Anda di halaman 1dari 19

JEMBATAN BOX BETON PRATEKAN METODA BALANCE CANTILEVER.

Bentang Bersih Jembatan L = 90 m


fc' 50 N/mm2
fci' 40 N/mm2 fct = -0.25 (fci)^0.5 =
fups 1860 N/mm2

Lebar jembatan b = 8m
Lebar slab cantilever lc = 1m
lebar bawah box b' = 6m

Tinggi box bagian tumpuan D (> L/22) = 4.091 m, dipakai = 5.000 m


Tinggi box bagian tengah D'(> 1.5m) = 2.000 m
Jumlah cell n = 2.000
Tebal web tw = 0.300 m
Bentang bersih slab Ls = 2.550 m
Tebal slab ts (Ls/14>ts> Ls/17 dan ts>12") = 0.300 m > Ls/17
< Ls/14
> 12"
Tebal slab cantilever tsc (lc/5 > 12") = 0.300 m > lc/5

Tebal bawah box tsb = 0.300 m


Persamaan parabola tinggi box h(x )= 0.001x^2 -0.133x 5

Perhitungan momen saat pelaksanaan


Segment X panjang tinggi 1 tinggi2
ke thd
pusat pilar
(m) (m) (m) (m)
0 0
1 2.4 2.4 5.000 4.700
2 4.8 2.4 4.700 4.400
3 7.2 2.4 4.400 4.125
4 9.6 2.4 4.125 3.875
5 12 2.4 3.875 3.625
6 14.4 2.4 3.625 3.400
7 16.8 2.4 3.400 3.200
8 19.8 3 3.200 2.950
9 22.8 3 2.950 2.750
10 25.8 3 2.750 2.550
11 28.8 3 2.550 2.400
12 31.8 3 2.400 2.275
13 34.8 3 2.275 2.175
14 37.8 3 2.175 2.100
15 40.8 3 2.100 2.050
16 43.8 3 2.050 2.025

Total Beban Pelaksanaan / sisi


Total Beban Pelaksanaan 2 sisi

Dipasang tendon prestress 12 strands 0.50 inch


Aps 1184.52 mm2
T tendon 1,321,924 N

fc' pilar = 40 Mpa


B pilar = 6m
Tinggi Pilar Lpilar = 7m
dipakai tebal pilar 0.8 m

5.05346901
fct = -0.25 (fci)^0.5 = -1.6 Mpa
fca' = 0.6 fci = 24 Mpa

Posisi garis netral :

Yt = (b*ts*(D-ts/2)+b'*tsb^2/2+(n+1)*tw*(D-ts-tsb)*D/2)
0.150 m (b*ts+b'*tsb+(n+1)*tw*(D-ts-tsb))
0.182 m
0.300 m Yb = D - Yt
0.200 m

Beton basah pusat beban Yt Yb A I


ctkan, pkrja, trvl thd 0
pusat pilar
(ton) (m) (m) (m) (m2) (m4)

77.97 1.2 2.673 2.327 8.160 20.35377 93.558


76.18 3.6 2.517 2.183 7.890 17.70788 367.8168
74.48 6 2.361 2.039 7.620 15.25857 814.6683
72.92 8.4 2.218 1.907 7.373 13.18415 1427.1627
71.43 10.8 2.088 1.787 7.148 11.43852 2198.6175
70.02 13.2 1.957 1.668 6.923 9.824976 3122.8848
68.76 15.6 1.838 1.562 6.720 8.484492 4195.5096
78.03 18.3 1.733 1.467 6.540 7.38085 5623.40141
76.36 21.3 1.601 1.349 6.315 6.116316 7249.78954
74.87 24.3 1.495 1.255 6.135 5.195633 9069.16091
73.57 27.3 1.388 1.162 5.955 4.35478 11077.6731
72.55 30.3 1.308 1.092 5.820 3.775936 13275.9665
71.72 33.3 1.241 1.034 5.708 3.327125 15664.0968
71.07 36.3 1.188 0.987 5.618 2.989851 18243.7904
70.60 39.3 1.147 0.953 5.550 2.749504 21018.444
70.32 42.3 1.120 0.930 5.505 2.595242 23993.1254
A (m2) 8.160
1170.83 I (m4) 20.3537692
2341.67 yt (m) 2.673
yb (m) 2.327
f top (Mpa) -31.507
f bot (Mpa) 27.433
n Tendon 38
F prestress (kN) 50233.124
f top (Mpa) -8.710
f bot (Mpa) 19.099
fct = -1.581

fca = 24.000
L=
Lc =

D>
=

tc =
=

Lclear =

t slab >
=

Mpelaksanaan terhadap masing2 segment


2.4 4.8 7.2 9.6 12 14.4 16.8 19.8 22.8 25.8

(ton-m)

91.4196
359.5305 89.3703
797.0265 351.8679 87.4992
1397.0469 780.4539 344.6508 85.7172
2153.2656 1368.624 764.7723 337.7901 84.0243
3060.8712 2111.2104 1342.3395 750.3381 331.5531 82.5096
4301.49851 3164.57321 2208.43781 1429.17191 823.122413 386.814413 117.040313
5744.63164 4424.45134 3285.06094 2322.54004 1533.23554 913.672538 460.643438 114.534375
7384.31201 5884.44071 4565.35931 3423.14741 2454.15191 1654.89791 1022.17781 451.455 112.306875
9216.2517 7539.8079 6044.154 4725.3696 3579.8016 2603.9751 1794.6825 1003.24406 443.380313 110.357813
11240.4229 9389.85681 7720.08066 6227.17401 4907.48376 3757.53501 2774.12016 1765.02891 987.512344 436.837031
13456.4357 11433.7521 9591.85847 7926.83432 6435.02657 5112.96032 3957.42797 2733.18984 1740.52641 974.704219
15865.571 13672.3292 11659.8773 9824.29485 8161.92885 6669.30435 5343.21375 3905.77781 2699.91656 1720.89656
18470.7801 16108.0938 13926.1974 11921.1705 10089.36 8427.29104 6931.75594 5282.51438 3864.8475 2674.02188
21276.6853 18745.2227 16394.5501 14220.7469 12220.1602 10389.3149 8725.00359 6864.79172 5236.15453 3834.35859
7.890 7.620 7.373 7.148 6.923 6.720 6.540 6.315 6.135 5.955
17.7078773 15.2585652 13.1841495 11.4385242 9.82497637 8.48449219 7.38084993 6.11631636 5.19563324 4.35478035
2.517 2.361 2.218 2.088 1.957 1.838 1.733 1.601 1.495 1.388
2.183 2.039 1.907 1.787 1.668 1.562 1.467 1.349 1.255 1.162
-30.246 -29.010 -27.583 -25.953 -24.336 -22.511 -20.486 -17.968 -15.065 -12.224
26.226 25.044 23.712 22.222 20.751 19.122 17.341 15.142 12.650 10.228
36 34 32 30 28 24 20 20 16 12
47589.276 44945.427 42301.578 39657.730 37013.881 31726.184 26438.486 26438.486 21150.789 15863.092
-8.200 -7.730 -7.126 -6.381 -5.672 -6.184 -6.617 -3.741 -3.434 -3.298
18.371 17.663 16.796 15.763 14.743 13.984 13.065 10.868 9.226 7.652
-1.581 -1.581 -1.581 -1.581 -1.581 -1.581 -1.581 -1.581 -1.581 -1.581

24.000 24.000 24.000 24.000 24.000 24.000 24.000 24.000 24.000 24.000
f top f bot
28.8 31.8 34.8 37.8 40.8
Mpa Mpa

108.826406
431.546719 107.573438
964.54125 427.370156 106.598906
1705.86094 956.884219 424.307344 105.902813
2655.22734 1695.28031 951.733125 422.358281 105.485156
5.820 5.708 5.618 5.550 5.505
3.7759357 3.32712475 2.98985053 2.74950362 2.59524223
1.308 1.241 1.188 1.147 1.120
1.092 1.034 0.987 0.953 0.930
-9.200 -6.325 -3.780 -1.762 -0.455
7.677 5.267 3.143 1.463 0.378
10 6 6 4 4
13219.243 7931.546 7931.546 5287.697 5287.697
-1.623 -1.706 0.901 1.391 2.720
5.522 3.967 1.837 0.589 -0.500
-1.581 -1.581 -1.581 -1.581 -1.581

24.000 24.000 24.000 24.000 24.000


90 m Bridge span
2m Cantilever span

L / 22 Depth of Box
5m

Lc/5 >12" Cantilever depth


0.4 m

4m

Lclear /17 < Lclear/14 > 12"


0.30 m

0 5 5
45 2

2025.00 A 45.00B 5= 2

90 8100.00 A 90.00B 5= 5
-4050.0 A 0.00B 5= -1
A 0.001481
B -0.133333
JEMBATAN BOX BETON PRATEKAN METODA BALANCE CANTILEVER.

Bentang Bersih Jembatan L = 100 m


fc' 50 N/mm2
fci' 40 N/mm2 fct = -0.25 (fci)^0.5 =
fups 1860 N/mm2

Lebar jembatan b = 8m
Lebar slab cantilever lc = 1m
lebar bawah box b' = 6m

Tinggi box bagian tumpuan D (> L/22) = 4.545 m, dipakai = 5.000 m


Tinggi box bagian tengah D'(> 1.5m) = 2.000 m
Jumlah cell n = 2.000
Tebal web tw = 0.300 m
Bentang bersih slab Ls = 2.550 m
Tebal slab ts (Ls/14>ts> Ls/17 dan ts>12") = 0.300 m > Ls/17
< Ls/14
> 12"
Tebal slab cantilever tsc (lc/5 > 12") = 0.300 m > lc/5

Tebal bawah box tsb = 0.300 m


Persamaan parabola tinggi box h(x )= 0.0012x^2 -0.120x 5

Perhitungan momen saat pelaksanaan


Segment X panjang tinggi 1 tinggi2
ke thd
pusat pilar
(m) (m) (m) (m)
0 0
1 2.4 2.4 5.000 4.725
2 4.8 2.4 4.725 4.475
3 7.2 2.4 4.475 4.200
4 9.6 2.4 4.200 3.975
5 12 2.4 3.975 3.750
6 14.4 2.4 3.750 3.525
7 16.8 2.4 3.525 3.325
8 19.2 2.4 3.325 3.150
9 21.6 2.4 3.150 2.975
10 24 2.4 2.975 2.825
11 26.4 2.4 2.825 2.675
12 28.8 2.4 2.675 2.550
13 31.2 2.4 2.550 2.425
14 33.6 2.4 2.425 2.325
15 36 2.4 2.325 2.250
16 38.4 2.4 2.250 2.175
17 40.8 2.4 2.175 2.125
18 43.2 2.4 2.125 2.075
19 45.6 2.4 2.075 2.025
20 48.6 3 2.025 2.025

Total Beban Pelaksanaan / sisi


Total Beban Pelaksanaan 2 sisi

Dipasang tendon prestress 12 strands 0.50 inch


Aps 1184.52 mm2
T tendon 1,321,924 N

fc' pilar = 40 Mpa


B pilar = 6m
Tinggi Pilar Lpilar = 7m
dipakai tebal pilar 0.8 m

5.820322396
fct = -0.25 (fci)^0.5 = -1.6 Mpa
fca' = 0.6 fci = 24 Mpa

Posisi garis netral :

Yt = (b*ts*(D-ts/2)+b'*tsb^2/2+(n+1)*tw*(D-ts-tsb)*D/2)
0.150 m (b*ts+b'*tsb+(n+1)*tw*(D-ts-tsb))
0.182 m
0.300 m Yb = D - Yt
0.200 m

Beton basah pusat beban Yt Yb A I


ctkan, pkrja, trvl thd 0
pusat pilar
(ton) (m) (m) (m) (m2) (m4)

78.04 1.2 2.673 2.327 8.160 20.35377 93.6471


76.48 3.6 2.530 2.195 7.913 17.92083 368.9751
74.92 6 2.400 2.075 7.688 15.85258 818.4996
73.44 8.4 2.257 1.943 7.440 13.7338 1435.3599
72.10 10.8 2.140 1.835 7.238 12.12084 2214.0318
70.76 13.2 2.022 1.728 7.035 10.61533 3148.1001
69.50 15.6 1.904 1.621 6.833 9.216211 4232.3079
68.39 18 1.799 1.526 6.653 8.060979 5463.2694
67.35 20.4 1.707 1.443 6.495 7.117764 6837.1533
66.38 22.8 1.614 1.361 6.338 6.237062 8350.6629
65.49 25.2 1.535 1.290 6.203 5.531483 10001.0361
64.67 27.6 1.455 1.220 6.068 4.87101 11786.0454
63.93 30 1.388 1.162 5.955 4.35478 13703.9979
63.26 32.4 1.322 1.103 5.843 3.869349 15753.7353
62.74 34.8 1.268 1.057 5.753 3.503007 17937.2178
62.30 37.2 1.228 1.022 5.685 3.240998 20254.7127
61.93 39.6 1.188 0.987 5.618 2.989851 22707.0219
61.63 42 1.161 0.964 5.573 2.828423 25295.4819
61.33 44.4 1.134 0.941 5.528 2.671777 28018.6671
70.23 47.1 1.107 0.918 5.483 2.519895 31326.5295
A (m2) 8.160
1354.88 I (m4) 20.3537692
2709.75 yt (m) 2.673
yb (m) 2.327
f top (Mpa) -41.137
f bot (Mpa) 35.818
n Tendon 56
F prestress (kN) 74027.762
f top (Mpa) -7.541
f bot (Mpa) 23.537
fct = -1.581

fca = 24.000
L=
Lc =

D>
=

tc =
=

Lclear =

t slab >
=

Mpelaksanaan terhadap masing2 segment


2.4 4.8 7.2 9.6 12 14.4 16.8 19.2 21.6 24

(ton-m)

91.776
361.4907 89.9049
802.1052 354.2736 88.1229
1407.7389 786.8691 347.6802 86.5191
2171.9766 1381.2762 772.2567 341.265 84.9153
3089.3832 2131.8816 1356.0609 758.268 335.1171 83.4006
4156.2165 3034.5867 2094.6378 1332.7167 745.4376 329.5929 82.0641
5368.467 4085.2038 2983.6215 2060.067 1311.1545 733.6764 324.5142 80.8167
6722.6598 5280.0798 4019.1807 2936.3094 2028.0801 1291.2852 722.8062 319.7919 79.6584
8215.8546 6616.0962 5198.0187 3957.969 2892.5613 1998.588 1272.9306 712.7379 315.426 78.5892
9845.6457 8090.6691 6517.3734 5122.1055 3901.4796 2852.2881 1971.4125 1256.0016 703.4715 311.4165
11610.162 9701.7492 7975.0173 6426.3132 5052.2511 3849.6234 2815.3116 1946.4645 1240.4982 695.007
13508.067 11447.8218 9569.2575 7868.721 6342.8265 4988.3664 3802.2222 2781.5427 1923.744 1226.4204
15540.9645 13330.1343 11300.985 9449.8635 7773.384 6268.3389 4931.6097 3760.3452 2751.9615 1904.0529
17708.9436 15348.5976 13169.9325 11169.2952 9343.2999 7688.739 6202.494 4881.7137 3723.8142 2726.3898
20012.628 17503.6572 15176.3673 13027.1052 11052.4851 9249.2994 7614.4296 6145.0245 4838.5002 3692.451
22453.176 19796.2932 17321.0913 15023.9172 12901.3851 10950.2874 9167.5056 7550.1885 6095.7522 4801.791
25029.162 22225.08 19602.6789 17158.3056 14888.5743 12790.2774 10860.2964 9095.7801 7494.1446 6052.9842
28168.4709 25195.8354 22404.8808 19791.954 17353.6692 15086.8188 12988.2843 11055.2145 9285.02554 7675.31164
7.913 7.688 7.440 7.238 7.035 6.833 6.653 6.495 6.338 6.203
17.92083 15.8525842 13.7338042 12.1208448 10.6153311 9.21621108 8.06097931 7.11776392 6.23706191 5.53148297
2.530 2.400 2.257 2.140 2.022 1.904 1.799 1.707 1.614 1.535
2.195 2.075 1.943 1.835 1.728 1.621 1.526 1.443 1.361 1.290
-39.772 -38.152 -36.824 -34.941 -33.057 -31.170 -28.985 -26.507 -24.029 -21.294
34.497 32.973 31.693 29.966 28.247 26.534 24.589 22.418 20.259 17.905
52 48 46 44 40 36 32 30 28 24
68740.065 63452.367 60808.519 58164.670 52876.973 47589.276 42301.578 39657.730 37013.881 31726.184
-7.982 -8.276 -7.590 -6.472 -6.684 -6.958 -7.060 -5.600 -4.164 -3.992
23.147 22.540 21.740 20.479 19.650 18.818 17.743 16.006 14.275 12.772
-1.581 -1.581 -1.581 -1.581 -1.581 -1.581 -1.581 -1.581 -1.581 -1.581

24.000 24.000 24.000 24.000 24.000 24.000 24.000 24.000 24.000 24.000
26.4 28.8 31.2 33.6 36 38.4 40.8 43.2 45.6

77.6091
307.7634 76.7181
687.3444 304.4667 75.9162
1214.3919 680.9292 301.7937 75.2925
1887.213 1204.2345 675.5832 299.5662 74.7579
2704.6494 1873.0461 1195.77 671.1282 222.9372 74.3124
3666.0774 2686.5621 1861.374 1188.8202 369.78 221.868 73.956
4770.0714 3643.3569 2670.9696 1851.2166 515.1972 367.998 220.7988 73.5996
6223.84534 4928.57734 3787.63654 2799.33004 779.559938 611.006438 442.452938 273.899438 105.345938
6.068 5.955 5.843 5.753 5.685 5.618 5.573 5.528 5.483
4.87101019 4.35478035 3.86934851 3.50300701 3.24099821 2.98985053 2.828423 2.671777 2.519895
1.455 1.388 1.322 1.268 1.228 1.188 1.161 1.134 1.107
1.220 1.162 1.103 1.057 1.022 0.987 0.964 0.941 0.918
-18.590 -15.713 -12.937 -10.134 -2.953 -2.427 -1.816 -1.162 -0.463
15.589 13.147 10.801 8.446 2.458 2.018 1.508 0.965 0.384
20 16 10 6 2 2 2 0 0
26438.486 21150.789 13219.243 7931.546 2643.849 2643.849 2643.849 0.000 0.000
-3.928 -3.811 -5.384 -5.545 -1.409 -0.867 -0.245 -1.162 -0.463
11.305 9.712 8.647 7.149 2.025 1.582 1.072 0.965 0.384
-1.581 -1.581 -1.581 -1.581 -1.581 -1.581 -1.581 -1.581 -1.581

24.000 24.000 24.000 24.000 24.000 24.000 24.000 24.000 24.000


90 m Bridge span
2m Cantilever span

L / 22 Depth of Box
5m

Lc/5 >12" Cantilever depth


0.4 m

4m

Lclear /17 < Lclear/14 > 12"


0.30 m

0
f top f bot 50
48.6
Mpa Mpa

100
5 5
2

2500.00 A 50.00B 5= 2

### 100.00B 5= 5
-5000.0 A 0.00B 5= -1
A 0.0012
B -0.12