Tugas Plumbing Perhitungan Diameter Pipa Buangan Black Water dan Grey Water yang Terpisah
Pipa horizontal
Pipa tegak
1 A FD1-FD1.1 1 1 50 8000
Isometri pipa buangan Black Water
Pipa horizontal
1 A C1-C1.1 8 8 50 1,500
1 A C1-C1.1 8 50 20
Perhitungan Debit Limbah Cair
Qlimbah cair = 80 % . Qd
Qd = 480 Liter/hari atau 0,48 m3/hari
Qlimbah cair = 80 % . 0,48 = 0,384 m3/hari.
Perencanaan Septictank
p = 0.79
l = 0.79
t = 1.4 x 0.79 = 1.106
Volume Septictank = 0.69 m3