TAN
BUM H MIL
(18
(10
2.3
A
I RA I K
8)
6.0
2)
YA
GG
.
TO
SIA
SB
Ger
eja ME
RO
OM
FR
P1 1:7
GA
-0.1 TO
0 P1
-3.3
0
ME
RO
OM
-0.1
0
RO
ME
OM
UN
MENYETUJUI :
LO IT
BB
LIFT Y
UN
FE IT
-0.1 OP
MA
DR
TO
ILE LE
AP LOBB
0 OFF
T
AR Y MA
±0 TMEN TO LE
ILE
.00 T T
UN
IT
ara
BO
H UN
IT
LO
UN
GE
FL+7
.50
FL+7
UN
hk
IT
.50
FL+8
.00
-0.1
0 UN
eK
IT
PARK
FL+8
LO
FL+8 AREA
BOH
.10
ING
REC
BB
.00
EIVIN
LIFT Y
G
-0.
FL+8P OFF
DRO
-1.0 3
UNLO
ota
FL+8ADIN
.00
LOAD
0 UN
.00 G
-0.4
ING
8
-0.6 -0.3 IT
-0.8
6
0 FR
-1.0
4
SB
2
1:7
FL+8 GE
-1.2
LOUN
0
ENTR
FL+6 ANC
.10
.50 E
Pon
FL+7
1:7
FL+8
ME
.50
ROO
.10
M
PARRM 6.0
FL+7
BE
.50
-2.5
tian
FL+8
.00
-1.0
IT 3 0
0
.00
ak
Konstruksi
TANK
PAR
DAILY
BER
Others
Others
Kota
Taman
-By
0 -By
Saluran
BOP.+0.550
Siram
BOP.+.0.55
800x400
650x300
Ø80 To
Ø80 To
Opening
Opening
Oulet
Oulet
Intake
Intake
Pag
IT 1 0
POMPA
N
FUNDATIO
BLOWER
PONDASI
Exhaust
ER
FILTER
BLOW
800x400
Opening
SF
R.
600
CF
M1
POMPA
TAMAN
PONDASI
F
SIRAM
ar
J
E
A
.00
AREA
AREA WL :
: 3.2 9
C
: 4.7
Ø6"
WL
: 3.2
Sparing
Tahap 1
I
-3.300
1000
D2
B1
AREA
: 8.5
B2
.8
WL
2000
E
: 3.8
Ø6"
B3
Sparing
B4
D1
Ø6"
B5
xis
Sparing
tin
Lebar Gate Minimal 12 m
PIT
TRAP
R
POMP SE GE
A FILTE
DARI GREASEWA
80CW DARO DARI
150SW
150KD
IHB
GSB
TAN
AR UNG
GSB
MALL
FCC
15.0
M
ROO
PLN
EA
0319145
20.0
99
IHB
KY
TANG
J
821 5
JUDUL GAMBAR
KO URA
6U
1
IN
NTA
FOU
TER
TM
WA
IHB
IHB
DA
P
M
W-2
HOLA
KONTROL
IK
F MUS
00
ELEKTRON
±0.0
R.
STAF
SECURITY
0
±0.00
R.
SERVER
R.
&
BATTERY
UPS
Konstruksi
R.
M
IHB
F
IHB
IHB
OPB
OPB
RKING
Tahap 1 PEKERJAAN
3
R PA
MOTO AREA T
4
1
6
5
IHB
LO
537
JL.
IHB
TR
GE SMAR
SUP
AN
DU
IHB
ADIO
kN
48
MW 2
kN
48
1
MW
NG T
MW2
kN
43
MW1
kN
43
4
MV
3
MW
R30000.0000
IHB
LOKASI
IHB
GSB = 15M
IHB
SERVICE
LIFT LOBBY
PANEL
ROOM
PERENCANA
0
GS B 15.0
3.00
PARIT
BERM 6.00
ANG
ALIANY
YOR
JL. MA
ANG
ALIANY
MAYOR
BU
JL.
N
DA
RA
SKALA TANGGAL
N
CATATAN :
Gate
Sirkulasi Eksternal Kendaraan Berat Pada Pembangunan Tahap 1a Rambu Peringatan Konstruksi