KETEBALAN DAN KEPADATAN HASIL CORE DRILL CAMPURAN BERASPAL

Pekerjaan : Preservasi Jalan Rate-rate (Bts.Kolaka Timur/Kab.Konawe) - Bts.Kota Unaaha


Kontraktor : PT.Sinar Lima Putra
Jenis : Ac -Wc lawele
Tanggal Uji : 26 januari s/d 27 Januari 2021

T.1 T.2 T.3 T.4 B.UDARA (gr) B. DALAM AIR (gr) B.SSD (gr) ISI (cc) DENSITY Lap (gr/cc) Gmb (gr/cc) % JSD
NO STA. POSISI TEBAL RATA2 Keterangan
cm cm cm cm A B C D= C-B E =A/D Rata2 harian f '=E/Gmbx100

1 3+550 R 4.93 5.0 4.9 4.9 4.9 693.6 399.7 702.5 302.8 2.290 2.291 99.97 99.97
2 3+600 R 5.63 5.6 5.6 5.6 5.7 821.0 472.4 831.0 358.6 2.289 2.291 99.93 99.93
3 3+650 R 4.15 4.2 4.1 4.1 4.2 625.5 362.0 635.5 273.5 2.287 2.291 99.83 99.83
4 3+700 R 4.75 4.8 4.8 4.7 4.7 680.1 393.8 690.1 296.3 2.296 2.291 100.20 100.2
5 3+750 R 5.65 5.6 5.6 5.8 5.6 825.8 475.0 835.8 360.8 2.289 2.291 99.91 99.91
6 3+800 R 5.10 5.1 5.1 5.1 5.1 713.3 413.1 724.5 311.4 2.290 2.291 99.97 99.97
7 3+850 R 4.68 4.6 4.7 4.7 4.7 669.0 386.8 679.0 292.2 2.289 2.291 99.93 99.930
8 3+900 R 4.55 4.5 4.6 4.6 4.5 672.8 389.0 682.8 293.8 2.290 2.291 99.97 99.97
9 3+950 R 4.00 4.0 4.0 4.0 4.0 597.3 346.6 607.4 260.8 2.290 2.291 99.95 99.95
10 4+000 R 4.10 4.1 4.0 4.1 4.2 613.4 355.2 623.6 268.4 2.286 2.291 99.76 99.76
11 4+050 R 4.83 4.9 5.0 4.6 4.8 681.1 394.4 690.8 296.4 2.298 2.291 100.30 100.3
12 4+100 R 5.28 5.2 5.4 5.2 5.3 733.5 424.2 743.9 319.7 2.294 2.291 100.14 100.14
13 4+150 R 4.63 4.6 4.6 4.6 4.7 673.7 390.6 683.9 293.3 2.297 2.291 100.26 100.26

Notes : STATION HAMPARAN ( SEGMEN ) Gmb. Harian 100.01 99.942

3 + 509 s/d 4 + 4177 Kanan ( R ) 2.291


25-Jan-21 18+ 028 s/d 18 + 200 Kanan( R ) 2.291
18 + 064 - 18 + 210 Kiri ( L)

Disetujui Diperiksa Dilaksanakan Oleh


Direksi PUPR Konsultan Supervisi Kontraktor Pelaksana
PPK. 2.4 PT. Surya Perkasa Raya J.O PT.Sinar Lima Putra

Muh.Ishak Saripuddin,ST Silvester Yones Trianto


( Pengawas Lab.Tek ) ( Material Teknisi) (Quality Control)
KETEBALAN DAN KEPADATAN HASIL CORE DRILL CAMPURAN BERASPAL

Pekerjaan : Preservasi Jalan Rate-rate (Bts.Kolaka Timur/Kab.Konawe) - Bts.Kota Unaaha


Kontraktor : PT.Sinar Lima Putra
Jenis : Ac -Wc lawele
Tanggal Uji : 26 januari s/d 27 Januari 2021

T.1 T.2 T.3 T.4 B.UDARA (gr) B. DALAM AIR (gr) B.SSD (gr) ISI (cc) DENSITY Lap (gr/cc) Gmb (gr/cc) % JSD
NO STA. POSISI TEBAL RATA2 Keterangan
cm cm cm cm A B C D= C-B E =A/D Rata2 harian f '=E/Gmbx100

1 3+950 L 4.20 4.2 4.2 4.2 4.2 633.6 367.0 643.6 276.6 2.290 2.291 99.97 99.97
2 4+000 L 4.45 4.5 4.4 4.4 4.5 671.0 388.3 681.4 293.1 2.289 2.291 99.93 99.93
3 4+050 L 5.18 5.1 5.1 5.2 5.3 721.5 415.4 730.9 315.5 2.287 2.291 99.83 99.83
4 4+100 L 4.78 4.8 4.8 4.7 4.8 670.3 388.8 680.8 292.0 2.296 2.291 100.20 100.2
5 4+150 L 4.78 4.9 4.7 4.7 4.8 675.8 390.6 685.8 295.2 2.289 2.291 99.91 99.91
6 4+200 L 4.25 4.2 4.3 4.3 4.2 622.3 361.0 632.7 271.7 2.290 2.291 99.97 99.97
7 4+250 L 4.38 4.4 4.3 4.3 4.5 639.0 369.9 649.0 279.1 2.289 2.291 99.93 99.930
8 4+300 L 5.08 5.0 5.1 5.0 5.2 712.8 411.2 722.4 311.2 2.290 2.291 99.97 99.97
9 4+350 L 4.43 4.4 4.5 4.4 4.4 647.8 375.0 657.9 282.9 2.290 2.291 99.95 99.95
10 4+400 L 4.43 4.5 4.4 4.4 4.4 643.7 372.1 653.7 281.6 2.286 2.291 99.76 99.76

99.95

Notes : STATION HAMPARAN ( SEGMEN ) Gmb. Harian 99.94 99.942

3 + 901 s/d 4 + 417 Kiri ( L ) 2.291


24-Jan-21 18+ 028 s/d 18 + 200 Kanan( R ) 2.291
18 + 064 - 18 + 210 Kiri ( L)

Disetujui Diperiksa Dilaksanakan Oleh


Direksi PUPR Konsultan Supervisi Kontraktor Pelaksana
PPK. 2.4 PT. Surya Perkasa Raya J.O PT.Sinar Lima Putra

Muh.Ishak Saripuddin,ST Silvester Yones Trianto


( Pengawas Lab.Tek ) ( Material Teknisi) (Quality Control)
KETEBALAN DAN KEPADATAN HASIL CORE DRILL CAMPURAN BERASPAL

Pekerjaan : Preservasi Jalan Rate-rate (Bts.Kolaka Timur/Kab.Konawe) - Bts.Kota Unaaha


Kontraktor : PT.Sinar Lima Putra
Jenis : Ac -Wc lawele
Tanggal Uji : 26 januari s/d 27 Januari 2021

T.1 T.2 T.3 T.4 B.UDARA (gr) B. DALAM AIR (gr) B.SSD (gr) ISI (cc) DENSITY Lap (gr/cc) Gmb (gr/cc) % JSD
NO STA. POSISI TEBAL RATA2 Keterangan
cm cm cm cm A B C D= C-B E =A/D Rata2 harian f '=E/Gmbx100

1 4+200 R 4.58 4.6 4.5 4.6 4.6 638.3 370.3 647.8 277.5 2.300 2.291 100.40 100.4
2 4+250 R 5.03 5.0 5.1 5.0 5.0 711.2 410.6 721.2 310.6 2.289 2.291 99.93 99.93
3 4+300 R 4.35 4.4 4.3 4.4 4.3 611.5 354.1 621.5 267.4 2.287 2.291 99.83 99.83
4 4+350 R 4.23 4.2 4.2 4.3 4.2 630.3 364.0 640.3 276.3 2.281 2.291 99.56 99.56
5 4+400 R 4.15 4.2 4.2 4.1 4.1 605.8 350.9 615.6 264.7 2.289 2.291 99.91 99.91
6 4+450 R 4.10 4.1 4.1 4.1 4.1 602.3 349.3 612.3 263.0 2.290 2.291 99.97 99.97
7 4+500 R 3.73 3.7 3.7 3.8 3.7 559.0 325.2 569.4 244.2 2.289 2.291 99.93 99.930
8 4+550 R 4.33 4.3 4.3 4.4 4.3 612.2 355.5 622.8 267.3 2.290 2.291 99.97 99.97
9 4+600 R 3.90 3.8 3.9 3.9 4.0 587.8 342.5 597.8 255.3 2.302 2.291 100.50 100.5
10 4+650 R 4.13 4.1 4.1 4.1 4.2 603.7 350.3 613.0 262.7 2.298 2.291 100.30 100.3
11 4+700 R 4.63 4.9 4.8 4.8 4.0 639.7 367.8 648.3 280.5 2.281 2.291 99.56 99.56
99.95

Notes : STATION HAMPARAN ( SEGMEN ) Gmb. Harian 99.99 100.03

4 + 177 s/d 4 + 739 Kanan ( R )


22-Jan-21 18+ 028 s/d 18 + 200 Kanan( R ) 2.291
18 + 064 - 18 + 210 Kiri ( L)

Disetujui Diperiksa Dilaksanakan Oleh


Direksi PUPR Konsultan Supervisi Kontraktor Pelaksana
PPK. 2.4 PT. Surya Perkasa Raya J.O PT.Sinar Lima Putra

Muh.Ishak Saripuddin,ST Silvester Yones Trianto


( Pengawas Lab.Tek ) ( Material Teknisi) (Quality Control)
KETEBALAN DAN KEPADATAN HASIL CORE DRILL CAMPURAN BERASPAL

Pekerjaan : Preservasi Jalan Rate-rate (Bts.Kolaka Timur/Kab.Konawe) - Bts.Kota Unaaha


Kontraktor : PT.Sinar Lima Putra
Jenis : Ac -Wc lawele
Tanggal Uji : 26 januari s/d 27 Januari 2021

T.1 T.2 T.3 T.4 B.UDARA (gr) B. DALAM AIR (gr) B.SSD (gr) ISI (cc) DENSITY Lap (gr/cc) Gmb (gr/cc) % JSD
NO STA. POSISI TEBAL RATA2 Keterangan
cm cm cm cm A B C D= C-B E =A/D Rata2 harian f '=E/Gmbx100

1 4+450 L 4.35 4.4 4.4 4.3 4.3 625.3 361.9 635.1 273.2 2.288 2.291 99.89 99.89
2 4+500 L 4.30 4.3 4.3 4.3 4.3 621.2 360.4 631.7 271.3 2.289 2.291 99.93 99.93
3 4+550 L 3.78 3.8 3.7 3.8 3.8 561.5 326.2 571.5 245.3 2.289 2.291 99.93 99.93
4 4+600 L 3.78 3.8 3.7 3.8 3.8 560.3 325.6 570.3 244.7 2.290 2.291 99.96 99.96
5 4+650 L 4.53 4.5 4.5 4.5 4.6 635.8 367.8 645.6 277.8 2.289 2.291 99.91 99.91
6 4+700 L 4.10 4.1 4.1 4.1 4.1 610.3 353.8 620.3 266.5 2.290 2.291 99.97 99.97
7 4+750 L 5.05 5.0 5.0 5.1 5.1 710.0 410.3 720.4 310.1 2.289 2.291 99.93 99.930
8 4+800 L 4.03 4.0 4.0 4.0 4.1 599.7 347.7 609.5 261.8 2.290 2.291 99.97 99.97
9 4+850 L 4.70 4.7 4.9 4.7 4.5 685.2 396.8 695.6 298.8 2.293 2.291 100.10 100.1
10 4+900 L 4.90 5.0 4.9 4.8 4.9 703.7 407.2 713.4 306.2 2.298 2.291 100.30 100.3
11 4+950 L 4.48 4.6 4.4 4.4 4.5 629.7 364.7 639.7 275.0 2.290 2.291 99.96 99.96
12 4+980 L 5.50 5.5 5.6 5.4 5.5 760.5 438.4 770.5 332.1 2.290 2.291 99.95 99.95

Notes : STATION HAMPARAN ( SEGMEN ) Gmb. Harian 99.98 99.989

4 + 417 s/d 4 + 982 Kiri (L )


20-Jan-21 18+ 028 s/d 18 + 200 Kanan( R ) 2.291
18 + 064 - 18 + 210 Kiri ( L)

Disetujui Diperiksa Dilaksanakan Oleh


Direksi PUPR Konsultan Supervisi Kontraktor Pelaksana
PPK. 2.4 PT. Surya Perkasa Raya J.O PT.Sinar Lima Putra

Muh.Ishak Saripuddin,ST Silvester Yones Trianto


( Pengawas Lab.Tek ) ( Material Teknisi) (Quality Control)
KETEBALAN DAN KEPADATAN HASIL CORE DRILL CAMPURAN BERASPAL

Pekerjaan : Preservasi Jalan Rate-rate (Bts.Kolaka Timur/Kab.Konawe) - Bts.Kota Unaaha


Kontraktor : PT.Sinar Lima Putra
Jenis : Ac -Bc lawele
Tanggal Uji : 25 April 2020 s/d 26 April 2020

T.1 T.2 T.3 T.4 B.UDARA (gr) B. DALAM AIR (gr) B.SSD (gr) ISI (cc) DENSITY Lap (gr/cc) Gmb (gr/cc) % JSD
NO STA. POSISI TEBAL RATA2 Keterangan
cm cm cm cm A B C D= C-B E =A/D Rata2 harian f '=E/Gmbx100

1 16 + 950 R 7.00 7.6 6.8 6.9 6.7 1348.6 767.3 1356.1 588.8 2.290 2.291 99.97 99.9674
2 17 + 000 CLR 6.00 6.0 6.0 6.0 6.0 926.9 528.8 933.5 404.7 2.290 2.291 99.98 99.9756
3 17 + 050 R 6.88 6.9 6.8 6.9 6.9 1100.4 633.1 1113.7 480.6 2.289 2.291 99.93 99.9331
4 17 + 100 CLR 6.28 6.3 6.2 6.2 6.4 1096.8 625.0 1104 479.0 2.290 2.291 99.96 99.956
5 17+ 150 R 6.13 6.1 6.2 6.1 6.1 1034.3 587.1 1038.8 451.7 2.290 2.291 99.95 99.9534
6 17 + 200 CLR 6.93 6.8 7.0 6.9 7.0 1222.2 699.6 1233.3 533.7 2.290 2.291 99.95 99.9541
7 18 + 028 L 6.43 6.6 6.4 6.1 6.6 1146.8 652.7 1153.6 500.9 2.290 2.291 99.94 99.9432
8 18 + 028 R 7.23 7.1 7.2 7.4 7.2 1233 706.0 1244.3 538.3 2.290 2.291 99.97 99.974
9 18 + 100 L 8.53 8.7 8.4 8.5 8.5 1520.5 867.2 1531.3 664.1 2.290 2.291 99.94 99.9432
10 18 + 100 R 6.60 6.6 6.6 6.6 6.6 1051.2 600.6 1059.7 459.1 2.290 2.291 99.94 99.9421

Notes : STATION HAMPARAN ( SEGMEN ) Gmb. Harian 2.2900 RATA-2 99.95 99.95421
767.3
16+ 907 s/d 17 + 250 Kanan (R )
22-Apr-20 18+ 028 s/d 18 + 200 Kanan( R ) 2.291
18 + 064 - 18 + 210 Kiri ( L)

Disetujui Diperiksa Dilaksanakan Oleh


Direksi PUPR Konsultan Supervisi Kontraktor Pelaksana
PPK. 2.4 PT. Surya Perkasa Raya J.O PT.Sinar Lima Putra

Muh.Ishak Burhan.ST Silvester Yones Trianto


( Pengawas Lab.Tek ) ( Material Teknisi) (Quality Control)
KETEBALAN DAN KEPADATAN HASIL CORE DRILL CAMPURAN BERASPAL

Pekerjaan : Preservasi Jalan Rate-rate (Bts.Kolaka Timur/Kab.Konawe) - Bts.Kota Unaaha


Kontraktor : PT.Sinar Lima Putra
Jenis : Ac -Bc lawele
Tanggal Uji : 25 April 2020 s/d 26 April 2020

T.1 T.2 T.3 T.4 B.UDARA (gr) B. DALAM AIR (gr) B.SSD (gr) ISI (cc) DENSITY Lap (gr/cc) Gmb (gr/cc) % JSD
NO STA. POSISI TEBAL RATA2 Keterangan
cm cm cm cm A B C D= C-B E =A/D Rata2 harian f '=E/Gmbx100

1 16 + 800 L 6.00 6.0 6.0 6.0 6.0 978.0 554.9 981.6 426.7 2.292 2.293 99.96 99.9571
2 16 + 800 R 6.93 6.9 7.0 7.0 6.8 1180.9 674.6 1189.8 515.2 2.292 2.293 99.96 99.9602
3 16 + 900 L 9.15 9.4 9.0 9.2 9.0 1543.1 881.4 1554.5 673.1 2.293 2.293 99.98 99.9812
4 16 + 900 CLR 6.93 7.0 6.8 6.9 7.0 1193.6 679.9 1200.7 520.8 2.292 2.293 99.95 99.9532
5 16 + 950 L 8.05 8.1 8.2 7.9 8.0 1436.7 817.1 1443.9 626.8 2.292 2.293 99.96 99.9632
6 17 + 000 L 6.73 6.6 6.8 6.7 6.8 1335.7 759.9 1342.7 582.8 2.292 2.293 99.94 99.9431
7 17 + 050 L 7.20 7.2 7.2 7.2 7.2 1192.3 680.8 1200.9 520.1 2.292 2.293 99.97 99.9671
8 17 + 100 L 7.50 7.5 7.4 7.7 7.4 1144.3 649.6 1148.7 499.1 2.293 2.293 99.98 99.9823
9 17 + 150 L 7.43 7.3 7.6 7.6 7.2 1254.1 716.6 1263.8 547.2 2.292 2.293 99.95 99.9511
10 17 + 200 CLL 7.15 7.2 7.2 7.0 7.2 1272.3 725.3 1280.5 555.2 2.292 2.293 99.95 99.9465

Catatan : STATION HAMPARAN ( SEGMEN ) Gmb. Harian 2.2921 RATA 2 99.961 99.9605

16 + 800 s/d 17+250 Kiri ( L ) RATA -RATA L/R 0.0000


21-Apr-20 2.293
16 + 804 s/d 16 + 907 Kan( R ) 99.9574

Disetujui Diperiksa Dilaksanakan Oleh


Direksi PUPR Konsultan Supervisi Kontraktor Pelaksana
PPK. 2.4 PT. Surya Perkasa Raya J.O PT.Sinar Lima Putra

Muh.Ishak Burhan.ST Silvester Yones Trianto


( Pengawas Lab.Tek ) ( Material Teknisi) (Quality Kontrol)
KETEBALAN DAN KEPADATAN HASIL CORE DRILL CAMPURAN BERASPAL

Pekerjaan : Preservasi Jalan Rate-rate (Bts.Kolaka Timur/Kab.Konawe) - Bts.Kota Unaaha


Kontraktor : PT.Sinar Lima Putra
Jenis : Ac -Bc lawele
Tanggal Uji : 19 Mei 2020 s/d 23 Mei 2020

T.1 T.2 T.3 T.4 B.UDARA (gr) B. DALAM AIR (gr) B.SSD (gr) ISI (cc) DENSITY Lap (gr/cc) Gmb (gr/cc) % JSD
NO STA. POSISI TEBAL RATA2 Keterangan
cm cm cm cm A B C D= C-B E =A/D Rata2 harian f '=E/Gmbx100

1 17+650 R 6.00 6.0 6.0 6.0 6.0 1076.3 598.5 1084.3 470.3 2.288 2.294 99.76 99.76
2 17+700 R 6.60 6.6 6.6 6.6 6.6 1152.6 652.7 1162 502.6 2.293 2.294 99.98 99.9756
3 17+750 R 5.95 5.8 5.9 6.0 6.1 1022.2 527.2 1030.1 450.1 2.271 2.294 98.99 98.99
4 17+800 R 5.96 6.0 5.9 6.0 6.0 1063.9 591.0 1070.2 464.0 2.293 2.294 99.96 99.956
5 17+850 R 6.45 6.5 6.4 6.5 6.4 1181.3 667.9 1189.8 520.2 2.271 2.294 99.00 99
6 17+900 R 6.05 6.0 6.0 6.0 6.2 761.7 420.3 763.7 332.2 2.293 2.294 99.95 99.9541
7 17+950 R 5.92 6.0 6.0 5.7 6.0 879.1 492.7 884.4 384.9 2.284 2.294 99.56 99.56
8 18+000 R 8.00 8.0 8.0 8.0 8.0 1441 799.1 1450.9 636.8 2.263 2.294 98.65 98.65
9 18 + 100 L 8.53 8.7 8.4 8.5 8.5 1520.5 437.2 1531.3 663.2 2.293 2.294 99.94 99.9432
10 18 + 100 R 6.60 6.6 6.6 6.6 6.6 1051.2 601.2 1059.7 458.5 2.293 2.294 99.94 99.9421

Notes : STATION HAMPARAN ( SEGMEN ) Gmb. Harian 2.2842 RATA-2 99.57 99.5731
614.0
17+ 652 s/d 18 + 028 Kanan (R )
9-May-20 18+ 028 s/d 18 + 200 Kanan( R ) 2.294
18 + 064 - 18 + 210 Kiri ( L)

Disetujui Diperiksa Dilaksanakan Oleh


Direksi PUPR Konsultan Supervisi Kontraktor Pelaksana
PPK. 2.4 PT. Surya Perkasa Raya J.O PT.Sinar Lima Putra

Muh.Ishak Burhan.ST Silvester Yones Trianto


( Pengawas Lab.Tek ) ( Material Teknisi) (Quality Control)
KETEBALAN DAN KEPADATAN HASIL CORE DRILL CAMPURAN BERASPAL

Pekerjaan : Preservasi Jalan Rate-rate (Bts.Kolaka Timur/Kab.Konawe) - Bts.Kota Unaaha


Kontraktor : PT.Sinar Lima Putra
Jenis : Ac -Bc lawele
Tanggal Uji : 19 Mei 2020 s/d 23 Mei 2020

T.1 T.2 T.3 T.4 B.UDARA (gr) B. DALAM AIR (gr) B.SSD (gr) ISI (cc) DENSITY Lap (gr/cc) Gmb (gr/cc) % JSD
NO STA. POSISI TEBAL RATA2 Keterangan
cm cm cm cm A B C D= C-B E =A/D Rata2 harian f '=E/Gmbx100

1 17+775 L 7.00 7.6 6.8 6.9 6.7 1194.4 660.9 1200.4 527.2 2.266 2.291 98.89 98.89
2 17+800 L 6.53 6.6 6.5 6.5 6.5 1109.2 650.1 1117.9 487.9 2.273 2.291 99.23 99.23
3 17+850 L 6.38 6.4 6.4 6.3 6.4 1097 601.7 1099.1 484.8 2.263 2.291 98.77 98.7712
4 17+900 L 6.03 6.0 6.0 6.0 6.1 1000.3 483.0 1010.9 442.0 2.263 2.291 98.78 98.78
5 17+950 L 8.00 8.0 8.0 8.0 8.0 1439.3 732.1 1447 634.5 2.268 2.291 99.01 99.01
6 18+000 L 7.85 7.9 7.8 7.9 7.8 1278 675.0 1285.8 563.5 2.268 2.291 98.99 98.99
7 18+050 L 6.03 6.1 6.0 6.0 6.0 1131 616.1 1138 498.5 2.269 2.291 99.03 99.030
8 18+100 R 7.23 7.1 7.2 7.4 7.2 793.3 437.2 1244.3 346.4 2.290 2.291 99.97 99.974
9 18 + 100 L 8.53 8.7 8.4 8.5 8.5 1520.5 437.2 1531.3 664.1 2.290 2.291 99.94 99.9432
10 18 + 100 R 6.60 6.6 6.6 6.6 6.6 1051.2 600.6 1059.7 459.1 2.290 2.291 99.94 99.9421

Notes : STATION HAMPARAN ( SEGMEN ) Gmb. Harian 2.2740 RATA-2 99.26 99.25605

17+ 760 s/d 18 + 064 Kiri (L )


10-May-20 18+ 028 s/d 18 + 200 Kanan( R ) 2.291
18 + 064 - 18 + 210 Kiri ( L)

Disetujui Diperiksa Dilaksanakan Oleh


Direksi PUPR Konsultan Supervisi Kontraktor Pelaksana
PPK. 2.4 PT. Surya Perkasa Raya J.O PT.Sinar Lima Putra

Muh.Ishak Burhan.ST Silvester Yones Trianto


( Pengawas Lab.Tek ) ( Material Teknisi) (Quality Control)
KETEBALAN DAN KEPADATAN HASIL CORE DRILL CAMPURAN BERASPAL

Pekerjaan : Preservasi Jalan Rate-rate (Bts.Kolaka Timur/Kab.Konawe) - Bts.Kota Unaaha


Kontraktor : PT.Sinar Lima Putra
Jenis : Ac -Wc lawele
Tanggal Uji : 26 januari s/d 27 Januari 2021

T.1 T.2 T.3 T.4 B.UDARA (gr) B. DALAM AIR (gr) B.SSD (gr) ISI (cc) DENSITY Lap (gr/cc) Gmb (gr/cc) % JSD
NO STA. POSISI TEBAL RATA2 Keterangan
cm cm cm cm A B C D= C-B E =A/D Rata2 harian f '=E/Gmbx100

1 4+750 R 4.33 4.3 4.4 4.3 4.3 621.7 359.7 631.7 272.0 2.286 2.290 99.82 99.82
2 4+800 R 4.78 4.7 4.8 4.8 4.8 650.9 376.1 660.6 284.5 2.288 2.290 99.90 99.9
3 4+850 R 3.88 3.8 3.8 3.9 4.0 562.3 325.9 571.6 245.7 2.288 2.290 99.93 99.93
4 4+900 R 4.60 4.5 4.5 4.7 4.7 640.1 377.7 657.5 279.8 2.288 2.290 99.91 99.91
5 4+950 R 4.25 4.2 4.3 4.2 4.3 621.7 359.6 630.8 271.2 2.292 2.290 100.10 100.1
6 4+982 R 5.20 5.2 5.2 5.2 5.2 717.7 410.5 724.3 313.8 2.287 2.290 99.87 99.87

Notes : STATION HAMPARAN ( SEGMEN ) Gmb. Harian 99.92 99.92166667

4 + 739 s/d 4 + 982 Kanan (R )


21-Jan-21 18+ 028 s/d 18 + 200 Kanan( R ) 2.290
18 + 064 - 18 + 210 Kiri ( L) 2.2900

Disetujui Diperiksa Dilaksanakan Oleh


Direksi PUPR Konsultan Supervisi Kontraktor Pelaksana
PPK. 2.4 PT. Surya Perkasa Raya J.O PT.Sinar Lima Putra

Muh.Ishak Saripuddin,ST Silvester Yones Trianto


( Pengawas Lab.Tek ) ( Material Teknisi) (Quality Control)