Anda di halaman 1dari 2

RAB ( RENCANA ANGGARAN BELANJ

RANCANG BANGUN SISTEM PENDINGIN AC SPLIT MENJADI AC MULTI KA


2 INDOOR DI LAB SMK MALAKA

NO URAIAN MERK UKURAN


BAHAN UTAMA
1 AC OUTDOOR 1 PK
2 AC INDOOR 1/2 PK
3 CONTRAKTOR
4 TIMER DELAY RELAY AC 220V H3Y
5 SOLENOID VALVE GAS 1/2PK
6 COIL SOLENOID VALVE GAS AC 220V
7 TERMINAL LISTRIK BLOK 2Rak
8 RELAY LISTRIK 200V
BAHAN PENDUKUNG
1 PLAT BESI SIKU 6 meter
2 PIPA KAPILER 1PK
3 PIPA AC HONDA 1 PK
4 KRAN NEPEL AC 1 PK
4 RODA TRAINER KARET 4"
5 AKRILIK 1M X 1M
6 PLAT SENG SENG TALANG
7 KABEL LISTRIK SERABUT MERAH, KUNING, BIRU, HIJAU
8 SKUN KABEL TERMINAL MERAH, KUNING, BIRU, HIJAU
9 TEMPERATUR RUANGAN HTC 2
10 JASA PENGERJAAN
CANA ANGGARAN BELANJA )
SPLIT MENJADI AC MULTI KAPASITAS 2 PK UNTUK
I LAB SMK MALAKA

JUMLAH SATUAN HARGA TOTAL

1 UNIT Rp600,000 Rp600,000


2 UNIT Rp450,000 Rp900,000
1 UNIT Rp250,000 Rp250,000
1 UNIT Rp250,000 Rp250,000
2 UNIT Rp200,000 Rp400,000
2 UNIT Rp200,000 Rp400,000
1 UNIT Rp50,000 Rp50,000
2 UNIT Rp100,000 Rp200,000

5 BATANG Rp70,000 Rp350,000


2 UNIT Rp50,000 Rp100,000
2 METER Rp70,000 Rp140,000
2 SET Rp50,000 Rp100,000
4 UNIT Rp60,000 Rp240,000
3 LEMBAR Rp180,000 540000
2 METER Rp15,000 Rp30,000
1 METER Rp50,000 Rp50,000
40 PICS Rp50,000 Rp50,000
2 UNIT Rp50,000 Rp100,000
Rp200,000
TOTAL Rp4,950,000