Bobot
No Uraian Pekerjaan Vol B1 B2 Sisa
Jumlah
M1 M2 M3 M4 M5 M6 M7 M8 M9 %
JUMLAH PROGRES MINGGUAN 100.00 - - - 3.188 6.277 15.490 12.316 16.313 16.447 70.032 #REF!
AKUMULASI PROGRES MINGGUAN - - - - 3.188 9.466 24.955 37.272 53.585 70.032
SELISIH - - - 3.188 7.077 21.265 32.582 47.895 63.342
KURVA S
80
70.032
70
60
53.585
50
37.272 40
24.955 30
20
9.466
10
3.188
- - -
0
-10
M1 M2 M3 M4 M5 M6 M7 M8 M9
AKUMULASI PROGRES MINGGUAN - - - 3.188 9.466 24.955 37.272 53.585 70.032
Kontraktor Pelaksana
CV. MUDA PUTRA KARYA