JADWAL WAKTU PELAKSANAAN

KEGIATAN : BELANJA PEMELIHARAAN GEDUNG DAN BANGUNAN


PEKERJAAN : PEMELIHARAAN GEDUNG RSUD
LOKASI : JALAN RUMAH SAKIT NO. 22 UJUNG BERUNG, KOTA BANDUNG

WAKTU PELAKSANAAN 120 HARI KALENDER


BOBOT
NO URAIAN PEKERJAAN JUMLAH HARGA (Rp.) BULAN 1 BULAN 2 BULAN 3 BULAN 4 KETERANG
PEKERJAAN
AN
M1 M2 M3 M4 M5 M6 M7 M8 M9 M10 M11 M12 M13 M14 M15 M16

1 PEKERJAAN PERSIAPAN 27.567.756,00 0,874% 0,055% 0,055% 0,055% 0,055% 0,055% 0,055% 0,055% 0,055% 0,055% 0,055% 0,055% 0,055% 0,055% 0,055% 0,055% 0,055%
95,070% 97,535% 100,000%
2 PEKERJAAN WATERPROOFING DAK BETON DAN BOCORAN
88,727%
A GEDUNG RADIOLOGI 128.799.639,60 4,085% 1,021% 1,021% 1,021% 1,021%
B GEDUNG F & G 344.933.708,82 10,940% 1,823% 1,823% 1,823% 1,823% 1,823% 1,823% 82,384%
C GEDUNG C 232.828.589,04 7,385% 1,846% 1,846% 1,846% 1,846%
75,891%
D PEKERJAAN PENGGANTIAN ATAP RUANG KOMITE MEDIK 84.670.394,40 2,686% 0,671% 0,671% 0,671% 0,671%

E ATAP RUANG MRI 6.624.360,00 0,210% 0,105% 0,105% 68,958%


F DAK LAB P.A 18.371.558,40 0,583% 0,291% 0,291%
62,025%
G RUANG DEPO FARMASI 9.318.266,40 0,296% 0,148% 0,148%
3 PEKERJAAN PEMASANGAN INSTALASI GAS MEDIS OKSIGEN
A PEKERJAAN INSTALASI GAS MEDIS LANTAI 2 51,403%
A.2 Instalasi Pemipaan Ruang Anggrek B 186.759.790,00 5,923% 1,481% 1,481% 1,481% 1,481%

B PEKERJAAN INSTALASI GAS MEDIS LANTAI 3 41,146%


B.1 Instalasi Pemipaan Ruang Sakura 27.981.930,00 0,888% 0,444% 0,444%
4 PEKERJAAN PEMASANGAN INSTALASI NURSE CALL
30,323%
A PEKERJAAN PEMASANGAN INSTALASI NURSE CALL LANTAI 2 428.658.200,00 13,596% 1,699% 1,699% 1,699% 1,699% 1,699% 1,699% 1,699% 1,699%

B PEKERJAAN INSTALASI NURSE CALL - LANTAI 3 135.629.600,00 4,302% 22,933% 1,075% 1,075% 1,075% 1,075%
5 PEKERJAAN PEMASANGAN KUSEN RUANG ANGGREK
A RUANG ANGGREK A LANTAI 2 555.015.184,76 17,603% 2,200% 2,200% 14,523%
2,200% 2,200% 2,200% 2,200% 2,200% 2,200%

B RUANG ANGGREK B LANTAI 2 549.455.443,76 17,427% 2,178% 2,178% 2,178% 2,178% 2,178% 2,178% 2,178% 2,178%
8,037%
6 PEKERJAAN PENGGANTIAN ATAP GEDUNG F & G 202.773.255,02 6,431% 0,429% 0,429% 0,429% 0,429% 0,429% 0,429% 0,429% 0,429% 0,429% 0,429% 0,429% 0,429% 0,429% 0,429% 0,429%
4,046%
7 PEKERJAAN PERBAIKAN LANTAI PLAFOND RAMP 78.210.699,19 2,481% 0,620% 0,620% 0,620% 0,620%
0,000% 0,055%
8 PEKERJAAN PERBAIKAN KAMAR MANDI RUANG ANGGREK A DAN B ( 11 KAMAR MANDI ) 135.274.016,68 4,291% 0,286% 0,286% 0,286% 0,286% 0,286% 0,286% 0,286% 0,286% 0,286% 0,286% 0,286% 0,286% 0,286% 0,286% 0,286%
JUMLAH TOTAL 3.152.872.392,07 100,000%

RENCANA PROGRES PERMINGGU 0,055% 3,991% 3,991% 6,486% 8,411% 7,389% 10,823% 10,257% 10,622% 6,933% 6,933% 6,493% 6,343% 6,343% 2,465% 2,465%
RENCANA KUMULATIF PROGRES PERMINGGU 0,000% 0,055% 4,046% 8,037% 14,523% 22,933% 30,323% 41,146% 51,403% 62,025% 68,958% 75,891% 82,384% 88,727% 95,070% 97,535% 100,000%