Anda di halaman 1dari 1

PEMERINTAH

KABUPATEN JOMBANG

Paving blok k 300 t=8cm Topi Uskup


KEGIATAN
Urugan tanah Bahu jalan

45.00

45.00 Urugan tanah Bahu jalan


Paving blok k 300 t=8cm Topi Uskup

LOKASI KEGIATAN

43.00 42.00

44.236

44.166

44.161

44.096

44.101

43.711

44.541

44.614

44.564

44.458

44.548

43.531
ELEVASI TANAH ASLI ELEVASI TANAH ASLI REVISI TGL TANDA TANGAN
ORIGINAL GROUND LEVEL ORIGINAL GROUND LEVEL

JARAK (m) 0.60


JARAK (m)

0.60
2.30 1.50 1.50 2.00 1.20 2.30 1.50 1.50 2.00 1.20
DISTANCE (m) DISTANCE (m)

CROSS SECTION STA 0+600 CROSS SECTION STA 0+700


SKALA 1:100 SKALA 1:100

Paving blok k 300 t=8cm Topi Uskup


Urugan tanah Bahu jalan

45.00
Paving blok k 300 t=8cm Topi Uskup
MENYETUJUI
Urugan tanah Bahu jalan

45.00

42.00 43.00
44.416

44.506

44.506

44.426

44.466

43.631

44.636

44.641

44.645

44.616

44.616

43.436
ELEVASI TANAH ASLI ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL ORIGINAL GROUND LEVEL

JARAK (m) JARAK (m)


0.60

0.60
2.30 1.50 1.50 2.00 1.20 2.30 1.50 1.50 2.00 1.20
DISTANCE (m) DISTANCE (m)
PERENCANA TEKNIK

CROSS SECTION STA 0+650 CROSS SECTION STA 0+750


SKALA 1:100 SKALA 1:100

JUDUL GAMBAR SKALA

JML. LEMBAR NO. LEMBAR KODE GAMBAR

07 05 A

Anda mungkin juga menyukai