STANDAR HARGA SATUAN BAHAN BANGUNAN DAN UPAH KERJA

PEMERINTAH PROVINSI SULAWESI SELATAN


KABUPATEN MAROS
TAHUN 2018

(Dalam Rupiah (Rp)

NO BAHAN DASAR SPESIFIKASI SATUAN HARGA

1 2 3 4 5
A BAHAN DASAR
1 Batu Kali m3 137,812.50
2 Chipping/Batu Pecah m3 301,875.00
3 Batu Gunung m3 146,632.50
4 Tanah Timbunan/Urugan m3 103,083.75
PASIR m3
5 Maros m3 121.275,00
6 Bili-bili m3 137.812,50
7 Timbunan / Urugan (Lokal) m3 128.992,50
8 Pasangan (Luar) m3 162.750,00
9 Beton m3 303.187,50
10 Kerikil/Koral Beton m3 333.506,25
11 Sirtu Saring m3 187.425,00
12 Sirtu Sungai m3 170.887,50
13 Kapur Pasangan m3 242.500,00
SEMEN (PC)
14 Semen PC 50 Kg Kg 1.261,26
15 Semen Putih (50 Kg) / Semen Warna Kg 1.819,13
16 Semen PC 40 Kg Kg 1.267,88
17 Batu Merah bh 544,95
18 Paving Block 21 x 10,5 x 6 cm K 225 m2 54.573,75
2
19 Paving Block 21 x 10,5 x 8 cm K 225 m 60.637,50
20 Paving Block 21 x 10,5 x 8 cm K 250 m2 66.701.25
2
21 Paving Block 21 x 10,5 x 8 cm K 300 m 74.970,00
22 Paving Block 21 x 10,5 x 8 cm K 350 m2 84.892,50
23 Paving Block 21 x 10,5 x 8 cm K 400 m2 109.390,05
24 Paving Block 21 x 10,5 x 10 cm K 400 m2 112.178,85
25 Paving Block segi 6 K 225 (10x10x6) cm m2 48,510,00
26 Paving Block segi 6 K 225 (10x10x8) cm m2 54.573,75
27 Grass Blok (54 x 36 x 10) cm m2 145,530,00
28 Topi uskup k 300 Tebal 6 Cm Biji 5,512,50
29 Topi uskup k 300 Tebal 8 Cm Biji 5,512,50
30 Hollow Brick P2B (9 x 19 x 39) cm m2 36.988,88
31 Hollow Brick P2K (9 x 19 x 39) cm m2 42,446,25
32 Kastin K 225 Kecil ( 20 x 25 x 50) cm bh 24,255,00
33 Kastin K 225 Besar ( 25 x 30 x 50) cm bh 36,382,50
34 Kastin K 225 (15 x 30 x 40) cm bh 27,562,50
35 Kastin K 225 (15 x 25 x 50) cm bh 30.318,75
36 Kastin K 225 (15 x 25 x 40) cm bh 24,806,25
37 Panel Pra cetak (5 x 40 x 240 ) cm Lbr 137,812,50
38 Tiang Pra Cetak 1,50 m 3 Susun 209.475,00
39 Tiang Pra Cetak 2,20 m 4 Susun 248.062,50
40 Tiang Pra Cetak 2,50 m 5 Susun 292.162,50
41 Tiang Pra Cetak 3,00 m 6 Susun 330.750,00
42 Tiang Pra Cetak 3,40 m 7 Susun 374.850,00
43 Tiang Pra Cetak 3,50 m 8 Susun 441.000,00
44 Bata Ringan m3 787.500,00
45 Gorong-Gorong 15 x 1 M bh 132.300,00
46 Gorong-Gorong 30 x 1 M bh 192.937,50

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
(Dalam Rupiah (Rp)

NO BAHAN DASAR SPESIFIKASI SATUAN HARGA

1 2 3 4 5
47 Gorong-Gorong 50 x 1 M bh 275.625,00
48 Gorong-Gorong 60 x 1 M bh 330.750,00
49 Aspal Beton Mikro ton 879.243,75
50 Aspal Bitumen Kg 11.025,00
B BAHAN KAYU
1 Kayu Klas I Bayam m3
Balok Gergaji Sawmil m3 11.521.125,00
Balok Gergaji Shansaw m3 7.882.875,00
Papan Gergaji Sawmil m3 13.946.625,00
Papan Gergaji Shansaw m3 8.489.250,00
Kayu Klas I (Sappu/Ulin) m3
Balok Sappu/Ulin m3 12.127.500,00
2 Kayu Klas II (Kumea)
Papan Sawmil m3 6.058.500,00
3
Balok Shansaw m 4.410.000,00
3 Kayu Klas II
Papan m3 3.969.000,00
3
Balok m 3.638.250,00
4 Kayu Klas III
Papan m3 2.590.875,00
3
Balok m 2.205.000,00
5 Kayu Papan Siri-siri Kls I Sappu (Ulin) / Bayam
Uk. 0.80 x 0.06 x 0.01 m lbr 2.756,25
Uk. 1.00 x 0.06 x 0.01 m lbr 2.921,63
Uk. 1.20 x 0.06 x 0.01 m lbr 3.307,50
Uk. 1.25 x 0.06 x 0.01 m lbr 3.858,75
Uk. 1.50 x 0.06 x 0.01 m lbr 4.134,38
C BAHAN LANTAI
1 Tegel PC
PC Abu-abu 20 x 20 cm bh 1.940,40
PC Abu-abu 30 x 30 cm bh 3.274,43
PC Warna 20 x 20 cm bh 3.638,25
PC Badak 20 x 20 cm bh 2.789,33
PC Badak 30 x 30 cm bh 3.153,15
PC Wafel 20 x 20 cm bh 3.395,70
PC Wafel 30 x 30 cm bh 3.698,89
Plint PC 15 x 20 cm bh 3.274,43
Plint PC 15 x 30 cm bh 7.519,05
Tegel Mozaik 30 x 30 cm bh 8.731,80
2 Tegel Keramik
Putih 10 x 20 cm dos / m2 46.690,88
Warna 10 x 20 cm dos / m2 53.361,00
2
Putih 30 x 30 cm ( Kasar ) dos / m 53.361,00
Warna 30 x 30 cm dos / m2 60.031,13

Putih 20 x 25 cm dos / m2 53.361,00

Warna 20 x 25 cm dos / m2 56.029,05


Putih 20 x 20 cm dos / m2 53.361,00
Warna 20 x 20 cm dos / m2 56.312,55
2
Putih 30 x 30 cm Polos (Setara Mulia) dos / m 45.356,85
Warna 30 x 30 cm (Setara Essensa) dos / m2 226.874,25
Warna 30 x 30 cm (Setara Asia) dos / m2 60.031,13
Warna 30 x 60 cm (Setara Roman) dos / m2 181.912,50
Putih 40 x 40 cm dos / m2 77.373,45

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
(Dalam Rupiah (Rp)

NO BAHAN DASAR SPESIFIKASI SATUAN HARGA

1 2 3 4 5
Warna 40 x 40 cm (Setara Asia/Ina) dos / m2 66.701,25
Warna 50 x 50 cm (Ex. Supermilan) dos / m2 90.666,45
2
Warna 60 x 60 cm dos / m 187.645,50
Bt. Alam 20 x 20 cm m2 220.500,00
Lantai Acrylic
Tebal 10 mm Lbr 2.094.750,00
Tebal 12 mm (2.25 m x 1.2 m) Lbr 2.425.500,00
Tebal 15 mm Lbr 2.976.750,00
D BAHAN KACA
Kaca Bening 3 mm m2 99.225,00
Kaca Bening 5 mm m2 132.300,00
Kaca Bening 2 mm m2 0,00
Kaca Buram 3 mm m2 120.062,25
Kaca Buram 5 mm m2 253.575,00
Kaca Rayben 3 mm m2 146.742,75
Kaca Rayben 5 mm m2 220.114,13
2
Kaca Cermin (3 mm) m 253.575,00
Kaca Cermin (5 mm) m2 330.750,00
2
Kaca One Way m 533.610,00
Kaca 8 mm m2 330.750,00
Kaca 10 mm m2 418.950,00
2
Kaca 12 mm m 496.125,00
Kaca Nako Lengkap Teralis 7 mata set 400.474,31
E BAHAN BESI
Besi Beton (SI = full )
Ø = 4 mm btg 18.676,35
Ø = 6 mm btg 40.020,75
Ø = 8 mm btg 60.031,13
Ø = 10 mm btg 86.711,63
Ø = 12 mm btg 114.726,15
Ø = 14 mm btg 180.093,38
Ø = 16 mm btg 213.444,00
Ø = 19 mm btg 293.485,50
Ø = 20 mm btg 333.506,25
Besi Ulir
Ø = 12 mm btg 129.543,75
Ø = 14 mm btg 174.746,25
Ø = 16 mm btg 303.738,75
Paku
Paku Biasa (4-10 cm) Kg 21.334,40
Paku Asbes Kg 26.680,50
Paku Seng (Payung) RRC Kg 26.680,50
Paku Skrup 3 1/2" Kg 22.945,23
Paku Skrup 4 " Kg 28.014,53
Paku Payung Berulir 75 mm Kg 33.350,63
Paku Sirap Kg 20.010,38
Paku Beton hitam dos 26.680,50
Paku Beton Putih dos 13.340,25
Paku Atap Spandek Baja BHHP G 550 biji 2.401,25
Paku Seng RRC Uk 5 cm biji 133,40
Paku Seng RRC Uk 6 cm biji 166,75
Paku Beton / Sappu Uk. 5 cm biji 266,81
Paku Beton / Sappu Uk. 6 cm biji 366,86
Paku Beton / Sappu Uk. 7 cm biji 500,26

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
(Dalam Rupiah (Rp)

NO BAHAN DASAR SPESIFIKASI SATUAN HARGA

1 2 3 4 5
Paku Beton / Sappu Uk. 10 cm biji 933,82
Kawat
Beton Kg 24.012,45
Nyamuk m 26.680,50
Ayakan Kecil m 19.950,00
Duri roll 180.093,38
Kawat Digalvano
3 mm Kg 24.012,45
4 mm Kg 24.012,45
5 mm Kg 24.012,45
Besi Plat
2 mm = 120 x240 mm lbr 375.375,00
3 mm = 120 x240 mm lbr 787.500,00
Besi H 15 cm 12 m Panjang btg 4.273.500,00
Besi Strep
30.3 mm = 3 m btg 24.012,45
35.4 mm = 3 m btg 26.680,50
46.4 mm = 3 m btg 42,688.80
40.6 mm = 3 m btg 38.953,53
50.6 mm = 6 m btg 49.625,73
60.6 mm = 6 m btg 58.296,89
Besi Siku = 6 m'
30.30.3 btg 100.051.88
40.40.4 btg 166.753,13
50.50.5 btg 280.145,25
60.60.6 btg 182.155,05
70.70.7 m 188.218,80
40.40.3 btg 103.326,30
50.50.4 btg 121.498,65
Baja Tralis kg 21.829,50
Pipa Besi Kotak Hembos 40 x 40 x2.60 (pjg = 6m) btg 133.402,50
Besi Plat Cakar Ayam uk: 1,2 x 2,4 x 2,6 lbr 1.091.475,00
Kawat Las Biasa kg 23.625,00
Kawat Las Stainless kg 42.446,25
Kawat Las Listrik kg 30.450,00
Pipa GIP Ø 2,50 medium A m' 25.200,00
Besi Siku 30 x 3 x 30 m' 1.470,00
Pagar Besi Kotak Hembos Uk : unit 0,00
7,5x3,75,2,6 Tinggi 1,1 0 m + Biaya Pasang 0,00
Roda Pintu Besi bh 28.875,00
Engsel Pintu Dorong Kupu-kupu psg 26.250,00
Besi Beton Biasa Kg 10.694,25
Besi Beton Ulir 24 Kg 11.884,95
Besi Galvanisir m 26.250,00
Besi Pagar BRC 90 x 2,40 m set 630.000,00
Besi Pagar BRC 100 x 2,40 m set 656.250,00
Besi Pagar BRC 120 x 2,40 m set 708.750,00
Besi Pagar BRC 150 x 2,40 m set 606.375,00
Pintu Pagar BRC 90 x 2,40 m set 1.050.000,00
Pintu Pagar BRC 120 x 2,40 m set 1.260.000,00
Pintu Pagar BRC 150 x 2,40 m set 1.417.500,00
Hollow Galfanis 4/4 Kg 6.366,94
Besi Strip 4/0.4 (Plat Baja) Kg 23.042,25

F BAHAN ALUMUNIUM
Alumunium Warna (2" x 1") 6 m m' 60.637,50

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
(Dalam Rupiah (Rp)

NO BAHAN DASAR SPESIFIKASI SATUAN HARGA

1 2 3 4 5
Alumunium Warna (3" x 1") 6 m m' 72.765,00
Alumunium Warna (4" x 1") 6 m m' 93.381,75
Baja Ringan Canai Dingin Kg 13.893,17
Web C75.75 m' 9.738,38
Top Span 40 m' 6.063,75
ZA, G550 m' 6.269,92
Main Truss 1.05 TCT m' 6.570.07
Web 0,8 TCT m' 6.470,03
Ancor / Seng Pelapis Genteng m' 66.701,25
Kusen Rangka Aluminium 4" m' 127.338,75
Bingkai Pintu/Jendela Aluminium m' 103.083,75
Aluminium Composite Panel (indoor) m2 0,00
Aluminium Composite Panel (out door) m2 0,00
Tarikan Pintu Aluminium bh 37.485,00
G BAHAN PIPA
1 Pipa Besi GIP
Ø1/2 " - 6 m Tbl 1,4 mm btg 73.500,00
Tbl 2,2 mm 94.500,00
Tbl 2,6 mm btg 115.500,00
Ø3/4 " - 6 m Tbl 2,4 mm btg 126.000,00
Tbl 2,6 mm btg 168.000,00
Ø1 " - 6 m Tbl 2,4 mm btg 152.250,00
Ø1 1/2 " - 6 m Tbl 2,4 mm btg 183.750,00
Ø2"-6m Tbl 2,4 mm btg 236.250,00
Ø 2 1/2 " - 6 m Tbl 3 mm btg 341.250,00
Ø3"-6m Tbl 3 mm btg 393.750,00
2 Pipa Paralon PVC
Ø 1/2 " - 4 m AW btg 18.375,00
Ø 3/4 " - 6 m AW btg 28.875,00
Ø 1 " - 6m AW btg 45.937,50
Ø1 1/2 " - 6 m AW btg 55.125,00
Ø 2 " - 6 m AW btg 42.000,00
Ø 2 1/2 " - 6 m AW btg 47.250,00
Ø 3 " - 6m AW btg 52.500,00
Ø 4 " - 6m AW btg 78.750,00
Ø 5 " - 6m AW btg 667.012,50
Ø 6 " - 6m AW btg 1.165.331,48
Ø 8 " - 6m AW btg 1.876.851,90
Ø 10 " - 6m AW btg 2.914.965,90
3 Pipa Paralon PVC (Setara Wavin)
Ø 1/2 " - 4 m AW (Setara Wavin) btg 20.010,38
Ø 3/4 " - 4 m AW btg 26.250,00
Ø 1 " - 4 m AW btg 36.018,15
Ø1 1/2 " - 4 m AW btg 63.350,00
Ø 2 " - 4 m AW btg 80.500,00
Ø 2 1/2 " - 4 AW btg 126.00,00
Ø 3 " - 4m AW btg 148.750,00
Ø 4 " - 4m AW btg 183.050,00
Ø1 1/2 " - 4 m D btg 41.475,00
Ø2"-4mD btg 51.100,00
Ø 2 1/2 " - 4 D btg 64.750,00
Ø 3 " - 4m D btg 83.125,00
Ø 4 " - 4m D btg 131.250,00
4 Jenis Batang D Untuk Saluran Pembuangan Air
Ø 1/2 " - 4m btg 19.950,00
Ø 3/4 " - 4m btg 26.250,00

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
(Dalam Rupiah (Rp)

NO BAHAN DASAR SPESIFIKASI SATUAN HARGA

1 2 3 4 5
Ø 1 " - 4m btg 36.750,00
Ø 11/2" - 4m btg 37.275,00
Ø 2 " - 4m btg 53.025,00
Ø 21/2" - 4m btg 65.625,00
Ø 3 " - 4m btg 84.000,00
Ø 4 " - 4m btg 136.500,00
Ø 5 " - 4m btg 236.250,00
Ø 6 " - 4m btg 278.250,00
Ø 8 " - 4m btg 472.500,00
Ø 10 " - 4m btg 126.000,00
5 Jenis Batang C Untuk Instalasi Listrik
Ø 5/8 " - 4m btg 8.925,00
Ø 3/4 " - 4m btg 30.561,30
Ø 1 " - 4m btg 39.656,93
Ø 11/2" - 4m btg 116.666,55
6 Pipa Sambungan Lurus
Ø 2" bh 6.300,00
Ø 3" bh 8.662,50
Ø 1/2" bh 2.625,00
Ø 21/2" bh 7.612,50
Ø 3/4" bh 2.887,50
Ø 1" bh 3.335,06
7 Pipa Sambungan L
Ø 1/2" bh 2.625,00
Ø 3/4" bh 3.150,00
Ø 1" bh 3.675,00
Ø 2" bh 5.775,00
Ø 21/2" bh 7.612,50
Ø 3" bh 10.672,20
Pipa GIP medium A Ø 2" btg 606.375,00
Pipa GIP medium A Ø 3" btg 1.267.875,00
Pipa GIP medium A Ø 4" btg 0,00
Pipa GIP medium B Ø 2" btg 236.250,00
Pipa GIP medium B Ø 3" btg 367.500,00
Pipa GIP medium B Ø 4" btg 472.500,00
Pipa Penguras / Pembuangan Air Bak m
G BAHAN LANGIT-LANGIT
Eternit 100 x 100 cm lbr 27.125,00
Calsiboard lbr 69.300,00
Woodplank 20 x 400 cm, T = 8 mm lbr 75.250,00
Woodplank 30 x 400 cm, T = 8 mm lbr 94.500,00
Tripleks
122 x 244 x 0,2 cm lbr 49.358,93
122 x 244 x 0,3 cm lbr 60.031,13
122 x 244 x 0.4 cm lbr 71.662,50
122 x 244 x 0,6 cm lbr 88.200,00
122 x 244 x 0,9 cm lbr 115.500,00
Tripleks Pintu 200 x 90 cm lbr 42.000,00
Tripleks Melamin
122 x 244 x 0,3 cm lbr 106.722,00
Multipleks 12 mm lbr 203.962,50
Multipleks 10 mm lbr 166.753,13
Multipleks 6 mm lbr 93.381,75
Multipleks 9 mm lbr 133.402,50
Tripleks 3 mm lbr 60.031,13
Tripleks 4 mm lbr 73.371,38

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
(Dalam Rupiah (Rp)

NO BAHAN DASAR SPESIFIKASI SATUAN HARGA

1 2 3 4 5
Tripleks Sungkai lbr 126.732,38
Acoustic 40 x 60 @ lbr 80.041,50
Teakwood
122 x 244 x 0,3 cm 120.062,25
Hard Board 122 x 244 cm 100.051,88
Teakwood Pintu 90 x 200 cm Tbl 3 mm lbr 68.250,00
Asbes Plat Harfeks lbr
200 x 100 x 0,3 cm lbr 0,00
List Profil
2 x 3 cm = 4 m btg 11.157,30
3 x 3 cm = 4 m btg 14.795,55
4 x 4 cm = 4 m btg 19.646,55
4 x 5 cm = 4 m btg 24.465,00
5 x 5 cm = 4 m btg 31.167,68
Plafon PVC Motif tbl 8 mm lbr 173.423,25
Plafon PVC Motif tbl 5 mm lbr 124.031,25
List Profil PVC Besar btg 133.402,50
List Profil PVC Sedang btg 128.066,40
List Profil PVC Kecil btg 106.722,00
Gypsum Board lbr 66.150,00
HPL Polos Lbr 181.912,50
HPL Urat Kayu Lbr 203.962,50
HPL Art From Lbr 225.225,00
H BAHAN ATAP
Genteng
Beton Warna bh 36.625,05
Keramik bh 11.576,25
Asbes Gelombang lbr 48.752,55
Harfeks (15 x 85 x 0,5) lbr 66.701,25
Karet Pelapis Genteng m2 8.489,25
Asbes Genteng lbr 33.350,63
Sirap ikat / m2 30.318,75
Seng Gelombang
BWG 33" BJLS 0,20 mm kaki 7.519,05
BWG 30" BJLS 0,22 mm kaki 7.519,05
BWG 31" BJLS 0,25 mm kaki 10.672,20
BWG 28" BJLS 0,35 mm kaki 18.433,80
BJLS Licin 0,30 mm 40 x 180 lbr 54.816,30
BJLS Licin 0,35 lbr 73.007,55
Setara Genteng Royal Polos bh 2.534,65
Setara Genteng Nusantara Polos bh 2.801,45
Bubungan Setara Royal Polos bh 2.868,16
Bubungan Setara Nusantara Polos bh 2.801,45
Seng Superdeck
180 x 70 cm - 10 kaki lbr 154.019,25
180 x 70 cm - 8 kaki lbr 145.408,73
180 x 70 cm - 7 kaki lbr 98.175,00
180 x 70 cm - 6 kaki lbr 82.005,00
Seng Alumunium Gelombang
SWG 32"0,27 mm kaki 8.731,80
SWG 32"0,31 mm kaki 9.944,55
SWG 32"0,38 mm kaki 11.157,30
Setara Sakura Roof 70 x 80 cm lbr 46.690,88
Setara Perkasa Roof 80 x 120 cm lbr 60.031,13
Setara Rotho Roof 70 x 80 cm lbr 42.688,80
Setara Multi Roof Licin 80 x 100 cm lbr 100.051,88

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
(Dalam Rupiah (Rp)

NO BAHAN DASAR SPESIFIKASI SATUAN HARGA

1 2 3 4 5
Setara Multi roof kasar 80 x 100 cm lbr 113.392,13
Setara Surya Roof Licin 70 x 80 cm lbr 56.029,05
Setara Surya Roof Kasar 70 x 80 cm lbr 66.701,25
Setara Prisma Roof lbr 86.711,63
Seng Plastik (Fiber) kaki 15.750,00
Fiber Semen (Harflex)
Super 240 x 108 x 0,6 cm lbr 76.645,80
Super 180 x 108 x 0,6 cm lbr 53.603,55
Ekonomi 240 x 92 x 0,5 cm lbr 59.667,30
Ekonomi 180 x 92 x 0,5 cm lbr 52.026,98
Mini 240 x 105 x 0,4 cm lbr 51.178,05
Mini 180 x 105 x 0,4 cm lbr 48.752,55
Super 240 x 105 x 0,5 cm lbr 61.486,43
Super 180 x 105 x 0,4 cm lbr 54.209,93
Nook / Bubungan
Beton Warna bh 24.497,55
Keramik bh 15.435,00
Asbes bh 60.880,05
Setara Multi roof Licin 90 cm lbr 84.892,50
Multi Roof kasar 90 cm lbr 86.625,00
Setara Surya Roof Licin 90 cm lbr 50.935,50
Surya Roof Licin 40 cm lbr 31.500,00
Setara Sakura Roof 90 cm lbr 36.382,50
Alm SWG 28" - 180 cmc lbr 56.635,43
Alm SWG 28" - 105 cmc lbr 46.327,05
Nok Steel Gelombang
Super - 180 cm bh 39.050,55
Mini - 105 cm bh 29.348,55
Ekonomi - 95 cm bh 22.072,05
Nok Steel Rata
Super - 180 cm bh 32.986,80
Mini - 105 cm bh 27.529,43
Ekonomi - 95 cm bh 26.923,05
Nok 1/2 Lingkaran bh 46.933,43
Karet Pelapis Genteng roll 525.000,00
Ukuran 55 m 6.306,30
Ukuran 90 m 12.370,05
Penangkal Petir set 3.395.700,00
Spandek Baja BHP Color Bond G 550 m2 234.070,75
Spandek Type G 300 m2 96.413,63
Spandek Baja BHP Zinc Alume G 550 bh 89.743,50
Spandek polos = 0,25 lbr 41.343,75
Spandek polos = 0,3 lbr 46.856,25
Spandek polos = 0,35 lbr 51.817,50
Spandek polos = 0,4 lbr 57.330,00
I BAHAN PENGGANTUNG
Kunci Tanam bh
Setara Union 1 x slag bh 182.155,05
SetaraUnion 2 x slag bh 275.536,80
Setara Yale 2 x slag bh 60.637,50
Yale 2 x slag bh 0,00
Kunci Bulat (asli) bh 63.000,00
Kunci Pintu KM/WC Ses (asli) bh 210.000,00
Kunci Pintu Merk Ses (asli) 0,00
Penggantung
Hak angin Kecil bh 11.157,30

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
(Dalam Rupiah (Rp)

NO BAHAN DASAR SPESIFIKASI SATUAN HARGA

1 2 3 4 5
Hak angin Besar bh 26.250,00
Grendel Kecil bh 25.710,30
Grendel Besar bh 34.199,55
Grendel Pintu Dobel bh 53.361,00
Engsel Pintu Biasa bh 40.020,75
Engsel Jendela Biasa psg 34.684,65
door Holder set 137.812,50
Expanyolet Tempel / Door Closer (Otomatis) set 275.073,75
Engsel Jendela Kuningan Setara 777 psg 9.338,18
Engsel Daun Pintu Koboi psg 60.031,13
Engsel Daun Pintu Kuningan Setara 777 psg 13.340,25
Expanyolet bh 31.500.00
Expanyolet Tanam daun Pintu (Otomatis) psg 26.250.00
Kunci Pintu Aluminium bh 0,00
Engsel Pintu Aluminium bh 0,00

J BAHAN SANITER
Kloset Duduk Standart bh 733.713,75
Kloset Jongkok Biasa bh 246.794,63
Wastafel bh 333.506,25
Wastafel Cuci Piring Logam bh 233.454,38
Pompa Tangan Terpasang bh 347.513,51
Pompa Mesin bh 2.001.304,31
Urinoar Setara Ex. KIA/Toto (Lengkap) bh 2.534.914,31
Bak Mandi Fiber unit 315.000,00
Reservoir=1/2 m3 bh 826.875,00
Reservoir=1 m3 bh 1.200.889,20
Reservoir=2 m3 bh 2.427.925,50
Kran Air Biasa bh 46.957,68
Stop Kran Biasa 1/2-1" bh 60.297,93
Stop Kran Kristal 1/2 " bh 148.837,50
Stop Kran Kristal 1 1/2 " bh 1.600.830,00
Stop Kran Kristal 2 " bh 3.134.958,75
Stop Kran Pembilas bh 91.875,00
Bak Air Fiberglass (Tangki) 1 m3 unit 2.401.245,00
Bak Air Fiberglass (Tangki) 2 m3 unit 2.401.245,00
Hand Shower bh 315.000,00
Kloset Duduk Setara Ex Toto/KIA set 0,00
Kloset Duduk Setara Ex Toto/KIA Warna Lengkap set 53.361,00
Kloset Jongkok Setara Ex KIA bh 31.500,00
Kotak Sambungan bh 0,00
Kran Air Stainless Steel bh 210.000,00
Kran Air Tarik Merah bh 266.805,00
Pintu Panil Bayam lbr 100.051,88
Pintu Panil PVC bh 472.500,00
Pintu Panil WC lbr 1.041.862,50
Tempat Sabun Setara Ex Toto (11x11) cm bh
Urinoir set
Sekat Urinoir Aluminium set
Washbashin (Ukuran Besar) bh
Washbashin (Ukuran Kecil) bh
Wastafel American Standard/KIA bh
Wood Filler Kg 49.875,00
Wood Stain Kg 63.000,00
Sending Sealer Kg 60.375,00
Clear Kg 60.375,00

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
(Dalam Rupiah (Rp)

NO BAHAN DASAR SPESIFIKASI SATUAN HARGA

1 2 3 4 5
Shower Tray (1x1) cm Kualitas I set
Shower Tray (1x1) cm Kualitas II set
Shower Tray (1x1) cm Kualitas III set
BAHAN FINISHING / CAT
Cat Tembok / Plafond
Setara Avitex Kg 21.000,00
Setara Metrolite Kg 20.010,38
Setara Klimex Kg 15.523,20
Setara Vinilex Nippon Paint Kg 16.493,40
Setara Dulux Ltr 90.713,70
Cat Dasar Setara Merk Mowilex ltr 49.612,50
Setara Mowilex (Dinding Dalam) ltr 61.365,15
Setara Mowilex (Dinding Luar) ltr 93.381,75
Dempul Kayu Kg 20.010,38
Plamur Tembok Kg 64.033,20
Waterprofing Kg 73.920,00
Setara No Drop Kg 55.125,00
Cat Kayu
Setara Glotex Kg 53.361,00
Setara Avian Kg 53.361,00
Palatone Ltr 45.720,68
Setara I C I. Dulux Kg 80.284,05
Politur Kg 53.361,00
Meni kayu / besi Kg 13.340,25
Minyak Cat Biasa Ltr 6.670,13
Thinner A Kg 26.680,50
Thinner B Kg 24.012,45
Cat Dasar Kg 26.680,50
Cat Atap
Setara A G A Kg 93.381,75
Setara Yoko Kg 86.771,63
Lem Seng Ltr 97.262,55
Amplas/Kertas Kosong lbr 32.744,25
Residu/Alcater 10 Ltr 60.880,05
Setara Lem Fox Kg 36.382,50
Realing Stainless Steel m 1.091.475,00
Tangga Putar Baja m 3.031.875,00
Alco Panel m2 716.625,00
K BAHAN INSTALASI LISTRIK
Pipa union untuk Kabel
5/8" - 4 m btg 15.765,75
3/4" - 4 m btg 20.616,75
11/2" - 4 m btg 30.318,75
1" - 4 m btg 29.106,00
Kabel Listrik
Type NYK roll 303.430,05
1 1/2 mm roll 424.705,05
2 1/2 mm
Type NYY
2 x 1 1/2 mm roll 643.000,05
2 x 2 1/2 mm roll 869.784,30
2 x 4 mm roll 364.067,55
Type NYM
2 x 2 1/2 mm m 6.063,75
2 x 3 1/2 mm m 10.308,38
Lampu TL Biasa

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
(Dalam Rupiah (Rp)

NO BAHAN DASAR SPESIFIKASI SATUAN HARGA

1 2 3 4 5
1 x 20 watt bh 85.135,05
2 x 20 watt bh 133.645,05
1 x 40 watt bh 113.028,30
2 x 40 watt bh 180.942,30
Lampu Pijar
25 Watt bh 6.306,30
40 Watt bh 7.519,05
60 Watt bh 11.157,30
100 Watt bh 11.763,68
Lampu taman Mercury bh 388.322,55
Lampu Mercury 20 Watt bh 242,550,00
Lampu Downlight kecil bh 25.467,75
Lampu RM 2 x 20 Watt bh 315.315,00
Lampu RM 2 x 36 Watt bh 375.952,50
Lampu Setara Sanex SL-14 bh 85.498,88
Lampu SL 25 Watt Setara Nasional bh 145.530,00
Lampu SL 9 Watt Setara Philips bh 61.850,25
Lampu SL 23 Watt Setara Nasional bh 103.083,75
Lampu TL 20 Watt bh 54.573,75
Lampu TL 1 x 36 Watt Merk Setara Nasional bh 133.402,50
Lampu TL 2 x 20 Watt bh 84.892,50
Lampu TL GCL 32 Watt Setara Philips/Baret bh 194.040,00
Lampu Downlight Besar bh 76.954,50
Lampu LED mtr 66.150,00
Lampu Kotak bh 84.892,50
Lampu TL 2 x 20 Watt Setara philips bh 253.575,00
Shakelar Phase
Tunggal Putih (Setara Broco) bh 16.008,30
Double Putih (Setara Broco) bh 24.297,55
Triple (Setara Broco) bh 48.510,00
Tunggal Putih (Setara Panasonic) bh 22.584,71
Double Putih (Setara Panasonic) bh 36.514,80
Triple (Setara Panasonic) bh 59.755,50
Stop Kontak
Stop Kontak bh 30.561,30
Stop Kontak AC bh 25.875,00
Stop Kontak TV bh 30.561,30
MCB 32 Amp Setara MG bh 72.765,00
MCB 6 Amp Setara MG bh 66.701,25
Zakering Case Lokal Biasa
Lokal 2 Group Automat bh 91.198,80
Lokal 3 Group Biasa bh 103.326,30
Panil Box ( Lengkap ) set 54.573,75
Fitting Elips Putih bh 12.370,05
Travo 3 Ampere bh 38.587,50
Travo 10 Ampere bh 60.637,50
L BAHAN PELUMAS
Gemuk ( Grease ) kg 30.318,75
Olie SAE 90 Ltr 30.561,30
Solar Ltr 5.650,00
Bensin Premium Ltr 6.950,00
Minyak Tanah Ltr 11.245,50
M LAIN - LAIN
Indoor Unit VRV,type Wall kap : 7 500 BTU /h unit 12.621.319,00
Indoor Unit VRV,type Wall kap : 9 500 BTU /h unit 13.531.319,00
Indoor Unit VRV,type Wall kap : 29 100 unit 16.478.819,00

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
(Dalam Rupiah (Rp)

NO BAHAN DASAR SPESIFIKASI SATUAN HARGA

1 2 3 4 5
Indoor Unit VRV,type Wall kap : 24 200 unit 17.368.919,00
Indoor Unit VRV,type Cassete kap : 24 200 B1 unit 24.301.419,00
Indoor Unit VRV,type Cassete kap : 30 700 unit 25.024.219,00
Indoor Unit VRV,type Cassete kap : 38 200 unit 25.282.519,00
Indoor Unit VRV,type Cassete kap : 47 800 B1 unit 26.270.519,00
Drymix pasangan bata Ex.PM-110 Setara @ 40 kg zak 66.000,00
Drymix plesteran Ex.PM-210 Setara @ 40 kg zak 58.449,51
Drymix acian Ex.PM-310 Setara @ 40 kg zak 63.283,68
mini pile 20x20 dan 25x25 btg 250.000,00
Bambu Perancah/Dolken Ø 8-10/400 cm btg 14.332,50
PABX5 Line dan 24 Cabang set 3.759.525,00
Timah Solder kg 24.255,00
Ijuk ikat / Kg 24.255,00
Polytene 125 mikron m2 3.638,25
Kawat Las Kg 30.318,75
Minyak Bekisting Ltr 6.112,26
Mur/Baut bh
Sealant Tube 14.000,00
Karet Pelapis Kaca m 4.000,00
Rangka metal hollow 40.40.2 mm m
List Gypsum m
Kuas bh
Floor Drain bh
Skrup fixer bh
Sealtape m
Pintu (Kaca Temper + Acces.) bh 9.350.000,00
Railing Tangga (Temper Glass + Access.) m 2.750.000,00
IPAL (ABR) bh 69.227.272,73
Manhole + GT bh 2.866.154,55
Floor Deck m2 115.000,00
GRC m2 850.000,00
Besi Baja C/Profil Kg
Plafon PVC Motif tbl 7 mm lbr 141.625,00
Logo Pemkab Maros bh 8.000.000,00
Logo DPRD Kab. Maros bh 10.000.000,00
Font cm 10.000,00
Air ltr 500,00
L UPAH KERJA
Pekerja Orang/Hr 85.000,00
Tukang
Tukang Orang/Hr 120.000,00
Tukang Batu Orang/Hr 120.000,00
Tukang Cat Orang/Hr 120.000,00
Tukang Listrik Orang/Hr 120.000,00
Tukang Pipa Orang/Hr 120.000,00
Tukang Besi Orang/Hr 120.000,00
Kepala Tukang
Kepala Tukang Orang/Hr 120.000,00
Kepala Tukang Kayu Orang/Hr 120.000,00
Kepala Tukang Listrik Orang/Hr 120.000,00
Kepala Tukang Cat Orang/Hr 120.000,00
Kepala Tukang Pipa Orang/Hr 120.000,00
Kepala Tukang Besi Orang/Hr 120.000,00
Mandor Orang/Hr 130.000,00
Operator Orang/Hr 120.000,00

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
(Dalam Rupiah (Rp)

NO BAHAN DASAR SPESIFIKASI SATUAN HARGA

1 2 3 4 5
Pembantu Operator Orang/Hr 85.000,00
Sopir Orang/Hr 120.000,00
Pembantu Sopir Orang/Hr 85.000,00
Mekanik Orang/Hr 120.000,00
Pembantu Mekanik Orang/Hr 85.000,00
Penjaga Gudang Orang/Hr 85.000,00
Penjaga Malam Orang/Hr 85.000,00

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
1. Wilayah I : Kec. Maros Baru, Turikale, Lau, Bontoa,
Mandai, Marusu, Bantimurung dan
Simbang
2. Wilayah II : Kec. Camba, Cenrana, Tanralili, dan
Moncongloe
3. Wilayah III : Kec. Mallawa, dan Tompobulu
* Harga ini adalah
proyek yangdihitung
dapat terjangkau kendaraan roda empat
sendiri oleh perencana dan disesuaikan
dengan jarak dan tingkat

SSSS

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
PEMERINTAH DESA BONTO MATE'NE
KECAMATAN MANDAI
KABUPATEN MAROS

RENCANA ANGGARAN BIAYA


PEMBANGUNAN BATAS DESA
1 UNIT

RP 20.000.000

KEGIATAN ALOKASI DANA DESA


TAHUN ANGGARAN 2020
DUSUN BARAMBANG
TAKE OF SHEET

Jenis Prasarana : Pembangunan Batas Desa


Desa : Bonto Mate'ne
Lokasi : Barambang
Analisa : AHSP Bidang Cipta Karya

No Uraian Pekerjaan Volume Pekerjaan

1 PEKERJAAN PERSIAPAN

2 PEKERJAAN GALIAN TANAH


- Galian Tanah pondasi Tapak Penampang Galian
Lebar galian = 1.1 m
Tinggi galian = 0.95 m
Panjang = 1.1 m
Volume galian = 1.15 m3

- Urugan Pasir Lebar galian = 1.1 m


Tinggi galian = 0.05 m
Panjang = 1.1 m
Volume urugan pasir = 0.06 m3

- Pasangan batu kosong Lebar galian = 1.1 m


Tinggi galian = 0.05 m
Panjang = 1.1 m
Volume batu kosong = 0.06 m3

- Urugan Tanah Volume galian = 1.15 m3 / 3


Volume urugan tanah = 0.38 m3

3 Pekerjaan Beton Bertulang


- Beton Cor Pondasi Tapak K-200 T1 = 0.35 m
T2 = 0.25 m
sisi = 1 m
sisi = 1 m
Volume = 0.30 m3

- Beton Cor Kolom Pedestal K-200 Lebar = 0.25 m


Panjang = 0.25 m
Tinggi = 0.50 m
Volume = 0.03 m3
- Tulangan Utama 4 Ø 14 Panjang besi tulangan utama x 12 = 15.97 kg
- Begel Ø8 - 15 Panjang besi begel x 6 = 2.46 kg
- Tulangan Dasar Ø 14 - 15 Panjang besi tulangan bawah x 12 = 14.67 kg
- Tulangan Pembentuk Ø 14 - 15 Panjang besi tulangan pembentuk x 12 = 28.46 kg

- Bekisting Pondasi Pondasi tapak = 1.20 m2


Kolom Pedestal = 0.50 m2
Total volume = 1.70 m2

- Beton Cor Kolom K-200 Lebar = 0.25 m


Panjang = 0.25 m
Tinggi = 2.50 m
Volume = 0.16 m3

- Tulangan Utama 4 Ø 14 Panjang besi tulangan utama x 12 = 37.17 kg


- Begel 8 - 15 Panjang besi begel x 16 = 6.55 kg

- Bekisting Kolom Luas sisi kolom x 4 = 2.50 m2

4 Pekerjaan Pasangan dan Plesteran


- Pasangan Bata 1/2 Camp. 1:4 Lebar bawah = 0.70 m
Lebar atas = 0.50 m
Tinggi = 2.50 m
Volume = 1.20 / 2.00 x 2.50
Volume total = 1.5 x 4 = 6 m2

Lebar = 0.80 m
Tinggi = 0.40 m

Volume = 0.32 m3
Volume total = 0.32 x 4 = 1.28 m2

- Plesteran Camp. 1:4 Lebar bawah = 0.70 m


Lebar atas = 0.50 m
Tinggi = 2.50 m
Volume = 1.20 / 2.00 x 2.50
Volume total = 1.5 x 4 = 6 m2

Lebar = 0.80 m
Tinggi = 0.40 m

Volume = 0.32 m3
Volume total = 0.32 x 4 = 1.28 m2
- Pasangan Batu Alam Lebar bawah = 0.70 m
Lebar atas = 0.50 m
Tinggi = 2.50 m
Volume = 1.20 / 2.00 x 2.50
Volume total = 1.5 x 4 = 6 m2

Lebar = 0.80 m
Tinggi = 0.40 m

Volume = 0.32 m3
Volume total = 0.32 x 4 = 1.28 m2
RENCANA ANGGARAN BIAYA (RAB)

Desa : Bontomate'ne No. RAB : 01 (ADD)


Kecamatan : Mandai Bidang/Jenis Kegiatan : : Pembangunan Batas Desa
Kabupaten : Maros Kegiatan/Item Kegiatan : : Persiapan/Finishing
Provinsi : Sulawesi Selatan Volume : 1 Paket

Jumlah Total (Harga Real


No Uraian Coef. Volume Satuan Harga Satuan Rp Kategori Biaya
+ Pajak ) Rp

a b c d e f g h
I. BAHAN/MATERIAL
I.1 Papan proyek 1.00 Ls 50,000 I-b 50,000
I.2 Prasasti Kegiatan 1.00 Buah 350,000 I-b 350,000
I.3
Sub Total 1) 400,000
II. ALAT
II.1 Gerobak Dorong 1 buah 500,000 II-a 500,000
II.2
Sub Total 2) 500,000
III. UPAH
III.1 Ketua 1 Keg 500,000 III-b 500,000
III.2 Sekertaris 1 Keg 400,000 III-b 400,000
III.3 Anggota 1 Keg 300,000 III-b 300,000
III.4 Perencana 1 Keg 1,000,000 III-b 1,000,000
Sub Total 3 ) 2,200,000
Total Biaya (1+2+3) 3,100,000
Keterangan :
Kategori Biaya
I-a Pembelian bahan hasil tenaga manusia
I-b Pembelian bahan hasil industri
II-a Pembelian alat tangan
II-b Pembelian / penyewaan alat mesin
III-a Pembayaran tenaga kerja untuk konstruksi
III-b Pembayaran tenaga untuk pengumpulan bahan
Bonto Matene, 20 Maret 2020
Diketahui Oleh ; Dibuat Oleh ;
KEPALA DESA Perencana

H. Sahrul Yundhi P. Putra


RENCANA ANGGARAN BIAYA (RAB)
Desa : Bontomate'ne No. RAB : 02 (ADD)
Kecamatan : Mandai Bidang/Jenis Kegiatan : : Pembangunan Batas Desa
Kabupaten : Maros Kegiatan/Item Kegiatan : : Galian Pondasi Tapak
Provinsi : Sulawesi Selatan Volume : 1,15 M3

Harga Satuan
No Uraian Koefisien Volume Satuan Kategori Biaya Jumlah Total (Harga Real + Pajak ) Rp
Rp

a b c d e f g h
I. BAHAN/MATERIAL
I.1 -
I.2
I.3
Sub Total 1) -
II. ALAT
II.1 Sekop 1 ls 90,000 II-b 90,000
II.2 cangkul 2 buah 90,000 II-a 180,000
Sub Total 2) 270,000
III. UPAH
III.1 Pekerja 1.500 2 HOK 90,000 III-a 180,000
III.4 Tukang 0.750 1 HOK 130,000 III-a 130,000
Sub Total 3 ) 310,000
Total Biaya (1+2+3) 580,000
Kategori Biaya
I-a Pembelian bahan hasil tenaga manusia
I-b Pembelian bahan hasil industri
II-a Pembelian alat tangan
II-b Pembelian / penyewaan alat mesin
III-a Pembayaran tenaga kerja untuk konstruksi
III-b Pembayaran tenaga untuk pengumpulan bahan
Bonto Matene, 20 Maret 2020
Diketahui Oleh ; Dibuat Oleh ;
KEPALA DESA Perencana

H. Sahrul Yundhi P. Putra


RENCANA ANGGARAN BIAYA (RAB)
Desa : Bontomate'ne No. RAB : 03 (ADD)
Kecamatan : Mandai Bidang/Jenis Kegiatan : Pembangunan Batas Desa
Kabupaten : Maros Kegiatan/Item Kegiatan : Urugan
Provinsi : Sulawesi Selatan Volume : 0,50M3

Harga Satuan Kategori


No Uraian Koefisien Volume Satuan Jumlah Total (Harga Real + Pajak ) Rp
Rp Biaya

a b c d e f g h
I. BAHAN/MATERIAL
I.1 Batu Belah/Batu gunung 1.200 0.605 M3 147,000.00 I-b 88,935
I.2 Pasir 0.520 0.262 M3 121,300.00 I-b 31,801
I.3 -
Sub Total 1) 120,736
II. ALAT
II.1 Benang Ukur 1 roll 9,000 II-a 9,000
II.2 Ember cor kecil 1 Buah 10,000 II-a 10,000
Sub Total 2) 19,000
III. UPAH
III.1 Pekerja 1.500 2 HOK 90,000 III-a 180,000
III.2 Tukang 0.750 1 HOK 130,000 III-a 130,000
III.4 Mandor 0.075 1 HOK 150,000 III-a 150,000
Sub Total 3 ) 460,000
Total Biaya (1+2+3) 599,736
Kategori Biaya
I-a Pembelian bahan hasil tenaga manusia
I-b Pembelian bahan hasil industri
II-a Pembelian alat tangan
II-b Pembelian / penyewaan alat mesin
III-a Pembayaran tenaga kerja untuk konstruksi
III-b Pembayaran tenaga untuk pengumpulan bahan
Bonto Matene, 20 Maret 2020
Diketahui Oleh ; Dibuat Oleh ;
KEPALA DESA Perencana

H. Sahrul Yundhi P. Putra


RENCANA ANGGARAN BIAYA (RAB)
Desa : Bontomate'ne No. RAB : 04 (ADD)
Kecamatan : Mandai Bidang/Jenis Kegiatan : : Pembangunan Batas Desa

Kabupaten : Maros Kegiatan/Item Kegiatan : : Pembesian


Provinsi : Sulawesi Selatan Volume : 61,55 kg

No Uraian Koefisien Volume Satuan Harga Satuan Rp Kategori Biaya Jumlah Total (Harga Real + Pajak ) Rp

a b c d e f g h
I. BAHAN/MATERIAL
I.1 Besi polos 8mm 10.500 27.00 kg 10,000.00 I-b 270,000
I.2 Besi polos 14mm 10.500 498.00 kg 10,500.00 I-b 5,229,000
I.3 Kawat beton 0.150 9.00 kg 23,000.00 I-b 207,000
I.4 I-b -
Sub Total 1) 5,706,000
II. ALAT
II.1
II.2
Sub Total 2) -
III. UPAH
III.1 Pekerja 0.070 4.00 HOK 90,000 III-a 360,000
III.2 Tukang 0.007 1.00 HOK 130,000 III-a 130,000
III.3 Tukang besi 0.070 5.00 HOK 150,000 III-a 750,000
Sub Total 3 ) 1,240,000
Total Biaya (1+2+3) 6,946,000

Kategori Biaya
I-a Pembelian bahan hasil tenaga manusia
I-b Pembelian bahan hasil industri
II-a Pembelian alat tangan
II-b Pembelian / penyewaan alat mesin
III-a Pembayaran tenaga kerja untuk konstruksi
III-b Pembayaran tenaga untuk pengumpulan bahan
Bonto Matene, 20 Maret 2020
Diketahui Oleh ; Dibuat Oleh ;
KEPALA DESA Perencana

H. Sahrul Yundhi P. Putra


RENCANA ANGGARAN BIAYA (RAB)
Desa : Bontomate'ne No. RAB : 05 (ADD)
Kecamatan : Mandai Bidang/Jenis Kegiatan : : Pembangunan Batas Desa

Kabupaten : Maros Kegiatan/Item Kegiatan : : Beton K200


Provinsi : Sulawesi Selatan Volume : 0,49 M3

No Uraian Koefisien Volume Satuan Harga Satuan Rp Kategori Biaya Jumlah Total (Harga Real + Pajak ) Rp

a b c d e f g h
I. BAHAN/MATERIAL
Semen Tonasa kg
I.1 371.000 190.00 1,261.250 I-b 239,638
Pasir Beton kg
I.2 698.000 340.00 219.700 I-b 74,698
Kerikil kg
I.3 1047.000 510.00 238.500 I-b 121,635
Air Liter
I.4 215.000 10.00 500.000 I-b 5,000
I.5 -
I.6 -
Sub Total 1) 440,971
II. ALAT
II.1 Ember cor 1.0 buah 10,000 10,000
II.2
II.3
Sub Total 2) 10,000
III. UPAH
III.1 Pekerja 1.65 4.00 HOK 90,000 III-a 360,000
III.4 Tukang 0.275 2.00 HOK 130,000 III-a 260,000
Sub Total 3 ) 620,000
Total Biaya (1+2+3) 1,070,971

Kategori Biaya
I-a Pembelian bahan hasil tenaga manusia
I-b Pembelian bahan hasil industri
II-a Pembelian alat tangan
II-b Pembelian / penyewaan alat mesin
III-a Pembayaran tenaga kerja untuk konstruksi
III-b Pembayaran tenaga untuk pengumpulan bahan
Bonto Matene, 20 Maret 2020
Diketahui Oleh ; Dibuat Oleh ;
KEPALA DESA Perencana

H. Sahrul Yundhi P. Putra


RENCANA ANGGARAN BIAYA (RAB)
Desa : Bontomate'ne No. RAB : 06 (ADD)
Kecamatan : Mandai Bidang/Jenis Kegiatan : Pembangunan Batas Desa
Kabupaten : Maros Kegiatan/Item Kegiatan : Bekisting Pondasi
Provinsi : Sulawesi Selatan Volume : 1,70 M3

Harga Satuan Jumlah Total (Harga Real +


No Uraian Koefisien Volume Satuan Kategori Biaya
Rp Pajak ) Rp

a b c d e f g h
I. BAHAN/MATERIAL
Kayu kelas III m3
I.1 0.040 0.068 2,591,000.00 I-b 176,188
Paku kg
I.2 0.300 1.000 18,000.00 I-b 18,000
Minyak bekisting Liter
I.3 1.000 1.700 6,000.00 I-b 10,200
Sub Total 1) 204,388
II. ALAT
II.1 -
II.2
II.3
Sub Total 2) -
III. UPAH
III.1 Pekerja 0.520 1.00 HOK 90,000 III-a 90,000
III.2 Tukang 0.260 1.00 HOK 130,000 III-a 130,000
III.3 Kepala tukang 0.026 1.00 HOK 150,000 III-a 150,000
III.1 Mandor 0.026 1.00 HOK 150,000 III-a 150,000
Sub Total 3 ) 370,000
Total Biaya (1+2+3) 574,388

Kategori Biaya
I-a Pembelian bahan hasil tenaga manusia
I-b Pembelian bahan hasil industri
II-a Pembelian alat tangan
II-b Pembelian / penyewaan alat mesin
III-a Pembayaran tenaga kerja untuk konstruksi
III-b Pembayaran tenaga untuk pengumpulan bahan
Bonto Matene, 20 Maret 2020
Diketahui Oleh ; Dibuat Oleh ;
KEPALA DESA Perencana

H. Sahrul Yundhi P. Putra


RENCANA ANGGARAN BIAYA (RAB)
Desa : Bontomate'ne No. RAB : 07 (ADD)
Kecamatan : Mandai Bidang/Jenis Kegiatan : Pembangunan Batas Desa
Kabupaten : Maros Kegiatan/Item Kegiatan : Bekisting Kolom
Provinsi : Sulawesi Selatan Volume : 2,50 M3

Harga Satuan Jumlah Total (Harga Real +


No Uraian Koefisien Volume Satuan Kategori Biaya
Rp Pajak ) Rp

a b c d e f g h
I. BAHAN/MATERIAL m3
I.1 Kayu kelas III 0.04 0.10 kg 2,591,000.00 I-b 259,100
I.2 Paku 0.40 1.00 Liter 18,000.00 I-b 18,000
I.3 Minyak bekisting 0.20 1.00 m3 6,000.00 I-b 6,000
I.4 Balok kayu kelas II 0.02 0.05 Lbr 3,638,250.00 I-b 181,913
I.5 Multipleks tebal 6mm 0.35 1.00 93,500.00 I-b 93,500
I.6 0.00 I-b -
Sub Total 1) 558,513
II. ALAT
II.1 -
II.2
II.3
Sub Total 2) -
III. UPAH
III.1 Pekerja 0.660 2.00 HOK 90,000 III-a 180,000
III.2 Tukang 0.330 1.00 HOK 130,000 III-a 130,000
III.3 Kepala tukang 0.033 0.00 HOK 150,000 III-a -
III.4 Mandor 0.033 0.00 HOK 150,000 III-a -
Sub Total 3 ) 310,000
Total Biaya (1+2+3) 868,513
Kategori Biaya
I-a Pembelian bahan hasil tenaga manusia
I-b Pembelian bahan hasil industri
II-a Pembelian alat tangan
II-b Pembelian / penyewaan alat mesin
III-a Pembayaran tenaga kerja untuk konstruksi
III-b Pembayaran tenaga untuk pengumpulan bahan
Bonto Matene, 20 Maret 2020
Diketahui Oleh ; Dibuat Oleh ;
KEPALA DESA Perencana

H. Sahrul Yundhi P. Putra


RENCANA ANGGARAN BIAYA (RAB)
Desa : Bontomate'ne No. RAB : 08 (ADD)
Kecamatan : Mandai Bidang/Jenis Kegiatan : Pembangunan Batas Desa
Kabupaten : Maros Kegiatan/Item Kegiatan : Pasangan dan Plesteran
Provinsi : Sulawesi Selatan Volume : 14,56 m2

No Uraian Koefisien Volume Satuan Harga Satuan Rp Kategori Biaya Jumlah Total (Harga Real + Pajak ) Rp

a b c d e f g h
I. BAHAN/MATERIAL
I.1 Batu bata 70.000 1000.00 bh 600.00 I-b 600,000
I.2 Semen Tonasa 11.500 168.00 kg 1,300.00 I-b 218,400
I.3 Pasir 0.043 0.63 m3 121,300.00 I-b 75,944
Sub Total 1) 894,344
II. ALAT
II.1 Benang ukur 1 buah 9,000 9,000
II.2
II.3
Sub Total 2) 9,000
III. UPAH
III.1 Pekerja 0.600 9.00 HOK 90,000 III-a 810,000
III.2 Tukang batu 0.200 3.00 HOK 130,000 III-a 390,000
III.3 Kepala Tukang 0.020 0.00 HOK 150,000 III-a -
III.4 Mandor 0.030 0.00 HOK 150,000 III-a -
Sub Total 3 ) 1,200,000
Total Biaya (1+2+3) 2,103,344
Kategori Biaya
I-a Pembelian bahan hasil tenaga manusia
I-b Pembelian bahan hasil industri
II-a Pembelian alat tangan
II-b Pembelian / penyewaan alat mesin
III-a Pembayaran tenaga kerja untuk konstruksi
III-b Pembayaran tenaga untuk pengumpulan bahan
Bonto Matene, 20 Maret 2020
Diketahui Oleh ; Dibuat Oleh ;
KEPALA DESA Perencana

H. Sahrul Yundhi P. Putra


RENCANA ANGGARAN BIAYA (RAB)
Desa : Bontomate'ne No. RAB : 09 (ADD)
Kecamatan : Mandai Bidang/Jenis Kegiatan : Pembangunan Batas Desa
Kabupaten : Maros Kegiatan/Item Kegiatan : Pasangan batu alam
Provinsi : Sulawesi Selatan Volume : 7,28 m3

Kategori
No Uraian Koefisien Volume Satuan Harga Satuan Rp Jumlah Total (Harga Real + Pajak ) Rp
Biaya

a b c d e f g h
I. BAHAN/MATERIAL
I.1 Batu alam 20.000 17.00 m2 190,000.00 I-b 3,230,000
I.2 Semen tonasa 9.300 2.00 zak 65,000.00 I-b 130,000
I.3 Pasir Pasang 0.018 3.00 m3 121,300.00 I-b 363,900
I.4 Semen warna 1.940 0.30 kg 90,000.00 I-b 27,000
I.5 I-b -
Sub Total 1) 3,750,900
II. ALAT
II.1
II.2
II.3
Sub Total 2) -
III. UPAH
III.1 Pekerja 0.900 5.0 HOK 90,000 III-a 450,000
III.2 Tukang 0.450 1.0 HOK 130,000 III-a 130,000
III.3 Kepala Tukang 0.045 1.0 HOK 150,000 III-a 150,000
III.4 Mandor 0.045 1.0 HOK 150,000 III-a 150,000
Sub Total 3 ) 880,000
Total Biaya (1+2+3) 4,630,900

Kategori Biaya
I-a Pembelian bahan hasil tenaga manusia
I-b Pembelian bahan hasil industri
II-a Pembelian alat tangan
II-b Pembelian / penyewaan alat mesin
III-a Pembayaran tenaga kerja untuk konstruksi
III-b Pembayaran tenaga untuk pengumpulan bahan
Bonto Matene, 20 Maret 2020
Diketahui Oleh ; Dibuat Oleh ;
KEPALA DESA Perencana

H. Sahrul Yundhi P. Putra


REKAPITULASI UPAH DAN BAHAN

Lokasi : Dusun Barambang


Kegiatan : Pekerjaan Batas Desa
Volume : 1 Unit

TOTAL HARGA ( HARGA REAL


NO. URAIAN VOLUME SATUAN HARGA SATUAN
+ PAJAK ) Rp

BAHAN

1 Papan proyek 1.00 Ls 50,000.00 50,000

2 Prasasti Kegiatan 1.00 Buah 350,000.00 350,000

3 Batu Belah/Batu gunung 0.61 M3 147,000.00 88,935

4 Besi polos 8mm 27.00 kg 10,000.00 270,000

5 Besi polos 14mm 498.00 kg 10,500.00 5,229,000

Pasir Beton
6 340.00 kg 219.70 74,698

7 Pasir Pasang 4 M3 121,300.00 485,200

Kayu kelas III


8 0.17 M3 2,591,000.00 435,288

Multipleks tebal 6mm


9 1.00 Lebar 93,500.00 93,500

10 Balok kayu kelas II 0.05 M3 3,638,250.00 181,574

11 Semen Tonasa 13.60 kg 65,000.00 883,805

12 Semen warna 0.30 kg 90,000.00 27,000

Paku
13 2.00 kg 18,000.00 36,000

14 Kawat beton 9.00 kg 23,000.00 207,000

15 Batu Alam 17.00 M2 190,000.00 3,230,000

16 Batu bata 1000.00 Buah 600.00 600,000

Sub Jumlah 12,242,000

ALAT

1 Gerobak Dorong 1.00 buah 500,000 500,000

2 Sekop 1.00 ls 90,000 90,000


3 Ember cor kecil 2.00 Buah 10,000 20,000

5 cangkul 2.00 buah 90,000 180,000

7 Benang Ukur 2.00 roll 9,000 18,000


Sub Jumlah 808,000

TENAGA

1 Pekerja 29 HOK 90,000 2,610,000

2 Tukang 8 HOK 130,000 1,040,000

3 Tukang besi 5 HOK 150,000 750,000

3 Kepala Tukang 2 HOK 150,000 300,000

4 Mandor 3 HOK 150,000 450,000

Sub Jumlah 5,150,000

OPERASIONAL TPK

1 Ketua 1 Keg 500,000 500,000

2 Sekretaris 1 keg 400,000 400,000

3 Anggota 1 Keg 300,000 300,000

4 Perencana 1 Keg 1,000,000 1,000,000

Sub Jumlah 1,800,000

TOTAL BIAYA 20,000,000

Bonto Matene, 20 Maret 2020


Disetujui Oleh ; Dibuat Oleh ;
Kepala Desa Perencana

H. Sahrul Yundhi P. Putra


REKAPITULASI RENCANA ANGGARAN BIAYA

Desa : Bonto mate'ne Lokasi/Dusun : Bentenge


Kecamatan : Mandai Bidang : Pembangunan Desa
Kabupaten : Maros Kegiatan : Batas Desa
Provinsi : Sulawesi Selatan Volume : 1 Unit

TOTAL HARGA ( HARGA REAL +


NO. ITEM KEGIATAN VOLUME SATUAN
PAJAK ) Rp

1 Persiapan/Finishing 1 Paket Ls 3,100,000

2 Galian Tanah 1.15 M3 580,000

3 Pas. Batu Kosong 0.504 M3 599,736

4 Pembesian 61.55 kg 6,946,000

5 Pek. Beton 0.49 M3 1,070,971

6 Bekisting Pondasi 1.70 M3 574,388

7 Bekisting Kolom 2.50 M4 868,513

8 Pasangan dan Plesteran 14.56 M2 2,103,344

9 Pasangan batu alam 7.28 M2 4,630,900

TOTAL HARGA 20,000,000

Bonto Matene, 20 Maret 2020


Diketahui Oleh ; Dibuat Oleh :
KEPALA DESA Perencana

H. Sahrul Yundhi P. Putra


ANALISIS HARGA SATUAN PEKERJAAN (AHSP)

DIVISI 2 - SITEWORK
2.2.1 Setting-out
1. Pembuatan 1 m2 Pagar Sementara dari Kayu
No. Uraian Kode Satuan Koefisien Harga Satuan
A TENAGA
Pekerja L.01 OH
0.400 65,000.00
Tukang Kayu L.02 OH
0.200 100,000.00
Kepala Tukang L.03 OH
0.020 120,000.00
Mandor L.04 OH
0.020 120,000.00
JUMLAH TENAGA KERJA
B BAHAN
Batang
Dolken Ø 8-10/400 cm 1.250 14,332.50
Semen portland Kg
5.000 1,261.26
Pasir Pasangan m3
0.005 162,750.00
Kerikil/Koral beton m3
0.009 333,506.25
Kayu 5/7 Kls III m3
0.072 2,205,000.00
Paku biasa 2” – 5” Kg
0.060 21,344.40
Residu Liter
0.400
JUMLAH HARGA BAHAN
C PERALATAN
- -
JUMLAH HARGA ALAT
Jumlah (A+B+C)
D
Overhead & Profit 10% x D
E
Harga Satuan Pekerjaan (D+E)
F

2. Pengukuran dan Pemasangan 1 m2 Bouwplank


No. Uraian Kode Satuan Koefisien Harga Satuan
A TENAGA
Pekerja L.01 OH
0.100 65,000.00
Tukang Kayu L.02 OH
0.100 100,000.00
Kepala Tukang L.03 OH
0.010 120,000.00
Mandor L.04 OH
0.005 120,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kayu balok 5/7 kls III m3
0.012 2,205,000.00
Paku 2”-3” Kg
0.020 21,344.40
Kayu papan 3/20 kls III m3
0.007 2,590,875.00
JUMLAH HARGA BAHAN
C PERALATAN
- -
JUMLAH HARGA ALAT
Jumlah (A+B+C)
D
Overhead & Profit 10% x D
E
Harga Satuan Pekerjaan (D+E)
F
3. Pembuatan 1 m2 Rumah Jaga (Konstruksi Kayu)
No. Uraian Kode Satuan Koefisien Harga Satuan
A TENAGA
Pekerja L.01 OH
1.000 65,000.00
Tukang Kayu L.02 OH
1.500 100,000.00
Kepala tukang L.03
0.150 120,000.00
Mandor L.04 OH
0.050 120,000.00
JUMLAH TENAGA KERJA
B BAHAN
Batang
Dolken kayu Ø 8-10/400 cm 3.000 14,332.50
Kayu kls II m3
0.276 3,638,250.00
Paku biasa Kg
0.700 21,344.40
Seng gelombang Kg
1.500
JUMLAH HARGA BAHAN
C PERALATAN
- -
JUMLAH HARGA ALAT
Jumlah (A+B+C)
D
Overhead & Profit 10% x D
E
Harga Satuan Pekerjaan (D+E)
F

4. Pembuatan 1 m2 Gudang Semen dan Peralatan


No. Uraian Kode Satuan Koefisien Harga Satuan
A TENAGA
Pekerja L.01 OH
1.000 65,000.00
Tukang Kayu L.02 OH
2.000 100,000.00
Kepala Tukang L.03 OH
0.200 120,000.00
Mandor L.04 OH
0.050 120,000.00
JUMLAH TENAGA KERJA
B BAHAN
Batang
Dolken Ø 8-10/400 cm 1.700 14,332.50
Kayu kls III m3
0.210 2,205,000.00
Paku biasa Kg
0.300 21,344.40
Semen Portland Kg
10.500 1,261.26
m3
Pasir pasangan 0.030 162,750.00
Kerikil/Koral beton m3
0.050 333,506.25
Seng gelombang Lbr
1.500 110,602.80
Seng plat Lbr
0.250 54,816.30
JUMLAH HARGA BAHAN
C PERALATAN
- -
JUMLAH HARGA ALAT
Jumlah (A+B+C)
D
Overhead & Profit 10% x D
E
Harga Satuan Pekerjaan (D+E)
F
5. Pembuatan 1 m2 Bedeng Pekerja
No. Uraian Kode Satuan Koefisien Harga Satuan
A TENAGA
Pekerja L.01 OH
1.000 65,000.00
Tukang Kayu L.02 OH
2.000 100,000.00
Kepala Tukang L.03 OH
0.200 120,000.00
Mandor L.04 OH
0.050 120,000.00
JUMLAH TENAGA KERJA
B BAHAN
Batang
Dolken Ø 8-10/400 cm 1.250 14,332.50
Kayu kls III m3
0.186 2,205,000.00
Paku biasa Kg
0.300 21,344.40
Semen Portland Kg
18.000 1,261.26
m3
Pasir pasangan 0.030 162,750.00
Kerikil/Koral beton m3
0.050 333,506.25
Seng gelombang Lbr
1.500 110,602.80
Mutipleks 4mm Lbr
1.350 73,371.38
JUMLAH HARGA BAHAN
C PERALATAN
- -
JUMLAH HARGA ALAT
Jumlah (A+B+C)
D
Overhead & Profit 10% x D
E
Harga Satuan Pekerjaan (D+E)
F

6. Pembersihan 1 m2 Lapangan dan Peralatan


No. Uraian Kode Satuan Koefisien Harga Satuan
A TENAGA
Pekerja L.01 OH
0.100 65,000.00
Mandor L.04 OH
0.050 120,000.00
JUMLAH TENAGA KERJA
B BAHAN
- -
JUMLAH HARGA BAHAN
C PERALATAN
- -
JUMLAH HARGA ALAT
Jumlah (A+B+C)
D
Overhead & Profit 10% x D
E
Harga Satuan Pekerjaan (D+E)
F
7. Pembongkaran 1 m3 Beton Bertulang
No. Uraian Kode Satuan Koefisien Harga Satuan
A TENAGA
Pekerja L.01
OH 13.334 65,000.00
Mandor L.04
OH 0.666 120,000.00
JUMLAH TENAGA KERJA
B BAHAN
- -
JUMLAH HARGA BAHAN
C PERALATAN
- -
JUMLAH HARGA ALAT
Jumlah (A+B+C)
D
Overhead & Profit 10% x D
E
Harga Satuan Pekerjaan (D+E)
F

8. Pembongkaran 1 m2 Dinding Tembok


No. Uraian Kode Satuan Koefisien Harga Satuan
A TENAGA
Pekerja L.01
OH 6.667 65,000.00
Mandor L.04
OH 0.333 120,000.00
JUMLAH TENAGA KERJA
B BAHAN
- -
JUMLAH HARGA BAHAN
C PERALATAN
- -
JUMLAH HARGA ALAT
Jumlah (A+B+C)
D
Overhead & Profit 10% x D
E
Harga Satuan Pekerjaan (D+E)
F

2.3.1 Pekerjaan Tanah


1. Penggalian Tanah Biasa Sedalam 1 m
No. Uraian Kode Satuan Koefisien Harga Satuan
A TENAGA
Pekerja L.01
OH 0.750 65,000.00
Mandor L.04
OH 0.025 120,000.00
JUMLAH TENAGA KERJA
B BAHAN
- -
JUMLAH HARGA BAHAN
C PERALATAN
- -
JUMLAH HARGA ALAT
Jumlah (A+B+C)
D
Overhead & Profit 10% x D
E
Harga Satuan Pekerjaan (D+E)
F
2. Penggalian Tanah Keras Sedalam 1 m
No. Uraian Kode Satuan Koefisien Harga Satuan
A TENAGA
Pekerja L.01
OH 1.000 65,000.00
Mandor L.04
OH 0.032 120,000.00
JUMLAH TENAGA KERJA
B BAHAN
- -
JUMLAH HARGA BAHAN
C PERALATAN
- -
JUMLAH HARGA ALAT
Jumlah (A+B+C)
D
Overhead & Profit 10% x D
E
Harga Satuan Pekerjaan (D+E)
F

3. Pengurugan Kembali Galian


No. Uraian Kode Satuan Koefisien Harga Satuan
A TENAGA
Pekerja L.01
OH 0.500 65,000.00
Mandor L.04
OH 0.050 120,000.00
JUMLAH TENAGA KERJA
B BAHAN
- -
JUMLAH HARGA BAHAN
C PERALATAN
- -
JUMLAH HARGA ALAT
Jumlah (A+B+C)
D
Overhead & Profit 10% x D
E
Harga Satuan Pekerjaan (D+E)
F

4. Pengurugan dengan Pasir Urug


No. Uraian Kode Satuan Koefisien Harga Satuan
A TENAGA
Pekerja L.01
OH 0.300 65,000.00
Mandor L.04
OH 0.010 120,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pasir Urug m3 1.200 128,992.50
JUMLAH HARGA BAHAN
C PERALATAN
- -
JUMLAH HARGA ALAT
Jumlah (A+B+C)
D
Overhead & Profit 10% x D
E
Harga Satuan Pekerjaan (D+E)
F
5. Pengurugan dengan Sirtu Padat
No. Uraian Kode Satuan Koefisien Harga Satuan
A TENAGA
Pekerja L.01 OH 0.250 65,000.00
Mandor L.04 OH 0.025 120,000.00
JUMLAH TENAGA KERJA
B BAHAN
Sirtu Saring m3 1.200 187,425.00
JUMLAH HARGA BAHAN
C PERALATAN
- -
JUMLAH HARGA ALAT
Jumlah (A+B+C)
D
Overhead & Profit 10% x D
E
Harga Satuan Pekerjaan (D+E)
F

6. Pengurugan dengan Tanah


No. Uraian Kode Satuan Koefisien Harga Satuan
A TENAGA
Pekerja L.01 OH 0.300 65,000.00
Mandor L.04 OH 0.010 120,000.00
JUMLAH TENAGA KERJA
B BAHAN
Tanah Urug m3 1.200 103,083.75
JUMLAH HARGA BAHAN
C PERALATAN
- -
JUMLAH HARGA ALAT
Jumlah (A+B+C)
D
Overhead & Profit 10% x D
E
Harga Satuan Pekerjaan (D+E)
F

DIVISI 3 - PEKERJAAN STRUKTURAL


3.2.1 Pekerjaan Pondasi
1. Pemasangan Pondasi Batu Belah 1PC : 4PP
No. Uraian Kode Satuan Koefisien Harga Satuan
A TENAGA
Pekerja L.01 OH
1.500 65,000.00
Tukang Batu L.02 OH
0.750 100,000.00
Kepala Tukang L.03 OH
0.075 120,000.00
Mandor L.04 OH
0.075 120,000.00
JUMLAH TENAGA KERJA
B BAHAN
Batu belah m3
1.200 146,632.50
Semen Portland Kg
163.000 1,261.26
Pasir Pasang m3
0.520 162,750.00
JUMLAH HARGA BAHAN
C PERALATAN
- -
JUMLAH HARGA ALAT
Jumlah (A+B+C)
D
Overhead & Profit 10% x D
E
Harga Satuan Pekerjaan (D+E)
F
2. Pemasangan Pondasi Batu Kosong (aanstampig)
No. Uraian Kode Satuan Koefisien Harga Satuan
A TENAGA
Pekerja L.01 OH
0.780 65,000.00
Tukang Batu L.02 OH
0.390 100,000.00
Kepala Tukang L.03 OH
0.039 120,000.00
Mandor L.04 OH
0.039 120,000.00
JUMLAH TENAGA KERJA
B BAHAN
Batu belah m3
1.200 146,632.50
Pasir urug m3
0.432 128,992.50
JUMLAH HARGA BAHAN
C PERALATAN
- -
JUMLAH HARGA ALAT
Jumlah (A+B+C)
D
Overhead & Profit 10% x D
E
Harga Satuan Pekerjaan (D+E)
F

3.3 Pekerjaan Rangka Atap


1. Pemasangan 1 m2 Kap Atap Baja Ringan
No. Uraian Kode Satuan Koefisien Harga Satuan
A TENAGA
Pekerja L.01 OH
0.800 65,000.00
Tukang L.02 OH
0.080 100,000.00
Kepala Tukang L.03 OH
0.080 120,000.00
Mandor L.04 OH
0.100 120,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kaso m 1.729 9,738.38
Reng m 1.122 6,063.75
JUMLAH HARGA BAHAN
C PERALATAN
- -
JUMLAH HARGA ALAT
Jumlah (A+B+C)
D
Overhead & Profit 10% x D
E
Harga Satuan Pekerjaan (D+E)
F

2. Pemasangan 1 m2 Atap Pelana Rangka Atap Baja Canai Dingin rofil C75
No. Uraian Kode Satuan Koefisien Harga Satuan
A TENAGA
Pekerja L.01 OH
0.734 65,000.00
Tukang L.02 OH
0.734 100,000.00
Kepala Tukang L.03 OH
0.073 120,000.00
Mandor L.04 OH
0.037 120,000.00
JUMLAH TENAGA KERJA
B BAHAN
Baja Ringan Canai Dingin Kg 3.065 13,893.17
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan 10% 4,258.26
JUMLAH HARGA ALAT
Jumlah (A+B+C)
D
Overhead & Profit 10% x D
E
Harga Satuan Pekerjaan (D+E)
F
DIVISI 4 - PEKERJAAN ARSITEKTUR
4.1.1 Pekerjaan Beton
1. Pembuatan 1 m3 Beton Mutu fc 9.8 Mpa (K125)
No. Uraian Kode Satuan Koefisien Harga Satuan
A TENAGA
Pekerja L.01 OH 1.650 65,000.00
Tukang Batu L.02 OH 0.275 100,000.00
Kepala Tukang L.03 OH 0.028 120,000.00
Mandor L.04 OH 0.083 120,000.00
JUMLAH TENAGA KERJA
B BAHAN
Semen Portland kg 276.000 1,261.26
Pasir Beton kg 828.000 219.70
Kerikil (Maks 30mm) kg 1012.000 238.22
Air Liter 215.000 500.00
JUMLAH HARGA BAHAN
C PERALATAN
- -
JUMLAH HARGA ALAT
Jumlah (A+B+C)
D
Overhead & Profit 10% x D
E
Harga Satuan Pekerjaan (D+E)
F

2. Pembuatan 1 m3 Beton Mutu fc 19.3 Mpa (K225)


No. Uraian Kode Satuan Koefisien Harga Satuan
A TENAGA
Pekerja L.01 OH
1.650 65,000.00
Tukang Batu L.02 OH
0.275 100,000.00
Kepala Tukang L.03 OH
0.028 120,000.00
Mandor L.04 OH
0.083 120,000.00
JUMLAH TENAGA KERJA
B BAHAN
Semen Portland kg
371.000 1,261.26
Pasir Beton kg
Kerikil 698.000 219.70
kg
(Maks 30mm) 1047.000 238.22
Air Liter
215.000 500.00
JUMLAH HARGA BAHAN
C PERALATAN
- -
JUMLAH HARGA ALAT
Jumlah (A+B+C)
D
Overhead & Profit 10% x D
E
Harga Satuan Pekerjaan (D+E)
F
3. Pembuatan 1 m3 Beton Mutu fc 21.7 Mpa (K250)
No. Uraian Kode Satuan Koefisien Harga Satuan
A TENAGA
Pekerja L.01 OH
1.650 65,000.00
Tukang Batu L.02 OH
0.275 100,000.00
Kepala Tukang L.03 OH
0.028 120,000.00
Mandor L.04 OH
0.083 120,000.00
JUMLAH TENAGA KERJA
B BAHAN
Semen Portland kg
384.000 1,261.26
Pasir Beton kg
Kerikil 692.000 219.70
kg
(Maks 30mm) 1039.000 238.22
Air Liter
215.000 500.00
JUMLAH HARGA BAHAN
C PERALATAN
- -
JUMLAH HARGA ALAT
Jumlah (A+B+C)
D
Overhead & Profit 10% x D
E
Harga Satuan Pekerjaan (D+E)
F

4. Pembuatan 1 m3 Beton Mutu fc 26.4 Mpa (K300)


No. Uraian Kode Satuan Koefisien Harga Satuan
A TENAGA
Pekerja L.01 OH
1.650 65,000.00
Tukang Batu L.02 OH
0.275 100,000.00
Kepala Tukang L.03 OH
0.028 120,000.00
Mandor L.04 OH
0.083 120,000.00
JUMLAH TENAGA KERJA
B BAHAN
Semen Portland kg
413.000 1,261.26
Pasir Beton kg
681.000 219.70
Kerikil (Maks 30mm) kg
1021.000 238.22
Air Liter
215.000 500.00
JUMLAH HARGA BAHAN
C PERALATAN
- -
JUMLAH HARGA ALAT
Jumlah (A+B+C)
D
Overhead & Profit 10% x D
E
Harga Satuan Pekerjaan (D+E)
F
5. Pembesian 10 Kg dengan Besi Polos atau Ulir
No. Uraian Kode Satuan Koefisien Harga Satuan
A TENAGA
Pekerja L.01 OH
0.070 65,000.00
Tukang Besi L.02 OH
0.070 100,000.00
Kepala Tukang L.03 OH
0.007 120,000.00
Mandor L.04 OH
0.004 120,000.00
JUMLAH TENAGA KERJA
B BAHAN
Besi beton
kg
(polos/ulir) 10.500 10,694.25
Kawat beton kg
0.150 24,012.45
JUMLAH HARGA BAHAN
C PERALATAN
- -
JUMLAH HARGA ALAT
Jumlah (A+B+C)
D
Overhead & Profit 10% x D
E
Harga Satuan Pekerjaan (D+E)
F
G Harga Satuan Pekerjaan Per Kg (F/10)

6. Pemasangan 10 Kg Jaring Kawat Baja (Wire Mesh)


No. Uraian Kode Satuan Koefisien Harga Satuan
A TENAGA
Pekerja L.01 OH
0.025 65,000.00
Tukang Besi L.02 OH
0.025 100,000.00
Kepala Tukang L.03 OH
0.025 120,000.00
Mandor L.04 OH
0.001 120,000.00
JUMLAH TENAGA KERJA
B BAHAN
Besi beton
kg
(polos/ulir) 10.200 10,694.25
Kawat beton kg
0.050 24,012.45
JUMLAH HARGA BAHAN
C PERALATAN
- -
JUMLAH HARGA ALAT
Jumlah (A+B+C)
D
Overhead & Profit 10% x D
E
Harga Satuan Pekerjaan (D+E)
F
G Harga Satuan Pekerjaan Per Kg (F/10)
7. Pemasangan 1 m2 Steel Deck
No. Uraian Kode Satuan Koefisien Harga Satuan
A TENAGA
Pekerja L.01 OH
0.660 65,000.00
Tukang Kayu L.02 OH
0.330 100,000.00
Kepala Tukang L.03 OH
0.033 120,000.00
Mandor L.04 OH
0.033 120,000.00
JUMLAH TENAGA KERJA
B BAHAN
Floor Deck m2 1.000 115,000.00
Perlengkapan 0.100 11,500.00
JUMLAH HARGA BAHAN
C PERALATAN
- -
JUMLAH HARGA ALAT
Jumlah (A+B+C)
D
Overhead & Profit 10% x D
E
Harga Satuan Pekerjaan (D+E)
F

8. Pemasangan 1 m2 Bekisting untuk Pondasi


No. Uraian Kode Satuan Koefisien Harga Satuan
A TENAGA
Pekerja L.01 OH
0.520 65,000.00
Tukang Kayu L.02 OH
0.260 100,000.00
Kepala Tukang L.03 OH
0.026 120,000.00
Mandor L.04 OH
0.026 120,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kayu kelas III m3
0.040 2,590,875.00
Paku 5 – 10 cm kg
0.300 21,344.40
Minyak bekisting Liter
0.100 6,112.26
JUMLAH HARGA BAHAN
C PERALATAN
- -
JUMLAH HARGA ALAT
Jumlah (A+B+C)
D
Overhead & Profit 10% x D
E
Harga Satuan Pekerjaan (D+E)
F
9. Pemasangan 1 m2 Bekisting untuk Sloof
No. Uraian Kode Satuan Koefisien Harga Satuan
A TENAGA
Pekerja L.01 OH
0.520 65,000.00
Tukang Kayu L.02 OH
0.260 100,000.00
Kepala Tukang L.03 OH
0.026 120,000.00
Mandor L.04 OH
0.026 120,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kayu kelas III m3
0.045 2,590,875.00
Paku 5 – 10 cm kg
0.300 21,344.40
Minyak bekisting Liter
0.100 6,112.26
JUMLAH HARGA BAHAN
C PERALATAN
- -
JUMLAH HARGA ALAT
Jumlah (A+B+C)
D
Overhead & Profit 10% x D
E
Harga Satuan Pekerjaan (D+E)
F

10. Pemasangan 1 m2 Bekisting untuk Kolom


No. Uraian Kode Satuan Koefisien Harga Satuan
A TENAGA
Pekerja L.01 OH
0.660 65,000.00
Tukang Kayu L.02 OH
0.330 100,000.00
Kepala Tukang L.03 OH
0.033 120,000.00
Mandor L.04 OH
0.033 120,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kayu kelas III m3
0.040 2,590,875.00
Paku 5 cm – 12 cm kg
0.400 21,344.40
Minyak bekisting Liter
0.200 6,112.26
Balok kayu kelas II m3
0.015 3,638,250.00
Multipleks tebal 6 mm Lbr
0.350 93,381.75
Batang
Dolken kayu Ø 8-10/400 cm 2.000 14,332.50
JUMLAH HARGA BAHAN
C PERALATAN
- -
JUMLAH HARGA ALAT
Jumlah (A+B+C)
D
Overhead & Profit 10% x D
E
Harga Satuan Pekerjaan (D+E)
F
11. Pemasangan 1 m2 Bekisting untuk Balok
No. Uraian Kode Satuan Koefisien Harga Satuan
A TENAGA
Pekerja L.01 OH
0.660 65,000.00
Tukang Kayu L.02 OH
0.330 100,000.00
Kepala Tukang L.03 OH
0.033 120,000.00
Mandor L.04 OH
0.033 120,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kayu kelas III m3
0.040 2,590,875.00
Paku 5 cm – 12 cm kg
0.400 21,344.40
Minyak bekisting Liter
0.200 6,112.26
Balok kayu kelas II m3
0.018 3,638,250.00
Multipleks tebal 6 mm Lbr
0.350 93,381.75
Batang
Dolken kayu Ø 8-10/400 cm 2.000 14,332.50
JUMLAH HARGA BAHAN
C PERALATAN
- -
JUMLAH HARGA ALAT
Jumlah (A+B+C)
D
Overhead & Profit 10% x D
E
Harga Satuan Pekerjaan (D+E)
F

12. Pemasangan 1 m2 Bekisting untuk Lantai


No. Uraian Kode Satuan Koefisien Harga Satuan
A TENAGA
Pekerja L.01 OH
0.660 65,000.00
Tukang Kayu L.02 OH
0.330 100,000.00
Kepala Tukang L.03 OH
0.033 120,000.00
Mandor L.04 OH
0.033 120,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kayu kelas III m3
0.040 2,590,875.00
Paku 5 cm – 12 cm kg
0.400 21,344.40
Minyak bekisting Liter
0.200 6,112.26
Balok kayu kelas II m3
0.015 3,638,250.00
Multipleks tebal 6 mm Lbr
0.350 93,381.75
Batang
Dolken Ø 8-10/400 cm 6.000 14,332.50
JUMLAH HARGA BAHAN
C PERALATAN
- -
JUMLAH HARGA ALAT
Jumlah (A+B+C)
D
Overhead & Profit 10% x D
E
Harga Satuan Pekerjaan (D+E)
F
13. Pemasangan 1 m2 Bekisting untuk Tangga
No. Uraian Kode Satuan Koefisien Harga Satuan
A TENAGA
Pekerja L.01 OH
0.660 65,000.00
Tukang Kayu L.02 OH
0.330 100,000.00
Kepala Tukang L.03 OH
0.033 120,000.00
Mandor L.04 OH
0.033 120,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kayu kelas III m3
0.030 2,590,875.00
Paku 5 cm – 12 cm kg
0.400 21,344.40
Minyak bekisting Liter
0.150 6,112.26
Balok kayu kelas II m3
0.015 3,638,250.00
Multipleks tebal 6 mm Lbr
0.350 93,381.75
Batang
Dolken kayu Ø 8-10/400 cm 2.000 14,332.50
JUMLAH HARGA BAHAN
C PERALATAN
- -
JUMLAH HARGA ALAT
Jumlah (A+B+C)
D
Overhead & Profit 10% x D
E
Harga Satuan Pekerjaan (D+E)
F

14. Pembuatan 1 m' Kolom Praktis Beton Bertulang (11x11)


No. Uraian Kode Satuan Koefisien Harga Satuan
A TENAGA
Pekerja L.01 OH
0.180 65,000.00
Tukang batu L.02 OH
0.020 100,000.00
Tukang kayu L.02 OH
0.020 100,000.00
Tukang besi L.02 OH
0.020 100,000.00
Kepala tukang L.03 OH
0.006 120,000.00
Mandor L.04 OH
0.009 120,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kayu kelas III m3
0.002 2,590,875.00
Paku 5 cm – 12 cm kg
0.010 21,344.40
Minyak bekisting Liter
Besi beton polos kg
3.000 10,694.25
Kawat beton kg
0.450 24,012.45
Semen Portland kg
4.000 1,261.26
Pasir Beton m3
0.006 303,187.50
Kerikil m3
0.009 333,506.25
JUMLAH HARGA BAHAN
C PERALATAN
- -
JUMLAH HARGA ALAT
Jumlah (A+B+C)
D
Overhead & Profit 10% x D
E
Harga Satuan Pekerjaan (D+E)
F
4.2. Pekerjaan Besi dan Aluminium
1. Pemasangan 1 Kg Besi Profil
No. Uraian Kode Satuan Koefisien Harga Satuan
A TENAGA
Pekerja L.01 OH
Tukang Las 0.060 65,000.00
L.03 OH
Konstruksi 0.060 100,000.00
Kepala tukang L.03 OH
0.006 120,000.00
Mandor L.04 OH
0.003 120,000.00
JUMLAH TENAGA KERJA
B BAHAN
Besi Profil Kg
1.150 15,750.00
Kg
Meni Besi 0.080 15,523.20
JUMLAH HARGA BAHAN
C PERALATAN
- -
JUMLAH HARGA ALAT
Jumlah (A+B+C)
D
Overhead & Profit 10% x D
E
Harga Satuan Pekerjaan (D+E)
F

2. Pemasangan 1 Kg Gording C
No. Uraian Kode Satuan Koefisien Harga Satuan
A TENAGA
Pekerja L.01 OH
Tukang Las 0.060 65,000.00
L.03 OH
Konstruksi 0.060 100,000.00
Kepala tukang L.03 OH
0.006 120,000.00
Mandor L.04 OH
0.003 120,000.00
JUMLAH TENAGA KERJA
B BAHAN
Besi Baja C Kg
1.150 15,750.00
Kg
Meni Besi 0.080 13,340.25
JUMLAH HARGA BAHAN
C PERALATAN
- -
JUMLAH HARGA ALAT
Jumlah (A+B+C)
D
Overhead & Profit 10% x D
E
Harga Satuan Pekerjaan (D+E)
F
3. Pengerjaan 100 Kg Perakitan
No. Uraian Kode Satuan Koefisien Harga Satuan
A TENAGA
Pekerja L.01 OH
0.100 65,000.00
L.03 OH
Tukang Besi Konstruksi 0.100 100,000.00
Kepala tukang L.03 OH
0.001 120,000.00
Mandor L.04 OH
0.005 120,000.00
JUMLAH TENAGA KERJA
B BAHAN
Solar Liter 1.000 5,650.00
Minyak Pelumas Liter 0.100 30,561.30
JUMLAH HARGA BAHAN
C PERALATAN
- -
JUMLAH HARGA ALAT
Jumlah (A+B+C)
D
Overhead & Profit 10% x D
E
Harga Satuan Pekerjaan (D+E)
F
Harga Pengerjaan Perakitan per Kg
G

4. Memasang 1 Titik Pelat Buhul


No. Uraian Kode Satuan Koefisien Harga Satuan
A TENAGA
Pekerja L.01 OH
0.250 65,000.00
L.03 OH
Tukang Besi Konstruksi 0.050 100,000.00
Kepala tukang L.03 OH
0.025 120,000.00
Mandor L.04 OH
0.002 120,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pelat Baja, t=10mm Kg 10.000 23,042.25
Mur/Baut Bh 6.000 5,650.00
JUMLAH HARGA BAHAN
C PERALATAN
- -
JUMLAH HARGA ALAT
Jumlah (A+B+C)
D
Overhead & Profit 10% x D
E
Harga Satuan Pekerjaan (D+E)
F
5. Pemasangan 1 m' Kusen Aluminium
No. Uraian Kode Satuan Koefisien Harga Satuan
A TENAGA
Pekerja L.01 OH
0.043 65,000.00
Tukang Khusus Alumunium L.03 OH
0.043 100,000.00
Kepala tukang L.03 OH
0.004 120,000.00
Mandor L.04 OH
0.002 120,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kusen Rangka Aluminium 4" m
1.100 127,338.75
Skrup fixer buah
2.000 500.00
Sealant Tube
0.060 14,000.00
JUMLAH HARGA BAHAN
C PERALATAN
- -
JUMLAH HARGA ALAT
Jumlah (A+B+C)
D
Overhead & Profit 10% x D
E
Harga Satuan Pekerjaan (D+E)
F

6. Pemasangan 1 m2 Pintu Kaca Rangka Aluminium


No. Uraian Kode Satuan Koefisien Harga Satuan
A TENAGA
Pekerja L.01 OH
0.085 65,000.00
Tukang Khusus Alumunium L.03 OH
0.085 100,000.00
Kepala tukang L.03 OH
0.009 120,000.00
Mandor L.04 OH
0.005 120,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pintu alluminium m
4.400 127,338.75
Profil kaca m
4.500
Sealant Tube
0.270 14,000.00
JUMLAH HARGA BAHAN
C PERALATAN
- -
JUMLAH HARGA ALAT
Jumlah (A+B+C)
D
Overhead & Profit 10% x D
E
Harga Satuan Pekerjaan (D+E)
F
7. Pemasangan 1 m2 Mengerjakan Pintu/Jendela Kaca Raybend Bingkai Aluminium
No. Uraian Kode Satuan Koefisien Harga Satuan
A TENAGA
L.01 OH
Pekerja
Tukang 2.690 65,000.00
L.03 OH
Alumunium 0.085 100,000.00
Kepala tukang L.03 OH
0.085 120,000.00
Mandor L.04 OH
0.009 120,000.00
JUMLAH TENAGA KERJA
B BAHAN
m
Bingkai Pintu/Jendela Aluminium 4.100 10,106.25
m2
Kaca Raybend 5 mm 0.810 220,114.13
Karet Pelapis Kaca m 4.200 4,000.00
JUMLAH HARGA BAHAN
C PERALATAN
Alat Bantu 0.005 50,000.00
JUMLAH HARGA ALAT
Jumlah (A+B+C)
D
Overhead & Profit 10% x D
E
Harga Satuan Pekerjaan (D+E)
F

8. Pemasangan 1 m2 Mengerjakan Jendela Kaca Mati (Rangka Aluminium)


No. Uraian Kode Satuan Koefisien Harga Satuan
A TENAGA
L.01 OH
Pekerja
Tukang 0.085 65,000.00
L.03 OH
Alumunium 0.150 100,000.00
Kepala tukang L.03 OH
0.015 120,000.00
Mandor L.04 OH
0.004 120,000.00
JUMLAH TENAGA KERJA
B BAHAN
m
Kaca Raybend 5 mm 1.100 220,114.13
m
Karet Pelapis Kaca 4.200 4,000.00
JUMLAH HARGA BAHAN
C PERALATAN
Alat Bantu 0.005 -
JUMLAH HARGA ALAT
Jumlah (A+B+C)
D
Overhead & Profit 10% x D
E
Harga Satuan Pekerjaan (D+E)
F
9. Pemasangan 1 m2 Rangka Besi Hollow 1x40.40.2mm, modul 60 x 120 cm, Dinding Partisi
No. Uraian Kode Satuan Koefisien Harga Satuan
A TENAGA
L.01 OH
Pekerja 0.250 65,000.00
L.03 OH
Tukang 0.250 100,000.00
Kepala tukang L.03 OH
0.025 120,000.00
Mandor L.04 OH
0.013 120,000.00
JUMLAH TENAGA KERJA
B BAHAN
Rangka metal hollow 40.40.2 mm m
3.500 23,100.00
m
Assesoris (Perkuatan, Las, dll.) 100%xrangka 23,100.00
JUMLAH HARGA BAHAN
C PERALATAN
- -
JUMLAH HARGA ALAT
Jumlah (A+B+C)
D
Overhead & Profit 10% x D
E
Harga Satuan Pekerjaan (D+E)
F

10. Pemasangan 1 m2 Rangka Besi Hollow 1x40.40.2mm, modul 60 x 60 cm, plafond


No. Uraian Kode Satuan Koefisien Harga Satuan
A TENAGA
L.01 OH
Pekerja 0.350 65,000.00
L.03 OH
Tukang 0.350 100,000.00
Kepala tukang L.03 OH
0.035 120,000.00
Mandor L.04 OH
0.018 120,000.00
JUMLAH TENAGA KERJA
B BAHAN
Rangka metal hollow 40.40.2 mm m
4.000 23,100.00
m
Assesoris (Perkuatan, Las, dll.) 100%xrangka 23,100.00
JUMLAH HARGA BAHAN
C PERALATAN
- -
JUMLAH HARGA ALAT
Jumlah (A+B+C)
D
Overhead & Profit 10% x D
E
Harga Satuan Pekerjaan (D+E)
F
11. Pemasangan 1 m2 Pagar Hollow
No. Uraian Kode Satuan Koefisien Harga Satuan
A TENAGA
L.01 OH
Pekerja 2.690 65,000.00
L.03 OH
Tukang 2.690 100,000.00
Kepala tukang L.03 OH
0.800 120,000.00
Mandor L.04 OH
0.269 120,000.00
JUMLAH TENAGA KERJA
B BAHAN
Hollow Galfanis 4/4 kg 10.000 6,366.94
Besi Strip 4/0.4 kg 5.500 23,042.25
Kawat Las kg 1.000 30,318.75
JUMLAH HARGA BAHAN
C PERALATAN
- -
JUMLAH HARGA ALAT
Jumlah (A+B+C)
D
Overhead & Profit 10% x D
E
Harga Satuan Pekerjaan (D+E)
F

4.4.1 Pekerjaan Dinding Pasangan


1. Pemasangan Dinding Bata Merah 1 Batu Campuran 1PC : 4PP
No. Uraian Kode Satuan Koefisien Harga Satuan
A TENAGA
Pekerja L.01 OH 0.600 65,000.00
Tukang Batu L.02 OH 0.200 100,000.00
Kepala Tukang L.03 OH 0.020 120,000.00
Mandor L.04 OH 0.030 120,000.00
JUMLAH TENAGA KERJA
B BAHAN
Bata merah
bh 140.000 544.95
Semen Portland Kg
26.550 1,261.26
Pasir Pasang (Luar) m3
0.093 162,750.00
JUMLAH HARGA BAHAN
C PERALATAN
- -
JUMLAH HARGA ALAT
Jumlah (A+B+C)
D
Overhead & Profit 10% x D
E
Harga Satuan Pekerjaan (D+E)
F
2. Pemasangan Dinding Bata Merah 1/2 Batu Campuran 1PC : 4PP
No. Uraian Kode Satuan Koefisien Harga Satuan
A TENAGA
Pekerja L.01 OH
0.300 65,000.00
Tukang Batu L.02 OH
0.100 100,000.00
Kepala Tukang L.03 OH
0.010 120,000.00
Mandor L.04 OH
0.015 120,000.00
JUMLAH TENAGA KERJA
B BAHAN
Bata merah
bh 70.000 544.95
Semen Portland Kg
11.500 1,261.26
Pasir Pasang (Luar) m3
0.043 162,750.00
JUMLAH HARGA BAHAN
C PERALATAN
- -
JUMLAH HARGA ALAT
Jumlah (A+B+C)
D
Overhead & Profit 10% x D
E
Harga Satuan Pekerjaan (D+E)
F

3. Pemasangan 1 m2 Dinding Terawang (Rooster)


No. Uraian Kode Satuan Koefisien Harga Satuan
A TENAGA
Pekerja L.01 OH
0.300 65,000.00
Tukang Batu L.02 OH
0.100 100,000.00
Kepala Tukang L.03 OH
0.010 120,000.00
Mandor L.04 OH
0.015 120,000.00
JUMLAH TENAGA KERJA
B BAHAN
Rooster bh 16.667 50,000.00
Semen Portland Kg
11.000 1,261.26
Pasir Pasang m3
0.035 162,750.00
JUMLAH HARGA BAHAN
C PERALATAN
- -
JUMLAH HARGA ALAT
Jumlah (A+B+C)
D
Overhead & Profit 10% x D
E
Harga Satuan Pekerjaan (D+E)
F
4.4.2 Pekerjaan Plesteran
1. Pemasangan Plesteran 1PC : 4PP Tebal 15 mm
No. Uraian Kode Satuan Koefisien Harga Satuan
A TENAGA
Pekerja L.01 OH
0.300 65,000.00
Tukang Batu L.03 OH
0.150 100,000.00
Kepala Tukang L.03 OH
0.015 120,000.00
Mandor L.04 OH
0.015 120,000.00
JUMLAH TENAGA KERJA
B BAHAN
Semen Portland Kg
6.240 1,261.26
Pasir Pasang (Luar) m3
0.024 162,750.00
JUMLAH HARGA BAHAN
C PERALATAN
- -
JUMLAH HARGA ALAT
Jumlah (A+B+C)
D
Overhead & Profit 10% x D
E
Harga Satuan Pekerjaan (D+E)
F

2. Pemasangan 1 m2 Acian
No. Uraian Kode Satuan Koefisien Harga Satuan
A TENAGA
Pekerja L.01 OH
0.200 65,000.00
Tukang Batu L.03 OH
0.100 100,000.00
Kepala Tukang L.03 OH
0.010 120,000.00
Mandor L.04 OH
0.010 120,000.00
JUMLAH TENAGA KERJA
B BAHAN
Semen Portland Kg
3.250 1,261.26
JUMLAH HARGA BAHAN
C PERALATAN
- -
JUMLAH HARGA ALAT
Jumlah (A+B+C)
D
Overhead & Profit 10% x D
E
Harga Satuan Pekerjaan (D+E)
F
4.4.3 Pekerjaan Penutup Lantai & Dinding
1. Pemasangan 1 m2 Lantai Keramik 60x60
No. Uraian Kode Satuan Koefisien Harga Satuan
A TENAGA
Pekerja L.01 OH 0.250 65,000.00
Tukang Batu L.02 OH 0.125 100,000.00
Kepala tukang L.03 OH 0.013 120,000.00
Mandor L.04 OH 0.013 120,000.00
JUMLAH TENAGA KERJA
B BAHAN
Keramik warna Bh 2.778 67,552.38
Semen Portland kg 9.800 1,261.26
Semen warna Kg 1.300 1,819.13
Pasir pasang M3 0.045 162,750.00
JUMLAH HARGA BAHAN
C PERALATAN
- -
JUMLAH HARGA ALAT
Jumlah (A+B+C)
D
Overhead & Profit 10% x D
E
Harga Satuan Pekerjaan (D+E)
F

2. Pemasangan 1 m2 Lantai Keramik 40x40


No. Uraian Kode Satuan Koefisien Harga Satuan
A TENAGA
Pekerja L.01 OH 0.250 65,000.00
Tukang Batu L.02 OH 0.125 100,000.00
Kepala tukang L.03 OH 0.013 120,000.00
Mandor L.04 OH 0.013 120,000.00
JUMLAH TENAGA KERJA
B BAHAN
Keramik warna Bh 6.250 12,379.75
Semen Portland kg 9.800 1,261.26
Semen warna Kg 1.300 1,819.13
Pasir pasang M3 0.045 162,750.00
JUMLAH HARGA BAHAN
C PERALATAN
- -
JUMLAH HARGA ALAT
Jumlah (A+B+C)
D
Overhead & Profit 10% x D
E
Harga Satuan Pekerjaan (D+E)
F
3. Pemasangan 1 m2 Lantai Keramik 20x20
No. Uraian Kode Satuan Koefisien Harga Satuan
A TENAGA
Pekerja L.01 OH 0.700 65,000.00
Tukang Batu L.02 OH 0.350 100,000.00
Kepala tukang L.03 OH 0.035 120,000.00
Mandor L.04 OH 0.035 120,000.00
JUMLAH TENAGA KERJA
B BAHAN
Keramik warna Bh 25.000 2,252.50
Semen Portland kg 10.400 1,261.26
Semen warna Kg 1.620 1,819.13
Pasir pasang M3 0.045 162,750.00
JUMLAH HARGA BAHAN
C PERALATAN
- -
JUMLAH HARGA ALAT
Jumlah (A+B+C)
D
Overhead & Profit 10% x D
E
Harga Satuan Pekerjaan (D+E)
F

4. Pemasangan 1 m2 Dinding Keramik 20x25


No. Uraian Kode Satuan Koefisien Harga Satuan
A TENAGA
Pekerja L.01 OH 0.900 65,000.00
Tukang Batu L.02 OH 0.450 100,000.00
Kepala tukang L.03 OH 0.045 120,000.00
Mandor L.04 OH 0.045 120,000.00
JUMLAH TENAGA KERJA
B BAHAN
Keramik artistik Bh 20.000 2,801.45
Semen Portland Kg 9.300 1,261.26
Pasir Pasang M3 0.018 162,750.00
Semen warna Kg 1.940 1,819.13
JUMLAH HARGA BAHAN
C PERALATAN
- -
JUMLAH HARGA ALAT
Jumlah (A+B+C)
D
Overhead & Profit 10% x D
E
Harga Satuan Pekerjaan (D+E)
F
5. Pemasangan 1 m Plint Multipleks lebar 10 cm
No. Uraian Kode Satuan Koefisien Harga Satuan
A TENAGA
Pekerja L.01 OH 0.120 65,000.00
Tukang Batu L.02 OH 0.120 100,000.00
Kepala tukang L.03 OH 0.012 120,000.00
Mandor L.04 OH 0.006 120,000.00
JUMLAH TENAGA KERJA
B BAHAN
Multipleks 122x244x0.9 Lbr 0.035 115,500.00
Paku Skrup 3 1/2" Kg 9.300 22,945.23
JUMLAH HARGA BAHAN
C PERALATAN
- -
JUMLAH HARGA ALAT
Jumlah (A+B+C)
D
Overhead & Profit 10% x D
E
Harga Satuan Pekerjaan (D+E)
F

4.5.1 Pekerjaan Plafond


1. Pemasangan 1 m2 Rangka Langit-langit (60 x 60 ) cm, Kayu Kls II
No. Uraian Kode Satuan Koefisien Harga Satuan
A TENAGA
Pekerja L.01 OH
0.200 65,000.00
Tukang kayu L.02 OH
0.300 100,000.00
Kepala tukang L.03 OH
0.030 120,000.00
Mandor L.04 OH
0.010 120,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kaso 5 x 7 cm m3 0.0163 3,638,250.00
Paku 7-10 cm kg 0.250 21,344.40
JUMLAH HARGA BAHAN
C PERALATAN
- -
JUMLAH HARGA ALAT
Jumlah (A+B+C)
D
Overhead & Profit 10% x D
E
Harga Satuan Pekerjaan (D+E)
F
2. Pemasangan 1 m2 Langit-langit Tripleks Ukuran ( 120x240x3) mm, Tebal 3 mm
No. Uraian Kode Satuan Koefisien Harga Satuan
A TENAGA
Pekerja L.01 OH
0.100 65,000.00
Tukang kayu L.02 OH
0.100 100,000.00
Kepala tukang L.03 OH
0.010 120,000.00
Mandor L.04 OH
0.005 120,000.00
JUMLAH TENAGA KERJA
B BAHAN
Lembar
Tripleks Tebal 3 mm 0.375 60,031.13
Paku Tripleks kg
0.030 21,344.40
JUMLAH HARGA BAHAN
C PERALATAN
- -
JUMLAH HARGA ALAT
Jumlah (A+B+C)
D
Overhead & Profit 10% x D
E
Harga Satuan Pekerjaan (D+E)
F

4. Pemasangan 1 m' List Kayu Profil


No. Uraian Kode Satuan Koefisien Harga Satuan
A TENAGA
Pekerja L.01 OH
0.050 65,000.00
Tukang kayu L.02 OH
0.050 100,000.00
Kepala tukang L.03 OH
0.005 120,000.00
Mandor L.04 OH
0.030 120,000.00
JUMLAH TENAGA KERJA
B BAHAN
List Kayu Profil 2 x 3 cm m 1.050 2,789.33
kg
Paku 0.010 21,344.40
JUMLAH HARGA BAHAN
C PERALATAN
- -
JUMLAH HARGA ALAT
Jumlah (A+B+C)
D
Overhead & Profit 10% x D
E
Harga Satuan Pekerjaan (D+E)
F
5. Pemasangan 1 m2 Langit-langit PVC
No. Uraian Kode Satuan Koefisien Harga Satuan
A TENAGA + BAHAN
OH
Langit-langit PVC 1.000 173,423.25
JUMLAH TENAGA KERJA
B PERALATAN
- -
JUMLAH HARGA ALAT
Jumlah (A+B)
C
Overhead & Profit 10% x D
D
Harga Satuan Pekerjaan (C+D)
E

6. Pemasangan 1 m' List Langit-langit PVC Harga Satuan


No. Uraian Kode Satuan Koefisien (Rp)
A TENAGA + BAHAN
List Langit-langit PVC m' 1.000 25,613.28
JUMLAH TENAGA KERJA
B PERALATAN
- -
JUMLAH HARGA ALAT
Jumlah (A+B)
C
Overhead & Profit 10% x D
D
Harga Satuan Pekerjaan (C+D)
E

4.5.2 Pekerjaan Penutup Atap


1. Pemasangan 1 m2 Genteng Keramik
No. Uraian Kode Satuan Koefisien Harga Satuan
A TENAGA
Pekerja L.01 OH
0.150 65,000.00
Tukang Kayu L.03 OH
0.060 100,000.00
Kepala tukang L.11 OH
0.006 120,000.00
Mandor L.15 OH
0.006 120,000.00
JUMLAH TENAGA KERJA
B BAHAN
Genteng keramik Bh
14.500 11,576.25
Paku biasa 2”-5” Kg
0.300 21,344.40
JUMLAH HARGA BAHAN
C PERALATAN
- -
JUMLAH HARGA ALAT
Jumlah (A+B+C)
D
Overhead & Profit 10% x D
E
Harga Satuan Pekerjaan (D+E)
F
2. Pemasangan 1 m2 Atap Spandek Type G 300
No. Uraian Kode Satuan Koefisien Harga Satuan
A TENAGA
Pekerja L.01 OH
0.120 65,000.00
Tukang Kayu L.03 OH
0.060 100,000.00
Kepala tukang L.11 OH
0.006 120,000.00
Mandor L.15 OH
0.006 120,000.00
JUMLAH TENAGA KERJA
B BAHAN
Spandek Type G 300 m2 1.000 96,413.63
Kg
Paku biasa 1/2" - 1" 0.020 21,344.40
JUMLAH HARGA BAHAN
C PERALATAN
- -
JUMLAH HARGA ALAT
Jumlah (A+B+C)
D
Overhead & Profit 10% x D
E
Harga Satuan Pekerjaan (D+E)
F

3. Pemasangan 1 m' Nok Genteng Keramik


No. Uraian Kode Satuan Koefisien Harga Satuan
A TENAGA
Pekerja L.01 OH
0.400 65,000.00
Tukang Kayu L.03 OH
0.200 100,000.00
Kepala tukang L.11 OH
0.020 120,000.00
Mandor L.15 OH
0.020 120,000.00
JUMLAH TENAGA KERJA
B BAHAN
Nok genteng keramik Bh
3.500 15,435.00
Paku biasa ½”-1” Kg
0.050 21,344.40
Semen PC Kg
10.800 1,261.26
Pasir pasang
m3 0.032 162,750.00
Semen warna Kg
1.000 1,819.13
JUMLAH HARGA BAHAN
C PERALATAN
- -
JUMLAH HARGA ALAT
Jumlah (A+B+C)
D
Overhead & Profit 10% x D
E
Harga Satuan Pekerjaan (D+E)
F
4. Pemasangan 1 m' Nok Genteng Metal
No. Uraian Kode Satuan Koefisien Harga Satuan
A TENAGA
Pekerja L.01 OH
0.250 65,000.00
Tukang Kayu L.03 OH
0.150 100,000.00
Kepala tukang L.11 OH
0.015 120,000.00
Mandor L.15 OH
0.013 120,000.00
JUMLAH TENAGA KERJA
B BAHAN
Nok Gent. Metal Kasar
m' 1.100 96,250.00
Paku biasa ½”-1” Kg
0.050 21,344.40
JUMLAH HARGA BAHAN
C PERALATAN
- -
JUMLAH HARGA ALAT
Jumlah (A+B+C)
D
Overhead & Profit 10% x D
E
Harga Satuan Pekerjaan (D+E)
F

5. Pemasangan 1 m2 Lapisan Atap Karet Roll


No. Uraian Kode Satuan Koefisien Harga Satuan
A TENAGA
Pekerja L.01 OH
0.150 65,000.00
Tukang Kayu L.03 OH
0.050 100,000.00
Kepala tukang L.11 OH
0.005 120,000.00
Mandor L.15 OH
0.008 120,000.00
JUMLAH TENAGA KERJA
B BAHAN
Karet Pelapis m2 1.050 8,489.25
JUMLAH HARGA BAHAN
C PERALATAN
- -
JUMLAH HARGA ALAT
Jumlah (A+B+C)
D
Overhead & Profit 10% x D
E
Harga Satuan Pekerjaan (D+E)
F
4.6.1 Pekerjaan Kayu
1. Pembuatan dan Pemasangan 1 m3 Kusen Pintu dan Kusen Jendela, Kayu Kls I
No. Uraian Kode Satuan Koefisien Harga Satuan
A TENAGA
Pekerja L.01 OH
7.000 65,000.00
Tukang kayu L.03 OH
21.000 100,000.00
Kepala tukang L.03 OH
2.100 120,000.00
Mandor L.04 OH
0.350 120,000.00
JUMLAH TENAGA KERJA
B BAHAN
Balok kayu m3
1.100 7,882,875.00
Paku 10 cm Kg
1.250 21,344.40
Lem kayu Kg
1.000 36,382.50
JUMLAH HARGA BAHAN
C PERALATAN
- -
JUMLAH HARGA ALAT
Jumlah (A+B+C)
D
Overhead & Profit 10% x D
E
Harga Satuan Pekerjaan (D+E)
F

2. Pembuatan dan Pemasangan 1 m2 Daun Pintu panel, Kayu Kelas I atau Kelas II
No. Uraian Kode Satuan Koefisien Harga Satuan
A TENAGA
Pekerja L.01 OH
1.000 65,000.00
Tukang kayu L.03 OH
3.000 100,000.00
Kepala tukang L.03 OH
0.300 120,000.00
Mandor L.04 OH
0.050 120,000.00
JUMLAH TENAGA KERJA
B BAHAN
Papan kayu Kls I m3
0.040 8,489,250.00
Kg
Lem Kayu 0.500 36,382.50
JUMLAH HARGA BAHAN
C PERALATAN
- -
JUMLAH HARGA ALAT
Jumlah (A+B+C)
D
Overhead & Profit 10% x D
E
Harga Satuan Pekerjaan (D+E)
F
3. Pembuatan dan Pemasangan Rangka Atap, Kayu Kelas II
No. Uraian Kode Satuan Koefisien Harga Satuan
A TENAGA
Pekerja L.01 OH
0.120 65,000.00
Tukang kayu L.03 OH
0.120 100,000.00
Kepala tukang L.03 OH
0.012 120,000.00
Mandor L.04 OH
0.006 120,000.00
JUMLAH TENAGA KERJA
B BAHAN
m3
Kayu Kelas II 0.014 3,638,250.00
m3
Paku 5-10 cm 0.057 21,344.40
JUMLAH HARGA BAHAN
C PERALATAN
- -
JUMLAH HARGA ALAT
Jumlah (A+B+C)
D
Overhead & Profit 10% x D
E
Harga Satuan Pekerjaan (D+E)
F

4. Pemasangan 1 m2 HPL (High Pressure Laminating)


No. Uraian Kode Satuan Koefisien Harga Satuan
A TENAGA
Pekerja L.01 OH
0.350 65,000.00
Tukang kayu L.03 OH
0.175 100,000.00
Kepala tukang L.03 OH
0.017 120,000.00
Mandor L.04 OH
0.002 120,000.00
JUMLAH TENAGA KERJA
B BAHAN
m2
High Pressure Lainating 0.382 225,225.00
Kg
Lem Khusus HPL 0.250 36,382.50
JUMLAH HARGA BAHAN
C PERALATAN
- -
JUMLAH HARGA ALAT
Jumlah (A+B+C)
D
Overhead & Profit 10% x D
E
Harga Satuan Pekerjaan (D+E)
F
5. Pemasangan Listplank
No. Uraian Kode Satuan Koefisien Harga Satuan
A TENAGA
Pekerja L.01 OH
0.100 65,000.00
Tukang kayu L.03 OH
0.200 100,000.00
Kepala tukang L.03 OH
0.020 120,000.00
Mandor L.04 OH
0.050 120,000.00
JUMLAH TENAGA KERJA
B BAHAN
Woodplank m' 1.000 23,625.00
Paku Kg
0.050 21,344.40
JUMLAH HARGA BAHAN
C PERALATAN
- -
JUMLAH HARGA ALAT
Jumlah (A+B+C)
D
Overhead & Profit 10% x D
E
Harga Satuan Pekerjaan (D+E)
F

4.6.2 Pekerjaan Kunci dan Kaca


1. Pemasangan 1 Buah Kunci Tanam biasa
No. Uraian Kode Satuan Koefisien Harga Satuan
A TENAGA
Pekerja L.01 OH
0.010 65,000.00
Tukang kayu L.02 OH
0.500 100,000.00
Kepala tukang L.03 OH
0.050 120,000.00
Mandor L.04 OH
0.005 120,000.00
JUMLAH TENAGA KERJA
B BAHAN
Bh
Kunci Tanam 2 slag 1.000 60,637.50
JUMLAH HARGA BAHAN
C PERALATAN
- -
JUMLAH HARGA ALAT
Jumlah (A+B+C)
D
Overhead & Profit 10% x D
E
Harga Satuan Pekerjaan (D+E)
F
2. Pemasangan 1 Buah Kunci Pintu Aluminium
No. Uraian Kode Satuan Koefisien Harga Satuan
A TENAGA
Pekerja L.01 OH
0.010 65,000.00
Tukang kayu L.02 OH
0.500 100,000.00
Kepala tukang L.03 OH
0.050 120,000.00
Mandor L.04 OH
0.005 120,000.00
JUMLAH TENAGA KERJA
B BAHAN
Bh
Kunci Pintu Aluminium 1.000 115,000.00
JUMLAH HARGA BAHAN
C PERALATAN
- -
JUMLAH HARGA ALAT
Jumlah (A+B+C)
D
Overhead & Profit 10% x D
E
Harga Satuan Pekerjaan (D+E)
F

3. Pemasangan 1 Buah Engsel Pintu


No. Uraian Kode Satuan Koefisien Harga Satuan
A TENAGA
Pekerja L.01 OH
0.015 65,000.00
Tukang kayu L.02 OH
0.150 100,000.00
Kepala tukang L.03 OH
0.015 120,000.00
Mandor L.04 OH
0.001 120,000.00
JUMLAH TENAGA KERJA
B BAHAN
Bh
Engsel Pintu 1.000 40,020.75
JUMLAH HARGA BAHAN
C PERALATAN
- -
JUMLAH HARGA ALAT
Jumlah (A+B+C)
D
Overhead & Profit 10% x D
E
Harga Satuan Pekerjaan (D+E)
F

4. Pemasangan 1 Buah Engsel Jendela


No. Uraian Kode Satuan Koefisien Harga Satuan
A TENAGA
Pekerja L.01 OH
0.010 65,000.00
Tukang kayu L.02 OH
0.100 100,000.00
Kepala tukang L.03 OH
0.010 120,000.00
Mandor L.04 OH
0.001 120,000.00
JUMLAH TENAGA KERJA
B BAHAN
Bh
Engsel Pintu 1.000 34,684.65
JUMLAH HARGA BAHAN
C PERALATAN
- -
JUMLAH HARGA ALAT
Jumlah (A+B+C)
D
Overhead & Profit 10% x D
E
Harga Satuan Pekerjaan (D+E)
F
5. Pemasangan 1 Buah Kaitan Angin
No. Uraian Kode Satuan Koefisien Harga Satuan
A TENAGA
Pekerja L.01 OH
0.015 65,000.00
Tukang kayu L.02 OH
0.150 100,000.00
Kepala tukang L.03 OH
0.015 120,000.00
Mandor L.04 OH
0.001 120,000.00
JUMLAH TENAGA KERJA
B BAHAN
Bh
kait Angin 1.000 11,157.30
JUMLAH HARGA BAHAN
C PERALATAN
- -
JUMLAH HARGA ALAT
Jumlah (A+B+C)
D
Overhead & Profit 10% x D
E
Harga Satuan Pekerjaan (D+E)
F

6. Pemasangan 1 Buah Grendel


No. Uraian Kode Satuan Koefisien Harga Satuan
A TENAGA
Pekerja L.01 OH
0.010 65,000.00
Tukang kayu L.02 OH
0.100 100,000.00
Kepala tukang L.03 OH
0.010 120,000.00
Mandor L.04 OH
0.001 120,000.00
JUMLAH TENAGA KERJA
B BAHAN
Bh
Grendel 1.000 25,710.30
JUMLAH HARGA BAHAN
C PERALATAN
- -
JUMLAH HARGA ALAT
Jumlah (A+B+C)
D
Overhead & Profit 10% x D
E
Harga Satuan Pekerjaan (D+E)
F

7. Pemasangan 1 Buah Door Closer


No. Uraian Kode Satuan Koefisien Harga Satuan
A TENAGA
Pekerja L.01 OH
0.050 65,000.00
Tukang kayu L.02 OH
0.500 100,000.00
Kepala tukang L.03 OH
0.050 120,000.00
Mandor L.04 OH
0.003 120,000.00
JUMLAH TENAGA KERJA
B BAHAN
Bh
Door Closer 1.000 275,073.75
JUMLAH HARGA BAHAN
C PERALATAN
- -
JUMLAH HARGA ALAT
Jumlah (A+B+C)
D
Overhead & Profit 10% x D
E
Harga Satuan Pekerjaan (D+E)
F
7. Pemasangan 1 Buah Door Holder
No. Uraian Kode Satuan Koefisien Harga Satuan
A TENAGA
Pekerja L.01 OH
0.050 65,000.00
Tukang kayu L.02 OH
0.500 100,000.00
Kepala tukang L.03 OH
0.050 120,000.00
Mandor L.04 OH
0.003 120,000.00
JUMLAH TENAGA KERJA
B BAHAN
Bh
Door Holder 1.000 137,812.50
JUMLAH HARGA BAHAN
C PERALATAN
- -
JUMLAH HARGA ALAT
Jumlah (A+B+C)
D
Overhead & Profit 10% x D
E
Harga Satuan Pekerjaan (D+E)
F

8. Pemasangan 1 m2 Kaca Tebal 5 mm


No. Uraian Kode Satuan Koefisien Harga Satuan
A TENAGA
Pekerja L.01 OH
0.015 65,000.00
Tukang kayu L.02 OH
0.150 100,000.00
Kepala tukang L.03 OH
0.015 120,000.00
Mandor L.04 OH
0.001 120,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kaca Tebal 5 mm (Rayben) m2 1.100 220,114.13
Sealant kg 0.050 14,000.00
JUMLAH HARGA BAHAN
C PERALATAN
- -
JUMLAH HARGA ALAT
Jumlah (A+B+C)
D
Overhead & Profit 10% x D
E
Harga Satuan Pekerjaan (D+E)
F
4.7.1 Pekerjaan Pengecatan
1. Pemasangan 1 m2 Pengecetan Bidang Kayu Baru (1 Lapis Plamuur, 1 Lapis Cat Dasar, 2 Lapis Cat Penutup)
No. Uraian Kode Satuan Koefisien Harga Satuan
A TENAGA
Pekerja L.01 OH
0.070 65,000.00
Tukang cat L.02 OH
0.009 100,000.00
Kepala tukang L.03 OH
0.006 120,000.00
Mandor L.04 OH
0.003 120,000.00
JUMLAH TENAGA KERJA
B BAHAN
Cat menie Kg
0.200 13,340.25
Dempul Kg
0.150 20,010.38
Cat dasar Kg
0.170 26,680.50
Cat penutup Kg
0.260 53,361.00
Kuas Bh
0.010 7,000.00
Pengencer Kg
0.030 24,012.45
Ampelas Lbr
0.200 32,744.25
JUMLAH HARGA BAHAN
C PERALATAN
- -
JUMLAH HARGA ALAT
Jumlah (A+B+C)
D
Overhead & Profit 10% x D
E
Harga Satuan Pekerjaan (D+E)
F

2. Pemasangan 1 m2 Pengecetan tembok Baru (1 Lapis Plamuur, 1 Lapis Cat Dasar, 2 Lapis Cat Penutup)
No. Uraian Kode Satuan Koefisien Harga Satuan
A TENAGA
Pekerja L.01 OH
0.020 65,000.00
Tukang cat L.02 OH
0.063 100,000.00
Kepala tukang L.03 OH
0.006 120,000.00
Mandor L.04 OH
0.003 120,000.00
JUMLAH TENAGA KERJA
B BAHAN
Plamuur Kg
0.100 64,033.20
Cat dasar Kg
0.100 49,612.50
Cat penutup (dalam) Kg
0.260 61,365.15
JUMLAH HARGA BAHAN
C PERALATAN
- -
JUMLAH HARGA ALAT
Jumlah (A+B+C)
D
Overhead & Profit 10% x D
E
Harga Satuan Pekerjaan (D+E)
F
3. Pemasangan 1 m2 Pengecetan tembok Luar (1 Lapis Cat Dasar, 2 Lapis Cat Penutup)
No. Uraian Kode Satuan Koefisien Harga Satuan
A TENAGA
Pekerja L.01 OH
0.028 65,000.00
Tukang cat L.02 OH
0.042 100,000.00
Kepala tukang L.03 OH
0.004 120,000.00
Mandor L.04 OH
0.003 120,000.00
JUMLAH TENAGA KERJA
B BAHAN
Cat dasar Kg
0.120 49,612.50
Cat penutup (luar) Kg
0.180 93,381.75
JUMLAH HARGA BAHAN
C PERALATAN
- -
JUMLAH HARGA ALAT
Jumlah (A+B+C)
D
Overhead & Profit 10% x D
E
Harga Satuan Pekerjaan (D+E)
F

4.7 Alco Panel


1. Pemasangan 1 m2 Alco Panel + Rangka
No. Uraian Kode Satuan Koefisien Harga Satuan
A TENAGA + BAHAN
OH
Alco Panel 1.000 716,625.00
JUMLAH TENAGA KERJA
B PERALATAN
- -
JUMLAH HARGA ALAT
Jumlah (A+B)
C
Overhead & Profit 10% x D
D
Harga Satuan Pekerjaan (C+D)
E

DIVISI 5 - PEKERJAAN MEKANIKAL


5.1.1 Pekerjaaan Sanitasi Gedung
1. Pemasangan 1 Buah closet Jongkok
No. Uraian Kode Satuan Koefisien Harga Satuan
A TENAGA
Pekerja L.01 OH
1.000 65,000.00
Tukang batu L.02 OH
1.500 100,000.00
Kepala tukang L.03 OH
0.150 120,000.00
Mandor L.04 OH
0.160 120,000.00
JUMLAH TENAGA KERJA
B BAHAN
Closet Jongkok Setara KIA Unit
1.00 315,000.00

Semen Portland kg 6.00 1,261.26


Pasir Pasang m3 0.01 162,750.00
JUMLAH HARGA BAHAN
C PERALATAN
- -
JUMLAH HARGA ALAT
Jumlah (A+B+C)
D
Overhead & Profit 10% x D
E
Harga Satuan Pekerjaan (D+E)
F
2. Pemasangan 1 Buah Urinoir
No. Uraian Kode Satuan Koefisien Harga Satuan
A TENAGA
Pekerja L.01 OH
1.000 65,000.00
Tukang batu L.02 OH
1.000 100,000.00
Kepala tukang L.03 OH
0.100 120,000.00
Mandor L.04 OH
0.050 120,000.00
JUMLAH TENAGA KERJA
B BAHAN
Unit
Urinoir Setara Toto 1.000 2,534,914.31
Ls 6% x urinoir
Semen Portland 152,094.86
Unit
Pasir Pasang 0.010 162,750.00
Perlengkapan Ls 30%
760,474.29
JUMLAH HARGA BAHAN
C PERALATAN
- -
JUMLAH HARGA ALAT
Jumlah (A+B+C)
D
Overhead & Profit 10% x D
E
Harga Satuan Pekerjaan (D+E)
F

3. Pemasangan Bak Kontrol Pas. 30x30 Tinggi 35 cm


No. Uraian Kode Satuan Koefisien Harga Satuan
A TENAGA
Pekerja L.01 OH
2.160 65,000.00
Tukang batu L.02 OH
0.720 100,000.00
Kepala tukang L.03 OH
0.072 120,000.00
Mandor L.04 OH
0.011 120,000.00
JUMLAH TENAGA KERJA
B BAHAN
Bata Merah Buah 40.000 544.95
Semen Portland kg 44.000 1,261.26
Pasir Pasang m3 0.070 162,750.00
Pasir Beton m3 0.060 303,187.50
Kerikil m3 0.070 333,506.25
Baja Tulangan kg 1.600 10,694.25
JUMLAH HARGA BAHAN
C PERALATAN
- -
JUMLAH HARGA ALAT
Jumlah (A+B+C)
D
Overhead & Profit 10% x D
E
Harga Satuan Pekerjaan (D+E)
F

3. Pemasangan 1 Buah Wastafel


No. Uraian Kode Satuan Koefisien Harga Satuan
A TENAGA
Pekerja L.01 OH
1.200 65,000.00
Tukang batu L.02 OH
1.450 100,000.00
Kepala tukang L.03 OH
0.150 120,000.00
Mandor L.04 OH
0.060 120,000.00
JUMLAH TENAGA KERJA
B BAHAN
Unit
Wastafel Setara Toto 1.200 333,506.25
sement portland kg 6.000 1,261.26
Pasir Pasang m3 0.010 162,750.00
perlengkapan % 12.000 40,020.75
JUMLAH HARGA BAHAN
C PERALATAN
- -
JUMLAH HARGA ALAT
Jumlah (A+B+C)
D
Overhead & Profit 10% x D
E
Harga Satuan Pekerjaan (D+E)
F
4. Pemasangan 1 buah kran air diameter 3/4" atai 1/2"
No. Uraian Kode Satuan Koefisien Harga Satuan
A TENAGA
Pekerja L.01 OH
0.054 65,000.00
Tukang batu L.02 OH
0.090 100,000.00
Kepala tukang L.03 OH
0.009 120,000.00
Mandor L.04 OH
0.027 120,000.00
JUMLAH TENAGA KERJA
B BAHAN
kran air stainless steel buah 1.000 53,361.00
sealtape m 0.025 39,000.00
JUMLAH HARGA BAHAN
C PERALATAN
- -
JUMLAH HARGA ALAT
Jumlah (A+B+C)
D
Overhead & Profit 10% x D
E
Harga Satuan Pekerjaan (D+E)
F

5. Pemasangan 1 buah Stop Kran Pembilas


No. Uraian Kode Satuan Koefisien Harga Satuan
A TENAGA
Pekerja L.01 OH
0.054 65,000.00
Tukang batu L.02 OH
0.090 100,000.00
Kepala tukang L.03 OH
0.009 120,000.00
Mandor L.04 OH
0.027 120,000.00
JUMLAH TENAGA KERJA
B BAHAN
stop kran pembilas buah 1.000 148,837.50
sealtape m 0.025 39,000.00
JUMLAH HARGA BAHAN
C PERALATAN
- -
JUMLAH HARGA ALAT
Jumlah (A+B+C)
D
Overhead & Profit 10% x D
E
Harga Satuan Pekerjaan (D+E)
F
6. Pemasangan 1 m' pipa PVC Tipe AW diameter 3/4 '' (6m / Batang)
No. Uraian Kode Satuan Koefisien Harga Satuan
A TENAGA
Pekerja L.01 OH
0.036 65,000.00
Tukang batu L.02 OH
0.060 100,000.00
Kepala tukang L.03 OH
0.006 120,000.00
Mandor L.04 OH
0.002 120,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC 3/4 ''
m 1.200 4,812.50
Perlengkapan Ls 35%xpipa
1,684.38
JUMLAH HARGA BAHAN
C PERALATAN
- -
JUMLAH HARGA ALAT
Jumlah (A+B+C)
D
Overhead & Profit 10% x D
E
Harga Satuan Pekerjaan (D+E)
F

7. Pemasangan 1 m' pipa PVC Tipe AW diameter 3'' (6m / Batang)


No. Uraian Kode Satuan Koefisien Harga Satuan
A TENAGA
Pekerja L.01 OH
0.081 65,000.00
Tukang batu L.02 OH
0.135 100,000.00
Kepala tukang L.03 OH
0.014 120,000.00
Mandor L.04 OH
0.004 120,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC 3''
m 1.200 8,750.00
Perlengkapan Ls 35%xpipa
3,062.50
JUMLAH HARGA BAHAN
C PERALATAN
- -
JUMLAH HARGA ALAT
Jumlah (A+B+C)
D
Overhead & Profit 10% x D
E
Harga Satuan Pekerjaan (D+E)
F
8. Pemasangan 1 m' pipa PVC Tipe AW diameter 4'' (6m / Batang)
No. Uraian Kode Satuan Koefisien Harga Satuan
A TENAGA
Pekerja L.01 OH
0.081 65,000.00
Tukang batu L.02 OH
0.135 100,000.00
Kepala tukang L.03 OH
0.014 120,000.00
Mandor L.04 OH
0.004 120,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC 4''
m 1.200 13,125.00
Perlengkapan Ls 35%xpipa
4,593.75
JUMLAH HARGA BAHAN
C PERALATAN
- -
JUMLAH HARGA ALAT
Jumlah (A+B+C)
D
Overhead & Profit 10% x D
E
Harga Satuan Pekerjaan (D+E)
F

9. Pemasangan 1 buah Floor Drain


No. Uraian Kode Satuan Koefisien Harga Satuan
A TENAGA
Pekerja L.01 OH
1.000 65,000.00
L.02 OH
Tukang 0.010 100,000.00
Kepala tukang L.03 OH
0.100 120,000.00
Mandor L.04 OH
0.010 120,000.00
JUMLAH TENAGA KERJA
B BAHAN
Floor Drain bh 1.000 27,500.00
JUMLAH HARGA BAHAN
C PERALATAN
- -
JUMLAH HARGA ALAT
Jumlah (A+B+C)
D
Overhead & Profit 10% x D
E
Harga Satuan Pekerjaan (D+E)
F
DIVISI 6 - PEKERJAAN ELEKTRIKAL
6.1 Sistem Distribusi Jaringan Listrik
1. Memasang Instalasi Untuk 1 Titik Lampu
No. Uraian Kode Satuan Koefisien Harga Satuan
A TENAGA
L.01 OH
Tukang Listrik 0.100 100,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kabel NYA (2x2.5) mm m 4.000 7,000.00
Klem Kabel No. 10 bh 8.000 500.00
Pipa PVC 5/8" btg 0.000 15,765.75
Inbow Dos bh 1.000 3,500.00
Las Dop bh 4.000 500.00
Isolasi roll 1.000 2,000.00
T - Dos 5/8" bh 2.000 500.00
JUMLAH HARGA BAHAN
C PERALATAN
Alat Bantu Ls 1.00 1,000.00
JUMLAH HARGA ALAT
Jumlah (A+B+C)
D
Overhead & Profit 10% x D
E
Harga Satuan Pekerjaan (D+E)
F

2. Memasang Instalasi Untuk 1 Titik Saklar/Stop Kontak


No. Uraian Kode Satuan Koefisien Harga Satuan
A TENAGA
L.01 OH
Tukang Listrik 0.100 100,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kabel NYA (2x2.5) mm m 4.000 7,000.00
Klem Kabel No. 10 bh 8.000 500.00
Pipa PVC 5/8" btg 1.500 15,765.75
Inbow Dos bh 1.000 3,500.00
Las Dop bh 6.000 500.00
Isolasi roll 1.000 2,000.00
T - Dos 5/8" bh 1.000 500.00
JUMLAH HARGA BAHAN
C PERALATAN
Alat Bantu Ls 1.00 1,000.00
JUMLAH HARGA ALAT
Jumlah (A+B+C)
D
Overhead & Profit 10% x D
E
Harga Satuan Pekerjaan (D+E)
F
3. Pemasangan 1 buah Saklar Tunggal
No. Uraian Kode Satuan Koefisien Harga Satuan
A TENAGA
Pekerja L.01 OH
0.005 65,000.00
L.02 OH
Tukang 0.050 100,000.00
Kepala tukang L.03 OH
0.005 120,000.00
Mandor L.04 OH
0.0003 120,000.00
JUMLAH TENAGA KERJA
B BAHAN
Saklar tunggal bh 1.000 16,008.30
JUMLAH HARGA BAHAN
C PERALATAN
- -
JUMLAH HARGA ALAT
Jumlah (A+B+C)
D
Overhead & Profit 10% x D
E
Harga Satuan Pekerjaan (D+E)
F

4. Pemasangan 1 buah Saklar Ganda


No. Uraian Kode Satuan Koefisien Harga Satuan
A TENAGA
Pekerja L.01 OH
0.005 65,000.00
L.02 OH
Tukang 0.050 100,000.00
Kepala tukang L.03 OH
0.005 120,000.00
Mandor L.04 OH
0.0003 120,000.00
JUMLAH TENAGA KERJA
B BAHAN
Saklar Ganda bh 1.000 24,497.55
JUMLAH HARGA BAHAN
C PERALATAN
- -
JUMLAH HARGA ALAT
Jumlah (A+B+C)
D
Overhead & Profit 10% x D
E
Harga Satuan Pekerjaan (D+E)
F

5. Pemasangan 1 buah Stop Kontak


No. Uraian Kode Satuan Koefisien Harga Satuan
A TENAGA
Pekerja L.01 OH
0.005 65,000.00
L.02 OH
Tukang 0.050 100,000.00
Kepala tukang L.03 OH
0.005 120,000.00
Mandor L.04 OH
0.000 120,000.00
JUMLAH TENAGA KERJA
B BAHAN
Stop Kontak bh 1.000 30,561.30
JUMLAH HARGA BAHAN
C PERALATAN
- -
JUMLAH HARGA ALAT
Jumlah (A+B+C)
D
Overhead & Profit 10% x D
E
Harga Satuan Pekerjaan (D+E)
F
6. Pemasangan 1 buah Lampu RM 2 x 36 Watt
No. Uraian Kode Satuan Koefisien Harga Satuan
A TENAGA
Pekerja L.01 OH
0.005 65,000.00
L.02 OH
Tukang 0.050 100,000.00
Kepala tukang L.03 OH
0.005 120,000.00
Mandor L.04 OH
0.000 120,000.00
JUMLAH TENAGA KERJA
B BAHAN
Lampu RM 2 x 36 Watt bh 1.000 375,952.50
JUMLAH HARGA BAHAN
C PERALATAN
- -
JUMLAH HARGA ALAT
Jumlah (A+B+C)
D
Overhead & Profit 10% x D
E
Harga Satuan Pekerjaan (D+E)
F

7. Pemasangan 1 buah Down Light


No. Uraian Kode Satuan Koefisien Harga Satuan
A TENAGA
Pekerja L.01 OH
0.005 65,000.00
L.02 OH
Tukang 0.050 100,000.00
Kepala tukang L.03 OH
0.005 120,000.00
Mandor L.04 OH
0.000 120,000.00
JUMLAH TENAGA KERJA
B BAHAN
Down Light Besar bh 1.000 76,954.50
JUMLAH HARGA BAHAN
C PERALATAN
- -
JUMLAH HARGA ALAT
Jumlah (A+B+C)
D
Overhead & Profit 10% x D
E
Harga Satuan Pekerjaan (D+E)
F

8. Pemasangan 1 buah TL 20 Watt


No. Uraian Kode Satuan Koefisien Harga Satuan
A TENAGA
Pekerja L.01 OH
0.005 65,000.00
L.02 OH
Tukang 0.050 100,000.00
Kepala tukang L.03 OH
0.005 120,000.00
Mandor L.04 OH
0.000 120,000.00
JUMLAH TENAGA KERJA
B BAHAN
TL 20 Watt bh 1.000 54,573.75
JUMLAH HARGA BAHAN
C PERALATAN
- -
JUMLAH HARGA ALAT
Jumlah (A+B+C)
D
Overhead & Profit 10% x D
E
Harga Satuan Pekerjaan (D+E)
F
ANALISIS HARGA SATUAN PEKERJAAN (AHSP)

DIVISI 2 - SITEWORK

Jumlah Harga

26,000.00
20,000.00
2,400.00
2,400.00
50,800.00

17,915.63
6,306.30
813.75
3,001.56
158,760.00
1,280.66
-
188,077.90

-
-
238,877.90
23,887.79
262,765.68

Jumlah Harga

6,500.00
10,000.00
1,200.00
600.00
18,300.00

26,460.00
426.89
18,136.13
45,023.01

-
-
63,323.01
6,332.30
69,655.31
Jumlah Harga

65,000.00
150,000.00
18,000.00
6,000.00
239,000.00

42,997.50
1,004,157.00
14,941.08
-
1,062,095.58

-
-
1,301,095.58
130,109.56
1,431,205.14

Jumlah Harga

65,000.00
200,000.00
24,000.00
6,000.00
295,000.00

24,365.25
463,050.00
6,403.32
13,243.23
4,882.50
16,675.31
165,904.20
13,704.08
708,227.89

-
-
1,003,227.89
100,322.79
1,103,550.68
Jumlah Harga

65,000.00
200,000.00
24,000.00
6,000.00
295,000.00

17,915.63
410,130.00
6,403.32
22,702.68
4,882.50
16,675.31
165,904.20
99,051.36
743,664.99

-
-
1,038,664.99
103,866.50
1,142,531.49

Jumlah Harga

6,500.00
6,000.00
12,500.00

-
-

-
-
12,500.00
1,250.00
13,750.00
Jumlah Harga

866,710.00
79,920.00
946,630.00

-
-

-
-
946,630.00
94,663.00
1,041,293.00

Jumlah Harga

433,355.00
39,960.00
473,315.00

-
-

-
-
473,315.00
47,331.50
520,646.50

Jumlah Harga

48,750.00
3,000.00
51,750.00

-
-

-
-
51,750.00
5,175.00
56,925.00
Jumlah Harga

65,000.00
3,840.00
68,840.00

-
-

-
-
68,840.00
6,884.00
75,724.00

Jumlah Harga

32,500.00
6,000.00
38,500.00

-
-

-
-
38,500.00
3,850.00
42,350.00

Jumlah Harga

19,500.00
1,200.00
20,700.00

154,791.00
154,791.00

-
-
175,491.00
17,549.10
193,040.10
Jumlah Harga

16,250.00
3,000.00
19,250.00

224,910.00
224,910.00

-
-
244,160.00
24,416.00
268,576.00

Jumlah Harga

19,500.00
1,200.00
20,700.00

123,700.50
123,700.50

-
-
144,400.50
14,440.05
158,840.55

DIVISI 3 - PEKERJAAN STRUKTURAL

Jumlah Harga

97,500.00
75,000.00
9,000.00
9,000.00
190,500.00

175,959.00
205,585.38
84,630.00
466,174.38

-
-
656,674.38
65,667.44
722,341.82
Jumlah Harga

50,700.00
39,000.00
4,680.00
4,680.00
99,060.00

175,959.00
55,724.76
231,683.76

-
-
330,743.76
33,074.38
363,818.14

Jumlah Harga

52,000.00
8,000.00
9,600.00
12,000.00
81,600.00

16,835.93
6,803.63
23,639.56

-
-
105,239.56
10,523.96
115,763.51

Jumlah Harga

47,710.00
73,400.00
8,760.00
4,440.00
134,310.00

42,582.56
42,582.56

4,258.26
4,258.26
181,150.82
18,115.08
199,265.90
DIVISI 4 - PEKERJAAN ARSITEKTUR

Jumlah Harga

107,250.00
27,500.00
3,360.00
9,960.00
148,070.00

348,107.76
181,912.50
241,077.38
107,500.00
878,597.64

-
-
1,026,667.64
102,666.76
1,129,334.40

Jumlah Harga

107,250.00
27,500.00
3,360.00
9,960.00
148,070.00

467,927.46
153,351.36
249,415.03
107,500.00
978,193.85

-
-
1,126,263.85
112,626.38
1,238,890.23
Jumlah Harga

107,250.00
27,500.00
3,360.00
9,960.00
148,070.00

484,323.84
152,033.15
247,509.28
107,500.00
991,366.27

-
-
1,139,436.27
113,943.63
1,253,379.90

Jumlah Harga

107,250.00
27,500.00
3,360.00
9,960.00
148,070.00

520,900.38
149,616.44
243,221.34
107,500.00
1,021,238.16

-
-
1,169,308.16
116,930.82
1,286,238.98
Jumlah Harga

4,550.00
7,000.00
840.00
480.00
12,870.00

112,289.63
3,601.87
115,891.49

-
-
128,761.49
12,876.15
141,637.64
14,163.76

Jumlah Harga

1,625.00
2,500.00
3,000.00
120.00
7,245.00

109,081.35
1,200.62
110,281.97

-
-
117,526.97
11,752.70
129,279.67
12,927.97
Jumlah Harga

42,900.00
33,000.00
3,960.00
3,960.00
83,820.00

115,000.00
1,150.00
116,150.00

-
-
199,970.00
19,997.00
219,967.00

Jumlah Harga

33,800.00
26,000.00
3,120.00
3,120.00
66,040.00

103,635.00
6,403.32
611.23
110,649.55

-
-
176,689.55
17,668.95
194,358.50
Jumlah Harga

33,800.00
26,000.00
3,120.00
3,120.00
66,040.00

116,589.38
6,403.32
611.23
123,603.92

-
-
189,643.92
18,964.39
208,608.31

Jumlah Harga

42,900.00
33,000.00
3,960.00
3,960.00
83,820.00

103,635.00
8,537.76
1,222.45
54,573.75
32,683.61
28,665.00
229,317.57

-
-
313,137.57
31,313.76
344,451.33
Jumlah Harga

42,900.00
33,000.00
3,960.00
3,960.00
83,820.00

103,635.00
8,537.76
1,222.45
65,488.50
32,683.61
28,665.00
240,232.32

-
-
324,052.32
32,405.23
356,457.56

Jumlah Harga

42,900.00
33,000.00
3,960.00
3,960.00
83,820.00

103,635.00
8,537.76
1,222.45
54,573.75
32,683.61
85,995.00
286,647.57

-
-
370,467.57
37,046.76
407,514.33
Jumlah Harga

42,900.00
33,000.00
3,960.00
3,960.00
83,820.00

77,726.25
8,537.76
916.84
54,573.75
32,683.61
28,665.00
203,103.21

-
-
286,923.21
28,692.32
315,615.53

Jumlah Harga

11,700.00
2,000.00
2,000.00
2,000.00
720.00
1,080.00
19,500.00

5,181.75
213.44
-
32,082.75
10,805.60
5,045.04
1,819.13
3,001.56
58,149.27

-
-
77,649.27
7,764.93
85,414.19
Jumlah Harga

3,900.00
6,000.00
720.00
360.00
10,980.00

18,112.50
1,241.86
19,354.36

-
-
30,334.36
3,033.44
33,367.79

Jumlah Harga

3,900.00
6,000.00
720.00
360.00
10,980.00

18,112.50
1,067.22
19,179.72

-
-
30,159.72
3,015.97
33,175.69
Jumlah Harga

6,500.00
10,000.00
120.00
600.00
17,220.00

5,650.00
3,056.13
8,706.13

-
-
25,926.13
2,592.61
28,518.74
285.19

Jumlah Harga

16,250.00
5,000.00
3,000.00
240.00
24,490.00

230,422.50
33,900.00
264,322.50

-
-
288,812.50
28,881.25
317,693.75
Jumlah Harga

2,795.00
4,300.00
516.00
252.00
7,863.00

140,072.63
1,000.00
840.00
141,912.63

-
-
149,775.63
14,977.56
164,753.19

Jumlah Harga

5,525.00
8,500.00
1,080.00
600.00
15,705.00

560,290.50
-
3,780.00
564,070.50

-
-
579,775.50
57,977.55
637,753.05
Jumlah Harga

174,850.00
8,500.00
10,200.00
1,080.00
194,630.00

41,435.63
178,292.44
16,800.00
236,528.07

250.00
250.00
431,408.07
43,140.81
474,548.87

Jumlah Harga

5,525.00
15,000.00
1,800.00
480.00
22,805.00

242,125.54
16,800.00
258,925.54

-
-
281,730.54
28,173.05
309,903.59
m2 Rangka Besi Hollow 1x40.40.2mm, modul 60 x 120 cm, Dinding Partisi
Jumlah Harga

16,250.00
25,000.00
3,000.00
1,560.00
45,810.00

80,850.00
23,100.00
103,950.00

-
-
149,760.00
14,976.00
164,736.00

Jumlah Harga

22,750.00
35,000.00
4,200.00
2,160.00
64,110.00

92,400.00
23,100.00
115,500.00

-
-
179,610.00
17,961.00
197,571.00
Jumlah Harga

174,850.00
269,000.00
96,000.00
32,280.00
572,130.00

63,669.38
23,042.25
30,318.75
117,030.38

-
-
689,160.38
68,916.04
758,076.41

Jumlah Harga

39,000.00
20,000.00
2,400.00
3,600.00
65,000.00

76,293.00
33,486.45
15,135.75
124,915.20

-
-
189,915.20
18,991.52
208,906.72
Jumlah Harga

19,500.00
10,000.00
1,200.00
1,800.00
32,500.00

38,146.50
14,504.49
6,998.25
59,649.24

-
-
92,149.24
9,214.92
101,364.16

Jumlah Harga

19,500.00
10,000.00
1,200.00
1,800.00
32,500.00

833,333.33
13,873.86
5,696.25
852,903.44

-
-
885,403.44
88,540.34
973,943.79
Jumlah Harga

19,500.00
15,000.00
1,800.00
1,800.00
38,100.00

7,870.26
3,906.00
11,776.26

-
-
49,876.26
4,987.63
54,863.89

Jumlah Harga

13,000.00
10,000.00
1,200.00
1,200.00
25,400.00

4,099.10
4,099.10

-
-
29,499.10
2,949.91
32,449.00
Jumlah Harga

16,250.00
12,500.00
1,560.00
1,560.00
31,870.00

187,645.50
12,360.35
2,364.86
7,323.75
209,694.46

-
-
241,564.46
24,156.45
265,720.91

Jumlah Harga

16,250.00
12,500.00
1,560.00
1,560.00
31,870.00

77,373.45
12,360.35
2,364.86
7,323.75
99,422.41

-
-
131,292.41
13,129.24
144,421.65
Jumlah Harga

45,500.00
35,000.00
4,200.00
4,200.00
88,900.00

56,312.55
13,117.10
2,946.98
7,323.75
79,700.39

-
-
168,600.39
16,860.04
185,460.43

Jumlah Harga

58,500.00
45,000.00
5,400.00
5,400.00
114,300.00

56,029.05
11,729.72
2,929.50
3,529.10
74,217.37

-
-
188,517.37
18,851.74
207,369.11
Jumlah Harga

7,800.00
12,000.00
1,440.00
720.00
21,960.00

4,042.50
213,390.64
217,433.14

-
-
239,393.14
23,939.31
263,332.45

Jumlah Harga

13,000.00
30,000.00
3,600.00
1,200.00
47,800.00

59,303.48
5,336.10
64,639.58

-
-
112,439.58
11,243.96
123,683.53
Jumlah Harga

6,500.00
10,000.00
1,200.00
600.00
18,300.00

22,511.67
640.33
23,152.00

-
-
41,452.00
4,145.20
45,597.20

Jumlah Harga

3,250.00
5,000.00
600.00
3,600.00
12,450.00

2,928.79
213.44
3,142.24

-
-
15,592.24
1,559.22
17,151.46
Jumlah Harga

173,423.25
173,423.25

-
-
173,423.25
17,342.33
190,765.58

Jumlah Harga
(Rp)

25,613.28
25,613.28

-
-
25,613.28
2,561.33
28,174.61

Jumlah Harga

9,750.00
6,000.00
720.00
720.00
17,190.00

167,855.63
6,403.32
174,258.95

-
-
191,448.95
19,144.89
210,593.84
Jumlah Harga

7,800.00
6,000.00
720.00
720.00
15,240.00

96,413.63
426.89
96,840.51

-
-
112,080.51
11,208.05
123,288.56

Jumlah Harga

26,000.00
20,000.00
2,400.00
2,400.00
50,800.00

54,022.50
1,067.22
13,621.61
5,208.00
1,819.13
75,738.45

-
-
126,538.45
12,653.85
139,192.30
Jumlah Harga

16,250.00
15,000.00
1,800.00
1,560.00
34,610.00

105,875.00
1,067.22
106,942.22

-
-
141,552.22
14,155.22
155,707.44

Jumlah Harga

9,750.00
5,000.00
600.00
960.00
16,310.00

8,913.71
8,913.71

-
-
25,223.71
2,522.37
27,746.08
Jumlah Harga

455,000.00
2,100,000.00
252,000.00
42,000.00
2,849,000.00

8,671,162.50
26,680.50
36,382.50
8,734,225.50

-
-
11,583,225.50
1,158,322.55
12,741,548.05

Jumlah Harga

65,000.00
300,000.00
36,000.00
6,000.00
407,000.00

339,570.00
18,191.25
357,761.25

-
-
764,761.25
76,476.13
841,237.38
Jumlah Harga

7,800.00
12,000.00
1,440.00
720.00
21,960.00

50,935.50
1,216.63
52,152.13

-
-
74,112.13
7,411.21
81,523.34

Jumlah Harga

22,750.00
17,500.00
2,040.00
240.00
42,530.00

86,035.95
9,095.63
95,131.58

-
-
137,661.58
13,766.16
151,427.73
Jumlah Harga

6,500.00
20,000.00
2,400.00
6,000.00
34,900.00

23,625.00
1,067.22
24,692.22

-
-
59,592.22
5,959.22
65,551.44

Jumlah Harga

650.00
50,000.00
6,000.00
600.00
57,250.00

60,637.50
60,637.50

-
-
117,887.50
11,788.75
129,676.25
Jumlah Harga

650.00
50,000.00
6,000.00
600.00
57,250.00

115,000.00
115,000.00

-
-
172,250.00
17,225.00
189,475.00

Jumlah Harga

975.00
15,000.00
1,800.00
96.00
17,871.00

40,020.75
40,020.75

-
-
57,891.75
5,789.18
63,680.93

Jumlah Harga

650.00
10,000.00
1,200.00
60.00
11,910.00

34,684.65
34,684.65

-
-
46,594.65
4,659.47
51,254.12
Jumlah Harga

975.00
15,000.00
1,800.00
96.00
17,871.00

11,157.30
11,157.30

-
-
29,028.30
2,902.83
31,931.13

Jumlah Harga

650.00
10,000.00
1,200.00
60.00
11,910.00

25,710.30
25,710.30

-
-
37,620.30
3,762.03
41,382.33

Jumlah Harga

3,250.00
50,000.00
6,000.00
360.00
59,610.00

275,073.75
275,073.75

-
-
334,683.75
33,468.38
368,152.13
Jumlah Harga

3,250.00
50,000.00
6,000.00
360.00
59,610.00

137,812.50
137,812.50

-
-
197,422.50
19,742.25
217,164.75

Jumlah Harga

975.00
15,000.00
1,800.00
96.00
17,871.00

242,125.54
700.00
242,825.54

-
-
260,696.54
26,069.65
286,766.19
m2 Pengecetan Bidang Kayu Baru (1 Lapis Plamuur, 1 Lapis Cat Dasar, 2 Lapis Cat Penutup)
Jumlah Harga

4,550.00
900.00
720.00
360.00
6,530.00

2,668.05
3,001.56
4,535.69
13,873.86
70.00
720.37
6,548.85
31,418.37

-
-
37,948.37
3,794.84
41,743.21

m2 Pengecetan tembok Baru (1 Lapis Plamuur, 1 Lapis Cat Dasar, 2 Lapis Cat Penutup)
Jumlah Harga

1,300.00
6,300.00
756.00
360.00
8,716.00

6,403.32
4,961.25
15,954.94
27,319.51

-
-
36,035.51
3,603.55
39,639.06
m2 Pengecetan tembok Luar (1 Lapis Cat Dasar, 2 Lapis Cat Penutup)
Jumlah Harga

1,820.00
4,200.00
504.00
360.00
6,884.00

5,953.50
16,808.72
22,762.22

-
-
29,646.22
2,964.62
32,610.84

Jumlah Harga

716,625.00
716,625.00

-
-
716,625.00
71,662.50
788,287.50

Jumlah Harga

65,000.00
150,000.00
18,000.00
19,200.00
252,200.00

315,000.00

7,567.56
1,627.50
324,195.06

-
-
576,395.06
57,639.51
634,034.57
Jumlah Harga

65,000.00
100,000.00
12,000.00
6,000.00
183,000.00

2,534,914.31
152,094.86
1,627.50
760,474.29
3,449,110.95

-
-
3,632,110.95
363,211.10
3,995,322.05

Jumlah Harga

140,400.00
72,000.00
8,640.00
1,320.00
222,360.00

21,798.00
55,495.44
11,392.50
18,191.25
23,345.44
17,110.80
147,333.43

-
-
369,693.43
36,969.34
406,662.77

Jumlah Harga

78,000.00
145,000.00
18,000.00
7,200.00
248,200.00

400,207.50
7,567.56
1,627.50
40,020.75
449,423.31

-
-
697,623.31
69,762.33
767,385.64
Jumlah Harga

3,510.00
9,000.00
1,080.00
3,240.00
16,830.00

53,361.00
975.00
54,336.00

-
-
71,166.00
7,116.60
78,282.60

Jumlah Harga

3,510.00
9,000.00
1,080.00
3,240.00
16,830.00

148,837.50
975.00
149,812.50

-
-
166,642.50
16,664.25
183,306.75
Jumlah Harga

2,340.00
6,000.00
720.00
240.00
9,300.00

5,775.00
1,684.38
7,459.38

-
-
16,759.38
1,675.94
18,435.31

Jumlah Harga

5,265.00
13,500.00
1,620.00
480.00
20,865.00

10,500.00
3,062.50
13,562.50

-
-
34,427.50
3,442.75
37,870.25
Jumlah Harga

5,265.00
13,500.00
1,620.00
480.00
20,865.00

15,750.00
4,593.75
20,343.75

-
-
41,208.75
4,120.88
45,329.63

Jumlah Harga

65,000.00
1,000.00
12,000.00
1,200.00
79,200.00

27,500.00
27,500.00

-
-
106,700.00
10,670.00
117,370.00
Jumlah Harga

10,000.00
10,000.00

28,000.00
4,000.00
-
3,500.00
2,000.00
2,000.00
1,000.00
40,500.00

1,000.00
1,000.00
51,500.00
5,150.00
56,650.00

Jumlah Harga

10,000.00
10,000.00

28,000.00
4,000.00
23,648.63
3,500.00
3,000.00
2,000.00
500.00
64,648.63

1,000.00
1,000.00
75,648.63
7,564.86
83,213.49
Jumlah Harga

325.00
5,000.00
600.00
36.00
5,961.00

16,008.30
16,008.30

-
-
21,969.30
2,196.93
24,166.23

Jumlah Harga

325.00
5,000.00
600.00
36.00
5,961.00

24,497.55
24,497.55

-
-
30,458.55
3,045.86
33,504.41

Jumlah Harga

325.00
5,000.00
600.00
36.00
5,961.00

30,561.30
30,561.30

-
-
36,522.30
3,652.23
40,174.53
Jumlah Harga

325.00
5,000.00
600.00
36.00
5,961.00

375,952.50
375,952.50

-
-
381,913.50
38,191.35
420,104.85

Jumlah Harga

325.00
5,000.00
600.00
36.00
5,961.00

76,954.50
76,954.50

-
-
82,915.50
8,291.55
91,207.05

Jumlah Harga

325.00
5,000.00
600.00
36.00
5,961.00

54,573.75
54,573.75

-
-
60,534.75
6,053.48
66,588.23
ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Galian Tanah Biasa Sedalam 1 Meter


Satuan / Unit : M3
Analisa : AHSP PU A.2.3.1.1

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja Galian Tanah OH 0.7500 80,000.00 60,000.00
2 Mandor OH 0.0250 100,000.00 2,500.00
Jumlah Tenaga Kerja 62,500.00
B. BAHAN
Jumlah Bahan -
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 62,500.00
E Overhead & Profit 15.0% X D 9,375.00
F Harga Satuan Pekerjaan ( D + E ) 71,875.00

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Galian Tanah Biasa Sedalam 2 Meter


Satuan / Unit : M3
Analisa : AHSP PU A.2.3.1.1.a

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja Galian Tanah OH 0.9000 80,000.00 72,000.00
2 Mandor OH 0.0450 100,000.00 4,500.00
Jumlah Tenaga Kerja 76,500.00
B. BAHAN
Jumlah Bahan -
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 76,500.00
E Overhead & Profit 15.0% X D 11,475.00
F Harga Satuan Pekerjaan ( D + E ) 87,975.00

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Mengurug Kembali Galian


Satuan / Unit : M3
Analisa : AHSP PU A.2.3.1.9

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja Galian Tanah OH 0.2500 80,000.00 20,000.00
2 Mandor OH 0.0833 100,000.00 8,330.00
Jumlah Tenaga Kerja 28,330
B. BAHAN
Jumlah Bahan -
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 28,330.00
E Overhead & Profit 15.0% X D 4,249.50
F Harga Satuan Pekerjaan ( D + E ) 32,579.50
ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Memadatkan tanah (per 20 cm)


Satuan / Unit : M3
Analisa : AHSP PU A.2.3.1.10

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja Galian Tanah OH 0.5000 80,000.00 40,000.00
2 Mandor OH 0.0500 100,000.00 5,000.00
Jumlah Tenaga Kerja 45,000
B. BAHAN
Jumlah Bahan -
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 45,000.00
E Overhead & Profit 15.0% X D 6,750.00
F Harga Satuan Pekerjaan ( D + E ) 51,750.00

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Timbunan Tanah didatangkan Termasuk Perataan dan Pemadatan


Satuan / Unit : M3
Analisa : AHSP PU - T.14 E

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja Galian Tanah OH 0.5000 80,000.00 40,000.00
2 Mandor OH 0.0500 100,000.00 5,000.00
Jumlah Tenaga Kerja 45,000.00
B. BAHAN
1 Tanah Timbun M3 1.200 71,250.00 85,500.00
Jumlah Bahan 85,500.00
C. PERALATAN
1 Pemadat Timbunan (Stamper) Sewa-Hari 0.050 125,000.00 6,250.00
Jumlah Peralatan 6,250.00
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 136,750.00
E Overhead & Profit 15.0% X D 20,512.50
F Harga Satuan Pekerjaan ( D + E ) 157,262.50

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Urugan Pasir


Satuan / Unit : M3
Analisa : AHSP PU A.2.3.1.11

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja Galian Tanah OH 0.3000 80,000.00 24,000.00
2 Mandor OH 0.0100 100,000.00 1,000.00
Jumlah Tenaga Kerja 25,000.00
B. BAHAN
1 Pasir Urug M3 1.200 89,900.00 107,880.00
Jumlah Bahan 107,880.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 132,880.00
E Overhead & Profit 15.0% X D 19,932.00
F Harga Satuan Pekerjaan ( D + E ) 152,812.00
ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Timbunan Tanah


Satuan / Unit : M3
Analisa : AHSP PU A.2.3.1.11.a

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja Galian Tanah OH 0.3000 80,000.00 24,000.00
2 Mandor OH 0.0100 100,000.00 1,000.00
Jumlah Tenaga Kerja 25,000.00
B. BAHAN
1 Tanah Timbun M3 1.200 71,250.00 85,500.00
Jumlah Bahan 85,500.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 110,500.00
E Overhead & Profit 15.0% X D 16,575.00
F Harga Satuan Pekerjaan ( D + E ) 127,075.00

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Pondasi Batu Belah / Kali Campuran 1 : 4


Satuan / Unit : M3
Analisa : AHSP PU A.3.2.1.2

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 1.5000 80,000.00 120,000.00
2 Tukang OH 0.7500 100,000.00 75,000.00
3 Kepala Tukang OH 0.0750 110,000.00 8,250.00
4 Mandor OH 0.0750 100,000.00 7,500.00
Jumlah Tenaga Kerja 210,750.00
B. BAHAN
1 Batu Gunung/ Batu Kali M3 1.200 160,000.00 192,000.00
2 Semen Portland Kg 163.000 1,325.00 215,975.00
3 Pasir Pasang M3 0.520 117,900.00 61,308.00
Jumlah Bahan 469,283.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 680,033.00
E Overhead & Profit 15.0% X D 102,004.95
F Harga Satuan Pekerjaan ( D + E ) 782,037.95
ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Pasangan Batu Kosong ( Anstamping )


Satuan / Unit : M3
Analisa : AHSP PU A.3.2.1.9

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.7800 80,000.00 62,400.00
2 Tukang OH 0.3900 100,000.00 39,000.00
3 Kepala Tukang OH 0.0390 110,000.00 4,290.00
4 Mandor OH 0.0390 100,000.00 3,900.00
Jumlah Tenaga Kerja 109,590.00
B. BAHAN
1 Batu Gunung/ Batu Kali M3 1.2000 160,000.00 192,000.00
2 Pasir Urug M3 0.4320 89,900.00 38,836.80
Jumlah Bahan 230,836.80
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 340,426.80
E Overhead & Profit 15.0% X D 51,064.02
F Harga Satuan Pekerjaan ( D + E ) 391,490.82

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Membuat Beton Mutu F'c = 7,4 Mpa (K 100), Slump (12 ± 2) cm, W/c = 0,87
Satuan / Unit : M3
Analisa : AHSP PU A.4.1.1.1

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 1.6500 80,000.00 132,000.00
2 Tukang OH 0.2750 100,000.00 27,500.00
3 Kepala Tukang OH 0.0280 110,000.00 3,080.00
4 Mandor OH 0.0830 100,000.00 8,300.00
Jumlah Tenaga Kerja 170,880.00
B. BAHAN
1 Semen Portland Kg 247.00 1,325.00 327,275.00
2 Pasir Beton Kg 869.00 74.50 64,740.50
3 Kerikil Kg 999.00 186.21 186,020.69
4 Air Liter 215.00 100.00 21,500.00
Jumlah Bahan 599,536.19
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 770,416.19
E Overhead & Profit 15.0% X D 115,562.43
F Harga Satuan Pekerjaan ( D + E ) 885,978.62
Wc Faktor; Pasir; 1.400 Kg, dan Kerikil = 1.350 Kg
ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Membuat Beton Mutu F'c = 9,8 Mpa (K 125), Slump (12 ± 2) cm, W/c = 0,78
Satuan / Unit : M3
Analisa : AHSP PU A.4.1.1.2

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 1.6500 80,000.00 132,000.00
2 Tukang OH 0.2750 100,000.00 27,500.00
3 Kepala Tukang OH 0.0280 110,000.00 3,080.00
4 Mandor OH 0.0830 100,000.00 8,300.00
Jumlah Tenaga Kerja 170,880.00
B. BAHAN
1 Semen Portland Kg 276.00 1,325.00 365,700.00
2 Pasir Beton Kg 828.00 74.50 61,686.00
3 Kerikil Kg 1,012.00 186.21 188,441.38
4 Air Liter 215.00 100.00 21,500.00
Jumlah Bahan 637,327.38
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 808,207.38
E Overhead & Profit 15.0% X D 121,231.11
F Harga Satuan Pekerjaan ( D + E ) 929,438.49
Wc Faktor; Pasir; 1.400 Kg, dan Kerikil = 1.350 Kg

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Beton Mutu F'c = 14,5 Mpa (K 175), Slump (12 ± 2) cm, W/c = 0,66
Satuan / Unit : M3
Analisa : AHSP PU A.4.1.1.5

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 1.6500 80,000.00 132,000.00
2 Tukang OH 0.2750 100,000.00 27,500.00
3 Kepala Tukang OH 0.0280 110,000.00 3,080.00
4 Mandor OH 0.0830 100,000.00 8,300.00
Jumlah Tenaga Kerja 170,880.00
B. BAHAN
1 Semen Portland Kg 326.00 1,325.00 431,950.00
2 Pasir Beton Kg 760.00 74.50 56,620.00
3 Kerikil Kg 1,029.00 186.21 191,606.90
4 Air Liter 215.00 100.00 21,500.00
Jumlah Bahan 701,676.90
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 872,556.90
E Overhead & Profit 15.0% X D 130,883.53
F Harga Satuan Pekerjaan ( D + E ) 1,003,440.43
Wc Faktor; Pasir; 1.400 Kg, dan Kerikil = 1.350 Kg
ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Beton Mutu F'c = 16,9 Mpa (K 200), Slump (12 ± 2) cm, W/c = 0,61
Satuan / Unit : M3
Analisa : AHSP PU A.4.1.1.6

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 1.6500 80,000.00 132,000.00
2 Tukang OH 0.2750 100,000.00 27,500.00
3 Kepala Tukang OH 0.0280 110,000.00 3,080.00
4 Mandor OH 0.0830 100,000.00 8,300.00
Jumlah Tenaga Kerja 170,880.00
B. BAHAN
1 Semen Portland Kg 352.00 1,325.00 466,400.00
2 Pasir Beton Kg 731.00 74.50 54,459.50
3 Kerikil Kg 1,029.00 186.21 191,606.90
4 Air Liter 215.00 100.00 21,500.00
Jumlah Bahan 733,966.40
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 904,846.40
E Overhead & Profit 15.0% X D 135,726.96
F Harga Satuan Pekerjaan ( D + E ) 1,040,573.36
Wc Faktor; Pasir; 1.400 Kg, dan Kerikil = 1.350 Kg

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Beton Mutu F'c = 19,3 Mpa (K 225), Slump (12 ± 2) cm, W/c = 0,58
Satuan / Unit : M3
Analisa : AHSP PU A.4.1.1.7

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 1.6500 80,000.00 132,000.00
2 Tukang OH 0.2750 100,000.00 27,500.00
3 Kepala Tukang OH 0.0280 110,000.00 3,080.00
4 Mandor OH 0.0830 100,000.00 8,300.00
Jumlah Tenaga Kerja 170,880.00
B. BAHAN
1 Semen Portland Kg 371.00 1,325.00 491,575.00
2 Pasir Beton Kg 698.00 74.50 52,001.00
3 Batu Pecah 2 - 3 Cm Kg 1,047.00 186.21 194,958.62
4 Air Liter 215.00 100.00 21,500.00
Jumlah Bahan 760,034.62
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 930,914.62
E Overhead & Profit 15.0% X D 139,637.19
F Harga Satuan Pekerjaan ( D + E ) 1,070,551.81
Wc Faktor; Pasir; 1.400 Kg, dan Kerikil = 1.350 Kg
ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Beton Mutu F'c = 21,7 Mpa (K 250), Slump (12 ± 2) cm, W/c = 0,56
Satuan / Unit : M3
Analisa : AHSP PU A.4.1.1.8

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 1.6500 80,000.00 132,000.00
2 Tukang OH 0.2750 100,000.00 27,500.00
3 Kepala Tukang OH 0.0280 110,000.00 3,080.00
4 Mandor OH 0.0830 100,000.00 8,300.00
Jumlah Tenaga Kerja 170,880.00
B. BAHAN
1 Semen Portland Kg 384.00 1,325.00 508,800.00
2 Pasir Beton Kg 692.00 74.50 51,554.00
3 Kerikil Kg 1,039.00 186.21 193,468.97
4 Air Liter 215.00 100.00 21,500.00
Jumlah Bahan 775,322.97
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 946,202.97
E Overhead & Profit 15.0% X D 141,930.44
F Harga Satuan Pekerjaan ( D + E ) 1,088,133.41
Wc Faktor; Pasir; 1.400 Kg, dan Kerikil = 1.350 Kg

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Beton Mutu F'c = 24,0 Mpa (K 275), Slump (12 ± 2) cm, W/c = 0,53
Satuan / Unit : M3
Analisa : AHSP PU A.4.1.1.8

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 1.6500 80,000.00 132,000.00
2 Tukang OH 0.2750 100,000.00 27,500.00
3 Kepala Tukang OH 0.0280 110,000.00 3,080.00
4 Mandor OH 0.0830 100,000.00 8,300.00
Jumlah Tenaga Kerja 170,880.00
B. BAHAN
1 Semen Portland Kg 406.00 1,325.00 537,950.00
2 Pasir Beton Kg 684.00 74.50 50,958.00
3 Kerikil Kg 1,026.00 186.21 191,048.28
4 Air Liter 215.00 100.00 21,500.00
Jumlah Bahan 801,456.28
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 972,336.28
E Overhead & Profit 15.0% X D 145,850.44
F Harga Satuan Pekerjaan ( D + E ) 1,118,186.72

Wc Faktor; Pasir; 1.400 Kg, dan Kerikil = 1.350 Kg


ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Beton Mutu F'c = 26,4 Mpa (K 300), Slump (12 ± 2) cm, W/c = 0,52
Satuan / Unit : M3
Analisa : AHSP PU A.4.1.1.8

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 1.6500 80,000.00 132,000.00
2 Tukang OH 0.2750 100,000.00 27,500.00
3 Kepala Tukang OH 0.0280 110,000.00 3,080.00
4 Mandor OH 0.0830 100,000.00 8,300.00
Jumlah Tenaga Kerja 170,880.00
B. BAHAN
1 Semen Portland Kg 413.00 1,325.00 547,225.00
2 Pasir Beton Kg 681.00 74.50 50,734.50
3 Kerikil Kg 1,021.00 186.21 190,117.24
4 Air Liter 215.00 100.00 21,500.00
Jumlah Bahan 809,576.74
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 980,456.74
E Overhead & Profit 15.0% X D 147,068.51
F Harga Satuan Pekerjaan ( D + E ) 1,127,525.25

Wc Faktor; Pasir; 1.400 Kg, dan Kerikil = 1.350 Kg

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Pembesian 1 Kg Dengan Besi Polos


Satuan / Unit : Kg
Analisa : AHSP PU A.4.1.1.17

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.0700 80,000.00 5,600.00
2 Tukang OH 0.0700 100,000.00 7,000.00
3 Kepala Tukang OH 0.0070 110,000.00 770.00
4 Mandor OH 0.0400 100,000.00 4,000.00
Jumlah Tenaga Kerja 17,370.00
B. BAHAN
1 Besi Beton Polos Kg 10.500 10,000.00 105,000.00
2 Kawat Beton Kg 0.150 18,700.00 2,805.00
Jumlah Bahan 107,805.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 125,175.00
E Per Kg Pembesian = D / 10 12,517.50
F Overhead & Profit 15.0% X E 1,877.63
G Harga Satuan Pekerjaan ( E + F ) 14,395.13
ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Pembesian 1 Kg Dengan Besi Ulir


Satuan / Unit : Kg
Analisa : AHSP PU A.4.1.1.17.a

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.0700 80,000.00 5,600.00
2 Tukang OH 0.0700 100,000.00 7,000.00
3 Kepala Tukang OH 0.0070 110,000.00 770.00
4 Mandor OH 0.0400 100,000.00 4,000.00
Jumlah Tenaga Kerja 17,370.00
B. BAHAN
1 Besi Beton Ulir Kg 10.500 10,500.00 110,250.00
2 Kawat Beton Kg 0.150 18,700.00 2,805.00
Jumlah Bahan 113,055.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 130,425.00
E Per Kg Pembesian = D / 10 13,042.50
F Overhead & Profit 15.0% X E 1,956.38
G Harga Satuan Pekerjaan ( E + F ) 14,998.88

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Memasang 1 Kg Jaring Kawat Baja / Wire Mesh


Satuan / Unit : Kg
Analisa : AHSP PU A.4.1.1.19

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.0250 80,000.00 2,000.00
2 Tukang OH 0.0250 100,000.00 2,500.00
3 Kepala Tukang OH 0.0020 110,000.00 220.00
4 Mandor OH 0.0010 100,000.00 100.00
Jumlah Tenaga Kerja 4,820.00
B. BAHAN
1 Jaring Kawat Baja Di Las Kg 1.020 15,500.00 15,810.00
2 Kawat Beton Kg 0.050 18,700.00 935.00
Jumlah Bahan 16,745.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 21,565.00
E Overhead & Profit 15.0% X D 3,234.75
F Harga Satuan Pekerjaan ( D + E ) 24,799.75
ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Memasang Bekisting Untuk Pondasi


Satuan / Unit : M2
Analisa : AHSP PU A.4.1.1.20

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.5200 80,000.00 41,600.00
2 Tukang OH 0.2600 100,000.00 26,000.00
3 Kepala Tukang OH 0.0260 110,000.00 2,860.00
4 Mandor OH 0.0260 100,000.00 2,600.00
Jumlah Tenaga Kerja 73,060.00
B. BAHAN
1 Kayu Kelas III M3 0.040 4,000,000.00 160,000.00
2 Paku 5 cm - 10 cm Kg 0.300 15,400.00 4,620.00
3 Minyak Bekisting Liter 0.100 6,861.00 686.10
Jumlah Bahan 165,306.10
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 238,366.10
E Bekisting Dipakai 3 x = D/3 79,455.37
F Overhead & Profit 15.0% X E 11,918.31
G Harga Satuan Pekerjaan ( E + F ) 91,373.67

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Memasang Bekisting Untuk Sloof


Satuan / Unit : M2
Analisa : AHSP PU A.4.1.1.21

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.5200 80,000.00 41,600.00
2 Tukang OH 0.2600 100,000.00 26,000.00
3 Kepala Tukang OH 0.0260 110,000.00 2,860.00
4 Mandor OH 0.0260 100,000.00 2,600.00
Jumlah Tenaga Kerja 73,060.00
B. BAHAN
1 Kayu Kelas III M3 0.045 4,000,000.00 180,000.00
2 Paku 5 cm - 10 cm Kg 0.300 15,400.00 4,620.00
3 Minyak Bekisting Liter 0.100 6,861.00 686.10
Jumlah Bahan 185,306.10
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 258,366.10
E Bekisting Dipakai 3x = D/2 86,122.03
F Overhead & Profit 15.0% X E 12,918.31
G Harga Satuan Pekerjaan ( E + F ) 99,040.34
ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Memasang Bekisting Untuk Kolom


Satuan / Unit : M2
Analisa : AHSP PU A.4.1.1.22

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.6600 80,000.00 52,800.00
2 Tukang OH 0.3300 100,000.00 33,000.00
3 Kepala Tukang OH 0.0330 110,000.00 3,630.00
4 Mandor OH 0.0330 100,000.00 3,300.00
Jumlah Tenaga Kerja 92,730.00
B. BAHAN
1 Kayu Kelas III M3 0.0400 4,000,000.00 160,000.00
2 Paku 5 cm - 10 cm Kg 0.4000 15,400.00 6,160.00
3 Minyak Bekisting Liter 0.2000 6,861.00 1,372.20
4 Balok Kayu Kelas II M3 0.0150 5,000,000.00 75,000.00
5 Plywood tebal 9 mm Lbr 0.3500 150,000.00 52,500.00
6 Kayu dolken dia. 8-10 cm, L = 4 M Batang 2.0000 28,000.00 56,000.00
Jumlah Bahan 351,032.20
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 443,762.20
E Bekisting Dipakai 3 x = D/3 147,920.73
F Overhead & Profit 15.0% X E 22,188.11
G Harga Satuan Pekerjaan ( E + F ) 170,108.84

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Memasang Bekisting Untuk Balok


Satuan / Unit : M2
Analisa : AHSP PU A.4.1.1.23

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.6600 80,000.00 52,800.00
2 Tukang OH 0.3300 100,000.00 33,000.00
3 Kepala Tukang OH 0.0330 110,000.00 3,630.00
4 Mandor OH 0.0330 100,000.00 3,300.00
Jumlah Tenaga Kerja 92,730.00
B. BAHAN
1 Kayu Kelas III M3 0.0400 4,000,000.00 160,000.00
2 Paku 5 cm - 10 cm Kg 0.4000 15,400.00 6,160.00
3 Minyak Bekisting Liter 0.2000 6,861.00 1,372.20
4 Balok Kayu Kelas II M3 0.0180 5,000,000.00 90,000.00
5 Plywood tebal 9 mm Lbr 0.3500 150,000.00 52,500.00
6 Kayu dolken dia. 8-10 cm, L = 4 M Batang 2.0000 28,000.00 56,000.00
Jumlah Bahan 366,032.20
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 458,762.20
E Bekisting Dipakai 3 x = D/2 152,920.73
F Overhead & Profit 15.0% X E 22,938.11
G Harga Satuan Pekerjaan ( E + F ) 175,858.84
ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Memasang Bekisting Untuk Plat Lantai


Satuan / Unit : M2
Analisa : AHSP PU A.4.1.1.24

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.6600 80,000.00 52,800.00
2 Tukang OH 0.3300 100,000.00 33,000.00
3 Kepala Tukang OH 0.0330 110,000.00 3,630.00
4 Mandor OH 0.0330 100,000.00 3,300.00
Jumlah Tenaga Kerja 92,730.00
B. BAHAN
1 Kayu Kelas III M3 0.0400 4,000,000.00 160,000.00
2 Paku 5 cm - 10 cm Kg 0.4000 15,400.00 6,160.00
3 Minyak Bekisting Liter 0.2000 6,861.00 1,372.20
4 Balok Kayu Kelas II M3 0.0150 5,000,000.00 75,000.00
5 Plywood tebal 9 mm Lbr 0.3500 150,000.00 52,500.00
6 Kayu dolken dia. 8-10 cm, L = 4 M Batang 6.0000 28,000.00 168,000.00
Jumlah Bahan 463,032.20
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 555,762.20
E Bekisting Dipakai 2 x = D/2 277,881.10
F Overhead & Profit 15.0% X E 41,682.17
G Harga Satuan Pekerjaan ( E + F ) 319,563.27

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Memasang Bekisting Untuk Dinding


Satuan / Unit : M2
Analisa : AHSP PU A.4.1.1.25

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.6600 80,000.00 52,800.00
2 Tukang OH 0.3300 100,000.00 33,000.00
3 Kepala Tukang OH 0.0330 110,000.00 3,630.00
4 Mandor OH 0.0330 100,000.00 3,300.00
Jumlah Tenaga Kerja 92,730.00
B. BAHAN
1 Kayu Kelas III M3 0.030 4,000,000.00 120,000.00
2 Paku 5 cm - 10 cm Kg 0.400 15,400.00 6,160.00
3 Minyak Bekisting Liter 0.200 6,861.00 1,372.20
4 Balok Kayu Kelas II M3 0.020 5,000,000.00 100,000.00
5 Plywood tebal 9 mm Lbr 0.350 150,000.00 52,500.00
6 Kayu dolken dia. 8-10 cm, L = 4 M Batang 3.000 28,000.00 84,000.00
7 Penjaga jarak bekisting/ Spacer Bh 4.000 25,000.00 100,000.00
Jumlah Bahan 464,032.20
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 556,762.20
E Bekisting Dipakai 2 x = D/2 278,381.10
F Overhead & Profit 15.0% X E 41,757.17
G Harga Satuan Pekerjaan ( E + F ) 320,138.27
ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Memasang Bekisting Untuk Tangga


Satuan / Unit : M2
Analisa : AHSP PU A.4.1.1.26

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.6600 80,000.00 52,800.00
2 Tukang OH 0.3300 100,000.00 33,000.00
3 Kepala Tukang OH 0.0330 110,000.00 3,630.00
4 Mandor OH 0.0330 100,000.00 3,300.00
Jumlah Tenaga Kerja 92,730.00
B. BAHAN
1 Kayu Kelas III M3 0.030 4,000,000.00 120,000.00
2 Paku 5 cm - 10 cm Kg 0.400 15,400.00 6,160.00
3 Minyak Bekisting Liter 0.150 6,861.00 1,029.15
4 Balok Kayu Kelas II M3 0.015 5,000,000.00 75,000.00
5 Plywood tebal 9 mm Lbr 0.350 150,000.00 52,500.00
6 Kayu dolken dia. 8-10 cm, L = 4 M Batang 2.000 28,000.00 56,000.00
Jumlah Bahan 310,689.15
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 403,419.15
E Bekisting Dipakai 2 x = D/2 201,709.58
F Overhead & Profit 15.0% X E 30,256.44
G Harga Satuan Pekerjaan ( E + F ) 231,966.01

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Pemasangan Baja Profil


Satuan / Unit : Kg
Analisa : AHSP PU A.4.2.1.1

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.0600 80,000.00 4,800.00
2 Tukang OH 0.0600 100,000.00 6,000.00
3 Kepala Tukang OH 0.0060 110,000.00 660.00
4 Mandor OH 0.0030 100,000.00 300.00
Jumlah Tenaga Kerja 11,760.00
B. BAHAN
1 Besi Baja Profil Kg 1.150 16,000.00 18,400.00
Jumlah Bahan 18,400.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 30,160.00
E Overhead & Profit 15.0% X E 4,524.00
F Harga Satuan Pekerjaan ( E + F ) 34,684.00
ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Pemasangan Rangka Kuda-Kuda Baja IWF


Satuan / Unit : Kg
Analisa : AHSP PU A.4.2.1.2

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.0600 80,000.00 4,800.00
2 Tukang OH 0.0600 100,000.00 6,000.00
3 Kepala Tukang OH 0.0060 110,000.00 660.00
4 Mandor OH 0.0030 100,000.00 300.00
Jumlah Tenaga Kerja 11,760.00
B. BAHAN
1 Besi Baja IWF Kg 1.150 16,000.00 18,400.00
Jumlah Bahan 18,400.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 30,160.00
E Overhead & Profit 15.0% X E 4,524.00
F Harga Satuan Pekerjaan ( E + F ) 34,684.00

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Pemasangan Kusen Pintu Alluminum


Satuan / Unit : M
Analisa : AHSP PU A.4.2.1.11

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.0430 80,000.00 3,440.00
2 Tukang OH 0.0430 100,000.00 4,300.00
3 Kepala Tukang OH 0.0043 110,000.00 473.00
4 Mandor OH 0.0021 100,000.00 210.00
Jumlah Tenaga Kerja 8,423.00
B. BAHAN
1 Profil Alluminium M 1.100 15,000.00 16,500.00
2 Sekrup fixer Buah 2.000 1,500.00 3,000.00
3 Sealant Tube 0.060 15,500.00 930.00
Jumlah Bahan 20,430.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 28,853.00
E Overhead & Profit 15.0% X E 4,327.95
F Harga Satuan Pekerjaan ( E + F ) 33,180.95
ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Pasangan Dinding Bata Tebal 1 Bata Camp. 1Pc : 2 PP.
Satuan / Unit : M2
Analisa : AHSP PU A.4.4.1.1

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.6000 80,000.00 48,000.00
2 Tukang OH 0.2000 100,000.00 20,000.00
3 Kepala Tukang OH 0.0200 110,000.00 2,200.00
4 Mandor OH 0.0300 100,000.00 3,000.00
Jumlah Tenaga Kerja 73,200.00
B. BAHAN
1 Batu Bata Bh 140.000 600.00 84,000.00
2 Semen Portland Kg 43.500 1,325.00 57,637.50
3 Pasir Pasang M3 0.080 117,900.00 9,432.00
Jumlah Bahan 151,069.50
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 224,269.50
E Overhead & Profit 15.0% X E 33,640.43
F Harga Satuan Pekerjaan ( E + F ) 257,909.93

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Pasangan Dinding Bata Tebal 1 Bata Camp. 1Pc : 3 PP


Satuan / Unit : M2
Analisa : AHSP PU A.4.4.1.2

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.6000 80,000.00 48,000.00
2 Tukang OH 0.2000 100,000.00 20,000.00
3 Kepala Tukang OH 0.0200 110,000.00 2,200.00
4 Mandor OH 0.0300 100,000.00 3,000.00
Jumlah Tenaga Kerja 73,200.00
B. BAHAN
1 Batu Bata Bh 140.000 600.00 84,000.00
2 Semen Portland Kg 32.950 1,325.00 43,658.75
3 Pasir Pasang M3 0.091 117,900.00 10,728.90
Jumlah Bahan 138,387.65
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 211,587.65
E Overhead & Profit 15.0% X E 31,738.15
F Harga Satuan Pekerjaan ( E + F ) 243,325.80
ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Pasangan Dinding Bata Tebal 1 Bata Camp. 1Pc : 4 PP


Satuan / Unit : M2
Analisa : AHSP PU A.4.4.1.3

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.6000 80,000.00 48,000.00
2 Tukang OH 0.2000 100,000.00 20,000.00
3 Kepala Tukang OH 0.0200 110,000.00 2,200.00
4 Mandor OH 0.0300 100,000.00 3,000.00
Jumlah Tenaga Kerja 73,200.00
B. BAHAN
1 Batu Bata Bh 140.000 600.00 84,000.00
2 Semen Portland Kg 26.550 1,325.00 35,178.75
3 Pasir Pasang M3 0.093 117,900.00 10,964.70
Jumlah Bahan 130,143.45
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 203,343.45
E Overhead & Profit 15.0% X E 30,501.52
F Harga Satuan Pekerjaan ( E + F ) 233,844.97

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Pasangan Dinding Bata Tebal 1 Bata Camp. 1Pc : 5 PP


Satuan / Unit : M2
Analisa : AHSP PU A.4.4.1.4

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.6000 80,000.00 48,000.00
2 Tukang OH 0.2000 100,000.00 20,000.00
3 Kepala Tukang OH 0.0200 110,000.00 2,200.00
4 Mandor OH 0.0300 100,000.00 3,000.00
Jumlah Tenaga Kerja 73,200.00
B. BAHAN
1 Batu Bata Bh 140.000 600.00 84,000.00
2 Semen Portland Kg 22.200 1,325.00 29,415.00
3 Pasir Pasang M3 0.102 117,900.00 12,025.80
Jumlah Bahan 125,440.80
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 198,640.80
E Overhead & Profit 15.0% X E 29,796.12
F Harga Satuan Pekerjaan ( E + F ) 228,436.92
ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Pasangan Dinding Bata Tebal 1/2 Bata Camp. 1Pc : 2 PP
Satuan / Unit : M2
Analisa : AHSP PU A.4.4.1.7

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.3000 80,000.00 24,000.00
2 Tukang OH 0.1000 100,000.00 10,000.00
3 Kepala Tukang OH 0.0100 110,000.00 1,100.00
4 Mandor OH 0.0150 100,000.00 1,500.00
Jumlah Tenaga Kerja 36,600.00
B. BAHAN
1 Batu Bata Bh 80.000 600.00 48,000.00
2 Semen Portland Kg 18.950 1,325.00 25,108.75
3 Pasir Pasang M3 0.038 117,900.00 4,480.20
Jumlah Bahan 77,588.95
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 114,188.95
E Overhead & Profit 15.0% X E 17,128.34
F Harga Satuan Pekerjaan ( E + F ) 131,317.29

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Pasangan Dinding Bata Tebal 1/2 Bata Camp. 1Pc : 3 PP
Satuan / Unit : M2
Analisa : AHSP PU A.4.4.1.8

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.3000 80,000.00 24,000.00
2 Tukang OH 0.1000 100,000.00 10,000.00
3 Kepala Tukang OH 0.0100 110,000.00 1,100.00
4 Mandor OH 0.0150 100,000.00 1,500.00
Jumlah Tenaga Kerja 36,600.00
B. BAHAN
1 Batu Bata Bh 70.000 600.00 42,000.00
2 Semen Portland Kg 14.370 1,325.00 19,040.25
3 Pasir Pasang M3 0.040 117,900.00 4,716.00
Jumlah Bahan 65,756.25
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 102,356.25
E Overhead & Profit 15.0% X E 15,353.44
F Harga Satuan Pekerjaan ( E + F ) 117,709.69
ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Pasangan Dinding Bata Tebal 1/2 Bata Camp. 1Pc : 4 PP
Satuan / Unit : M2
Analisa : AHSP PU A.4.4.1.9

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.3000 80,000.00 24,000.00
2 Tukang OH 0.1000 100,000.00 10,000.00
3 Kepala Tukang OH 0.0100 110,000.00 1,100.00
4 Mandor OH 0.0150 100,000.00 1,500.00
Jumlah Tenaga Kerja 36,600.00
B. BAHAN
1 Batu Bata Bh 80.000 600.00 48,000.00
2 Semen Portland Kg 11.500 1,325.00 15,237.50
3 Pasir Pasang M3 0.043 117,900.00 5,069.70
Jumlah Bahan 68,307.20
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 104,907.20
E Overhead & Profit 15.0% X E 15,736.08
F Harga Satuan Pekerjaan ( E + F ) 120,643.28

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Pasangan Dinding Bata Tebal 1/2 Bata Camp. 1Pc : 5 PP
Satuan / Unit : M2
Analisa : AHSP PU A.4.4.1.10

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.3000 80,000.00 24,000.00
2 Tukang OH 0.1000 100,000.00 10,000.00
3 Kepala Tukang OH 0.0100 110,000.00 1,100.00
4 Mandor OH 0.0150 100,000.00 1,500.00
Jumlah Tenaga Kerja 36,600.00
B. BAHAN
1 Batu Bata Bh 70.000 600.00 42,000.00
2 Semen Portland Kg 9.680 1,325.00 12,826.00
3 Pasir Pasang M3 0.045 117,900.00 5,305.50
Jumlah Bahan 60,131.50
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 96,731.50
E Overhead & Profit 15.0% X E 14,509.73
F Harga Satuan Pekerjaan ( E + F ) 111,241.23
ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Pasangan Dinding Kerawang (Roster) Camp. 1 PC : 3 PP


Satuan / Unit : M2
Analisa : AHSP PU A.4.4.1.22

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.3000 80,000.00 24,000.00
2 Tukang OH 0.1000 100,000.00 10,000.00
3 Kepala Tukang OH 0.0100 110,000.00 1,100.00
4 Mandor OH 0.0150 100,000.00 1,500.00
Jumlah Tenaga Kerja 36,600.00
B. BAHAN
1 Kerawang/ Roster Bh 30.000 3,500.00 105,000.00
2 Semen Portland Kg 11.000 1,325.00 14,575.00
3 Pasir Pasang M3 0.035 117,900.00 4,126.50
Jumlah Bahan 123,701.50
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 160,301.50
E Overhead & Profit 15.0% X E 24,045.23
F Harga Satuan Pekerjaan ( E + F ) 184,346.73

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Pasangan Dinding Kerawang (Roster) Camp. 1 PC : 4 PP


Satuan / Unit : M2
Analisa : AHSP PU A.4.4.1.23

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.3000 80,000.00 24,000.00
2 Tukang OH 0.1000 100,000.00 10,000.00
3 Kepala Tukang OH 0.0100 110,000.00 1,100.00
4 Mandor OH 0.0150 100,000.00 1,500.00
Jumlah Tenaga Kerja 36,600.00
B. BAHAN
1 Kerawang/ Roster Bh 30.000 3,500.00 105,000.00
2 Semen Portland Kg 11.000 1,325.00 14,575.00
3 Pasir Pasang M3 0.035 117,900.00 4,126.50
Jumlah Bahan 123,701.50
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 160,301.50
E Overhead & Profit 15.0% X E 24,045.23
F Harga Satuan Pekerjaan ( E + F ) 184,346.73
ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Plesteran 1 PC : 1 PP Tebal 15 mm


Satuan / Unit : M2
Analisa : AHSP PU A.4.4.2.1

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.3000 80,000.00 24,000.00
2 Tukang OH 0.1500 100,000.00 15,000.00
3 Kepala Tukang OH 0.0150 110,000.00 1,650.00
4 Mandor OH 0.0150 100,000.00 1,500.00
Jumlah Tenaga Kerja 42,150.00
B. BAHAN
1 Semen Portland Kg 15.504 1,325.00 20,542.80
2 Pasir Pasang M3 0.016 117,900.00 1,886.40
Jumlah Bahan 22,429.20
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 64,579.20
E Overhead & Profit 15.0% X E 9,686.88
F Harga Satuan Pekerjaan ( E + F ) 74,266.08

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Plesteran 1 PC : 2 PP Tebal 15 mm


Satuan / Unit : M2
Analisa : AHSP PU A.4.4.2.2

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.3000 80,000.00 24,000.00
2 Tukang OH 0.1500 100,000.00 15,000.00
3 Kepala Tukang OH 0.0150 110,000.00 1,650.00
4 Mandor OH 0.0150 100,000.00 1,500.00
Jumlah Tenaga Kerja 42,150.00
B. BAHAN
1 Semen Portland Kg 10.224 1,325.00 13,546.80
2 Pasir Pasang M3 0.020 117,900.00 2,358.00
Jumlah Bahan 15,904.80
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 58,054.80
E Overhead & Profit 15.0% X E 8,708.22
F Harga Satuan Pekerjaan ( E + F ) 66,763.02
ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Plesteran 1 PC : 3 PP Tebal 15 mm


Satuan / Unit : M2
Analisa : AHSP PU A.4.4.2.3

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.3000 80,000.00 24,000.00
2 Tukang OH 0.1500 100,000.00 15,000.00
3 Kepala Tukang OH 0.0150 110,000.00 1,650.00
4 Mandor OH 0.0150 100,000.00 1,500.00
Jumlah Tenaga Kerja 42,150.00
B. BAHAN
1 Semen Portland Kg 7.776 1,325.00 10,303.20
2 Pasir Pasang M3 0.023 117,900.00 2,711.70
Jumlah Bahan 13,014.90
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 55,164.90
E Overhead & Profit 15.0% X E 8,274.74
F Harga Satuan Pekerjaan ( E + F ) 63,439.64

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Plesteran 1 PC : 4 PP Tebal 15 mm


Satuan / Unit : M2
Analisa : AHSP PU A.4.4.2.4

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.3000 80,000.00 24,000.00
2 Tukang OH 0.1500 100,000.00 15,000.00
3 Kepala Tukang OH 0.0150 110,000.00 1,650.00
4 Mandor OH 0.0150 100,000.00 1,500.00
Jumlah Tenaga Kerja 42,150.00
B. BAHAN
1 Semen Portland Kg 6.240 1,325.00 8,268.00
2 Pasir Pasang M3 0.024 117,900.00 2,829.60
Jumlah Bahan 11,097.60
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 53,247.60
E Overhead & Profit 15.0% X E 7,987.14
F Harga Satuan Pekerjaan ( E + F ) 61,234.74
ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Plesteran 1 PC : 5 PP Tebal 15 mm


Satuan / Unit : M2
Analisa : AHSP PU A.4.4.2.5

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.3000 80,000.00 24,000.00
2 Tukang OH 0.1500 100,000.00 15,000.00
3 Kepala Tukang OH 0.0150 110,000.00 1,650.00
4 Mandor OH 0.0150 100,000.00 1,500.00
Jumlah Tenaga Kerja 42,150.00
B. BAHAN
1 Semen Portland Kg 5.184 1,325.00 6,868.80
2 Pasir Pasang M3 0.026 117,900.00 3,065.40
Jumlah Bahan 9,934.20
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 52,084.20
E Overhead & Profit 15.0% X E 7,812.63
F Harga Satuan Pekerjaan ( E + F ) 59,896.83
ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Memasang 1 m² Plesteran Ciprat 1 PC : 2 PP


Satuan / Unit : M2
Analisa : AHSP PU A.4.4.2.23

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.3000 80,000.00 24,000.00
2 Tukang OH 0.1000 100,000.00 10,000.00
3 Kepala Tukang OH 0.0100 110,000.00 1,100.00
4 Mandor OH 0.0150 100,000.00 1,500.00
Jumlah Tenaga Kerja 36,600.00
B. BAHAN
1 Semen Portland Kg 4.320 1,325.00 5,724.00
2 Pasir Pasang M3 0.006 117,900.00 707.40
Jumlah Bahan 6,431.40
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 43,031.40
E Overhead & Profit 15.0% X E 6,454.71
F Harga Satuan Pekerjaan ( E + F ) 49,486.11

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Acian


Satuan / Unit : M2
Analisa : AHSP PU A.4.4.2.27

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.2000 80,000.00 16,000.00
2 Tukang OH 0.1000 100,000.00 10,000.00
3 Kepala Tukang OH 0.0100 110,000.00 1,100.00
4 Mandor OH 0.0100 100,000.00 1,000.00
Jumlah Tenaga Kerja 28,100.00
B. BAHAN
1 Semen Portland Kg 3.250 1,325.00 4,306.25
Jumlah Bahan 4,306.25
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 32,406.25
E Overhead & Profit 15.0% X E 4,860.94
F Harga Satuan Pekerjaan ( E + F ) 37,267.19
ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Pasangan 1 m2 lantai Keramik Uk. 60 x 60 cm


Satuan / Unit : M2
Analisa : AHSP PU A.4.4.3.16

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.2500 80,000.00 20,000.00
2 Tukang OH 0.1250 100,000.00 12,500.00
3 Kepala Tukang OH 0.0130 110,000.00 1,430.00
4 Mandor OH 0.0130 100,000.00 1,300.00
Jumlah Tenaga Kerja 35,230.00
B. BAHAN
1 Keramik Lantai 60 x 60 cm Bh 3.100 80,000.00 248,000.00
2 Semen Portland Kg 9.600 1,325.00 12,720.00
3 Semen Warna Kg 1.500 3,000.00 4,500.00
4 Pasir Pasang M3 0.045 117,900.00 5,305.50
Jumlah Bahan 270,525.50
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 305,755.50
E Overhead & Profit 15.0% X E 45,863.33
F Harga Satuan Pekerjaan ( E + F ) 351,618.83

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Pasangan 1 m2 lantai Keramik Uk. 40 x 40 cm


Satuan / Unit : M2
Analisa : AHSP PU A.4.4.3.9

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.2500 80,000.00 20,000.00
2 Tukang OH 0.1250 100,000.00 12,500.00
3 Kepala Tukang OH 0.0130 110,000.00 1,430.00
4 Mandor OH 0.0130 100,000.00 1,300.00
Jumlah Tenaga Kerja 35,230.00
B. BAHAN
1 Keramik Lantai 40 x 40 cm Bh 6.630 12,000.00 79,560.00
2 Semen Portland Kg 9.800 1,325.00 12,985.00
3 Semen Warna Kg 1.300 3,700.00 4,810.00
4 Pasir Pasang M3 0.045 117,900.00 5,305.50
Jumlah Bahan 102,660.50
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 137,890.50
E Overhead & Profit 15.0% X E 20,683.58
F Harga Satuan Pekerjaan ( E + F ) 158,574.08
ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Pasangan Keramik Lantai Uk. 30 x 30 cm


Satuan / Unit : M2
Analisa : AHSP PU A.4.4.3.35

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.7000 80,000.00 56,000.00
2 Tukang OH 0.3500 100,000.00 35,000.00
3 Kepala Tukang OH 0.0350 110,000.00 3,850.00
4 Mandor OH 0.0350 100,000.00 3,500.00
Jumlah Tenaga Kerja 98,350.00
B. BAHAN
1 Keramik Lantai 30 x 30 cm Bh 11.870 5,160.07 61,250.00
2 Semen Portland Kg 10.000 1,325.00 13,250.00
3 Semen Warna Kg 1.500 3,700.00 5,550.00
4 Pasir Pasang M3 0.045 117,900.00 5,305.50
Jumlah Bahan 85,355.50
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 183,705.50
E Overhead & Profit 15.0% X E 27,555.83
F Harga Satuan Pekerjaan ( E + F ) 211,261.33

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Pasangan Keramik Lantai Uk. 20 x 20 cm


Satuan / Unit : M2
Analisa : AHSP PU A.4.4.3.36

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.2700 80,000.00 21,600.00
2 Tukang OH 0.1350 100,000.00 13,500.00
3 Kepala Tukang OH 0.0140 110,000.00 1,540.00
4 Mandor OH 0.0140 100,000.00 1,400.00
Jumlah Tenaga Kerja 38,040.00
B. BAHAN
1 Keramik Lantai 20 x 20 cm Bh 26.500 3,981.25 105,503.13
2 Semen Portland Kg 10.400 1,325.00 13,780.00
3 Semen Warna Kg 1.620 3,700.00 5,994.00
4 Pasir Pasang M3 0.045 117,900.00 5,305.50
Jumlah Bahan 130,582.63
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 168,622.63
E Overhead & Profit 15.0% X E 25,293.39
F Harga Satuan Pekerjaan ( E + F ) 193,916.02
ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Pasangan Plint Keramik Uk. 10 x 10 cm


Satuan / Unit : M2
Analisa : AHSP PU A.4.4.3.40

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.0900 80,000.00 7,200.00
2 Tukang OH 0.0900 100,000.00 9,000.00
3 Kepala Tukang OH 0.0350 110,000.00 3,850.00
4 Mandor OH 0.0050 100,000.00 500.00
Jumlah Tenaga Kerja 20,550.00
B. BAHAN
1 Plint Keramik 10 x 10 cm Bh 10.600 1,400.00 14,840.00
2 Semen Portland Kg 1.140 1,325.00 1,510.50
3 Semen Warna Kg 0.050 3,700.00 185.00
4 Pasir Pasang M3 0.003 117,900.00 353.70
Jumlah Bahan 16,889.20
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 37,439.20
E Overhead & Profit 15.0% X E 5,615.88
F Harga Satuan Pekerjaan ( E + F ) 43,055.08

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Pasangan Dinding Keramik Uk. 20 x 25 cm


Satuan / Unit : M2
Analisa : AHSP PU A.4.4.3.54

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.9000 80,000.00 72,000.00
2 Tukang OH 0.4500 100,000.00 45,000.00
3 Kepala Tukang OH 0.0450 110,000.00 4,950.00
4 Mandor OH 0.0450 100,000.00 4,500.00
Jumlah Tenaga Kerja 126,450.00
B. BAHAN
1 Keramik Dinding 20 x 25 cm Bh 20.000 3,981.25 79,625.00
2 Semen Portland Kg 9.300 1,325.00 12,322.50
3 Semen Warna Kg 1.940 3,700.00 7,178.00
4 Pasir Pasang M3 0.018 117,900.00 2,122.20
Jumlah Bahan 101,247.70
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 227,697.70
E Overhead & Profit 15.0% X E 34,154.66
F Harga Satuan Pekerjaan ( E + F ) 261,852.36
ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Pasangan Dinding Keramik Uk. 30 x 30 cm


Satuan / Unit : M2
Analisa : AHSP PU A.4.4.3.54.a

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.9000 80,000.00 72,000.00
2 Tukang OH 0.4500 100,000.00 45,000.00
3 Kepala Tukang OH 0.0450 110,000.00 4,950.00
4 Mandor OH 0.0450 100,000.00 4,500.00
Jumlah Tenaga Kerja 126,450.00
B. BAHAN
1 Keramik Dinding 30 x 30 cm Bh 11.870 5,160.07 61,250.00
2 Semen Portland Kg 9.300 1,325.00 12,322.50
3 Semen Warna Kg 1.940 3,700.00 7,178.00
4 Pasir Pasang M3 0.018 117,900.00 2,122.20
Jumlah Bahan 82,872.70
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 209,322.70
E Overhead & Profit 15.0% X E 31,398.41
F Harga Satuan Pekerjaan ( E + F ) 240,721.11

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Pasangan Plin Keramik Uk. 10 x 60 cm


Satuan / Unit : M2
Analisa : AHSP PU A.4.4.3.54.a

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.0900 80,000.00 7,200.00
2 Tukang OH 0.0900 100,000.00 9,000.00
3 Kepala Tukang OH 0.0090 110,000.00 990.00
4 Mandor OH 0.0050 100,000.00 500.00
Jumlah Tenaga Kerja 17,690.00
B. BAHAN
1 Plin Keramik Uk. 10 x 60 cm Bh 2.000 45,000.00 90,000.00
2 Semen Portland Kg 1.140 1,325.00 1,510.50
3 Semen Warna Kg 0.025 3,700.00 92.50
4 Pasir Pasang M3 0.003 117,900.00 353.70
Jumlah Bahan 91,956.70
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 109,646.70
E Overhead & Profit 15.0% X E 16,447.01
F Harga Satuan Pekerjaan ( E + F ) 126,093.71
ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Memasang Langit-Langit Tripleks Ukuran (120 x 240) cm, tebal 4 mm
Satuan / Unit : M2
Analisa : AHSP PU A.4.5.1.5

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.1000 80,000.00 8,000.00
2 Tukang OH 0.1000 100,000.00 10,000.00
3 Kepala Tukang OH 0.0100 110,000.00 1,100.00
4 Mandor OH 0.0050 100,000.00 500.00
Jumlah Tenaga Kerja 19,600.00
B. BAHAN
1 Tripleks Tebal 4 mm Lbr 0.3750 87,000.00 32,625.00
2 Paku Triplek Kg 0.0300 15,400.00 462.00
Jumlah Bahan 33,087.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 52,687.00
E Overhead & Profit 15.0% X D 7,903.05
F Harga Satuan Pekerjaan ( D + E ) 60,590.05

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Memasang Langit-Langit Gypsum Board Tebal 9 mm + Rangka Hollow


Satuan / Unit : M2
Analisa : AHSP PU A.4.5.1.7

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.1000 80,000.00 8,000.00
2 Tukang OH 0.0500 100,000.00 5,000.00
3 Kepala Tukang OH 0.0050 110,000.00 550.00
4 Mandor OH 0.0050 100,000.00 500.00
Jumlah Tenaga Kerja 14,050.00
B. BAHAN
1 Gypsum Board Lbr 0.3640 105,000.00 38,220.00
2 Paku Gypsum Kg 0.1100 20,000.00 2,200.00
3 Hollow 4/4 Zincromate Btg 0.4150 65,000.00 26,975.00
4 Hollow 2/4 Zincromate Btg 0.1500 47,500.00 7,125.00
5 Ramset/ Dina Bolt Bh 4.0000 8,500.00 34,000.00
6 Cotton Plaster Bh 0.0720 18,000.00 1,296.00
7 Compoun Zak 0.1250 150,000.00 18,750.00
Jumlah Bahan 128,566.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 142,616.00
E Overhead & Profit 15.0% X D 21,392.40
F Harga Satuan Pekerjaan ( D + E ) 164,008.40
ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Memasang List Profil Gypsum


Satuan / Unit : M2
Analisa : AHSP PU A.4.5.1.7a

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.0600 80,000.00 4,800.00
2 Tukang OH 0.0600 100,000.00 6,000.00
3 Kepala Tukang OH 0.0060 110,000.00 660.00
4 Mandor OH 0.0030 100,000.00 300.00
Jumlah Tenaga Kerja 11,760.00
B. BAHAN
1 List Profil M 1.0500 8,500.00 8,925.00
2 Tepung Gypsum Kg 0.1500 18,500.00 2,775.00
Jumlah Bahan 11,700.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 23,460.00
E Overhead & Profit 15.0% X D 3,519.00
F Harga Satuan Pekerjaan ( D + E ) 26,979.00

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Memasang Atap Seng Genteng


Satuan / Unit : M2
Analisa : AHSP PU A.4.5.2.32

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.2000 80,000.00 16,000.00
2 Tukang OH 0.1000 100,000.00 10,000.00
3 Kepala Tukang OH 0.0100 110,000.00 1,100.00
4 Mandor OH 0.0010 100,000.00 100.00
Jumlah Tenaga Kerja 27,200.00
B. BAHAN
1 Atap Seng Genteng Lbr 1.1500 74,000.00 85,100.00
2 Paku Seng Kg 0.2000 20,000.00 4,000.00
Jumlah Bahan 89,100.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 116,300.00
E Overhead & Profit 15.0% X D 17,445.00
F Harga Satuan Pekerjaan ( D + E ) 133,745.00
ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Memasang Rabung seng Atap


Satuan / Unit : M2
Analisa : AHSP PU A.4.5.2.39.a

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.1500 80,000.00 12,000.00
2 Tukang OH 0.0700 100,000.00 7,000.00
3 Kepala Tukang OH 0.0070 110,000.00 770.00
4 Mandor OH 0.0200 100,000.00 2,000.00
Jumlah Tenaga Kerja 21,770.00
B. BAHAN
1 Rabung Seng Genteng M 0.3000 85,000.00 25,500.00
2 Paku seng Kg 0.2160 20,000.00 4,320.00
Jumlah Bahan 29,820.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 51,590.00
E Overhead & Profit 15.0% X D 7,738.50
F Harga Satuan Pekerjaan ( D + E ) 59,328.50

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Membuat dan Memasang Kusen pintu dan Kusen Jendela, Kayu Kelas I
Satuan / Unit : M3
Analisa : AHSP PU A.4.6.1.1

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 7.0000 80,000.00 560,000.00
2 Tukang OH 21.0000 100,000.00 2,100,000.00
3 Kepala Tukang OH 2.1000 110,000.00 231,000.00
4 Mandor OH 0.3500 100,000.00 35,000.00
Jumlah Tenaga Kerja 2,926,000.00
B. BAHAN
1 Balok Kayu Kelas I M3 1.1000 6,000,000.00 6,600,000.00
2 Paku Kayu Kg 1.2500 15,400.00 19,250.00
3 Lem Kayu Kg 1.0000 15,000.00 15,000.00
Jumlah Bahan 6,634,250.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 9,560,250.00
E Overhead & Profit 15.0% X D 1,434,037.50
F Harga Satuan Pekerjaan ( D + E ) 10,994,287.50
ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Membuat dan Memasang Daun Pintu Panel Kayu Kelas II
Satuan / Unit : M2
Analisa : AHSP PU A.4.6.1.5

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 1.0000 80,000.00 80,000.00
2 Tukang OH 3.0000 100,000.00 300,000.00
3 Kepala Tukang OH 0.3000 110,000.00 33,000.00
4 Mandor OH 0.0500 100,000.00 5,000.00
Jumlah Tenaga Kerja 418,000.00
B. BAHAN
1 Papan Kayu Kelas II M3 0.0400 5,000,000.00 200,000.00
2 Lem Kayu Kg 0.5000 15,000.00 7,500.00
Jumlah Bahan 207,500.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 625,500.00
E Overhead & Profit 15.0% X D 93,825.00
F Harga Satuan Pekerjaan ( D + E ) 719,325.00

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Membuat dan Memasang Daun Jendela Kayu Kelas II


Satuan / Unit : M2
Analisa : AHSP PU A.4.6.1.6

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.8000 80,000.00 64,000.00
2 Tukang OH 2.4000 100,000.00 240,000.00
3 Kepala Tukang OH 0.2400 110,000.00 26,400.00
4 Mandor OH 0.0400 100,000.00 4,000.00
Jumlah Tenaga Kerja 334,400.00
B. BAHAN
1 Papan Kayu Kelas II M3 0.0240 5,000,000.00 120,000.00
2 Lem Kayu Kg 0.3000 15,000.00 4,500.00
Jumlah Bahan 124,500.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 458,900.00
E Overhead & Profit 15.0% X D 68,835.00
F Harga Satuan Pekerjaan ( D + E ) 527,735.00
ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Memasang Jalusi Kusen, Kayu Kelas I


Satuan / Unit : M2
Analisa : AHSP PU A.4.6.1.10

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.6700 80,000.00 53,600.00
2 Tukang OH 2.0000 100,000.00 200,000.00
3 Kepala Tukang OH 0.2000 110,000.00 22,000.00
4 Mandor OH 0.3350 100,000.00 33,500.00
Jumlah Tenaga Kerja 309,100.00
B. BAHAN
1 Papan Kayu Kelas I M3 0.0600 6,000,000.00 360,000.00
2 Paku Kayu Kg 0.1500 15,400.00 2,310.00
Jumlah Bahan 362,310.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 671,410.00
E Overhead & Profit 15.0% X D 100,711.50
F Harga Satuan Pekerjaan ( D + E ) 772,121.50

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Memasang Konstruksi Kuda-Kuda, Kayu Kelas I


Satuan / Unit : M3
Analisa : AHSP PU A.4.6.1.14

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 6.7000 80,000.00 536,000.00
2 Tukang OH 20.1000 100,000.00 2,010,000.00
3 Kepala Tukang OH 2.0100 110,000.00 221,100.00
4 Mandor OH 0.3350 100,000.00 33,500.00
Jumlah Tenaga Kerja 2,800,600.00
B. BAHAN
1 Balok Kayu Kelas I M3 1.200 6,000,000.00 7,200,000.00
2 Besi Strip Tebal 5 mm Kg 15.000 16,000.00 240,000.00
3 Paku Kayu Kg 5.600 15,400.00 86,240.00
Jumlah Bahan 7,526,240.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 10,326,840.00
E Overhead & Profit 15.0% X D 1,549,026.00
F Harga Satuan Pekerjaan ( D + E ) 11,875,866.00
ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Memasang Konstruksi Gordeng, Kayu Kelas II


Satuan / Unit : M3
Analisa : AHSP PU A.4.6.1.15

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 2.4000 80,000.00 192,000.00
2 Tukang OH 7.2000 100,000.00 720,000.00
3 Kepala Tukang OH 0.7200 110,000.00 79,200.00
4 Mandor OH 0.1200 100,000.00 12,000.00
Jumlah Tenaga Kerja 1,003,200.00
B. BAHAN
1 Balok Kayu Kelas II M3 1.1000 5,000,000.00 5,500,000.00
2 Besi Strip Tebal 5 mm Kg 15.0000 16,000.00 240,000.00
3 Paku Kayu Kg 3.0000 15,400.00 46,200.00
Jumlah Bahan 5,786,200.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 6,789,400.00
E Overhead & Profit 15.0% X D 1,018,410.00
F Harga Satuan Pekerjaan ( D + E ) 7,807,810.00

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Memasang Rangka Langit-Langit Kayu Kelas III


Satuan / Unit : M2
Analisa : AHSP PU A.4.6.1.20

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.2000 80,000.00 16,000.00
2 Tukang OH 0.3000 100,000.00 30,000.00
3 Kepala Tukang OH 0.0300 110,000.00 3,300.00
4 Mandor OH 0.0100 100,000.00 1,000.00
Jumlah Tenaga Kerja 50,300.00
B. BAHAN
1 Kayu Kaso 5 x 7 cm M3 0.0163 4,000,000.00 65,200.00
2 Paku Kayu Kg 0.2500 15,400.00 3,850.00
Jumlah Bahan 69,050.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 119,350.00
E Overhead & Profit 15.0% X D 17,902.50
F Harga Satuan Pekerjaan ( D + E ) 137,252.50
ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Memasang Listplank Uk. 2.5 x 30 Cm Kayu Kelas I atau Klas II
Satuan / Unit : M'
Analisa : AHSP PU A.4.6.1.21

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.1000 80,000.00 8,000.00
2 Tukang OH 0.2000 100,000.00 20,000.00
3 Kepala Tukang OH 0.0200 110,000.00 2,200.00
4 Mandor OH 0.0050 100,000.00 500.00
Jumlah Tenaga Kerja 30,700.00
B. BAHAN
1 Kayu Kelas II M3 0.0108 4,000,000.00 43,200.00
2 Paku Kg 0.1000 15,400.00 1,540.00
Jumlah Bahan 44,740.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 75,440.00
E Overhead & Profit 15.0% X D 11,316.00
F Harga Satuan Pekerjaan ( D + E ) 86,756.00

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Memasang Kunci Silinder


Satuan / Unit : Buah
Analisa : AHSP PU A.4.6.2.4

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.0050 80,000.00 400.00
2 Tukang OH 0.5000 100,000.00 50,000.00
3 Kepala Tukang OH 0.0500 110,000.00 5,500.00
4 Mandor OH 0.0030 100,000.00 300.00
Jumlah Tenaga Kerja 56,200.00
B. BAHAN
1 Kunci Pintu Silinder Bh 1.0000 185,000.00 185,000.00
Jumlah Bahan 185,000.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 241,200.00
E Overhead & Profit 15.0% X D 36,180.00
F Harga Satuan Pekerjaan ( D + E ) 277,380.00
ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Memasang Engsel Pintu


Satuan / Unit : Buah
Analisa : AHSP PU A.4.6.2.5

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.0150 80,000.00 1,200.00
2 Tukang OH 0.1500 100,000.00 15,000.00
3 Kepala Tukang OH 0.0150 110,000.00 1,650.00
4 Mandor OH 0.0008 100,000.00 80.00
Jumlah Tenaga Kerja 17,930.00
B. BAHAN
1 Engsel Pintu Bh 1.0000 17,500.00 17,500.00
Jumlah Bahan 17,500.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 35,430.00
E Overhead & Profit 15.0% X D 5,314.50
F Harga Satuan Pekerjaan ( D + E ) 40,744.50

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Memasang Engsel Jendela Kupu-Kupu


Satuan / Unit : Buah
Analisa : AHSP PU A.4.6.2.6

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.0150 80,000.00 1,200.00
2 Tukang OH 0.1500 100,000.00 15,000.00
3 Kepala Tukang OH 0.0150 110,000.00 1,650.00
4 Mandor OH 0.0008 100,000.00 80.00
Jumlah Tenaga Kerja 17,930.00
B. BAHAN
1 Engsel Jendela Bh 1.0000 14,500.00 14,500.00
Jumlah Bahan 14,500.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 32,430.00
E Overhead & Profit 15.0% X D 4,864.50
F Harga Satuan Pekerjaan ( D + E ) 37,294.50
ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Memasang Hak/ Kait Angin Jendela


Satuan / Unit : Buah
Analisa : AHSP PU A.4.6.2.9

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.0150 80,000.00 1,200.00
2 Tukang OH 0.1500 100,000.00 15,000.00
3 Kepala Tukang OH 0.0150 110,000.00 1,650.00
4 Mandor OH 0.0008 100,000.00 80.00
Jumlah Tenaga Kerja 17,930.00
B. BAHAN
1 Hak Angin Jendela Bh 1.0000 8,500.00 8,500.00
Jumlah Bahan 8,500.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 26,430.00
E Overhead & Profit 15.0% X D 3,964.50
F Harga Satuan Pekerjaan ( D + E ) 30,394.50

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Memasang Pacok Jendela


Satuan / Unit : Buah
Analisa : AHSP PU A.4.6.2.10

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.0150 80,000.00 1,200.00
2 Tukang OH 0.1500 100,000.00 15,000.00
3 Kepala Tukang OH 0.0150 110,000.00 1,650.00
4 Mandor OH 0.0008 100,000.00 80.00
Jumlah Tenaga Kerja 17,930.00
B. BAHAN
1 Pacok Jendela Bh 1.0000 5,500.00 5,500.00
Jumlah Bahan 5,500.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 23,430.00
E Overhead & Profit 15.0% X D 3,514.50
F Harga Satuan Pekerjaan ( D + E ) 26,944.50
ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Memasang Kloset Jongkok Porselen


Satuan / Unit : Buah
Analisa : AHSP PU A.5.1.1.2

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 1.0000 80,000.00 80,000.00
2 Tukang OH 1.5000 100,000.00 150,000.00
3 Kepala Tukang OH 0.1500 110,000.00 16,500.00
4 Mandor OH 0.1600 100,000.00 16,000.00
Jumlah Tenaga Kerja 262,500.00
B. BAHAN
1 Kloset Jongkok Porselen Bh 1.0000 394,500.00 394,500.00
2 Semen Portland Kg 6.0000 1,325.00 7,950.00
3 Pasir Pasang M3 0.0100 117,900.00 1,179.00
Jumlah Bahan 403,629.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 666,129.00
E Overhead & Profit 15.0% X D 99,919.35
F Harga Satuan Pekerjaan ( D + E ) 766,048.35

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Memasang 1 Buah Urinoir


Satuan / Unit : Buah
Analisa : AHSP PU A.5.1.1.4

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 1.0000 80,000.00 80,000.00
2 Tukang OH 1.0000 100,000.00 100,000.00
3 Kepala Tukang OH 0.1000 110,000.00 11,000.00
4 Mandor OH 0.0500 100,000.00 5,000.00
Jumlah Tenaga Kerja 196,000.00
B. BAHAN
1 Urinoir Bh 1.0000 1,860,000.00 1,860,000.00
2 Semen Portland Kg 6.0000 1,325.00 7,950.00
3 Pasir Pasang M3 0.0100 117,900.00 1,179.00
4 Perlengkapan % 30.0000 558,000.00 167,400.00
Jumlah Bahan 2,036,529.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 2,232,529.00
E Overhead & Profit 15.0% X D 334,879.35
F Harga Satuan Pekerjaan ( D + E ) 2,567,408.35
ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Memasang Floor Drain


Satuan / Unit : Buah
Analisa : AHSP PU A.4.5.1.14

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.0100 80,000.00 800.00
2 Tukang OH 0.1000 100,000.00 10,000.00
3 Kepala Tukang OH 0.0100 110,000.00 1,100.00
4 Mandor OH 0.0050 100,000.00 500.00
Jumlah Tenaga Kerja 12,400.00
B. BAHAN
1 Floor Drain Bh 1.0000 45,000.00 45,000.00
Jumlah Bahan 45,000.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 57,400.00
E Overhead & Profit 15.0% X D 8,610.00
F Harga Satuan Pekerjaan ( D + E ) 66,010.00

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Memasang Kran Air dia. 1/2" atau 3/4"


Satuan / Unit : Buah
Analisa : AHSP PU A.4.5.1.19

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.0100 80,000.00 800.00
2 Tukang OH 0.1000 100,000.00 10,000.00
3 Kepala Tukang OH 0.0100 110,000.00 1,100.00
4 Mandor OH 0.0050 100,000.00 500.00
Jumlah Tenaga Kerja 12,400.00
B. BAHAN
1 Kran Air 3/4" Bh 1.0000 65,000.00 65,000.00
Jumlah Bahan 65,000.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 77,400.00
E Overhead & Profit 15.0% X D 11,610.00
F Harga Satuan Pekerjaan ( D + E ) 89,010.00
ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Memasang 1 m2 Kaca tebal 5 mm


Satuan / Unit : M2
Analisa : AHSP PU A.4.6.2.17

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.0150 80,000.00 1,200.00
2 Tukang OH 0.1500 100,000.00 15,000.00
3 Kepala Tukang OH 0.0150 110,000.00 1,650.00
4 Mandor OH 0.0008 100,000.00 80.00
Jumlah Tenaga Kerja 17,930.00
B. BAHAN
1 Kaca Tebal 5 mm M2 1.1000 120,000.00 132,000.00
2 Sealant Tube 0.0500 15,500.00 775.00
Jumlah Bahan 132,775.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 150,705.00
E Overhead & Profit 15.0% X D 22,605.75
F Harga Satuan Pekerjaan ( D + E ) 173,310.75

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Pengecatan Bidang Kayu lama


Satuan / Unit : M2
Analisa : AHSP PU A.4.7.1.4a

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.0700 80,000.00 5,600.00
2 Tukang OH 0.0090 100,000.00 900.00
3 Kepala Tukang OH 0.0060 110,000.00 660.00
4 Mandor OH 0.0030 100,000.00 300.00
Jumlah Tenaga Kerja 7,460.00
B. BAHAN
1 Pengencer/ Minyak cat Liter 0.0300 9,185.00 275.55
2 Cat Kayu Penutup Kg 0.1700 52,500.00 8,925.00
Jumlah Bahan 9,200.55
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 16,660.55
E Overhead & Profit 15.0% X D 2,499.08
F Harga Satuan Pekerjaan ( D + E ) 19,159.63
ANALISA HARGA SATUAN PEKERJAAN
Jenis Pekerjaan : Pengecatan Bidang Kayu/ Besi Baru (1 x plamir, 1 x cat dasar,2 x cat penutup)
Satuan / Unit : M2
Analisa : AHSP PU A.4.7.1.4

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.0700 80,000.00 5,600.00
2 Tukang OH 0.0090 100,000.00 900.00
3 Kepala Tukang OH 0.0060 110,000.00 660.00
4 Mandor OH 0.0030 100,000.00 300.00
Jumlah Tenaga Kerja 7,460.00
B. BAHAN
1 Cat Menie Kg 0.2000 65,000.00 13,000.00
2 Plamir Kayu/ Besi Kg 0.1500 15,290.00 2,293.50
3 Cat dasar minyak Kg 0.1700 29,000.00 4,930.00
4 Cat minyak penutup Kg 0.2600 52,500.00 13,650.00
5 Kuas Bh 0.0100 8,000.00 80.00
6 Pengencer Liter 0.0300 9,185.00 275.55
7 Ampelas Lembar 0.2000 9,800.00 1,960.00
Jumlah Bahan 36,189.05
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 43,649.05
E Overhead & Profit 15.0% X D 6,547.36
F Harga Satuan Pekerjaan ( D + E ) 50,196.41

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Pengecatan Tembok Baru (1 x plamir, 1 x cat dasar, 2 x cat penutup)
Satuan / Unit : M2
Analisa : AHSP PU A.4.7.1.10

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.0200 80,000.00 1,600.00
2 Tukang OH 0.0630 100,000.00 6,300.00
3 Kepala Tukang OH 0.0063 110,000.00 693.00
4 Mandor OH 0.0025 100,000.00 250.00
Jumlah Tenaga Kerja 8,843.00
B. BAHAN
1 Plamir Kg 0.1000 15,290.00 1,529.00
2 Cat dasar tembok Kg 0.1000 29,000.00 2,900.00
3 Cat tembok/penutup 2x Kg 0.2600 35,000.00 9,100.00
Jumlah Bahan 13,529.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 22,372.00
E Overhead & Profit 15.0% X D 3,355.80
F Harga Satuan Pekerjaan ( D + E ) 25,727.80
ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Pengecatan Tembok lama (1 x cat dasar, 2 x cat penutup)


Satuan / Unit : M2
Analisa : AHSP PU A.4.7.1.11

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.0280 80,000.00 2,240.00
2 Tukang OH 0.0420 100,000.00 4,200.00
3 Kepala Tukang OH 0.0042 110,000.00 462.00
4 Mandor OH 0.0025 100,000.00 250.00
Jumlah Tenaga Kerja 7,152.00
B. BAHAN
1 Cat dasar tembok Kg 0.1200 29,000.00 3,480.00
2 Cat tembok/penutup 2x Kg 0.1800 35,000.00 6,300.00
Jumlah Bahan 9,780.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 16,932.00
E Overhead & Profit 15.0% X D 2,539.80
F Harga Satuan Pekerjaan ( D + E ) 19,471.80
ANALISA HARGA SATUAN PEKERJAAN

Jenis Peker : Pemasangan 1 m2 rangka besi hollow 1 x 40.40.2 mm, modul 60 x 60 cm, plafont
Satuan / Uni: M2
Analisa : AHSP PU A. 4.2.1.21

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.3500 80,000.00 28,000.00
2 Tukang OH 0.3500 100,000.00 35,000.00
3 Kepala Tukang OH 0.0350 110,000.00 3,850.00
4 Mandor OH 0.0180 100,000.00 1,800.00
Jumlah Tenaga Kerja 68,650.00
B. BAHAN
1 Rangka metal Hollow 40.4 m' 4.0000 12,500.00 50,000.00
2 Assesories (perkuatan,las. d Ls 1.0000 10,000.00 10,000.00
Jumlah Bahan 60,000.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 128,650.00
E Overhead & Profit 15.0% X D 19,297.50
F Harga Satuan Pekerjaan ( D + E ) 147,947.50
ANALISA HARGA SATUAN PEKERJAAN

Jenis Peker : Pemasangan 1 m2 Atap Onduline


Satuan / Uni: M2
Analisa : AHSP PU A. 4.5.2.33.b

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.0500 80,000.00 4,000.00
2 Tukang OH 0.1500 100,000.00 15,000.00
3 Kepala Tukang OH 0.0150 110,000.00 1,650.00
4 Mandor OH 0.0010 100,000.00 100.00
Jumlah Tenaga Kerja 20,750.00
B. BAHAN
1 Atap Onduline m2 1.1000 105,000.00 115,500.00
2 Sekrup fixer Buah 12.0000 1,500.00 18,000.00
Jumlah Bahan 133,500.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 154,250.00
E Overhead & Profit 15.0% X D 23,137.50
F Harga Satuan Pekerjaan ( D + E ) 177,387.50

ANALISA HARGA SATUAN PEKERJAAN

Jenis Peker : Pemasangan 1 m' Bubungan Atap Onduline


Satuan / Uni: M2
Analisa : AHSP PU A. 4.5.2.33.c

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.0800 80,000.00 6,400.00
2 Tukang OH 0.2500 100,000.00 25,000.00
3 Kepala Tukang OH 0.0250 110,000.00 2,750.00
4 Mandor OH 0.0125 100,000.00 1,250.00
Jumlah Tenaga Kerja 35,400.00
B. BAHAN
1 Bubungan Onduline m2 1.2000 62,500.00 75,000.00
2 Sekrup fixer Buah 12.0000 1,500.00 18,000.00
Jumlah Bahan 93,000.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 128,400.00
E Overhead & Profit 15.0% X D 19,260.00
F Harga Satuan Pekerjaan ( D + E ) 147,660.00
HARGA SATUAN BAHAN DAN UPAH
KABUPATEN MAROS

No. JENIS SATUAN HARGA BARANG (Rp) KET.


1 2 3 4 5
A BAHAN DASAR
1 Batu Kali m3 137,812.50
2 Chipping/Batu Pecah m3 301,875.00
3 Batu Gunung m3 146,632.50
4 Tanah Timbunan/Urugan m3 103,083.75
PASIR m3
5 Maros m3 121,275.00
6 Bili-bili m3 137,812.50
7 Timbunan / Urugan (Lokal) m3 128,992.50
8 Pasangan (Luar) m3 162,750.00
9 Beton m3 303,187.50
10 Kerikil/Koral Beton m3 333,506.25
11 Sirtu Saring m3 187,425.00
12 Sirtu Sungai m3 170,887.50
13 Kapur Pasangan m3 242,550.00
SEMEN (PC)
14 Semen PC 50 Kg Kg 1,261.26
15 Semen Putih (50 Kg) / Semen Warna Kg 1,819.13
16 Semen PC 40 Kg Kg 1,267.88
17 Batu Merah bh 544.95
18 Paving Block 21 x 10,5 x 6 cm K 225 m2 54,573.75
19 Paving Block 21 x 10,5 x 8 cm K 225 m2 60,637.50
20 Paving Block 21 x 10,5 x 8 cm K 250 m2 66,701.25
21 Paving Block 21 x 10,5 x 8 cm K 300 m2 74,970.00
22 Paving Block 21 x 10,5 x 8 cm K 350 m2 84,892.50
23 Paving Block 21 x 10,5 x 8 cm K 400 m2 109,390.05
24 Paving Block 21 x 10,5 x 10 cm K 400 m2 112,178.85
25 Paving Block segi 6 K 225 (10x10x6) cm m2 48,510.00
26 Paving Block segi 6 K 225 (10x10x8) cm m2 54,573.75
27 Grass Blok (54 x 36 x 10) cm m2 145,530.00
28 Topi uskup k 300 Tebal 6 Cm Biji 5,512.50
28 Topi uskup k 300 Tebal 8 Cm Biji 5,512.50
29 Hollow Brick P2B (9 x 19 x 39) cm m2 36,988.88
30 Hollow Brick P2K (9 x 19 x 39) cm m2 42,446.25
31 Kastin K 225 Kecil ( 20 x 25 x 50) cm bh 24,255.00
32 Kastin K 225 Besar ( 25 x 30 x 50) cm bh 36,382.50
33 Kastin K 225 (15 x 30 x 40) cm bh 27,562.50
34 Kastin K 225 (15 x 25 x 50) cm bh 30,318.75
35 Kastin K 225 (15 x 25 x 40) cm bh 24,806.25
36 Panel Pra cetak (5 x 40 x 240 ) cm Lbr 137,812.50
37 Tiang Pra Cetak 1,50 m 3 Susun 209,475.00
38 Tiang Pra Cetak 2,20 m 4 Susun 248,062.50
39 Tiang Pra Cetak 2,50 m 5 Susun 292,162.50
40 Tiang Pra Cetak 3,00 m 6 Susun 330,750.00
41 Tiang Pra Cetak 3,40 m 7 Susun 374,850.00
42 Tiang Pra Cetak 3,50 m 8 Susun 441,000.00
43 Bataco ( 40 x 20 x 10 ) bh 5,512.50
44 Gorong-Gorong 15 x 1 M bh 132,300.00
45 Gorong-Gorong 30 x 1 M bh 192,937.50
46 Gorong-Gorong 50 x 1 M bh 275,625.00
47 Gorong-Gorong 60 x 1 M bh 330,750.00
48 Aspal Beton Mikro ton 879,243.75
49 Aspal Bitumen Kg 11,025.00
No. JENIS SATUAN HARGA BARANG (Rp) KET.
1 2 3 4 5
B BAHAN KAYU
1 Kayu Klas I Bayam
Balok Gergaji Sawmil m3 11,521,125.00
Balok Gergaji Shansaw m3 7,882,875.00
Papan Gergaji Sawmil m3 13,946,625.00
Papan Gergaji Shansaw m3 8,489,250.00
2 Kayu Klas I (Sappu/Ulin)
Balok Sappu/Ulin m3 12,127,500.00
3 Kayu Klas II (Kumea)
Papan Sawmil m3 6,058,500.00
Balok Shansaw m3 4,410,000.00
4 Kayu Klas II
Papan m3 3,969,000.00
Balok m3 3,638,250.00
5 Kayu Klas III
Papan m3 2,590,875.00
Balok m3 2,205,000.00
6 Kayu Papan Siri-siri Kls I Sappu (Ulin) / Bayam
Uk. 0.80 x 0.06 x 0.01 m lbr 2,756.25
Uk. 1.00 x 0.06 x 0.01 m lbr 2,921.63
Uk. 1.20 x 0.06 x 0.01 m lbr 3,307.50
Uk. 1.25 x 0.06 x 0.01 m lbr 3,858.75
Uk. 1.50 x 0.06 x 0.01 m lbr 4,134.38
C BAHAN LANTAI
1 Tegel PC
PC Abu-abu 20 x 20 cm bh 1,940.40
PC Abu-abu 30 x 30 cm bh 3,274.43
PC Warna 20 x 20 cm bh 3,638.25
PC Badak 20 x 20 cm bh 2,789.33
PC Badak 30 x 30 cm bh 3,153.15
PC Wafel 20 x 20 cm bh 3,395.70
PC Wafel 30 x 30 cm bh 3,698.89
Plint PC 15 x 20 cm bh 3,274.43
Plint PC 15 x 30 cm bh 7,519.05
Tegel Mozaik 30 x 30 cm bh 8,731.80
2 Tegel Keramik
Putih 10 x 20 cm dos / m2 46,690.88
Warna 10 x 20 cm dos / m2 53,361.00
Putih 30 x 30 cm ( Kasar ) dos / m2 53,361.00
Warna 30 x 30 cm dos / m2 60,031.13
Putih 20 x 25 cm dos / m2 53,361.00
Warna 20 x 25 cm dos / m2 56,029.05
Putih 20 x 20 cm dos / m2 53,361.00
Warna 20 x 20 cm dos / m2 56,312.55
Putih 30 x 30 cm Polos (Setara Mulia) dos / m2 45,356.85
Warna 30 x 30 cm (Setara Essensa) dos / m2 226,784.25
Warna 30 x 30 cm (Setara Asia) dos / m2 60,031.13
Warna 30 x 60 cm (Setara Roman) dos / m2 181,912.50
Putih 40 x 40 cm dos / m2 77,373.45
Warna 40 x 40 cm (Setara Asia/Ina) dos / m2 66,701.25
Warna 50 x 50 cm (Ex. Supermilan) dos / m2 90,666.45 platinum
Warna 60 x 60 cm dos / m2 187,645.50 polos cream
Bt. Alam 20 x 20 cm m2 220,500.00
3 Lantai Acrylic
Tebal 10 mm Lbr 2,094,750.00
Tebal 12 mm (2.25 m x 1.2 m) Lbr 2,425,500.00
No. JENIS SATUAN HARGA BARANG (Rp) KET.
1 2 3 4 5
Tebal 15 mm Lbr 2,976,750.00
No. JENIS SATUAN HARGA BARANG (Rp) KET.
1 2 3 4 5
D BAHAN KACA
1 Kaca Bening 3 mm m2 99,225.00
2 Kaca Bening 5 mm m2 132,300.00
3 Kaca Bening 2 mm m2 132,300.00
4 Kaca Buram 3 mm m2 120,062.25
5 Kaca Buram 5 mm m2 253,575.00
6 Kaca Rayben 3 mm m2 146,742.75
7 Kaca Rayben 5 mm m2 220,114.13
8 Kaca Cermin (3 mm) m2 253,575.00
9 Kaca Cermin (5 mm) m2 330,750.00
10 Kaca One Way m2 533,610.00
11 Kaca 8 mm m2 330,750.00
12 Kaca 10 mm m2 418,950.00
13 Kaca 12 mm m2 496,125.00
14 Kaca Nako Lengkap Teralis 7 mata set 400,474.31
E BAHAN BESI
1 Besi Beton (SI = full )
Ø = 4 mm btg 18,676.35
Ø = 6 mm btg 40,020.75
Ø = 8 mm btg 60,031.13
Ø = 10 mm btg 86,711.63
Ø = 12 mm btg 114,726.15
Ø = 14 mm btg 180,093.38
Ø = 16 mm btg 213,444.00
Ø = 19 mm btg 293,485.50
Ø = 20 mm btg 333,506.25
Besi Ulir
Ø = 12 mm btg 129,543.75
Ø = 14 mm btg 174,746.25
Ø = 16 mm btg 303,738.75
2 Paku
Paku Biasa (4-10 cm) Kg 21,344.40
Paku Asbes Kg 26,680.50
Paku Seng (Payung) RRC Kg 26,680.50
Paku Skrup 3 1/2" Kg 22,945.23
Paku Skrup 4 " Kg 28,014.53
Paku Payung Berulir 75 mm Kg 33,350.63
Paku Sirap Kg 20,010.38
Paku Beton hitam dos 26,680.50
Paku Beton Putih dos 13,340.25
Paku Atap Spandek Baja BHHP G 550 biji 2,401.25
Paku Seng RRC Uk 5 cm biji 133.40
Paku Seng RRC Uk 6 cm biji 166.75
Paku Beton / Sappu Uk. 5 cm biji 266.81
Paku Beton / Sappu Uk. 6 cm biji 366.86
Paku Beton / Sappu Uk. 7 cm biji 500.26
Paku Beton / Sappu Uk. 10 cm biji 933.82
3 Kawat
Beton Kg 24,012.45
Nyamuk m 26,680.50
Ayakan Kecil m 19,950.00
Duri roll 180,093.38
4 Kawat Digalvano
3 mm Kg 24,012.45
4 mm Kg 24,012.45
5 mm Kg 24,012.45
5 Besi Plat
2 mm = 120 x240 mm lbr 375,375.00
3 mm = 120 x240 mm lbr 787,500.00
No. JENIS SATUAN HARGA BARANG (Rp) KET.
1 2 3 4 5
Besi H 15 cm 12 m Panjang btg 4,273,500.00
No. JENIS SATUAN HARGA BARANG (Rp) KET.
1 2 3 4 5
6 Besi Strep
30.3 mm = 3 m btg 24,012.45
35.4 mm = 3 m btg 26,680.50
46.4 mm = 3 m btg 42,688.80
40.6 mm = 3 m btg 38,953.53
50.6 mm = 6 m btg 49,625.73
60.6 mm = 6 m btg 58,296.89
7 Besi Siku = 6 m'
30.30.3 btg 100,051.88
40.40.4 btg 166,753.13
50.50.5 btg 280,145.25
60.60.6 btg 182,155.05
70.70.7 m 188,218.80
40.40.3 btg 103,326.30
50.50.4 btg 121,498.65
8 Baja Tralis kg 21,829.50
9 Pipa Besi Kotak Hembos 40 x 40 x2.60 (pjg = 6m) btg 133,402.50
10 Besi Plat Cakar Ayam uk: 1,2 x 2,4 x 2,6 lbr 1,091,475.00
11 Kawat Las Biasa kg 23,625.00
12 Kawat Las Stainless kg 42,446.25
13 Kawat Las Listrik kg 30,450.00
14 Pipa GIP Ø 2,50 medium A m' 25,200.00
15 Besi Siku 30 x 3 x 30 m' 1,470.00
16 Pagar Besi Kotak Hembos Uk : unit 1,470.00
17 7,5x3,75,2,6 Tinggi 1,1 0 m + Biaya Pasang 1,470.00
18 Roda Pintu Besi bh 28,875.00
19 Engsel Pintu Dorong Kupu-kupu psg 26,250.00
20 Besi Beton Biasa Kg 10,694.25
21 Besi Beton Ulir 24 Kg 11,884.95
22 Besi Galvanisir m 26,250.00
23 Besi Pagar BRC 90 x 2,40 m set 630,000.00
24 Besi Pagar BRC 100 x 2,40 m set 656,250.00
25 Besi Pagar BRC 120 x 2,40 m set 708,750.00
26 Besi Pagar BRC 150 x 2,40 m set 606,375.00
27 Pintu Pagar BRC 90 x 2,40 m set 1,050,000.00
28 Pintu Pagar BRC 120 x 2,40 m set 1,260,000.00
29 Pintu Pagar BRC 150 x 2,40 m set 1,417,500.00
30 Hollow Galfanis 4/4 Kg 6,366.94
31 Besi Strip 4/0.4 (Plat Baja) Kg 23,042.25
F BAHAN ALUMUNIUM
1 Alumunium Warna (2" x 1") 6 m m' 60,637.50 6 mtr
2 Alumunium Warna (3" x 1") 6 m m' 72,765.00 6 mtr
3 Alumunium Warna (4" x 1") 6 m m' 93,381.75 6 mtr
4 Baja Ringan Canai Dingin Kg 13,893.17
5 Web C75.75 m' 9,738.38
6 Top Span 40 m' 6,063.75
7 ZA, G550 m' 6,269.92
8 Main Truss 1.05 TCT m' 6,570.07
9 Web 0,8 TCT m' 6,470.03
10 Ancor / Seng Pelapis Genteng m' 66,701.25
11 Kusen Rangka Aluminium 4" m' 127,338.75
12 Bingkai Pintu/Jendela Aluminium m' 103,083.75
13 Aluminium Composite Panel (indoor) m2 103,083.75
14 Aluminium Composite Panel (out door) m2 103,083.75
15 Tarikan Pintu Aluminium bh 37,485.00
G BAHAN PIPA
1 Pipa Besi GIP
Ø1/2 " - 6 m Tbl 1,4 mm btg 73,500.00
Tbl 2,2 mm btg 94,500.00
Tbl 2,6 mm btg 115,500.00
Ø3/4 " - 6 m Tbl 2,4 mm btg 126,000.00
No. JENIS SATUAN HARGA BARANG (Rp) KET.
1 2 3 4 5
Tbl 2,6 mm btg 168,000.00
Ø1 " - 6 m Tbl 2,4 mm btg 152,250.00
Ø1 1/2 " - 6 m Tbl 2,4 mm btg 183,750.00
Ø2"-6m Tbl 2,4 mm btg 236,250.00
Ø 2 1/2 " - 6 m Tbl 3 mm btg 341,250.00
Ø3"-6m Tbl 3 mm btg 393,750.00
2 Pipa Paralon PVC
Ø 1/2 " - 4 m AW btg 18,375.00
Ø 3/4 " - 6 m AW btg 28,875.00
Ø 1 " - 6m AW btg 45,937.50
Ø1 1/2 " - 6 m AW btg 55,125.00
Ø 2 " - 6 m AW btg 42,000.00
Ø 2 1/2 " - 6 m AW btg 47,250.00
Ø 3 " - 6m AW btg 52,500.00
Ø 4 " - 6m AW btg 78,750.00
Ø 5 " - 6m AW btg 667,012.50
Ø 6 " - 6m AW btg 1,165,331.48
Ø 8 " - 6m AW btg 1,876,851.90
Ø 10 " - 6m AW btg 2,914,965.90
3 Pipa Paralon PVC (Setara Wavin)
Ø 1/2 " - 4 m AW (Setara Wavin) btg 20,010.38
Ø 3/4 " - 4 m AW btg 26,250.00
Ø 1 " - 4 m AW btg 36,018.15
Ø1 1/2 " - 4 m AW btg 63,350.00
Ø 2 " - 4 m AW btg 80,500.00
Ø 2 1/2 " - 4 AW btg 126,000.00
Ø 3 " - 4m AW btg 148,750.00
Ø 4 " - 4m AW btg 183,050.00
Ø1 1/2 " - 4 m D btg 41,475.00
Ø2"-4mD btg 51,100.00
Ø 2 1/2 " - 4 D btg 64,750.00
Ø 3 " - 4m D btg 83,125.00
Ø 4 " - 4m D btg 131,250.00
4 Jenis Batang D Untuk Saluran Pembuangan Air
Ø 1/2 " - 4m btg 19,950.00
Ø 3/4 " - 4m btg 26,250.00
Ø 1 " - 4m btg 36,750.00
Ø 11/2" - 4m btg 37,275.00
Ø 2 " - 4m btg 53,025.00
Ø 21/2" - 4m btg 65,625.00
Ø 3 " - 4m btg 84,000.00
Ø 4 " - 4m btg 136,500.00
Ø 5 " - 4m btg 236,250.00
Ø 6 " - 4m btg 278,250.00
Ø 8 " - 4m btg 472,500.00
Ø 10 " - 4m btg 126,000.00
5 Jenis Batang C Untuk Instalasi Listrik
Ø 5/8 " - 4m btg 8,925.00
Ø 3/4 " - 4m btg 30,561.30
Ø 1 " - 4m btg 39,656.93
Ø 11/2" - 4m btg 116,666.55
6 Pipa Sambungan Lurus
Ø 2" bh 6,300.00
Ø 3" bh 8,662.50
Ø 1/2" bh 2,625.00
Ø 21/2" bh 7,612.50
Ø 3/4" bh 2,887.50
Ø 1" bh 3,335.06
7 Pipa Sambungan L
Ø 1/2" bh 2,625.00
Ø 3/4" bh 3,150.00
No. JENIS SATUAN HARGA BARANG (Rp) KET.
1 2 3 4 5
Ø 1" bh 3,675.00
Ø 2" bh 5,775.00
Ø 21/2" bh 7,612.50
Ø 3" bh 10,672.20
Pipa GIP medium A Ø 2" btg 606,375.00
Pipa GIP medium A Ø 3" btg 1,267,875.00
Pipa GIP medium A Ø 4" btg 1,267,875.00
Pipa GIP medium B Ø 2" btg 236,250.00
Pipa GIP medium B Ø 3" btg 367,500.00
Pipa GIP medium B Ø 4" btg 472,500.00
Pipa Penguras / Pembuangan Air Bak m
H BAHAN LANGIT-LANGIT
1 Eternit 100 x 100 cm lbr 27,125.00
Calsiboard lbr 69,300.00
Woodplank 20 x 400 cm, T = 8 mm lbr 75,250.00
Woodplank 30 x 400 cm, T = 8 mm lbr 94,500.00
2 Tripleks
122 x 244 x 0,2 cm lbr 49,358.93
122 x 244 x 0,3 cm lbr 60,031.13
122 x 244 x 0.4 cm lbr 71,662.50
122 x 244 x 0,6 cm lbr 88,200.00
122 x 244 x 0,9 cm lbr 115,500.00
Tripleks Pintu 200 x 90 cm lbr 42,000.00
3 Tripleks Melamin
122 x 244 x 0,3 cm lbr 106,722.00
Multipleks 12 mm lbr 203,962.50 export
Multipleks 10 mm lbr 166,753.13
Multipleks 6 mm lbr 93,381.75 export
Multipleks 9 mm lbr 133,402.50 export
Tripleks 3 mm lbr 60,031.13 export
Tripleks 4 mm lbr 73,371.38 export
Tripleks Sungkai lbr 126,732.38
4 Acoustic 40 x 60 @ lbr 80,041.50
5 Teakwood
122 x 244 x 0,3 cm lbr 120,062.25
Hard Board 122 x 244 cm lbr 100,051.88
Teakwood Pintu 90 x 200 cm Tbl 3 mm lbr 68,250.00
6 Asbes Plat Harfeks
200 x 100 x 0,3 cm lbr 68,250.00
7 List Profil
2 x 3 cm = 4 m btg 11,157.30
3 x 3 cm = 4 m btg 14,795.55
4 x 4 cm = 4 m btg 19,646.55
4 x 5 cm = 4 m btg 24,465.00
5 x 5 cm = 4 m btg 31,167.68
Plafon PVC Motif tbl 8 mm lbr 173,423.25 Sunda Plafond
Plafon PVC Motif tbl 5 mm lbr 124,031.25 Sunda Plafond
List Profil PVC Besar btg 133,402.50 Sunda Plafond
List Profil PVC Sedang btg 128,066.40 Sunda Plafond
List Profil PVC Kecil btg 106,722.00 Sunda Plafond
Gypsum Board lbr 66,150.00
HPL Polos Lbr 181,912.50
HPL Urat Kayu Lbr 203,962.50
HPL Art From Lbr 225,225.00
I BAHAN ATAP
1 Genteng
Beton Warna bh 36,625.05
Keramik bh 11,576.25
Asbes Gelombang lbr 48,752.55
Harfeks (15 x 85 x 0,5) lbr 66,701.25
Karet Pelapis Genteng m2 8,489.25
No. JENIS SATUAN HARGA BARANG (Rp) KET.
1 2 3 4 5
Asbes Genteng lbr 33,350.63
Sirap ikat / m2 30,318.75
2 Seng Gelombang
BWG 33" BJLS 0,20 mm kaki 7,519.05
BWG 30" BJLS 0,22 mm kaki 7,519.05
BWG 31" BJLS 0,25 mm kaki 10,672.20
BWG 28" BJLS 0,35 mm kaki 18,433.80
BJLS Licin 0,30 mm 40 x 180 lbr 54,816.30
BJLS Licin 0,35 lbr 73,007.55
Setara Genteng Royal Polos bh 2,534.65
Setara Genteng Nusantara Polos bh 2,801.45
Bubungan Setara Royal Polos bh 2,868.16
Bubungan Setara Nusantara Polos bh 2,801.45
3 Seng Superdeck
180 x 70 cm - 10 kaki lbr 154,019.25
180 x 70 cm - 8 kaki lbr 145,408.73
180 x 70 cm - 7 kaki lbr 98,175.00
180 x 70 cm - 6 kaki lbr 82,005.00
4 Seng Alumunium Gelombang
SWG 32"0,27 mm kaki 8,731.80
SWG 32"0,31 mm kaki 9,944.55
SWG 32"0,38 mm kaki 11,157.30
Setara Sakura Roof 70 x 80 cm lbr 46,690.88
Setara Perkasa Roof 80 x 120 cm lbr 60,031.13
Setara Rotho Roof 70 x 80 cm lbr 42,688.80
Setara Multi Roof Licin 80 x 100 cm lbr 100,051.88
Setara Multi roof kasar 80 x 100 cm lbr 113,392.13
Setara Surya Roof Licin 70 x 80 cm lbr 56,029.05
Setara Surya Roof Kasar 70 x 80 cm lbr 66,701.25
Setara Prisma Roof lbr 86,711.63
Seng Plastik (Fiber) kaki 15,750.00
5 Fiber Semen (Harflex)
Super 240 x 108 x 0,6 cm lbr 76,645.80
Super 180 x 108 x 0,6 cm lbr 53,603.55
Ekonomi 240 x 92 x 0,5 cm lbr 59,667.30
Ekonomi 180 x 92 x 0,5 cm lbr 52,026.98
Mini 240 x 105 x 0,4 cm lbr 51,178.05
Mini 180 x 105 x 0,4 cm lbr 48,752.55
Super 240 x 105 x 0,5 cm lbr 61,486.43
Super 180 x 105 x 0,4 cm lbr 54,209.93
6 Nook / Bubungan
Beton Warna bh 24,497.55
Keramik bh 15,435.00
Asbes bh 60,880.05
Setara Multi roof Licin 90 cm lbr 84,892.50
Multi Roof kasar 90 cm lbr 86,625.00
Setara Surya Roof Licin 90 cm lbr 50,935.50
Surya Roof Licin 40 cm lbr 31,500.00
Setara Sakura Roof 90 cm lbr 36,382.50
Alm SWG 28" - 180 cmc lbr 56,635.43
Alm SWG 28" - 105 cmc lbr 46,327.05
7 Nok Steel Gelombang
Super - 180 cm bh 39,050.55
Mini - 105 cm bh 29,348.55
Ekonomi - 95 cm bh 22,072.05
8 Nok Steel Rata
Super - 180 cm bh 32,986.80
Mini - 105 cm bh 27,529.43
Ekonomi - 95 cm bh 26,923.05
Nok 1/2 Lingkaran bh 46,933.43
Karet Pelapis Genteng roll 525,000.00
No. JENIS SATUAN HARGA BARANG (Rp) KET.
1 2 3 4 5
Ukuran 55 m 6,306.30
Ukuran 90 m 12,370.05
Penangkal Petir set 3,395,700.00
Spandek Baja BHP Color Bond G 550 m2 234,060.75
Spandek Type G 300 m2 96,413.63
Spandek Baja BHP Zinc Alume G 550 bh 89,743.50
Spandek polos = 0,25 lbr 41,343.75
Spandek polos = 0,3 lbr 46,856.25
Spandek polos = 0,35 lbr 51,817.50
Spandek polos = 0,4 lbr 57,330.00

J BAHAN PENGGANTUNG
1 Kunci Tanam
Setara Union 1 x slag bh 182,155.05
SetaraUnion 2 x slag bh 275,536.80
Setara Yale 2 x slag bh 60,637.50
Yale 2 x slag bh 60,637.50
Kunci Bulat (asli) bh 63,000.00
Kunci Pintu KM/WC Ses (asli) bh 210,000.00
Kunci Pintu Merk Ses (asli) bh 210,000.00
2 Penggantung
Hak angin Kecil bh 11,157.30
Hak angin Besar bh 26,250.00
Grendel Kecil bh 25,710.30
Grendel Besar bh 34,199.55
Grendel Pintu Dobel bh 53,361.00
Engsel Pintu Biasa bh 40,020.75
Engsel Jendela Biasa psg 34,684.65
door Holder set 137,812.50
Expanyolet Tempel / Door Closer (Otomatis) set 275,073.75
Engsel Jendela Kuningan Setara 777 psg 9,338.18
Engsel Daun Pintu Koboi psg 60,031.13
Engsel Daun Pintu Kuningan Setara 777 psg 13,340.25
Expanyolet bh 31,500.00
Expanyolet Tanam daun Pintu (Otomatis) psg 26,250.00
Kunci Pintu Aluminium bh 115,000.00
Engsel Pintu Aluminium bh 0.00

K BAHAN SANITER
1 Kloset Duduk Standart bh 733,713.75
2 Kloset Jongkok Biasa bh 246,794.63 toto
3 Wastafel bh 333,506.25 toto
4 Wastafel Cuci Piring Logam bh 233,454.38
5 Pompa Tangan Terpasang bh 347,513.51
6 Pompa Mesin bh 2,001,304.31
7 Urinoar Setara Ex. KIA/Toto (Lengkap) bh 2,534,914.31
8 Bak Mandi Fiber unit 315,000.00
9 Reservoir=1/2 m3 bh 826,875.00
10 Reservoir=1 m3 bh 1,200,889.20
11 Reservoir=2 m3 bh 2,427,925.50
12 Kran Air Biasa bh 46,957.68
13 Stop Kran Biasa 1/2-1" bh 60,297.93
17 Stop Kran Pembilas bh 148,837.50
18 Bak Air Fiberglass (Tangki) 1 m3 unit 1,600,830.00
19 Bak Air Fiberglass (Tangki) 2 m3 unit 3,134,958.75
20 Hand Shower bh 91,875.00
21 Kloset Duduk Setara Ex Toto/KIA set 2,401,245.00
22 Kloset Duduk Setara Ex Toto/KIA Warna Lengkap set 2,401,245.00
23 Kloset Jongkok Setara Ex KIA bh 315,000.00
24 Kotak Sambungan bh 315,000.00
No. JENIS SATUAN HARGA BARANG (Rp) KET.
1 2 3 4 5
25 Kran Air Stainless Steel bh 53,361.00
26 Kran Air Tarik Merah bh 31,500.00
27 Pintu Panil Bayam lbr 31,500.00
28 Pintu Panil PVC bh 210,000.00
29 Pintu Panil WC lbr 266,805.00
30 Tempat Sabun Setara Ex Toto (11x11) cm bh 100,051.88
31 Urinoir set 472,500.00
32 Sekat Urinoir Aluminium set 1,041,862.50 toto
33 Washbashin (Ukuran Besar) bh
34 Washbashin (Ukuran Kecil) bh
35 Wastafel American Standard/KIA bh
36 Wood Filler Kg 49,875.00
37 Wood Stain Kg 63,000.00
38 Sending Sealer Kg 60,375.00
39 Clear Kg 60,375.00
40 Shower Tray (1x1) cm Kualitas I set
41 Shower Tray (1x1) cm Kualitas II set
42 Shower Tray (1x1) cm Kualitas III set
L BAHAN FINISHING / CAT
1 Cat Tembok / Plafond
Setara Avitex Kg 21,000.00
Setara Metrolite Kg 20,010.38
Setara Klimex Kg 15,523.20
Setara Vinilex Nippon Paint Kg 16,493.40 5 kg
Setara Dulux Ltr 90,713.70 2,5 ltr
Cat Dasar Setara Merk Mowilex ltr 49,612.50 2,5 ltr
Setara Mowilex (Dinding Dalam) ltr 61,365.15 2,5 ltr
Setara Mowilex (Dinding Luar) ltr 93,381.75 2,5 ltr
Dempul Kayu Kg 20,010.38
Plamur Tembok Kg 64,033.20 aga
Waterprofing Kg 73,920.00
Setara No Drop Kg 55,125.00
2 Cat Kayu
Setara Glotex Kg 53,361.00
Setara Avian Kg 53,361.00
Palatone Ltr 45,720.68
Setara I C I. Dulux Kg 80,284.05
Politur Kg 53,361.00
Meni kayu / besi Kg 13,340.25 5 kg
Minyak Cat Biasa Ltr 6,670.13 botol
Thinner A Kg 26,680.50
Thinner B Kg 24,012.45
Cat Dasar Kg 26,680.50
3 Cat Atap
Setara A G A Kg 93,381.75
Setara Yoko Kg 86,711.63
Lem Seng Ltr 97,262.55 per mtr
Amplas/Kertas Kosong lbr 32,744.25
Residu/Alcater 10 Ltr 60,880.05
Setara Lem Fox Kg 36,382.50
Realing Stainless Steel m 1,091,475.00
Tangga Putar Baja m 3,031,875.00
4 Alco Panel m2 716,625.00
M BAHAN INSTALASI LISTRIK
1 Pipa union untuk Kabel
5/8" - 4 m btg 15,765.75
3/4" - 4 m btg 20,616.75
11/2" - 4 m btg 30,318.75
1" - 4 m btg 29,106.00
2 Kabel Listrik
a Type NYK
No. JENIS SATUAN HARGA BARANG (Rp) KET.
1 2 3 4 5
1 1/2 mm roll 303,430.05
2 1/2 mm roll 424,705.05
b Type NYY
2 x 1 1/2 mm roll 643,000.05
2 x 2 1/2 mm roll 869,784.30
2 x 4 mm roll 364,067.55
c Type NYM
2 x 2 1/2 mm m 6,063.75 roll
2 x 3 1/2 mm m 10,308.38 roll
No. JENIS SATUAN HARGA BARANG (Rp) KET.
1 2 3 4 5
3 Lampu TL Biasa
1 x 20 watt bh 85,135.05 osram
2 x 20 watt bh 133,645.05
1 x 40 watt bh 113,028.30 osram
2 x 40 watt bh 180,942.30
4 Lampu Pijar
25 Watt bh 6,306.30
40 Watt bh 7,519.05
60 Watt bh 11,157.30
100 Watt bh 11,763.68
Lampu taman Mercury bh 388,322.55
Lampu Mercury 20 Watt bh 242,550.00
Lampu Downlight kecil bh 25,467.75
Lampu RM 2 x 20 Watt bh 315,315.00
Lampu RM 2 x 36 Watt bh 375,952.50
Lampu Setara Sanex SL-14 bh 85,498.88
Lampu SL 25 Watt Setara Nasional bh 145,530.00
Lampu SL 9 Watt Setara Philips bh 61,850.25
Lampu SL 23 Watt Setara Nasional bh 103,083.75
Lampu TL 20 Watt bh 54,573.75
Lampu TL 1 x 36 Watt Merk Setara Nasional bh 133,402.50 osram
Lampu TL 2 x 20 Watt bh 84,892.50
Lampu TL GCL 32 Watt Setara Philips/Baret bh 194,040.00
Lampu Downlight Besar bh 76,954.50 5 Inci
Lampu LED mtr 66,150.00
Lampu Kotak bh 84,892.50
Lampu TL 2 x 20 Watt Setara philips bh 253,575.00
5 Shakelar Phase
Tunggal Putih (Setara Broco) bh 16,008.30
Double Putih (Setara Broco) bh 24,497.55
Triple (Setara Broco) bh 48,510.00
Tunggal Putih (Setara Panasonic) bh 22,584.71
Double Putih (Setara Panasonic) bh 36,514.80
Triple (Setara Panasonic) bh 59,755.50
6 Stop Kontak
Stop Kontak bh 30,561.30
Stop Kontak AC bh 25,875.00
Stop Kontak TV bh 30,561.30
MCB 32 Amp Setara MG bh 72,765.00
MCB 6 Amp Setara MG bh 66,701.25
7 Zakering Case Lokal Biasa
Lokal 2 Group Automat bh 91,198.80
Lokal 3 Group Biasa bh 103,326.30
Panil Box ( Lengkap ) set 54,573.75
Fitting Elips Putih bh 12,370.05
Travo 3 Ampere bh 38,587.50
Travo 10 Ampere bh 60,637.50
N BAHAN PELUMAS
Gemuk ( Grease ) kg 30,318.75
Olie SAE 90 Ltr 30,561.30
Solar Ltr 5,650.00
Bensin Premium Ltr 6,950.00
Minyak Tanah Ltr 11,245.50
O LAIN - LAIN
Bambu Perancah/Dolken Ø 8-10/400 cm btg 14,332.50
PABX5 Line dan 24 Cabang set 3,759,525.00
Timah Solder kg 24,255.00
Ijuk ikat / Kg 24,255.00
Polytene 125 mikron m2 3,638.25
Kawat Las Kg 30,318.75
Minyak Bekisting Ltr 6,112.26
No. JENIS SATUAN HARGA BARANG (Rp) KET.
1 2 3 4 5
Mur/Baut bh 5,650.00
Sealant Tube 14,000.00
Karet Pelapis Kaca m 4,000.00
Rangka metal hollow 40.40.2 mm m 23,100.00
List Gypsum m 2,789.33
Kuas bh 7,000.00
Floor Drain bh 27,500.00
Skrup fixer bh 500.00
Sealtape m 39,000.00
Pintu (Kaca Temper + Acces.) bh 9,350,000.00
Railing Tangga (Temper Glass + Access.) m 2,750,000.00
IPAL (ABR) bh 102,064,090.91
Manhole + GT bh 2,866,154.55
Kabel NYA (2x2.5) mm m 7,000.00
Klem Kabel No. 10 bh 500.00
Inbow Dos bh 3,500.00
Las Dop bh 500.00
Isolasi roll 2,000.00
T - Dos 5/8" bh 500.00
Floor Deck m2 115,000.00
GRC m2 850,000.00
Besi Baja C/Profil Kg 15,750.00
Plafon PVC Motif tbl 7 mm lbr 141,625.00
Font cm 10,000.00
Air ltr 500.00
Tangki Biofilter AFB JSI
Individu (2 kk) unit 7,260,000.00
Capsuler (3 kk) unit 14,300,000.00
Capsuler (4 kk) unit 19,250,000.00
Capsuler (5 kk) unit 24,623,500.00
Capsuler (10 kk) unit 35,474,400.50
Capsuler (15 kk) unit 47,300,000.00
Capsuler (20 kk) unit 70,950,000.00
Capsuler (30 kk) unit 94,743,000.00
Capsuler (40kk) unit 129,937,500.00
Capsuler (50 kk) unit 166,171,720.00
Capsuler (60 kk) unit 204,160,000.00
P UPAH KERJA
1 Pekerja Orang/Hr 65,000.00
2 Tukang
Tukang Orang/Hr 100,000.00
Tukang Batu Orang/Hr 100,000.00
Tukang Cat Orang/Hr 100,000.00
Tukang Listrik Orang/Hr 100,000.00
Tukang Pipa Orang/Hr 100,000.00
Tukang Besi Orang/Hr 100,000.00
3 Kepala Tukang
Kepala Tukang Orang/Hr 120,000.00
Kepala Tukang Kayu Orang/Hr 120,000.00
Kepala Tukang Listrik Orang/Hr 120,000.00
Kepala Tukang Cat Orang/Hr 120,000.00
Kepala Tukang Pipa Orang/Hr 120,000.00
Kepala Tukang Besi Orang/Hr 120,000.00
4 Mandor Orang/Hr 120,000.00
5 Operator Orang/Hr 120,000.00
6 Pembantu Operator Orang/Hr 85,000.00
7 Sopir Orang/Hr 120,000.00
8 Pembantu Sopir Orang/Hr 85,000.00
9 Mekanik Orang/Hr 120,000.00
10 Pembantu Mekanik Orang/Hr 85,000.00
No. JENIS SATUAN HARGA BARANG (Rp) KET.
1 2 3 4 5
11 Penjaga Gudang Orang/Hr 65,000.00
12 Penjaga Malam Orang/Hr 65,000.00

KETERANGAN
- Untuk wilayah yang tidak terjangkau kendaraan roda empat, biaya angkut ke
lokasi proyek dapat dihitung tersendiri.
- Khusus untuk daerah yang tidak ada air kerja, biaya air kerja dapat diperhitungkan sendiri oleh perencana
FOTO NOL KEGIATAN
ALOKASI DANA DESA TAHUN ANGGARAN 2020
PEMBANGUNAN BATAS DESA

3.34 x 3.44 3.29 x

Obyek : FOTO NOL


Lokasi : Dusun Barambang
Kegiatan : Pembangunan Batas Desa
ATAN
ANGGARAN 2020
AS DESA

3.29 x 3.48