1 Pek. Papan Nama Proyek LS Unit 1.00 250,000.00 250,000.00
2 Pek. Pengukuran LS Lokasi 1.00 3,380,000.00 3,380,000.00
JUMLAH I 3,630,000.00
II PEKERJAAN PENGADAAN DAN PEMASANGAN PIPA DISTRIBUSI
Cor Jalur Pipa Rabat Beton K-150 Tebal 25 cm A. 4.1.1.3. M3 52.95 1,183,509.52 62,666,829.16
JUMLAH V 62,666,829.16
Lampiran Hal - 1
DAFTAR HARGA SATUAN
BAJA
Besi Beton U-24 Kg 18,342.50
Kawat Beton Kg 21,800.00
Rangka Atap Baja Ringan M2 155,129.00
Tiang Pipa Besi Galvanis Ø 1.5" Tinggi 260 cm M1 200,000.00
Klem / U -Clip Bh 20,000.00
Panel Pagar BRC Ukuran 240 x 240 cm Lbr 825,000.00
Pintu Swing Ganda 250 x 240 Unit 1,750,000.00
PENUTUP ATAP
Genteng Metal Lbr 160,000.00
Nok Metal Lbr 35,000.00
PLAFOND
Gypsum 9 mm Lbr 89,800.00
List Profil Gypsum 5 mm M1 20,000.00
Rangka Metal Hollow 40.40.2 mm M1 27,500.00
BAHAN FINISHING
Minyak Bekesting Ltr 5,500.00
Plamur Kg 12,800.00
Cat Dasar Kg 37,500.00
Cat Penutup Kg 37,500.00
Lampiran Hal - 2
DAFTAR HARGA SATUAN
MATERIAL PERPIPAAN
Pipa HDPE Ø 250 mm (10") Bh 695,200.00
Pipa HDPE Ø 200 mm (8") Bh 447,200.00
Pipa HDPE Ø 160 mm (6") Bh 286,500.00
Dop HDPE Ø 250 mm (10") Bh 400,000.00
Dop HDPE Ø 200 mm (8") Bh 300,000.00
Dop HDPE Ø 160 mm (6") Bh 215,000.00
Bend 90˚ HDPE Ø 250 mm (10") Bh 1,800,000.00
Bend 90˚ HDPE Ø 200 mm (8") Bh 1,100,000.00
Bend 90˚ HDPE Ø 160 mm (6") Bh 950,000.00
Tee All Socket HDPE Ø 250 mm (10") Bh 4,200,000.00
Tee All Socket HDPE Ø 200 mm (8") Bh 2,300,000.00
Tee All Socket HDPE Ø 160 mm (6") Bh 1,300,000.00
Reducer HDPE Ø 160 - 110 mm Bh 950,000.00
Air Valve Ø 250 mm (10") Bh 5,000,000.00
Air Valve Ø 200 mm (8") Bh 4,000,000.00
Air Valve Ø 1600 mm (6") Bh 3,000,000.00
Karet Packing Ø 200 mm (8") Bh 1,200,000.00
Karet Packing Ø 160 mm (6") Bh 1,000,000.00
Mur dan Baut Bh 15,000.00
POMPA AIR
Pengadaan Pompa Distribusi Centrifugal 15 KW Unit 45,000,000.00
Pompa Dosing Unit 30,000,000.00
Pekerja OH 95,220.00
Tukang Kayu OH 124,200.00
Tukang Batu OH 124,200.00
Tukang Besi OH 108,900.00
Tukang Cat OH 124,200.00
Tukang Gali OH 95,220.00
Kepala Tukang Kayu OH 130,680.00
Kepala Tukang Batu OH 154,980.00
Kepala Tukang Besi OH 154,980.00
Kepala Tukang Cat OH 154,980.00
Mandor OH 175,320.00
Lampiran Hal - 3
ANALISA HARGA SATUAN
A TENAGA
Pekerja L.01 OH 0.300 95,220.00 28,566
Mandor L.04 OH 0.010 175,320.00 1,753
JUMLAH TENAGA KERJA 30,319
B BAHAN
Pasir Urug M3 1.20 66,700 80,040.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah(A+B+C) 110,359.20
E Overhead & Profit 15% x D 16,553.88
F Harga Satuan Pekerjaan (D+E) 126,913.08
Lampiran Hal - 4
ANALISA HARGA SATUAN
A.4.1.1 HARGA SATUAN PEKERJAAN BETON
A. 4.1.1.1. Membuat 1 m3 Mutu K-100
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 1.650 95,220.00 157,113.00
Tukang Batu 0.275 124,200.00 34,155.00
Kepala Tukang 0.028 154,980.00 4,339.44
Mandor L.04 OH 0.083 175,320.00 14,551.56
JUMLAH TENAGA KERJA 210,159.00
B BAHAN
Semen Portland Kg 230.000 1,730.00 397,900
Pasir Pasang Kg 893.000 165.57 147,855
Batu Pecah 1-2 Kg 1,027.000 165.57 170,042
Air Liter 200.000 4.80 960
JUMLAH HARGA BAHAN 716,757
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah(A+B+C) 926,916.14
E Overhead & Profit 15% x D 139,037.42
F Harga Satuan Pekerjaan (D+E) 1,065,953.56
Lampiran Hal - 5
ANALISA HARGA SATUAN
A. 4.1.1.29. Membuat 1 m3 sloof beton bertulang (200 kg besi + bekisting)
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 5.650 95,220.00 537,993.00
Tukang Batu L.02 OH 0.275 124,200.00 34,155.00
Tukang Kayu L.02 OH 1.560 124,200.00 193,752.00
Tukang Besi L.02 OH 1.400 108,900.00 152,460.00
Kepala Tukang L.03 OH 0.323 154,980.00 50,058.54
Mandor L.04 OH 0.283 175,320.00 49,615.56
JUMLAH TENAGA KERJA 1,018,034.10
B BAHAN
Kayu Kelas III m3 0.270 5,200,000.00 1,404,000.00
Paku 5 Cm - 12 Cm kg 2.000 20,300.00 40,600.00
Minyak bekisting Liter 0.600 5,500.00 3,300.00
Besi Beton polos kg 210.000 18,342.50 3,851,925.00
Kawat Beton kg 3.000 21,800.00 65,400.00
Semen Portland 40 Kg kg 336.000 1,730.00 581,280.00
Pasir Pasang m3 0.540 165.57 89.41
Batu Pecah 1-2 m3 0.810 165.57 134.11
JUMLAH HARGA BAHAN 5,946,728.52
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah(A+B+C) 6,964,762.62
E Overhead & Profit 15% x D 1,044,714.39
F Harga Satuan Pekerjaan (D+E) 8,009,477.01
A. 4.2.1.21. Pemasangan 1 m2 rangka besi hollow 1x40.40.2 mm, modul 60 x 60 cm, plafon
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.350 95,220.00 33,327.00
Tukang Kayu L.02 OH 0.350 124,200.00 43,470.00
Kepala Tukang Kayu L.03 OH 0.035 154,980.00 5,424.30
Mandor L.04 OH 0.018 175,320.00 3,155.76
JUMLAH TENAGA KERJA 85,377.06
B BAHAN
Rangka Metal Hollow 40.40.2 mm m' 4.000 27,500.00 110,000.00
Asesoris ls 100%xrangka 27,500.00 27,500.00
JUMLAH HARGA BAHAN 137,500.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah(A+B+C) 222,877.06
E Overhead & Profit 15% x D 33,431.56
F Harga Satuan Pekerjaan (D+E) 256,308.62
Lampiran Hal - 6
ANALISA HARGA SATUAN
A. 4.5.2.32.b. Pemasangan 1 m2 Atap Zincalume
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.2 95,220.00 19,044.00
Tukang Kayu L.02 OH 0.1 124,200.00 12,420.00
Kepala Tukang L.03 OH 0.01 154,980.00 1,549.80
Mandor L.04 OH 0.001 175,320.00 175.32
JUMLAH TENAGA KERJA 33,189.12
B BAHAN
Atap Zincalume Bh 1.02 160,000.00 163,200.00
Paku Metal Kg 0.2 27,500.00 5,500.00
JUMLAH HARGA BAHAN 168,700.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah(A+B+C) 201,889.12
E Overhead & Profit 15% x D 30,283.37
F Harga Satuan Pekerjaan (D+E) 232,172.49
A. 4.7.1.10. Pengecetan 1 m2 tembok baru (1 Lapis Plamur, 1 Lapis Cat Dasar, 2 Lapis Cat Penutup
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.200 95,220.00 19,044.00
Tukang Cat L.02 OH 0.063 124,200.00 7,824.60
Kepala Tukang L.03 OH 0.006 154,980.00 976.37
Mandor L.04 OH 0.003 175,320.00 525.96
JUMLAH TENAGA KERJA 28,370.93
B BAHAN
Palmur Kg 0.10 12,800.00 1,280.00
Cat Dasar Kg 0.100 37,500.00 3,750.00
Cat Penutup Kg 0.260 37,500.00 9,750.00
JUMLAH HARGA BAHAN 14,780.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah(A+B+C) 43,150.93
E Overhead & Profit 15% x D 6,472.64
F Harga Satuan Pekerjaan (D+E) 49,623.57
Lampiran Hal - 7
ANALISA HARGA SATUAN
Lampiran Hal - 8
ANALISA HARGA SATUAN
Lampiran Hal - 9
ANALISA HARGA SATUAN
Lampiran Hal - 10
ANALISA HARGA SATUAN
Lampiran Hal - 11
ANALISA HARGA SATUAN
A.8.4.3.16 Pemasangan 1 buah Tee Ø 200 mm
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.216 95,220.00 20,567.52
Tukang pipa L.02 OH 0.108 108,900.00 11,761.20
Mandor L.04 OH 0.022 175,320.00 3,857.04
JUMLAH TENAGA KERJA 36,185.76
B BAHAN
Tee Ø 200 mm bh 1.000 2,300,000.00 2,300,000.00
JUMLAH HARGA BAHAN 2,300,000.00
C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T hari 0.029 600,000.00 17,400.00
JUMLAH HARGA ALAT 17,400.00
Lampiran Hal - 12
ANALISA HARGA SATUAN
Lampiran Hal - 13
DETAIL ENGINEERING DESIGN
Lampiran Hal - 14
DETAIL ENGINEERING DESIGN
Lampiran Hal - 15
FOTO – FOTO KONSTRUKSI
Lampiran Hal - 16
FOTO – FOTO KONSTRUKSI
Lampiran Hal - 17
FOTO – FOTO KONSTRUKSI
Lampiran Hal - 18