COORDINATES AS-SSP PER 20 m

E
,KG
POINTS EASTING NORTHING

ON R
SSP-01 414898.898 9235691.796

LO
.B
SSP-02 414912.358 9235677.002

K
SSP-03 414925.817 9235662.209
SSP-04 414939.276 9235647.415
SSP-05 414952.735 9235632.622
SSP-06 414966.194 9235617.828
SSP-07 414979.652 9235603.032
SSP-08 414991.077 9235586.650
SSP-09 414998.241 9235568.006

EL
EL
SSP-10 415000.155 9235557.588

LE TE
LE TE

PI S

EL
PI S

T NA
T NA

LE TE
EE CA
EE CA

PI S
SH N

T NA
SH N

RE
RE

EE CA
SH N
RE
KISTDAM HULU
SSP-01

SSP-02

SSP-03

SSP-04

SSP-05

SSP-06

SSP-07

8
SSP-0

9
P-0
SS

10
P-
SS
SITUASI PEMANCANGAN STEEL SHEET PILE KISTDAM HULU KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
SKALA 1:500 DIREKTORAT JENDERAL SUMBER DAYA AIR
BALAI BESAR WILAYAH SUNGAI PEMALI JUANA
SNVT PELAKSANAAN JARINGAN PEMANFAATAN AIR
PPK PENYEDIAAN AIR BAKU
Jl. Brigjen S.Sudiarto no. 375 Semarang, Telp./Fax (024) 6732046
NO. REGISTER WIKA-SD-PPABKDL-PGL- -
CONSTRUCTION DRAWING
PEMBANGUNAN PENYEDIAAN AIR BAKU NO. LEMBAR - R0
KABUPATEN KENDAL (MYC) JUMLAH LEMBAR 11
KONTRAKTOR : KONSULTAN SUPERVISI : PT. INAKKO INTERNASIONAL KONSULINDO -
PT. HILMI ANUGERAH CONSULTING ENGINEER KSO.
KONTRAK NO. :
PT. WIJAYA KARYA (PERSERO). Tbk KU.03.01 / Ao.9.4/03/MYC/XI/2020 KONTRAK NO. : KU.03.01 / Ao.7.12/Ao.6.3/Sup - 01/MYC/VI/2020
GAMBAR DISETUJUI

MANAGER KONSULTAN SUPERVISI KOORINATOR PELAKSANA


PPK PAB
PROYEK TEAM LEADER PELAKSANAAN TEKNIK
SITUASI PEMANCANGAN STEEL
SHEET PILE KISTDAM HULU
EKO MARSUDI UTOMO, ST. Ir. RIMBAR YUNUS, Dipl HE. EKO BUDI C., S.T., M.T. EKO BUDI C., S.T., M.T. CHANIF, ST. MT.
t = 10.5 mm
STEEL SHEET PILE

300 mm
h = 100 mm

AS-SSP

w = 400 mm

DETAIL STEEL SHEET PILE


SKALA 1:10

0.40 0.40

w = 400 mm h = 100 mm

300 mm h = 100 mm
0.80 0.80

TAMPAK DEPAN SSP TAMPAK SAMPING SSP TAMPAK ATAS STEEL SHEET PILE
SKALA 1:10 SKALA 1:10 SKALA 1:10

KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT


DIREKTORAT JENDERAL SUMBER DAYA AIR
BALAI BESAR WILAYAH SUNGAI PEMALI JUANA
SNVT PELAKSANAAN JARINGAN PEMANFAATAN AIR
PPK PENYEDIAAN AIR BAKU
Jl. Brigjen S.Sudiarto no. 375 Semarang, Telp./Fax (024) 6732046
NO. REGISTER WIKA-SD-PPABKDL-PGL- -
CONSTRUCTION DRAWING
PEMBANGUNAN PENYEDIAAN AIR BAKU NO. LEMBAR - R0
KABUPATEN KENDAL (MYC) JUMLAH LEMBAR 11
KONTRAKTOR : KONSULTAN SUPERVISI : PT. INAKKO INTERNASIONAL KONSULINDO -
PT. HILMI ANUGERAH CONSULTING ENGINEER KSO.
KONTRAK NO. :
PT. WIJAYA KARYA (PERSERO). Tbk KU.03.01 / Ao.9.4/03/MYC/XI/2020 KONTRAK NO. : KU.03.01 / Ao.7.12/Ao.6.3/Sup - 01/MYC/VI/2020
GAMBAR DISETUJUI

MANAGER KONSULTAN SUPERVISI KOORINATOR PELAKSANA


PPK PAB
PROYEK TEAM LEADER PELAKSANAAN TEKNIK
DETAIL STEEL SHEET PILE

EKO MARSUDI UTOMO, ST. Ir. RIMBAR YUNUS, Dipl HE. EKO BUDI C., S.T., M.T. EKO BUDI C., S.T., M.T. CHANIF, ST. MT.