Anda di halaman 1dari 2

Pekerjaan : Preservasi Jalan Rate-rate (Bts.Kolaka Timur/Kab.Konawe) - Bts.

Kota Unaaha
Kontraktor : PT.Sinar Lima Putra
Material : Timbunan Biasa
Quarry : Sirtu Sungai Konaweeha
Tanggal : 27 April 2020

PERCOBAAN PEMADATAN
( SNI 03 - 1743 - 1989 )

Berat Contoh 5500 5500 5500 5500 5500


Kadar air mula 0.76%
Penambahan air % 3 4 5 6 7 ###
Penambahan air cc 165 220 150 200 250

Berat isi
Berat Contoh + tabung 9965 10324 10465 10415 10157
Berat tabung (no….) 5849 5849 5849 5849 5849
Berat Contoh Basah 4116 4475 4616 4566 4308
Isi Tabung 2076.26 2076.26 2076.26 2076.26 2076.26
Berat isi Basah (γ) 1.98 2.16 2.22 2.20 2.07
γ
γ D= x 100 1.901 2.034 2.077 2.031 1.896
100+W

Kadar Air
Contoh Basah + cawan 65.21 83.40 81.10 79.10 95.27
Contoh kering + cawan 63.10 79.48 76.42 74.11 88.45
Berat air 2.11 3.92 4.68 4.99 6.82
Berat cawan 13.70 13.90 10.00 13.80 16.30
Berat contoh kering 49.40 65.58 66.42 60.31 72.15
Kadar air % 4.27 5.98 7.05 8.27 9.45

2.30
Berat Isi Kering

2.20

d Max = 2,077 t/m3 % 100


2.10

2.00

1.90
d Max = 1,973 t/m3 % 95
1.80
W. Opt

1.70

1.60

1.50
3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00 11.00

Kadar Air (%)

Catatan : Type Pemadatan = D


Bj.Gabungan = 2.655 t/m3
γ D Max 100 = 2.077 t/m3
γ D Max 95 = 1.973 t/m3
k.a opt = 7.05 %

Disetujui oleh : Diperiksa oleh : Dikerjakan oleh :


Direksi Konsultan Pengawas Kontraktor Pelaksana
Kementrian Pekerjaan Umum PT.Surya Perkasa Raya,JO. PT.Sinar Lima Putra
Dan Perumahan Rakyat PT.Anugerah Kridapradana

Muh.Ishak Burhan,ST Hendro


(Pengawas Teknik Lab.) (Material Teknisi) Lab.tek
PENGUJIAN KEPADATAN LAPANGAN
METODE SAND CONE TEST
SNI 03 - 2828 - 2011

PEKERJAAN : TIMBUNANBIASA
KONTRAKTOR : PT. SINAR LIMA PUTRA
TANGGAL UJI : 28 April 2020
MATERIAL/QUARRY : SIRTU SUNGAI KONAWEEHA

No. 0 + 575 0 +525


1 POSISI 19.5 L R
2 KEDALAMAN LUBANG 0 18 15 16
PENENTUAN ISI LUBANG
3 BERAT PASIR + BOTOL + CORONG gr 8414 8250 8165
4 BERAT SISA PASIR + BOTOL + CORONG gr 3057 3545 3415
5 BERAT PASIR TERPAKAI gr 3-4 5357 4705 4750
6 BERAT PASIR DALAM CORONG = ( Kalibrasi LAB ) gr 1672 1672 1672
7 BERAT PASIR DALAM BOTOL gr 5-6 3685 3033 3078
8 BERAT ISI PASIR = ( Kalibrasi LAB ) gr/cm3 1.452 1.452 1.452
9 VOLUME LUBANG cm3 7:8 2537.9 2088.8 2119.8
PENETUAN KADAR AIR
10 BERAT TANAH BASAH + TEMPAT gr 66.05 56.6 65.5
11 BERAT TANAH KERING + TEMPAT gr 62.86 53.5 63
12 BERAT TEMPAT gr 11.15 15 11.15
13 BERAT AIR gr 10 - 11 3.2 3.1 2.5
14 BERAT TANAH KERING gr 11 - 12 51.71 38.5 51.85
15 KADAR AIR % 13 : 14 x 100 3.89 5.00 4.82
PENENTUAN KEPADATAN
16 BERAT MATERIAL DALAM LUBANG gr 6781 4725 4840
17 BERAT MATERIAL TERTAHAN 3/4" gr 1562 870 1240
18 BERAT MATERIAL LOLOS 3/4" gr 16 - 17 5219 3855 3600
19 % MATERIAL TERTAHAN 3/4" gr 17 : 16 x 100 23.03 18.41 25.62
20 % MATERIAL LOLOS 3/4" gr 18 : 16 x 100 76.97 81.59 74.38
21 BERAT JENIS GABUNGAN ( Sp. Gr ) % 3.090 2.655 2.655
22 BERAT ISI BASAH % 16 : 9 2.672 2.262 2.283
23 BERAT ISI KERING gr/cm3 22/(15+100)*100) 2.572 2.154 2.178
24 Y ͩLAB gr/cm3 2.609 2.077 2.077
25 GABUNGAN Sp.Gr Y ͩLAB gr/cc 21 x 24 8.062 5.514 5.514
(25) X 100
26 Y ͩ KOREKSI = gr/cm3
{(19) x (24)} + {(20)} x (21)} 2.706 2.164 2.200
27 % DERAJAT KEPADATAN % 23 : 26 x 100 95.04 99.56 99.02
Catatan

Dari hasil 2 titik pengujian nilai kepadatan lapangan belum tercapai , maka disimpulkan untuk menambah pemadatan untuk melanjutkan

ke konstruksi selanjutnya.

Di setujui Oleh : Di Periksa Oleh : Dibuat dan dites oleh,

Muh.Ishak Burhan,ST Silvester Yones Trianto


pengawas Laboratorium Mat.Teknisi Quality Kontrol