Anda di halaman 1dari 1

CATATAN:

Kendaraan berat yang keluar dan


JL. ADI SUCIPTO, KM. 08, SEI RAYA, PONTIANAK
masuk di lingkungan proyek WAJIB
MENGETAHUI :
pada pagi/malam hari ketika mall
tidak beroperasi

TAN
BUM H MIL

(18

(10
2.3
A
I RA I K

8)

6.0
2)
YA
GG
.
TO

SIA
SB

Ger
eja ME
RO
OM
FR
P1 1:7

GA
-0.1 TO
0 P1

-3.3
0

ME
RO
OM

-0.1
0

RO
ME
OM
UN
MENYETUJUI :
LO IT
BB
LIFT Y

UN
FE IT

-0.1 OP
MA

DR
TO
ILE LE
AP LOBB

0 OFF
T
AR Y MA
±0 TMEN TO LE
ILE
.00 T T
UN
IT
ara

BO
H UN
IT
LO
UN
GE

FL+7
.50

FL+7
UN
hk

IT

.50

FL+8
.00
-0.1
0 UN
eK

IT

PARK

FL+8
LO

FL+8 AREA

BOH
.10
ING

REC
BB

.00

EIVIN
LIFT Y

G
-0.

FL+8P OFF
DRO
-1.0 3

UNLO
ota

FL+8ADIN
.00

LOAD
0 UN

.00 G
-0.4

ING
8
-0.6 -0.3 IT
-0.8
6
0 FR
-1.0
4
SB
2
1:7

FL+8 GE
-1.2

LOUN
0

ENTR
FL+6 ANC

.10
.50 E
Pon

FL+7
1:7

FL+8
ME
.50

ROO
.10
M

PARRM 6.0
FL+7

BE
.50
-2.5
tian

FL+8
.00
-1.0

IT 3 0
0

.00
ak

Konstruksi

TANK
PAR

DAILY
BER

Others

Others
Kota

Taman
-By

0 -By
Saluran
BOP.+0.550

Siram
BOP.+.0.55

800x400
650x300

Ø80 To

Ø80 To

Opening
Opening

Oulet

Oulet

Intake
Intake
Pag
IT 1 0

POMPA

N
FUNDATIO
BLOWER
PONDASI
Exhaust

ER
FILTER

BLOW
800x400
Opening

SF

R.
600
CF
M1

POMPA
TAMAN
PONDASI
F

SIRAM
ar

J
E
A
.00

AREA
AREA WL :
: 3.2 9

C
: 4.7

Ø6"
WL
: 3.2

Sparing
Tahap 1
I
-3.300
1000

D2
B1
AREA
: 8.5

B2
.8

WL

2000
E
: 3.8

Ø6"
B3

Sparing
B4

D1
Ø6"

B5
xis

Sparing
tin
Lebar Gate Minimal 12 m

PIT
TRAP

R
POMP SE GE
A FILTE
DARI GREASEWA
80CW DARO DARI
150SW
150KD
IHB
GSB

TAN
AR UNG
GSB
MALL
FCC

15.0
M
ROO
PLN

EA
0319145

20.0
99

IHB

KY
TANG

J
821 5

JUDUL GAMBAR

KO URA
6U

1
IN
NTA
FOU
TER
TM

WA
IHB

IHB

DA
P
M
W-2
HOLA

KONTROL

IK
F MUS

00

ELEKTRON
±0.0

R.
STAF

SECURITY

0
±0.00
R.
SERVER
R.

&
BATTERY
UPS
Konstruksi

R.

M
IHB

F
IHB

IHB

OPB

OPB

RKING
Tahap 1 PEKERJAAN
3

R PA
MOTO AREA T
4
1

6
5
IHB

LO
537
JL.

IHB
TR
GE SMAR
SUP

AN
DU

IHB
ADIO

kN
48

MW 2
kN
48

1
MW
NG T

MW2
kN
43

MW1
kN
43

4
MV

3
MW

R30000.0000

IHB

LOKASI

IHB

GSB = 15M
IHB
SERVICE
LIFT LOBBY

PANEL
ROOM

PERENCANA
0
GS B 15.0
3.00
PARIT

BERM 6.00

ANG
ALIANY
YOR
JL. MA

ANG
ALIANY
MAYOR
BU

JL.
N
DA
RA

SKALA TANGGAL
N

CATATAN :

Gate

Sirkulasi Keluar Kendaraan Berat

Sirkulasi Masuk Kendaraan Berat

Pagar Pembatas Proyek Konstruksi

Sirkulasi Eksternal Kendaraan Berat Pada Pembangunan Tahap 1a Rambu Peringatan Konstruksi

Lampu Peringatan Konstruksi

Ruko 59 Unit Parkir Kendaraan Material Konstruksi

Tempat Loading dan Unloading Material

Anda mungkin juga menyukai