PEKERJAAN : PEMBANGUNAN RUANG KELAS BARU 4 LOKAL LOKASI :- TAHUN ANGGARAN :-
NOMOR HARGA SATUAN
NO URAIAN PEKERJAAN SAT VOLUME TOTAL HARGA ANALISA (RP) I PEKERJAAN PERSIAPAN 1 Pengukuran dan Pasang Bouwplank m1 184.0 1.4 Rp 29,350.00 Rp 5,400,400.00 SUBTOTAL (I) PEKERJAAN PESIAPAN Rp 5,400,400.00 II PEKERJAAN TANAH DAN PASIR 1 Galian tanah pondasi m3 91.0 2.1 Rp 39,750.00 Rp 3,617,250.00 2 Mengurug kembali galian pondasi m3 30.0 2.9 Rp 13,220.00 Rp 396,600.00 3 Urugan pasir bawah pondasi m3 12.0 2.11 Rp 117,900.00 Rp 1,414,800.00 4 Urugan tanah peninggian lantai disiram m3 57.0 2.15 Rp 91,550.00 Rp 5,218,350.00 5 Pemadatan tanah m3 57.0 2.10 Rp 29,500.0 Rp 1,681,500.00 SUBTOTAL (II) PEKERJAAN TANAH DAN PASIR Rp 12,328,500.00 III PEKERJAAN PASANGAN 1 Pasangan batu kosong m3 24.0 3.1 Rp 298,600.00 Rp 7,166,400.00 2 Pasangan pondasi batu 1 pc : 5 ps m3 37.0 3.7 Rp 518,140.00 Rp 19,171,180.00 3 Pasangan dinding 1/2 bata 1 pc : 5 ps m2 420.0 4.12 Rp 87,684.00 Rp 36,827,280.00 4 Pasangan dinding 1/2 bata 1 pc : 3 ps m2 40.0 4.10 Rp 93,231.00 Rp 3,729,240.00 SUB TOTAL (III) PEKERJAAN PASANGAN Rp 66,894,100.00 IV PEKEJAAN BETON 1 Sloop 13/20 m3 3.3 7.38 Rp 3,547,293.57 Rp 11,706,068.78 2 Kolom 13/20 m3 3.0 7.43 Rp 5,284,875.07 Rp 15,854,625.21 3 Balok 13/20 m3 1.2 7.55 Rp 4,468,325.79 Rp 5,361,990.95 4 Kolom praktis 10/10 m3 0.4 7.45 Rp 6,936,237.76 Rp 2,774,495.10 5 Kolom struktur 15/15 (selasar) m3 1.0 7.44 Rp 4,793,455.69 Rp 4,793,455.69 6 Balok ring, geuvel 10/15 m3 4.0 7.59 Rp 6,918,469.95 Rp 27,673,879.80 SUB TOTAL (IV) PEKERJAAN BETON Rp 68,164,515.53 V PEKERJAAN PLESTERAN DAN LANTAI 1 Pek. Lantai keramik 40x40 (Lt.1+Lt.2) m2 280.0 13.2 Rp 144,564.00 Rp 40,477,920.00 2 Plesteran m2 713.0 5.8 Rp 42,271.00 Rp 30,139,223.00 3 Acian plesteran m2 713.0 5.32 Rp 23,425.00 Rp 16,702,025.00 SUB TOTAL (V) PEKERJAAN PLESTERAN DAN LANTAI Rp 87,319,168.00 VI PEKERJAAN KAYU DAN ALUMINIUM 1 Listplank kayu klas II m' 152.0 6.40 Rp 61,750.00 Rp 9,386,000.00 2 Kusen kayu klas II m3 2.1 6.2 Rp 6,103,562.50 Rp 13,061,623.75 3 Daun jendela kaca m2 42.0 6.10 Rp 332,100.00 Rp 13,948,200.00 4 Daun pintu panil m2 6.5 6.6 Rp 466,640.00 Rp 3,033,160.00 5 Pek. Ventilasi krepyek m2 23.0 6.18 Rp 268,450.00 Rp 6,174,350.00 6 Kaca polos 3 mm m2 41.0 12.7 Rp 138,667.50 Rp 5,685,367.50 SUB TOTAL (VI) PEKERJAAN KAYU DAN ALUMINIUM Rp 51,288,701.25 VII PEKERJAAN ATAP / PLAFOND 1 Pek. Rangka baja ringan m2 517.0 LS Rp 225,000.00 Rp 116,325,000.00 2 Atap genteng pejaten lokal m2 517.0 8.4 Rp 61,835.00 Rp 31,968,695.00 3 Bubungan genteng pejaten m' 40.0 8.5 Rp 37,280.00 Rp 1,491,200.00 4 Plafond calsiboard 3,5 mm rangka kayu m2 438.0 9.21 Rp 80,620.00 Rp 35,311,560.00 5 List gifsum C7 m' 312.0 9.23 Rp 25,090.00 Rp 7,828,080.00 SUB TOTAL (VII) PEKERJAAN ATAP / PLAFOND Rp 192,924,535.00 VIII PEKERJAAN BESI 1 Kunci pintu 2 slang besar bh 4.0 12.1 Rp 161,070.00 Rp 644,280.00 2 Engsel pintu bh 12.0 12.4 Rp 39,722.50 Rp 476,670.00 3 Engsel jendela bh 88.0 12.5 Rp 23,200.00 Rp 2,041,600.00 4 Hak angin kecil bh 88.0 12.7 Rp 27,500.00 Rp 2,420,000.00 5 Grendel kecil bh 88.0 12.6 Rp 21,545.00 Rp 1,895,960.00 SUB TOTAL (VIII) PEKEJAAN BESI Rp 7,478,510.00 IX PEKERJAAN INSTALASI LISTRIK 1 Titik lampu + instalasi bh 16.0 16.1 Rp 173,500.00 Rp 2,776,000.00 2 Lampu SL 18 watt bh 16.0 16.6 Rp 39,900.00 Rp 638,400.00 3 Saklar dobell bh - 16.4 Rp 55,000.00 Rp - 4 Saklar tunggal bh 8.0 16.3 Rp 55,000.00 Rp 440,000.00 5 Stop kontak bh 4.0 16.2 Rp 56,000.00 Rp 224,000.00 SUB TOTAL (IX) PEKERJAAN INSTALASI LISTRIK Rp 4,078,400.00 X PEKERJAAN PENGECATAN 1 Cat tembok m2 713.0 14.14 Rp 20,644.00 Rp 14,719,172.00 2 Cat plapond m2 438.0 14.14 Rp 20,644.00 Rp 9,042,072.00 3 Cat kayu m2 155.0 14.8 Rp 27,950.00 Rp 4,332,250.00 SUB TOTAL (X) PEKERJAAN PENGECATAN Rp 28,093,494.00 XI PEKERJAAN PENGADAAN MEUBELAIR 1 Meja belajar bh 48.0 Rp 650,000.00 Rp 31,200,000.00 2 Kursi siswa bh 96.0 Rp 175,000.00 Rp 16,800,000.00 3 Meja kerja 1/2 biro bh 4.0 Rp 725,000.00 Rp 2,900,000.00 4 kursi kerja bh 4.0 Rp 250,000.00 Rp 1,000,000.00 5 lemari kelas bh 4.0 Rp 1,350,000.00 Rp 5,400,000.00 6 Tempat sampah bh 4.0 Rp 100,000.00 Rp 400,000.00 7 Papan tulis (whiteboard) bh 4.0 Rp 350,000.00 Rp 1,400,000.00 SUB TOTAL (XI) PEKERJAAN PENGADAAN MEUBLAELAIR Rp 59,100,000.00 TOTAL : I + II + III + IV + V + VI + VII + VIII + IX + X + XI Rp 583,070,323.78 PEMBULATAN Rp 583,070,000.00