GAMBAR KERJA
TAHUN 2020
l e a.88"E
a m 5'41
°0
MALUKU UTARA
c . N =1
2 7
U e
K .64 "S
| Y
'1 5
3°16
X =
LT. MALUKU
P. BACAN
P. OBI
P. MANGOLI PAPUA
P. TALIABU
P R O P I N S I
P. SULABES
M A L U K U L A U T S E R A M
P.SERAM
P. BURU
P. SAPARUA
P. GOROM
P. AMBON
L A U T B A N D A
Nama Gambar :
R
T A
T
W E PETA ORIENTASI Kabupaten Buru
L A LOKASI PEKERJAAN
S E No. Register ....................
No. Lembar
L T. A R A F U R U No. Kontrak
Tanggal
HK.02.01/BPPW-Maluku/02
20 Maret 2020
PT. ANTARIKSA GLOBALINDO
Jl. Borong Raya Kompleks Graha Janna Land I Blok A2 No. 06 -kota Makasar
Kode Pos : 90223
30.00
30.00 30.00
30.00
30.00
30.00
32.00
34.00
32.00
34.00 30.00
32.00
30.00
P1
32.00
32.00 30.00
30.00
32.00
P2
34.00 30.00
34.00
30.00
P3
34.00 30.00
30.00
34.00
P4
32.00 30.00
30.00
30.00
30.00 KOORDINAT
P5
BPS-01
30.00 30.00
34.00
X = 3°16'15.64"S
P6
30.00
Y = 127°05'41.88"E
30.00 32.00
Z = +28.50 m
P7
32.00
32.00
30.00
P8
30.00 34.00 32.00
30.00
20.00 KOORDINAT
34.00
SR
P9
34.00 32.00
32.00
30.00 32.00 30.00 X = 3°16'15.98"S
P1
20.00
32.00 Y = 127°05'42.29"E
0
32.00
Z = +28.00 m
32.00
P1
1
32.00 32.00
P1
34.00
30.00
2
32.00 30.00
34.00
P1
10.00
3
20.00
10.00 32.00 30.00 34.00
P1
4
20.00 32.00
30.00 34.00
P1
32.00 32.00
5
28.00
P1
34.00
6
10.00 28.00
32.00
P1
30.00
7
10.00
32.00
P1
30.00
8
0.00
P1
30.00
9
10.00 20.00 32.00
P2
0.00 30.00
0
30.00
32.00
32.00
30.00
U
P2
32.00
32.00
1
32.00 30.00 SR
30.00
10
BPS 1
32.00 32.00 30.00 BPS 2
0.00 BPS 3
30.00 30.00 30.00
10.00 20.00 S1
30.00 30.00
30.00 S2
30.00 S3
32.00 32.00
30.00
32.00 32.00
34.00
0.00 30.00 36.00 KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT Provinsi MALUKU
34.00
34.00
32.00 DIREKTORAT JENDERAL CIPTA KARYA Sistem Pengelolaan Drainase Lingkungan
32.00 Pekerjaan
SATKER PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM Permukiman, Kabupaten Buru
PROVINSI MALUKU
JL. D.I. Panjaitan No.2 Kotak Pos 88 , Telp (0911) 315060 - AMBON Lokasi Kecamatan Namlea
34.00
Nama Gambar :
0
.0
30
0
0
.0
34
.0
32
34
.0
0
30
.0
0
32
.0
30
0
.0
0
32
.0
34
0
0
.0
.0
34
.0
34
0
34
.0
0
.0
32
0
32
.0
0
0
.0
32
.0
0
32
32
.0
0
0
0
.0
.0
34
.0
32
30
32
0
.0
.0
30
30
P1 P2 P3 P4 P5 P6 P7 P8 P9 P10 P11 P12 P13 P14 P15 P16 P17 P18 P19 P20 P21
0
.0
.0
0
0
28
.0
.0
32
0
.0
30
32
0
.0
32
.0
0
32
.0
30
0
32
.0
0
30
.0
30
0
.0
0
34
.0
.0
30
34
0
.0
32
46.00 46.00
42.00 42.00
38.00 38.00
ELEVASI (m)
ELEVASI (m)
34.00 34.00
30.00 30.00
26.00 26.00
22.00 22.00
18.00 18.00
14.00 14.00
NOMOR PATOK P1 P2 P3 P4 P5 P6 P7 P8 P9 P10 P11 P12 P13 P14 P15 P16 P17 P18 P19 P20 P21
JARAK (m) 25.0 28.69 25.0 25.0 25.0 19.13 26.07 27.38 22.62 25.0 25.0 24.12 25.0 25.0 19.08 25.0 25.0 25.0 25.0 32.51
JARAK KUMULATIF (m) 25.0 53.69 78.69 103.69 128.69 147.82 173.89 198.89 221.51 246.51 271.51 295.63 320.63 345.63 370.63 395.63 420.63 445.63 470.63 503.14
ELEVASI TANAH (m) 32.07 31.60 32.00 31.62 31.07 30.50 30.00 30.00 30.00 31.80 32.00 31.00 30.00 29.00 28.50 28.00 28.40 30.60 31.00 31.50 32.00
ELEV. DASAR DRAINASE (m) 30.57 30.10 30.50 30.12 30.07 29.50 29.00 29.00 29.00 30.30 30.50 29.50 28.50 28.00 27.90 27.40 27.8 29.10 29.50 30.00 30.50
Nama Gambar :
U
No. Lembar
SR
10
BPS 1 No. Kontrak HK.02.01/BPPW-Maluku/02
BPS 2 Tanggal 20 Maret 2020
BPS 3
S1 PT. ANTARIKSA GLOBALINDO
S2 Jl. Borong Raya Kompleks Graha Janna Land I Blok A2 No. 06 -kota Makasar
S3 Kode Pos : 90223
100
100
400
100
URUGAN KEMBALI
100 BUIS BETON
Nama Gambar :
Direncana
130
130
130 20 90 20
20 90 20
20 90 20
MUKA TANAH
MUKA TANAH MUKA TANAH
MUKA TANAH
63 103
100
Pas. Batu Kali
150 153
Lantai beton Cor Tb.7 cm
Pas. Batu Kali
Pas. Batu Kosong Tb.10 cm 200
7
10
Lantai beton Cor Tb.7 cm
20 7
Pas. Batu Kosong Tb.10 cm
10
Pas. Batu Kali
47
30 70 30 30
Lantai beton Cor Tb.7 cm
7
130 Pas. Batu Kosong Tb.10 cm
10
30 70 30 47
30
130
30 70 30
POTONGAN SALURAN TIPE A POTONGANSALURAN TIPE B
Skala 1:10 Skala 1:10 130
203
173
220
250
Direncana
30.00 140.00
MUKA TANAH 30.00 MUKA TANAH
Ø12- 15 CM
500.00
Ø12- 15 CM
Ø12- 15 CM
300.00
Ø12-100 CM
Ø12
200.00
Ø12
LANTAI KERJA tb. 8 cm 8.00 LANTAI KERJA tb. 8 cm 8.00 LANTAI KERJA tb. 8 cm 8.00 LANTAI KERJA tb. 8 cm 8.00
URUGAN PASIR tb. 5 cm URUGAN PASIR tb. 5 cm 5.00 5.00
5.00 URUGAN PASIR tb. 5 cm URUGAN PASIR tb. 5 cm 5.00
140.00
140.00
200.00 140.00
200.00
140.00
220.00 220.00 200.00 200.00
220.00
220.00
POTONGAN KOLAM RETENSI TIPE I POTONGAN KOLAM RETENSI TIPE II POTONGAN KOLAM RETENSI TIPE III POTONGAN KOLAM RETENSI TIPE IV
Skala 1:10 Skala 1:10 Skala 1:10 Skala 1:10
94.90
Ø12- 15 CM
Ø12-100 CM 607.57
499.29
Ø12
Nama Gambar :