SHIFT: HARI: TANGGAL: BULAN: TAHUN: WAKTU KETERANGAN KEGIATAN NOMOR UNIT : 7.00 S/D 8.00 S/D LOKASI LOADING : 9.00 S/D 10.00 S/D LOKASI DUMPUING : 11.00 S/D 12.00 S/D MATERIAL : SHIFT 13.00 S/D KERJA 14.00 S/D TOTAL JAM KERJA : 15.00 S/D 16.00 S/D KM AWAL : 17.00 S/D KM AKHIR : 18.00 S/D FUEL : 19.00 S/D KET 3 RANGKAP PUTIH:OFFICE, MERAH: DEPT, KUNING:OPERATOR
OPERATOR PENGAWAS TID
TIME SHEET DAILY ACTIVITY PROJECT TANAH
PT. TEMPOPRESS INTERNASIONAL DELIVERY
SHIFT: HARI : TANGGAL: BULAN: TAHUN:
WAKTU KETERANGAN KEGIATAN NOMOR UNIT : 7.00 S/D 8.00 S/D LOKASI LOADING : 9.00 S/D 10.00 S/D LOKASI DUMPUING : 11.00 S/D 12.00 S/D MATERIAL : SHIFT KERJA 13.00 S/D 14.00 S/D TOTAL JAM KERJA : 15.00 S/D 16.00 S/D KM AWAL : 17.00 S/D KM AKHIR : 18.00 S/D FUEL : 19.00 S/D KET 3 RANGKAP PUTIH:OFFICE, MERAH: DEPT, KUNING:OPERATOR