A PEKERJAAN PERSIAPAN
B PEKERJAAN TANAH & PONDASI
C PEKERJAAN STRUKTUR
D PEKERJAAN ATAP & PLAFOND
E PEKERJAAN PASANGAN
F PEKERJAAN KUSEN PINTU & JENDELA
G PEKERJAAN PENGECATAN
H PEKERJAAN PLUMBING & SANITAIR
I PEKERJAAN LISTRIK
TOTAL
PEMBULATAN
TERBILANG
Pimpinan Lembaga
HARGA
JUMLAH
NO. URAIAN PEKERJAAN VOLUME SAT. SATUAN HARGA
( Rp. ) ( Rp. )
A PEKERJAAN PERSIAPAN
1 Papan Proyek 1.00 unit
2 Pek. Laporan & Dokumentasi 1.00 ls
Sub Total A
B PEKERJAAN TANAH DAN PONDASI
1 Pek. Galian Tanah Pondasi 83.22 3
m
2 Pek. Urug Tanah Kembali 27.74 3
m
3 Pek. Urug Tanah Peninggian Peil Lantai (t = 10 cm) 16.83 3
m
4 Pek. Pasir Urug
- Bawah Pondasi 5.93 3
m
- Bawah Lantai 22.76 3
m
5 Pek. Pondasi Tapak P1 (100x100x20)
- Beton K-225 3.20 3
m
- Pembesian kg
500.68
- Bekisting 19.20 2
m
6 Pek. Pondasi Batu Belah P2 28.23 3
m
7 Pek. Sloof Beton (15/30)
- Beton K-225 3.44 3
m
- Pembesian kg
745.23
- Bekisting 45.93 2
m
Sub Total B
C PEKERJAAN STRUKTUR
C.1 STRUKTUR BETON
1 Pek. Kolom Beton K1 (30/30)
- Beton K-225 8.21 3
m
- Pembesian kg
1,185.02
- Bekisting 2
109.44 m
2 Pek. Kolom Praktis KP (15/15)
- Beton K-175 0.55 3
m
HARGA
JUMLAH
NO. URAIAN PEKERJAAN VOLUME SAT. SATUAN
HARGA
( Rp. )
( Rp. )
- Pembesian kg
105.76
- Bekisting 14.70 2
m
3 Pek. Balok Beton B1,B2 (20/30)
- Beton K-225 3.42 3
m
- Pembesian kg
580.24
- Bekisting 45.60 2
m
4 Pek. Balok Lintel BL (15/15),dan RB (15/15)
- Beton K-175 1.37 3
m
- Pembesian kg
477.72
- Bekisting 27.45 2
m
5 Pek. Lantai Beton T=15 cm
- Beton K-225 23.69 3
m
- Pembesian Wiremesh M-8 1 lapis kg
157.90
- Bekisting 7.80 2
m
6 Pek. Ramp Beton T = 10 cm
- Beton K-175 0.35 3
m
- Pembesian 42.24 kg
- Bekisting 0.69 2
m
7 Pek. Kolom Sopi Sopi (30/30)
- Beton K-225 1.98 3
m
- Pembesian 73.37 kg
- Bekisting 26.46 2
m
8 Pek. Balok B4 dan Sopi Sopi (15/20)
- Beton K-175 1.58 3
m
- Pembesian kg
244.92
- Bekisting 28.93 2
m
9 Pek. Plat Beton Topi Topi (10/60)
- Beton K-225 1.21 3
m
- Pembesian kg
200.13
- Bekisting 14.14 2
m
C.2 PEKERJAAN ATAP
Rangka Atap
1 L 40.40.4 kg
366.65
2 2 X L 50,50,5 kg
946.30
3 Kuda-kuda 2x C 100.50.20.2,3 32.50 kg
4 Gording C 125.50.20.2,3 kg
902.00
5 L 50,50,5 dudukan gording 49.80 kg
6 Trekstang Ø12 49.65 kg
10 Bout M12 x 30 mm bh
608.00
11 Cat Sincromat Rangka baja m2
150.00
Penutup