NO. PAKET/KONTRAK : - KONSULTAN PERENCANA : PT. GENTA PRIMA PERTIWI JUDUL GAMBAR :
No. Lembar 01 /32
DIREKTORAT JENDERAL BINA MARGA Direncanakan Oleh : Diperiksa Oleh : Disetujui Oleh :
BALAI PELAKSANAAN JALAN NASIONAL MERAUKE NO. RUAS :
PERENCANAAN TEKNIS PRESERVASI JALAN DAN PENANGANAN
PETA SITUASI Skala 1:100
SATUAN KERJA PERENCANAAN DAN PENGAWASAN LONGSORAN DI BPJN XXII MERAUKE
NAMA RUAS : WAROPKO - MINDIPTANAH
JALAN NASIONAL PROVINSI PAPUA (MERAUKE) POTONGAN MEMANJANG
EMI L SIRAIT, ST Ir. FARDI KHALID M. IRWANTO P, ST Tahun
ALAMAT: JL. RE MARTADINATA, KABUPATEN MERAUKE, PROVINSI PAPUA,
E-mail:p2jnmerauke@gmail.com PROVINSI/ KABUPATEN : BOVEN DIGOEL 457
X=4
Drafter CAD Higway Engginer Team Leader
POTONGAN MELINTANG 2020
50
Y=9
355
250
X=4
457
50
Y=9
355
200
TA X=4
457 458
X=4
NA
50 00
Y=9
Y=9
H
355
355
ME
30
150
RA 0+
0
H 17
0.0 X=4
809+
458
00
Y=9
16 63.00
0
63.00
64.00
0+040
35
62
0+060
.0
64.0
525
0
0
0+14 0+080 0+02
0
0
0+120 0+100 0
458
X=4
0+00
0
61.9 62 bh 62.8sl
00
sl
Y=9
42 .817
3 90
64.0
552
63 0
.00
00
MIN
61.0
DIP
63
.00 62
X=4 .0 X=4
0
0
TAN
64.1
458 585 4
.11
BM
BM-0
11
00
Y=9
0
Y=9
1
A
62.0
65.00
63.
66.00
62
00
355
3
6
0
64
60 1.00 61
551
.0
.00
.0
0
.0
66.00
0
60
59
300
0
.00
50
.0
0
65.00
GARIS
63
64.00 59.00 LONG
.0
X=4
SORA
0
63.00 585 4 58.00
57.00 N
Y=9
0
56.00
62.00 55.00
55.00 GARIS
355
56.00 DINDIN
G TURA
P
502
X=4
458
50
Y=9
PETA SITUASI LONGSORAN KM 467+800
355
TITIK BM 01
X=445817.84 0 Kali/Mata
200
Skala 1 : 100 Y=9355204.0 Air
S=5°44'16.88" "
E=140°45'47.42
X=4
Pohon
459
00
Y=9
355
Sagu
300
X=4
459
00
Y=9
355
250
Dinding Turap Baja (Sheet Pile) Type IV
60
64.61
64.39
64.46
64.42
64.03
63.54
62.79
61.90
61.03
60.62
POTONGAN MEMANJANG KM 467+800
0+000 0+040 0+080 0+120 0+160
Skala 1 : 100
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT PEKERJAAN NO. PAKET/KONTRAK : - KONSULTAN PERENCANA : PT. GENTA PRIMA PERTIWI JUDUL GAMBAR :
No. Lembar 02 /32
DIREKTORAT JENDERAL BINA MARGA Direncanakan Oleh : Diperiksa Oleh : Disetujui Oleh :
BALAI PELAKSANAAN JALAN NASIONAL MERAUKE NO. RUAS :
PERENCANAAN TEKNIS PRESERVASI JALAN DAN PENANGANAN
PETA SITUASI Skala 1:100
SATUAN KERJA PERENCANAAN DAN PENGAWASAN LONGSORAN DI BPJN XXII MERAUKE
NAMA RUAS : WAROPKO - MINDIPTANAH
JALAN NASIONAL PROVINSI PAPUA (MERAUKE) POTONGAN MEMANJANG
EMI L SIRAIT, ST Ir. FARDI KHALID M. IRWANTO P, ST Tahun
ALAMAT: JL. RE MARTADINATA, KABUPATEN MERAUKE, PROVINSI PAPUA,
E-mail:p2jnmerauke@gmail.com PROVINSI/ KABUPATEN : BOVEN DIGOEL Drafter CAD Higway Engginer Team Leader
POTONGAN MELINTANG 2020
Patok Pengarah
Pile Cap Beton fc 20 MPa
Turap Baja (Sheet Pile) type NS-SP-IV Cor Bahu Beton fc 15 MPa
Garis Bidang Longsoran DETAIL SHEET PILE
0+050
66 Digunakan Sheet Pile Type IV
64
62
60
58
56
64.486
64.49
54
-20 -10 0 10
POTONGAN STA 0+050
Skala 1 : 25
Patok Pengarah
Pile Cap Beton fc 20 MPa
Turap Baja (Sheet Pile) type NS-SP-IV Cor Bahu Beton fc 15 MPa Tul Pokok 6 Ø D16 mm
62 62 45
60 60
29
64.418
64.42
58 58
Beton fc 20 MPa
56 56
-40 -30 -20 -10 0 10 Tul Pokok 6 Ø D16 mm
POTONGAN STA 0+060 Tul Geser Ø 10 mm - 13 cm 45
Skala 1 : 25 5
30
Turap Baja (Sheet Pile) type NS-SP-IV 5
5 5
62
60
58
64.398
64.40
56
54
-20 -10 0 10
POTONGAN STA 0+030
Skala 1 : 25
62 29
60
Beton fc 20 MPa
58 Tul Pokok 6 Ø D16 mm
Tul Geser Ø 10 mm - 13 cm 45
64.457
64.46 56 5
54 30
TA
ALAMAT: JL. RE MARTADINATA, KABUPATEN MERAUKE, PROVINSI PAPUA,
: BOVEN DIGOEL
POTONGAN MELINTANG
E-mail:p2jnmerauke@gmail.com PROVINSI/ KABUPATEN Drafter CAD Higway Engginer Team Leader
NA
HM
ER
AH
0+0
00
Y=9350500 Y=9350500 Y=9350500 Y=9350500
X=456150
X=456200
X=456250
X=456300
0+0
5
57 6.000
63.00
20
.0
62
00
58 .00 0
GARIS DINDING TURAP
.0
.0
0
00
59 0.00
61.0
00
6
59.00
0
00
58.00
GARIS LONGSORAN
61
60
0
.0
62 .000 0
.00
.0
0
0
.00
0
00
63 0000
0
0+
57
0
6465.
04
. 0
66
0
58.0
0
.0
.00
0 0 00
00
62
59. .0 0
63 .00
0+ 000
69
64
06 60.0 GALIAN SALURAN
.0
00
68.0
00
TITIK BM 01
68.0 00
X=456184.05 0 61.0
62.0 00
69
00
00
63. 00
.0
Y=9350449.00 0+080 0+157.188
70 000
S=5°44'16.89"
.0
00 64.000
65.000 0+100 0+120 0+140
67.0
E=140°45'47.51" 00
Y=9350450 Y=9350450 Y=9350450 Y=9350450
MINDIPTANA
X=456150
X=456200
X=456250
X=456300
66.000
67.000
68
67.71
67.01
66.42
66.14
65.96
65.89
66.28
66.28
0+000 0+040 0+080 0+120
66 66
64 64
62 62
60 60
58 58
67.009
67.01
56 56
54 54
-50 -40 -30 -20 -10 0 10 20
Pile Cap Beton fc 20 MPa Turap Baja (Sheet Pile) type NS-SP-IV
68 68
29
66 66
64 64 Beton fc 20 MPa
Tul Pokok 6 Ø D16 mm
62 62 45
Tul Geser Ø 10 mm - 13 cm
5
60 60
30
58 66.270 58
Turap Baja (Sheet Pile) type NS-SP-IV 5
66.27
5 5
56 56
54 54
-50 -40 -30 -20 -10 0 10 DETAIL PILE CAP TURAP
Skala 1 : 20
66 66
64 64
62 62
65.845
60 60
65.84
58 58
64 64
Beton fc 20 MPa
65.834
58 58
65.83 Turap Baja (Sheet Pile) type NS-SP-IV 5
5
56 56 5
Skala 1 : 25
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT PEKERJAAN NO. PAKET/KONTRAK : - KONSULTAN PERENCANA : PT. GENTA PRIMA PERTIWI JUDUL GAMBAR :
No. Lembar 07 /32
DIREKTORAT JENDERAL BINA MARGA Direncanakan Oleh : Diperiksa Oleh : Disetujui Oleh :
BALAI PELAKSANAAN JALAN NASIONAL MERAUKE NO. RUAS :
PERENCANAAN TEKNIS PRESERVASI JALAN DAN PENANGANAN
PETA SITUASI Skala 1:100
SATUAN KERJA PERENCANAAN DAN PENGAWASAN LONGSORAN DI BPJN XXII MERAUKE
NAMA RUAS : WAROPKO - MINDIPTANAH
JALAN NASIONAL PROVINSI PAPUA (MERAUKE) POTONGAN MEMANJANG
EMI L SIRAIT, ST Ir. FARDI KHALID M. IRWANTO P, ST Tahun
ALAMAT: JL. RE MARTADINATA, KABUPATEN MERAUKE, PROVINSI PAPUA,
E-mail:p2jnmerauke@gmail.com PROVINSI/ KABUPATEN : BOVEN DIGOEL Drafter CAD Higway Engginer Team Leader
POTONGAN MELINTANG 2020
Y=9363850
Y=9363900
Y=9363950
Y=9364000
Y=9364050
MI
ND
IP
TA
NA 0+
H
94.0
000
95.0 00
00
96
.00
8823.0.000 0
84 .0000
856.0 00
0
.0 00
97 8 .0
8
8 4.0
00
878.0000
0
.00 00
8 9.0 00
865.0
0+
98
8 .0 00
98.00
99092
.0
0 000
93
96.000
97.0
.
95.000
00
94.000
87.0
1.0.0
02
0 00
.0
0
88.0
00
00
89.0 00
00
0
0 90 00
91 .000
92.0.000
00
93.0 94.000
0+
04
00
0
X=471050 X=471050 X=471050 X=471050 X=471050
95.000
96.000
97.000
98.000
Y=9363850
Y=9363900
Y=9363950
Y=9364000
Y=9364050
99.000
100.0
0+
00
98
.0 06
98
00
0 101.0
102.0
.00 00
0
0+
00
08
0
98. 0+1
99.0000
00 00 0+120 0+140 0+160 0+178.28
7
PETA SITUASI LONGSORAN KM 512+975
WAROPKO
Skala 1 : 100 GARIS LONGSORAN
Y=9363900
Y=9363950
Y=9364000
Y=9364050
X=471194.05
Y=9363972.00
S=5°44'16.91" GALIAN SALURAN
E=140°45'47.59"
GARIS DINDING TURAP
104
100
100.53
102.39
103.31
103.63
99.61
98.99
98.36
98.42
98.91
99.69
96 96
94 94
92 92
90 90
88 88
86 86
84 84
98.914
98.91
82 82
80 80
-50 -40 -30 -20 -10 0 10
POTONGAN STA 0+080
Skala 1 : 25
Pile Cap Beton fc 20 MPa Patok Pengarah
Timbunan Pilihan Tul Pokok 6 Ø D16 mm
Turap Baja (Sheet Pile) type NS-SP-IV Cor Bahu Beton fc 15 MPa Tul Geser Ø 10 mm - 13 cm
Garis Bidang Longsoran 0+090 Galian Saluran Turap Baja (Sheet Pile) type NS-SP-IV
14 13 13 14 40
102 102
100 100
45
98 98
96 96 29
94 94
Beton fc 20 MPa
88 88 30
Turap Baja (Sheet Pile) type NS-SP-IV 5
86 86 5
99.131 5
99.13
84 84
DETAIL PILE CAP TURAP
82 82 Skala 1 : 20
-50 -40 -30 -20 -10 0 10
POTONGAN STA 0+090
Skala 1 : 25
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT PEKERJAAN NO. PAKET/KONTRAK : - KONSULTAN PERENCANA : PT. GENTA PRIMA PERTIWI JUDUL GAMBAR :
No. Lembar 09 /32
DIREKTORAT JENDERAL BINA MARGA Direncanakan Oleh : Diperiksa Oleh : Disetujui Oleh :
BALAI PELAKSANAAN JALAN NASIONAL MERAUKE NO. RUAS :
PERENCANAAN TEKNIS PRESERVASI JALAN DAN PENANGANAN
PETA SITUASI Skala 1:100
SATUAN KERJA PERENCANAAN DAN PENGAWASAN LONGSORAN DI BPJN XXII MERAUKE
NAMA RUAS : WAROPKO - MINDIPTANAH
JALAN NASIONAL PROVINSI PAPUA (MERAUKE) POTONGAN MEMANJANG
EMI L SIRAIT, ST Ir. FARDI KHALID M. IRWANTO P, ST Tahun
ALAMAT: JL. RE MARTADINATA, KABUPATEN MERAUKE, PROVINSI PAPUA,
E-mail:p2jnmerauke@gmail.com PROVINSI/ KABUPATEN : BOVEN DIGOEL Drafter CAD Higway Engginer Team Leader
POTONGAN MELINTANG 2020
100 100
98 98
96 96
94 94
92 92
90 90
88 88
100.440
86 86
100.44
84 84
82 82
-50 -40 -30 -20 -10 0 10
14 13 13 14 40
29
Beton fc 20 MPa
Tul Pokok 6 Ø D16 mm
Tul Geser Ø 10 mm - 13 cm 45
5
30
Turap Baja (Sheet Pile) type NS-SP-IV 5
5 5
Y= Y=
93
X=
93
X=
TITIK 6 57 65
X=473 BM 01
47
0 0 75
47
0
Y=936 487.00
35
36
5
S=5°4 664.00
00
00
E=1404'16.91"
°45'47
.67"
8 KO
7 .66 R OP
19 WA
Y=
93 Y= 0+
X=
Y=
0+000 93
X=
65 9
X=
65 65 36
0
47
0 7 57
47
00
0+020 18
95.00
47
50
34
0
MINDIP 95.0
35
0+
36
0+040
50
TANAH
50
50
0+060
60
0+080 0+1
0+100 0
94 Y= 0+120 0+14 Y=
95.0
93
X=
.0 93
X=
95 6
96.0
0 56 6
.0 57
47
5
0
0
47
96 0 00
35
.0
36
0
00
00
92. 00
91.00
90.00
89.00
88.00
91.
87.00
00
90.
86.00
96.0 0
Y=
00
0 Y=
95.0 .00
93 85.0
89.0
X=
93 Y=
X=
0
65 93
94 .00
X=
60 95.00 65 65
47
84.00 6
0
0
93
47
50 70
47
0
34
92.0
91.0 0
35
83.00
36
90.0
50
50
0
0
50
89.0 0
94.00 .00
88.0.00 0
82
0
87 6.0 00
P
8 5.
RA
8
0
81.0
G TU
DIN
DIN
0
80.0
RIS
Y= Y= GA
93
X=
93
X=
656 65
4
00 6
47
50
73
0
.0
36
50
79
00
0
78
.5
kli 03 N
O RA
PETA SITUASI LONGSORAN KM 516+350 LI N GS
KA LO
IR/ IS
Skala 1 : 100 T AA G AR
MA
Y=
9
X=
36
56
47
00
35
50
96
92
95.86
95.39
94.73
93.42
93.02
92.45
92.41
92.20
92.97
93.39
94.02
POTONGAN MEMANJANG KM 516+350
Skala 1 : 100 0+000 0+040 0+080 0+120 0+160
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT PEKERJAAN NO. PAKET/KONTRAK : - KONSULTAN PERENCANA : PT. GENTA PRIMA PERTIWI JUDUL GAMBAR :
No. Lembar 11 /32
DIREKTORAT JENDERAL BINA MARGA Direncanakan Oleh : Diperiksa Oleh : Disetujui Oleh :
BALAI PELAKSANAAN JALAN NASIONAL MERAUKE NO. RUAS :
PERENCANAAN TEKNIS PRESERVASI JALAN DAN PENANGANAN
PETA SITUASI Skala 1:100
SATUAN KERJA PERENCANAAN DAN PENGAWASAN LONGSORAN DI BPJN XXII MERAUKE
NAMA RUAS : WAROPKO - MINDIPTANAH
JALAN NASIONAL PROVINSI PAPUA (MERAUKE) POTONGAN MEMANJANG
EMI L SIRAIT, ST Ir. FARDI KHALID M. IRWANTO P, ST Tahun
ALAMAT: JL. RE MARTADINATA, KABUPATEN MERAUKE, PROVINSI PAPUA,
E-mail:p2jnmerauke@gmail.com PROVINSI/ KABUPATEN : BOVEN DIGOEL Drafter CAD Higway Engginer Team Leader
POTONGAN MELINTANG 2020
94 94
92 92
90 90
88 88
86 86
84 84
93.020
93.02
82 82
80 80
-10 0 10 20 30 40 50
94 94
45
92 92
90 90 29
88 88
Beton fc 20 MPa
86 86 Tul Pokok 6 Ø D16 mm
Tul Geser Ø 10 mm - 13 cm 45
84 84
5
92.508
92.51
82 82 30
Turap Baja (Sheet Pile) type NS-SP-IV 5
80 80 5 5
-10 0 10 20 30 40 50
90 90
88 88
86 86
84 84
82 82
92.453
92.45
80 80
78 78
-10 0 10 20 30 40 50
POTONGAN STA 0+100
Skala 1 : 25 Tul Pokok 6 Ø D16 mm
Tul Geser Ø 10 mm - 13 cm
Patok Pengarah Turap Baja (Sheet Pile) type NS-SP-IV
Pile Cap Beton fc 20 MPa
14 13 13 14 40
Turap Baja (Sheet Pile) type NS-SP-IV
Garis Bidang Longsoran
0+120 45
94 94
29
92 92
90 90 Beton fc 20 MPa
Tul Geser Ø 10 mm - 13 cm
92.41
86 86 5
30
84 84
Turap Baja (Sheet Pile) type NS-SP-IV 5
5 5
-20 -10 0 10 20 30
POTONGAN STA 0+120
Skala 1 : 25 DETAIL PILE CAP TURAP
Skala 1 : 20
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT PEKERJAAN NO. PAKET/KONTRAK : - KONSULTAN PERENCANA : PT. GENTA PRIMA PERTIWI JUDUL GAMBAR :
No. Lembar 13 /32
DIREKTORAT JENDERAL BINA MARGA Direncanakan Oleh : Diperiksa Oleh : Disetujui Oleh :
BALAI PELAKSANAAN JALAN NASIONAL MERAUKE NO. RUAS :
PERENCANAAN TEKNIS PRESERVASI JALAN DAN PENANGANAN
PETA SITUASI Skala 1:100
SATUAN KERJA PERENCANAAN DAN PENGAWASAN LONGSORAN DI BPJN XXII MERAUKE
NAMA RUAS : WAROPKO - MINDIPTANAH
JALAN NASIONAL PROVINSI PAPUA (MERAUKE) POTONGAN MEMANJANG
EMI L SIRAIT, ST Ir. FARDI KHALID M. IRWANTO P, ST Tahun
ALAMAT: JL. RE MARTADINATA, KABUPATEN MERAUKE, PROVINSI PAPUA,
E-mail:p2jnmerauke@gmail.com PROVINSI/ KABUPATEN : BOVEN DIGOEL Drafter CAD Higway Engginer Team Leader
POTONGAN MELINTANG 2020
KA
L I
X=
Y=
47 X=
41
93
Y=
00 47 X=
66
41
93
Y=
47
95
50
67
42
93
0
00
0
67
0
05
0
61
.00
62
0
63
.00
.00
64
68.0
0
69.0 00
.00
0
65
7 00
71.0 0.000
66
.00
00 61
67
72
.00
.0
73.0 .000
0
00
6
0
0
8
00
74 00
6
.00
75 .000
70 .000
9
62
.00
0
76 .000 .
.
63 000
0
71 00
00
77 .000
71 00
.00
7
78.0 .000
1
.0
0
71 00
.0
X= 79.0
75 0
00
.
64
71 00
0
0
.0
00
71 00
Y=
47
.0
.0
X=
71
00
.0
0
71
41
93
.0
65
Y=
78.000 47 X=
.00
00
.0
66
77.000 41
93
Y=
00
47
0
66 X=
76.000
90
50
80
66
.0 4
93
67 00
Y=
20 47
.0
9
.0
67
00
68 00
42
50
93
0+198.985
0
.
00
69. 000
5
67
75.000 0
0+180
0
000
05
0+000
O
WAROPK
74.000
0+160
0
0+020 73.000
0+040 0+140
0+060 0+120
72.000 0+080 0+100
MINDIPTANAH
72.000
73.000
74.0
75. 00
0
76.000
1
72.000
BM 0
X= 00
73.000
TITIK4245.82 1
Y=
4 X=
74
74
93
Y=
.00
X=47367006.1
15 47 X=
66
PETA SITUASI LONGSORAN KM 518+700
42
93
0
0
Y=
47
Y=9 4'16.93" 6"
90
00
66
P 42
ING TURA
93
0
GARIS DIND 4 7
95
S=5° 0°45'47.
5
67
0
00
Skala 1 : 100 E=14
0
N
SORA
GALIAN SALURAN LONG
GARIS
76
72
71.42
71.51
71.74
72.12
71.41
71.43
71.74
72.98
74.40
75.29
75.20
POTONGAN MEMANJANG KM 518+700
Skala 1 : 100
0+000 0+040 0+080 0+120 0+160
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT PEKERJAAN NO. PAKET/KONTRAK : - KONSULTAN PERENCANA : PT. GENTA PRIMA PERTIWI JUDUL GAMBAR :
No. Lembar 14 /32
DIREKTORAT JENDERAL BINA MARGA Direncanakan Oleh : Diperiksa Oleh : Disetujui Oleh :
BALAI PELAKSANAAN JALAN NASIONAL MERAUKE NO. RUAS :
PERENCANAAN TEKNIS PRESERVASI JALAN DAN PENANGANAN
PETA SITUASI Skala 1:100
SATUAN KERJA PERENCANAAN DAN PENGAWASAN LONGSORAN DI BPJN XXII MERAUKE
NAMA RUAS : WAROPKO - MINDIPTANAH
JALAN NASIONAL PROVINSI PAPUA (MERAUKE) POTONGAN MEMANJANG
EMI L SIRAIT, ST Ir. FARDI KHALID M. IRWANTO P, ST Tahun
ALAMAT: JL. RE MARTADINATA, KABUPATEN MERAUKE, PROVINSI PAPUA,
E-mail:p2jnmerauke@gmail.com PROVINSI/ KABUPATEN : BOVEN DIGOEL Drafter CAD Higway Engginer Team Leader
POTONGAN MELINTANG 2020
72 72
70 70
68 68
66 66
64 64
71.407
71.41
62 62
60 60
-40 -30 -20 -10 0 10 20
72 72
29
70 70
68 68 Beton fc 20 MPa
Tul Pokok 6 Ø D16 mm
66 66
Tul Geser Ø 10 mm - 13 cm 45
64 64 5
30
62 62
71.430 Turap Baja (Sheet Pile) type NS-SP-IV 5
5
71.43
5
60 60
58 58
-50 -40 -30 -20 -10 0 10 DETAIL PILE CAP TURAP
Skala 1 : 20
70 70
68 68
66 66
64 64
62 62
60 60
71.451
71.45
58 58
-50 -40 -30 -20 -10 0 10
14 13 13 14 40
72 72
70 70 45
68 68
29
66 66
64 64 Beton fc 20 MPa
Tul Pokok 6 Ø D16 mm
62 62 Tul Geser Ø 10 mm - 13 cm 45
5
60 60
30
71.745
71.74
56 56
-50 -40 -30 -20 -10 0 10
DETAIL PILE CAP TURAP
POTONGAN STA 0+120 Skala 1 : 20
Skala 1 : 25
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT PEKERJAAN NO. PAKET/KONTRAK : - KONSULTAN PERENCANA : PT. GENTA PRIMA PERTIWI JUDUL GAMBAR :
No. Lembar 16 /32
DIREKTORAT JENDERAL BINA MARGA Direncanakan Oleh : Diperiksa Oleh : Disetujui Oleh :
BALAI PELAKSANAAN JALAN NASIONAL MERAUKE NO. RUAS :
PERENCANAAN TEKNIS PRESERVASI JALAN DAN PENANGANAN
PETA SITUASI Skala 1:100
SATUAN KERJA PERENCANAAN DAN PENGAWASAN LONGSORAN DI BPJN XXII MERAUKE
NAMA RUAS : WAROPKO - MINDIPTANAH
JALAN NASIONAL PROVINSI PAPUA (MERAUKE) POTONGAN MEMANJANG
EMI L SIRAIT, ST Ir. FARDI KHALID M. IRWANTO P, ST Tahun
ALAMAT: JL. RE MARTADINATA, KABUPATEN MERAUKE, PROVINSI PAPUA,
E-mail:p2jnmerauke@gmail.com PROVINSI/ KABUPATEN : BOVEN DIGOEL Drafter CAD Higway Engginer Team Leader
POTONGAN MELINTANG 2020
Y=
X=
93
47
67
85
50
ATA AIR HUTAN SAGU
KALI KECIL/M 0
0 5
Y=
X= 70.000
93
47 71.000
67
64.0
65.000
66.000
80
67.000
5
68.000
69.000
00
0
72.000
00
73.000
0
74.000
75.000
Y= 000
64. 000
X=
9 36 .
47
77 65 .000
66 .000
49
50 PO 67 000
50
HO 68. 000
76
N 69. 000
77.
.00
SA 70. 000 Y=
X
000
0
GU 71. 000 93
= 47
67
72. 000 85
51
73. 000 0
00
74. 000
7 75. 000Y=
79 8.00
X
76. 000 93
= 47
8 .0 0 77. 000 678
81 0.00 00
50
78. 000 00
0+0 82 .0 0
50
0 .0 00 79.
MIND 0 00 000
83 4.00
Y=
IPTAN 80.
X=
.00 0
93 0
8
AH 0+02 .00
4
67
85.0
0
81
75
0 75
2
57.08
00
0 0
0+140 0+1
00
0+040 .00
0
82
Y=
0+100 0+120
X=
00
93
85.000 0+060 0+080 83.0
4
67
WAROPKO
74
70
95 0
0
Y=
X=
9 36
4
86.00 78
75
0 85.00 00
10
0
84.000
0
86.000
87.000 Y85.000
=9
X=
3 NGSORAN
GARIS LO
4
67
75
75
05
0
P
ING TURA
0
TITIK BM 01
Y= GALIAN SALURAN X=475090.00 GARIS DIND
X=
93
Y=9367735.77
4
67
75
70 S=5°44'16.94"
00
0 E=140°45'47.86"
84
85.65
85.37
85.05
84.46
83.64
83.37
83.23
83.54
83.76
POTONGAN MEMANJANG KM 519+850
Skala 1 : 100
86 86
84 84
82 82
80 80
78 78
76 76
84.458
84.46
74 74
72 72
Timbunan Pilihan
Pile Cap Beton fc 20 MPa Galian Saluran
Turap Baja (Sheet Pile) type NS-SP-IV 0+080
88 Garis Bidang Longsoran 88
82 82
80 80
78 78
76 76
74 74
72 72
83.641
70 83.64 70
68 68
80 Galian Saluran 80
78 78
Patok Pengarah
76 76
74 74
72 72
70 70
68 68
83.333
83.33
66 66
64 64
-50 -40 -30 -20 -10 0 10
POTONGAN STA 0+090 Patok Pengarah
Cor Pile Cap eton fc 20 MPa Cor Bahu Beton fc 15 MPa
Skala 1 : 25 Timbunan Pilihan Galian Saluran
Turap Baja (Sheet Pile) type NS-SP-IV
Garis Bidang Longsoran
0+100
86 86 Tul Pokok 6 Ø D16 mm
Tul Geser Ø 10 mm - 13 cm
84 84
Turap Baja (Sheet Pile) type NS-SP-IV
82 82 14 13 13 14 40
80 80
45
78 78
76 76 29
74 74
Beton fc 20 MPa
72 72
Tul Pokok 6 Ø D16 mm
Tul Geser Ø 10 mm - 13 cm 45
70 70
5
68 68 30
64 64
X=475550
X=475600
X=475650
X=475700
TITIK BM 01
X=475578.93
Y=9368039.03
S=5°44'16.97"
E=140°45'47.95"
X=475550
X=475600
X=475650
X=475700
7
+ 1603.73
0 WAROPKO
0+020 0+0
00 40 40
0+0 0+1
0+0 0
60 0+12
0+080 0
0+10
MINDIPTANAH
GARIS DINDING TURAP
X=475600
X=475650
X=475700
GARIS LONGSORAN
128
130.74
130.50
130.24
130.24
130.19
130.25
130.29
130.34
130.38
130.39
POTONGAN MEMANJANG KM 520+500 0+000 0+040 0+080 0+120 0+160
Skala 1 : 100
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT PEKERJAAN NO. PAKET/KONTRAK : - KONSULTAN PERENCANA : PT. GENTA PRIMA PERTIWI JUDUL GAMBAR :
No. Lembar 20 /32
DIREKTORAT JENDERAL BINA MARGA Direncanakan Oleh : Diperiksa Oleh : Disetujui Oleh :
BALAI PELAKSANAAN JALAN NASIONAL MERAUKE NO. RUAS :
PERENCANAAN TEKNIS PRESERVASI JALAN DAN PENANGANAN
PETA SITUASI Skala 1:100
SATUAN KERJA PERENCANAAN DAN PENGAWASAN LONGSORAN DI BPJN XXII MERAUKE
NAMA RUAS : WAROPKO - MINDIPTANAH
JALAN NASIONAL PROVINSI PAPUA (MERAUKE) POTONGAN MEMANJANG
EMI L SIRAIT, ST Ir. FARDI KHALID M. IRWANTO P, ST Tahun
ALAMAT: JL. RE MARTADINATA, KABUPATEN MERAUKE, PROVINSI PAPUA,
E-mail:p2jnmerauke@gmail.com PROVINSI/ KABUPATEN : BOVEN DIGOEL Drafter CAD Higway Engginer Team Leader
POTONGAN MELINTANG 2020
132 132
Digunakan Sheet Pile Type IV
130 130
128 128
126 126
124 124
122 122
120 120
118 118
130.193
116 116
130.19
114 114
112 112
-50 -40 -30 -20 -10 0 10
POTONGAN STA 0+080
Skala 1 : 25
Pile Cap Beton fc 20 MPa Patok Pengarah
Turap Baja (Sheet Pile) type NS-SP-IV Timbunan Pilihan
Cor Bahu Beton fc 15 MPa Tul Pokok 6 Ø D16 mm
Garis Bidang Longsoran Tul Geser Ø 10 mm - 13 cm
0+090 Turap Baja (Sheet Pile) type NS-SP-IV
132 132 14 13 13 14 40
130 130
45
128 128
126 126 29
124 124
Beton fc 20 MPa
122 122 Tul Pokok 6 Ø D16 mm
Tul Geser Ø 10 mm - 13 cm 45
120 120
5
118 118 30
130.028
Turap Baja (Sheet Pile) type NS-SP-IV 5
116 130.03 116 5 5
114 114
128 128
126 126
124 124
122 122
120 120
118 118
130.246
130.25
116 116
114 114
130 130 45
128 128
29
126 126
30
118 118
Turap Baja (Sheet Pile) type NS-SP-IV 5
5 5
116 116
Skala 1 : 25
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT PEKERJAAN NO. PAKET/KONTRAK : - KONSULTAN PERENCANA : PT. GENTA PRIMA PERTIWI JUDUL GAMBAR :
No. Lembar 22 /32
DIREKTORAT JENDERAL BINA MARGA Direncanakan Oleh : Diperiksa Oleh : Disetujui Oleh :
BALAI PELAKSANAAN JALAN NASIONAL MERAUKE NO. RUAS :
PERENCANAAN TEKNIS PRESERVASI JALAN DAN PENANGANAN
PETA SITUASI Skala 1:100
SATUAN KERJA PERENCANAAN DAN PENGAWASAN LONGSORAN DI BPJN XXII MERAUKE
NAMA RUAS : WAROPKO - MINDIPTANAH
JALAN NASIONAL PROVINSI PAPUA (MERAUKE) POTONGAN MEMANJANG
EMI L SIRAIT, ST Ir. FARDI KHALID M. IRWANTO P, ST Tahun
ALAMAT: JL. RE MARTADINATA, KABUPATEN MERAUKE, PROVINSI PAPUA,
E-mail:p2jnmerauke@gmail.com PROVINSI/ KABUPATEN : BOVEN DIGOEL Drafter CAD Higway Engginer Team Leader
POTONGAN MELINTANG 2020
0
N
960
RA
GARIS LONGSO
36
Y=9
W
GARIS DINDING TURAP
AR
X=4 TITIK BM 01
775
O
50 X=477550.00
PK
Y=9369556.00
S=5°44'16.99"
550
O
E=140°45'48.05"
369
Y=9
0
965
0+080 0+060 0+040
X=4 0+020 0+000
36
90 775
Y=9
50
0.1
X=4 0 +11 MINDIPTANAH
0
0
950
7 750 10
0 0+
36
126.00
Y=9
00
0
7.
960
0
00 12 4.0
8. 123 12
12 122 .00 X=4
36
.0 124.00
121.0 0 775
0
123.0
Y=9
50
5.0
120.000 122.0
0
12
119.0 0
118.0 0 121.0
0
X=4 11
0 120.0
775 1167..000 119.0
0
00 115 0 0
.00 118.0
114 0
.0
113 0
.00
117
550
.00
.00
112 0
111 116
.00 .00
369
.0
110 .00 115
9 .00
0
0
Y=9
0
126.0
1 114
0
125.0
00
0
124.0
0
8. .00
123.0
0
0
120.0
0
122.0
0
0
1 7.00
121.0
.00
0
127.0
128.0
.00
129.0
130.0
.00
.00
113
.00
10 00
119
X=4
.00
.00
118
115
6. 0
.00
.00
775
117
11 11. .00
.00
10 5.0 0
114
116
00
113
111
1 12
.00
10 4.0
1 12
00
.00
1
.00
10
1 10
.00
.00
9. .00
109
.00
108
00
0
106
10 7
00
105
695
10
00
8.
10
00
3
Y=9
7.
10
X=4
775
00
AIR
TA
MA
PETA TOPOGRAFI LONGSORAN KM 522+900
Skala 1 : 100
124
123.69
123.73
124.03
124.31
124.55
124.67
125.10
0+040 0+080
Timbunan Pilihan
Pile Cap Beton fc 20 MPa
Turap Baja (Sheet Pile) type NS-SP-IV
Garis Bidang Longsoran 0+060
DETAIL SHEET PILE
126 126
Digunakan Sheet Pile Type IV
124 124
122 122
120 120
118 118
116 116
114 114
124.312
124.31
112 112
110 110
14 13 13 14 40
Timbunan Pilihan
45
Pile Cap Beton fc 20 MPa
Turap Baja (Sheet Pile) type NS-SP-IV
29
Garis Bidang Longsoran
0+070
Beton fc 20 MPa
126 126 Tul Pokok 6 Ø D16 mm
Tul Geser Ø 10 mm - 13 cm 45
124 124
5
122 122 30
114 114
0.00
0
X=47815 1.00
2.00
Y=93713
0
X=47815
Y=93714
3.00
0
50
X=47815
Y=93714
4.00 19.00
18.00
00
4.00 17.00
16.00
15.00
5.00 14.00
7 6.0 5.00
50
13.00
8. .00 0
0
12.00 109.0 0 12.00
.0 0
11.00 0 6.00 11.00
0+020
7.00
8.00
MINDIPTAN
9.00
WAROPKO
AH
10 0+100 0+12
0+12
1.5208
9.00 .00
0+0000 0+080
X=47820
8.
00
11
7.0
0+040 0+060 9.0
0 12.0.00
0
0
Y=93713
0
X=47820 TITIK BM 01
X=478188.00
GARIS LONGSORAN Y=9371443.90
8.00
Y=93714
0 S=5°44'17.02"
50
X=47820
PETA SITUASI LONGSORAN KM 525+300 GARIS DINDING TUR
AP E=140°45'48.15"
Y=93714
00
Skala 1 : 100
50
Dinding Turap Baja (Sheet Pile) Type IV
124
120
123.37
122.69
122.49
122.37
122.17
122.80
124.03
124.68
0+040 0+080 0+120
122 122
120 120
118 118
116 116
122.441
122.44
114 114
112 112
-50 -40 -30 -20 -10 0 10 20
Timbunan Pilihan
Pile Cap Beton fc 20 MPa Patok Pengarah
Turap Baja (Sheet Pile) type NS-SP-IV
Cor Bahu Beton fc 15 MPa
Garis Bidang Longsoran
0+040
Tul Pokok 6 Ø D16 mm
40
122 122 14 13 13 14
120 120 45
118 118
29
116 116
122.490
Beton fc 20 MPa
114 122.49 114 Tul Pokok 6 Ø D16 mm
Tul Geser Ø 10 mm - 13 cm 45
112 112 5
30
110 110 Turap Baja (Sheet Pile) type NS-SP-IV 5
5
-50 -40 -30 -20 -10 0 10 20 5
122 122
120 120
118 118
116 116
122.373
122.37
114 114
112 112
Turap Baja (Sheet Pile) type NS-SP-IV Patok Pengarah Turap Baja (Sheet Pile) type NS-SP-IV
14 13 13 14 40
Garis Bidang Longsoran 0+080
124 124 45
122 122
29
120 120
122.171
Tul Pokok 6 Ø D16 mm
116 116
122.17
Tul Geser Ø 10 mm - 13 cm 45
5
114 114
30
112 112Turap Baja (Sheet Pile) type NS-SP-IV 5
-50 -40 -30 -20 -10 0 10 5 5
X=
4
Y=
78
93
60
0
7
X=
28
47
Y=
00
86
0
93
169.0 50
72
85
.0 0
168
0
TITIK BM 01
X=478653.00 .00
Y=9372821.00 167 GARIS
LONGS
S=5°44'17.04"
.00
ORAN
E=140°45'48.23" 166
.00
165 0+080
0 0+1 GALIAN
0+06
X=
4 00 SALUR
Y=
78 GARIS DINDING TURAP AN
93
60
0
7
X= 0+1
27
47 20
Y=
50
86
93
0
04
50
72
X=
0+ 0+1
8
47
Y=
00
87 40 16
93
16 00 4.
163.00 00
72
162.00
85
1
160.00 0+1
0
0 .00 60
02 159.00
0+ 158.00
157.00
15 00
6.
00 00++1
155..0
1 54 0 18803
153.00 .09
2
0
00
0+ 163
X= 162 .00
4 161 .00
Y=
78
160 .00 WA
93
65
159 .00
0 RO
72
X=
158 .00
15
PKO
75
15 .00
3.
47
Y=
16 .
15 .00
AH 157 00
8
00
15 .00
4.
.00 87
15
5
158.00
93
.
00
156 00
6
AN
16 00
159
7
9.0
72
160
.00 X=
0
161
T 155
8
.00
162
47
Y=
IP .00
00
.00
163
87
.00
164
93
D 15
.00
165.0
4.0 50
IN
.00
166.0
72
0
.00
167.0
1
1553.0
168.0
M
85
2.0 0
0
16
0
17 0
9.0
0
0.0
0
0
0
KALI/MATA AIR
164
167.36
166.61
165.50
164.67
164.12
163.80
162.86
163.31
163.52
163.80
164.14
POTONGAN MEMANJANG KM 527+000
Skala 1 : 100
0+040 0+080 0+120 0+160
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT PEKERJAAN NO. PAKET/KONTRAK : - KONSULTAN PERENCANA : PT. GENTA PRIMA PERTIWI JUDUL GAMBAR :
No. Lembar 28 /32
DIREKTORAT JENDERAL BINA MARGA Direncanakan Oleh : Diperiksa Oleh : Disetujui Oleh :
BALAI PELAKSANAAN JALAN NASIONAL MERAUKE NO. RUAS :
PERENCANAAN TEKNIS PRESERVASI JALAN DAN PENANGANAN
PETA SITUASI Skala 1:100
SATUAN KERJA PERENCANAAN DAN PENGAWASAN LONGSORAN DI BPJN XXII MERAUKE
NAMA RUAS : WAROPKO - MINDIPTANAH
JALAN NASIONAL PROVINSI PAPUA (MERAUKE) POTONGAN MEMANJANG
EMI L SIRAIT, ST Ir. FARDI KHALID M. IRWANTO P, ST Tahun
ALAMAT: JL. RE MARTADINATA, KABUPATEN MERAUKE, PROVINSI PAPUA,
E-mail:p2jnmerauke@gmail.com PROVINSI/ KABUPATEN : BOVEN DIGOEL Drafter CAD Higway Engginer Team Leader
POTONGAN MELINTANG 2020
Timbunan Pilihan
Patok Pengarah
Pile Cap Beton fc 20 MPa
Galian Saluran Cor Bahu Beton fc 15 MPa
Turap Baja (Sheet Pile) type NS-SP-IV
DETAIL SHEET PILE
0+080 Garis Bidang Longsoran
Digunakan Sheet Pile Type IV
170 170
168 168
166 166
164 164
162 162
160 160
164.116
158 158
164.12
156 156
154 154
-30 -20 -10 0 10 20 30 40
Patok Pengarah
Pile Cap Beton fc 20 MPa
Galian Saluran Cor Bahu Beton fc 15 MPa Tul Pokok 6 Ø D16 mm
Turap Baja (Sheet Pile) type NS-SP-IV
0+100 Tul Geser Ø 10 mm - 13 cm
Turap Baja (Sheet Pile) type NS-SP-IV
Garis Bidang Longsoran
14 13 13 14 40
166 166
45
164 164
162 162 29
156 156 30
163.805
163.80
152 152
DETAIL PILE CAP TURAP
Skala 1 : 20
164 164
162 162
160 160
158 158
156 156
162.858
154 154
162.86
152 152
150 150
-20 -10 0 10 20 30 40
Timbunan Pilihan
Patok Pengarah Tul Pokok 6 Ø D16 mm
Pile Cap Beton fc 20 MPa
Tul Geser Ø 10 mm - 13 cm
Cor Bahu Beton fc 15 MPa Turap Baja (Sheet Pile) type NS-SP-IV Turap Baja (Sheet Pile) type NS-SP-IV
Galian Saluran
0+140 Garis Bidang Longsoran 14 13 13 14 40
166 166
164 164 45
162 162
29
160 160
30
163.31
150 150
-10 0 10 20 30 40
DETAIL PILE CAP TURAP
Skala 1 : 20
TIT
X=4 IK BM 0
Y=9380751.1 1
50
GARIS LONGSOR S=5 76723.67
67
AN E=14°04°44'17.08"3
37
5'48.3
9
GALIAN S 5"
Y=
A LURAN
X=
00
GARIS D 48
INDING 07
68
TURAP 50
9 37
Y=
9.00
0+100 0+080 8.00
X= 7.00
48 0+060
07 20
0
00 0+1
0
10.0 0
70
9.0 0+0
76
0
8.0 0 40
0
63
93
7.0 0
6.040
Y=
0+1 6.00
X= 0+
02
0
60 48 0
00
75
0+1 07
5.
50
76
00
93
0+180
4.
5.00
Y=
00
4.00
X= 3.
0
48
0
07
68
00
7
PKO
0 00
0 5.00
93
2.
3.0
3. 0
ARO
0
2.0 0
4.
Y=
0
0
W
1.00
0
00
0.00
1.
-1.00
0
X= 0.0
0+
0 0
-2.0
48 2.0 .00
06 -1 0
0
50
.0
-2 0
70
.0
76
-3 0
TITIK MATA -4
.0
93
AIR/KALI K
MIN
ECIL
Y=
X=
DIP
0
48
PETA SITUASI LONGSORAN KM 531+350
75
07
0
76
0
TA
93
Skala 1 : 100
NA
Y=
X=
H
48
06
50
116
118.72
118.92
119.13
119.47
119.52
119.22
118.75
118.44
118.23
118.23
118.25
POTONGAN MEMANJANG KM 531+350
Skala 1 : 100 0+000 0+040 0+080 0+120 0+160
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT PEKERJAAN NO. PAKET/KONTRAK : - KONSULTAN PERENCANA : PT. GENTA PRIMA PERTIWI JUDUL GAMBAR :
No. Lembar 31 /32
DIREKTORAT JENDERAL BINA MARGA Direncanakan Oleh : Diperiksa Oleh : Disetujui Oleh :
BALAI PELAKSANAAN JALAN NASIONAL MERAUKE NO. RUAS :
PERENCANAAN TEKNIS PRESERVASI JALAN DAN PENANGANAN
PETA SITUASI Skala 1:100
SATUAN KERJA PERENCANAAN DAN PENGAWASAN LONGSORAN DI BPJN XXII MERAUKE
NAMA RUAS : WAROPKO - MINDIPTANAH
JALAN NASIONAL PROVINSI PAPUA (MERAUKE) POTONGAN MEMANJANG
EMI L SIRAIT, ST Ir. FARDI KHALID M. IRWANTO P, ST Tahun
ALAMAT: JL. RE MARTADINATA, KABUPATEN MERAUKE, PROVINSI PAPUA,
E-mail:p2jnmerauke@gmail.com PROVINSI/ KABUPATEN : BOVEN DIGOEL Drafter CAD Higway Engginer Team Leader
POTONGAN MELINTANG 2020
Pile Cap Beton fc 20 MPa Patok Pengarah
Turap Baja (Sheet Pile) type NS-SP-IV Cor Bahu Beton fc 15 MPa Galian Saluran
Garis Bidang Longsoran 0+080
124 124
118 118
116 116
114 114
112 112
119.524
119.52
110 110
108 108
Patok Pengarah
Pile Cap Beton fc 20 MPa
Cor Bahu Beton fc 15 MPa
Turap Baja (Sheet Pile) type NS-SP-IV
Timbunan Pilihan
Garis Bidang Longsoran 0+100 Galian Saluran
Tul Pokok 6 Ø D16 mm
Tul Geser Ø 10 mm - 13 cm
126 126 Turap Baja (Sheet Pile) type NS-SP-IV
14 13 13 14 40
124 124
122 122 45
120 120
29
118 118
108 108
DETAIL PILE CAP TURAP
-50 -40 -30 -20 -10 0 10 Skala 1 : 20
122 122
Digunakan Sheet Pile Type IV
120 120
118 118
116 116
114 114
118.748
118.75
112 112
110 110
-50 -40 -30 -20 -10 0 10
Timbunan Pilihan
Pile Cap Beton fc 20 MPa Patok Pengarah
Cor Bahu Beton fc 15 MPa
Turap Baja (Sheet Pile) type NS-SP-IV Tul Pokok 6 Ø D16 mm
14 13 13 14 40
124 124
122 122 45
120 120
29
118 118
Beton fc 20 MPa
116 116
Tul Pokok 6 Ø D16 mm
Tul Geser Ø 10 mm - 13 cm 45
114 114
5
108 108
DETAIL PILE CAP TURAP
-50 -40 -30 -20 -10 0 10 Skala 1 : 20