PEKERJAAN
UPAH DAN BAHAN
TAHUN ANGGARAN 2013
KOTA BOGOR
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
PEKERJA
TUKANG BATU/GALI
KEPALA TUKANG BATU
TUKANG KAYU
KEPALA TUKANG KAYU
TUKANG CAT / PELITUR
KEPALA TUKANG CAT / PELITUR
TUKANG BESI BETON
KEPALA TUKANG BESI BETON
TUKANG BESI PROFIL
KEPALA TUKANG BESI PROFIL
MANDOR
OPERATOR ALAT BESAR
PEMBANTU OPERATOR / MEKANIK
SUPIR TRUK
KENEK TRUK
PENJAGA MALAM
HARGA UPAH
Rp.
SATUAN WAKTU
40,000.00
55,000.00
70,000.00
55,000.00
70,000.00
55,000.00
70,000.00
55,000.00
70,000.00
60,000.00
75,000.00
80,000.00
80,000.00
50,000.00
70,000.00
45,000.00
55,000.00
Bogor,
Nopember 2012
Kepala Dinas Pengawasan Bangunan dan Permukiman
Kota Bogor
SATUAN
A
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
m
bh
bh
bh
bh
bh
m
m
kg
m
m
m
m
m
m
m
m
bh
bh
m
m
m
btg
bh
bh
bh
bh
bh
bh
bh
bh
m1
m
kg
m
m
m
m
bh
m
m
m
m
m
m
m
m
m
bh
bh
zak
kg
kg
m
m
m
m
bh
bh
m
m3
HARGA SATUAN
Rp.
4
155,000.00
600.00
500.00
1,150.00
1,400.00
650.00
140,000.00
145,000.00
15,600.00
109,800.00
130,000.00
185,000.00
230,000.00
178,500.00
200,000.00
160,000.00
140,000.00
12,700.00
45,000.00
40,500.00
105,000.00
85,000.00
19,620.00
8,500.00
4,200.00
9,500.00
3,600.00
4,200.00
4,800.00
62,000.00
50,000.00
25,000.00
330,000.00
7,500.00
185,000.00
180,000.00
105,000.00
155,000.00
89,100.00
103,000.00
120,000.00
118,000.00
139,000.00
660,000.00
693,000.00
726,000.00
759,000.00
792,000.00
2,100.00
7,000.00
63,000.00
1,825.00
2,200.00
130,000.00
130,000.00
23,000.00
63,000.00
5,500.00
8,500.00
112,860.00
1,250.00
B
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
lbr
kg
kg
kg
kg
lt
kg
kg
kg
kg
lt
lt
lt
kg
kg
gln
kg
kg
kg
kg
kg
kg
bh
bh
bh
kg
bh
bh
kg
kg
kg
bks
bks
lt
m
m
kg
kg
bh
kg
5 lt
lt
lt
lt
lt
kg
ml
2,500.00
87,200.00
36,500.00
84,000.00
48,800.00
31,000.00
47,200.00
66,600.00
66,600.00
26,400.00
54,000.00
72,000.00
54,000.00
12,200.00
18,000.00
90,000.00
30,900.00
28,800.00
24,400.00
24,000.00
26,900.00
26,400.00
4,800.00
4,800.00
1,000.00
32,600.00
7,500.00
10,900.00
37,500.00
16,000.00
21,100.00
3,700.00
2,000.00
25,300.00
261,400.00
435,600.00
12,400.00
19,200.00
16,000.00
32,600.00
28,000.00
4,000.00
5,000.00
14,900.00
16,300.00
42,500.00
79,900.00
C
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
bt
bt
bt
bt
bt
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
10,200.00
14,600.00
36,300.00
15,400.00
20,600.00
1,375,000.00
3,004,400.00
4,125,000.00
3,520,000.00
5,940,000.00
2,178,000.00
2,500,000.00
5,854,500.00
6,534,000.00
13,503,600.00
24,865,500.00
13,503,600.00
3,833,300.00
3,135,000.00
4,290,000.00
3,740,000.00
5,940,000.00
2,530,000.00
132
133
134
135
136
136
137
137
138
138
139
139
Kayu Terentang
List profil kamper 1 cm
List profil kamper 2 cm
List profil kamper 4 cm
List profil kamper 5 cm
List profil kamper 10 cm
Pegangan Tangga profil Jati
Pegangan Tangga profil Kamper
m'
m'
m'
bh
m
m'
m'
m'
m'
m'
m'
m'
2,200.00
3,000.00
6,000.00
5,000.00
2,400,000.00
2,200.00
3,700.00
8,300.00
12,400.00
25,900.00
143,400.00
41,600.00
D
140
141
142
143
144
145
146
147
148
149
lbr
lbr
m
lbr
lbr
lbr
lbr
lbr
lbr
m'
123,500.00
14,600.00
18,600.00
60,300.00
69,200.00
66,800.00
50,000.00
90,000.00
125,000.00
4,500.00
E
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
m
m
m
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
m
m
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
m
15,400.00
10,500.00
21,800.00
161,200.00
121,600.00
80,500.00
79,900.00
131,600.00
196,800.00
258,000.00
150,700.00
334,000.00
52,300.00
121,900.00
123,400.00
94,400.00
139,700.00
111,400.00
45,000.00
61,000.00
49,400.00
113,800.00
169,900.00
25,500.00
F
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
193
194
bh
bh
bh
kg
ltr
m
m
m
m
m
m
m
m
m
m
bh
bh
bh
bh
bh
bh
7,300.00
1,200.00
1,500.00
8,500.00
34,300.00
1,974,800.00
1,669,800.00
1,974,800.00
1,350,400.00
420,000.00
335,000.00
275,400.00
187,600.00
294,000.00
116,200.00
800.00
1,000.00
900.00
1,100.00
1,800.00
2,200.00
1
195
196
197
198
199
200
201
202
203
204
205
206
207
208
209
203
204
205
206
207
208
209
210
211
212
213
214
215
216
217
218
219
220
221
222
223
224
225
226
227
228
229
230
231
232
233
234
235
236
237
238
239
240
241
242
243
244
245
246
247
248
249
250
251
252
253
254
255
256
257
258
259
2
Keramik 20 x 20 (KM) KWI DN Putih Polos Mulia
Keramik 20 x 20 (KM) KWI DN Putih Polos Roman
Keramik 20 x 25 Dinding KM KWI DN Corak Mulia
Keramik 20 x 25 Dinding KM KWI DN Corak Roman
Keramik 30 x 30 KW I DN putih polos Mulia
Keramik 30 x 30 KW I DN putih polos Roman
Keramik 30 x 30 KW I DN Warna/Corak ( ANTI SLIP ) Mulia
Keramik 30 x 30 KW I DN Warna/Corak ( ANTI SLIP ) Roman
Keramik 33 x 33 KW I DN putih polos Mulia
Keramik 33 x 33 KW I DN putih polos Roman
Keramik 33 x 33 KW I DN Corak / Warna / Mulia
Keramik 33 x 33 KW I DN Corak / Warna / Roman
Keramik 10 x 33 ,Variasi/border
Keramik artistik ukuran (10 x 20) cm
Keramik artistik ukuran (5 x 20) cm
Marmer Alam Lampung Ukuran Besar
Marmer Alam Lampung Ukuran Kecil
Marmer Alam Citatah Ukuran Besar
Marmer Alam Citatah Ukuran Kecil
Marmer Sintetis
Mozaik 30x30
Mozaik 10x20
Plint ubin PC abu-abu ukuran (15 x 20) cm
Plint ubin PC abu-abu ukuran (10 x 30) cm
Plint ubin PC abu-abu ukuran (10 x 40) cm
Plint ubin PC warna ukuran (10 x 20) cm
Plint ubin PC warna ukuran (10 x 30) cm
Plint ubin PC warna ukuran (10 x 40) cm
Plint ubin teraso ukuran (10 x 30) cm
Plint ubin teraso ukuran (10 x 40) cm
Plint ubin granit ukuran (10 x 40) cm
Plint ubin granit ukuran (10 x 30) cm
Plint ubin teralux kerang ukuran (10 x 40) cm
Plint ubin teralux kerang ukuran (10 x 30) cm
Plint ubin teralux marmer ukuran (10 x 60) cm
Plint ubin teralux marmer ukuran (10 x 40) cm
Plint ubin teralux marmer ukuran (10 x 30) cm
Plint Vinyl karet ukuran (15 x 30) cm dengan perekat
Plint kayu kelas II tebal 2Cm, Lebar 10 Cm
Plint Keramik
Plint Keramik (10 x 10)
Plint Keramik (5 x 20)
Plint Internal Cove (5x5x20)
Poslin 11 x 11 Khusus DN
Poslin 11 x 11 Standar DN
Poslin 10 x 20 Standar DN
Poslin 20 x 20 Standar DN
Stairnosing fiber
Stairnosing keramik 10/20
Taraso Kerang 30 x 30
Taraso Kerang 40 x 40
Tegel Badak PC 30 x 30
Tegel PC 20 x 20
Tegel PC 30 x 30
Tegel PC 40 x 40
Tegel Wafel PC 20 x 20
Tegel Wafel Warna 20 x 20
Tegel Warna 20 x 20
Tegel Warna 30 x 30
Tegel Warna 40 x 40
Ubin teralux ukuran (40 x 40) cm
Ubin teralux ukuran (30 x 30) cm
Ubin teralux marmer ukuran (60 x 60) cm
Ubin teralux marmer ukuran (40 x 40) cm
Ubin teralux marmer ukuran (30 x 30) cm
Bahan teraso cor
Underlayer / Pelapis bawah karpet
Parquet kayu
Gymfloor
Vinyl Lantai standar
Vinyl karet
Floor hardener
3
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
m
m
m
m
m
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
m3
bh
bh
bh
bh
bh
bh
bh
bh
m'
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
m
m
m
m
bh
kg
4
1,500.00
2,000.00
2,500.00
3,200.00
3,000.00
4,100.00
3,000.00
5,900.00
3,500.00
4,800.00
3,800.00
7,000.00
1,400.00
8,300.00
16,600.00
305,000.00
203,300.00
522,800.00
351,400.00
135,100.00
4,500.00
3,000.00
2,340.00
3,900.00
5,850.00
2,500.00
2,750.00
3,250.00
3,000.00
3,500.00
4,000.00
7,500.00
10,000.00
6,500.00
25,000.00
17,500.00
15,000.00
55,000.00
7,750,000.00
1,760.00
880.00
1,760.00
6,500.00
700.00
600.00
900.00
1,800.00
20,400.00
9,200.00
2,500.00
4,800.00
2,400.00
1,700.00
2,500.00
3,300.00
1,800.00
2,100.00
2,100.00
3,100.00
4,000.00
20,000.00
13,750.00
500,000.00
250,000.00
135,000.00
450,000.00
85,000.00
125,000.00
230,000.00
2,500.00
17,000.00
29,000.00
1
G
260
261
262
263
264
265
266
267
268
269
270
271
272
273
274
275
276
277
278
279
280
281
282
283
284
285
286
287
288
289
290
291
292
293
294
295
296
297
298
299
300
301
302
303
304
305
306
307
308
309
310
311
312
313
314
315
316
317
318
319
320
321
322
323
324
325
326
327
328
329
330
331
2
BAHAN SALURAN AIR KOTOR / BERSIH
Buis Beton 100 cm ( 0.50 m )
Buis Beton 20 cm ( 1 m' )
Buis Beton 30 cm ( 1 m' )
Buis Beton 40 cm ( 1 m' )
Buis Beton 50 cm ( 1 m' )
Buis Beton 60 cm ( 1 m' )
Buis Beton 80 cm ( 0.50 m )
Buis Tanah 10 cm ( 0.50 m )
Buis Tanah 15 cm ( 0.50 m )
Buis Tanah 20 cm ( 0.50 m )
Buis Tanah 25 cm ( 0.50 m )
Grafel U 20 cm'
Grafel U 30 cm'
Grafel U 40 cm'
Ground Reservoir 100 m3
Ground Reservoir 1000 m3
Ground Reservoir 200 m3
Ground Reservoir 300 m3
Ground Reservoir 50 m3
Ground Reservoir 500 m3
Injuk
Pipa PVC Diameter 20 mm
Pipa PVC Diameter 25 mm
Pipa PVC Diameter 32 mm
Pipa PVC Diameter 40 mm
Pipa PVC Diameter 50 mm
Pipa PVC Diameter 63 mm
Pipa PVC Diameter 75 mm
Pipa PVC Diameter 90 mm
Pipa PVC Diameter 110 mm
Pipa PVC Diameter 140 mm
Pipa PVC Diameter 160 mm
Pipa PVC Diameter 200 mm
Pipa PVC Diameter 225 mm
Pipa PVC Diameter 250 mm
Pipa PVC Diameter 315 mm
Pipa PVC Diameter 355 mm
Pipa PVC Diameter 400 mm
Pipa PVC Diameter 500 mm
Pipa PVC Diameter 630 mm
Beton Box Culvert Pracetak 40-40-100 cm Heavy Duty
Beton Box Culvert Pracetak 50-50-100 cm Heavy Duty
Beton Box Culvert Pracetak 60-60-100 cm Heavy Duty
Beton Box Culvert Pracetak 80-80-100 cm Heavy Duty
Beton Box Culvert Pracetak 100-100-100 cm Heavy Duty
Beton Box Culvert Pracetak 120-120-100 cm Heavy Duty
Beton Box Culvert Pracetak 140-140-100 cm Heavy Duty
Beton Box Culvert Pracetak 150-150-100 cm Heavy Duty
Beton Box Culvert Pracetak 40-40-100 cm Light Duty
Beton Box Culvert Pracetak 50-50-100 cm Light Duty
Beton Box Culvert Pracetak 60-60-100 cm Light Duty
Beton Box Culvert Pracetak 80-80-100 cm Light Duty
Beton Box Culvert Pracetak 100-100-100 cm Light Duty
Beton Box Culvert Pracetak 120-120-100 cm Light Duty
Beton Box Culvert Pracetak 140-140-100 cm Light Duty
Beton Box Culvert Pracetak 150-150-100 cm Light Duty
Beton Saluran U-Ditch Pracetak 40-40-120 cm
Beton Saluran U-Ditch Pracetak 50-50-120 cm
Beton Saluran U-Ditch Pracetak 60-60-120 cm
Beton Saluran U-Ditch Pracetak 80-80-120 cm
Beton Saluran U-Ditch Pracetak 100-100-120 cm
Beton Saluran U-Ditch Pracetak 120-120-120 cm
Beton Saluran U-Ditch Pracetak 140-140-120 cm
Beton Saluran U-Ditch Pracetak 160-160-120 cm
Cover Saluran Terbuka Heavy Duty 40-60 cm
Cover Saluran Terbuka Heavy Duty 50-60 cm
Cover Saluran Terbuka Heavy Duty 60-60 cm
Cover Saluran Terbuka Heavy Duty 80-60 cm
Cover Saluran Terbuka Heavy Duty 100-60 cm
Cover Saluran Terbuka Heavy Duty 120-60 cm
Cover Saluran Terbuka Heavy Duty 140-60 cm
Cover Saluran Terbuka Heavy Duty 160-60 cm
unit
m1
m1
m1
unit
unit
unit
unit
unit
unit
unit
m1
m1
m1
unit
unit
unit
unit
unit
unit
kg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
404,800.00
41,200.00
50,600.00
56,100.00
67,100.00
117,100.00
189,800.00
7,300.00
11,400.00
13,600.00
18,600.00
23,900.00
29,700.00
55,000.00
294,683,400.00
1,956,570,000.00
582,978,000.00
798,600,000.00
84,515,900.00
1,086,096,000.00
5,500.00
14,600.00
19,200.00
39,000.00
56,800.00
101,900.00
119,400.00
190,500.00
247,600.00
327,500.00
658,900.00
694,800.00
1,221,900.00
1,661,100.00
1,880,800.00
2,938,900.00
4,272,600.00
5,031,200.00
8,864,500.00
14,135,300.00
676,800.00
778,000.00
1,018,400.00
1,878,600.00
2,289,700.00
2,922,200.00
3,889,900.00
4,459,200.00
537,700.00
683,100.00
855,800.00
1,218,200.00
1,815,300.00
2,587,000.00
3,655,900.00
3,959,500.00
375,800.00
518,100.00
620,400.00
966,300.00
1,424,500.00
2,068,300.00
2,561,700.00
3,175,200.00
113,900.00
158,200.00
196,100.00
265,700.00
335,300.00
398,500.00
563,000.00
714,800.00
332
333
334
335
336
337
338
339
H
340
341
342
343
344
345
346
347
348
349
350
351
352
353
354
355
356
357
358
359
360
361
362
363
364
365
366
367
368
369
370
371
372
373
374
375
I
376
377
378
379
380
381
382
383
384
385
386
387
388
389
390
391
392
393
394
395
unit
unit
unit
unit
unit
unit
unit
unit
88,600.00
113,900.00
139,200.00
170,800.00
259,400.00
291,000.00
442,800.00
638,900.00
m
m
m
m
m
m
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
109,600.00
146,600.00
237,600.00
128,100.00
128,100.00
165,000.00
111,400.00
111,400.00
222,700.00
445,300.00
556,600.00
407,800.00
108,600.00
685,700.00
679,100.00
679,100.00
135,800.00
135,800.00
109,100.00
679,100.00
814,900.00
1,222,400.00
951,000.00
121,200.00
1,492,100.00
3,018,800.00
2,516,400.00
3,018,800.00
3,522,600.00
4,025,000.00
4,528,800.00
5,031,200.00
bh
20,124,800.00
bh
20,124,800.00
bh
25,155,900.00
bh
35,218,300.00
m'
40,000.00
11,000.00
11,000.00
12,000.00
12,000.00
14,000.00
10,300.00
12,300.00
10,300.00
11,000.00
10,300.00
10,300.00
22,000.00
20,000.00
151,100.00
21,795.45
32,340.91
42,909.09
32,340.91
403,700.00
20,000.00
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
m'
m'
Bondek
Daun Jendela Alumunium Natural ( Tanpa Kaca dan accessories )
Daun Jendela Alumunium Warna ( Tanpa Kaca dan accessories )
Daun Pintu Alumunium Natural ( tanpa kaca dan accessories )
Daun Pintu Alumunium Warna ( tanpa kaca dan accessories )
Handle Alumunium ( Tarikan Pintu Alumunium )
Besi Hollow Block 20 X 20
m
m
m
m
m
bh
396
397
398
399
400
401
402
403
404
405
406
407
408
409
410
411
412
413
414
415
416
417
418
419
420
421
422
423
424
425
426
427
428
429
430
431
432
433
434
435
436
437
438
439
440
441
442
443
444
445
446
447
448
449
450
451
452
453
454
455
456
J
457
458
459
460
461
462
463
464
465
466
BAHAN KACA
Glass Blead
Glass Block DN 20 x 20 ( Kedawung )
Glass Block DN 20 x 20 Ex LN
Kaca 6 mm Gravver
Kaca Patri EX Luar negeri terpasang
Kaca Patri Lokal Terpasang ( ASAHI )
Kaca Polos 2 mm ( ASAHI )
Kaca Polos 3 mm ( ASAHI )
Kaca Polos 5 mm ( ASAHI )
Kaca Rayband 12 mm ( ASAHI )
kg
kg
m
ps
m1
kg
kg
kg
m1
m
m
m
kg
m
m1
kg
m1
m1
kg
kg
kg
m
m
m
m
m
m
m
kg
kg
kg
kg
kg
kg
kg
kg
bt
bt
cm
m
m'
m'
m
m
m
m
m
lbr
lbr
rool
rool
tube
bh
kg
m
kg
m
kg
m
m
25,000.00
11,000.00
13,200.00
400,000.00
111,900.00
6,300.00
10,700.00
19,800.00
19,800.00
3,000.00
23,300.00
34,900.00
29,100.00
18,400.00
27,000.00
900.00
30,500.00
108,200.00
143,000.00
24,000.00
29,100.00
5,500.00
130,700.00
50,100.00
82,100.00
105,200.00
128,600.00
151,300.00
175,300.00
11,100.00
11,100.00
11,100.00
14,400.00
13,400.00
12,000.00
12,000.00
12,000.00
28,400.00
36,300.00
4,500.00
450,000.00
85,000.00
4,500.00
9,800.00
11,400.00
20,100.00
13,100.00
600,000.00
61,000.00
46,600.00
1,582,700.00
2,279,700.00
25,000.00
3,000.00
25,000.00
350,000.00
40,700.00
275,000.00
35,600.00
35,300.00
43,500.00
kg
bh
bh
m
m
m
m
m
m
m
22,000.00
23,000.00
88,600.00
1,306,800.00
3,746,200.00
1,379,400.00
43,600.00
63,400.00
93,600.00
292,900.00
467
468
469
m
m
kg
94,400.00
481,100.00
34,700.00
K
470
471
472
473
474
475
476
477
478
479
480
481
482
483
kg
kg
bh
bh
bh
kg
kg
kg
bh
kg
bh
kg
bh
bh
12,100.00
18,000.00
5,900.00
53,900.00
9,900.00
11,000.00
10,000.00
10,000.00
2,500.00
46,500.00
800.00
13,650.00
190.00
4,800.00
L
484
485
486
487
488
489
490
491
492
493
494
495
496
497
498
499
500
501
502
503
504
505
506
507
508
509
510
511
512
513
514
515
516
517
518
519
520
521
522
523
524
525
526
527
528
529
530
531
532
533
534
535
BAHAN PERPIPAAN
Besi Pipa Hitam 1" t=2 mm
Besi Pipa Hitam 2" t=2 mm
Besi Pipa Hitam 3" t=2 mm
Besi Pipa Hitam 4" t=2 mm
Besi Pipa Hitam 6" t=2 mm
Besi Pipa untuk Hydrant BSP 1"
Besi Pipa untuk Hydrant BSP 1,25"
Besi Pipa untuk Hydrant BSP 1,5"
Besi Pipa untuk Hydrant BSP 2"
Besi Pipa untuk Hydrant BSP 2,5"
Besi Pipa untuk Hydrant BSP 3"
Besi Pipa untuk Hydrant BSP 4"
Besi Pipa untuk Hydrant BSP 6"
Lem Paralon
Macam2 Sambungan GIP 1/2"
Macam2 Sambungan GIP 3/4"
Macam2 Sambungan GIP 1"
Macam2 Sambungan GIP 1 1/4"
Macam2 Sambungan GIP 1 1/2"
Macam2 Sambungan GIP 1 3/4"
Macam2 Sambungan GIP 2"
Macam2 Sambungan GIP 2 1/2"
Macam2 Sambungan GIP 3"
Macam2 Sambungan GIP 4"
Macam2 Sambungan Paralon 1/2"
Macam2 Sambungan Paralon 3/4"
Macam2 Sambungan Paralon 1"
Macam2 Sambungan Paralon 1 1/4"
Macam2 Sambungan Paralon 1 1/2"
Macam2 Sambungan Paralon 1 3/4"
Macam2 Sambungan Paralon 2"
Macam2 Sambungan Paralon 2 1/2"
Macam2 Sambungan Paralon 3"
Macam2 Sambungan Paralon 4"
Penyekat Poslin Urinoir TOTO
Pipa GIP Medium A 1/2" ( 6 m1 )
Pipa GIP Medium A 3/4" ( 6 m1 )
Pipa GIP Medium A 1" ( 6 m1 )
Pipa GIP Medium A 1 1/4" ( 6 m1 )
Pipa GIP Medium A 1 1/2" ( 6 m1 )
Pipa GIP Medium A 1 3/4"( 6 m1 )
Pipa GIP Medium A 2" ( 6 m1 )
Pipa GIP Medium A 2 1/2" ( 6 m1 )
Pipa GIP Medium A 3" ( 6 m1 )
Pipa GIP Medium A 4" ( 6 m1 )
Pipa PVC MASPION ABU 1 1/2" (AW)
Pipa PVC MASPION ABU 1 1/4" (AW)
Pipa PVC MASPION ABU 1" (AW)
Pipa PVC MASPION ABU 1/2" (AW)
Pipa PVC MASPION ABU 2 1/2" (AW)
Pipa PVC MASPION ABU 2" (AW)
Pipa PVC MASPION ABU 3" (AW)
1.
bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
tb
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
lbr
bh
bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
108,200.00
217,800.00
393,500.00
519,900.00
726,000.00
162,700.00
223,700.00
246,900.00
346,400.00
505,100.00
657,100.00
936,600.00
1,576,900.00
6,300.00
6,100.00
7,300.00
12,000.00
18,200.00
20,400.00
24,900.00
41,600.00
53,000.00
71,800.00
113,300.00
2,600.00
2,800.00
3,200.00
7,200.00
7,300.00
8,300.00
14,600.00
21,800.00
29,100.00
36,300.00
436,300.00
108,200.00
126,800.00
184,500.00
259,700.00
286,800.00
363,800.00
382,400.00
538,200.00
716,900.00
955,800.00
52,800.00
40,000.00
28,500.00
18,400.00
106,300.00
76,700.00
151,300.00
536
537
538
539
540
541
542
543
544
545
546
547
548
549
550
551
bt
bt
m1
bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
bh
gl
22,400.00
211,500.00
35,300.00
86,300.00
70,300.00
52,800.00
25,600.00
148,600.00
118,200.00
218,900.00
44,000.00
335,500.00
638,900.00
926,400.00
87,200.00
3,700.00
M
552
553
554
555
556
557
558
559
560
561
562
563
564
565
566
567
568
569
570
571
572
573
574
575
576
577
578
579
580
581
582
583
584
585
586
587
BAHAN SANITAIR
Stop Kran 3/4 " KIT
Stop Kran 1 " KIT
Stop Kran 1 1/2 " KIT
Stop Kran 2 " KIT
Stop Kran 2 1/2" KIT
Stop Kran 3 " KIT
Check Valve 1/2 "
Double Neple 1/2 "
Water Mur 1/2 "
Gate Walve 1/2 "
Saringan Air Lt KM Stainless Steel
Apooer Bath Tube
Kran stain less Lokal Kait
Shower Dengan Tiang
Shower Tanpa Tiang
Kran Tembok Sun Eui dia. 1/2 "
Kran Tembok ITAP dia. 1/2 "
Kran Bebek Sun Eui 1/2 "
Kran Bebek ITAP 1/2 "
Kran Panas Dingin San Eui Standard
Bath Cape Washteren
Tempat Sabun Poslin
Wastafel Lengkap TOTO LW 230
Wastafel Lengkap INA
Closet Jongkok Poslin warna TOTO
Closet Jongkok Standard Putih Poslin TOTO
Closet Jongkok Lengkap Sistem Jet TOTO
Closet Duduk Warna Standard TOTO C 240 Lengkap
Wastafel Bulat Warna Standard Lengkap
Closet Duduk Warna Standard lengkap INA
Urinoir Lengkap TOTO Warna Standard lengkap
Penyekat Poslin Urinoar TOTO
Kitchen Zink Stainless Standard Lokal ( 1 Lobang )
Kitchen Zink Stainless Non Standard Franke ( 1 Lobang )
Kitchen Zink Stainless Non Standard Franke ( 2 Lobang )
Sealtipe
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
unit
bh
unit
unit
unit
unit
unit
unit
unit
bh
unit
lbr
bh
bh
bh
bh
94,400.00
130,700.00
226,600.00
313,700.00
784,100.00
888,700.00
78,500.00
29,100.00
45,600.00
58,100.00
58,100.00
284,600.00
49,700.00
196,100.00
108,900.00
87,200.00
34,900.00
156,900.00
52,300.00
217,800.00
2,368,300.00
50,100.00
1,134,100.00
750,000.00
217,800.00
191,700.00
1,986,400.00
1,876,000.00
1,283,600.00
1,430,300.00
1,938,500.00
523,500.00
409,200.00
1,252,800.00
1,873,100.00
750.00
N
588
589
590
591
592
593
594
595
596
597
598
599
600
601
602
603
604
lbr
m
m
m
lbr
lbr
lbr
lbr
lbr
lbr
m
bh
bh
bh
bh
bh
m
22,400.00
8,800.00
154,000.00
177,600.00
76,400.00
106,000.00
82,100.00
40,700.00
50,900.00
77,000.00
94,600.00
1,300.00
1,700.00
1,500.00
1,700.00
1,400.00
537,300.00
605
606
607
608
609
610
611
612
613
614
615
616
617
618
619
620
621
622
623
624
625
626
627
628
629
630
m
bh
bh
bh
bh
bh
m
m
bh
bh
m
m
m
m
m
m
bh
bh
bh
m1
m1
m1
m1
bh
m1
m1
297,700.00
6,300.00
8,300.00
6,300.00
7,300.00
4,000.00
92,500.00
79,800.00
9,900.00
4,400.00
145,000.00
128,800.00
121,600.00
108,200.00
237,900.00
171,400.00
5,900.00
3,200.00
3,200.00
154,800.00
83,200.00
104,900.00
107,200.00
1,100.00
107,100.00
83,200.00
O
631
632
633
634
635
636
637
638
639
640
641
642
643
644
BAHAN MEKANIKAL
AC Split 1 PK Setara TOSHIBA
AC Split 2 PK Setara TOSHIBA
AC Split 3 PK Setara TOSHIBA
Diesel Pump kap. 750 gln / menit 120 m1 ( 105 kW )
Down Light +SL 25 W
Electrical Pump kap. 750 gln / menit 120 m1 ( 90 kW )
Exhouse Fan H 100 W 40 x 40 cm
Exhouse Fan H 360 W 60 x 60 cm
Exhouse Fan H 380 W CFM 55 x 55 cm
Fire House 1.5 x 30 m + nose
Hydran Box dalam Gedung (lengkap)
Jockey Pump kap. 80 gln / menit 100 m1 ( 18,6 kW )
Mesin AC Split DAIKIN ( Indoor / Outdoor Unit )
Presure Tank kap. 500 liter lengkap
unit
unit
unit
unit
bh
unit
unit
unit
unit
unit
unit
unit
unit
unit
4,743,200.00
21,642,100.00
30,310,500.00
623,267,400.00
127,800.00
249,307,000.00
952,300.00
5,366,400.00
6,050,000.00
5,198,200.00
6,461,400.00
72,714,500.00
1,980,000.00
36,445,200.00
P
645
646
647
648
649
650
651
652
653
654
655
656
657
658
659
660
661
662
663
664
665
666
667
668
669
670
671
672
673
BAHAN ELEKTRIKAL
Kabel NYA 1x 1.5 Prima (1 rol = 50 m')
Kabel NYA 1x 2.5 Prima (1 rol = 50 m')
Kabel NYM 2 x 1.5 Prima (1 rol = 50 m')
Kabel NYM 3 x 1.5 Prima (1 rol = 50 m')
Kabel NYM 2 x 2.5 Prima (1 rol = 50 m')
Kabel NYM 3 x 2.5 Prima (1 rol = 50 m')
Kabel NYM 4 x 2.5 Prima (1 rol = 50 m')
Kabel NYM 2 x 4 Prima (1 rol = 50 m')
Kabel NYM 3 x 4 Prima (1 rol = 50 m')
Kabel NYM 4 x 4 Prima (1 rol = 50 m')
Kabel NYM 2 x 6 Supreme (1 rol = 50 m')
Kabel NYM 3 x 6 Supreme (1 rol = 50 m')
Kabel NYM 4 x 6 Supreme (1 rol = 50 m')
Kabel NYM 2 x 10 Supreme (1 rol = 50 m')
Kabel NYM 3 x 10 Supreme (1 rol = 50 m')
Kabel NYM 4 x 10 Supreme (1 rol = 50 m')
Kabel NYM 4 x 16 Supreme (1 rol = 50 m')
Kabel NYY 2 x 4 Supreme (1 rol = 50 m')
Kabel NYY 3 x 4 Supreme (1 rol = 50 m')
Kabel NYY 4 x 4 Supreme (1 rol = 50 m')
Kabel NYY 2 x 6 Supreme (1 rol = 50 m')
Kabel NYY 3 x 6 Supreme (1 rol = 50 m')
Kabel NYY 4 x 6 Supreme (1 rol = 50 m')
Kabel NYY 2 x 10 Supreme (1 rol = 50 m')
Kabel NYY 3 x 10 Supreme (1 rol = 50 m')
Kabel NYY 4 x 10 Supreme (1 rol = 50 m')
Kabel NYY 4 x 16 Supreme (1 rol = 50 m')
NSFB FUJI EA - 100 A
NSFB FUJI EA - 150 A
1.5
ROLL
ROLL
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
bh
bh
84,300.00
125,800.00
3,200.00
6,700.00
4,300.00
7,300.00
6,300.00
5,300.00
12,000.00
16,700.00
9,500.00
12,500.00
16,700.00
15,700.00
20,800.00
22,900.00
31,300.00
9,500.00
12,500.00
20,800.00
9,400.00
15,700.00
19,400.00
16,700.00
22,800.00
28,100.00
44,600.00
884,000.00
2,090,900.00
674
675
676
677
678
679
680
681
682
683
684
685
686
687
688
689
690
691
692
693
694
695
696
697
698
699
700
701
702
703
704
705
706
707
708
Q
709
710
711
712
713
714
715
716
717
718
719
720
721
722
723
724
725
726
727
728
729
730
731
732
733
734
735
736
737
738
739
740
R
741
742
unt
unt
unt
unt
bh
bh
bh
bh
bh
bh
bh
bh
bh
ttk
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
kg
ttk
ttk
155,400.00
190,000.00
227,300.00
477,800.00
48,000.00
60,300.00
538,200.00
18,200.00
21,800.00
20,400.00
84,300.00
143,400.00
84,100.00
156,460.00
8,300.00
21,800.00
26,200.00
30,500.00
36,300.00
25,500.00
30,100.00
5,100.00
2,700.00
108,100.00
299,200.00
130,700.00
65,400.00
108,200.00
299,200.00
203,300.00
740,600.00
95,600.00
40,700.00
421,100.00
181,500.00
unt
unt
unt
m1
ps
ps
ps
ps
bh
bh
ps
ps
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
dn
bh
unt
m1
m1
bh
bh
bh
bh
202,600.00
597,500.00
418,700.00
12,400.00
12,000.00
7,300.00
17,200.00
40,700.00
36,300.00
3,700.00
23,300.00
5,100.00
28,500.00
129,800.00
181,500.00
82,800.00
120,600.00
267,500.00
538,700.00
65,400.00
84,300.00
43,600.00
314,400.00
24,000.00
836,300.00
180,100.00
32,300.00
46,700.00
9,500.00
28,500.00
12,400.00
377,300.00
kg
kg
8,300.00
10,800.00
743
744
745
746
747
748
749
Aspal RC 70 ( Cilacap )
Asphal Concrete Base (ATB) / AC-Base
Asphal Concrete Base Course (ATB) / AC-BC
Asphal Concrete Wearing Course (Laston) / AC-WC
Hot Roller Sheet (Lataston) / HRS
Lapis`Aspal Resap Pengikat / Prime Coat
Lapis`Aspal Perekat ? Tack Coat
kg
ton
ton
ton
ton
ton
ton
6,900.00
765,400.00
778,000.00
797,000.00
1,200,000.00
5,600.00
5,600.00
S
750
751
752
753
754
755
756
757
758
759
760
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
220,000,000.00
16,450,000.00
4,961,000.00
1,095,100.00
1,891,300.00
836,400.00
274,900.00
191,300.00
34,267,200.00
5,808,000.00
9,438,000.00
T
761
762
763
764
765
766
bh
bh
bh
bh
bh
bh
716,800.00
1,134,400.00
2,268,100.00
227,300.00
48,000.00
143,500.00
1 watt
m
m
m
m
ttk
m
spl
spl
spl
1 watt
unit
unit
ttk
900.00
28,400.00
25,500.00
32,000.00
28,400.00
268,700.00
1,400.00
108,900.00
238,200.00
82,700.00
600.00
7,260,000.00
798,600.00
399,300.00
U
767
768
769
770
771
772
773
774
775
776
777
778
779
780
V
781
782
783
784
785
786
787
788
789
790
791
792
793
794
ALAT TUKANG.
Alat-alat bantu
Cangkul
Karbit
Kawat Las Listrik
Linggis
Palu 0,5 kg
Pengki
Rool Meter 30 meter ( Bahan Plastik )
Rool Meter 5 meter ( Bahan Besi )
Sekop
Selang Plastik untuk Water Pas dia. 0.5 cm
Singkup
Tali Rami
Water Pas Alumuniumm 60 cm
bh
bh
kg
kg
bh
bh
bh
bh
bh
bh
bh
bh
rool
bh
38,500.00
27,500.00
5,900.00
10,700.00
27,500.00
19,300.00
13,800.00
82,500.00
16,500.00
27,500.00
1,600.00
27,500.00
7,300.00
33,000.00
/jam
/jam
/jam
/jam
/jam
/jam
/jam
/jam
/jam
36,900.00
112,200.00
770,000.00
198,000.00
89,700.00
89,700.00
89,700.00
110,000.00
104,500.00
W
795
796
797
798
799
800
801
802
803
1
804
805
806
807
808
809
810
811
812
813
814
815
816
817
818
819
820
821
822
823
824
825
826
827
828
829
830
831
832
833
834
X
1
2
3
4
5
6
7
8
9
10
11
12
13
14
/jam
/jam
/jam
/jam
/jam
/jam
/jam
/jam
/jam
/jam
/jam
/jam
/jam
/jam
/jam
/jam
/jam
/jam
/jam
/jam
/jam
/jam
/jam
/jam
/jam
/jam
/paket
275,000.00
89,700.00
93,500.00
93,500.00
71,500.00
93,500.00
104,500.00
220,000.00
104,500.00
36,900.00
192,500.00
385,000.00
36,900.00
49,500.00
69,300.00
104,500.00
36,900.00
31,900.00
104,500.00
104,500.00
93,500.00
93,500.00
104,500.00
99,000.00
176,000.00
19,300.00
632,500.00
/paket
1,320,000.00
/paket
5,500,000.00
/paket
5,500,000.00
/paket
10,450,000.00
lt
m
lt
lt
lt
lt
lt
15 kg
15.1 kg
btl
kg
kg
m
lt
3,300.00
66,000.00
2,200.00
5,500.00
6,000.00
1,500.00
36,300.00
79,900.00
94,400.00
54,300.00
18,200.00
8,800.00
1,102,100.00
36,300.00
Bogor,
Nopember 2012
Kepala Dinas Pengawasan Bangunan dan Permukiman
Kota Bogor
ANALISA HARGA
SATUAN PEKERJAAN
KEBUTUHAN
2
PEKERJAAN PERSIAPAN
Mengukur kembali 1 m2 Site
Tenaga kerja
A002
Tenaga kerja
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Membuat 1 m2 Los kerja / Gudang
Bahan
A004
Tenaga kerja
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Membuat 1 m2 Kantor Direksi
Bahan
A005
Tenaga kerja
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Membuat 1 m2 Papan Nama Proyek
Bahan
A006
A 007
A 008
A 009
INDEKS
4
5
SAT
6
JUMLAH
7=(4x6)
Tukang Batu
Pekerja
Peralatan
0.010
0.020
0.500
org
org
lot
55,000.00
40,000.00
1,350.00
550.00
800.00
675.00
2,025.00
202.50
2,227.50
2,220.00
0.010
0.038
0.155
m
kg
ls
3,004,400.00
10,000.00
30,424.00
30,044.00
380.00
4,715.72
35,139.72
3,513.97
38,653.69
38,650.00
0.100
0.250
1.100
0.500
0.100
0.025
0.125
m
kg
lbr
lbr
zak
lot
ls
3,004,400.00
10,000.00
46,600.00
45,000.00
63,000.00
383,000.00
392,575.00
300,440.00
2,500.00
51,260.00
22,500.00
6,300.00
9,575.00
49,071.88
441,646.88
44,164.69
485,811.56
485,810.00
0.100
0.250
1.100
0.500
0.100
0.250
70.000
0.020
0.150
m
kg
lbr
lbr
zak
m
bh
lot
ls
3,004,400.00
10,000.00
61,000.00
45,000.00
63,000.00
180,000.00
500.00
478,840.00
488,416.80
300,440.00
2,500.00
67,100.00
22,500.00
6,300.00
45,000.00
35,000.00
9,576.80
73,262.52
561,679.32
56,167.93
617,847.25
617,840.00
0.065
1.000
0.250
1.000
0.125
0.125
m
m
kg
kg
ls
ls
3,004,400.00
61,000.00
10,000.00
47,200.00
305,986.00
344,234.25
195,286.00
61,000.00
2,500.00
47,200.00
38,248.25
43,029.28
387,263.53
38,726.35
425,989.88
425,980.00
1.430
0.036
0.200
1.800
0.200
lbr
m
kg
m
ls
61,000.00
3,004,400.00
10,000.00
47,200.00
282,348.40
87,230.00
108,158.40
2,000.00
84,960.00
56,469.68
338,818.08
33,881.81
372,699.89
372,690.00
0.2000
0.0090
org
org
40,000.00
80,000.00
8,000.00
720.00
8,720.00
872.00
9,592.00
9,590.00
0.1000
0.0090
org
org
40,000.00
80,000.00
4,000.00
720.00
4,720.00
472.00
5,192.00
5,190.00
0.0500
0.0250
org
org
40,000.00
80,000.00
2,000.00
2,000.00
4,000.00
400.00
4,400.00
4,400.00
Jumlah
Biaya tak terduga dan Keuntungan
Jumlah
Dibulatkan
Memasang 1 m1 bouplank
Bahan
A003
Tenaga kerja
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Mengerjakan 1 m2 Pagar Pengaman Proyek
Seng Glb BJLS 28 ( 80 x 180 )
Kayu Borneo Super
Bahan
Paku 5 - 7
Pengecatan cat minyak 2x bag. luar
Tenaga kerja
Ongkos Pasang
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Membongkar 1 m2 Dinding bata
(Jika bongkaran di pakai lagi )
Pekerja
Tenaga kerja
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Membongkar 1 m2 Dinding bata
(Jika bongkaran tidak di pakai lagi )
Pekerja
Tenaga kerja
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Membongkar 1 m2 Plesteran dinding
Pekerja
Tenaga kerja
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
1
A 010
2
Membongkar 1 m2 Genteng/Sirap
(Jika bongkaran di pakai lagi )
Tenaga kerja
A 011
A 013
A 014
A 015
A 016
A 017
A 018
7=(4x6)
0.0400
0.0100
org
org
40,000.00
80,000.00
1,600.00
800.00
2,400.00
240.00
2,640.00
2,640.00
Pekerja
Mandor
0.0200
0.0100
org
org
40,000.00
80,000.00
800.00
800.00
1,600.00
160.00
1,760.00
1,760.00
4.0000
6.0000
0.6000
0.2000
org
org
org
org
40,000.00
55,000.00
70,000.00
80,000.00
160,000.00
330,000.00
42,000.00
16,000.00
548,000.00
54,800.00
602,800.00
602,800.00
4.0000
3.0000
0.2000
org
org
org
40,000.00
55,000.00
80,000.00
160,000.00
165,000.00
16,000.00
341,000.00
34,100.00
375,100.00
375,100.00
0.1000
0.2500
0.0025
0.0050
org
org
org
org
40,000.00
55,000.00
70,000.00
80,000.00
4,000.00
13,750.00
175.00
400.00
18,325.00
1,832.50
20,157.50
20,150.00
0.1250
0.0050
org
org
40,000.00
80,000.00
5,000.00
400.00
5,400.00
540.00
5,940.00
5,940.00
0.2000
0.0500
0.0050
0.0100
org
org
org
org
40,000.00
55,000.00
70,000.00
80,000.00
8,000.00
2,750.00
350.00
800.00
11,900.00
1,190.00
13,090.00
13,090.00
0.1000
0.0250
0.0025
0.0050
org
org
org
org
40,000.00
55,000.00
70,000.00
80,000.00
4,000.00
1,375.00
175.00
400.00
5,950.00
595.00
6,545.00
6,540.00
Pekerja
Mandor
6.6670
0.3330
org
org
40,000.00
80,000.00
266,680.00
26,640.00
293,320.00
29,332.00
322,652.00
322,650.00
Pekerja
Mandor
0.1000
0.0050
org
org
40,000.00
80,000.00
4,000.00
400.00
4,400.00
440.00
4,840.00
4,840.00
0.750
0.025
OH
OH
40,000.00
80,000.00
30,000.00
2,000.00
32,000.00
3,200.00
35,200.00
35,200.00
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Membersihkan 1 m2 lokasi kegiatan
Tenaga kerja
B
B001
Pekerja
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Membongkar 1 m3 Kuda-kuda, Gording/Balok
(Jika bongkaran di pakai lagi )
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Membongkar 1 m3 Kuda-kuda, Gording/Balok
(Jika bongkaran tidak di pakai lagi )
Pekerja
Tenaga kerja
Tukang batu
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Membongkar 1 m2 Plafond
(Jika bongkaran di pakai lagi )
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Membongkar 1 m2 Plafond
(Jika bongkaran tidak di pakai lagi )
Pekerja
Tenaga kerja
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Membongkar 1 m2 Rangka Atap/Reng kaso
(Jika bongkaran di pakai lagi )
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Membongkar 1 m2 Rangka Atap/Reng kaso
(Jika bongkaran tidak di pakai lagi )
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Membongkar 1 m3 Beton bertulang
Tenaga kerja
A 018
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Membongkar 1 m2 Genteng/Sirap
(Jika bongkaran tidak di pakai lagi )
Tenaga kerja
A 012
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
PEKERJAAN TANAH (SNI 2835:2008)
Menggali 1 m3 tanah biasa sedalam 1 meter
Pekerja
Tenaga kerja
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
1
B002
B003
B004
B005
B006
B007
B008
B009
B010
B011
B012
B013
B014
2
3
Menggali 1 m3 tanah biasa sedalam 2 meter
Pekerja
Tenaga kerja
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Menggali 1 m3 tanah biasa sedalam 3 meter
Pekerja
Tenaga kerja
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Menggali 1 m3 tanah biasa sedalam 4 meter
Pekerja
Tenaga kerja
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Menggali 1 m3 tanah biasa sedalam 5 meter
Pekerja
Tenaga kerja
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Menggali 1 m3 tanah keras sedalam 1 meter
Pekerja
Tenaga kerja
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Menggali 1 m3 tanah cadas sedalam 1 meter
Pekerja
Tenaga kerja
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Menggali 1 m3 tanah lumpur sedalam 1 meter
Pekerja
Tenaga kerja
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Mengerjakan 1 m2 stripping tebing setinggi 1 meter
Pekerja
Tenaga kerja
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Membuang 1 m3 tanah sejauh 15 meter
Pekerja
Tenaga kerja
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Mengurug kembali 1 m3 galian
Pekerja
Tenaga kerja
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memadatkan 1 m3 tanah (per 20 cm)
Pekerja
Tenaga kerja
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Mengurug 1 m3 pasir urug
Bahan
Pasir Urug
Pekerja
Tenaga kerja
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m3 Lapisan pudel campuran 1 KP : 3 PP : 7 TL untuk stabilisasi tanah
Kapur Padam
Bahan
Pasir Pasang
Tanah liat
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
7=(4x6)
0.900
0.045
OH
OH
40,000.00
80,000.00
36,000.00
3,600.00
39,600.00
3,960.00
43,560.00
43,560.00
1.050
0.067
OH
OH
40,000.00
80,000.00
42,000.00
5,360.00
47,360.00
4,736.00
52,096.00
52,090.00
1.200
0.089
OH
OH
40,000.00
80,000.00
48,000.00
7,120.00
55,120.00
5,512.00
60,632.00
60,630.00
1.350
0.105
OH
OH
40,000.00
80,000.00
54,000.00
8,400.00
62,400.00
6,240.00
68,640.00
68,640.00
1.000
0.032
OH
OH
40,000.00
80,000.00
40,000.00
2,560.00
42,560.00
4,256.00
46,816.00
46,810.00
1.500
0.060
OH
OH
40,000.00
80,000.00
60,000.00
4,800.00
64,800.00
6,480.00
71,280.00
71,280.00
1.200
0.045
OH
OH
40,000.00
80,000.00
48,000.00
3,600.00
51,600.00
5,160.00
56,760.00
56,760.00
0.050
0.005
OH
OH
40,000.00
80,000.00
2,000.00
400.00
2,400.00
240.00
2,640.00
2,640.00
0.330
0.010
OH
OH
40,000.00
80,000.00
13,200.00
800.00
14,000.00
1,400.00
15,400.00
15,400.00
0.250
0.008
OH
OH
40,000.00
80,000.00
10,000.00
666.67
10,666.67
1,066.67
11,733.33
11,730.00
0.500
0.050
OH
OH
40,000.00
80,000.00
20,000.00
4,000.00
24,000.00
2,400.00
26,400.00
26,400.00
1.200
0.300
0.010
m
OH
OH
155,000.00
40,000.00
80,000.00
186,000.00
12,000.00
800.00
198,800.00
19,880.00
218,680.00
218,680.00
0.135
0.400
0.948
0.800
0.400
0.040
0.080
m
m
m
OH
OH
OH
OH
330,000.00
180,000.00
23,000.00
40,000.00
55,000.00
70,000.00
80,000.00
44,550.00
72,000.00
21,804.00
32,000.00
22,000.00
2,800.00
6,400.00
201,554.00
20,155.40
221,709.40
221,700.00
Analisa SNI Hal 17
1
B015
B016
B017
B018
B019
B020
B021
C
C001
C002
2
3
Memasang 1 m3 Lapisan pudel campuran 1 KP : 5 TL untuk stabilisasi tanah
Kapur Padam
Bahan
Tanah liat
Pekerja
Tukangk batu
Tenaga kerja
Kep.tukang batu
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 lapisan ijuk tebal 10 cm , untuk bidang resapan
Bahan
Injuk
Pekerja
Tenaga kerja
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Mengurug 1 m3 sirtu padat untuk peninggian lantai bangunan
Bahan
Sirtu ( Membeli Sirtu )
Tukang Gali
Tenaga kerja
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Membuat 1 m2 jalan sementara tebal 20 cm
Batu Belah
Bahan
Kerikil
Pasir Pasang
Pekerja
Tenaga kerja
Mandor
Alat Bantu ( Pek. Pemadatan Tanah 1 m2 )
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Menggali 1 m3 tanah untuk sumuran maksimum 10 m
Pekerja
Tenaga kerja
Mandor
Alat Bantu
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Mengurug 1 m3 tanah pakai alat besar, tanah dari luar dipadatkan (5000m3)
Pek. Galian ( 10 org ) 50 %
Pek. Galian tanah berbatu ( 10 org ) 50 %
Pek. Grading Plant ( 10 org ) 50 %
Beli Tanah + Angkut Max 10 Km
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1m2 cerucuk dolken
Bahan
Dolken dia 5 -7 cm
Pekerja
Tenaga kerja
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
PEKERJAAN PONDASI (SNI 2836:2008)
Memasang 1 m3 pondasi batu belah, campuran 1 PC : 3 PP
Batu belah 15 cm/20cm
Bahan
Portland Cement
Pasir Pasang
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m3 pondasi batu belah, campuran 1 PC : 4 PP
Batu belah 15 cm/20cm
Bahan
Portland Cement
Pasir Pasang
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
7=(4x6)
0.248
1.240
0.800
0.400
0.040
0.080
m
m
OH
OH
OH
OH
330,000.00
23,000.00
40,000.00
55,000.00
70,000.00
80,000.00
81,840.00
28,520.00
32,000.00
22,000.00
2,800.00
6,400.00
173,560.00
17,356.00
190,916.00
190,910.00
6.000
0.150
0.015
kg
org
org
5,500.00
40,000.00
80,000.00
33,000.00
6,000.00
1,200.00
40,200.00
4,020.00
44,220.00
44,220.00
1.200
0.250
0.025
m
org
org
130,000.00
55,000.00
80,000.00
156,000.00
13,750.00
2,000.00
171,750.00
17,175.00
188,925.00
188,920.00
0.250
0.030
0.050
0.500
0.100
0.060
m
m
m
org
org
lot
140,000.00
130,000.00
180,000.00
40,000.00
80,000.00
75,900.00
35,000.00
3,900.00
9,000.00
20,000.00
8,000.00
4,554.00
80,454.00
8,045.40
88,499.40
88,490.00
1.150
0.025
0.200
org
org
lot
40,000.00
80,000.00
48,000.00
46,000.00
2,000.00
9,600.00
57,600.00
5,760.00
63,360.00
63,360.00
0.600
0.600
5.000
1.200
m
m
m
m
16,000.00
21,280.00
12,000.00
63,000.00
4,800.00
6,384.00
30,000.00
75,600.00
116,784.00
11,678.40
128,462.40
128,460.00
3.000
0.100
0.010
btg
org
org
14,600.00
40,000.00
80,000.00
43,800.00
4,000.00
800.00
48,600.00
4,860.00
53,460.00
53,460.00
1.200
202.000
0.485
1.500
0.750
0.075
0.075
m
kg
m
OH
OH
OH
OH
140,000.00
1,260.00
180,000.00
40,000.00
55,000.00
70,000.00
80,000.00
168,000.00
254,520.00
87,300.00
60,000.00
41,250.00
5,250.00
6,000.00
622,320.00
62,232.00
684,552.00
684,550.00
1.200
163.000
0.520
1.500
0.750
0.075
0.075
m
kg
m
OH
OH
OH
OH
140,000.00
1,260.00
180,000.00
40,000.00
55,000.00
70,000.00
80,000.00
168,000.00
205,380.00
93,600.00
60,000.00
41,250.00
5,250.00
6,000.00
579,480.00
57,948.00
637,428.00
637,420.00
1
C003
C004
C005
C006
C007
C008
C009
2
3
Memasang 1 m3 pondasi batu belah, campuran 1 PC : 5 PP
Batu belah 15 cm/20cm
Bahan
Portland Cement
Pasir Pasang
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m3 pondasi batu belah, campuran 1 PC : 6 PP
Batu belah 15 cm/20cm
Bahan
Portland Cement
Pasir Pasang
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m3 pondasi batu belah, campuran 1 PC : 8 PP
Batu belah 15 cm/20cm
Bahan
Portland Cement
Pasir Pasang
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m3 pondasi batu belah, campuran 1 KP : 1 SM : 2 PP
Batu belah 15 cm/20cm
Kapur Padam
Bahan
Semen Merah
Pasir Pasang
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m3 pondasi batu belah, campuran 1 PC : 3 KP : 10 PP
Batu belah 15 cm/20cm
Portland Cement
Bahan
Kapur Padam
Pasir Pasang
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m3 pondasi batu belah, campuran PC : 1 KP : 4 PP
Batu belah 15 cm/20cm
Portland Cement
Bahan
Kapur Padam
Pasir Pasang
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m3 batu kosong (anstamping)
Batu belah 15 cm/20cm
Bahan
Pasir Urug
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
7=(4x6)
1.200
136.000
0.544
1.500
0.750
0.075
0.075
m
kg
m
OH
OH
OH
OH
140,000.00
1,260.00
180,000.00
40,000.00
55,000.00
70,000.00
80,000.00
168,000.00
171,360.00
97,920.00
60,000.00
41,250.00
5,250.00
6,000.00
549,780.00
54,978.00
604,758.00
604,750.00
1.200
117.000
0.561
1.500
0.750
0.075
0.075
m
kg
m
OH
OH
OH
OH
140,000.00
1,260.00
180,000.00
40,000.00
55,000.00
70,000.00
80,000.00
168,000.00
147,420.00
100,980.00
60,000.00
41,250.00
5,250.00
6,000.00
528,900.00
52,890.00
581,790.00
581,790.00
1.200
91.000
0.584
1.500
0.750
0.075
0.075
m
kg
m
OH
OH
OH
OH
140,000.00
1,260.00
180,000.00
40,000.00
55,000.00
70,000.00
80,000.00
168,000.00
114,660.00
105,120.00
60,000.00
41,250.00
5,250.00
6,000.00
500,280.00
50,028.00
550,308.00
550,300.00
1.208
0.170
0.170
0.340
1.500
0.750
0.075
0.075
m
m
m
m
OH
OH
OH
OH
140,000.00
330,000.00
130,000.00
180,000.00
40,000.00
55,000.00
70,000.00
80,000.00
169,120.00
56,100.00
22,100.00
61,200.00
60,000.00
41,250.00
5,250.00
6,000.00
421,020.00
42,102.00
463,122.00
463,120.00
1.200
61.000
0.147
0.492
1.500
0.750
0.075
0.075
m
kg
m
m
OH
OH
OH
OH
140,000.00
1,260.00
330,000.00
180,000.00
40,000.00
55,000.00
70,000.00
80,000.00
168,000.00
76,860.00
48,510.00
88,560.00
60,000.00
41,250.00
5,250.00
6,000.00
494,430.00
49,443.00
543,873.00
543,870.00
1.200
41.000
0.131
0.523
1.500
0.750
0.075
0.075
m
kg
m
m
OH
OH
OH
OH
140,000.00
1,260.00
330,000.00
180,000.00
40,000.00
55,000.00
70,000.00
80,000.00
168,000.00
51,660.00
43,230.00
94,140.00
60,000.00
41,250.00
5,250.00
6,000.00
469,530.00
46,953.00
516,483.00
516,480.00
1.200
0.432
0.780
0.390
0.039
0.039
m
m
OH
OH
OH
OH
140,000.00
155,000.00
40,000.00
55,000.00
70,000.00
80,000.00
168,000.00
66,960.00
31,200.00
21,450.00
2,730.00
3,120.00
293,460.00
29,346.00
322,806.00
322,800.00
1
C010
C011
C012
C013
C014
D
D001
D002
2
3
4
Memasang 1 m3 pondasi siklop, 60% beton campuran 1 PC : 2 PB : 3 KR dan 40% batu belah
Batu belah 15 cm/20cm
0.480
Portland Cement
194.000
Pasir Beton
0.312
Bahan
Kerikil (Batu Pecah 1/2)
0.468
Besi Beton
126.000
Kawat Beton
1.800
Pekerja
0.340
Tukang batu
0.850
Tenaga kerja
Kepala tukang
0.085
Mandor
0.170
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m3 pondasi sumuran, diameter 100 cm
Batu belah 15 cm/20cm
0.450
Portland Cement
194.000
Bahan
Pasir Beton
0.312
Kerikil (Batu Pecah 1/2)
0.468
Pekerja
2.400
Tukang batu
0.800
Tenaga kerja
Kepala tukang
0.080
Mandor
0.119
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m3 pondasi batu belah, campuran 1 PC : 4 PP, pakai muka batu + siaran
Batu belah 15 cm/20cm
1.500
Bahan
Portland Cement
163.000
Pasir Pasang
0.520
Pekerja
1.500
Tukang batu
0.750
Tenaga kerja
Kepala tukang
0.075
Mandor
0.075
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 batu tempel + siaran
Batu tempel
1.100
Bahan
Portland Cement
6.000
Pasir Pasang
0.031
Pekerja
0.187
Tukang batu
0.225
Tenaga kerja
Kepala tukang
0.037
Mandor
0.034
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m3 batu bronjong
Batu kali
1.200
Bahan
Kawat bronjong 3 mm
6.500
Pekerja
1.500
Tenaga kerja
Tukang batu
0.200
Mandor
0.020
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
PEKERJAAN BETON (SNI 7394:2008)
Membuat 1 m3 lantai kerja 1PC : 3 PS : 5 KR
PC (50 kg)
197.800
Bahan
Pasir beton
0.550
Split Pecah mesin 2/3
0.930
Pekerja
2.000
Tukang batu
0.500
Tenaga kerja
Kepala tukang
0.050
Mandor
0.010
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Membuat 1 m3 beton mutu fc = 7,4 MPa (K 100), slump (12 2) cm, w/c = 0,87
PC (50 kg)
247.00
Pasir beton
869.00
Bahan
Split Pecah mesin 2/3
999.00
Air
215.00
Pekerja
1.650
Tukang batu
0.275
Tenaga kerja
Kepala tukang
0.028
Mandor
0.083
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Bobot isi pasir = 1.400 kg/m3, Bobot isi kerikil = 1.350 kg/m3, Bukling factor pasir = 20 %
7=(4x6)
m
kg
m
m
kg
kg
OH
OH
OH
OH
140,000.00
1,260.00
185,000.00
230,000.00
11,000.00
10,700.00
40,000.00
55,000.00
70,000.00
80,000.00
67,200.00
244,440.00
57,720.00
107,640.00
1,386,000.00
19,260.00
13,600.00
46,750.00
5,950.00
13,600.00
1,962,160.00
196,216.00
2,158,376.00
2,158,370.00
m
kg
m
m
OH
OH
OH
OH
140,000.00
1,260.00
185,000.00
230,000.00
40,000.00
55,000.00
70,000.00
80,000.00
63,000.00
244,440.00
57,720.00
107,640.00
96,000.00
44,000.00
5,600.00
9,520.00
627,920.00
62,792.00
690,712.00
690,710.00
m
kg
m
OH
OH
OH
OH
140,000.00
1,260.00
180,000.00
40,000.00
55,000.00
70,000.00
80,000.00
210,000.00
205,380.00
93,600.00
60,000.00
41,250.00
5,250.00
6,000.00
621,480.00
62,148.00
683,628.00
683,620.00
m
kg
m
OH
OH
OH
OH
85,000.00
1,260.00
180,000.00
40,000.00
55,000.00
70,000.00
80,000.00
93,500.00
7,560.00
5,580.00
7,480.00
12,375.00
2,590.00
2,720.00
131,805.00
13,180.50
144,985.50
144,980.00
m
kg
OH
OH
OH
109,800.00
19,800.00
40,000.00
55,000.00
80,000.00
131,760.00
128,700.00
60,000.00
11,000.00
1,600.00
333,060.00
33,306.00
366,366.00
366,360.00
kg
m
m
HO
HO
HO
HO
1,260.00
185,000.00
178,500.00
40,000.00
55,000.00
70,000.00
80,000.00
249,228.00
101,750.00
166,005.00
80,000.00
27,500.00
3,500.00
800.00
628,783.00
62,878.30
691,661.30
691,660.00
kg
kg
kg
ltr
HO
HO
HO
HO
1,260.00
132.14
132.22
12.50
40,000.00
55,000.00
70,000.00
80,000.00
311,220.00
114,832.14
132,090.00
2,687.50
66,000.00
15,125.00
1,960.00
6,640.00
650,554.64
65,055.46
715,610.11
715,610.00
1
D003
D004
D005
D006
D007
D008
D009
2
3
4
Membuat 1 m3 beton mutu fc = 9,8 MPa (K 125), slump (12 2) cm, w/c = 0,78
PC (50 kg)
276.00
Pasir beton
828.00
Bahan
Split Pecah mesin 2/3
1,012.00
Air
215.000
Pekerja
1.650
Tukang batu
0.275
Tenaga kerja
Kepala tukang
0.028
Mandor
0.083
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Membuat 1 m3 beton mutu fc = 12,2 MPa (K 150), slump (12 2) cm, w/c = 0,72
PC (50 kg)
299.00
Pasir beton
799.00
Bahan
Split Pecah mesin 2/3
1,017.00
Air
215.00
Pekerja
1.650
Tukang batu
0.275
Tenaga kerja
Kepala tukang
0.028
Mandor
0.083
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Membuat 1 m3 lantai kerja beton mutu fc = 7,4 MPa (K 100), slump (3-6) cm, w/c = 0,87
PC (50 kg)
230.00
Pasir beton
893.00
Bahan
Split Pecah mesin 2/3
1,017.00
Air
200.00
Pekerja
1.200
Tukang batu
0.200
Tenaga kerja
Kepala tukang
0.020
Mandor
0.060
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Membuat 1 m3 beton mutu fc = 14,5 MPa (K 175), slump (12 2) cm, w/c = 0,66
PC (50 kg)
326.00
Pasir beton
760.00
Bahan
Split Pecah mesin 2/3
1,029.00
Air
215.00
Pekerja
1.650
Tukang batu
0.275
Tenaga kerja
Kepala tukang
0.028
Mandor
0.083
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Membuat 1 m3 beton mutu fc = 16,9 MPa (K 200), slump (12 2) cm, w/c = 0,61
PC (50 kg)
352.00
Pasir beton
731.00
Bahan
Split Pecah mesin 2/3
1,031.00
Air
215.00
Pekerja
1.650
Tukang batu
0.275
Tenaga kerja
Kepala tukang
0.028
Mandor
0.083
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Membuat 1 m3 beton mutu fc = 19,3 MPa (K 225), slump (12 2) cm, w/c = 0,58
PC (50 kg)
371.00
Pasir beton
698.00
Bahan
Split Pecah mesin 2/3
1,047.00
Air
215.00
Pekerja
1.650
Tukang batu
0.275
Tenaga kerja
Kepala tukang
0.028
Mandor
0.083
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Membuat 1 m3 beton mutu fc = 21,7 MPa (K 250), slump (12 2) cm, w/c = 0,56
PC (50 kg)
384.00
Pasir beton
692.00
Bahan
Split Pecah mesin 2/3
1,039.00
Air
215.00
Pekerja
1.650
Tukang batu
0.275
Tenaga kerja
Kepala tukang
0.028
Mandor
0.083
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
7=(4x6)
kg
kg
kg
ltr
HO
HO
HO
HO
1,260.00
132.14
132.22
12.50
40,000.00
55,000.00
70,000.00
80,000.00
347,760.00
109,414.29
133,808.89
2,687.50
66,000.00
15,125.00
1,960.00
6,640.00
683,395.67
68,339.57
751,735.24
751,730.00
kg
kg
kg
ltr
HO
HO
HO
HO
1,260.00
132.14
132.22
12.50
40,000.00
55,000.00
70,000.00
80,000.00
376,740.00
105,582.14
134,470.00
2,687.50
66,000.00
15,125.00
1,960.00
6,640.00
709,204.64
70,920.46
780,125.11
780,120.00
kg
kg
kg
ltr
HO
HO
HO
HO
1,260.00
132.14
132.22
12.50
40,000.00
55,000.00
70,000.00
80,000.00
289,800.00
118,003.57
134,470.00
2,500.00
48,000.00
11,000.00
1,400.00
4,800.00
609,973.57
60,997.36
670,970.93
670,970.00
kg
kg
kg
ltr
HO
HO
HO
HO
1,260.00
132.14
132.22
12.50
40,000.00
55,000.00
70,000.00
80,000.00
410,760.00
100,428.57
136,056.67
2,687.50
66,000.00
15,125.00
1,960.00
6,640.00
739,657.74
73,965.77
813,623.51
813,620.00
kg
kg
kg
ltr
HO
HO
HO
HO
1,260.00
132.14
132.22
12.50
40,000.00
55,000.00
70,000.00
80,000.00
443,520.00
96,596.43
136,321.11
2,687.50
66,000.00
15,125.00
1,960.00
6,640.00
768,850.04
76,885.00
845,735.04
845,730.00
kg
kg
kg
ltr
HO
HO
HO
HO
1,260.00
132.14
132.22
12.50
40,000.00
55,000.00
70,000.00
80,000.00
467,460.00
92,235.71
138,436.67
2,687.50
66,000.00
15,125.00
1,960.00
6,640.00
790,544.88
79,054.49
869,599.37
869,590.00
kg
kg
kg
ltr
HO
HO
HO
HO
1,260.00
132.14
132.22
12.50
40,000.00
55,000.00
70,000.00
80,000.00
483,840.00
91,442.86
137,378.89
2,687.50
66,000.00
15,125.00
1,960.00
6,640.00
805,074.25
80,507.42
885,581.67
885,580.00
1
D010
D011
D012
D013
D014
D015
D016
D017
2
3
Membuat 1 m3 beton mutu fc = 24,0 MPa (K 275), slump (12 2) cm, w/c = 0,53
PC (50 kg)
Pasir beton
Bahan
Split Pecah mesin 2/3
Air
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Membuat 1 m3 beton mutu fc = 26,4 MPa (K 300), slump (12 2) cm, w/c = 0,52
PC (50 kg)
Pasir beton
Bahan
Split Pecah mesin 2/3
Air
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Membuat 1 m3 beton mutu fc = 28,8 MPa (K 325), slump (12 2) cm, w/c = 0,49
PC (50 kg)
Pasir beton
Bahan
Split Pecah mesin 2/3
Air
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Membuat 1 m3 beton mutu fc = 28,8 MPa (K 350), slump (12 2) cm, w/c = 0,49
PC (50 kg)
Pasir beton
Bahan
Split Pecah mesin 2/3
Air
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Membuat 1 m3 cor beton mutu K-175 (Ready Mix) Min. 6 m3 + slang
Bahan
Adukan K-175 Ready Mix
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Peralatan
Alat bantu Slab + selang
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Membuat 1 m3 cor beton mutu K-225 (Ready Mix) Min. 6 m3 + slang
Bahan
Adukan K-225 Ready Mix
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Peralatan
Alat bantu Slab + selang
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Membuat 1 m3 cor beton mutu K-250 (Ready Mix) Min. 6 m3 + slang
Bahan
Adukan K-250 Ready Mix
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Peralatan
Alat bantu Slab + selang
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Membuat 1 m3 cor beton mutu K-300 (Ready Mix) Min. 6 m3 + slang
Bahan
Adukan K-300 Ready Mix
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Peralatan
Alat bantu Slab + selang
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
7=(4x6)
406.00
684.00
1,026.00
215.00
1.650
0.275
0.028
0.083
kg
kg
kg
ltr
HO
HO
HO
HO
1,260.00
132.14
132.22
12.50
40,000.00
55,000.00
70,000.00
80,000.00
511,560.00
90,385.71
135,660.00
2,687.50
66,000.00
15,125.00
1,960.00
6,640.00
830,018.21
83,001.82
913,020.04
913,020.00
413.00
681.00
1,021.00
215.00
1.650
0.275
0.028
0.083
kg
kg
kg
ltr
HO
HO
HO
HO
1,260.00
132.14
132.22
12.50
40,000.00
55,000.00
70,000.00
80,000.00
520,380.00
89,989.29
134,998.89
2,687.50
66,000.00
15,125.00
1,960.00
6,640.00
837,780.67
83,778.07
921,558.74
921,550.00
439.00
670.00
1,006.00
215.00
2.100
0.350
0.035
0.105
kg
kg
kg
ltr
HO
HO
HO
HO
1,260.00
132.14
132.22
12.50
40,000.00
55,000.00
70,000.00
80,000.00
553,140.00
88,535.71
133,015.56
2,687.50
84,000.00
19,250.00
2,450.00
8,400.00
891,478.77
89,147.88
980,626.65
980,620.00
448.00
667.00
1,000.00
215.00
2.100
0.350
0.035
0.105
kg
kg
kg
ltr
HO
HO
HO
HO
1,260.00
132.14
132.22
12.50
40,000.00
55,000.00
70,000.00
80,000.00
564,480.00
88,139.29
132,222.22
2,687.50
84,000.00
19,250.00
2,450.00
8,400.00
901,629.01
90,162.90
991,791.91
991,790.00
1.00
2.100
0.350
0.035
0.105
0.045
m3
HO
HO
HO
HO
lot
660,000.00
40,000.00
55,000.00
70,000.00
80,000.00
774,100.00
660,000.00
84,000.00
19,250.00
2,450.00
8,400.00
34,834.50
808,934.50
80,893.45
889,827.95
889,820.00
1.00
2.100
0.350
0.035
0.105
0.045
m3
HO
HO
HO
HO
lot
693,000.00
40,000.00
55,000.00
70,000.00
80,000.00
807,100.00
693,000.00
84,000.00
19,250.00
2,450.00
8,400.00
36,319.50
843,419.50
84,341.95
927,761.45
927,760.00
1.00
2.100
0.350
0.035
0.105
0.045
m3
HO
HO
HO
HO
lot
726,000.00
40,000.00
55,000.00
70,000.00
80,000.00
840,100.00
726,000.00
84,000.00
19,250.00
2,450.00
8,400.00
37,804.50
877,904.50
87,790.45
965,694.95
965,690.00
1.00
2.100
0.350
0.035
0.105
0.045
m3
HO
HO
HO
HO
lot
759,000.00
40,000.00
55,000.00
70,000.00
80,000.00
873,100.00
759,000.00
84,000.00
19,250.00
2,450.00
8,400.00
39,289.50
912,389.50
91,238.95
1,003,628.45
1,003,620.00
1
D018
D019
D020
D021
D022
D023
D024
D025
2
3
Membuat 1 m3 cor beton mutu K-350 (Ready Mix) Min. 6 m3 + slang
Bahan
Adukan K-350 Ready Mix
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Peralatan
Alat bantu Slab + selang
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Membuat 1 m3 beton kedap air dengan strorox 100
PC (50 kg)
Pasir beton
Bahan
Split Pecah mesin 2/3
Storox-100
Air
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m PVC Waterstop lebar 150 mm
Bahan
Waterstop lebar 150 mm
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m PVC Waterstop lebar 200 mm
Bahan
Waterstop lebar 200 mm
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Membuat 1 m PVC Waterstop lebar 230 mm 320 mm
Bahan
Waterstop lebar 230 mm - 320 mm
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Pembesian 10 kg dengan besi polos atau besi ulir
Besi beton (polos/ulir)
Bahan
Kawat beton
Pekerja
Tukang besi
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 10 kg kabel presstressed polos/strands
Besi beton (polos/ulir)
Bahan
Kawat beton
Pekerja
Tukang besi
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 Kg jaring kawat baja/wire mesh
Jaring kawat baja dilas
Bahan
Kawat beton
Pekerja
Tukang besi
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
7=(4x6)
1.00
2.100
0.350
0.035
0.105
0.045
m3
HO
HO
HO
HO
lot
792,000.00
40,000.00
55,000.00
70,000.00
80,000.00
906,100.00
792,000.00
84,000.00
19,250.00
2,450.00
8,400.00
40,774.50
946,874.50
94,687.45
1,041,561.95
1,041,560.00
400.00
0.480
0.800
1.200
210.00
2.100
0.350
0.035
0.105
kg
m
m
kg
ltr
HO
HO
HO
HO
1,260.00
185,000.00
178,500.00
25,000.00
12.50
40,000.00
55,000.00
70,000.00
80,000.00
504,000.00
88,800.00
142,800.00
30,000.00
2,625.00
84,000.00
19,250.00
2,450.00
8,400.00
882,325.00
88,232.50
970,557.50
970,550.00
1.050
0.060
0.030
0.003
0.003
m'
HO
HO
HO
HO
109,816.67
40,000.00
55,000.00
70,000.00
80,000.00
115,307.50
2,400.00
1,650.00
210.00
240.00
119,807.50
11,980.75
131,788.25
131,780.00
1.050
0.070
0.035
0.004
0.004
m'
HO
HO
HO
HO
203,650.00
40,000.00
55,000.00
70,000.00
80,000.00
213,832.50
2,800.00
1,925.00
280.00
320.00
219,157.50
21,915.75
241,073.25
241,070.00
1.050
0.080
0.040
0.004
0.004
m'
HO
HO
HO
HO
313,466.67
40,000.00
55,000.00
70,000.00
80,000.00
329,140.00
3,200.00
2,200.00
280.00
320.00
335,140.00
33,514.00
368,654.00
368,650.00
10.500
0.150
0.070
0.070
0.007
0.004
kg
kg
HO
HO
HO
HO
11,000.00
10,700.00
40,000.00
55,000.00
70,000.00
80,000.00
115,500.00
1,605.00
2,800.00
3,850.00
490.00
320.00
124,565.00
12,456.50
137,021.50
137,020.00
10.500
0.100
0.050
0.050
0.005
0.003
kg
kg
HO
HO
HO
HO
11,000.00
10,700.00
40,000.00
55,000.00
70,000.00
80,000.00
115,500.00
1,070.00
2,000.00
2,750.00
350.00
240.00
121,910.00
12,191.00
134,101.00
134,100.00
1.020
0.050
0.025
0.025
0.002
0.001
kg
kg
HO
HO
HO
HO
35,300.00
10,700.00
40,000.00
55,000.00
70,000.00
80,000.00
36,006.00
535.00
1,000.00
1,375.00
140.00
80.00
39,136.00
3,913.60
43,049.60
43,040.00
1
D026
D027
D028
D029
D030
D031
2
3
Memasang 1 m2 bekisting untuk pondasi
Kayu kelas III
Bahan
Paku 5-10 cm
Minyak bekisting
Pekerja
Tukang kayu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 bekisting untuk sloof
Kayu kelas III
Bahan
Paku 5-10 cm
Minyak bekisting
Pekerja
Tukang kayu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 bekisting untuk kolom
Kayu kelas III
Paku 5-10 cm
Minyak bekisting
Bahan
Balok kayu kelas II
Plywood tebal 9 mm
Dolken kayu galam (8-10 cm) pj. 4 m
Pekerja
Tukang kayu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 bekisting untuk balok
Kayu kelas III
Paku 5-12 cm
Minyak bekisting
Bahan
Balok kayu kelas II
Plywood tebal 9 mm
Dolken kayu galam (8-10 cm) pj. 4 m
Pekerja
Tukang kayu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 bekisting untuk plat lantai
Kayu kelas III
Paku 5-12 cm
Minyak bekisting
Bahan
Balok kayu kelas II
Plywood tebal 9 mm
Dolken kayu galam (8-10 cm) pj. 4 m
Pekerja
Tukang kayu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 bekisting untuk dinding
Kayu kelas III
Paku 5-12 cm
Minyak bekisting
Bahan
Balok kayu kelas II
Plywood tebal 9 mm
Dolken kayu galam (8-10 cm) pj. 4 m
Formite/penjaga jarak bekisting/spacer
Pekerja
Tukang kayu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
7=(4x6)
0.040
0.300
0.100
0.520
0.260
0.026
0.026
m
kg
ltr
HO
HO
HO
HO
2,400,000.00
10,000.00
36,300.00
40,000.00
55,000.00
70,000.00
80,000.00
96,000.00
3,000.00
3,630.00
20,800.00
14,300.00
1,820.00
2,080.00
141,630.00
14,163.00
155,793.00
155,790.00
0.045
0.300
0.100
0.520
0.260
0.026
0.026
m
kg
ltr
HO
HO
HO
HO
2,400,000.00
10,000.00
36,300.00
40,000.00
55,000.00
70,000.00
80,000.00
108,000.00
3,000.00
3,630.00
20,800.00
14,300.00
1,820.00
2,080.00
42,630.00
196,260.00
238,890.00
238,890.00
0.040
0.400
0.200
0.015
0.350
2.000
0.660
0.330
0.033
0.033
m
kg
ltr
m
lbr
bt
HO
HO
HO
HO
2,400,000.00
10,000.00
36,300.00
3,004,400.00
150,700.00
15,400.00
40,000.00
55,000.00
70,000.00
80,000.00
96,000.00
4,000.00
7,260.00
45,066.00
52,745.00
30,800.00
26,400.00
18,150.00
2,310.00
2,640.00
285,371.00
28,537.10
313,908.10
313,900.00
0.040
0.400
0.200
0.018
0.350
2.000
0.660
0.330
0.033
0.033
m
kg
ltr
m
lbr
bt
HO
HO
HO
HO
2,400,000.00
10,000.00
36,300.00
3,004,400.00
150,700.00
15,400.00
40,000.00
55,000.00
70,000.00
80,000.00
96,000.00
4,000.00
7,260.00
54,079.20
52,745.00
30,800.00
26,400.00
18,150.00
2,310.00
2,640.00
294,384.20
29,438.42
323,822.62
323,820.00
0.040
0.400
0.200
0.015
0.350
6.000
0.660
0.330
0.033
0.033
m
kg
ltr
m
lbr
bt
HO
HO
HO
HO
2,400,000.00
10,000.00
36,300.00
3,004,400.00
150,700.00
15,400.00
40,000.00
55,000.00
70,000.00
80,000.00
96,000.00
4,000.00
7,260.00
45,066.00
52,745.00
92,400.00
26,400.00
18,150.00
2,310.00
2,640.00
346,971.00
34,697.10
381,668.10
381,660.00
0.040
0.400
0.200
0.020
0.350
3.000
4.000
0.660
0.330
0.033
0.033
m
kg
ltr
m
lbr
bt
bh
HO
HO
HO
HO
2,400,000.00
10,000.00
36,300.00
3,004,400.00
150,700.00
15,400.00
5,000.00
40,000.00
55,000.00
70,000.00
80,000.00
96,000.00
4,000.00
7,260.00
60,088.00
52,745.00
46,200.00
20,000.00
26,400.00
18,150.00
2,310.00
2,640.00
335,793.00
33,579.30
369,372.30
369,370.00
1
D032
2
Memasang 1 m2 bekisting untuk tangga
Bahan
Tenaga kerja
D033
D034
D035
D036
3
Kayu kelas III
Paku 5-12 cm
Minyak bekisting
Balok kayu kelas II
Plywood tebal 9 mm
Dolken kayu galam (8-10 cm) pj. 4 m
Pekerja
Tukang kayu
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 jembatan untuk pengecoran beton
Kayu kelas III
Bahan
Paku 5-12 cm
Dolken kayu galam (8-10 cm) pj. 4 m
Pekerja
Tukang kayu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Membuat 1 m3 pondasi beton bertulang (150 kg besi + bekisting)
Kayu kelas III
Paku 5-12 cm
Minyak bekisting
Besi beton polos
Bahan
Kawat beton
Portland Cement
Pasir Beton
Split Pecah mesin 2/3
Pekerja
Tukang batu
Tukang kayu
Tenaga kerja
Tukang besi
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Membuat 1 m3 sloof beton bertulang (200 kg besi + bekisting)
Kayu kelas III
Paku 5-12 cm
Minyak bekisting
Besi beton polos
Bahan
Kawat beton
Portland Cement
Pasir Beton
Split Pecah mesin 2/3
Pekerja
Tukang batu
Tukang kayu
Tenaga kerja
Tukang besi
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Membuat 1 m3 kolom beton bertulang (300 kg besi + bekisting)
Kayu kelas III
Paku 5-12 cm
Minyak bekisting
Besi beton polos
Kawat beton
Bahan
Portland Cement
Pasir Beton
Split Pecah mesin 2/3
Balok kayu kelas II
Plywood tebal 9 mm
Dolken kayu galam (8-10 cm) pj. 4 m
Pekerja
Tukang batu
Tukang kayu
Tenaga kerja
Tukang besi
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
7=(4x6)
0.030
0.400
0.150
0.015
0.350
2.000
0.660
0.330
0.033
0.033
m
kg
ltr
m
lbr
bt
HO
HO
HO
HO
2,400,000.00
10,000.00
36,300.00
3,004,400.00
150,700.00
15,400.00
40,000.00
55,000.00
70,000.00
80,000.00
72,000.00
4,000.00
5,445.00
45,066.00
52,745.00
30,800.00
26,400.00
18,150.00
2,310.00
2,640.00
259,556.00
25,955.60
285,511.60
285,510.00
0.0264
0.600
0.500
0.150
0.050
0.005
0.008
m
kg
bt
HO
HO
HO
HO
2,400,000.00
10,000.00
15,400.00
40,000.00
55,000.00
70,000.00
80,000.00
63,360.00
6,000.00
7,700.00
6,000.00
2,750.00
350.00
640.00
86,800.00
8,680.00
95,480.00
95,480.00
0.200
1.500
0.400
157.500
2.250
336.000
0.540
0.810
5.300
0.275
1.300
1.050
0.262
0.265
m
kg
ltr
kg
kg
kg
m
m
HO
HO
HO
HO
HO
HO
2,400,000.00
10,000.00
36,300.00
12,000.00
10,700.00
1,260.00
185,000.00
178,500.00
40,000.00
55,000.00
55,000.00
55,000.00
70,000.00
80,000.00
480,000.00
15,000.00
14,520.00
1,890,000.00
24,075.00
423,360.00
99,900.00
144,585.00
212,000.00
15,125.00
71,500.00
57,750.00
18,340.00
21,200.00
3,487,355.00
348,735.50
3,836,090.50
3,836,090.00
0.270
2.000
0.600
210.000
3.000
336.000
0.540
0.810
5.650
0.275
1.560
1.400
0.323
0.283
m
kg
ltr
kg
kg
kg
m
m
HO
HO
HO
HO
HO
HO
2,400,000.00
10,000.00
36,300.00
12,000.00
10,700.00
1,260.00
185,000.00
178,500.00
40,000.00
55,000.00
55,000.00
55,000.00
70,000.00
80,000.00
648,000.00
20,000.00
21,780.00
2,520,000.00
32,100.00
423,360.00
99,900.00
144,585.00
226,000.00
15,125.00
85,800.00
77,000.00
22,610.00
22,640.00
4,358,900.00
435,890.00
4,794,790.00
4,794,790.00
0.400
4.000
2.000
315.000
4.500
336.000
0.540
0.810
0.150
3.500
20.000
7.050
0.275
1.650
2.100
0.403
0.353
m
kg
ltr
kg
kg
kg
m
m
m
lbr
bt
HO
HO
HO
HO
HO
HO
2,400,000.00
10,000.00
36,300.00
12,000.00
10,700.00
1,260.00
185,000.00
178,500.00
3,004,400.00
150,700.00
15,400.00
40,000.00
55,000.00
55,000.00
55,000.00
70,000.00
80,000.00
960,000.00
40,000.00
72,600.00
3,780,000.00
48,150.00
423,360.00
99,900.00
144,585.00
450,660.00
527,450.00
308,000.00
282,000.00
15,125.00
90,750.00
115,500.00
28,210.00
28,240.00
7,414,530.00
741,453.00
8,155,983.00
8,155,980.00
1
D037
D038
D039
D040
2
3
Membuat 1 m3 balok beton bertulang (200 kg besi + bekisting)
Kayu kelas III
Paku 5-12 cm
Minyak bekisting
Besi beton polos
Kawat beton
Bahan
Portland Cement
Pasir Beton
Split Pecah mesin 2/3
Balok kayu kelas II
Plywood tebal 9 mm
Dolken kayu galam (8-10 cm) pj. 4 m
Pekerja
Tukang batu
Tukang kayu
Tenaga kerja
Tukang besi
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Membuat 1 m3 plat beton bertulang (150 kg besi + bekisting)
Kayu kelas III
Paku 5-12 cm
Minyak bekisting
Besi beton polos
Kawat beton
Bahan
Portland Cement
Pasir Beton
Split Pecah mesin 2/3
Balok kayu kelas II
Plywood tebal 9 mm
Dolken kayu galam (8-10 cm) pj. 4 m
Pekerja
Tukang batu
Tukang kayu
Tenaga kerja
Tukang besi
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Membuat 1 m3 dinding beton bertulang (150 kg besi + bekisting)
Kayu kelas III
Paku 5-12 cm
Minyak bekisting
Besi beton polos
Kawat beton
Bahan
Portland Cement
Pasir Beton
Split Pecah mesin 2/3
Balok kayu kelas II
Plywood tebal 9 mm
Dolken kayu galam (8-10 cm) pj. 4 m
Pekerja
Tukang batu
Tukang kayu
Tenaga kerja
Tukang besi
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Membuat 1 m3 dinding beton bertulang (200 kg besi + bekisting)
Kayu kelas III
Paku 5-12 cm
Minyak bekisting
Besi beton polos
Kawat beton
Bahan
Portland Cement
Pasir Beton
Split Pecah mesin 2/3
Balok kayu kelas II
Plywood tebal 9 mm
Dolken kayu galam (8-10 cm) pj. 4 m
Pekerja
Tukang batu
Tukang kayu
Tenaga kerja
Tukang besi
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
7=(4x6)
0.320
3.200
1.600
210.000
3.000
336.000
0.540
0.810
0.140
2.800
16.000
6.350
0.275
1.650
1.400
0.333
0.318
m
kg
ltr
kg
kg
kg
m
m
m
lbr
bt
HO
HO
HO
HO
HO
HO
2,400,000.00
10,000.00
36,300.00
12,000.00
10,700.00
1,260.00
185,000.00
178,500.00
3,004,400.00
150,700.00
15,400.00
40,000.00
55,000.00
55,000.00
55,000.00
70,000.00
80,000.00
768,000.00
32,000.00
58,080.00
2,520,000.00
32,100.00
423,360.00
99,900.00
144,585.00
420,616.00
421,960.00
246,400.00
254,000.00
15,125.00
90,750.00
77,000.00
23,310.00
25,440.00
5,652,626.00
565,262.60
6,217,888.60
6,217,880.00
0.320
3.200
1.600
157.500
2.250
336.000
0.540
0.810
0.120
2.800
32.000
5.300
0.275
1.300
1.050
0.265
0.265
m
kg
ltr
kg
kg
kg
m
m
m
lbr
bt
HO
HO
HO
HO
HO
HO
2,400,000.00
10,000.00
36,300.00
12,000.00
10,700.00
1,260.00
185,000.00
178,500.00
3,004,400.00
150,700.00
15,400.00
40,000.00
55,000.00
55,000.00
55,000.00
70,000.00
80,000.00
768,000.00
32,000.00
58,080.00
1,890,000.00
24,075.00
423,360.00
99,900.00
144,585.00
360,528.00
421,960.00
492,800.00
212,000.00
15,125.00
71,500.00
57,750.00
18,550.00
21,200.00
5,111,413.00
511,141.30
5,622,554.30
5,622,550.00
0.240
3.200
1.600
157.500
2.250
336.000
0.540
0.810
0.160
2.800
24.000
5.300
0.275
1.300
1.050
0.262
0.265
m
kg
ltr
kg
kg
kg
m
m
m
lbr
bt
HO
HO
HO
HO
HO
HO
2,400,000.00
10,000.00
36,300.00
12,000.00
10,700.00
1,260.00
185,000.00
178,500.00
3,004,400.00
150,700.00
15,400.00
40,000.00
55,000.00
55,000.00
55,000.00
70,000.00
80,000.00
576,000.00
32,000.00
58,080.00
1,890,000.00
24,075.00
423,360.00
99,900.00
144,585.00
480,704.00
421,960.00
369,600.00
212,000.00
15,125.00
71,500.00
57,750.00
18,340.00
21,200.00
4,916,179.00
491,617.90
5,407,796.90
5,407,790.00
0.250
3.000
1.200
210.000
3.000
336.000
0.540
0.810
0.105
2.500
14.000
5.650
0.275
1.560
1.400
0.323
0.283
m
kg
ltr
kg
kg
kg
m
m
m
lbr
bt
HO
HO
HO
HO
HO
HO
2,400,000.00
10,000.00
36,300.00
12,000.00
10,700.00
1,260.00
185,000.00
178,500.00
3,004,400.00
150,700.00
15,400.00
40,000.00
55,000.00
55,000.00
55,000.00
70,000.00
80,000.00
600,000.00
30,000.00
43,560.00
2,520,000.00
32,100.00
423,360.00
99,900.00
144,585.00
315,462.00
376,750.00
215,600.00
226,000.00
15,125.00
85,800.00
77,000.00
22,610.00
22,640.00
5,250,492.00
525,049.20
5,775,541.20
5,775,540.00
1
D041
D042
E
E001
E002
E003
E004
E005
2
3
4
5
Membuat 1 m kolom praktis beton bertulang (11 x 11) cm
Kayu kelas III
0.002
m
Paku 5-12 cm
0.010
kg
Besi beton polos
3.000
kg
Bahan
Kawat beton
0.045
kg
Portland Cement
4.000
kg
Pasir Beton
0.006
m
Split Pecah mesin 2/3
0.009
m
Pekerja
0.180
HO
Tukang batu
0.020
HO
Tukang kayu
0.020
HO
Tenaga kerja
Tukang besi
0.020
HO
Kepala tukang
0.006
HO
Mandor
0.009
HO
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Membuat 1 m ring balok beton bertulang (10 x 15) cm
Kayu kelas III
0.003
m
Paku 5-12 cm
0.020
kg
Besi beton polos
3.600
kg
Bahan
Kawat beton
0.050
kg
Portland Cement
5.500
kg
Pasir Beton
0.009
m
Split Pecah mesin 2/3
0.015
m
Pekerja
0.297
HO
Tukang batu
0.033
HO
Tukang kayu
0.033
HO
Tenaga kerja
Tukang besi
0.033
HO
Kepala tukang
0.010
HO
Mandor
0.015
HO
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
PEKERJAAN DINDING (SNI 6897:2008)
Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal 1 bata, campuran spesi 1 PC : 2 PP
Bata Merah
140.000
bh
Bahan
Portland Cement
43.500
kg
Pasir Pasang
0.080
m
Pekerja
0.600
HO
Tukang batu
0.200
HO
Tenaga kerja
Kepala tukang
0.020
HO
Mandor
0.030
HO
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal 1 bata, campuran spesi 1 PC : 3 PP
Bata Merah
140.000
bh
Bahan
Portland Cement
32.950
kg
Pasir Pasang
0.091
m
Pekerja
0.600
HO
Tukang batu
0.200
HO
Tenaga kerja
Kepala tukang
0.020
HO
Mandor
0.030
HO
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal 1 bata, campuran spesi 1 PC : 4 PP
Bata Merah
140.000
bh
Bahan
Portland Cement
26.550
kg
Pasir Pasang
0.093
m
Pekerja
0.600
HO
Tukang batu
0.200
HO
Tenaga kerja
Kepala tukang
0.020
HO
Mandor
0.030
HO
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal 1 bata, campuran spesi 1 PC : 5 PP
Bata Merah
140.000
bh
Bahan
Portland Cement
22.200
kg
Pasir Pasang
0.102
m
Pekerja
0.600
HO
Tukang batu
0.200
HO
Tenaga kerja
Kepala tukang
0.020
HO
Mandor
0.030
HO
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal 1 bata, campuran spesi 1 PC : 6 PP
Bata Merah
140.000
bh
Bahan
Portland Cement
18.500
kg
Pasir Pasang
0.112
m
Pekerja
0.600
HO
Tukang batu
0.200
HO
Tenaga kerja
Kepala tukang
0.020
HO
Mandor
0.030
HO
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
7=(4x6)
2,400,000.00
10,000.00
12,000.00
10,700.00
1,260.00
185,000.00
178,500.00
40,000.00
55,000.00
55,000.00
55,000.00
70,000.00
80,000.00
4,800.00
100.00
36,000.00
481.50
5,040.00
1,110.00
1,606.50
7,200.00
1,100.00
1,100.00
1,100.00
420.00
720.00
60,778.00
6,077.80
66,855.80
66,850.00
2,400,000.00
10,000.00
12,000.00
10,700.00
1,260.00
185,000.00
178,500.00
40,000.00
55,000.00
55,000.00
55,000.00
70,000.00
80,000.00
7,200.00
200.00
43,200.00
535.00
6,930.00
1,665.00
2,677.50
11,880.00
1,815.00
1,815.00
1,815.00
700.00
1,200.00
81,632.50
8,163.25
89,795.75
89,790.00
600.00
1,260.00
180,000.00
40,000.00
55,000.00
70,000.00
80,000.00
84,000.00
54,810.00
14,400.00
24,000.00
11,000.00
1,400.00
2,400.00
192,010.00
19,201.00
211,211.00
211,210.00
600.00
1,260.00
180,000.00
40,000.00
55,000.00
70,000.00
80,000.00
84,000.00
41,517.00
16,380.00
24,000.00
11,000.00
1,400.00
2,400.00
180,697.00
18,069.70
198,766.70
198,760.00
600.00
1,260.00
180,000.00
40,000.00
55,000.00
70,000.00
80,000.00
84,000.00
33,453.00
16,740.00
24,000.00
11,000.00
1,400.00
2,400.00
172,993.00
17,299.30
190,292.30
190,290.00
600.00
1,260.00
180,000.00
40,000.00
55,000.00
70,000.00
80,000.00
84,000.00
27,972.00
18,360.00
24,000.00
11,000.00
1,400.00
2,400.00
169,132.00
16,913.20
186,045.20
186,040.00
600.00
1,260.00
180,000.00
40,000.00
55,000.00
70,000.00
80,000.00
84,000.00
23,310.00
20,160.00
24,000.00
11,000.00
1,400.00
2,400.00
166,270.00
16,627.00
182,897.00
182,890.00
1
E006
E007
E008
E009
E010
E011
E012
E013
2
3
4
5
Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal 1 bata, campuran spesi 1 PC : 10 PP
Bata Merah
140.000
bh
Bahan
Portland Cement
10.080
kg
Pasir Pasang
0.0925
m
Pekerja
0.600
HO
Tukang batu
0.200
HO
Tenaga kerja
Kepala tukang
0.020
HO
Mandor
0.030
HO
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal bata, campuran spesi 1 PC : 2 PP
Bata Merah
70.000
bh
Bahan
Portland Cement
18.950
kg
Pasir Pasang
0.038
m
Pekerja
0.300
HO
Tukang batu
0.100
HO
Tenaga kerja
Kepala tukang
0.010
HO
Mandor
0.015
HO
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal bata, campuran spesi 1 PC : 3 PP
Bata Merah
70.000
bh
Bahan
Portland Cement
14.370
kg
Pasir Pasang
0.040
m
Pekerja
0.300
HO
Tukang batu
0.100
HO
Tenaga kerja
Kepala tukang
0.010
HO
Mandor
0.015
HO
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal bata, campuran spesi 1 PC : 4 PP
Bata Merah
70.000
bh
Bahan
Portland Cement
11.500
kg
Pasir Pasang
0.043
m
Pekerja
0.300
HO
Tukang batu
0.100
HO
Tenaga kerja
Kepala tukang
0.010
HO
Mandor
0.015
HO
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal bata, campuran spesi 1 PC : 5 PP
Bata Merah
70.000
bh
Bahan
Portland Cement
9.680
kg
Pasir Pasang
0.045
m
Pekerja
0.300
HO
Tukang batu
0.100
HO
Tenaga kerja
Kepala tukang
0.010
HO
Mandor
0.015
HO
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal bata, campuran spesi 1 PC : 6 PP
Bata Merah
70.000
bh
Bahan
Portland Cement
8.320
kg
Pasir Pasang
0.049
m
Pekerja
0.300
HO
Tukang batu
0.100
HO
Tenaga kerja
Kepala tukang
0.010
HO
Mandor
0.015
HO
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal bata, campuran spesi 1 PC : 8 PP
Bata Merah
70.000
bh
Bahan
Portland Cement
6.500
kg
Pasir Pasang
0.050
m
Pekerja
0.300
HO
Tukang batu
0.100
HO
Tenaga kerja
Kepala tukang
0.010
HO
Mandor
0.015
HO
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal bata, campuran spesi 1 PC : 3 KP : 10 PP
Bata Merah
70.000
bh
Bahan
Portland Cement
4.500
kg
Pasir Pasang
0.050
m
Pekerja
0.300
HO
Tukang batu
0.100
HO
Tenaga kerja
Kepala tukang
0.010
HO
Mandor
0.015
HO
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
7=(4x6)
600.00
1,260.00
180,000.00
40,000.00
55,000.00
70,000.00
80,000.00
84,000.00
12,700.80
16,650.00
24,000.00
11,000.00
1,400.00
2,400.00
152,150.80
15,215.08
167,365.88
167,360.00
600.00
1,260.00
180,000.00
40,000.00
55,000.00
70,000.00
80,000.00
42,000.00
23,877.00
6,840.00
12,000.00
5,500.00
700.00
1,200.00
92,117.00
9,211.70
101,328.70
101,320.00
600.00
1,260.00
180,000.00
40,000.00
55,000.00
70,000.00
80,000.00
42,000.00
18,106.20
7,200.00
12,000.00
5,500.00
700.00
1,200.00
86,706.20
8,670.62
95,376.82
95,370.00
600.00
1,260.00
180,000.00
40,000.00
55,000.00
70,000.00
80,000.00
42,000.00
14,490.00
7,740.00
12,000.00
5,500.00
700.00
1,200.00
83,630.00
8,363.00
91,993.00
91,990.00
600.00
1,260.00
180,000.00
40,000.00
55,000.00
70,000.00
80,000.00
42,000.00
12,196.80
8,100.00
12,000.00
5,500.00
700.00
1,200.00
81,696.80
8,169.68
89,866.48
89,860.00
600.00
1,260.00
180,000.00
40,000.00
55,000.00
70,000.00
80,000.00
42,000.00
10,483.20
8,820.00
12,000.00
5,500.00
700.00
1,200.00
80,703.20
8,070.32
88,773.52
88,770.00
600.00
1,260.00
180,000.00
40,000.00
55,000.00
70,000.00
80,000.00
42,000.00
8,190.00
9,000.00
12,000.00
5,500.00
700.00
1,200.00
78,590.00
7,859.00
86,449.00
86,440.00
600.00
1,260.00
180,000.00
40,000.00
55,000.00
70,000.00
80,000.00
42,000.00
5,670.00
9,000.00
12,000.00
5,500.00
700.00
1,200.00
76,070.00
7,607.00
83,677.00
83,670.00
1
E014
E015
E016
E017
E018
E019
E020
2
3
4
5
Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal bata, campuran spesi 1 KP : 1 SM : 1 PP
Bata Merah
70.000
bh
Semen Merah
0.018
m
Bahan
Pasir Pasang
0.018
m
Kapur Padam
0.018
m
Pekerja
0.300
HO
Tukang batu
0.100
HO
Tenaga kerja
Kepala tukang
0.010
HO
Mandor
0.015
HO
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal bata, campuran spesi 1 KP : 1 SM : 2 PP
Bata Merah
70.000
bh
Semen Merah
0.014
m
Bahan
Pasir pasang
0.028
m
Kapur Padam
0.014
m
Pekerja
0.300
HO
Tukang batu
0.100
HO
Tenaga kerja
Kepala tukang
0.010
HO
Mandor
0.015
HO
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 dinding HB/CB 20 , campuran spesi 1 PC : 3 PP
Hollow Block 20
12.500
bh
Portland Cement
20.320
kg
Bahan
Pasir Pasang
0.728
m
Besi angkur 8 mm
0.280
kg
Pekerja
0.350
HO
Tukang batu
0.150
HO
Tenaga kerja
Kepala tukang
0.015
HO
Mandor
0.018
HO
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 dinding HB/CB 20 , campuran spesi 1 PC : 4 PP
Hollow Block 20
12.500
bh
Portland Cement
24.260
kg
Bahan
Pasir Pasang
0.772
m
Besi angkur 8 mm
0.280
kg
Pekerja
0.350
HO
Tukang batu
0.150
HO
Tenaga kerja
Kepala tukang
0.015
HO
Mandor
0.018
HO
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 dinding HB/CB 15, campuran spesi 1 PC : 3 PP
Hollow Block 15
12.500
bh
Portland Cement
22.740
kg
Bahan
Pasir Pasang
0.550
m
0.280
kg
Besi angkur 8 mm
Pekerja
0.350
HO
Tukang batu
0.150
HO
Tenaga kerja
Kepala tukang
0.015
HO
Mandor
0.018
HO
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 dinding HB/CB 15, campuran spesi 1 PC : 4 PP
Hollow Block 15
12.500
bh
Portland Cement
18.200
kg
Bahan
Pasir Pasang
0.582
m
Besi angkur 8 mm
0.280
kg
Pekerja
0.320
HO
Tukang batu
0.120
HO
Tenaga kerja
Kepala tukang
0.012
HO
Mandor
0.016
HO
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 dinding HB/CB 10, campuran spesi 1 PC : 3 PP
Hollow Block 10
12.500
bh
Portland Cement
15.160
kg
Bahan
Pasir Pasang
0.363
m
Besi angkur 8 mm
0.280
kg
Pekerja
0.300
HO
Tukang batu
0.100
HO
Tenaga kerja
Kepala tukang
0.010
HO
Mandor
0.015
HO
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
7=(4x6)
600.00
130,000.00
180,000.00
330,000.00
40,000.00
55,000.00
70,000.00
80,000.00
42,000.00
2,340.00
3,240.00
5,940.00
12,000.00
5,500.00
700.00
1,200.00
72,920.00
7,292.00
80,212.00
80,210.00
600.00
130,000.00
180,000.00
330,000.00
40,000.00
55,000.00
70,000.00
80,000.00
42,000.00
1,820.00
5,040.00
4,620.00
12,000.00
5,500.00
700.00
1,200.00
72,880.00
7,288.00
80,168.00
80,160.00
3,600.00
1,260.00
180,000.00
10,300.00
40,000.00
55,000.00
70,000.00
80,000.00
45,000.00
25,603.20
131,040.00
2,884.00
14,000.00
8,250.00
1,050.00
1,440.00
229,267.20
22,926.72
252,193.92
252,190.00
3,600.00
1,260.00
180,000.00
10,300.00
40,000.00
55,000.00
70,000.00
80,000.00
45,000.00
30,567.60
138,960.00
2,884.00
14,000.00
8,250.00
1,050.00
1,440.00
242,151.60
24,215.16
266,366.76
266,360.00
3,600.00
1,260.00
180,000.00
10,300.00
40,000.00
55,000.00
70,000.00
80,000.00
45,000.00
28,652.40
99,000.00
2,884.00
14,000.00
8,250.00
1,050.00
1,440.00
200,276.40
20,027.64
220,304.04
220,300.00
3,600.00
1,260.00
180,000.00
10,300.00
40,000.00
55,000.00
70,000.00
80,000.00
45,000.00
22,932.00
104,760.00
2,884.00
12,800.00
6,600.00
840.00
1,280.00
197,096.00
19,709.60
216,805.60
216,800.00
3,600.00
1,260.00
180,000.00
10,300.00
40,000.00
55,000.00
70,000.00
80,000.00
45,000.00
19,101.60
65,340.00
2,884.00
12,000.00
5,500.00
700.00
1,200.00
151,725.60
15,172.56
166,898.16
166,890.00
1
E021
E022
E023
E024
E025
E026
E027
2
3
4
5
Memasang 1 m2 dinding HB/CB 10, campuran spesi 1 PC : 4 PP
Hollow Block 10
12.500
bh
Portland Cement
12.130
kg
Bahan
Pasir Pasang
0.388
m
Besi angkur 8 mm
0.280
kg
Pekerja
0.300
HO
Tukang batu
0.100
HO
Tenaga kerja
Kepala tukang
0.010
HO
Mandor
0.015
HO
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 dinding terawang (roster) ukuran (12 x 11 x 24) cm, campuran spesi 1 PC : 3 PP
Terawang (roster)
30.000
bh
Bahan
Portland Cement
14.000
kg
Pasir Pasang
0.032
m
Pekerja
0.300
HO
Tukang batu
0.100
HO
Tenaga kerja
Kepala tukang
0.010
HO
Mandor
0.015
HO
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 dinding terawang (roster) ukuran (12 x 11 x 24) cm, campuran spesi 1 PC : 4 PP
Terawang (roster)
30.000
bh
Bahan
Portland Cement
11.000
kg
Pasir Pasang
0.035
m
Pekerja
0.300
HO
Tukang batu
0.100
HO
Tenaga kerja
Kepala tukang
0.010
HO
Mandor
0.015
HO
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 dinding bata berongga ekspose ukuran (5 x 11 x 24) cm, campuran spesi 1 PC : 3 PP
Terawang (roster)
70.000
bh
Bahan
Portland Cement
14.000
kg
Pasir Pasang
0.032
m
Pekerja
0.300
HO
Tukang batu
0.100
HO
Tenaga kerja
Kepala tukang
0.010
HO
Mandor
0.015
HO
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 dinding batako kecil tras ukuran (8 x 10 x 20) cm, campuran spesi 1 PC : 4 PP
Batako 8X10X20
30.000
bh
Bahan
Portland Cement
9.000
kg
Pasir Pasang
0.022
m
Pekerja
0.120
HO
Tukang batu
0.092
HO
Tenaga kerja
Kepala tukang
0.360
HO
Mandor
0.018
HO
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 dinding batako besar pres ukuran (8 x 20 x30) cm, campuran spesi 1 PC : 4 PP
Batako 8X20X30
11.000
bh
Bahan
Portland Cement
9.000
kg
Pasir Pasang
0.032
m
Pekerja
0.300
HO
Tukang batu
0.100
HO
Tenaga kerja
Kepala tukang
0.010
HO
Mandor
0.015
HO
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Membuat 1 UNIT Septictank 2,5 X 1,5 X 2 M + rembesannya ( kantor tipe besar)
Galian tanah
7.5000
m
Pasir urug
0.3570
m
Lantai kerja
3.7500
m
Pas. bata 1 PC : 2 PS + Plesteran
25.0000
m
Plat beton penutup & balok
0.5000
m
Pipa PVC 4" jenis AW + sambungan
9.0000
m1
Sat. Pekerjaan
Pipa GIP 1 1/2"
2.0000
m1
Galian tanah untuk rembesan
5.6250
m
Pas. injuk
9.0000
kg
Urugan kerikil 3,5 cm
1.7500
m
Pipa PVC 4" berlobang jenis AW
6.0000
m1
Urugan kembali perataan tanah
1.8750
m
Tambahan upah
0.0850
ls
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
7=(4x6)
3,600.00
1,260.00
180,000.00
10,300.00
40,000.00
55,000.00
70,000.00
80,000.00
45,000.00
15,283.80
69,840.00
2,884.00
12,000.00
5,500.00
700.00
1,200.00
152,407.80
15,240.78
167,648.58
167,640.00
8,500.00
1,260.00
180,000.00
40,000.00
55,000.00
70,000.00
80,000.00
255,000.00
17,640.00
5,760.00
12,000.00
5,500.00
700.00
1,200.00
297,800.00
29,780.00
327,580.00
327,580.00
8,500.00
1,260.00
180,000.00
40,000.00
55,000.00
70,000.00
80,000.00
255,000.00
13,860.00
6,300.00
12,000.00
5,500.00
700.00
1,200.00
294,560.00
29,456.00
324,016.00
324,010.00
5,500.00
1,260.00
180,000.00
40,000.00
55,000.00
70,000.00
80,000.00
385,000.00
17,640.00
5,760.00
12,000.00
5,500.00
700.00
1,200.00
427,800.00
42,780.00
470,580.00
470,580.00
650.00
1,260.00
180,000.00
40,000.00
55,000.00
70,000.00
80,000.00
19,500.00
11,340.00
3,960.00
4,800.00
5,060.00
25,200.00
1,440.00
71,300.00
7,130.00
78,430.00
78,430.00
1,400.00
1,260.00
180,000.00
40,000.00
55,000.00
70,000.00
80,000.00
15,400.00
11,340.00
5,760.00
12,000.00
5,500.00
700.00
1,200.00
51,900.00
5,190.00
57,090.00
57,090.00
39,600.00
155,000.00
628,783.00
92,117.00
5,111,413.00
35,250.00
47,800.00
39,600.00
39,600.00
200,000.00
35,250.00
10,666.67
9,142,402.75
297,000.00
55,335.00
2,357,936.25
2,302,925.00
2,555,706.50
317,250.00
95,600.00
222,750.00
356,400.00
350,000.00
211,500.00
20,000.00
777,104.23
9,919,506.98
991,950.70
10,911,457.68
10,911,450.00
1
E028
E029
F
F001
F002
F003
F004
F005
F006
2
3
Membuat 1 UNIT Septictank 2 X 1,5 X 1,5 M + rembesannya ( kantor tipe kecil)
Galian tanah
Pasir urug
Lantai kerja
Pas. bata 1 PC : 2 PS + Plesteran
Plat beton penutup & balok
Pipa PVC 4" jenis AW + sambungan
Sat. Pekerjaan
Pipa GIP 1 1/2"
Galian tanah untuk rembesan
Pas. injuk
Urugan kerikil 3,5 cm
Pipa PVC 4" berlobang jenis AW
Urugan kembali perataan tanah
Tambahan upah
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Membuat 1 UNIT Septictank 1,5 X 1 X 1,5 M + rembesannya ( rumah kapasitas kecil)
Galian tanah
Pasir urug
Lantai kerja
Pas. bata 1 PC : 2 PS + Plesteran
Plat beton penutup & balok
Pipa PVC 4" jenis AW + sambungan
Sat. Pekerjaan
Pipa GIP 1 1/2"
Galian tanah untuk rembesan
Pas. injuk
Urugan kerikil 3,5 cm
Pipa PVC 4" berlobang jenis AW
Urugan kembali perataan tanah
Tambahan upah
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
PEKERJAAN PENGECATAN (SNI 2407:2008)
Mengecat 1 m2 Beton ICI Eksterior
Cat tembok ICI
Alkali ICI sebelum pengecatan
Bahan
Rol cat
Ampelas
Pekerja
Tukang cat
Tenaga kerja
Kepala tukang
Mandor
Alat
Steger Werk
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Mengecat 1 m2 Plafond dan Dinding Interior ICI
Cat tembok ICI
Cat dasar sebelum pengecatan
Bahan
Rol cat
Ampelas
Pekerja
Tukang cat
Tenaga kerja
Kepala tukang
Mandor
Alat
Steger Werk
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Mengecat 1 m2 Dinding Vinilex (3X)
Cat tembok Vinilex
Plamir tembok
Bahan
Rol cat
Ampelas
Pekerja
Tukang cat
Tenaga kerja
Kepala tukang
Mandor
Alat
Steger Werk
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Mengecat 1 m2 Dinding Lama Vinilex (2X)
Mengecat 1 m2 Dinding Vinilex (3X)
Dibulatkan
Mengecat 1 m2 Plafond Vinilex (3X)
Cat tembok Vinilex
Plamir tembok
Bahan
Rol cat
Ampelas
Pekerja
Tukang cat
Tenaga kerja
Kepala tukang
Mandor
Alat
Steger Werk
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Mengecat 1 m2 Plafond Lama Vinilex (2X)
Mengecat 1 m2 Plafond Vinilex (3X)
7=(4x6)
4.5000
0.2142
2.2500
15.0000
0.3000
5.4000
1.2000
3.3750
5.4000
1.0500
9.0000
1.1250
0.0920
m
m
m
m
m
m1
btg
m
kg
m
m1
m
ls
39,600.00
155,000.00
628,783.00
92,117.00
5,111,413.00
38,775.00
47,800.00
39,600.00
39,600.00
200,000.00
35,250.00
10,666.67
5,694,826.65
178,200.00
33,201.00
1,414,761.75
1,381,755.00
1,533,423.90
209,385.00
57,360.00
133,650.00
213,840.00
210,000.00
317,250.00
12,000.00
523,924.05
6,218,750.70
621,875.07
6,840,625.77
6,840,620.00
2.2500
0.1071
1.1250
7.5000
0.1500
9.0000
0.6000
1.6875
2.7000
0.5250
9.0000
0.5625
0.0650
m
m
m
m
m
m1
btg
m
kg
m
m1
m
ls
39,600.00
155,000.00
628,783.00
92,117.00
5,111,413.00
38,775.00
47,800.00
39,600.00
39,600.00
200,000.00
35,250.00
10,666.67
3,250,320.83
89,100.00
16,600.50
707,380.88
690,877.50
766,711.95
348,975.00
28,680.00
66,825.00
106,920.00
105,000.00
317,250.00
6,000.00
211,270.85
3,461,591.68
346,159.17
3,807,750.85
3,807,750.00
0.2500
0.1250
0.0100
0.5000
0.1600
0.2800
0.0300
0.0100
0.0250
lt
lt
bh
lbr
HO
HO
HO
HO
lot
72,000.00
25,300.00
16,000.00
2,500.00
40,000.00
55,000.00
70,000.00
80,000.00
47,272.50
18,000.00
3,162.50
160.00
1,250.00
6,400.00
15,400.00
2,100.00
800.00
1,181.81
48,454.31
4,845.43
53,299.74
53,290.00
0.2500
0.1250
0.0100
0.5000
0.2000
0.3000
0.0300
0.0100
0.0250
lt
lt
bh
lbr
HO
HO
HO
HO
lot
72,000.00
31,000.00
16,000.00
2,500.00
40,000.00
55,000.00
70,000.00
80,000.00
50,685.00
18,000.00
3,875.00
160.00
1,250.00
8,000.00
16,500.00
2,100.00
800.00
1,267.13
51,952.13
5,195.21
57,147.34
57,140.00
0.1750
0.1600
0.0100
0.5000
0.1600
0.2800
0.0300
0.0100
0.0450
kg
kg
bh
lbr
HO
HO
HO
HO
lot
18,000.00
12,400.00
16,000.00
2,500.00
40,000.00
55,000.00
70,000.00
80,000.00
31,244.00
3,150.00
1,984.00
160.00
1,250.00
6,400.00
15,400.00
2,100.00
800.00
1,405.98
32,649.98
3,265.00
35,914.98
35,910.00
35,910.00
23,940.00
23,940.00
kg
kg
bh
lbr
HO
HO
HO
HO
lot
18,000.00
12,400.00
16,000.00
2,500.00
40,000.00
55,000.00
70,000.00
80,000.00
31,694.00
3,600.00
1,984.00
160.00
1,250.00
6,400.00
15,400.00
2,100.00
800.00
1,347.00
33,041.00
3,304.10
36,345.09
36,340.00
36,340.00
24,226.67
2/3
0.2000
0.1600
0.0100
0.5000
0.1600
0.2800
0.0300
0.0100
0.0425
2/3
1
F007
2
Dibulatkan
Mengecat 1 m2 Dinding Sanlex (3X)
Bahan
Tenaga kerja
F008
F009
F010
F011
F012
F013
F014
Alat
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Mengecat 1 m2 Dinding Lama Sanlex (2X)
Mengecat 1 m2 Dinding Sanlex (3X)
Dibulatkan
Mengecat 1 m2 Plafond Sanlex (3X)
Cat tembok Sanlex
Plamir tembok
Bahan
Rol cat
Ampelas
Pekerja
Tukang cat
Tenaga kerja
Kepala tukang
Mandor
Alat
Steger Werk
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Mengecat 1 m2 Plafond Lama Sanlex (2X)
Mengecat 1 m2 Plafond Sanlex (3X)
Dibulatkan
Mengecat 1 m2 Kayu (3X) Glotex berikut Meni
Meni kayu
Plamir kayu
Cat kayu merk GLOTEK
Bahan
Amplas kayu
Minyak cat terpentin
Kwas 3"
Pekerja
Tukang cat
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Mengecat 1 m2 Kayu Lama (2X) Glotex
Mengecat 1 m2 Kayu (3X) Glotex berikut Meni
Dibulatkan
Mengecat 1 m2 Besi (3X) Glotex
Meni besi
Cat besi merk Glotek
Bahan
Amplas besi
Minyak cat thiner B
Kwas 3"
Pekerja
Tukang cat
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Mengecat 1 m2 Plituran Bangunan (Biasa)
Dempul plitur (dempul kasar)
Wood Filer (INFRA)
Oker putih
Oker warna
Bahan
Batu Apung (gosok)
Sirlak ex India
Kwas 3"
Spirtus
Ampelas kayu
Pekerja
Tukang cat
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
0.1750
0.1600
0.0100
0.5000
0.1040
0.1820
0.0195
0.0100
0.0450
7=(4x6)
24,220.00
kg
kg
bh
lbr
HO
HO
HO
HO
lot
12,200.00
12,400.00
16,000.00
2,500.00
40,000.00
55,000.00
70,000.00
80,000.00
21,864.00
2,135.00
1,984.00
160.00
1,250.00
4,160.00
10,010.00
1,365.00
800.00
983.88
22,847.88
2,284.79
25,132.67
25,130.00
25,130.00
16,753.33
16,750.00
kg
kg
bh
lbr
HO
HO
HO
HO
lot
12,200.00
12,400.00
16,000.00
2,500.00
40,000.00
55,000.00
70,000.00
80,000.00
22,929.00
2,440.00
1,984.00
160.00
1,250.00
4,160.00
10,010.00
1,365.00
1,560.00
974.48
23,903.48
2,390.35
26,293.83
26,290.00
26,290.00
17,526.67
17,520.00
kg
kg
kg
lbr
ltr
bh
HO
HO
HO
HO
16,000.00
24,400.00
36,500.00
2,500.00
5,000.00
10,900.00
40,000.00
55,000.00
70,000.00
80,000.00
2,672.00
2,025.20
7,300.00
1,000.00
750.00
545.00
8,000.00
16,500.00
2,100.00
800.00
41,692.20
4,169.22
45,861.42
45,860.00
45,860.00
30,573.33
30,570.00
0.1670
0.2000
0.4000
0.1500
0.0500
0.2000
0.3000
0.0300
0.0100
kg
kg
lbr
ltr
bh
HO
HO
HO
HO
16,000.00
36,500.00
2,500.00
16,300.00
10,900.00
40,000.00
55,000.00
70,000.00
80,000.00
2,672.00
7,300.00
1,000.00
2,445.00
545.00
8,000.00
16,500.00
2,100.00
800.00
41,362.00
4,136.20
45,498.20
45,490.00
0.0300
0.2000
0.0200
0.0100
0.1000
0.2000
0.0100
0.2000
0.1000
0.2500
0.2850
0.0400
0.0200
kg
kg
kg
kg
kg
kg
bh
ltr
lbr
HO
HO
HO
HO
26,400.00
28,800.00
21,100.00
21,100.00
15,600.00
87,200.00
10,900.00
4,000.00
2,500.00
40,000.00
55,000.00
70,000.00
80,000.00
792.00
5,760.00
422.00
211.00
1,560.00
17,440.00
109.00
800.00
250.00
10,000.00
15,675.00
2,800.00
1,600.00
57,419.00
5,741.90
63,160.90
63,160.00
2/3
0.2000
0.1600
0.0100
0.5000
0.1040
0.1820
0.0195
0.0195
0.0425
2/3
0.1670
0.0830
0.2000
0.4000
0.1500
0.0500
0.2000
0.3000
0.0300
0.0100
2/3
1
F015
2
Mengecat 1 m2 Plituran Meubulair
Bahan
Tenaga kerja
G
G001
G002
G003
G004
G005
G006
3
Dempul plitur (dempul kasar)
Wood Filer (INFRA)
Melamik
Oker putih
Oker warna
Batu Apung (gosok)
Sirlak ex India
Kwas 3"
Spirtus
Ampelas kayu
Pekerja
Tukang cat
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
PEKERJAAN PENUTUP LANTAI DAN DINDING (SNI 7395:2008)
Memasang 1 m2 lantai ubin PC abu-abu ukuran (40 x 40) cm
Ubin abu-abu
Bahan
Portland Cement
Pasir Pasang
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 lantai ubin PC abu-abu ukuran (30 x 30) cm
Ubin abu-abu
Bahan
Portland Cement
Pasir Pasang
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 lantai ubin PC abu-abu ukuran (20 x 20) cm
Ubin abu-abu
Bahan
Portland Cement
Pasir Pasang
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 lantai ubin warna ukuran (40 x 40) cm
Ubin warna
Portland Cement
Bahan
Pasir Pasang
Semen Warna
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 lantai ubin warna ukuran (30 x 30) cm
Ubin warna
Portland Cement
Bahan
Pasir Pasang
Semen Warna
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 lantai ubin warna ukuran (20 x 20) cm
Ubin warna
Portland Cement
Bahan
Pasir Pasang
Semen Warna
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
7=(4x6)
0.0300
0.2000
0.3500
0.0200
0.0100
0.1000
0.2000
0.0100
0.2000
0.1000
0.2500
0.2850
0.0400
0.0200
kg
kg
kg
kg
kg
kg
kg
bh
ltr
lbr
HO
HO
HO
HO
26,400.00
28,800.00
37,500.00
21,100.00
21,100.00
15,600.00
87,200.00
10,900.00
4,000.00
2,500.00
40,000.00
55,000.00
70,000.00
80,000.00
792.00
5,760.00
13,125.00
422.00
211.00
1,560.00
17,440.00
109.00
800.00
250.00
10,000.00
15,675.00
2,800.00
1,600.00
70,544.00
7,054.40
77,598.40
77,590.00
6.630
9.800
0.045
0.250
0.125
0.013
0.013
bh
kg
m
HO
HO
HO
HO
3,300.00
1,260.00
180,000.00
40,000.00
55,000.00
70,000.00
80,000.00
21,879.00
12,348.00
8,100.00
10,000.00
6,875.00
910.00
1,040.00
61,152.00
6,115.20
67,267.20
67,260.00
11.870
10.000
0.045
0.250
0.125
0.013
0.013
bh
kg
m
HO
HO
HO
HO
2,500.00
1,260.00
180,000.00
40,000.00
55,000.00
70,000.00
80,000.00
29,675.00
12,600.00
8,100.00
10,000.00
6,875.00
910.00
1,040.00
69,200.00
6,920.00
76,120.00
76,120.00
26.500
10.400
0.045
0.270
0.135
0.014
0.014
bh
kg
m
HO
HO
HO
HO
1,700.00
1,260.00
180,000.00
40,000.00
55,000.00
70,000.00
80,000.00
45,050.00
13,104.00
8,100.00
10,800.00
7,425.00
980.00
1,120.00
86,579.00
8,657.90
95,236.90
95,230.00
6.630
9.800
0.045
1.300
0.250
0.125
0.013
0.013
bh
kg
m
kg
HO
HO
HO
HO
4,000.00
1,260.00
180,000.00
2,200.00
40,000.00
55,000.00
70,000.00
80,000.00
26,520.00
12,348.00
8,100.00
2,860.00
10,000.00
6,875.00
910.00
1,040.00
68,653.00
6,865.30
75,518.30
75,510.00
11.870
10.000
0.045
1.500
0.260
0.130
0.013
0.013
bh
kg
m
kg
HO
HO
HO
HO
3,100.00
1,260.00
180,000.00
2,200.00
40,000.00
55,000.00
70,000.00
80,000.00
36,797.00
12,600.00
8,100.00
3,300.00
10,400.00
7,150.00
910.00
1,040.00
80,297.00
8,029.70
88,326.70
88,320.00
26.500
10.400
0.045
1.620
0.270
0.135
0.014
0.014
bh
kg
m
kg
HO
HO
HO
HO
2,100.00
1,260.00
180,000.00
2,200.00
40,000.00
55,000.00
70,000.00
80,000.00
55,650.00
13,104.00
8,100.00
3,564.00
10,800.00
7,425.00
980.00
1,120.00
100,743.00
10,074.30
110,817.30
110,810.00
1
G007
G008
G009
G010
G011
G012
G013
2
3
Memasang 1 m2 lantai ubin teraso ukuran (40 x 40) cm
Ubin teraso
Portland Cement
Bahan
Pasir Pasang
Semen Warna
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Keterangan: Harga Bahan sudah termasuk ongkos poles
Memasang 1 m2 lantai ubin teraso ukuran (30 x 30) cm
Ubin teraso
Portland Cement
Bahan
Pasir Pasang
Semen Warna
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Keterangan: Harga Bahan sudah termasuk ongkos poles
Memasang 1 m2 lantai ubin granit ukuran (40 x 40) cm
Ubin granit
Portland Cement
Bahan
Pasir Pasang
Semen Warna
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 lantai ubin granit ukuran (30 x 30) cm
Ubin granit
Portland Cement
Bahan
Pasir Pasang
Semen Warna
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 lantai ubin teralux ukuran (40 x 40) cm
Ubin teralux kerang
Portland Cement
Bahan
Pasir Pasang
Semen Warna
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 lantai ubin teralux ukuran (30 x 30) cm
Ubin teralux kerang
Portland Cement
Bahan
Pasir Pasang
Semen Warna
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 lantai ubin teralux marmer ukuran (60 x 60) cm
Ubin teralux marmer
Portland Cement
Bahan
Pasir Pasang
Semen Warna
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
7=(4x6)
6.630
9.800
0.045
1.300
0.250
0.125
0.013
0.013
bh
kg
m
kg
HO
HO
HO
HO
4,800.00
1,260.00
180,000.00
2,200.00
40,000.00
55,000.00
70,000.00
80,000.00
31,824.00
12,348.00
8,100.00
2,860.00
10,000.00
6,875.00
910.00
1,040.00
73,957.00
7,395.70
81,352.70
81,350.00
11.870
10.000
0.045
1.500
0.260
0.130
0.013
0.013
bh
kg
m
kg
HO
HO
HO
HO
2,500.00
1,260.00
180,000.00
2,200.00
40,000.00
55,000.00
70,000.00
80,000.00
29,675.00
12,600.00
8,100.00
3,300.00
10,400.00
7,150.00
910.00
1,040.00
73,175.00
7,317.50
80,492.50
80,490.00
6.630
9.800
0.045
1.300
0.250
0.125
0.013
0.013
bh
kg
m
kg
HO
HO
HO
HO
297,858.22
1,260.00
180,000.00
2,200.00
40,000.00
55,000.00
70,000.00
80,000.00
1,974,800.00
12,348.00
8,100.00
2,860.00
10,000.00
6,875.00
910.00
1,040.00
2,016,933.00
201,693.30
2,218,626.30
2,218,620.00
11.870
10.000
0.045
1.500
0.260
0.130
0.013
0.013
bh
kg
m
kg
HO
HO
HO
HO
140,673.97
1,260.00
180,000.00
2,200.00
40,000.00
55,000.00
70,000.00
80,000.00
1,669,800.00
12,600.00
8,100.00
3,300.00
10,400.00
7,150.00
910.00
1,040.00
1,713,300.00
171,330.00
1,884,630.00
1,884,630.00
6.630
9.800
0.045
1.300
0.250
0.125
0.013
0.013
bh
kg
m
kg
HO
HO
HO
HO
20,000.00
1,260.00
180,000.00
2,200.00
40,000.00
55,000.00
70,000.00
80,000.00
132,600.00
12,348.00
8,100.00
2,860.00
10,000.00
6,875.00
910.00
1,040.00
174,733.00
17,473.30
192,206.30
192,200.00
11.870
10.000
0.045
1.500
0.260
0.130
0.013
0.013
bh
kg
m
kg
HO
HO
HO
HO
13,750.00
1,260.00
180,000.00
2,200.00
40,000.00
55,000.00
70,000.00
80,000.00
163,212.50
12,600.00
8,100.00
3,300.00
10,400.00
7,150.00
910.00
1,040.00
206,712.50
20,671.25
227,383.75
227,380.00
3.100
9.600
0.045
1.500
0.240
0.120
0.012
0.012
bh
kg
m
kg
HO
HO
HO
HO
500,000.00
1,260.00
180,000.00
2,200.00
40,000.00
55,000.00
70,000.00
80,000.00
1,550,000.00
12,096.00
8,100.00
3,300.00
9,600.00
6,600.00
840.00
960.00
1,591,496.00
159,149.60
1,750,645.60
1,750,640.00
1
G014
G015
G016
G017
G018
G019
G020
2
3
Memasang 1 m2 lantai ubin teralux marmer ukuran (40 x 40) cm
Ubin teralux marmer
Portland Cement
Bahan
Pasir Pasang
Semen Warna
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 lantai ubin teralux marmer ukuran (30 x 30) cm
Ubin teralux marmer
Portland Cement
Bahan
Pasir Pasang
Semen Warna
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m plint ubin PC abu-abu ukuran (15 x 20) cm
Plin ubin
Bahan
Portland Cement
Pasir Pasang
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m plint ubin PC abu-abu ukuran (10 x 30) cm
Plin ubin
Bahan
Portland Cement
Pasir Pasang
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m plint ubin PC abu-abu ukuran (10 x 40) cm
Plin ubin
Bahan
Portland Cement
Pasir Pasang
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m plint ubin PC warna ukuran (10 x 20) cm
Plin ubin PC warna
Portland Cement
Bahan
Pasir Pasang
Semen Warna
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m plint ubin PC warna ukuran (10 x 30) cm
Plin ubin PC warna
Portland Cement
Bahan
Pasir Pasang
Semen Warna
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
7=(4x6)
6.630
9.800
0.045
1.300
0.250
0.125
0.013
0.013
bh
kg
m
kg
HO
HO
HO
HO
250,000.00
1,260.00
180,000.00
2,200.00
40,000.00
55,000.00
70,000.00
80,000.00
1,657,500.00
12,348.00
8,100.00
2,860.00
10,000.00
6,875.00
910.00
1,040.00
1,699,633.00
169,963.30
1,869,596.30
1,869,590.00
11.870
10.000
0.045
1.500
0.260
0.130
0.013
0.013
bh
kg
m
kg
HO
HO
HO
HO
135,000.00
1,260.00
180,000.00
2,200.00
40,000.00
55,000.00
70,000.00
80,000.00
1,602,450.00
12,600.00
8,100.00
3,300.00
10,400.00
7,150.00
910.00
1,040.00
1,645,950.00
164,595.00
1,810,545.00
1,810,540.00
5.300
1.650
0.004
0.090
0.090
0.009
0.005
bh
kg
m
HO
HO
HO
HO
2,340.00
1,260.00
180,000.00
40,000.00
55,000.00
70,000.00
80,000.00
12,402.00
2,079.00
720.00
3,600.00
4,950.00
630.00
400.00
24,781.00
2,478.10
27,259.10
27,250.00
3.500
1.240
0.003
0.090
0.090
0.009
0.005
bh
kg
m
HO
HO
HO
HO
3,900.00
1,260.00
180,000.00
40,000.00
55,000.00
70,000.00
80,000.00
13,650.00
1,562.40
540.00
3,600.00
4,950.00
630.00
400.00
25,332.40
2,533.24
27,865.64
27,860.00
2.650
1.240
0.003
0.090
0.090
0.009
0.005
bh
kg
m
HO
HO
HO
HO
5,850.00
1,260.00
180,000.00
40,000.00
55,000.00
70,000.00
80,000.00
15,502.50
1,562.40
540.00
3,600.00
4,950.00
630.00
400.00
27,184.90
2,718.49
29,903.39
29,900.00
5.300
1.140
0.003
0.100
0.090
0.090
0.009
0.005
bh
kg
m
kg
HO
HO
HO
HO
2,500.00
1,260.00
180,000.00
2,200.00
40,000.00
55,000.00
70,000.00
80,000.00
13,250.00
1,436.40
540.00
220.00
3,600.00
4,950.00
630.00
400.00
25,026.40
2,502.64
27,529.04
27,520.00
3.530
1.140
0.003
0.100
0.090
0.090
0.009
0.005
bh
kg
m
kg
HO
HO
HO
HO
2,750.00
1,260.00
180,000.00
2,200.00
40,000.00
55,000.00
70,000.00
80,000.00
9,707.50
1,436.40
540.00
220.00
3,600.00
4,950.00
630.00
400.00
21,483.90
2,148.39
23,632.29
23,630.00
1
G021
G022
G023
G024
G025
G026
G027
2
3
Memasang 1 m plint ubin PC warna ukuran (10 x 40) cm
Plin ubin PC warna
Portland Cement
Bahan
Pasir Pasang
Semen Warna
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m plint ubin teraso ukuran (10 x 30) cm
Plin ubin teraso
Portland Cement
Bahan
Pasir Pasang
Semen Warna
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m plint ubin teraso ukuran (10 x 40) cm
Plin ubin teraso
Portland Cement
Bahan
Pasir Pasang
Semen Warna
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m plint ubin granit ukuran (10 x 40) cm
Plin ubin teraso
Portland Cement
Bahan
Pasir Pasang
Semen Warna
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m plint ubin granit ukuran (10 x 30) cm
Plin ubin teraso
Portland Cement
Bahan
Pasir Pasang
Semen Warna
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m plint ubin teralux kerang ukuran (10 x 40) cm
Plin ubin teralux kerang
Portland Cement
Bahan
Pasir Pasang
Semen Warna
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m plint ubin teralux kerang ukuran (10 x 30) cm
Plin ubin teralux kerang
Portland Cement
Bahan
Pasir Pasang
Semen Warna
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
7=(4x6)
2.650
1.140
0.003
0.100
0.090
0.090
0.009
0.005
bh
kg
m
kg
HO
HO
HO
HO
3,250.00
1,260.00
180,000.00
2,200.00
40,000.00
55,000.00
70,000.00
80,000.00
8,612.50
1,436.40
540.00
220.00
3,600.00
4,950.00
630.00
400.00
20,388.90
2,038.89
22,427.79
22,420.00
3.530
1.140
0.003
0.100
0.090
0.090
0.009
0.005
bh
kg
m
kg
HO
HO
HO
HO
3,000.00
1,260.00
180,000.00
2,200.00
40,000.00
55,000.00
70,000.00
80,000.00
10,590.00
1,436.40
540.00
220.00
3,600.00
4,950.00
630.00
400.00
22,366.40
2,236.64
24,603.04
24,600.00
2.650
1.140
0.003
0.100
0.090
0.090
0.009
0.005
bh
kg
m
kg
HO
HO
HO
HO
3,500.00
1,260.00
180,000.00
2,200.00
40,000.00
55,000.00
70,000.00
80,000.00
9,275.00
1,436.40
540.00
220.00
3,600.00
4,950.00
630.00
400.00
21,051.40
2,105.14
23,156.54
23,150.00
2.650
1.140
0.003
0.100
0.090
0.090
0.009
0.005
bh
kg
m
kg
HO
HO
HO
HO
4,000.00
1,260.00
180,000.00
2,200.00
40,000.00
55,000.00
70,000.00
80,000.00
10,600.00
1,436.40
540.00
220.00
3,600.00
4,950.00
630.00
400.00
22,376.40
2,237.64
24,614.04
24,610.00
3.530
1.140
0.003
0.100
0.090
0.090
0.009
0.005
bh
kg
m
kg
HO
HO
HO
HO
7,500.00
1,260.00
180,000.00
2,200.00
40,000.00
55,000.00
70,000.00
80,000.00
26,475.00
1,436.40
540.00
220.00
3,600.00
4,950.00
630.00
400.00
38,251.40
3,825.14
42,076.54
42,070.00
2.650
1.140
0.003
0.100
0.090
0.090
0.009
0.005
bh
kg
m
kg
HO
HO
HO
HO
10,000.00
1,260.00
180,000.00
2,200.00
40,000.00
55,000.00
70,000.00
80,000.00
26,500.00
1,436.40
540.00
220.00
3,600.00
4,950.00
630.00
400.00
38,276.40
3,827.64
42,104.04
42,100.00
3.530
1.140
0.003
0.100
0.090
0.090
0.009
0.005
bh
kg
m
kg
HO
HO
HO
HO
6,500.00
1,260.00
180,000.00
2,200.00
40,000.00
55,000.00
70,000.00
80,000.00
22,945.00
1,436.40
540.00
220.00
3,600.00
4,950.00
630.00
400.00
34,721.40
3,472.14
38,193.54
38,190.00
1
G028
G029
G030
G031
G032
G033
G034
2
3
Memasang 1 m plint ubin teralux marmer ukuran (10 x 60) cm
Plin ubin teralux marmer
Portland Cement
Bahan
Pasir Pasang
Semen Warna
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m plint ubin teralux marmer ukuran (10 x 40) cm
Plin ubin teralux marmer
Portland Cement
Bahan
Pasir Pasang
Semen Warna
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m plint ubin teralux marmer ukuran (10 x 30) cm
Plin ubin teralux marmer
Portland Cement
Bahan
Pasir Pasang
Semen Warna
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 lantai teraso cor ditempat, tebal 3 cm
Bahan
Bahan teraso cor
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 lantai keramik artistik ukuran (10 x 20) cm
Ubin keramik artistik
Portland Cement
Bahan
Pasir Pasang
Semen Warna
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 lantai keramik artistik ukuran (10 x 10) cm atau (5 x 20) cm
Ubin keramik artistik
Portland Cement
Bahan
Pasir Pasang
Semen Warna
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 lantai keramik ukuran (33 x 33) cm DN Putih setara Mulya
Ubin keramik
Portland Cement
Bahan
Pasir Pasang
Semen Warna
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
7=(4x6)
1.700
1.140
0.003
0.100
0.090
0.090
0.009
0.005
bh
kg
m
kg
HO
HO
HO
HO
25,000.00
1,260.00
180,000.00
2,200.00
40,000.00
55,000.00
70,000.00
80,000.00
42,500.00
1,436.40
540.00
220.00
3,600.00
4,950.00
630.00
400.00
54,276.40
5,427.64
59,704.04
59,700.00
2.650
1.140
0.003
0.100
0.090
0.090
0.009
0.005
bh
kg
m
kg
HO
HO
HO
HO
17,500.00
1,260.00
180,000.00
2,200.00
40,000.00
55,000.00
70,000.00
80,000.00
46,375.00
1,436.40
540.00
220.00
3,600.00
4,950.00
630.00
400.00
58,151.40
5,815.14
63,966.54
63,960.00
3.530
1.140
0.003
0.100
0.090
0.090
0.009
0.005
bh
kg
m
kg
HO
HO
HO
HO
15,000.00
1,260.00
180,000.00
2,200.00
40,000.00
55,000.00
70,000.00
80,000.00
52,950.00
1,436.40
540.00
220.00
3,600.00
4,950.00
630.00
400.00
64,726.40
6,472.64
71,199.04
71,190.00
0.036
0.360
0.180
0.018
0.018
bh
HO
HO
HO
HO
450,000.00
40,000.00
55,000.00
70,000.00
80,000.00
16,200.00
14,400.00
9,900.00
1,260.00
1,440.00
43,200.00
4,320.00
47,520.00
47,520.00
53.000
8.190
0.045
2.750
0.700
0.350
0.035
0.035
bh
kg
m
kg
HO
HO
HO
HO
8,300.00
1,260.00
180,000.00
2,200.00
40,000.00
55,000.00
70,000.00
80,000.00
439,900.00
10,319.40
8,100.00
6,050.00
28,000.00
19,250.00
2,450.00
2,800.00
516,869.40
51,686.94
568,556.34
568,550.00
106.000
8.190
0.045
3.200
0.700
0.350
0.035
0.035
bh
kg
m
kg
HO
HO
HO
HO
16,600.00
1,260.00
180,000.00
2,200.00
40,000.00
55,000.00
70,000.00
80,000.00
1,759,600.00
10,319.40
8,100.00
7,040.00
28,000.00
19,250.00
2,450.00
2,800.00
1,837,559.40
183,755.94
2,021,315.34
2,021,310.00
10.000
8.190
0.045
1.620
0.700
0.350
0.035
0.035
bh
kg
m
kg
HO
HO
HO
HO
3,500.00
1,260.00
180,000.00
2,200.00
40,000.00
55,000.00
70,000.00
80,000.00
35,000.00
10,319.40
8,100.00
3,564.00
28,000.00
19,250.00
2,450.00
2,800.00
109,483.40
10,948.34
120,431.74
120,430.00
1
G035
G036
G037
G038
G039
G040
G041
2
3
4
Memasang 1 m2 lantai keramik ukuran (30 x 30) cm DN Putih setara Mulya
Ubin keramik
11.870
Portland Cement
10.000
Bahan
Pasir Pasang
0.045
Semen Warna
1.500
Pekerja
0.700
Tukang batu
0.350
Tenaga kerja
Kepala tukang
0.035
Mandor
0.035
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 lantai keramik ukuran (20 x 20) cm DN Putih setara Mulya
Ubin keramik
26.500
Portland Cement
10.400
Bahan
Pasir Pasang
0.045
Semen Warna
1.630
Pekerja
0.700
Tukang batu
0.350
Tenaga kerja
Kepala tukang
0.035
Mandor
0.035
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 lantai keramik ukuran (10 x 33) cm, variasi/border
Ubin keramik
33.000
Portland Cement
9.800
Bahan
Pasir Pasang
0.045
Semen Warna
4.370
Pekerja
1.050
Tukang batu
0.525
Tenaga kerja
Kepala tukang
0.530
Mandor
0.530
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 lantai keramik ukuran (33 x 33) cm DN bercorak/berwarna setara Mulya
Ubin keramik
10.000
Portland Cement
8.190
Bahan
Pasir Pasang
0.045
Semen Warna
1.620
Pekerja
0.700
Tukang batu
0.350
Tenaga kerja
Kepala tukang
0.035
Mandor
0.035
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 lantai keramik ukuran (30 x 30) cm DN bercorak/berwarna setara Mulya
Ubin keramik
11.870
Portland Cement
10.000
Bahan
Pasir Pasang
0.045
Semen Warna
1.500
Pekerja
0.700
Tukang batu
0.350
Tenaga kerja
Kepala tukang
0.035
Mandor
0.035
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 lantai keramik ukuran (20 x 20) cm DN bercorak/berwarna setara Mulya
Ubin keramik
26.500
Portland Cement
10.400
Bahan
Pasir Pasang
0.045
Semen Warna
1.630
Pekerja
0.700
Tukang batu
0.350
Tenaga kerja
Kepala tukang
0.035
Mandor
0.035
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 lantai keramik ukuran (33 x 33) cm DN Putih setara Roman
Ubin keramik
10.000
Portland Cement
8.190
Bahan
Pasir Pasang
0.045
Semen Warna
1.620
Pekerja
0.700
Tukang batu
0.350
Tenaga kerja
Kepala tukang
0.035
Mandor
0.035
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
7=(4x6)
bh
kg
m
kg
HO
HO
HO
HO
3,000.00
1,260.00
180,000.00
2,200.00
40,000.00
55,000.00
70,000.00
80,000.00
35,610.00
12,600.00
8,100.00
3,300.00
28,000.00
19,250.00
2,450.00
2,800.00
112,110.00
11,211.00
123,321.00
123,320.00
bh
kg
m
kg
HO
HO
HO
HO
1,500.00
1,260.00
180,000.00
2,200.00
40,000.00
55,000.00
70,000.00
80,000.00
39,750.00
13,104.00
8,100.00
3,586.00
28,000.00
19,250.00
2,450.00
2,800.00
117,040.00
11,704.00
128,744.00
128,740.00
bh
kg
m
kg
HO
HO
HO
HO
1,400.00
1,260.00
180,000.00
2,200.00
40,000.00
55,000.00
70,000.00
80,000.00
46,200.00
12,348.00
8,100.00
9,614.00
42,000.00
28,875.00
37,100.00
42,400.00
226,637.00
22,663.70
249,300.70
249,300.00
bh
kg
m
kg
HO
HO
HO
HO
3,800.00
1,260.00
180,000.00
2,200.00
40,000.00
55,000.00
70,000.00
80,000.00
38,000.00
10,319.40
8,100.00
3,564.00
28,000.00
19,250.00
2,450.00
2,800.00
112,483.40
11,248.34
123,731.74
123,730.00
bh
kg
m
kg
HO
HO
HO
HO
3,000.00
1,260.00
180,000.00
2,200.00
40,000.00
55,000.00
70,000.00
80,000.00
35,610.00
12,600.00
8,100.00
3,300.00
28,000.00
19,250.00
2,450.00
2,800.00
112,110.00
11,211.00
123,321.00
123,320.00
bh
kg
m
kg
HO
HO
HO
HO
1,800.00
1,260.00
180,000.00
2,200.00
40,000.00
55,000.00
70,000.00
80,000.00
47,700.00
13,104.00
8,100.00
3,586.00
28,000.00
19,250.00
2,450.00
2,800.00
124,990.00
12,499.00
137,489.00
137,480.00
bh
kg
m
kg
HO
HO
HO
HO
7,000.00
1,260.00
180,000.00
2,200.00
40,000.00
55,000.00
70,000.00
80,000.00
70,000.00
10,319.40
8,100.00
3,564.00
28,000.00
19,250.00
2,450.00
2,800.00
144,483.40
14,448.34
158,931.74
158,930.00
1
G042
G043
G044
G045
G046
G047
G048
2
3
4
Memasang 1 m2 lantai keramik ukuran (30 x 30) cm DN Putih setara Roman
Ubin keramik
11.870
Portland Cement
10.000
Bahan
Pasir Pasang
0.045
Semen Warna
1.500
Pekerja
0.700
Tukang batu
0.350
Tenaga kerja
Kepala tukang
0.035
Mandor
0.035
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 lantai keramik ukuran (20 x 20) cm DN Putih setara Roman
Ubin keramik
26.500
Portland Cement
10.400
Bahan
Pasir Pasang
0.045
Semen Warna
1.630
Pekerja
0.700
Tukang batu
0.350
Tenaga kerja
Kepala tukang
0.035
Mandor
0.035
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 lantai keramik ukuran (33 x 33) cm DN bercorak/berwarna setara Roman
Ubin keramik
10.000
Portland Cement
8.190
Bahan
Pasir Pasang
0.045
Semen Warna
1.620
Pekerja
0.700
Tukang batu
0.350
Tenaga kerja
Kepala tukang
0.035
Mandor
0.035
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 lantai keramik ukuran (30 x 30) cm DN bercorak/berwarna setara Roman
Ubin keramik
11.870
Portland Cement
10.000
Bahan
Pasir Pasang
0.045
Semen Warna
1.500
Pekerja
0.700
Tukang batu
0.350
Tenaga kerja
Kepala tukang
0.035
Mandor
0.035
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 lantai keramik ukuran (20 x 20) cm DN bercorak/berwarna setara Roman
Ubin keramik
26.500
Portland Cement
10.400
Bahan
Pasir Pasang
0.045
Semen Warna
1.630
Pekerja
0.700
Tukang batu
0.350
Tenaga kerja
Kepala tukang
0.035
Mandor
0.035
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 lantai mosaik ukuran (30 x 30) cm, campuran spesi 1 PC : 3 PP
Mozaik
11.870
Portland Cement
14.150
Bahan
Pasir Pasang
0.039
Semen Warna
2.000
Pekerja
0.700
Tukang batu
0.350
Tenaga kerja
Kepala tukang
0.035
Mandor
0.035
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m plint keramik ukuran (10 x 20) cm
Mozaik
5.300
Portland Cement
1.140
Bahan
Pasir Pasang
0.003
Semen Warna
0.025
Pekerja
0.090
Tukang batu
0.090
Tenaga kerja
Kepala tukang
0.009
Mandor
0.005
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
7=(4x6)
bh
kg
m
kg
HO
HO
HO
HO
4,100.00
1,260.00
180,000.00
2,200.00
40,000.00
55,000.00
70,000.00
80,000.00
48,667.00
12,600.00
8,100.00
3,300.00
28,000.00
19,250.00
2,450.00
2,800.00
125,167.00
12,516.70
137,683.70
137,680.00
bh
kg
m
kg
HO
HO
HO
HO
2,000.00
1,260.00
180,000.00
2,200.00
40,000.00
55,000.00
70,000.00
80,000.00
53,000.00
13,104.00
8,100.00
3,586.00
28,000.00
19,250.00
2,450.00
2,800.00
130,290.00
13,029.00
143,319.00
143,310.00
bh
kg
m
kg
HO
HO
HO
HO
3,800.00
1,260.00
180,000.00
2,200.00
40,000.00
55,000.00
70,000.00
80,000.00
38,000.00
10,319.40
8,100.00
3,564.00
28,000.00
19,250.00
2,450.00
2,800.00
112,483.40
11,248.34
123,731.74
123,730.00
bh
kg
m
kg
HO
HO
HO
HO
5,900.00
1,260.00
180,000.00
2,200.00
40,000.00
55,000.00
70,000.00
80,000.00
70,033.00
12,600.00
8,100.00
3,300.00
28,000.00
19,250.00
2,450.00
2,800.00
146,533.00
14,653.30
161,186.30
161,180.00
bh
kg
m
kg
HO
HO
HO
HO
2,200.00
1,260.00
180,000.00
2,200.00
40,000.00
55,000.00
70,000.00
80,000.00
58,300.00
13,104.00
8,100.00
3,586.00
28,000.00
19,250.00
2,450.00
2,800.00
135,590.00
13,559.00
149,149.00
149,140.00
bh
kg
m
kg
HO
HO
HO
HO
4,500.00
1,260.00
180,000.00
2,200.00
40,000.00
55,000.00
70,000.00
80,000.00
53,415.00
17,829.00
7,020.00
4,400.00
28,000.00
19,250.00
2,450.00
2,800.00
135,164.00
13,516.40
148,680.40
148,680.00
bh
kg
m
kg
HO
HO
HO
HO
1,760.00
1,260.00
180,000.00
2,200.00
40,000.00
55,000.00
70,000.00
80,000.00
9,328.00
1,436.40
540.00
55.00
3,600.00
4,950.00
630.00
400.00
20,939.40
2,093.94
23,033.34
23,030.00
1
G049
G050
G051
G052
G053
G054
G055
G056
2
3
Memasang 1 m plint keramik ukuran (10 x 10) cm
Plin Keramik
Portland Cement
Bahan
Pasir Pasang
Semen Warna
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m plint keramik ukuran (5 x 20) cm
Plin Keramik
Portland Cement
Bahan
Pasir Pasang
Semen Warna
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m plint internal cove artistik ukuran (5 x 5 x 20) cm
Internal cove
Portland Cement
Bahan
Pasir Pasang
Semen Warna
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 lantai marmer ukuran (100 x 100) cm
marmer
Portland Cement
Bahan
Pasir Pasang
Semen Warna
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 lantai karpet
Karpet
Bahan
Lem
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 underlayer / Pelapis bawah karpet
Underlayer / rubber corrugated
Bahan
Lem
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 lantai parquet kayu
Parquet
Bahan
Lem
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 lantai kayu (gymfloor)
Gymfloor
Bahan
Lem
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
7=(4x6)
10.600
1.140
0.003
0.050
0.090
0.090
0.009
0.005
bh
kg
m
kg
HO
HO
HO
HO
880.00
1,260.00
180,000.00
2,200.00
40,000.00
55,000.00
70,000.00
80,000.00
9,328.00
1,436.40
540.00
110.00
3,600.00
4,950.00
630.00
400.00
20,994.40
2,099.44
23,093.84
23,090.00
5.300
0.057
0.0015
0.013
0.090
0.090
0.009
0.005
bh
kg
m
kg
HO
HO
HO
HO
1,760.00
1,260.00
180,000.00
2,200.00
40,000.00
55,000.00
70,000.00
80,000.00
9,328.00
71.82
270.00
28.60
3,600.00
4,950.00
630.00
400.00
19,278.42
1,927.84
21,206.26
21,200.00
5.300
1.140
0.003
0.100
0.750
0.750
0.075
0.038
bh
kg
m
kg
HO
HO
HO
HO
6,500.00
1,260.00
180,000.00
2,200.00
40,000.00
55,000.00
70,000.00
80,000.00
34,450.00
1,436.40
540.00
220.00
30,000.00
41,250.00
5,250.00
3,040.00
116,186.40
11,618.64
127,805.04
127,800.00
1.060
9.190
0.045
0.650
0.700
0.350
0.035
0.035
bh
kg
m
kg
HO
HO
HO
HO
522,800.00
1,260.00
180,000.00
2,200.00
40,000.00
55,000.00
70,000.00
80,000.00
554,168.00
11,579.40
8,100.00
1,430.00
28,000.00
19,250.00
2,450.00
2,800.00
627,777.40
62,777.74
690,555.14
690,550.00
1.050
0.350
0.170
0.170
0.017
0.009
m2
kg
HO
HO
HO
HO
116,200.00
29,100.00
40,000.00
55,000.00
70,000.00
80,000.00
122,010.00
10,185.00
6,800.00
9,350.00
1,190.00
720.00
150,255.00
15,025.50
165,280.50
165,280.00
1.050
0.350
0.120
0.120
0.012
0.006
m2
kg
HO
HO
HO
HO
85,000.00
29,100.00
40,000.00
55,000.00
70,000.00
80,000.00
89,250.00
10,185.00
4,800.00
6,600.00
840.00
480.00
112,155.00
11,215.50
123,370.50
123,370.00
1.050
0.600
0.700
0.350
0.035
0.035
m2
kg
HO
HO
HO
HO
125,000.00
29,100.00
40,000.00
55,000.00
70,000.00
80,000.00
131,250.00
17,460.00
28,000.00
19,250.00
2,450.00
2,800.00
201,210.00
20,121.00
221,331.00
221,330.00
1.050
0.600
0.700
0.350
0.035
0.035
m2
kg
HO
HO
HO
HO
230,000.00
29,100.00
40,000.00
55,000.00
70,000.00
80,000.00
241,500.00
17,460.00
28,000.00
19,250.00
2,450.00
2,800.00
311,460.00
31,146.00
342,606.00
342,600.00
1
G057
G058
G059
G060
G061
G062
G063
2
3
Memasang 1 m2 dinding porselen ukuran (11 x 11) cm
Porselin
Portland Cement
Bahan
Pasir Pasang
Semen Warna
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 dinding porselin ukuran (10 x 20) cm
Porselin
Portland Cement
Bahan
Pasir Pasang
Semen Warna
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 dinding porselin ukuran (20 x 20) cm
Porselin
Portland Cement
Bahan
Pasir Pasang
Semen Warna
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 dinding keramik artistik ukuran (10 x 20) cm
Keramik artistik
Portland Cement
Bahan
Pasir Pasang
Semen Warna
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 dinding keramik artistik ukuran (5 x 20) cm
Keramik artistik
Portland Cement
Bahan
Pasir Pasang
Semen Warna
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 dinding keramik ukuran (10 x 20) cm, DN Putih setara Mulya
Keramik
Portland Cement
Bahan
Pasir Pasang
Semen Warna
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 dinding keramik ukuran (20 x 20) cm, DN Putih setara Mulya
Keramik
Portland Cement
Bahan
Pasir Pasang
Semen Warna
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
7=(4x6)
86.000
9.300
0.018
2.750
0.900
0.450
0.045
0.045
m2
kg
m
kg
HO
HO
HO
HO
600.00
1,260.00
180,000.00
2,200.00
40,000.00
55,000.00
70,000.00
80,000.00
51,600.00
11,718.00
3,240.00
6,050.00
36,000.00
24,750.00
3,150.00
3,600.00
140,108.00
14,010.80
154,118.80
154,110.00
53.000
9.300
0.018
2.750
0.900
0.450
0.045
0.045
m2
kg
m
kg
HO
HO
HO
HO
900.00
1,260.00
180,000.00
2,200.00
40,000.00
55,000.00
70,000.00
80,000.00
47,700.00
11,718.00
3,240.00
6,050.00
36,000.00
24,750.00
3,150.00
3,600.00
136,208.00
13,620.80
149,828.80
149,820.00
26.500
9.300
0.018
2.750
0.900
0.450
0.045
0.045
m2
kg
m
kg
HO
HO
HO
HO
1,800.00
1,260.00
180,000.00
2,200.00
40,000.00
55,000.00
70,000.00
80,000.00
47,700.00
11,718.00
3,240.00
6,050.00
36,000.00
24,750.00
3,150.00
3,600.00
136,208.00
13,620.80
149,828.80
149,820.00
53.000
9.300
0.018
2.750
0.900
0.450
0.045
0.045
m2
kg
m
kg
HO
HO
HO
HO
8,300.00
1,260.00
180,000.00
2,200.00
40,000.00
55,000.00
70,000.00
80,000.00
439,900.00
11,718.00
3,240.00
6,050.00
36,000.00
24,750.00
3,150.00
3,600.00
528,408.00
52,840.80
581,248.80
581,240.00
106.000
9.300
0.018
2.750
0.900
0.450
0.045
0.045
m2
kg
m
kg
HO
HO
HO
HO
16,600.00
1,260.00
180,000.00
2,200.00
40,000.00
55,000.00
70,000.00
80,000.00
1,759,600.00
11,718.00
3,240.00
6,050.00
36,000.00
24,750.00
3,150.00
3,600.00
1,848,108.00
184,810.80
2,032,918.80
2,032,910.00
53.000
9.300
0.018
2.750
0.900
0.450
0.045
0.045
m2
kg
m
kg
HO
HO
HO
HO
800.00
1,260.00
180,000.00
2,200.00
40,000.00
55,000.00
70,000.00
80,000.00
42,400.00
11,718.00
3,240.00
6,050.00
36,000.00
24,750.00
3,150.00
3,600.00
130,908.00
13,090.80
143,998.80
143,990.00
26.500
9.300
0.018
1.940
0.900
0.450
0.045
0.045
m2
kg
m
kg
HO
HO
HO
HO
1,500.00
1,260.00
180,000.00
2,200.00
40,000.00
55,000.00
70,000.00
80,000.00
39,750.00
11,718.00
3,240.00
4,268.00
36,000.00
24,750.00
3,150.00
3,600.00
126,476.00
12,647.60
139,123.60
139,120.00
1
G064
G065
G066
G067
G068
G069
G070
2
3
4
Memasang 1 m2 dinding keramik ukuran (10 x 20) cm, DN bercorak/berwarna setara Mulya
Keramik
53.000
Portland Cement
9.300
Bahan
Pasir Pasang
0.018
Semen Warna
2.750
Pekerja
0.900
Tukang batu
0.450
Tenaga kerja
Kepala tukang
0.045
Mandor
0.045
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 dinding keramik ukuran (20 x 20) cm, DN bercorak/berwarna setara Mulya
Keramik
26.500
Portland Cement
9.300
Bahan
Pasir Pasang
0.018
Semen Warna
1.940
Pekerja
0.900
Tukang batu
0.450
Tenaga kerja
Kepala tukang
0.045
Mandor
0.045
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 dinding keramik ukuran (10 x 20) cm, DN Putih setara Roman
Keramik
53.000
Portland Cement
9.300
Bahan
Pasir Pasang
0.018
Semen Warna
2.750
Pekerja
0.900
Tukang batu
0.450
Tenaga kerja
Kepala tukang
0.045
Mandor
0.045
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 dinding keramik ukuran (20 x 20) cm, DN Putih setara Roman
Keramik
26.500
Portland Cement
9.300
Bahan
Pasir Pasang
0.018
Semen Warna
1.940
Pekerja
0.900
Tukang batu
0.450
Tenaga kerja
Kepala tukang
0.045
Mandor
0.045
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 dinding keramik ukuran (10 x 20) cm, DN bercorak/berwarna setara Roman
Keramik
53.000
Portland Cement
9.300
Bahan
Pasir Pasang
0.018
Semen Warna
2.750
Pekerja
0.900
Tukang batu
0.450
Tenaga kerja
Kepala tukang
0.045
Mandor
0.045
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 dinding keramik ukuran (20 x 20) cm, DN bercorak/berwarna setara Roman
Keramik
26.500
Portland Cement
9.300
Bahan
Pasir Pasang
0.018
Semen Warna
1.940
Pekerja
0.900
Tukang batu
0.450
Tenaga kerja
Kepala tukang
0.045
Mandor
0.045
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 dinding marmer ukuran (100 x 100) cm
Marmer
1.060
Paku 12 cm
3.003
Bahan
Portland Cement
12.440
Pasir Pasang
0.025
Semen Warna
0.650
Pekerja
0.900
Tukang batu
0.450
Tenaga kerja
Kepala tukang
0.045
Mandor
0.045
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
7=(4x6)
m2
kg
m
kg
HO
HO
HO
HO
900.00
1,260.00
180,000.00
2,200.00
40,000.00
55,000.00
70,000.00
80,000.00
47,700.00
11,718.00
3,240.00
6,050.00
36,000.00
24,750.00
3,150.00
3,600.00
136,208.00
13,620.80
149,828.80
149,820.00
m2
kg
m
kg
HO
HO
HO
HO
1,800.00
1,260.00
180,000.00
2,200.00
40,000.00
55,000.00
70,000.00
80,000.00
47,700.00
11,718.00
3,240.00
4,268.00
36,000.00
24,750.00
3,150.00
3,600.00
134,426.00
13,442.60
147,868.60
147,860.00
m2
kg
m
kg
HO
HO
HO
HO
1,000.00
1,260.00
180,000.00
2,200.00
40,000.00
55,000.00
70,000.00
80,000.00
53,000.00
11,718.00
3,240.00
6,050.00
36,000.00
24,750.00
3,150.00
3,600.00
141,508.00
14,150.80
155,658.80
155,650.00
m2
kg
m
kg
HO
HO
HO
HO
2,000.00
1,260.00
180,000.00
2,200.00
40,000.00
55,000.00
70,000.00
80,000.00
53,000.00
11,718.00
3,240.00
4,268.00
36,000.00
24,750.00
3,150.00
3,600.00
139,726.00
13,972.60
153,698.60
153,690.00
m2
kg
m
kg
HO
HO
HO
HO
1,100.00
1,260.00
180,000.00
2,200.00
40,000.00
55,000.00
70,000.00
80,000.00
58,300.00
11,718.00
3,240.00
6,050.00
36,000.00
24,750.00
3,150.00
3,600.00
146,808.00
14,680.80
161,488.80
161,480.00
m2
kg
m
kg
HO
HO
HO
HO
2,200.00
1,260.00
180,000.00
2,200.00
40,000.00
55,000.00
70,000.00
80,000.00
58,300.00
11,718.00
3,240.00
4,268.00
36,000.00
24,750.00
3,150.00
3,600.00
145,026.00
14,502.60
159,528.60
159,520.00
m2
kg
kg
m
kg
HO
HO
HO
HO
522,800.00
10,000.00
1,260.00
180,000.00
2,200.00
40,000.00
55,000.00
70,000.00
80,000.00
554,168.00
30,030.00
15,674.40
4,500.00
1,430.00
36,000.00
24,750.00
3,150.00
3,600.00
673,302.40
67,330.24
740,632.64
740,630.00
1
G071
G072
G073
G074
G075
G076
F077
G078
2
3
Memasang 1 m2 dinding bata pelapis ukuran (3 x 7 x 24) cm
Bata pelapis dinding
Portland Cement
Bahan
Pasir Pasang
Semen Warna
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 dinding batu paras
Batu paras
Bahan
Portland Cement
Pasir Pasang
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 dinding batu tempel hitam
Batu tempel hitam
Bahan
Portland Cement
Pasir Pasang
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 lantai Vinyl ukuran (30 x 30) cm KL. I
Vinyl
Bahan
Lem vinyl
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 wall paper, lebar 50 cm
Wall paper
Bahan
Lem
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 floor hardener
Bahan
Floor hardener
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m plint Vinyl karet ukuran (15 x 30) cm dengan perekat
Vinyl karet
Bahan
Lem vinyl
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m plint kayu kelas II tebal 2Cm, Lebar 10 Cm
Papan kayu kelas II
Bahan
Paku /skrup 5 cm
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
7=(4x6)
63.000
12.440
0.025
2.750
1.000
0.500
0.050
0.050
m2
kg
m
kg
HO
HO
HO
HO
1,200.00
1,260.00
180,000.00
2,200.00
40,000.00
55,000.00
70,000.00
80,000.00
75,600.00
15,674.40
4,500.00
6,050.00
40,000.00
27,500.00
3,500.00
4,000.00
176,824.40
17,682.44
194,506.84
194,500.00
1.100
11.750
0.035
1.000
0.500
0.050
0.050
m2
kg
m
HO
HO
HO
HO
1,500.00
1,260.00
180,000.00
40,000.00
55,000.00
70,000.00
80,000.00
1,650.00
14,805.00
6,300.00
40,000.00
27,500.00
3,500.00
4,000.00
97,755.00
9,775.50
107,530.50
107,530.00
1.100
11.750
0.035
0.700
0.350
0.035
0.035
m2
kg
m
HO
HO
HO
HO
85,000.00
1,260.00
180,000.00
40,000.00
55,000.00
70,000.00
80,000.00
93,500.00
14,805.00
6,300.00
28,000.00
19,250.00
2,450.00
2,800.00
167,105.00
16,710.50
183,815.50
183,810.00
11.870
0.350
0.150
0.150
0.015
0.008
bh
kg
HO
HO
HO
HO
2,500.00
29,100.00
40,000.00
55,000.00
70,000.00
80,000.00
29,675.00
10,185.00
6,000.00
8,250.00
1,050.00
640.00
55,800.00
5,580.00
61,380.00
61,380.00
2.200
0.250
0.350
0.175
0.017
0.002
bh
kg
HO
HO
HO
HO
25,500.00
29,100.00
40,000.00
55,000.00
70,000.00
80,000.00
56,100.00
7,275.00
14,000.00
9,625.00
1,190.00
160.00
88,350.00
8,835.00
97,185.00
97,180.00
5.000
0.120
0.120
0.012
0.006
kg
HO
HO
HO
HO
29,000.00
40,000.00
55,000.00
70,000.00
80,000.00
145,000.00
4,800.00
6,600.00
840.00
480.00
157,720.00
15,772.00
173,492.00
173,490.00
1.760
0.080
0.080
0.080
0.008
0.004
bh
kg
HO
HO
HO
HO
55,000.00
29,100.00
40,000.00
55,000.00
70,000.00
80,000.00
96,800.00
2,328.00
3,200.00
4,400.00
560.00
320.00
107,608.00
10,760.80
118,368.80
118,360.00
0.003
0.050
0.120
0.120
0.012
0.005
m3
kg
HO
HO
HO
HO
7,750,000.00
10,000.00
40,000.00
55,000.00
70,000.00
80,000.00
23,250.00
500.00
4,800.00
6,600.00
840.00
400.00
36,390.00
3,639.00
40,029.00
40,020.00
1
H
H001
H002
H003
H004
H005
H006
H007
H008
2
PEKERJAAN PLESTERAN (SNI 2837:2008)
Membuat 1 m2 plesteran 1 PC : 1 PP, tebal 15 mm
Portland Cement
Bahan
Pasir Pasang
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Membuat 1 m2 plesteran 1 PC : 2 PP, tebal 15 mm
Portland Cement
Bahan
Pasir Pasang
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Membuat 1 m2 plesteran 1 PC : 3 PP, tebal 15 mm
Portland Cement
Bahan
Pasir Pasang
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Membuat 1 m2 plesteran 1 PC : 4 PP, tebal 15 mm
Portland Cement
Bahan
Pasir Pasang
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Membuat 1 m2 plesteran 1 PC : 5 PP, tebal 15 mm
Portland Cement
Bahan
Pasir Pasang
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Membuat 1 m2 plesteran 1 PC : 6 PP, tebal 15 mm
Portland Cement
Bahan
Pasir Pasang
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Membuat 1 m2 plesteran 1 PC : 7 PP, tebal 15 mm
Portland Cement
Bahan
Pasir Pasang
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Membuat 1 m2 plesteran 1 PC : 8 PP, tebal 15 mm
Portland Cement
Bahan
Pasir Pasang
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
7=(4x6)
15.504
0.016
0.300
0.150
0.015
0.015
kg
m3
HO
HO
HO
HO
1,260.00
180,000.00
40,000.00
55,000.00
70,000.00
80,000.00
19,535.04
2,880.00
12,000.00
8,250.00
1,050.00
1,200.00
44,915.04
4,491.50
49,406.54
49,400.00
10.224
0.020
0.300
0.150
0.015
0.015
kg
m3
HO
HO
HO
HO
1,260.00
180,000.00
40,000.00
55,000.00
70,000.00
80,000.00
12,882.24
3,600.00
12,000.00
8,250.00
1,050.00
1,200.00
38,982.24
3,898.22
42,880.46
42,880.00
7.775
0.023
0.300
0.150
0.015
0.015
kg
m3
HO
HO
HO
HO
1,260.00
180,000.00
40,000.00
55,000.00
70,000.00
80,000.00
9,796.50
4,140.00
12,000.00
8,250.00
1,050.00
1,200.00
36,436.50
3,643.65
40,080.15
40,080.00
6.240
0.024
0.300
0.150
0.015
0.015
kg
m3
HO
HO
HO
HO
1,260.00
180,000.00
40,000.00
55,000.00
70,000.00
80,000.00
7,862.40
4,320.00
12,000.00
8,250.00
1,050.00
1,200.00
34,682.40
3,468.24
38,150.64
38,150.00
5.184
0.026
0.300
0.150
0.015
0.015
kg
m3
HO
HO
HO
HO
1,260.00
180,000.00
40,000.00
55,000.00
70,000.00
80,000.00
6,531.84
4,680.00
12,000.00
8,250.00
1,050.00
1,200.00
33,711.84
3,371.18
37,083.02
37,080.00
4.416
0.027
0.300
0.150
0.015
0.015
kg
m3
HO
HO
HO
HO
1,260.00
180,000.00
40,000.00
55,000.00
70,000.00
80,000.00
5,564.16
4,860.00
12,000.00
8,250.00
1,050.00
1,200.00
32,924.16
3,292.42
36,216.58
36,210.00
3.936
0.028
0.300
0.150
0.015
0.015
kg
m3
HO
HO
HO
HO
1,260.00
180,000.00
40,000.00
55,000.00
70,000.00
80,000.00
4,959.36
5,040.00
12,000.00
8,250.00
1,050.00
1,200.00
32,499.36
3,249.94
35,749.30
35,740.00
3.456
0.029
0.300
0.150
0.015
0.015
kg
m3
HO
HO
HO
HO
1,260.00
180,000.00
40,000.00
55,000.00
70,000.00
80,000.00
4,354.56
5,220.00
12,000.00
8,250.00
1,050.00
1,200.00
32,074.56
3,207.46
35,282.02
35,280.00
1
H009
H010
H011
H012
H013
H014
H015
H016
2
Membuat 1 m2 plesteran 1 PC : KP : 3 PP, tebal 15 mm
Portland Cement
Bahan
Kapur Padam
Pasir Pasang
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Membuat 1 m2 plesteran 1 PC : 2 KP : 8 PP, tebal 15 mm
Portland Cement
Bahan
Kapur Padam
Pasir Pasang
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Membuat 1 m2 plesteran 1 SM : 1 KP : 1 PP, tebal 15 mm
Semen Merah
Bahan
Kapur Padam
Pasir Pasang
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Membuat 1 m2 plesteran 1 SM : 1 KP : 2 PP, tebal 15 mm
Semen Merah
Bahan
Kapur Padam
Pasir Pasang
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Membuat 1 m2 plesteran 1 PC : 2 PP, tebal 20 mm
Portland Cement
Bahan
Pasir Pasang
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Membuat 1 m2 plesteran 1 PC : 3 PP, tebal 20 mm
Portland Cement
Bahan
Pasir Pasang
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Membuat 1 m2 plesteran 1 PC : 4 PP, tebal 20 mm
Portland Cement
Bahan
Pasir Pasang
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Membuat 1 m2 plesteran 1 PC : 5 PP, tebal 20 mm
Portland Cement
Bahan
Pasir Pasang
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
7=(4x6)
5.760
0.003
0.013
0.360
0.120
0.012
0.018
kg
m3
m3
HO
HO
HO
HO
1,260.00
330,000.00
180,000.00
40,000.00
55,000.00
70,000.00
80,000.00
7,257.60
990.00
2,340.00
14,400.00
6,600.00
840.00
1,440.00
25,620.00
2,562.00
28,182.00
28,180.00
3.000
0.005
0.020
0.360
0.120
0.012
0.018
kg
m3
m3
HO
HO
HO
HO
1,260.00
330,000.00
180,000.00
40,000.00
55,000.00
70,000.00
80,000.00
3,780.00
1,650.00
3,600.00
14,400.00
6,600.00
840.00
1,440.00
32,310.00
3,231.00
35,541.00
35,540.00
0.009
0.009
0.009
0.360
0.120
0.012
0.018
m3
m3
m3
HO
HO
HO
HO
130,000.00
330,000.00
180,000.00
40,000.00
55,000.00
70,000.00
80,000.00
1,170.00
2,970.00
1,620.00
14,400.00
6,600.00
840.00
1,440.00
29,040.00
2,904.00
31,944.00
31,940.00
0.007
0.007
0.015
0.360
0.120
0.012
0.018
m3
m3
m3
HO
HO
HO
HO
130,000.00
330,000.00
180,000.00
40,000.00
55,000.00
70,000.00
80,000.00
910.00
2,310.00
2,700.00
14,400.00
6,600.00
840.00
1,440.00
29,200.00
2,920.00
32,120.00
32,120.00
13.632
0.027
0.400
0.200
0.020
0.022
m3
m3
HO
HO
HO
HO
1,260.00
180,000.00
40,000.00
55,000.00
70,000.00
80,000.00
17,176.32
4,860.00
16,000.00
11,000.00
1,400.00
1,760.00
52,196.32
5,219.63
57,415.95
57,410.00
10.368
0.031
0.260
0.200
0.020
0.013
kg
m3
HO
HO
HO
HO
1,260.00
180,000.00
40,000.00
55,000.00
70,000.00
80,000.00
13,063.68
5,580.00
10,400.00
11,000.00
1,400.00
1,040.00
42,483.68
4,248.37
46,732.05
46,730.00
8.320
0.032
0.400
0.200
0.020
0.022
kg
m3
HO
HO
HO
HO
1,260.00
180,000.00
40,000.00
55,000.00
70,000.00
80,000.00
10,483.20
5,760.00
16,000.00
11,000.00
1,400.00
1,760.00
46,403.20
4,640.32
51,043.52
51,040.00
6.912
0.035
0.400
0.200
0.020
0.022
kg
m3
HO
HO
HO
HO
1,260.00
180,000.00
40,000.00
55,000.00
70,000.00
80,000.00
8,709.12
6,300.00
16,000.00
11,000.00
1,400.00
1,760.00
45,169.12
4,516.91
49,686.03
49,680.00
1
H017
H018
H019
H020
H021
H022
H023
H024
H025
2
3
Membuat 1 m2 plesteran 1 PC : 6 PP, tebal 20 mm
Portland Cement
Bahan
Pasir Pasang
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Membuat 1 m2 plesteran 1 SM : 1 KP : 2 PP, tebal 20 mm
Semen Merah
Bahan
Kapur Padam
Pasir Pasang
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Membuat 1 m2 Berapen 1 PC : 5 PP, tebal 15 mm
Portland Cement
Bahan
Pasir Pasang
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Membuat 1 m Plesteran Skoning lebar 10 mm 1 PC : 2 PP.
Portland Cement
Bahan
Pasir Pasang
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Membuat 1 m2 Plesteran Granit , 1 PC : 2 Granit, tebal 10 mm
Portland Cement
Bahan
Batu granit
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Membuat 1 m2 Plesteran Teraso , 1 PC : 2 Batu Teraso, tebal 10 mm
Portland Cement
Bahan
Batu teraso
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Membuat 1 m2 Plesteran Ciprat / Kamprotan 1 PC : 2 PP
Portland Cement
Bahan
Pasir Pasang
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Membuat 1 m2 finishing siar pasangan dinding bata merah (=20 m)
Bahan
Portland Cement
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Membuat 1 m2 finishing siar pasangan dinding conblock ekspose (=8 m)
Bahan
Portland Cement
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
7=(4x6)
5.888
0.036
0.400
0.200
0.020
0.022
kg
m3
HO
HO
HO
HO
1,260.00
180,000.00
40,000.00
55,000.00
70,000.00
80,000.00
7,418.88
6,480.00
16,000.00
11,000.00
1,400.00
1,760.00
44,058.88
4,405.89
48,464.77
48,460.00
0.009
0.009
0.180
0.440
0.220
0.022
0.022
m3
m3
m3
HO
HO
HO
HO
130,000.00
330,000.00
180,000.00
40,000.00
55,000.00
70,000.00
80,000.00
1,170.00
2,970.00
32,400.00
17,600.00
12,100.00
1,540.00
1,760.00
69,540.00
6,954.00
76,494.00
76,490.00
5.184
0.026
0.150
0.075
0.008
0.008
kg
m3
HO
HO
HO
HO
1,260.00
180,000.00
40,000.00
55,000.00
70,000.00
80,000.00
6,531.84
4,680.00
6,000.00
4,125.00
560.00
640.00
22,536.84
2,253.68
24,790.52
24,790.00
0.500
0.013
0.080
0.400
0.040
0.004
kg
m3
HO
HO
HO
HO
1,260.00
180,000.00
40,000.00
55,000.00
70,000.00
80,000.00
630.00
2,340.00
3,200.00
22,000.00
2,800.00
320.00
31,290.00
3,129.00
34,419.00
34,410.00
10.000
15.000
0.450
0.250
0.023
0.023
kg
kg
HO
HO
HO
HO
1,260.00
1,669.80
40,000.00
55,000.00
70,000.00
80,000.00
12,600.00
25,047.00
18,000.00
13,750.00
1,610.00
1,840.00
72,847.00
7,284.70
80,131.70
80,130.00
10.000
15.000
0.450
0.250
0.023
0.023
kg
kg
HO
HO
HO
HO
1,260.00
8,500.00
40,000.00
55,000.00
70,000.00
80,000.00
12,600.00
127,500.00
18,000.00
13,750.00
1,610.00
1,840.00
175,300.00
17,530.00
192,830.00
192,830.00
4.320
0.006
0.300
0.100
0.010
0.015
kg
m3
HO
HO
HO
HO
1,260.00
180,000.00
40,000.00
55,000.00
70,000.00
80,000.00
5,443.20
1,080.00
12,000.00
5,500.00
700.00
1,200.00
25,923.20
2,592.32
28,515.52
28,510.00
3.108
0.150
0.075
0.008
0.008
m3
HO
HO
HO
HO
1,260.00
40,000.00
55,000.00
70,000.00
80,000.00
3,916.08
6,000.00
4,125.00
560.00
640.00
15,241.08
1,524.11
16,765.19
16,760.00
1.600
0.070
0.035
0.004
0.004
kg
HO
HO
HO
HO
1,260.00
40,000.00
55,000.00
70,000.00
80,000.00
2,016.00
2,800.00
1,925.00
280.00
320.00
7,341.00
734.10
8,075.10
8,070.00
Analisa SNI Hal 46
1
H026
H027
I
I001
I002
I003
I004
I005
I006
2
3
4
Membuat 1 m2 finishing siar pasangan batu kali adukan 1 PC : 2 PP
Bahan
Portland Cement
6.340
Pasir Pasang
0.012
Pekerja
0.300
Tukang batu
0.150
Tenaga kerja
Kepala tukang
0.015
Mandor
0.015
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Membuat 1 m2 acian
Bahan
Portland Cement
3.250
Pekerja
0.200
Tukang batu
0.100
Tenaga kerja
Kepala tukang
0.010
Mandor
0.010
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
PEKERJAAN KAYU (SNI 3434:2008)
Membuat dan memasang 1 m3 kusen pintu dan kusen jendela, kayu kelas I
Balok Kayu
1.100
Bahan
Paku 10 cm
1.250
Lem kayu
1.000
Pekerja
7.000
Tukang Kayu
21.000
Tenaga kerja
Kepala tukang
2.100
Mandor
0.350
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Membuat dan memasang 1 m3 kusen pintu dan kusen jendela, kayu kelas II atau III
Balok Kayu
1.200
Bahan
Paku 10 cm
1.250
Lem kayu
1.000
Pekerja
6.000
Tukang Kayu
18.000
Tenaga kerja
Kepala tukang
1.800
Mandor
0.300
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Membuat dan memasang 1 m2 pintu klamp standar, kayu kelas II
Papan Kayu
0.040
Bahan
Paku 5-7 cm
0.050
Pekerja
0.350
Tukang Kayu
1.050
Tenaga kerja
Kepala tukang
0.105
Mandor
0.018
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Membuat dan memasang 1 m2 pintu klamp sederhana, kayu kelas III untuk gudang sementara
Papan Kayu
0.040
Bahan
Paku 5-7 cm
0.050
Pekerja
0.350
Tukang Kayu
1.050
Tenaga kerja
Kepala tukang
0.105
Mandor
0.018
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Membuat dan memasang 1 m2 daun pintu panel, kayu kelas I atau II
Papan Kayu
0.040
Bahan
Lem kayu
0.500
Pekerja
1.000
Tukang Kayu
3.000
Tenaga kerja
Kepala tukang
0.300
Mandor
0.050
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Membuat dan memasang 1 m2 pintu dan jendela kaca, kayu kelas I atau II
Papan Kayu
0.040
Bahan
Lem kayu
0.300
Pekerja
0.800
Tukang Kayu
2.400
Tenaga kerja
Kepala tukang
0.240
Mandor
0.240
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
7=(4x6)
kg
m3
HO
HO
HO
HO
1,260.00
180,000.00
40,000.00
55,000.00
70,000.00
80,000.00
7,988.40
2,160.00
12,000.00
8,250.00
1,050.00
1,200.00
32,648.40
3,264.84
35,913.24
35,910.00
m3
HO
HO
HO
HO
1,260.00
40,000.00
55,000.00
70,000.00
80,000.00
4,095.00
8,000.00
5,500.00
700.00
800.00
19,095.00
1,909.50
21,004.50
21,000.00
m3
kg
kg
HO
HO
HO
HO
4,125,000.00
10,000.00
24,000.00
40,000.00
55,000.00
70,000.00
80,000.00
4,537,500.00
12,500.00
24,000.00
280,000.00
1,155,000.00
147,000.00
28,000.00
6,184,000.00
618,400.00
6,802,400.00
6,802,400.00
m3
kg
kg
HO
HO
HO
HO
3,004,400.00
10,000.00
24,000.00
40,000.00
55,000.00
70,000.00
80,000.00
3,605,280.00
12,500.00
24,000.00
240,000.00
990,000.00
126,000.00
24,000.00
5,021,780.00
502,178.00
5,523,958.00
5,523,950.00
m3
kg
HO
HO
HO
HO
4,290,000.00
10,000.00
40,000.00
55,000.00
70,000.00
80,000.00
171,600.00
500.00
14,000.00
57,750.00
7,350.00
1,440.00
252,640.00
25,264.00
277,904.00
277,900.00
m3
kg
HO
HO
HO
HO
3,135,000.00
10,000.00
40,000.00
55,000.00
70,000.00
80,000.00
125,400.00
500.00
14,000.00
57,750.00
7,350.00
1,440.00
206,440.00
20,644.00
227,084.00
227,080.00
m3
kg
HO
HO
HO
HO
4,290,000.00
24,000.00
40,000.00
55,000.00
70,000.00
80,000.00
171,600.00
12,000.00
40,000.00
165,000.00
21,000.00
4,000.00
413,600.00
41,360.00
454,960.00
454,960.00
m3
kg
HO
HO
HO
HO
4,290,000.00
24,000.00
40,000.00
55,000.00
70,000.00
80,000.00
171,600.00
7,200.00
32,000.00
132,000.00
16,800.00
19,200.00
378,800.00
37,880.00
416,680.00
416,680.00
1
I007
I008
I009
I010
I011
I012
I013
I014
2
3
4
5
Membuat dan memasang 1 m2 pintu dan jendela jalusi, kayu kelas I atau II
Papan Kayu
0.064
m3
Bahan
Lem kayu
0.500
kg
Pekerja
1.000
HO
Tukang Kayu
3.000
HO
Tenaga kerja
Kepala tukang
0.300
HO
Mandor
0.050
HO
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Membuat 1 m2 daun pintu kayu lapis (plywood) rangkap, rangka tertutup kayu kelas II (lebar sampai 90 cm)
Papan Kayu
0.025
m3
Paku 1 cm - 2,5 cm
0.030
kg
Bahan
Lem kayu
0.500
kg
Plywood tebal 4 mm (uk. 90X220) cm
1.000
lbr
Pekerja
0.700
HO
Tukang Kayu
2.100
HO
Tenaga kerja
Kepala tukang
0.210
HO
Mandor
0.035
HO
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Membuat 1 m2 daun plywood rangkap, rangka ekspose kayu kelas I atau II
Papan Kayu
0.0256
m3
Paku 1 cm - 2,5 cm
0.030
kg
Bahan
Lem kayu
0.500
kg
Plywood tebal 4 mm (uk. 90X220) cm
1.000
lbr
Pekerja
0.800
HO
Tukang Kayu
2.400
HO
Tenaga kerja
Kepala tukang
0.240
HO
Mandor
0.040
HO
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 jalusi kusen, kayu kelas I atau II
Papan Kayu
0.060
m3
Bahan
Paku 1 cm - 2,5 cm
0.150
kg
Pekerja
0.670
HO
Tukang Kayu
2.000
HO
Tenaga kerja
Kepala tukang
0.200
HO
Mandor
0.335
HO
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 teakwood rangkap, rangka ekspose kayu kelas I
Papan Kayu
0.025
m3
Paku 1 cm - 2,5 cm
0.030
kg
Bahan
Lem kayu
0.300
kg
Teakwood tebal 4 mm (uk. 90X220) cm
1.000
lbr
Pekerja
0.800
HO
Tukang Kayu
2.400
HO
Tenaga kerja
Kepala tukang
0.240
HO
Mandor
0.040
HO
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 teakwood rangkap lapis formika, rangka ekspose kayu kelas II
Papan Kayu
0.025
m3
Paku 1 cm - 2,5 cm
0.030
kg
Bahan
Lem kayu
0.800
kg
Teakwood tebal 4 mm (uk. 90X220) cm
1.000
lbr
Pekerja
0.850
HO
Tukang Kayu
2.550
HO
Tenaga kerja
Kepala tukang
0.255
HO
Mandor
0.043
HO
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m3 konstruksi kuda-kuda konvesional kayu kelas I, II dan III
Balok Kayu
1.100
m3
Bahan
Besi strip tebal 5 mm
15.000
kg
Paku 12 cm
5.600
kg
Pekerja
4.000
HO
Tukang Kayu
12.000
HO
Tenaga kerja
Kepala tukang
1.200
HO
Mandor
0.200
HO
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m3 konstruksi kuda-kuda ekspose kayu kelas I
Balok Kayu
1.200
m3
Bahan
Besi strip tebal 5 mm
15.000
kg
Paku 12 cm
3.000
kg
Pekerja
2.400
HO
Tukang Kayu
7.200
HO
Tenaga kerja
Kepala tukang
0.720
HO
Mandor
0.120
HO
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
7=(4x6)
4,290,000.00
24,000.00
40,000.00
55,000.00
70,000.00
80,000.00
274,560.00
12,000.00
40,000.00
165,000.00
21,000.00
4,000.00
516,560.00
51,656.00
568,216.00
568,210.00
4,290,000.00
11,000.00
24,000.00
334,000.00
40,000.00
55,000.00
70,000.00
80,000.00
107,250.00
330.00
12,000.00
334,000.00
28,000.00
115,500.00
14,700.00
2,800.00
614,580.00
61,458.00
676,038.00
676,030.00
5,940,000.00
11,000.00
24,000.00
334,000.00
40,000.00
55,000.00
70,000.00
80,000.00
152,064.00
330.00
12,000.00
334,000.00
32,000.00
132,000.00
16,800.00
3,200.00
682,394.00
68,239.40
750,633.40
750,630.00
5,940,000.00
11,000.00
40,000.00
55,000.00
70,000.00
80,000.00
356,400.00
1,650.00
26,800.00
110,000.00
14,000.00
26,800.00
535,650.00
53,565.00
589,215.00
589,210.00
5,940,000.00
11,000.00
24,000.00
94,400.00
40,000.00
55,000.00
70,000.00
80,000.00
148,500.00
330.00
7,200.00
94,400.00
32,000.00
132,000.00
16,800.00
3,200.00
434,430.00
43,443.00
477,873.00
477,870.00
4,125,000.00
11,000.00
24,000.00
94,400.00
40,000.00
55,000.00
70,000.00
80,000.00
103,125.00
330.00
19,200.00
94,400.00
34,000.00
140,250.00
17,850.00
3,440.00
412,595.00
41,259.50
453,854.50
453,850.00
4,125,000.00
10,300.00
10,000.00
40,000.00
55,000.00
70,000.00
80,000.00
4,537,500.00
154,500.00
56,000.00
160,000.00
660,000.00
84,000.00
16,000.00
5,668,000.00
566,800.00
6,234,800.00
6,234,800.00
5,940,000.00
10,300.00
10,000.00
40,000.00
55,000.00
70,000.00
80,000.00
7,128,000.00
154,500.00
30,000.00
96,000.00
396,000.00
50,400.00
9,600.00
7,864,500.00
786,450.00
8,650,950.00
8,650,950.00
Analisa SNI Hal 48
1
I015
I016
I017
I018
I019
I020
I021
I022
2
3
Memasang 1 m3 konstruksi gordeng, kayu kelas II
Balok Kayu
Bahan
Besi strip tebal 5 mm
Paku 12 cm
Pekerja
Tukang Kayu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 rangka atap genteng keramik, kayu kelas II
Balok Kayu
Bahan
Besi strip tebal 5 mm
Paku 5 -10 cm
Pekerja
Tukang Kayu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 rangka atap genteng beton, kayu kelas II
Balok Kayu
Bahan
Paku 5 -10 cm
Pekerja
Tukang Kayu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 rangka atap sirap, kayu kelas II
Balok Kayu
Bahan
Paku 5 -10 cm
Pekerja
Tukang Kayu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 rangka langit-langit (50X100) cm, kayu kelas II atau III
Balok Kayu
Bahan
Paku 7-10 cm
Pekerja
Tukang Kayu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 rangka langit-langit (60X60) cm, kayu kelas II atau III
Balok Kayu
Bahan
Paku 7-10 cm
Pekerja
Tukang Kayu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m' lisplank ukuran (3X20) cm, kayu kelas I atau II
Balok Kayu
Bahan
Paku 5-7 cm
Pekerja
Tukang Kayu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m' lisplank ukuran (3X30) cm, kayu kelas I atau II
Balok Kayu
Bahan
Paku 5-7 cm
Pekerja
Tukang Kayu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
7=(4x6)
1.100
15.000
3.000
2.400
7.200
0.720
0.120
m3
kg
kg
HO
HO
HO
HO
4,125,000.00
10,300.00
10,000.00
40,000.00
55,000.00
70,000.00
80,000.00
4,537,500.00
154,500.00
30,000.00
96,000.00
396,000.00
50,400.00
9,600.00
5,274,000.00
527,400.00
5,801,400.00
5,801,400.00
0.014
0.0036
0.250
0.100
0.100
0.010
0.005
m3
kg
kg
HO
HO
HO
HO
4,125,000.00
10,300.00
10,000.00
40,000.00
55,000.00
70,000.00
80,000.00
57,750.00
37.08
2,500.00
4,000.00
5,500.00
700.00
400.00
70,887.08
7,088.71
77,975.79
77,970.00
0.014
0.0072
0.250
0.100
0.100
0.005
m3
kg
HO
HO
HO
HO
4,125,000.00
10,000.00
40,000.00
55,000.00
70,000.00
80,000.00
57,750.00
72.00
10,000.00
5,500.00
7,000.00
400.00
80,722.00
8,072.20
88,794.20
88,790.00
0.165
0.200
0.120
0.120
0.012
0.006
m3
kg
HO
HO
HO
HO
4,125,000.00
10,000.00
40,000.00
55,000.00
70,000.00
80,000.00
680,625.00
2,000.00
4,800.00
6,600.00
840.00
480.00
695,345.00
69,534.50
764,879.50
764,870.00
0.0154
0.100
0.150
0.300
0.030
0.075
m3
kg
HO
HO
HO
HO
3,004,400.00
10,000.00
40,000.00
55,000.00
70,000.00
80,000.00
46,267.76
1,000.00
6,000.00
16,500.00
2,100.00
6,000.00
77,867.76
7,786.78
85,654.54
85,650.00
0.0163
0.250
0.200
0.300
0.030
0.010
m3
kg
HO
HO
HO
HO
3,004,400.00
10,000.00
40,000.00
55,000.00
70,000.00
80,000.00
48,971.72
2,500.00
8,000.00
16,500.00
2,100.00
800.00
78,871.72
7,887.17
86,758.89
86,750.00
0.0108
0.100
0.100
0.200
0.020
0.005
m3
kg
HO
HO
HO
HO
5,940,000.00
10,000.00
40,000.00
55,000.00
70,000.00
80,000.00
64,152.00
1,000.00
4,000.00
11,000.00
1,400.00
400.00
81,952.00
8,195.20
90,147.20
90,140.00
0.0110
0.050
0.100
0.200
0.020
0.005
m3
kg
HO
HO
HO
HO
5,940,000.00
10,000.00
40,000.00
55,000.00
70,000.00
80,000.00
65,340.00
500.00
4,000.00
11,000.00
1,400.00
400.00
82,640.00
8,264.00
90,904.00
90,900.00
1
I023
I024
I025
I026
I027
I028
J
J001
J002
2
3
Memasang 1 m2 rangka dinding pemisah (60X120) cm, kayu kelas I atau II
Balok Kayu
Bahan
Paku 5-7 cm
Pekerja
Tukang Kayu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 dinding pemisah tekwood rangkap, kayu kelas II
Balok Kayu uk. (6X12) cm
Paku 5-10 cm
Bahan
Teakwood tebal 4 mm uk.120X240 cm
Lem Kayu
Pekerja
Tukang Kayu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 dinding pemisah plywood rangkap, kayu kelas II
Balok Kayu uk. (6X12) cm
Paku 5-10 cm
Bahan
Plywood tebal 4 mm uk.120X240 cm
Lem Kayu
Pekerja
Tukang Kayu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 dinding lambriziring papan kayu kayu kelas I
Papan Kayu
Bahan
Paku 5-10 cm
Paku skrup
Pekerja
Tukang Kayu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 dinding lambriziring dari plywood ukuran (120 X240) cm
Plywood tebal 4 mm
Bahan
Paku 1 - 2,5 cm
Pekerja
Tukang Kayu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 dinding bilik, rangka kayu kelas III atau IV
Bilik bambu
Kaso-kaso (5-7) cm
Bahan
Paku
List kayu 2/4
Pekerja
Tukang Kayu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
PEKERJAAN BESI DAN ALUMINIUM (SNI 7393:2008)
Memasang 1 kg besi profil
Bahan
Besi profil
Pekerja
Tukang las konstruksi
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 kg rangka kuda-kuda baja IWF
Bahan
Besi baja IWF
Pekerja
Tukang las konstruksi
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
7=(4x6)
0.028
0.150
0.150
0.450
0.045
0.008
m3
kg
HO
HO
HO
HO
5,940,000.00
10,000.00
40,000.00
55,000.00
70,000.00
80,000.00
166,320.00
1,500.00
6,000.00
24,750.00
3,150.00
640.00
202,360.00
20,236.00
222,596.00
222,590.00
0.028
0.150
0.860
0.560
0.200
0.600
0.060
0.010
m3
kg
lbr
kg
HO
HO
HO
HO
4,125,000.00
10,000.00
139,700.00
24,000.00
40,000.00
55,000.00
70,000.00
80,000.00
115,500.00
1,500.00
120,142.00
13,440.00
8,000.00
33,000.00
4,200.00
800.00
296,582.00
29,658.20
326,240.20
326,240.00
0.028
0.150
0.860
0.560
0.200
0.600
0.060
0.010
m3
kg
lbr
kg
HO
HO
HO
HO
4,125,000.00
10,000.00
334,000.00
24,000.00
40,000.00
55,000.00
70,000.00
80,000.00
115,500.00
1,500.00
287,240.00
13,440.00
8,000.00
33,000.00
4,200.00
800.00
463,680.00
46,368.00
510,048.00
510,040.00
0.007
0.100
0.150
0.600
1.800
0.180
0.030
m3
kg
kg
HO
HO
HO
HO
5,940,000.00
10,000.00
13,650.00
40,000.00
55,000.00
70,000.00
80,000.00
41,580.00
1,000.00
2,047.50
24,000.00
99,000.00
12,600.00
2,400.00
182,627.50
18,262.75
200,890.25
200,890.00
0.400
0.050
0.025
0.075
0.008
0.001
lbr
kg
HO
HO
HO
HO
334,000.00
11,000.00
40,000.00
55,000.00
70,000.00
80,000.00
133,600.00
550.00
1,000.00
4,125.00
560.00
80.00
139,915.00
13,991.50
153,906.50
153,900.00
1.500
0.014
0.012
0.003
0.100
0.050
0.005
0.005
m2
m3
kg
m3
HO
HO
HO
HO
15,400.00
3,004,400.00
10,000.00
3,700.00
40,000.00
55,000.00
70,000.00
80,000.00
23,100.00
42,061.60
120.00
11.10
4,000.00
2,750.00
350.00
400.00
72,792.70
7,279.27
80,071.97
80,070.00
1.150
0.060
0.060
0.006
0.003
kg
HO
HO
HO
HO
10,300.00
40,000.00
60,000.00
75,000.00
80,000.00
11,845.00
2,400.00
3,600.00
450.00
240.00
18,535.00
1,853.50
20,388.50
20,380.00
1.150
0.060
0.060
0.006
0.003
kg
HO
HO
HO
HO
11,000.00
40,000.00
60,000.00
75,000.00
80,000.00
12,650.00
2,400.00
3,600.00
450.00
240.00
19,340.00
1,934.00
21,274.00
21,270.00
1
J003
2
Mengerjakan 100 kg pekerjaan perakitan
Bahan
Tenaga kerja
J004
J005
J006
J007
J008
J009
J010
3
Solar
Minyak pelumas
Pekerja
Tukang las konstruksi
Kepala tukang
Mandor
Sewa alat
Alat
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Membuat 1 m2 pintu besi plat baja tebal 2 mm rangkap, rangka baja siku
Besi siku L 30.30.3
Bahan
Besi plat baja
Kawat las
Pekerja
Tukang las konstruksi
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Mengerjakan 10 cm pengelasan dengan las listrik
Kawat las listrik
Bahan
Solar
Minyak pelumas
Pekerja
Tukang las konstruksi
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Membuat 1 m2 rangka jendela besi scuare tube (25 x 5) cm
Besi scuare tube
Bahan
Besi lis kaca (1 x 1) cm
Pintu gulung besi
Pekerja
Tukang las biasa
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 pintu rolling door besi
Bahan
Pintu gulung besi
Pekerja
Tukang las biasa
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 pintu lipat (Folding door) bahan plastik/PVC
Bahan
Pintu lipat
Pekerja
Tukang
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 sunscreen alluminium
Bahan
Sunscreen alluminium
Pekerja
Tukang
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 rolling door alluminium
Bahan
Rolling door alluminium
Pekerja
Tukang
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
7=(4x6)
1.000
0.100
0.100
0.100
0.001
0.005
0.800
ltr
ltr
HO
HO
HO
HO
jam
5,500.00
36,300.00
40,000.00
60,000.00
75,000.00
80,000.00
19,605.00
5,500.00
3,630.00
4,000.00
6,000.00
75.00
400.00
15,684.00
26,159.00
2,615.90
28,774.90
28,770.00
15.000
32.800
0.050
1.050
1.050
0.105
0.052
kg
kg
kg
HO
HO
HO
HO
11,000.00
11,100.00
18,400.00
40,000.00
60,000.00
75,000.00
80,000.00
165,000.00
364,080.00
920.00
42,000.00
63,000.00
7,875.00
4,160.00
647,035.00
64,703.50
711,738.50
711,730.00
0.400
0.300
0.040
0.040
0.002
0.002
0.170
kg
ltr
ltr
HO
HO
HO
HO
18,400.00
5,500.00
36,300.00
40,000.00
60,000.00
75,000.00
80,000.00
7,360.00
1,650.00
1,452.00
1,600.00
120.00
150.00
13,600.00
16,922.00
1,692.20
18,614.20
18,610.00
4.760
4.522
20.000
0.650
0.650
0.065
0.032
m'
m'
cm
HO
HO
HO
HO
22,000.00
20,000.00
4,500.00
40,000.00
60,000.00
75,000.00
80,000.00
104,720.00
90,440.00
90,000.00
26,000.00
39,000.00
4,875.00
2,560.00
162,435.00
16,243.50
178,678.50
178,670.00
1.000
1.200
1.200
0.120
0.006
m2
HO
HO
HO
HO
4,500.00
40,000.00
60,000.00
75,000.00
80,000.00
4,500.00
48,000.00
72,000.00
9,000.00
480.00
133,980.00
13,398.00
147,378.00
147,370.00
1.000
0.440
0.440
0.044
0.220
m2
HO
HO
HO
HO
450,000.00
40,000.00
60,000.00
75,000.00
80,000.00
450,000.00
17,600.00
26,400.00
3,300.00
17,600.00
514,900.00
51,490.00
566,390.00
566,390.00
1.000
0.088
0.800
0.080
0.004
m2
HO
HO
HO
HO
350,000.00
40,000.00
60,000.00
75,000.00
80,000.00
350,000.00
3,520.00
48,000.00
6,000.00
320.00
407,840.00
40,784.00
448,624.00
448,620.00
1.000
1.000
1.000
0.100
0.050
m2
HO
HO
HO
HO
600,000.00
40,000.00
60,000.00
75,000.00
80,000.00
600,000.00
40,000.00
60,000.00
7,500.00
4,000.00
711,500.00
71,150.00
782,650.00
782,650.00
1
J011
2
Memasang 1 m kusen pintu alluminium
Bahan
Tenaga kerja
J012
J013
J014
J015
J016
J017
J018
3
Profil alluminium
Skrup fixer
Sealant
Pekerja
Tukang khusus alluminium
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 pintu alluminium strip lebar 8 cm
Profil alluminium
Bahan
Alluminium strip
Pekerja
Tukang khusus alluminium
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 pintu kaca rangka alluminium
Pintu alluminium
Bahan
Profil kaca
Sealant
Pekerja
Tukang khusus alluminium
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 venetions blinds dan Vertical blinds
Bahan
Venetions blinds dan vertical blinds (tirai)
Pekerja
Tukang
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 terali besi strip (2 x 3) mm
Besi strip
Bahan
Pengelasan
Pekerja
Tukang las
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 kawat nyamuk
Kawat nyamuk
Bahan
Pengelasan
Baja strip (0,2X2)cm
Pekerja
Tukang las
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 jendela nako & tralis
Jendela nako (rangka + kaca 5 mm)
Bahan
Paku skrup 1 cm 2,5 cm
Besi strip
Pekerja
Tukang
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m talang datar/ jurai seng bjls 28 lebar 90 cm
Seng plat
Bahan
Paku 1 cm 2,5 cm
Papan kayu kelas II atau III
Pekerja
Tukang
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
7=(4x6)
1.100
2.000
0.060
0.043
0.043
0.0043
0.0021
m'
bh
tube
HO
HO
HO
HO
85,000.00
3,000.00
25,000.00
40,000.00
60,000.00
75,000.00
80,000.00
93,500.00
6,000.00
1,500.00
1,720.00
2,580.00
322.50
168.00
105,790.50
10,579.05
116,369.55
116,360.00
4.400
14.600
0.085
0.085
0.0085
0.0042
m'
m'
HO
HO
HO
HO
85,000.00
40,000.00
40,000.00
60,000.00
75,000.00
80,000.00
374,000.00
584,000.00
3,400.00
5,100.00
637.50
336.00
593,473.50
59,347.35
652,820.85
652,820.00
4.400
4.500
0.270
0.085
0.085
0.009
0.005
m'
m'
tube
HO
HO
HO
HO
42,909.09
4,500.00
25,000.00
40,000.00
60,000.00
75,000.00
80,000.00
188,800.00
20,250.00
6,750.00
3,400.00
5,100.00
675.00
400.00
225,375.00
22,537.50
247,912.50
247,910.00
1.000
0.350
0.350
0.035
0.018
m2
HO
HO
HO
HO
275,000.00
40,000.00
60,000.00
75,000.00
80,000.00
275,000.00
14,000.00
21,000.00
2,625.00
1,440.00
314,065.00
31,406.50
345,471.50
345,470.00
6.177
27.080
1.670
1.670
0.167
0.083
kg
cm
HO
HO
HO
HO
10,300.00
1,692.20
40,000.00
60,000.00
75,000.00
80,000.00
1.100
11.110
1.716
0.100
0.100
0.010
0.005
m2
cm
kg
HO
HO
HO
HO
27,000.00
1,692.20
10,300.00
40,000.00
60,000.00
75,000.00
80,000.00
29,700.00
18,800.34
17,674.80
4,000.00
6,000.00
750.00
400.00
77,325.14
7,732.51
85,057.66
85,050.00
1.100
10.000
7.000
0.200
0.200
0.020
0.001
m2
bh
m'
HO
HO
HO
HO
24,000.00
190.00
4,733.33
40,000.00
60,000.00
75,000.00
80,000.00
26,400.00
1,900.00
33,133.33
8,000.00
12,000.00
1,500.00
80.00
83,013.33
8,301.33
91,314.67
91,310.00
1.050
0.015
0.019
0.200
0.100
0.250
0.010
m'
kg
m3
HO
HO
HO
HO
25,888.89
11,000.00
2,400,000.00
40,000.00
60,000.00
75,000.00
80,000.00
27,183.33
165.00
45,600.00
8,000.00
6,000.00
18,750.00
800.00
106,498.33
10,649.83
117,148.17
117,140.00
45,824.78
66,800.00
100,200.00
12,525.00
6,640.00
231,989.78
23,198.98
255,188.75
255,180.00
1
J019
J020
2
3
Memasang 1 m talang lingkaran D-15 cm, seng plat bjls 30 lebar 45 cm
Seng plat
Bahan
Paku 1 cm 2,5 cm
Besi strip
Pekerja
Tukang
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
K
K001
K002
K003
K004
K005
K006
1.050
0.010
0.500
0.150
0.300
0.030
0.008
7=(4x6)
m
kg
kg
HO
HO
HO
HO
12,944.44
11,000.00
10,300.00
40,000.00
60,000.00
75,000.00
80,000.00
13,591.67
110.00
5,150.00
6,000.00
18,000.00
2,250.00
640.00
45,741.67
4,574.17
50,315.83
50,310.00
m2
176,000.00
176,000.00
176,000.00
17,600.00
193,600.00
193,600.00
m2
195,000.00
195,000.00
195,000.00
19,500.00
214,500.00
214,500.00
m2
kg
HO
HO
HO
HO
18,600.00
11,000.00
40,000.00
55,000.00
70,000.00
80,000.00
20,460.00
110.00
1,200.00
3,850.00
490.00
320.00
26,430.00
2,643.00
29,073.00
29,070.00
lbr
kg
HO
HO
HO
HO
15,437.50
11,000.00
40,000.00
55,000.00
70,000.00
80,000.00
185,250.00
550.00
4,800.00
6,600.00
840.00
480.00
198,520.00
19,852.00
218,372.00
218,370.00
lbr
kg
HO
HO
HO
HO
30,875.00
11,000.00
40,000.00
55,000.00
70,000.00
80,000.00
179,075.00
550.00
4,000.00
5,500.00
700.00
400.00
190,225.00
19,022.50
209,247.50
209,240.00
lbr
kg
HO
HO
HO
HO
123,500.00
11,000.00
40,000.00
55,000.00
70,000.00
80,000.00
185,250.00
550.00
4,000.00
5,500.00
700.00
400.00
196,400.00
19,640.00
216,040.00
216,040.00
lbr
kg
HO
HO
HO
HO
61,000.00
11,000.00
40,000.00
55,000.00
70,000.00
80,000.00
22,875.00
330.00
4,000.00
5,500.00
700.00
400.00
33,805.00
3,380.50
37,185.50
37,180.00
m3
kg
HO
HO
HO
HO
4,290,000.00
11,000.00
40,000.00
55,000.00
70,000.00
80,000.00
64,350.00
110.00
3,200.00
4,400.00
5,600.00
3,200.00
80,860.00
8,086.00
88,946.00
88,940.00
Memasang 1 M2 atap baja ringan Setara Maxitop Bluescope lysaght bentang max. 8m + rangka dan reng
1.000
Memasang 1 M2 atap baja ringan Setara Smarttruss Bluescope lysaght bentang lebih dari 8m + rangka dan reng
1
K007
K008
K009
K010
K011
K012
K013
K014
2
3
Memasang 1 m2 langit-langit gypsum board ukuran (1200x2400x9) mm
Gypsum board
Bahan
Paku skrup
Pekerja
Tukang kayu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m list plafond gypsum profil
List gypsum profil
Bahan
Tepung gypsum
Pekerja
Tukang kayu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 langit-langit GRC board ukuran (1200x2400x4) mm
Gypsum board
Bahan
Paku skrup
Pekerja
Tukang kayu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 langit-langit GRC board ukuran (1200x2400x6) mm
Gypsum board
Bahan
Paku skrup
Pekerja
Tukang kayu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 langit-langit GRC board ukuran (1200x2400x9) mm
Gypsum board
Bahan
Paku skrup
Pekerja
Tukang kayu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 langit-langit akustik ukuran (60 x 120) cm + rangka alluminium
Profil Alluminium "T"
Kawat diameter 4 mm
Bahan
Ramset
Akustik 60 cm x 120 cm
Pekerja
Tukang besi
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m list langit-langit kayu profil
List kayu profil
Bahan
Paku
Pekerja
Tukang kayu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 rangka langit-langit uk. 1 m x 1 m, kayu kelas II
Kayu gergajian kelas II, balok
Bahan
Paku berbagai ukuran (4 - 7 cm)
Pekerja
Tukang kayu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
7=(4x6)
0.364
0.110
0.100
0.050
0.005
0.005
lbr
kg
HO
HO
HO
HO
69,200.00
13,650.00
40,000.00
55,000.00
70,000.00
80,000.00
25,188.80
1,501.50
4,000.00
2,750.00
350.00
400.00
34,190.30
3,419.03
37,609.33
37,600.00
1.050
0.150
0.060
0.060
0.006
0.003
m'
kg
HO
HO
HO
HO
4,500.00
36.50
40,000.00
55,000.00
70,000.00
80,000.00
4,725.00
5.48
2,400.00
3,300.00
420.00
240.00
11,090.48
1,109.05
12,199.52
12,190.00
0.364
0.110
0.100
0.050
0.005
0.005
lbr
kg
HO
HO
HO
HO
50,000.00
13,650.00
40,000.00
55,000.00
70,000.00
80,000.00
18,200.00
1,501.50
4,000.00
2,750.00
350.00
400.00
27,201.50
2,720.15
29,921.65
29,920.00
0.364
0.110
0.100
0.050
0.005
0.005
lbr
kg
HO
HO
HO
HO
90,000.00
13,650.00
40,000.00
55,000.00
70,000.00
80,000.00
32,760.00
1,501.50
4,000.00
2,750.00
350.00
400.00
41,761.50
4,176.15
45,937.65
45,930.00
0.364
0.110
0.100
0.050
0.005
0.005
lbr
kg
HO
HO
HO
HO
125,000.00
13,650.00
40,000.00
55,000.00
70,000.00
80,000.00
45,500.00
1,501.50
4,000.00
2,750.00
350.00
400.00
54,501.50
5,450.15
59,951.65
59,950.00
3.600
0.150
1.050
1.500
0.500
0.500
0.050
0.025
m'
kg
bh
lbr
HO
HO
HO
HO
85,000.00
19,800.00
9,800.00
123,500.00
40,000.00
55,000.00
70,000.00
80,000.00
306,000.00
2,970.00
10,290.00
185,250.00
20,000.00
27,500.00
3,500.00
2,000.00
557,510.00
55,751.00
613,261.00
613,260.00
1.050
0.010
0.050
0.050
0.005
0.003
m'
kg
HO
HO
HO
HO
12,400.00
10,000.00
40,000.00
55,000.00
70,000.00
80,000.00
13,020.00
100.00
2,000.00
2,750.00
350.00
240.00
18,460.00
1,846.00
20,306.00
20,300.00
0.0120
0.1000
0.1500
0.2500
0.0250
0.0750
m
kg
HO
HO
HO
HO
3,004,400.00
10,000.00
40,000.00
55,000.00
70,000.00
80,000.00
36,052.80
1,000.00
6,000.00
13,750.00
1,750.00
6,000.00
64,552.80
6,455.28
71,008.08
71,000.00
1
K015
K016
K017
K018
K019
K020
K021
K022
2
3
Memasang 1 m2 rangka langit-langit uk. 30 cm x 60 cm, kayu kelas II
Kayu gergajian kelas II, balok
Bahan
Paku berbagai ukuran (4 - 7 cm)
Pekerja
Tukang kayu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 rangka langit-langit uk. 30 cm x 30 cm, kayu kelas II
Kayu gergajian kelas II, balok
Bahan
Paku berbagai ukuran (4 - 7 cm)
Pekerja
Tukang kayu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 rangka langit-langit uk. 60 cm x 60 cm, besi hollow
Besi hollow 40x40 mm
Bahan
Besi hollow 20x20 mm
Paku skrup
Pekerja
Tukang kayu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m1 lisplank uk. 3 cm x 20 cm, kayu kamper Samarinda
Kayu papan kamper
Bahan
Paku berbagai ukuran (4 - 7 cm)
Pekerja
Tukang kayu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
7=(4x6)
0.0230
0.1500
0.2000
0.3000
0.0300
0.0100
m
kg
HO
HO
HO
HO
3,004,400.00
10,000.00
40,000.00
55,000.00
70,000.00
80,000.00
69,101.20
1,500.00
8,000.00
16,500.00
2,100.00
800.00
98,001.20
9,800.12
107,801.32
107,800.00
0.0270
0.2000
0.2500
0.3500
0.0350
0.0125
m'
kg
HO
HO
HO
HO
3,004,400.00
10,000.00
40,000.00
55,000.00
70,000.00
80,000.00
81,118.80
2,000.00
10,000.00
19,250.00
2,450.00
1,000.00
115,818.80
11,581.88
127,400.68
127,400.00
1.6500
2.3000
30.0000
0.1500
0.2500
0.0250
0.0075
m'
m'
bh
HO
HO
HO
HO
20,000.00
25,000.00
190.00
40,000.00
55,000.00
70,000.00
80,000.00
33,000.00
57,500.00
5,700.00
6,000.00
13,750.00
1,750.00
600.00
118,300.00
11,830.00
130,130.00
130,130.00
0.0072
0.0500
0.1000
0.2000
0.0200
0.0050
m
kg
HO
HO
HO
HO
5,940,000.00
10,000.00
40,000.00
55,000.00
70,000.00
80,000.00
42,768.00
500.00
4,000.00
11,000.00
1,400.00
400.00
60,068.00
6,006.80
66,074.80
66,070.00
0.0110
0.0500
0.1100
0.2200
0.0220
0.0050
m
kg
HO
HO
HO
HO
5,940,000.00
10,000.00
40,000.00
55,000.00
70,000.00
80,000.00
65,340.00
500.00
4,400.00
12,100.00
1,540.00
400.00
84,280.00
8,428.00
92,708.00
92,700.00
0.0110
0.0500
0.1100
0.2200
0.0220
0.0050
m
kg
HO
HO
HO
HO
5,940,000.00
10,000.00
40,000.00
55,000.00
70,000.00
80,000.00
65,340.00
500.00
4,400.00
12,100.00
1,540.00
400.00
84,280.00
8,428.00
92,708.00
92,700.00
0.0760
0.0500
0.1100
0.2200
0.0220
0.0050
lbr
kg
HO
HO
HO
HO
50,000.00
11,000.00
40,000.00
55,000.00
70,000.00
80,000.00
3,800.00
550.00
4,400.00
12,100.00
1,540.00
400.00
22,790.00
2,279.00
25,069.00
25,060.00
0.0760
0.0500
0.1100
0.2200
0.0220
0.0050
lbr
kg
HO
HO
HO
HO
90,000.00
11,000.00
40,000.00
55,000.00
70,000.00
80,000.00
6,840.00
550.00
4,400.00
12,100.00
1,540.00
400.00
25,830.00
2,583.00
28,413.00
28,410.00
1
K023
K024
L
L001
L002
L003
L004
L005
L006
L007
2
3
Memasang 1 m1 lisplank GRC uk. 4 mm x 30 cm
GRC 4 mm
Bahan
Paku berbagai ukuran (1 - 3 cm)
Pekerja
Tukang kayu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m1 lisplank GRC uk. 6 mm x 30 cm
GRC 4 mm
Bahan
Paku berbagai ukuran (1 - 3 cm)
Pekerja
Tukang kayu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
PEKERJAAN PENUTUP ATAP
Memasang 1 m2 penutup atap Sirap (4 lapis) + rangka atap
Kayu kaso 5/7 kamper Banjar
Reng kayu 2/3 kamper Banjar
Bahan
Atap sirap 4 lapis
Paku 5 s.d. 7 cm
Pekerja
Tukang kayu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 penutup atap genteng plentong
Bahan
Atap Genteng Plentong pres Bakar KW 1
Pekerja
Tukang kayu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 penutup atap genteng kodok
Bahan
Atap Genteng Kodok
Pekerja
Tukang kayu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 penutup atap genteng beton
Bahan
Atap Genteng Beton
Pekerja
Tukang kayu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 penutup atap genteng murando glazur
Bahan
Atap Genteng Murando glazur
Pekerja
Tukang kayu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 penutup atap genteng murando natural
Bahan
Atap Genteng Murando glazur
Pekerja
Tukang kayu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 penutup atap genteng metal (Rainbow Roof)
Bahan
Atap Genteng Metal
Pekerja
Tukang kayu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
7=(4x6)
0.1150
0.0500
0.1100
0.2200
0.0220
0.0050
lbr
kg
HO
HO
HO
HO
50,000.00
11,000.00
40,000.00
55,000.00
70,000.00
80,000.00
5,750.00
550.00
4,400.00
12,100.00
1,540.00
400.00
24,740.00
2,474.00
27,214.00
27,210.00
0.1150
0.0500
0.1100
0.2200
0.0220
0.0050
lbr
kg
HO
HO
HO
HO
90,000.00
11,000.00
40,000.00
55,000.00
70,000.00
80,000.00
10,350.00
550.00
4,400.00
12,100.00
1,540.00
400.00
29,340.00
2,934.00
32,274.00
32,270.00
0.0110
4.0000
80.0000
0.2500
0.1500
0.1500
0.0100
0.0050
m
m1
bh
kg
org
org
org
org
4,125,000.00
3,000.00
1,100.00
10,000.00
40,000.00
55,000.00
70,000.00
80,000.00
45,375.00
12,000.00
88,000.00
2,500.00
6,000.00
8,250.00
700.00
400.00
163,225.00
16,322.50
179,547.50
179,540.00
25.000
0.060
0.006
0.120
0.006
bh
org
org
org
org
1,300.00
40,000.00
55,000.00
70,000.00
80,000.00
32,500.00
2,400.00
330.00
8,400.00
480.00
44,110.00
4,411.00
48,521.00
48,520.00
25.000
0.060
0.006
0.120
0.006
bh
org
org
org
org
1,400.00
40,000.00
55,000.00
70,000.00
80,000.00
35,000.00
2,400.00
330.00
8,400.00
480.00
46,610.00
4,661.00
51,271.00
51,270.00
14.500
0.010
0.010
0.200
0.010
bh
org
org
org
org
6,524.14
40,000.00
55,000.00
70,000.00
80,000.00
94,600.00
400.00
550.00
14,000.00
800.00
110,350.00
11,035.00
121,385.00
121,380.00
18.000
0.010
0.010
0.200
0.010
bh
org
org
org
org
5,900.00
40,000.00
55,000.00
70,000.00
80,000.00
106,200.00
400.00
550.00
14,000.00
800.00
121,950.00
12,195.00
134,145.00
134,140.00
20.000
0.010
0.010
0.200
0.010
bh
org
org
org
org
3,200.00
40,000.00
55,000.00
70,000.00
80,000.00
64,000.00
400.00
550.00
14,000.00
800.00
79,750.00
7,975.00
87,725.00
87,720.00
1.100
0.010
0.010
0.200
0.010
m2
org
org
org
org
237,900.00
40,000.00
55,000.00
70,000.00
80,000.00
261,690.00
400.00
550.00
14,000.00
800.00
277,440.00
27,744.00
305,184.00
305,180.00
1
L008
L009
L010
L011
L012
L013
L014
L015
2
3
Memasang 1 m2 penutup atap genteng metal (Hana)
Bahan
Atap Genteng Metal
Pekerja
Tukang kayu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
7=(4x6)
1.100
0.010
0.010
0.200
0.010
m2
org
org
org
org
171,400.00
40,000.00
55,000.00
70,000.00
80,000.00
188,540.00
400.00
550.00
14,000.00
800.00
204,290.00
20,429.00
224,719.00
224,710.00
0.5000
2.0000
0.1400
0.0670
0.0070
0.0070
lbr
bh
org
org
org
org
76,400.00
800.00
40,000.00
55,000.00
70,000.00
80,000.00
38,200.00
1,600.00
5,600.00
3,685.00
490.00
560.00
50,135.00
5,013.50
55,148.50
55,140.00
0.5000
4.0000
0.1500
0.1500
0.0100
0.0050
lbr
bh
org
org
org
org
50,900.00
800.00
40,000.00
55,000.00
70,000.00
80,000.00
25,450.00
3,200.00
6,000.00
8,250.00
700.00
400.00
44,000.00
4,400.00
48,400.00
48,400.00
4.0000
6.5200
0.2100
0.1500
0.2000
0.0100
0.0050
bh
kg
m3
org
org
org
org
6,300.00
1,260.00
180,000.00
40,000.00
55,000.00
70,000.00
80,000.00
25,200.00
8,215.20
37,800.00
6,000.00
11,000.00
700.00
400.00
89,315.20
8,931.52
98,246.72
98,240.00
4.0000
6.5200
0.2100
0.1500
0.2000
0.0100
0.0050
bh
kg
m3
org
org
org
org
4,000.00
1,260.00
180,000.00
40,000.00
55,000.00
70,000.00
80,000.00
16,000.00
8,215.20
37,800.00
6,000.00
11,000.00
700.00
400.00
80,115.20
8,011.52
88,126.72
88,120.00
3.0000
6.5200
0.2100
0.1500
0.2000
0.0100
0.0050
bh
kg
m3
org
org
org
org
9,900.00
1,260.00
180,000.00
40,000.00
55,000.00
70,000.00
80,000.00
29,700.00
8,215.20
37,800.00
6,000.00
11,000.00
700.00
400.00
93,815.20
9,381.52
103,196.72
103,190.00
5.0000
6.5200
0.2100
0.1500
0.2000
0.0100
0.0050
bh
kg
m3
org
org
org
org
8,300.00
1,260.00
180,000.00
40,000.00
55,000.00
70,000.00
80,000.00
41,500.00
8,215.20
37,800.00
6,000.00
11,000.00
700.00
400.00
105,615.20
10,561.52
116,176.72
116,170.00
5.0000
6.5200
0.2100
0.1500
0.2000
0.0100
0.0050
bh
kg
m3
org
org
org
org
6,300.00
1,260.00
180,000.00
40,000.00
55,000.00
70,000.00
80,000.00
31,500.00
8,215.20
37,800.00
6,000.00
11,000.00
700.00
400.00
95,615.20
9,561.52
105,176.72
105,170.00
1
L016
L017
L018
L019
M
M001
M002
N
N001
N002
N003
2
3
Memasang 1 m' bubungan atap genteng metal (Rainbow Roof)
Bahan
Bubungan Genteng metal
Paku sekrup 3,5"/Kait
Pekerja
Tukang kayu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m' bubungan atap genteng metal (Hana)
Bahan
Bubungan Genteng metal
Paku sekrup 3,5"/Kait
Pekerja
Tukang kayu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m' bubungan atap genteng asbes gelombang
Bubungan Genteng Asbes gelombang
Bahan
Paku sekrup 3,5"/Kait
Pekerja
Tukang kayu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m' bubungan atap genteng seng gelombang
Bubungan Genteng seng gelombang
Bahan
Paku sekrup 3,5"/Kait
Pekerja
Tukang kayu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
PEKERJAAN PAGAR
Memasang 1 m2 pagar depan tralis (standar)
Bouplank
Galian Tanah
Urugan Pasir 10 cm'
Pasang Aanstamping
Pekerjaan
Pas.Batu Belah 1 pc : 4 psr
Plesteran & Acian 1 pc : 4 psr
Beton Tulang ( 100 kg/m3 )
Pagar Tralis
Pengecatan
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 pagar samping/belakang
Galian Tanah
Urugan Pasir 10 cm'
Pasang Aanstamping
Pas.Batu Belah 1 pc : 4 psr
Pekerjaan
Pas.bata + plesteran 1 : 4
Beton Tulang ( 100 kg/m3 )
Besi Siku
Kawat Duri
Pengecatan
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
PEKERJAAN KUNCI/ALAT GANTUNG & KACA
Memasang 1 buah kunci tanam 2 Slaag Ancor Asli
Bahan
Kunci 2 Slaag Ancor Asli
Tenaga kerja
Tukang kayu
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 buah kunci tanam 2 Slaag ISO
Bahan
Kunci 2 Slaag ISO
Tenaga kerja
Tukang kayu
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
7=(4x6)
1.0500
4.0000
0.1500
0.2000
0.0100
0.0050
m'
bh
org
org
org
org
154,800.00
800.00
40,000.00
55,000.00
70,000.00
80,000.00
162,540.00
3,200.00
6,000.00
11,000.00
700.00
400.00
183,840.00
18,384.00
202,224.00
202,220.00
0.2500
2.0000
0.1500
0.2000
0.0100
0.0050
m'
bh
org
org
org
org
83,200.00
800.00
40,000.00
55,000.00
70,000.00
80,000.00
20,800.00
1,600.00
6,000.00
11,000.00
700.00
400.00
40,500.00
4,050.00
44,550.00
44,550.00
0.2500
2.0000
0.1400
0.0670
0.0070
0.0070
m'
bh
org
org
org
org
76,400.00
800.00
40,000.00
55,000.00
70,000.00
80,000.00
19,100.00
1,600.00
5,600.00
3,685.00
490.00
560.00
31,035.00
3,103.50
34,138.50
34,130.00
0.2500
2.0000
0.1400
0.0670
0.0070
0.0070
m'
bh
org
org
org
org
50,900.00
800.00
40,000.00
55,000.00
70,000.00
80,000.00
12,725.00
1,600.00
5,600.00
3,685.00
490.00
560.00
24,660.00
2,466.00
27,126.00
27,120.00
1.0000
0.4500
0.0800
0.1200
0.2000
0.4100
0.0563
1.5000
1.0000
m1
m
m
m
m
m
m
m'
m
35,139.72
32,000.00
198,800.00
293,460.00
579,480.00
53,777.40
650,554.64
130,700.00
41,362.00
35,139.72
14,400.00
15,904.00
35,215.20
115,896.00
22,048.73
36,593.70
196,050.00
41,362.00
512,609.35
51,260.94
563,870.29
563,870.00
0.4500
0.0800
0.1200
0.2000
1.8000
0.0563
1.0000
3.0000
1.0000
m
m
m
m
m
m
kg
m1
m
32,000.00
198,800.00
293,460.00
579,480.00
130,033.20
650,554.64
11,000.00
3,000.00
41,362.00
14,400.00
15,904.00
35,215.20
115,896.00
234,059.76
36,593.70
11,000.00
9,000.00
41,362.00
513,430.66
51,343.07
564,773.72
564,770.00
1.000
0.5000
bh
org
129,800.00
55,000.00
129,800.00
27,500.00
157,300.00
15,730.00
173,030.00
173,030.00
1.000
0.5000
bh
org
181,500.00
55,000.00
181,500.00
27,500.00
209,000.00
20,900.00
229,900.00
229,900.00
1.000
0.5000
bh
org
82,800.00
55,000.00
82,800.00
27,500.00
110,300.00
11,030.00
121,330.00
121,330.00
Analisa SNI Hal 58
1
N004
N005
N006
N007
N008
N009
N010
N011
N012
N013
N014
N015
2
3
Memasang 1 buah kunci tanam 2 Slaag ROYAL
Bahan
Kunci 2 Slaag ROYAL
Tenaga kerja
Tukang kayu
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 buah kunci tanam 2 Slaag Silinder SEIS Asli type 210 s/d type 226
Bahan
Kunci 2 Slaag Silinder SEIS
Tenaga kerja
Tukang kayu
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 buah kunci tanam 2 Slaag Silinder Utama Standard
Bahan
Kunci 2 Slaag Silinder Utama Standard
Tenaga kerja
Tukang kayu
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 buah Kunci Gembok Besar
Bahan
Kunci Gembok Besar
Tenaga kerja
Tukang kayu
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 buah Kunci KM Bulat ALFA
Bahan
Kunci KM Bulat ALFA
Tenaga kerja
Tukang kayu
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 buah Kunci KM Bulat Kualitas Biasa
Bahan
Kunci KM Bulat Kualitas Biasa
Tenaga kerja
Tukang kayu
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 buah Kunci Silinder ALFA untuk Pintu Alumunium
Bahan
Kunci Silinder ALFA
Tenaga kerja
Tukang kayu
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 buah Engsel Pintu Unilon Standard
Bahan
Engsel Pintu Unilon Standard
Tenaga kerja
Tukang kayu
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 buah Engsel Jendela Unilon
Bahan
Engsel Jendela Unilon
Tenaga kerja
Tukang kayu
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 Kaca Polos tebal 3 mm
Bahan
Kaca Polos tebal 3 mm
Pekerja
Tenaga kerja
Tukang kayu
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 Kaca Polos tebal 5 mm
Bahan
Kaca Polos tebal 5 mm
Pekerja
Tenaga kerja
Tukang kayu
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m2 Kaca Rayband tebal 5 mm
Bahan
Kaca Polos tebal 5 mm
Pekerja
Tenaga kerja
Tukang kayu
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
7=(4x6)
1.000
0.5000
bh
org
120,600.00
55,000.00
120,600.00
27,500.00
148,100.00
14,810.00
162,910.00
162,910.00
1.000
0.5000
bh
org
267,500.00
55,000.00
267,500.00
27,500.00
295,000.00
29,500.00
324,500.00
324,500.00
1.000
0.5000
bh
org
538,700.00
55,000.00
538,700.00
27,500.00
566,200.00
56,620.00
622,820.00
622,820.00
1.000
0.5000
bh
org
65,400.00
55,000.00
65,400.00
27,500.00
92,900.00
9,290.00
102,190.00
102,190.00
1.000
0.5000
bh
org
84,300.00
55,000.00
84,300.00
27,500.00
111,800.00
11,180.00
122,980.00
122,980.00
1.000
0.5000
bh
org
43,600.00
55,000.00
43,600.00
27,500.00
71,100.00
7,110.00
78,210.00
78,210.00
1.000
0.5000
bh
org
314,400.00
55,000.00
314,400.00
27,500.00
341,900.00
34,190.00
376,090.00
376,090.00
1.000
0.1500
bh
org
17,200.00
55,000.00
17,200.00
8,250.00
25,450.00
2,545.00
27,995.00
27,990.00
1.000
0.1500
bh
org
12,000.00
55,000.00
12,000.00
8,250.00
20,250.00
2,025.00
22,275.00
22,270.00
1.000
0.1500
0.1500
bh
org
org
63,400.00
40,000.00
55,000.00
63,400.00
6,000.00
8,250.00
77,650.00
7,765.00
85,415.00
85,410.00
1.000
0.1500
0.2000
bh
org
org
93,600.00
40,000.00
55,000.00
93,600.00
6,000.00
11,000.00
110,600.00
11,060.00
121,660.00
121,660.00
1.000
0.1500
0.2000
bh
org
org
94,400.00
40,000.00
55,000.00
94,400.00
6,000.00
11,000.00
111,400.00
11,140.00
122,540.00
122,540.00
1
O
O 001
2
PEKERJAAN SANITAIR
Memasang 1 buah Wastafel
Bahan
Tenaga kerja
O 002
O 003
O 004
O 005
O 006
O 007
O 008
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 buah Bak KM Fiber 60 x 60
Bahan
Bak KM Fiber 60 x 60
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 buah Bank mandi bata merah volume 0,3 m3
Bata Merah
Bahan
PC (50 kg)
Pasir pasang
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 buah Closet Jongkok Standard Putih Poslin TOTO
Bahan
Closet Jongkok TOTO
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 buah Urinoir Lengkap TOTO Warna Standard lengkap
Urinoir Lengkap TOTO Warna Standard
Bahan
PC (50 kg)
Pasir pasang
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m' pipa galvanis 1/2"
Pipa galvanis 1/2"
Bahan
Perlengkapan (dari harga pipa)
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m' pipa galvanis 3/4"
Pipa galvanis 3/4"
Bahan
Perlengkapan (dari harga pipa)
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m' pipa galvanis 1"
Pipa galvanis 1"
Bahan
Perlengkapan (dari harga pipa)
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
7=(4x6)
1.0000
6.0000
0.0100
1.2000
1.4500
0.1500
0.1000
umit
kg
m
org
org
org
org
750,000.00
1,260.00
180,000.00
40,000.00
55,000.00
70,000.00
80,000.00
750,000.00
7,560.00
1,800.00
48,000.00
79,750.00
10,500.00
8,000.00
905,610.00
90,561.00
996,171.00
996,170.00
1.0000
2.1000
0.7500
0.0700
0.1100
bh
org
org
org
org
227,300.00
40,000.00
55,000.00
70,000.00
80,000.00
227,300.00
84,000.00
41,250.00
4,900.00
8,800.00
366,250.00
36,625.00
402,875.00
402,870.00
200.0000
144.0000
0.3000
6.0000
3.0000
0.3000
0.3000
bh
kg
m
org
org
org
org
600.00
1,260.00
180,000.00
40,000.00
55,000.00
70,000.00
80,000.00
120,000.00
181,440.00
54,000.00
240,000.00
165,000.00
21,000.00
24,000.00
805,440.00
80,544.00
885,984.00
885,980.00
1.0000
1.0000
1.5000
0.1500
0.1600
unit
org
org
org
org
217,800.00
40,000.00
55,000.00
70,000.00
80,000.00
217,800.00
40,000.00
82,500.00
10,500.00
12,800.00
363,600.00
36,360.00
399,960.00
399,960.00
1.0000
6.0000
0.0100
1.0000
1.0000
0.1000
0.1100
unit
zak
m
org
org
org
org
1,938,500.00
1,260.00
180,000.00
40,000.00
55,000.00
70,000.00
80,000.00
1,938,500.00
7,560.00
1,800.00
40,000.00
55,000.00
7,000.00
8,800.00
2,058,660.00
205,866.00
2,264,526.00
2,264,520.00
1.2000
35.0000
0.0540
0.0900
0.0090
0.0270
m'
%
Oh
Oh
Oh
Oh
18,033.33
18,033.33
40,000.00
55,000.00
70,000.00
80,000.00
21,640.00
6,311.67
2,160.00
4,950.00
630.00
2,160.00
37,851.67
3,785.17
41,636.83
41,630.00
1.2000
35.0000
0.0540
0.0900
0.0090
0.0270
m'
%
Oh
Oh
Oh
Oh
21,133.33
21,133.33
40,000.00
55,000.00
70,000.00
80,000.00
25,360.00
7,396.67
2,160.00
4,950.00
630.00
2,160.00
42,656.67
4,265.67
46,922.33
46,920.00
1.2000
35.0000
0.0540
0.0900
0.0090
0.0270
m'
%
Oh
Oh
Oh
Oh
30,750.00
30,750.00
40,000.00
55,000.00
70,000.00
80,000.00
36,900.00
10,762.50
2,160.00
4,950.00
630.00
2,160.00
57,562.50
5,756.25
63,318.75
63,310.00
1
O 009
2
Memasang 1 m' pipa galvanis 11/2"
Bahan
Tenaga kerja
O 010
Tenaga kerja
Tenaga kerja
Tenaga kerja
Tenaga kerja
Tenaga kerja
O 015
Tenaga kerja
47,800.00
47,800.00
40,000.00
55,000.00
70,000.00
80,000.00
57,360.00
16,730.00
2,160.00
4,950.00
630.00
2,160.00
83,990.00
8,399.00
92,389.00
92,380.00
1.2000
35.0000
0.0540
0.0900
0.0090
0.0270
m'
%
Oh
Oh
Oh
Oh
63,733.33
63,733.33
40,000.00
55,000.00
70,000.00
80,000.00
76,480.00
22,306.67
2,160.00
4,950.00
630.00
2,160.00
108,686.67
10,868.67
119,555.33
119,550.00
1.2000
35.0000
0.0540
0.0900
0.0090
0.0270
m'
%
Oh
Oh
Oh
Oh
159,300.00
159,300.00
40,000.00
55,000.00
70,000.00
80,000.00
191,160.00
55,755.00
2,160.00
4,950.00
630.00
2,160.00
256,815.00
25,681.50
282,496.50
282,490.00
1.2000
35.0000
0.0540
0.0900
0.0090
0.0270
m'
%
Oh
Oh
Oh
Oh
4,600.00
4,600.00
40,000.00
55,000.00
70,000.00
80,000.00
5,520.00
1,610.00
2,160.00
4,950.00
630.00
2,160.00
17,030.00
1,703.00
18,733.00
18,730.00
1.2000
35.0000
0.0540
0.0900
0.0090
0.0270
m'
%
Oh
Oh
Oh
Oh
5,600.00
5,600.00
40,000.00
55,000.00
70,000.00
80,000.00
6,720.00
1,960.00
2,160.00
4,950.00
630.00
2,160.00
18,580.00
1,858.00
20,438.00
20,430.00
1.2000
35.0000
0.0540
0.0900
0.0090
0.0270
m'
%
Oh
Oh
Oh
Oh
7,125.00
7,125.00
40,000.00
55,000.00
70,000.00
80,000.00
8,550.00
2,493.75
2,160.00
4,950.00
630.00
2,160.00
20,943.75
2,094.38
23,038.13
23,030.00
1.2000
35.0000
0.0540
0.0900
0.0090
0.0270
m'
%
Oh
Oh
Oh
Oh
13,200.00
13,200.00
40,000.00
55,000.00
70,000.00
80,000.00
15,840.00
4,620.00
2,160.00
4,950.00
630.00
2,160.00
30,360.00
3,036.00
33,396.00
33,390.00
1.2000
35.0000
0.0540
0.0900
0.0090
0.0270
m'
%
Oh
Oh
Oh
Oh
19,175.00
19,175.00
40,000.00
55,000.00
70,000.00
80,000.00
23,010.00
6,711.25
2,160.00
4,950.00
630.00
2,160.00
39,621.25
3,962.13
43,583.38
43,580.00
1.2000
35.0000
0.0540
0.0900
0.0090
0.0270
m'
%
Oh
Oh
Oh
Oh
52,875.00
52,875.00
40,000.00
55,000.00
70,000.00
80,000.00
63,450.00
18,506.25
2,160.00
4,950.00
630.00
2,160.00
91,856.25
9,185.63
101,041.88
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m' PVC tipe AW 2"
Bahan
Tenaga kerja
O 017
m'
%
Oh
Oh
Oh
Oh
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m' PVC tipe AW 11/2"
Bahan
O 016
1.2000
35.0000
0.0540
0.0900
0.0090
0.0270
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m' PVC tipe AW 1"
Bahan
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m' PVC tipe AW 4"
Bahan
Tenaga kerja
Jumlah
Overhead + Profit
Jumlah
7=(4x6)
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m' PVC tipe AW 3/4"
Bahan
O 014
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m' pipa PVC tipe AW 1/2"
Bahan
O 013
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m' pipa galvanis 4"
Bahan
O 012
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 m' pipa galvanis 2"
Bahan
O 011
1
O 018
2
Dibulatkan
Memasang 1 bh kran air 3/4" atau 1/2"
Bahan
Tenaga kerja
O 019
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 bh floor drain
Bahan
Tenaga kerja
P
P 001
Tenaga kerja
P 003
P 004
P 005
P 006
7=(4x6)
101,040.00
1.0000
0.0250
0.0100
0.1000
0.0100
0.0050
bh
bh
Oh
Oh
Oh
Oh
94,400.00
750.00
40,000.00
55,000.00
70,000.00
80,000.00
94,400.00
0.19
400.00
5,500.00
700.00
400.00
101,400.19
10,140.02
111,540.21
111,540.00
Floor drain
Pekerja
Tukang batu
Kepala tukang
Mandor
1.0000
0.0100
0.1000
0.0100
0.0050
bh
Oh
Oh
Oh
Oh
58,100.00
40,000.00
55,000.00
70,000.00
80,000.00
58,100.00
400.00
5,500.00
700.00
400.00
65,100.00
6,510.00
71,610.00
71,610.00
10.000
10.000
1.0000
0.1100
0.1100
0.0110
0.0110
m'
m'
ls
Oh
Oh
Oh
Oh
7,300.00
4,750.00
9,640.00
40,000.00
55,000.00
70,000.00
80,000.00
73,000.00
47,500.00
9,640.00
4,400.00
6,050.00
770.00
880.00
142,240.00
14,224.00
156,464.00
156,460.00
1.000
1.000
0.1100
0.1100
0.0110
0.0110
bh
ls
Oh
Oh
Oh
Oh
18,200.00
1,820.00
40,000.00
55,000.00
70,000.00
80,000.00
18,200.00
1,820.00
4,400.00
6,050.00
770.00
880.00
32,120.00
3,212.00
35,332.00
35,330.00
1.000
1.000
0.1100
0.1100
0.0110
0.0110
bh
ls
Oh
Oh
Oh
Oh
21,800.00
2,180.00
40,000.00
55,000.00
70,000.00
80,000.00
21,800.00
2,180.00
4,400.00
6,050.00
770.00
880.00
36,080.00
3,608.00
39,688.00
39,680.00
1.000
1.000
0.1100
0.1100
0.0110
0.0110
bh
ls
Oh
Oh
Oh
Oh
20,400.00
2,040.00
40,000.00
55,000.00
70,000.00
80,000.00
20,400.00
2,040.00
4,400.00
6,050.00
770.00
880.00
34,540.00
3,454.00
37,994.00
37,990.00
1.000
1.000
0.1100
0.1100
0.0110
0.0110
bh
ls
Oh
Oh
Oh
Oh
84,300.00
8,430.00
40,000.00
55,000.00
70,000.00
80,000.00
84,300.00
8,430.00
4,400.00
6,050.00
770.00
880.00
104,830.00
10,483.00
115,313.00
115,310.00
1.000
1.000
0.1100
0.1100
0.0110
0.0110
bh
ls
Oh
Oh
Oh
Oh
8,300.00
830.00
40,000.00
55,000.00
70,000.00
80,000.00
8,300.00
830.00
4,400.00
6,050.00
770.00
880.00
21,230.00
2,123.00
23,353.00
23,350.00
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
PEKERJAAN ELEKTRIKAL
Memasang 1 Titik Instalasi Penerangan
Bahan
P 002
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 Bh Saklar Tunggal, 10 A, 250 VAC
Saklar tunggal, 10 A, 250 VAC
Bahan
Kotak sambung & alat bantu lainnya
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 Bh Saklar Ganda, 10 A, 250 VAC
Saklar ganda, 10 A, 250 VAC
Bahan
Kotak sambung & alat bantu lainnya
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 Bh Stop Kontak, 1 Phase, 10 A, 250 VAC
Stop Kontak, 1 Phase, 10 A, 250 VAC
Bahan
Kotak sambung & alat bantu lainnya
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 Bh Stop Kontak, 3 Phase, 10 A, 250 VAC
Stop Kontak, 3 Phase, 10 A, 250 VAC
Bahan
Kotak sambung & alat bantu lainnya
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 Bh Lampu Pijar (25 - 100 Watt)
Lampu Pijar (25 - 100 Watt)
Bahan
Kotak sambung & alat bantu lainnya
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
1
P 007
P 008
P 009
P 010
P 011
Q
Q 001
Q 002
2
3
Memasang 1 Bh Lampu V - Shape 1x20 W
Lampu TL 20 W
Travo
Bahan
Starter
Rumah TL In Bow / Out Bow 1 x 20 W
Kotak sambung & alat bantu lainnya
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 Bh Lampu V - Shape 2x20 W
Lampu TL 20 W
Travo
Bahan
Starter
Rumah TL In Bow / Out Bow 1 x 20 W
Kotak sambung & alat bantu lainnya
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 Bh Lampu V - Shape 1x40 W
Lampu TL 40 W
Travo
Bahan
Starter
Rumah TL In Bow / Out Bow 1 x 40 W
Kotak sambung & alat bantu lainnya
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 Bh Lampu V - Shape 2x40 Watt
Lampu TL 40 W
Travo
Bahan
Starter
Rumah TL In Bow / Out Bow 2 x 40 W
Kotak sambung & alat bantu lainnya
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
Memasang 1 Bh Lampu Down light + SL 25 Watt
Down light + SL 25 Watt
Bahan
Kotak sambung & alat bantu lainnya
Pekerja
Tukang batu
Tenaga kerja
Kepala tukang
Mandor
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
PEKERJAAN JALAN LINGKUNGAN DAN DRAINASE
1 M2 PEMBERSIHAN DAMIJA
Grass Cutter
Bahan
Alat Bantu
Pekerja
Tenaga Kerja
Mandor
Jumlah
7=(4x6)
1.000
1.000
1.000
1.000
1.000
0.1100
0.1100
0.0110
0.0110
bh
bh
bh
bh
ls
Oh
Oh
Oh
Oh
21,800.00
30,500.00
5,100.00
75,670.00
13,307.00
40,000.00
55,000.00
70,000.00
80,000.00
21,800.00
30,500.00
5,100.00
75,670.00
13,307.00
4,400.00
6,050.00
770.00
880.00
158,477.00
15,847.70
174,324.70
174,320.00
2.000
2.000
2.000
1.000
1.000
0.1100
0.1100
0.0110
0.0110
bh
bh
bh
bh
ls
Oh
Oh
Oh
Oh
21,800.00
30,500.00
5,100.00
108,100.00
22,290.00
40,000.00
55,000.00
70,000.00
80,000.00
43,600.00
61,000.00
10,200.00
108,100.00
22,290.00
4,400.00
6,050.00
770.00
880.00
257,290.00
25,729.00
283,019.00
283,010.00
1.000
1.000
1.000
1.000
1.000
0.1100
0.1100
0.0110
0.0110
bh
bh
bh
bh
ls
Oh
Oh
Oh
Oh
26,200.00
30,500.00
5,100.00
75,670.00
13,747.00
40,000.00
55,000.00
70,000.00
80,000.00
26,200.00
30,500.00
5,100.00
75,670.00
13,747.00
4,400.00
6,050.00
770.00
880.00
163,317.00
16,331.70
179,648.70
179,640.00
2.000
2.000
2.000
1.000
1.000
0.1100
0.1100
0.0110
0.0110
bh
bh
bh
bh
ls
Oh
Oh
Oh
Oh
26,200.00
30,500.00
5,100.00
108,100.00
23,170.00
40,000.00
55,000.00
70,000.00
80,000.00
52,400.00
61,000.00
10,200.00
108,100.00
23,170.00
4,400.00
6,050.00
770.00
880.00
266,970.00
26,697.00
293,667.00
293,660.00
1.000
1.000
0.1100
0.1100
0.0110
0.0110
bh
ls
Oh
Oh
Oh
Oh
299,200.00
29,920.00
40,000.00
55,000.00
70,000.00
80,000.00
299,200.00
29,920.00
4,400.00
6,050.00
770.00
880.00
341,220.00
34,122.00
375,342.00
375,340.00
0.0200
org
19,300.00
386.00
0.0008
0.0200
set
m
38,500.00
40,000.00
30.80
800.00
0.0020
org
80,000.00
160.00
1,376.80
Overhead + Profit
Jumlah
137.68
1,514.48
Dibulatkan
1 M2 PAS. ONDERLAG BATU BELAH T = 20 CM
1,510.00
Pasir Pasang
Batu Belah + Batu Kancing/Tepi
Peralatan
0.1500
0.2500
0.3200
m
m
lot
180,000.00
145,000.00
38,500.00
27,000.00
36,250.00
12,320.00
0.0133
0.2000
lot
OH
93,500.00
40,000.00
1,246.67
8,000.00
Mandor
0.0200
OH
80,000.00
Jumlah
1,600.00
59,416.67
Overhead + Profit
Jumlah
5,941.67
65,358.33
Dibulatkan
65,350.00
Bahan
Peralatan
Tenaga Kerja
1
Q 003
2
1 M2 AMPARAN BATU PECAH MESIN 5/7 t=10 cm
Bahan
m
lot
160,000.00
399,300.00
19,200.00
63,888.00
0.0267
0.1100
lot
OH
93,500.00
40,000.00
2,493.27
4,400.00
Mandor
0.0110
OH
80,000.00
Jumlah
Overhead + Profit
880.00
85,581.27
8,558.13
Jumlah
Dibulatkan
94,139.40
94,130.00
0.0600
178,500.00
10,710.00
Peralatan
Peralatan
Peralatan (Sewa Wales) = 1/75000 (W4)
0.0800
0.0267
lot
lot
38,500.00
93,500.00
3,080.00
2,493.27
Tenaga Kerja
0.1875
0.0027
OH
OH
40,000.00
80,000.00
7,500.00
213.33
Jumlah
Overhead + Profit
23,996.60
2,399.66
Jumlah
Dibulatkan
26,396.26
26,390.00
0.0120
0.0100
m
m
230,000.00
180,000.00
2,760.00
1,800.00
Peralatan
Peralatan
Peralatan (Sewa Wales) = 1/75000 (W4)
0.0200
0.0267
lot
lot
38,500.00
93,500.00
770.00
2,493.27
Tenaga Kerja
0.1000
0.0100
OH
OH
40,000.00
75,000.00
4,000.00
750.00
Jumlah
Overhead + Profit
9,813.27
981.33
Jumlah
Dibulatkan
Q 006
Tenaga Kerja
155,000.00
775.00
4.0000
0.0300
kg
m
6,900.00
66,000.00
27,600.00
1,980.00
Pekerja
Mandor
0.1500
0.0150
OH
OH
40,000.00
80,000.00
6,000.00
1,200.00
Dibulatkan
1 LITER LAPIS RESAP PENGIKAT (PRIME COAT)
41,310.00
Aspal Bitumen
Minyak Tanah
0.9171
0.6986
kg
ltr
10,800.00
3,300.00
9,904.68
2,305.38
Alat Bantu
Pekerja
0.0006
0.0034
set
org
38,500.00
40,000.00
23.10
136.00
Mandor
0.0003
org
80,000.00
Jumlah
24.00
12,393.16
Overhead + Profit
Jumlah
1,239.32
13,632.48
Dibulatkan
1 LITER LAPIS PEREKAT (TACK COAT)
13,630.00
Bahan
Aspal Bitumen
Minyak Tanah
Alat Bantu
1.1840
0.3387
0.0003
kg
kg
m
10,800.00
3,300.00
38,500.00
12,787.20
1,117.60
12.83
Tenaga Kerja
Pekerja
Mandor
0.0033
0.0002
org
org
40,000.00
80,000.00
132.00
16.00
Jumlah
Overhead + Profit
14,065.63
1,406.56
Jumlah
Dibulatkan
15,472.20
15,470.00
1 M2 HOTMIX TANGAN T=3 cm (JADI) u/ HAL & JALAN KLS 6 TON KE BAWAH
Abu batu
0.0360
155,000.00
5,580.00
Aspal Panas
Kayu Bakar
5.0000
0.0080
kg
m
8,300.00
66,000.00
41,500.00
528.00
Peralatan
Pekerja
0.0980
0.1100
lot
org
63,009.40
40,000.00
6,174.92
4,400.00
Mandor
0.0100
org
80,000.00
Jumlah
800.00
58,982.92
Overhead + Profit
Jumlah
Dibulatkan
5,898.29
64,881.21
64,880.00
Bahan
Q 010
0.0050
Aspal Drum
Kayu Bakar
37,555.00
3,755.50
41,310.50
Tenaga Kerja
Q 009
Abu Batu
Jumlah
Overhead + Profit
Jumlah
Bahan
Q 008
10,794.60
10,790.00
Q 007
7=(4x6)
0.1200
0.1600
Tenaga Kerja
Q 005
Peralatan
Q 004
0.0460
ton
1,200,000.00
55,200.00
Peralatan
Ongkos Angkut Hotmix (Jarak 20-40km)
1.0000
0.0460
ls
ton
3,000.00
50,000.00
3,000.00
2,300.00
Pekerja
Tukang
0.0057
0.0010
org
org
40,000.00
55,000.00
228.00
55.00
Mandor
0.0005
org
80,000.00
Jumlah
40.00
60,823.00
Overhead + Profit
Jumlah
6,082.30
66,905.30
Dibulatkan
66,900.00
Bahan
Tenaga Kerja
1
Q 011
2
3
1 M2 HOTMIX HRS T=3 cm KLS JALAN 6 TON LEBIH (HAMPARAN MANUAL)
1,200,000.00
50,000.00
82,800.00
3,450.00
Peralatan
Pekerja
1.0000
0.0057
ls
org
3,000.00
40,000.00
3,000.00
228.00
Tukang
Mandor
0.0010
0.0005
org
org
55,000.00
80,000.00
Jumlah
55.00
40.00
89,573.00
Overhead + Profit
Jumlah
8,957.30
98,530.30
Dibulatkan
1 M2 HOTMIX HRS T=3 cm KLS JALAN 6 TON LEBIH (PAKAI ALAT BESAR)
98,530.00
Hotmix HRS
Peralatan
0.0690
0.0238
ton
hr
1,200,000.00
100,000.00
82,800.00
2,380.00
Pekerja
Pekerja Trampil
0.0050
0.0009
org
org
40,000.00
80,000.00
200.00
72.00
Mandor
0.0004
org
80,000.00
Jumlah
32.00
85,484.00
Overhead + Profit
Jumlah
8,548.40
94,032.40
Dibulatkan
1 M2 HOTMIX PAKAI ALAT BESAR T=5 cm KLS JALAN 8 TON LEBIH
Hotmix HRS
Bahan
Peralatan
Pekerja
94,030.00
Tenaga Kerja
Tenaga Kerja
Q 017
Q 018
ton
1,200,000.00
133,200.00
hr
100,000.00
40,000.00
2,380.00
200.00
0.0009
0.0004
org
org
80,000.00
80,000.00
72.00
32.00
135,884.00
13,588.40
Jumlah
Dibulatkan
149,472.40
149,470.00
Tenaga Kerja
Q 016
Pekerja Trampil
Mandor
0.1110
0.0238
0.0050
Jumlah
Overhead + Profit
Bahan
Q 015
7=(4x6)
ton
ton
Bahan
Q 014
0.0690
0.0690
Tenaga Kerja
Q 013
Hotmix HRS
Ongkos Angkut Hotmix (Jarak 20-40km)
Bahan
Q 012
Batu Pecah 3 - 5 cm
0.0480
200,000.00
9,600.00
Batu Pecah 1 - 2 cm
Abu Batu / Screnn 0.5 - 1 cm
0.0220
0.0080
m
m
230,000.00
185,000.00
5,060.00
1,480.00
5.0000
0.0500
kg
lot
10,800.00
38,500.00
54,000.00
1,925.00
Pekerja
Tukang Batu Terampil
Mandor
0.0667
0.0100
0.0033
org
org
org
40,000.00
70,000.00
80,000.00
2,668.00
700.00
264.00
Jumlah
Overhead + Profit
75,697.00
7,569.70
Jumlah
Dibulatkan
83,266.70
83,260.00
0.1500
35,200.00
5,280.00
Grefel Beton 20 Cm
Pas . Bata 1 : 4
1.0000
0.4000
bh
m2
41,200.00
190,290.00
41,200.00
76,116.00
Plesteran 1 : 3
Upah kerja
0.7000
0.1500
m2
ls
40,080.00
105,139.68
28,056.00
15,770.95
Jumlah
Overhead + Profit
166,422.95
16,642.30
Jumlah
Dibulatkan
1 M1 SALURAN BUIS BETON 1/2 DIA 30 CM + PASANGAN BATA MERAH
183,065.25
183,060.00
Galian Tanah
Grefel Beton 30 Cm
0.2000
1.0000
m
bh
35,200.00
50,600.00
7,040.00
50,600.00
Pas . Bata 1 : 4
Plesteran 1 : 3
0.4000
0.7000
m2
m2
190,290.00
40,080.00
76,116.00
28,056.00
Upah Kerja
0.1500
ls
122,427.18
Jumlah
18,364.08
180,176.08
Overhead + Profit
Jumlah
18,017.61
198,193.68
Dibulatkan
1 M1 PASANGAN DRANASE BUIS BETON BULAT DIA 20 UNTUK SODETAN
198,190.00
Galian Tanah
Urugan Tanah Kembali Dipadatkan
0.1500
0.0750
m
m
35,200.00
26,400.00
5,280.00
1,980.00
1.0000
0.0600
bh
m
41,200.00
691,660.00
41,200.00
41,499.60
Jumlah
Overhead + Profit
Jumlah
89,959.60
8,995.96
98,955.56
Dibulatkan
1 M1 PASANGAN DRANASE BUIS BETON BULAT DIA 30 UNTUK SODETAN
98,950.00
Galian Tanah
Urugan Tanah Kembali Dipadatkan
0.2400
0.1143
m
m
35,200.00
26,400.00
8,448.00
3,017.52
1.0000
0.0600
bh
m
50,600.00
691,660.00
50,600.00
41,499.60
Jumlah
Overhead + Profit
103,565.12
10,356.51
Jumlah
Dibulatkan
113,921.63
113,920.00
1
Q 019
2
1 M2 PASANGAN PAVING BLOCK WARNA 6 CM K-225
7=(4x6)
118,000.00
185,000.00
119,180.00
18,500.00
0.2500
0.5000
org
org
30,000.00
55,000.00
7,500.00
27,500.00
0.0250
0.0030
0.2400
org
org
jam
70,000.00
80,000.00
15,000.00
1,750.00
240.00
3,600.00
Peralatan Bantu
1.0000
ls
1,000.00
Jumlah
1,000.00
179,270.00
Overhead + Profit
Jumlah
17,927.00
197,197.00
Dibulatkan
1 M2 PASANGAN PAVING BLOCK WARNA 8 CM K-225
197,190.00
1.0100
0.1000
m
m
139,000.00
185,000.00
140,390.00
18,500.00
0.2500
0.5000
org
org
30,000.00
55,000.00
7,500.00
27,500.00
0.0250
0.0030
org
org
70,000.00
80,000.00
1,750.00
240.00
Stamper
Peralatan Bantu
0.2400
1.0000
jam
ls
15,000.00
1,000.00
Jumlah
3,600.00
1,000.00
200,480.00
Overhead + Profit
Jumlah
20,048.00
220,528.00
Dibulatkan
1 M2 PASANGAN PAVING BLOCK NATURAL 6 CM K-225
220,520.00
Bahan
Tenaga Kerja
Peralatan
Bahan
Tenaga Kerja
Peralatan
1.0100
0.1000
m
m
103,000.00
185,000.00
104,030.00
18,500.00
0.2500
0.5000
org
org
30,000.00
55,000.00
7,500.00
27,500.00
0.0250
0.0030
org
org
70,000.00
80,000.00
1,750.00
240.00
Stamper
Peralatan Bantu
0.2400
1.0000
jam
ls
15,000.00
1,000.00
3,600.00
1,000.00
Jumlah
Overhead + Profit
164,120.00
16,412.00
Jumlah
Dibulatkan
1 M2 PASANGAN PAVING BLOCK NATURAL 8 CM K-225
180,532.00
180,530.00
Bahan
Tenaga Kerja
Peralatan
Q 023
m
m
Peralatan
Q 022
1.0100
0.1000
Tenaga Kerja
Q 021
Bahan
Q 020
1.0100
0.1000
m
m
120,000.00
185,000.00
121,200.00
18,500.00
0.2500
0.5000
org
org
30,000.00
55,000.00
7,500.00
27,500.00
0.0250
0.0030
org
org
70,000.00
80,000.00
1,750.00
240.00
Stamper
Peralatan Bantu
0.2400
1.0000
jam
ls
15,000.00
1,000.00
3,600.00
1,000.00
Jumlah
Overhead + Profit
181,290.00
18,129.00
Jumlah
Dibulatkan
199,419.00
199,410.00
0.1000
1.1000
m
kg
2,433.33
7,500.00
243.33
8,250.00
Pekerja
0.0540
org
40,000.00
2,160.00
10,653.33
Overhead + Profit
Jumlah
1,065.33
11,718.67
Dibulatkan
11,710.00
Bogor,
Nopember 2012
URAIAN
2
JUMLAH (Rp)
3
A
A 001
A 002
A 003
A 004
A 005
A 006
A 007
A 008
A 009
A 010
A 011
A 012
A 013
A 014
A 015
A 016
A 017
A 018
A 019
PEKERJAAN PERSIAPAN
Mengukur kembali 1 m2 Site
Memasang 1 m1 bouplank
Membuat 1 m2 Los kerja / Gudang
Membuat 1 m2 Kantor Direksi
Membuat 1 m2 Papan Nama Proyek
Mengerjakan 1 m2 Pagar Pengaman Proyek
Membongkar 1 m2 Dinding bata
Membongkar 1 m2 Dinding bata
Membongkar 1 m2 Plesteran dinding
Membongkar 1 m2 Genteng/Sirap
Membongkar 1 m2 Genteng/Sirap
Membongkar 1 m3 Kuda-kuda, Gording/Balok
Membongkar 1 m3 Kuda-kuda, Gording/Balok
Membongkar 1 m2 Plafond
Membongkar 1 m2 Plafond
Membongkar 1 m2 Rangka Atap/Reng kaso
Membongkar 1 m2 Rangka Atap/Reng kaso
Membongkar 1 m3 Beton bertulang
Membersihkan 1 m2 lokasi kegiatan
B
B 001
B 002
B 003
B 004
B 005
B 006
B 007
B 008
B 009
B 010
B 011
B 012
B 013
B 014
B 015
B 016
B 017
B 018
B 019
B 020
B 021
C
C 001
C 002
C 003
C 004
C 005
C 006
C 007
C 008
C 009
C 010
C 011
C 012
C 013
C014
D
D 001
D 002
D 003
D 004
D 005
D 006
D 007
D 008
D 009
D 010
D 011
D 012
D 013
D 014
2,220.00
38,650.00
485,810.00
617,840.00
425,980.00
372,690.00
9,590.00
5,190.00
4,400.00
2,640.00
1,760.00
602,800.00
375,100.00
20,150.00
5,940.00
13,090.00
6,540.00
322,650.00
4,840.00
35,200.00
43,560.00
52,090.00
60,630.00
68,640.00
46,810.00
71,280.00
56,760.00
2,640.00
15,400.00
11,730.00
26,400.00
218,680.00
221,700.00
190,910.00
44,220.00
188,920.00
88,490.00
63,360.00
128,460.00
53,460.00
684,550.00
637,420.00
604,750.00
581,790.00
550,300.00
463,120.00
543,870.00
516,480.00
322,800.00
2,158,370.00
690,710.00
683,620.00
144,980.00
366,360.00
691,660.00
715,610.00
751,730.00
780,120.00
670,970.00
813,620.00
845,730.00
869,590.00
885,580.00
913,020.00
921,550.00
980,620.00
991,790.00
889,820.00
NO
1
URAIAN
2
JUMLAH (Rp)
3
D 015
D 016
D 017
D 018
D 019
D 020
D 021
D 022
D 023
D 024
D 025
D 026
D 027
D 028
D 029
D 030
D 031
D 032
D 033
D 034
D 035
D 036
D 037
D 038
D 039
D 040
D 041
D 042
927,760.00
965,690.00
1,003,620.00
1,041,560.00
970,550.00
131,780.00
241,070.00
368,650.00
137,020.00
134,100.00
43,040.00
155,790.00
238,890.00
313,900.00
323,820.00
381,660.00
369,370.00
285,510.00
95,480.00
3,836,090.00
4,794,790.00
8,155,980.00
6,217,880.00
5,622,550.00
5,407,790.00
5,775,540.00
66,850.00
89,790.00
E
E 001
E 002
E 003
E 004
E 005
E 006
E 007
E 008
E 009
E 010
E 011
E 012
E 013
E 014
E 015
E 016
E 017
E 018
E 019
E 020
E 021
E 022
E 023
E 024
E 025
E 026
E 027
E 028
E 029
F
F 001
F 002
F 003
F 004
F 005
F 006
F 007
F 008
F 009
F 010
F 011
F 012
F 013
F 014
F 015
53,290.00
57,140.00
35,910.00
23,940.00
36,340.00
24,220.00
25,130.00
16,750.00
26,290.00
17,520.00
45,860.00
30,570.00
45,490.00
63,160.00
77,590.00
G
G 001
G 002
G 003
G 004
67,260.00
76,120.00
95,230.00
75,510.00
211,210.00
198,760.00
190,290.00
186,040.00
182,890.00
167,360.00
101,320.00
95,370.00
91,990.00
89,860.00
88,770.00
86,440.00
83,670.00
80,210.00
80,160.00
252,190.00
266,360.00
220,300.00
216,800.00
166,890.00
167,640.00
327,580.00
324,010.00
470,580.00
78,430.00
57,090.00
10,911,450.00
6,840,620.00
3,807,750.00
NO
1
URAIAN
2
G 005
G 006
G 007
G 008
G 009
G 010
G 011
G 012
G 013
G 014
G 015
G 016
G 017
G 018
G 019
G 020
G 021
G 022
G 023
G 024
G 025
G 026
G 027
G 028
G 029
G 030
G 031
G 032
G 033
G 034
G 035
G 036
G 037
G 038
G 039
G 040
G 041
G 042
G 043
G 044
G 045
G 046
G 047
G 048
G 049
G 050
G 051
G 052
G 053
G 054
G 055
G 056
G 057
G 058
G 059
G 060
G 061
G 062
G 063
G 064
G 065
G 066
G 067
G 068
G 069
G 070
G 071
G 072
G 073
G 074
G 075
G 076
G 077
G 078
H
H 001
H 002
H 003
H 004
H 005
H 006
JUMLAH (Rp)
3
88,320.00
110,810.00
81,350.00
80,490.00
2,218,620.00
1,884,630.00
192,200.00
227,380.00
1,750,640.00
1,869,590.00
1,810,540.00
27,250.00
27,860.00
29,900.00
27,520.00
23,630.00
22,420.00
24,600.00
23,150.00
24,610.00
42,070.00
42,100.00
38,190.00
59,700.00
63,960.00
71,190.00
47,520.00
568,550.00
2,021,310.00
120,430.00
123,320.00
128,740.00
249,300.00
123,730.00
123,320.00
137,480.00
158,930.00
137,680.00
143,310.00
123,730.00
161,180.00
149,140.00
148,680.00
23,030.00
23,090.00
21,200.00
127,800.00
690,550.00
165,280.00
123,370.00
221,330.00
342,600.00
154,110.00
149,820.00
149,820.00
581,240.00
2,032,910.00
143,990.00
139,120.00
149,820.00
147,860.00
155,650.00
153,690.00
161,480.00
159,520.00
740,630.00
194,500.00
107,530.00
183,810.00
61,380.00
97,180.00
173,490.00
118,360.00
40,020.00
49,400.00
42,880.00
40,080.00
38,150.00
37,080.00
36,210.00
NO
1
URAIAN
2
JUMLAH (Rp)
3
H 007
H 008
H 009
H 010
H 011
H 012
H 013
H 014
H 015
H 016
H 017
H 018
H 019
H 020
H 021
H 022
H 023
H 024
H 025
H 026
H 027
35,740.00
35,280.00
28,180.00
35,540.00
31,940.00
32,120.00
57,410.00
46,730.00
51,040.00
49,680.00
48,460.00
76,490.00
24,790.00
34,410.00
80,130.00
192,830.00
28,510.00
16,760.00
8,070.00
35,910.00
21,000.00
I
I 001
I 002
I 003
I 004
I 005
I 006
I 007
I 008
I 009
I 010
I 011
I 012
I 013
I 014
I 015
I 016
I 017
I 018
I 019
I 020
I 021
I 022
I 023
I 024
I 025
I 026
I 027
I 028
J
J 001
J 002
J 003
J 004
J 005
J 006
J 007
J 008
J 009
J 010
J 011
J 012
J 013
J 014
J 015
J 016
J 017
J 018
J 019
J 020
J 021
20,380.00
21,270.00
28,770.00
711,730.00
18,610.00
178,670.00
147,370.00
566,390.00
448,620.00
782,650.00
116,360.00
652,820.00
247,910.00
345,470.00
255,180.00
85,050.00
91,310.00
117,140.00
50,310.00
193,600.00
214,500.00
K
K 001
K 002
K 003
K 004
K 005
K 006
29,070.00
218,370.00
209,240.00
216,040.00
37,180.00
88,940.00
6,802,400.00
5,523,950.00
277,900.00
227,080.00
454,960.00
416,680.00
568,210.00
676,030.00
750,630.00
589,210.00
477,870.00
453,850.00
6,234,800.00
8,650,950.00
5,801,400.00
77,970.00
88,790.00
764,870.00
85,650.00
86,750.00
90,140.00
90,900.00
222,590.00
326,240.00
510,040.00
200,890.00
153,900.00
80,070.00
NO
1
URAIAN
2
JUMLAH (Rp)
3
K 007
K 008
K 009
K 010
K 011
K 012
K 013
K 014
K 015
K 016
K 017
K 018
K 019
K 020
K 021
K 022
K 023
K 024
37,600.00
12,190.00
29,920.00
45,930.00
59,950.00
613,260.00
20,300.00
71,000.00
107,800.00
127,400.00
130,130.00
66,070.00
92,700.00
92,700.00
25,060.00
28,410.00
27,210.00
32,270.00
L
L 001
L 002
L 003
L 004
L 005
L 006
L 007
L 008
L 009
L 010
L 011
L 012
L 013
L 014
L 015
L 016
L 017
L 018
L 019
179,540.00
48,520.00
51,270.00
121,380.00
134,140.00
87,720.00
305,180.00
224,710.00
55,140.00
48,400.00
98,240.00
88,120.00
103,190.00
116,170.00
105,170.00
202,220.00
44,550.00
34,130.00
27,120.00
M
M 001
M 002
PEKERJAAN PAGAR
Memasang 1 m2 pagar depan tralis (standar)
Memasang 1 m2 pagar samping/belakang
563,870.00
564,770.00
N
N 001
N 002
N 003
N 004
N 005
N 006
N 007
N 008
N 009
N 010
N 011
N 012
N 013
N 014
N 015
173,030.00
229,900.00
121,330.00
162,910.00
324,500.00
622,820.00
102,190.00
122,980.00
78,210.00
376,090.00
27,990.00
22,270.00
85,410.00
121,660.00
122,540.00
O
O 001
O 002
O 003
O 004
O 005
O 006
O 007
O 008
O 009
O 010
O 011
O 012
O 013
O 014
O 015
O 016
O 017
O 018
O 019
PEKERJAAN SANITARI
Memasang 1 buah Wastafel
Memasang 1 buah Bak KM Fiber 60 x 60
Memasang 1 buah Bank mandi bata merah volume 0,3 m3
Memasang 1 buah Closet Jongkok Standard Putih Poslin TOTO
Memasang 1 buah Urinoir Lengkap TOTO Warna Standard lengkap
Memasang 1 m' pipa galvanis 1/2"
Memasang 1 m' pipa galvanis 3/4"
Memasang 1 m' pipa galvanis 1"
Memasang 1 m' pipa galvanis 11/2"
Memasang 1 m' pipa galvanis 2"
Memasang 1 m' pipa galvanis 4"
Memasang 1 m' pipa PVC tipe AW 1/2"
Memasang 1 m' PVC tipe AW 3/4"
Memasang 1 m' PVC tipe AW 1"
Memasang 1 m' PVC tipe AW 11/2"
Memasang 1 m' PVC tipe AW 2"
Memasang 1 m' PVC tipe AW 4"
Memasang 1 bh kran air 3/4" atau 1/2"
Memasang 1 bh floor drain
996,170.00
402,870.00
885,980.00
399,960.00
2,264,520.00
41,630.00
46,920.00
63,310.00
92,380.00
119,550.00
282,490.00
18,730.00
20,430.00
23,030.00
33,390.00
101,040.00
111,540.00
71,610.00
NO
1
URAIAN
2
JUMLAH (Rp)
3
P
P 001
P 002
P 003
P 004
P 005
P 006
P 007
P 008
P 009
P 010
P 011
PEKERJAAN ELEKTRIKAL
Memasang 1 Titik Instalasi Penerangan
Memasang 1 Bh Saklar Tunggal, 10 A, 250 VAC
Memasang 1 Bh Saklar Ganda, 10 A, 250 VAC
Memasang 1 Bh Stop Kontak, 1 Phase, 10 A, 250 VAC
Memasang 1 Bh Stop Kontak, 3 Phase, 10 A, 250 VAC
Memasang 1 Bh Lampu Pijar (25 - 100 Watt)
Memasang 1 Bh Lampu V - Shape 1x20 W
Memasang 1 Bh Lampu V - Shape 2x20 W
Memasang 1 Bh Lampu V - Shape 1x40 W
Memasang 1 Bh Lampu V - Shape 2x40 Watt
Memasang 1 Bh Lampu Down light + SL 25 Watt
156,460.00
35,330.00
39,680.00
37,990.00
115,310.00
23,350.00
174,320.00
283,010.00
179,640.00
293,660.00
375,340.00
Q
Q 001
Q 002
Q 003
Q 004
Q 005
Q 006
Q 007
Q 008
Q 009
Q 010
Q 011
Q 012
Q 013
Q 014
Q 015
Q 016
Q 017
Q 018
Q 019
Q 020
Q 021
Q 022
Q 023
1,514.48
65,358.33
94,139.40
26,396.26
10,794.60
41,310.50
13,632.48
15,472.20
64,881.21
66,905.30
98,530.30
94,032.40
149,472.40
83,266.70
183,065.25
198,193.68
98,955.56
113,921.63
197,197.00
220,528.00
180,532.00
199,419.00
11,718.67
Bogor,
Nopember 2012
CONTOH PERHITUNGAN
BETON
1.
Hasil Analisa Pekerjaan 1 m3 beton mutu fc = 7,4 MPa (K 100), slump (12 2) cm, w/c = 0,87
Hasil Analisa Pekerjaan 1 m3 beton mutu fc = 9,8 MPa (K 125), slump (12 2) cm, w/c = 0,78
Hasil Analisa Pekerjaan 1 m3 beton mutu fc = 12,2 MPa (K 150), slump (12 2) cm, w/c = 0,72
Hasil Analisa Pekerjaan 1 m3 beton mutu fc = 14,5 MPa (K 175), slump (12 2) cm, w/c = 0,66
Hasil Analisa Pekerjaan 1 m3 beton mutu fc = 16,9 MPa (K 200), slump (12 2) cm, w/c = 0,61
Hasil Analisa Pekerjaan 1 m3 beton mutu fc = 19,3 MPa (K 225), slump (12 2) cm, w/c = 0,58
Hasil Analisa Pekerjaan 1 m3 beton mutu fc = 21,7 MPa (K 250), slump (12 2) cm, w/c = 0,56
Hasil Analisa Pekerjaan 1 m3 beton mutu fc = 24,0 MPa (K 275), slump (12 2) cm, w/c = 0,53
Hasil Analisa Pekerjaan 1 m3 beton mutu fc = 26,4 MPa (K 300), slump (12 2) cm, w/c = 0,52
Hasil Analisa Pekerjaan 1 m3 beton mutu fc = 28,8 MPa (K 325), slump (12 2) cm, w/c = 0,49
Hasil Analisa Pekerjaan 1 m3 beton mutu fc = 28,8 MPa (K 350), slump (12 2) cm, w/c = 0,49
Hasil Analisa Pekerjaan 1 m3 beton mutu K-175 (Ready Mix)
Hasil Analisa Pekerjaan 1 m3 beton mutu K-225 (Ready Mix)
Hasil Analisa Pekerjaan 1 m3 beton mutu K-250 (Ready Mix)
Hasil Analisa Pekerjaan 1 m3 beton mutu K-300 (Ready Mix)
Hasil Analisa Pekerjaan 1 m3 beton mutu K-350 (Ready Mix)
Hasil Analisa Pekerjaan Pembesian 10 kg dengan Besi Beton (polos/ulir)
Hasil Analisa Pekerjaan Bekisting untuk Pondasi
Hasil Analisa Pekerjaan Bekisting untuk Sloop
Hasil Analisa Pekerjaan Bekisting untuk Kolom
Hasil Analisa Pekerjaan Bekisting untuk Balok
Hasil Analisa Pekerjaan Bekisting untuk Plat lantai
Hasil Analisa Pekerjaan Bekisting untuk Dinding
Hasil Analisa Pekerjaan Bekisting untuk Tangga
1 M3 PEKERJAAN PONDASI (Cor Beton mutu K 175 Ready Mix Besi 150 kg + Bekisting)
- Hasil Analisa Pekerjaan 1 m3 beton mutu K-175 (Ready Mix)
- Pembesian 15 kg dengan Besi Beton (polos/ulir) ; 15 x Hasil Analisa (D 018)
- Bekisting untuk pondasi 5 x Hasil Analisa (D 021)
Jumlah
2.
1 M3 PEKERJAAN SLOOP (Cor Beton mutu K 225 Ready Mix Besi 300 kg + Bekisting)
- Hasil Analisa Pekerjaan 1 m3 beton mutu K-225 (Ready Mix)
- Pembesian 20 kg dengan Besi Beton (polos/ulir) ; 20 x Hasil Analisa (D 018)
- Bekisting untuk sloop 5 x Hasil Analisa (D 022)
Jumlah
3.
1 M3 PEKERJAAN KOLOM (Cor Beton mutu K 300 Ready Mix Besi 300 kg + Bekisting)
- Hasil Analisa Pekerjaan 1 m3 beton mutu K-300 (Ready Mix)
- Pembesian 30 kg dengan Besi Beton (polos/ulir) ; 30 x Hasil Analisa (D 018)
- Bekisting untuk kolom 5 x Hasil Analisa (D 023)
Jumlah
4.
1 M3 PEKERJAAN BALOK (Cor Beton mutu K 300 Ready Mix Besi 200 kg + Bekisting)
- Hasil Analisa Pekerjaan 1 m3 beton mutu K-300 (Ready Mix)
- Pembesian 20 kg dengan Besi Beton (polos/ulir) ; 20 x Hasil Analisa (D 018)
- Bekisting untuk balok 5 x Hasil Analisa (D 024)
Jumlah
5.
1 M3 PEKERJAAN PLAT LANTAI (Cor Beton mutu K 300 Ready Mix Besi 150 kg + Bekisting)
- Hasil Analisa Pekerjaan 1 m3 beton mutu K-300 (Ready Mix)
- Pembesian 15 kg dengan Besi Beton (polos/ulir) ; 15 x Hasil Analisa (D 018)
- Bekisting untuk plat lantai 5 x Hasil Analisa (D 025)
Jumlah
6.
1 M3 PEKERJAAN DINDING (Cor Beton mutu K 175 Ready Mix Besi 150 kg + Bekisting)
- Hasil Analisa Pekerjaan 1 m3 beton mutu K-175 (Ready Mix)
- Pembesian 15 kg dengan Besi Beton (polos/ulir) ; 15 x Hasil Analisa (D 018)
- Bekisting untuk dinding 5 x Hasil Analisa (D 026)
Jumlah
7.
1 M3 PEKERJAAN DINDING (Cor Beton mutu K 225 Ready Mix Besi 200 kg + Bekisting)
- Hasil Analisa Pekerjaan 1 m3 beton mutu K-225 (Ready Mix)
- Pembesian 20 kg dengan Besi Beton (polos/ulir) ; 20 x Hasil Analisa (D 018)
- Bekisting untuk tangga 5 x Hasil Analisa (D 027)
Jumlah
D 002
D 003
D 004
D 006
D 007
D 008
D 009
D 010
D 011
D 012
D 013
D 014
D 015
D 016
D 017
D 018
D 019
D 020
D 021
D 022
D 023
D 024
D 025
D 026
715,610.00
751,730.00
780,120.00
813,620.00
845,730.00
869,590.00
885,580.00
913,020.00
921,550.00
980,620.00
991,790.00
889,820.00
927,760.00
965,690.00
1,003,620.00
1,041,560.00
137,020.00
155,790.00
238,890.00
313,900.00
323,820.00
381,660.00
369,370.00
285,510.00
889,820.00
2,055,300.00
778,950.00
3,724,070.00
927,760.00
2,740,400.00
1,194,450.00
4,862,610.00
1,003,620.00
4,110,600.00
1,569,500.00
6,683,720.00
1,003,620.00
2,740,400.00
1,619,100.00
5,363,120.00
1,003,620.00
2,055,300.00
1,908,300.00
4,967,220.00
889,820.00
2,055,300.00
1,846,850.00
4,791,970.00
927,760.00
2,740,400.00
1,427,550.00
5,095,710.00
KETERANGAN :
Untuk Pekerjaan Plat Lantai Beton, Balok Beton dan Pekerjaan Beton lainnya disesuaikan dengan kondisi penempatan
Apabila terletak diatas dan membutuhkan penyangga maka ditambah Pekerjaan Stoot Werk
CONTOH PERHITUNGAN
BESI
No
Diameter
Berat Besi
mm
Kg / m1
4.0
0.13
5.0
0.12
5.5
0.19
5.7
No
Diameter
Berat Besi
mm
Kg / m1
No.
Diameter
Berat Besi
mm
Kg / m1
11
12
0.89
10.00
0.62
12
13
1.04
13.00
1.04
13
14
1.21
16.00
1.58
0.20
14
16
1.58
19.00
2.23
6.0
0.22
15
19
2.23
22.00
2.98
6.5
0.31
16
22
2.98
25.00
3.85
8.0
0.40
17
23
3.26
29.00
5.19
9.0
0.53
18
25
3.85
32.00
6.31
10.0
0.62
19
28
4.83
36.00
7.99
10
11.0
0.75
20
31
5.93
21
32
6.31
Kolom Praktis 12 X 12 cm' pakai tulangan 4 batang dia. 12 beugel dia. 8 jarak 20 cm
Panjang 1 m3 ukuran 12 x 12 cm
= ( 1 : 0.12 : 0.12 )
4 x
69,44 x 0,89 kg
Kolom praktis 15 X 15 cm' pakai tulangan 4 batang dia. 12 beugel dia. 8 jarak 20 cm
Panjang 1 m3 ukuran 15 x 15 cm
= ( 1 : 0.15 : 0.15 )
4 x
44,44 x 0,89 kg
44.44 m1
158.22 kg ( A)
71.11 kg ( B )
229.33 kg/m3 ( A + B )
Sloof praktis 15 X 20 cm' pakai tulangan 4 batang dia. 12 beugel dia. 8 jarak 15 cm
`
= ( 1 : 0.15 : 0.20 )
4 x
33,33 x 0,89 kg
66.67 kg ( B )
313.89 kg/m3 ( A + B )
69.44 m1
247.22 kg ( A)
=
=
33.33 m1
118.67 kg ( A)
62.22 kg ( B )
180.89 kg/m3 ( A + B )
Kolom Beton 20 X 30 cm' pakai tulangan 4 batang dia. 12 + 2 batang dia. 10 beugel dia. 8 jarak 15 cm
Panjang 1 m3 ukuran 20 x 30 cm
= ( 1 : 0.20 : 0.30 )
16.67 m1
59.33 kg ( A)
= 2 x 16.67 x 0.62 kg
73.57 kg ( B)
44.44 kg ( C )
4 x
16,67 x 0,89 kg
177.35 kg/m3 ( A + B + C )
NO
BERAT BESI
60
30
10
1.6
mm
9.80
kg
1.63
kg
60
30
10
2.3
mm
13.90
kg
2.32
kg
75
35
15
1.6
mm
12.50
kg
2.08
kg
75
35
15
2.3
mm
17.40
kg
2.90
kg
75
45
15
1.6
mm
14.00
kg
2.33
kg
75
45
15
2.3
mm
19.00
kg
3.17
kg
100
50
20
mm
21.40
kg
3.57
kg
100
50
20
2.3
mm
24.40
kg
4.07
kg
100
50
20
3.2
mm
33.00
kg
5.50
kg
10
125
50
20
mm
23.70
kg
3.95
kg
11
125
50
20
2.3
mm
27.10
kg
4.52
kg
12
125
50
20
3.2
mm
37.00
kg
6.17
kg
13
150
50
20
mm
26.10
kg
4.35
kg
14
150
50
20
2.3
mm
29.76
kg
4.96
kg
15
150
50
20
3.2
mm
40.56
kg
6.76
kg
16
150
65
20
mm
28.92
kg
4.82
kg
17
150
65
20
2.3
mm
33.00
kg
5.50
kg
18
150
65
20
3.2
mm
45.10
kg
7.52
kg
19
200
75
20
mm
35.52
kg
5.92
kg
20
200
75
20
2.3
mm
40.52
kg
6.75
kg
21
200
75
20
3.2
mm
55.52
kg
9.25
kg
NO
UKURAN IWF
BERAT BESI 12 M1
BERAT PER 1 M1
100
50
mm
112.00
kg
9.33
kg
125
60
mm
158.40
kg
13.20
kg
148
100
mm
253.20
kg
21.10
kg
150
75
mm
168.00
kg
14.00
kg
175
90
mm
217.40
kg
18.12
kg
198
99
4.5
mm
218.40
kg
18.20
kg
200
100
5.5
mm
256.00
kg
21.33
kg
248
124
mm
308.40
kg
25.70
kg
250
125
mm
355.20
kg
29.60
kg
10
298
149
mm
384.00
kg
32.00
kg
11
300
150
6.5
mm
440.40
kg
36.70
kg
12
346
174
mm
497.00
kg
41.42
kg
13
350
175
11
mm
595.20
kg
49.60
kg
14
396
199
11
mm
679.20
kg
56.60
kg
15
400
200
13
mm
792.00
kg
66.00
kg
16
446
199
12
mm
794.40
kg
66.20
kg
17
450
200
14
mm
912.00
kg
76.00
kg
18
500
200
10
16
mm
1075.00
kg
89.58
kg
19
588
300
12
20
mm
1812.00
kg
151.00
kg
20
600
200
11
17
mm
1272.00
kg
106.00
kg
21
700
300
13
24
mm
2220.00
kg
185.00
kg
22
800
300
14
26
mm
2520.00
kg
210.00
kg
23
900
300
16
28
mm
2916.00
kg
243.00
kg
NO
BERAT / BATANG
BERAT PER 1 M1
25
25
mm
6.72
kg
0.56
kg
30
30
mm
8.16
kg
0.68
kg
40
40
mm
11.00
kg
0.92
kg
40
40
mm
14.50
kg
1.21
kg
50
50
mm
18.50
kg
1.54
kg
50
50
mm
22.60
kg
1.88
kg
60
60
mm
27.30
kg
2.28
kg
60
60
mm
32.52
kg
2.71
kg
65
65
mm
35.46
kg
2.96
kg
10
70
70
mm
44.28
kg
3.69
kg
11
75
75
mm
41.22
kg
3.44
kg
12
75
75
mm
54.18
kg
4.52
kg
13
80
80
mm
57.96
kg
4.83
kg
14
90
90
mm
73.20
kg
6.10
kg
15
100
100
mm
73.20
kg
6.10
kg
16
100
100
10
mm
90.60
kg
7.55
kg
17
120
120
10
12
mm
218.40
kg
18.20
kg
18
120
120
12
12
mm
260.00
kg
21.67
kg
19
125
125
12
12
mm
280.00
kg
23.33
kg
20
130
130
12
mm
214.20
kg
17.85
kg
21
130
130
12
12
mm
280.00
kg
23.33
kg
NO
BERAT 6 M1
BERAT PER 1 M1
16
mm
2.26
kg
0.38
kg
19
mm
2.68
kg
0.45
kg
25
mm
3.54
kg
0.59
kg
30
mm
4.21
kg
0.70
kg
19
mm
3.56
kg
0.59
kg
25
mm
4.68
kg
0.78
kg
30
mm
5.61
kg
0.94
kg
32
mm
5.99
kg
1.00
kg
38
mm
7.11
kg
1.19
kg
10
50
mm
9.36
kg
1.56
kg
11
4.5
19
mm
4.04
kg
0.67
kg
12
4.5
25
mm
5.30
kg
0.88
kg
13
4.5
30
mm
6.90
kg
1.15
kg
14
4.5
38
mm
8.13
kg
1.36
kg
15
4.5
50
mm
10.53
kg
1.76
kg
16
19
mm
4.50
kg
0.75
kg
17
25
mm
5.85
kg
0.98
kg
18
30
mm
7.02
kg
1.17
kg
19
32
mm
7.50
kg
1.25
kg
20
38
mm
8.90
kg
1.48
kg
21
50
mm
11.00
kg
1.83
kg
22
19
mm
5.37
kg
0.90
kg
23
25
mm
7.24
kg
1.21
kg
24
32
mm
9.22
kg
1.54
kg
25
38
mm
10.80
kg
1.80
kg
26
50
mm
13.86
kg
2.31
kg
27
65
mm
18.25
kg
3.04
kg
28
75
mm
21.06
kg
3.51
kg
29
150
mm
44.00
kg
7.33
kg
30
38
mm
14.40
kg
2.40
kg
31
38
mm
16.15
kg
2.69
kg
32
50
mm
21.00
kg
3.50
kg
33
65
mm
27.37
kg
4.56
kg
34
75
mm
31.50
kg
5.25
kg
35
100
mm
42.20
kg
7.03
kg
36
125
mm
53.50
kg
8.92
kg
37
150
mm
63.60
kg
10.60
kg
38
12
38
mm
21.34
kg
3.56
kg
39
12
50
mm
28.26
kg
4.71
kg
40
12
65
mm
36.50
kg
6.08
kg
41
12
75
mm
42.36
kg
7.06
kg
42
12
100
mm
56.52
kg
9.42
kg
ENGINEERING ESTIMATE ( EE )
KEGIATAN
PEKERJAAN
LOKASI PEKER
TAHUN ANGGA
NILAI PEKERJA
:
:
:
:
:
No
I
Uraian Pekerjaan
PEKERJAAN PERSIAPAN
1 Pek. Papan nama kegiatan
2 Pek. Administrasi dan Dokumentasi
II
1
2
3
Volume
0.96
1.00
Jumlah
PEKERJAAN JALAN
Pek. Lapisan Penetrasi makadam (Lapen)
74.25
Pek. Lapisan Perekat ( tack coat )
101.25
Pek. Hotmix (HRS) teb. 3 cm Hamparan Manu 225.00
Jumlah
Harga
Harga
Satuan ( Rp Pekerjaan
)
( Rp
m2
ls
M2
ltr
m2
###
###
408,940.80
500,000.00
83,266.70
15,472.20
98,530.30
###
###
###
REKAPITULASI
ENGINEERING ESTIMATE ( EE )
KEGIATAN
PEKERJAAN
LOKASI PEKER
TAHUN ANGGA
NILAI PEKERJA
:
:
:
:
:
NO
URAIAN PEKERJAAN
JUMLAH HARGA
PEKERJAAN PERSIAPAN
Rp
II
PEKERJAAN JALAN
Rp
JUMLAH
P.P.N 10 %
JUMLAH TOTAL
DIBULATKAN
Rp
Rp
Rp
Rp
Terbilang
Tiga Puluh
: ( Tiga Juta Seratus Enam Puluh Sembilan Ribu Dua Ratus Tiga PuluhEmpat Rupiah
Bogor, Desember 2012
Konsultan Perencana
CV. CIPTA SELARAS
Jumlah
Harga (Rp)
908,940.80
29,918,429.89
JUMLAH HARGA
908,940.80
29,918,429.89
30,827,370.69
3,082,737.07
33,910,107.76
33,910,108.00
)
A SRI SUNDARI, SH
DIREKTRIS
ENGINEERING ESTIMATE ( EE )
KEGIATAN
PEKERJAAN
LOKASI PEKERJAAN
TAHUN ANGGARAN
NILAI PEKERJAAN
No
I
II
:
:
:
:
:
Uraian Pekerjaan
Volume
PEKERJAAN PERSIAPAN
1 Pek. Papan nama kegiatan
2 Pek. Administrasi dan Dokumentasi
3 Pek. Damija
0.96
1.00
200.00
Jumlah
PEKERJAAN JALAN
2 Pek. Lapisan Penetrasi makadam (Lapen)
110.00
3 Pek. Lapisan Perekat ( tack coat )
90.00
4 Pek. Hotmix (HRS) teb. 2 cm Hamparan Man 200.00
Jumlah
Harga
Satuan ( Rp )
m2
ls
m2
425,980.00
500,000.00
1,514.48
M2
ltr
m2
83,266.70
15,472.20
66,905.30
REKAPITULASI
ENGINEERING ESTIMATE ( EE )
KEGIATAN
PEKERJAAN
LOKASI PEKERJAAN
TAHUN ANGGARAN
NILAI PEKERJAAN
:
:
:
:
:
NO
URAIAN PEKERJAAN
PEKERJAAN PERSIAPAN
II
PEKERJAAN JALAN
JUMLAH
P.P.N 10 %
JUMLAH TOTAL
DIBULATKAN
Terbilang :
Harga
Pekerjaan ( Rp
Jumlah
Harga (Rp)
408,940.80
500,000.00
302,896.00
908,940.80
9,159,337.00
1,392,497.70
13,381,060.00
23,932,894.70
JUMLAH HARGA
Rp
908,940.80
Rp
23,932,894.70
Rp
Rp
Rp
Rp
24,841,835.50
2,484,183.55
27,326,019.05
27,326,019.00
-
ENGINEERING ESTIMATE ( EE )
KEGIATAN
PEKERJAAN
LOKASI PEKERJAAN
TAHUN ANGGARAN
NILAI PEKERJAAN
No
I
:
:
:
:
:
Uraian Pekerjaan
Volume
PEKERJAAN PERSIAPAN
1 Pek. Papan nama kegiatan
2 Pek. Administrasi dan Dokumentasi
Harga
Harga
Satuan ( Rp ) Pekerjaan ( Rp
0.96
1.00
m2
ls
425,980.00
500,000.00
M2
ltr
m2
83,266.70
15,472.20
98,530.30
478,512.00
500,000.00
Jumlah
II
PEKERJAAN JALAN
###
1,566,559.91
###
REKAPITULASI
ENGINEERING ESTIMATE ( EE )
KEGIATAN
PEKERJAAN
LOKASI PEKERJAAN
TAHUN ANGGARAN
NILAI PEKERJAAN
:
:
:
:
:
NO
URAIAN PEKERJAAN
JUMLAH HARGA
PEKERJAAN PERSIAPAN
Rp
II
PEKERJAAN JALAN
Rp
JUMLAH
P.P.N 10 %
JUMLAH TOTAL
DIBULATKAN
Terbilang :
Rp
Rp
Rp
Rp
Bogor, Desember 2012
Konsultan Perencana
CV. CIPTA SELARAS
Jumlah
Harga (Rp)
978,512.00
36,850,382.66
JUMLAH HARGA
978,512.00
36,850,382.66
37,828,894.66
3,782,889.47
41,611,784.13
41,611,784.00
)
r, Desember 2012
nsultan Perencana
V. CIPTA SELARAS
A SRI SUNDARI, SH
DIREKTRIS
ENGINEERING ESTIMATE ( EE )
KEGIATAN
PEKERJAAN
LOKASI PEKERJAAN
TAHUN ANGGARAN
NILAI PEKERJAAN
No
I
II
:
:
:
:
:
Uraian Pekerjaan
Volume
PEKERJAAN PERSIAPAN
1 Pek. Papan nama kegiatan
2 Pek. Administrasi dan Dokumentasi
0.96
1.00
Jumlah
PEKERJAAN JALAN
1 Pek. Lapisan Penetrasi makadam (Lapen 107.50
2 Pek. Lapisan Perekat ( tack coat )
112.50
3 Pek. Hotmix (HRS) teb. 3 cm Hamparan 250.00
Jumlah
Harga
Satuan ( Rp )
m2
ls
425,980.00
500,000.00
M2
ltr
m2
83,266.70
15,472.20
98,530.30
REKAPITULASI
ENGINEERING ESTIMATE ( EE )
KEGIATAN
PEKERJAAN
LOKASI PEKERJAAN
TAHUN ANGGARAN
NILAI PEKERJAAN
:
:
:
:
:
NO
URAIAN PEKERJAAN
PEKERJAAN PERSIAPAN
II
PEKERJAAN JALAN
JUMLAH
P.P.N 10 %
JUMLAH TOTAL
DIBULATKAN
Terbilang :
EE )
Harga
Pekerjaan ( Rp
Jumlah
Harga (Rp)
478,512.00
500,000.00
978,512.00
8,951,170.25
1,740,622.13
24,632,575.00
35,324,367.38
EE )
JUMLAH HARGA
Rp
978,512.00
Rp
35,324,367.38
Rp
Rp
Rp
Rp
36,302,879.38
3,630,287.94
39,933,167.31
39,933,167.00
-
ENGINEERING ESTIMATE ( EE )
KEGIATAN
PEKERJAAN
LOKASI PEKERJAAN
TAHUN ANGGARAN
NILAI PEKERJAAN
No
I
:
:
:
:
:
Uraian Pekerjaan
Volume
PEKERJAAN PERSIAPAN
1 Pek. Papan nama kegiatan
2 Pek. Administrasi dan Dokumentasi
Harga
Harga
Satuan ( Rp ) Pekerjaan ( Rp
0.96
1.00
m2
ls
425,980.00
500,000.00
M2
ltr
m2
83,266.70
15,472.20
66,905.30
478,512.00
500,000.00
Jumlah
II
PEKERJAAN JALAN
8,693,043.48
2,506,495.86
###
REKAPITULASI
ENGINEERING ESTIMATE ( EE )
KEGIATAN
PEKERJAAN
LOKASI PEKERJAAN
TAHUN ANGGARAN
NILAI PEKERJAAN
:
:
:
:
:
NO
URAIAN PEKERJAAN
JUMLAH HARGA
PEKERJAAN PERSIAPAN
Rp
II
PEKERJAAN JALAN
Rp
JUMLAH
P.P.N 10 %
JUMLAH TOTAL
DIBULATKAN
Rp
Rp
Rp
Rp
TIGA
Terbilang
PULUH :SEMBILAN
(
JUTA DELAPAN RATUS SEMBILAN PULUH RIBU TIGA RATUS LIMA PULUH LIMA
Bogor, Desember 2012
Konsultan Perencana
CV. CIPTA SELARAS
Jumlah
Harga (Rp)
978,512.00
35,285,447.34
JUMLAH HARGA
978,512.00
35,285,447.34
36,263,959.34
3,626,395.93
39,890,355.27
39,890,355.00
)
A SRI SUNDARI, SH
DIREKTRIS
ENGINEERING ESTIMATE ( EE )
KEGIATAN
PEKERJAAN
LOKASI PEKERJAAN
TAHUN ANGGARAN
NILAI PEKERJAAN
:
:
:
:
:
No
Uraian Pekerjaan
II
PEKERJAAN PERSIAPAN
1 Pek. Papan nama kegiatan
2 Pek. Administrasi dan Dokumentasi
Volume
0.96
1.00
Jumlah
PEKERJAAN JALAN
1 Pek. Lapisan Penetrasi makadam (Lapen)
98.70
2 Pek. Lapisan Perekat ( tack coat )
94.50
3 Pek. Hotmix (HRS) teb. 3 cm Hamparan Manu 210.00
Jumlah
Harga
Harga
Satuan ( Rp )Pekerjaan ( Rp
m2
ls
M2
ltr
m2
###
###
83,266.70
15,472.20
98,530.30
478,512.00
500,000.00
8,218,423.29
1,462,122.59
###
REKAPITULASI
ENGINEERING ESTIMATE ( EE )
KEGIATAN
PEKERJAAN
LOKASI PEKERJAAN
TAHUN ANGGARAN
NILAI PEKERJAAN
:
:
:
:
:
NO
URAIAN PEKERJAAN
JUMLAH HARGA
PEKERJAAN PERSIAPAN
Rp
II
PEKERJAAN JALAN
Rp
JUMLAH
P.P.N 10 %
JUMLAH TOTAL
DIBULATKAN
Terbilang :
Rp
Rp
Rp
Rp
Bogor, Desember 2012
Konsultan Perencana
CV. CIPTA SELARAS
Jumlah
Harga (Rp)
978,512.00
30,371,908.88
JUMLAH HARGA
978,512.00
30,371,908.88
31,350,420.88
3,135,042.09
34,485,462.96
34,485,463.00
)
r, Desember 2012
nsultan Perencana
V. CIPTA SELARAS
A SRI SUNDARI, SH
DIREKTRIS
ENGINEERING ESTIMATE ( EE )
KEGIATAN
PEKERJAAN
LOKASI PEKERJAAN
TAHUN ANGGARAN
NILAI PEKERJAAN
No
I
:
:
:
:
:
Uraian Pekerjaan
PEKERJAAN PERSIAPAN
1 Pek. Papan nama kegiatan
2 Pek. Administrasi dan Dokumentasi
II
Volume
0.96
1.00
Jumlah
PEKERJAAN JALAN
1 Pek. Lapisan Perekat ( tack coat )
182.25
2 Pek. Hotmix (HRS) teb. 2 cm Hamparan Man 405.00
Jumlah
Harga
Harga
Satuan ( Rp ) Pekerjaan ( Rp
m2
ls
425,980.00
500,000.00
478,512.00
500,000.00
ltr
m2
15,472.20
66,905.30
2,819,807.84
27,096,646.50
REKAPITULASI
ENGINEERING ESTIMATE ( EE )
KEGIATAN
PEKERJAAN
LOKASI PEKERJAAN
TAHUN ANGGARAN
NILAI PEKERJAAN
:
:
:
:
:
NO
URAIAN PEKERJAAN
JUMLAH HARGA
PEKERJAAN PERSIAPAN
Rp
II
PEKERJAAN JALAN
Rp
JUMLAH
P.P.N 10 %
JUMLAH TOTAL
DIBULATKAN
Terbilang :
Rp
Rp
Rp
Rp
Bogor, Desember 2012
Konsultan Perencana
CV. CIPTA SELARAS
Jumlah
Harga (Rp)
978,512.00
29,916,454.34
JUMLAH HARGA
978,512.00
29,916,454.34
30,894,966.34
3,089,496.63
33,984,462.98
33,984,463.00
)
, Desember 2012
sultan Perencana
CIPTA SELARAS
SRI SUNDARI, SH
DIREKTRIS
ENGINEERING ESTIMATE ( EE )
KEGIATAN
PEKERJAAN
LOKASI PEKERJAAN
TAHUN ANGGARAN
NILAI PEKERJAAN
No
I
:
:
:
:
:
Uraian Pekerjaan
Volume
PEKERJAAN PERSIAPAN
1 Pek. Papan nama kegiatan
2 Pek. Administrasi dan Dokumentasi
Harga
Harga
Satuan ( Rp ) Pekerjaan ( Rp
0.96
1.00
m2
ls
425,980.00
500,000.00
M2
ltr
m2
83,266.70
15,472.20
66,905.30
478,512.00
500,000.00
Jumlah
II
PEKERJAAN JALAN
###
2,088,746.55
###
REKAPITULASI
ENGINEERING ESTIMATE ( EE )
KEGIATAN
PEKERJAAN
LOKASI PEKERJAAN
TAHUN ANGGARAN
NILAI PEKERJAAN
:
:
:
:
:
NO
URAIAN PEKERJAAN
JUMLAH HARGA
PEKERJAAN PERSIAPAN
Rp
II
PEKERJAAN JALAN
Rp
JUMLAH
P.P.N 10 %
JUMLAH TOTAL
DIBULATKAN
Terbilang :
Rp
Rp
Rp
Rp
Bogor, Desember 2012
Konsultan Perencana
CV. CIPTA SELARAS
Jumlah
Harga (Rp)
978,512.00
35,899,342.05
JUMLAH HARGA
978,512.00
35,899,342.05
36,877,854.05
3,687,785.41
40,565,639.46
40,565,639.00
)
r, Desember 2012
nsultan Perencana
V. CIPTA SELARAS
A SRI SUNDARI, SH
DIREKTRIS
ENGINEERING ESTIMATE ( EE )
KEGIATAN
PEKERJAAN
LOKASI PEKERJAAN
TAHUN ANGGARAN
NILAI PEKERJAAN
No
I
:
:
:
:
:
Uraian Pekerjaan
Volume
PEKERJAAN PERSIAPAN
1 Pek. Papan nama kegiatan
2 Pek. Administrasi dan Dokumentasi
Harga
Harga
Satuan ( Rp ) Pekerjaan ( Rp
0.96
1.00
m2
ls
425,980.00
500,000.00
M2
ltr
m2
83,266.70
15,472.20
66,905.30
478,512.00
500,000.00
Jumlah
II
PEKERJAAN JALAN
9,960,778.99
1,514,341.25
###
REKAPITULASI
ENGINEERING ESTIMATE ( EE )
KEGIATAN
PEKERJAAN
LOKASI PEKERJAAN
TAHUN ANGGARAN
NILAI PEKERJAAN
:
:
:
:
:
NO
URAIAN PEKERJAAN
JUMLAH HARGA
PEKERJAAN PERSIAPAN
Rp
II
PEKERJAAN JALAN
Rp
JUMLAH
P.P.N 10 %
JUMLAH TOTAL
DIBULATKAN
Terbilang :
Rp
Rp
Rp
Rp
Bogor, Desember 2012
Konsultan Perencana
CV. CIPTA SELARAS
Jumlah
Harga (Rp)
978,512.00
26,027,022.99
JUMLAH HARGA
978,512.00
26,027,022.99
27,005,534.99
2,700,553.50
29,706,088.48
29,706,088.00
)
A SRI SUNDARI, SH
DIREKTRIS
ENGINEERING ESTIMATE ( EE )
KEGIATAN
PEKERJAAN
LOKASI PEKERJAAN
TAHUN ANGGARAN
NILAI PEKERJAAN
No
I
:
:
:
:
:
Uraian Pekerjaan
Volume
PEKERJAAN PERSIAPAN
1 Pek. Papan nama kegiatan
2 Pek. Administrasi dan Dokumentasi
0.96
1.00
m2
ls
M2
ltr
m2
Harga
Harga
Satuan ( Rp )Pekerjaan ( Rp
###
###
478,512.00
500,000.00
Jumlah
II
PEKERJAAN JALAN
83,266.70
15,472.20
66,905.30
###
1,705,809.68
###
REKAPITULASI
ENGINEERING ESTIMATE ( EE )
KEGIATAN
PEKERJAAN
LOKASI PEKERJAAN
TAHUN ANGGARAN
NILAI PEKERJAAN
:
:
:
:
:
NO
URAIAN PEKERJAAN
JUMLAH HARGA
PEKERJAAN PERSIAPAN
Rp
II
PEKERJAAN JALAN
Rp
JUMLAH
P.P.N 10 %
JUMLAH TOTAL
DIBULATKAN
Terbilang :
Rp
Rp
Rp
Rp
Bogor, Desember 2012
Konsultan Perencana
CV. CIPTA SELARAS
Jumlah
Harga (Rp)
978,512.00
29,317,796.01
JUMLAH HARGA
978,512.00
29,317,796.01
30,296,308.01
3,029,630.80
33,325,938.81
33,325,939.00
)
r, Desember 2012
nsultan Perencana
V. CIPTA SELARAS
A SRI SUNDARI, SH
DIREKTRIS
ENGINEERING ESTIMATE ( EE )
KEGIATAN
PEKERJAAN
LOKASI PEKERJAAN
TAHUN ANGGARAN
NILAI PEKERJAAN
No
I
:
:
:
:
:
Uraian Pekerjaan
Volume
PEKERJAAN PERSIAPAN
1 Pek. Papan nama kegiatan
2 Pek. Administrasi dan Dokumentasi
0.96
1.00
m2
ls
M2
ltr
m2
Harga
Harga
Satuan ( Rp )Pekerjaan ( Rp
###
###
478,512.00
500,000.00
Jumlah
II
PEKERJAAN JALAN
83,266.70
15,472.20
66,905.30
9,159,337.00
1,392,497.70
13,381,060.00
REKAPITULASI
ENGINEERING ESTIMATE ( EE )
KEGIATAN
PEKERJAAN
LOKASI PEKERJAAN
TAHUN ANGGARAN
NILAI PEKERJAAN
:
:
:
:
:
NO
URAIAN PEKERJAAN
JUMLAH HARGA
PEKERJAAN PERSIAPAN
Rp
II
PEKERJAAN JALAN
Rp
JUMLAH
P.P.N 10 %
JUMLAH TOTAL
DIBULATKAN
Rp
Rp
Rp
Rp
Terbilang
Tiga
: Puluh
(
Empat Juta Delapan Puluh Lima Ribu Empat Ratus Sembilan PuluhTiga Rupiah
Bogor, Desember 2012
Konsultan Perencana
CV. CIPTA SELARAS
Jumlah
Harga (Rp)
978,512.00
23,932,894.70
JUMLAH HARGA
978,512.00
23,932,894.70
24,911,406.70
2,491,140.67
27,402,547.37
27,402,547.00
)
r, Desember 2012
sultan Perencana
. CIPTA SELARAS
A SRI SUNDARI, SH
DIREKTRIS
ENGINEERING ESTIMATE ( EE )
KEGIATAN
PEKERJAAN
LOKASI PEKERJAAN
TAHUN ANGGARAN
NILAI PEKERJAAN
No
I
:
:
:
:
:
Uraian Pekerjaan
Volume
PEKERJAAN PERSIAPAN
1 Pek. Papan nama kegiatan
2 Pek. Administrasi dan Dokumentasi
0.96
1.00
m2
ls
39.00
175.50
390.00
M2
ltr
m2
Harga
Harga
Satuan ( Rp )Pekerjaan ( Rp
###
###
478,512.00
500,000.00
Jumlah
II
PEKERJAAN JALAN
2 Pek. Lapisan Penetrasi makadam (Lapen)
3 Pek. Lapisan Perekat ( tack coat )
4 Pek. Hotmix (HRS) teb. 3 cm Hamparan Ma
Jumlah
83,266.70
15,472.20
98,530.30
3,247,401.30
2,715,370.52
###
REKAPITULASI
ENGINEERING ESTIMATE ( EE )
KEGIATAN
PEKERJAAN
LOKASI PEKERJAAN
TAHUN ANGGARAN
NILAI PEKERJAAN
:
:
:
:
:
NO
URAIAN PEKERJAAN
JUMLAH HARGA
PEKERJAAN PERSIAPAN
Rp
II
PEKERJAAN JALAN
Rp
JUMLAH
P.P.N 10 %
JUMLAH TOTAL
DIBULATKAN
Rp
Rp
Rp
Rp
Terbilang :Dua (Puluh Tujuh Juta Tujuh Ratus Dua Puluh Empat Ribu Seratus Sebelas Rupiah
Bogor, Desember 2012
Konsultan Perencana
CV. CIPTA SELARAS
Jumlah
Harga (Rp)
978,512.00
44,389,588.82
JUMLAH HARGA
978,512.00
44,389,588.82
45,368,100.82
4,536,810.08
49,904,910.90
49,904,911.00
)
A SRI SUNDARI, SH
DIREKTRIS
ENGINEERING ESTIMATE ( EE )
KEGIATAN
:
PEKERJAAN
:
LOKASI PEKERJAAN :
TAHUN ANGGARAN :
NILAI PEKERJAAN :
No
I
Uraian Pekerjaan
Volume
PEKERJAAN PERSIAPAN
1 Pek. Papan nama kegiatan
2 Pek. Administrasi dan Dokumentasi
Harga
Satuan ( Rp )
0.96
1.00
m2
ls
425,980.00
500,000.00
M2
ltr
m2
83,266.70
15,472.20
98,530.30
Jumlah
II
PEKERJAAN JALAN
REKAPITULASI
ENGINEERING ESTIMATE ( EE )
KEGIATAN
:
PEKERJAAN
:
LOKASI PEKERJAAN :
TAHUN ANGGARAN :
NILAI PEKERJAAN :
NO
URAIAN PEKERJAAN
PEKERJAAN PERSIAPAN
II
PEKERJAAN JALAN
JUMLAH
P.P.N 10 %
JUMLAH TOTAL
DIBULATKAN
Terbilang
Tiga :Puluh
( Empat Juta Empat Ratus Delapan Puluh Delapan Ribu Dua Ratus Tujuh Belas Rupi
Harga
Pekerjaan ( Rp
Jumlah
Harga (Rp)
478,512.00
500,000.00
978,512.00
###
###
###
30,796,587.55
JUMLAH HARGA
Rp
978,512.00
Rp
30,796,587.55
Rp
Rp
Rp
Rp
31,775,099.55
3,177,509.96
34,952,609.51
34,952,610.00
ENGINEERING ESTIMATE ( EE )
KEGIATAN
PEKERJAAN
LOKASI PEKERJAAN
TAHUN ANGGARAN
NILAI PEKERJAAN
No
I
:
:
:
:
:
Uraian Pekerjaan
Volume
PEKERJAAN PERSIAPAN
1 Pek. Papan nama kegiatan
2 Pek. Administrasi dan Dokumentasi
Harga
Satuan ( Rp )
Harga
Pekerjaan ( Rp
0.96
1.00
m2
ls
425,980.00
500,000.00
478,512.00
500,000.00
M2
ltr
m2
83,266.70
15,472.20
98,530.30
10,304,254.13
1,566,559.91
22,169,317.50
Jumlah
II
PEKERJAAN JALAN
REKAPITULASI
ENGINEERING ESTIMATE ( EE )
KEGIATAN
PEKERJAAN
LOKASI PEKERJAAN
TAHUN ANGGARAN
NILAI PEKERJAAN
:
:
:
:
:
NO
URAIAN PEKERJAAN
JUMLAH HARGA
PEKERJAAN PERSIAPAN
Rp
II
PEKERJAAN JALAN
Rp
JUMLAH
P.P.N 10 %
JUMLAH TOTAL
DIBULATKAN
Terbilang :
Rp
Rp
Rp
Rp
Bogor, Desember 2012
Konsultan Perencana
CV. CIPTA SELARAS
Jumlah
Harga (Rp)
978,512.00
34,040,131.54
JUMLAH HARGA
978,512.00
34,040,131.54
35,018,643.54
3,501,864.35
38,520,507.89
38,520,508.00
-
Desember 2012
ultan Perencana
CIPTA SELARAS
SRI SUNDARI, SH
DIREKTRIS