Anda di halaman 1dari 70

DAFTAR SATUAN UPAH

NO JENIS PEKERJA BANGUNAN HARGA UPAH


Rp.

1 PEKERJA 80,000.00
2 TUKANG BATU/GALI 110,000.00
3 KEPALA TUKANG BATU 130,000.00
4 TUKANG KAYU 110,000.00
5 KEPALA TUKANG KAYU 130,000.00
6 TUKANG CAT / PELITUR 110,000.00
7 KEPALA TUKANG CAT / PELITUR 130,000.00
8 TUKANG BESI BETON 110,000.00
9 KEPALA TUKANG BESI BETON 130,000.00
10 TUKANG BESI PROFIL 110,000.00
11 KEPALA TUKANG BESI PROFIL 130,000.00
12 MANDOR 130,000.00
13 OPERATOR ALAT BESAR 125,000.00
14 PEMBANTU OPERATOR / MEKANIK 90,000.00
15 SUPIR TRUK 110,000.00
16 KENEK TRUK 90,000.00
17 PENJAGA MALAM 125,000.00

Harsat Upah Hal 1


H

SATUAN WAKTU

1 ORANG/ HR/ 8 JAM


1 ORANG/ HR/ 8 JAM
1 ORANG/ HR/ 8 JAM
1 ORANG/ HR/ 8 JAM
1 ORANG/ HR/ 8 JAM
1 ORANG/ HR/ 8 JAM
1 ORANG/ HR/ 8 JAM
1 ORANG/ HR/ 8 JAM
1 ORANG/ HR/ 8 JAM
1 ORANG/ HR/ 8 JAM
1 ORANG/ HR/ 8 JAM
1 ORANG/ HR/ 8 JAM
1 ORANG/ HR/ 8 JAM
1 ORANG/ HR/ 8 JAM
1 ORANG/ HR/ 8 JAM
1 ORANG/ HR/ 8 JAM
1 ORANG/ HR/ 8 JAM

Harsat Upah Hal 2


DAFTAR SATUAN HARGA BAHAN

NO JENIS BAHAN BANGUNAN

1 2

A AGREGAT KASAR, BAHAN PEREKAT & BAHAN JADINYA


1 Abu Batu
2 Bata Merah Bakar Kelas I
3 Bata Merah Bakar Kelas II
4 Bata Merah Oven ( Klingker )
5 Batako Besar 8 x 20 x 30
6 Batako kecil 8 x 10 x 20
7 Batu Belah Pondasi
8 Batu Bronjol ( Untuk Bronjong )
9 Batu Gosok ( Apung )
10 Batu Gunung ( Quarry )
11 Batu Koral Beton Kali
12 Batu Pecah Mesin 0,5-1 cm (abu batu)
13 Batu Pecah Mesin 1/2
14 Batu Pecah Mesin 2/3
15
16 Batu Pecah Mesin 5/7
17 Batu Pecah Tersaring Bergradasi
18 Batu Pinggir Beton 10 x 20 x 35
19 Batu Pinggir Beton 15 x 35 x 50 ( K -225 )
20 Batu Sikat Koral
21 Batu Telor
22 Batu Tempel Hitam
23 Bibit Tanaman
24 Con Blok 8 x 20 x 40
25 Grass Blok 20 x 20
26 Grass Blok 30 x 30
27 Hollow Block 10
28 Hollow Block 15
29 Hollow Block 20
30 Kanstin / Kerb Beton Pracetak P = 60 cm
31 Kanstin / Kerb Beton Pracetak P = 50 cm
32 Kanstin Paving Blok
33 Kapur Pasang/ kapur tembok
34 Kapur Sirih
35 Pasir Beton
36 Pasir Pasang Kali
37 Pasir Teras
38 Pasir Urug
39 Patok Hm

Harsat Bahan Hal 2


1 2

40 Paving Blok Natural 6 cm


41 Paving Blok Natural 8 cm
42 Paving Blok Warna 6 cm
43 Paving Blok Warna 8 cm
44 Readymix Beton K 175, tanpa pompa ( selang )
45 Readymix Beton K 225, tanpa pompa ( selang )
46 Readymix Beton K 250, tanpa pompa ( selang )
47 Readymix Beton K 300, tanpa pompa ( selang )
48 Readymix Beton K 350, tanpa pompa ( selang )
49 Roster Beton 20 x 20
50 Roster Beton 30 x 30
51 Semen PC / 50 kg
52 Semen Putih
53 Semen Warna
54 Semen Merah
55 Sirtu
56 Tanah Liat
57 Tanah Urug
58 Terawang/roster 5X11X24
59 Terawang/roster 12X11X24
60 Urugan Pilihan
61 Air

Harsat Bahan Hal 3


1 2

B BAHAN FINISHING LABURAN, PENGISI DAN ALATNYA


62 Ampelas
63 Bahan Plitur Kripik ( Sirlak India )
64 Cat Besi/ Kayu Glotek
65 Cat Besi Duco Danaglos/ICI
66 Cat Bron
67 Cat Dasar ICI untuk Interior ( 2 Pelapis )
68 Cat Kayu Seiv
69 Cat Marka / Spotlight
70 Cat Primer Marka
71 Cat Tahan Asam
72 Cat Tembok ICI Eksterior
73 Cat Tembok ICI Eksterior ( BETON )
74 Cat Tembok ICI Interior ( PLAFOND DAN DINDING )
75 Cat Tembok Sanlex
76 Cat Tembok Vinilex
77 Cat Tembok Vinilex
78 Dempul Duco
79 Dempul Halus / Imfra ( Wood Filler )
80 Dempul Kayu Cap Kucing
81 Dempul Lilin
82 Dempul Plastik
83 Dempul Plitur
84 Kape Kayu
85 Kape Tembok
86 Karung Plastik
87 Kumpon
88 Kwas 1 1/2"
89 Kwas 3"
90 Melamik
91 Meni Kayu / Besi
92 Oker
93 Oten (Pewarna Plitur )
94 Oyan
95 Pelapis Alkali ICI ( Cat Dasar Beton Ekterior )
96 Pengawetan Kayu
97 Pengopenan Kayu
98 Plamir Tembok
99 Plincote
100 Rool Cat Tembok
101 Sincromat
102 Soligneum 1 blek
103 Spirtus
104 Terpentin
105 Tiner A
106 Tiner B
107 Water Profing Emulsion
108 Water Profing Membrance

C BAHAN KAYU BERIKUT BAHAN JADINYA


109 Bambu Gombong

Harsat Bahan Hal 4


1 2

110 Bambu Ø 5 s.d 7


111 Bambu Ø 7 s.d 10
112 Dolken 5 s/d 7
113 Dolken 7 s/d 10
114 Kayu Albasia
115 Kayu Balok Borneo Super
116 Kayu Balok Kamper Banjar
117 Kayu Balok Kamper Medan (kruing)
118 Kayu Balok Kamper Samarinda
119 Kayu Balok Rasamala
120 Kayu Hutan Kelas I ( Segeng, Mahoni, Laban )
121 Kayu Jati Jabar dia. 40 cm kebawah
122 Kayu Jati Jabar Tua dia. 40 cm
123 Kayu Jati Jateng Tua dia. 40 cm
124 Kayu Jati Jateng Tua Lepas Mata dari dia. 80 cm ke atas
125 Kayu Jati Jatim Tua dia. 40 cm
126 Kayu Kamper Singkil / Kapur (K. Samarinda Klas II)
127 Kayu Papan Borneo Super
128 Kayu Papan Kamper Banjar
129 Kayu Papan Kamper Medan (Kruing)
130 Kayu Papan Kamper Samarinda
131 Kayu Papan Untuk Bekisting

Harsat Bahan Hal 5


1 2

132 Kayu Reng 2/3 Borneo Super


133 Kayu Reng 2/3 Kamper Banjar
134 Kayu Reng 3/4 Kamper Banjar
135 Formite/penjaga jarak bekisting/spacer
136 Kayu Terentang
136 List profil kamper 1 cm
137 List profil kamper 2 cm
137 List profil kamper 4 cm
138 List profil kamper 5 cm
138 List profil kamper 10 cm
139 Pegangan Tangga profil Jati
139 Pegangan Tangga profil Kamper

D BAHAN PENUTUP RANGKA PLAFOND


140 Acustik Amstrong 60 x 120
141 Bahan plafond Enternit 4 mm
142 Bahan plafond Asbes Semen 5 mm
143 Bahan plafond hardpleks 5 mm 120 x 240
144 Gypsum 120 x 240 t = 9 mm ex DN
145 Gypsum 120 x 240 t = 9 mm ex Luar
146 GRC 4 mm
147 GRC 6 mm
148 GRC 9 mm
149 List profil gypsum

E BAHAN KAYU LAPIS


150 Bilik Bambu ( dengan kulit )
151 Bilik Bambu ( tanpa kulit )
152 Bilik Bambu Hitam Variasi
153 Formika 120 x 240
154 Formika Ukuran Pintu
155 Jabar Wood 4 mm
156 Melamin 4 mm 120 x 240
157 Melamin TOK 4 mm
158 Multiplek 12 mm 120 x 240
159 Multiplek 18 mm 120 x 240
160 Multiplek 9 mm 120 x 240
161 Play Wood 18 mm 120 x 240
162 Supercon
163 Tacon ( tahan bakar )
164 Teak Wood 3 mm 120 x 240
165 Teak Wood 3 mm 120 x 240 Ukuran Pintu
166 Teak Wood 4 mm 120 x 240
167 Teak Wood ukuran Pintu 4 mm
168 Triplek 3 mm 120 x 240
169 Triplek 4 mm 120 x 240
170 Triplek 4 mm Ukuran Pintu
171 Triplek 6 mm 120 x 240
172 Triplek 9 mm 120 x 240
173 Wall Paper ( kls menengah )

Harsat Bahan Hal 6


1 2

F BAHAN LANTAI DAN PELAPIS DINDING


174 Bata Karawang
175 Bata pelapis dinding
176 Batu paras
177 Batu teraso
178 Campuran untuk Kedap Air (AM)
179 Granit Alam DN Ukuran Besar
180 Granit Alam DN Ukuran Kecil
181 Granit Alam LN Ukuran Besar
182 Granit Alam LN Ukuran Kecil
183 Granito Tile Essenza 60 x 60 Polis
184 Granito Tile Essenza 60 x 60 Unpolis
185 Granito Tile Essenza Ukuran 40 x 40 Polis
186 Granito Tile Essenza Ukuran 40 x 40 Unpolis
187 Karpet Kelas Baik LN
188 Karpet Kelas Sedang LN
189 Keramik 10 x 20 KW I DN Putih / Polos Mulia
190 Keramik 10 x 20 KW I DN Putih / Polos Roman
191 Keramik 10 x 20 KW I DN Corak / Warna / Anti Slip Mulia
192 Keramik 10 x 20 KW I DN Corak / Warna / Anti Slip Roman
193 Keramik 20 x 20 (KM) KW I DN Corak / Warna / Anti Slip Mulia
194 Keramik 20 x 20 (KM) KW I DN Corak / Warna / Anti Slip Roman

Harsat Bahan Hal 7


1 2

195 Keramik 20 x 20 (KM) KWI DN Putih Polos Mulia


196 Keramik 20 x 20 (KM) KWI DN Putih Polos Roman
197 Keramik 20 x 25 Dinding KM KWI DN Corak Mulia
198 Keramik 20 x 25 Dinding KM KWI DN Corak Roman
199 Keramik 30 x 30 KW I DN putih polos Mulia
200 Keramik 30 x 30 KW I DN putih polos Roman
201 Keramik 30 x 30 KW I DN Warna/Corak ( ANTI SLIP ) Mulia
202 Keramik 30 x 30 KW I DN Warna/Corak ( ANTI SLIP ) Roman
203 Keramik 33 x 33 KW I DN putih polos Mulia
204 Keramik 33 x 33 KW I DN putih polos Roman
205 Keramik 33 x 33 KW I DN Corak / Warna / Mulia
206 Keramik 33 x 33 KW I DN Corak / Warna / Roman
207 Keramik 10 x 33 ,Variasi/border
208 Keramik artistik ukuran (10 x 20) cm
209 Keramik artistik ukuran (5 x 20) cm
203 Marmer Alam Lampung Ukuran Besar
204 Marmer Alam Lampung Ukuran Kecil
205 Marmer Alam Citatah Ukuran Besar
206 Marmer Alam Citatah Ukuran Kecil
207 Marmer Sintetis
208 Mozaik 30x30
209 Mozaik 10x20
210 Plint ubin PC abu-abu ukuran (15 x 20) cm
211 Plint ubin PC abu-abu ukuran (10 x 30) cm
212 Plint ubin PC abu-abu ukuran (10 x 40) cm
213 Plint ubin PC warna ukuran (10 x 20) cm
214 Plint ubin PC warna ukuran (10 x 30) cm
215 Plint ubin PC warna ukuran (10 x 40) cm
216 Plint ubin teraso ukuran (10 x 30) cm
217 Plint ubin teraso ukuran (10 x 40) cm
218 Plint ubin granit ukuran (10 x 40) cm
219 Plint ubin granit ukuran (10 x 30) cm
220 Plint ubin teralux kerang ukuran (10 x 40) cm
221 Plint ubin teralux kerang ukuran (10 x 30) cm
222 Plint ubin teralux marmer ukuran (10 x 60) cm
223 Plint ubin teralux marmer ukuran (10 x 40) cm
224 Plint ubin teralux marmer ukuran (10 x 30) cm
225 Plint Vinyl karet ukuran (15 x 30) cm dengan perekat
226 Plint kayu kelas II tebal 2Cm, Lebar 10 Cm
227 Plint Keramik
228 Plint Keramik (10 x 10)
229 Plint Keramik (5 x 20)
230 Plint Internal Cove (5x5x20)
231 Poslin 11 x 11 Khusus DN
232 Poslin 11 x 11 Standar DN
233 Poslin 10 x 20 Standar DN
234 Poslin 20 x 20 Standar DN
235 Stairnosing fiber
236 Stairnosing keramik 10/20
237 Taraso Kerang 30 x 30
238 Taraso Kerang 40 x 40

Harsat Bahan Hal 8


1 2

239 Tegel Badak PC 30 x 30


240 Tegel PC 20 x 20
241 Tegel PC 30 x 30
242 Tegel PC 40 x 40
243 Tegel Wafel PC 20 x 20
244 Tegel Wafel Warna 20 x 20
245 Tegel Warna 20 x 20
246 Tegel Warna 30 x 30
247 Tegel Warna 40 x 40
248 Ubin teralux ukuran (40 x 40) cm
249 Ubin teralux ukuran (30 x 30) cm
250 Ubin teralux marmer ukuran (60 x 60) cm
251 Ubin teralux marmer ukuran (40 x 40) cm
252 Ubin teralux marmer ukuran (30 x 30) cm
253 Bahan teraso cor
254 Underlayer / Pelapis bawah karpet
255 Parquet kayu
256 Gymfloor
257 Vinyl Lantai standar
258 Vinyl karet
259 Floor hardener

Harsat Bahan Hal 9


1 2

G BAHAN SALURAN AIR KOTOR / BERSIH


260 Buis Beton Ø 100 cm ( 0.50 m )
261 Buis Beton Ø 20 cm ( 1 m' )
262 Buis Beton Ø 30 cm ( 1 m' )
263 Buis Beton Ø 40 cm ( 1 m' )
264 Buis Beton Ø 50 cm ( 1 m' )
265 Buis Beton Ø 60 cm ( 1 m' )
266 Buis Beton Ø 80 cm ( 0.50 m )
267 Buis Tanah Ø 10 cm ( 0.50 m )
268 Buis Tanah Ø 15 cm ( 0.50 m )
269 Buis Tanah Ø 20 cm ( 0.50 m )
270 Buis Tanah Ø 25 cm ( 0.50 m )
271 Grafel U 20 cm'
272 Grafel U 30 cm'
273 Grafel U 40 cm'
274 Ground Reservoir 100 m3
275 Ground Reservoir 1000 m3
276 Ground Reservoir 200 m3
277 Ground Reservoir 300 m3
278 Ground Reservoir 50 m3
279 Ground Reservoir 500 m3
280 Injuk
281 Pipa PVC Diameter 20 mm
282 Pipa PVC Diameter 25 mm
283 Pipa PVC Diameter 32 mm
284 Pipa PVC Diameter 40 mm
285 Pipa PVC Diameter 50 mm
286 Pipa PVC Diameter 63 mm
287 Pipa PVC Diameter 75 mm
288 Pipa PVC Diameter 90 mm
289 Pipa PVC Diameter 110 mm
290 Pipa PVC Diameter 140 mm
291 Pipa PVC Diameter 160 mm
292 Pipa PVC Diameter 200 mm
293 Pipa PVC Diameter 225 mm
294 Pipa PVC Diameter 250 mm
295 Pipa PVC Diameter 315 mm
296 Pipa PVC Diameter 355 mm
297 Pipa PVC Diameter 400 mm
298 Pipa PVC Diameter 500 mm
299 Pipa PVC Diameter 630 mm
300 Beton Box Culvert Pracetak 40-40-100 cm Heavy Duty
301 Beton Box Culvert Pracetak 50-50-100 cm Heavy Duty
302 Beton Box Culvert Pracetak 60-60-100 cm Heavy Duty
303 Beton Box Culvert Pracetak 80-80-100 cm Heavy Duty
304 Beton Box Culvert Pracetak 100-100-100 cm Heavy Duty
305 Beton Box Culvert Pracetak 120-120-100 cm Heavy Duty
306 Beton Box Culvert Pracetak 140-140-100 cm Heavy Duty
307 Beton Box Culvert Pracetak 150-150-100 cm Heavy Duty
308 Beton Box Culvert Pracetak 40-40-100 cm Light Duty
309 Beton Box Culvert Pracetak 50-50-100 cm Light Duty

Harsat Bahan Hal 10


1 2

310 Beton Box Culvert Pracetak 60-60-100 cm Light Duty


311 Beton Box Culvert Pracetak 80-80-100 cm Light Duty
312 Beton Box Culvert Pracetak 100-100-100 cm Light Duty
313 Beton Box Culvert Pracetak 120-120-100 cm Light Duty
314 Beton Box Culvert Pracetak 140-140-100 cm Light Duty
315 Beton Box Culvert Pracetak 150-150-100 cm Light Duty
316 Beton Saluran U-Ditch Pracetak 40-40-120 cm
317 Beton Saluran U-Ditch Pracetak 50-50-120 cm
318 Beton Saluran U-Ditch Pracetak 60-60-120 cm
319 Beton Saluran U-Ditch Pracetak 80-80-120 cm
320 Beton Saluran U-Ditch Pracetak 100-100-120 cm
321 Beton Saluran U-Ditch Pracetak 120-120-120 cm
322 Beton Saluran U-Ditch Pracetak 140-140-120 cm
323 Beton Saluran U-Ditch Pracetak 160-160-120 cm
324 Cover Saluran Terbuka Heavy Duty 40-60 cm
325 Cover Saluran Terbuka Heavy Duty 50-60 cm
326 Cover Saluran Terbuka Heavy Duty 60-60 cm
327 Cover Saluran Terbuka Heavy Duty 80-60 cm
328 Cover Saluran Terbuka Heavy Duty 100-60 cm
329 Cover Saluran Terbuka Heavy Duty 120-60 cm
330 Cover Saluran Terbuka Heavy Duty 140-60 cm
331 Cover Saluran Terbuka Heavy Duty 160-60 cm

Harsat Bahan Hal 11


1 2

332 Cover Saluran Terbuka Light Duty 40-60 cm


333 Cover Saluran Terbuka Light Duty 50-60 cm
334 Cover Saluran Terbuka Light Duty 60-60 cm
335 Cover Saluran Terbuka Light Duty 80-60 cm
336 Cover Saluran Terbuka Light Duty 100-60 cm
337 Cover Saluran Terbuka Light Duty 120-60 cm
338 Cover Saluran Terbuka Light Duty 140-60 cm
339 Cover Saluran Terbuka Light Duty 160-60 cm
340 Pipa CL Class 2 uk. 40 cm
341 Pipa CL Class 2 uk. 50 cm
342 Pipa CL Class 2 uk. 60 cm
343 Pipa CL Class 2 uk. 70 cm
344 Titik tangkap drainase jalan (side entry Pit) type efrat
345 Titik tangkap drainase jalan (side entry Pit) type tigris
346 Titik tangkap drainase jalan (side entry Pit) type phisyon
347 Titik tangkap drainase jalan (side entry Pit) type gihon

H BAHAN FASILITAS PENGAIRAN


348 Karet Penyekat Air/Rubber Water Stop Lebar 150 cm
349 Karet Penyekat Air/Rubber Water Stop Lebar 225 cm
350 Plat Karet untuk Perletakan Jembatan Type 4 Kx
351 Penutup Sambungan/Joint Sealer tebal 25
352 Pengisi Sambungan/Joint Sealer tebal 10
353 Pengisi Sambungan/Joint Sealer tebal 20
354 Mistar Ukur Panjang 0,50 -1,00 Meter
355 Mistar Ukur Panjang 1,00 -1,50 Meter
356 Mistar Ukur Panjang 1,50 -2,00 Meter
357 Mistar Ukur Panjang 2,00 -3,00 Meter
358 Mistar Ukur Panjang 3,00 -4,00 Meter
359 Papan Nama Bendung
360 Papan Nama Saluran
361 Papan Nama Bendung/Nomenklatur
362 Papan Eksploitasi
363 Papan Operasi Bendung
364 Kotak Baja untuk menyimpan data
365 Plat Tanda Muka Air/Peil Schal
366 Patok Hektometer (Pengairan)
367 Pintu Angkat type IB = 0,30 Meter
368 Pintu Angkat type IB = 0,40 Meter
369 Pintu Angkat type IB = 0,50 Meter
370 Pintu Angkat type IIB = 0,30 Meter
371 Pintu Angkat type IIB = 0,40 Meter
372 Pintu Angkat type IIB = 0,50 Meter
373 Pintu Sorong Baja type 1A ukuran (B=0,30-0,60)&(H=0,30-0,60)
374 Pintu Sorong Baja type 2A ukuran (B=0,60-0,80)&(H=0,30-1,00)
375 Pintu Sorong Baja type 3A ukuran (B=0,80-1,20)&(H=0,40-1,50)
376 Pintu Sorong Baja type 4A ukuran (B=1,00-1,00)&(H=0,50-2,00)
377 Pintu Sorong Baja type 5A ukuran (B=1,00-1,50)&(H=0,70-0,90)
378 Pintu Sorong Baja type 6A ukuran (B=1,60-2,00)&(H=0,90-1,35)
379 Pintu Sorong Baja type 7A ukuran (B=2,10-2,50)&(H=1,35-1,70)
380 Pintu Sorong Baja type dua Draadstang Ulir dengan 3 stel roda gigi

Harsat Bahan Hal 12


1 2

b = 1,00 M ; H = 1,60 M
381 Pintu Sorong Baja type dua Draadstang Ulir dengan 3 stel roda gigi
b = 1,20 M ; H = 1,70 M
382 Pintu Sorong Baja type dua Draadstang Ulir dengan 3 stel roda gigi
b = 1,50 M ; H = 1,80 M
383 Pintu Sorong Baja type dua Draadstang Ulir dengan 3 stel roda gigi
b = 2,00 M ; H = 2,00 M

I BAHAN LOGAM DAN BAHAN JADINYA


Aluminium strip
384 Baja Konstruksi U-39 / U-32
385 Baja Tulangan Beton
386 Besi Beton U-24 Rata - Rata
387 Besi Beton U-39 / U-32 Rata - Rata
388 Besi Galvanisir
389 Besi Profil DN SII
390 Besi Profil Ex LN
391 Besi C Lip Chanel
392 Besi L 30.30.3
393 Besi Strip
394 Besi angkur
395 Besi scuare tube
396 Besi lis kaca (1 x 1) cm
397 Bondek
398 Daun Jendela Alumunium Natural ( Tanpa Kaca dan accessories )
399 Daun Jendela Alumunium Warna ( Tanpa Kaca dan accessories )
400 Daun Pintu Alumunium Natural ( tanpa kaca dan accessories )
401 Daun Pintu Alumunium Warna ( tanpa kaca dan accessories )

Harsat Bahan Hal 13


1 2

402 Handle Alumunium ( Tarikan Pintu Alumunium )


403 Besi Hollow Block 20 X 40 ( Galvanis )
404 Besi Hollow Block 40 X 40 Galvanis )
405 IWF Ex DN SII
406 IWF Ex Jepang
407 Folding Gate
408 Kait Angin alumunium
409 Karet Asisoris Kusen / Pintu Alumunium
410 Kawat Beton
411 Kawat Bronjong 3 mm
412 Kawat Bronjong 4 mm
413 Kawat Duri
414 Kawat Harmonika 2 cm
415 Kawat Harmonika 4 cm
416 Kawat Kasa 1 x 1 cm ( Putih )
417 Kawat Las Listrik
418 Kawat Nyamuk
419 Kawat Pengikat
420 Kawat Tembaga
421 Kusen Alumunium Natural 1.3 mm t=1,3 mm ( 4 " )
422 Kusen Alumunium Warna 1.3 mm t=1,3 mm ( 4 " )
423 Lem Fox
424 Lem Kuning (aibond)
425 Ongkos Galfanis Besi
426 Pagar BRC Lengkap Tiang ( Tanpa Pondasi )
427 Plat Alumunium 0.1 mm
428 Plat Alumunium 0.2 mm
429 Plat Alumunium 0.3 mm
430 Plat Alumunium 0.4 mm
431 Plat Alumunium 0.5 mm
432 Plat Alumunium 0.6 mm
433 Plat Besi 10 mm Ke atas
434 Plat Besi 2 mm s/d 5 mm
435 Plat Besi 6 mm s/d 10 mm
436 Plat Besi Tipis 0.5 mm
437 Plat Besi Tipis 1 mm
438 Plat Besi Tipis 10 mm ke atas
439 Plat Besi Tipis 2 - 5 mm
440 Plat Besi Tipis 6 - 10 mm
441 Plat Srip Ø 2 x 30 mm ( 6 m1)
442 Plat Srip Ø 3 x 30 mm ( 6 m1)
443 Pintu gulung
444 Pintu lipat
445 Profil Aluminium
446 Profil Kaca
447 Ram Ayam
448 Ram Kawat 1 x 1 cm
449 Ram Nyamuk Aluminium
450 Ram Nyamuk Hijau
451 Rooling Door Aluminium

Harsat Bahan Hal 14


1 2

452 Seng Plat BJLS 28 (80 X 180 )


453 Seng Plat BJLS 30 (80 X 180 )
454 Seng Plat BJLS 30 dia. 60 cm ( 100 m1 )
455 Seng Plat BJLS 30 dia. 90 cm ( 100 m1 )
456 Sealant
457 Skrup fixer
458 Storox-100
459 Sunscreen aluminium
460 Timah
461 Venetions blinds dan vertical blinds (tirai)
462 Timah Hitam
463 Wiremesh M6
464 Wiremesh M8

J BAHAN KACA
465 Glass Blead
466 Glass Block DN 20 x 20 ( Kedawung )
467 Glass Block DN 20 x 20 Ex LN
468 Kaca 6 mm Gravver
469 Kaca Patri EX Luar negeri terpasang
470 Kaca Patri Lokal Terpasang ( ASAHI )
471 Kaca Polos 2 mm ( ASAHI )
472 Kaca Polos 3 mm ( ASAHI )
473 Kaca Polos 5 mm ( ASAHI )
474 Kaca Rayband 12 mm ( ASAHI )

Harsat Bahan Hal 15


1 2

475 Kaca Rayband 5 mm ( ASAHI )


476 Kaca Rayband 8 mm ( ASAHI )
477 Thermo Plastik

K BAHAN PAKU DAN MUR BAUT


478 Besi Beugel kuda - kuda
479 Duk Angker
480 Mur Baut Biasa dia.19 s/d 16 (5 cm)
481 Mur Baut dia.19 / panjang 60 cm
482 Mur Baut HTB dia. 19 s/d 16 (5 cm)
483 Paku 1 cm s/d 3 cm
484 Paku 4 cm s/d 7 cm
485 Paku 8 cm s/d 12 cm
486 Paku Beton 2 cm s/d 5 cm
487 Paku Cacing
488 Paku Kait Lengkap
489 Paku Skrup
490 Paku Skrup 1 cm – 2,5 cm
491 Piser dia. 12 s/d 20 cm

L BAHAN PERPIPAAN
492 Besi Pipa Hitam Ø 1" t=2 mm
493 Besi Pipa Hitam Ø 2" t=2 mm
494 Besi Pipa Hitam Ø 3" t=2 mm
495 Besi Pipa Hitam Ø 4" t=2 mm
496 Besi Pipa Hitam Ø 6" t=2 mm
497 Besi Pipa untuk Hydrant BSP Ø 1"
498 Besi Pipa untuk Hydrant BSP Ø 1,25"
499 Besi Pipa untuk Hydrant BSP Ø 1,5"
500 Besi Pipa untuk Hydrant BSP Ø 2"
501 Besi Pipa untuk Hydrant BSP Ø 2,5"
502 Besi Pipa untuk Hydrant BSP Ø 3"
503 Besi Pipa untuk Hydrant BSP Ø 4"
504 Besi Pipa untuk Hydrant BSP Ø 6"
505 Lem Paralon
506 Macam2 Sambungan GIP Ø 1/2"
507 Macam2 Sambungan GIP Ø 3/4"
508 Macam2 Sambungan GIP Ø 1"
509 Macam2 Sambungan GIP Ø 1 1/4"
510 Macam2 Sambungan GIP Ø 1 1/2"
511 Macam2 Sambungan GIP Ø 1 3/4"
512 Macam2 Sambungan GIP Ø 2"
513 Macam2 Sambungan GIP Ø 2 1/2"
514 Macam2 Sambungan GIP Ø 3"
515 Macam2 Sambungan GIP Ø 4"
516 Macam2 Sambungan Paralon Ø 1/2"
517 Macam2 Sambungan Paralon Ø 3/4"
518 Macam2 Sambungan Paralon Ø 1"
519 Macam2 Sambungan Paralon Ø 1 1/4"
520 Macam2 Sambungan Paralon Ø 1 1/2"
521 Macam2 Sambungan Paralon Ø 1 3/4"

Harsat Bahan Hal 16


1 2

522 Macam2 Sambungan Paralon Ø 2"


523 Macam2 Sambungan Paralon Ø 2 1/2"
524 Macam2 Sambungan Paralon Ø 3"
525 Macam2 Sambungan Paralon Ø 4"
526 Penyekat Poslin Urinoir TOTO
527 Pipa GIP Medium A Ø 1/2" ( 6 m1 )
528 Pipa GIP Medium A Ø 3/4" ( 6 m1 )
529 Pipa GIP Medium A Ø 1" ( 6 m1 )
530 Pipa GIP Medium A Ø 1 1/4" ( 6 m1 )
531 Pipa GIP Medium A Ø 1 1/2" ( 6 m1 )
532 Pipa GIP Medium A Ø 1 3/4"( 6 m1 )
533 Pipa GIP Medium A Ø 2" ( 6 m1 )
534 Pipa GIP Medium A Ø 2 1/2" ( 6 m1 )
535 Pipa GIP Medium A Ø 3" ( 6 m1 )
536 Pipa GIP Medium A Ø 4" ( 6 m1 )
537 Pipa PVC MASPION ABU Ø 1 1/2" (AW)
538 Pipa PVC MASPION ABU Ø 1 1/4" (AW)
539 Pipa PVC MASPION ABU Ø 1" (AW)
540 Pipa PVC MASPION ABU Ø 1/2" (AW)
541 Pipa PVC MASPION ABU Ø 2 1/2" (AW)
542 Pipa PVC MASPION ABU Ø 2" (AW)
543 Pipa PVC MASPION ABU Ø 3" (AW)

Harsat Bahan Hal 17


1 2

544 Pipa PVC MASPION ABU Ø 3/4" (AW)


545 Pipa PVC MASPION ABU Ø 4" (AW)
546 Pipa PVC 4" berlobang jenis AW
547 Pipa PVC RUCIKA type AW Ø 1 1/2"
548 Pipa PVC RUCIKA type AW Ø 1 1/4"
549 Pipa PVC RUCIKA type AW Ø 1"
550 Pipa PVC RUCIKA type AW Ø 1/2"
551 Pipa PVC RUCIKA type AW Ø 2 1/2"
552 Pipa PVC RUCIKA type AW Ø 2"
553 Pipa PVC RUCIKA type AW Ø 3"
554 Pipa PVC RUCIKA type AW Ø 3/4"
555 Pipa PVC RUCIKA type AW Ø 4"
556 Pipa PVC RUCIKA type AW Ø 6"
557 Pipa PVC RUCIKA type AW Ø 8"
558 Sambungan Pipa PVC Jenis AW 4 " TY
559 Solatip Leideng
560 Tempat Sabun Poslin
561 Urinoir lengkap TOTO warna standar lengkap
562 Wastafel Bulat warna standar lengkap
563 Wastafel lengkap INA
564 Wastaafel lengkap TOTO LW 230
565 Sambungan rumah (SR) Ø 1/2"
566 Air valve 1/2"

M BAHAN SANITAIR
567 Stop Kran 3/4 " KIT
568 Stop Kran 1 " KIT
569 Stop Kran 1 1/2 " KIT
570 Stop Kran 2 " KIT
571 Stop Kran 2 1/2" KIT
572 Stop Kran 3 " KIT
573 Check Valve 1/2 "
574 Double Neple 1/2 "
575 Water Mur 1/2 "
576 Gate Walve 1/2 "
577 Saringan Air Lt KM Stainless Steel
578 Apooer Bath Tube
579 Kran stain less Lokal Kait
580 Shower Dengan Tiang
581 Shower Tanpa Tiang
582 Kran Tembok Sun Eui dia. 1/2 "
583 Kran Tembok ITAP dia. 1/2 "
584 Kran Bebek Sun Eui 1/2 "
585 Kran Bebek ITAP 1/2 "
586 Kran Panas Dingin San Eui Standard
587 Bath Cape Washteren
588 Tempat Sabun Poslin
589 Wastafel Lengkap TOTO LW 230
590 Wastafel Lengkap INA
591 Closet Jongkok Poslin warna TOTO
592 Closet Jongkok Standard Putih Poslin TOTO

Harsat Bahan Hal 18


1 2

593 Closet Jongkok Lengkap Sistem Jet TOTO


594 Closet Duduk Warna Standard TOTO C 240 Lengkap
595 Wastafel Bulat Warna Standard Lengkap
596 Closet Duduk Warna Standard lengkap INA
597 Urinoir Lengkap TOTO Warna Standard lengkap
598 Penyekat Poslin Urinoar TOTO
599 Kitchen Zink Stainless Standard Lokal ( 1 Lobang )
600 Kitchen Zink Stainless Non Standard Franke ( 1 Lobang )
601 Kitchen Zink Stainless Non Standard Franke ( 2 Lobang )
602 Sealtipe

N BAHAN PENUTUP ATAP


603 Atap Plastik Gelombang 80 x 180
604 Aluminium foile
605 Atap Aluminium Natural USR 26 ( JAINDO )
606 Atap Aluminium Warna USR 26 ( JAINDO )
607 Atap Asbes Gel. Besar 4 mm 80 x 180
608 Atap Asbes Gel. Kecil 5 mm 80 x 180
609 Atap Fiber Glass Tebal 80 x 180 (gelombang)
610 Atap Fiber Glass Tipis 80 x 180 (gelombang)
611 Atap Seng Gelombang 3 mm 80 x 180
612 Atap Seng Gelombang 5 mm 80 x 180
613 Atap Genteng Beton Warna 14,5/m2
614 Atap Genteng Plentong pres Bakar KW 1
615 Atap Genteng Plentong pres Molen Oven Jatiwangi
616 Atap Genteng Plentong pres Molen Oven KW1
617 Atap Genteng Flam pres Molen Oven Jatiwangi
618 Atap Genteng Kodok
619 Atap Tegola Kubota, lengkap

Harsat Bahan Hal 19


1 2

620 Atap Tegola Kwalitas Sedang


621 Bubung Genteng pres Bulat Ex Jatiwangi
622 Bubung Murando Glasur
623 Bubung Murando Natural
624 Bubungan Genteng Keramik
625 Bubungan Genteng Kodok
626 Genteng Beton Warna
627 Genteng Beton Natural
628 Genteng Bubungan Beton
629 Genteng Bubungan Ex Jatiwangi Segi Tiga
630 Genteng Keramik Glasur Premium 14,5 / m2
631 Genteng Keramik Glasur Special 14,5 / m2
632 Genteng Keramik Glasur Standard 14,5 / m2
633 Genteng Keramik Natural Intan 14,5 / m2
634 Genteng Metal ( Rainbow Roof )
635 Genteng Metal Hana
636 Genteng Murando Glasur 1m2 = 18 bh
637 Genteng Murando Glasur 1m2 = 20 bh
638 Genteng Murando Natural 1m2 = 20 bh
639 Nok Atas Metal ( Rainbow Roof )
640 Nok Atas Metal Hana
641 Nok Pinggir Hana
642 Nok Pinggir Metal ( Rainbow Roof )
643 Sirap Kelas I ( 80 / m2 )
644 Wall Flashing ( Rainbow Roof )
645 Wall Flashing Hana

O BAHAN MEKANIKAL
646 AC Split 1 PK Setara TOSHIBA
647 AC Split 2 PK Setara TOSHIBA
648 AC Split 3 PK Setara TOSHIBA
649 Diesel Pump kap. 750 gln / menit 120 m1 ( 105 kW )
650 Down Light +SL 25 W
651 Electrical Pump kap. 750 gln / menit 120 m1 ( 90 kW )
652 Exhouse Fan H 100 W 40 x 40 cm
653 Exhouse Fan H 360 W 60 x 60 cm
654 Exhouse Fan H 380 W CFM 55 x 55 cm
655 Fire House 1.5 x 30 m + nose
656 Hydran Box dalam Gedung (lengkap)
657 Jockey Pump kap. 80 gln / menit 100 m1 ( 18,6 kW )
658 Mesin AC Split DAIKIN ( Indoor / Outdoor Unit )
659 Presure Tank kap. 500 liter lengkap

P BAHAN ELEKTRIKAL
660 Kabel NYA 1x 1.5 Prima (1 rol = 50 m')
661 Kabel NYA 1x 2.5 Prima (1 rol = 50 m')
662 Kabel NYM 2 x 1.5 Prima (1 rol = 50 m')
663 Kabel NYM 3 x 1.5 Prima (1 rol = 50 m')
664 Kabel NYM 2 x 2.5 Prima (1 rol = 50 m')
665 Kabel NYM 3 x 2.5 Prima (1 rol = 50 m')
666 Kabel NYM 4 x 2.5 Prima (1 rol = 50 m')

Harsat Bahan Hal 20


1 2

667 Kabel NYM 2 x 4 Prima (1 rol = 50 m')


668 Kabel NYM 3 x 4 Prima (1 rol = 50 m')
669 Kabel NYM 4 x 4 Prima (1 rol = 50 m')
670 Kabel NYM 2 x 6 Supreme (1 rol = 50 m')
671 Kabel NYM 3 x 6 Supreme (1 rol = 50 m')
672 Kabel NYM 4 x 6 Supreme (1 rol = 50 m')
673 Kabel NYM 2 x 10 Supreme (1 rol = 50 m')
674 Kabel NYM 3 x 10 Supreme (1 rol = 50 m')
675 Kabel NYM 4 x 10 Supreme (1 rol = 50 m')
676 Kabel NYM 4 x 16 Supreme (1 rol = 50 m')
677 Kabel NYY 2 x 4 Supreme (1 rol = 50 m')
678 Kabel NYY 3 x 4 Supreme (1 rol = 50 m')
679 Kabel NYY 4 x 4 Supreme (1 rol = 50 m')
680 Kabel NYY 2 x 6 Supreme (1 rol = 50 m')
681 Kabel NYY 3 x 6 Supreme (1 rol = 50 m')
682 Kabel NYY 4 x 6 Supreme (1 rol = 50 m')
683 Kabel NYY 2 x 10 Supreme (1 rol = 50 m')
684 Kabel NYY 3 x 10 Supreme (1 rol = 50 m')
685 Kabel NYY 4 x 10 Supreme (1 rol = 50 m')
686 Kabel NYY 4 x 16 Supreme (1 rol = 50 m')
687 NSFB FUJI EA - 100 A
688 NSFB FUJI EA - 150 A

Harsat Bahan Hal 21


1 2

689 Rumah Panel 30 x 60 cm (kosong)


690 Skring Kas 2 grop Biasa
691 Skring Kas 3 grop Biasa
692 Skring Kas 5 grop Biasa
693 MCB 1 PAS
694 MCB 3 PAS
695 Tahanan 50 A Merk Fuji
696 Saklar Broko Tunggal Standard ( 1 Phase )
697 Saklar Broko Seri Standard ( 1 Phase )
698 Stop Kontak Broko Standard ( 1 Phase )
699 Stop Kontak Broko 3 Phase ( Out Bow )
700 Stop Kontak Broko 3 Phase ( In Bow )
701 Stop Kontak Handle 3 Phase
702 Instalasi Titik Lampu / Stop Kontak ( Upah dan Alat )
703 Lampu pijar 25 Watt s/d 100 Watt
704 Lampu Neon TL Philip 20 W
705 Lampu Neon TL Philip 40 W
706 Trapo TL 20 W ( Philip )
707 Trapo TL 40 W ( Philip )
708 Trapo TL 20 W ( Sinar )
709 Trapo TL 40 W ( Sinar )
710 Stater Neon Philip
711 Stater Neon Biasa
712 Rumah TL In Bow / Out Bow 2 x 20 W ( Kosongan )
713 Down Light + SL 25 W
714 Lampu SL Philip 25 W
715 Lampu Sirkel TL 20 W Lengkap
716 Lampu Mercuri 80 W
717 Lampu Taman + Tiang + Lampu 1 Buah
718 Lampu Baret 30 cm + Neon
719 Lampu Neon Arcrilik 2 x 40 W lengkap
720 Jarum Penangkal Petir 16
721 Kawat BC ( Tembaga )
722 Pentanahan Penangkal Petir
723 Pentanahan Panel

Q BAHAN ALAT PENGANTUNG DAN KUNCI


724 Door Closer Kelas Rendah
725 Door Closer Kelas Standard ( Kelas Baik )
726 Door Closer Kelas Standard ( Kelas Sedang )
727 Engsel Harmonika
728 Engsel Jendela Unilon
729 Engsel Patrun
730 Engsel Pintu Unilon Standard
731 Espangolet
732 Grendel 15 cm
733 Grendel 5 cm
734 Hak Angin Jendela Antik
735 Hak Angin Kait Jendela Biasa
736 Hak Angin Sendok Stainless / Kuningan
737 Kunci 2 Slaag Ancor Asli

Harsat Bahan Hal 22


1 2

738 Kunci 2 Slaag ISO


739 Kunci 2 Slaag Kuda Terbang
740 Kunci 2 Slaag ROYAL
741 Kunci 2 Slaag Silinder SEIS Asli type 210 s/d type 226
742 Kunci 2 Slaag Silinder Utama Standard
743 Kunci Gembok Besar
744 Kunci KM Bulat ALFA
745 Kunci KM Bulat Kualitas Biasa
746 Kunci Silinder ALFA untuk Pintu Alumunium
747 Nako Lengkap Tralis 1 Daun
748 Rel Henderson Lengkap
749 Rel Maraton I Pintu
750 Seng BJLS 30 lebar 60cm (1 rol 50 m' )
751 Seng BJLS 30 lebar 90cm (1 rol 50 m' )
752 Sloot Jendela Tunggal
753 Sloot Pintu berikut Rantai
754 Tarikan Almari Rata - rata
755 Tarikan Pintu Alumunium

R BAHAN PENGIKAT UNTUK KONTRUKSI JALAN


756 Aspal ( ESO ) 1 Drum 155 Kg
757 Aspal Curah/ Aspal Bitumen

Harsat Bahan Hal 23


1 2

758 Aspal RC 70 ( Cilacap )


759 Asphal Concrete Base (ATB) / AC-Base
760 Asphal Concrete Base Course (ATB) / AC-BC
761 Asphal Concrete Wearing Course (Laston) / AC-WC
762 Hot Roller Sheet (Lataston) / HRS
763 Lapis`Aspal Resap Pengikat / Prime Coat
764 Lapis`Aspal Perekat ? Tack Coat

S BAHAN PENGHISAP AIR SUMUR DALAM


765 Deep Well dengan kelengkapannya kap. 150 liter/menit
766 Gear Pump kap. 60 liter/menit
767 Hand Oil Pump
768 Mesin Pompa Air 100 W - Sanyo
769 Mesin Pompa Air 150 W - Sanyo
770 Pompa Dragon Asli
771 Pompa Dragon Tegal
772 Pompa Kodok
773 Pompa Submersible kap. 150 liter/menit 3 kW
774 Pompa Zet pump 250 W - Sanyo
775 Pompa Zet pump 450 W - Sanyo

T BAHAN PENAMPUNG AIR


776 Tangki Air Fiber Glass 0.5 m3 ( Excel )
777 Tangki Air Fiber Glass 1 m3 ( Excel )
778 Tangki Air Fiber Glass 2 m3 ( Excel )
779 Bak KM Fiber 60 x 60
780 Bak Taraso WC 40 x 40
781 Bak KM Taraso 60 x 60

U BIAYA QUALITY CONTROL, IZIN-IZIN, PENGUKURAN


BIASA DAN BIAYA PENYAMBUNGAN
782 Penyambungan Listrik PLN
783 IMB Bertingkat Rata-rata (Rumah / Kantor)
784 IMB Tidak Bertingkat Rata-rata (Rumah / Kantor)
785 IMB Bertingkat Rata-rata (Usaha)
786 IMB Tidak Bertingkat Rata-rata (Usaha)
787 Sondir Rata-rata
788 Pengukuran Site + Patok
789 Biaya Test Jalan (quqlity control)
790 Biaya Test 1 macam Beton
791 Biaya pengujian bahan agregat
792 bIaya pengujian listrik + ganbar + travfo dan adm
793 Ijin Sumur Artesis Lengkap
794 Penyambungan PDAM untuk Rumah
795 Geolistrik

V ALAT TUKANG.
796 Alat-alat bantu
797 Cangkul
798 Karbit
799 Kawat Las Listrik

Harsat Bahan Hal 24


1 2

800 Linggis
801 Palu 0,5 kg
802 Pengki
803 Rool Meter 30 meter ( Bahan Plastik )
804 Rool Meter 5 meter ( Bahan Besi )
805 Sekop
806 Selang Plastik untuk Water Pas dia. 0.5 cm
807 Singkup
808 Tali Rami
809 Water Pas Alumuniumm 60 cm

W STANDARD RATA - RATA SEWA ALAT BESAR , ALAT MEKANIK


TRUK, KENDARAAN RODA 4 & LAINNYA
810 Alat Penggetar Beton 4 HP
811 Asphal Finisher
812 Asphal Mixing Plant
813 Buldozer 110 HP
814 Compresor 210 m3
815 Compresor Blower
816 Compresor Jack Hammer
817 Crane 10 - 15 ton
818 Dump Truck 5 Ton

Harsat Bahan Hal 25


1 2

819 Exavator Backhoe 5 jam/hari


820 Jack Hammer
821 Mesin Gilas 3 roda 8 Ton s/d 12 ton
822 Mesin Gilas bergetar 6 Ton s/d 7 ton
823 Mesin Gilas bergetar 1 Ton
824 Mesin Gilas roda karet 8 - 15 Ton
825 Mesin Gilas Tandem 8 - 15 Ton
826 Mesin Penyaring 80 HP
827 Mesin Penyemprot aspal 200 ltr
828 Mesin Pompa Air 3 "
829 Motor Grader 100 HP
830 Pemecah 30 t/j 185 HP
831 Pengaduk Beton 125 ltr/6 HP
832 Pengaduk Beton 250 ltr/10 HP
833 Pengaduk Beton 500 ltr/20 HP
834 Plat Bed Truck
835 Pompa Air (50 mm) 30 m3/jam
836 Stamper 4 HP
837 Truck bak terbuka
838 Truck Fuso
839 Truck Tangki Air 115 HP
840 Vibro Roller
841 Whell Loader 115 HP
842 Pheumatic Drill Hammer
843 Ship Foot Roller
844 Grass Cutter
845 Mobilisasi dan Demobilisasi
Mesin Gilas 3 Roda di Wilayah Kota Bogor
846 Mobilisasi dan Demobilisasi
Back Hoe Roda Karet di Wilayah Kota Bogor
847 Mobilisasi dan Demobilisasi
Excavator di Wilayah Kota Bogor
848 Mobilisasi dan Demobilisasi
Dozer di Wilayah Kota Bogor
849 Mobilisasi dan Demobilisasi Alat Berat
Hotmix di wilayah Kota Bogor terdiri atas :
Penyediaan Acces Road Alat - alat Berat dari AMP ke Lokasi Proyek
yang berada di wilayah Kota Bogor
Penyediaan Acces Road Dump Truck Hotmix dari AMP ke Lokasi Proyek
Pengiriman Alat Asphalt Finisher / Mesin Penghampar Hotmix
Pengiriman Alat Mesin Gilas Roda Karet / Tire Roller
Pengiriman Alat Mesin Gilas Tandem / Tandem Roller
Pengiriman Alat Mesin Penyemprot Aspal
Pengiriman Alat Mesin Compressor
Demobilisasi Alat Berat setelah pekerjaan Overlay
Pemberesan kembali Areal lapangan setelah pekerjaan Overlay
Pengambilan Contoh Uji Ketebalan Hotmix (Core Drill)
Test Laboratorium Ekstraksi Kadar Mutu Aspal Hotmix

X BAHAN BAKAR DAN PELUMAS


1 Minyak Tanah

Harsat Bahan Hal 26


1 2

2 Kayu Bakar Dari Kayu Karet


3 Bahan Bakar Residu
4 Minyak Solar
5 Bensin Premium
6 Plus Oil
7 Oli Mesran 40 SAE
8 Elpiji / botol
9 Asitilin / botol
10 Angin ( 02 ) / botol
11 Kawat Las Listrik
12 Karbit
13 Kapur Bakar
14 Minyak Pelumas Oli

Harsat Bahan Hal 27


A BAHAN

SATUAN HARGA SATUAN


Rp.
3 4

m³ 210,000.00
bh 1,000.00
bh 1,000.00
bh 1,000.00
bh 2,000.00
bh 1,000.00
m³ 170,000.00
m³ 150,000.00
kg 16,000.00
m³ 120,000.00
m³ 150,000.00
m³ 135,000.00
m³ 195,000.00
m³ 185,000.00
m³ 200,000.00
m³ 178,000.00
m³ 170,000.00
bh 13,000.00
bh 45,000.00
m² 41,000.00
m³ 105,000.00
m² 95,000.00
btg 20,000.00
bh 9,000.00
bh 4,200.00
bh 10,000.00
bh 4,000.00
bh 4,200.00
bh 5,000.00
bh 70,000.00
bh 60,000.00
m1 120,000.00
m³ 330,000.00
kg 8,000.00
m³ 175,000.00
m³ 140,000.00
m³ 120,000.00
m³ 160,000.00
bh 90,000.00

Harsat Bahan Hal 28


3 4

m² 103,000.00
m² 120,000.00
m² 118,000.00
m² 139,000.00
m³ 825,000.00
m³ 835,000.00
m³ 850,000.00
m³ 880,000.00
m³ 900,000.00
bh 2,500.00
bh 7,000.00
zak 72,000.00
kg 90,000.00
kg 2,500.00
m³ 130,000.00
m³ 160,000.00
m³ 23,000.00
m³ 75,000.00
bh 6,000.00
bh 9,000.00
m³ 113,000.00
m3 650.00

Harsat Bahan Hal 29


3 4

###
lbr 3,000.00
kg 87,200.00
kg 40,000.00
kg 85,000.00
kg 50,000.00
lt 46,000.00
kg 47,500.00
kg 70,000.00
kg 70,000.00
kg 80,000.00
lt 54,000.00
lt 85,000.00
lt 85,000.00
kg 13,000.00
kg 20,000.00
gln 95,000.00
kg 31,000.00
kg 29,000.00
kg 25,000.00
kg 25,000.00
kg 27,000.00
kg 27,000.00
bh 5,000.00
bh 8,000.00
bh 1,000.00
kg 33,000.00
bh 8,000.00
bh 11,000.00
kg 38,000.00
kg 16,000.00
kg 21,000.00
bks 4,000.00
bks 2,000.00
lt 46,000.00
m³ 300,000.00
m³ 450,000.00
kg 13,000.00
kg 19,500.00
bh 25,000.00
kg 33,000.00
5 lt 28,000.00
lt 6,000.00
lt 6,000.00
lt 17,000.00
lt 17,000.00
kg 43,000.00
ml 80,000.00
###
###
bt 16,000.00

Harsat Bahan Hal 30


3 4

bt 15,000.00
bt 37,000.00
bt 17,000.00
bt 21,000.00
m³ 1,500,000.00
m³ 3,500,000.00
m³ 4,500,000.00
m³ 5,000,000.00
m³ 6,500,000.00
m³ 3,250,000.00
m³ 2,500,000.00
m³ 5,855,000.00
m³ 6,534,000.00
m³ 13,504,000.00
m³ 24,866,000.00
m³ 13,504,000.00
m³ 3,834,000.00
m³ 3,750,000.00
m³ 4,750,000.00
m³ 5,250,000.00
m³ 6,750,000.00
m³ 2,500,000.00
###

Harsat Bahan Hal 31


3 4

m' 5,000.00
m' 6,000.00
m' 6,000.00
bh 5,000.00
m³ 1,500,000.00
m' 6,000.00
m' 7,000.00
m' 9,000.00
m' 13,000.00
m' 26,000.00
m' 144,000.00
m' 42,000.00
###
###
lbr 150,000.00
lbr 20,000.00
m² 25,000.00
lbr 61,000.00
lbr 70,000.00
lbr 67,000.00
lbr 49,000.00
lbr 90,000.00
lbr 125,000.00
m' 5,000.00
###
###
m² 16,000.00
m² 11,000.00
m² 22,000.00
lbr 161,200.00
lbr 122,000.00
lbr 81,000.00
lbr 80,000.00
lbr 132,000.00
lbr 145,000.00
lbr 258,000.00
lbr 110,000.00
lbr 334,000.00
m² 53,000
m² 122,000
lbr 124,000
lbr 95,000
lbr 140,000
lbr 112,000
lbr 45,000.00
lbr 61,000.00
lbr 50,000.00
lbr 115,000.00
lbr 170,000.00
m² 25,000.00
###

Harsat Bahan Hal 32


3 4

###
bh 8,000.00
bh 1,200.00
bh 2,000
kg 9,000
ltr 35,000
m² 2,000,000
m² 1,700,000
m² 2,200,000
m² 1,900,000
m² 420,000
m² 335,000
m² 400,000
m² 300,000
m² 294,000
m² 116,000
m² 47,500
m² 52,500
m² 42,500
m² 57,500
m² 50,000
m² 62,500

Harsat Bahan Hal 33


3 4

m² 47,500
m² 60,000
m² 50,000
m² 65,000
m² 50,000
m² 60,000
m² 60,000
m² 70,000
m² 50,000
m² 60,000
m² 60,000
m² 70,000
m² 70,000
m² 275,000
m² 300,000
m² 300,000
m² 200,000
m² 520,000
m² 350,000
m² 135,000
bh 5,000
bh 7,000
bh 3,000
bh 4,000
bh 6,000
bh 3,000
bh 3,000
bh 3,000
bh 3,000
bh 4,000
bh 4,000
bh 8,000
bh 10,000
bh 7,000
bh 25,000
bh 18,000
bh 15,000
bh 55,000
m3 7,750,000
bh 2,000
bh 1,000
bh 2,000
bh 7,000
bh 1,000
bh 1,000
bh 1,000
bh 2,000
m' 21,000
bh 9,000
bh 3,000
bh 5,000

Harsat Bahan Hal 34


3 4

bh 3,000
bh 2,000
bh 3,000
bh 4,000
bh 2,000
bh 2,500
bh 2,500
bh 3,000
bh 4,000
bh 20,000
bh 14,000
bh 500,000
bh 250,000
bh 135,000
bh 450,000
m² 85,000
m² 125,000
m² 230,000
m² 3,000
bh 17,000
kg 29,000
###
###

Harsat Bahan Hal 35


3 4

unit 405,000
m1 42,000
m1 52,500
m1 56,000
unit 70,000
unit 117,000
unit 190,000
unit 12,500
unit 15,000
unit 20,000
unit 25,000
m1 30,000
m1 40,000
m1 55,000
unit 295,000,000
unit 1,956,570,000
unit 582,978,000
unit 798,600,000
unit 85,000,000
unit 1,086,096,000
kg 6,000
btg 15,000
btg 19,500
btg 39,000
btg 60,000
btg 102,500
btg 120,000
btg 200,000
btg 250,000
btg 328,000
btg 659,000
btg 700,000
btg 1,250,000
btg 1,661,000
btg 1,881,000
btg 3,000,000
btg 4,273,000
btg 5,031,000
btg 8,865,000
btg 14,136,000
unit 970,000
unit 1,250,000
unit 1,525,000
unit 2,550,000
unit 3,425,000
unit 4,675,000
unit 3,900,000
unit 4,500,000
unit 540,000
unit 685,000

Harsat Bahan Hal 36


3 4

unit 875,000
unit 1,250,000
unit 1,850,000
unit 2,600,000
unit 3,700,000
unit 4,000,000
unit 435,000
unit 590,000
unit 725,000
unit 1,150,000
unit 1,630,000
unit 2,500,000
unit 4,000,000
unit 5,400,000
unit 165,000
unit 235,000
unit 275,000
unit 430,000
unit 1,250,000
unit 1,550,000
unit 575,000
unit 750,000
###

Harsat Bahan Hal 37


3 4

unit 115,000
unit 175,000
unit 200,000
unit 275,000
unit 775,000
unit 985,000
unit 445,000
unit 640,000
unit 560,000
unit 1,100,000
unit 1,350,000
unit 1,700,000
unit 450,000
unit 450,000
unit 450,000
unit 1,000,000

###
m 110,000
m 150,000
m 240,000
m 130,000
m² 140,000
m² 170,000
bh 110,000
bh 220,000
bh 275,000
bh 446,000
bh 557,000
bh 408,000
bh 120,000
bh 686,000
bh 686,000
bh 685,000
bh 140,000
bh 140,000
bh 110,000
bh 680,000
bh 820,000
bh 1,250,000
bh 951,000
bh 121,000
bh 1,500,000
bh 3,019,000
bh 2,517,000
bh 3,019,000
bh 3,523,000
bh 4,025,000
bh 4,529,000
bh 5,031,000
###

Harsat Bahan Hal 38


3 4

bh 20,125,000
###
bh 20,000,000
###
bh 25,156,000
###
bh 35,219,000
###
###
m' 40,000
kg 10,500
kg 10,000
kg 10,000
kg 10,500
kg 14,000
kg 11,000
kg 13,000
kg 11,000
kg 11,000
kg 11,000
kg 11,000
m' 22,000
m' 20,000
m² 151,000
m¹ 25,000
m¹ 35,000
m¹ 43,000
m¹ 50,000

Harsat Bahan Hal 39


3 4

bh 404,000
btg 30,000
btg 35,000
kg 11,000
kg 13,000
m² 400,000
ps 112,000
m1 7,000
kg 15,000
kg 20,000
kg 20,000
m1 3,000
m² 24,000
m² 35,000
m² 29,000
kg 25,000
m² 27,000
m1 1,000
kg 35,000
m1 105,000
m1 135,000
kg 30,000
kg 45,000
kg 7,500
m² 145,000
m² 50,000
m² 82,000
m² 105,000
m² 128,000
m² 152,000
m² 176,000
kg 11,000
kg 11,000
kg 11,000
kg 15,000
kg 14,000
kg 12,000
kg 12,000
kg 12,000
bt 29,000
bt 37,000
cm 5,000
m² 450,000
m' 85,000
m' 5,000
m² 10,000
m² 12,000
m² 20,000
m² 13,000
m² 600,000

Harsat Bahan Hal 40


3 4

lbr 61,000
lbr 47,000
rool 1,583,000
rool 2,280,000
tube 25,000
bh 3,000
kg 25,000
m² 350,000
kg 41,000
m² 275,000
kg 36,000
m² 36,000
m² 45,000

kg 22,000.00
bh 23,000.00
bh 89,000.00
m² 1,307,000
m² 3,746,000
m² 1,380,000
m² 44,000
m² 64,000
m² 94,000
m² 293,000

Harsat Bahan Hal 41


3 4

m² 95,000.00
m² 481,000.00
kg 35,000.00

kg 12,000
kg 18,000
bh 6,000
bh 54,000
bh 10,000
kg 16,000
kg 13,000
kg 13,000
bh 3,000
kg 47,000
bh 1,000
kg 14,000
bh 190.00
bh 5,000.00
###
1.² ###
bt 110,000
bt 220,000
bt 400,000
bt 520,000
bt 730,000
bt 163,000
bt 224,000
bt 247,000
bt 347,000
bt 505,000
bt 657,000
bt 937,000
bt 1,577,000
tb 7,000
bh 21,000
bh 18,000
bh 24,000
bh 12,000
bh 6,000
bh 50,000
bh 40,000
bh 70,000
bh 7,000
bh 110,000
bh 10,000
bh 7,000
bh 8,000
bh 5,500,000
bh 5,500
bh 3,000

Harsat Bahan Hal 42


3 4

bh 25,000
bh 14,000
bh 29,000
bh 5,000
lbr 50,000
bh 118,800
bt 139,700
bt 203,500
bt 286,000
bt 315,700
bt 400,400
bt 421,300
bt 591,800
bt 788,700
bt 1,051,600
bt 52,000
bt 40,000
bt 28,500
bt 18,000
bt 10,500
bt 75,000
bt 150,000

Harsat Bahan Hal 43


3 4

bt 22,000
bt 200,000
m1 36,000
bt 85,000
bt 70,000
bt 52,000
bt 25,000
bt 145,000
bt 115,000
bt 21,000
bt 44,000
bt 335,000
bt 635,000
bt 925,000
bh 87,500
gl 4,000
bh 35,000.00
unit 1,900,000.00
unit 1,200,000.00
unit 750,000.00
bh 1,130,000.00
paket 300,000.00
unit 500,000.00

bh 95,000
bh 131,000
bh 227,000
bh 314,000
bh 784,000
bh 889,000
bh 79,000
bh 29,000
bh 46,000
bh 58,000
bh 58,000
bh 285,000
bh 50,000
bh 196,000
bh 109,000
bh 87,000
bh 35,000
bh 157,000
bh 60,000
bh 218,000
unit 2,369,000
bh 50,000
unit 1,134,000
unit 750,000
unit 220,000
unit 192,000

Harsat Bahan Hal 44


3 4

unit 1,987,000
unit 1,876,000
unit 1,284,000
bh 1,431,000
unit 1,939,000
lbr 600,000
bh 409,000
bh 1,253,000
bh 1,873,000
bh 3,000

lbr 45,000
m² 9,500
m² 154,000
m² 178,000
lbr 77,000
lbr 106,000
lbr 82,000
lbr 50,000
lbr 51,000
lbr 77,000
m² 95,000
bh 2,000
bh 2,000
bh 2,000
bh 2,000
bh 2,000
m² 538,000

Harsat Bahan Hal 45


3 4

m² 298,000
bh 7,000
bh 9,000
bh 7,000
bh 15,000
bh 4,000
m² 93,000
m² 80,000
bh 10,000
bh 5,000
m² 145,000
m² 129,000
m² 122,000
m² 108,000
m² 180,000
m² 70,000
bh 6,000
bh 3,500
bh 3,500
m1 155,000
m1 83,000
m1 105,000
m1 107,000
bh 1,100
m1 107,000
m1 83,000

unit 4,743,000
unit 21,642,000
unit 30,311,000
unit 623,268,000
bh 128,000
unit 249,307,000
unit 953,000
unit 5,367,000
unit 6,050,000
unit 5,198,000
unit 6,462,000
unit 72,715,000
unit 1,980,000
unit 36,445,000

1.5
ROLL 85,000
ROLL 120,000
m' 5,250
m' 6,700
m' 9,450
m' 10,500
m' 7,000

Harsat Bahan Hal 46


3 4

m' 6,000
m' 12,000
m' 17,000
m' 9,500
m' 12,500
m' 16,700
m' 15,700
m' 20,800
m' 22,900
m' 31,300
m' 9,500
m' 12,500
m' 20,800
m' 9,400
m' 15,700
m' 19,400
m' 16,700
m' 22,800
m' 28,100
m' 44,600
bh 880,000
bh 1,800,000
###

Harsat Bahan Hal 47


3 4

unt 150,000
unt 190,000
unt 228,000
unt 478,000
bh 50,000
bh 61,000
bh 538,000
bh 18,000
bh 22,000
bh 21,000
bh 85,000
bh 144,000
bh 84,000
ttk 180,000
bh 10,000
bh 30,000
bh 35,000
bh 47,500
bh 50,000
bh 25,000
bh 30,000
bh 5,000
bh 3,500
bh 125,000
bh 290,000
bh 125,000
bh 105,000
bh 108,000
bh 380,000
bh 200,000
bh 740,000
bh 95,000
kg 40,000
ttk 420,000
ttk 180,000
###
###
unt 203,000
unt 598,000
unt 419,000
m1 17,500
ps 15,000
ps 8,000
ps 25,000
ps 45,000
bh 37,000
bh 10,000
ps 25,000
ps 15,000
bh 30,000
bh 130,000

Harsat Bahan Hal 48


3 4

bh 182,000
bh 83,000
bh 121,000
bh 275,000
bh 539,000
bh 66,000
85,000
bh 44,000
bh 315,000
dn 25,000
bh 837,000
unt 180,000
m1 33,000
m1 47,000
bh 15,000
bh 29,000
bh 17,500
bh 378,000
###
###
kg 9,500
kg 11,500.00
###

Harsat Bahan Hal 49


3 4

kg 11,500.00
ton 1,100,000.00
ton 1,120,000.00
ton 1,180,000.00
ton 1,315,000.00
ton 16,000.00
ton 14,000.00
###
###
unit 220,000,000.00
unit 16,450,000.00
unit 4,961,000.00
unit 1,100,000
unit 1,900,000
unit 837,000
unit 275,000
unit 192,000
unit 34,267,000
unit 5,808,000
unit 9,438,000
###
###
bh 750,000
bh 1,200,000
bh 2,300,000
bh 273,600
bh 50,000
bh 144,000
###
###
###
1 watt 1,000
m² 29,000
m² 26,000
m² 32,000
m² 29,000
ttk 270,000
m² 2,000
spl 110,000
spl 250,000
spl 85,000
1 watt 1,000
unit 7,260,000
unit 799,000
ttk 400,000
###
###
bh 50,000
bh 69,000
kg 20,000
kg 33,000

Harsat Bahan Hal 50


3 4

bh 69,000
bh 64,000
bh 15,000
bh 91,000
bh 26,000
bh 69,000
bh 2,000
bh 64,000
rool 17,000
bh 43,000
###
###
###
/jam 37,000
/jam 112,200
/jam 770,000
/jam 198,000
/jam 90,000
/jam 90,000
/jam 90,000
/jam 200,000
/jam 105,000
###

Harsat Bahan Hal 51


3 4

/jam 275,000
/jam 90,000
/jam 94,000
/jam 94,000
/jam 80,000
/jam 95,000
/jam 105,000
/jam 220,000
/jam 120,000
/jam 37,000
/jam 193,000
/jam 385,000
/jam 37,000
/jam 50,000
/jam 69,000
/jam 105,000
/jam 37,000
/jam 35,000
/jam 105,000
/jam 105,000
/jam 94,000
/jam 94,000
/jam 180,000
/jam 99,000
/jam 176,000
/jam 20,000
/paket 633,000
###
/paket 1,500,000
###
/paket 5,500,000
###
/paket 5,500,000
###
/paket 10,500,000
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
lt 8,000

Harsat Bahan Hal 52


3 4

m³ 70,000
lt 6,000
lt 6,000
lt 7,000
lt 40,000
lt 40,000
15 kg 80,000
15.1 kg 105,000
btl 70,000
kg 25,000
kg 12,500
m³ 1,102,000
lt 40,000

Harsat Bahan Hal 53


PEKERJAAN PLESTERAN (SNI 2837:2008)
1 Membuat 1 m2 plesteran 1 PC : 1 PP, tebal 15 mm
Portland Cement 15.504
Bahan
Pasir Pasang 0.016
Pekerja 0.300
Tukang batu 0.150
Tenaga kerja
Kepala tukang 0.015
Mandor 0.015
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
2 Membuat 1 m2 plesteran 1 PC : 2 PP, tebal 15 mm
Portland Cement 10.224
Bahan
Pasir Pasang 0.020
Pekerja 0.300
Tukang batu 0.150
Tenaga kerja
Kepala tukang 0.015
Mandor 0.015
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
3 Membuat 1 m2 plesteran 1 PC : 3 PP, tebal 15 mm
Portland Cement 7.775
Bahan
Pasir Pasang 0.023
Pekerja 0.300
Tukang batu 0.150
Tenaga kerja
Kepala tukang 0.015
Mandor 0.015
Jumlah
Overhead + Profit
Jumlah
Dibulatkan

AHSP SNI Hal 15


4 Membuat 1 m2 plesteran 1 PC : 4 PP, tebal 15 mm
Portland Cement 6.240
Bahan
Pasir Pasang 0.024
Pekerja 0.300
Tukang batu 0.150
Tenaga kerja
Kepala tukang 0.015
Mandor 0.015
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
5 Membuat 1 m2 plesteran 1 PC : 5 PP, tebal 15 mm
Portland Cement 5.184
Bahan
Pasir Pasang 0.026
Pekerja 0.300
Tukang batu 0.150
Tenaga kerja
Kepala tukang 0.015
Mandor 0.015
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
6 Membuat 1 m2 plesteran 1 PC : 6 PP, tebal 15 mm
Portland Cement 4.416
Bahan
Pasir Pasang 0.027
Pekerja 0.300
Tukang batu 0.150
Tenaga kerja
Kepala tukang 0.015
Mandor 0.015
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
7 Membuat 1 m2 plesteran 1 PC : 7 PP, tebal 15 mm
Portland Cement 3.936
Bahan
Pasir Pasang 0.028
Pekerja 0.300
Tukang batu 0.150
Tenaga kerja
Kepala tukang 0.015
Mandor 0.015
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
8 Membuat 1 m2 plesteran 1 PC : 8 PP, tebal 15 mm
Portland Cement 3.456
Bahan
Pasir Pasang 0.029
Pekerja 0.300
Tukang batu 0.150
Tenaga kerja
Kepala tukang 0.015
Mandor 0.015
Jumlah
AHSP SNI Hal 16
Overhead + Profit
Jumlah
Dibulatkan
9 Membuat 1 m2 plesteran 1 PC : ½ KP : 3 PP, tebal 15 mm
Portland Cement 5.760
Bahan Kapur Padam 0.003
Pasir Pasang 0.013
Pekerja 0.360
Tukang batu 0.120
Tenaga kerja
Kepala tukang 0.012
Mandor 0.018
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
10 Membuat 1 m2 plesteran 1 PC : 2 KP : 8 PP, tebal 15 mm
Portland Cement 3.000
Bahan Kapur Padam 0.005
Pasir Pasang 0.020
Pekerja 0.360
Tukang batu 0.120
Tenaga kerja
Kepala tukang 0.012
Mandor 0.018
Jumlah
Overhead + Profit
Jumlah
Dibulatkan

AHSP SNI Hal 17


11 Membuat 1 m2 plesteran 1 SM : 1 KP : 1 PP, tebal 15 mm
Semen Merah 0.009
Bahan Kapur Padam 0.009
Pasir Pasang 0.009
Pekerja 0.360
Tukang batu 0.120
Tenaga kerja
Kepala tukang 0.012
Mandor 0.018
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
12 Membuat 1 m2 plesteran 1 SM : 1 KP : 2 PP, tebal 15 mm
Semen Merah 0.007
Bahan Kapur Padam 0.007
Pasir Pasang 0.015
Pekerja 0.360
Tukang batu 0.120
Tenaga kerja
Kepala tukang 0.012
Mandor 0.018
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
13 Membuat 1 m2 plesteran 1 PC : 2 PP, tebal 20 mm
Portland Cement 13.632
Bahan
Pasir Pasang 0.027
Pekerja 0.400
Tukang batu 0.200
Tenaga kerja
Kepala tukang 0.020
Mandor 0.022
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
14 Membuat 1 m2 plesteran 1 PC : 3 PP, tebal 20 mm
Portland Cement 10.368
Bahan
Pasir Pasang 0.031
Pekerja 0.260
Tukang batu 0.200
Tenaga kerja
Kepala tukang 0.020
Mandor 0.013
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
15 Membuat 1 m2 plesteran 1 PC : 4 PP, tebal 20 mm
Portland Cement 8.320
Bahan
Pasir Pasang 0.032
Pekerja 0.400
Tukang batu 0.200
Tenaga kerja
Kepala tukang 0.020
AHSP SNI Hal 18
Tenaga kerja

Mandor 0.022
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
16 Membuat 1 m2 plesteran 1 PC : 5 PP, tebal 20 mm
Portland Cement 6.912
Bahan
Pasir Pasang 0.035
Pekerja 0.400
Tukang batu 0.200
Tenaga kerja
Kepala tukang 0.020
Mandor 0.022
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
17 Membuat 1 m2 plesteran 1 PC : 6 PP, tebal 20 mm
Portland Cement 5.888
Bahan
Pasir Pasang 0.036
Pekerja 0.400
Tukang batu 0.200
Tenaga kerja
Kepala tukang 0.020
Mandor 0.022
Jumlah
Overhead + Profit
Jumlah
Dibulatkan

AHSP SNI Hal 19


18 Membuat 1 m2 plesteran 1 SM : 1 KP : 2 PP, tebal 20 mm
Semen Merah 0.009
Bahan Kapur Padam 0.009
Pasir Pasang 0.180
Pekerja 0.440
Tukang batu 0.220
Tenaga kerja
Kepala tukang 0.022
Mandor 0.022
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
19 Membuat 1 m2 Berapen 1 PC : 5 PP, tebal 15 mm
Portland Cement 5.184
Bahan
Pasir Pasang 0.026
Pekerja 0.150
Tukang batu 0.075
Tenaga kerja
Kepala tukang 0.008
Mandor 0.008
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
20 Membuat 1 m’ Plesteran Skoning lebar 10 mm 1 PC : 2 PP.
Portland Cement 0.500
Bahan
Pasir Pasang 0.013
Pekerja 0.080
Tukang batu 0.400
Tenaga kerja
Kepala tukang 0.040
Mandor 0.004
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
21 Membuat 1 m2 Plesteran Granit , 1 PC : 2 Granit, tebal 10 mm
Portland Cement 10.000
Bahan
Batu granit 15.000
Pekerja 0.450
Tukang batu 0.250
Tenaga kerja
Kepala tukang 0.023
Mandor 0.023
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
22 Membuat 1 m2 Plesteran Teraso , 1 PC : 2 Batu Teraso, tebal 10 mm
Portland Cement 10.000
Bahan
Batu teraso 15.000
Pekerja 0.450
Tukang batu 0.250
Tenaga kerja
Kepala tukang 0.023
Mandor 0.023
AHSP SNI Hal 20
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
23 Membuat 1 m2 Plesteran Ciprat / Kamprotan 1 PC : 2 PP
Portland Cement 4.320
Bahan
Pasir Pasang 0.006
Pekerja 0.300
Tukang batu 0.100
Tenaga kerja
Kepala tukang 0.010
Mandor 0.015
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
24 Membuat 1 m2 finishing siar pasangan dinding bata merah (=20 m’)
Bahan Portland Cement 3.108
Pekerja 0.150
Tukang batu 0.075
Tenaga kerja
Kepala tukang 0.008
Mandor 0.008
Jumlah
Overhead + Profit
Jumlah
Dibulatkan

AHSP SNI Hal 21


25 Membuat 1 m2 finishing siar pasangan dinding conblock ekspose (=8 m’)
Bahan Portland Cement 1.600
Pekerja 0.070
Tukang batu 0.035
Tenaga kerja
Kepala tukang 0.004
Mandor 0.004
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
26 Membuat 1 m2 finishing siar pasangan batu kali adukan 1 PC : 2 PP
Bahan Portland Cement 6.340
Pasir Pasang 0.012
Pekerja 0.300
Tukang batu 0.150
Tenaga kerja
Kepala tukang 0.015
Mandor 0.015
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
27 Membuat 1 m2 acian
Bahan Portland Cement 3.250
Pekerja 0.200
Tukang batu 0.100
Tenaga kerja
Kepala tukang 0.010
Mandor 0.010
Jumlah
Overhead + Profit
Jumlah
Dibulatkan

AHSP SNI Hal 22


kg 1,440.00 22,325.76
m3 140,000.00 2,240.00
HO 80,000.00 24,000.00
HO 110,000.00 16,500.00
HO 130,000.00 1,950.00
HO 130,000.00 1,950.00
68,965.76
6,896.58
75,862.34
75,860.00

kg 1,440.00 14,722.56
m3 140,000.00 2,800.00
HO 80,000.00 24,000.00
HO 110,000.00 16,500.00
HO 130,000.00 1,950.00
HO 130,000.00 1,950.00
61,922.56
6,192.26
68,114.82
68,110.00

kg 1,440.00 11,196.00
m3 140,000.00 3,220.00
HO 80,000.00 24,000.00
HO 110,000.00 16,500.00
HO 130,000.00 1,950.00
HO 130,000.00 1,950.00
58,816.00
5,881.60
64,697.60
64,690.00

AHSP SNI Hal 23


kg 1,440.00 8,985.60
m3 140,000.00 3,360.00
HO 80,000.00 24,000.00
HO 110,000.00 16,500.00
HO 130,000.00 1,950.00
HO 130,000.00 1,950.00
56,745.60
5,674.56
62,420.16
62,420.00

kg 1,440.00 7,464.96
m3 140,000.00 3,640.00
HO 80,000.00 24,000.00
HO 110,000.00 16,500.00
HO 130,000.00 1,950.00
HO 130,000.00 1,950.00
55,504.96
5,550.50
61,055.46
61,050.00

kg 1,440.00 6,359.04
m3 140,000.00 3,780.00
HO 80,000.00 24,000.00
HO 110,000.00 16,500.00
HO 130,000.00 1,950.00
HO 130,000.00 1,950.00
54,539.04
5,453.90
59,992.94
59,990.00

kg 1,440.00 5,667.84
m3 140,000.00 3,920.00
HO 80,000.00 24,000.00
HO 110,000.00 16,500.00
HO 130,000.00 1,950.00
HO 130,000.00 1,950.00
53,987.84
5,398.78
59,386.62
59,380.00

kg 1,440.00 4,976.64
m3 140,000.00 4,060.00
HO 80,000.00 24,000.00
HO 110,000.00 16,500.00
HO 130,000.00 1,950.00
HO 130,000.00 1,950.00
53,436.64
AHSP SNI Hal 24
5,343.66
58,780.30
58,780.00

kg 1,440.00 8,294.40
m3 330,000.00 990.00
m3 140,000.00 1,820.00
HO 80,000.00 28,800.00
HO 110,000.00 13,200.00
HO 130,000.00 1,560.00
HO 130,000.00 2,340.00
47,720.00
4,772.00
52,492.00
52,490.00

kg 1,440.00 4,320.00
m3 330,000.00 1,650.00
m3 140,000.00 2,800.00
HO 80,000.00 28,800.00
HO 110,000.00 13,200.00
HO 130,000.00 1,560.00
HO 130,000.00 2,340.00
54,670.00
5,467.00
60,137.00
60,130.00

AHSP SNI Hal 25


m3 130,000.00 1,170.00
m3 330,000.00 2,970.00
m3 140,000.00 1,260.00
HO 80,000.00 28,800.00
HO 110,000.00 13,200.00
HO 130,000.00 1,560.00
HO 130,000.00 2,340.00
51,300.00
5,130.00
56,430.00
56,430.00

m3 130,000.00 910.00
m3 330,000.00 2,310.00
m3 140,000.00 2,100.00
HO 80,000.00 28,800.00
HO 110,000.00 13,200.00
HO 130,000.00 1,560.00
HO 130,000.00 2,340.00
51,220.00
5,122.00
56,342.00
56,340.00

m3 1,440.00 19,630.08
m3 140,000.00 3,780.00
HO 80,000.00 32,000.00
HO 110,000.00 22,000.00
HO 130,000.00 2,600.00
HO 130,000.00 2,860.00
82,870.08
8,287.01
91,157.09
91,150.00

kg 1,440.00 14,929.92
m3 140,000.00 4,340.00
HO 80,000.00 20,800.00
HO 110,000.00 22,000.00
HO 130,000.00 2,600.00
HO 130,000.00 1,690.00
66,359.92
6,635.99
72,995.91
72,990.00

kg 1,440.00 11,980.80
m3 140,000.00 4,480.00
HO 80,000.00 32,000.00
HO 110,000.00 22,000.00
HO 130,000.00 2,600.00
AHSP SNI Hal 26
HO 130,000.00 2,860.00
75,920.80
7,592.08
83,512.88
83,510.00

kg 1,440.00 9,953.28
m3 140,000.00 4,900.00
HO 80,000.00 32,000.00
HO 110,000.00 22,000.00
HO 130,000.00 2,600.00
HO 130,000.00 2,860.00
74,313.28
7,431.33
81,744.61
81,740.00

kg 1,440.00 8,478.72
m3 140,000.00 5,040.00
HO 80,000.00 32,000.00
HO 110,000.00 22,000.00
HO 130,000.00 2,600.00
HO 130,000.00 2,860.00
72,978.72
7,297.87
80,276.59
80,270.00

AHSP SNI Hal 27


m3 130,000.00 1,170.00
m3 330,000.00 2,970.00
m3 140,000.00 25,200.00
HO 80,000.00 35,200.00
HO 110,000.00 24,200.00
HO 130,000.00 2,860.00
HO 130,000.00 2,860.00
94,460.00
9,446.00
103,906.00
103,900.00

kg 1,440.00 7,464.96
m3 140,000.00 3,640.00
HO 80,000.00 12,000.00
HO 110,000.00 8,250.00
HO 130,000.00 1,040.00
HO 130,000.00 1,040.00
33,434.96
3,343.50
36,778.46
36,770.00

kg 1,440.00 720.00
m3 140,000.00 1,820.00
HO 80,000.00 6,400.00
HO 110,000.00 44,000.00
HO 130,000.00 5,200.00
HO 130,000.00 520.00
58,660.00
5,866.00
64,526.00
64,520.00

kg 1,440.00 14,400.00
kg 1,700.00 25,500.00
HO 80,000.00 36,000.00
HO 110,000.00 27,500.00
HO 130,000.00 2,990.00
HO 130,000.00 2,990.00
109,380.00
10,938.00
120,318.00
120,310.00

kg 1,440.00 14,400.00
kg 9,000.00 135,000.00
HO 80,000.00 36,000.00
HO 110,000.00 27,500.00
HO 130,000.00 2,990.00
HO 130,000.00 2,990.00
AHSP SNI Hal 28
218,880.00
21,888.00
240,768.00
240,760.00

kg 1,440.00 6,220.80
m3 140,000.00 840.00
HO 80,000.00 24,000.00
HO 110,000.00 11,000.00
HO 130,000.00 1,300.00
HO 130,000.00 1,950.00
45,310.80
4,531.08
49,841.88
49,840.00

m3 1,440.00 4,475.52
HO 80,000.00 12,000.00
HO 110,000.00 8,250.00
HO 130,000.00 1,040.00
HO 130,000.00 1,040.00
26,805.52
2,680.55
29,486.07
29,480.00

AHSP SNI Hal 29


kg 1,440.00 2,304.00
HO 80,000.00 5,600.00
HO 110,000.00 3,850.00
HO 130,000.00 520.00
HO 130,000.00 520.00
12,794.00
1,279.40
14,073.40
14,070.00

kg 1,440.00 9,129.60
m3 140,000.00 1,680.00
HO 80,000.00 24,000.00
HO 110,000.00 16,500.00
HO 130,000.00 1,950.00
HO 130,000.00 1,950.00
55,209.60
5,520.96
60,730.56
60,730.00

m3 1,440.00 4,680.00
HO 80,000.00 16,000.00
HO 110,000.00 11,000.00
HO 130,000.00 1,300.00
HO 130,000.00 1,300.00
34,280.00
3,428.00
37,708.00
37,700.00

AHSP SNI Hal 30

Anda mungkin juga menyukai