ANDIKA FEBRIAJURI
18021107018
1.
- Lt 2
Jumlah penghuni 7 org x 100 liter pegawai/hari = 700liter/hari
- Lt 3
Jumlah penghuni 5 org x 100 liter pegawai/hari = 500liter/hari
1600 x 1,2 = 1920 lt/hari
B. Mencari nilai Qh (keb air rata2)
Qh = Qd/h
T = 8.00 – 16.00 = 8 jam
- Lt 2
Jumlah penghuni 7 org x 100 liter pegawai/hari = 700liter/hari
- Lt 3
Jumlah penghuni 5 org x 100 liter pegawai/hari = 500liter/hari
1600 x 1,2 = 1920 lt/hari
B. Mencari nilai Qh (keb air rata2)
Qh = Qd/h
T = 8.00 – 16.00 = 8 jam
- Tabel kebutuhan unit beban alat plumbing unit 1 lantai 2 berdasarkan SNI 2005:
No Alat plumbing Jumlah UABP Kebutuhan ket
(liter/hari)
1 Kloset duduk tangki 2 5 10 Black Water
glontor
2 Peturasan terbuka 1 5 5 Grey Water
(katup glontor)
3 Bak cuci tangan 1 2 2 Gray Water
- Tabel kebutuhan unit beban alat plumbing unit 1 lantai 3 berdasarkan SNI 2005:
No Alat plumbing Jumlah UABP Kebutuhan ket
(liter/hari)
1 Kloset duduk tangki 2 5 10 Black Water
glontor
2 Peturasan terbuka 1 5 5 Grey Water
(katup glontor)
3 Bak cuci tangan 1 2 2 Gray Water
B. Unit 2
- Tabel kebutuhan unit beban alat plumbing unit 1 lantai 1 berdasarkn SNI 2005:
- Tabel kebutuhan unit beban alat plumbing unit 1 lantai 2 berdasarkan SNI 2005:
No Alat plumbing Jumlah UABP Kebutuhan ket
(liter/hari)
1 Kloset duduk tangki 2 5 10 Black Water
glontor
2 Peturasan terbuka 1 5 5 Grey Water
(katup glontor)
3 Bak cuci tangan - 2 - Gray Water
- Tabel kebutuhan unit beban alat plumbing unit 1 lantai 3 berdasarkan SNI 2005:
No Alat plumbing Jumlah UABP Kebutuhan ket
(liter/hari)
1 Kloset duduk tangki 2 5 10 Black Water
glontor
2 Peturasan terbuka 1 5 5 Grey Water
(katup glontor)
3 Bak cuci tangan 1 2 2 Gray Water
C. Unit 3
- Tabel kebutuhan unit beban alat plumbing unit 1 lantai 1 berdasarkn SNI 2005:
- Tabel kebutuhan unit beban alat plumbing unit 1 lantai 2 berdasarkan SNI 2005:
No Alat plumbing Jumlah UABP Kebutuhan ket
(liter/hari)
1 Kloset duduk tangki 2 5 10 Black Water
glontor
2 Peturasan terbuka 1 5 5 Grey Water
(katup glontor)
3 Bak cuci tangan - 2 - Gray Water
- Tabel kebutuhan unit beban alat plumbing unit 1 lantai 3 berdasarkan SNI 2005:
No Alat plumbing Jumlah UABP Kebutuhan (liter/hari) ket
Menghitung Unit 1
Cth unit 1 sesuai perhitungn nmr 1 diperoleh : 1,8 m3/hari = 1800 L/hari
V limbah cair = 80 % . Qd
= 805 x 1,8 m3/hari = 1,44 m3/hari
- Volume lumpur/orang = 25 liter/orang/tahun
Perencanaan Septictank :
p = 1,2
l = 1,2
t = 1,4 x 1,2 = 1,68
Menghitung Unit 2
Cth unit 1 sesuai perhitungn nmr 1 diperoleh : 1,92 m3/hari = 1920 L/hari
V limbah cair = 80 % . Qd
= 805 x 1,92 m3/hari = 1,536 m3/hari
Perencanaan Septictank :
p = 1,25
l = 1,25
t = 1,4 x 1,25 = 1,75
Menghitung Unit 3
Cth unit 1 sesuai perhitungn nmr 1 diperoleh : 1,92 m3/hari = 1920 L/hari
V limbah cair = 80 % . Qd
= 805 x 1,92 m3/hari = 1,536 m3/hari
Perencanaan Septictank :
p = 1,25
l = 1,25
t = 1,4 x 1,25 = 1,75
3.
Pipa Horizontal (GREY WATER)
Lanta Sekto Dari- Alat Plumbing Diamater Diamete Slope Panjan
i r Ke Perangka r Pipa = 1/(8) g Pipa ΔH =
Jenis NBUA Akumulas p (mm) Datar (mm) (9) x
P i = (4) x (mm) (10
(5)
(1) (2) (3) (4) (5) (6) (7) (8) (9) (`10) (11)
1 A-B FD1 3 40 45
–
BCT1