PERHITUNGAN ANALISA TYPE KUSEN (SURO RAHMAD, ST)

PERLETAKAN KUSEN LANTAI SATU


NO TYPE KUSEN JUMLAH (UNIT) L x T = LUAS (M2) L + T = M1 KUSEN PINTU RUANG (UNIT) PINTU WC (UNIT) PINTU SHAFT (UNIT) PINTU TEMPERED CASEMENT (M2) L x T = M2 KACA PANIL ALUM COMPOSITE SUNGLASS GLASS BLOCK (BH) FOLDING
1 P1 1.00 3.780 - - - - 3.780 - - 6.400 2.160 - -
2 P2 1.00 2.662 5.360 2.448 - - - - - - - - -
3 P3 3.00 5.491 4.960 1.632 - - - - - - - - -
4 P4 3.00 4.555 4.810 - 1.326 - - - - - - 0.870 - -
5 PS 1.00 0.832 3.700 - - 0.684 - - - - - - - -
6 J1 12.00 40.435 12.240 - - - - 1.080 1.800 - - - - -
7 J2 - - 20.400 - - - - 1.080 5.800 - - - - -
8 J3 2.00 9.960 19.500 - - - - 1.620 2.700 - - - - -
9 J4 2.00 6.960 14.000 - - - - - 3.000 - - - - -
25.000 74.676 84.970

NO TYPE KUSEN PANJANG (M1) TINGGI PARTISI LUAS KUSEN (-) L x T = LUAS (M2)
1 PARTISI 7.000 3.200 2.662 19.738

TABEL INI LINK ANALISA (NO EDIT)………………………………..PERLETAKAN KUSEN LANTAI DUA


NO TYPE KUSEN JUMLAH (UNIT) L x T = LUAS (M2) L + T = M1 KUSEN PINTU RUANG (UNIT) PINTU WC (UNIT) PINTU SHAFT (UNIT) PINTU TEMPERED CASEMENT (M2) L x T = M2 KACA PANIL ALUM COMPOSITE SUNGLASS GLASS BLOCK (BH) FOLDING
1 P1 - - - - - - 3.780 - - 6.400 2.160 - -
2 P2 1.00 2.662 5.360 2.448 - - - - - - - - -
3 P3 - - 4.960 1.632 - - - - - - - - -
4 P4 2.00 3.037 4.810 - 1.326 - - - - - - 0.870 - -
5 PS 1.00 0.832 3.700 - - 0.684 - - - - - - - -
6 J1 13.00 43.805 12.240 - - - - 1.080 1.800 - - - - -
7 J2 1.00 7.696 20.400 - - - - 1.080 5.800 - - - - -
8 J3 - - 19.500 - - - - 1.620 2.700 - - - - -
9 J4 - - 14.000 - - - - - 3.000 - - - - -
18.000 58.032 84.970

NO TYPE KUSEN PANJANG (M1) TINGGI PARTISI LUAS KUSEN (-) L x T = LUAS (M2)
1 PARTISI 53.000 3.200 #DIV/0! #DIV/0!
KUSEN LUAR LUAS
-
-
-
-
-
-
-
-
-
-

KUSEN LUAR LUAS


-
-
-
-
-
-
-
-
-
-
PERHITUNGAN ANALISA KG BERAT BESI (SURO RAHMAD, ST)

DAFTAR KG BERAT BESI PER M1


Rumus : (Ø2 x 6165 x panjang)/1 jt FORMULA CATATAN

KODE DIA = BERAT 1M1 SAT BERAT 12 M1 SAT DIA PANJANG HOOK 4 X 2 = 8 CM
Ø 6 = 0.222 Kg/1 m1 2.663 Kg/12 m1 6 SELIMUT BETON 2 X 2 = 4 CM
Ø 8 = 0.395 Kg/1 m1 4.735 Kg/12 m1 8
D & Ø 10 = 0.617 Kg/1 m1 7.398 Kg/12 m1 10
D 12 = 0.888 Kg/1 m1 10.653 Kg/12 m1 12
D 13 = 1.042 Kg/1 m1 12.503 Kg/12 m1 13
D 16 = 1.578 Kg/1 m1 18.939 Kg/12 m1 16
D 19 = 2.226 Kg/1 m1 26.707 Kg/12 m1 19
D 22 = 2.984 Kg/1 m1 35.806 Kg/12 m1 22
D 25 = 3.853 Kg/1 m1 46.238 Kg/12 m1 25
D 28 = 4.833 Kg/1 m1 58.000 Kg/12 m1 28
D 32 = 6.313 Kg/1 m1 75.756 Kg/12 m1 32
D 36 = 7.990 Kg/1 m1 95.878 Kg/12 m1 36

TABEL KOLOM STRUKTUR ................................................. BEGISTING DIKANAN >>>>>>>>>>>>>

JUMLAH DALAM M3 JUMLAH BESI BERAT JUMLAH BEGISTING


NO KOLOM 30/30 TYPE K1 Ø BESI
M3 P L ATAU T JML / M3 Jml SAT JML BESI (M1) (KG) KOLOM DAN BALOK
KELILING SETENGAHNYA
DIMENSI M3 VOL M3 JML SAT
1 BESI POKOK D 16 10,000 30 30 = 11.111 x 4 M1 = 44.444 x 1.578 = 70.144 DIMENSI M2/M3
2 BESI EXTRA D 16 10,000 30 30 = 11.111 x 8 M1 = 88.889 x 1.578 = 140.288 1
M3 JML / M3 JARAK CINCIN P. Cincin = ### x ( 1 x 120 ) = 13.333 M2 6.667
3 BESI CINCIN Ø 10 10,000 11.111 12.500 = 0.889 x 112 M1 = 99.556 x 0.617 = 61.376 30 x 30 0.267 M3/T.2 0.133
JUMLAH = 271.808

JUMLAH DALAM M3 JUMLAH BESI BERAT JUMLAH BEGISTING


NO KOLOM 30/30 TYPE K2 Ø BESI
M3 P L ATAU T JML / M3 Jml SAT JML BESI (M1) (KG) KOLOM DAN BALOK
KELILING SETENGAHNYA
DIMENSI M3 VOL M3 JML SAT
1 BESI POKOK D 12 10,000 30 30 = 11.111 x 4 M1 = 44.444 x 0.888 = 39.456 DIMENSI M2/M3
2 BESI EXTRA D 12 10,000 30 30 = 11.111 x 4 M1 = 44.444 x 0.888 = 39.456 1
M3 JML / M3 JARAK CINCIN P. Cincin = ### x ( 1 x 120 ) = 13.333 M2 6.667
3 BESI CINCIN Ø 8 10,000 11.111 12.500 = 0.889 x 112 M1 = 99.556 x 0.395 = 39.281 30 x 30 0.267 M3/T.2 0.133
JUMLAH = 118.193

JUMLAH DALAM M3 JUMLAH BESI BERAT JUMLAH BEGISTING


NO KOLOM 10/30 TYPE K3 Ø BESI
M3 P L ATAU T JML / M3 Jml SAT JML BESI (M1) (KG) KOLOM DAN BALOK
KELILING SETENGAHNYA
DIMENSI M3 VOL M3 JML SAT
1 BESI POKOK D 12 10,000 10 30 = 33.333 x 4 M1 = 133.333 x 0.888 = 118.368 DIMENSI M2/M3
2 BESI EXTRA D 12 10,000 10 30 = 33.333 x 2 M1 = 66.667 x 0.888 = 59.184 1
M3 JML / M3 JARAK CINCIN P. Cincin = ### x ( 1 x 80 ) = 26.667 M2 13.333
3 BESI CINCIN Ø 8 10,000 33.333 12.500 = 2.667 x 72 M1 = 192.000 x 0.395 = 75.756 10 x 30 0.533 M3/T.2 0.267
JUMLAH = 253.308

JUMLAH DALAM M3 JUMLAH BESI BERAT JUMLAH BEGISTING


NO KOLOM 30/60 TYPE K4 Ø BESI
M3 P L ATAU T JML / M3 Jml SAT JML BESI (M1) (KG) KOLOM DAN BALOK
KELILING SETENGAHNYA
DIMENSI M3 VOL M3 JML SAT
1 BESI POKOK D 12 10,000 30 60 = 5.556 x 4 M1 = 22.222 x 0.888 = 19.728 DIMENSI M2/M3
2 BESI EXTRA D 12 10,000 30 60 = 5.556 x 10 M1 = 55.556 x 0.888 = 49.320 1
M3 JML / M3 JARAK CINCIN P. Cincin = ### x ( 1 x 180 ) = 10.000 M2 5.000
3 BESI CINCIN Ø 8 10,000 5.556 12.500 = 0.444 x 172 M1 = 76.444 x 0.395 = 30.162 30 x 60 0.200 M3/T.2 0.100
JUMLAH = 99.210
JUMLAH DALAM M3 JUMLAH BESI BERAT JUMLAH BEGISTING
NO KOLOM 30/30 TYPE K5 Ø BESI
M3 P L ATAU T JML / M3 Jml SAT JML BESI (M1) (KG) KOLOM DAN BALOK
KELILING SETENGAHNYA
DIMENSI M3 VOL M3 JML SAT
1 BESI POKOK D 16 10,000 30 30 = 11.111 x 4 M1 = 44.444 x 1.578 = 70.144 DIMENSI M2/M3
2 BESI EXTRA D 16 10,000 30 30 = 11.111 x 4 M1 = 44.444 x 1.578 = 70.144 1
M3
JML / M 3
JARAK CINCIN P. Cincin = ### x ( 1 x 120 ) = 13.333 M2 6.667
3 BESI CINCIN Ø 10 10,000 11.111 12.500 = 0.889 x 112 M1 = 99.556 x 0.617 = 61.376 30 x 30 0.267 M3/T.2 0.133
JUMLAH = 201.664

JUMLAH DALAM M3 JUMLAH BESI BERAT JUMLAH BEGISTING


NO KOLOM 10/10 Kp Ø BESI
M3 P L ATAU T JML / M3 Jml SAT JML BESI (M1) (KG) KOLOM DAN BALOK
KELILING SETENGAHNYA
DIMENSI M3 VOL M3 JML SAT
1 BESI POKOK D 8 10,000 10 10 = 100.000 x 4 M1 = 400.000 x 0.395 = 157.824 DIMENSI M2/M3
2 BESI EXTRA D 8 10,000 10 10 = 100.000 x 0 M1 = 0.000 x 0.395 = 0.000 1
M3
JML / M 3
JARAK CINCIN P. Cincin = ### x ( 1 x 20 ) = 20.000 M2 10.000
3 BESI CINCIN Ø 6 10,000 100.000 15.000 = 6.667 x 32 M1 = 213.333 x 0.222 = 47.347 10 x 10 0.400 M3/T.2 0.200
JUMLAH = 205.171
TABEL SLOOF ................................................. BEGISTING DIKANAN >>>>>>>>>>>>>

JUMLAH DALAM M3 JUMLAH BESI BERAT JUMLAH BEGISTING


NO SLOOF 25/35TYPE S1 Ø BESI
M3 P L ATAU T JML / M3 Jml SAT JML BESI (M1) (KG) KOLOM DAN BALOK
KELILING SETENGAHNYA
DIMENSI M3 VOL M3 JML SAT
1 BESI POKOK D 16 10,000 25 35 = 11.429 x 4 M1 = 45.714 x 1.578 = 72.148 DIMENSI M2/M3
2 BESI EXTRA D 16 10,000 25 35 = 11.429 x 6 M1 = 68.571 x 1.578 = 108.222 1
M3 JML / M3 JARAK CINCIN P. Cincin = ### x ( 1 x 70 ) = 8.000 M2 4.000
3 BESI CINCIN Ø 10 10,000 11.429 12.500 = 0.914 x 112 M1 = 102.400 x 0.617 = 63.130 25 x 35 0.160 M3/T.2 0.080
JUMLAH = 243.500

JUMLAH DALAM M3 JUMLAH BESI BERAT JUMLAH BEGISTING


NO SLOOF 15/35TYPE S2 Ø BESI
M3 P L ATAU T JML / M3 Jml SAT JML BESI (M1) (KG) KOLOM DAN BALOK
KELILING SETENGAHNYA
DIMENSI M3 VOL M3 JML SAT
1 BESI POKOK D 12 10,000 15 35 = 19.048 x 4 M1 = 76.190 x 0.888 = 67.639 DIMENSI M2/M3
2 BESI EXTRA D 12 10,000 15 35 = 19.048 x 2 M1 = 38.095 x 0.888 = 33.819 1
M3 JML / M3 JARAK CINCIN P. Cincin = ### x ( 1 x 70 ) = 13.333 M2 6.667
3 BESI CINCIN Ø 8 10,000 19.048 12.500 = 1.524 x 92 M1 = 140.190 x 0.395 = 55.314 15 x 35 0.267 M3/T.2 0.133
JUMLAH = 156.772

JUMLAH DALAM M3 JUMLAH BESI BERAT JUMLAH BEGISTING


NO SLOOF 25/35TYPE S3 Ø BESI
M3 P L ATAU T JML / M3 Jml SAT JML BESI (M1) (KG) KOLOM DAN BALOK
KELILING SETENGAHNYA
DIMENSI M3 VOL M3 JML SAT
1 BESI POKOK D 12 10,000 20 30 = 16.667 x 4 M1 = 66.667 x 0.888 = 59.184 DIMENSI M2/M3
2 BESI EXTRA D 12 10,000 20 30 = 16.667 x 6 M1 = 100.000 x 0.888 = 88.776 1
M3 JML / M3 JARAK CINCIN P. Cincin = ### x ( 1 x 60 ) = 10.000 M2 5.000
3 BESI CINCIN Ø 8 10,000 16.667 12.500 = 1.333 x 92 M1 = 122.667 x 0.395 = 48.399 20 x 30 0.200 M3/T.2 0.100
JUMLAH = 196.359

JUMLAH DALAM M3 JUMLAH BESI BERAT JUMLAH BEGISTING


NO SLOOF 15/35TYPE S4 Ø BESI
M3 P L ATAU T JML / M3 Jml SAT JML BESI (M1) (KG) KOLOM DAN BALOK
KELILING SETENGAHNYA
DIMENSI M3 VOL M3 JML SAT
1 BESI POKOK D 12 10,000 15 30 = 22.222 x 4 M1 = 88.889 x 0.888 = 78.912 DIMENSI M2/M3
2 BESI EXTRA D 12 10,000 15 30 = 22.222 x 2 M1 = 44.444 x 0.888 = 39.456 1
M3 JML / M3 JARAK CINCIN P. Cincin = ### x ( 1 x 60 ) = 13.333 M2 6.667
3 BESI CINCIN Ø 8 10,000 22.222 12.500 = 1.778 x 82 M1 = 145.778 x 0.395 = 57.518 15 x 30 0.267 M3/T.2 0.133
JUMLAH = 175.886

TABEL BALOK ................................................. BEGISTING DIKANAN >>>>>>>>>>>>>

JUMLAH DALAM M3 JUMLAH BESI BERAT JUMLAH BEGISTING


NO BALOK 25/50 TYPE B1 Ø BESI
M3 P L ATAU T JML / M3 Jml SAT JML BESI (M1) (KG) KOLOM DAN BALOK
KELILING SETENGAHNYA
DIMENSI M3 VOL M3 JML SAT
1 BESI POKOK D 16 10,000 25 50 = 8.000 x 4 M1 = 32.000 x 1.578 = 50.504 DIMENSI M2/M3
2 BESI EXTRA D 16 10,000 25 50 = 8.000 x 10 M1 = 80.000 x 1.578 = 126.259 1
M3 JML / M3 JARAK CINCIN P. Cincin = ### x ( 1 x 101 ) = 8.080 M2 4.040
3 BESI CINCIN Ø 10 10,000 8.000 12.500 = 0.640 x 142 M1 = 90.880 x 0.617 = 56.028 25 x 50 0.162 M3/T.2 0.081
JUMLAH = 232.790

JUMLAH DALAM M3 JUMLAH BESI BERAT JUMLAH BEGISTING


NO BALOK 25/35 TYPE B2 Ø BESI
M3 P L ATAU T JML / M3 Jml SAT JML BESI (M1) (KG) KOLOM DAN BALOK
KELILING SETENGAHNYA
DIMENSI M3 VOL M3 JML SAT
1 BESI POKOK D 16 10,000 25 35 = 11.429 x 4 M1 = 45.714 x 1.578 = 72.148 DIMENSI M2/M3
2 BESI EXTRA D 16 10,000 25 35 = 11.429 x 8 M1 = 91.429 x 1.578 = 144.296 1
M3 JML / M3 JARAK CINCIN P. Cincin = ### x ( 1 x 71 ) = 8.114 M2 4.057
3 BESI CINCIN Ø 10 10,000 11.429 12.500 = 0.914 x 112 M1 = 102.400 x 0.395 = 40.403 25 x 35 0.162 M3/T.2 0.081
JUMLAH = 256.847

JUMLAH DALAM M3 JUMLAH BESI BERAT JUMLAH BEGISTING


NO BALOK 20/30 TYPE B3 Ø BESI
M3 P L ATAU T JML / M3 Jml SAT JML BESI (M1) (KG) KOLOM DAN BALOK
KELILING SETENGAHNYA
DIMENSI M3 VOL M3 JML SAT
1 BESI POKOK D 12 10,000 20 30 = 16.667 x 4 M1 = 66.667 x 0.888 = 59.184 DIMENSI M2/M3
2 BESI EXTRA D 12 10,000 20 30 = 16.667 x 6 M1 = 100.000 x 0.888 = 88.776 1
M3 JML / M3 JARAK CINCIN P. Cincin = ### x ( 1 x 56 ) = 9.333 M2 4.667
3 BESI CINCIN Ø 8 10,000 16.667 12.500 = 1.333 x 92 M1 = 122.667 x 0.395 = 48.399 20 x 30 0.187 M3/T.2 0.093
JUMLAH = 196.359

JUMLAH DALAM M3 JUMLAH BESI BERAT JUMLAH BEGISTING


NO BALOK 15/25 TYPE B4 Ø BESI
M3 P L ATAU T JML / M3 Jml SAT JML BESI (M1) (KG) KOLOM DAN BALOK
KELILING SETENGAHNYA
DIMENSI M3 VOL M3 JML SAT
1 BESI POKOK D 12 10,000 15 25 = 26.667 x 4 M1 = 106.667 x 0.888 = 94.694 DIMENSI M2/M3
2 BESI EXTRA D 12 10,000 15 25 = 26.667 x 2 M1 = 53.333 x 0.888 = 47.347 1
M3 JML / M3 JARAK CINCIN P. Cincin = ### x ( 1 x 41 ) = 10.933 M2 5.467
3 BESI CINCIN Ø 8 10,000 26.667 12.500 = 2.133 x 72 M1 = 153.600 x 0.395 = 60.604 15 x 25 0.219 M3/T.2 0.109
JUMLAH = 202.646

JUMLAH DALAM M3 JUMLAH BESI BERAT JUMLAH BEGISTING


NO BALOK 10/15 TYPE B5 Ø BESI
M3 P L ATAU T JML / M3 Jml SAT JML BESI (M1) (KG) KOLOM DAN BALOK
KELILING SETENGAHNYA
DIMENSI M3 VOL M3 JML SAT
1 BESI POKOK Ø 8 10,000 10 15 = 66.667 x 4 M1 = 266.667 x 0.395 = 105.216 DIMENSI M2/M3
2 BESI EXTRA Ø 8 10,000 10 15 = 66.667 x 0 M1 = 0.000 x 0.395 = 0.000 1
M3 JML / M3 JARAK CINCIN P. Cincin = ### x ( 1 x 30 ) = 20.000 M2 10.000
3 BESI CINCIN Ø 6 10,000 66.667 12.500 = 5.333 x 42 M1 = 224.000 x 0.222 = 49.715 10 x 15 0.400 M3/T.2 0.200
JUMLAH = 154.931

JUMLAH DALAM M3 JUMLAH BESI BERAT JUMLAH BEGISTING


NO BALOK 20/30 TYPE B6 Ø BESI
M3 P L ATAU T JML / M3 Jml SAT JML BESI (M1) (KG) KOLOM DAN BALOK
KELILING SETENGAHNYA
DIMENSI M3 VOL M3 JML SAT
DIMENSI M3 VOL M3 JML SAT
1 BESI POKOK D 16 10,000 20 30 = 16.667 x 4 M1 = 66.667 x 1.578 = 105.216 DIMENSI M2/M3
2 BESI EXTRA D 16 10,000 20 30 = 16.667 x 4 M1 = 66.667 x 1.578 = 105.216 1
M3 JML / M3 JARAK CINCIN P. Cincin = ### x ( 1 x 56 ) = 9.333 M2 4.667
3 BESI CINCIN Ø 8 10,000 16.667 12.500 = 1.333 x 92 M1 = 122.667 x 0.395 = 48.399 20 x 30 0.187 M3/T.2 0.093
JUMLAH = 258.831

JUMLAH DALAM M3 JUMLAH BESI BERAT JUMLAH BEGISTING


NO BALOK 20/50 TYPE B7 Ø BESI
M3 P L ATAU T JML / M3 Jml SAT JML BESI (M1) (KG) KOLOM DAN BALOK
KELILING SETENGAHNYA
DIMENSI M3 VOL M3 JML SAT
1 BESI POKOK D 12 10,000 20 50 = 10.000 x 4 M1 = 40.000 x 0.888 = 35.510 DIMENSI M2/M3
2 BESI EXTRA D 12 10,000 20 50 = 10.000 x 10 M1 = 100.000 x 0.888 = 88.776 1
M3 JML / M3 JARAK CINCIN P. Cincin = ### x ( 1 x 96 ) = 9.600 M2 4.800
3 BESI CINCIN Ø 8 10,000 10.000 12.500 = 0.800 x 132 M1 = 105.600 x 0.395 = 41.666 20 x 50 0.192 M3/T.2 0.096
JUMLAH = 165.952

JUMLAH DALAM M3 JUMLAH BESI BERAT JUMLAH BEGISTING


NO BALOK 20/25 TYPE RB1 Ø BESI
M3 P L ATAU T JML / M3 Jml SAT JML BESI (M1) (KG) KOLOM DAN BALOK
KELILING SETENGAHNYA
DIMENSI M3 VOL M3 JML SAT
1 BESI POKOK D 16 10,000 20 25 = 20.000 x 4 M1 = 80.000 x 1.578 = 126.259 DIMENSI M2/M3
2 BESI EXTRA D 16 10,000 20 25 = 20.000 x 2 M1 = 40.000 x 1.578 = 63.130 1
M3 JML / M3 JARAK CINCIN P. Cincin = ### x ( 1 x 46 ) = 9.200 M2 4.600
3 BESI CINCIN Ø 8 10,000 20.000 12.500 = 1.600 x 82 M1 = 131.200 x 0.395 = 51.766 20 x 25 0.184 M3/T.2 0.092
JUMLAH = 241.155

JUMLAH DALAM M3 JUMLAH BESI BERAT JUMLAH BEGISTING


NO BALOK 15/25 TYPE RB2 Ø BESI
M3 P L ATAU T JML / M3 Jml SAT JML BESI (M1) (KG) KOLOM DAN BALOK
KELILING SETENGAHNYA
DIMENSI M3 VOL M3 JML SAT
1 BESI POKOK D 12 10,000 15 25 = 26.667 x 4 M1 = 106.667 x 0.888 = 94.694 DIMENSI M2/M3
2 BESI EXTRA D 12 10,000 15 25 = 26.667 x 0 M1 = 0.000 x 0.888 = 0.000 1
M3 JML / M3 JARAK CINCIN P. Cincin = ### x ( 1 x 41 ) = 10.933 M2 5.467
3 BESI CINCIN Ø 8 10,000 26.667 12.500 = 2.133 x 72 M1 = 153.600 x 0.395 = 60.604 15 x 25 0.219 M3/T.2 0.109
JUMLAH = 155.299

JUMLAH DALAM M3 JUMLAH BESI BERAT JUMLAH BEGISTING


NO BALOK 15/25 TYPE RB3 Ø BESI
M3 P L ATAU T JML / M3 Jml SAT JML BESI (M1) (KG) KOLOM DAN BALOK
KELILING SETENGAHNYA
DIMENSI M3 VOL M3 JML SAT
1 BESI POKOK D 16 10,000 15 25 = 26.667 x 4 M1 = 106.667 x 0.888 = 94.694 DIMENSI M2/M3
2 BESI EXTRA D 16 10,000 15 25 = 26.667 x 2 M1 = 53.333 x 0.888 = 47.347 1
M3 JML / M3 JARAK CINCIN P. Cincin = ### x ( 1 x 41 ) = 10.933 M2 5.467
3 BESI CINCIN Ø 8 10,000 26.667 12.500 = 2.133 x 72 M1 = 153.600 x 0.395 = 60.604 15 x 25 0.219 M3/T.2 0.109
JUMLAH = 202.646

JUMLAH DALAM M3 JUMLAH BESI BERAT JUMLAH BEGISTING


NO BALOK 15/20 TYPE RB4 Ø BESI
M3 P L ATAU T JML / M3 Jml SAT JML BESI (M1) (KG) KOLOM DAN BALOK
KELILING SETENGAHNYA
DIMENSI M3 VOL M3 JML SAT
1 BESI POKOK D 12 10,000 15 20 = 33.333 x 4 M1 = 133.333 x 0.888 = 118.368 DIMENSI M2/M3
2 BESI EXTRA D 12 10,000 15 20 = 33.333 x 0 M1 = 0.000 x 0.888 = 0.000 1
M3 JML / M3 JARAK CINCIN P. Cincin = ### x ( 1 x 31 ) = 10.333 M2 5.167
3 BESI CINCIN Ø 8 10,000 33.333 12.500 = 2.667 x 62 M1 = 165.333 x 0.395 = 65.234 15 x 20 0.207 M3/T.2 0.103
JUMLAH = 183.602
TABEL PONDASI PLAT SETEMPAT ................................................. BEGISTING DIKANAN >>>>>>>>>>>>>

1 M3 PEMBESIAN DATAR PONDASI PLAT SETEMPAT (2 LAPIS)PERSEGI KUBUS P1 banyak lapis


JUMLAH DALAM M3 ARAH HORIZONTAL (X) JUMLAH BESI BERAT JUMLAH BEGISTING
NO PONDASI T.P1 DIAMETER BESI
M2 JARAK START 0 ARAH X (M1) JML BARIS +1 SAT JML BTG 12 M1 BESI 1 M1 (KG) PONDASI
TEBAL CM 30 L LUAS SETENGAHNYA
DIMENSI M3 VOL M3 JML SAT
TEBAL M2 3600 BESI ATAS (BA) 12 10 1 = 12 x 13.000 BTG M1 = 31.096 x 0.888 = 27.606 KELILING M2/M3
120
AUTOCAD BA 124 BESI BAWAH (BB) 16 10 1 = 12 x 13.000 BTG M1 = 44.136 x 1.578 = 69.657 1
AUTOCAD BB 176
VOLUME JUMLAH DALAM M3 ARAH VERTICAL (Y) JUMLAH BESI BERAT = ### x ( 1.0 x 1728000 ) = 3.333 M2 1.667
1M3
10000 23.148148148148 M2 JARAK START 0 ARAH Y (M1) M2 SAT JML BESI 14400 x 3600 0.067 M3/T.2 0.033
P
SETEMPAT 432 BESI ATAS (BA) 12 10 1 = 12 x 13.000 BTG M1 = 31.096 x 0.888 = 27.606
120
AUTOCAD BA 124 BESI BAWAH (BB) 16 10 1 = 12 x 13.000 BTG M1 = 44.136 x 1.578 = 69.657
AUTOCAD BB 176
CEX (HARUS = 432 ) = 432 Ok! JUMLAH = 194.525

1 M3 PEMBESIAN DATAR PONDASI PLAT SETEMPAT (2 LAPIS)PERSEGI KUBUS P2 banyak lapis


JUMLAH DALAM M3 ARAH HORIZONTAL (X) JUMLAH BESI BERAT JUMLAH BEGISTING
NO PONDASI T.P1 DIAMETER BESI
M2 JARAK START 0 ARAH X (M1) JML BARIS +1 SAT JML BTG 12 M1 BESI 1 M1 (KG) PONDASI
TEBAL CM 30 L LUAS SETENGAHNYA
DIMENSI M3 VOL M3 JML SAT
TEBAL M2 3600 BESI ATAS (BA) 12 10 1 = 12 x 13.000 BTG M1 = 31.096 x 0.888 = 27.606 KELILING M2/M3
120
AUTOCAD BA 124 BESI BAWAH (BB) 16 10 1 = 12 x 13.000 BTG M1 = 44.136 x 1.578 = 69.657 1
AUTOCAD BB 176
VOLUME JUMLAH DALAM M3 ARAH VERTICAL (Y) JUMLAH BESI BERAT = ### x ( 1.0 x 1728000 ) = 3.333 M2 1.667
1M3
10000 23.148148148148 M2 JARAK START 0 ARAH Y (M1) M2 SAT JML BESI 14400 x 3600 0.067 M3/T.2 0.033
P
SETEMPAT 432 BESI ATAS (BA) 12 10 1 = 12 x 13.000 BTG M1 = 31.096 x 0.888 = 27.606
120
AUTOCAD BA 124 BESI BAWAH (BB) 16 10 1 = 12 x 13.000 BTG M1 = 44.136 x 1.578 = 69.657
AUTOCAD BB 176
CEX (HARUS = 432 ) = 432 Ok! JUMLAH = 194.525

1 M3 PEMBESIAN DATAR PONDASI PLAT SETEMPAT (2 LAPIS)PERSEGI KUBUS P1A banyak lapis
JUMLAH DALAM M3 ARAH HORIZONTAL (X) JUMLAH BESI BERAT JUMLAH BEGISTING
NO PONDASI T.P1 DIAMETER BESI
M2 JARAK START 0 ARAH X (M1) JML BARIS +1 SAT JML BTG 12 M1 BESI 1 M1 (KG) PONDASI
TEBAL CM 20 L LUAS SETENGAHNYA
DIMENSI M3 VOL M3 JML SAT
TEBAL M2 2000 BESI ATAS (BA) 12 10 1 = 10 x 11.000 BTG M1 = 47.667 x 0.888 = 42.317 KELILING M2/M3
100
AUTOCAD BA 104 BESI BAWAH (BB) 12 10 1 = 10 x 11.000 BTG M1 = 71.500 x 0.888 = 63.475 1
AUTOCAD BB 156
VOLUME JUMLAH DALAM M3 ARAH VERTICAL (Y) JUMLAH BESI BERAT = ### x ( 1.0 x 800000 ) = 4.000 M2 2.000
1M3
10000 50.000000000000 M2 JARAK START 0 ARAH Y (M1) M2 SAT JML BESI 10000 x 2000 0.080 M3/T.2 0.040
P
SETEMPAT 200 BESI ATAS (BA) 12 10 1 = 10 x 11.000 BTG M1 = 47.667 x 0.888 = 42.317
100
AUTOCAD BA 104 BESI BAWAH (BB) 12 10 1 = 10 x 11.000 BTG M1 = 62.333 x 0.888 = 55.337
AUTOCAD BB 136
CEX (HARUS = 200 ) = 200 Ok! JUMLAH = 203.445

1 M3 PEMBESIAN DATAR PONDASI PLAT MENERUS(2 LAPIS)PERSEGI PANJANG banyak lapis


JUMLAH DALAM M3 ARAH HORIZONTAL (X) JUMLAH BESI BERAT JUMLAH BEGISTING
NO PONDASI PM DIAMETER BESI
M2 JARAK START 0 ARAH X (M1) JML BARIS +1 SAT JML BTG 12 M1 BESI 1 M1 (KG) PONDASI
L LUAS SETENGAHNYA
DIMENSI M3 VOL M3 JML SAT
1 TEBAL M2 3000 BESI ATAS (BA) 12 10 1 = 14 x 15.000 BTG M1 = 30.357 x 0.888 = 26.950 KELILING M2/M3
140
AUTOCAD BA 204 BESI BAWAH (BB) 16 10 1 = 14 x 15.000 BTG M1 = 41.071 x 1.578 = 64.821 1
AUTOCAD BB 276
VOLUME JUMLAH DALAM M3 ARAH VERTICAL (Y) JUMLAH BESI BERAT = ### x ( 1.0 x 840000 ) = 1.429 M2 0.714
1M3
10000 11.904761904762 M2 JARAK START 0 ARAH Y (M1) M2 SAT JML BESI 19600 x 3000 0.029 M3/T.2 0.014
P DIBAGI 2 SISI
MENERUS 420 BESI ATAS (BA) 12 10 1 = 14 x 15.000 BTG M1 = 20.833 x 0.888 = 18.495
140
AUTOCAD BA 140 BESI BAWAH (BB) 16 10 1 = 14 x 15.000 BTG M1 = 20.833 x 1.578 = 32.880
AUTOCAD BB 140
CEX (HARUS = 420 ) = 420 Ok! JUMLAH = 143.145

TABEL PLAT BETON LANTAI PEMBESIAN KROMO 1/4 L ................................................. BEGISTING DIKANAN >>>>>>>>>>>>>

1 M3 PEMBESIAN DATAR (2 LAPIS) banyak lapis


JUMLAH DALAM M3 ARAH HORIZONTAL (X) JUMLAH BESI BERAT JUMLAH BEGISTING
NO PLAT BETON DIAMETER BESI
M2 JARAK START 0 ARAH X (M1) JML BARIS +1 SAT JML BTG 12 M1 BESI 12 M1 (KG) PLAT BETON
KELILING SETENGAHNYA
DIMENSI M3 VOL M3 JML SAT
1 TEBAL 12 BESI ATAS 10 25 1 = 8.3333333 x 34.333 BTG M1 = 2.861 x 7.398 = 21.167 DIMENSI M2/M3
100
BESI BAWAH 10 25 1 = 8.3333333 x 34.333 BTG M1 = 2.861 x 7.398 = 21.167 1
JUMLAH DALAM M3 ARAH VERTICAL (Y) JUMLAH BESI BERAT = ### x ( 1 x 1 ) = 8.333 M2 4.167
M2 JARAK START 0 ARAH Y (M1) M2 SAT JML BESI 1 x 12 0.167 M3/T.2 0.083

25 1 = 1 x 5.000 BTG M1 = 3.472 x 7.398 = 25.688


100
25 1 = 1 x 5.000 BTG M1 = 3.472 x 7.398 = 25.688
CEX (HARUS 100) = 100 Ok! JUMLAH = 93.708
JUMLAH DALAM M3 ARAH VERTICAL (X) JUMLAH BESI BERAT
M2 JARAK START 0 ARAH Y (M1) M2 SAT JML BESI

BESI ATAS 10 100 12.5 1 = 8.3333333 x 67.667 BTG M1 = 5.639 x 7.398 = 41.717
JUMLAH DALAM M3 ARAH VERTICAL (Y) JUMLAH BESI BERAT
M2 JARAK START 0 ARAH Y (M1) M2 SAT JML BESI

BESI BAWAH 10 100 12.5 1 = 1 x 9.000 BTG M1 = 6.250 x 7.398 = 46.238


Ok! JUMLAH = 87.954
CEX (HARUS 100) = 100 Ok! JUMLAH = 136.247
TABEL PLAT BETON LANTAI PEMBESIAN WIREMESH MANUAL ................................................. BEGISTING DIKANAN >>>>>>>>>>>>>

1 M3 PEMBESIAN DATAR (2 LAPIS) banyak lapis


JUMLAH DALAM M3 ARAH HORIZONTAL (X) JUMLAH BESI BERAT JUMLAH BEGISTING
NO PLAT BETON DIAMETER BESI
M2 JARAK START 0 ARAH X (M1) JML BARIS +1 SAT JML BTG 12 M1 BESI 12 M1 (KG) PLAT BETON
KELILING SETENGAHNYA
DIMENSI M3 VOL M3 JML SAT
1 TEBAL 12 BESI ATAS 10 20 1 = 8.3333333 x 42.667 BTG M1 = 3.556 x 7.398 = 26.304 DIMENSI M2/M3
100
BESI BAWAH 10 20 1 = 8.3333333 x 42.667 BTG M1 = 3.556 x 7.398 = 26.304 1
JUMLAH DALAM M3 ARAH VERTICAL (Y) JUMLAH BESI BERAT = ### x ( 1 x 1 ) = 8.333 M2 4.167
M2 JARAK START 0 ARAH Y (M1) M2 SAT JML BESI 1 x 12 0.167 M3/T.2 0.083

20 1 = 1 x 6.000 BTG M1 = 4.167 x 7.398 = 30.825


100
20 1 = 1 x 6.000 BTG M1 = 4.167 x 7.398 = 30.825
CEX (HARUS 100) = 100 Ok! JUMLAH = 114.258

TABEL PLAT BETON LANTAI BASEMENT PEMBESIAN WIREMESH MANUAL ................................................. BEGISTING DIKANAN >>>>>>>>>>>>>

1 M3 PEMBESIAN DATAR (1 LAPIS) banyak lapis


JUMLAH DALAM M3 ARAH HORIZONTAL (X) JUMLAH BESI BERAT JUMLAH BEGISTING
NO PLAT BETON DIAMETER BESI
M2 JARAK START 0 ARAH X (M1) JML BARIS +1 SAT JML BTG 12 M1 BESI 12 M1 (KG) PLAT BETON
KELILING SETENGAHNYA
DIMENSI M3 VOL M3 JML SAT
1 TEBAL 10 BESI 1 LAPIS 10 15 1 = 10 x 67.667 BTG M1 = 5.639 x 7.398 = 41.717 DIMENSI M2/M3
100
1
JUMLAH DALAM M3 ARAH VERTICAL (Y) JUMLAH BESI BERAT = ### x ( 1 x 1 ) = 20.000 M2 10.000
M2 JARAK START 0 ARAH Y (M1) M2 SAT JML BESI 1 x 10 0.400 M3/T.2 0.200

15 1 = 1 x 7.667 BTG M1 = 6.389 x 7.398 = 47.265


100

CEX (HARUS 100) = 100 Ok! JUMLAH = 88.982


TABEL PLAT BETON LISTPLANK ................................................. BEGISTING DIKANAN >>>>>>>>>>>>>

1 M3 PEMBESIAN DATAR (1 LAPIS) banyak lapis


JUMLAH DALAM M3 ARAH HORIZONTAL (X) JUMLAH BESI BERAT JUMLAH BEGISTING
NO PLAT BETON DIAMETER BESI
M2 JARAK START 0 ARAH X (M1) JML BARIS +1 SAT JML BTG 12 M1 BESI 12 M1 (KG) PLAT BETON
KELILING SETENGAHNYA
DIMENSI M3 VOL M3 JML SAT
1 TEBAL 12 BESI 1 LAPIS 10 15 1 = 8.3333333 x 56.556 BTG M1 = 4.713 x 7.398 = 34.867 DIMENSI M2/M3
100
1
JUMLAH DALAM M3 ARAH VERTICAL (Y) JUMLAH BESI BERAT = ### x ( 1 x 1 ) = 8.333 M2 4.167
M2 JARAK START 0 ARAH Y (M1) M2 SAT JML BESI 1 x 12 0.167 M3/T.2 0.083
Untuk Dua Lapis Begisiting >>>16.667 M2
15 1 = 1 x 7.667 BTG M1 = 5.324 x 7.398 = 39.388
100

CEX (HARUS 100) = 100 Ok! JUMLAH = 74.254

TABEL PLAT BETON CANOPY ................................................. BEGISTING DIKANAN >>>>>>>>>>>>>

1 M3 PEMBESIAN DATAR (1 LAPIS) banyak lapis


JUMLAH DALAM M3 ARAH HORIZONTAL (X) JUMLAH BESI BERAT JUMLAH BEGISTING
NO PLAT BETON DIAMETER BESI
M2 JARAK START 0 ARAH X (M1) JML BARIS +1 SAT JML BTG 12 M1 BESI 12 M1 (KG) PLAT BETON
KELILING SETENGAHNYA
DIMENSI M3 VOL M3 JML SAT
1 TEBAL 10 BESI 1 LAPIS 10 15 1 = 10 x 67.667 BTG M1 = 5.639 x 7.398 = 41.717 DIMENSI M2/M3
100
1
JUMLAH DALAM M3 ARAH VERTICAL (Y) JUMLAH BESI BERAT = ### x ( 1 x 1 ) = 10.000 M2 5.000
M2 JARAK START 0 ARAH Y (M1) M2 SAT JML BESI 1 x 10 0.200 M3/T.2 0.100

15 1 = 1 x 7.667 BTG M1 = 6.389 x 7.398 = 47.265


100

CEX (HARUS 100) = 100 Ok! JUMLAH = 88.982

TABEL PLAT BETON GROUND TANK ................................................. BEGISTING DIKANAN >>>>>>>>>>>>>

1 M3 PEMBESIAN DATAR (2 LAPIS) banyak lapis


JUMLAH DALAM M3 ARAH HORIZONTAL (X) JUMLAH BESI BERAT JUMLAH BEGISTING
NO PLAT BETON DIAMETER BESI
M2 JARAK START 0 ARAH X (M1) JML BARIS +1 SAT JML BTG 12 M1 BESI 12 M1 (KG) PLAT BETON
KELILING SETENGAHNYA
DIMENSI M3 VOL M3 JML SAT
1 TEBAL 10 BESI ATAS 8 15 1 = 10 x 67.667 BTG M1 = 5.639 x 7.398 = 41.717 DIMENSI M2/M3
100
BESI BAWAH 8 15 1 = 10 x 67.667 BTG M1 = 5.639 x 7.398 = 0.000 1
JUMLAH DALAM M3 ARAH VERTICAL (Y) JUMLAH BESI BERAT = ### x ( 1 x 1 ) = 10.000 M2 5.000
M2 JARAK START 0 ARAH Y (M1) M2 SAT JML BESI 1 x 10 0.200 M3/T.2 0.100

15 1 = 1 x 7.667 BTG M1 = 6.389 x 7.398 = 47.265 Untuk Dua Lapis Begisiting >>>20.000 M2
100
15 1 = 1 x 7.667 BTG M1 = 6.389 x 7.398 = 0.000
CEX (HARUS 100) = 100 Ok! JUMLAH = 88.982

TABEL PLAT BETON GROUND TANK ................................................. BEGISTING DIKANAN >>>>>>>>>>>>>

1 M3 PEMBESIAN DATAR (2 LAPIS) banyak lapis


JUMLAH DALAM M3 ARAH HORIZONTAL (X) JUMLAH BESI BERAT JUMLAH BEGISTING
NO PLAT BETON DIAMETER BESI
M2 JARAK START 0 ARAH X (M1) JML BARIS +1 SAT JML BTG 12 M1 BESI 12 M1 (KG) PLAT BETON
KELILING SETENGAHNYA
DIMENSI M3 VOL M3 JML SAT
1 TEBAL 12 BESI ATAS 10 15 1 = 8.3333333 x 56.556 BTG M1 = 4.713 x 7.398 = 34.867 DIMENSI M2/M3
100
BESI BAWAH 10 15 1 = 8.3333333 x 56.556 BTG M1 = 4.713 x 7.398 = 0.000 1
JUMLAH DALAM M3 ARAH VERTICAL (Y) JUMLAH BESI BERAT = ### x ( 1 x 1 ) = 8.333 M2 4.167
M2 JARAK START 0 ARAH Y (M1) M2 SAT JML BESI 1 x 12 0.167 M3/T.2 0.083

15 1 = 1 x 7.667 BTG M1 = 5.324 x 7.398 = 39.388 Untuk Dua Lapis Begisiting >>>16.667 M2
100
15 1 = 1 x 7.667 BTG M1 = 5.324 x 7.398 = 0.000
CEX (HARUS 100) = 100 Ok! JUMLAH = 74.254

MANUAL CHECK KROMO


FAKULTAS TEKNIK
PROGRAM STUDI TEKNIK SIPIL
UNIVERSITAS BENGKULU
MANAJEMEN KONSTRUKSI
DAFTAR HARGA SATUAN BAHAN
KOMPLEKS PERUMAHAN GRIYA ASRI
PEKERJAAN : PEMBANGUNAN RUMAH REAL ESTATE
VOLUME : 180 m2
LOKASI : Jln. Danau Kel.Dusun Besar Kec.Singaran Pati Kota Bengkulu Provinsi Bengkulu
TAHUN ANGGARAN : 2020

NO URAIAN UPAH DAN BAHAN HARGA SATUAN SATUAN KETERANGAN


A UPAH TENAGA KERJA
1 Pekerja Rp. 98,000.00 OH Terampil
2 Tukang Rp. 150,000.00 OH Keahlian
3 Kepala Tukang Rp. 150,000.00 OH
4 Mandor Rp. 165,000.00 OH
B BAHAN PASANGAN
1 Semen PC Rp. 1,200.00 Kg
2 Semen warna Rp. 3,500.00 Kg
3 Batu kali Rp. 225,000.00 M3
4 Batu kerikil/koral Rp. 225,000.00 M3
5 Bata Pecah 2-3 cm Rp. 400,000.00 Bh
6 Bata Pecah 1-2 cm Rp. 400,000.00 Bh
7 Bata merah standar Rp. 550.00 Bh 5,5 x 11 x 22 cm
8 Bata merah lokal Rp. 600.00 Bh 4 x 9 x 18 cm
9 Bata merah bolong Rp. 800.00 Bh 11 x 11 x 22 cm
10 Pasir pasang Rp. 250,000.00 M3
11 Pasir urug Rp. 195,000.00 M3
12 Tanah Urug Rp. 200,000.00 M3
13 Air kerja Rp. 150.00 Ltr
C BAHAN KAYU
1 Kayu kelas II Rp. 3,100,000.00 M3
2 Kayu Balok 5/7 Rp. 2,000,000.00 M3
3 Kayu Papan 3/20 Rp. 2,000,000.00 M3
4 Kayu kelas IV Rp. 2,000,000.00 M3
5 Plywood 9mm Rp. 135,000.00 Lbr
6 Kayu dolken dia 7cm Rp. 25,000.00 Btg
D BAHAN ATAP
1 Atap Seng Gelombang warna Rp. 48,000.00 M2
2 Genteng metal berpasir 0,25 mm Rp. 50,000.00 M2
3 Nok atas, nok samping dan wallflashing metal berpasir 0,25 mm Rp. 57,500.00 M1
4 Nok atas, nok samping dan wallflashing metal warna polos 0,25 mm Rp. 20,000.00 M1
5 Aluminium Plat 0,25 x 30 mm Rp. 50,000.00 M1
6 Alumunium Foil Rp. 45,000.00 M2
7 Listplank fiber semen 9 x 300 mm Rp. 35,000.00 M1
C BAHAN PLAFOND
1 Rangka hollow galvanis 40.40.2 mm Rp. 8,500.00 M1
2 Rangka hollow galvanis 20.40.2 mm Rp. 4,500.00 M1
3 Gypsum Board 9 mm Rp. 75,000.00 Lbr
4 List Gypsum 8 cm Rp. 25,000.00 Lbr
E BAHAN BESI, ALUMUNIUM DAN KACA
1 Besi beton Rp. 12,000.00 Kg SNI
2 Chanal zincalume C.75.75 mm Rp. 93,500.00 Btg
3 Reng zincalume R.32.45 mm Rp. 49,500.00 Btg
4 Dyna bold Rp. 4,500.00 Bh
5 Baut screw driver Rp. 500.00 Bh
6 Kawat beton Rp. 25,000.00 Kg
7 Paku 5-12 cm Rp. 16,500.00
8 Paku 2"-3" Rp. 16,000.00 Kg
9 Paku Skrup Rp. 30,000.00 Kg
10 Paku Campur Rp. 16,500.00 Kg
F BAHAN LANTAI
1 Keramik warna motif 30 x 30 cm Rp. 4,590.00 Buah ###
2 Keramik warna motif anti slip 30 x 30 cm Rp. 5,450.00 Buah ###
3 Keramik warna motif 40 x 40 cm Rp. 10,500.00 Buah ###
4 Keramik warna anti slip 40 x 40 cm Rp. 10,000.00 Buah ###
5 Keramik warna 60 x 60 cm Rp. 39,600.00 Buah ###
6 Granit warna 60 x 60 cm Rp. 60,000.00 Buah ###
G BAHAN PENGECATAN
1 Plamir tembok Rp. 25,000.00 Kg
2 Cat tembok Rp. 25,000.00 Kg
3 Dempul kayu Rp. 8,000.00 Kg
4 Cat minyak Rp. 60,000.00 Kg
5 Tinner A Rp. 20,000.00 Kg
6 Lem putih Rp. 17,500.00 Kg Setara FOX
7 Menie Rp. 29,000.00 Kg
8 Kuas cat 3" Rp. 7,000.00 Bh
9 Ampelas Rp. 7,500.00 Lbr
NO URAIAN UPAH DAN BAHAN HARGA SATUAN SATUAN KETERANGAN
10 Minyak bekisting Rp. 7,500.00 L
NO URAIAN UPAH DAN BAHAN HARGA SATUAN SATUAN KETERANGAN
H BAHAN KUNCI DAN ASESOREIS
1 Kunci Silinder Stainless Steell Rp. 225,000.00 /Bh
2 Kunci Tanam Pintu 2 Slaag Rp. 154,000.00 /Bh
3 Kunci Tanam Pintu 1 Slaag Rp. 165,000.00 /Bh
4 Kunci Tik-Tak Aluminium Warna Coklat Rp. 5,000.00 /Bh
5 Engsel Pintu Kupu-kupu Rp. 35,000.00 /Bh
6 Engsel Jendela Kupu-kupu Rp. 11,000.00 /Bh
7 Grendel Pintu Rp. 24,200.00 /Bh
8 Grendel Jendela Rp. 10,000.00 /Bh
9 Grendel Ram Buncis Jendela Rp. 50,000.00 /Bh
10 Handle Jendela Rp. 8,200.00 /Bh
11 Handle Pintu Stainless Steell Rp. 175,000.00 /Bh
12 Hak Angin Jendela Rp. 10,000.00 /Bh
13 Door closer Rp. 250,000.00 /Bh
14 Floor Hing Rp. 1,500,000.00 /Bh
I BAHAN INTALASI LISTRIK
1 Box Panel MCB Group 5 - 6 Group Rp. 1,000,000.00 Unit
2 Instalasi Listrik Titik Api Induk Kabel NYA 1 x 4 mm Dan Pertak Kabel NYA 1 x 2,5 mm Rp. 225,000.00 Titik
3 Instalasi Listrik Titik Api AC (Kabel NYM 2 x 2,5 mm) Rp. 275,000.00 Titik
4 Fitting Down Light 5" + Bola Lampu SL 23 Watt Rp. 200,000.00 Unit
5 Fitting Outbow Box + Bola Lampu SL 23 Watt Rp. 185,000.00 Unit
6 Spotlight 8 Watt Rp. 125,000.00 Bh
7 Saklar Ganda Rp. 25,000.00 Bh Setara Broco
8 Saklar Tunggal Rp. 25,000.00 Bh Setara Broco
9 Saklar Triple Rp. 25,000.00 Bh Setara Broco
10 Stop Kontak Rp. 25,000.00 Bh Setara Broco
11 Stop AC Rp. 85,000.00 Bh
I BAHAN SANITASI/PLUMBING
1 Klosed Duduk Porselin Rp. 2,500,000.00 /Bh Setara KIA
2 Klosed Jongkok Porselin Rp. 510,000.00 /Bh Setara KIA
3 Saringan Air/Floor Drain Rp. 10,000.00 /Bh Plastik
4 Kran Air Plastik Rp. 25,000.00 /Bh Plastik
5 Selang Jet Washer Rp. 185,000.00 /Bh
6 Kran Air Wash Sink (Leher Angsa) Rp. 290,000.00 /Bh Stainlees Stell
7 Kran Air Washtafel Rp. 135,000.00 /Bh Stainlees Stell
8 Wash Sink Rp. 650,000.00 /Bh Stainlees Stell
9 Washtafel Rp. 1,331,700.00 /Bh Porselin
10 Soap Holder Tabung Rp. 250,000.00 /Bh Porselin
11 Tempat Sabun Rp. 50,000.00 /Bh Porselin
12 Tanki Air Fiber Glass 1000 Liter Rp. 1,700,000.00 Unit
13 Tanki Air Fiber Glass 500 Liter Rp. 1,437,500.00 /Bh Setara Excel
14 Seal tape Rp. 8,400.00 /Bh
15 Pipa PVC AW 1/2" Rp. 25,000.00 /Btg
16 Pipa PVC AW 3/4" Rp. 36,000.00 /Btg
17 Pipa PVC AW 2" Rp. 65,000.00 /Btg
18 Pipa PVC AW 3" Rp. 135,000.00 /Btg
19 Tower Besi L.40.40.4 mm Rp. 1,437,500.00 /M1
20 Jet Pump + Instalasi Listrik Setara Eterna 2 x 2,4 mm Rp. 3,220,000.00 Unit
21 Mesin Air + Instalasi Listrik Setara Eterna 2 x 2,4 mm Rp. 1,035,000.00 /Unit
I BAHAN KUSEN ALUMINIUM
1 Kusen Alluminium Warna Original 3" Rp. 100,000.00 /M1 Setara Hape
2 Kusen Alluminium Warna Coklat 3" Rp. 125,000.00 /M1 Setara Hape
3 Kusen Alluminium Warna Coklat 4" Rp. 224,000.00 /M1 Setara Hape
4 Bingkai profil alluminium Warna Coklat + Karet Sielent Rp. 42,500.00 /M1
5 Bingkai Casement Profil Alluminium Warna Coklat + Karet Sielent Rp. 67,500.00 /M1
6 Profil Kaca Warna Coklat Rp. 7,500.00 /M1
7 Daun Pintu Tempered 90 x 210 x 12 mm + Pengunci Rp. 3,000,000.00 /M2
8 Skrup fixer Rp. 7,500.00 /Bh
9 Karet Sielent Rp. 4,100.00 /M1
10 Sielent Rp. 55,000.00 /tube
11 Sun Glass Type 4 Kotak Rp. 122,400.00 /M1
12 Sun Glass Type Buram Gelap Rp. 93,600.00 /M1
13 Kaca Rayben 5 mm Rp. 165,000.00 /M2 Setara Asahi
14 Kaca Bening Screen Glass 5 mm Rp. 145,000.00 /M2 Setara Asahi
15 Composite Panel 4 mm + Rangka Hollow Zincalume Rp. 900,000.00 /M2

PEKERJAAN
VOLUME
LOKASI
TAHUN ANGGARAN

ANALISA
1

A.2.2.1.19

A.2.3.1.11

A.2.3.1.11

A.2.3.1.2

A.2.3.1.9

A.2.3.1.15

A.3.2.1.2
NOMOR
2

D
E
F

D
E
F

D
E
F

D
E
F

D
E
F

D
E
F
:
:
:
:
90 m2

Paku 2"-3"
Kayu Papan 3/20

PERALATAN

Jumlah (A+B+C)
Overhead & Profit ( 15 %)

BAHAN

PERALATAN

Jumlah (A+B+C)
Overhead & Profit ( 15 %)
3

Pembersihan 1 m2 lapangan dan perataan


TENAGA
Pekerja
Pekerja

Harga Satuan Pekerjaan (D+E)

Harga Satuan Pekerjaan (D+E)

BAHAN
Pasir urug

PERALATAN

Jumlah (A+B+C)
Overhead & Profit ( 15 %)
Harga Satuan Pekerjaan (D+E)

Harga Satuan Pekerjaan (D+E)


Pengurugan kembali 1 M3 galian tanah
TENAGA
Pekerja
Mandor

BAHAN

PERALATAN

Jumlah (A+B+C)
Overhead & Profit ( 15 %)
Harga Satuan Pekerjaan (D+E)
Urugan Tanah dari Luar Lokasi
TENAGA
Pekerja
Mandor

BAHAN
Tanah urug

PERALATAN

Jumlah (A+B+C)
Overhead & Profit ( 15 %)
Harga Satuan Pekerjaan (D+E)

TENAGA
Pekerja
Tukang
Kepala Tukang
Mandor

BAHAN
Batu kali
Semen PC
Pasir Pasang

PERALATAN

Jumlah (A+B+C)
Overhead & Profit ( 15 %)
FAKULTAS TEKNIK
PROGRAM STUDI TEKNIK SIPIL
UNIVERSITAS BENGKULU
MANAJEMEN KONSTRUKSI

ANALISIS HARGA SATUAN PEKERJAAN (AHSP) SNI

KOMPLEKS PERUMAHAN JANABIJANA


PEMBANGUNAN RUMAH REAL ESTATE

Jln. Semarak Kel. Bentiring Kec. Muara Bangkahulu Kota Bengkulu Prov. Bengkulu (Utara Kota BKL)
2020

URAIAN

Pengukuran dan pemasangan 1 m’ Bouwplank


TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

BAHAN
Kayu Balok 5/7
KODE
4
A.2.2.1 HARGA SATUAN PEKERJAAN PERSIAPAN

L.01
L.04

L.01
L.02
L.03
L.04

A.2.3.1 HARGA SATUAN PEKERJAAN TANAH


Pengurugan 1 M3 dengan Pasir Urug
TENAGA
Pekerja
Mandor

Penggalian Tanah Biasa m3 sedalam 2 Meter


TENAGA
Pekerja
Mandor
L.01
L.04

L.01
L.04

L.01
L.04

L.01
L.04

A.3.2.1 HARGA SATUAN PEKERJAAN PONDASI


Pemasangan 1 M3 Pondasi Batu kali 1 SP : 4 PP

Harga Satuan Pekerjaan (D+E)


L.01
L.02
L.03
L.04
SATUAN
5

OH
OH

OH
OH
OH
OH

OH
OH

OH
OH

OH
OH

OH
OH

OH
OH
OH
OH

M3
Kg
M3
KOEFISIEN
6

0.1000 Rp
0.0500 Rp

0.1000 Rp
0.1000 Rp
0.0100 Rp
0.0050 Rp

0.0120 Rp
0.0200 Rp
0.0070 Rp

0.0100 Rp

1.2000 Rp
HARGA SATUAN

JUMLAH UPAH KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT


7

98,000.00 Rp
150,000.00 Rp
JUMLAH UPAH KERJA

98,000.00
150,000.00
150,000.00
165,000.00
JUMLAH UPAH KERJA

2,000,000.00
16,000.00
2,000,000.00
JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

15% x Jumlah Harga (D)

0.3000 Rp

15% x Jumlah Harga (D)

0.5000 Rp
0.0500 Rp

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

15% x Jumlah Harga (D)

0.3000 Rp
0.0100 Rp

1.0000 Rp
JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

15% x Jumlah Harga (D)

1.5000 Rp
0.7500 Rp
0.0750 Rp
0.0750 Rp

1.2000 Rp
163.0000 Rp
0.5200 Rp
98,000.00
150,000.00
150,000.00
165,000.00
JUMLAH UPAH KERJA

225,000.00
1,200.00
250,000.00
JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

10% x Jumlah Harga (D)


Rp
Rp

98,000.00 Rp
165,000.00 Rp
JUMLAH UPAH KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

15% x Jumlah Harga (D)

0.9000 Rp
0.0450 Rp
Rp

195,000.00 Rp
Rp

98,000.00 Rp
165,000.00 Rp
Rp

98,000.00 Rp
165,000.00 Rp
JUMLAH UPAH KERJA Rp

98,000.00 Rp
165,000.00 Rp
JUMLAH UPAH KERJA Rp

200,000.00 Rp
Rp
JUMAH HARGA

Rp
Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp

Rp
Rp

Rp
Rp
Rp
Rp

Rp
Rp

Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp
8

9,800.00
7,500.00
17,300.00
17,300.00

9,800.00
15,000.00
1,500.00
825.00
27,125.00

24,000.00
320.00
14,000.00
38,320.00

-
65,445.00
9,816.75
75,261.75

29,400.00
1,650.00
31,050.00

234,000.00
234,000.00

-
265,050.00
39,757.50
304,807.50

88,200.00
7,425.00
95,625.00

-
-

-
-
-
95,625.00
14,343.75
109,968.75

49,000.00
8,250.00
57,250.00

-
57,250.00
8,587.50
65,837.50

29,400.00
1,650.00
31,050.00

200,000.00
200,000.00

-
231,050.00
34,657.50
265,707.50

147,000.00
112,500.00
11,250.00
12,375.00
283,125.00

270,000.00
195,600.00
130,000.00
595,600.00

-
878,725.00
87,872.50
966,597.50

ANALISA
A.3.2.1.9

A.4.1.1.7

A.4.1.1.17

A.4.1.1.20
NOMOR

D
E
F

D
E
F

D
E
F
G

D
E
F
Tukang
Kepala Tukang
Mandor

BAHAN
Batu kali
Pasir Urug

PERALATAN

Jumlah (A+B+C)
Overhead & Profit ( 15 %)

TENAGA
Pekerja
Tukang
Kepala Tukang
Mandor

BAHAN
Semen PC
Pasir Pasang/Beton
Batu Pecah 2-3 cm
Air

PERALATAN

Jumlah (A+B+C)
Overhead & Profit ( 15 %)
URAIAN
Pemasangan 1 M3 Batu Kosong (anstamping)
TENAGA
Pekerja

Harga Satuan Pekerjaan (D+E)

Harga Satuan Pekerjaan (D+E)


Pembesian 10 Kg dengan besi polos
TENAGA
Pekerja
Tukang
Kepala Tukang
Mandor

BAHAN
Besi beton (polos/ulir)
Kawat beton

PERALATAN

Jumlah (A+B+C)
Overhead & Profit ( 15 %)
Harga Satuan Pekerjaan (D+E)
Harga Satuan Pembesian Untuk 1 Kg
Pemasangan 1 M2 bekisting untuk Pondasi
TENAGA
Pekerja
Tukang
Kepala Tukang
Mandor

BAHAN
Kayu kelas IV
Paku 5 cm – 12 cm
Minyak bekisting

PERALATAN

Jumlah (A+B+C)
Overhead & Profit (Contoh 15 %)
Harga Satuan Pekerjaan (D+E)
KODE

L.01
L.02
L.03
L.04

A.4.1.1 HARGA SATUAN PEKERJAAN BETON


Membuat 1 M3 beton mutu f’c = 19,3 MPa (K 225 )

L.01
L.02
L.03
L.04

L.01
L.02
L.03
L.04

L.01
L.02
L.03
L.04
SATUAN

OH
OH
OH
OH

M3
M3

OH
OH
OH
OH

Kg
M3
M3
Liter

OH
OH
OH
OH

Kg
Kg

OH
OH
OH
OH

M3
Kg
Liter
KOEFISIEN

0.7800 Rp
0.3900 Rp
0.0390 Rp
0.0390 Rp

1.2000 Rp
0.4320 Rp

1.6500 Rp
0.2750 Rp
0.0280 Rp
0.0830 Rp

371.0000 Rp
0.4986 Rp
0.7756 Rp
215.0000 Rp

0.0700 Rp
0.0700 Rp
0.0070 Rp
0.0040 Rp
HARGA SATUAN

JUMLAH UPAH KERJA

10.5000 Rp
0.1500 Rp

0.5200 Rp
0.2600 Rp
0.0260 Rp
0.0260 Rp

0.0400 Rp
0.3000 Rp
0.1000 Rp
98,000.00
150,000.00
150,000.00
165,000.00
JUMLAH UPAH KERJA

225,000.00 Rp
195,000.00 Rp
JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

15% x Jumlah Harga (D)

98,000.00
150,000.00
150,000.00
165,000.00
JUMLAH UPAH KERJA

1,200.00
250,000.00
400,000.00

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT


150.00

15% x Jumlah Harga (D)

98,000.00
150,000.00
150,000.00
165,000.00
Rp

12,000.00 Rp
25,000.00 Rp
JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

15% x Jumlah Harga (D)

98,000.00
150,000.00
150,000.00
165,000.00
JUMLAH UPAH KERJA

2,000,000.00

JUMLAH HARGA ALAT


16,500.00

JUMLAH HARGA BAHAN


7,500.00

15% x Jumlah Harga (D)


Rp
JUMAH HARGA

Rp
Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp
76,440.00
58,500.00
5,850.00
6,435.00
147,225.00

270,000.00
84,240.00
354,240.00

-
501,465.00
75,219.75
576,684.75

161,700.00
41,250.00
4,200.00
13,695.00
220,845.00

445,200.00
124,642.86
310,222.22
32,250.00
912,315.08

-
1,133,160.08
113,316.01
1,246,476.09

6,860.00
10,500.00
1,050.00
660.00
19,070.00

126,000.00
3,750.00
129,750.00

-
148,820.00
14,882.00
163,702.00
16,370.20

50,960.00
39,000.00
3,900.00
4,290.00
98,150.00

80,000.00
4,950.00
750.00
85,700.00

-
183,850.00
27,577.50
211,427.50
 ANALISA
AHPS-A.4.1.1.21

A.4.1.1.22

A.4.1.1.23

A.4.1.1.24

A.4.1.1.26

A.4.1.1.37.a

A.4.1.1.38.a

A.4.1.1.39.a

A.4.1.1.39.b
NOMOR

D
E
F

D
E
F

D
E
F

D
E
F

D
E
F

A
B
C

A
B
C

A
B
C

A
B
C
Tukang
Kepala Tukang
Mandor

BAHAN
Kayu kelas IV
Paku 5 cm – 12 cm
Minyak bekisting

PERALATAN

Jumlah (A+B+C)

Kayu balok kelas IV


Plywood tebal 9 mm
Dolken kayu 7-9 mm

PERALATAN

Jumlah (A+B+C)
URAIAN
Pemasangan 1 M2 bekisting untuk Sloof
TENAGA
Pekerja

Overhead & Profit (Contoh 15 %)


Harga Satuan Pekerjaan (D+E)
Pemasangan 1 M2 bekisting untuk Kolom
TENAGA
Pekerja
Tukang
Kepala Tukang
Mandor

BAHAN
Kayu kelas IV
Paku 5 cm – 12 cm
Minyak bekisting

Overhead & Profit (Contoh 15 %)


Harga Satuan Pekerjaan (D+E)
Pemasangan 1 m2 bekisting untuk balok
TENAGA
Pekerja
Tukang
Kepala Tukang
Mandor

BAHAN
Kayu kelas IV
Paku 5 cm – 12 cm
Minyak bekisting
Kayu balok kelas IV
Plywood tebal 9 mm
Dolken kayu 7-9 mm

PERALATAN

Jumlah (A+B+C)
Overhead & Profit (Contoh 15 %)
Harga Satuan Pekerjaan (D+E)
Pemasangan 1 M2 bekisting untuk Lantai
TENAGA
Pekerja
Tukang
Kepala Tukang
Mandor

BAHAN
Kayu kelas IV
Paku 5 cm – 12 cm
Minyak bekisting
Kayu balok kelas IV
Plywood tebal 9 mm
Dolken kayu 7-9 mm

PERALATAN

Jumlah (A+B+C)
Overhead & Profit (Contoh 15 %)
Harga Satuan Pekerjaan (D+E)
Pemasangan 1 M2 bekisting untuk Tangga
TENAGA
Pekerja
Tukang
Kepala Tukang
Mandor

BAHAN
Kayu kelas IV
Paku 5 cm – 12 cm
Minyak bekisting
Kayu balok kelas IV
Plywood tebal 9 mm
Dolken kayu 7-9 mm

PERALATAN

Jumlah (A+B+C)
Overhead & Profit (Contoh 15 %)
Harga Satuan Pekerjaan (D+E)
Membuat Beton Pondasi Plat Setempat Type P1
Beton 1 : 2 : 3 (AHPS-A.4.1.1.7)
KODE

L.01
L.02
L.03
L.04

L.01
L.02
L.03
L.04

L.01
L.02
L.03
L.04

L.01
L.02
L.03
L.04

L.01
L.02
L.03
L.04

Pembesian bawah D 16 - 10 cm + atas D 16 - 15 cm (AHPS-A.4.1.1.17)


Begisting + perancah (AHPS-A.4.1.1.20)

Membuat Beton Sloof 20/40


Beton 1 : 2 : 3 (AHPS-A.4.1.1.7)
Pembesian 1 , 6 Ø 12 cincin Ø 8 - 10 cm (AHPS-A.4.1.1.17)
Begisting + perancah (AHPS-A.4.1.1.21)

Membuat Beton Kolom 30/30


Beton 1 : 2 : 3 (AHPS-A.4.1.1.7)
Pembesian 8 Ø 12 , cincin Ø 8 - 10 cm (AHPS-A.4.1.1.17)
Begisting + perancah (AHPS-A.4.1.1.22)

Membuat Beton Kolom 15/15


Beton 1 : 2 : 3 (AHPS-A.4.1.1.7)
Pembesian 4 Ø 12 , cincin Ø8 - 15 cm (AHPS-A.4.1.1.17)
Begisting + perancah (AHPS-A.4.1.1.22)
SATUAN

OH
OH
OH
OH

M3
Kg
Liter

OH
OH
OH
OH

M3
Kg
Liter
M3
Lembar
Batang

OH
OH
OH
OH

M3
Kg
Liter
M3
Lembar
Batang

OH
OH
OH
OH

M3
Kg
Liter
M3
Lembar
Batang

OH
OH
OH
OH

M3
Kg
Liter
M3
Lembar
Batang

M3
Kg
M2

M3
Kg
M2

M3
Kg
M2

M3
Kg
M2
KOEFISIEN

0.5200 Rp
0.2600 Rp
0.0260 Rp
0.0260 Rp

0.0450 Rp
0.3000 Rp
0.1000 Rp

0.0150 Rp
0.3500 Rp
2.0000 Rp

0.6600 Rp
0.3300 Rp
0.0330 Rp
0.0330 Rp

0.0400 Rp
0.4000 Rp
0.2000 Rp
0.0150 Rp
0.3500 Rp
6.0000 Rp
HARGA SATUAN

JUMLAH HARGA ALAT

JUMLAH HARGA ALAT

0.0330 Rp

0.0400 Rp
0.4000 Rp
0.2000 Rp
0.0180 Rp
0.3500 Rp
2.0000 Rp

JUMLAH HARGA ALAT

0.3300 Rp
0.0330 Rp
0.0330 Rp

0.0300 Rp
0.4000 Rp
0.1500 Rp
0.0150 Rp
0.3500 Rp
2.0000 Rp

JUMLAH HARGA ALAT

JUMLAH (A+B+C)

1.0000 Rp
121.0300 Rp
5.0000 Rp
JUMLAH (A+B+C)

1.0000 Rp
152.0500 Rp
3.3300 Rp
JUMLAH (A+B+C)

1.0000 Rp
195.1500 Rp
6.6600 Rp
98,000.00
150,000.00
150,000.00
165,000.00
JUMLAH UPAH KERJA

2,000,000.00
16,500.00

JUMLAH HARGA BAHAN


7,500.00

15% x Jumlah Harga (D)

0.6600 Rp
0.3300 Rp
0.0330 Rp
0.0330 Rp

0.0400 Rp
0.4000 Rp
0.2000 Rp
98,000.00
150,000.00
150,000.00
165,000.00
JUMLAH UPAH KERJA

2,000,000.00
16,500.00
7,500.00
2,000,000.00
135,000.00
25,000.00
JUMLAH HARGA BAHAN

15% x Jumlah Harga (D)

0.6600 Rp
0.3300 Rp
0.0330 Rp
98,000.00
150,000.00
150,000.00
165,000.00
JUMLAH UPAH KERJA

2,000,000.00
16,500.00
7,500.00
2,000,000.00
135,000.00

JUMLAH HARGA ALAT


25,000.00
JUMLAH HARGA BAHAN

15% x Jumlah Harga (D)

98,000.00
150,000.00
150,000.00
165,000.00
JUMLAH UPAH KERJA

2,000,000.00
16,500.00
7,500.00
2,000,000.00
135,000.00
25,000.00
JUMLAH HARGA BAHAN

15% x Jumlah Harga (D)

0.6600 Rp 98,000.00
150,000.00
150,000.00
165,000.00
JUMLAH UPAH KERJA

2,000,000.00
16,500.00
7,500.00
2,000,000.00
135,000.00
25,000.00
JUMLAH HARGA BAHAN

15% x Jumlah Harga (D)

1.0000 Rp
250.3160 Rp
3.8700 Rp
Rp
Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp

1,246,476.09 Rp
16,370.20 Rp
95,700.00 Rp
Rp

1,246,476.09 Rp
16,370.20 Rp
222,927.50 Rp
Rp

1,246,476.09 Rp
16,370.20 Rp
373,917.50 Rp
Rp
JUMAH HARGA

1,246,476.09 Rp
16,370.20 Rp
373,917.50 Rp
50,960.00
39,000.00
3,900.00
4,290.00
98,150.00

90,000.00
4,950.00
750.00
95,700.00

-
193,850.00
29,077.50
222,927.50

64,680.00
49,500.00
4,950.00
5,445.00
124,575.00

80,000.00
6,600.00
1,500.00
30,000.00
47,250.00
50,000.00
215,350.00

-
339,925.00
33,992.50
373,917.50

64,680.00
49,500.00
4,950.00
5,445.00
124,575.00

80,000.00
6,600.00
1,500.00
36,000.00
47,250.00
50,000.00
221,350.00

-
345,925.00
34,592.50
380,517.50

64,680.00
49,500.00
4,950.00
5,445.00
124,575.00

80,000.00
6,600.00
1,500.00
30,000.00
47,250.00
150,000.00
315,350.00

-
439,925.00
65,988.75
505,913.75

64,680.00
49,500.00
4,950.00
5,445.00
124,575.00

60,000.00
6,600.00
1,125.00
30,000.00
47,250.00
50,000.00
194,975.00

-
319,550.00
47,932.50
367,482.50

1,246,476.09
4,097,722.98
370,359.00
5,714,558.07

1,246,476.09
1,981,285.31
1,114,637.50
4,342,398.89

1,246,476.09
2,489,088.91
1,245,145.28
4,980,710.27

1,246,476.09
3,194,644.53
2,490,290.55
 ANALISA NOMOR URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN
JUMLAH (A+B+C)
JUMAH HARGA
Rp 6,931,411.17
 ANALISA
A.4.1.1.40.a

A.4.1.1.40.b

A.4.1.1.40.c

A.4.1.1.41.a

A.4.1.1.41.b

A.4.1.1.42.c

A.4.1.1.42.d

A.4.2.1.18

A.4.4.1.7
NOMOR

A
B
C

A
B
C

A
B
C

A
B
C

A
B
C

A
B
C

A
B
C

D
E
F

D
E
F
Membuat Beton Balok 20/30
URAIAN

Beton 1 : 2 : 3 (AHPS-A.4.1.1.7)
Pembesian 6 Ø 12 , cincin Ø 8- 10 cm (AHPS-A.4.1.1.17)
Begisting + perancah (AHPS-A.4.1.1.23)

Membuat Beton Balok 15/15


Beton 1 : 2 : 3 (AHPS-A.4.1.1.7)
Pembesian 4 Ø 12 , cincin Ø 8- 15 cm (AHPS-A.4.1.1.17)
Begisting + perancah (AHPS-A.4.1.1.23)

Membuat Beton Balok 15/20


Beton 1 : 2 : 3 (AHPS-A.4.1.1.7)
Pembesian 4 Ø 12 , cincin Ø 8- 15 cm (AHPS-A.4.1.1.17)
Begisting + perancah (AHPS-A.4.1.1.23)

Beton 1 : 2 : 3 (AHPS-A.4.1.1.7)
Pembesian Ø 10 - 12,5/25 cm (AHPS-A.4.1.1.17)
Begisting + perancah (AHPS-A.4.1.1.24)

Begisting + perancah (AHPS-A.4.1.1.26)

Tukang
Kepala tukang
Mandor

BAHAN
Seng pelat
KODE SATUAN

A.4.2.1 HARGA SATUAN PEKERJAAN BESI DAN ALUMUNIUM


Pemasangan 1 m’ talang datar/ jurai seng bjls 28 lebar 90 cm
TENAGA
Pekerja

Papan Kayu Kelas II atau III


Paku 1-2,5 cm

PERALATAN

Jumlah (A+B+C)
Overhead & Profit ( 15 %)
Harga Satuan Pekerjaan (D+E)

TENAGA
Pekerja
Tukang
Kepala Tukang
Mandor

BAHAN
Batu Bata Merah
Semen PC
Pasir Pasang

PERALATAN

Jumlah (A+B+C)
Overhead & Profit ( 15 %)
L.01
L.03
L.11
L.15
OH
OH
OH
OH
M3
Kg
M2

M3
Kg
M2

M3
Kg
M2

Membuat Beton Plat Lantai Tebal 12 cm, Pembesian Kromo Manual Dua Lapis

M2

M1
m3
kg

A.4.4.1 HARGA SATUAN PEKERJAAN PASANGAN DINDING


Pemasangan 1 M2 dinding bata merah tebal 1/2 bata adukan 1 SP : 2 PP

Harga Satuan Pekerjaan (D+E)


L.01
L.03
L.03
L.04
OH
OH
OH
OH

M2
Kg
M3
M3
Kg
M2

Membuat Beton Plat Canopy Tebal 10 cm, Pembesian Wiremesh Manual Satu Lapis
Beton 1 : 2 : 3 (AHPS-A.4.1.1.7)
Pembesian Ø 10 - 15 cm (AHPS-A.4.1.1.17)
Begisting + perancah (AHPS-A.4.1.1.24)
M3
Kg
M2

Membuat Beton Plat Tangga Tebal 12 cm, Pembesian Wiremesh Manual Dua Lapis
Beton 1 : 2 : 3 (AHPS-A.4.1.1.7)
Pembesian Ø 10 - 15 cm (AHPS-A.4.1.1.17)
Begisting + perancah (AHPS-A.4.1.1.26)

Membuat Beton Tangga


Beton 1 : 2 : 3 (AHPS-A.4.1.1.7)
Pembesian Ø 10 - 15 cm (AHPS-A.4.1.1.17)
M3
Kg
M2

M3
Kg
KOEFISIEN

1.0000 Rp
109.0300 Rp
4.9800 Rp

216.9890 Rp
6.6600 Rp

1.0000 Rp
136.2465 Rp
8.3333 Rp

4.5990 Rp
HARGA SATUAN

JUMLAH (A+B+C)

1.0000 Rp

JUMLAH (A+B+C)

1.0000 Rp
176.4600 Rp
6.6600 Rp
JUMLAH (A+B+C)

JUMLAH (A+B+C)

1.0000 Rp
88.9815 Rp
10.0000 Rp
JUMLAH (A+B+C)

1.0000 Rp
114.2580 Rp
8.3333 Rp
JUMLAH (A+B+C)

1.0000 Rp
56.8500 Rp

JUMLAH (A+B+C)

0.2000 Rp
0.2000 Rp
0.0200 Rp
0.0010 Rp
1,246,476.09 Rp

JUMLAH UPAH KERJA

1.0500 Rp
0.0190 Rp
0.0150 Rp

JUMLAH HARGA ALAT

0.3000 Rp
0.0100 Rp
0.0100 Rp
0.0150 Rp

1.0000 Rp
18.9500 Rp
0.0380 Rp
16,370.20 Rp
380,517.50 Rp
Rp

1,246,476.09 Rp
16,370.20 Rp
380,517.50 Rp
Rp

1,246,476.09 Rp
16,370.20 Rp
380,517.50 Rp
Rp

1,246,476.09 Rp
16,370.20 Rp
505,913.75 Rp
Rp

1,246,476.09 Rp
16,370.20 Rp
505,913.75 Rp
Rp

1,246,476.09 Rp
16,370.20 Rp
367,482.50 Rp
Rp

1,246,476.09 Rp
16,370.20 Rp
367,482.50 Rp

98,000.00
150,000.00
150,000.00
165,000.00

35,000.00
3,100,000.00
20,000.00
JUMLAH HARGA BAHAN

15% x Jumlah Harga (D)

98,000.00
150,000.00
150,000.00
165,000.00
JUMLAH UPAH KERJA

45,650.00
1,200.00
250,000.00
JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

15% x Jumlah Harga (D)


Rp
JUMAH HARGA

Rp
Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp

Rp
Rp
Rp
1,246,476.09
1,784,842.91
1,894,977.15
4,926,296.14

1,246,476.09
3,552,153.33
2,534,246.55
7,332,875.97

1,246,476.09
2,888,685.49
2,534,246.55
6,669,408.13

1,246,476.09
2,230,382.45
4,215,947.92
7,692,806.46

1,246,476.09
1,456,644.95
5,059,137.50
7,762,258.54

1,246,476.09
1,870,426.31
3,062,354.17
6,179,256.57

1,246,476.09
930,645.87
1,690,052.02
3,867,173.97

19,600.00
30,000.00
3,000.00
165.00
52,765.00

36,750.00
58,900.00
300.00
95,950.00

-
148,715.00
22,307.25
171,022.25

29,400.00
1,500.00
1,500.00
2,475.00
34,875.00

45,650.00
22,740.00
9,500.00
77,890.00

112,765.00
16,914.75
129,679.75
 ANALISA
A.4.4.1.9

A.4.4.2.2

A.4.4.2.4

A.4.4.2.30
NOMOR

D
E
F

D
E
F

D
E
F

D
E
F
Tukang
Kepala Tukang
Mandor

BAHAN
Batu Bata Merah
Semen PC
Pasir Pasang

PERALATAN

Jumlah (A+B+C)
Overhead & Profit ( 15 %)

Overhead & Profit ( 15 %)


URAIAN

Harga Satuan Pekerjaan (D+E)

Tukang
Kepala Tukang
Mandor

BAHAN
Semen PC
Pasir Pasang

PERALATAN

Jumlah (A+B+C)

Harga Satuan Pekerjaan (D+E)


Pemasangan 1 M2 plesteran 1 SP : 4 PP tebal 15 mm
TENAGA
Pekerja
Tukang
Kepala Tukang
Mandor

BAHAN
Semen PC
Pasir Pasang

PERALATAN

Jumlah (A+B+C)
Overhead & Profit ( 15 %)
Harga Satuan Pekerjaan (D+E)
Pemasangan 1 M2 plesteran 1 SP : 2 PP tebal 75 mm
TENAGA
Pekerja
Tukang
Kepala Tukang
Mandor

BAHAN
Semen PC
Pasir pasang

PERALATAN

Jumlah (A+B+C)
Overhead & Profit ( 15 %)
Harga Satuan Pekerjaan (D+E)
KODE
Pemasangan 1 M2 dinding bata merah tebal 1/2 bata adukan 1 SP : 4 PP
TENAGA
Pekerja L.01
L.03
L.03
L.04

AHSP A.4.4.2 HARGA SATUAN PEKERJAAN PLESTERAN


Pemasangan 1 M2 plesteran 1 SP : 2 PP tebal 15 mm
TENAGA
Pekerja L.01
L.03
L.03
L.04

L.01
L.03
L.03
L.04

L.01
L.03
L.03
L.04
OH
OH
OH
OH
SATUAN

OH
OH
OH
OH

M2
Kg
M3

Kg
M3

OH
OH
OH
OH

Kg
M3

OH
OH
OH
OH

Kg
M3
KOEFISIEN

0.3000 Rp
0.0100 Rp
0.0100 Rp
0.0150 Rp

1.0000 Rp
11.5000 Rp
0.0430 Rp
HARGA SATUAN

98,000.00
150,000.00
150,000.00
165,000.00
JUMLAH UPAH KERJA

45,650.00
1,200.00
250,000.00
JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

15% x Jumlah Harga (D)

0.3000 Rp
0.1500 Rp
0.0150 Rp
0.0150 Rp

10.2240 Rp
0.0200 Rp
98,000.00
150,000.00
150,000.00
165,000.00
JUMLAH UPAH KERJA

1,200.00 Rp
250,000.00 Rp
JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

15% x Jumlah Harga (D)

0.3000 Rp
0.1500 Rp
0.0150 Rp
0.0150 Rp

6.2400 Rp
0.0240 Rp

0.2000 Rp
0.1000 Rp
0.0100 Rp
0.0100 Rp
JUMLAH UPAH KERJA

50.0000 Rp
0.1000 Rp

JUMLAH HARGA ALAT


98,000.00
150,000.00
150,000.00
165,000.00
JUMLAH UPAH KERJA
Rp

1,200.00 Rp
250,000.00 Rp
JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

15% x Jumlah Harga (D)

98,000.00
150,000.00
150,000.00
165,000.00
Rp

1,200.00 Rp
250,000.00 Rp
JUMLAH HARGA BAHAN

15% x Jumlah Harga (D)


Rp
JUMAH HARGA

Rp
Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp

Rp
Rp
Rp

Rp
Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp
29,400.00
1,500.00
1,500.00
2,475.00
34,875.00

45,650.00
13,800.00
10,750.00
70,200.00

105,075.00
10,507.50
115,582.50

29,400.00
22,500.00
2,250.00
2,475.00
56,625.00

12,268.80
5,000.00
17,268.80

-
73,893.80
11,084.07
84,977.87

29,400.00
22,500.00
2,250.00
2,475.00
56,625.00

7,488.00
6,000.00
13,488.00

-
70,113.00
7,011.30
77,124.30

19,600.00
15,000.00
1,500.00
1,650.00
37,750.00

60,000.00
25,000.00
23,250.00

-
61,000.00
9,150.00
70,150.00
 ANALISA

A.4.4.3.35.a

A.4.4.3.35.b

A.4.4.3.35.c
NOMOR

D
E
F

D
E
F

D
E
F
TENAGA
Pekerja
Tukang
Kepala tukang
Mandor

BAHAN
Keramik 30 x 30 cm
Semen PC
Pasir pasang
Semen warna

PERALATAN

Jumlah (A+B+C)
Overhead & Profit ( 15 %)

BAHAN
Keramik 30 x 30 cm
Semen PC
Pasir pasang
Semen warna

PERALATAN

Jumlah (A+B+C)
Overhead & Profit ( 15 %)
URAIAN

Harga Satuan Pekerjaan (D+E)

Harga Satuan Pekerjaan (D+E)


Pemasangan 1M2 lantai keramik warna motif ukuran 40cm x 40cm
TENAGA
Pekerja
Tukang
Kepala tukang
Mandor

BAHAN
Keramik 40 x 40 cm
Semen PC
Pasir pasang
Semen warna

PERALATAN

Jumlah (A+B+C)
Overhead & Profit ( 15 %)
Harga Satuan Pekerjaan (D+E)
KODE

L.02
L.03
L.04

Pemasangan 1M2 lantai keramik warna anti slip ukuran 30cm x 30cm
TENAGA
Pekerja
Tukang
Kepala tukang
Mandor
L.01
L.02
L.03
L.04

L.01
L.02
L.03
L.04
SATUAN KOEFISIEN HARGA SATUAN
A.4.4.3 HARGA SATUAN PEKERJAAN PENUTUP LANTAI DAN PENUTUP
DINDING
Pemasangan 1M2 lantai keramik warna motif ukuran 30cm x 30cm

L.01 OH
OH
OH
OH

Bh
Kg
M3
Kg

OH
OH
OH
OH

Bh
Kg
M3
Kg

OH
OH
OH
OH

Bh
Kg
M3
Kg
0.7000 Rp
0.3500 Rp
0.0350 Rp
0.0350 Rp
JUMLAH UPAH KERJA

11.1111 Rp
10.0000 Rp
0.0450 Rp
1.5000 Rp
JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

0.7000 Rp
0.3500 Rp
0.0350 Rp
0.0350 Rp
JUMLAH UPAH KERJA

11.1111 Rp
10.0000 Rp
0.0450 Rp
1.5000 Rp
JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

0.0350 Rp
0.0350 Rp
JUMLAH UPAH KERJA

6.2500 Rp
10.0000 Rp
0.0450 Rp
1.5000 Rp
JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT


98,000.00
150,000.00
150,000.00
165,000.00

4,590.00
1,200.00
250,000.00
3,500.00

15% x Jumlah Harga (D)

98,000.00
150,000.00
150,000.00
165,000.00

5,450.00
1,200.00
250,000.00
3,500.00

15% x Jumlah Harga (D)

0.7000 Rp
0.3500 Rp
98,000.00
150,000.00
150,000.00
165,000.00

10,500.00
1,200.00
250,000.00
3,500.00

15% x Jumlah Harga (D)


JUMAH HARGA

Rp
Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp
68,600.00
52,500.00
5,250.00
5,775.00
132,125.00

51,000.00
12,000.00
11,250.00
5,250.00
79,500.00

-
211,625.00
21,162.50
232,787.50

68,600.00
52,500.00
5,250.00
5,775.00
132,125.00

60,555.56
12,000.00
11,250.00
5,250.00
89,055.56

-
221,180.56
33,177.08
254,357.64

68,600.00
52,500.00
5,250.00
5,775.00
132,125.00

65,625.00
12,000.00
11,250.00
5,250.00
94,125.00

-
226,250.00
33,937.50
260,187.50
 ANALISA
A.4.4.3.35.d

A.4.4.3.35.e

A.4.4.3.35.f

A.4.4.3.39.a

A.4.4.3.53.a
NOMOR

D
E
F

D
E
F

D
E
F

D
E
F

D
E
F
Pekerja
Tukang
Kepala tukang
Mandor

BAHAN
Keramik 40 x 40 cm
Semen PC
Pasir pasang
Semen warna

PERALATAN

Jumlah (A+B+C)
Overhead & Profit ( 15 %)

Kepala tukang
Mandor

BAHAN
Keramik 60 x 60 cm
Semen PC
Pasir pasang
Semen warna

PERALATAN

Jumlah (A+B+C)
Overhead & Profit ( 15 %)

BAHAN
Granit 60 x 60 cm
Semen PC
Pasir pasang
Semen warna

PERALATAN

Jumlah (A+B+C)
Overhead & Profit ( 15 %)
URAIAN

Harga Satuan Pekerjaan (D+E)


Pemasangan 1M2 lantai keramik warna ukuran 60cm x 60cm
TENAGA
Pekerja
Tukang

Harga Satuan Pekerjaan (D+E)


Pemasangan 1M2 lantai granit warna ukuran 60cm x 60cm
TENAGA
Pekerja
Tukang
Kepala tukang
Mandor

Harga Satuan Pekerjaan (D+E)


Pemasangan 1 M1 plint keramik warna 10cm x 60cm
TENAGA
Pekerja
Tukang
Kepala tukang
Mandor

BAHAN
Keramik 10 x 60 cm
Semen PC
Pasir Pasang
Semen warna

PERALATAN

Jumlah (A+B+C)
Overhead & Profit ( 15 %)
Harga Satuan Pekerjaan (D+E)
Pemasangan 1 M2 dinding keramik warna motif 30cm x 30cm
TENAGA
Pekerja
Tukang
Kepala tukang
Mandor

BAHAN
Keramik 30 x 30 cm
Semen PC
Pasir Pasang
Semen warna

PERALATAN

Jumlah (A+B+C)
Overhead & Profit ( 15 %)
Harga Satuan Pekerjaan (D+E)
KODE
Pemasangan 1M2 lantai keramik warna anti slip ukuran 20cm x 25cm
TENAGA
L.01
L.02
L.03
L.04

L.01
L.02
L.03
L.04

L.01
L.02
L.03
L.04

L.01
L.02
L.03
L.04

L.01
L.02
L.03
L.04
SATUAN

OH
OH
OH
OH

Bh
Kg
M3
Kg

OH
OH
OH
OH

Bh
Kg
M3
Kg

OH
OH
OH
OH

Bh
Kg
M3
Kg

OH
OH
OH
OH

Bh
Kg
M3
Kg

OH
OH
OH
OH

Bh
Kg
M3
Kg
KOEFISIEN

0.7000 Rp
0.3500 Rp
0.0350 Rp
0.0350 Rp

10.0000 Rp
0.0450 Rp
1.5000 Rp

0.3500 Rp
0.0350 Rp
0.0350 Rp

2.7778 Rp
10.0000 Rp
0.0450 Rp
1.5000 Rp

2.7778 Rp
10.0000 Rp
0.0450 Rp
1.5000 Rp

0.0900 Rp
0.0900 Rp
0.0350 Rp
0.0050 Rp

JUMLAH BAHAN
HARGA SATUAN

JUMLAH HARGA ALAT


98,000.00
150,000.00
150,000.00
165,000.00
JUMLAH UPAH KERJA

20.0000 Rp 10,000.00
1,200.00
250,000.00
3,500.00
JUMLAH HARGA BAHAN

15% x Jumlah Harga (D)

0.7000 Rp 98,000.00
150,000.00
150,000.00
165,000.00
JUMLAH UPAH KERJA

39,600.00

JUMLAH HARGA ALAT


1,200.00
250,000.00
3,500.00
JUMLAH HARGA BAHAN

15% x Jumlah Harga (D)

0.7000 Rp
0.3500 Rp
0.0350 Rp
0.0350 Rp
98,000.00
150,000.00
150,000.00
165,000.00
JUMLAH UPAH KERJA

60,000.00

JUMLAH HARGA ALAT

JUMLAH UPAH KERJA

1.6667 Rp
5.3000 Rp
0.0030 Rp
0.0250 Rp

JUMLAH HARGA ALAT


1,200.00
250,000.00
3,500.00
JUMLAH HARGA BAHAN

10% x Jumlah Harga (D)

98,000.00
150,000.00
150,000.00
165,000.00

10,000.00
1,200.00
250,000.00
3,500.00

15% x Jumlah Harga (D)

0.9000 Rp
0.4500 Rp
0.0450 Rp
0.0450 Rp

11.1111 Rp
9.3000 Rp
0.0180 Rp
2.7500 Rp
JUMLAH BAHAN
98,000.00
150,000.00
150,000.00
165,000.00
JUMLAH UPAH KERJA

JUMLAH HARGA ALAT


5,450.00
1,200.00
250,000.00
3,500.00

15% x Jumlah Harga (D)


JUMAH HARGA

Rp
Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp
68,600.00
52,500.00
5,250.00
5,775.00
132,125.00

200,000.00
12,000.00
11,250.00
5,250.00
228,500.00

-
360,625.00
54,093.75
414,718.75

68,600.00
52,500.00
5,250.00
5,775.00
132,125.00

110,000.00
12,000.00
11,250.00
5,250.00
138,500.00

-
270,625.00
40,593.75
311,218.75

68,600.00
52,500.00
5,250.00
5,775.00
132,125.00

166,666.67
12,000.00
11,250.00
5,250.00
195,166.67

-
327,291.67
32,729.17
360,020.83

8,820.00
13,500.00
5,250.00
825.00
28,395.00

16,666.67
6,360.00
750.00
87.50
23,864.17

-
52,259.17
7,838.88
60,098.04

88,200.00
67,500.00
6,750.00
7,425.00
169,875.00

60,555.56
11,160.00
4,500.00
9,625.00
85,840.56

-
255,715.56
38,357.33
294,072.89
 ANALISA
A.4.4.3.53.b

A.4.4.3.53.c

A.4.4.3.53.d

A.4.4.3.58.a

AHPS-A.4.5.1.5.

AHPS-A.4.5.2.32.a

AHPS-A.4.5.2.23
NOMOR

D
E
F

D
E
F

D
E
F

D
E
F

D
E
F

D
E
F

B
Tukang
Kepala tukang
Mandor

BAHAN
Keramik 40 x 40 cm
Semen PC
Pasir Pasang
Semen warna

PERALATAN

Jumlah (A+B+C)
Overhead & Profit ( 15 %)

Semen PC
Pasir Pasang
Semen warna

PERALATAN

Jumlah (A+B+C)
Overhead & Profit ( 15 %)

Pekerja
Tukang
Kepala Tukang
Mandor

BAHAN
Batu tempel hitam
Semen PC
Pasir Pasang

PERALATAN

Jumlah (A+B+C)
Overhead & Profit ( 15 %)
URAIAN
Pemasangan 1 M2 dinding keramik warna motif 40cm x 40cm
TENAGA
Pekerja

Harga Satuan Pekerjaan (D+E)


Pemasangan 1 M2 dinding keramik warna motif 60cm x 60cm
TENAGA
Pekerja
Tukang
Kepala tukang
Mandor

BAHAN
Keramik 60 x 60 cm

Harga Satuan Pekerjaan (D+E)


Pemasangan 1 M2 dinding granit warna 60cm x 60cm
TENAGA
Pekerja
Tukang
Kepala tukang
Mandor

BAHAN
Granit 60 x 60 cm
Semen PC
Pasir Pasang
Semen warna

PERALATAN

Jumlah (A+B+C)
Overhead & Profit ( 15 %)
Harga Satuan Pekerjaan (D+E)
Pemasangan 1 m2 dinding batu tempel hitam (Batu Alam)
TENAGA

Harga Satuan Pekerjaan (D+E)

TENAGA
Pekerja
Tukang
Kepala tukang
Mandor

BAHAN
Gypsum board 9 mm
Paku skrup

PERALATAN

Jumlah (A+B+C)
Overhead & Profit ( 15 %)
Harga Satuan Pekerjaan (D+E)

TENAGA
Pekerja
Tukang
Kepala tukang
Mandor

BAHAN
multiroof 2 x 5
Paku skrup

PERALATAN

Jumlah (A+B+C)
Overhead & Profit ( 15 %)
KODE

L.01
L.02
L.03
L.04

L.01
L.02
L.03
L.04

L.01
L.02
L.03
L.04

L.01
L.02
L.03
L.04

A.4.5.1 HARGA SATUAN PEKERJAAN PLAFOND


Pemasangan 1 M2 Plafond Multipleks

L.01
L.02
L.03
L.04
SATUAN

OH
OH
OH
OH

Bh
Kg
M3
Kg

OH
OH
OH
OH

Bh
Kg
M3
Kg

OH
OH
OH
OH

Bh
Kg
M3
Kg

OH
OH
OH
OH

Buah
Kg
M3

OH
OH
OH
OH

M2
Kg

A.4.5.2 HARGA SATUAN PEKERJAAN PENUTUP ATAP


Pemasangan 1 M2 Atap MULTIROOF

Harga Satuan Pekerjaan (D+E)


Pemasangan 1 m’ bubung stel gelombang 1,05 m
TENAGA
Pekerja
Tukang
Kepala tukang
Mandor

BAHAN
Bubung stel. Gelombang
Paku Sekrup
L.01
L.03
L.11
L.15

L.01
L.03
L.11
L.15
OH
OH
OH
OH

lbr
Kg

OH
OH
OH
OH

Lbr
Bh
KOEFISIEN

0.9000 Rp
0.4500 Rp
0.0450 Rp
0.0450 Rp

6.2500 Rp
9.3000 Rp
0.0180 Rp
2.7500 Rp
JUMLAH BAHAN

2.7778 Rp
9.3000 Rp
0.0180 Rp
2.7500 Rp
JUMLAH BAHAN

0.7000 Rp
0.3500 Rp
0.0350 Rp
0.0350 Rp

0.0800 Rp
11.7500 Rp
0.0350 Rp
HARGA SATUAN

JUMLAH HARGA ALAT

0.9000 Rp
0.4500 Rp
0.0450 Rp
0.0450 Rp

JUMLAH HARGA ALAT

0.0450 Rp
0.0450 Rp

2.7778 Rp
9.3000 Rp
0.0180 Rp
2.7500 Rp
JUMLAH BAHAN
98,000.00
150,000.00
150,000.00
165,000.00
JUMLAH UPAH KERJA

10,500.00
1,200.00
250,000.00
3,500.00

15% x Jumlah Harga (D)

98,000.00
150,000.00
150,000.00
165,000.00
JUMLAH UPAH KERJA

39,600.00
1,200.00
250,000.00
3,500.00

15% x Jumlah Harga (D)

0.9000 Rp
0.4500 Rp
98,000.00
150,000.00
150,000.00
165,000.00
JUMLAH UPAH KERJA

JUMLAH HARGA ALAT


60,000.00
1,200.00
250,000.00
3,500.00

15% x Jumlah Harga (D)

98,000.00
150,000.00
150,000.00
165,000.00
JUMLAH UPAH KERJA

225,000.00
1,200.00
250,000.00
JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

10% x Jumlah Harga (D)

0.1000 Rp
0.0500 Rp
0.0050 Rp
0.0050 Rp

0.3640 Rp
0.1100 Rp
98,000.00
150,000.00
150,000.00
165,000.00
JUMLAH UPAH KERJA

75,000.00 Rp
30,000.00 Rp
JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

15% x Jumlah Harga (D)

0.2000 Rp
0.1000 Rp
0.0100 Rp
0.0010 Rp

2.65000 Rp
0.0700 Rp

JUMLAH HARGA ALAT


98,000.00
150,000.00
150,000.00
165,000.00
JUMLAH UPAH KERJA
Rp

96,500.00 Rp
30,000.00 Rp
JUMLAH HARGA BAHAN

10% x Jumlah Harga (D)

0.0840 Rp
0.1250 Rp
0.0130 Rp
0.0040 Rp
98,000.00
150,000.00
150,000.00
165,000.00
JUMLAH UPAH KERJA

2.1000 Rp
6.0000 Rp
45,000.00
Rp

30,000.00 Rp
JUMLAH HARGA BAHAN Rp
JUMAH HARGA

Rp
Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp
Rp
88,200.00
67,500.00
6,750.00
7,425.00
169,875.00

65,625.00
11,160.00
4,500.00
9,625.00
90,910.00

-
260,785.00
39,117.75
299,902.75

88,200.00
67,500.00
6,750.00
7,425.00
169,875.00

110,000.00
11,160.00
4,500.00
9,625.00
135,285.00

-
305,160.00
45,774.00
350,934.00

88,200.00
67,500.00
6,750.00
7,425.00
169,875.00

166,666.67
11,160.00
4,500.00
9,625.00
191,951.67

-
361,826.67
54,274.00
416,100.67

68,600.00
52,500.00
5,250.00
5,775.00
132,125.00

18,000.00
14,100.00
8,750.00
40,850.00

-
172,975.00
17,297.50
190,272.50

9,800.00
7,500.00
750.00
825.00
18,875.00

27,300.00
3,300.00
30,600.00

-
49,475.00
4,947.50
54,422.50

19,600.00
15,000.00
1,500.00
165.00
36,265.00

255,725.00
2,100.00
257,825.00

-
294,090.00
29,409.00
323,499.00

8,232.00
18,750.00
1,950.00
660.00
29,592.00

180,000.00
180,000.00
 ANALISA NOMOR
C

D
E
F
PERALATAN

Jumlah (A+B+C)
URAIAN

Overhead & Profit ( 15 %)


Harga Satuan Pekerjaan (D+E)
KODE SATUAN KOEFISIEN HARGA SATUAN

JUMLAH HARGA ALAT

15% x Jumlah Harga (D)


JUMAH HARGA

Rp
Rp
Rp
Rp
-
209,592.00
31,438.80
241,030.80
 ANALISA
AHPS-A.4.5.2.c

AHPS-A.4.6.1.5

A.4.6.1.6

A.4.4.6.1.23

A.4.6.1.14

A.4.6.1.15
NOMOR

D
E
F

A
A

D
E
F

D
E
F

D
E
F

D
E
F

D
E
F

D
E
Tukang
Kepala tukang
Mandor

BAHAN

Jumlah (A+B+C)
Overhead & Profit ( 15 %)
Harga Satuan Pekerjaan (D+E)
AHSP A.4.6.1 HARGA SATUAN PEKERJAAN KAYU
A.4.6.1.2

Lem kayu

PERALATAN

Jumlah (A+B+C)
Overhead & Profit ( 15 %)
Harga Satuan Pekerjaan (D+E)

BAHAN
Kayu papan
Kaca polos 5 mm
Paku 5 – 7 cm

PERALATAN

Jumlah (A+B+C)
Overhead & Profit ( 15 %)
Harga Satuan Pekerjaan (D+E)
URAIAN
Pemasangan 1 M1 Listplank Fiber Semen 9 x 300 mm
TENAGA
Pekerja

Listplank Fiber semen 9 x 300 mm


Baut screw driver

PERALATAN

Pembuatan dan pemasangan 1 M3 kusen pintu / jendela


TENAGA
Pekerja
Tukang
Kepala tukang
Mandor

BAHAN
Balok kayu
Paku 10 cm

Pemasangan 1 M2 rangka langit-langit


TENAGA
Pekerja
Tukang
Kepala tukang
Mandor

BAHAN
Kayu kaso 5/7
Paku 7 – 10 cm

PERALATAN

Jumlah (A+B+C)
Overhead & Profit ( 15 %)
Harga Satuan Pekerjaan (D+E)
Pemasangan 1 m3 konstruksi kuda-kuda expose, kayu kelas I
TENAGA
Pekerja
Tukang
Kepala tukang
Mandor

BAHAN
Balok Kayu
Besi strip tebal 5 mm
Paku 12cm

PERALATAN

Jumlah (A+B+C)
Overhead & Profit ( 15 %)
Harga Satuan Pekerjaan (D+E)
Pemasangan 1 m3 konstruksi gordeng, kayu kelas II
TENAGA
Pekerja
Tukang
Kepala tukang
Mandor

BAHAN
Balok Kayu
Besi strip tebal 5 mm
Paku 12cm

PERALATAN

Jumlah (A+B+C)
Overhead & Profit ( 15 %)
KODE

L.01
L.03
L.11
L.15

L.01
L.03
L.03
L.04

Pembuatan dan pemasangan 1 M2 daun pintu panel, kayu kelas I atau II


TENAGA
Pekerja
Tukang
Kepala tukang
Mandor

BAHAN
Kayu papan
Paku 5 – 7 cm

PERALATAN

Jumlah (A+B+C)
Overhead & Profit ( 15 %)
Harga Satuan Pekerjaan (D+E)
L.01
L.03
L.03
L.04

L.01
L.03
L.03
L.04

L.01
L.03
L.03
L.04

L.01
L.03
L.03
L.04
SATUAN

OH
OH
OH
OH

Btg
Bh

OH
OH
OH
OH

M3
Kg
Kg

OH
OH
OH
OH

M3
Kg

Pembuatan dan pemasangan 1 M2 pintu dan jendela kaca, kayu kelas I atau II
TENAGA
Pekerja
Tukang
Kepala tukang
Mandor
L.01
L.03
L.03
L.04

M3
M2
Kg
OH
OH
OH
OH

OH
OH
OH
OH

M3
Kg

OH
OH
OH
OH

M3
Kg
Kg

OH
OH
OH
OH

M3
Kg
Kg
KOEFISIEN

0.1000 Rp
0.2000 Rp
0.0200 Rp
0.0050 Rp

1.1000 Rp
6.0000 Rp

1.0000 Rp
HARGA SATUAN

JUMLAH HARGA ALAT

1.0000 Rp
3.0000 Rp
0.3000 Rp
0.0500 Rp

0.0400 Rp
0.0500 Rp

0.8000 Rp
2.4000 Rp
0.2400 Rp
0.0400 Rp
JUMLAH UPAH KERJA

0.0240 Rp
1.2000 Rp
0.0300 Rp

0.0300 Rp
0.0100 Rp

0.0160 Rp
0.2500 Rp
JUMLAH BAHAN

2.0100 Rp
0.3350 Rp

5.6000 Rp
JUMLAH BAHAN

6.7000 Rp
20.1000 Rp
2.0100 Rp
0.3350 Rp

1.1000 Rp
15.0000 Rp
3.0000 Rp
JUMLAH BAHAN
98,000.00
150,000.00
150,000.00
165,000.00
JUMLAH UPAH KERJA

35,000.00 Rp

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT


500.00 Rp

15% x Jumlah Harga (D)

6.0000 Rp
18.0000 Rp
1.8000 Rp
0.3000 Rp

1.2000 Rp
1.2500 Rp
98,000.00
150,000.00
150,000.00
165,000.00
JUMLAH UPAH KERJA

3,100,000.00
16,500.00
17,500.00
JUMLAH HARGA BAHAN

15% x Jumlah Harga (D)

98,000.00
150,000.00
150,000.00
165,000.00
JUMLAH UPAH KERJA

2,000,000.00
120,000.00
16,500.00
JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

15% x Jumlah Harga (D)

0.2000 Rp
0.3000 Rp
98,000.00
150,000.00
150,000.00
165,000.00
JUMLAH UPAH KERJA
Rp

2,000,000.00 Rp

JUMLAH HARGA ALAT


16,500.00 Rp
JUMLAH HARGA BAHAN

15% x Jumlah Harga (D)

98,000.00
150,000.00
150,000.00
165,000.00
Rp

3,100,000.00 Rp
16,500.00 Rp

JUMLAH HARGA ALAT

15% x Jumlah Harga (D)

6.7000 Rp
20.1000 Rp
98,000.00
150,000.00
150,000.00
165,000.00
JUMLAH UPAH KERJA

1.2000 Rp
15.0000 Rp

JUMLAH HARGA ALAT

JUMLAH HARGA ALAT


98,000.00
150,000.00
150,000.00
165,000.00
JUMLAH UPAH KERJA
Rp
JUMAH HARGA

Rp
Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp
Rp

125,000.00 Rp
135,600.00 Rp
36,000.00 Rp

15% x Jumlah Harga (D)


Rp

Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp
Rp

125,000.00 Rp
135,600.00 Rp
36,000.00 Rp

15% x Jumlah Harga (D)


Rp

Rp
Rp
Rp
9,800.00
30,000.00
3,000.00
825.00
43,625.00

38,500.00
3,000.00
41,500.00

-
85,125.00
12,768.75
97,893.75

588,000.00
2,700,000.00
270,000.00
49,500.00
3,607,500.00

3,720,000.00
20,625.00
17,500.00
3,758,125.00

-
7,365,625.00
1,104,843.75
8,470,468.75

98,000.00
450,000.00
45,000.00
8,250.00
601,250.00

80,000.00
825.00
80,825.00

-
682,075.00
102,311.25
784,386.25

78,400.00
360,000.00
36,000.00
6,600.00
481,000.00

48,000.00
144,000.00
495.00
192,495.00

-
673,495.00
101,024.25
774,519.25

19,600.00
45,000.00
4,500.00
1,650.00
70,750.00

49,600.00
4,125.00
53,725.00

-
124,475.00
18,671.25
143,146.25

656,600.00
3,015,000.00
301,500.00
55,275.00
4,028,375.00

150,000.00
2,034,000.00
201,600.00
2,385,600.00

-
6,413,975.00
962,096.25
7,376,071.25

656,600.00
3,015,000.00
301,500.00
55,275.00
4,028,375.00

137,500.00
2,034,000.00
108,000.00
2,279,500.00

-
6,307,875.00
946,181.25
 ANALISA NOMOR
F
URAIAN
Harga Satuan Pekerjaan (D+E)
KODE SATUAN KOEFISIEN HARGA SATUAN JUMAH HARGA
Rp 7,254,056.25
 ANALISA
A.4.6.1.15a

A.4.6.1.15b

A.4.6.1.15c
NOMOR

D
E
F

D
E
F

D
E
F
Pekerja
Tukang
Kepala tukang
Mandor

BAHAN
Balok Kayu
Paku 12cm

PERALATAN

Jumlah (A+B+C)
Overhead & Profit ( 15 %)

BAHAN
Reng 2/3
Kasau 5/7
Paku 5 dan 10 cm

PERALATAN

Jumlah (A+B+C)
Overhead & Profit ( 15 %)
URAIAN
Pemasangan 1 m3 konstruksi Balok Nok, kayu kelas II
TENAGA

Harga Satuan Pekerjaan (D+E)


Pemasangan 1 m2 rangka atap, kayu kelas II
TENAGA
Pekerja
Tukang
Kepala tukang
Mandor

Harga Satuan Pekerjaan (D+E)


Pemasangan 1 m2 Papan Ruiter 3/25
TENAGA
Pekerja
Tukang
Kepala tukang
Mandor

BAHAN
Papan 3/25
Paku 5 dan 10 cm

PERALATAN

Jumlah (A+B+C)
Overhead & Profit ( 15 %)
Harga Satuan Pekerjaan (D+E)
KODE

L.01
L.03
L.03
L.04

L.01
L.03
L.03
L.04

L.01
L.03
L.03
L.04
SATUAN

OH
OH
OH
OH

M3
Kg

OH
OH
OH
OH

M3
M3
Kg

OH
OH
OH
OH

M3
Kg
KOEFISIEN

6.7000 Rp
20.1000 Rp
2.0100 Rp
0.3350 Rp

JUMLAH BAHAN
HARGA SATUAN

JUMLAH HARGA ALAT

0.1000 Rp
0.1000 Rp
0.0100 Rp
0.0050 Rp
JUMLAH UPAH KERJA

0.0360 Rp
0.0140 Rp
0.2500 Rp
JUMLAH BAHAN

JUMLAH HARGA ALAT


98,000.00
150,000.00
150,000.00
165,000.00
JUMLAH UPAH KERJA

1.1000 Rp
3.0000 Rp

15% x Jumlah Harga (D)

0.1000 Rp
0.1000 Rp
0.0100 Rp
0.0050 Rp

0.0300 Rp
0.2500 Rp
JUMLAH BAHAN
98,000.00
150,000.00
150,000.00
165,000.00
JUMLAH UPAH KERJA

JUMLAH HARGA ALAT


Rp
Rp
Rp
Rp
Rp

125,000.00 Rp
36,000.00 Rp

15% x Jumlah Harga (D)

98,000.00
150,000.00
150,000.00
165,000.00
Rp

Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp
Rp
JUMAH HARGA

17,000.00 Rp
43,000.00 Rp
45,000.00 Rp
Rp

Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp
Rp

11,500.00 Rp
45,000.00 Rp

15% x Jumlah Harga (D)


Rp

Rp
Rp
Rp
Rp
656,600.00
3,015,000.00
301,500.00
55,275.00
4,028,375.00

137,500.00
108,000.00
245,500.00

9,800.00
15,000.00
1,500.00
825.00
27,125.00

612.00
602.00
11,250.00
11,852.00

-
38,977.00
5,846.55
44,823.55

9,800.00
15,000.00
1,500.00
825.00
27,125.00

345.00
11,250.00
11,595.00

-
38,720.00
5,808.00
44,528.00
-
4,273,875.00
641,081.25
4,914,956.25
 ANALISA

A.4.4.6.2.2

A.4.4.6.2.2.a

A.4.6.2.5

A.4.6.2.5.a

A.4.6.2.5.b

A.4.6.2.5.c
NOMOR

D
E
F

D
E
F

D
E
F

D
E
F

D
E
F

D
E
F
Kepala tukang
Mandor

BAHAN
Kunci tanam biasa

PERALATAN

Jumlah (A+B+C)
Overhead & Profit ( 15 %)

Mandor

BAHAN
Kunci silinder

PERALATAN

Jumlah (A+B+C)
Overhead & Profit ( 15 %)

Overhead & Profit ( 15 %)


URAIAN

Pemasangan 1 buah kunci tanam biasa


TENAGA KERJA
Pekerja
Tukang

Harga Satuan Pekerjaan (D+E)


Pemasangan 1 buah kunci silinder
TENAGA KERJA
Pekerja
Tukang
Kepala tukang

Harga Satuan Pekerjaan (D+E)


Pemasangan 1 buah engsel pintu
TENAGA
Pekerja
Tukang
Kepala tukang
Mandor

BAHAN
Engsel pintu

PERALATAN

Jumlah (A+B+C)

Harga Satuan Pekerjaan (D+E)


Pemasangan 1 buah Grendel Ram Buncis Casement
TENAGA
Pekerja
Tukang
Kepala tukang
Mandor

BAHAN
Grendel Ram Buncis Casement

PERALATAN

Jumlah (A+B+C)
Overhead & Profit ( 15 %)
Harga Satuan Pekerjaan (D+E)
Pemasangan 1 buah Grendel Pintu
TENAGA
Pekerja
Tukang
Kepala tukang
Mandor

BAHAN
Grendel Pintu

PERALATAN

Jumlah (A+B+C)
Overhead & Profit ( 15 %)
Harga Satuan Pekerjaan (D+E)
Pemasangan 1 buah Handle Pintu Stainless Steel
TENAGA
Pekerja
Tukang
Kepala tukang
Mandor

BAHAN
Handle Stainless Steel

PERALATAN

Jumlah (A+B+C)
Overhead & Profit ( 15 %)
Harga Satuan Pekerjaan (D+E)
KODE

L.01
L.02
L.03
L.04

L.01
L.02
L.03
L.04

L.01
L.02
L.03
L.04

L.01
L.02
L.03
L.04

L.01
L.02
L.03
L.04

L.01
L.02
L.03
L.04
SATUAN
A.4.6.2 HARGA SATUAN PEKERJAAN KUNCI DAN KACA

OH
OH
OH
OH

Bh

OH
OH
OH
OH

Bh

OH
OH
OH
OH

Bh

OH
OH
OH
OH

Bh

OH
OH
OH
OH

Bh

OH
OH
OH
OH

Bh
KOEFISIEN

0.0100 Rp
0.5000 Rp
0.0500 Rp
0.0050 Rp

1.0000 Rp

0.0100 Rp
0.5000 Rp
0.0500 Rp
0.0050 Rp

0.0150 Rp
0.1500 Rp
0.0150 Rp
0.0080 Rp

1.0000 Rp
HARGA SATUAN

98,000.00
150,000.00
150,000.00
165,000.00
JUMLAH UPAH KERJA

154,000.00 Rp
JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

15% x Jumlah Harga (D)

98,000.00
150,000.00
150,000.00
165,000.00
JUMLAH UPAH KERJA

1.0000 Rp
Rp

225,000.00 Rp
JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

15% x Jumlah Harga (D)

98,000.00
150,000.00
150,000.00
165,000.00
JUMLAH UPAH KERJA
Rp

35,000.00 Rp
JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT


Rp
Rp
Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp
Rp
JUMAH HARGA

Rp
15% x Jumlah Harga (D) maksimu Rp

0.0150 Rp
0.1500 Rp
0.0150 Rp
0.0080 Rp

1.0000 Rp

0.0150 Rp
0.1500 Rp
0.0150 Rp
0.0080 Rp

1.0000 Rp

0.0150 Rp
0.1500 Rp
0.0150 Rp
0.0080 Rp

1.0000 Rp
98,000.00
150,000.00
150,000.00
165,000.00
JUMLAH UPAH KERJA

50,000.00 Rp
JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

98,000.00
150,000.00
150,000.00
165,000.00
JUMLAH UPAH KERJA
Rp

24,200.00 Rp
JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

98,000.00
150,000.00
150,000.00
165,000.00
JUMLAH UPAH KERJA
Rp

175,000.00 Rp
JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT


Rp
Rp

Rp
Rp
Rp
Rp
Rp

Rp
15% x Jumlah Harga (D) maksimu Rp
Rp

Rp
Rp
Rp
Rp
Rp

Rp
15% x Jumlah Harga (D) maksimu Rp
Rp

Rp
Rp
Rp
Rp
Rp

Rp
15% x Jumlah Harga (D) maksimu Rp
Rp
980.00
75,000.00
7,500.00
825.00
84,305.00

154,000.00
154,000.00

-
238,305.00
35,745.75
274,050.75

980.00
75,000.00
7,500.00
825.00
84,305.00

225,000.00
225,000.00

-
309,305.00
46,395.75
355,700.75

1,470.00
22,500.00
2,250.00
1,320.00
27,540.00

35,000.00
35,000.00

62,540.00
9,381.00
71,921.00

1,470.00
22,500.00
2,250.00
1,320.00
27,540.00

50,000.00
50,000.00

77,540.00
11,631.00
89,171.00

1,470.00
22,500.00
2,250.00
1,320.00
27,540.00

24,200.00
24,200.00

51,740.00
7,761.00
59,501.00

1,470.00
22,500.00
2,250.00
1,320.00
27,540.00

175,000.00
175,000.00

202,540.00
30,381.00
232,921.00
 ANALISA
A.4.6.2.5.d

A.4.6.2.10

A.4.6.2.17

A.4.6.2.19.a

A.4.7.1.4

A.4.7.1.10

A.4.7.1.10.1
NOMOR

D
E
F

D
E
F

D
E
F

D
E
F

D
E
F

D
E
F

D
E
F
Tukang
Kepala tukang
Mandor

BAHAN
Floor hing

PERALATAN

Jumlah (A+B+C)
Overhead & Profit ( 15 %)

Overhead & Profit ( 15 %)

Jumlah (A+B+C)
Overhead & Profit ( 15 %)
URAIAN
Pemasangan 1 buah Floor Hing
TENAGA
Pekerja

Harga Satuan Pekerjaan (D+E)


Pemasangan 1 buah Door Closser
TENAGA
Pekerja
Tukang
Kepala tukang
Mandor

BAHAN
Door Closser

PERALATAN

Jumlah (A+B+C)

Harga Satuan Pekerjaan (D+E)


Pemasangan 1 M2 kaca bening tebal 5 mm
TENAGA
Pekerja
Tukang
Kepala tukang
Mandor

BAHAN
Kaca bening tebal 5 mm

PERALATAN

Jumlah (A+B+C)
Overhead & Profit ( 15 %)
Harga Satuan Pekerjaan (D+E)
Pemasangan 1 M2 kaca tempered tebal 12 mm
TENAGA
Pekerja
Tukang
Kepala tukang
Mandor

BAHAN
Kaca tempered tebal 12 mm

PERALATAN

Harga Satuan Pekerjaan (D+E)

Kepala tukang
Mandor

BAHAN
Cat menie
Plamur
Cat dasar
Cat penutup
Kuas
Pengencer
Ampelas

PERALATAN

Jumlah (A+B+C)

Mandor

BAHAN
Plamir
Cat dasar
Cat penutup 2 kali

PERALATAN

Jumlah (A+B+C)
A.4.7.1 HARGA SATUAN PEKERJAAN PENGECATAN

Overhead & Profit ( 15 %)


Harga Satuan Pekerjaan (D+E)

Overhead & Profit ( 15 %)


Harga Satuan Pekerjaan (D+E)
Pengecatan 1 M2 Plafond
TENAGA
Pekerja
Tukang
Kepala tukang
Mandor

BAHAN
Plamir
Cat dasar
Cat penutup 2 kali

PERALATAN

Jumlah (A+B+C)
Overhead & Profit ( 15 %)
Harga Satuan Pekerjaan (D+E)
KODE

L.01
L.02
L.03
L.04

L.01
L.02
L.03
L.04

L.01
L.02
L.03
L.04

L.01
L.02
L.03
L.04

L.03
L.04

L.03
L.04

L.01
L.02
L.03
L.04
SATUAN

OH
OH
OH
OH

Bh

OH
OH
OH
OH

Bh

OH
OH
OH
OH

M2

OH
OH
OH
OH

M2

OH
OH

Kg
Kg
Kg
Kg
Bh
Kg
Lembar

Pengecatan 1 M2 tembok baru ( 1lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup)
TENAGA
Pekerja
Tukang
Kepala tukang
L.01
L.02
OH
OH
OH
OH

Kg
Kg
Kg

OH
OH
OH
OH

Kg
Kg
Kg
KOEFISIEN

0.0150 Rp
0.1500 Rp
0.0150 Rp
0.0080 Rp

1.0000 Rp
HARGA SATUAN

98,000.00
150,000.00
150,000.00
165,000.00
JUMLAH UPAH KERJA

1,500,000.00 Rp
JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

15% x Jumlah Harga (D)

1 M2 Pengecatan bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
TENAGA
Pekerja
Tukang
L.01
L.02
OH
OH
0.0700 Rp
0.0090 Rp
0.0060 Rp
0.0030 Rp
JUMLAH UPAH KERJA

0.2000 Rp
0.1500 Rp
0.1700 Rp
0.2600 Rp
0.0100 Rp
0.0300 Rp
0.2000 Rp
JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

0.0200 Rp
0.0630 Rp
0.0063 Rp
0.0030 Rp
JUMLAH UPAH KERJA

0.1000 Rp
0.1000 Rp
0.2600 Rp
JUMLAH BAHAN

JUMLAH HARGA ALAT

0.0630 Rp
0.0063 Rp
0.0030 Rp
JUMLAH UPAH KERJA

0.1000 Rp
0.1000 Rp
0.2600 Rp
JUMLAH BAHAN

JUMLAH HARGA ALAT


Rp
Rp
Rp
Rp
Rp
Rp

Rp
15% x Jumlah Harga (D) maksimu Rp

0.0500 Rp
0.5000 Rp
0.0500 Rp
0.0030 Rp

1.0000 Rp
98,000.00
150,000.00
150,000.00
165,000.00
JUMLAH UPAH KERJA

250,000.00 Rp
JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT


Rp
Rp

Rp
Rp
Rp
Rp
Rp

Rp
15% x Jumlah Harga (D) maksimu Rp

0.0150 Rp
0.1500 Rp
0.0150 Rp
0.0008 Rp

1.1000 Rp

JUMLAH ALAT
98,000.00
150,000.00
150,000.00
165,000.00
JUMLAH UPAH KERJA

145,000.00 Rp
JUMLAH HARGA BAHAN

15% x Jumlah Harga (D)

0.0150 Rp
0.1500 Rp
0.0150 Rp
0.0008 Rp

1.1000 Rp
98,000.00
150,000.00
150,000.00
165,000.00
JUMLAH UPAH KERJA
Rp

3,000,000.00 Rp
JUMLAH HARGA BAHAN

JUMLAH ALAT
Rp
Rp

Rp
Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp
Rp
JUMAH HARGA

Rp
Rp
Rp
Rp

98,000.00 Rp
150,000.00 Rp
150,000.00 Rp
165,000.00 Rp
Rp

29,000.00 Rp
25,000.00 Rp
60,000.00 Rp
60,000.00 Rp
7,000.00 Rp
20,000.00 Rp
7,500.00 Rp
Rp

Rp
Rp
15% x Jumlah Harga (D) maksimu Rp
Rp

98,000.00 Rp
150,000.00 Rp
150,000.00 Rp
165,000.00 Rp

15% x Jumlah Harga (D)

0.0200 Rp
Rp

25,000.00 Rp
25,000.00 Rp
25,000.00 Rp
Rp

Rp
Rp
Rp
Rp

98,000.00 Rp
150,000.00 Rp
150,000.00 Rp
165,000.00 Rp
Rp

25,000.00 Rp
25,000.00 Rp
25,000.00 Rp

15% x Jumlah Harga (D)


Rp

Rp
Rp
Rp
Rp
1,470.00
22,500.00
2,250.00
1,320.00
27,540.00

1,500,000.00
1,500,000.00

1,527,540.00
229,131.00
1,756,671.00

4,900.00
75,000.00
7,500.00
495.00
87,895.00

250,000.00
250,000.00

337,895.00
50,684.25
388,579.25

1,470.00
22,500.00
2,250.00
132.00
26,352.00

159,500.00
159,500.00

-
185,852.00
27,877.80
213,729.80

1,470.00
22,500.00
2,250.00
132.00
26,352.00

3,300,000.00
3,300,000.00

10,200.00
15,600.00
70.00
600.00
1,500.00
37,520.00

-
47,125.00
7,068.75
54,193.75

1,960.00
9,450.00
945.00
495.00
12,850.00

2,500.00
2,500.00
6,500.00
11,500.00

-
24,350.00
3,652.50
28,002.50

1,960.00
9,450.00
945.00
495.00
12,850.00

2,500.00
2,500.00
6,500.00
11,500.00

-
24,350.00
3,652.50
28,002.50
-
3,326,352.00
498,952.80
3,825,304.80

6,860.00
1,350.00
900.00
495.00
9,605.00

5,800.00
3,750.00
 ANALISA

A.5.1.1.1

A.5.1.1.2

A.5.1.1.5

A.5.1.1.12.a

A.5.1.1.14

A.5.1.1.19
NOMOR

D
E
F

D
E
F

D
E
F

D
E
F

D
E
F

D
E
F
TENAGA
Pekerja
Tukang
Kepala tukang
Mandor

BAHAN
Closed duduk porsein

PERALATAN

Jumlah (A+B+C)
Overhead & Profit ( 15 %)

BAHAN
Closed duduk porsein
Semen PC
Pasir pasang
Bata merah lokal

PERALATAN

Jumlah (A+B+C)
Overhead & Profit ( 15 %)

PERALATAN

Jumlah (A+B+C)
Overhead & Profit ( 15 %)
URAIAN

Perlengkapan 6 % x harga closed

Harga Satuan Pekerjaan (D+E)


Pemasangan 1 Buah Closed Jongkok Porselin
TENAGA
Pekerja
Tukang
Kepala tukang
Mandor

Harga Satuan Pekerjaan (D+E)


Pemasangan 1 Buah Washtafel Porselin
TENAGA
Pekerja
Tukang
Kepala tukang
Mandor

BAHAN
Washtafel porsein
Semen PC
Pasir pasang
Perlengkapan 12 % x harga closed

Harga Satuan Pekerjaan (D+E)


L.01
L.02
L.03
L.04

Pemasangan 1 Buah Washzink Stainless Steel (Bak Cuci Piring)


TENAGA
Pekerja
Tukang
Kepala tukang
Mandor

BAHAN
Washzink Stainless Steel

PERALATAN

Jumlah (A+B+C)
Overhead & Profit ( 15 %)
Harga Satuan Pekerjaan (D+E)
Pemasangan 1 Buah Floor Drain (Saringan Air)
TENAGA
Pekerja
Tukang
Kepala tukang
Mandor

BAHAN
Floor drain plastik

PERALATAN

Jumlah (A+B+C)
Overhead & Profit ( 15 %)
Harga Satuan Pekerjaan (D+E)
Pemasangan 1 Buah Kran Air 1/2" - 3/4"
TENAGA
Pekerja
Tukang
Kepala tukang
Mandor

BAHAN
Kran air plastik

PERALATAN

Jumlah (A+B+C)
Overhead & Profit ( 15 %)
Harga Satuan Pekerjaan (D+E)
KODE
A.5.1.1 HARGA SATUAN PEKERJAAN SANITASI GEDUNG
Pemasangan 1 Buah Closed Duduk Porselin

L.01
L.02
L.03
L.04

L.01
L.02
L.03
L.04

L.01
L.02
L.03
L.04

L.01
L.02
L.03
L.04

L.01
L.02
L.03
L.04
OH
OH
OH
OH
SATUAN

Unit
Ls

OH
OH
OH
OH

Unit
Ls
Ls
Ls

OH
OH
OH
OH

Unit
Ls
Ls
Ls

OH
OH
OH
OH

Unit

OH
OH
OH
OH

Unit

OH
OH
OH
OH

Unit
KOEFISIEN

3.3000 Rp
1.1000 Rp
0.0100 Rp
0.1600 Rp

1.0000 Rp
1.0000 Rp
JUMLAH BAHAN

1.0000 Rp
1.5000 Rp
0.1500 Rp
0.0500 Rp

1.0000 Rp
6.0000 Rp
0.0100 Rp
7.0000 Rp
JUMLAH BAHAN

1.2000 Rp
1.4500 Rp
0.1500 Rp
0.0500 Rp

1.0000 Rp
6.0000 Rp
0.0100 Rp
1.0000 Rp
JUMLAH BAHAN

0.0300 Rp
0.3000 Rp
0.0300 Rp
0.0150 Rp

1.0000 Rp
JUMLAH BAHAN

0.0100 Rp
0.0050 Rp

0.1000 Rp
0.0100 Rp
0.0050 Rp

1.0000 Rp
JUMLAH BAHAN
HARGA SATUAN

98,000.00
150,000.00
150,000.00
165,000.00
JUMLAH UPAH KERJA

2,500,000.00 Rp
150,000.00 Rp

JUMLAH HARGA ALAT

15% x Jumlah Harga (D)

98,000.00
150,000.00
150,000.00
165,000.00
JUMLAH UPAH KERJA

JUMLAH HARGA ALAT


Rp

510,000.00
1,200.00
250,000.00

15% x Jumlah Harga (D)


600.00

98,000.00
150,000.00
150,000.00
165,000.00
JUMLAH UPAH KERJA

1,331,700.00 Rp
1,200.00 Rp
250,000.00 Rp
159,804.00 Rp

JUMLAH HARGA ALAT

15% x Jumlah Harga (D)

98,000.00
150,000.00
150,000.00
165,000.00
JUMLAH UPAH KERJA

JUMLAH HARGA ALAT

150,000.00
165,000.00
JUMLAH UPAH KERJA

1.0000 Rp
JUMLAH BAHAN

JUMLAH HARGA ALAT

15% x Jumlah Harga (D)

0.0100 Rp 98,000.00
150,000.00
150,000.00
165,000.00
JUMLAH UPAH KERJA

JUMLAH HARGA ALAT


Rp

650,000.00 Rp

15% x Jumlah Harga (D)

0.0100 Rp
0.1000 Rp
98,000.00
150,000.00
Rp
JUMAH HARGA

Rp
Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp
Rp

10,000.00 Rp
Rp

Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp
Rp

25,000.00 Rp

15% x Jumlah Harga (D)


Rp

Rp
Rp
Rp
Rp
323,400.00
165,000.00
1,500.00
26,400.00
516,300.00

2,500,000.00
150,000.00
2,650,000.00

98,000.00
225,000.00
22,500.00
8,250.00
353,750.00

510,000.00
7,200.00
2,500.00
4,200.00
523,900.00

-
877,650.00
131,647.50
-
3,166,300.00
474,945.00
3,641,245.00

1,009,297.50

117,600.00
217,500.00
22,500.00
8,250.00
365,850.00

1,331,700.00
7,200.00
2,500.00
159,804.00
1,501,204.00

2,940.00
45,000.00
4,500.00
2,475.00
54,915.00

650,000.00
650,000.00

-
704,915.00
105,737.25
810,652.25

980.00
15,000.00
1,500.00
825.00
18,305.00

10,000.00
10,000.00

-
28,305.00
4,245.75
32,550.75

980.00
15,000.00
1,500.00
825.00
18,305.00

25,000.00
25,000.00

-
43,305.00
6,495.75
49,800.75
-
1,867,054.00
280,058.10
2,147,112.10
 ANALISA
A.5.1.1.19.a

A.5.1.1.19.b

Singkatan
Singkatan
Singkatan
Singkatan
Singkatan
Singkatan
Singkatan
Singkatan
Singkatan
Singkatan
NOMOR

Kg
M1
M2
M3
OH
PC
PU
PP
PB
KR
A

D
E
F

D
E
F

D
E
F

D
E
F

=
=
=
=
=
=
=
=
=
=
Tukang
Kepala tukang
Mandor

BAHAN
Kran air washtafel

PERALATAN

Jumlah (A+B+C)
Overhead & Profit ( 15 %)

Tukang
Kepala tukang
Mandor

BAHAN
Selang Jet washer

PERALATAN

Jumlah (A+B+C)
Overhead & Profit ( 15 %)

BAHAN
List Gypsum
Paku List

PERALATAN

Jumlah (A+B+C)
Overhead & Profit ( 15 %)
URAIAN
Pemasangan 1 Buah Kran Air Washtafel
TENAGA
Pekerja

Harga Satuan Pekerjaan (D+E)


Pemasangan 1 Buah Selang Jet Washer
TENAGA
Pekerja

Harga Satuan Pekerjaan (D+E)

Pemasangan 1M' list Langit-Langit Gypsum 10 cm sleebor


Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

Harga Satuan Pekerjaan (D+E)

Pemasangan 1 M2 Plafond Gypsum Rangka Hollow


Tenaga
Pekerja
Tukang Besi/ Plafond
Kepala Tukang
Mandor

BAHAN
Gypsum Board (120x240x9)
Rangka Metal Furing (4 x 4 cm) panjang
Paku Kalsiboard

PERALATAN

Jumlah (A+B+C)
Overhead & Profit ( 15 %)
Harga Satuan Pekerjaan (D+E)

KETERANGAN SINGKATAN ISTILAH


Singkatan CM = Centi Meter (satuan)
Kilo Gram (satuan)
Meter Panjang (satuan)
Meter Persegi (satuan)
Meter Kubik (satuan)
Orang Hari (satuan)
Portland Cement (semen)
Pasir Urug (agregat)
Pasir Pasang (agregat halus <5 mm)
Pasir Pasang/Beton (agregat kasar -40 mm)
Kerikil/Koral (agregat pasir batu)
KODE

L.01
L.02
L.03
L.04

L.01
L.02
L.03
L.04

L.01
L.02
L.03
L.04

L.01
L.02
L.03
L.04
SATUAN

M'
Kg

Lbr
btg
OH
OH
OH
OH

Unit

OH
OH
OH
OH

Unit

OH
OH
OH
OH

OH
OH
OH
OH

kg
KOEFISIEN

0.0100 Rp
0.1000 Rp
0.0100 Rp
0.0050 Rp

0.1000 Rp
0.0100 Rp
0.0050 Rp

1.0000 Rp
JUMLAH BAHAN

0.0050 Rp

1.050 Rp
0.0100 Rp

0.3000 Rp
0.3500 Rp
0.0100 Rp
0.0050 Rp

1.0000 Rp
0.1100 Rp
HARGA SATUAN

JUMLAH UPAH KERJA

1.0000 Rp
JUMLAH BAHAN

JUMLAH HARGA ALAT


98,000.00
150,000.00
150,000.00
165,000.00

15% x Jumlah Harga (D)

0.0100 Rp 98,000.00
150,000.00
150,000.00
165,000.00
JUMLAH UPAH KERJA

JUMLAH HARGA ALAT

15% x Jumlah Harga (D)

0.0500 Rp
0.0500 Rp
0.0100 Rp
98,000.00
150,000.00
150,000.00
165,000.00
JUMLAH UPAH KERJA

12,000.00 Rp
30,000.00 Rp
JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

15% x Jumlah Harga (D)

98,000.00
150,000.00
150,000.00
165,000.00
JUMLAH UPAH KERJA

0.364 Rp 12,000.00
54,000.00
45,000.00
JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

15% x Jumlah Harga (D)


Rp
JUMAH HARGA

Rp
Rp
Rp
Rp
Rp

135,000.00 Rp
Rp

Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp
Rp

185,000.00 Rp
Rp

Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp
980.00
15,000.00
1,500.00
825.00
18,305.00

135,000.00
135,000.00

-
153,305.00
22,995.75
176,300.75

980.00
15,000.00
1,500.00
825.00
18,305.00

185,000.00
185,000.00

-
203,305.00
30,495.75
233,800.75

4,900.00
7,500.00
1,500.00
825.00
14,725.00

12,600.00
300.00
12,600.00

-
27,325.00
4,098.75
31,423.75

29,400.00
52,500.00
1,500.00
825.00
84,225.00

4,368.00
54,000.00
4,950.00
63,318.00

-
147,543.00
22,131.45
169,674.45
FAKULTAS TEKNIK
PROGRAM STUDI TEKNIK SIPIL
UNIVERSITAS BENGKULU
MANAJEMEN KONSTRUKSI

RENCANA ANGGARAN BIAYA (RAB)


: PEMBANGUNAN RUMAHKOMPLEKS PERUMAHAN GRIYA ASRI
REAL ESTATE
PEKERJAAN TYPE 90 M²
VOLUME : 180 m2
LOKASI : Jln. Danau Kel.Dusun Besar Kec.Singaran Pati Kota Bengkulu Provinsi Bengkulu
TAHUN ANGGARAN : 2020

HARGA JUMLAH
NO JENIS PEKERJAAN SATUAN QUANT SATUAN HARGA
(Rp) (Rp)
1 2 3 4 5 6=4X5
A PEKERJAAN PERSIAPAN
a Pekerjaan Persiapan Umum
1 Pengadaan Air Kerja Unit 1.000 Rp 500,000.00 Rp 500,000.00
2 P3K Unit 1.000 Rp 250,000.00 Rp 250,000.00
b Pekerjaan Persiapan Fisik Rp -
1 Pek. Pembersihan awal lokasi M² 224.000 Rp 17,300.00 Rp 3,875,200.00
2 Pek. Pas. Bowplank dan Pengukuran M' 48.000 Rp 75,261.75 Rp 3,612,564.00
SUB JUMLAH A Rp 8,237,764.00
B PEKERJAAN TANAH DAN PASIR
1 Pek. Galian Tanah Pondasi M³ 43.39 Rp 109,968.75 Rp 4,771,544.06
2 Pek. Urugan Tanah Kembali M³ 25.63 Rp 65,837.50 Rp 1,687,415.13
3 Pek. Urugan Pasir di Bawah Pondasi M³ 5.424 Rp 304,807.50 Rp 1,653,275.88
4 Pek. Urugan Pasir di Bawah Lantai M³ 9 Rp 304,807.50 Rp 2,743,267.50
5 Pek. Urugan Tanah di Bawah Lantai M³ 13.37 Rp 265,707.50 Rp 3,552,509.28
SUB JUMLAH B Rp 14,408,011.84
C PEKERJAAN PASANGAN DAN BETON
a Pekerjaan Pasangan
1 Pas. Dinding Bata 1 : 2 M² 73.19 Rp 129,679.75 Rp 9,491,260.90
2 Pas. Plesteran 1 : 2 M² 146.38 Rp 84,977.87 Rp 12,439,060.61
3 Pas. Dinding Bata 1 : 4 M² 374.24 Rp 115,582.50 Rp 43,255,594.80
4 Pas. Plesteran 1 : 4 M² 748.48 Rp 77,124.30 Rp 57,725,996.06
5 Pas. Lantai keramik 40x40 M² 153 Rp 260,187.50 Rp 39,808,687.50
6 Pas. Lantai Keramik 20x20 anti slip M² 21 Rp 414,718.75 Rp 8,709,093.75
7 Pas. Dinding Keramik 30x30 M² 36.75 Rp 294,072.89 Rp 10,807,178.67
b Pekerjaan Beton (*Struktur Beton Bertulang dengan Beton K-225)
1 Pek. Pondasi Plat Setempat M³ 8.78 Rp 5,714,558.07 Rp 50,173,819.86
2 Pek. Tie Beam 30/55 M³ 13.20 Rp 4,342,398.89 Rp 57,319,665.39
3 Pek. Sloof 15/20 M³ 0.36 Rp 6,669,408.13 Rp 2,400,986.93
4 Pek. Balok Induk 30/55 M³ 12.71 Rp 4,926,296.14 Rp 62,613,223.98
5 Pek. Balok Anak 25/40 M³ 3.00 Rp 6,669,408.13 Rp 20,008,224.39
6 Pek. Ring Balok 15/20 M³ 3.30 Rp 4,926,296.14 Rp 16,256,777.27
7 Pek. Balok Tangga 20/30 M³ 0.34 Rp 4,926,296.14 Rp 1,674,940.69
8 Pek. Kolom Struktur 40/40 M³ 20.88 Rp 4,980,710.27 Rp 103,997,230.49
9 Pek. Kolom Praktis 15/15 M³ 3.26 Rp 6,931,411.17 Rp 22,596,400.41
10 Pek. Tangga M³ 1.20 Rp 3,867,173.97 Rp 4,640,608.77
11 Pek. Plat Lantai tebal 12 cm M³ 10.080 Rp 7,692,806.46 Rp 77,543,489.10
12 Pek. Lantai Kerja di Bawah Pondasi dan lantai M³ 5.80 Rp 1,246,476.09 Rp 7,224,575.40
SUB JUMLAH C Rp 608,686,814.96
D PEKERJAAN KAYU DAN KACA
1 Pek. Kusen Pintu, Jendela dan Ventilasi M³ 0.84 Rp 8,470,468.75 Rp 7,115,193.75
2 Pek. Pintu Panil Multipleks M² 8.08 Rp 784,386.25 Rp 6,337,840.90
3 Pek. Jendela Kaca Hidup M² 9.78 Rp 774,519.25 Rp 7,574,798.27
4 Pek. Kaca Mati dan Ventilasi M² 5 Rp 213,729.80 Rp 1,068,649.00
5 Pek. Plafond Gypsum Rangka Hollow M² 84 Rp 169,674.45 Rp 14,252,653.80
7 Pek. List Profil Plafond M' 103 Rp 31,423.75 Rp 3,236,646.25
SUB JUMLAH D Rp 39,585,781.97
HARGA JUMLAH
NO JENIS PEKERJAAN SATUAN QUANT SATUAN HARGA
(Rp) (Rp)
1 2 3 4 5 6=4X5
E PEKERJAAN ATAP
1 Pek. Penutup Atap (Multiroof) M² 166.277 Rp 323,499.00 Rp 53,790,443.22
2 Pek. Rangka Kuda-Kuda 8/12 M³ 0.980 Rp 7,376,071.25 Rp 7,228,549.83
3 Pek. Gording 8/12 M³ 0.220 Rp 7,254,056.25 Rp 1,595,892.38
4 Pek. Kasau 5/7 dan Reng 2/3 M² 64.110 Rp 44,823.55 Rp 2,873,637.79
5 Pek. Balok Nok 8/15 M³ 0.030 Rp 4,914,956.25 Rp 147,448.69
6 Pek. Listplank Fiber M' 45.000 Rp 97,893.75 Rp 4,405,218.75
7 Pek. Bubungan Plat M³ 41.660 Rp 241,030.80 Rp 10,041,343.13
SUB JUMLAH E Rp 80,082,533.78
F PEKERJAAN KUNCI DAN PENGGANTUNG
1 Kunci Tanam 2 Slaag bh 12.000 Rp 154,000.00 Rp 1,848,000.00
2 Engsel Pintu bh 36.000 Rp 35,000.00 Rp 1,260,000.00
3 Engsel jendela bh 50.000 Rp 11,000.00 Rp 550,000.00
4 Grendel Pintu bh 14.000 Rp 24,200.00 Rp 338,800.00
5 Grendel Jendela bh 30.000 Rp 10,000.00 Rp 300,000.00
6 Pegangan Jendela bh 13.000 Rp 8,200.00 Rp 106,600.00
7 Hak Angin Jendela bh 26.000 Rp 10,000.00 Rp 260,000.00
8 Relling Tangga Stainless Steel M² 7.320 Rp 350,000.00 Rp 2,562,000.00
SUB JUMLAH F Rp 7,225,400.00
G PEKERJAAN INSTALASI LISTRIK
1 Lampu SL 18 Watt bh 15.000 Rp 45,000.00 Rp 675,000.00
2 Lampu SL 9 Watt bh 4.000 Rp 35,000.00 Rp 140,000.00
3 Box MCB Unit 1.000 Rp 1,000,000.00 Rp 1,000,000.00
4 Stop Kontak bh 15.000 Rp 25,000.00 Rp 375,000.00
5 Saklar Tunggal bh 11.000 Rp 25,000.00 Rp 275,000.00
6 Saklar Ganda bh 4.000 Rp 25,000.00 Rp 100,000.00
7 Pek. Instalasi Titik Api Unit 28.000 Rp 225,000.00 Rp 6,300,000.00
SUB JUMLAH G Rp 8,865,000.00
H PEKERJAAN SANITASI
1 Pek. Septic Tank dan Resapan Unit 1.000 Rp 7,500,000.00 Rp 7,500,000.00
2 Pek. Bak Kontrol Unit 5.000 Rp 250,000.00 Rp 1,250,000.00
3 Pek. Menara Air Unit 1.000 Rp 5,000,000.00 Rp 5,000,000.00
4 Closed Duduk bh 4.000 Rp 3,641,245.00 Rp 14,564,980.00
5 Bak Fiberglass bh 1.000 Rp 350,000.00 Rp 350,000.00
6 Mesin Air bh 1.000 Rp 1,035,000.00 Rp 1,035,000.00
7 Pek. Sumur Bor Unit 1.000 Rp 2,000,000.00 Rp 2,000,000.00
8 Kran Air bh 4.000 Rp 49,800.75 Rp 199,203.00
9 Floor Drain bh 4.000 Rp 32,550.75 Rp 130,203.00
10 Pek. Bak Cuci Piring bh 1.000 Rp 810,652.25 Rp 810,652.25
11 Shower bh 3.000 Rp 250,000.00 Rp 750,000.00
12 Tangki Air bh 1.000 Rp 1,700,000.00 Rp 1,700,000.00
13 Exhaust Fan bh 1.000 Rp 225,000.00 Rp 225,000.00
14 Pek. Instalasi Air Bersih Unit 1.000 Rp 1,750,000.00 Rp 1,750,000.00
15 Pek. Instalasi Air Kotor Unit 1.000 Rp 3,750,000.00 Rp 3,750,000.00
SUB JUMLAH H Rp 41,015,038.25
I PEKERJAAN PENGECATAN
1 Pek. Pengecatan cat kayu untuk Kuda-Kuda M² 43.670 Rp 54,193.75 Rp 2,366,641.06
2 Pek. Pengecatan Plafond M² 84.000 Rp 28,002.50 Rp 2,352,210.00
6 Pek. Pengecatan Tembok + Kolom + Balok M² 1336.860 Rp 28,002.50 Rp 37,435,422.15
SUB JUMLAH I Rp 42,154,273.21
J PEKERJAAN LAIN-LAIN
1 Pek. Pembersihan Akhir Unit 1.000 Rp 200,000.00 Rp 200,000.00
SUB JUMLAH J Rp 200,000.00
FAKULTAS TEKNIK
PROGRAM STUDI TEKNIK SIPIL
UNIVERSITAS BENGKULU
MANAJEMEN KONSTRUKSI
REKAPITULASI
Rencana Anggaran Biaya (RAB)

KOMPLEKS PERUMAHAN
: PEMBANGUNAN RUMAHJANABIJANA
REAL ESTATE
PEKERJAAN TYPE 90 M²
VOLUME : 90 m2
LOKASI : Jln. Semarak Kel. Bentiring Kec. Muara Bangkahulu
Kota Bengkulu Prov. Bengkulu (Utara Kota BKL)
TAHUN ANGGARAN : 2020

I PEKERJAAN PERSIAPAN Rp8,237,764

II PEKERJAAN TANAH DAN PASIR Rp14,408,012

III PEKERJAAN PASANGAN DAN BETON Rp608,686,815

IV PEKERJAAN KAYU DAN KACA Rp39,585,782

V PEKERJAAN ATAP Rp80,082,534

VI PEKRJAAN KUNCI DAN PENGGANTUNG Rp7,225,400

VII PEKERJAAN INSTALASI LISTRIK Rp8,865,000

VIII PEKERJAAN SANITASI Rp41,015,038

IX PEKERJAAN PENGECATAN Rp42,154,273

X PEKERJAAN LAI-LAIN Rp200,000


###
JUMLAH Rp850,460,618

Pajak-pajak (10%) Rp85,046,062


###
TOTAL Rp935,506,680 ###
DIBULATKAN Rp935,510,000 ###
TERBILANG : Sembilan Ratus Tiga Puluh Lima Juta Lima Ratus ###
Sepuluh Ribu Rupiah
###

###
FAKULTAS TEKNIK
PROGRAM STUDI TEKNIK SIPIL
UNIVERSITAS BENGKULU
MANAJEMEN KONSTRUKSI
ESTIMASI PRODUKTIVITAS DAN DURASI PEKERJA
KOMPLEKS PERUMAHAN JANABIJANA
PEKERJAAN : PEMBANGUNAN RUMAH REAL ESTATE
VOLUME : 90 m2
LOKASI : Jln. Semarak Kel. Bentiring Kec. Muara Bangkahulu
Kota Bengkulu Prov. Bengkulu (Utara Kota BKL)
TAHUN ANGGARAN : 2020

Produktivitas/Hari Jumlah Produktivitas Per


No. Jenis Pekerjaan
(Orang/Volume) Pekerja Hari
Lantai 1
1 Persiapan
pemasangan bowplank

2 Galian dan pondasi


Penggalian 1 :. 2 m3 15 30 m3
Pondasi 1 :. 1 m3 10 10 m3
Penulangan Pondasi 1 :. 25 kg 25 625 kg
Timbunan 1 :. 4 m3 10 40 m3

3 Sloof
Penulangan 1 :. 25 kg 20 500 kg
> Sloof 15/20
> Tie beam 30/55
Total
Bekisting 1 :. 2.5 m2 15 37.5 m2
Pengecoran 1 :. 0.75 m3 4 3 m3
Bongkar

4 Kolom Lantai 1 dan 2


Penulangan 1 :. 25 kg 20 500 kg
> Kolom Utama 40/40
> Kolom praktis 15/15
Total
Bekisting 1 :. 2.5 m2 15 37.5 m2
Pengecoran 1 :. 0.75 m3 4 3 m3
Bongkar

5 Balok dan Pelat Lantai


Penulangan 1 :. 25 kg 25 625 kg
> Balok Utama 30/55
> Balok Anak 25/20
> Pelat
Total
Bekisting 1 :. 2.5 m2 10 25 m2
Pengecoran 1 :. 0.75 m3 4 3 m3
Bongkar

6 Kolom Lantai 2
Penulangan 1 :. 25 kg 20 500 kg
> Kolom Utama 40/40
> Kolom praktis 15/15
Total
Bekisting 1 :. 2.5 m2 2 37.5 m2
Pengecoran 1 :. 0.75 m3 2 1.5 m3
Bongkar

7 Tangga
Penulangan 1 :. 25 Kg 10 250 Kg
Bekisting 1 :. 2.5 m2 4 10 m2
Pengecoran 1 :. 0.75 m3 2 1.5 m3
Bongkar

8 Dinding, Kusen lantai I


Dinding 1 :. 0.5 m3 20 10 m3
Kusen pintu dan jendela 1 :. 0.05 m3 15 15 m3
ventilasi 4

9 Dinding, Kusen lantai II


Dinding 1 :. 0.5 m3 20 10 m3
Kusen pintu dan jendela 1 :. 0.05 m3 15 0.75 m3
ventilasi 4

10 Ring Balok 15/20


Penulangan 1 :. 25 kg 10 250 kg
Bekisting 1 :. 2.5 m2 2 5 m2
Pengecoran 1 :. 0.75 m3 2 1.5 m3
Bongkar

11 Atap
Kuda-kuda 1 :. 0.5 m3 5 2.5 m3
Atap Seng Gelombang Warna 1 :. 15 m2 8 120 m2
Lisplank 1 :. 10 m 5 50 m

12 Plafond 1 :. 5 m2 10 50 m2

13 Lantai
Pasir Pasang 4
Keramik 1 :. 6 m2 12 72 m2

14 Sanitasi
Pasang Keramik 1 :. 5 m2 5 25 m2
Kloset 2
Septictank dan bak kontrol 4

15 Plesteran 1 :. 9 m2 20 180 m2

16 Elektrikal dan mekanikal 6

17 Plumbing 6

18 Pengecatan dan Finishing


Pemasangan pintu dan jendela 2
Pengecetan Dinding 1 :. 30 m2 10 300 m2
Pengecatan kusen+pintu+jendela 1 :. 15 m2 4 60 m2
Pengecatan Plafond 1 :. 30 m2 6 180 m2
Pemasangan kitchen set 2

19 Landscaping 6

Total Durasi
SI PEKERJAAN
ANA

Bangkahulu
Kota BKL)

Durasi
Volume Pekerjaan
(Hari)

3
Total 3

43.390 m3 1
14.576 m3 1
3004.560 kg 5
53.424 m3 1
Total 7

63.526 kg
1597.590 kg 3
1661.122 kg 3
37.300 m2 1
3.730 m3 1
7
Total 15

1510.77 kg
673.27 kg
2184.04 kg 4
39.960 m2 1
3.996 m3 1
7
Total 13

1384.68 kg
287.10 kg
174.99 kg
1846.77 kg 3
39.90 m2 2
3.99 m3 1
14
Total 20

577.79 kg
741.57 kg
1319.36 3
39.96 m2 1
4.00 m3 1
7
Total 10

209.52 Kg 1
0.03 m2 1
0.0030 m3 1
7
Total 10

57.69 m3 6
0.69 m3 1
1
Total 8

57.69 m3 6
0.45 m3 1
1
Total 7

582.32 kg 2
24.30 m2 1
2.43 m3 1
14
Total 18

1.23 m3 0
166.28 m2 1
45.00 m 1
Total 3

84.00 m2 2
Total 2

2
153.00 m2 2
Total 4

40.06 m2 2
1
2
Total 5

894.86 m2 5

894.86 m2 3
43.67 m2 1
84.00 m2 1
1
Total 6

Durasi 143
NO JENIS PEKERJAAN KODE PEKERJAAN
1 PEKERJAAN PERSIAPAN A
2 PEKERJAAN CIVIL WORK DAN PONDASI B
3 PEKERJAAN KOLOM LANTAI 1 C
4 PEKERJAAN BALOK DAN PELAT LANTAI D
5 PEKERJAAN TANGGA E
6 PEKERJAAN KOLOM LANTAI 2 F
7 PEKERJAAN DINDING, KUSEN LANTAI 1 G
8 PEKERJAAN DINDING, KUSEN LANTAI 2 H
9 PEKERJAAN PLUMBING I
10 PEKERJAAN SANITASI J
11 PEKERJAAN RING BALOK K
12 PEKERJAAN ATAP L
13 PEKERJAAN INSTALASI LISTRIK M
14 PEKERJAAN PLESTERAN N
15 PEKERJAAN PLAFOND O
16 PEKERJAAN LANTAI P
17 PEKERJAAN PENGECATAN DAN FINISHING Q
18 PEKERJAAN LAIN-LAIN (LANSCAPING) R
KETERGANTUNGAN
- 3
A 22
B 13
C 20
C 10
D 10
D,E 8
F 7
G,H 2
I 5
H 18
K 3
L 2
L,M 5
N 3
I,O 4
P 5
Q 3
143
FAKULTAS TEKNIK
PROGRAM STUDI TEKNIK SIPIL
UNIVERSITAS BENGKULU
MANAJEMEN KONSTRUKSI
TIME SCHEDULE
KOMPLEKS PERUMAHAN JANABIJANA
PEKERJAAN : PEMBANGUNAN RUMAH REAL ESTATE
VOLUME : 90 m2
LOKASI : Jln. Semarak Kel. Bentiring Kec. Muara Bangkahulu
Kota Bengkulu Prov. Bengkulu (Utara Kota BKL)
TAHUN ANGGARAN : 2020

DANA BOBOT DURASI BOBOT JADWAL WAKTU PELAKSANAAN (MINGGU KE-)


NO. JENIS PEKERJAAN ( Rp.) (%) ( Hari ) PER HARI 1 2 3 4 5 6 7 8 9 10
(%) 1 2 3 4 5 6 7 1 2 3 4 5 6 7 1 2 3 4 5 6 7 1 2 3 4 5 6 7 1 2 3 4 5 6 7 1 2 3 4 5 6 7 1 2 3 4 5 6 7 1 2 3 4 5 6 7 1 2 3 4 5 6 7 1
1 PEKERJAAN PERSIAPAN 8,237,764 0.969 3 0.323 ### 0.323 0.323
2 PEKERJAAN CIVIL WORK DAN PONDASI 131,527,059 15.465 22 0.703 0.703 0.703 0.703 0.703 0.703 0.703 0.703 0.703 0.703 0.703 0.703 0.703 0.703 0.703 0.703 0.703 0.703 0.703 0.703 0.703 0.703 0.703
3 PEKERJAAN KOLOM LANTAI 1 63,296,815 7.443 13 0.573 0.573 0.573 0.573 0.573 0.573 0.573 0.573 0.573 0.573 0.573 0.573 0.573 0.573
4 PEKERJAAN BALOK DAN PELAT LANTAI 160,164,937 18.833 20 0.942 0.942 0.942 0.942 0.942 0.942 0.942 0.942 0.942 0.942 0.942 0.942 0.942 0.942 0.942 0.942 0.942 0.942 0.942 0.942 0.942
5 PEKERJAAN TANGGA 6,315,549 0.743 10 0.074 0.074 0.074 0.074 0.074 0.074 0.074 0.074 0.074 0.074
6 PEKERJAAN KOLOM LANTAI 2 63,296,815 7.443 10 0.744 0.744
7 PEKERJAAN DINDING, KUSEN LANTAI 1 41,034,369 4.825 8 0.603
8 PEKERJAAN DINDING, KUSEN LANTAI 2 41,034,369 4.825 7 0.689
9 PEKERJAAN PLUMBING 5,500,000 0.647 2 0.323
10 PEKERJAAN SANITASI 35,515,038 4.176 5 0.835
11 PEKERJAAN RING BALOK 16,256,777 1.912 18 0.106
12 PEKERJAAN ATAP 80,082,534 9.416 3 3.139
13 PEKERJAAN INSTALASI LISTRIK 8,865,000 1.042 2 0.521
14 PEKERJAAN PLESTERAN 70,165,057 8.250 5 1.650
15 PEKERJAAN PLAFOND 17,489,300 2.056 3 0.685
16 PEKERJAAN LANTAI 59,324,960 6.976 4 1.744
17 PEKERJAAN PENGECATAN DAN FINISHING 42,154,273 4.957 5 0.991
18 PEKERJAAN LAIN-LAIN (LANDSCAPING) 200,000 0.024 3 0.008
Kemajuan Fisik Per Minggu 3.781 4.921 4.921 4.531 4.011 5.487 6.594 6.668 2.402 5.356
850,460,618 100 % 143
Komulati (%) 3.781 8.702 13.623 18.154 22.165 27.652 34.246 40.914 43.316 48.672
f
10 11 12 13 14 15 16 17 18 19 20
2 3 4 5 6 7 1 2 3 4 5 6 7 1 2 3 4 5 6 7 1 2 3 4 5 6 7 1 2 3 4 5 6 7 1 2 3 4 5 6 7 1 2 3 4 5 6 7 1 2 3 4 5 6 7 1 2 3 4 5 6 7 1 2 3 4 5 6 7 1 2 3 4 5 6 7

0.074
0.744 0.744 0.744 0.744 0.744 0.744 0.744 0.744 0.744
0.603 0.603 0.603 0.603 0.603 0.603 0.603 0.603
0.689 0.689 0.689 0.689 0.689 0.689 0.689
0.323 0.323
0.835 0.835 0.835 0.835 0.835
0.106 0.106 0.106 0.106 0.106 0.106 0.106 0.106 0.106 0.106 0.106 0.106 0.106 0.106 0.106 0.106 0.106 0.106
3.139 3.139 3.139
0.521 0.521
1.650 1.650 1.650 1.650 1.650
0.685 0.685 0.685
1.744 1.744 1.744 1.744
0.991 0.991 0.991 0.991 0.991
0.008 0.008 0.008
5.356 5.850 4.651 2.342 0.742 0.742 11.250 9.620 7.663 8.443 0.024

48.672 54.522 59.173 61.515 62.257 62.999 74.249 83.869 91.532 99.975 100.00