ENGINEERING ESTIMATE ( EE )
JUMLAH HARGA
NO URAIAN PEKERJAAN
(Rp)
Jumlah 148,023,093.08
PPN 10% 14,802,309.31
Total 162,825,402.39
Dibulatkan 164,806,000.00
Terbilang :
Seratus Enam Puluh Empat Juta Delapan Ratus Enam Ribu Rupiah
Mengetahui :
KEPALA DINAS
PERINDUSTRIAN DAN PERDAGANGAN
NO KONTRAK MC 0%
URAIAN PEKERJAAN HARGA SATUAN
VOLUME HARGA SATUAN (Rp) JUMLAH HARGA (Rp) VOLUME JUMLAH HARGA (Rp)
(Rp)
I PEKERJAAN PENDAHULUAN
1 Uitzed 1.00 Ls 500,000.00 500,000.00 1.00 Ls 500,000.00 500,000.00
2 Pembersihan Lokasi 1.00 Ls 1,750,000.00 1,750,000.00 1.00 Ls 1,750,000.00 1,750,000.00
3 Pengadaan listrik kerja 1.00 Ls 750,000.00 750,000.00 1.00 Ls 750,000.00 750,000.00
4 K3 Konstruksi 1.00 Ls 500,000.00 500,000.00 1.00 Ls 500,000.00 500,000.00
5 Papan Nama Proyek 1.00 Ls 450,000.00 450,000.00 1.00 Ls 450,000.00 450,000.00
6 Pekerjaan bongkaran rangka atap kayu 272.21 m² 9,125.00 2,483,916.25 272.21 m² 9,125.00 2,483,950.01
7 Bongkaran saluran lama 1.00 Ls 4,000,000.00 4,000,000.00 1.00 Ls 4,000,000.00 4,000,000.00
10,433,916.25 10,433,950.01
II PEKERJAAN SALURAN AIR
1 Galian tanah 2.08 m³ 66,875.00 139,100.00 13.00 m³ 66,875.00 869,375.00
2 Lantai Kerja t = 5 cm 3.33 m³ 961,449.00 3,201,625.17 1.04 m³ 961,449.00 999,906.96
3 Pasangan 1/2 Bata Merah 41.60 m² 120,775.00 5,024,240.00 41.60 m² 120,775.00 5,024,240.00
4 Pasang Buis Beton Ø 40 52.00 m¹ 530,265.00 27,573,780.00 52.00 m¹ 530,265.00 27,573,780.00
5 Plat t = 8 cm ( Beton K 175 ) 2.08 m³ 1,079,751.00 2,245,882.08 2.08 m³ 1,079,751.00 2,245,882.08
6 Bak Kontrol 5.00 bh 425,860.00 2,129,300.00 5.00 bh 425,860.00 2,129,300.00
7 Normalisasi Saluran 1.00 Ls 1,500,000.00 1,500,000.00 1.00 Ls 1,500,000.00 1,500,000.00
41,813,927.25 40,342,484.04
III PEKERJAAN TALANG, RANGKA ATAP DAN PENUTUP ATAP
1 Pasang Talang Seng L 90 146.00 m¹ 182,628.00 26,663,688.00 98.00 m¹ 182,628.00 17,897,544.00
2 Pasang Rangka Hollow 4/4 untuk penyangga asbes gelombang 247.47 m² 176,925.00 43,783,629.75 293.14 m² 176,925.00 51,863,794.50
3 Pasang Atap Asbes gelombang 247.47 m² 86,900.00 21,505,143.00 293.14 m² 86,900.00 25,473,866.00
4 Pasang Talang Tegak PVC 3" 17.43 m¹ 115,384.00 2,011,143.12
91,952,460.75 97,246,347.62
IV PEKERJAAN ATAP KANOPI KANTOR DAN LAMPU SOROT
1 Pasang Rangka Hollow 4/4 untuk penyangga Atap Kanopi di tangga naik 4.95 m² 176,925.00 875,778.75 - - - -
kantor
2 Pasang Atap Seng Galvalum 4.95 m² 453,941.43 2,247,010.08 - - - -
3 Pasang Lampu Sorot Taman Depan 2.00 bh 350,000.00 700,000.00 - - - -
3,822,788.83 -
I PEKERJAAN PENDAHULUAN
1 Pembersihan Lokasi 1.00 Ls
2 Pengadaan listrik kerja 1.00 Ls
3 Pengadaan jaringan pengamanan (debu) 1.00 Ls
4 Pekerjaan bongkaran rangka atap kayu = #REF! 1.00 1.10 #REF! m²
5 Bongkaran saluran lama = 1.00 1.00 1.00 1.00 Ls
2 Pasang Rangka Hollow 4/4 untuk penyangga asbes gelombang 49.00 x 2.73 = 133.77 2.00 1.00 267.54 m²
3 Pasang Atap Asbes gelombang 49.00 x 2.73 = 133.77 2.00 1.00 267.54 m²
Rangka Atap untuk penerangan 8.00 x 1.60 = 12.80 2.00 1.00 25.60 m²
10.7 Memasang 1 buah bak mandi Batu Bata volume 0.30 M³ Upah+Bahan / Bh Rp 1,509,348.00
10.8 Memasang 1 buah bak Fibreglass volume 1 M³ air Upah+Bahan / Bh Rp 1,172,822.00
10.9 Memasang 1m pipa beton, diameter 15 cm - 20 cm Upah+Bahan / m' Rp 114,142.00
10.10 Memasang 1m pipa beton / buis beton, diameter 30 - 100 cm Upah+Bahan / m' Rp 535,015.00
10.11 Memasang 1 bh bak kontrol Pas. 1/2 bata ukuran 30x30cm, T. 35cm Upah+Bahan / Unit Rp 447,765.00
10.12 Memasang 1 bh bak kontrol Pas. 1/2 bata ukuran 45 x 45 T. 50cm Upah+Bahan / Unit Rp 685,680.00
10.14 Memasang 1 m' pipa galvanis diameter 1/2'' Upah+Bahan / m' Rp 422,580.00
10.15 Memasang 1 m' pipa galvanis diameter 3/4'' Upah+Bahan / m' Rp 112,433.88
10.16 Memasang 1 m' pipa galvanis diameter 1'' Upah+Bahan / m' Rp 392,225.00
10.17 Memasang 1 m' pipa galvanis diameter 1 1/2'' medium Upah+Bahan / m' Rp 606,600.00
10.18 Memasang 1 m' pipa PVC diameter 1/2'' Upah+Bahan / m' Rp 21,690.00
10.19 Memasang 1 m' pipa PVC diameter 3/4'' Upah+Bahan / m' Rp 24,208.75
10.20 Memasang 1 m' pipa PVC diameter 3'' Upah+Bahan / m' Rp 87,165.00
10.21 Memasang 1 m' pipa PVC diameter 4'' Upah+Bahan / m' Rp 115,383.75
10.22 Memasang 1 buah kran diameter 3/4'' atau 1/2'' Upah+Bahan / Bh Rp 75,819.25
10.23 Memasang 1 buah Floor Drain Upah+Bahan / Bh Rp 58,250.00
10.24 Memasang 1 buah Kran Wastafel Upah+Bahan / Bh Rp 44,319.25
10.25 Memasang 1 buah Kitchen Zink 1 lubang 1 sayap Upah+Bahan / Bh Rp 461,150.00
10.26 Memasang 1 buah Kran Kitchen Zink Upah+Bahan / Bh Rp 68,219.25
10.27 Memasang 1 m' pipa galvanis diameter 4'' Upah+Bahan / m' Rp 2,870,940.00
10.28 Memasang 1 m' pipa galvanis diameter 3'' Upah+Bahan / m' Rp 2,153,290.00
10.29 Memasang 1 m' pipa galvanis diameter 2'' Upah+Bahan / m' Rp 1,271,780.00
10.30 Memasang 1 m' pipa galvanis diameter 1'' Upah+Bahan / m' Rp 392,225.00
10.31 Memasang 1 m' pipa PVC AW diameter 1/2'' Upah+Bahan / m' Rp 21,690.00
10.32 Memasang 1 m' pipa PVC AW diameter 3/4'' Upah+Bahan / m' Rp 22,064.56
10.33 Memasang 1 m' pipa PVC AW diameter 1'' Upah+Bahan / m' Rp 28,200.00
10.34 Memasang 1 m' pipa PVC AW diameter 2'' Upah+Bahan / m' Rp 47,820.00
10.35 Memasang 1 m' pipa PVC AW diameter 3'' Upah+Bahan / m' Rp 118,415.00
10.36 Memasang 1 m' pipa PVC AW diameter 4'' Upah+Bahan / m' Rp 160,071.25
10.37 Memasang 1 m' pipa PVC AW diameter 6'' Upah+Bahan / m' Rp 409,040.00
10.38 1 Unit Kusen + Daun Pintu PVC Upah+Bahan / Unit Rp 608,065.00
7. 1 m² Menurunkan Rangka Atap Kayu (Bahan Atap Tidak Dipakai Lagi) 9,100.00
Tenaga
No Kode Uraian Satuan Koef Harga Jumlah Harga
1 Kl Pekerja Orang 0.1000 85,000.00 8,500.00
2 Mdr Mandor Orang 0.0050 120,000.00 600.00
2 3 4
Jenis Bahan Bangunan Penutup Atap dan Plafond
A1 Asbes datar tebal. 4 mm ( 100 X 100 ) Lbr Rp 66,200.00
A2 Asbes datar tebal. 4 mm ( 120 X 240 ) Lbr Rp 76,800.00
A3 Asbes datar tebal. 5 mm ( 60 X 180 ) Lbr Rp 62,400.00
A4 Asbes datar tebal. 6 mm ( 40 X 80 ) Lbr Rp 58,150.00
A20 Asbes Eternit 1 x 1 m Lbr Rp 19,500.00
A21 Gypsum tebal 12 mm M2 Rp 100,000.00
A22 Fiber glass lebar (180X230) cm M2 Rp 108,000.00
A23 Roolflight Twinlight M2 Rp 157,500.00
A24 Atap Polli Carbonat + Rangka M2 Rp 680,000.00
A25 Policarbonat M2
A26 Sisalation/Alumunium Foil M2 Rp 40,800.00
A27 Genteng flam pres jawa / lokal BH Rp 750.00
A28 Genteng galvanum BH Rp 59,200.00
A34 Genteng model Karang pilang Ex.Lokal BH Rp 3,900.00
A35 Genteng wuwung karang pilang Ex.Lokal BH Rp 9,700.00
A36 Genteng Kodok Ex. Bambe BH Rp 7,500.00
A37 Genteng Kodok Ex. Wisma BH Rp 7,500.00
A38 Genteng Palentong BH Rp 4,900.00
A39 Genteng Palentong Super BH Rp 11,000.00
A40 Genteng Nok Palentong BH Rp 9,600.00
A41 Genteng Bubung Kodok BH Rp 8,100.00
A42 Genteng Nok Kodok Glazzur BH Rp 12,750.00
A43 Genteng Beton BH Rp 8,100.00
A44 Genteng Nok Beton BH Rp 8,000.00
A45 Genteng Sirap M2 Rp 166,000.00
A46 Nok Genteng Pinggir BH Rp 49,000.00
A47 Nok Stel Gelombang Lbr Rp 49,650.00
A59 Soft Board 4 x 8 x 4 mm Lbr Rp 88,700.00
A60 Gypsum Board 122 x 244 x 9 mm Lbr Rp 126,000.00
A61 Kalsi Board 120 x 240 x 4 mm Lbr Rp 80,820.00
A62 Triplek 122x244x4 mm Lbr Rp 123,850.00
A63 Triplek 122x244x6 mm Lbr Rp 189,100.00
A64 Triplek 122x244x9 mm Lbr Rp 202,400.00
A65 Triplek 120x244x12 mm Lbr Rp 192,800.00
A66 Sirap asbes 4 mm M2 Rp 76,510.00
A67 Sirap asbes 5 mm M2 Rp 91,900.00
A68 Tripleks 4 mm lapis aluminium 0,9 x 1,80 m Lbr Rp 225,000.00
A69 HPL Lbr Rp 250,000.00
A70 Lem FOX Kg Rp 45,000.00
2 3 4
B11 Kayu meranti (papan) M³ Rp 7,335,000.00
B12 Kayu meranti (usuk) M³ Rp 6,920,000.00
B13 Kayu (begesting) M³ Rp 3,500,000.00
B14 Kayu bengkirai balok M³ Rp 11,958,000.00
B15 Kayu bengkirai papan M³ Rp 13,160,000.00
B16 Kayu bengkirai usuk M³ Rp 11,958,000.00
B17 Dolken Kayu Ø 8-10 cm/400 cm Bt Rp 84,400.00
B18 Kayu Kruing (Balok) M³ Rp 8,480,000.00
B19 Kayu Kruing (Papan) M³ Rp 8,895,000.00
B20 Kayu Kruing (Usuk) M³ Rp 8,480,000.00
B21 Kayu Ulin M³ Rp 1,350,000.00
B22 List Kayu 2/4 Kamper Ljr Rp 9,100.00
B23 List Kayu Propil M' Rp 38,000.00
2 3 4
D3 Besi beton ulir Kg Rp 16,000.00
D39 Besi steinliss steel Kg Rp 31,500.00
D40 Besi Strip Kg Rp 27,500.00
D41 Besi strip 2 x 3 M' Rp 20,000.00
D42 Besi Kotak Hollow 5 x 5 T.3mm Kg Rp 40,500.00
D43 Canal C. Kg Rp 21,000.00
D44 Kawat baja hitam 10 mm Kg Rp 39,100.00
D85 Profil List Kaca bh Rp 27,720.00
D86 Sealant tube Rp 39,870.00
D87 Besi Balok Kg Rp 32,500.00
D88 Besi bulat 42 Kg Rp 20,160.00
D89 Besi Bulat 60 Kg Rp 20,160.00
D90 Besi Siku Kg Rp 21,420.00
D91 Bronjong kawat pabrikasi diameter 2,7 mm Bh Rp 297,500.00
D92 Bronze Kg Rp 113,400.00
D93 Besi cor Kg Rp 19,500.00
D94 Baja cor Kg Rp 25,000.00
D95 Besi INP Kg Rp 37,500.00
D96 Drucklager besar Bh Rp 320,000.00
D97 Drucklager kecil Bh Rp 320,000.00
D98 Gembok Besar Bh Rp 106,400.00
D99 kawat bronjong M1 Rp 37,325.00
D100 Kawat biasa galvanis Kg Rp 107,100.00
D101 Mur baut 1/2", 5/8", 7/8" Kg Rp 44,100.00
D102 Mur Baut Sambungan Kuda-kuda Baja Bh Rp 2,300.00
D103 Baut Angkur Dia. 19 Panjang 40cm Bh Rp 75,000.00
D104 Jarum Keras Bh Rp 60,000.00
D105 Splite pen Bh Rp 52,920.00
D106 Rantai Kg Rp 37,800.00
D107 Seal Bh Rp 47,880.00
D108 Naf + ring besar Bh Rp 617,400.00
D109 Naf + ring kecil Bh Rp 485,100.00
D110 Baja Tulangan (polos) U24 Kg Rp 13,686.00
D111 Baja Tulangan (ulir) U32 Kg Rp 15,356.00
D112 Baja Bergelombang Kg Rp 16,703.00
D113 Baja Struktur Kg Rp 30,000.00
D114 Pipa Baja Kg Rp 21,420.00
D115 Baja Prategang Kg Rp 15,000.00
D116 Baja Tulangan (polos) U32 Kg Rp 15,000.00
D117 Baja Tulangan (ulir) D39 Kg Rp 17,000.00
D118 Baja Tulangan (ulir) D48 Kg Rp 17,500.00
D119 Rel Pengaman M1 Rp 506,000.00
D120 Pelat Rambu (Eng. Grade) Bh Rp 245,700.00
D121 Pelat Rambu (High I. Grade) Bh Rp 264,000.00
D122 Kawat Beton Kg Rp 25,300.00
D123 Kawat Las Kg Rp 41,370.00
D124 Spie bh Rp 17,640.00
D125 Seal Karet bh Rp 176,000.00
2 3 4
E37 Tegel keramik 20 x 40 Bh Rp 8,000.00
E38 Tegel keramik 25 x 40 Bh Rp 8,100.00
E39 Tegel Keramik 50 x 50 Bh Rp 22,500.00
E40 Tegel list dinding Bh Rp 32,500.00
E41 Tegel keramik 20 x 25 (dinding) Bh Rp 5,400.00
E42 Tegel keramik 20 x 20 (Lantai) Bh Rp 2,750.00
E43 Tegel wafel 20 x 20 Bh Rp 2,750.00
E44 Tegel keramik 20 x 60 Bh Rp 10,200.00
E45 Plint Ubin PC Warna 10x20 cm Bh Rp 2,800.00
E46 Plint Ubin PC Warna 10x30 cm Bh Rp 3,150.00
E47 Plint Ubin PC Warna 10x40 cm Bh Rp 3,400.00
E48 Plint Keramik 10 x 20cm Bh Rp 5,000.00
E49 Plint Keramik 5 x 20cm Bh Rp 3,000.00
E50 Bahan Teraso Cor Bh Rp 57,400.00
E51 Marmer M2 Rp 530,000.00
E52 Batu lempeng jember acak M2 Rp 75,650.00
E53 Batu candi hitam M2 Rp 150,000.00
E54 Batu sisir M2 Rp 305,000.00
E55 Batu ampyang M2 Rp 68,650.00
E56 Nero Granito 60/60 cm (Setara) bh Rp 180,650.00
E57 Lantai Granit 60 x 60 M2 Rp 275,000.00
E58 Roster 20 x 40 M2 Rp 13,300.00
E59 Batu Alur Cetak M2 Rp 70,000.00
E60 List Keramik Dinding 5 / 25 bh Rp 1,385.00
E61 Kolplint Lantai 8 / 40 bh Rp 6,000.00
2 3 4
G2 Engsel kuningan ARCH Stl Rp 95,500.00
G3 Engsel Jendela Stl Rp 27,100.00
G4 Hak Angin Stl Rp 34,500.00
G5 Engsel Pintu Stl Rp 45,800.00
G6 Grendel Bh Rp 18,000.00
G7 Grendel biasa (besar) Bh Rp 27,500.00
G8 Grendel biasa (kecil) Bh Rp 13,860.00
G9 Grendel kuningan / cromm (kecil) Bh Rp 20,680.00
G10 Grendel tanam Bh Rp 113,000.00
G11 Grendel Spring knife Bh Rp 37,500.00
G12 Kunci gembok besar Bh Rp 68,900.00
G13 Kunci gembok sedang Bh Rp 48,250.00
G14 Kunci tanam -808 Bh Rp 140,000.00
G15 Kunci tanam besar kupu tarung Bh Rp 161,500.00
G16 Kunci tanam antik Bh Rp 377,000.00
G17 Kunci tanam kamar mandi Bh Rp 83,000.00
G18 Kunci silinder Bh Rp 161,000.00
G19 Kunci selot (Cap Kuda terbang 2 x putaran) Bh Rp 194,000.00
G20 Kunci lemari Bh Rp 33,700.00
G21 Kait angin Bh Rp 35,500.00
G22 Hak angin 4 mm (lurus) Bh Rp 6,460.00
G23 Hak angin (sikutan) Stl Rp 23,000.00
G24 Hak angin lurus (bisa disetel maju/mundur) Stl Rp 100,010.00
G25 Kait angin Bh Rp 32,000.00
G26 Dor closer Bh Rp 424,400.00
G27 Dor stop Bh Rp 45,800.00
G28 Rel pintu dorong Bh Rp 481,600.00
G29 pintu kaca tempert + acessories unit Rp 57,330,000.00
2 3 4
I7 Kaca rayband tb. 5 mm M2 Rp 255,000.00
I8 Krepyak kaca nako + kerangka Lbr Rp 215,400.00
I9 Kaca cermin tebal 5 mm M2 Rp 413,700.00
I10 Kaca cermin tebal 10 mm M2 Rp 369,800.00
I11 Profil Aluminium Coklat Sekualitas Indall M' Rp 110,000.00
I12 Profil Kaca M' Rp 12,550.00
I13 Sealant Tube Rp 27,500.00
2 3 4
L2 Paku Segala Ukuran Kg Rp 20,200.00
L3 Paku seng payung Kg Rp 36,800.00
L4 Paku skrup 2'' Dos Rp 51,000.00
L5 Paku sumbat Bh Rp 1,500.00
L6 Paku triplek Kg Rp 31,500.00
L7 Paku usuk Kg Rp 30,300.00
L8 Sekerup Bh Rp 1,300.00
L9 Sekrup Fixer Bh Rp 600.00
L10 Paku Pancing Bh Rp 3,400.00
L11 Paku Baja Dos Rp 64,000.00
L12 Paku Reng Kg Rp 33,000.00
L13 Paku Sekrup 3.5'' Dos Rp 103,500.00
L14 Paku Keling 3/4''.5/8''.7/8'' Kg Rp 33,800.00
KODE
NO TENAGA KERJA SATUAN HARGA ( Rp )
UPAH
1 2 3 4
1 2 3
Harga ( Rp )
Rp 389,000.00
Rp 378,200.00
Rp 77,000.00
Rp 220,000.00
Rp 105,700.00
Rp 378,200.00
Rp 111,750.00
Rp 18,975.00
Rp 686,500.00
Rp 96,000.00
Rp 373,800.00
Rp 271,000.00
Rp 261,000.00
Rp 31,500.00
Rp 629,500.00
Rp 720,500.00
Rp 269,600.00
Rp 268,900.00
Rp 126,500.00
Rp 292,400.00
Rp 292,400.00
Rp 292,400.00
Rp 292,400.00
Rp 292,400.00
Rp 66,300.00
Rp 22,500.00
Rp 28,900.00
Rp 619,300.00
Rp 144,700.00
Rp 50,050.00
Rp 82,800.00
Rp 17,200.00
Rp 27,500.00
Rp 17,000.00
Rp 74,500.00
Rp 35,600.00
Rp 25,100.00
Rp 495,000.00
Rp 97,100.00
Rp 36,200.00
Rp 602,800.00
Rp 830,000.00
Rp 785,000.00
Rp 651,800.00
Rp 27,500.00
Rp 104,000.00
Rp 25,000.00
Rp 5,280,000,000.00
Rp 1,584,000,000.00
Rp 114,840,000.00
Rp 1,364,880,000.00
Rp 145,200,000.00
Rp 231,660,000.00
Rp 1,964,160,000.00
Rp 158,400,000.00
Rp 396,000,000.00
Rp 1,516,970,255.00
Rp 396,000,000.00
Rp 198,000,000.00
Rp 1,296,240,000.00
Rp 982,000,000.00
Rp 744,480,000.00
Rp 462,000,000.00
Rp 462,000,000.00
Rp 947,232,000.00
Rp 1,212,799,500.00
Rp 5,280,000.00
Rp 1,320,000,000.00
Rp 6,600,000.00
Rp 138,600,000.00
Rp 198,000,000.00
Rp 22,440,000.00
Rp 46,200,000.00
Rp 1,188,000,000.00
Rp 165,500,000.00
Rp 792,000,000.00
Rp 1,155,000,000.00
Rp 1,122,000,000.00
Rp 25,100,000.00
Rp 2,970,000,000.00
Rp 19,800,000.00
Rp 594,000,000.00
Rp 1,241,157,481.00
Rp 4,945,000,000.00
Rp 6,922,080,000.00
Rp 35,610,000,000.00
Rp 521,400,000.00
Rp 521,400,000.00
Rp 1,765,028,572.00
Rp 1,323,901,313.00
Rp 1,188,000,000.00
Rp 660,000,000.00
Rp 660,000,000.00
Rp 46,200,000.00
Rp 26,400,000.00
Rp 660,000,000.00
Rp 1,544,400,000.00
Rp 1,188,000,000.00
Rp 660,000,000.00
Rp 1,080,000,000.00
Rp 27,600,000.00
Rp 9,600,000.00
Rp 3,000,000.00
Rp 840,000.00
Rp 2,400,000.00
Rp 124,116.00
Rp 121,500.00
Rp 72,100.00
Rp 24,200.00
Rp 30,800.00
Rp 89,100.00
Rp 17,900.00
Rp 39,400.00
Rp 656,600.00
ANALISA BIAYA PEKERJAAN BONGKARAN
Jumlah Harga
1,133,390.00
79,920.00
606,655.00
Jumlah Harga
566,695.00
39,960.00
9,700.00
Jumlah Harga
8,500.00
1,200.00
4,550.00
Jumlah Harga
4,250.00
300.00
1,450.00
Jumlah Harga
850.00
600.00
2,900.00
Jumlah Harga
1,700.00
1,200.00
11,725.00
Jumlah Harga
2,375.00
8,500.00
250.00
600.00
9,100.00
Jumlah Harga
8,500.00
600.00
970,000.00
Jumlah Harga
570,000.00
60,000.00
340,000.00
24,000.00
414,000.00
Jumlah Harga
380,000.00
34,000.00
1 ANALISA BIAYA KONTRUKSI PEKERJAAN PERSIAPAN
Tenaga
No Kode Uraian Satuan Koef Harga
1 T Ky Tukang Kayu Orang 0.400 95,000.00
2 KL Ky Pembantu Tukang Kayu Orang 0.200 85,000.00
3 KT Ky Kepala Tukang Kayu Orang 0.020 100,000.00
4 Mdr Mandor Orang 0.020 120,000.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 T Ky Tukang Kayu Orang 0.100 95,000.00
2 KL Ky Pembantu Tukang Kayu Orang 0.100 85,000.00
3 KT Ky Kepala Tukang Kayu Orang 0.010 100,000.00
4 Mdr Mandor Orang 0.005 120,000.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL Pekerja Orang 1.000 85,000.00
2 Mdr Mandor Orang 0.005 120,000.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 T Bt Tukang Batu Orang 0.125 95,000.00
2 KL Bt Pembantu Tukang Batu Orang 0.375 85,000.00
3 KT Bt Kepala Tukang Batu Orang 0.012 100,000.00
4 Mdr Mandor Orang 0.019 120,000.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 T Ky Tukang Kayu Orang 3.000 95,000.00
2 T Bt Tukang Batu Orang 2.000 95,000.00
3 KL Ky Pembantu Tukang Kayu Orang 1.500 85,000.00
4 KL Bt Pembantu Tukang Batu Orang 1.500 85,000.00
5 KT Ky Kepala Tukang Kayu Orang 0.750 100,000.00
6 Mdr Mandor Orang 0.750 120,000.00
360,867.00
Jumlah Harga
105,500.00
4,000.00
97,680.00
1,890.00
2,925.00
67,200.00
1,212.00
21,060.00
301,467.00
Jumlah Harga
38,000.00
17,000.00
2,000.00
2,400.00
59,400.00
132,384.00
Jumlah Harga
83,040.00
404.00
29,340.00
112,784.00
Jumlah Harga
9,500.00
8,500.00
1,000.00
600.00
19,600.00
14,500.00
Jumlah Harga
8,500.00
6,000.00
14,500.00
147,813.00
Jumlah Harga
35,250.00
23,463.00
3,500.00
62,213.00
Jumlah Harga
85,000.00
600.00
85,600.00
542,777.00
Jumlah Harga
170,937.50
177,187.50
27,972.00
47,450.00
72,000.00
495,547.00
Jumlah Harga
11,875.00
31,875.00
1,200.00
2,280.00
47,230.00
39,589,401.00
2,199,411.17
Jumlah Harga
-
4,359,600.00
24,220,000.00
736.00
2,421,000.00
409,600.00
229,250.00
177,660.00
254,475.00
692,000.00
388,080.00
247,200.00
45,800.00
27,500.00
161,500.00
5,060,000.00
38,694,401.00
Jumlah Harga
285,000.00
190,000.00
127,500.00
127,500.00
75,000.00
90,000.00
895,000.00
2 ANALISA BIAYA KONTRUKSI PEKERJAAN TANAH
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL Pekerja Orang 0.300 85,000.00
2 Mdr Mandor Orang 0.010 120,000.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL Pekerja Orang 0.300 85,000.00
2 Mdr Mandor Orang 0.010 120,000.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL Pekerja Orang 0.250 85,000.00
2 Mdr Mandor Orang 0.025 120,000.00
2.13 1 M2 Pasangan lapisan Ijuk Tebal 10 cm untuk resapan
Bahan
No Kode Uraian Satuan Koef Harga
1 C48 Ijuk Kg 6.000 35,100.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL Pekerja Orang 0.150 85,000.00
2 Mdr Mandor Orang 0.015 120,000.00
Jumlah Harga
63,750.00
3,000.00
66,750.00
81,900.00
Jumlah Harga
76,500.00
5,400.00
81,900.00
97,290.00
Jumlah Harga
89,250.00
8,040.00
97,290.00
88,840.00
Jumlah Harga
85,000.00
3,840.00
88,840.00
134,700.00
Jumlah Harga
127,500.00
7,200.00
134,700.00
107,400.00
Jumlah Harga
102,000.00
5,400.00
107,400.00
48,500.00
Jumlah Harga
42,500.00
6,000.00
48,500.00
29,250.00
Jumlah Harga
28,050.00
1,200.00
29,250.00
48,500.00
Jumlah Harga
42,500.00
6,000.00
48,500.00
260,700.00
Jumlah Harga
234,000.00
234,000.00
Jumlah Harga
25,500.00
1,200.00
26,700.00
253,500.00
Jumlah Harga
226,800.00
226,800.00
Jumlah Harga
25,500.00
1,200.00
26,700.00
296,410.00
Jumlah Harga
272,160.00
272,160.00
Jumlah Harga
21,250.00
3,000.00
24,250.00
225,150.00
Jumlah Harga
210,600.00
210,600.00
Jumlah Harga
12,750.00
1,800.00
14,550.00
119,500.00
Jumlah Harga
59,500.00
54,000.00
6,000.00
119,500.00
3 ANALISA BIAYA KONTRUKSI PEKERJAAN PONDASI
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL Bt Pembantu Tukang Batu Orang 1.500 85,000.00
2 T Bt Tukang Batu Orang 0.750 95,000.00
3 KT Bt Kepala Tukang Batu Orang 0.075 100,000.00
4 Mdr Mandor Orang 0.075 120,000.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL Bt Pembantu Tukang Batu Orang 1.500 85,000.00
2 T Bt Tukang Batu Orang 0.750 95,000.00
3 KT Bt Kepala Tukang Batu Orang 0.075 100,000.00
4 Mdr Mandor Orang 0.075 120,000.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL Bt Pembantu Tukang Batu Orang 0.780 85,000.00
2 T Bt Tukang Batu Orang 0.390 95,000.00
3 KT Bt Kepala Tukang Batu Orang 0.039 100,000.00
4 Mdr Mandor Orang 0.039 120,000.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL Bt Pembantu Tukang Batu Orang 2.400 85,000.00
2 T Bt Tukang Batu Orang 0.800 95,000.00
3 KT Bt Kepala Tukang Batu Orang 0.080 100,000.00
4 Mdr Mandor Orang 0.119 120,000.00
880,800.00
Jumlah Harga
282,000.00
187,200.00
196,350.00
665,550.00
Jumlah Harga
127,500.00
71,250.00
7,500.00
9,000.00
215,250.00
990,200.00
Jumlah Harga
282,000.00
323,200.00
169,750.00
774,950.00
Jumlah Harga
127,500.00
71,250.00
7,500.00
9,000.00
215,250.00
478,170.00
Jumlah Harga
282,000.00
84,240.00
366,240.00
Jumlah Harga
66,300.00
37,050.00
3,900.00
4,680.00
111,930.00
988,466.00
Jumlah Harga
105,750.00
310,400.00
117,936.00
152,100.00
686,186.00
Jumlah Harga
204,000.00
76,000.00
8,000.00
14,280.00
302,280.00
4 ANALISA BIAYA KONTRUKSI PEKERJAAN DINDING
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL Bt Pembantu Tukang Batu Orang 0.600 85,000.00
2 T Bt Tukang Batu Orang 0.200 95,000.00
3 KT Bt Kepala Tukang Batu Orang 0.020 100,000.00
4 Mdr Mandor Orang 0.030 120,000.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL Bt Pembantu Tukang Batu Orang 0.600 85,000.00
2 T Bt Tukang Batu Orang 0.200 95,000.00
3 KT Bt Kepala Tukang Batu Orang 0.020 100,000.00
4 Mdr Mandor Orang 0.030 120,000.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL Bt Pembantu Tukang Batu Orang 0.300 85,000.00
2 T Bt Tukang Batu Orang 0.100 95,000.00
3 KT Bt Kepala Tukang Batu Orang 0.010 100,000.00
4 Mdr Mandor Orang 0.015 120,000.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL Bt Pembantu Tukang Batu Orang 0.300 85,000.00
2 T Bt Tukang Batu Orang 0.100 95,000.00
3 KT Bt Kepala Tukang Batu Orang 0.010 100,000.00
4 Mdr Mandor Orang 0.015 120,000.00
4.5 1 m² Pasangan Bata Merah Tebal 1/2 Bata 1 Pc : 6 Ps
Bahan
No Kode Uraian Satuan Koef Harga
1 C3 Batu bata merah Bh 70.000 750.00
2 C37 Semen PC (Portland Cemen) Kg 8.320 1,600.00
3 C30 Pasir pasang M³ 0.049 350,000.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL Bt Pembantu Tukang Batu Orang 0.300 85,000.00
2 T Bt Tukang Batu Orang 0.100 95,000.00
3 KT Bt Kepala Tukang Batu Orang 0.010 100,000.00
4 Mdr Mandor Orang 0.015 120,000.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL Bt Pembantu Tukang Batu Orang 0.300 85,000.00
2 T Bt Tukang Batu Orang 0.100 95,000.00
3 KT Bt Kepala Tukang Batu Orang 0.010 100,000.00
4 Mdr Mandor Orang 0.015 120,000.00
265,170.00
Jumlah Harga
105,000.00
52,720.00
31,850.00
189,570.00
Jumlah Harga
51,000.00
19,000.00
2,000.00
3,600.00
75,600.00
252,900.00
Jumlah Harga
105,000.00
29,600.00
42,700.00
177,300.00
Jumlah Harga
51,000.00
19,000.00
2,000.00
3,600.00
75,600.00
127,292.00
Jumlah Harga
52,500.00
22,992.00
14,000.00
89,492.00
Jumlah Harga
25,500.00
9,500.00
1,000.00
1,800.00
37,800.00
123,750.00
Jumlah Harga
52,500.00
18,400.00
15,050.00
85,950.00
Jumlah Harga
25,500.00
9,500.00
1,000.00
1,800.00
37,800.00
120,762.00
Jumlah Harga
52,500.00
13,312.00
17,150.00
82,962.00
Jumlah Harga
25,500.00
9,500.00
1,000.00
1,800.00
37,800.00
337,650.00
Jumlah Harga
270,000.00
17,600.00
12,250.00
299,850.00
Jumlah Harga
25,500.00
9,500.00
1,000.00
1,800.00
37,800.00
5 ANALISA BIAYA KONTRUKSI PEKERJAAN PLESTERAN
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL Bt Pembantu Tukang Batu Orang 0.300 85,000.00
2 T Bt Tukang Batu Orang 0.150 95,000.00
3 KT Bt Kepala Tukang Batu Orang 0.015 100,000.00
4 Mdr Mandor Orang 0.015 120,000.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL Bt Pembantu Tukang Batu Orang 0.150 85,000.00
2 T Bt Tukang Batu Orang 0.300 95,000.00
3 KT Bt Kepala Tukang Batu Orang 0.015 100,000.00
4 Mdr Mandor Orang 0.015 120,000.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL Bt Pembantu Tukang Batu Orang 0.300 85,000.00
2 T Bt Tukang Batu Orang 0.150 95,000.00
3 KT Bt Kepala Tukang Batu Orang 0.015 100,000.00
4 Mdr Mandor Orang 0.015 120,000.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL Bt Pembantu Tukang Batu Orang 0.260 85,000.00
2 T Bt Tukang Batu Orang 0.200 95,000.00
3 KT Bt Kepala Tukang Batu Orang 0.020 100,000.00
4 Mdr Mandor Orang 0.013 120,000.00
5.5 1 m² Plesteran 1 Pc : 6 Ps tebal 20 mm
Bahan
No Kode Uraian Satuan Koef Harga
1 C37 Semen PC (Portland Cemen) Kg 5.888 1,600.00
2 C30 Pasir pasang M³ 0.036 350,000.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL Bt Pembantu Tukang Batu Orang 0.400 85,000.00
2 T Bt Tukang Batu Orang 0.200 95,000.00
3 KT Bt Kepala Tukang Batu Orang 0.020 100,000.00
4 Mdr Mandor Orang 0.022 120,000.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL Bt Pembantu Tukang Batu Orang 0.300 85,000.00
2 T Bt Tukang Batu Orang 0.150 95,000.00
3 KT Bt Kepala Tukang Batu Orang 0.015 100,000.00
4 Mdr Mandor Orang 0.015 120,000.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL Bt Pembantu Tukang Batu Orang 0.080 85,000.00
2 T Bt Tukang Batu Orang 0.400 95,000.00
3 KT Bt Kepala Tukang Batu Orang 0.040 100,000.00
4 Mdr Mandor Orang 0.004 120,000.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL Bt Pembantu Tukang Batu Orang 0.300 85,000.00
2 T Bt Tukang Batu Orang 0.150 95,000.00
3 KT Bt Kepala Tukang Batu Orang 0.015 100,000.00
4 Mdr Mandor Orang 0.015 120,000.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL Bt Pembantu Tukang Batu Orang 0.150 85,000.00
2 T Bt Tukang Batu Orang 0.075 95,000.00
3 KT Bt Kepala Tukang Batu Orang 0.008 100,000.00
4 Mdr Mandor Orang 0.008 120,000.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL Bt Pembantu Tukang Batu Orang 0.300 85,000.00
2 T Bt Tukang Batu Orang 0.100 95,000.00
3 KT Bt Kepala Tukang Batu Orang 0.010 100,000.00
4 Mdr Mandor Orang 0.015 120,000.00
5.11 1 m² Acian
Bahan
No Kode Uraian Satuan Koef Harga
1 C37 Semen PC (Portland Cemen) Kg 3.250 1,600.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL Bt Pembantu Tukang Batu Orang 0.200 85,000.00
2 T Bt Tukang Batu Orang 0.100 95,000.00
3 KT Bt Kepala Tukang Batu Orang 0.010 100,000.00
4 Mdr Mandor Orang 0.010 120,000.00
Tenaga :
No Kode Uraian Satuan Koef Harga
1 KL Bt Pembantu Tukang Batu Orang 0.050 85,000.00
2 T Bt Tukang Batu Orang 0.150 95,000.00
3 KT Bt Kepala Tukang Batu Orang 0.010 100,000.00
4 Mdr Mandor Orang 0.010 120,000.00
63,541.60
Jumlah Harga
12,441.60
8,050.00
20,491.60
Jumlah Harga
25,500.00
14,250.00
1,500.00
1,800.00
43,050.00
62,934.00
Jumlah Harga
9,984.00
8,400.00
18,384.00
Jumlah Harga
12,750.00
28,500.00
1,500.00
1,800.00
44,550.00
59,565.60
Jumlah Harga
7,065.60
9,450.00
16,515.60
Jumlah Harga
25,500.00
14,250.00
1,500.00
1,800.00
43,050.00
72,098.80
Jumlah Harga
16,588.80
10,850.00
27,438.80
Jumlah Harga
22,100.00
19,000.00
2,000.00
1,560.00
44,660.00
79,660.80
Jumlah Harga
9,420.80
12,600.00
22,020.80
Jumlah Harga
34,000.00
19,000.00
2,000.00
2,640.00
57,640.00
66,408.40
Jumlah Harga
16,358.40
7,000.00
23,358.40
Jumlah Harga
25,500.00
14,250.00
1,500.00
1,800.00
43,050.00
54,630.00
Jumlah Harga
800.00
4,550.00
5,350.00
Jumlah Harga
6,800.00
38,000.00
4,000.00
480.00
49,280.00
57,394.00
Jumlah Harga
10,144.00
4,200.00
14,344.00
Jumlah Harga
25,500.00
14,250.00
1,500.00
1,800.00
43,050.00
26,607.80
Jumlah Harga
4,972.80
4,972.80
Jumlah Harga
12,750.00
7,125.00
800.00
960.00
21,635.00
46,812.00
Jumlah Harga
6,912.00
2,100.00
9,012.00
Jumlah Harga
25,500.00
9,500.00
1,000.00
1,800.00
37,800.00
33,900.00
Jumlah Harga
5,200.00
5,200.00
Jumlah Harga
17,000.00
9,500.00
1,000.00
1,200.00
28,700.00
26,820.00
Jumlah Harga
1,920.00
4,200.00
6,120.00
Jumlah Harga
4,250.00
14,250.00
1,000.00
1,200.00
20,700.00
6 ANALISA BIAYA KONTRUKSI PEKERJAAN KAYU
6.1 1 m³ Pasang Kusen pintu dan jendela kayu jati (Kayu Kelas I)
Bahan
No Kode Uraian Satuan Koef Harga
1 B3 Kayu jati usuk 5/7, 4/6, 3/5 M³ 1.100 36,148,000.00
2 L2 Paku Segala Ukuran Kg 1.250 20,200.00
3 F23 Lem Kg 1.000 17,000.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL Ky Pembantu Tukang Kayu Orang 7.000 85,000.00
2 T Ky Tukang Kayu Orang 21.000 95,000.00
3 KT Ky Kepala Tukang Kayu Orang 2.100 100,000.00
4 Mdr Mandor Orang 0.350 120,000.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL Ky Pembantu Tukang Kayu Orang 6.000 85,000.00
2 T Ky Tukang Kayu Orang 18.000 95,000.00
3 KT Ky Kepala Tukang Kayu Orang 1.800 100,000.00
4 Mdr Mandor Orang 0.300 120,000.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL Ky Pembantu Tukang Kayu Orang 0.350 85,000.00
2 T Ky Tukang Kayu Orang 1.050 95,000.00
3 KT Ky Kepala Tukang Kayu Orang 0.105 100,000.00
4 Mdr Mandor Orang 0.018 120,000.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL Ky Pembantu Tukang Kayu Orang 0.350 85,000.00
2 T Ky Tukang Kayu Orang 1.050 95,000.00
3 KT Ky Kepala Tukang Kayu Orang 0.105 100,000.00
4 Mdr Mandor Orang 0.018 120,000.00
6.5 1 m² Pasang Daun pintu panel kayu jati ( Kayu Kelas I / II)
Bahan
No Kode Uraian Satuan Koef Harga
1 B4 Kayu jati papan 2/20 x 2 m M³ 0.040 40,535,000.00
2 F23 Lem Kg 0.500 17,000.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL Ky Pembantu Tukang Kayu Orang 1.000 85,000.00
2 T Ky Tukang Kayu Orang 3.000 95,000.00
3 KT Ky Kepala Tukang Kayu Orang 0.300 100,000.00
4 Mdr Mandor Orang 0.050 120,000.00
6.6 1 m² Pasang Daun pintu panel kayu kamfer (Kayu Kelas I / II)
Bahan
No Kode Uraian Satuan Koef Harga
1 B7 Kayu kamper (papan) M³ 0.040 16,180,000.00
2 F23 Lem Kg 0.500 17,000.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL Ky Pembantu Tukang Kayu Orang 1.000 85,000.00
2 T Ky Tukang Kayu Orang 3.000 95,000.00
3 KT Ky Kepala Tukang Kayu Orang 0.300 100,000.00
4 Mdr Mandor Orang 0.050 120,000.00
6.7 1 m² Pasang pintu dan jendela kaca kayu jati (Kayu Kelas I / II)
Bahan
No Kode Uraian Satuan Koef Harga
1 B4 Kayu jati papan 2/20 x 2 m M³ 0.024 40,535,000.00
2 F23 Lem Kg 0.300 17,000.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL Ky Pembantu Tukang Kayu Orang 0.800 85,000.00
2 T Ky Tukang Kayu Orang 2.400 95,000.00
3 KT Ky Kepala Tukang Kayu Orang 0.240 100,000.00
4 Mdr Mandor Orang 0.040 120,000.00
6.8 1 m² Pasang pintu dan jendela kaca kayu kamfer (Kayu Kelas I / II)
Bahan
No Kode Uraian Satuan Koef Harga
1 B6 Kayu kamper (balok) M³ 0.035 14,420,000.00
2 F23 Lem Kg 0.300 17,000.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL Ky Pembantu Tukang Kayu Orang 0.800 85,000.00
2 T Ky Tukang Kayu Orang 2.400 95,000.00
3 KT Ky Kepala Tukang Kayu Orang 0.240 100,000.00
4 Mdr Mandor Orang 0.040 120,000.00
6.9 1 m² Pasang pintu dan jendela jalusi kayu jati (kayu Kelas I / II)
Bahan
No Kode Uraian Satuan Koef Harga
1 B4 Kayu jati papan 2/20 x 2 m M³ 0.064 40,535,000.00
2 F23 Lem Kg 0.500 17,000.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL Ky Pembantu Tukang Kayu Orang 1.000 85,000.00
2 T Ky Tukang Kayu Orang 3.000 95,000.00
3 KT Ky Kepala Tukang Kayu Orang 0.300 100,000.00
4 Mdr Mandor Orang 0.050 120,000.00
6.10 1 m² Pasang pintu dan jendela jalusi kayu kamper (Kayu Kelas I / II )
Bahan
No Kode Uraian Satuan Koef Harga
1 B7 Kayu kamper (papan) M³ 0.064 16,180,000.00
2 F23 Lem Kg 0.500 17,000.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL Ky Pembantu Tukang Kayu Orang 1.000 85,000.00
2 T Ky Tukang Kayu Orang 3.000 95,000.00
3 KT Ky Kepala Tukang Kayu Orang 0.300 100,000.00
4 Mdr Mandor Orang 0.050 120,000.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL Ky Pembantu Tukang Kayu Orang 0.700 85,000.00
2 T Ky Tukang Kayu Orang 2.100 95,000.00
3 KT Ky Kepala Tukang Kayu Orang 0.210 100,000.00
4 Mdr Mandor Orang 0.030 120,000.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL Ky Pembantu Tukang Kayu Orang 0.670 85,000.00
2 T Ky Tukang Kayu Orang 2.000 95,000.00
3 KT Ky Kepala Tukang Kayu Orang 0.200 100,000.00
4 Mdr Mandor Orang 0.335 120,000.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL Ky Pembantu Tukang Kayu Orang 0.800 85,000.00
2 T Ky Tukang Kayu Orang 2.400 95,000.00
3 KT Ky Kepala Tukang Kayu Orang 0.240 100,000.00
4 Mdr Mandor Orang 0.040 120,000.00
6.14 1 m² Pasang pintu teakwood rangkap, rangka expose kayu kamper
Bahan
No Kode Uraian Satuan Koef Harga
1 B7 Kayu kamper (papan) M³ 0.025 16,180,000.00
2 L6 Paku triplek Kg 0.030 31,500.00
3 F23 Lem Kg 0.300 17,000.00
4 A57 Teakwood 122x244x4mm Lbr 1.000 148,709.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL Ky Pembantu Tukang Kayu Orang 0.800 85,000.00
2 T Ky Tukang Kayu Orang 2.400 95,000.00
3 KT Ky Kepala Tukang Kayu Orang 0.240 100,000.00
4 Mdr Mandor Orang 0.040 120,000.00
6.15 1 m3 Pasang konstruksi kuda-kuda konvensional kayu Kelas I, II, dan III
Bahan
No Kode Uraian Satuan Koef Harga
1 B2 Kayu jati balok 8/12, 6/12 M³ 1.100 36,148,000.00
2 D40 Besi Strip Kg 15.000 27,500.00
3 L7 Paku usuk Kg 5.600 30,300.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL Ky Pembantu Tukang Kayu Orang 4.000 85,000.00
2 T Ky Tukang Kayu Orang 12.000 95,000.00
3 KT Ky Kepala Tukang Kayu Orang 1.200 100,000.00
4 Mdr Mandor Orang 0.200 120,000.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL Ky Pembantu Tukang Kayu Orang 6.700 85,000.00
2 T Ky Tukang Kayu Orang 20.100 95,000.00
3 KT Ky Kepala Tukang Kayu Orang 2.010 100,000.00
4 Mdr Mandor Orang 0.335 120,000.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL Ky Pembantu Tukang Kayu Orang 6.700 85,000.00
2 T Ky Tukang Kayu Orang 20.000 95,000.00
3 KT Ky Kepala Tukang Kayu Orang 2.010 100,000.00
4 Mdr Mandor Orang 0.335 120,000.00
6.18 1 m² Pasang kaso + reng 2/3 genteng Keramik Kayu Kelas II
Bahan
No Kode Uraian Satuan Koef Harga
1 B8 Kayu kamper (usuk) M³ 0.014 12,720,000.00
2 B9 Kayu kamper (reng) M³ 0.003 12,720,000.00
3 L7 Paku usuk Kg 0.250 30,300.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL Ky Pembantu Tukang Kayu Orang 0.100 85,000.00
2 T Ky Tukang Kayu Orang 0.100 95,000.00
3 KT Ky Kepala Tukang Kayu Orang 0.010 100,000.00
4 Mdr Mandor Orang 0.005 120,000.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL Ky Pembantu Tukang Kayu Orang 0.100 85,000.00
2 T Ky Tukang Kayu Orang 0.100 95,000.00
3 KT Ky Kepala Tukang Kayu Orang 0.010 100,000.00
4 Mdr Mandor Orang 0.005 120,000.00
6.20 1 m² Pasang kaso + reng atap sirap kayu kamper / Kayu Kelas II
Bahan
No Kode Uraian Satuan Koef Harga
1 B6 Kayu kamper (balok) M³ 0.014 14,420,000.00
2 L7 Paku usuk Kg 0.057 30,300.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL Ky Pembantu Tukang Kayu Orang 0.120 85,000.00
2 T Ky Tukang Kayu Orang 0.120 95,000.00
3 KT Ky Kepala Tukang Kayu Orang 0.012 100,000.00
4 Mdr Mandor Orang 0.006 120,000.00
6.21 1 m² Pasang rangka langit - langit 50 x 100 cm, kayu kelas II / III
Bahan
No Kode Uraian Satuan Koef Harga
1 B6 Kayu kamper (balok) M³ 0.0154 14,420,000.00
2 L7 Paku usuk Kg 0.200 30,300.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL Ky Pembantu Tukang Kayu Orang 0.150 85,000.00
2 T Ky Tukang Kayu Orang 0.300 95,000.00
3 KT Ky Kepala Tukang Kayu Orang 0.030 100,000.00
4 Mdr Mandor Orang 0.075 120,000.00
6.23 1 m' Pasang Lisplang ukuran ( 3 x 20 ) cm, kayu Jati / Kayu kelas I
Bahan
No Kode Uraian Satuan Koef Harga
1 B4 Kayu jati papan 2/20 x 2 m M³ 0.0108 40,535,000.00
2 L2 Paku Segala Ukuran Kg 0.100 20,200.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL Ky Pembantu Tukang Kayu Orang 0.100 85,000.00
2 T Ky Tukang Kayu Orang 0.200 95,000.00
3 KT Ky Kepala Tukang Kayu Orang 0.020 100,000.00
4 Mdr Mandor Orang 0.005 120,000.00
6.24 1 m' Pasang Lisplang ukuran ( 3 x 20 ) cm, kayu kamper / Kayu Kelas II
Bahan
No Kode Uraian Satuan Koef Harga
1 B7 Kayu kamper (papan) M³ 0.0108 16,180,000.00
2 L2 Paku Segala Ukuran Kg 0.100 20,200.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL Ky Pembantu Tukang Kayu Orang 0.100 85,000.00
2 T Ky Tukang Kayu Orang 0.200 95,000.00
3 KT Ky Kepala Tukang Kayu Orang 0.020 100,000.00
4 Mdr Mandor Orang 0.005 120,000.00
6.25 1 m' Pasang Lisplang ukuran ( 3 x 30 ) cm, kayu jati / Kayu Kelas I
Bahan
No Kode Uraian Satuan Koef Harga
1 B4 Kayu jati papan 2/20 x 2 m M³ 0.011 40,535,000.00
2 L2 Paku Segala Ukuran Kg 0.050 20,200.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL Ky Pembantu Tukang Kayu Orang 0.100 85,000.00
2 T Ky Tukang Kayu Orang 0.200 95,000.00
3 KT Ky Kepala Tukang Kayu Orang 0.020 100,000.00
4 Mdr Mandor Orang 0.005 120,000.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL Ky Pembantu Tukang Kayu Orang 0.100 85,000.00
2 T Ky Tukang Kayu Orang 0.200 95,000.00
3 KT Ky Kepala Tukang Kayu Orang 0.020 100,000.00
4 Mdr Mandor Orang 0.005 120,000.00
6.27 1 m² Pasang rangka dinding pemisah (60 x 120) cm kayu kelas II / III
Bahan
No Kode Uraian Satuan Koef Harga
1 B6 Kayu kamper (balok) M³ 0.028 14,420,000.00
2 L7 Paku usuk Kg 0.150 30,300.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL Ky Pembantu Tukang Kayu Orang 0.150 85,000.00
2 T Ky Tukang Kayu Orang 0.450 95,000.00
3 KT Ky Kepala Tukang Kayu Orang 0.045 100,000.00
4 Mdr Mandor Orang 0.008 120,000.00
6.28 1 m² Pasang rangka dinding pemisah (60 x 120)cm Kayu Kelas II / III
Bahan
No Kode Uraian Satuan Koef Harga
1 B10 Kayu meranti (balok) M³ 0.028 6,970,000.00
2 L7 Paku usuk Kg 0.150 30,300.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL Ky Pembantu Tukang Kayu Orang 0.150 85,000.00
2 T Ky Tukang Kayu Orang 0.450 95,000.00
3 KT Ky Kepala Tukang Kayu Orang 0.045 100,000.00
4 Mdr Mandor Orang 0.080 120,000.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL Ky Pembantu Tukang Kayu Orang 0.150 85,000.00
2 T Ky Tukang Kayu Orang 0.450 95,000.00
3 KT Ky Kepala Tukang Kayu Orang 0.045 100,000.00
4 Mdr Mandor Orang 0.008 120,000.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL Ky Pembantu Tukang Kayu Orang 0.200 85,000.00
2 T Ky Tukang Kayu Orang 0.600 95,000.00
3 KT Ky Kepala Tukang Kayu Orang 0.060 100,000.00
4 Mdr Mandor Orang 0.010 120,000.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL Ky Pembantu Tukang Kayu Orang 0.600 85,000.00
2 T Ky Tukang Kayu Orang 1.800 95,000.00
3 KT Ky Kepala Tukang Kayu Orang 0.180 100,000.00
4 Mdr Mandor Orang 0.030 120,000.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL Ky Pembantu Tukang Kayu Orang 0.025 85,000.00
2 T Ky Tukang Kayu Orang 0.075 95,000.00
3 KT Ky Kepala Tukang Kayu Orang 0.008 100,000.00
4 Mdr Mandor Orang 0.001 120,000.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL Ky Pembantu Tukang Kayu Orang 0.025 85,000.00
2 T Ky Tukang Kayu Orang 0.075 95,000.00
3 KT Ky Kepala Tukang Kayu Orang 0.008 100,000.00
4 Mdr Mandor Orang 0.001 120,000.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL Ky Pembantu Tukang Kayu Orang 6.700 85,000.00
2 T Ky Tukang Kayu Orang 20.100 95,000.00
3 KT Ky Kepala Tukang Kayu Orang 2.010 100,000.00
4 Mdr Mandor Orang 0.335 120,000.00
42,647,050.00
Jumlah Harga
39,762,800.00
25,250.00
17,000.00
39,805,050.00
Jumlah Harga
595,000.00
1,995,000.00
210,000.00
42,000.00
2,842,000.00
19,782,250.00
Jumlah Harga
17,304,000.00
25,250.00
17,000.00
17,346,250.00
Jumlah Harga
510,000.00
1,710,000.00
180,000.00
36,000.00
2,436,000.00
790,875.00
Jumlah Harga
647,200.00
1,515.00
648,715.00
Jumlah Harga
29,750.00
99,750.00
10,500.00
2,160.00
142,160.00
437,075.00
Jumlah Harga
293,400.00
1,515.00
294,915.00
Jumlah Harga
29,750.00
99,750.00
10,500.00
2,160.00
142,160.00
2,035,900.00
Jumlah Harga
1,621,400.00
8,500.00
1,629,900.00
Jumlah Harga
85,000.00
285,000.00
30,000.00
6,000.00
406,000.00
1,061,700.00
Jumlah Harga
647,200.00
8,500.00
655,700.00
Jumlah Harga
85,000.00
285,000.00
30,000.00
6,000.00
406,000.00
1,302,740.00
Jumlah Harga
972,840.00
5,100.00
977,940.00
Jumlah Harga
68,000.00
228,000.00
24,000.00
4,800.00
324,800.00
834,600.00
Jumlah Harga
504,700.00
5,100.00
509,800.00
Jumlah Harga
68,000.00
228,000.00
24,000.00
4,800.00
324,800.00
3,008,740.00
Jumlah Harga
2,594,240.00
8,500.00
2,602,740.00
Jumlah Harga
85,000.00
285,000.00
30,000.00
6,000.00
406,000.00
1,450,020.00
Jumlah Harga
1,035,520.00
8,500.00
1,044,020.00
Jumlah Harga
85,000.00
285,000.00
30,000.00
6,000.00
406,000.00
886,210.00
Jumlah Harga
404,500.00
510.00
8,500.00
189,100.00
602,610.00
Jumlah Harga
59,500.00
199,500.00
21,000.00
3,600.00
283,600.00
2,743,795.00
Jumlah Harga
2,432,100.00
4,545.00
2,436,645.00
Jumlah Harga
56,950.00
190,000.00
20,000.00
40,200.00
307,150.00
1,492,893.00
Jumlah Harga
1,013,375.00
909.00
5,100.00
148,709.00
1,168,093.00
Jumlah Harga
68,000.00
228,000.00
24,000.00
4,800.00
324,800.00
884,054.00
Jumlah Harga
404,500.00
945.00
5,100.00
148,709.00
559,254.00
Jumlah Harga
68,000.00
228,000.00
24,000.00
4,800.00
324,800.00
41,968,980.00
Jumlah Harga
39,762,800.00
412,500.00
169,680.00
40,344,980.00
Jumlah Harga
340,000.00
1,140,000.00
120,000.00
24,000.00
1,624,000.00
10,890,600.00
Jumlah Harga
7,667,000.00
412,500.00
90,900.00
8,170,400.00
Jumlah Harga
569,500.00
1,909,500.00
201,000.00
40,200.00
2,720,200.00
46,613,920.00
Jumlah Harga
43,377,600.00
412,500.00
113,120.00
43,903,220.00
Jumlah Harga
569,500.00
1,900,000.00
201,000.00
40,200.00
2,710,700.00
243,415.00
Jumlah Harga
178,080.00
38,160.00
7,575.00
223,815.00
Jumlah Harga
8,500.00
9,500.00
1,000.00
600.00
19,600.00
281,575.00
Jumlah Harga
178,080.00
76,320.00
7,575.00
261,975.00
Jumlah Harga
8,500.00
9,500.00
1,000.00
600.00
19,600.00
227,127.10
Jumlah Harga
201,880.00
1,727.10
203,607.10
Jumlah Harga
10,200.00
11,400.00
1,200.00
720.00
23,520.00
281,378.00
Jumlah Harga
222,068.00
6,060.00
228,128.00
Jumlah Harga
12,750.00
28,500.00
3,000.00
9,000.00
53,250.00
170,886.00
Jumlah Harga
113,611.00
7,575.00
121,186.00
Jumlah Harga
17,000.00
28,500.00
3,000.00
1,200.00
49,700.00
469,898.00
Jumlah Harga
437,778.00
2,020.00
439,798.00
Jumlah Harga
8,500.00
19,000.00
2,000.00
600.00
30,100.00
206,864.00
Jumlah Harga
174,744.00
2,020.00
176,764.00
Jumlah Harga
8,500.00
19,000.00
2,000.00
600.00
30,100.00
476,995.00
Jumlah Harga
445,885.00
1,010.00
446,895.00
Jumlah Harga
8,500.00
19,000.00
2,000.00
600.00
30,100.00
209,090.00
Jumlah Harga
177,980.00
1,010.00
178,990.00
Jumlah Harga
8,500.00
19,000.00
2,000.00
600.00
30,100.00
469,265.00
Jumlah Harga
403,760.00
4,545.00
408,305.00
Jumlah Harga
12,750.00
42,750.00
4,500.00
960.00
60,960.00
269,305.00
Jumlah Harga
195,160.00
4,545.00
199,705.00
Jumlah Harga
12,750.00
42,750.00
4,500.00
9,600.00
69,600.00
606,674.74
Jumlah Harga
403,760.00
127,889.74
9,520.00
4,545.00
545,714.74
Jumlah Harga
12,750.00
42,750.00
4,500.00
960.00
60,960.00
605,536.00
Jumlah Harga
403,760.00
4,545.00
9,520.00
106,511.00
524,336.00
Jumlah Harga
17,000.00
57,000.00
6,000.00
1,200.00
81,200.00
512,666.00
Jumlah Harga
253,036.00
3,030.00
13,000.00
269,066.00
Jumlah Harga
51,000.00
171,000.00
18,000.00
3,600.00
243,600.00
61,271.00
Jumlah Harga
49,540.00
1,575.00
51,115.00
Jumlah Harga
2,125.00
7,125.00
750.00
156.00
10,156.00
44,059.00
Jumlah Harga
32,328.00
1,575.00
33,903.00
Jumlah Harga
2,125.00
7,125.00
750.00
156.00
10,156.00
20,443,980.00
Jumlah Harga
17,304,000.00
412,500.00
7,280.00
17,723,780.00
Jumlah Harga
569,500.00
1,909,500.00
201,000.00
40,200.00
2,720,200.00
7 ANALISA BIAYA KONTRUKSI PEKERJAAN BETON
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL Bs Pembantu Tukang Besi Orang 0.007 85,000.00
2 T Bs Tukang Besi Orang 0.007 95,000.00
3 KT Bs Kepala Tukang Besi Orang 0.001 100,000.00
4 Mdr Mandor Orang 0.0003 120,000.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL Ky Pembantu Tukang Kayu Orang 0.520 85,000.00
2 T Ky Tukang Kayu Orang 0.260 95,000.00
3 KT Ky Kepala Tukang Kayu Orang 0.026 100,000.00
4 Mdr Mandor Orang 0.026 120,000.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL Ky Pembantu Tukang Kayu Orang 0.520 85,000.00
2 T Ky Tukang Kayu Orang 0.260 95,000.00
3 KT Ky Kepala Tukang Kayu Orang 0.026 100,000.00
4 Mdr Mandor Orang 0.026 120,000.00
7.4 1 M² Pasang bekisting untuk kolom
Bahan
No Kode Uraian Satuan Koef Harga
1 B35 Kayu Terentang m3 0.040 3,500,000.00
2 L2 Paku Segala Ukuran Kg 0.400 20,200.00
3 T95 Minyak Bekisting Liter 0.200 4,400.00
4 B13 Kayu (begesting) M³ 0.015 3,500,000.00
5 A64 Triplek 122x244x9 mm Lbr 0.350 202,400.00
6 B17 Dolken Kayu Ø 8-10 cm/400 cm Bt 2.000 84,400.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL Ky Pembantu Tukang Kayu Orang 0.660 85,000.00
2 T Ky Tukang Kayu Orang 0.330 95,000.00
3 KT Ky Kepala Tukang Kayu Orang 0.033 100,000.00
4 Mdr Mandor Orang 0.033 120,000.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL Ky Pembantu Tukang Kayu Orang 0.660 85,000.00
2 T Ky Tukang Kayu Orang 0.330 95,000.00
3 KT Ky Kepala Tukang Kayu Orang 0.033 100,000.00
4 Mdr Mandor Orang 0.033 120,000.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL Ky Pembantu Tukang Kayu Orang 0.660 85,000.00
2 T Ky Tukang Kayu Orang 0.330 95,000.00
3 KT Ky Kepala Tukang Kayu Orang 0.033 100,000.00
4 Mdr Mandor Orang 0.033 120,000.00
7.7 1 M² Pasang bekisting untuk Dinding
Bahan
No Kode Uraian Satuan Koef Harga
1 B35 Kayu Terentang m3 0.030 3,500,000.00
2 L2 Paku Segala Ukuran Kg 0.400 20,200.00
3 T95 Minyak Bekisting Liter 0.200 4,400.00
4 B13 Kayu (begesting) M³ 0.020 3,500,000.00
5 A64 Triplek 122x244x9 mm Lbr 0.350 202,400.00
6 B17 Dolken Kayu Ø 8-10 cm/400 cm Bt 3.000 84,400.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL Ky Pembantu Tukang Kayu Orang 0.660 85,000.00
2 T Ky Tukang Kayu Orang 0.330 95,000.00
3 KT Ky Kepala Tukang Kayu Orang 0.033 100,000.00
4 Mdr Mandor Orang 0.033 120,000.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL Ky Pembantu Tukang Kayu Orang 0.660 85,000.00
2 T Ky Tukang Kayu Orang 0.330 95,000.00
3 KT Ky Kepala Tukang Kayu Orang 0.033 100,000.00
4 Mdr Mandor Orang 0.033 120,000.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL Bt Pembantu Tukang Batu Orang 1.650 85,000.00
2 T Bt Tukang Batu Orang 0.275 95,000.00
3 KT Bt Kepala Tukang Batu Orang 0.028 100,000.00
4 Mdr Mandor Orang 0.083 120,000.00
7.10 1 M³ Membuat beton dengan mutu K, 100
Bahan
No Kode Uraian Satuan Koef Harga
1 C37 Semen PC (Portland Cemen) Kg 247.000 1,600.00
2 C28 Pasir cor/beton M³ 0.621 378,000.00
3 C18 Batu / cor koral pecah (Pecah Mesin) 2/3 M³ 0.555 325,000.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL Bt Pembantu Tukang Batu Orang 1.650 85,000.00
2 T Bt Tukang Batu Orang 0.275 95,000.00
3 KT Bt Kepala Tukang Batu Orang 0.028 100,000.00
4 Mdr Mandor Orang 0.083 120,000.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL Bt Pembantu Tukang Batu Orang 1.650 85,000.00
2 T Bt Tukang Batu Orang 0.275 95,000.00
3 KT Bt Kepala Tukang Batu Orang 0.028 100,000.00
4 Mdr Mandor Orang 0.083 120,000.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL Bt Pembantu Tukang Batu Orang 1.650 85,000.00
2 T Bt Tukang Batu Orang 0.275 95,000.00
3 KT Bt Kepala Tukang Batu Orang 0.028 100,000.00
4 Mdr Mandor Orang 0.083 120,000.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL Bt Pembantu Tukang Batu Orang 1.650 85,000.00
2 T Bt Tukang Batu Orang 0.275 95,000.00
3 KT Bt Kepala Tukang Batu Orang 0.028 100,000.00
4 Mdr Mandor Orang 0.083 120,000.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL Bt Pembantu Tukang Batu Orang 1.650 85,000.00
2 T Bt Tukang Batu Orang 0.275 95,000.00
3 KT Bt Kepala Tukang Batu Orang 0.028 100,000.00
4 Mdr Mandor Orang 0.083 120,000.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL Bt Pembantu Tukang Batu Orang 1.650 85,000.00
2 T Bt Tukang Batu Orang 0.275 95,000.00
3 KT Bt Kepala Tukang Batu Orang 0.028 100,000.00
4 Mdr Mandor Orang 0.083 120,000.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL Bt Pembantu Tukang Batu Orang 1.650 85,000.00
2 T Bt Tukang Batu Orang 0.275 95,000.00
3 KT Bt Kepala Tukang Batu Orang 0.028 100,000.00
4 Mdr Mandor Orang 0.083 120,000.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL Bt Pembantu Tukang Batu Orang 1.650 85,000.00
2 T Bt Tukang Batu Orang 0.275 95,000.00
3 KT Bt Kepala Tukang Batu Orang 0.028 100,000.00
4 Mdr Mandor Orang 0.083 120,000.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL Bt Pembantu Tukang Batu Orang 2.100 85,000.00
2 T Bt Tukang Batu Orang 0.350 95,000.00
3 KT Bt Kepala Tukang Batu Orang 0.035 100,000.00
4 Mdr Mandor Orang 0.105 120,000.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL Bt Pembantu Tukang Batu Orang 2.100 85,000.00
2 T Bt Tukang Batu Orang 0.350 95,000.00
3 KT Bt Kepala Tukang Batu Orang 0.035 100,000.00
4 Mdr Mandor Orang 0.105 120,000.00
7.21 1m1 Kolom penguat beton bertulang (11 x 11) cm
Bahan
No Kode Uraian Satuan Koef Harga
1 B35 Kayu Terentang m3 0.002 3,500,000.00
2 L2 Paku Segala Ukuran Kg 0.010 20,200.00
3 D2 Besi beton polos Kg 3.000 14,900.00
4 D46 Kawat ikat beton Kg 0.045 27,500.00
5 C37 Semen PC (Portland Cemen) Kg 4.000 1,600.00
6 C28 Pasir cor/beton M³ 0.006 378,000.00
7 C18 Batu / cor koral pecah (Pecah Mesin) 2/3 M³ 0.009 325,000.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL Pekerja Orang 0.180 85,000.00
2 T Bt Tukang Batu Orang 0.020 95,000.00
3 T Ky Tukang Kayu Orang 0.020 95,000.00
4 T Bs Tukang Besi Orang 0.020 95,000.00
5 KT Bt Kepala Tukang Batu Orang 0.006 100,000.00
6 Mdr Mandor Orang 0.009 120,000.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL Pekerja Orang 0.297 85,000.00
2 T Bt Tukang Batu Orang 0.033 95,000.00
3 T Ky Tukang Kayu Orang 0.033 95,000.00
4 T Bs Tukang Besi Orang 0.033 95,000.00
5 KT Bt Kepala Tukang Batu Orang 0.010 100,000.00
6 Mdr Mandor Orang 0.015 120,000.00
17,423.50
Jumlah Harga
15,645.00
412.50
16,057.50
Jumlah Harga
595.00
665.00
70.00
36.00
1,366.00
221,120.00
Jumlah Harga
140,000.00
6,060.00
440.00
146,500.00
Jumlah Harga
44,200.00
24,700.00
2,600.00
3,120.00
74,620.00
238,620.00
Jumlah Harga
157,500.00
6,060.00
440.00
164,000.00
Jumlah Harga
44,200.00
24,700.00
2,600.00
3,120.00
74,620.00
535,810.00
Jumlah Harga
140,000.00
8,080.00
880.00
52,500.00
70,840.00
168,800.00
441,100.00
Jumlah Harga
56,100.00
31,350.00
3,300.00
3,960.00
94,710.00
546,310.00
Jumlah Harga
140,000.00
8,080.00
880.00
63,000.00
70,840.00
168,800.00
451,600.00
Jumlah Harga
56,100.00
31,350.00
3,300.00
3,960.00
94,710.00
873,410.00
Jumlah Harga
140,000.00
8,080.00
880.00
52,500.00
70,840.00
506,400.00
778,700.00
Jumlah Harga
56,100.00
31,350.00
3,300.00
3,960.00
94,710.00
602,710.00
Jumlah Harga
105,000.00
8,080.00
880.00
70,000.00
70,840.00
253,200.00
508,000.00
Jumlah Harga
56,100.00
31,350.00
3,300.00
3,960.00
94,710.00
500,590.00
Jumlah Harga
105,000.00
8,080.00
660.00
52,500.00
70,840.00
168,800.00
405,880.00
Jumlah Harga
56,100.00
31,350.00
3,300.00
3,960.00
94,710.00
973,549.00
Jumlah Harga
368,000.00
241,164.00
185,250.00
794,414.00
Jumlah Harga
140,250.00
26,125.00
2,800.00
9,960.00
179,135.00
989,448.00
Jumlah Harga
395,200.00
234,738.00
180,375.00
810,313.00
Jumlah Harga
140,250.00
26,125.00
2,800.00
9,960.00
179,135.00
1,026,783.00
Jumlah Harga
441,600.00
223,398.00
182,650.00
847,648.00
Jumlah Harga
140,250.00
26,125.00
2,800.00
9,960.00
179,135.00
1,056,998.00
Jumlah Harga
478,400.00
215,838.00
183,625.00
877,863.00
Jumlah Harga
140,250.00
26,125.00
2,800.00
9,960.00
179,135.00
1,091,851.20
Jumlah Harga
521,600.00
205,216.20
185,900.00
912,716.20
Jumlah Harga
140,250.00
26,125.00
2,800.00
9,960.00
179,135.00
1,125,876.00
Jumlah Harga
563,200.00
197,316.00
186,225.00
946,741.00
Jumlah Harga
140,250.00
26,125.00
2,800.00
9,960.00
179,135.00
1,150,129.00
Jumlah Harga
593,600.00
188,244.00
189,150.00
970,994.00
Jumlah Harga
140,250.00
26,125.00
2,800.00
9,960.00
179,135.00
1,167,792.00
Jumlah Harga
614,400.00
186,732.00
187,525.00
988,657.00
Jumlah Harga
140,250.00
26,125.00
2,800.00
9,960.00
179,135.00
1,198,449.00
Jumlah Harga
649,600.00
184,464.00
185,250.00
1,019,314.00
Jumlah Harga
140,250.00
26,125.00
2,800.00
9,960.00
179,135.00
1,207,918.00
Jumlah Harga
660,800.00
183,708.00
184,275.00
1,028,783.00
Jumlah Harga
140,250.00
26,125.00
2,800.00
9,960.00
179,135.00
1,292,987.00
Jumlah Harga
702,400.00
181,062.00
181,675.00
1,065,137.00
Jumlah Harga
178,500.00
33,250.00
3,500.00
12,600.00
227,850.00
1,304,953.00
Jumlah Harga
716,800.00
179,928.00
180,375.00
1,077,103.00
Jumlah Harga
178,500.00
33,250.00
3,500.00
12,600.00
227,850.00
87,412.50
Jumlah Harga
7,000.00
202.00
44,700.00
1,237.50
6,400.00
2,268.00
2,925.00
64,732.50
Jumlah Harga
15,300.00
1,900.00
1,900.00
1,900.00
600.00
1,080.00
22,680.00
120,446.00
Jumlah Harga
10,500.00
404.00
53,640.00
1,375.00
8,800.00
3,402.00
4,875.00
82,996.00
Jumlah Harga
25,245.00
3,135.00
3,135.00
3,135.00
1,000.00
1,800.00
37,450.00
8 ANALISA BIAYA KONTRUKSI PEKERJAAN PENUTUP ATAP
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL Ky Pembantu Tukang Kayu Orang 0.150 85,000.00
2 T Ky Tukang Kayu Orang 0.075 95,000.00
3 KT Ky Kepala Tukang Kayu Orang 0.0075 100,000.00
4 Mdr Mandor Orang 0.008 120,000.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL Bt Pembantu Tukang Batu Orang 0.150 85,000.00
2 T Bt Tukang Batu Orang 0.075 95,000.00
3 KT Bt Kepala Tukang Batu Orang 0.008 100,000.00
4 Mdr Mandor Orang 0.008 120,000.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL Bt Pembantu Tukang Batu Orang 0.400 85,000.00
2 T Bt Tukang Batu Orang 0.200 95,000.00
3 KT Bt Kepala Tukang Batu Orang 0.020 100,000.00
4 Mdr Mandor Orang 0.002 120,000.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL Bt Pembantu Tukang Batu Orang 0.400 85,000.00
2 T Bt Tukang Batu Orang 0.200 95,000.00
3 KT Bt Kepala Tukang Batu Orang 0.020 100,000.00
4 Mdr Mandor Orang 0.002 120,000.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL Ky Pembantu Tukang Kayu Orang 0.140 85,000.00
2 T Ky Tukang Kayu Orang 0.050 95,000.00
3 KT Ky Kepala Tukang Kayu Orang 0.008 100,000.00
4 Mdr Mandor Orang 0.008 120,000.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL Ky Pembantu Tukang Kayu Orang 0.140 85,000.00
2 T Ky Tukang Kayu Orang 0.050 95,000.00
3 KT Ky Kepala Tukang Kayu Orang 0.008 100,000.00
4 Mdr Mandor Orang 0.008 120,000.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL Ky Pembantu Tukang Kayu Orang 0.084 85,000.00
2 T Ky Tukang Kayu Orang 0.125 95,000.00
3 KT Ky Kepala Tukang Kayu Orang 0.013 100,000.00
4 Mdr Mandor Orang 0.004 120,000.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL Ky Pembantu Tukang Kayu Orang 0.166 85,000.00
2 T Ky Tukang Kayu Orang 0.250 95,000.00
3 KT Ky Kepala Tukang Kayu Orang 0.025 100,000.00
4 Mdr Mandor Orang 0.008 120,000.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL Ky Pembantu Tukang Kayu Orang 0.166 85,000.00
2 T Ky Tukang Kayu Orang 0.250 95,000.00
3 KT Ky Kepala Tukang Kayu Orang 0.025 100,000.00
4 Mdr Mandor Orang 0.008 120,000.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL Ky Pembantu Tukang Kayu Orang 0.140 85,000.00
2 T Ky Tukang Kayu Orang 0.050 95,000.00
3 KT Ky Kepala Tukang Kayu Orang 0.008 100,000.00
4 Mdr Mandor Orang 0.008 120,000.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL Ky Pembantu Tukang Kayu Orang 0.100 85,000.00
2 T Ky Tukang Kayu Orang 1.000 95,000.00
3 KT Ky Kepala Tukang Kayu Orang 0.100 100,000.00
4 Mdr Mandor Orang 0.050 120,000.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL Ky Pembantu Tukang Kayu Orang 0.200 85,000.00
2 T Ky Tukang Kayu Orang 0.100 95,000.00
3 KT Ky Kepala Tukang Kayu Orang 0.010 100,000.00
4 Mdr Mandor Orang 0.010 120,000.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL Bt Pembantu Tukang Batu Orang 0.400 85,000.00
2 T Bt Tukang Batu Orang 0.200 95,000.00
3 KT Bt Kepala Tukang Batu Orang 0.020 100,000.00
4 Mdr Mandor Orang 0.020 120,000.00
40,335.00
Jumlah Harga
18,750.00
18,750.00
Jumlah Harga
12,750.00
7,125.00
750.00
960.00
21,585.00
119,135.00
Jumlah Harga
97,500.00
97,500.00
Jumlah Harga
12,750.00
7,125.00
800.00
960.00
21,635.00
119,740.00
Jumlah Harga
40,500.00
12,800.00
11,200.00
64,500.00
Jumlah Harga
34,000.00
19,000.00
2,000.00
240.00
55,240.00
127,740.00
Jumlah Harga
48,500.00
12,800.00
11,200.00
72,500.00
Jumlah Harga
34,000.00
19,000.00
2,000.00
240.00
55,240.00
91,710.00
Jumlah Harga
52,900.00
20,400.00
73,300.00
Jumlah Harga
11,900.00
4,750.00
800.00
960.00
18,410.00
88,390.00
Jumlah Harga
49,580.00
20,400.00
69,980.00
Jumlah Harga
11,900.00
4,750.00
800.00
960.00
18,410.00
152,315.00
Jumlah Harga
123,720.00
7,800.00
131,520.00
Jumlah Harga
7,140.00
11,875.00
1,300.00
480.00
20,795.00
316,407.50
Jumlah Harga
182,600.00
42,840.00
43,347.50
6,300.00
275,087.50
Jumlah Harga
14,110.00
23,750.00
2,500.00
960.00
41,320.00
171,252.00
Jumlah Harga
102,422.00
21,210.00
6,300.00
129,932.00
Jumlah Harga
14,110.00
23,750.00
2,500.00
960.00
41,320.00
455,431.43
Jumlah Harga
428,571.43
8,450.00
437,021.43
Jumlah Harga
11,900.00
4,750.00
800.00
960.00
18,410.00
199,900.00
Jumlah Harga
60,000.00
20,400.00
80,400.00
Jumlah Harga
8,500.00
95,000.00
10,000.00
6,000.00
119,500.00
118,406.00
Jumlah Harga
89,100.00
606.00
89,706.00
Jumlah Harga
17,000.00
9,500.00
1,000.00
1,200.00
28,700.00
133,880.00
Jumlah Harga
28,000.00
17,280.00
20,000.00
11,200.00
76,480.00
Jumlah Harga
34,000.00
19,000.00
2,000.00
2,400.00
57,400.00
9 ANALISA BIAYA KONTRUKSI PEKERJAAN LANGIT - LANGIT
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL Ky Pembantu Tukang Kayu Orang 0.030 85,000.00
2 T Ky Tukang Kayu Orang 0.070 95,000.00
3 KT Ky Kepala Tukang Kayu Orang 0.007 100,000.00
4 Mdr Mandor Orang 0.004 120,000.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL Ky Pembantu Tukang Kayu Orang 0.050 85,000.00
2 T Ky Tukang Kayu Orang 0.050 95,000.00
3 KT Ky Kepala Tukang Kayu Orang 0.005 100,000.00
4 Mdr Mandor Orang 0.003 120,000.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL Ky Pembantu Tukang Kayu Orang 0.180 85,000.00
2 T Ky Tukang Kayu Orang 0.320 95,000.00
3 KT Ky Kepala Tukang Kayu Orang 0.032 100,000.00
4 Mdr Mandor Orang 0.009 120,000.00
9.4 1 m2 Pasang Plafond Rangka Hollow + Gypsump Board
Bahan
No Kode Uraian Satuan Koef Harga
1 D81 Hollow Galvalum 4x4 M' 0.417 17,000.00
2 D82 Hollow Galvalum 2x4 M' 2.083 15,000.00
3 A60 Gypsum Board 122 x 244 x 9 mm Lbr 0.347 126,000.00
4 L8 Sekerup Bh 12.000 1,300.00
5 F21 Plaster / Lakban Gypsum Roll 0.220 15,000.00
6 F17 Kompon / Plamur Gypsum Kg 1.050 1,900.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL Bs Pembantu Tukang Besi Orang 0.150 85,000.00
2 T Bs Tukang Besi Orang 0.150 95,000.00
3 KT Bs Kepala Tukang Besi Orang 0.015 100,000.00
4 Mdr Mandor Orang 0.015 120,000.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL Bs Pembantu Tukang Besi Orang 0.100 85,000.00
2 T Bs Tukang Besi Orang 0.050 95,000.00
3 KT Bs Kepala Tukang Besi Orang 0.005 100,000.00
4 Mdr Mandor Orang 0.005 120,000.00
32,145.00
Jumlah Harga
21,450.00
315.00
21,765.00
Jumlah Harga
2,550.00
6,650.00
700.00
480.00
10,380.00
45,813.00
Jumlah Harga
39,900.00
303.00
40,203.00
Jumlah Harga
4,250.00
4,750.00
500.00
360.00
5,610.00
160,590.00
Jumlah Harga
83,640.00
5,520.00
21,450.00
110,610.00
Jumlah Harga
15,300.00
30,400.00
3,200.00
1,080.00
49,980.00
133,278.33
Jumlah Harga
7,083.33
31,250.00
43,750.00
15,600.00
3,300.00
1,995.00
102,978.33
Jumlah Harga
12,750.00
14,250.00
1,500.00
1,800.00
30,300.00
85,082.50
Jumlah Harga
45,937.50
19,500.00
3,300.00
1,995.00
70,732.50
Jumlah Harga
8,500.00
4,750.00
500.00
600.00
14,350.00
10 ANALISA BIAYA KONTRUKSI PEKERJAAN PIPA DAN SANITASI
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL Bt Pembantu Tukang Batu Orang 3.300 85,000.00
2 T Bt Tukang Batu Orang 1.100 95,000.00
3 KT Bt Kepala Tukang Batu Orang 0.010 100,000.00
4 Mdr Mandor Orang 0.160 120,000.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL Bt Pembantu Tukang Batu Orang 1.000 85,000.00
2 T Bt Tukang Batu Orang 1.500 95,000.00
3 KT Bt Kepala Tukang Batu Orang 0.150 100,000.00
4 Mdr Mandor Orang 0.160 120,000.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL Bt Pembantu Tukang Batu Orang 1.000 85,000.00
2 T Bt Tukang Batu Orang 1.500 95,000.00
3 KT Bt Kepala Tukang Batu Orang 0.150 100,000.00
4 Mdr Mandor Orang 0.050 120,000.00
10.4 Memasang 1 buah urinoir
Bahan
No Kode Uraian Satuan Koef Harga
1 H17 Urinoir Bh 1.000 2,694,800.00
2 Perlengkapan 0.300 2,694,800.00
3 C37 Semen PC (Portland Cemen) Kg 6.000 1,600.00
4 C30 Pasir pasang M³ 0.010 350,000.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL Bt Pembantu Tukang Batu Orang 1.000 85,000.00
2 T Bt Tukang Batu Orang 1.000 95,000.00
3 KT Bt Kepala Tukang Batu Orang 0.100 100,000.00
4 Mdr Mandor Orang 0.050 120,000.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL Bt Pembantu Tukang Batu Orang 1.200 85,000.00
2 T Bt Tukang Batu Orang 1.450 95,000.00
3 KT Bt Kepala Tukang Batu Orang 0.150 100,000.00
4 Mdr Mandor Orang 0.060 120,000.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL Bt Pembantu Tukang Batu Orang 3.000 85,000.00
2 T Bt Tukang Batu Orang 4.500 95,000.00
3 KT Bt Kepala Tukang Batu Orang 0.050 100,000.00
4 Mdr Mandor Orang 0.900 120,000.00
10.7 Memasang 1 buah bak mandi Batu Bata volume 0.30 M³
Bahan
No Kode Uraian Satuan Koef Harga
1 C2 Batu bata merah kelas I Bh 150.000 800.00
2 C37 Semen PC (Portland Cemen) Kg 120.000 1,600.00
3 C30 Pasir pasang M³ 0.300 350,000.00
4 E41 Tegel keramik 20 x 25 (dinding) Bh 26.620 5,400.00
5 C35 Semen warna / isi nat Kg 6.000 20,000.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL Bt Pembantu Tukang Batu Orang 6.000 85,000.00
2 T Bt Tukang Batu Orang 3.000 95,000.00
3 KT Bt Kepala Tukang Batu Orang 0.300 100,000.00
4 Mdr Mandor Orang 0.030 120,000.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL Bt Pembantu Tukang Batu Orang 0.300 85,000.00
2 T Bt Tukang Batu Orang 0.450 95,000.00
3 KT Bt Kepala Tukang Batu Orang 0.045 100,000.00
4 Mdr Mandor Orang 0.015 120,000.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL Bt Pembantu Tukang Batu Orang 0.140 85,000.00
2 T Bt Tukang Batu Orang 0.070 95,000.00
3 KT Bt Kepala Tukang Batu Orang 0.007 100,000.00
4 Mdr Mandor Orang 0.007 120,000.00
10.10 Memasang 1m pipa beton / buis beton, diameter 30 - 100 cm
Bahan
No Kode Uraian Satuan Koef Harga
1 J4 Buis beton diameter 30 cm Bh 1.100 60,000.00
2 C2 Batu bata merah kelas I Bh 454.000 800.00
3 C37 Semen PC (Portland Cemen) Kg 10.300 1,600.00
4 C30 Pasir pasang M³ 0.061 350,000.00
5 C31 Pasir urug M³ 0.069 195,000.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL Bt Pembantu Tukang Batu Orang 0.380 85,000.00
2 T Bt Tukang Batu Orang 0.190 95,000.00
3 KT Bt Kepala Tukang Batu Orang 0.019 100,000.00
4 Mdr Mandor Orang 0.019 120,000.00
10.11 Memasang 1 bh bak kontrol Pas. 1/2 bata ukuran 30x30cm, tinggi 35cm
Bahan
No Kode Uraian Satuan Koef Harga
1 C2 Batu bata merah kelas I Bh 40.000 800.00
2 C37 Semen PC (Portland Cemen) Kg 44.000 1,600.00
3 C30 Pasir pasang M³ 0.070 350,000.00
4 C24 Batu krikil beton pecah mesin (jagungan) M³ 0.070 197,500.00
5 D2 Besi beton polos Kg 1.600 14,900.00
6 C28 Pasir cor/beton M³ 0.060 378,000.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL Bt Pembantu Tukang Batu Orang 2.160 85,000.00
2 T Bt Tukang Batu Orang 0.720 95,000.00
3 KT Bt Kepala Tukang Batu Orang 0.072 100,000.00
4 Mdr Mandor Orang 0.011 120,000.00
10.12 Memasang 1 buah bak kontrol Pas. 1/2 bata ukuran 45 x 45 tinggi 50 cm
Bahan
No Kode Uraian Satuan Koef Harga
1 C2 Batu bata merah kelas I Bh 70.000 800.00
2 C37 Semen PC (Portland Cemen) Kg 77.000 1,600.00
3 C30 Pasir pasang M³ 0.130 350,000.00
4 C24 Batu krikil beton pecah mesin (jagungan) M³ 0.020 197,500.00
5 D2 Besi beton polos Kg 2.600 14,900.00
6 C28 Pasir cor/beton M³ 0.090 378,000.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL Bt Pembantu Tukang Batu Orang 3.200 85,000.00
2 T Bt Tukang Batu Orang 1.150 95,000.00
3 KT Bt Kepala Tukang Batu Orang 0.011 100,000.00
4 Mdr Mandor Orang 0.016 120,000.00
10.13 Memasang 1 buah bak kontrol Pas. 1/2 bata ukuran 60 x 60 tinggi 65 cm
Bahan
No Kode Uraian Satuan Koef Harga
1 C2 Batu bata merah kelas I Bh 123.000 800.00
2 C37 Semen PC (Portland Cemen) Kg 114.000 1,600.00
3 C30 Pasir pasang M³ 0.184 350,000.00
4 C24 Batu krikil beton pecah mesin (jagungan) M³ 0.033 197,500.00
5 D2 Besi beton polos Kg 4.850 14,900.00
6 C28 Pasir cor/beton M³ 0.120 378,000.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL Bt Pembantu Tukang Batu Orang 3.200 85,000.00
2 T Bt Tukang Batu Orang 1.150 95,000.00
3 KT Bt Kepala Tukang Batu Orang 0.011 100,000.00
4 Mdr Mandor Orang 0.016 120,000.00
5 T Gl Tukang Gali Tanah Orang 0.100 90,000.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL Pp Pembantu Tukang Pipa Orang 0.054 85,000.00
2 T Pp Tukang Pipa Orang 0.090 95,000.00
3 KT Pp Kepala Tukang Pipa Orang 0.009 100,000.00
4 Mdr Mandor Orang 0.027 120,000.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL Pp Pembantu Tukang Pipa Orang 0.054 85,000.00
2 T Pp Tukang Pipa Orang 0.090 95,000.00
3 KT Pp Kepala Tukang Pipa Orang 0.009 100,000.00
4 Mdr Mandor Orang 0.027 120,000.00
10.16 Memasang 1 m' pipa galvanis diameter 1''
Bahan
No Kode Uraian Satuan Koef Harga
1 D15 Besi pipa galvanish medium 1, 6m Lonjor 1.200 241,900.00
2 Perlengkapan 0.350 241,900.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL Pp Pembantu Tukang Pipa Orang 0.054 85,000.00
2 T Pp Tukang Pipa Orang 0.090 95,000.00
3 KT Pp Kepala Tukang Pipa Orang 0.009 100,000.00
4 Mdr Mandor Orang 0.027 120,000.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL Pp Pembantu Tukang Pipa Orang 0.108 85,000.00
2 T Pp Tukang Pipa Orang 0.180 95,000.00
3 KT Pp Kepala Tukang Pipa Orang 0.018 100,000.00
4 Mdr Mandor Orang 0.005 120,000.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL Pp Pembantu Tukang Pipa Orang 0.036 85,000.00
2 T Pp Tukang Pipa Orang 0.060 95,000.00
3 KT Pp Kepala Tukang Pipa Orang 0.006 100,000.00
4 Mdr Mandor Orang 0.002 120,000.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL Pp Pembantu Tukang Pipa Orang 0.036 85,000.00
2 T Pp Tukang Pipa Orang 0.060 95,000.00
3 KT Pp Kepala Tukang Pipa Orang 0.006 100,000.00
4 Mdr Mandor Orang 0.002 120,000.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL Pp Pembantu Tukang Pipa Orang 0.081 85,000.00
2 T Pp Tukang Pipa Orang 0.135 95,000.00
3 KT Pp Kepala Tukang Pipa Orang 0.014 100,000.00
4 Mdr Mandor Orang 0.004 120,000.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL Pp Pembantu Tukang Pipa Orang 0.010 85,000.00
2 T Pp Tukang Pipa Orang 0.400 95,000.00
3 KT Pp Kepala Tukang Pipa Orang 0.040 100,000.00
4 Mdr Mandor Orang 0.005 120,000.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL Pp Pembantu Tukang Pipa Orang 0.010 85,000.00
2 T Pp Tukang Pipa Orang 0.100 95,000.00
3 KT Pp Kepala Tukang Pipa Orang 0.010 100,000.00
4 Mdr Mandor Orang 0.005 120,000.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL Pp Pembantu Tukang Pipa Orang 0.010 85,000.00
2 T Pp Tukang Pipa Orang 0.100 95,000.00
3 KT Pp Kepala Tukang Pipa Orang 0.010 100,000.00
4 Mdr Mandor Orang 0.005 120,000.00
10.25 Memasang 1 buah Kitchen Zink 1 lubang 1 sayap
Bahan
No Kode Uraian Satuan Koef Harga
1 H16 Kitchen Zink Bh 1.000 220,000.00
2 Perlengkapan 0.120 220,000.00
3 C37 Semen PC (Portland Cemen) Kg 6.000 1,600.00
4 C30 Pasir pasang M³ 0.010 350,000.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL Pp Pembantu Tukang Pipa Orang 0.700 85,000.00
2 T Pp Tukang Pipa Orang 1.250 95,000.00
3 KT Pp Kepala Tukang Pipa Orang 0.150 100,000.00
4 Mdr Mandor Orang 0.070 120,000.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL Pp Pembantu Tukang Pipa Orang 0.030 85,000.00
2 T Pp Tukang Pipa Orang 0.300 95,000.00
3 KT Pp Kepala Tukang Pipa Orang 0.030 100,000.00
4 Mdr Mandor Orang 0.015 120,000.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL Pp Pembantu Tukang Pipa Orang 0.135 85,000.00
2 T Pp Tukang Pipa Orang 0.225 95,000.00
3 KT Pp Kepala Tukang Pipa Orang 0.023 100,000.00
4 Mdr Mandor Orang 0.007 120,000.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL Pp Pembantu Tukang Pipa Orang 0.135 85,000.00
2 T Pp Tukang Pipa Orang 0.225 95,000.00
3 KT Pp Kepala Tukang Pipa Orang 0.023 100,000.00
4 Mdr Mandor Orang 0.007 120,000.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL Pp Pembantu Tukang Pipa Orang 0.108 85,000.00
2 T Pp Tukang Pipa Orang 0.180 95,000.00
3 KT Pp Kepala Tukang Pipa Orang 0.018 100,000.00
4 Mdr Mandor Orang 0.005 120,000.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL Pp Pembantu Tukang Pipa Orang 0.054 85,000.00
2 T Pp Tukang Pipa Orang 0.090 95,000.00
3 KT Pp Kepala Tukang Pipa Orang 0.009 100,000.00
4 Mdr Mandor Orang 0.027 120,000.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL Pp Pembantu Tukang Pipa Orang 0.036 85,000.00
2 T Pp Tukang Pipa Orang 0.060 95,000.00
3 KT Pp Kepala Tukang Pipa Orang 0.006 100,000.00
4 Mdr Mandor Orang 0.002 120,000.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL Pp Pembantu Tukang Pipa Orang 0.036 85,000.00
2 T Pp Tukang Pipa Orang 0.060 95,000.00
3 KT Pp Kepala Tukang Pipa Orang 0.006 100,000.00
4 Mdr Mandor Orang 0.002 120,000.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL Pp Pembantu Tukang Pipa Orang 0.036 85,000.00
2 T Pp Tukang Pipa Orang 0.060 95,000.00
3 KT Pp Kepala Tukang Pipa Orang 0.006 100,000.00
4 Mdr Mandor Orang 0.002 120,000.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL Pp Pembantu Tukang Pipa Orang 0.036 85,000.00
2 T Pp Tukang Pipa Orang 0.060 95,000.00
3 KT Pp Kepala Tukang Pipa Orang 0.006 100,000.00
4 Mdr Mandor Orang 0.002 120,000.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL Pp Pembantu Tukang Pipa Orang 0.081 85,000.00
2 T Pp Tukang Pipa Orang 0.135 95,000.00
3 KT Pp Kepala Tukang Pipa Orang 0.014 100,000.00
4 Mdr Mandor Orang 0.004 120,000.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL Pp Pembantu Tukang Pipa Orang 0.081 85,000.00
2 T Pp Tukang Pipa Orang 0.135 95,000.00
3 KT Pp Kepala Tukang Pipa Orang 0.014 100,000.00
4 Mdr Mandor Orang 0.004 120,000.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL Pp Pembantu Tukang Pipa Orang 0.081 85,000.00
2 T Pp Tukang Pipa Orang 0.135 95,000.00
3 KT Pp Kepala Tukang Pipa Orang 0.014 100,000.00
4 Mdr Mandor Orang 0.004 120,000.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL Bt Pembantu Tukang Batu Orang 0.150 85,000.00
2 T Bt Tukang Batu Orang 0.200 95,000.00
3 KT Bt Kepala Tukang Batu Orang 0.045 100,000.00
4 Mdr Mandor Orang 0.075 120,000.00
2,466,900.00
Jumlah Harga
1,945,000.00
116,700.00
2,061,700.00
Jumlah Harga
280,500.00
104,500.00
1,000.00
19,200.00
405,200.00
467,800.00
Jumlah Harga
193,000.00
9,600.00
3,500.00
206,100.00
Jumlah Harga
85,000.00
142,500.00
15,000.00
19,200.00
261,700.00
517,200.00
Jumlah Harga
250,000.00
5,600.00
9,600.00
3,500.00
268,700.00
Jumlah Harga
85,000.00
142,500.00
15,000.00
6,000.00
248,500.00
3,712,340.00
Jumlah Harga
2,694,800.00
808,440.00
9,600.00
3,500.00
3,516,340.00
Jumlah Harga
85,000.00
95,000.00
10,000.00
6,000.00
196,000.00
1,171,050.00
Jumlah Harga
800,000.00
96,000.00
9,600.00
3,500.00
909,100.00
Jumlah Harga
102,000.00
137,750.00
15,000.00
7,200.00
261,950.00
1,893,772.00
Jumlah Harga
980,600.00
117,672.00
1,098,272.00
Jumlah Harga
255,000.00
427,500.00
5,000.00
108,000.00
795,500.00
1,509,348.00
Jumlah Harga
120,000.00
192,000.00
105,000.00
143,748.00
120,000.00
680,748.00
Jumlah Harga
510,000.00
285,000.00
30,000.00
3,600.00
828,600.00
1,172,822.00
Jumlah Harga
980,600.00
117,672.00
1,098,272.00
Jumlah Harga
25,500.00
42,750.00
4,500.00
1,800.00
74,550.00
114,142.00
Jumlah Harga
45,100.00
18,400.00
6,272.00
19,600.00
4,680.00
94,052.00
Jumlah Harga
11,900.00
6,650.00
700.00
840.00
20,090.00
535,015.00
Jumlah Harga
66,000.00
363,200.00
16,480.00
21,350.00
13,455.00
480,485.00
Jumlah Harga
32,300.00
18,050.00
1,900.00
2,280.00
54,530.00
447,765.00
Jumlah Harga
32,000.00
70,400.00
24,500.00
13,825.00
23,840.00
22,680.00
187,245.00
Jumlah Harga
183,600.00
68,400.00
7,200.00
1,320.00
260,520.00
685,680.00
Jumlah Harga
56,000.00
123,200.00
45,500.00
3,950.00
38,740.00
34,020.00
301,410.00
Jumlah Harga
272,000.00
109,250.00
1,100.00
1,920.00
384,270.00
862,612.50
Jumlah Harga
98,400.00
182,400.00
64,400.00
6,517.50
72,265.00
45,360.00
469,342.50
Jumlah Harga
272,000.00
109,250.00
1,100.00
1,920.00
9,000.00
393,270.00
422,580.00
Jumlah Harga
303,975.00
101,325.00
405,300.00
Jumlah Harga
4,590.00
8,550.00
900.00
3,240.00
17,280.00
112,433.88
Jumlah Harga
86,340.00
8,813.88
95,153.88
Jumlah Harga
4,590.00
8,550.00
900.00
3,240.00
17,280.00
392,225.00
Jumlah Harga
290,280.00
84,665.00
374,945.00
Jumlah Harga
4,590.00
8,550.00
900.00
3,240.00
17,280.00
606,600.00
Jumlah Harga
433,440.00
144,480.00
577,920.00
Jumlah Harga
9,180.00
17,100.00
1,800.00
600.00
28,680.00
21,690.00
Jumlah Harga
9,360.00
2,730.00
12,090.00
Jumlah Harga
3,060.00
5,700.00
600.00
240.00
9,600.00
24,208.75
Jumlah Harga
11,310.00
3,298.75
14,608.75
Jumlah Harga
3,060.00
5,700.00
600.00
240.00
9,600.00
87,165.00
Jumlah Harga
65,625.00
-
65,625.00
Jumlah Harga
6,885.00
12,825.00
1,350.00
480.00
21,540.00
115,383.75
Jumlah Harga
93,843.75
-
93,843.75
Jumlah Harga
6,885.00
12,825.00
1,350.00
480.00
21,540.00
75,819.25
Jumlah Harga
32,100.00
269.25
32,369.25
Jumlah Harga
850.00
38,000.00
4,000.00
600.00
43,450.00
58,250.00
Jumlah Harga
46,300.00
46,300.00
Jumlah Harga
850.00
9,500.00
1,000.00
600.00
11,950.00
44,319.25
Jumlah Harga
32,100.00
269.25
32,369.25
Jumlah Harga
850.00
9,500.00
1,000.00
600.00
11,950.00
461,150.00
Jumlah Harga
220,000.00
26,400.00
9,600.00
3,500.00
259,500.00
Jumlah Harga
59,500.00
118,750.00
15,000.00
8,400.00
201,650.00
68,219.25
Jumlah Harga
32,100.00
269.25
32,369.25
Jumlah Harga
2,550.00
28,500.00
3,000.00
1,800.00
35,850.00
2,870,940.00
Jumlah Harga
2,194,800.00
640,150.00
2,834,950.00
Jumlah Harga
11,475.00
21,375.00
2,300.00
840.00
35,990.00
2,153,290.00
Jumlah Harga
1,639,200.00
478,100.00
2,117,300.00
Jumlah Harga
11,475.00
21,375.00
2,300.00
840.00
35,990.00
1,271,780.00
Jumlah Harga
962,400.00
280,700.00
1,243,100.00
Jumlah Harga
9,180.00
17,100.00
1,800.00
600.00
28,680.00
392,225.00
Jumlah Harga
290,280.00
84,665.00
374,945.00
Jumlah Harga
4,590.00
8,550.00
900.00
3,240.00
17,280.00
21,690.00
Jumlah Harga
9,360.00
2,730.00
12,090.00
Jumlah Harga
3,060.00
5,700.00
600.00
240.00
9,600.00
22,064.56
Jumlah Harga
11,310.00
1,154.56
12,464.56
Jumlah Harga
3,060.00
5,700.00
600.00
240.00
9,600.00
28,200.00
Jumlah Harga
14,400.00
4,200.00
18,600.00
Jumlah Harga
3,060.00
5,700.00
600.00
240.00
9,600.00
47,820.00
Jumlah Harga
38,220.00
-
38,220.00
Jumlah Harga
3,060.00
5,700.00
600.00
240.00
9,600.00
118,415.00
Jumlah Harga
75,000.00
21,875.00
96,875.00
Jumlah Harga
6,885.00
12,825.00
1,350.00
480.00
21,540.00
160,071.25
Jumlah Harga
107,250.00
31,281.25
138,531.25
Jumlah Harga
6,885.00
12,825.00
1,350.00
480.00
21,540.00
409,040.00
Jumlah Harga
300,000.00
87,500.00
387,500.00
Jumlah Harga
6,885.00
12,825.00
1,350.00
480.00
21,540.00
608,065.00
Jumlah Harga
511,650.00
51,165.00
562,815.00
Jumlah Harga
12,750.00
19,000.00
4,500.00
9,000.00
45,250.00
11 ANALISA BIAYA KONTRUKSI PEKERJAAN BESI DAN ALLUMINIUM
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL Bs Pembantu Tukang Besi Orang 0.060 85,000.00
2 T Bs Tukang Besi Orang 0.060 95,000.00
3 KT Bs Kepala Tukang Besi Orang 0.006 100,000.00
4 Mdr Mandor Orang 0.003 120,000.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL Bs Pembantu Tukang Besi Orang 0.060 85,000.00
2 T Bs Tukang Besi Orang 0.060 95,000.00
3 KT Bs Kepala Tukang Besi Orang 0.006 100,000.00
4 Mdr Mandor Orang 0.003 120,000.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL Bs Pembantu Tukang Besi Orang 0.100 85,000.00
2 T Bs Tukang Besi Orang 0.100 95,000.00
3 KT Bs Kepala Tukang Besi Orang 0.001 100,000.00
4 Mdr Mandor Orang 0.005 120,000.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL Bs Pembantu Tukang Besi Orang 1.000 85,000.00
2 T Bs Tukang Besi Orang 1.000 95,000.00
3 KT Bs Kepala Tukang Besi Orang 0.100 100,000.00
4 Mdr Mandor Orang 0.050 120,000.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL Bs Pembantu Tukang Besi Orang 0.200 85,000.00
2 T Bs Tukang Besi Orang 0.200 95,000.00
3 KT Bs Kepala Tukang Besi Orang 0.020 100,000.00
4 Mdr Mandor Orang 0.001 120,000.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL Ky Pembantu Tukang Kayu Orang 0.200 85,000.00
2 T Ky Tukang Kayu Orang 0.200 95,000.00
3 KT Ky Kepala Tukang Kayu Orang 0.020 100,000.00
4 Mdr Mandor Orang 0.001 120,000.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL Ky Pembantu Tukang Kayu Orang 0.200 85,000.00
2 T Ky Tukang Kayu Orang 0.200 95,000.00
3 KT Ky Kepala Tukang Kayu Orang 0.020 100,000.00
4 Mdr Mandor Orang 0.001 120,000.00
11.8 1 M' Pasang talang 1/2 lingkaran D - 10 cm, seng bjls 30
Bahan
No Kode Uraian Satuan Koef Harga
1 A52 Seng Plat Dasar BJLS 30 (0,45x1,00) Lbr 1.050 31,100.00
2 L2 Paku Segala Ukuran Kg 0.010 20,200.00
3 B13 Kayu (begesting) M³ 0.019 3,500,000.00
4 D40 Besi Strip Kg 0.500 27,500.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL Ky Pembantu Tukang Kayu Orang 0.150 85,000.00
2 T Ky Tukang Kayu Orang 0.300 95,000.00
3 KT Ky Kepala Tukang Kayu Orang 0.030 100,000.00
4 Mdr Mandor Orang 0.008 120,000.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL Bs Pembantu Tukang Besi Orang 0.060 85,000.00
2 T Bs Tukang Besi Orang 0.060 95,000.00
3 KT Bs Kepala Tukang Besi Orang 0.006 100,000.00
4 Mdr Mandor Orang 0.003 120,000.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL Bs Pembantu Tukang Besi Orang 0.060 85,000.00
2 T Bs Tukang Besi Orang 0.060 95,000.00
3 KT Bs Kepala Tukang Besi Orang 0.006 100,000.00
4 Mdr Mandor Orang 0.003 120,000.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL Bs Pembantu Tukang Besi Orang 0.060 85,000.00
2 T Bs Tukang Besi Orang 0.060 95,000.00
3 KT Bs Kepala Tukang Besi Orang 0.006 100,000.00
4 Mdr Mandor Orang 0.003 120,000.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL Bs Pembantu Tukang Besi Orang 0.085 85,000.00
2 T Bs Tukang Besi Orang 0.085 95,000.00
3 KT Bs Kepala Tukang Besi Orang 0.009 100,000.00
4 Mdr Mandor Orang 0.005 120,000.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL Bs Pembantu Tukang Besi Orang 0.020 85,000.00
2 T Bs Tukang Besi Orang 0.030 95,000.00
3 KT Bs Kepala Tukang Besi Orang 0.006 100,000.00
4 Mdr Mandor Orang 0.000 120,000.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL Bs Pembantu Tukang Besi Orang 0.020 85,000.00
2 Mdr Mandor Orang 0.000 120,000.00
11.16 1m2 Pasang pagar besi hollow
Bahan
No Kode Uraian Satuan Koef Harga
1 D33 Besi profil WF <= 200 mm(256Kg/ljr) Kg 7.254 17,500.00
2 D50 Elektroda stainless Kg 1.000 380,400.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL Bs Pembantu Tukang Besi Orang 0.750 85,000.00
2 T Bs Tukang Besi Orang 0.500 95,000.00
3 KT Bs Kepala Tukang Besi Orang 0.050 100,000.00
4 Mdr Mandor Orang 0.050 120,000.00
Tenaga :
No Kode Uraian Satuan Koef Harga
1 KL Bs Pembantu Tukang Besi Orang 0.050 85,000.00
2 T Bs Tukang Besi Orang 1.000 95,000.00
3 KT Bs Kepala Tukang Besi Orang 0.010 100,000.00
4 Mdr Mandor Orang 0.010 120,000.00
Tenaga :
No Kode Uraian Satuan Koef Harga
1 KL Bs Pembantu Tukang Besi Orang 0.100 85,000.00
2 T Bs Tukang Besi Orang 0.050 95,000.00
3 KT Bs Kepala Tukang Besi Orang 0.005 100,000.00
4 Mdr Mandor Orang 0.005 120,000.00
31,885.00
Jumlah Harga
20,125.00
20,125.00
Jumlah Harga
5,100.00
5,700.00
600.00
360.00
11,760.00
31,885.00
Jumlah Harga
20,125.00
20,125.00
Jumlah Harga
5,100.00
5,700.00
600.00
360.00
11,760.00
34,394.90
Jumlah Harga
11,600.00
4,094.90
15,694.90
Jumlah Harga
8,500.00
9,500.00
100.00
600.00
18,700.00
891,000.00
Jumlah Harga
695,000.00
695,000.00
Jumlah Harga
85,000.00
95,000.00
10,000.00
6,000.00
196,000.00
670,508.00
Jumlah Harga
426,888.00
13,000.00
192,500.00
632,388.00
Jumlah Harga
17,000.00
19,000.00
2,000.00
120.00
38,120.00
186,823.00
Jumlah Harga
81,900.00
303.00
66,500.00
148,703.00
Jumlah Harga
17,000.00
19,000.00
2,000.00
120.00
38,120.00
147,448.00
Jumlah Harga
42,525.00
303.00
66,500.00
109,328.00
Jumlah Harga
17,000.00
19,000.00
2,000.00
120.00
38,120.00
158,317.00
Jumlah Harga
32,655.00
202.00
66,500.00
13,750.00
113,107.00
Jumlah Harga
12,750.00
28,500.00
3,000.00
960.00
45,210.00
35,910.00
Jumlah Harga
24,150.00
24,150.00
Jumlah Harga
5,100.00
5,700.00
600.00
360.00
11,760.00
35,910.00
Jumlah Harga
24,150.00
24,150.00
Jumlah Harga
5,100.00
5,700.00
600.00
360.00
11,760.00
32,460.00
Jumlah Harga
20,700.00
20,700.00
Jumlah Harga
5,100.00
5,700.00
600.00
360.00
11,760.00
135,344.20
Jumlah Harga
104,500.00
1,200.00
2,392.20
108,092.20
Jumlah Harga
12,750.00
14,250.00
252.00
27,252.00
570,304.90
Jumlah Harga
418,000.00
124,740.00
10,764.90
553,504.90
Jumlah Harga
7,225.00
8,075.00
900.00
600.00
16,800.00
38,186.00
Jumlah Harga
33,000.00
33,000.00
Jumlah Harga
1,700.00
2,850.00
600.00
36.00
5,186.00
4,036.00
Jumlah Harga
2,300.00
2,300.00
Jumlah Harga
1,700.00
36.00
1,736.00
629,591.09
Jumlah Harga
126,941.09
380,400.00
507,341.09
Jumlah Harga
63,750.00
47,500.00
5,000.00
6,000.00
122,250.00
191,702.00
Jumlah Harga
78,000.00
552.00
11,700.00
90,252.00
Jumlah Harga
4,250.00
95,000.00
1,000.00
1,200.00
101,450.00
65,822.00
Jumlah Harga
50,000.00
1,472.00
51,472.00
Jumlah Harga
8,500.00
4,750.00
500.00
600.00
14,350.00
12 ANALISA BIAYA KONTRUKSI PEKERJAAN KUNCI DAN KACA
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL Ky Pembantu Tukang Kayu Orang 0.060 85,000.00
2 T Ky Tukang Kayu Orang 0.600 95,000.00
3 KT Ky Kepala Tukang Kayu Orang 0.060 100,000.00
4 Mdr Mandor Orang 0.003 120,000.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL Ky Pembantu Tukang Kayu Orang 0.010 85,000.00
2 T Ky Tukang Kayu Orang 0.500 95,000.00
3 KT Ky Kepala Tukang Kayu Orang 0.050 100,000.00
4 Mdr Mandor Orang 0.005 120,000.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL Ky Pembantu Tukang Kayu Orang 0.005 85,000.00
2 T Ky Tukang Kayu Orang 0.500 95,000.00
3 KT Ky Kepala Tukang Kayu Orang 0.050 100,000.00
4 Mdr Mandor Orang 0.003 120,000.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL Ky Pembantu Tukang Kayu Orang 0.005 85,000.00
2 T Ky Tukang Kayu Orang 0.500 95,000.00
3 KT Ky Kepala Tukang Kayu Orang 0.050 100,000.00
4 Mdr Mandor Orang 0.003 120,000.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL Ky Pembantu Tukang Kayu Orang 0.010 85,000.00
2 T Ky Tukang Kayu Orang 0.100 95,000.00
3 KT Ky Kepala Tukang Kayu Orang 0.010 100,000.00
4 Mdr Mandor Orang 0.001 120,000.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL Ky Pembantu Tukang Kayu Orang 0.015 85,000.00
2 T Ky Tukang Kayu Orang 0.150 95,000.00
3 KT Ky Kepala Tukang Kayu Orang 0.015 100,000.00
4 Mdr Mandor Orang 0.008 120,000.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL Ky Pembantu Tukang Kayu Orang 0.015 85,000.00
2 T Ky Tukang Kayu Orang 0.150 95,000.00
3 KT Ky Kepala Tukang Kayu Orang 0.015 100,000.00
4 Mdr Mandor Orang 0.001 120,000.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL Ky Pembantu Tukang Kayu Orang 0.015 85,000.00
2 T Ky Tukang Kayu Orang 0.150 95,000.00
3 KT Ky Kepala Tukang Kayu Orang 0.015 100,000.00
4 Mdr Mandor Orang 0.001 120,000.00
12.9 1 m2 pasang kaca , tebal 8 mm
Bahan
No Kode Uraian Satuan Koef Harga
1 I3 Kaca polos tb. 8 mm M2 1.100 241,000.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL Ky Pembantu Tukang Kayu Orang 0.017 85,000.00
2 T Ky Tukang Kayu Orang 0.170 95,000.00
3 KT Ky Kepala Tukang Kayu Orang 0.017 100,000.00
4 Mdr Mandor Orang 0.001 120,000.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL Ky Pembantu Tukang Kayu Orang 0.017 85,000.00
2 T Ky Tukang Kayu Orang 0.170 95,000.00
3 KT Ky Kepala Tukang Kayu Orang 0.017 100,000.00
4 Mdr Mandor Orang 0.001 120,000.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL Ky Pembantu Tukang Kayu Orang 0.017 85,000.00
2 T Ky Tukang Kayu Orang 0.170 95,000.00
3 KT Ky Kepala Tukang Kayu Orang 0.017 100,000.00
4 Mdr Mandor Orang 0.001 120,000.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL Ky Pembantu Tukang Kayu Orang 0.017 85,000.00
2 T Ky Tukang Kayu Orang 0.170 95,000.00
3 KT Ky Kepala Tukang Kayu Orang 0.017 100,000.00
4 Mdr Mandor Orang 0.001 120,000.00
12.13 1 Buah pasang grendel / Kunci slot
Bahan
No Kode Uraian Satuan Koef Harga
1 G6 Grendel Bh 1.000 18,000.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL Ky Pembantu Tukang Kayu Orang 0.020 85,000.00
2 T Ky Tukang Kayu Orang 0.200 95,000.00
3 KT Ky Kepala Tukang Kayu Orang 0.020 100,000.00
4 Mdr Mandor Orang 0.001 120,000.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL Ky Pembantu Tukang Kayu Orang 0.015 85,000.00
2 T Ky Tukang Kayu Orang 0.150 95,000.00
3 KT Ky Kepala Tukang Kayu Orang 0.015 100,000.00
4 Mdr Mandor Orang 0.008 120,000.00
445,460.00
Jumlah Harga
377,000.00
377,000.00
Jumlah Harga
5,100.00
57,000.00
6,000.00
360.00
68,460.00
215,450.00
Jumlah Harga
161,500.00
161,500.00
Jumlah Harga
850.00
47,500.00
5,000.00
600.00
53,950.00
214,285.00
Jumlah Harga
161,000.00
161,000.00
Jumlah Harga
425.00
47,500.00
5,000.00
360.00
53,285.00
148,785.00
Jumlah Harga
95,500.00
95,500.00
Jumlah Harga
425.00
47,500.00
5,000.00
360.00
53,285.00
38,510.00
Jumlah Harga
27,100.00
27,100.00
Jumlah Harga
850.00
9,500.00
1,000.00
60.00
11,410.00
49,025.00
Jumlah Harga
32,000.00
32,000.00
Jumlah Harga
1,275.00
14,250.00
1,500.00
960.00
17,025.00
170,461.00
Jumlah Harga
153,340.00
153,340.00
Jumlah Harga
1,275.00
14,250.00
1,500.00
96.00
17,121.00
243,721.00
Jumlah Harga
226,600.00
226,600.00
Jumlah Harga
1,275.00
14,250.00
1,500.00
96.00
17,121.00
284,410.50
Jumlah Harga
265,100.00
265,100.00
Jumlah Harga
1,402.50
16,150.00
1,650.00
108.00
19,310.50
844,310.50
Jumlah Harga
825,000.00
825,000.00
Jumlah Harga
1,402.50
16,150.00
1,650.00
108.00
19,310.50
1,009,310.50
Jumlah Harga
990,000.00
990,000.00
Jumlah Harga
1,402.50
16,150.00
1,650.00
108.00
19,310.50
1,119,310.50
Jumlah Harga
1,100,000.00
1,100,000.00
Jumlah Harga
1,402.50
16,150.00
1,650.00
108.00
19,310.50
40,820.00
Jumlah Harga
18,000.00
18,000.00
Jumlah Harga
1,700.00
19,000.00
2,000.00
120.00
22,820.00
55,485.00
Jumlah Harga
37,500.00
37,500.00
Jumlah Harga
1,275.00
14,250.00
1,500.00
960.00
17,985.00
13 ANALISA BIAYA KONTRUKSI PEKERJAAN PENUTUP LANTAI
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL Bt Pembantu Tukang Batu Orang 0.270 85,000.00
2 T Bt Tukang Batu Orang 0.135 95,000.00
3 KT Bt Kepala Tukang Batu Orang 0.014 100,000.00
4 Mdr Mandor Orang 0.014 120,000.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL Bt Pembantu Tukang Batu Orang 0.700 85,000.00
2 T Bt Tukang Batu Orang 0.350 95,000.00
3 KT Bt Kepala Tukang Batu Orang 0.035 100,000.00
4 Mdr Mandor Orang 0.035 120,000.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL Bt Pembantu Tukang Batu Orang 0.700 85,000.00
2 T Bt Tukang Batu Orang 0.350 95,000.00
3 KT Bt Kepala Tukang Batu Orang 0.035 100,000.00
4 Mdr Mandor Orang 0.035 120,000.00
13.4 1 m2 Pasang lantai keramik 30 x 30 cm putih polos
Bahan
No Kode Uraian Satuan Koef Harga
1 E34 Tegel putih polos ex mulia 30 x 30 Bh 11.870 6,250.00
2 C37 Semen PC (Portland Cemen) Kg 10.000 1,600.00
3 C30 Pasir pasang M³ 0.045 350,000.00
4 C35 Semen warna / isi nat Kg 1.500 20,000.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL Bt Pembantu Tukang Batu Orang 0.700 85,000.00
2 T Bt Tukang Batu Orang 0.350 95,000.00
3 KT Bt Kepala Tukang Batu Orang 0.035 100,000.00
4 Mdr Mandor Orang 0.035 120,000.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL Bt Pembantu Tukang Batu Orang 0.700 85,000.00
2 T Bt Tukang Batu Orang 0.350 95,000.00
3 KT Bt Kepala Tukang Batu Orang 0.035 100,000.00
4 Mdr Mandor Orang 0.035 120,000.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL Bt Pembantu Tukang Batu Orang 0.700 85,000.00
2 T Bt Tukang Batu Orang 0.350 95,000.00
3 KT Bt Kepala Tukang Batu Orang 0.035 100,000.00
4 Mdr Mandor Orang 0.035 120,000.00
13.7 1 m2 Pasang Lantai Granit 60 x 60 cm
Bahan
No Kode Uraian Satuan Koef Harga
1 E57 Lantai Granit 60 x 60 M2 1.100 275,000.00
2 C37 Semen PC (Portland Cemen) Kg 12.000 1,600.00
3 C30 Pasir pasang M³ 0.045 350,000.00
4 C35 Semen warna / isi nat Kg 1.500 20,000.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL Bt Pembantu Tukang Batu Orang 0.700 85,000.00
2 T Bt Tukang Batu Orang 0.350 95,000.00
3 KT Bt Kepala Tukang Batu Orang 0.035 100,000.00
4 Mdr Mandor Orang 0.035 120,000.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL Bt Pembantu Tukang Batu Orang 0.900 85,000.00
2 T Bt Tukang Batu Orang 0.450 95,000.00
3 KT Bt Kepala Tukang Batu Orang 0.045 100,000.00
4 Mdr Mandor Orang 0.045 120,000.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL Bt Pembantu Tukang Batu Orang 0.900 85,000.00
2 T Bt Tukang Batu Orang 0.450 95,000.00
3 KT Bt Kepala Tukang Batu Orang 0.045 100,000.00
4 Mdr Mandor Orang 0.045 120,000.00
13.10 1 m2 Pasang dinding keramik 20x25 cm,
Bahan
No Kode Uraian Satuan Koef Harga
1 E41 Tegel keramik 20 x 25 (dinding) Bh 21.200 5,400.00
2 C37 Semen PC (Portland Cemen) Kg 9.300 1,600.00
3 C30 Pasir pasang M³ 0.018 350,000.00
4 C35 Semen warna / isi nat Kg 1.940 20,000.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL Bt Pembantu Tukang Batu Orang 0.900 85,000.00
2 T Bt Tukang Batu Orang 0.450 95,000.00
3 KT Bt Kepala Tukang Batu Orang 0.045 100,000.00
4 Mdr Mandor Orang 0.045 120,000.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL Bt Pembantu Tukang Batu Orang 0.500 85,000.00
2 T Bt Tukang Batu Orang 0.250 95,000.00
3 KT Bt Kepala Tukang Batu Orang 0.025 100,000.00
4 Mdr Mandor Orang 0.025 120,000.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL Bt Pembantu Tukang Batu Orang 0.500 85,000.00
2 T Bt Tukang Batu Orang 0.250 95,000.00
3 KT Bt Kepala Tukang Batu Orang 0.025 100,000.00
4 Mdr Mandor Orang 0.025 120,000.00
13.13 1 m' Pasang Kanstin Sepatu Besar P.33cm L.17cm T.22cm
Bahan
No Kode Uraian Satuan Koef Harga
1 E23 Kanstin Sepatu Besar 30 cm Bh 5.000 17,500.00
2 C37 Semen PC (Portland Cemen) Kg 9.300 1,600.00
3 C30 Pasir pasang M³ 0.001 350,000.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL Bt Pembantu Tukang Batu Orang 0.100 85,000.00
2 T Bt Tukang Batu Orang 0.100 95,000.00
3 KT Bt Kepala Tukang Batu Orang - 100,000.00
4 Mdr Mandor Orang - 120,000.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL Bt Pembantu Tukang Batu Orang 0.700 85,000.00
2 T Bt Tukang Batu Orang 0.350 95,000.00
3 KT Bt Kepala Tukang Batu Orang 0.035 100,000.00
4 Mdr Mandor Orang 0.035 120,000.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL Bt Pembantu Tukang Batu Orang 0.700 85,000.00
2 T Bt Tukang Batu Orang 0.350 95,000.00
3 KT Bt Kepala Tukang Batu Orang 0.035 100,000.00
4 Mdr Mandor Orang 0.035 120,000.00
113,645.00
Jumlah Harga
42,400.00
16,640.00
15,750.00
74,790.00
Jumlah Harga
22,950.00
12,825.00
1,400.00
1,680.00
38,855.00
261,965.00
Jumlah Harga
96,725.00
16,640.00
15,750.00
32,400.00
161,515.00
Jumlah Harga
59,500.00
33,250.00
3,500.00
4,200.00
100,450.00
256,862.50
Jumlah Harga
80,122.50
22,640.00
13,650.00
40,000.00
156,412.50
Jumlah Harga
59,500.00
33,250.00
3,500.00
4,200.00
100,450.00
236,387.50
Jumlah Harga
74,187.50
16,000.00
15,750.00
30,000.00
135,937.50
Jumlah Harga
59,500.00
33,250.00
3,500.00
4,200.00
100,450.00
242,322.50
Jumlah Harga
80,122.50
16,000.00
15,750.00
30,000.00
141,872.50
Jumlah Harga
59,500.00
33,250.00
3,500.00
4,200.00
100,450.00
278,225.00
Jumlah Harga
116,025.00
16,000.00
15,750.00
30,000.00
177,775.00
Jumlah Harga
59,500.00
33,250.00
3,500.00
4,200.00
100,450.00
467,900.00
Jumlah Harga
302,500.00
19,200.00
15,750.00
30,000.00
367,450.00
Jumlah Harga
59,500.00
33,250.00
3,500.00
4,200.00
100,450.00
539,230.00
Jumlah Harga
333,900.00
14,880.00
6,300.00
55,000.00
410,080.00
Jumlah Harga
76,500.00
42,750.00
4,500.00
5,400.00
129,150.00
285,855.00
Jumlah Harga
96,725.00
14,880.00
6,300.00
38,800.00
156,705.00
Jumlah Harga
76,500.00
42,750.00
4,500.00
5,400.00
129,150.00
303,610.00
Jumlah Harga
114,480.00
14,880.00
6,300.00
38,800.00
174,460.00
Jumlah Harga
76,500.00
42,750.00
4,500.00
5,400.00
129,150.00
165,000.00
Jumlah Harga
81,000.00
12,250.00
93,250.00
Jumlah Harga
42,500.00
23,750.00
2,500.00
3,000.00
71,750.00
148,350.00
Jumlah Harga
64,350.00
12,250.00
76,600.00
Jumlah Harga
42,500.00
23,750.00
2,500.00
3,000.00
71,750.00
120,730.00
Jumlah Harga
87,500.00
14,880.00
350.00
102,730.00
Jumlah Harga
8,500.00
9,500.00
-
-
18,000.00
214,715.00
Jumlah Harga
83,215.00
18,800.00
12,250.00
114,265.00
Jumlah Harga
59,500.00
33,250.00
3,500.00
4,200.00
100,450.00
296,500.00
Jumlah Harga
165,000.00
18,800.00
12,250.00
196,050.00
Jumlah Harga
59,500.00
33,250.00
3,500.00
4,200.00
100,450.00
14 ANALISA BIAYA KONTRUKSI PEKERJAAN PENGECATAN
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL bt Pembantu Tukang Batu Orang 0.150 85,000.00
2 Mdr Mandor Orang 0.0030 120,000.00
14.2 1 M2 mengerok karat cat lama permukaan baja dengan cara manual
Bahan
No Kode Uraian Satuan Koef Harga
1 F26 Sabun Kg 0.050 37,500.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL bt Pembantu Tukang Batu Orang 0.150 85,000.00
2 Mdr Mandor Orang 0.0080 120,000.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL C Pembantu Tukang Cat Orang 0.070 85,000.00
2 TC Tukang Cat Orang 0.075 95,000.00
3 KT C Kepala Tukang Cat Orang 0.0080 100,000.00
4 Mdr Mandor Orang 0.0080 120,000.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL C Pembantu Tukang Cat Orang 0.070 85,000.00
2 TC Tukang Cat Orang 0.009 95,000.00
3 KT C Kepala Tukang Cat Orang 0.006 100,000.00
4 Mdr Mandor Orang 0.0030 120,000.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL C Pembantu Tukang Cat Orang 0.070 85,000.00
2 TC Tukang Cat Orang 0.105 95,000.00
3 KT C Kepala Tukang Cat Orang 0.004 100,000.00
4 Mdr Mandor Orang 0.0030 120,000.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL C Pembantu Tukang Cat Orang 0.040 85,000.00
2 TC Tukang Cat Orang 0.063 95,000.00
3 KT C Kepala Tukang Cat Orang 0.063 100,000.00
4 Mdr Mandor Orang 0.0030 120,000.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL C Pembantu Tukang Cat Orang 0.040 85,000.00
2 TC Tukang Cat Orang 0.060 95,000.00
3 KT C Kepala Tukang Cat Orang 0.016 100,000.00
4 Mdr Mandor Orang 0.0030 120,000.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL C Pembantu Tukang Cat Orang 0.100 85,000.00
2 Mdr Mandor Orang 0.006 120,000.00
14.9 1 M2 pengecatan tembok baru :
( 1 lapis plamir, 1 lapis cat dasar dan 2 lapis cat penutup )
Bahan
No Kode Uraian Satuan Koef Harga
1 F18 Plamur tembok Kg 0.100 107,800.00
2 F16 Kertas gosok Lbr 0.250 5,700.00
3 F7 Cat tembok Kg 0.100 27,000.00
4 F7 Cat tembok Kg 0.260 27,000.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL C Pembantu Tukang Cat Orang 0.020 85,000.00
2 TC Tukang Cat Orang 0.063 95,000.00
3 KT C Kepala Tukang Cat Orang 0.0600 100,000.00
4 Mdr Mandor Orang 0.0030 120,000.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL C Pembantu Tukang Cat Orang 0.020 85,000.00
2 TC Tukang Cat Orang 0.063 95,000.00
3 KT C Kepala Tukang Cat Orang 0.0600 100,000.00
4 Mdr Mandor Orang 0.0030 120,000.00
14.11 1 M2 pengecatan tembok lama, (1 lapis cat dasar, 2 lapis cat penutup).
Bahan
No Kode Uraian Satuan Koef Harga
1 F7 Cat tembok Kg 0.120 27,000.00
2 F7 Cat tembok Kg 0.180 27,000.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL C Pembantu Tukang Cat Orang 0.028 85,000.00
2 TC Tukang Cat Orang 0.042 95,000.00
3 KT C Kepala Tukang Cat Orang 0.0042 100,000.00
4 Mdr Mandor Orang 0.0030 120,000.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL C Pembantu Tukang Cat Orang 0.020 85,000.00
2 TC Tukang Cat Orang 0.200 95,000.00
3 KT C Kepala Tukang Cat Orang 0.02 100,000.00
4 Mdr Mandor Orang 0.0025 120,000.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL C Pembantu Tukang Cat Orang 0.020 85,000.00
2 TC Tukang Cat Orang 0.200 95,000.00
3 KT C Kepala Tukang Cat Orang 0.02 100,000.00
4 Mdr Mandor Orang 0.0100 120,000.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL C Pembantu Tukang Cat Orang 0.0200 85,000.00
2 TC Tukang Cat Orang 0.0630 95,000.00
3 KT C Kepala Tukang Cat Orang 0.0600 100,000.00
4 Mdr Mandor Orang 0.0030 120,000.00
15,870.00
Jumlah Harga
2,760.00
2,760.00
Jumlah Harga
12,750.00
360.00
13,110.00
15,585.00
Jumlah Harga
1,875.00
1,875.00
Jumlah Harga
12,750.00
960.00
13,710.00
50,850.00
Jumlah Harga
5,415.00
15,300.00
15,300.00
36,015.00
Jumlah Harga
5,950.00
7,125.00
800.00
960.00
14,835.00
62,860.00
Jumlah Harga
9,360.00
5,415.00
15,300.00
23,400.00
480.00
1,140.00
55,095.00
Jumlah Harga
5,950.00
855.00
600.00
360.00
7,765.00
79,880.00
Jumlah Harga
9,360.00
5,415.00
15,300.00
31,500.00
480.00
1,140.00
63,195.00
Jumlah Harga
5,950.00
9,975.00
400.00
360.00
16,685.00
26,845.00
Jumlah Harga
10,800.00
10,800.00
Jumlah Harga
3,400.00
5,985.00
6,300.00
360.00
16,045.00
71,058.20
Jumlah Harga
13,965.00
34,633.20
11,400.00
59,998.20
Jumlah Harga
3,400.00
5,700.00
1,600.00
360.00
11,060.00
20,245.00
Jumlah Harga
11,025.00
11,025.00
Jumlah Harga
8,500.00
720.00
9,220.00
35,970.00
Jumlah Harga
10,780.00
1,425.00
2,700.00
7,020.00
21,925.00
Jumlah Harga
1,700.00
5,985.00
6,000.00
360.00
14,045.00
59,406.00
Jumlah Harga
10,780.00
1,425.00
9,210.00
23,946.00
45,361.00
Jumlah Harga
1,700.00
5,985.00
6,000.00
360.00
14,045.00
15,250.00
Jumlah Harga
3,240.00
4,860.00
8,100.00
Jumlah Harga
2,380.00
3,990.00
420.00
360.00
7,150.00
28,160.00
Jumlah Harga
4,680.00
480.00
5,160.00
Jumlah Harga
1,700.00
19,000.00
2,000.00
300.00
23,000.00
30,485.00
Jumlah Harga
4,680.00
1,425.00
480.00
6,585.00
Jumlah Harga
1,700.00
19,000.00
2,000.00
1,200.00
23,900.00
34,545.00
Jumlah Harga
10,780.00
2,700.00
7,020.00
20,500.00
Jumlah Harga
1,700.00
5,985.00
6,000.00
360.00
14,045.00
15 ANALISA BIAYA KONTRUKSI PEKERJAAN ELEKTRIKAL
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL Lt Pembantu Tukang Listrik Orang 0.40 85,000.00
2 T Lt Tukang Listrik Orang 0.20 95,000.00
3 T Bt Tukang Batu Orang 0.10 95,000.00
4 KT Bt Kepala Tukang Batu Orang 0.03 100,000.00
5 Mdr Mandor Orang 0.01 120,000.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL Lt Pembantu Tukang Listrik Orang 0.40 85,000.00
2 T Lt Tukang Listrik Orang 0.20 95,000.00
3 T Bt Tukang Batu Orang 0.10 95,000.00
4 KT Bt Kepala Tukang Batu Orang 0.03 100,000.00
5 Mdr Mandor Orang 0.01 120,000.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL Lt Pembantu Tukang Listrik Orang 0.40 85,000.00
2 T Lt Tukang Listrik Orang 0.20 95,000.00
3 T Bt Tukang Batu Orang 0.10 95,000.00
4 KT Bt Kepala Tukang Batu Orang 0.03 100,000.00
5 Mdr Mandor Orang 0.01 120,000.00
15.4 1 unit Memasang lampu pijar 15 / 25 watt
Bahan
No Kode Uraian Satuan Koef Harga
1 M21 Lampu Pijar 25,10,75/220 V Bh 1.00 75,500.00
2 K3 Pipa paralon 5/8" Ljr 1.00 7,000.00
3 M35 Kabel NYM 500 V 2x1,5 mm M' 5.00 25,400.00
4 M3 Faiting Flapon Bh 1.00 77,400.00
5 M7 Isolator Bh 2.00 1,250.00
6 M4 T Doos PVC Bh 1.00 30,500.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL Lt Pembantu Tukang Listrik Orang 0.40 85,000.00
2 T Lt Tukang Listrik Orang 0.20 95,000.00
3 T Bt Tukang Batu Orang 0.10 95,000.00
4 KT Bt Kepala Tukang Batu Orang 0.03 100,000.00
5 Mdr Mandor Orang 0.01 120,000.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL Lt Pembantu Tukang Listrik Orang 0.65 85,000.00
2 T Lt Tukang Listrik Orang 0.35 95,000.00
3 T Bt Tukang Batu Orang 0.10 95,000.00
4 KT Bt Kepala Tukang Batu Orang 0.03 100,000.00
5 Mdr Mandor Orang 0.01 120,000.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL Lt Pembantu Tukang Listrik Orang 0.65 85,000.00
2 T Lt Tukang Listrik Orang 0.35 95,000.00
3 T Bt Tukang Batu Orang 0.10 95,000.00
4 KT Bt Kepala Tukang Batu Orang 0.03 100,000.00
5 Mdr Mandor Orang 0.01 120,000.00
15.7 1 Titik Memasang Stop Kontak
Bahan
No Kode Uraian Satuan Koef Harga
1 M8 Stop Kontak (Broco) Bh 1.00 2,300.00
2 K3 Pipa paralon 5/8" Ljr 1.00 7,000.00
3 M29 Kabel NYA 1000 V 1x2,5 mm2 M' 10.00 6,000.00
4 M7 Isolator Bh 3.00 1,250.00
5 M6 Inbouw doos Bh 1.00 41,500.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 KL Lt Pembantu Tukang Listrik Orang 0.24 85,000.00
2 T Lt Tukang Listrik Orang 0.12 95,000.00
3 T Bt Tukang Batu Orang 0.30 95,000.00
4 KT Bt Kepala Tukang Batu Orang 0.03 100,000.00
5 Mdr Mandor Orang 0.03 120,000.00
Tenaga
No Kode Uraian Satuan Koef Harga
1 Upah Grounding + Instalasi PMD Unit 1.00 750,000.00
292,760.00
Jumlah Harga
110,000.00
7,000.00
76,200.00
2,500.00
30,500.00
226,200.00
Jumlah Harga
34,000.00
19,000.00
9,500.00
2,500.00
1,560.00
66,560.00
277,760.00
Jumlah Harga
95,000.00
7,000.00
76,200.00
2,500.00
30,500.00
211,200.00
Jumlah Harga
34,000.00
19,000.00
9,500.00
2,500.00
1,560.00
66,560.00
285,760.00
Jumlah Harga
103,000.00
7,000.00
76,200.00
2,500.00
30,500.00
219,200.00
Jumlah Harga
34,000.00
19,000.00
9,500.00
2,500.00
1,560.00
66,560.00
386,460.00
Jumlah Harga
75,500.00
7,000.00
127,000.00
77,400.00
2,500.00
30,500.00
319,900.00
Jumlah Harga
34,000.00
19,000.00
9,500.00
2,500.00
1,560.00
66,560.00
844,560.00
Jumlah Harga
650,000.00
7,000.00
50,000.00
5,000.00
30,500.00
742,500.00
Jumlah Harga
55,250.00
33,250.00
9,500.00
2,500.00
1,560.00
102,060.00
424,560.00
Jumlah Harga
220,000.00
7,000.00
60,000.00
5,000.00
30,500.00
322,500.00
Jumlah Harga
55,250.00
33,250.00
9,500.00
2,500.00
1,560.00
102,060.00
180,850.00
Jumlah Harga
2,300.00
7,000.00
60,000.00
3,750.00
41,500.00
114,550.00
Jumlah Harga
20,400.00
11,400.00
28,500.00
3,000.00
3,000.00
66,300.00
1,781,000.00
Jumlah Harga
1,016,000.00
15,000.00
-
1,031,000.00
Jumlah Harga
750,000.00
750,000.00
DAFTAR HARGA SATUAN BAHAN BANGUNAN ( NON ANALISA )
TAHUN ANGGARAN 2018
Bahan
No Kode Uraian Satuan Koef Harga
1 A65 Triplek 120x244x12 mm Lbr 1.100 192,800.00
2 A69 HPL Lbr 0.417 250,000.00
3 A70 Lem FOX Kg 2.200 45,000.00
992,746.67
Jumlah Harga
127,500.00
75,000.00
285,000.00
90,000.00
577,500.00
Jumlah Harga
212,080.00
104,166.67
99,000.00
415,246.67