Tugas Latihan Standard Costing

E10.32 Varian Tenaga Kerja

Dik:
AH = 360.000
AR = 9,50/ jam
SH = 0,5
SR = 10/ jam

1. Varian efisiensi tenaga kerja = (AH x SR) – (SH x SR)


= (360.000 x 10) – (0,5 x 10)
= 3.599.995

2. Varian tarif tenaga kerja = (AH x AR) – (AH x SR)


= ( 3.600.000 – 9,50) – ( 360.000 x 10 )
= - 180.000

E10.26 kualitas tenaga kerja dan material standar

1. Tenaga kerja = standar harga x standar penggunaan


= 12 x 5 = 60
Dengan volume sebanyak 7.500 unit = 60 x 7.500 = 450.000
2.
Bahan baku langsung Standar harga Standar penggunaan Standar biaya
Kit 150 7.500 1.125.000
Lemari 50 7.500 375.000
Total bahan baku 1.500.000

3.

P10.41 menetapkan standar, varian bahan baku, dan tenaga kerja

Dik :
AR = tetap dari standar
= 15 + 2 = 17
SR = 17
AH = 180 + 390 = 570
SH = 1,50 + 6,25 = 7,75

Biaya Aktual Biaya


Standard
Bahan baku langsung
1 Gaint/m2 79.048 50.000
Lem (10 ons @ 0,15) 2.560 1,50
Total bahan baku langsung 81.608 50.001,5
2 Jam Tenaga kerja Langsung
Upah Tenaga kerja Pemotong 180 1,50
Upah tenaga kerja pemasang 390 6,25
Total jam tenaga kerja langsung 570 7,75

1. Variansi harga bahan baku (MPV) = (AP – SP) AQ


= (81.608 – 50.001,5) 17.640
= 55.808.704

Varian penggunaan bahan baku (MUV) = (AQ – SQ) SP


= ((1.640+16.000) – (32+10))50.001,5
= (17.640 – 42) 50.001,5
= 879.926.397

2. Varian upah tenaga kerja (LRV) = (AR – SR) AH


= (0) x 570
=0

Varian efisiensi tenaga kerja (LEV) = (AH – SH) SR


= (570 – 7,75) 17
= 9.558,28