2 Instalasi Lantai 2
- Terminal Box ( TB - FA.2 ) 1.00 Unit Rp 3,400,000 Rp 3,400,000
- Smoke Detector 5.00 Buah Rp 785,000 Rp 3,925,000
- ROR Heat Detector 10.00 Buah Rp 425,000 Rp 4,250,000
- Alarm Bell 1.00 Buah Rp 630,000 Rp 630,000
- Manual Push Button 1.00 Buah Rp 570,000 Rp 570,000
- Indicator Lamp 1.00 Buah Rp 285,000 Rp 285,000
- End Of Line 2.00 Buah Rp 23,000 Rp 46,000
- Pengkabelan dari MDF-FA ke TB-FA 28.00 m' Rp 170,000 Rp 4,760,000
- Instalasi Fire Alarm 18.00 Titik Rp 725,000 Rp 13,050,000
Sub total Rp 62,467,000
LANTAI 01
I Fire Hydrant
1 HBI (80x18x100) 1.00 unit Rp 6,375,000 Rp 6,375,000
valve 1 1/2``, 150 psi
fire hose 1 1/2`` x 30 m,klas 18 kg/cm2
straight nozel 1 1/2``
II Fire Sprikler
1 Pipa Dia 3" 11.00 m Rp 415,000 Rp 4,565,000
2 Pipa Dia 2 1/2" 10.00 m Rp 325,000 Rp 3,250,000
3 Pipa Dia 2" 10.00 m Rp 265,000 Rp 2,650,000
4 Pipa Dia 1" 65.00 m Rp 135,000 Rp 8,775,000
5 Head sprinkler 15.00 bh Rp 165,000 Rp 2,475,000
6 Gate valve 3`` 1.00 bh Rp 4,800,000 Rp 4,800,000
7 Gate valve 1`` 1.00 bh Rp 650,000 Rp 650,000
8 Flow switch 3" 1.00 bh Rp. 1,800,000 Rp 1,800,000
8 Test and drain + sight glass 1.00 bh Rp 2,785,000 Rp 2,785,000
9 Fitting dan Accessories 1.00 ls Rp 9,500,000 Rp 9,500,000
LANTAI 02
I Fire Hydrant
1 HBI (80x18x100) 1.00 unit Rp 6,375,000 Rp 6,375,000
valve 1 1/2``, 150 psi
fire hose 1 1/2`` x 30 m,klas 18 kg/cm2
straight nozel 1 1/2``
II Fire Sprikler
1 Pipa Dia 3" 11.00 m Rp 415,000 Rp 4,565,000
2 Pipa Dia 2 1/2" 10.00 m Rp 325,000 Rp 3,250,000
3 Pipa Dia 2" 10.00 m Rp 265,000 Rp 2,650,000
4 Pipa Dia 1" 65.00 m Rp 135,000 Rp 8,775,000
5 Head sprinkler 15.00 bh Rp 165,000 Rp 2,475,000
6 Gate valve 3`` 1.00 bh Rp 4,800,000 Rp 4,800,000
7 Gate valve 1`` 1.00 bh Rp 650,000 Rp 650,000
8 Flow switch 3" 1.00 bh Rp. 1,800,000 Rp 1,800,000
8 Test and drain + sight glass 1.00 bh Rp 2,785,000 Rp 2,785,000
9 Fitting dan Accessories 1.00 ls Rp 9,500,000 Rp 9,500,000
Sub total Rp 113,900,000
GRAND TOTAL Rp 841,107,000
TOTAL
7 Pipa Dia 3/4" 10.50 m Rp 52,943 Rp
8 head sprinkler 35.00 bh Rp 88,238 Rp
9 MCFA Convensional 5 Zone c/w battery & charge 1.00 Ls Rp 13,700,000 Rp
11 BCV 6" (butterfly valve c/w tamper switch 6", flow switch 6", test and drain + sight gla 1.00 bh Rp 7,310,000 Rp
12 Fitting dan Accessories 1.00 ls Rp 4,000,000 Rp
LANTAI 04
I Fire Hydrant
1 HBI (80x18x100) 1.00 unit Rp 4,117,750 Rp
valve 1 1/2``, 150 psi
fire hose 1 1/2`` x 30 m,klas 18 kg/cm2
straight nozel 1 1/2``
II Fire Sprikler
1 Pipa Dia 4" 7.90 m Rp 570,000 Rp
2 Pipa Dia 3" 13.60 m Rp 285,000 Rp
3 Pipa Dia 2 1/2" 28.90 m Rp 23,000 Rp
4 Pipa Dia 2" 28.00 m Rp 170,000 Rp
5 Pipa Dia 1 1/2" 18.00 m Rp 725,000 Rp
6 Pipa Dia 1" 115.90 m Rp 70,590 Rp
7 Pipa Dia 3/4" 12.00 m Rp 52,943 Rp
8 head sprinkler 40.00 bh Rp 3,400,000 Rp
10 gate valve 2`` 5.00 bh Rp 785,000 Rp
11 BCV 6" (butterfly valve c/w tamper switch 6", flow switch 6", test and drain + sight gla 10.00 bh Rp 425,000 Rp
12 Fitting dan Accessories 1.00 ls Rp 630,000 Rp
1
LANTAI 05 1
I Fire Hydrant 2
1 HBI (80x18x100) 28.00 unit Rp 170,000 Rp
valve 1 1/2``, 150 psi 18
fire hose 1 1/2`` x 30 m,klas 18 kg/cm2
Catatan :
1. Pembayaran sesuai kesepakatan :
- DP 30% Setelah PO Diterima
- Pembayaran I 20% Setelah Progres Pekerjaan 50%
- Pembayaran II 30% Setelah Progres Pekerjaan 80%
- Pembayaran III 20% Setelah Progres Pekerjaan 100%
2. Masa Pemeliharaan 180 Hari
Contact Person : 085284555179 (Sugianto)
555,896
3,088,313
10,117,900
10,679,000
4,705,588
4,117,750
2,602,418
3,200,080
5,100,128
447,070
330,891
8,181,381
635,310
3,529,500
411,775
10,117,900
4,467,436
4,117,750