000.00
36,250.00
12,320.00

Peralatan (Sewa Wales) = 1/75000 (W4)


Pekerja Trampil (Gali + Urug + Ampar)

0.0133
0.2000

lot
OH

93,500.00
40,000.00

1,246.67
8,000.00

Mandor

0.0200

OH

80,000.00

Jumlah

1,600.00
59,416.67

Overhead + Profit
Jumlah

5,941.67
65,358.33

Dibulatkan

65,350.00

Bahan
Peralatan
Tenaga Kerja

Analisa SNI Hal 63

1
Q 003

2
1 M2 AMPARAN BATU PECAH MESIN 5/7 t=10 cm
Bahan

m
lot

160,000.00
399,300.00

19,200.00
63,888.00

Peralatan (Sewa Wales) = 1/75000 (W4)


Pekerja Trampil (Gali + Urug + Ampar)

0.0267
0.1100

lot
OH

93,500.00
40,000.00

2,493.27
4,400.00

Mandor

0.0110

OH

80,000.00

Jumlah
Overhead + Profit

880.00
85,581.27
8,558.13

Jumlah
Dibulatkan

94,139.40
94,130.00

1 M2 AMPARAN BATU PECAH MESIN 2/3 t=5 cm


Bahan
Batu Pecah Mesin 2/3 - 1/2

0.0600

178,500.00

10,710.00

Peralatan

Peralatan
Peralatan (Sewa Wales) = 1/75000 (W4)

0.0800
0.0267

lot
lot

38,500.00
93,500.00

3,080.00
2,493.27

Tenaga Kerja

Pekerja Trampil (Gali + Urug + Ampar)


Mandor

0.1875
0.0027

OH
OH

40,000.00
80,000.00

7,500.00
213.33

Jumlah
Overhead + Profit

23,996.60
2,399.66

Jumlah
Dibulatkan

26,396.26
26,390.00

1 M2 LAPISAN PENGISI /PENUTUP


Bahan

Batu Pecah Mesin 1/2


Pasir Pasang

0.0120
0.0100

m
m

230,000.00
180,000.00

2,760.00
1,800.00

Peralatan

Peralatan
Peralatan (Sewa Wales) = 1/75000 (W4)

0.0200
0.0267

lot
lot

38,500.00
93,500.00

770.00
2,493.27

Tenaga Kerja

Pekerja Trampil (Gali + Urug + Ampar)


Mandor

0.1000
0.0100

OH
OH

40,000.00
75,000.00

4,000.00
750.00

Jumlah
Overhead + Profit

9,813.27
981.33

Jumlah
Dibulatkan
Q 006

Tenaga Kerja

155,000.00

775.00

4.0000
0.0300

kg
m

6,900.00
66,000.00

27,600.00
1,980.00

Pekerja
Mandor

0.1500
0.0150

OH
OH

40,000.00
80,000.00

6,000.00
1,200.00

Dibulatkan
1 LITER LAPIS RESAP PENGIKAT (PRIME COAT)

41,310.00

Aspal Bitumen
Minyak Tanah

0.9171
0.6986

kg
ltr

10,800.00
3,300.00

9,904.68
2,305.38

Alat Bantu
Pekerja

0.0006
0.0034

set
org

38,500.00
40,000.00

23.10
136.00

Mandor

0.0003

org

80,000.00

Jumlah

24.00
12,393.16

Overhead + Profit
Jumlah

1,239.32
13,632.48

Dibulatkan
1 LITER LAPIS PEREKAT (TACK COAT)

13,630.00

Bahan

Aspal Bitumen
Minyak Tanah
Alat Bantu

1.1840
0.3387
0.0003

kg
kg
m

10,800.00
3,300.00
38,500.00

12,787.20
1,117.60
12.83

Tenaga Kerja

Pekerja
Mandor

0.0033
0.0002

org
org

40,000.00
80,000.00

132.00
16.00

Jumlah
Overhead + Profit

14,065.63
1,406.56

Jumlah
Dibulatkan

15,472.20
15,470.00

1 M2 HOTMIX TANGAN T=3 cm (JADI) u/ HAL & JALAN KLS 6 TON KE BAWAH
Abu batu

0.0360

155,000.00

5,580.00

Aspal Panas
Kayu Bakar

5.0000
0.0080

kg
m

8,300.00
66,000.00

41,500.00
528.00

Peralatan
Pekerja

0.0980
0.1100

lot
org

63,009.40
40,000.00

6,174.92
4,400.00

Mandor

0.0100

org

80,000.00

Jumlah

800.00
58,982.92

Overhead + Profit
Jumlah
Dibulatkan

5,898.29
64,881.21
64,880.00

Bahan

Q 010

0.0050

Aspal Drum
Kayu Bakar

37,555.00
3,755.50
41,310.50

Tenaga Kerja

Q 009

Abu Batu

Jumlah
Overhead + Profit
Jumlah

Bahan

Q 008

10,794.60
10,790.00

1 M2 LABURAN ASPAL (ASPAL 4 KG)


Bahan

Q 007

7=(4x6)

0.1200
0.1600

Tenaga Kerja

Q 005

Batu Pecah Mesin 5/7


Peralatan

Peralatan

Q 004

1 M2 HOTMIX HRS T=2 cm KLS JALAN 6 TON LEBIH


Hotmix HRS

0.0460

ton

1,200,000.00

55,200.00

Peralatan
Ongkos Angkut Hotmix (Jarak 20-40km)

1.0000
0.0460

ls
ton

3,000.00
50,000.00

3,000.00
2,300.00

Pekerja
Tukang

0.0057
0.0010

org
org

40,000.00
55,000.00

228.00
55.00

Mandor

0.0005

org

80,000.00

Jumlah

40.00
60,823.00

Overhead + Profit
Jumlah

6,082.30
66,905.30

Dibulatkan

66,900.00

Bahan

Tenaga Kerja

Analisa SNI Hal 64

1
Q 011

2
3
1 M2 HOTMIX HRS T=3 cm KLS JALAN 6 TON LEBIH (HAMPARAN MANUAL)

1,200,000.00
50,000.00

82,800.00
3,450.00

Peralatan
Pekerja

1.0000
0.0057

ls
org

3,000.00
40,000.00

3,000.00
228.00

Tukang
Mandor

0.0010
0.0005

org
org

55,000.00
80,000.00

Jumlah

55.00
40.00
89,573.00

Overhead + Profit
Jumlah

8,957.30
98,530.30

Dibulatkan
1 M2 HOTMIX HRS T=3 cm KLS JALAN 6 TON LEBIH (PAKAI ALAT BESAR)

98,530.00

Hotmix HRS
Peralatan

0.0690
0.0238

ton
hr

1,200,000.00
100,000.00

82,800.00
2,380.00

Pekerja
Pekerja Trampil

0.0050
0.0009

org
org

40,000.00
80,000.00

200.00
72.00

Mandor

0.0004

org

80,000.00

Jumlah

32.00
85,484.00

Overhead + Profit
Jumlah

8,548.40
94,032.40

Dibulatkan
1 M2 HOTMIX PAKAI ALAT BESAR T=5 cm KLS JALAN 8 TON LEBIH
Hotmix HRS
Bahan
Peralatan
Pekerja

94,030.00

Tenaga Kerja

Tenaga Kerja

Q 017

Q 018

ton

1,200,000.00

133,200.00

hr

100,000.00
40,000.00

2,380.00
200.00

0.0009
0.0004

org
org

80,000.00
80,000.00

72.00
32.00
135,884.00
13,588.40

Jumlah
Dibulatkan

149,472.40
149,470.00

1 M2 LAPISAN PENETRASI (LAPEN)

Tenaga Kerja

Q 016

Pekerja Trampil
Mandor

0.1110
0.0238
0.0050

Jumlah
Overhead + Profit

Bahan

Q 015

7=(4x6)

ton
ton

Bahan

Q 014

0.0690
0.0690

Tenaga Kerja

Q 013

Hotmix HRS
Ongkos Angkut Hotmix (Jarak 20-40km)

Bahan

Q 012

Batu Pecah 3 - 5 cm

0.0480

200,000.00

9,600.00

Batu Pecah 1 - 2 cm
Abu Batu / Screnn 0.5 - 1 cm

0.0220
0.0080

m
m

230,000.00
185,000.00

5,060.00
1,480.00

Aspal Curah/ Aspal Bitumen


Peralatan

5.0000
0.0500

kg
lot

10,800.00
38,500.00

54,000.00
1,925.00

Pekerja
Tukang Batu Terampil
Mandor

0.0667
0.0100
0.0033

org
org
org

40,000.00
70,000.00
80,000.00

2,668.00
700.00
264.00

Jumlah
Overhead + Profit

75,697.00
7,569.70

Jumlah
Dibulatkan

83,266.70
83,260.00

1 M1 SALURAN BUIS BETON 1/2 DIA 20 CM + PASANGAN BATA MERAH


Galian Tanah

0.1500

35,200.00

5,280.00

Grefel Beton 20 Cm
Pas . Bata 1 : 4

1.0000
0.4000

bh
m2

41,200.00
190,290.00

41,200.00
76,116.00

Plesteran 1 : 3
Upah kerja

0.7000
0.1500

m2
ls

40,080.00
105,139.68

28,056.00
15,770.95

Jumlah
Overhead + Profit

166,422.95
16,642.30

Jumlah
Dibulatkan
1 M1 SALURAN BUIS BETON 1/2 DIA 30 CM + PASANGAN BATA MERAH

183,065.25
183,060.00

Galian Tanah
Grefel Beton 30 Cm

0.2000
1.0000

m
bh

35,200.00
50,600.00

7,040.00
50,600.00

Pas . Bata 1 : 4
Plesteran 1 : 3

0.4000
0.7000

m2
m2

190,290.00
40,080.00

76,116.00
28,056.00

Upah Kerja

0.1500

ls

122,427.18

Jumlah

18,364.08
180,176.08

Overhead + Profit
Jumlah

18,017.61
198,193.68

Dibulatkan
1 M1 PASANGAN DRANASE BUIS BETON BULAT DIA 20 UNTUK SODETAN

198,190.00

Galian Tanah
Urugan Tanah Kembali Dipadatkan

0.1500
0.0750

m
m

35,200.00
26,400.00

5,280.00
1,980.00

Buis Beton Dia 20 Cm


Cor Beton Tumbuk

1.0000
0.0600

bh
m

41,200.00
691,660.00

41,200.00
41,499.60

Jumlah
Overhead + Profit
Jumlah

89,959.60
8,995.96
98,955.56

Dibulatkan
1 M1 PASANGAN DRANASE BUIS BETON BULAT DIA 30 UNTUK SODETAN

98,950.00

Galian Tanah
Urugan Tanah Kembali Dipadatkan

0.2400
0.1143

m
m

35,200.00
26,400.00

8,448.00
3,017.52

Buis Beton Dia 30 Cm


Cor Beton Tumbuk

1.0000
0.0600

bh
m

50,600.00
691,660.00

50,600.00
41,499.60

Jumlah
Overhead + Profit

103,565.12
10,356.51

Jumlah
Dibulatkan

113,921.63
113,920.00

Analisa SNI Hal 65

1
Q 019

2
1 M2 PASANGAN PAVING BLOCK WARNA 6 CM K-225

7=(4x6)

118,000.00
185,000.00

119,180.00
18,500.00

Pekerja Setengah Terampil


Tukang Batu Setengah Terampil

0.2500
0.5000

org
org

30,000.00
55,000.00

7,500.00
27,500.00

Kepala Tukang Batu


Mandor
Stamper

0.0250
0.0030
0.2400

org
org
jam

70,000.00
80,000.00
15,000.00

1,750.00
240.00
3,600.00

Peralatan Bantu

1.0000

ls

1,000.00

Jumlah

1,000.00
179,270.00

Overhead + Profit
Jumlah

17,927.00
197,197.00

Dibulatkan
1 M2 PASANGAN PAVING BLOCK WARNA 8 CM K-225

197,190.00

Paving Block Warna 8 cm K-225


Pasir Beton

1.0100
0.1000

m
m

139,000.00
185,000.00

140,390.00
18,500.00

Pekerja Setengah Terampil


Tukang Batu Setengah Terampil

0.2500
0.5000

org
org

30,000.00
55,000.00

7,500.00
27,500.00

Kepala Tukang Batu


Mandor

0.0250
0.0030

org
org

70,000.00
80,000.00

1,750.00
240.00

Stamper
Peralatan Bantu

0.2400
1.0000

jam
ls

15,000.00
1,000.00

Jumlah

3,600.00
1,000.00
200,480.00

Overhead + Profit
Jumlah

20,048.00
220,528.00

Dibulatkan
1 M2 PASANGAN PAVING BLOCK NATURAL 6 CM K-225

220,520.00

Bahan

Tenaga Kerja

Peralatan

Bahan

Tenaga Kerja

Peralatan

Paving Block Natural 6 cm K-225


Pasir Beton

1.0100
0.1000

m
m

103,000.00
185,000.00

104,030.00
18,500.00

Pekerja Setengah Terampil


Tukang Batu Setengah Terampil

0.2500
0.5000

org
org

30,000.00
55,000.00

7,500.00
27,500.00

Kepala Tukang Batu


Mandor

0.0250
0.0030

org
org

70,000.00
80,000.00

1,750.00
240.00

Stamper
Peralatan Bantu

0.2400
1.0000

jam
ls

15,000.00
1,000.00

3,600.00
1,000.00

Jumlah
Overhead + Profit

164,120.00
16,412.00

Jumlah
Dibulatkan
1 M2 PASANGAN PAVING BLOCK NATURAL 8 CM K-225

180,532.00
180,530.00

Bahan

Tenaga Kerja

Peralatan

Q 023

m
m

Peralatan

Q 022

1.0100
0.1000

Tenaga Kerja

Q 021

Paving Block Warna 6 cm K-225


Pasir Beton

Bahan

Q 020

Paving Block Natural 8 cm K-225


Pasir Beton

1.0100
0.1000

m
m

120,000.00
185,000.00

121,200.00
18,500.00

Pekerja Setengah Terampil


Tukang Batu Setengah Terampil

0.2500
0.5000

org
org

30,000.00
55,000.00

7,500.00
27,500.00

Kepala Tukang Batu


Mandor

0.0250
0.0030

org
org

70,000.00
80,000.00

1,750.00
240.00

Stamper
Peralatan Bantu

0.2400
1.0000

jam
ls

15,000.00
1,000.00

3,600.00
1,000.00

Jumlah
Overhead + Profit

181,290.00
18,129.00

Jumlah
Dibulatkan

199,419.00
199,410.00

1 M2 PASANGAN SULINGAN + IJUK


Bahan
Tenaga Kerja
Jumlah

Suling-Suling PVC 2"


Ijuk

0.1000
1.1000

m
kg

2,433.33
7,500.00

243.33
8,250.00

Pekerja

0.0540

org

40,000.00

2,160.00
10,653.33

Overhead + Profit
Jumlah

1,065.33
11,718.67

Dibulatkan

11,710.00

Bogor,

Nopember 2012

Kepala Dinas Pengawasan Bangunan dan Permukiman


Kota Bogor

Ir. Hj. Erna Hernawati, MM


Pembina Tk.I
NIP. 19621208 199202 2 004

Analisa SNI Hal 66

DAFTAR HARGA SATUAN


PEKERJAAN

HARGA SATUAN PEKERJAAN


KOTA BOGOR
TAHUN ANGGARAN 2013
NO
1

URAIAN
2

JUMLAH (Rp)
3

A
A 001
A 002
A 003
A 004
A 005
A 006
A 007
A 008
A 009
A 010
A 011
A 012
A 013
A 014
A 015
A 016
A 017
A 018
A 019

PEKERJAAN PERSIAPAN
Mengukur kembali 1 m2 Site
Memasang 1 m1 bouplank
Membuat 1 m2 Los kerja / Gudang
Membuat 1 m2 Kantor Direksi
Membuat 1 m2 Papan Nama Proyek
Mengerjakan 1 m2 Pagar Pengaman Proyek
Membongkar 1 m2 Dinding bata
Membongkar 1 m2 Dinding bata
Membongkar 1 m2 Plesteran dinding
Membongkar 1 m2 Genteng/Sirap
Membongkar 1 m2 Genteng/Sirap
Membongkar 1 m3 Kuda-kuda, Gording/Balok
Membongkar 1 m3 Kuda-kuda, Gording/Balok
Membongkar 1 m2 Plafond
Membongkar 1 m2 Plafond
Membongkar 1 m2 Rangka Atap/Reng kaso
Membongkar 1 m2 Rangka Atap/Reng kaso
Membongkar 1 m3 Beton bertulang
Membersihkan 1 m2 lokasi kegiatan

B
B 001
B 002
B 003
B 004
B 005
B 006
B 007
B 008
B 009
B 010
B 011
B 012
B 013
B 014
B 015
B 016
B 017
B 018
B 019
B 020
B 021

PEKERJAAN TANAH (SNI 2835:2008)


Menggali 1 m3 tanah biasa sedalam 1 meter
Menggali 1 m3 tanah biasa sedalam 2 meter
Menggali 1 m3 tanah biasa sedalam 3 meter
Menggali 1 m3 tanah biasa sedalam 4 meter
Menggali 1 m3 tanah biasa sedalam 5 meter
Menggali 1 m3 tanah keras sedalam 1 meter
Menggali 1 m3 tanah cadas sedalam 1 meter
Menggali 1 m3 tanah lumpur sedalam 1 meter
Mengerjakan 1 m2 stripping tebing setinggi 1 meter
Membuang 1 m3 tanah sejauh 15 meter
Mengurug kembali 1 m3 galian
Memadatkan 1 m3 tanah (per 20 cm)
Mengurug 1 m3 pasir urug
Memasang 1 m3 Lapisan pudel campuran 1 KP : 3 PP : 7 TL untuk stabilisasi tanah
Memasang 1 m3 Lapisan pudel campuran 1 KP : 5 TL untuk stabilisasi tanah
Memasang 1 m2 lapisan ijuk tebal 10 cm , untuk bidang resapan
Mengurug 1 m3 sirtu padat untuk peninggian lantai bangunan
Membuat 1 m2 jalan sementara tebal 20 cm
Menggali 1 m3 tanah untuk sumuran maksimum 10 m
Mengurug 1 m3 tanah pakai alat besar, tanah dari luar dipadatkan (5000m3)
Memasang 1m2 cerucuk dolken

C
C 001
C 002
C 003
C 004
C 005
C 006
C 007
C 008
C 009
C 010
C 011
C 012
C 013
C014

PEKERJAAN PONDASI (SNI 2836:2008)


Memasang 1 m3 pondasi batu belah, campuran 1 PC : 3 PP
Memasang 1 m3 pondasi batu belah, campuran 1 PC : 4 PP
Memasang 1 m3 pondasi batu belah, campuran 1 PC : 5 PP
Memasang 1 m3 pondasi batu belah, campuran 1 PC : 6 PP
Memasang 1 m3 pondasi batu belah, campuran 1 PC : 8 PP
Memasang 1 m3 pondasi batu belah, campuran 1 KP : 1 SM : 2 PP
Memasang 1 m3 pondasi batu belah, campuran 1 PC : 3 KP : 10 PP
Memasang 1 m3 pondasi batu belah, campuran PC : 1 KP : 4 PP
Memasang 1 m3 batu kosong (anstamping)
Memasang 1 m3 pondasi siklop, 60% beton campuran 1 PC : 2 PB : 3 KR dan 40% batu belah
Memasang 1 m3 pondasi sumuran, diameter 100 cm
Memasang 1 m3 pondasi batu belah, campuran 1 PC : 4 PP, pakai muka batu + siaran
Memasang 1 m2 batu tempel + siaran
Memasang 1 m3 batu bronjong

D
D 001
D 002
D 003
D 004
D 005
D 006
D 007
D 008
D 009
D 010
D 011
D 012
D 013
D 014

PEKERJAAN BETON (SNI 7394:2008)


Membuat 1 m3 lantai kerja 1PC : 3 PS : 5 KR
Membuat 1 m3 beton mutu fc = 7,4 MPa (K 100), slump (12 2) cm, w/c = 0,87
Membuat 1 m3 beton mutu fc = 9,8 MPa (K 125), slump (12 2) cm, w/c = 0,78
Membuat 1 m3 beton mutu fc = 12,2 MPa (K 150), slump (12 2) cm, w/c = 0,72
Membuat 1 m3 lantai kerja beton mutu fc = 7,4 MPa (K 100), slump (3-6) cm, w/c = 0,87
Membuat 1 m3 beton mutu fc = 14,5 MPa (K 175), slump (12 2) cm, w/c = 0,66
Membuat 1 m3 beton mutu fc = 16,9 MPa (K 200), slump (12 2) cm, w/c = 0,61
Membuat 1 m3 beton mutu fc = 19,3 MPa (K 225), slump (12 2) cm, w/c = 0,58
Membuat 1 m3 beton mutu fc = 21,7 MPa (K 250), slump (12 2) cm, w/c = 0,56
Membuat 1 m3 beton mutu fc = 24,0 MPa (K 275), slump (12 2) cm, w/c = 0,53
Membuat 1 m3 beton mutu fc = 26,4 MPa (K 300), slump (12 2) cm, w/c = 0,52
Membuat 1 m3 beton mutu fc = 28,8 MPa (K 325), slump (12 2) cm, w/c = 0,49
Membuat 1 m3 beton mutu fc = 28,8 MPa (K 350), slump (12 2) cm, w/c = 0,49
Membuat 1 m3 cor beton mutu K-175 (Ready Mix) Min. 6 m3 + slang

(Jika bongkaran di pakai lagi )


(Jika bongkaran tidak di pakai lagi )
(Jika bongkaran di pakai lagi )
(Jika bongkaran tidak di pakai lagi )
(Jika bongkaran di pakai lagi )
(Jika bongkaran tidak di pakai lagi )
(Jika bongkaran di pakai lagi )
(Jika bongkaran tidak di pakai lagi )
(Jika bongkaran di pakai lagi )
(Jika bongkaran tidak di pakai lagi )

2,220.00
38,650.00
485,810.00
617,840.00
425,980.00
372,690.00
9,590.00
5,190.00
4,400.00
2,640.00
1,760.00
602,800.00
375,100.00
20,150.00
5,940.00
13,090.00
6,540.00
322,650.00
4,840.00

35,200.00
43,560.00
52,090.00
60,630.00
68,640.00
46,810.00
71,280.00
56,760.00
2,640.00
15,400.00
11,730.00
26,400.00
218,680.00
221,700.00
190,910.00
44,220.00
188,920.00
88,490.00
63,360.00
128,460.00
53,460.00

684,550.00
637,420.00
604,750.00
581,790.00
550,300.00
463,120.00
543,870.00
516,480.00
322,800.00
2,158,370.00
690,710.00
683,620.00
144,980.00
366,360.00

691,660.00
715,610.00
751,730.00
780,120.00
670,970.00
813,620.00
845,730.00
869,590.00
885,580.00
913,020.00
921,550.00
980,620.00
991,790.00
889,820.00

Harsat Pekerjaan SNI Hal 67

NO
1

URAIAN
2

JUMLAH (Rp)
3

D 015
D 016
D 017
D 018
D 019
D 020
D 021
D 022
D 023
D 024
D 025
D 026
D 027
D 028
D 029
D 030
D 031
D 032
D 033
D 034
D 035
D 036
D 037
D 038
D 039
D 040
D 041
D 042

Membuat 1 m3 cor beton mutu K-225 (Ready Mix) Min. 6 m3 + slang


Membuat 1 m3 cor beton mutu K-250 (Ready Mix) Min. 6 m3 + slang
Membuat 1 m3 cor beton mutu K-300 (Ready Mix) Min. 6 m3 + slang
Membuat 1 m3 cor beton mutu K-350 (Ready Mix) Min. 6 m3 + slang
Membuat 1 m3 beton kedap air dengan strorox 100
Memasang 1 m PVC Waterstop lebar 150 mm
Memasang 1 m PVC Waterstop lebar 200 mm
Membuat 1 m PVC Waterstop lebar 230 mm 320 mm
Pembesian 10 kg dengan besi polos atau besi ulir
Memasang 10 kg kabel presstressed polos/strands
Memasang 1 Kg jaring kawat baja/wire mesh
Memasang 1 m2 bekisting untuk pondasi
Memasang 1 m2 bekisting untuk sloof
Memasang 1 m2 bekisting untuk kolom
Memasang 1 m2 bekisting untuk balok
Memasang 1 m2 bekisting untuk plat lantai
Memasang 1 m2 bekisting untuk dinding
Memasang 1 m2 bekisting untuk tangga
Memasang 1 m2 jembatan untuk pengecoran beton
Membuat 1 m3 pondasi beton bertulang (150 kg besi + bekisting)
Membuat 1 m3 sloof beton bertulang (200 kg besi + bekisting)
Membuat 1 m3 kolom beton bertulang (300 kg besi + bekisting)
Membuat 1 m3 balok beton bertulang (200 kg besi + bekisting)
Membuat 1 m3 plat beton bertulang (150 kg besi + bekisting)
Membuat 1 m3 dinding beton bertulang (150 kg besi + bekisting)
Membuat 1 m3 dinding beton bertulang (200 kg besi + bekisting)
Membuat 1 m kolom praktis beton bertulang (11 x 11) cm
Membuat 1 m ring balok beton bertulang (10 x 15) cm

927,760.00
965,690.00
1,003,620.00
1,041,560.00
970,550.00
131,780.00
241,070.00
368,650.00
137,020.00
134,100.00
43,040.00
155,790.00
238,890.00
313,900.00
323,820.00
381,660.00
369,370.00
285,510.00
95,480.00
3,836,090.00
4,794,790.00
8,155,980.00
6,217,880.00
5,622,550.00
5,407,790.00
5,775,540.00
66,850.00
89,790.00

E
E 001
E 002
E 003
E 004
E 005
E 006
E 007
E 008
E 009
E 010
E 011
E 012
E 013
E 014
E 015
E 016
E 017
E 018
E 019
E 020
E 021
E 022
E 023
E 024
E 025
E 026
E 027
E 028
E 029

PEKERJAAN DINDING (SNI 6897:2008)


Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal 1 bata, campuran spesi 1 PC : 2 PP
Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal 1 bata, campuran spesi 1 PC : 3 PP
Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal 1 bata, campuran spesi 1 PC : 4 PP
Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal 1 bata, campuran spesi 1 PC : 5 PP
Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal 1 bata, campuran spesi 1 PC : 6 PP
Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal 1 bata, campuran spesi 1 PC : 10 PP
Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal bata, campuran spesi 1 PC : 2 PP
Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal bata, campuran spesi 1 PC : 3 PP
Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal bata, campuran spesi 1 PC : 4 PP
Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal bata, campuran spesi 1 PC : 5 PP
Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal bata, campuran spesi 1 PC : 6 PP
Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal bata, campuran spesi 1 PC : 8 PP
Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal bata, campuran spesi 1 PC : 3 KP :
Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal bata, campuran spesi 1 KP : 1 SM :
Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal bata, campuran spesi 1 KP : 1 SM :
Memasang 1 m2 dinding HB/CB 20 , campuran spesi 1 PC : 3 PP
Memasang 1 m2 dinding HB/CB 20 , campuran spesi 1 PC : 4 PP
Memasang 1 m2 dinding HB/CB 15, campuran spesi 1 PC : 3 PP
Memasang 1 m2 dinding HB/CB 15, campuran spesi 1 PC : 4 PP
Memasang 1 m2 dinding HB/CB 10, campuran spesi 1 PC : 3 PP
Memasang 1 m2 dinding HB/CB 10, campuran spesi 1 PC : 4 PP
Memasang 1 m2 dinding terawang (roster) ukuran (12 x 11 x 24) cm, campuran spesi 1 PC : 3 PP
Memasang 1 m2 dinding terawang (roster) ukuran (12 x 11 x 24) cm, campuran spesi 1 PC : 4 PP
Memasang 1 m2 dinding bata berongga ekspose ukuran (5 x 11 x 24) cm, campuran spesi 1 PC : 3 PP
Memasang 1 m2 dinding batako kecil tras ukuran (8 x 10 x 20) cm, campuran spesi 1 PC : 4 PP
Memasang 1 m2 dinding batako besar pres ukuran (8 x 20 x30) cm, campuran spesi 1 PC : 4 PP
Membuat 1 UNIT Septictank 2,5 X 1,5 X 2 M + rembesannya ( kantor tipe besar)
Membuat 1 UNIT Septictank 2 X 1,5 X 1,5 M + rembesannya ( kantor tipe kecil)
Membuat 1 UNIT Septictank 1,5 X 1 X 1,5 M + rembesannya ( rumah kapasitas kecil)

F
F 001
F 002
F 003
F 004
F 005
F 006
F 007
F 008
F 009
F 010
F 011
F 012
F 013
F 014
F 015

PEKERJAAN PENGECATAN (SNI 2407:2008)


Mengecat 1 m2 Beton ICI Eksterior
Mengecat 1 m2 Plafond dan Dinding Interior ICI
Mengecat 1 m2 Dinding Vinilex (3X)
Mengecat 1 m2 Dinding Lama Vinilex (2X)
Mengecat 1 m2 Plafond Vinilex (3X)
Mengecat 1 m2 Plafond Lama Vinilex (2X)
Mengecat 1 m2 Dinding Sanlex (3X)
Mengecat 1 m2 Dinding Lama Sanlex (2X)
Mengecat 1 m2 Plafond Sanlex (3X)
Mengecat 1 m2 Plafond Lama Sanlex (2X)
Mengecat 1 m2 Kayu (3X) Glotex berikut Meni
Mengecat 1 m2 Kayu Lama (2X) Glotex
Mengecat 1 m2 Besi (3X) Glotex
Mengecat 1 m2 Plituran Bangunan (Biasa)
Mengecat 1 m2 Plituran Meubulair

53,290.00
57,140.00
35,910.00
23,940.00
36,340.00
24,220.00
25,130.00
16,750.00
26,290.00
17,520.00
45,860.00
30,570.00
45,490.00
63,160.00
77,590.00

G
G 001
G 002
G 003
G 004

PEKERJAAN PENUTUP LANTAI DAN DINDING (SNI 7395:2008)


Memasang 1 m2 lantai ubin PC abu-abu ukuran (40 x 40) cm
Memasang 1 m2 lantai ubin PC abu-abu ukuran (30 x 30) cm
Memasang 1 m2 lantai ubin PC abu-abu ukuran (20 x 20) cm
Memasang 1 m2 lantai ubin warna ukuran (40 x 40) cm

67,260.00
76,120.00
95,230.00
75,510.00

211,210.00
198,760.00
190,290.00
186,040.00
182,890.00
167,360.00
101,320.00
95,370.00
91,990.00
89,860.00
88,770.00
86,440.00
83,670.00
80,210.00
80,160.00
252,190.00
266,360.00
220,300.00
216,800.00
166,890.00
167,640.00
327,580.00
324,010.00
470,580.00
78,430.00
57,090.00
10,911,450.00
6,840,620.00
3,807,750.00

Harsat Pekerjaan SNI Hal 68

NO
1

URAIAN
2

G 005
G 006
G 007
G 008
G 009
G 010
G 011
G 012
G 013
G 014
G 015
G 016
G 017
G 018
G 019
G 020
G 021
G 022
G 023
G 024
G 025
G 026
G 027
G 028
G 029
G 030
G 031
G 032
G 033
G 034
G 035
G 036
G 037
G 038
G 039
G 040
G 041
G 042
G 043
G 044
G 045
G 046
G 047
G 048
G 049
G 050
G 051
G 052
G 053
G 054
G 055
G 056
G 057
G 058
G 059
G 060
G 061
G 062
G 063
G 064
G 065
G 066
G 067
G 068
G 069
G 070
G 071
G 072
G 073
G 074
G 075
G 076
G 077
G 078

Memasang 1 m2 lantai ubin warna ukuran (30 x 30) cm


Memasang 1 m2 lantai ubin warna ukuran (20 x 20) cm
Memasang 1 m2 lantai ubin teraso ukuran (40 x 40) cm
Memasang 1 m2 lantai ubin teraso ukuran (30 x 30) cm
Memasang 1 m2 lantai ubin granit ukuran (40 x 40) cm
Memasang 1 m2 lantai ubin granit ukuran (30 x 30) cm
Memasang 1 m2 lantai ubin teralux ukuran (40 x 40) cm
Memasang 1 m2 lantai ubin teralux ukuran (30 x 30) cm
Memasang 1 m2 lantai ubin teralux marmer ukuran (60 x 60) cm
Memasang 1 m2 lantai ubin teralux marmer ukuran (40 x 40) cm
Memasang 1 m2 lantai ubin teralux marmer ukuran (30 x 30) cm
Memasang 1 m plint ubin PC abu-abu ukuran (15 x 20) cm
Memasang 1 m plint ubin PC abu-abu ukuran (10 x 30) cm
Memasang 1 m plint ubin PC abu-abu ukuran (10 x 40) cm
Memasang 1 m plint ubin PC warna ukuran (10 x 20) cm
Memasang 1 m plint ubin PC warna ukuran (10 x 30) cm
Memasang 1 m plint ubin PC warna ukuran (10 x 40) cm
Memasang 1 m plint ubin teraso ukuran (10 x 30) cm
Memasang 1 m plint ubin teraso ukuran (10 x 40) cm
Memasang 1 m plint ubin granit ukuran (10 x 40) cm
Memasang 1 m plint ubin granit ukuran (10 x 30) cm
Memasang 1 m plint ubin teralux kerang ukuran (10 x 40) cm
Memasang 1 m plint ubin teralux kerang ukuran (10 x 30) cm
Memasang 1 m plint ubin teralux marmer ukuran (10 x 60) cm
Memasang 1 m plint ubin teralux marmer ukuran (10 x 40) cm
Memasang 1 m plint ubin teralux marmer ukuran (10 x 30) cm
Memasang 1 m2 lantai teraso cor ditempat, tebal 3 cm
Memasang 1 m2 lantai keramik artistik ukuran (10 x 20) cm
Memasang 1 m2 lantai keramik artistik ukuran (10 x 10) cm atau (5 x 20) cm
Memasang 1 m2 lantai keramik ukuran (33 x 33) cm DN Putih setara Mulya
Memasang 1 m2 lantai keramik ukuran (30 x 30) cm DN Putih setara Mulya
Memasang 1 m2 lantai keramik ukuran (20 x 20) cm DN Putih setara Mulya
Memasang 1 m2 lantai keramik ukuran (10 x 33) cm, variasi/border
Memasang 1 m2 lantai keramik ukuran (33 x 33) cm DN bercorak/berwarna setara Mulya
Memasang 1 m2 lantai keramik ukuran (30 x 30) cm DN bercorak/berwarna setara Mulya
Memasang 1 m2 lantai keramik ukuran (20 x 20) cm DN bercorak/berwarna setara Mulya
Memasang 1 m2 lantai keramik ukuran (33 x 33) cm DN Putih setara Roman
Memasang 1 m2 lantai keramik ukuran (30 x 30) cm DN Putih setara Roman
Memasang 1 m2 lantai keramik ukuran (20 x 20) cm DN Putih setara Roman
Memasang 1 m2 lantai keramik ukuran (33 x 33) cm DN bercorak/berwarna setara Roman
Memasang 1 m2 lantai keramik ukuran (30 x 30) cm DN bercorak/berwarna setara Roman
Memasang 1 m2 lantai keramik ukuran (20 x 20) cm DN bercorak/berwarna setara Roman
Memasang 1 m2 lantai mosaik ukuran (30 x 30) cm, campuran spesi 1 PC : 3 PP
Memasang 1 m plint keramik ukuran (10 x 20) cm
Memasang 1 m plint keramik ukuran (10 x 10) cm
Memasang 1 m plint keramik ukuran (5 x 20) cm
Memasang 1 m plint internal cove artistik ukuran (5 x 5 x 20) cm
Memasang 1 m2 lantai marmer ukuran (100 x 100) cm
Memasang 1 m2 lantai karpet
Memasang 1 m2 underlayer / Pelapis bawah karpet
Memasang 1 m2 lantai parquet kayu
Memasang 1 m2 lantai kayu (gymfloor)
Memasang 1 m2 dinding porselen ukuran (11 x 11) cm
Memasang 1 m2 dinding porselin ukuran (10 x 20) cm
Memasang 1 m2 dinding porselin ukuran (20 x 20) cm
Memasang 1 m2 dinding keramik artistik ukuran (10 x 20) cm
Memasang 1 m2 dinding keramik artistik ukuran (5 x 20) cm
Memasang 1 m2 dinding keramik ukuran (10 x 20) cm, DN Putih setara Mulya
Memasang 1 m2 dinding keramik ukuran (20 x 20) cm, DN Putih setara Mulya
Memasang 1 m2 dinding keramik ukuran (10 x 20) cm, DN bercorak/berwarna setara Mulya
Memasang 1 m2 dinding keramik ukuran (20 x 20) cm, DN bercorak/berwarna setara Mulya
Memasang 1 m2 dinding keramik ukuran (10 x 20) cm, DN Putih setara Roman
Memasang 1 m2 dinding keramik ukuran (20 x 20) cm, DN Putih setara Roman
Memasang 1 m2 dinding keramik ukuran (10 x 20) cm, DN bercorak/berwarna setara Roman
Memasang 1 m2 dinding keramik ukuran (20 x 20) cm, DN bercorak/berwarna setara Roman
Memasang 1 m2 dinding marmer ukuran (100 x 100) cm
Memasang 1 m2 dinding bata pelapis ukuran (3 x 7 x 24) cm
Memasang 1 m2 dinding batu paras
Memasang 1 m2 dinding batu tempel hitam
Memasang 1 m2 lantai Vinyl ukuran (30 x 30) cm KL. I
Memasang 1 m2 wall paper, lebar 50 cm
Memasang 1 m2 floor hardener
Memasang 1 m plint Vinyl karet ukuran (15 x 30) cm dengan perekat
Memasang 1 m plint kayu kelas II tebal 2Cm, Lebar 10 Cm

H
H 001
H 002
H 003
H 004
H 005
H 006

PEKERJAAN PLESTERAN (SNI 2837:2008)


Membuat 1 m2 plesteran 1 PC : 1 PP, tebal 15 mm
Membuat 1 m2 plesteran 1 PC : 2 PP, tebal 15 mm
Membuat 1 m2 plesteran 1 PC : 3 PP, tebal 15 mm
Membuat 1 m2 plesteran 1 PC : 4 PP, tebal 15 mm
Membuat 1 m2 plesteran 1 PC : 5 PP, tebal 15 mm
Membuat 1 m2 plesteran 1 PC : 6 PP, tebal 15 mm

JUMLAH (Rp)
3
88,320.00
110,810.00
81,350.00
80,490.00
2,218,620.00
1,884,630.00
192,200.00
227,380.00
1,750,640.00
1,869,590.00
1,810,540.00
27,250.00
27,860.00
29,900.00
27,520.00
23,630.00
22,420.00
24,600.00
23,150.00
24,610.00
42,070.00
42,100.00
38,190.00
59,700.00
63,960.00
71,190.00
47,520.00
568,550.00
2,021,310.00
120,430.00
123,320.00
128,740.00
249,300.00
123,730.00
123,320.00
137,480.00
158,930.00
137,680.00
143,310.00
123,730.00
161,180.00
149,140.00
148,680.00
23,030.00
23,090.00
21,200.00
127,800.00
690,550.00
165,280.00
123,370.00
221,330.00
342,600.00
154,110.00
149,820.00
149,820.00
581,240.00
2,032,910.00
143,990.00
139,120.00
149,820.00
147,860.00
155,650.00
153,690.00
161,480.00
159,520.00
740,630.00
194,500.00
107,530.00
183,810.00
61,380.00
97,180.00
173,490.00
118,360.00
40,020.00

49,400.00
42,880.00
40,080.00
38,150.00
37,080.00
36,210.00

Harsat Pekerjaan SNI Hal 69

NO
1

URAIAN
2

JUMLAH (Rp)
3

H 007
H 008
H 009
H 010
H 011
H 012
H 013
H 014
H 015
H 016
H 017
H 018
H 019
H 020
H 021
H 022
H 023
H 024
H 025
H 026
H 027

Membuat 1 m2 plesteran 1 PC : 7 PP, tebal 15 mm


Membuat 1 m2 plesteran 1 PC : 8 PP, tebal 15 mm
Membuat 1 m2 plesteran 1 PC : KP : 3 PP, tebal 15 mm
Membuat 1 m2 plesteran 1 PC : 2 KP : 8 PP, tebal 15 mm
Membuat 1 m2 plesteran 1 SM : 1 KP : 1 PP, tebal 15 mm
Membuat 1 m2 plesteran 1 SM : 1 KP : 2 PP, tebal 15 mm
Membuat 1 m2 plesteran 1 PC : 2 PP, tebal 20 mm
Membuat 1 m2 plesteran 1 PC : 3 PP, tebal 20 mm
Membuat 1 m2 plesteran 1 PC : 4 PP, tebal 20 mm
Membuat 1 m2 plesteran 1 PC : 5 PP, tebal 20 mm
Membuat 1 m2 plesteran 1 PC : 6 PP, tebal 20 mm
Membuat 1 m2 plesteran 1 SM : 1 KP : 2 PP, tebal 20 mm
Membuat 1 m2 Berapen 1 PC : 5 PP, tebal 15 mm
Membuat 1 m Plesteran Skoning lebar 10 mm 1 PC : 2 PP.
Membuat 1 m2 Plesteran Granit , 1 PC : 2 Granit, tebal 10 mm
Membuat 1 m2 Plesteran Teraso , 1 PC : 2 Batu Teraso, tebal 10 mm
Membuat 1 m2 Plesteran Ciprat / Kamprotan 1 PC : 2 PP
Membuat 1 m2 finishing siar pasangan dinding bata merah (=20 m)
Membuat 1 m2 finishing siar pasangan dinding conblock ekspose (=8 m)
Membuat 1 m2 finishing siar pasangan batu kali adukan 1 PC : 2 PP
Membuat 1 m2 acian

35,740.00
35,280.00
28,180.00
35,540.00
31,940.00
32,120.00
57,410.00
46,730.00
51,040.00
49,680.00
48,460.00
76,490.00
24,790.00
34,410.00
80,130.00
192,830.00
28,510.00
16,760.00
8,070.00
35,910.00
21,000.00

I
I 001
I 002
I 003
I 004
I 005
I 006
I 007
I 008
I 009
I 010
I 011
I 012
I 013
I 014
I 015
I 016
I 017
I 018
I 019
I 020
I 021
I 022
I 023
I 024
I 025
I 026
I 027
I 028

PEKERJAAN KAYU (SNI 3434:2008)


Membuat dan memasang 1 m3 kusen pintu dan kusen jendela, kayu kelas I
Membuat dan memasang 1 m3 kusen pintu dan kusen jendela, kayu kelas II atau III
Membuat dan memasang 1 m2 pintu klamp standar, kayu kelas II
Membuat dan memasang 1 m2 pintu klamp sederhana, kayu kelas III untuk gudang sementara
Membuat dan memasang 1 m2 daun pintu panel, kayu kelas I atau II
Membuat dan memasang 1 m2 pintu dan jendela kaca, kayu kelas I atau II
Membuat dan memasang 1 m2 pintu dan jendela jalusi, kayu kelas I atau II
Membuat 1 m2 daun pintu kayu lapis (plywood) rangkap, rangka tertutup kayu kelas II (lebar sampai 90 c
Membuat 1 m2 daun plywood rangkap, rangka ekspose kayu kelas I atau II
Memasang 1 m2 jalusi kusen, kayu kelas I atau II
Memasang 1 m2 teakwood rangkap, rangka ekspose kayu kelas I
Memasang 1 m2 teakwood rangkap lapis formika, rangka ekspose kayu kelas II
Memasang 1 m3 konstruksi kuda-kuda konvesional kayu kelas I, II dan III
Memasang 1 m3 konstruksi kuda-kuda ekspose kayu kelas I
Memasang 1 m3 konstruksi gordeng, kayu kelas II
Memasang 1 m2 rangka atap genteng keramik, kayu kelas II
Memasang 1 m2 rangka atap genteng beton, kayu kelas II
Memasang 1 m2 rangka atap sirap, kayu kelas II
Memasang 1 m2 rangka langit-langit (50X100) cm, kayu kelas II atau III
Memasang 1 m2 rangka langit-langit (60X60) cm, kayu kelas II atau III
Memasang 1 m' lisplank ukuran (3X20) cm, kayu kelas I atau II
Memasang 1 m' lisplank ukuran (3X30) cm, kayu kelas I atau II
Memasang 1 m2 rangka dinding pemisah (60X120) cm, kayu kelas I atau II
Memasang 1 m2 dinding pemisah tekwood rangkap, kayu kelas II
Memasang 1 m2 dinding pemisah plywood rangkap, kayu kelas II
Memasang 1 m2 dinding lambriziring papan kayu kayu kelas I
Memasang 1 m2 dinding lambriziring dari plywood ukuran (120 X240) cm
Memasang 1 m2 dinding bilik, rangka kayu kelas III atau IV

J
J 001
J 002
J 003
J 004
J 005
J 006
J 007
J 008
J 009
J 010
J 011
J 012
J 013
J 014
J 015
J 016
J 017
J 018
J 019
J 020
J 021

PEKERJAAN BESI DAN ALUMINIUM (SNI 7393:2008)


Memasang 1 kg besi profil
Memasang 1 kg rangka kuda-kuda baja IWF
Mengerjakan 100 kg pekerjaan perakitan
Membuat 1 m2 pintu besi plat baja tebal 2 mm rangkap, rangka baja siku
Mengerjakan 10 cm pengelasan dengan las listrik
Membuat 1 m2 rangka jendela besi scuare tube (25 x 5) cm
Memasang 1 m2 pintu rolling door besi
Memasang 1 m2 pintu lipat (Folding door) bahan plastik/PVC
Memasang 1 m2 sunscreen alluminium
Memasang 1 m2 rolling door alluminium
Memasang 1 m kusen pintu alluminium
Memasang 1 m2 pintu alluminium strip lebar 8 cm
Memasang 1 m2 pintu kaca rangka alluminium
Memasang 1 m2 venetions blinds dan Vertical blinds
Memasang 1 m2 terali besi strip (2 x 3) mm
Memasang 1 m2 kawat nyamuk
Memasang 1 m2 jendela nako & tralis
Memasang 1 m talang datar/ jurai seng bjls 28 lebar 90 cm
Memasang 1 m talang lingkaran D-15 cm, seng plat bjls 30 lebar 45 cm
Memasang 1 M2 atap baja ringan Setara Maxitop Bluescope lysaght bentang max. 8m + rangka dan reng
Memasang 1 M2 atap baja ringan Setara Smarttruss Bluescope lysaght bentang lebih dari 8m + rangka d

20,380.00
21,270.00
28,770.00
711,730.00
18,610.00
178,670.00
147,370.00
566,390.00
448,620.00
782,650.00
116,360.00
652,820.00
247,910.00
345,470.00
255,180.00
85,050.00
91,310.00
117,140.00
50,310.00
193,600.00
214,500.00

K
K 001
K 002
K 003
K 004
K 005
K 006

PEKERJAAN LANGIT-LANGIT (SNI 2839:2008)


Memasang 1 m2 langit-langit asbes semen, tebal 4 mm, 5 mm, dan 6 mm
Memasang 1 m2 langit-langit akustik ukuran (30 x 30) cm
Memasang 1 m2 langit-langit akustik ukuran (30 x 60) cm
Memasang 1 m2 langit-langit akustik ukuran (60 x 120) cm
Memasang 1 m2 langit-langit tripleks ukuran (120 x 240) cm, tebal 3 mm, 4 mm dan 6 mm
Memasang 1 m2 langit-langit lambriziring kayu, tebal 9 mm

29,070.00
218,370.00
209,240.00
216,040.00
37,180.00
88,940.00

6,802,400.00
5,523,950.00
277,900.00
227,080.00
454,960.00
416,680.00
568,210.00
676,030.00
750,630.00
589,210.00
477,870.00
453,850.00
6,234,800.00
8,650,950.00
5,801,400.00
77,970.00
88,790.00
764,870.00
85,650.00
86,750.00
90,140.00
90,900.00
222,590.00
326,240.00
510,040.00
200,890.00
153,900.00
80,070.00

Harsat Pekerjaan SNI Hal 70

NO
1

URAIAN
2

JUMLAH (Rp)
3

K 007
K 008
K 009
K 010
K 011
K 012
K 013
K 014
K 015
K 016
K 017
K 018
K 019
K 020
K 021
K 022
K 023
K 024

Memasang 1 m2 langit-langit gypsum board ukuran (1200x2400x9) mm


Memasang 1 m list plafond gypsum profil
Memasang 1 m2 langit-langit GRC board ukuran (1200x2400x4) mm
Memasang 1 m2 langit-langit GRC board ukuran (1200x2400x6) mm
Memasang 1 m2 langit-langit GRC board ukuran (1200x2400x9) mm
Memasang 1 m2 langit-langit akustik ukuran (60 x 120) cm + rangka alluminium
Memasang 1 m list langit-langit kayu profil
Memasang 1 m2 rangka langit-langit uk. 1 m x 1 m, kayu kelas II
Memasang 1 m2 rangka langit-langit uk. 30 cm x 60 cm, kayu kelas II
Memasang 1 m2 rangka langit-langit uk. 30 cm x 30 cm, kayu kelas II
Memasang 1 m2 rangka langit-langit uk. 60 cm x 60 cm, besi hollow
Memasang 1 m1 lisplank uk. 3 cm x 20 cm, kayu kamper Samarinda
Memasang 1 m1 lisplank uk. 3 cm x 30 cm, kayu kamper Samarinda
Memasang 1 m1 lisplank 2 x (3 cm x 20 cm), kayu kamper Samarinda
Memasang 1 m1 lisplank GRC uk. 4 mm x 20 cm
Memasang 1 m1 lisplank GRC uk. 6 mm x 20 cm
Memasang 1 m1 lisplank GRC uk. 4 mm x 30 cm
Memasang 1 m1 lisplank GRC uk. 6 mm x 30 cm

37,600.00
12,190.00
29,920.00
45,930.00
59,950.00
613,260.00
20,300.00
71,000.00
107,800.00
127,400.00
130,130.00
66,070.00
92,700.00
92,700.00
25,060.00
28,410.00
27,210.00
32,270.00

L
L 001
L 002
L 003
L 004
L 005
L 006
L 007
L 008
L 009
L 010
L 011
L 012
L 013
L 014
L 015
L 016
L 017
L 018
L 019

PEKERJAAN PENUTUP ATAP


Memasang 1 m2 penutup atap Sirap (4 lapis) + rangka atap
Memasang 1 m2 penutup atap genteng plentong
Memasang 1 m2 penutup atap genteng kodok
Memasang 1 m2 penutup atap genteng beton
Memasang 1 m2 penutup atap genteng murando glazur
Memasang 1 m2 penutup atap genteng murando natural
Memasang 1 m2 penutup atap genteng metal (Rainbow Roof)
Memasang 1 m2 penutup atap genteng metal (Hana)
Memasang 1 m2 penutup atap genteng asbes gelombang
Memasang 1 m2 penutup atap genteng seng gelombang
Memasang 1 m' bubungan atap genteng plentong
Memasang 1 m' bubungan atap genteng kodok
Memasang 1 m' bubungan atap genteng beton
Memasang 1 m' bubungan atap genteng murando glazur
Memasang 1 m' bubungan atap genteng murando natural
Memasang 1 m' bubungan atap genteng metal (Rainbow Roof)
Memasang 1 m' bubungan atap genteng metal (Hana)
Memasang 1 m' bubungan atap genteng asbes gelombang
Memasang 1 m' bubungan atap genteng seng gelombang

179,540.00
48,520.00
51,270.00
121,380.00
134,140.00
87,720.00
305,180.00
224,710.00
55,140.00
48,400.00
98,240.00
88,120.00
103,190.00
116,170.00
105,170.00
202,220.00
44,550.00
34,130.00
27,120.00

M
M 001
M 002

PEKERJAAN PAGAR
Memasang 1 m2 pagar depan tralis (standar)
Memasang 1 m2 pagar samping/belakang

563,870.00
564,770.00

N
N 001
N 002
N 003
N 004
N 005
N 006
N 007
N 008
N 009
N 010
N 011
N 012
N 013
N 014
N 015

PEKERJAAN KUNCI/ALAT GANTUNG & KACA


Memasang 1 buah kunci tanam 2 Slaag Ancor Asli
Memasang 1 buah kunci tanam 2 Slaag ISO
Memasang 1 buah kunci tanam 2 Slaag Kuda Terbang
Memasang 1 buah kunci tanam 2 Slaag ROYAL
Memasang 1 buah kunci tanam 2 Slaag Silinder SEIS Asli type 210 s/d type 226
Memasang 1 buah kunci tanam 2 Slaag Silinder Utama Standard
Memasang 1 buah Kunci Gembok Besar
Memasang 1 buah Kunci KM Bulat ALFA
Memasang 1 buah Kunci KM Bulat Kualitas Biasa
Memasang 1 buah Kunci Silinder ALFA untuk Pintu Alumunium
Memasang 1 buah Engsel Pintu Unilon Standard
Memasang 1 buah Engsel Jendela Unilon
Memasang 1 m2 Kaca Polos tebal 3 mm
Memasang 1 m2 Kaca Polos tebal 5 mm
Memasang 1 m2 Kaca Rayband tebal 5 mm

173,030.00
229,900.00
121,330.00
162,910.00
324,500.00
622,820.00
102,190.00
122,980.00
78,210.00
376,090.00
27,990.00
22,270.00
85,410.00
121,660.00
122,540.00

O
O 001
O 002
O 003
O 004
O 005
O 006
O 007
O 008
O 009
O 010
O 011
O 012
O 013
O 014
O 015
O 016
O 017
O 018
O 019

PEKERJAAN SANITARI
Memasang 1 buah Wastafel
Memasang 1 buah Bak KM Fiber 60 x 60
Memasang 1 buah Bank mandi bata merah volume 0,3 m3
Memasang 1 buah Closet Jongkok Standard Putih Poslin TOTO
Memasang 1 buah Urinoir Lengkap TOTO Warna Standard lengkap
Memasang 1 m' pipa galvanis 1/2"
Memasang 1 m' pipa galvanis 3/4"
Memasang 1 m' pipa galvanis 1"
Memasang 1 m' pipa galvanis 11/2"
Memasang 1 m' pipa galvanis 2"
Memasang 1 m' pipa galvanis 4"
Memasang 1 m' pipa PVC tipe AW 1/2"
Memasang 1 m' PVC tipe AW 3/4"
Memasang 1 m' PVC tipe AW 1"
Memasang 1 m' PVC tipe AW 11/2"
Memasang 1 m' PVC tipe AW 2"
Memasang 1 m' PVC tipe AW 4"
Memasang 1 bh kran air 3/4" atau 1/2"
Memasang 1 bh floor drain

996,170.00
402,870.00
885,980.00
399,960.00
2,264,520.00
41,630.00
46,920.00
63,310.00
92,380.00
119,550.00
282,490.00
18,730.00
20,430.00
23,030.00
33,390.00
101,040.00
111,540.00
71,610.00

Harsat Pekerjaan SNI Hal 71

NO
1

URAIAN
2

JUMLAH (Rp)
3

P
P 001
P 002
P 003
P 004
P 005
P 006
P 007
P 008
P 009
P 010
P 011

PEKERJAAN ELEKTRIKAL
Memasang 1 Titik Instalasi Penerangan
Memasang 1 Bh Saklar Tunggal, 10 A, 250 VAC
Memasang 1 Bh Saklar Ganda, 10 A, 250 VAC
Memasang 1 Bh Stop Kontak, 1 Phase, 10 A, 250 VAC
Memasang 1 Bh Stop Kontak, 3 Phase, 10 A, 250 VAC
Memasang 1 Bh Lampu Pijar (25 - 100 Watt)
Memasang 1 Bh Lampu V - Shape 1x20 W
Memasang 1 Bh Lampu V - Shape 2x20 W
Memasang 1 Bh Lampu V - Shape 1x40 W
Memasang 1 Bh Lampu V - Shape 2x40 Watt
Memasang 1 Bh Lampu Down light + SL 25 Watt

156,460.00
35,330.00
39,680.00
37,990.00
115,310.00
23,350.00
174,320.00
283,010.00
179,640.00
293,660.00
375,340.00

Q
Q 001
Q 002
Q 003
Q 004
Q 005
Q 006
Q 007
Q 008
Q 009
Q 010
Q 011
Q 012
Q 013
Q 014
Q 015
Q 016
Q 017
Q 018
Q 019
Q 020
Q 021
Q 022
Q 023

PEKERJAAN JALAN LINGKUNGAN DAN DRAINASE


1 M2 PEMBERSIHAN DAMIJA
1 M2 PAS. ONDERLAG BATU BELAH T = 20 CM
1 M2 AMPARAN BATU PECAH MESIN 5/7 t=10 cm
1 M2 AMPARAN BATU PECAH MESIN 2/3 t=5 cm
1 M2 LAPISAN PENGISI /PENUTUP
1 M2 LABURAN ASPAL (ASPAL 4 KG)
1 LITER LAPIS RESAP PENGIKAT (PRIME COAT)
1 LITER LAPIS PEREKAT (TACK COAT)
1 M2 HOTMIX TANGAN T=3 cm (JADI) u/ HAL & JALAN KLS 6 TON KE BAWAH
1 M2 HOTMIX HRS T=2 cm KLS JALAN 6 TON LEBIH
1 M2 HOTMIX HRS T=3 cm KLS JALAN 6 TON LEBIH (HAMPARAN MANUAL)
1 M2 HOTMIX HRS T=3 cm KLS JALAN 6 TON LEBIH (PAKAI ALAT BESAR)
1 M2 HOTMIX PAKAI ALAT BESAR T=5 cm KLS JALAN 8 TON LEBIH
1 M2 LAPISAN PENETRASI (LAPEN)
1 M1 SALURAN BUIS BETON 1/2 DIA 20 CM + PASANGAN BATA MERAH
1 M1 SALURAN BUIS BETON 1/2 DIA 30 CM + PASANGAN BATA MERAH
1 M1 PASANGAN DRANASE BUIS BETON BULAT DIA 20 UNTUK SODETAN
1 M1 PASANGAN DRANASE BUIS BETON BULAT DIA 30 UNTUK SODETAN
1 M2 PASANGAN PAVING BLOCK WARNA 6 CM K-225
1 M2 PASANGAN PAVING BLOCK WARNA 8 CM K-225
1 M2 PASANGAN PAVING BLOCK NATURAL 6 CM K-225
1 M2 PASANGAN PAVING BLOCK NATURAL 8 CM K-225
1 M2 PASANGAN SULINGAN + IJUK

1,514.48
65,358.33
94,139.40
26,396.26
10,794.60
41,310.50
13,632.48
15,472.20
64,881.21
66,905.30
98,530.30
94,032.40
149,472.40
83,266.70
183,065.25
198,193.68
98,955.56
113,921.63
197,197.00
220,528.00
180,532.00
199,419.00
11,718.67

Bogor,

Nopember 2012

Kepala Dinas Pengawasan Bangunan dan Permukiman


Kota Bogor

Ir. Hj. Erna Hernawati, MM


Pembina Tk.I
NIP. 19621208 199202 2 004

Harsat Pekerjaan SNI Hal 72

CONTOH PERHITUNGAN
BETON

CONTOH PERHITUNGAN BETON BERTULANG


TAHUN ANGGARAN 2013
NO.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24

1.

URAIAN HASIL ANALISA

NOMOR HASIL HARGA BERIKUT


ANALISA
KEUNTUNGAN

Hasil Analisa Pekerjaan 1 m3 beton mutu fc = 7,4 MPa (K 100), slump (12 2) cm, w/c = 0,87
Hasil Analisa Pekerjaan 1 m3 beton mutu fc = 9,8 MPa (K 125), slump (12 2) cm, w/c = 0,78
Hasil Analisa Pekerjaan 1 m3 beton mutu fc = 12,2 MPa (K 150), slump (12 2) cm, w/c = 0,72
Hasil Analisa Pekerjaan 1 m3 beton mutu fc = 14,5 MPa (K 175), slump (12 2) cm, w/c = 0,66
Hasil Analisa Pekerjaan 1 m3 beton mutu fc = 16,9 MPa (K 200), slump (12 2) cm, w/c = 0,61
Hasil Analisa Pekerjaan 1 m3 beton mutu fc = 19,3 MPa (K 225), slump (12 2) cm, w/c = 0,58
Hasil Analisa Pekerjaan 1 m3 beton mutu fc = 21,7 MPa (K 250), slump (12 2) cm, w/c = 0,56
Hasil Analisa Pekerjaan 1 m3 beton mutu fc = 24,0 MPa (K 275), slump (12 2) cm, w/c = 0,53
Hasil Analisa Pekerjaan 1 m3 beton mutu fc = 26,4 MPa (K 300), slump (12 2) cm, w/c = 0,52
Hasil Analisa Pekerjaan 1 m3 beton mutu fc = 28,8 MPa (K 325), slump (12 2) cm, w/c = 0,49
Hasil Analisa Pekerjaan 1 m3 beton mutu fc = 28,8 MPa (K 350), slump (12 2) cm, w/c = 0,49
Hasil Analisa Pekerjaan 1 m3 beton mutu K-175 (Ready Mix)
Hasil Analisa Pekerjaan 1 m3 beton mutu K-225 (Ready Mix)
Hasil Analisa Pekerjaan 1 m3 beton mutu K-250 (Ready Mix)
Hasil Analisa Pekerjaan 1 m3 beton mutu K-300 (Ready Mix)
Hasil Analisa Pekerjaan 1 m3 beton mutu K-350 (Ready Mix)
Hasil Analisa Pekerjaan Pembesian 10 kg dengan Besi Beton (polos/ulir)
Hasil Analisa Pekerjaan Bekisting untuk Pondasi
Hasil Analisa Pekerjaan Bekisting untuk Sloop
Hasil Analisa Pekerjaan Bekisting untuk Kolom
Hasil Analisa Pekerjaan Bekisting untuk Balok
Hasil Analisa Pekerjaan Bekisting untuk Plat lantai
Hasil Analisa Pekerjaan Bekisting untuk Dinding
Hasil Analisa Pekerjaan Bekisting untuk Tangga

1 M3 PEKERJAAN PONDASI (Cor Beton mutu K 175 Ready Mix Besi 150 kg + Bekisting)
- Hasil Analisa Pekerjaan 1 m3 beton mutu K-175 (Ready Mix)
- Pembesian 15 kg dengan Besi Beton (polos/ulir) ; 15 x Hasil Analisa (D 018)
- Bekisting untuk pondasi 5 x Hasil Analisa (D 021)
Jumlah

2.

1 M3 PEKERJAAN SLOOP (Cor Beton mutu K 225 Ready Mix Besi 300 kg + Bekisting)
- Hasil Analisa Pekerjaan 1 m3 beton mutu K-225 (Ready Mix)
- Pembesian 20 kg dengan Besi Beton (polos/ulir) ; 20 x Hasil Analisa (D 018)
- Bekisting untuk sloop 5 x Hasil Analisa (D 022)
Jumlah

3.

1 M3 PEKERJAAN KOLOM (Cor Beton mutu K 300 Ready Mix Besi 300 kg + Bekisting)
- Hasil Analisa Pekerjaan 1 m3 beton mutu K-300 (Ready Mix)
- Pembesian 30 kg dengan Besi Beton (polos/ulir) ; 30 x Hasil Analisa (D 018)
- Bekisting untuk kolom 5 x Hasil Analisa (D 023)
Jumlah

4.

1 M3 PEKERJAAN BALOK (Cor Beton mutu K 300 Ready Mix Besi 200 kg + Bekisting)
- Hasil Analisa Pekerjaan 1 m3 beton mutu K-300 (Ready Mix)
- Pembesian 20 kg dengan Besi Beton (polos/ulir) ; 20 x Hasil Analisa (D 018)
- Bekisting untuk balok 5 x Hasil Analisa (D 024)
Jumlah

5.

1 M3 PEKERJAAN PLAT LANTAI (Cor Beton mutu K 300 Ready Mix Besi 150 kg + Bekisting)
- Hasil Analisa Pekerjaan 1 m3 beton mutu K-300 (Ready Mix)
- Pembesian 15 kg dengan Besi Beton (polos/ulir) ; 15 x Hasil Analisa (D 018)
- Bekisting untuk plat lantai 5 x Hasil Analisa (D 025)
Jumlah

6.

1 M3 PEKERJAAN DINDING (Cor Beton mutu K 175 Ready Mix Besi 150 kg + Bekisting)
- Hasil Analisa Pekerjaan 1 m3 beton mutu K-175 (Ready Mix)
- Pembesian 15 kg dengan Besi Beton (polos/ulir) ; 15 x Hasil Analisa (D 018)
- Bekisting untuk dinding 5 x Hasil Analisa (D 026)
Jumlah

7.

1 M3 PEKERJAAN DINDING (Cor Beton mutu K 225 Ready Mix Besi 200 kg + Bekisting)
- Hasil Analisa Pekerjaan 1 m3 beton mutu K-225 (Ready Mix)
- Pembesian 20 kg dengan Besi Beton (polos/ulir) ; 20 x Hasil Analisa (D 018)
- Bekisting untuk tangga 5 x Hasil Analisa (D 027)
Jumlah

D 002
D 003
D 004
D 006
D 007
D 008
D 009
D 010
D 011
D 012
D 013
D 014
D 015
D 016
D 017
D 018
D 019
D 020
D 021
D 022
D 023
D 024
D 025
D 026

715,610.00
751,730.00
780,120.00
813,620.00
845,730.00
869,590.00
885,580.00
913,020.00
921,550.00
980,620.00
991,790.00
889,820.00
927,760.00
965,690.00
1,003,620.00
1,041,560.00
137,020.00
155,790.00
238,890.00
313,900.00
323,820.00
381,660.00
369,370.00
285,510.00

889,820.00
2,055,300.00
778,950.00
3,724,070.00

927,760.00
2,740,400.00
1,194,450.00
4,862,610.00

1,003,620.00
4,110,600.00
1,569,500.00
6,683,720.00

1,003,620.00
2,740,400.00
1,619,100.00
5,363,120.00

1,003,620.00
2,055,300.00
1,908,300.00
4,967,220.00

889,820.00
2,055,300.00
1,846,850.00
4,791,970.00

927,760.00
2,740,400.00
1,427,550.00
5,095,710.00

KETERANGAN :
Untuk Pekerjaan Plat Lantai Beton, Balok Beton dan Pekerjaan Beton lainnya disesuaikan dengan kondisi penempatan
Apabila terletak diatas dan membutuhkan penyangga maka ditambah Pekerjaan Stoot Werk

Contoh Perhitungan Beton Hal.74

CONTOH PERHITUNGAN
BESI

CONTOH PERHITUNGAN BERAT BESI BETON DALAM 1 M3


BESI BETON POLOS

No

Diameter

Berat Besi

mm

Kg / m1

4.0

0.13

5.0

0.12

5.5

0.19

5.7

No

BESI BETON SPIRAL

Diameter

Berat Besi

mm

Kg / m1

No.

Diameter

Berat Besi

mm

Kg / m1

11

12

0.89

10.00

0.62

12

13

1.04

13.00

1.04

13

14

1.21

16.00

1.58

0.20

14

16

1.58

19.00

2.23

6.0

0.22

15

19

2.23

22.00

2.98

6.5

0.31

16

22

2.98

25.00

3.85

8.0

0.40

17

23

3.26

29.00

5.19

9.0

0.53

18

25

3.85

32.00

6.31

10.0

0.62

19

28

4.83

36.00

7.99

10

11.0

0.75

20

31

5.93

21

32

6.31

MENGHITUNG BERAT BESI BETON DALAM 1 M3


1.

Kolom Praktis 12 X 12 cm' pakai tulangan 4 batang dia. 12 beugel dia. 8 jarak 20 cm
Panjang 1 m3 ukuran 12 x 12 cm

= ( 1 : 0.12 : 0.12 )

Besi 4 batang dia. 12

Besi beugel dia. 8 jarak 20 mm

= ( 69,44 : 0,20 ) x ( 4 x 0,12 ) x 0, 40 kg

4 x

69,44 x 0,89 kg

BERAT BESI BETON UNTUK UKURAN 12 x 12 CM1 DALAM 1 M3 =


2.

Kolom praktis 15 X 15 cm' pakai tulangan 4 batang dia. 12 beugel dia. 8 jarak 20 cm
Panjang 1 m3 ukuran 15 x 15 cm

= ( 1 : 0.15 : 0.15 )

Besi 4 batang dia. 12

Besi beugel dia. 8 jarak 20 mm

= ( 44,44 : 0,20 ) x ( 4 x 0,15 ) x 0, 40 kg

4 x

44,44 x 0,89 kg

44.44 m1
158.22 kg ( A)
71.11 kg ( B )
229.33 kg/m3 ( A + B )

Sloof praktis 15 X 20 cm' pakai tulangan 4 batang dia. 12 beugel dia. 8 jarak 15 cm
`

= ( 1 : 0.15 : 0.20 )

Besi 4 batang dia. 12

Besi beugel dia. 8 jarak 15 mm

4 x

33,33 x 0,89 kg

= ( 33,33 : 0,15 ) x ( 2 x 0,15 ) + ( 2 x 0,2 ) x 0, 40 kg

BERAT BESI BETON UNTUK 15 x 20 CM1 DALAM 1 M3


4.

66.67 kg ( B )
313.89 kg/m3 ( A + B )

BERAT BESI BETON UNTUK UKURAN 15 x 15 CM1 DALAM 1 M3 =


3.

69.44 m1
247.22 kg ( A)

=
=

33.33 m1
118.67 kg ( A)
62.22 kg ( B )
180.89 kg/m3 ( A + B )

Kolom Beton 20 X 30 cm' pakai tulangan 4 batang dia. 12 + 2 batang dia. 10 beugel dia. 8 jarak 15 cm
Panjang 1 m3 ukuran 20 x 30 cm

= ( 1 : 0.20 : 0.30 )

16.67 m1

Besi 4 batang dia. 12

59.33 kg ( A)

Besi 2 batang dia. 10

= 2 x 16.67 x 0.62 kg

73.57 kg ( B)

Besi beugel dia. 8 jarak 15 mm

= ( 16,67 : 0.15 ) x (( 2 x 0.2 ) + ( 2 X 0,3 )) X 0,40 kg

44.44 kg ( C )

4 x

16,67 x 0,89 kg

BERAT BESI BETON UNTUK UKURAN 20 x 30 CM DALAM 1 M3

177.35 kg/m3 ( A + B + C )

Contoh Perhitungan Besi Hal. 75

DAFTAR BERAT BESI

DAFTAR BERAT BESI KANAL " C "

NO

UKURAN BESI KANAL " C "

BERAT BESI

BERAT PER 1 M'

60

30

10

1.6

mm

9.80

kg

1.63

kg

60

30

10

2.3

mm

13.90

kg

2.32

kg

75

35

15

1.6

mm

12.50

kg

2.08

kg

75

35

15

2.3

mm

17.40

kg

2.90

kg

75

45

15

1.6

mm

14.00

kg

2.33

kg

75

45

15

2.3

mm

19.00

kg

3.17

kg

100

50

20

mm

21.40

kg

3.57

kg

100

50

20

2.3

mm

24.40

kg

4.07

kg

100

50

20

3.2

mm

33.00

kg

5.50

kg

10

125

50

20

mm

23.70

kg

3.95

kg

11

125

50

20

2.3

mm

27.10

kg

4.52

kg

12

125

50

20

3.2

mm

37.00

kg

6.17

kg

13

150

50

20

mm

26.10

kg

4.35

kg

14

150

50

20

2.3

mm

29.76

kg

4.96

kg

15

150

50

20

3.2

mm

40.56

kg

6.76

kg

16

150

65

20

mm

28.92

kg

4.82

kg

17

150

65

20

2.3

mm

33.00

kg

5.50

kg

18

150

65

20

3.2

mm

45.10

kg

7.52

kg

19

200

75

20

mm

35.52

kg

5.92

kg

20

200

75

20

2.3

mm

40.52

kg

6.75

kg

21

200

75

20

3.2

mm

55.52

kg

9.25

kg

Daftar Berat Besi Hal. 76

DAFTAR BERAT BESI IWF

NO

UKURAN IWF

BERAT BESI 12 M1

BERAT PER 1 M1

100

50

mm

112.00

kg

9.33

kg

125

60

mm

158.40

kg

13.20

kg

148

100

mm

253.20

kg

21.10

kg

150

75

mm

168.00

kg

14.00

kg

175

90

mm

217.40

kg

18.12

kg

198

99

4.5

mm

218.40

kg

18.20

kg

200

100

5.5

mm

256.00

kg

21.33

kg

248

124

mm

308.40

kg

25.70

kg

250

125

mm

355.20

kg

29.60

kg

10

298

149

mm

384.00

kg

32.00

kg

11

300

150

6.5

mm

440.40

kg

36.70

kg

12

346

174

mm

497.00

kg

41.42

kg

13

350

175

11

mm

595.20

kg

49.60

kg

14

396

199

11

mm

679.20

kg

56.60

kg

15

400

200

13

mm

792.00

kg

66.00

kg

16

446

199

12

mm

794.40

kg

66.20

kg

17

450

200

14

mm

912.00

kg

76.00

kg

18

500

200

10

16

mm

1075.00

kg

89.58

kg

19

588

300

12

20

mm

1812.00

kg

151.00

kg

20

600

200

11

17

mm

1272.00

kg

106.00

kg

21

700

300

13

24

mm

2220.00

kg

185.00

kg

22

800

300

14

26

mm

2520.00

kg

210.00

kg

23

900

300

16

28

mm

2916.00

kg

243.00

kg

Daftar Berat Besi Hal. 77

DAFTAR BERAT BESI SIKU " L "

NO

UKURAN BESI KANAL " L "

BERAT / BATANG

BERAT PER 1 M1

25

25

mm

6.72

kg

0.56

kg

30

30

mm

8.16

kg

0.68

kg

40

40

mm

11.00

kg

0.92

kg

40

40

mm

14.50

kg

1.21

kg

50

50

mm

18.50

kg

1.54

kg

50

50

mm

22.60

kg

1.88

kg

60

60

mm

27.30

kg

2.28

kg

60

60

mm

32.52

kg

2.71

kg

65

65

mm

35.46

kg

2.96

kg

10

70

70

mm

44.28

kg

3.69

kg

11

75

75

mm

41.22

kg

3.44

kg

12

75

75

mm

54.18

kg

4.52

kg

13

80

80

mm

57.96

kg

4.83

kg

14

90

90

mm

73.20

kg

6.10

kg

15

100

100

mm

73.20

kg

6.10

kg

16

100

100

10

mm

90.60

kg

7.55

kg

17

120

120

10

12

mm

218.40

kg

18.20

kg

18

120

120

12

12

mm

260.00

kg

21.67

kg

19

125

125

12

12

mm

280.00

kg

23.33

kg

20

130

130

12

mm

214.20

kg

17.85

kg

21

130

130

12

12

mm

280.00

kg

23.33

kg

Daftar Berat Besi Hal. 78

DAFTAR BERAT BESI STRIP (FLAT BAR)

NO

UKURAN BESI PLAT TRIP

BERAT 6 M1

BERAT PER 1 M1

16

mm

2.26

kg

0.38

kg

19

mm

2.68

kg

0.45

kg

25

mm

3.54

kg

0.59

kg

30

mm

4.21

kg

0.70

kg

19

mm

3.56

kg

0.59

kg

25

mm

4.68

kg

0.78

kg

30

mm

5.61

kg

0.94

kg

32

mm

5.99

kg

1.00

kg

38

mm

7.11

kg

1.19

kg

10

50

mm

9.36

kg

1.56

kg

11

4.5

19

mm

4.04

kg

0.67

kg

12

4.5

25

mm

5.30

kg

0.88

kg

13

4.5

30

mm

6.90

kg

1.15

kg

14

4.5

38

mm

8.13

kg

1.36

kg

15

4.5

50

mm

10.53

kg

1.76

kg

16

19

mm

4.50

kg

0.75

kg

17

25

mm

5.85

kg

0.98

kg

18

30

mm

7.02

kg

1.17

kg

19

32

mm

7.50

kg

1.25

kg

20

38

mm

8.90

kg

1.48

kg

21

50

mm

11.00

kg

1.83

kg

22

19

mm

5.37

kg

0.90

kg

23

25

mm

7.24

kg

1.21

kg

24

32

mm

9.22

kg

1.54

kg

25

38

mm

10.80

kg

1.80

kg

26

50

mm

13.86

kg

2.31

kg

27

65

mm

18.25

kg

3.04

kg

28

75

mm

21.06

kg

3.51

kg

29

150

mm

44.00

kg

7.33

kg

30

38

mm

14.40

kg

2.40

kg

31

38

mm

16.15

kg

2.69

kg

32

50

mm

21.00

kg

3.50

kg

33

65

mm

27.37

kg

4.56

kg

34

75

mm

31.50

kg

5.25

kg

35

100

mm

42.20

kg

7.03

kg

36

125

mm

53.50

kg

8.92

kg

37

150

mm

63.60

kg

10.60

kg

38

12

38

mm

21.34

kg

3.56

kg

39

12

50

mm

28.26

kg

4.71

kg

40

12

65

mm

36.50

kg

6.08

kg

41

12

75

mm

42.36

kg

7.06

kg

42

12

100

mm

56.52

kg

9.42

kg

Daftar Berat Besi Hal. 79

ENGINEERING ESTIMATE ( EE )
KEGIATAN
PEKERJAAN
LOKASI PEKER
TAHUN ANGGA
NILAI PEKERJA

:
:
:
:
:

No
I

PEMBANGUNAN/PERBAIKAN SARANA PRASARANA LINGKUNGAN PERUMAHAN PERMUKIMAN KEC. BOGOR


PERBAIKAN JALAN LINGKUNGAN RT.07 KELURAHAN BATU TULIS
KELURAHAN BATU TULIS
2013
Rp.33,910,108

Uraian Pekerjaan

PEKERJAAN PERSIAPAN
1 Pek. Papan nama kegiatan
2 Pek. Administrasi dan Dokumentasi

II
1
2
3

Volume
0.96
1.00

Jumlah
PEKERJAAN JALAN
Pek. Lapisan Penetrasi makadam (Lapen)
74.25
Pek. Lapisan Perekat ( tack coat )
101.25
Pek. Hotmix (HRS) teb. 3 cm Hamparan Manu 225.00
Jumlah

Harga
Harga
Satuan ( Rp Pekerjaan
)
( Rp

m2
ls

M2
ltr
m2

###
###

408,940.80
500,000.00

83,266.70
15,472.20
98,530.30

###
###
###

REKAPITULASI
ENGINEERING ESTIMATE ( EE )
KEGIATAN
PEKERJAAN
LOKASI PEKER
TAHUN ANGGA
NILAI PEKERJA

:
:
:
:
:

PEMBANGUNAN/PERBAIKAN SARANA PRASARANA LINGKUNGAN PERUMAHAN PERMUKIMAN KEC. BOGOR


PERBAIKAN JALAN LINGKUNGAN RT.07 KELURAHAN BATU TULIS
KELURAHAN BATU TULIS
2013
Rp.33,910,108

NO

URAIAN PEKERJAAN

JUMLAH HARGA

PEKERJAAN PERSIAPAN

Rp

II

PEKERJAAN JALAN

Rp

JUMLAH
P.P.N 10 %
JUMLAH TOTAL
DIBULATKAN

Rp
Rp
Rp
Rp

Terbilang
Tiga Puluh
: ( Tiga Juta Seratus Enam Puluh Sembilan Ribu Dua Ratus Tiga PuluhEmpat Rupiah
Bogor, Desember 2012
Konsultan Perencana
CV. CIPTA SELARAS

ANITA SRI SUNDARI, SH


DIREKTRIS

PERMUKIMAN KEC. BOGOR SELATAN

Jumlah
Harga (Rp)

908,940.80

29,918,429.89

PERMUKIMAN KEC. BOGOR SELATAN

JUMLAH HARGA
908,940.80
29,918,429.89

30,827,370.69
3,082,737.07
33,910,107.76
33,910,108.00
)

or, Desember 2012


nsultan Perencana
V. CIPTA SELARAS

A SRI SUNDARI, SH
DIREKTRIS

ENGINEERING ESTIMATE ( EE )
KEGIATAN
PEKERJAAN
LOKASI PEKERJAAN
TAHUN ANGGARAN
NILAI PEKERJAAN

No
I

II

:
:
:
:
:

PEMBANGUNAN/PERBAIKAN SARANA PRASARANA LINGKUNGAN PERUMAHAN PERMU


PERBAIKAN JALAN SETAPAK RW. 10 KELURAHAN BATU TULIS
KELURAHAN BATU TULIS
2013
###

Uraian Pekerjaan

Volume

PEKERJAAN PERSIAPAN
1 Pek. Papan nama kegiatan
2 Pek. Administrasi dan Dokumentasi
3 Pek. Damija

0.96
1.00
200.00

Jumlah
PEKERJAAN JALAN
2 Pek. Lapisan Penetrasi makadam (Lapen)
110.00
3 Pek. Lapisan Perekat ( tack coat )
90.00
4 Pek. Hotmix (HRS) teb. 2 cm Hamparan Man 200.00
Jumlah

Harga
Satuan ( Rp )

m2
ls
m2

425,980.00
500,000.00
1,514.48

M2
ltr
m2

83,266.70
15,472.20
66,905.30

REKAPITULASI
ENGINEERING ESTIMATE ( EE )
KEGIATAN
PEKERJAAN
LOKASI PEKERJAAN
TAHUN ANGGARAN
NILAI PEKERJAAN

:
:
:
:
:

NO

URAIAN PEKERJAAN

PEKERJAAN PERSIAPAN

II

PEKERJAAN JALAN

PEMBANGUNAN/PERBAIKAN SARANA PRASARANA LINGKUNGAN PERUMAHAN PERMU


PERBAIKAN JALAN SETAPAK RW. 10 KELURAHAN BATU TULIS
KELURAHAN BATU TULIS
2013
###

JUMLAH
P.P.N 10 %
JUMLAH TOTAL
DIBULATKAN
Terbilang :

RANA LINGKUNGAN PERUMAHAN PERMUKIMAN KEC. BOGOR SELATAN


HAN BATU TULIS

Harga
Pekerjaan ( Rp

Jumlah
Harga (Rp)

408,940.80
500,000.00
302,896.00
908,940.80
9,159,337.00
1,392,497.70
13,381,060.00
23,932,894.70

RANA LINGKUNGAN PERUMAHAN PERMUKIMAN KEC. BOGOR SELATAN


HAN BATU TULIS

JUMLAH HARGA
Rp

908,940.80

Rp

23,932,894.70

Rp
Rp
Rp
Rp

24,841,835.50
2,484,183.55
27,326,019.05
27,326,019.00
-

Bogor, Desember 2012


Konsultan Perencana
CV. CIPTA SELARAS

ANITA SRI SUNDARI, SH


DIREKTRIS

ENGINEERING ESTIMATE ( EE )
KEGIATAN
PEKERJAAN
LOKASI PEKERJAAN
TAHUN ANGGARAN
NILAI PEKERJAAN

No
I

:
:
:
:
:

PEMBANGUNAN/PERBAIKAN SARANA PRASARANA LINGKUNGAN PERUMAHAN PERMUKIMAN KEC. BO


PERBAIKAN JALAN LINGKUNGAN RT.02 RW. 14 KELURAHAN BONDONGAN
KELURAHAN BONDONGAN
2013
Rp.41,611,784

Uraian Pekerjaan

Volume

PEKERJAAN PERSIAPAN
1 Pek. Papan nama kegiatan
2 Pek. Administrasi dan Dokumentasi

Harga
Harga
Satuan ( Rp ) Pekerjaan ( Rp

0.96
1.00

m2
ls

425,980.00
500,000.00

2 Pek. Lapisan Penetrasi makadam (Lapen)


157.50
3 Pek. Lapisan Perekat ( tack coat )
101.25
4 Pek. Hotmix (HRS) teb. 3 cm Hamparan Ma 225.00
Jumlah

M2
ltr
m2

83,266.70
15,472.20
98,530.30

478,512.00
500,000.00

Jumlah
II

PEKERJAAN JALAN
###
1,566,559.91
###

REKAPITULASI
ENGINEERING ESTIMATE ( EE )
KEGIATAN
PEKERJAAN
LOKASI PEKERJAAN
TAHUN ANGGARAN
NILAI PEKERJAAN

:
:
:
:
:

PEMBANGUNAN/PERBAIKAN SARANA PRASARANA LINGKUNGAN PERUMAHAN PERMUKIMAN KEC. BO


PERBAIKAN JALAN LINGKUNGAN RT.02 RW. 14 KELURAHAN BONDONGAN
KELURAHAN BONDONGAN
2013
Rp.41,611,784

NO

URAIAN PEKERJAAN

JUMLAH HARGA

PEKERJAAN PERSIAPAN

Rp

II

PEKERJAAN JALAN

Rp

JUMLAH
P.P.N 10 %
JUMLAH TOTAL
DIBULATKAN
Terbilang :

Rp
Rp
Rp
Rp
Bogor, Desember 2012
Konsultan Perencana
CV. CIPTA SELARAS

ANITA SRI SUNDARI, SH


DIREKTRIS

AN PERMUKIMAN KEC. BOGOR SELATAN

Jumlah
Harga (Rp)

978,512.00

36,850,382.66

AN PERMUKIMAN KEC. BOGOR SELATAN

JUMLAH HARGA
978,512.00
36,850,382.66

37,828,894.66
3,782,889.47
41,611,784.13
41,611,784.00
)

r, Desember 2012
nsultan Perencana
V. CIPTA SELARAS

A SRI SUNDARI, SH
DIREKTRIS

ENGINEERING ESTIMATE ( EE )
KEGIATAN
PEKERJAAN
LOKASI PEKERJAAN
TAHUN ANGGARAN
NILAI PEKERJAAN

No
I

II

:
:
:
:
:

PEMBANGUNAN/PERBAIKAN SARANA PRASARANA LINGKUNGAN PERUMAHAN PERMUKIMAN


PERBAIKAN JALAN LINGKUNGAN RT.05 RW. 05 KELURAHAN BONDONGAN
KELURAHAN BONDONGAN
2013
Rp.39,933,167

Uraian Pekerjaan

Volume

PEKERJAAN PERSIAPAN
1 Pek. Papan nama kegiatan
2 Pek. Administrasi dan Dokumentasi

0.96
1.00

Jumlah
PEKERJAAN JALAN
1 Pek. Lapisan Penetrasi makadam (Lapen 107.50
2 Pek. Lapisan Perekat ( tack coat )
112.50
3 Pek. Hotmix (HRS) teb. 3 cm Hamparan 250.00
Jumlah

Harga
Satuan ( Rp )

m2
ls

425,980.00
500,000.00

M2
ltr
m2

83,266.70
15,472.20
98,530.30

REKAPITULASI
ENGINEERING ESTIMATE ( EE )
KEGIATAN
PEKERJAAN
LOKASI PEKERJAAN
TAHUN ANGGARAN
NILAI PEKERJAAN

:
:
:
:
:

NO

PEMBANGUNAN/PERBAIKAN SARANA PRASARANA LINGKUNGAN PERUMAHAN PERMUKIMAN


PERBAIKAN JALAN LINGKUNGAN RT.05 RW. 05 KELURAHAN BONDONGAN
KELURAHAN BONDONGAN
2013
Rp.39,933,167

URAIAN PEKERJAAN

PEKERJAAN PERSIAPAN

II

PEKERJAAN JALAN

JUMLAH
P.P.N 10 %
JUMLAH TOTAL
DIBULATKAN
Terbilang :

EE )

ANA LINGKUNGAN PERUMAHAN PERMUKIMAN KEC. BOGOR SELATAN


KELURAHAN BONDONGAN

Harga
Pekerjaan ( Rp

Jumlah
Harga (Rp)

478,512.00
500,000.00
978,512.00
8,951,170.25
1,740,622.13
24,632,575.00
35,324,367.38

EE )

ANA LINGKUNGAN PERUMAHAN PERMUKIMAN KEC. BOGOR SELATAN


KELURAHAN BONDONGAN

JUMLAH HARGA
Rp

978,512.00

Rp

35,324,367.38

Rp
Rp
Rp
Rp

36,302,879.38
3,630,287.94
39,933,167.31
39,933,167.00
-

Bogor, Desember 2012


Konsultan Perencana
CV. CIPTA SELARAS

ANITA SRI SUNDARI, SH


DIREKTRIS

ENGINEERING ESTIMATE ( EE )
KEGIATAN
PEKERJAAN
LOKASI PEKERJAAN
TAHUN ANGGARAN
NILAI PEKERJAAN

No
I

:
:
:
:
:

PEMBANGUNAN/PERBAIKAN SARANA PRASARANA LINGKUNGAN PERUMAHAN PERMUKIMAN KEC. BOG


PERBAIKAN JALAN LINGKUNGAN RT.01 RW. 06 KELURAHAN BONDONGAN
KELURAHAN BONDONGAN
2013
Rp.39,890,355

Uraian Pekerjaan

Volume

PEKERJAAN PERSIAPAN
1 Pek. Papan nama kegiatan
2 Pek. Administrasi dan Dokumentasi

Harga
Harga
Satuan ( Rp ) Pekerjaan ( Rp

0.96
1.00

m2
ls

425,980.00
500,000.00

2 Pek. Lapisan Penetrasi makadam (Lapen)


104.40
3 Pek. Lapisan Perekat ( tack coat )
162.00
4 Pek. Hotmix (HRS) teb. 2 cm Hamparan Ma 360.00
Jumlah

M2
ltr
m2

83,266.70
15,472.20
66,905.30

478,512.00
500,000.00

Jumlah
II

PEKERJAAN JALAN
8,693,043.48
2,506,495.86
###

REKAPITULASI
ENGINEERING ESTIMATE ( EE )
KEGIATAN
PEKERJAAN
LOKASI PEKERJAAN
TAHUN ANGGARAN
NILAI PEKERJAAN

:
:
:
:
:

PEMBANGUNAN/PERBAIKAN SARANA PRASARANA LINGKUNGAN PERUMAHAN PERMUKIMAN KEC. BOG


PERBAIKAN JALAN LINGKUNGAN RT.01 RW. 06 KELURAHAN BONDONGAN
KELURAHAN BONDONGAN
2013
Rp.39,890,355

NO

URAIAN PEKERJAAN

JUMLAH HARGA

PEKERJAAN PERSIAPAN

Rp

II

PEKERJAAN JALAN

Rp

JUMLAH
P.P.N 10 %
JUMLAH TOTAL
DIBULATKAN

Rp
Rp
Rp
Rp

TIGA
Terbilang
PULUH :SEMBILAN
(
JUTA DELAPAN RATUS SEMBILAN PULUH RIBU TIGA RATUS LIMA PULUH LIMA
Bogor, Desember 2012
Konsultan Perencana
CV. CIPTA SELARAS

ANITA SRI SUNDARI, SH


DIREKTRIS

N PERMUKIMAN KEC. BOGOR SELATAN

Jumlah
Harga (Rp)

978,512.00

35,285,447.34

N PERMUKIMAN KEC. BOGOR SELATAN

JUMLAH HARGA
978,512.00
35,285,447.34

36,263,959.34
3,626,395.93
39,890,355.27
39,890,355.00
)

or, Desember 2012


nsultan Perencana
V. CIPTA SELARAS

A SRI SUNDARI, SH
DIREKTRIS

ENGINEERING ESTIMATE ( EE )
KEGIATAN
PEKERJAAN
LOKASI PEKERJAAN
TAHUN ANGGARAN
NILAI PEKERJAAN

:
:
:
:
:

No

Uraian Pekerjaan

II

PEMBANGUNAN/PERBAIKAN SARANA PRASARANA LINGKUNGAN PERUMAHAN PERMUKIMAN KEC. BOG


PERBAIKAN JALAN KOMPLEK MINABHAKTI RT.06 RW. 03 KELURAHAN CIKARET
KELURAHAN CIKARET
2013
Rp.34,485,463

PEKERJAAN PERSIAPAN
1 Pek. Papan nama kegiatan
2 Pek. Administrasi dan Dokumentasi

Volume
0.96
1.00

Jumlah
PEKERJAAN JALAN
1 Pek. Lapisan Penetrasi makadam (Lapen)
98.70
2 Pek. Lapisan Perekat ( tack coat )
94.50
3 Pek. Hotmix (HRS) teb. 3 cm Hamparan Manu 210.00
Jumlah

Harga
Harga
Satuan ( Rp )Pekerjaan ( Rp

m2
ls

M2
ltr
m2

###
###

83,266.70
15,472.20
98,530.30

478,512.00
500,000.00

8,218,423.29
1,462,122.59
###

REKAPITULASI
ENGINEERING ESTIMATE ( EE )
KEGIATAN
PEKERJAAN
LOKASI PEKERJAAN
TAHUN ANGGARAN
NILAI PEKERJAAN

:
:
:
:
:

PEMBANGUNAN/PERBAIKAN SARANA PRASARANA LINGKUNGAN PERUMAHAN PERMUKIMAN KEC. BOG


PERBAIKAN JALAN KOMPLEK MINABHAKTI RT.06 RW. 03 KELURAHAN CIKARET
KELURAHAN CIKARET
2013
Rp.34,485,463

NO

URAIAN PEKERJAAN

JUMLAH HARGA

PEKERJAAN PERSIAPAN

Rp

II

PEKERJAAN JALAN

Rp

JUMLAH
P.P.N 10 %
JUMLAH TOTAL
DIBULATKAN
Terbilang :

Rp
Rp
Rp
Rp
Bogor, Desember 2012
Konsultan Perencana
CV. CIPTA SELARAS

ANITA SRI SUNDARI, SH


DIREKTRIS

PERMUKIMAN KEC. BOGOR SELATAN

Jumlah
Harga (Rp)

978,512.00

30,371,908.88

PERMUKIMAN KEC. BOGOR SELATAN

JUMLAH HARGA
978,512.00
30,371,908.88

31,350,420.88
3,135,042.09
34,485,462.96
34,485,463.00
)

r, Desember 2012
nsultan Perencana
V. CIPTA SELARAS

A SRI SUNDARI, SH
DIREKTRIS

ENGINEERING ESTIMATE ( EE )
KEGIATAN
PEKERJAAN
LOKASI PEKERJAAN
TAHUN ANGGARAN
NILAI PEKERJAAN

No
I

:
:
:
:
:

PEMBANGUNAN/PERBAIKAN SARANA PRASARANA LINGKUNGAN PERUMAHAN PERMUKIMAN KEC. BOG


PERBAIKAN JALAN SETAPAK RT.05 RW. 10 KELURAHAN CIKARET
KELURAHAN CIKARET
2013
Rp.33,984,463

Uraian Pekerjaan

PEKERJAAN PERSIAPAN
1 Pek. Papan nama kegiatan
2 Pek. Administrasi dan Dokumentasi

II

Volume
0.96
1.00

Jumlah
PEKERJAAN JALAN
1 Pek. Lapisan Perekat ( tack coat )
182.25
2 Pek. Hotmix (HRS) teb. 2 cm Hamparan Man 405.00
Jumlah

Harga
Harga
Satuan ( Rp ) Pekerjaan ( Rp

m2
ls

425,980.00
500,000.00

478,512.00
500,000.00

ltr
m2

15,472.20
66,905.30

2,819,807.84
27,096,646.50

REKAPITULASI
ENGINEERING ESTIMATE ( EE )
KEGIATAN
PEKERJAAN
LOKASI PEKERJAAN
TAHUN ANGGARAN
NILAI PEKERJAAN

:
:
:
:
:

PEMBANGUNAN/PERBAIKAN SARANA PRASARANA LINGKUNGAN PERUMAHAN PERMUKIMAN KEC. BOG


PERBAIKAN JALAN SETAPAK RT.05 RW. 10 KELURAHAN CIKARET
KELURAHAN CIKARET
2013
Rp.33,984,463

NO

URAIAN PEKERJAAN

JUMLAH HARGA

PEKERJAAN PERSIAPAN

Rp

II

PEKERJAAN JALAN

Rp

JUMLAH
P.P.N 10 %
JUMLAH TOTAL
DIBULATKAN
Terbilang :

Rp
Rp
Rp
Rp
Bogor, Desember 2012
Konsultan Perencana
CV. CIPTA SELARAS

ANITA SRI SUNDARI, SH


DIREKTRIS

AN PERMUKIMAN KEC. BOGOR SELATAN

Jumlah
Harga (Rp)

978,512.00

29,916,454.34

AN PERMUKIMAN KEC. BOGOR SELATAN

JUMLAH HARGA
978,512.00
29,916,454.34

30,894,966.34
3,089,496.63
33,984,462.98
33,984,463.00
)

, Desember 2012
sultan Perencana
CIPTA SELARAS

SRI SUNDARI, SH
DIREKTRIS

ENGINEERING ESTIMATE ( EE )
KEGIATAN
PEKERJAAN
LOKASI PEKERJAAN
TAHUN ANGGARAN
NILAI PEKERJAAN

No
I

:
:
:
:
:

PEMBANGUNAN/PERBAIKAN SARANA PRASARANA LINGKUNGAN PERUMAHAN PERMUKIMAN KEC.


PERBAIKAN JALAN SETAPAK RW. 09 KELURAHAN EMPANG
KELURAHAN EMPANG
2013
Rp.40,565,639

Uraian Pekerjaan

Volume

PEKERJAAN PERSIAPAN
1 Pek. Papan nama kegiatan
2 Pek. Administrasi dan Dokumentasi

Harga
Harga
Satuan ( Rp ) Pekerjaan ( Rp

0.96
1.00

m2
ls

425,980.00
500,000.00

1 Pek. Lapisan Penetrasi makadam (Lapen)


165.00
2 Pek. Lapisan Perekat ( tack coat )
135.00
3 Pek. Hotmix (HRS) teb. 2 cm Hamparan Man 300.00
Jumlah

M2
ltr
m2

83,266.70
15,472.20
66,905.30

478,512.00
500,000.00

Jumlah
II

PEKERJAAN JALAN
###
2,088,746.55
###

REKAPITULASI
ENGINEERING ESTIMATE ( EE )
KEGIATAN
PEKERJAAN
LOKASI PEKERJAAN
TAHUN ANGGARAN
NILAI PEKERJAAN

:
:
:
:
:

PEMBANGUNAN/PERBAIKAN SARANA PRASARANA LINGKUNGAN PERUMAHAN PERMUKIMAN KEC.


PERBAIKAN JALAN SETAPAK RW. 09 KELURAHAN EMPANG
KELURAHAN EMPANG
2013
Rp.40,565,639

NO

URAIAN PEKERJAAN

JUMLAH HARGA

PEKERJAAN PERSIAPAN

Rp

II

PEKERJAAN JALAN

Rp

JUMLAH
P.P.N 10 %
JUMLAH TOTAL
DIBULATKAN
Terbilang :

Rp
Rp
Rp
Rp
Bogor, Desember 2012
Konsultan Perencana
CV. CIPTA SELARAS

ANITA SRI SUNDARI, SH


DIREKTRIS

MAHAN PERMUKIMAN KEC. BOGOR SELATAN

Jumlah
Harga (Rp)

978,512.00

35,899,342.05

MAHAN PERMUKIMAN KEC. BOGOR SELATAN

JUMLAH HARGA
978,512.00
35,899,342.05

36,877,854.05
3,687,785.41
40,565,639.46
40,565,639.00
)

r, Desember 2012
nsultan Perencana
V. CIPTA SELARAS

A SRI SUNDARI, SH
DIREKTRIS

ENGINEERING ESTIMATE ( EE )
KEGIATAN
PEKERJAAN
LOKASI PEKERJAAN
TAHUN ANGGARAN
NILAI PEKERJAAN

No
I

:
:
:
:
:

PEMBANGUNAN/PERBAIKAN SARANA PRASARANA LINGKUNGAN PERUMAHAN PERMUKIMAN KEC. BO


PERBAIKAN JALAN SETAPAK RT.03,04 RW. 05 KELURAHAN EMPANG
KELURAHAN EMPANG
2013
Rp.29,706,088

Uraian Pekerjaan

Volume

PEKERJAAN PERSIAPAN
1 Pek. Papan nama kegiatan
2 Pek. Administrasi dan Dokumentasi

Harga
Harga
Satuan ( Rp ) Pekerjaan ( Rp

0.96
1.00

m2
ls

425,980.00
500,000.00

2 Pek. Lapisan Penetrasi makadam (Lapen)


119.63
3 Pek. Lapisan Perekat ( tack coat )
97.88
4 Pek. Hotmix (HRS) teb. 3 cm Hamparan Manua 217.50
Jumlah

M2
ltr
m2

83,266.70
15,472.20
66,905.30

478,512.00
500,000.00

Jumlah
II

PEKERJAAN JALAN
9,960,778.99
1,514,341.25
###

REKAPITULASI
ENGINEERING ESTIMATE ( EE )
KEGIATAN
PEKERJAAN
LOKASI PEKERJAAN
TAHUN ANGGARAN
NILAI PEKERJAAN

:
:
:
:
:

PEMBANGUNAN/PERBAIKAN SARANA PRASARANA LINGKUNGAN PERUMAHAN PERMUKIMAN KEC. BO


PERBAIKAN JALAN SETAPAK RT.03,04 RW. 05 KELURAHAN EMPANG
KELURAHAN EMPANG
2013
Rp.29,706,088

NO

URAIAN PEKERJAAN

JUMLAH HARGA

PEKERJAAN PERSIAPAN

Rp

II

PEKERJAAN JALAN

Rp

JUMLAH
P.P.N 10 %
JUMLAH TOTAL
DIBULATKAN
Terbilang :

Rp
Rp
Rp
Rp
Bogor, Desember 2012
Konsultan Perencana
CV. CIPTA SELARAS

ANITA SRI SUNDARI, SH


DIREKTRIS

AN PERMUKIMAN KEC. BOGOR SELATAN

Jumlah
Harga (Rp)

978,512.00

26,027,022.99

AN PERMUKIMAN KEC. BOGOR SELATAN

JUMLAH HARGA
978,512.00
26,027,022.99

27,005,534.99
2,700,553.50
29,706,088.48
29,706,088.00
)

or, Desember 2012


nsultan Perencana
V. CIPTA SELARAS

A SRI SUNDARI, SH
DIREKTRIS

ENGINEERING ESTIMATE ( EE )
KEGIATAN
PEKERJAAN
LOKASI PEKERJAAN
TAHUN ANGGARAN
NILAI PEKERJAAN

No
I

:
:
:
:
:

PEMBANGUNAN/PERBAIKAN SARANA PRASARANA LINGKUNGAN PERUMAHAN PERMUKIMAN KEC. BO


PERBAIKAN JALAN SETAPAK RT.02 RW. 03 KELURAHAN GENTENG
KELURAHAN GENTENG
2013
Rp.33,325,939

Uraian Pekerjaan

Volume

PEKERJAAN PERSIAPAN
1 Pek. Papan nama kegiatan
2 Pek. Administrasi dan Dokumentasi

0.96
1.00

m2
ls

2 Pek. Lapisan Penetrasi makadam (Lapen)


134.75
3 Pek. Lapisan Perekat ( tack coat )
110.25
4 Pek. Hotmix (HRS) teb. 2 cm Hamparan Man 245.00
Jumlah

M2
ltr
m2

Harga
Harga
Satuan ( Rp )Pekerjaan ( Rp
###
###

478,512.00
500,000.00

Jumlah
II

PEKERJAAN JALAN
83,266.70
15,472.20
66,905.30

###
1,705,809.68
###

REKAPITULASI
ENGINEERING ESTIMATE ( EE )
KEGIATAN
PEKERJAAN
LOKASI PEKERJAAN
TAHUN ANGGARAN
NILAI PEKERJAAN

:
:
:
:
:

PEMBANGUNAN/PERBAIKAN SARANA PRASARANA LINGKUNGAN PERUMAHAN PERMUKIMAN KEC. BO


PERBAIKAN JALAN SETAPAK RT.02 RW. 03 KELURAHAN GENTENG
KELURAHAN GENTENG
2013
Rp.33,325,939

NO

URAIAN PEKERJAAN

JUMLAH HARGA

PEKERJAAN PERSIAPAN

Rp

II

PEKERJAAN JALAN

Rp

JUMLAH
P.P.N 10 %
JUMLAH TOTAL
DIBULATKAN
Terbilang :

Rp
Rp
Rp
Rp
Bogor, Desember 2012
Konsultan Perencana
CV. CIPTA SELARAS

ANITA SRI SUNDARI, SH


DIREKTRIS

HAN PERMUKIMAN KEC. BOGOR SELATAN

Jumlah
Harga (Rp)

978,512.00

29,317,796.01

HAN PERMUKIMAN KEC. BOGOR SELATAN

JUMLAH HARGA
978,512.00
29,317,796.01

30,296,308.01
3,029,630.80
33,325,938.81
33,325,939.00
)

r, Desember 2012
nsultan Perencana
V. CIPTA SELARAS

A SRI SUNDARI, SH
DIREKTRIS

ENGINEERING ESTIMATE ( EE )
KEGIATAN
PEKERJAAN
LOKASI PEKERJAAN
TAHUN ANGGARAN
NILAI PEKERJAAN

No
I

:
:
:
:
:

PEMBANGUNAN/PERBAIKAN SARANA PRASARANA LINGKUNGAN PERUMAHAN PERMUKIMAN KEC. BO


PERBAIKAN JALAN SETAPAK RT.02 RW. 08 KELURAHAN MULYAHARJA
KELURAHAN MULYAHARJA
2013
Rp.27,402,547

Uraian Pekerjaan

Volume

PEKERJAAN PERSIAPAN
1 Pek. Papan nama kegiatan
2 Pek. Administrasi dan Dokumentasi

0.96
1.00

m2
ls

1 Pek. Lapisan Penetrasi makadam (Lapen)


110.00
2 Pek. Lapisan Perekat ( tack coat )
90.00
3 Pek. Hotmix (HRS) teb. 3 cm Hamparan Man 200.00
Jumlah

M2
ltr
m2

Harga
Harga
Satuan ( Rp )Pekerjaan ( Rp
###
###

478,512.00
500,000.00

Jumlah
II

PEKERJAAN JALAN
83,266.70
15,472.20
66,905.30

9,159,337.00
1,392,497.70
13,381,060.00

REKAPITULASI
ENGINEERING ESTIMATE ( EE )
KEGIATAN
PEKERJAAN
LOKASI PEKERJAAN
TAHUN ANGGARAN
NILAI PEKERJAAN

:
:
:
:
:

PEMBANGUNAN/PERBAIKAN SARANA PRASARANA LINGKUNGAN PERUMAHAN PERMUKIMAN KEC. BO


PERBAIKAN JALAN SETAPAK RT.02 RW. 08 KELURAHAN MULYAHARJA
KELURAHAN MULYAHARJA
2013
Rp.27,402,547

NO

URAIAN PEKERJAAN

JUMLAH HARGA

PEKERJAAN PERSIAPAN

Rp

II

PEKERJAAN JALAN

Rp

JUMLAH
P.P.N 10 %
JUMLAH TOTAL
DIBULATKAN

Rp
Rp
Rp
Rp

Terbilang
Tiga
: Puluh
(
Empat Juta Delapan Puluh Lima Ribu Empat Ratus Sembilan PuluhTiga Rupiah
Bogor, Desember 2012
Konsultan Perencana
CV. CIPTA SELARAS

ANITA SRI SUNDARI, SH


DIREKTRIS

N PERMUKIMAN KEC. BOGOR SELATAN

Jumlah
Harga (Rp)

978,512.00

23,932,894.70

N PERMUKIMAN KEC. BOGOR SELATAN

JUMLAH HARGA
978,512.00
23,932,894.70

24,911,406.70
2,491,140.67
27,402,547.37
27,402,547.00
)

r, Desember 2012
sultan Perencana
. CIPTA SELARAS

A SRI SUNDARI, SH
DIREKTRIS

ENGINEERING ESTIMATE ( EE )
KEGIATAN
PEKERJAAN
LOKASI PEKERJAAN
TAHUN ANGGARAN
NILAI PEKERJAAN

No
I

:
:
:
:
:

PEMBANGUNAN/PERBAIKAN SARANA PRASARANA LINGKUNGAN PERUMAHAN PERMUKIMAN KEC. BOG


PERBAIKAN JALAN RT.02 RW. 07 KELURAHAN PAMOYANAN
KELURAHAN PAMOYANAN
2013
Rp.49,904,911

Uraian Pekerjaan

Volume

PEKERJAAN PERSIAPAN
1 Pek. Papan nama kegiatan
2 Pek. Administrasi dan Dokumentasi

0.96
1.00

m2
ls

39.00
175.50
390.00

M2
ltr
m2

Harga
Harga
Satuan ( Rp )Pekerjaan ( Rp
###
###

478,512.00
500,000.00

Jumlah
II

PEKERJAAN JALAN
2 Pek. Lapisan Penetrasi makadam (Lapen)
3 Pek. Lapisan Perekat ( tack coat )
4 Pek. Hotmix (HRS) teb. 3 cm Hamparan Ma
Jumlah

83,266.70
15,472.20
98,530.30

3,247,401.30
2,715,370.52
###

REKAPITULASI
ENGINEERING ESTIMATE ( EE )
KEGIATAN
PEKERJAAN
LOKASI PEKERJAAN
TAHUN ANGGARAN
NILAI PEKERJAAN

:
:
:
:
:

PEMBANGUNAN/PERBAIKAN SARANA PRASARANA LINGKUNGAN PERUMAHAN PERMUKIMAN KEC. BOG


PERBAIKAN JALAN RT.02 RW. 07 KELURAHAN PAMOYANAN
KELURAHAN PAMOYANAN
2013
Rp.49,904,911

NO

URAIAN PEKERJAAN

JUMLAH HARGA

PEKERJAAN PERSIAPAN

Rp

II

PEKERJAAN JALAN

Rp

JUMLAH
P.P.N 10 %
JUMLAH TOTAL
DIBULATKAN

Rp
Rp
Rp
Rp

Terbilang :Dua (Puluh Tujuh Juta Tujuh Ratus Dua Puluh Empat Ribu Seratus Sebelas Rupiah
Bogor, Desember 2012
Konsultan Perencana
CV. CIPTA SELARAS

ANITA SRI SUNDARI, SH


DIREKTRIS

AN PERMUKIMAN KEC. BOGOR SELATAN

Jumlah
Harga (Rp)

978,512.00

44,389,588.82

AN PERMUKIMAN KEC. BOGOR SELATAN

JUMLAH HARGA
978,512.00
44,389,588.82

45,368,100.82
4,536,810.08
49,904,910.90
49,904,911.00
)

or, Desember 2012


nsultan Perencana
V. CIPTA SELARAS

A SRI SUNDARI, SH
DIREKTRIS

ENGINEERING ESTIMATE ( EE )
KEGIATAN
:
PEKERJAAN
:
LOKASI PEKERJAAN :
TAHUN ANGGARAN :
NILAI PEKERJAAN :

No
I

PEMBANGUNAN/PERBAIKAN SARANA PRASARANA LINGKUNGAN PERUMAHAN PERMUKIMAN KEC. BOGO


PERBAIKAN JALAN LINGKUNGAN RW. 07 DAN RW. 09 KELURAHAN RANCAMAYA
KELURAHAN RANCAMAYA
2013
Rp.34,952,610

Uraian Pekerjaan

Volume

PEKERJAAN PERSIAPAN
1 Pek. Papan nama kegiatan
2 Pek. Administrasi dan Dokumentasi

Harga
Satuan ( Rp )

0.96
1.00

m2
ls

425,980.00
500,000.00

2 Pek. Lapisan Penetrasi makadam (Lapen)


21.45
3 Pek. Lapisan Perekat ( tack coat )
123.75
4 Pek. Hotmix (HRS) teb. 3 cm Hamparan Manua 275.00
Jumlah

M2
ltr
m2

83,266.70
15,472.20
98,530.30

Jumlah
II

PEKERJAAN JALAN

REKAPITULASI
ENGINEERING ESTIMATE ( EE )
KEGIATAN
:
PEKERJAAN
:
LOKASI PEKERJAAN :
TAHUN ANGGARAN :
NILAI PEKERJAAN :

PEMBANGUNAN/PERBAIKAN SARANA PRASARANA LINGKUNGAN PERUMAHAN PERMUKIMAN KEC. BOGO


PERBAIKAN JALAN LINGKUNGAN RW. 07 DAN RW. 09 KELURAHAN RANCAMAYA
KELURAHAN RANCAMAYA
2013
Rp.34,952,610

NO

URAIAN PEKERJAAN

PEKERJAAN PERSIAPAN

II

PEKERJAAN JALAN

JUMLAH
P.P.N 10 %
JUMLAH TOTAL
DIBULATKAN

Terbilang
Tiga :Puluh
( Empat Juta Empat Ratus Delapan Puluh Delapan Ribu Dua Ratus Tujuh Belas Rupi

PERUMAHAN PERMUKIMAN KEC. BOGOR SELATAN


N RANCAMAYA

Harga
Pekerjaan ( Rp

Jumlah
Harga (Rp)

478,512.00
500,000.00
978,512.00

###
###
###
30,796,587.55

PERUMAHAN PERMUKIMAN KEC. BOGOR SELATAN


N RANCAMAYA

JUMLAH HARGA
Rp

978,512.00

Rp

30,796,587.55

Rp
Rp
Rp
Rp

31,775,099.55
3,177,509.96
34,952,609.51
34,952,610.00

bu Dua Ratus Tujuh Belas


) Rupiah
Bogor, Desember 2012
Konsultan Perencana
CV. CIPTA SELARAS

ANITA SRI SUNDARI, SH


DIREKTRIS

ENGINEERING ESTIMATE ( EE )
KEGIATAN
PEKERJAAN
LOKASI PEKERJAAN
TAHUN ANGGARAN
NILAI PEKERJAAN

No
I

:
:
:
:
:

PEMBANGUNAN/PERBAIKAN SARANA PRASARANA LINGKUNGAN PERUMAHAN PERMUKIMAN KEC. BOGO


PERBAIKAN JALAN KE TPU DAN JEMBATAN KP. LEGOK MUNCANG RT. 03 RW. 05 KELURAHAN RANCAMAYA
KELURAHAN RANCAMAYA
2013
Rp.38,520,508

Uraian Pekerjaan

Volume

PEKERJAAN PERSIAPAN
1 Pek. Papan nama kegiatan
2 Pek. Administrasi dan Dokumentasi

Harga
Satuan ( Rp )

Harga
Pekerjaan ( Rp

0.96
1.00

m2
ls

425,980.00
500,000.00

478,512.00
500,000.00

2 Pek. Lapisan Penetrasi makadam (Lapen) 123.75


3 Pek. Lapisan Perekat ( tack coat )
101.25
4 Pek. Hotmix (HRS) teb.3 cm Hamparan Ma 225.00
Jumlah

M2
ltr
m2

83,266.70
15,472.20
98,530.30

10,304,254.13
1,566,559.91
22,169,317.50

Jumlah
II

PEKERJAAN JALAN

REKAPITULASI
ENGINEERING ESTIMATE ( EE )
KEGIATAN
PEKERJAAN
LOKASI PEKERJAAN
TAHUN ANGGARAN
NILAI PEKERJAAN

:
:
:
:
:

PEMBANGUNAN/PERBAIKAN SARANA PRASARANA LINGKUNGAN PERUMAHAN PERMUKIMAN KEC. BOGO


PERBAIKAN JALAN KE TPU DAN JEMBATAN KP. LEGOK MUNCANG RT. 03 RW. 05 KELURAHAN RANCAMAYA
KELURAHAN RANCAMAYA
2013
Rp.38,520,508

NO

URAIAN PEKERJAAN

JUMLAH HARGA

PEKERJAAN PERSIAPAN

Rp

II

PEKERJAAN JALAN

Rp

JUMLAH
P.P.N 10 %
JUMLAH TOTAL
DIBULATKAN
Terbilang :

Rp
Rp
Rp
Rp
Bogor, Desember 2012
Konsultan Perencana
CV. CIPTA SELARAS

ANITA SRI SUNDARI, SH


DIREKTRIS

ERMUKIMAN KEC. BOGOR SELATAN


KELURAHAN RANCAMAYA

Jumlah
Harga (Rp)

978,512.00

34,040,131.54

ERMUKIMAN KEC. BOGOR SELATAN


KELURAHAN RANCAMAYA

JUMLAH HARGA
978,512.00
34,040,131.54

35,018,643.54
3,501,864.35
38,520,507.89
38,520,508.00
-

Desember 2012
ultan Perencana
CIPTA SELARAS

SRI SUNDARI, SH
DIREKTRIS