Daftar Harga Upah dan Bahan

No.
1
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48

Uraian
2
MATERIAL
Amplas
Air
Alat bantu
Aspal
Bensin/Premiun
Batu Bata
Bataco
Baja profil IWF
Besi Beton
Baja Prof il Siku
Besi Bendrat
Baut / besi strip
Batu gunung / batu belah
Cat Dasar Kayu
Cat Dasar Tembok
Cat Menie besi
Cat kilap
Cat Tembok
Dempul Kayu
Dempul Besi
Espanolet Tanam
Engsel pintu 5'
Engsel jendela 3 '
Atap Zincalume tbl. 4 mm
Pemuung Zincalume
Glasblock
Kunci Tanam 2 sllag
Kait angin
Koral / Kerikil
Kaca Bening 5 mm
Kaca Rayben 5 mm
Kayu Bekesting
Kayu Papan lanan
Kayu lanan Balok
Kayu Balok Ulin Kelas I
Kayu Papan Ulin kelas I
Kayu bakar
Kayu galam dia 8-10
Keramik Polos Putih 30 x 30
Keramik Lantai KM 20 x 20
Keramik Dinding KM Polos 20 x 20
Kloset Jongkok
Kalsiboard 3.6 mm
Kuda Baja ringan
Laston Ac - AMP
Kerosene
Nako Jendela
Minyak Cat

Harga Satuan
3
Rp5,000.00
Rp10.00
Rp50,000.00
Rp5,000.00
Rp5,000.00
Rp450.00
Rp1,500.00
Rp9,000.00
Rp9,000.00
Rp9,000.00
Rp10,000.00
Rp10,000.00
Rp200,000.00
Rp37,500.00
Rp37,500.00
Rp37,500.00
Rp37,500.00
Rp37,500.00
Rp35,000.00
Rp35,000.00
Rp75,000.00
Rp50,000.00
Rp35,000.00
Rp65,000.00
Rp30,000.00
Rp50,000.00
Rp250,000.00
Rp25,000.00
Rp200,000.00
Rp85,000.00
Rp100,000.00
Rp900,000.00
Rp1,250,000.00
Rp1,000,000.00
Rp6,500,000.00
Rp7,000,000.00
Rp600,000.00
Rp5,000.00
Rp65,000.00
Rp60,000.00
Rp60,000.00
Rp450,000.00
Rp57,500.00
Rp200,000.00
Rp1,150,000.00
Rp7,000.00
Rp16,500.00
Rp5,000.00

lbr
ltr
set
kg
ltr
bh
bh
kg
kg
kg
kg
kg
m3
kg
kg
kg
kg
kg
kg
kg
bh
bh
bh
m2
m1
bh
bh
bh
m2
m2
m2
m3
m3
m3
m3
m3
m3
btg
m2
m2
m2
bh
lbr
m2
m3
ltr
bf
ltr

49
50
51
52
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76

Minyak Bekisting
Minyak pelumas
playwood/multiplek 9 mm
Playwood 4 mm
Pemuung type U
Paku
Paku anti karat
Pasir Beton
Pasir Pasang
Pintu besi Lipat
Pasir Urug
Batu belah 10/15
Batu belah 5/7
Batu belah 3/5
Batu belah 2/3
Batu BaseCourse
Tanah laterit
Porland Cement
Porland Cement (Putih)
Plamir
Pipa PVC 3"
Pintu PVC
Pemeliharaan Bahan Bakar
Roster kerawang
Solar/Diesel
Seng gelombang
Saklar Tunggal
Saklar Ganda
Stop Kontak
SEWA ALAT
77
Dumptruck
No.
1
1 Operator Terlatih
2 Pembantu Operator
3 Supir truck
4 Pembantu Supir
5 Mandor
6 Kepala Tukang
7 Tukang kayu
8 Tukang Batu
9 Tukang Besi
10 Tukang Cat
11 Jaga Pekerja
12 Pekerja

UPAH
2

Rp5,000.00
Rp25,000.00
Rp100,000.00
Rp60,000.00
Rp27,500.00
Rp12,500.00
Rp22,500.00
Rp90,000.00
Rp90,000.00
Rp200,000.00
Rp75,000.00
Rp250,000.00
Rp225,000.00
Rp200,000.00
Rp200,000.00
Rp200,000.00
Rp75,000.00
Rp1,150.00
Rp1,850.00
Rp27,500.00
Rp50,000.00
Rp350,000.00
Rp500,000.00
Rp1,850.00
Rp7,000.00
Rp50,000.00
Rp30,000.00
Rp35,000.00
Rp30,000.00

ltr
ltr
lbr
lbr
m'
kg
kg
m3
m3
m2
m2
m2
m2
m2
m2
m2
m2
kg
kg
kg
m'
unit
Ls
Bh
ltr
m
bh
bh
bh

Rp150,000.00

Jam

Harga Satuan
3
Rp75,000.00
Rp45,000.00
Rp75,000.00
Rp45,000.00
Rp50,000.00
Rp70,000.00
Rp50,000.00
Rp50,000.00
Rp50,000.00
Rp50,000.00
Rp30,000.00
Rp35,000.00

/hari
/hari
/hari
/hari
/hari
/hari
/hari
/hari
/hari
/hari
/hari
/hari

ANALISA HARGA SATUAN PEKERJAAN


PEKERJAAN : PEMBANGUNAN GUDANG PUPUK KABUPATEN TANAH LAUT
LOKASI : DESA AMBUNGAN KECAMATAN PELAIHARI, KAB. TANAH LAUT
TAHUN ANGGARAN : 2011
No

URAIAN PEKERJAAN

HARGA
SATUAN
(Rp.)

UPAH KERJA
(Rp.)

HARGA BAHAN
JUMLAH (RP.)
(Rp.)

I. PEKERJAAN PERSIAPAN
1

1 M Pengukuran dan pemasangan Bouwplank


0.0120 m3 Balok Kayu lanan 5/7
0.0200 Kg Paku kayu
0.0070 m3 Papan Lanan
0.0050 org Mandor
0.0100 org Kep. Tukang
0.1000 org Tukang batu
0.1000 org Pekerja

1 m2 Pembuatan kantor sementara dengan lantai plesteran


1.2500 Btg galam dia. 8-10/400 cm
Rp5,000.00
###
0.1800 m3 Kayu Begisting
Rp12,500.00
0.8500 kg Paku Kayu
1.1000 kg Besi Strip
Rp10,000.00
###
kg Semen portland
Rp1,150.00
0.1500 m3 Pasir Pasang
Rp90,000.00
Rp90,000.00
0.1000 m3 Pasir Beton
###
0.1500 m3 koral
###
bh Bata Merah
Rp450.00
1.0000 m2 Seng Gelombang 3"-5"
Rp50,000.00
Rp16,500.00
2.0000 bh Jendela Nako
0.0800 m2 Kaca Polos
Rp85,000.00
0.1500 bh Kunci Tanam
###
Rp60,000.00
0.0600 lbr Playwood 4 mm
Rp50,000.00
0.0200 org Mandor
0.0200 org Kep. Tukang
Rp70,000.00
Rp50,000.00
0.2000 org Tukang Kayu
Rp35,000.00
0.4000 org Pekerja

II. PEKERJAAN TANAH


3
1 m3 Galian tanah biasa sedalam 1 m
0.0400 org Mandor
0.4000 org Pekerja
4

###
Rp12,500.00
###
Rp50,000.00
Rp70,000.00
Rp50,000.00
Rp35,000.00

Rp12,000.00
Rp250.00
Rp8,750.00
Rp250.00
Rp700.00
Rp5,000.00
Rp3,500.00
Rp9,450.00

Rp6,250.00
###
Rp10,625.00
Rp11,000.00
Rp40,250.00
Rp13,500.00
Rp9,000.00
Rp30,000.00
Rp13,500.00
Rp50,000.00
Rp33,000.00
Rp6,800.00
Rp37,500.00
Rp3,600.00
Rp1,000.00
Rp1,400.00
Rp10,000.00
Rp14,000.00
Rp26,400.00

Rp50,000.00
Rp35,000.00

Rp2,000.00
Rp14,000.00
Rp16,000.00

1 m3 Urugan Tanah Kembali


0.0190 org Mandor
0.1900 org Pekerja

Rp50,000.00
Rp35,000.00

Rp950.00
Rp6,650.00
Rp7,600.00

1 m3 Pemadatan Tanah
0.0500 org Mandor
0.5000 org Pekerja

Rp50,000.00
Rp35,000.00

Rp2,500.00
Rp17,500.00
Rp20,000.00

1 m3 Urugan tanah
1.2000 m3 Tanah urug
0.0250 org Mandor
0.2500 org Pekerja

Rp75,000.00
Rp50,000.00
Rp35,000.00

1 m3 Urugan Pasir
1.2000 m3 Pasir Urug
0.0100 org Mandor
0.3000 org Pekerja

Rp75,000.00
Rp50,000.00
Rp35,000.00

III. PEKERJAAN PONDASI


1 m3 Pasangan batu belah 1 : 4
###
1.1000 m3 Batu gunung
Rp1,150.00
###
kg Semen PC
Rp90,000.00
0.5200 m3 Pasir pasang
Rp50,000.00
0.0750 org Mandor
Rp70,000.00
0.0600 org Kep. Tukang
Rp50,000.00
0.6000 org Tukang batu
Rp35,000.00
1.5000 org Pekerja

Rp21,000.00

###

Rp950.00
Rp6,650.00
Rp7,600.00
Rp2,500.00
Rp17,500.00
Rp20,000.00

Rp90,000.00
Rp90,000.00

Rp500.00
Rp10,500.00
Rp11,000.00

Rp6,250.00
###
Rp10,625.00
Rp11,000.00
Rp40,250.00
Rp13,500.00
Rp9,000.00
Rp30,000.00
Rp13,500.00
Rp50,000.00
Rp33,000.00
Rp6,800.00
Rp37,500.00
Rp3,600.00
Rp1,000.00
Rp1,400.00
Rp10,000.00
Rp14,000.00
###

Rp2,000.00
Rp14,000.00
Rp16,000.00

Rp90,000.00
Rp1,250.00
Rp8,750.00
Rp10,000.00

Rp12,000.00
Rp250.00
Rp8,750.00
Rp250.00
Rp700.00
Rp5,000.00
Rp3,500.00
Rp30,450.00

Rp90,000.00

###
###
Rp46,800.00
Rp3,750.00
Rp4,200.00
Rp30,000.00
Rp52,500.00
Rp90,450.00

###

Rp1,500.00
Rp1,400.00
Rp10,000.00
Rp22,750.00
Rp35,650.00

###

Rp90,000.00
Rp1,250.00
Rp8,750.00
###
Rp90,000.00
Rp500.00
Rp10,500.00
###

###
###
Rp46,800.00
Rp3,750.00
Rp4,200.00
Rp30,000.00
Rp52,500.00
###

IV. PEKERJAAN DIN DING


9
###
###
0.0930
0.0300
0.0200
0.2000
0.6500
10

11

12

13

1 m2 Pasangan batu bata 1 : 4 tebal : 1


bata
bh Bata
kg Semen PC
m3 Pasir pasang
org Mandor
org Kep. Tukang
org Tukang batu
org Pekerja

Rp450.00
Rp1,150.00
Rp90,000.00
Rp50,000.00
Rp70,000.00
Rp50,000.00
Rp35,000.00

1 m2 Pasangan batu bata camp. 1 : 4


tebal 1/2 bata
###
bh Bata
###
kg Semen PC
0.0430 m3 Pasir pasang
0.0150 org Mandor
0.0100 org Kep. Tukang
0.1000 org Tukang batu
0.3200 org Pekerja

Rp450.00
Rp1,150.00
Rp90,000.00
Rp50,000.00
Rp70,000.00
Rp50,000.00
Rp35,000.00

1 m2 Pasangan batu bata camp. 1 : 2


tebal 1/2 bata
###
bh Bata
###
kg Semen PC
0.0380 m3 Pasir pasang
0.0150 org Mandor
0.0100 org Kep. Tukang
0.1000 org Tukang batu
0.3200 org Pekerja

Rp450.00
Rp1,150.00
Rp90,000.00
Rp50,000.00
Rp70,000.00
Rp50,000.00
Rp35,000.00

1 m2 Pasang dinding roster/terawang


(20 x 20)
###
bh Roster/terawang
kg Semen PC
###
0.0350 m3 Pasir pasang
0.0150 org Mandor
0.0100 org Kep. Tukang
0.1000 org Tukang batu
0.3000 org Pekerja

Rp1,850.00
Rp1,150.00
Rp90,000.00
Rp50,000.00
Rp70,000.00
Rp50,000.00
Rp35,000.00

1 m2 Pasang dinding Bataco


bh Bataco
###
9.0000 kg Semen PC
0.0180 m3 Pasir pasang
0.0480 org Mandor
0.0160 org Kep. Tukang
0.1600 org Tukang batu
0.4800 org Pekerja

Rp1,500.00
Rp1,150.00
Rp90,000.00
Rp50,000.00
Rp70,000.00
Rp50,000.00
Rp35,000.00

Rp63,000.00
Rp30,532.50
Rp8,370.00

Rp31,500.00
Rp13,225.00
Rp3,870.00
Rp750.00
Rp700.00
Rp5,000.00
Rp11,200.00
Rp17,650.00

Rp48,595.00
Rp31,500.00
Rp21,792.50
Rp3,420.00

Rp750.00
Rp700.00
Rp5,000.00
Rp11,200.00
Rp17,650.00

Rp56,712.50
Rp46,250.00
Rp14,720.00
Rp3,150.00

Rp750.00
Rp700.00
Rp5,000.00
Rp10,500.00
Rp16,950.00

Rp64,120.00
Rp19,500.00
Rp10,350.00
Rp1,620.00

Rp2,400.00
Rp1,120.00
Rp8,000.00
Rp16,800.00
Rp28,320.00

Rp31,470.00

Rp63,000.00
Rp30,532.50
Rp8,370.00
Rp1,500.00
Rp1,400.00
Rp10,000.00
Rp22,750.00
###
Rp31,500.00
Rp13,225.00
Rp3,870.00
Rp750.00
Rp700.00
Rp5,000.00
Rp11,200.00
Rp66,245.00
Rp31,500.00
Rp21,792.50
Rp3,420.00
Rp750.00
Rp700.00
Rp5,000.00
Rp11,200.00
Rp74,362.50
Rp46,250.00
Rp14,720.00
Rp3,150.00
Rp750.00
Rp700.00
Rp5,000.00
Rp10,500.00
Rp81,070.00
Rp19,500.00
Rp10,350.00
Rp1,620.00
Rp2,400.00
Rp1,120.00
Rp8,000.00
Rp16,800.00
Rp59,790.00

V. PEKERJAAN PLESTERAN
14

15

16

1 m2 Plesteran tebal 15 mm dengan


campuran 1:4
5.2000 5.2000 kg Semen PC
0.0200 0.0200 m3 Pasir pasang
0.0100 0.0100 org Mandor
0.0150 0.0150 org Kep.Tukang
0.1500 0.1500 org Tukang batu
0.2000 0.2000 org Pekerja

Rp1,150.00
Rp90,000.00
Rp50,000.00
Rp70,000.00
Rp50,000.00
Rp35,000.00

1 m2 Plesteran tebal 15 mm dengan campuran 1 PC : 2


PS
Rp1,150.00
8.5200 kg Semen PC
Rp90,000.00
0.0180 m3 Pasir pasang
Rp50,000.00
0.0130 org Mandor
Rp70,000.00
0.0200 org Kepala Tukang
Rp50,000.00
0.2000 org Tukang Batu
Rp35,000.00
0.2600 org Pekerja
1 m2 Pekerjaan siar dengan camp. 1 PC :
2 PS
Rp1,150.00
4.3200 kg Semen PC
Rp90,000.00
0.0160 m3 Pasir pasang
0.0080 org Mandor
Rp50,000.00
Rp70,000.00
0.0070 org Kep.Tukang
Rp50,000.00
0.0700 org Tukang Batu
Rp35,000.00
0.1500 org Pekerja

Rp5,980.00
Rp1,800.00
Rp500.00
Rp1,050.00
Rp7,500.00
Rp7,000.00
Rp16,050.00

Rp7,780.00
Rp9,798.00
Rp1,620.00

Rp650.00
Rp1,400.00
Rp10,000.00
Rp9,100.00
Rp21,150.00

Rp11,418.00
Rp4,968.00
Rp1,440.00

Rp400.00
Rp490.00
Rp3,500.00
Rp5,250.00
Rp9,640.00

Rp6,408.00

Rp5,980.00
Rp1,800.00
Rp500.00
Rp1,050.00
Rp7,500.00
Rp7,000.00
Rp23,830.00
Rp9,798.00
Rp1,620.00
Rp650.00
Rp1,400.00
Rp10,000.00
Rp9,100.00
Rp32,568.00
Rp4,968.00
Rp1,440.00
Rp400.00
Rp490.00
Rp3,500.00
Rp5,250.00
Rp16,048.00

VI. PEKERJAAAN KAYU


15

1 m2 Pekerjaan Lantai ulin


0.0200 M3 papan ulin
0.1000 Kg Paku
0.0180 Oh Kepala Tukang
0.1800 Oh Tukang
0.0900 Oh Pekerja
0.0045 Oh Mandor

16

1 m1 Pasang list plafond kayu profil 5 cm


Rp7,500.00
1.0500 m1 Kayu profil
Rp12,500.00
0.1000 kg Paku
Rp50,000.00
0.0010 org Mandor
Rp70,000.00
0.0020 org Kep.Tukang
Rp50,000.00
0.0210 org Tukang kayu
Rp35,000.00
0.0210 org Pekerja

###
Rp12,500.00
Rp70,000.00
Rp50,000.00
Rp35,000.00
Rp50,000.00

###
Rp1,250.00
Rp1,260.00
Rp9,000.00
Rp3,150.00
Rp225.00
Rp13,635.00

###
Rp7,875.00
Rp1,250.00

Rp50.00
Rp140.00
Rp1,050.00
Rp735.00
Rp1,975.00

Rp9,125.00

###
Rp1,250.00
Rp1,260.00
Rp9,000.00
Rp3,150.00
Rp225.00
###
Rp7,875.00
Rp1,250.00
Rp50.00
Rp140.00
Rp1,050.00
Rp735.00
Rp11,100.00

VII. PEKERJAAN BETON


17

1 m3 Pekerjan beton K-125


###
kg Semen PC
0.8700 m3 koral
0.5200 m3 Pasir beton
Ltr Air
###
0.0830 org Mandor
0.2750 org Kep. Tukang
0.2750 org Tukang batu
1.6500 org Pekerja

Rp1,150.00
###
Rp90,000.00
Rp10.00
Rp50,000.00
Rp70,000.00
Rp50,000.00
Rp35,000.00

18

1 m3 Pekerjan beton K-225


kg Semen PC
###
0.7760 m3 koral
0.4990 m3 Pasir beton
###
Ltr Air
0.0830 org Mandor
0.0275 org Kep. Tukang
0.2750 org Tukang batu
1.6500 org Pekerja

Rp1,150.00
###
Rp90,000.00
Rp10.00
Rp50,000.00
Rp70,000.00
Rp50,000.00
Rp35,000.00

19

1 kg Pekerjan Tulangan besi polos / ulir


1.0500 Kg Besi Beton Polos
0.0150 Kg kawat beton
0.0003 org Mandor
0.0007 org Kep.Tukang
0.0070 org Tukang besi
0.0070 org Pekerja

20
0.0400
0.3000
0.1000
0.0050
0.0260
0.2600
0.3000
21

1 m2 Pasang Bekisting untuk pondasi


M3 Kayu Bekisting
Kg Paku
Ltr Minyak Bekisting
org Mandor
org Kep.Tukang
org Tukang Kayu
org Pekerja

1 m2 Pasang Bekisting untuk Sloof


0.0450 M3 Kayu Bekisting
0.3000 Kg Paku
0.1000 Ltr Minyak Bekisting
0.0050 org Mandor
0.0260 org Kep.Tukang
0.2600 org Tukang Kayu
0.3000 org Pekerja

22

###
Rp12,500.00
Rp5,000.00
Rp50,000.00
Rp70,000.00
Rp50,000.00
Rp35,000.00

0.0400
0.4000
0.2000
0.0150
0.3500
2.0000
0.0060
0.0330
0.3300
0.3000

1 m2 Pasang Bekisting untuk Kolom


M3 Kayu Bekisting
Kg Paku
Ltr Minyak Bekisting
M3 Kayu bekisting
Lbr Plywood tbl 9 mm
Btg Dolken Ky. Galam dia. 8-10 / 4 M
org Mandor
org Kep.Tukang
org Tukang Kayu
org Pekerja

###
Rp12,500.00
Rp5,000.00
###
###
Rp5,000.00
Rp50,000.00
Rp70,000.00
Rp50,000.00
Rp35,000.00

0.0400
0.4000
0.2000
0.0180
0.3500
2.0000
0.0060
0.0330
0.3300
0.3200

1 m2 Pasang Bekisting untuk Balok


M3 Kayu Bekisting
Kg Paku
Ltr Minyak Bekisting
M3 Kayu bekisting
Lbr Plywood tbl 9 mm
Btg Dolken Ky. Galam dia. 8-10 / 4 M
org Mandor
org Kep.Tukang
org Tukang Kayu
org Pekerja

###
Rp12,500.00
Rp5,000.00
###
###
Rp5,000.00
Rp50,000.00
Rp70,000.00
Rp50,000.00
Rp35,000.00

0.0400
0.4000
0.2000
0.0150
0.3500
6.0000
0.0060
0.0330
0.3300
0.3200

1 m2 Pasang Bekisting untuk Lantai


M3 Kayu Bekisting
Kg Paku
Ltr Minyak Bekisting
m3 Kayu Bekisting
lbr Plywood tbl 9 mm
btg Dolken Ky. Galam dia. 8-10 / 4 M
org Mandor
org Kep.Tukang
org Tukang Kayu
org Pekerja

###
Rp12,500.00
Rp5,000.00
###
###
Rp5,000.00
Rp50,000.00
Rp70,000.00
Rp50,000.00
Rp35,000.00

23

24

VIII. PEKERJAAN PENUTUP ATAP


25
1 m2 Pasang atap Zincalume
1.0200 m2 Atap Zincalume
0.2000 Kg Paku anti karat
0.0010 org Mandor
0.0100 org Kep. tukang
0.1000 org Tukang kayu
0.2000 org Pekerja
26

Rp9,000.00
Rp10,000.00
Rp50,000.00
Rp70,000.00
Rp50,000.00
Rp35,000.00

###
Rp12,500.00
Rp5,000.00
Rp50,000.00
Rp70,000.00
Rp50,000.00
Rp35,000.00

Pasang pemuung Zincalume per m'


1.0000 m' Pemuung
0.0400 kg Paku ulir
0.0100 org Mandor
0.0100 org Kep. tukang
0.0750 org Tukang kayu
0.1000 org Pekerja

Rp65,000.00
Rp22,500.00
Rp50,000.00
Rp70,000.00
Rp50,000.00
Rp35,000.00

###
###
Rp46,800.00
Rp2,150.00
Rp4,150.00
Rp19,250.00
Rp13,750.00
Rp57,750.00
Rp94,900.00

Rp4,150.00
Rp1,925.00
Rp13,750.00
Rp57,750.00
Rp77,575.00

29

Memasang 1 buah kloset jongkok


1.0000 bh Kloset jongkok porselen
6.0000 kg Semen PC
0.0100 m3 Pasir pasang
0.1100 org Mandor
0.3000 org Kep.Tukang
1.5000 org Tukang batu
1.0000 org Pekerja
Memasang pipa PVC tipe AW 3" per
m1
Ljr Pipa PVC
35% harga pipa Perlengkapan
0.0041 org Mandor
0.0135 org Kep.Tukang
0.1350 org Tukang batu
0.0810 org Pekerja
0.3000

Rp50,000.00
Rp17,500.00
Rp50,000.00
Rp70,000.00
Rp50,000.00
Rp35,000.00

Rp9,600.00
Rp36,000.00
Rp3,750.00
Rp500.00

Rp250.00
Rp1,820.00
Rp13,000.00
Rp10,500.00
Rp25,570.00

Rp40,250.00
Rp40,500.00
Rp3,750.00
Rp500.00

Rp250.00
Rp1,820.00
Rp13,000.00
Rp10,500.00
Rp25,570.00

Rp44,750.00
Rp36,000.00
Rp5,000.00
Rp1,000.00
Rp13,500.00
Rp35,000.00
Rp10,000.00

Rp300.00
Rp2,310.00
Rp16,500.00
Rp10,500.00
Rp29,610.00

###
Rp36,000.00
Rp5,000.00
Rp1,000.00
Rp16,200.00
Rp35,000.00
Rp10,000.00

Rp300.00
Rp2,310.00
Rp16,500.00
Rp11,200.00
Rp30,310.00

###
Rp36,000.00
Rp5,000.00
Rp1,000.00
Rp13,500.00
Rp35,000.00
Rp30,000.00

Rp300.00
Rp2,310.00
Rp16,500.00
Rp11,200.00
Rp30,310.00

###

Rp66,300.00
Rp4,500.00
Rp50.00
Rp700.00
Rp5,000.00
Rp7,000.00
Rp12,750.00

Rp27,500.00
Rp22,500.00
Rp50,000.00
Rp70,000.00
Rp50,000.00
Rp35,000.00

###
Rp1,150.00
Rp90,000.00
Rp50,000.00
Rp70,000.00
Rp50,000.00
Rp35,000.00

###
Rp9,450.00
Rp150.00

Rp15.00
Rp49.00
Rp350.00
Rp245.00
Rp659.00

Rp70,800.00
Rp27,500.00
Rp900.00

Rp500.00
Rp700.00
Rp3,750.00
Rp3,500.00
Rp8,450.00
IX. PEKERJAAN LANGIT-LANGIT
Langit-langit Kalsiboard 3.6 mm + rangka kayu lanan per
27
m2
###
0.0230 m3 Kayu balok lanan
Rp12,500.00
0.0600 kg Paku
Rp57,500.00
0.3900 lbr Kalsiboard
Rp50,000.00 Rp675.00
0.0135 org Mandor
Rp70,000.00 Rp2,800.00
0.0400 org Kep.Tukang
Rp50,000.00 Rp20,000.00
0.4000 org Tukang kayu
Rp35,000.00 Rp9,450.00
0.2700 org Pekerja
Rp32,925.00
X. PEKERJAAN SAN ITASI
28

###
###
###
Rp44,910.00
Rp2,150.00

Rp28,400.00

Rp23,000.00
Rp750.00
Rp22,425.00

Rp46,175.00

###
Rp6,900.00
Rp900.00
Rp5,500.00
Rp21,000.00
Rp75,000.00
Rp35,000.00
###

###
Rp15,000.00
Rp17,500.00

Rp205.00
Rp945.00
Rp6,750.00
Rp2,835.00
Rp10,735.00

Rp32,500.00

###
###
Rp46,800.00
Rp2,150.00
Rp4,150.00
Rp19,250.00
Rp13,750.00
Rp57,750.00
###
###
###
Rp44,910.00
Rp2,150.00
Rp4,150.00
Rp1,925.00
Rp13,750.00
Rp57,750.00
###
Rp9,450.00
Rp150.00
Rp15.00
Rp49.00
Rp350.00
Rp245.00
Rp10,259.00
Rp36,000.00
Rp3,750.00
Rp500.00
Rp250.00
Rp1,820.00
Rp13,000.00
Rp10,500.00
Rp65,820.00
Rp40,500.00
Rp3,750.00
Rp500.00
Rp250.00
Rp1,820.00
Rp13,000.00
Rp10,500.00
Rp70,320.00
Rp36,000.00
Rp5,000.00
Rp1,000.00
Rp13,500.00
Rp35,000.00
Rp10,000.00
Rp300.00
Rp2,310.00
Rp16,500.00
Rp10,500.00
###
Rp36,000.00
Rp5,000.00
Rp1,000.00
Rp16,200.00
Rp35,000.00
Rp10,000.00
Rp300.00
Rp2,310.00
Rp16,500.00
Rp11,200.00
###
Rp36,000.00
Rp5,000.00
Rp1,000.00
Rp13,500.00
Rp35,000.00
Rp30,000.00
Rp300.00
Rp2,310.00
Rp16,500.00
Rp11,200.00
###

Rp66,300.00
Rp4,500.00
Rp50.00
Rp700.00
Rp5,000.00
Rp7,000.00
Rp83,550.00
Rp27,500.00
Rp900.00
Rp500.00
Rp700.00
Rp3,750.00
Rp3,500.00
Rp36,850.00

Rp23,000.00
Rp750.00
Rp22,425.00
Rp675.00
Rp2,800.00
Rp20,000.00
Rp9,450.00
Rp79,100.00

###
Rp6,900.00
Rp900.00
Rp5,500.00
Rp21,000.00
Rp75,000.00
Rp35,000.00
###
Rp15,000.00
Rp17,500.00
Rp205.00
Rp945.00
Rp6,750.00
Rp2,835.00
Rp43,235.00

XI. PEKERJAAN BESI DAN ALUM UNIUM


30

31

32

33

1 kg Pekerjaan Konstruksi/rangka (Besi


IWF)
1.1000 kg Besi profil IWF
0.0800 kg Meni besi
0.0003 org Mandor
0.0060 org Kep.Tukang
0.0060 org Tukang besi
0.0060 org Pekerja

Rp9,000.00
Rp37,500.00
Rp50,000.00
Rp70,000.00
Rp50,000.00
Rp35,000.00

1 kg Pekerjaan Konstuksi/rangka ( Besi


siku )
1.1000 kg Besi profil siku
0.0800 kg Meni besi
0.0003 org Mandor
0.0060 org Kep.Tukang
0.0060 org Tukang besi
0.0060 org Pekerja

Rp9,000.00
Rp37,500.00
Rp50,000.00
Rp70,000.00
Rp50,000.00
Rp35,000.00

1 kg Pekerjaan Konstuksi/rangka ( Besi


beton )
1.1000 kg Besi beton
0.0800 kg Meni besi
0.0003 org Mandor
0.0060 org Kep.Tukang
0.0060 org Tukang besi
0.0060 org Pekerja

Rp9,000.00
Rp37,500.00
Rp50,000.00
Rp70,000.00
Rp50,000.00
Rp35,000.00

1 m2 Pekerjaan Konstruksi/rangka (Baja ringan)


SmartTruss
###
1.0000 M2 Konstruksi Baja Ringan A

34

Pasang pintu besi baja per m2 / Type


lipat
1.0000 m2 Pintu besi baja
0.0320 org Mandor
0.0650 org Kep.Tukang
0.6500 org Tukang besi konstruksi
0.6500 org Pekerja

###
Rp50,000.00
Rp70,000.00
Rp50,000.00
Rp35,000.00

35

Pasang pintu Kamar Mandi PVC


1.0000 Unit Pintu PVC
0.0052 org Mandor
0.1050 org Kep.Tukang
1.0500 org Tukang kayu
1.0500 org Pekerja

###
Rp50,000.00
Rp70,000.00
Rp50,000.00
Rp35,000.00

36
0.2000
0.1500
0.1700
0.3500
0.0025
0.0040
0.1050
0.0700
37
0.1000
0.1000
0.2600
0.0025
0.0063
0.0630
0.0200
38
0.1000
0.0100
0.0100
0.0200
0.2000
0.0200
39

40

41

42

43

44

45

Rp9,900.00
Rp3,000.00
Rp15.00
Rp420.00
Rp300.00
Rp210.00
Rp945.00

Rp12,900.00
Rp9,900.00
Rp3,000.00

Rp15.00
Rp420.00
Rp300.00
Rp210.00
Rp945.00

Rp12,900.00
Rp9,900.00
Rp3,000.00

Rp15.00
Rp420.00
Rp300.00
Rp210.00
Rp945.00

Rp12,900.00

Rp9,900.00
Rp3,000.00
Rp15.00
Rp420.00
Rp300.00
Rp210.00
Rp13,845.00
Rp9,900.00
Rp3,000.00
Rp15.00
Rp420.00
Rp300.00
Rp210.00
Rp13,845.00
Rp9,900.00
Rp3,000.00
Rp15.00
Rp420.00
Rp300.00
Rp210.00
Rp13,845.00
###
###

###
Rp1,600.00
Rp4,550.00
Rp32,500.00
Rp22,750.00
Rp61,400.00

Rp260.00
Rp7,350.00
Rp52,500.00
Rp36,750.00
Rp96,860.00
XII PEKERJAAN PEN GECATAN
Pengecatan bidang kayu baru (1 lapis plamir), 1 lapis cat dasar, 3 lapis
cat penutup per m2
Rp37,500.00
kg Cat meni
kg Plamir
Rp27,500.00
kg Cat dasar
Rp37,500.00
Kg Cat penutup 3 kali
Rp37,500.00
Rp50,000.00 Rp125.00
org Mandor
org Kep.Tukang
Rp70,000.00 Rp280.00
org Tukang cat
Rp50,000.00 Rp5,250.00
org Pekerja
Rp35,000.00 Rp2,450.00
Rp8,105.00
Pengecatan tembok baru (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat
penutup) per m2
kg Plamir
Rp27,500.00
kg Cat dasar
Rp37,500.00
Rp37,500.00
kg Cat pen utup 2 x
Rp50,000.00 Rp125.00
org Mandor
org Kep.Tukang
Rp70,000.00 Rp441.00
org Tukang cat
Rp50,000.00 Rp3,150.00
Rp35,000.00 Rp700.00
org Pekerja
Rp4,416.00
Pengecatan permukaan baja dengan
meni besi per m2
kg Meni besi
Rp37,500.00
Rp15,000.00
bh Kuas
org Mandor
Rp50,000.00 Rp500.00
org Kep.Tukang
Rp70,000.00 Rp1,400.00
org Tukang cat
Rp50,000.00 Rp10,000.00
Rp35,000.00 Rp700.00
org Pekerja
Rp12,600.00
Beton bertulang ( POER / PLAT ) type a
1.5 x1.5
Beton K-225
Rp77,575.00
Besi Tulangan (Kg)
125 Rp82,375.00
Bekisting Pondasi (M2)
3.73 Rp95,376.10
Rp255,326.10
Beton bertulang ( Sloof 20 x 30 )
Beton K-225
Rp77,575.00
Besi Tulangan (Kg)
235.37 Rp155,108.83
Bekisting sloof 2 x pakai (M2)
3.33 Rp85,148.10
Rp317,831.93
Beton bertulang ( Sloof 30 x 35 )
Beton K-225
Rp77,575.00
Besi Tulangan (Kg)
184.27 Rp121,433.93
Bekisting sloof 2 x pakai (M2)
2.5 Rp63,925.00
Rp262,933.93
Beton bertulang ( Kolom 30 x 30 )
Beton K-225
Rp77,575.00
Besi Tulangan (Kg)
173.99 Rp114,659.41
Bekisting kolom 2 x pakai (M2)
6.67 Rp197,498.70
Rp389,733.11
Beton bertulang ( Kolom 40 x 40 )
Beton K-225
Rp77,575.00
Besi Tulangan (Kg)
174.62 Rp115,074.58
Bekisting kolom 2 x pakai (M2)
5 Rp148,050.00
Rp340,699.58
Beton bertulang ( Balok 15 x 15 )
Beton K-225
Rp77,575.00
Besi Tulangan (Kg)
175.07 Rp115,371.13
Bekisting balok 2 x pakai (M2)
6.67 Rp202,167.70
Rp395,113.83
Beton bertulang ( Plat lantai )
Beton K-225
Rp77,575.00
Besi Tulangan (Kg)
153.44 Rp101,116.96
Bekseting plat lantai
8.33 ###
Rp431,274.28

###
###

###

Rp7,500.00
Rp4,125.00
Rp6,375.00
Rp13,125.00

Rp31,125.00
Rp2,750.00
Rp3,750.00
Rp9,750.00

Rp16,250.00

Rp3,750.00
Rp150.00

Rp3,900.00
Rp628,910.00
Rp1,200,000.0
0Rp150,132.50
Rp1,979,042.5
0
Rp628,910.00
Rp2,259,552.0
0Rp149,017.50
Rp3,037,479.5
0
Rp628,910.00
Rp1,768,992.0
0Rp111,875.00
Rp2,509,777.0
0
Rp628,910.00
Rp1,670,304.0
0Rp670,335.00
Rp2,969,549.0
0
Rp628,910.00
Rp1,676,352.0
0Rp502,500.00
Rp2,807,762.0
0
Rp628,910.00
Rp1,680,672.0
0Rp688,344.00
Rp2,997,926.0
0
Rp628,910.00
Rp1,473,024.0
0
###
Rp3,106,096.6
5

###
Rp1,600.00
Rp4,550.00
Rp32,500.00
Rp22,750.00
###
###
Rp260.00
Rp7,350.00
Rp52,500.00
Rp36,750.00
###

Rp7,500.00
Rp4,125.00
Rp6,375.00
Rp13,125.00
Rp125.00
Rp280.00
Rp5,250.00
Rp2,450.00
Rp39,230.00
Rp2,750.00
Rp3,750.00
Rp9,750.00
Rp125.00
Rp441.00
Rp3,150.00
Rp700.00
Rp20,666.00

Rp3,750.00
Rp150.00
Rp500.00
Rp1,400.00
Rp10,000.00
Rp700.00
Rp16,500.00
Rp706,485.00
Rp1,282,375.0
0Rp245,508.60
Rp2,234,368.6
0
Rp706,485.00
Rp2,414,660.8
3Rp234,165.60
Rp3,355,311.4
3
Rp706,485.00
Rp1,890,425.9
3Rp175,800.00
Rp2,772,710.9
3
Rp706,485.00
Rp1,784,963.4
1Rp867,833.70
Rp3,359,282.1
1
Rp706,485.00
Rp1,791,426.5
8Rp650,550.00
Rp3,148,461.5
8
Rp706,485.00
Rp1,796,043.1
3Rp890,511.70
Rp3,393,039.8
3
Rp706,485.00
Rp1,574,140.9
6
###
Rp3,537,370.9
3

RENCANA ANGGARAN BIAYA (RAB)


PEKERJAAN : PEMBANGUNAN GUDANG PUPUK KABUPATEN TANAH LAUT
LOKASI : DESA AMBUNGAN KECAMATAN PELAIHARI, KAB. TANAH LAUT
TAHUN ANGGARAN : 2011
NO.

URAIAN PEKERJAAN

VOLUME

A.
I.
1
2
3
4

PEKERJAAN PEMBANGUNAN GUDANG PUPUK


PEKERJAAN PERSIAPAN
Pek. Pembersihan lokasi
Pek. Pengukuran/pas.Bouwplank
Pek. Papan Nama Proyek
Pek. Ijin Mendirikan Bangunan (IMB)

II
1
2
3
4
5
6

PEKERJAAN TANAH
Pek. Galian Tanah Pondasi
Pek. Urugan Tanah Kembali
Pek. Urugan Tanah Bawah lantai
Pek. Pemadatan tanah
Pek. Urugan Pasir Bawah Pondasi 10 cm
Pek. Urugan Pasir Bawah Lantai 10 cm

658.08
658.08
1,636.80
1,636.80
73.12
105.60

III
1
2
3
4

PEKERJAAN PASANGAN & PLESTERAN


Pas. Batu bata dinding 1/2 Bt camp 1 : 4
Pas. Dinding Zincalume 4 mm
Pek. Plesteran tb. 15 mm camp 1 : 4
Pek. Batu gunung camp 1;4

828.00
254.40
1,656.00
678.72

IV
1
2
3
4
5
6
7
8
9

PEKERJAAN BETON
Pek. Plat Pondasi 1.5 x 1.5 m tbl. 25 cm beton bertulang
Pek. Sloof 25 x 30 cm beton bertulang
Pek. Sloof 30 x 35 cm beton bertulang
Pek. Neut Kolom 40 x 40 cm beton bertulang
Pek. Kolom 40 x 40 cm beton bertulang
Pek. Cor Plat lantai dalam beton bertulang tebal 15 cm
Pek. Cor Plat lantai luar beton bertulang tebal 10 cm
Pek. Pembuatan Saluran air hujan Keliling bangunan gudang
Pek. Lantai Kerja bwh pondasi & lantai tbl. 5 cm camp.1:3 :5

18.00
13.50
52.92
7.94
6.14
132.00
32.00
138.00
34.88

V PEKERJAAN BAJA, RANGKA ATAP, DAN PENUTUP ATAP


1 Pek. Kuda-kuda WF 250x125x6x9

6,400.00

1.000
152.00
1.00
880.00

2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19

Pek. Kuda-kuda WF.150x75x5x7 overstek


Pek. Tiang Baja WF 300x150x6,5x9
Pek. Pengaku Tiang Baja WF 150x75x5x7
Pek. Plat Landas tebal 10 mm
Pek. Plat pengaku tbl 9 mm tiang
Pek. Plat pengaku kuda tbl 10 mm jarak 100 cm
Pek. Treck stang kuda-kuda besi beton dia. 12 mm
Pek. Dudukan Gording Besi L.70.70.7
Pek. Kuda - Kuda Baja siku L 70.70.7
Pek. Plat tbl 6 mm pada kuda- kuda baja siku
Pek. Gording & rangka dinding zincalumne baja kanal C 124 x 50 x 2.3
mm
Pek. Tutup Atap Zincalume 4mm
Pek. Bubungan nok + tepi Zincalume 4mm
Pek. Angkur baut 19 mm pj. 0.75 m
Pek Mur dan baut serta Pengelasan sambungan
Pek Talang air setara Dura Gutter lengkap klam
Pek Pipa PVC 3" lengkap klam
Pek. Ventilasi / angin - angin
a Besi kanal C 124 x 50 x 2.3 mm
b Besi beton dia.12
c Kawat nyamuk stainless steel
20 Pek. Pintu besi type lipat tebal 5 mm +Kunci +Accesorinya
21 Pek. Penangkal petir 3 speed 2 arde
22 Pek. Siklon 60 X 60 CM Aluminium
VI
1
2
3
4
5
6
7

PEKERJAAN INSTALASI LISTRIK


Pek Instalasi listrik
Pek Saklar Tunggal
Pek Saklar Ganda
Pek Stop Kontak
Pek Lampu SL 23 Watt lengkap (armatur+pipa penggantung)
Pek Sekring Box panel / Mcb lengkap panel
Penyambungan listrik kebangunan lama

VII PEKERJAAN CAT- CATAN


1 Pek Cat menie Besi utk pintu lipat
2 Pek. Cat Dinding

B. PEKERJAAN PALET

560.00
7,633.60
2,389.33
401.28
610.31
112.86
559.20
185.17
954.84
192.33
4,382.24
1,281.57
48.00
384.00
1.00
96.00
288.00
455.47
215.56
28.00
54.00
1.00
8.00

36.00
1.00
6.00
3.00
33.00
1.00
1.00

108.00
1,656.00

I. PEKERJAAN KAYU
1 Pek. Rangka Fallet 8/16 Kayu Ulin
2 Pek. Lantai Fallet 3/15 Kayu papan ulin

C.
I.
1
2

PEKERJAAN PERKERASAN JALAN LINGKUNGAN


PEKERJAAN PERSIAPAN
Pengukuran dan pemasangan patok
Mobilisasi/Demobilisasi Alat

II
1
2
3
4

PEK. PERKERASAN JALAN LINGKUNGAN


Pengupasan Tanah asal Tb. 20 cm dgn alat
Paklag batu belah 10/15 tebal 15 cm
Urugan tanah tb.10 cm
Membuat Lapis Kulit Penahan tebal 6 cm

14.98
351.00
156 Unit ( Dal

138.100
1.000

2,322.675
2,322.675
232.268
2,322.675

N BIAYA (RAB)

SATUAN

ANALIS HARGA SATUAN


A
(Rp.)

JUM LAH BIAYA (Rp.)

ls
m'
Unit
m

1
-

Rp2,500,000.00
Rp30,450.00
Rp350,000.00
Rp12,500.00
Sub Total I

Rp2,500,000.00
Rp4,628,400.00
Rp350,000.00
Rp11,000,000.00
Rp18,478,400.00

m
m
m
m
m
m

3
4
6
K-342
7
7

Rp16,000.00
Rp7,600.00
Rp100,000.00
Rp5,786.86
Rp101,000.00
Rp101,000.00
Sub Total II

Rp10,529,280.00
Rp5,001,408.00
Rp163,680,000.00
Rp9,471,934.67
Rp7,385,120.00
Rp10,665,600.00
Rp206,733,342.67

m
m
m
m

10
25
14
8

Rp66,245.00
Rp83,550.00
Rp23,830.00
Rp544,700.00
Sub Total III

Rp54,850,860.00
Rp21,255,120.00
Rp39,462,480.00
Rp369,698,784.00
Rp485,267,244.00

m
m
m
m
m
m
m
m'
m

39
40
41
43
43
45
45
17

Rp2,234,368.60
Rp3,355,311.43
Rp2,772,710.93
Rp3,148,461.58
Rp3,148,461.58
Rp3,537,370.93
Rp3,537,370.93
Rp75,000.00
Rp568,550.00
Sub Total IV

Rp40,218,634.80
Rp45,296,704.31
Rp146,731,862.42
Rp24,998,784.95
Rp19,331,554.10
Rp466,932,963.16
Rp113,195,869.86
Rp10,350,000.00
Rp19,831,024.00
Rp886,887,397.58

kg

30

Rp13,845.00

Rp88,608,000.00

kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
m
m'
bh
ls
m'
m'

30
30
30
30
30
30
32
31
31
30
30
25
26
29

Rp13,845.00
Rp13,845.00
Rp13,845.00
Rp13,845.00
Rp13,845.00
Rp13,845.00
Rp13,845.00
Rp13,845.00
Rp13,845.00
Rp13,845.00
Rp13,845.00
Rp83,550.00
Rp36,850.00
Rp25,000.00
Rp5,000,000.00
Rp75,000.00
Rp43,235.00

Rp7,753,200.00
Rp105,687,192.00
Rp33,080,273.85
Rp5,555,721.60
Rp8,449,741.95
Rp1,562,546.70
Rp7,742,124.00
Rp2,563,678.65
Rp13,219,759.80
Rp2,662,808.85
Rp60,672,112.80
Rp107,075,173.50
Rp1,768,800.00
Rp9,600,000.00
Rp5,000,000.00
Rp7,200,000.00
Rp12,451,680.00

kg
kg
m
m
unit
unit

30
32
34
-

Rp13,845.00
Rp13,845.00
Rp75,000.00
Rp261,400.00
Rp5,000,000.00
Rp1,250,000.00
Sub Total V

Rp6,305,982.15
Rp2,984,428.20
Rp2,100,000.00
Rp14,115,600.00
Rp5,000,000.00
Rp10,000,000.00
Rp521,158,824.05

titik
bh
bh
bh
bh
unit
Ls

Rp200,000.00
Rp30,000.00
Rp35,000.00
Rp30,000.00
Rp175,000.00
Rp250,000.00
Rp500,000.00
Sub Total VI

Rp7,200,000.00
Rp30,000.00
Rp210,000.00
Rp90,000.00
Rp5,775,000.00
Rp250,000.00
Rp500,000.00
Rp14,055,000.00

m
m

38
37

Rp16,500.00
Rp20,666.00
Sub Total VII
Sub Total A ( I S/D VII )

Rp1,782,000.00
Rp34,222,896.00
Rp36,004,896.00
Rp2,168,585,104.30

m
Rp6,500,000.00
m
15
Rp32,568.00
156 Unit ( Dalam Ukuran 1.5 x 1.5 m2 )
Sub Total B ( I )

m'
Ls

m
m
m
m

K-211
I
7
V

Rp97,370,000.00
Rp11,431,368.00
Rp108,801,368.00
Rp108,801,368.00

Rp10,000.00
Rp1,381,000.00
Rp2,000,000.00
Rp2,000,000.00
Sub Total I Rp3,381,000.00
Rp916.52
Rp69,816.67
Rp101,000.00
Rp34,170.33

Rp2,128,770.10
Rp162,161,426.25
Rp23,459,068.00
Rp79,366,578.98
Rp267,115,843.32

Sub Total II Rp267,115,843.32


Sub Total C ( I s/d II ) Rp270,496,843.32

REKAPITU LASI REN CANA AN GGARAN BIAYA (RAB)


PEKERJAAN : PEMBANGUNAN GUDANG PUPUK KABUPATEN TANAH LAUT
LOKASI : DESA AMBUNGAN KECAMATAN PELAIHARI, KAB. TANAH LAUT
TAHUN ANGGARAN : 2011
NO
.
A.
I.
II
III
IV
V
VI
VII
B.
I.
C.
I.
II.

URAIAN PEKERJAAN
PEKERJAAN PEMBANGUNAN GUDANG PUPUK
PEKERJAAN PERSIAPAN
PEKERJAAN TANAH
PEKERJAAN PASANGAN & PLESTERAN
PEKERJAAN BETON
PEKERJAAN BAJA, RANGKA ATAP, DAN PENUTUP
ATAP
PEKERJAAN INSTALASI LISTRIK
PEKERJAAN CAT- CATAN
PEKERJAAN PALET
PEKERJAAN KAYU
PEKERJAAN PERKERASAN JALAN LINGKUNGAN
PEKERJAAN PERSIAPAN
PEK. PERKERASAN JALAN LINGKUNGAN

JUMLAH BIAYA (Rp.)

Rp18,478,400.00
Rp206,733,342.67
Rp485,267,244.00
Rp886,887,397.58
Rp521,158,824.05
Rp14,055,000.00
Rp36,004,896.00
Rp108,801,368.00
Rp3,381,000.00
Rp267,115,843.32

JUMLAH
Rp2,547,883,315.63
Rp254,788,331.56
PPN 10 %
Rp2,802,671,647.19
Total Keseluruhan
Rp2,802,671,000.00
Jumlah Dibulatkan
Terbilang : Dua milyar delapan ratus dua juta enam ratus tujuh puluh satu ribu rupiah
CATATAN
Jumlah harga diatas sudah termasuk biaya persiapan, mobilisasi
demobilisasi, keuntungan, pajak-pajak, dan pungutan resmi lainnya
Pelaihari, 24 Juni 2011
PT. TRIASA PUTRA ABADI

Hj. Ainun Jariah


Direktur

ANALISA HARGA SATUAN PEKERJAAN JALAN


No
I

II

Harga Sat.
(Rp)
IV

Upah (Rp)
V

Pekerjaan Lapis Paglak Bt. Belah Tb.15 Cm Padat A.2/m2


0.200 M3 Batu Belah 10/15
250,000.00
0.050 M3 Pasir Pasang
90,000.00
0.370 Pekerja
35,000.00 12,950.00
0.020 Mandor
50,000.00 1,000.00
13,950.00
Biaya Menggilas
1/7500 x W4
1,300.00
15,250.00

II

Biaya Menggilas sebulan W.4


30.000 Operator terlatih / bulan
30.000 Pembantu Operator / bulan
150.000 Pekerja
30.000 Jaga Pekerja
1.000 Pemeliharaan Bahan Bakar

75,000.00
45,000.00
35,000.00
30,000.00
500,000.00

2,250,000.00
1,350,000.00
5,250,000.00
900,000.00
9,750,000.00

III

IV

Mengaspal Muka Jalan dengan Laston AC Tb 3 Cm W.6 /100m2


3.000 M3 Laston AC
1,150,000.00
1.000 Alat-Alat
50,000.00
12.000 Pekerja
35,000.00 420,000.00
0.010 Mandor
50,000.00 500.00
420,500.00
1 m2
4,205.00
Biaya Menggilas
2/7500 x W4
2,600.00
6,805.00
Menaruh batu Pecah diatas Jalan W.1 / m3
1.200 m3 Batu Pecah 5/7
225,000.00
0.380 Pekerja
35,000.00 13,300.00
0.190 Mandor
50,000.00 9,500.00
22,800.00
Membuat Lapisan Kulit Penahan tebal 6 cm W.5a Sub / 100m2
2.000 m3 Split 2/3
200,000.00
8.000 m3 Split 5/7
225,000.00
7.500 Pekerja
35,000.00 262,500.00
0.380 Mandor
50,000.00 19,000.00
100m2
281,500.00
1 m2
2,815.00
1.000 ltr Prime coat
Biaya Menggilas
2/7500 x W4
2,600.00
5,415.00

ALAN
Bahan (Rp)
VI

Jumlah
(Rp)
VII

50,000.00
4,500.00

54,500.00
68,450.00
66.67
1,366.67
54,566.67
69,816.67

500,000.00
500,000.00

10,250,000.00

3,450,000.00
50,000.00

3,500,000.00
35,000.00
133.33
35,133.33

3,920,500.00
39,205.00
2,733.33
41,938.33

270,000.00

270,000.00

292,800.00

400,000.00
1,800,000.00

2,200,000.00
22,000.00
133.33
22,133.33

2,481,500.00
24,815.00
6,622.00
2,733.33
34,170.33

ANALISA HARGA SATUAN PEMADATAN TANAH DASAR (MENGGUNAKAN ALAT)

DISIAPKAN OLEH : CV. RISCON SULTARINDO

PROPINSI : KALIMANTAN SELATAN


KABUPATEN : TANAH LAUT

KECAMATAN DESA
Konsultan Perencana

URAIAN :
1.Pembentukan Badan Jalan
2.Dipadatkan dengan mesin gilas

N ANGGAPAN / ASUMSI :
1.Menggunakan Alat Berat
2.Damija dibersihkan dari semak 3. Menyiapkan dasar jalan 100m/hari

JUMLAH
ORANG

PEKERJA

P
E
K
E
R
J
A

HARI

KODE

TOTAL
VOL.
(org/hari)

UPAH
(Rp/org/hari)

BIAYA (Rp)

Mandor

1.00

1.00

L.061

1.00

50,000.00

50,000.00

Pekerja

4.00

1.00

L.061

4.00

35,000.00

140,000.00

Operator Terlatih

2.00

1.00

L.061

2.00

75,000.00

150,000.00

Jumlah Biaya Untuk Pekerja OMS ( 1 ) PEKERJA (1)


( 2 ) KONTRAKTOR

Jumlah Biaya Untuk Pekerja Kontraktor ( 2 )

PEKERJA (1)
Jumlah Biaya Untuk Pekerja

JUMLAH
MATERIAL

MATERIAL

M
A
T
E
R
I
A
L

Alat Bantu

SATUAN

KODE

TOTAL HARGA
VOL. (Rp/unit)

Set

M170

BIAYA (Rp)

50,000.00

Jumlah Biaya Untuk Material OMS ( 1 ) MATERIAL (1)


( 2 ) KONTRAKTOR

Jumlah Biaya Untuk Material Kontraktor ( 2 )

MATERIAL (2)
Jumlah Biaya Untuk Material

JUMLAH
ALAT

PERALATAN
Mesin Gilas 4 Ton
PE
RA
LA
TA
N

PEKERJA

1.00

HARI
KERJA
1.00

KODE

HARGA
JAM KERJA
(Rp/unit)

E080

6.00

MATERIAL
BIAYA (Rp)

184,452.56

1,106,715.34

Jumlah Biaya Untuk Peralatan OMS ( 1 ) PERALATAN (1)


( 2 ) KONTRAKTOR
Jumlah Biaya
Untuk

Peralatan

Kontraktor (2)

PERALATAN (1)
Jumlah Biaya Untuk Peralatan

PERALATAN
TOTAL (Rp...)

VOLUME : 250.00

SATUAN ;

M2

HARGA SATUAN :

5,786.86

PER'

KODE :
K-342
TGL :

an 100m/hari

SUB TOTAL
(Rp)

340,000.00

0
340,000.00
SUB TOTAL
(Rp)

0
0
SUB TOTAL
(Rp)

1,106,715.34

0
1,106,715.34
1,446,715.34
M3

URAIAN ANALISA ALAT


No.

URAIAN

KODE

A.
1.
2.
3.
4.

URAIAN PERALATAN
Jenis Peralatan
Tenaga
Kapasitas
Alat Baru
: a. Umur Ekonomis
b. Jam Kerja Dalam 1 Tahun
c. Harga Alat

B.
1.

BIAYA PASTI PER JAM KERJA


Nilai Sisa Alat
= 10 % x B

2.

Faktor Angsuran Modal

3.

Biaya Pasti per Jam :


a. Biaya Pengembalian Modal =

b. Asuransi, dll =

C.

THREE WHEEL ROLLER 6-8 T


Pw
55.0
Cp
8.0
A
5.0
W
2,000.0
B
350,000,000

35,000,000

i x (1 + i)^A
(1 + i)^A - 1

0.29832

(B-C)xD
W

46,984.70

0.00

46,984.70

0 x B
W

Biaya Pasti per Jam

KOEF.

(E+F)

BIAYA OPERASI PER JAM KERJA

1.

Bahan Bakar = (12%-15%) x Pw x Ms

46,200.00

2.

Pelumas

37,812.50

15,313

(12,5 % - 17,5 %) x B
W

21,000.00

Operator
= ( 1 Orang / Jam ) x U1
Pembantu Operator = ( 1 Orang / Jam ) x U2

L
M

10,714.29
6,428.57

Biaya Operasi per Jam

137,467.86

= (2.5%-3%) x Pw x Mp

Biaya bengkel

3.

4.
5.

Perawatan dan
perbaikan

(6.25% dan 8.75%) x B


W

(H+I+K+L+M)

D.

TOTAL BIAYA SEWA ALAT / JAM = ( G + P )

184,452.56

E.
1.

LAIN - LAIN
Tingkat Suku Bunga

15.00

2.
3.
4.
5.
6.
7.

Upah Operator / Sopir


Upah Pembantu Operator / Pmb.Sopir
Bahan Bakar Bensin
Bahan Bakar Solar
Minyak Pelumas
PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan

U1
U2
Mb
Ms
Mp

10,714.29
6,428.57
5,000.00
7,000.00
25,000.00

SATUAN

EL ROLLER 6-8 T
HP
Ton
Tahun
Jam
Rupiah

Rupiah
-

Rupiah

Rupiah

Rupiah

Rupiah
Rupiah
Rupiah

Rupiah

Rupiah
Rupiah
Rupiah
Rupiah

% / Tahun

KET.

E16

Rp./Jam
Rp./Jam
Liter
Liter
Liter

JENIS PEKERJAAN : LAPIS RESAP PENGIKAT


SATUAN PEKERJAAN : Liter

NO.

K O M P O N E N SATUAN

PERKIRAAN
KUANTITAS

HARGA
SATUAN
( Rp. )

A TENAGA
1 Pekerja ( L01 )
2 Mandor ( L03 )

Jam
Jam

0.0333
0.0067

35,000.00
50,000.00

JUMLAH HARGA TENAGA


B BAHAN
1 Aspal ( M09 )
2 Kerosene ( M10 )

Kg
Liter

0.6468
0.4840

JUMLAH HARGA BAHAN 0.00


C JUMLAH HARGA TENAGA DAN BAHAN ( A + B )

5,000.00
7,000.00

AT

JUMLAH HARGA ( Rp. )

1,165.50
335.00
1,500.50
3,234.00
3,388.00
6,622.00

DIREKTORAT JENDERAL BINA


MARGA DIREKTORAT BINA
PROGRAM JALAN SUB DIT.
PERENCANAAN JALAN LOKAL &
KABUPATEN
PROPINSI KODE
KALIMANTAN SELATAN 63

ANALISBIAYAPEKERJAAN
PENGUPASAN TANAH DAN PEMBERSIHAN SEMAK PADA DAMIJA
( MENGGUNAKAN ALAT )

KABUPATEN KODE
TANAH LAUT 01

URAIAN :
1. Pengupasan dgn menggunakan
alat greder membentuk badan jalan
dan membuang semak dari daerah
milik jalan

DISIAPKAN OLEH TANGGAL


KONSULTAN PERENCANA

ANGGAPAN / ASUMSI :
1.Menggunakan alat berat
2.Lebar Daerah Milik Jalan 12 m
3.Pembersihan damija 200 m perhari
4.Membentuk badan jalan 5. Penggunaan alat bantu

JUMLAH
ORANG

PEKERJA
Mandor
P Operator terlatih
E
K
Buruh / Pekerja
E
R
J
A

HARI

KODE

JUMLAH
ORANG-HARI

UPAH
Rp. / org / hari

1.00

1 L.061

1.00

50,000.00

1.00

1 L.081

1.00

75,000.00

2.00

1 L.101

2.00

35,000.00

Jumlah Biaya Untuk Pekerja


M
A
T
E
R Alat bantu
I
A
L

MATERIAL

1.50

KODE

UPAH
Rp. / org / har

set M 170

50,000.00

Jumlah Biaya Untuk Material


PERALATAN

P
E
R Grader
A
L
A
T
A
N

JUMLAH VOLUME
SATUAN

JUMLAH HARI
KERJA
1.00

KODE

E.10

JAM KERJA

HARGA
( Rp. / jam )
5.00 385,927.95

Jumlah Biaya Untuk Peralatan


VOLUME / QUALITY :
2400 SATUAN m2

HARGA SAT

AAN
MAK PADA DAMIJA

KODE
K-211

APKAN OLEH TANGGAL


SULTAN PERENCANA

BIAYA
( Rp )

SUB TOTAL
( Rp )

50,000.00
75,000.00
70,000.00

195,000.00
BIAYA
( Rp )

SUB TOTAL
( Rp )

75,000.00
75,000.00
BIAYA
( Rp )

SUB TOTAL
( Rp )

1,929,639.74

T O T A L ( Rp
0.00
916.52 per m2

1,929,639.74
2,199,639.74

URAIAN ANALISA ALAT


No.

URAIAN

KODE

A.
1.
2.
3.
4.

URAIAN PERALATAN
Jenis Peralatan
Tenaga
Kapasitas
Alat Baru
:
a. Umur Ekonomis
b. Jam Kerja Dalam 1 Tahun
c. Harga Alat

B.
1.

BIAYA PASTI PER JAM KERJA


Nilai Sisa Alat
= 10 % x B

2.

Faktor Angsuran Modal

3.

Biaya Pasti per Jam :


a. Biaya Pengembalian Modal =

i x (1 + i)^A
(1 + i)^A - 1

(B-C)xD
W

0 x B
W

Biaya Pasti per Jam


C.

b. Asuransi, dll =

MOTOR GRADER >100 HP


Pw
Cp
A
W
B

(E+F)

BIAYA OPERASI PER JAM KERJA

1.

Bahan Bakar = (12%-15%) x Pw x Ms

2.

Pelumas

= (2.5%-3%) x Pw x Mp

Biaya bengkel

3.

4.
5.

Perawatan dan
perbaikan

(6.25% dan 8.75%) x B


W
(12,5 % - 17,5 %) x B
W

= ( 1 Orang / Jam ) x U1
= ( 1 Orang / Jam ) x U2

L
M

Operator
Pembantu Operator

Biaya Operasi per Jam

(H+I+K+L+M)

D.

TOTAL BIAYA SEWA ALAT / JAM = ( G + P )

E.

LAIN - LAIN
Tingkat Suku Bunga

1.

2.
3.
4.
5.
6.
7.

Upah Operator / Sopir


Upah Pembantu Operator / Pmb.Sopir
Bahan Bakar Bensin
Bahan Bakar Solar
Minyak Pelumas
PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan

U1
U2
Mb
Ms
Mp

A ALAT
KOEF.

SATUAN

MOTOR GRADER >100 HP


135.0
10,800.0
5.0
2,000.0
676,000,000

HP
Tahun
Jam
Rupiah

67,600,000

Rupiah

0.29832

KET.

E-13

90,747.59

Rupiah

0.00

Rupiah

90,747.59

Rupiah

113,400.00

Rupiah

92,812.50

Rupiah

29,575

Rupiah

42,250.00

Rupiah

10,714.29
6,428.57

Rupiah
Rupiah

295,180.36

Rupiah

385,927.95

Rupiah

15.00 % / Tahun

10,714.29 Rp./Jam
6,428.57 Rp./Jam
5,000.00
Liter
7,000.00
Liter
25,000.00
Liter

URAIAN ANALISA HARGA SATUAN


Analisa EI - 611
JENIS PEKERJAAN : LAPIS RESAP PENGIKAT
SATUAN PEMBAYARAN : LITER
NO.

URAIAN

KODE

KOEF.

SATUAN

KETERANGAN

I ASUMSI
1 Menggunakan alat berat ( cara mekanik )
2 Lokasi pekerjaan : sepanjang jalan
3 Jarak rata-rata Base Camp ke lokasi pekerjaan

0.00

Km

4 Jam kerja efektif per-hari

Tk

7.00

Jam

5 Faktor kehilangan bahan

Fh

1.10

- Aspal AC - 10 atau AC - 20

As

56

100 bagian

- Minyak Flux / Pencair

44

80 bagian

6 Komposisi campuran :

7 Berat Jenis bahan :


- Aspal AC - 10 atau AC - 20

D1

1.05

Kg/Liter

- Minyak Flux / Pencair

D2

0.80

Kg/Liter

PC

1.10

Liter

0.6468
0.4840

Kg
Liter

Liter

8 Bahan dasar ( Aspal & Minyak Pencair ) semuanya


diterima di lokasi pekerjaan

II URUTAN KERJA
1 Aspal dan Minyak Flux dicampur dan dipanaskan sehingga
menjadi campuran aspal cair
2 Permukaan yang akan dilapis dibersihkan dari debu dan
kotoran
3 Campuran aspal cair diampar dengan tenaga buruh ke
atas permukaan yang akan dilapis
4 Angkutan Aspal & Minyak Flux menggunakan
Dump Truck

III PEMAKAIAN BAHAN, ALAT DAN TENAGA


1 BAHAN
Untuk mendapatkan 1 liter Lapis Resap Pengikat
diperlukan : ( 1 liter x Fh )
1.a Aspal = As x PC x D1

( M10 )
( M11 )

1.b Karosen = K x Pc
2ALAT
2.a ASPHALT SPRAYER

0.00E+00

Kapasitas alat

800.00

Faktor efisiensi alat

Fa

0.75

Waktu siklus ( termasuk proses pemanasan )

Ts

2.00

Jam

Q1

300.00

Liter

0.00E+00

0.0033

Jam

V x Fa
=
Kap. Prod./Jam
Ts

Koefisien Alat ! Liter = 1 : Q1


3 TENAGA
Produksi menentukan : ASPHALT SPRAYER

Q4

300.00

Liter

Produksi lapis Resap Pengikat / Hari = Tk x Q4

Qt

2,100.00

Liter

- Pekerja

10.00

Orang

- Mandor

2.00

Orang

Kebutuhan Tenaga :

Koefisien Tenaga ! Liter :


- Pekerja = ( Tk x P ) :

t( L01 )

0.0333

Jam

- Mandor = ( Tk x M ) :

t( L03 )

0.0067

Jam

4 HARGA DASAR SATUAN UPAH , BAHAN

Campuran

DAN ALAT
Lihat Lampiran

TIME SCHEDULE
PEKERJAAN : PEMBANGUNAN GUDANG PUPUK KABUPATEN TANAH LAUT
LOKASI : DESA AMBUNGAN KECAMATAN PELAIHARI, KAB. TANAH LAUT
TAHUN ANGGARAN : 2011
Bulan I

NO
.

URAIAN PEKERJAAN

A.
I.
II
III
IV
V
VI
VII
B.
I.
C.
I.
II.

PEKERJAAN PEMBANGUNAN GUDANG


PUPUK
PEKERJAAN PERSIAPAN
PEKERJAAN TANAH
PEKERJAAN PASANGAN & PLESTERAN
PEKERJAAN BETON
PEKERJAAN BAJA, RANGKA ATAP, DAN PENUTUP
ATAP
PEKERJAAN INSTALASI LISTRIK
PEKERJAAN CAT- CATAN
PEKERJAAN PALET
PEKERJAAN KAYU
PEKERJAAN PERKERASAN JALAN
LINGKUNGAN
PEKERJAAN PERSIAPAN
PEK. PERKERASAN JALAN LINGKUNGAN
JUMLAH
Komulatif

Bulan II

Bulan III

Bulan IV

Bulan V

Minggu Ke

Bobot
1

10

11

Keterangan
12

13

14

15

16

17

18

19

20
100

0.73% 0.7%
8.11%

2.7% 2.7% 2.7%

19.05%

2.4% 2.4% 2.4% 2.4% 2.4% 2.4% 2.4% 2.4%

34.81%

3.2% 3.2% 3.2% 3.2% 3.2% 3.2% 3.2% 3.2% 3.2% 3.2% 3.2%

20.45%

1.9% 1.9% 1.9% 1.9% 1.9% 1.9% 1.9% 1.9% 1.9% 1.9% 1.9%

0.55%

0.6%

1.41%

0.7%

0.7%

4.27%

2.1%

2.1%

1.7% 1.7% 1.7% 1.7% 1.7%

1.7%

100.00% 0.7% 2.7% 2.7% 5.1% 2.4% 5.5% 5.5% 5.5% 7.4% 7.4% 7.4% 5.0% 5.0% 5.2% 6.8% 6.8% 3.6% 3.6% 6.4%

5.1%

0.13%

50

0.1%

10.48%

1%

3%

6%

11%

14%

19%

25%

30%

38%

45%

52%

57%

62%

68%

74%

81%

Banjarmasin, 24 Juni 2011


PT. TRIASA PUTRA ABADI

Hj. Ainun Jariah


Direktur

85%

88%

95% 100%