Rab Paud-2020 Al-Mardhiyyah Ok
Rab Paud-2020 Al-Mardhiyyah Ok
SPS AL-MARDHIYYAH
KABUPATEN PURWAKARTA PROPINSI JAWA BARAT
I PEKERJAAN PERSIAPAN Rp - - -
II PEKERJAAN TANAH Rp - - - - -
III PEKERJAAN PONDASI Rp - - - -
IV PEKERJAAN BETON Rp - - - - -
V PEKERJAAN PASANGAN, PLESTERAN & KERAMIK Rp - - - - -
VI PEKERJAAN ATAP Rp - - -
VII PEKERJAAN KUSEN, PINTU DAN JENDELA Rp 12,769,250.50 34.470 10.341 13.788 10.341
VIII PEKERJAAN PLAFOND Rp 11,434,840.69 30.867 30.867
IX ALAT PENGGANTUNG DAN PENGUNCI Rp 3,146,750.00 8.494 8.494
X PEKERJAAN PENGECATAN Rp 9,694,099.11 26.168 13.084 13.084
XI PEK INSTALASI PENERANGAN DAN STOP KONTAK Rp - - -
REKAPITULASI:
I PEKERJAAN PERSIAPAN Rp -
II PEKERJAAN TANAH Rp -
III PEKERJAAN PONDASI Rp -
IV PEKERJAAN BETON Rp -
V PEKERJAAN PASANGAN, PLESTERAN & KERAMIK Rp -
VI PEKERJAAN ATAP Rp -
VII PEKERJAAN KUSEN, PINTU DAN JENDELA Rp 12,769,250.50
VIII PEKERJAAN PLAFOND Rp 11,434,840.69
IX ALAT PENGGANTUNG DAN PENGUNCI Rp 3,146,750.00
X PEKERJAAN PENGECATAN Rp 9,694,099.11
XI PEK INSTALASI PENERANGAN DAN STOP KONTAK Rp -
Nor Ilman Saputra,SH Ir, Yus Rizal Andi Fardiansyah. ST Nurdiatul Jahroh, S.Ud
NIP. 197812062005011001 Team Teknis Perencana Kepala Sekolah
Rekap
RENCANA ANGGARAN BIAYA REHABILITASI
LEMBAGA : SPS AL-MARDHIYYAH
LOKASI : KABUPATEN PURWAKARTA
PROVINSI : JAWA BARAT
TOTAL %
NO URAIAN PEKERJAAN VOLUME SATUAN HARGA JUMLAH
KERUSAKAN
Nor Ilman Saputra,SH Ir. Yusrizal Andi Fardiansyah. ST Nurdiatul Jahroh, S.Ud
NIP. 197812062005011001 Team Teknis Perencana Lembaga Kepala Sekolah
I. PEKERJAAN PERSIAPAN
I. PEKERJAAN BONGKARAN
1 Bongkar Dinding 1/2 batu per m2
Pekerja 0.15 ohr x Rp. 0.00 = Rp -
Kepala Tukang 0.01 ohr x Rp. 0.00 = Rp -
Total Upah -
ANALISA Lembar ke : 5
ANALISA HARGA SATUAN PEKERJAAN
KABUPATEN PURWAKARTA PROPINSI JAWA BARAT
PROYEK PEMBANGUNAN PER TAHUN 2020
Upah :
Pekerja 0.7500 Hr x Rp. 120,000.00 = Rp 90,000.00
Mandor 0.0250 Hr x Rp. 0.00 = Rp 0.00
Total Upah = Rp 90,000.00
Total Pekerjaan = Rp 90,000.00
2 Pekerjaan Urugan tanah kembali / M3
Upah :
Pekerja 0.2500 Hr x Rp. 120,000.00 = Rp 30,000.00
Mandor 0.0083 Hr x Rp. 0.00 = Rp 0.00
Total Upah = Rp 30,000.00
Total Pekerjaan = Rp 30,000.00
3 Urugan Pasir Bawah Lantai & Pondasi / M³
Bahan :
Pasir urug 1.2000 m³ x Rp. 165,000.00 = Rp 198,000.00
Total Bahan = Rp 198,000.00
Upah :
Pekerja 0.3000 Hr x Rp. 120,000.00 = Rp 36,000.00
Mandor 0.0100 Hr x Rp. 0.00 = Rp 0.00
Total Upah = Rp 36,000.00
Total Pekerjaan = Rp 234,000.00
Bahan :
Batu belah 15/20 cm 1.2000 m³ x Rp. 250,000.00 = Rp 300,000.00
Pasir Pasang 0.4320 m³ x Rp. 200,000.00 = Rp 86,400.00
Total Bahan = Rp 386,400.00
Upah :
Pekerja 0.7800 Hr x Rp. 120,000.00 = Rp 93,600.00
Tukang batu 0.3900 Hr x Rp. 135,000.00 = Rp 52,650.00
Kepala Tukang 0.0390 Hr x Rp. 155,000.00 = Rp 6,045.00
Mandor 0.0390 Hr x Rp. 0.00 = Rp 0.00
Total Upah = Rp 152,295.00
Total Pekerjaan = Rp 538,695.00
Bahan :
Batu belah 15/20 cm 1.2000 m³ x Rp. 250,000.00 = Rp 300,000.00
ANALISA Lembar ke : 6
ANALISA HARGA SATUAN PEKERJAAN
KABUPATEN PURWAKARTA PROPINSI JAWA BARAT
PROYEK PEMBANGUNAN PER TAHUN 2020
Bahan :
Batu Bata Merah 140.0000 Bh x Rp. 750.00 = Rp 105,000.00
PC 24.0000 Zak x Rp. 1,250.00 = Rp 30,000.00
Pasir Pasang 0.0800 m³ x Rp. 200,000.00 = Rp 16,000.00
Total Bahan = Rp 151,000.00
Upah :
Pekerja 0.6000 Hr x Rp. 120,000.00 = Rp 72,000.00
Tukang batu 0.2000 Hr x Rp. 145,000.00 = Rp 29,000.00
Kepala Tukang 0.0200 Hr x Rp. 155,000.00 = Rp 3,100.00
Mandor 0.0300 Hr x Rp. 0.00 = Rp 0.00
Total Upah = Rp 104,100.00
Bobot isi pasir = 1.400 kg/m3, bobot isi kerikil = 1.350 kg/m3, buckling factor pasir = 20 %
1 Beton mutu f'c=12,2 Mpa (K 150), slump (12+/-2) cm, w/c= 0,72
Bahan :
Koral Beton 0.7533 m³ x Rp. 265,000.00 = Rp 199,624.50
PC 299.0000 kg x Rp. 1,250.00 = Rp 373,750.00
Pasir Beton 0.5707 m³ x Rp. 260,000.00 = Rp 148,382.00
Air 215.0000 liter x Rp. 7,000.00 = Rp 1,505,000.00
Total Bahan = Rp 721,756.50
Upah :
Pekerja 1.6500 Hr x Rp. 120,000.00 = Rp 198,000.00
Tukang batu 0.2750 Hr x Rp. 135,000.00 = Rp 37,125.00
Kepala Tukang 0.0280 Hr x Rp. 155,000.00 = Rp 4,340.00
Mandor 0.0830 Hr x Rp. 0.00 = Rp 0.00
Total Upah = Rp 239,465.00
Bahan :
Besi beton (polos) 1.0500 kg x Rp. 10,500.00 = Rp 11,025.00
Kawat beton 0.0015 kg x Rp. 25,000.00 = Rp 37.50
Total Bahan = Rp 11,062.50
Upah :
Pekerja 0.0070 Hr x Rp. 120,000.00 = Rp 840.00
Tukang besi 0.0070 Hr x Rp. 145,000.00 = Rp 1,015.00
Kepala tukang 0.0007 Hr x Rp. 155,000.00 = Rp 108.50
Mandor 0.0004 Hr x Rp. 0.00 = Rp 0.00
Total Upah = Rp 1,963.50
Bahan :
Kayu kelas IV 0.0450 m³ x Rp. 2,200,000.00 = Rp 99,000.00
ANALISA Lembar ke : 7
ANALISA HARGA SATUAN PEKERJAAN
KABUPATEN PURWAKARTA PROPINSI JAWA BARAT
PROYEK PEMBANGUNAN PER TAHUN 2020
4 Balok Sloof Praktis , (15x20) cm, beton mutu f'c = 12,2 (K 150), slump (12+/-2) cm, w/c = 0,52, pembesian = 156 kg/m3
6 Ring Balok , (15x25) cm, beton mutu f'c = 12,2 (K 150), slump (12+/-2) cm, w/c = 0,52, pembesian = 135 kg/m3
7 Kolom Praktis Kp (15x15) cm , beton mutu f'c = 12,2 (K 150), slump (12+/-2) cm, w/c = 0,72, pembesian = 90 kg/m3
8 Kolom Praktis Kp (20x20) cm , beton mutu f'c = 12,2 (K 150), slump (12+/-2) cm, w/c = 0,72, pembesian = 152 kg/m3
9 Balok Kuda-Kuda Kp (20x15) cm , beton mutu f'c = 12,2 (K 150), slump (12+/-2) cm, w/c = 0,72, pembesian = 115 kg/m3
V PEKERJAAN DINDING
Bahan :
Batu Bata Merah 70.0000 Bh x Rp. 750.00 = Rp 52,500.00
PC 11.5000 Zak x Rp. 1,250.00 = Rp 14,375.00
Pasir Pasang 0.0430 m³ x Rp. 200,000.00 = Rp 8,600.00
Total Bahan = Rp 75,475.00
Upah :
Pekerja 0.3000 Hr x Rp. 120,000.00 = Rp 36,000.00
Tukang batu 0.1000 Hr x Rp. 135,000.00 = Rp 13,500.00
Kepala Tukang 0.0100 Hr x Rp. 155,000.00 = Rp 1,550.00
Mandor 0.0150 Hr x Rp. 0.00 = Rp 0.00
Total Upah = Rp 51,050.00
Total Pekerjaan = Rp 126,525.00
Bahan :
ANALISA Lembar ke : 8
ANALISA HARGA SATUAN PEKERJAAN
KABUPATEN PURWAKARTA PROPINSI JAWA BARAT
PROYEK PEMBANGUNAN PER TAHUN 2020
VI PEKERJAAN ATAP
Bahan :
Genteng plentong 25.0000 lbr x Rp. 3,000.00 = Rp 75,000.00
Paku biasa 2" - 5" 0.0300 kg x Rp 25,000.00 = Rp 750.00
Total Bahan = Rp 75,750.00
Upah :
Pekerja 0.2000 Hr x Rp. 120,000.00 = Rp 24,000.00
Tukang kayu 0.1000 Hr x Rp. 135,000.00 = Rp 13,500.00
Kepala Tukang Kayu 0.0100 Hr x Rp. 155,000.00 = Rp 1,550.00
Mandor 0.0100 Hr x Rp. 0.00 = Rp 0.00
Total Upah = Rp 39,050.00
Total Pekerjaan = Rp 114,800.00
2 Pekerjaan Nok Genteng / M'
Bahan :
Nok genteng plentong 3.5000 bh x Rp. 25,000.00 = Rp 87,500.00
Paku biasa 2" - 5" 0.0500 kg x Rp. 15,000.00 = Rp 750.00
semen abu-abu 10.8000 kg x Rp. 1,250.00 = Rp 13,500.00
Pasing pasang 0.0320 m3 x Rp. 200,000.00 = Rp 6,400.00
Semen warna 1.0000 kg x Rp. 8,500.00 = Rp 8,500.00
Total Bahan = Rp 116,650.00
Upah :
Pekerja 0.4000 Hr x Rp. 120,000.00 = Rp 48,000.00
Tukang kayu 0.2000 Hr x Rp. 135,000.00 = Rp 27,000.00
Kepala Tukang Kayu 0.0200 Hr x Rp. 155,000.00 = Rp 3,100.00
Mandor 0.0200 Hr x Rp. 0.00 = Rp 0.00
Total Upah = Rp 78,100.00
Total Pekerjaan = Rp 194,750.00
Bahan :
Seng Gelombang 0.7000 lbr x Rp. 25,000.00 = Rp 17,500.00
Paku seng 0.0400 kg x Rp 25,000.00 = Rp 1,000.00
Total Bahan = Rp 18,500.00
Upah :
Pekerja 0.1200 Hr x Rp. 120,000.00 = Rp 14,400.00
Tukang kayu 0.0600 Hr x Rp. 135,000.00 = Rp 8,100.00
Kepala Tukang Kayu 0.0060 Hr x Rp. 155,000.00 = Rp 930.00
ANALISA Lembar ke : 9
ANALISA HARGA SATUAN PEKERJAAN
KABUPATEN PURWAKARTA PROPINSI JAWA BARAT
PROYEK PEMBANGUNAN PER TAHUN 2020
Bahan :
Seng plat 3"x6" BJLS 25 1.1000 m' x Rp. 65,000.00 = Rp 71,500.00
Paku seng 0.0500 kg x Rp. 25,000.00 = Rp 1,250.00
Total Bahan = Rp 72,750.00
Upah :
Pekerja 0.1500 Hr x Rp. 120,000.00 = Rp 18,000.00
Tukang kayu 0.0700 Hr x Rp. 145,000.00 = Rp 10,150.00
Kepala Tukang Kayu 0.0080 Hr x Rp. 155,000.00 = Rp 1,240.00
Mandor 0.0060 Hr x Rp. 0.00 = Rp 0.00
Total Upah = Rp 29,390.00
8 Memasang Kuda kuda Baja Ringan Berikut reng untuk atap genteng biasa/metal per m2
Bahan :
Profil C - 7.5, 08 2.8000 m' x Rp. 13,333.33 = Rp 37,333.33
Baut (screw driver) dia.6 x 20mm 25.0000 bh x Rp. 200.00 = Rp 5,000.00
Baut (screw driver) dia.4 x 16mm 25.0000 bh x Rp. 200.00 = Rp 5,000.00
Dynabolt dia 12 x 120mm 1.0000 bh x Rp. 2,000.00 = Rp 2,000.00
Reng R-33, 045 5.4000 m' x Rp. 35,000.00 = Rp 189,000.00
Total Bahan = Rp 238,333.33
Upah :
Pekerja 0.2000 Hr x Rp. 120,000.00 = Rp 24,000.00
Tukang Besi 0.1750 Hr x Rp. 145,000.00 = Rp 25,375.00
Kepala Tukang 0.0100 Hr x Rp. 155,000.00 = Rp 1,550.00
Mandor 0.0050 Hr x Rp. 0.00 = Rp 0.00
Total Upah = Rp 50,925.00
Total Pekerjaan = Rp 289,258.33
9 Memasang Kuda kuda Baja Ringan Berikut reng untuk atap seng/spandek per m2
Bahan :
Profil C - 7.5, 08 2.8000 m' x Rp. 13,333.33 = Rp 37,333.33
Baut (screw driver) dia.6 x 20mm 25.0000 bh x Rp. 200.00 = Rp 5,000.00
Baut (screw driver) dia.4 x 16mm 25.0000 bh x Rp. 200.00 = Rp 5,000.00
Dynabolt dia 12 x 120mm 1.0000 bh x Rp. 2,000.00 = Rp 2,000.00
Reng R-33, 045 3.6000 m' x Rp. 35,000.00 = Rp 126,000.00
Total Bahan = Rp 175,333.33
Upah :
Pekerja 0.2000 Hr x Rp. 0.00 = Rp 0.00
Tukang Batu 0.1750 Hr x Rp. 0.00 = Rp 0.00
Kepala Tukang 0.0100 Hr x Rp. 0.00 = Rp 0.00
Mandor 0.0050 Hr x Rp. 0.00 = Rp 0.00
Total Upah = Rp 0.00
Total Pekerjaan = Rp 175,333.33
ANALISA Lembar ke : 10
ANALISA HARGA SATUAN PEKERJAAN
KABUPATEN PURWAKARTA PROPINSI JAWA BARAT
PROYEK PEMBANGUNAN PER TAHUN 2020
Bahan :
Kaca (t=5 mm) 1.1000 M² x Rp. 175,000.00 = Rp 192,500.00
Sealent (300 ml) 0.3837 tube x Rp. 0.00 = Rp 0.00
Total Bahan = Rp 192,500.00
Upah :
Pekerja 0.0165 Hr x Rp. 120,000.00 = Rp 1,980.00
Tukang Kayu 0.1650 Hr x Rp. 135,000.00 = Rp 22,275.00
Kepala Tukang 0.0165 Hr x Rp. 155,000.00 = Rp 2,557.50
Mandor 0.0008 Hr x Rp. 0.00 = Rp 0.00
Total Upah = Rp 26,812.50
5 Pintu P 1 / unit
Pekerjaan Kusen Kayu Kelas II 0.0660 m³ x Rp. 11,262,750.00 = Rp 743,341.50
Daun Pintu Double Tripleks 2.0000 unit x Rp. 1,196,412.00 = Rp 2,392,824.00
Pasang Kaca Mati tebal 5 mm 0.4600 m2 x Rp. 219,312.50 = Rp 100,883.75
Total Pekerjaan \ = Rp 3,237,049.25
6 Pintu P 2 / unit
Pekerjaan Kusen Kayu Kelas II 0.0525 m³ x Rp. 11,262,750.00 = Rp 591,294.38
Daun Pintu Double Tripleks 1.0000 unit x Rp. 1,345,963.50 = Rp 1,345,963.50
Pasang Kaca Mati tebal 5 mm 0.3600 m2 x Rp. 219,312.50 = Rp 78,952.50
Total Pekerjaan = Rp 2,016,210.38
Bahan :
Engsel Jendela 1.0000 bh x Rp. 30,000.00 = Rp 30,000.00
Total Bahan = Rp 30,000.00
Upah :
Pekerja 0.0150 Hr x Rp. 120,000.00 = Rp 1,800.00
Tukang Kayu 0.1500 Hr x Rp. 135,000.00 = Rp 20,250.00
Kepala Tukang 0.0150 Hr x Rp. 155,000.00 = Rp 2,325.00
Mandor 0.0008 Hr x Rp. 0.00 = Rp 0.00
Total Upah = Rp 24,375.00
Total Pekerjaan = Rp 54,375.00
12 Pasangan 1 Bh Grendel Pintu
Bahan :
Grendel Pintu 1.0000 bh x Rp. 35,000.00 = Rp 35,000.00
Total Bahan = Rp 35,000.00
Upah :
Pekerja 0.0500 Hr x Rp. 120,000.00 = Rp 6,000.00
Tukang Kayu 0.5000 Hr x Rp. 135,000.00 = Rp 67,500.00
Kepala Tukang 0.0500 Hr x Rp. 155,000.00 = Rp 7,750.00
Mandor 0.0008 Hr x Rp. 0.00 = Rp 0.00
Total Upah = Rp 81,250.00
Total Pekerjaan = Rp 116,250.00
Bahan :
Grendel Jendela 1.0000 bh x Rp. 7,500.00 = Rp 7,500.00
Total Bahan = Rp 7,500.00
Upah :
Pekerja 0.0500 Hr x Rp. 120,000.00 = Rp 6,000.00
ANALISA Lembar ke : 13
ANALISA HARGA SATUAN PEKERJAAN
KABUPATEN PURWAKARTA PROPINSI JAWA BARAT
PROYEK PEMBANGUNAN PER TAHUN 2020
Bahan :
Kayu balok klas III 1.1000 M³ x Rp. 3,750,000.00 = Rp 4,125,000.00
Besi strip 15.0000 Kg x Rp. 10,500.00 = Rp 157,500.00
Paku biasa 2" - 5" 5.6000 Kg x Rp. 15,000.00 = Rp 84,000.00
Total Bahan = Rp 4,366,500.00
Upah :
Pekerja 4.0000 Hr x Rp. 120,000.00 = Rp 480,000.00
Tukang kayu 12.0000 Hr x Rp. 135,000.00 = Rp 1,620,000.00
Kepala Tukang Kayu 1.2000 Hr x Rp. 155,000.00 = Rp 186,000.00
Mandor 0.2000 Hr x Rp. 0.00 = Rp 0.00
Total Upah = Rp 2,286,000.00
Total Pekerjaan = Rp 6,652,500.00
Bahan :
Kayu kruing, balok 1.1000 M³ x Rp. 3,750,000.00 = Rp 4,125,000.00
Besi strip 15.0000 Kg x Rp. 10,500.00 = Rp 157,500.00
Paku biasa 2" - 5" 3.0000 Kg x Rp. 15,000.00 = Rp 45,000.00
Total Bahan = Rp 4,327,500.00
Upah :
Pekerja 2.4000 Hr x Rp. 120,000.00 = Rp 288,000.00
Tukang kayu 7.2000 Hr x Rp. 135,000.00 = Rp 972,000.00
Kepala Tukang Kayu 0.7200 Hr x Rp. 155,000.00 = Rp 111,600.00
Mandor 0.1200 Hr x Rp. 0.00 = Rp 0.00
Total Upah = Rp 1,371,600.00
Total Pekerjaan = Rp 5,699,100.00
Bahan :
Kaso & reng 0.0140 M³ x Rp. 3,750,000.00 = Rp 52,500.00
Paku biasa 2" - 5" 0.1500 Kg x Rp. 15,000.00 = Rp 2,250.00
Total Bahan = Rp 54,750.00
Upah :
Pekerja 0.1000 Hr x Rp. 120,000.00 = Rp 12,000.00
Tukang kayu 0.1000 Hr x Rp. 135,000.00 = Rp 13,500.00
Kepala Tukang Kayu 0.0100 Hr x Rp. 155,000.00 = Rp 1,550.00
Mandor 0.0050 Hr x Rp. 0.00 = Rp 0.00
Total Upah = Rp 27,050.00
Bahan :
Kayu Kelas III / Borneo / Meranti 0.0095 M³ x Rp. 3,500,000.00 = Rp 33,250.00
Paku 0.1000 Kg x Rp 15,000.00 = Rp 1,500.00
Total Bahan = Rp 34,750.00
Upah :
Pekerja 0.0750 Hr x Rp. 120,000.00 = Rp 9,000.00
Tukang kayu 0.1500 Hr x Rp. 135,000.00 = Rp 20,250.00
Kepala Tukang Kayu 0.0150 Hr x Rp. 155,000.00 = Rp 2,325.00
Mandor 0.0300 Hr x Rp. 0.00 = Rp 0.00
Total Upah = Rp 31,575.00
ANALISA Lembar ke : 14
ANALISA HARGA SATUAN PEKERJAAN
KABUPATEN PURWAKARTA PROPINSI JAWA BARAT
PROYEK PEMBANGUNAN PER TAHUN 2020
1 Screeding 5 CM / M²
Bahan :
PC 0.2270 Zak x Rp. 62,500.00 = Rp 14,187.50
Pasir 0.0195 M³ x Rp. 260,000.00 = Rp 5,070.00
Total Bahan = Rp 19,257.50
Upah :
Pekerja 0.4400 Hr x Rp. 120,000.00 = Rp 52,800.00
Tukang Batu 0.2200 Hr x Rp. 135,000.00 = Rp 29,700.00
Kepala Tukang Batu 0.0220 Hr x Rp. 155,000.00 = Rp 3,410.00
Mandor 0.0220 Hr x Rp. 0.00 = Rp 0.00
Total Upah = Rp 85,910.00
Total Pekerjaan = Rp 105,167.50
Bahan :
Keramik 1.0608 M² xRp. 105,000.00 = Rp 111,384.00
PC 8.1900 kg xRp. 1,250.00 = Rp 10,237.50
Pasir pasang 0.0450 M² xRp. 200,000.00 = Rp 9,000.00
Semen warna 1.3000 kg xRp. 8,500.00 = Rp 11,050.00
Total Bahan = Rp 141,671.50
Upah :
Pekerja 0.7000 Hr x Rp. 120,000.00 = Rp 84,000.00
Tukang Batu 0.3500 Hr x Rp. 135,000.00 = Rp 47,250.00
Kepala Tukang 0.0350 Hr x Rp. 155,000.00 = Rp 5,425.00
Mandor 0.0350 Hr x Rp. 0.00 = Rp 0.00
Total Upah = Rp 136,675.00
X PEKERJAAN PLAFOND
Bahan :
Kayu borneo, balok 0.0088 M³ x Rp. 3,750,000.00 = Rp 32,812.50
Paku biasa 2" - 5" 0.1000 Kg x Rp. 15,000.00 = Rp 1,500.00
Total Bahan = Rp 34,312.50
Upah :
Pekerja 0.1500 Hr x Rp. 120,000.00 = Rp 18,000.00
Tukang kayu 0.2500 Hr x Rp. 135,000.00 = Rp 33,750.00
Kepala Tukang Kayu 0.0250 Hr x Rp. 155,000.00 = Rp 3,875.00
Mandor 0.0750 Hr x Rp. 0.00 = Rp 0.00
Total Upah = Rp 55,625.00
Bahan :
Calsiboard 120x240x4 mm 0.3750 Lbr x Rp. 0.00 = Rp 0.00
Paku 0.0300 Kg x Rp. 15,000.00 = Rp 450.00
Total Bahan = Rp 450.00
Upah :
Pekerja 0.1000 Hr x Rp. 120,000.00 = Rp 12,000.00
Tukang Kayu 0.1000 Hr x Rp. 135,000.00 = Rp 13,500.00
Kepala Tukang 0.0100 Hr x Rp. 155,000.00 = Rp 1,550.00
Mandor 0.0050 Hr x Rp. 0.00 = Rp 0.00
Total Upah = Rp 27,050.00
Bahan :
Triplek Ukr. 4x8 FT x 4 mm 0.3750 Lbr x Rp. 75,000.00 = Rp 28,125.00
ANALISA Lembar ke : 15
ANALISA HARGA SATUAN PEKERJAAN
KABUPATEN PURWAKARTA PROPINSI JAWA BARAT
PROYEK PEMBANGUNAN PER TAHUN 2020
XI PEKERJAAN CAT
Bahan :
Kabel NYM 3 x 1,5 mm² 15.0000 M¹ x Rp. 12,000.00 = Rp 180,000.00
Perlengkapan (35% harga kabel) 0.3500 lot x Rp. 180,000.00 = Rp 63,000.00
Total Bahan = Rp 243,000.00
Upah :
Kepala Tukang 0.1065 Hr x Rp. 145,000.00 = Rp 15,442.50
Tukang Instalasi 0.2306 Hr x Rp. 135,000.00 = Rp 31,131.00
Pekerja 0.3714 Hr x Rp. 120,000.00 = Rp 44,568.00
Total Upah = Rp 91,141.50
Total Pekerjaan = Rp 334,141.50
Bahan :
Kabel NYM 3 x 2,5 mm² 10.0000 M¹ x Rp. 13,000.00 = Rp 130,000.00
ANALISA Lembar ke : 16
ANALISA HARGA SATUAN PEKERJAAN
KABUPATEN PURWAKARTA PROPINSI JAWA BARAT
PROYEK PEMBANGUNAN PER TAHUN 2020
Bahan :
ANALISA Lembar ke : 17
ANALISA HARGA SATUAN PEKERJAAN
KABUPATEN PURWAKARTA PROPINSI JAWA BARAT
PROYEK PEMBANGUNAN PER TAHUN 2020
ANALISA Lembar ke : 18
DAFTAR HARGA SATUAN BAHAN
KABUPATEN PURWAKARTA PROPINSI JAWA BARAT
PROYEK PEMBANGUNAN PER TAHUN 2020
AN-BYA.WK4
SATBHN Hal : 19
NO. URAIAN SATUAN HARGA (Rp.)
36 Plamur Tembok setera Matex kg 55,000.00
37 Lem Kayu kg 15,000.00
38 Sealent tube 21,000.00
39 Hampelas Gosok lembar 5,000.00
V UBIN
40 Ubin Keramik Ukr. 40/40 M² 105,000.00
SPS AL-MARDHIYYAH
SATBHN Hal : 20
DAFTAR HARGA SATUAN UPAH
KABUPATEN PURWAKARTA PROPINSI JAWA BARAT
PROYEK PEMBANGUNAN PER TAHUN 2020
1 Mandor Hari
2 Kepala Tukang Hari 155,000.00
3 Tukang Besi Hari 145,000.00
4 Tukang Kayu Hari 135,000.00
5 Tukang Batu Hari 135,000.00
6 Tukang Cat Hari 135,000.00
7 Kepala Tukang Listrik / Plumbing Hari 145,000.00
8 Tukang Listrik / Plumbing Hari 135,000.00
9 Pekerja Hari 120,000.00
SPS AL-MARDHIYYAH
Memanjang
2 Pekerjaan Pengukuran & Pasang Bowplank 30.00 m' 8.00 2.00 16.00
1.00 0.00
Melintang
7.00 2.00 14.00
1.00 0.00
30.00 m1
Memanjang
2 Pekerjaan Galian Tanah Biasa Kedalaman 1 m' 13.65 m3 7.00 0.70 0.75 1.00 3.68
7.00 0.70 0.75 1.00 3.68
0.00 0.40 0.45 1.00 0.00
Melintang
6.00 0.70 0.75 1.00 3.15
6.00 0.70 0.75 1.00 3.15
0.00 0.40 0.45 1.00 0.00
0.00 0.40 0.45 1.00 0.00
13.65 m3
4 Urugan Pasir Bawah Lantai 2.10 m3 7.00 6.00 0.05 1.00 2.10
0.00 2.00 0.05 1.00 0.00
2.10 m3
IV PEKERJAAN BETON
1 Kolom Praktis Kp (15x15) cm , beton mutu f'c = 12,2 (K 150), 0.27 m3 3.00 0.15 0.15 4.00 0.27 m3
slump (12+/-2) cm, w/c = 0,72, pembesian = 149 kg/m3 0.27 m3
2 Kolom Praktis Kp (20x20) cm , beton mutu f'c = 12,2 (K 150), 0.48 m3 3.00 0.20 0.20 4.00 0.48 m3
slump (12+/-2) cm, w/c = 0,72, pembesian = 131 kg/m3 0.48 m3
Sengkang
Pekerjaan Pembesian Kolom 20/20 73.42 kg 0.60 60.00 36.00
152.96 kg/m3 jumlah x kof.
36.00 0.395 = 14.22 kg
Tulangan
12.00 8.00 96.00
jumlah x kof.
96.00 0.617 = 59.20 kg
jumlah total 73.42 kg
73.42 kg
3 Ring Balok , (15x15) cm, beton mutu f'c = 26,4 (K 150), slump 0.00 m3 Memanjang
(12+/-2) cm, w/c = 0,52, pembesian = 153 kg/m3 0.00 0.15 0.15 1.00 0.00
0.00 0.15 0.15 1.00 0.00
Melintang
0.00 0.15 0.15 1.00 0.00
0.00 0.15 0.15 1.00 0.00
0.00 m3
4 Ring Balok , (25x15) cm, beton mutu f'c = 26,4 (K 150), slump 1.46 m3 Memanjang
(12+/-2) cm, w/c = 0,52, pembesian = 153 kg/m3 7.00 0.25 0.15 1.00 0.26
7.00 0.25 0.15 1.00 0.26
7.00 0.25 0.15 1.00 0.26
Melintang
6.00 0.25 0.15 1.00 0.23
6.00 0.25 0.15 1.00 0.23
6.00 0.25 0.15 1.00 0.23
1.46 m3
40.60
Kusen
0.00 1.70 2.00 0.00
0.00 2.00 4.00 0.00
0.00 2.00 0.00 0.00
jumlah 0.00
4 Pasang Lantai Keramik ukr. 40x40 cm 42.00 m2 7.00 6.00 1.00 42.00 42.00
0.00 6.00 1.00 0.00
42.00 m2
7 Pasangan Lantai Keramik Kamar Mandi ukuran 20x20 0.00 m2 0.00 0.00 1.00 0.00
0.00 0.00 1.00 0.00
0.00 m2
VI PEKERJAAN ATAP
1 Pekerjaan Atap Genteng Keramik Natural 65.12 m2 8.00 7.00 1.00 65.12
Sudut Kemiringan 15 derajat
jumlah 65.12 m2
2 a. Pekerjaan Balok Kuda-kuda Beton (20/15) 0.19 m3 4.23 0.15 0.20 1.50 0.19
0.00 0.15 0.20 1.00 0.00
jumlah 0.19 m3
VI Pintu Tipe P1
1 Pintu Tipe P1 2.00 unit
2 Pintu Tipe P2 0.00 unit
3 Pintu Tipe P3 0.00 unit
4 Jendela J1 5.00 unit
5 Jendela J2 0.00 unit
6 Boven BV 1 5.00 unit
7 Boven BV 2 0.00 unit
VII PEKERJAAN PLAFOND
1 Pasang Rangka Plafond Kayu 97.37 m2 10.70 9.10 1.00 97.37
0.00 1.00 1.00 0.00
0.00 1.00 2.00 0.00
0.00 4.23 2.00 2.00 0.00
97.37 m2
Toilet
0.00 0.00 1.00 0.00
0.00 0.00 1.00 0.00
0.00 m2
36.00 m2
Toilet
3 Pek Plafon GRC / Kalsi Board 6 mm 100.00 m2 10.00 10.00 1.00 100.00
0.00 1.00 2.00 0.00
0.00 4.23 2.00 2.00 0.00
100.00 m2
3 Cat Kayu Kusen, Daun Pintu dan Jendela 120.40 m2 2.50 2.00 5.00 m2 (Kusen Pintu P1)
92.40 0.80 2.10 2.00 2.00 6.72 m2 ( Daun Pintu P1)
28.00 3.83 1.00 3.83 m2 (Kusen Jendela J1)
7.00 0.02 0.06 1.00 1.12 m2 (Daun Jendela J1)
3.30 4.00 13.20 m2 (Bovenlicht BV1)
15.46 0.30 2.00 2.00 Lisplang
29.87 m2
XIII PEK. INSTALASI ELEKTRIKAL
1 Instalasi titik lampu (NYM 2 x 1.5 mm) in PVC Conduit 5.00 Titik
2 Instalasi Stop Kontak (NYM 3 x 2.5 mm) in PVC Conduit 2.00 Titik
3 Lampu TL 36 W 4.00 Buah
4 Lampu Pijar SL, 14 W + Fitting 1.00 Buah
5 Saklar Tunggal 3.00 Buah
6 Saklar Seri 0.00 Buah
7 Box MCB Power dan Penerangan 0.00 unit
8 Penyambungan Daya Listrik PLN 0.00 Lot