Daftar Kuantitas Dan Harga
Daftar Kuantitas Dan Harga
JUMLAH HARGA
I NO. I URAIAN PEKERJAA N
I (Rp.)
I
I PEKERJAAN PERSIAPAN Rp 99,599,129 .21
- --
II. BIAYA SMKK Rp 85 ,504,400 .00
Ill. PEKERJAAN TANAH Rp 799 ,109,095 .21
-
IV. PEKERJAAN PATHWAY Rp 2,252 ,174 ,878 .73
V. PEKERJAAN PATTERN PUCUK BAN G Rp 996 ,832,772 .00
VI. PEKERJAAN AREA TI ANG BENDERA Rp 574 ,695,628 .87
VI I. PEKERJAAN STAGE UTARA Rp 2,216 ,11 1,078.69
VIII. PEKERJAAN GATE / ENTRANCE Rp 780 ,844 ,252 .23
IX. PEKERJAAN OUTDOOR GYM & KID'S PLAYGROUND Rp 962 ,625,515 .64
-
X. PEKERJAAN AREA SKATEBOARD Rp 796,503,407 .81
XI. PEKERJAAN BATU TERAPI (LANSIA) Rp 429,090,352 .53
-
XII. PEKERJAAN W IFI AREA Rp 273,475 .296 .68
- -
XIII. PEKERJAAN SPORT AREA Rp 1,751 ,819,024 .54
-- -- -
XIV. PEKERJAAN AREA FOODCOURT Rp 1,561,927,738 .94
-
XV . PEKERJAAN TOILET Rp 498 ,440 ,678 .14
-
XVI. PEKERJAAN AREA SUCI Rp 170,287 ,912 .31
XVIII. PEKERJAAN RUANG LAKTASI Rp 386 ,945,465.44
-
XIX. PEKERJAANLANDS CAP E R_p 3,473 ,622 ,352 .50
XXI I. PEKERJAAN PAPAN NAMA
- Rp 104,311 ,966 .00
-
XXII. PEKERJAAN MEP Rp 988,500 ,126.91
JUMLAH HARGA Rp 19,202 ,42 1,672 .39
PPN 10% Rp 1,920 ,242 ,167 .24
JUMLAH HARGA Rp 21 ,122,663 ,839 .62
DIBULATKAN Rp 21,122,664,000.00
Terbi lang : Dua Puluh Satu Milyar Seratus Dua Puluh Dua Juta Enam Ratus Enam Puluh Empat Ribu Rupia h
-~ 'AA
LUI'
' '
Ir. I Ketut Karnaya
Direktur Utama
II
ENGINEERING ESTIMATE
Provinsi : Bali
Kota : Bangli
Kegiatan : Penyelenggaraan Penataan Bangunan dan Lingkungannya di Daerah Kabupaten/Kota
Pekerjaan : Penataan Lapangan Kapten Muditha
Tahun Anggaran : 2021
I PEKERJAAN PERSIAPAN
1 Pengukuran dan Pemasangan Bowplank m' 600.00 Rp 38,000.00 Rp 22,800,000.00
2 Pekerjaan Papan Nama Proyek Ls 1.00 Rp 1,000,000.00 Rp 1,000,000.00
3 Pembongkaran Bangunan Eksisting Ls 1.00 Rp 23,861,629.21 Rp 23,861,629.21
4 Pekerjaan Perataan Site Lapangan m3 8750.00 Rp 4,450.00 Rp 38,937,500.00
5 Mobilasasi Alat Ls 1.00 Rp 10,000,000.00 Rp 10,000,000.00
6 Papan Prasasti Ls 1.00 Rp 3,000,000.00 Rp 3,000,000.00
SUBJUMLAH I Rp 99,599,129.21
d Pekerjaan Sanitary
Closet Toto CW637J unit 6.00 Rp 3,183,039.48 Rp 19,098,236.88
Wahtafel LW247CJ unit 4.00 Rp 1,631,986.20 Rp 6,527,944.80
Kran Wastafel TX 109 LD unit 4.00 Rp 808,258.32 Rp 3,233,033.28
Urinoir U57M unit 2.00 Rp 3,383,829.48 Rp 6,767,658.96
Jet Spray THX 20 MCRB unit 6.00 Rp 439,095.72 Rp 2,634,574.32
SUBJUMLAH VII Rp 2,216,111,078.69
Instalasi Saklar, NYM 3x2,5mm2 in HIC Conduit 20mm2 Ttk 2.00 Rp 267,347.52 Rp 534,695.04
Instalasi Stop Kontak, NYM 3x2,5mm2 in HIC Conduit 20mm2 Ttk 4.00 Rp 314,524.44 Rp 1,258,097.76
Lampu downlight Genie 11W 220V set 8.00 Rp 195,936.12 Rp 1,567,488.96
Saklar Seri set 2.00 Rp 60,434.88 Rp 120,869.76
Stop Kontak Vivace set 4.00 Rp 58,500.00 Rp 234,000.00
c Pekerjaan Plumbing
PVC AW 2" m1 45.00 Rp 62,817.96 Rp 2,826,808.20
PVC AW 1" m1 10.00 Rp 34,221.60 Rp 342,216.00
PPR PN10 DN 20 m1 15.00 Rp 34,803.58 Rp 522,053.70
PPR PN10 DN25 m1 10.00 Rp 43,463.72 Rp 434,637.20
d Pekerjaan Sanitary
Wastafel LW 247J set 2.00 Rp 1,631,986.20 Rp 3,263,972.40
Kran Wastafel TH 109 LD set 2.00 Rp 808,258.32 Rp 1,616,516.64
Stop Valve set 1.00 Rp 242,240.04 Rp 242,240.04
f Pekerjaan Plumbing
PVC AW 4" m1 16.00 Rp 180,089.40 Rp 2,881,430.40
PVC AW 2" m1 16.00 Rp 62,817.96 Rp 1,005,087.36
PVC AW 1" m1 8.00 Rp 34,221.60 Rp 273,772.80
PPR PN10 DN 20 m1 24.00 Rp 34,803.58 Rp 835,285.92
PPR PN10 DN25 m1 18.00 Rp 43,463.72 Rp 782,346.96
g Pekerjaan Sanitary
Kloset CW637J unit 1.00 Rp 3,183,039.48 Rp 3,183,039.48
Wastafel LW 247J unit 1.00 Rp 1,631,986.20 Rp 1,631,986.20
Kran Wastafel TH 109 LD unit 1.00 Rp 808,258.32 Rp 808,258.32
Jet Spray TX 20 MCRB unit 1.00 Rp 439,095.72 Rp 439,095.72
Stop Valve unit 2.00 Rp 242,240.04 Rp 484,480.08
SUBJUMLAH VIII Rp 780,844,252.23
b Area Toilet
Instalasi lampu penerangan, NYM 3x2,5mm2 in HIC Conduit 20mm2
ttk 8.00 Rp 290,930.16 Rp 2,327,441.28
Instalasi saklar NYM 3x2,5mm2 in HIC Conduit 20mm2 ttk 6.00 Rp 267,347.52 Rp 1,604,085.12
Lampu Downlight Genie 11W 220V set 8.00 Rp 195,936.12 Rp 1,567,488.96
Saklar tunggal set 6.00 Rp 44,767.44 Rp 268,604.64
c Pekerjaan Plumbing
Air Bersih
PPR PN10 DN20 m1 15.00 Rp 34,803.58 Rp 522,053.70
PPR PN10 DN25 m1 10.00 Rp 43,463.72 Rp 434,637.20
d Air Kotor
PVC AW 4" Rucika m1 12.00 Rp 180,089.40 Rp 2,161,072.80
PVC AW 2" Rucika m1 15.00 Rp 62,817.96 Rp 942,269.40
PVC AW 1" Rucika m1 8.00 Rp 34,221.60 Rp 273,772.80
e Pekerjaan Sanitary
Kloset CW637J unit 4.00 Rp 3,183,039.48 Rp 12,732,157.92
Wastafel LW 247J unit 4.00 Rp 1,631,986.20 Rp 6,527,944.80
Kran Wastafel TH 109 LD unit 4.00 Rp 808,258.32 Rp 3,233,033.28
Jet Spray TX 20 MCRB unit 4.00 Rp 439,095.72 Rp 1,756,382.88
Urinal U57M unit 3.00 Rp 3,383,829.48 Rp 10,151,488.44
Stop Valve unit 4.00 Rp 242,240.04 Rp 968,960.16
SUBJUMLAH IX Rp 962,625,515.64
4 Pekerjaan Pasangan
Pekerjaan & Urugan Pasir Dibawah Pondasi m3 22.27 Rp 229,000.00 Rp 5,099,830.00
Pekerjaan Pasangan Batu Kosong m3 22.00 Rp 335,100.00 Rp 7,372,200.00
Pekerjaan Pondasi Pas. Batu Kali m3 70.00 Rp 552,500.00 Rp 38,675,000.00
Pekerjaan Tangga m2 15.00 Rp 555,258.00 Rp 8,328,870.00
6 Pekerjaan Finishing
Pekerjaan Besi Ornamen Rail & Coping m' 120.00 Rp 548,900.00 Rp 65,868,000.00
coping besi 2" t: 3mm
railing pipa besi 2" t: 3mm
7 Pekerjaan Pagar
Besi 4x6 + 4x4 m' 60.00 Rp 555,258.00 Rp 33,315,480.00
9 Pekerjaan MEP
Pekerjaan Drainase Porus 4" Titik 3.00 Rp 1,205,132.78 Rp 3,615,398.34
Plat besi 1 cm
bak kontrol 50 x 50 cm
Catch drainage
Pekerjaan Pipa AW 4 " m' 50.00 Rp 181,141.68 Rp 9,057,084.00
10 Pekerjaan Listrik
Pekerjaan Panel + MCB ls 1.00 Rp 4,836,943.80 Rp 4,836,943.80
Pekerjaan Tiang Titik 6.00 Rp 4,452,300.00 Rp 26,713,800.00
Pekerjaan Instalasi Kabel m' 180.00 Rp 36,759.12 Rp 6,616,641.60
Pekerjaan Lampu Titik 12.00 Rp 8,984,194.32 Rp 107,810,331.84
SUBJUMLAH X Rp 796,503,407.81
8 Pek. Finishing
Pelapisan lem + pasir khusus (kasar) system tuang/tarik m2 714.00 Rp 29,458.00 Rp 21,033,012.00
Pelapisan lem + pasir khusus (halus) system tuang/tarik m2 714.00 Rp 29,458.00 Rp 21,033,012.00
Pelapisan cat flexi pave + pasir khusus (halus) system tuang/tarik m2 714.00 Rp 39,358.00 Rp 28,101,612.00
Pelapisan top coat system roll ke 1 m2 714.00 Rp 29,458.00 Rp 21,033,012.00
Pelapisan top coat system roll ke 2 m2 714.00 Rp 29,458.00 Rp 21,033,012.00
Pek. Sloof 15 x 20
Beton f'c = 19,3 Mpa m3 3.30 Rp 982,414.68 Rp 3,241,968.44
Besi kg 1650.00 Rp 16,634.00 Rp 27,446,100.00
Pek. Pondasi Menerus
Pek. Pas.Batu Kali 1:5 m3 16.50 Rp 552,500.00 Rp 9,116,250.00
Pek. Pas.Batu Kosong m3 4.95 Rp 335,100.00 Rp 1,658,745.00
Pek. Urugan Pasir m3 1.65 Rp 229,000.00 Rp 377,850.00
9 Pek. Penanaman Pohon
Phn. Jepun /Plumeria rubra bunga merah fanta (renteng) ph 1.00 Rp 4,405,258.00 Rp 4,405,258.00
10 Pek. Penanaman Semak
Penutup tanah Rumput jepang/Zoysia japonica m2 114.70 Rp 41,780.00 Rp 4,792,166.00
12 Pek. MEP
Instalasi Lampu Penerangan, NYY 3x2,5mm2 ttk 15.00 Rp 626,569.56 Rp 9,398,543.40
Lampu BVP382 LED260/CW200W220V SWB GM Dengan Tiang ttk 12.00 Rp 12,941,794.32 Rp 155,301,531.84
SUBJUMLAH XIII Rp 1,751,819,624.54
9 Pek MEP
Instalasi Lampu Penerangan NYY 3x2,5mm2 ttk 1.00 Rp 626,569.56 Rp 626,569.56
Lampu taman Bollard 120cm 15W set 1.00 Rp 3,239,237.40 Rp 3,239,237.40
SUBJUMLAH XVI Rp 170,287,912.31
2 Pekerjaan Panel
MDP unit 1.00 Rp 114,154,678.92 Rp 114,154,678.92
SDP A unit 1.00 Rp 6,933,459.12 Rp 6,933,459.12
SDP B unit 1.00 Rp 9,389,534.04 Rp 9,389,534.04
SDP C unit 1.00 Rp 9,062,077.56 Rp 9,062,077.56
SDP D unit 1.00 Rp 9,062,077.56 Rp 9,062,077.56
SDP Pond unit 1.00 Rp 6,521,950.20 Rp 6,521,950.20
PP Tenis unit 1.00 Rp 4,836,943.80 Rp 4,836,943.80
PP Pump unit 1.00 Rp 10,021,562.76 Rp 10,021,562.76
PP Voley unit 1.00 Rp 4,836,943.80 Rp 4,836,943.80
4 Pekerjaan Wifi
Peralatan utama ruang server unit 1.00 Rp 43,556,880.00 Rp 43,556,880.00
MDF dengan switch hub 16 port, dan Terminal Box unit 1.00 Rp 43,556,880.00 Rp 43,556,880.00
Instalasi 2xUTP CAT6 in HIC Conduit 20mm2 titik 6.00 Rp 697,515.36 Rp 4,185,092.16
No Uraian Pekerjaan Satuan Volume Harga Satuan Harga Pekerjaan
1 2 3 4 5 6
TOTAL Rp 19,202,421,672.39
Catatan :
ANALISA BIAYA SMK3 KONSTRUKSI Ans.K3
ASUMSI TENAGA KERJA 75 ORANG
HARGA JUMLAH
NO URAIAN SATUAN VOLUME SATUAN HARGA KET.
(Rp.) (Rp.)
1 Penyiapan RKK Terdiri atas
a Pembuatan manual, Prosedur,Instruksi Kerja, Ijin Kerja dan set 1.000 2,500,000.00 2,500,000.00
b Pembuatan Kartu Identitas Pekerjaa (KIP) lg 75.000 10,000.00 750,000.00
JUMLAH 3,250,000.00
2 Sosialisasi, Promosi dan Pelatihan
a Induksi K3 (Safety Induktion); org 75.000 25,000.00 1,875,000.00
b Pengarahan K3 (Safety Briefing) : org 75.000 25,000.00 1,875,000.00
Pertemuan Keselamatan (Safety talk dan / atau tool box meeting; -
c Pelatihan K3; org 75.000 50,000.00 3,750,000.00
d Simulasi K3; org 75.000 50,000.00 3,750,000.00
e Spanduk (Banner); lb 1.000 7,248,000.00 7,248,000.00
f poster lb 1.000 500,000.00 500,000.00
g papan informasi K3 bh 1.000 1,500,000.00 1,500,000.00
JUMLAH 20,498,000.00
3 Alat Pelindung Kerja dan Alat Pelindung Diri
a jaring Pengaman (safety net); ls - -
b Tali Keselamatan (Life Line); ls 3.000 1,000,000.00 3,000,000.00
c Penahan jatuh (safety deck0; ls - -
d Pagar pengaman (guard ralling); ls - -
e Pembatas area (restrictet area) ls - -
f Topi pelindung (safety helmet); bh 75.000 35,000.00 2,625,000.00
g Pelindung mata (goggles, spectacles); psg 5.000 55,000.00 275,000.00
h tameng mata (kaceshield); bh - -
i Masker selam (breating apparatus); bh - -
j Pelindung telinga (Ear plug, ear muff); psg - -
k Pelindung pernapasan dan mulut (masker); asumsi 3 x ganti bh 225.000 2,500.00 562,500.00
l sarung tangan (safety gloves); psg 75.000 5,000.00 375,000.00
m Sepatu Keselamatan (safety shoes); psg 75.000 70,000.00 5,250,000.00
n Penunjang seluruh tubuh (full body harness) bh - -
o Jaket Pelampung (Life vest); bh - -
p Rompi keselamatan (safety vest); bh 75.000 30,000.00 2,250,000.00
q Celemek (apron/coveralls); bh - -
r Pelindung jatuh (falls arrester); bh - -
JUMLAH 14,337,500.00
4 Asuransi dan perijinan terdiri atas
a BPJS ketenagakerjaan dan kesehatan kerja: ls 0.002 19,950,000,000.00 39,900,000.00
b Surat ijin kelayakan alat: alat/Kend - -
c Surat ijin operator ; lb/alat - -
d Surat ijin pengesahan panitia pembina keselamatan dan kesehatan kerja ls(P2k3) -
JUMLAH 39,900,000.00
5 Personil Keselamatan Konstruksi
a Ahli K3 ob 1.000 3,500,000.00 3,500,000.00
b Petugas K3 ob 1.000 1,500,000.00 1,500,000.00
c Petugas tanggap darurat ob - -
d Petugas P3K ob - -
e Petugas pengatur lalu lintas (flagman) ob - -
f Petugas medis ob - -
JUMLAH 5,000,000.00
6 Fasilitas sarana kesehatan ; -
a Peralatan P3K (kotak P3K, tandu, tabung oksigen, obat luka, perban) ls 3.000 1,500,000.00 4,500,000.00
b Ruangan P3K (tempat tidur pasien, stetoskop, timbangan berat badan) ls 1.000 2,000,000.00 2,000,000.00
c Peralatan pengasapan bh 1.000 350,000.00 350,000.00
d Obat pengasapan ls 1.000 125,000.00 125,000.00
JUMLAH 6,975,000.00
7 Rambu - rambu terdiri atas :
a Rambu petunjuk; bh 1.000 100,000.00 100,000.00
b Rambu larangan bh 1.000 100,000.00 100,000.00
c Rambu peringatan bh 1.000 100,000.00 100,000.00
d Rambu kewajiban bh - -
e Rambu informasi bh 1.000 100,000.00 100,000.00
f Rambu pekerjaan sementara bh - -
g Tongkat pengatur lalu lintas (warning lights stick) bh -
h Kerurcut lalu lintas (trafic cone) bh - -
i Lampu putar (rotary lamp) bh - -
j Lampu selang lalu lintas bh -
JUMLAH 400,000.00
8 Konsultasi dengan ahli terkait keselamatan konstruksi
a Biaya Konsultasi ls 1.000 1,500,000.00 1,500,000.00
JUMLAH 1,500,000.00
9 Kegiatan dan peralatan terkait dengan pengendalian resiko keselamatan konstruksi .
a Sewa Alat pemadam api ringan (APAR) bln 2.000 650,000.00 1,300,000.00
b Sirine bh - -
c Bendera K3 bh 1.000 120,000.00 120,000.00
d Jalur evakuasi (escape route) ls - - -
e Lampu darurat (Emergency lamp) bh - -
f Program inspeksi dan audit internal ls - -
g laporan dan penyelidikan insiden ls - -
JUMLAH 1,420,000.00
HARGA JUMLAH
NO URAIAN SATUAN VOLUME SATUAN HARGA KET.
(Rp.) (Rp.)
10 Protokol Covid
a Ketua merangkap anggota Oh 1.000 3,000,000.00 3,000,000.00
b Anggota Oh 2.000 2,000,000.00 4,000,000.00
c Petugas Medis Oh 1.000 2,000,000.00 2,000,000.00
d Sewa Tabung Oksigen bln -
e Sewa Alat Ukur Suhu Badan (thermorscan) bln 1.000 250,000.00 250,000.00
f Sewa Alat Ukur Tekanan Darah bln 1.000 850,000.00 850,000.00
g Obat-obatan ls 1.000 1,500,000.00 1,500,000.00
h Poster pencegahan COVID-19 Bh 4.000 500,000.00 2,000,000.00
JUMLAH 13,600,000.00
II PEKERJAAN TANAH
1 1 M3 Menggali 1 m3 tanah biasa sedalam 1 meter
0.7500 Oh Pekerja 99,000.00 74,250.00 74,250.00
0.0250 Oh Mandor 130,000.00 3,250.00
Total : 77,500.00 74,250.00
7 1 M3 Menggali stripping tebing setinggi 1 meter
0.0500 Oh Pekerja 99,000.00 4,950.00 4,950.00
0.0050 Oh Mandor 130,000.00 650.00 650.00
Total : 5,600.00 5,600.00
8 1 M3 Membuang 1 m3 tanah sejauh 30 meter
0.3300 Oh Pekerja 99,000.00 32,670.00 32,670.00
0.0100 Oh Mandor 130,000.00 1,300.00 1,300.00
Total : 33,970.00 33,970.00
9 1 M3 Mengurug kembali 1 m3 galian tanah biasa sedalam 1
meter
0.2500 Oh Pekerja 99,000.00 24,750.00 24,750.00
0.0080 Oh Mandor 130,000.00 1,040.00 1,040.00
Total : 25,790.00 25,790.00
16 1 3 Mengurug 1 m3 pasir urug
M
1.2000 M3 Pasir urug 165,000.00 198,000.00 198,000.00
0.3000 Oh Pekerja 99,000.00 29,700.00 29,700.00
0.0100 Oh Mandor 130,000.00 1,300.00 1,300.00
Total : 198,000.00 31,000.00 229,000.00
17 1 M3 Mengurug 1 m3 tanah urug
1.2000 M3 Tanah urug 80,000.00 96,000.00 96,000.00
0.3000 Oh Pekerja 99,000.00 29,700.00
0.0100 Oh Mandor 130,000.00 1,300.00 1,300.00
Total : 96,000.00 31,000.00 97,300.00
18 1 M3 Memasang 1 m2 lapisan ijuk tebal 10 cm
6.0000 Kg Ijuk 0.00 0.00 0.00
0.1500 Oh Pekerja 99,000.00 14,850.00 14,850.00
0.0150 Oh Mandor 130,000.00 1,950.00 1,950.00
Total : 0.00 16,800.00 16,800.00
IV PEKERJAAN BETON
4 Membuat 1 m3 beton mutu f'c=7,4 Mpa (K 100), slump (12±2) cm, w/c= 0,87
247.0000 Kg Portland Cement 1,400.00 345,800.00 345,800.00
869.0000 Kg Pasir beton 110.71 96,210.71 96,210.71
999.0000 Kg Kerikil (maksimum 30 mm) 148.15 148,000.00 148,000.00
215.0000 ltr Air 100.00 21,500.00 21,500.00
1.6500 Oh Pekerja 99,000.00 163,350.00 163,350.00
0.2750 Oh Tukang batu 115,000.00 31,625.00
0.0280 Oh Kepala Tukang 120,000.00 3,360.00
0.0830 Oh Mandor 130,000.00 10,790.00
Total : 611,510.71 209,125.00 774,860.71
9 Membuat 1 m3 beton mutu f'c= 16,9 Mpa (K 200), slump (12±2) cm, w/c=
352.00 Kg Portland Cement 1,400.00 492,800.00 492,800.00
731.00 Kg Pasir beton 110.71 80,932.14 80,932.14
1,031.00 Kg Kerikil (maksimum 30 mm) 148.15 152,740.74 152,740.74
215.00 ltr Air 100.00 21,500.00 21,500.00
1.6500 Oh Pekerja 99,000.00 163,350.00 163,350.00
0.2750 Oh Tukang batu 115,000.00 31,625.00 31,625.00
0.0280 Oh Kepala Tukang 120,000.00 3,360.00 3,360.00
0.0830 Oh Mandor 130,000.00 10,790.00 10,790.00
Total : 747,972.88 209,125.00 957,097.88
10 Membuat 1 m3 beton mutu f'c= 19,3 Mpa (K 225), slump (12±2) cm, w/c=
371.00 Kg Portland Cement 1,400.00 519,400.00 519,400.00
698.00 Kg Pasir beton 110.71 77,278.57 77,278.57
1,047.00 Kg Kerikil (maksimum 30 mm) 148.15 155,111.11 155,111.11
215.00 ltr Air 100.00 21,500.00 21,500.00
1.6500 Oh Pekerja 99,000.00 163,350.00 163,350.00
0.2750 Oh Tukang batu 115,000.00 31,625.00 31,625.00
0.0280 Oh Kepala Tukang 120,000.00 3,360.00 3,360.00
0.0830 Oh Mandor 130,000.00 10,790.00 10,790.00
Total : 773,289.68 209,125.00 982,414.68
11 Membuat 1 m3 beton mutu f'c= 21,7 Mpa (K 250), slump (12±2) cm, w/c=
384.00 Kg Portland Cement 1,400.00 537,600.00 537,600.00
692.00 Kg Pasir beton 110.71 76,614.29 76,614.29
1,039.00 Kg Kerikil (maksimum 30 mm) 148.15 153,925.93 153,925.93
215.00 ltr Air 100.00 21,500.00 21,500.00
1.6500 Oh Pekerja 99,000.00 163,350.00 163,350.00
0.2750 Oh Tukang batu 115,000.00 31,625.00 31,625.00
0.0280 Oh Kepala Tukang 120,000.00 3,360.00 3,360.00
0.0830 Oh Mandor 130,000.00 10,790.00 10,790.00
Total : 789,640.21 209,125.00 998,765.21
20 10 Kg Pembesian 10 Kg dengan besi polos atau besi ulir
10.5000 Kg Besi beton (polos/ulir) 13,000.00 136,500.00 136,500.00
0.1500 Kg Kawat beton 90,000.00 13,500.00 13,500.00
0.0700 Oh Pekerja 99,000.00 6,930.00 6,930.00
0.0700 Oh Tukang besi 115,000.00 8,050.00 8,050.00
0.0070 Oh Kepala Tukang 120,000.00 840.00 840.00
0.0040 Oh Mandor 130,000.00 520.00 520.00
Total : 150,000.00 16,340.00 166,340.00
untuk 1 Kg besi polos atau ulir 16,634.00
HARGA SATUAN HARGA HARGA HARGA
NO URAIAN
( Rp.) (BAHAN) (UPAH) JUMLAH
1 2 3 4 5 6
23 1 M2 Memasang 1 m2 bekisting untuk pondasi
0.0400 M3 Kayu kelas III (albesia ) 4,700,000.00 188,000.00 188,000.00
0.3000 Kg Paku 5 cm - 10 cm 30,000.00 9,000.00 9,000.00
0.1000 Ltr Minyak bekisting 40,000.00 4,000.00 4,000.00
0.5200 Oh Pekerja 99,000.00 51,480.00
0.2600 Oh Tukang kayu 115,000.00 29,900.00 29,900.00
0.0260 Oh Kepala Tukang 120,000.00 3,120.00
0.0260 Oh Mandor 130,000.00 3,380.00
Total : 201,000.00 87,880.00 230,900.00
24 1 2 Memasang 1 m2 bekisting untuk sloof
M
0.0450 3 Kayu kelas III (albesia ) 4,700,000.00 211,500.00 211,500.00
M
0.3000 Kg Paku 5cm - 10 cm 30,000.00 9,000.00 9,000.00
0.1000 Ltr Minyak bekisting 40,000.00 4,000.00 4,000.00
0.5200 Oh Pekerja 99,000.00 51,480.00 51,480.00
0.2600 Oh Tukang kayu 115,000.00 29,900.00 29,900.00
0.0260 Oh Kepala Tukang 120,000.00 3,120.00 3,120.00
0.0260 Oh Mandor 130,000.00 3,380.00 3,380.00
Total : 224,500.00 87,880.00 312,380.00
25 1 M2 Memasang 1 m2 bekisting untuk kolom
0.0400 3 Kayu kelas III (Albesia) 3,700,000.00 148,000.00 148,000.00
M
0.4000 Kg Paku 5 cm - 12 cm 30,000.00 12,000.00 12,000.00
0.2000 Ltr Minyak bekisting 40,000.00 8,000.00 8,000.00
0.0150 3 Balok kayu kelas II (kruwing) 3,700,000.00 55,500.00 55,500.00
M
0.3500 Lbr Plywood tebal 9 mm 140,000.00 49,000.00 49,000.00
2.0000 Btg Bambu Ø 8 -10 cm, panjang 4 m 10,000.00 20,000.00 20,000.00
0.6600 Oh Pekerja 99,000.00 65,340.00
0.3300 Oh Tukang kayu 115,000.00 37,950.00 37,950.00
0.0330 Oh Kepala Tukang 120,000.00 3,960.00
0.0330 Oh Mandor 130,000.00 4,290.00
Total : 292,500.00 111,540.00 330,450.00
26 1 M2 Memasang 1 m2 bekisting untuk balok
0.0400 3 Kayu kelas III (Albesia) 3,700,000.00 148,000.00 148,000.00
M
0.4000 Kg Paku 5 cm - 12 cm 30,000.00 12,000.00 12,000.00
0.2000 Ltr Minyak bekisting 40,000.00 8,000.00 8,000.00
0.0180 3 Balok kayu kelas II (kruwing) 3,700,000.00 66,600.00 66,600.00
M
0.3500 Lbr Plywood tebal 9 mm 140,000.00 49,000.00 49,000.00
2.0000 Btg Bambu Ø 8-10 cm, panjang 4 m 10,000.00 20,000.00 20,000.00
0.6600 Oh Pekerja 99,000.00 65,340.00
0.3300 Oh Tukang kayu 115,000.00 37,950.00 37,950.00
0.0330 Oh Kepala Tukang 120,000.00 3,960.00
0.0330 Oh Mandor 130,000.00 4,290.00
Total : 303,600.00 111,540.00 341,550.00
27 1 M2 Memasang 1 m2 bekisting untuk lantai
0.0400 M3 Kayu kelas III (albesia) 4,700,000.00 188,000.00 188,000.00
0.4000 Kg Paku 5 cm - 12 cm 30,000.00 12,000.00 12,000.00
0.2000 Ltr Minyak bekisting 40,000.00 8,000.00 8,000.00
0.0150 M3 Balok kayu kelas II (kruwing) 3,700,000.00 55,500.00
0.3500 Lbr Plywood tebal 9 mm 140,000.00 49,000.00 49,000.00
6.0000 Btg Bambu Ø 8-10 cm, panjang 4 m 10,000.00 60,000.00
0.6600 Oh Pekerja 99,000.00 65,340.00 65,340.00
0.3300 Oh Tukang kayu 115,000.00 37,950.00 37,950.00
0.0330 Oh Kepala Tukang 120,000.00 3,960.00
0.0330 Oh Mandor 130,000.00 4,290.00
Total : 372,500.00 111,540.00 360,290.00
28 1 M2 Memasang 1 m2 bekisting untuk dinding
0.0300 M3 keramik 3,700,000.00 111,000.00 111,000.00
0.4000 Kg Paku 5 cm - 12 cm 30,000.00 12,000.00 12,000.00
0.2000 Ltr Minyak bekisting 40,000.00 8,000.00 8,000.00
0.0200 3 Balok kayu kelas II (kruwing) 3,700,000.00 74,000.00 74,000.00
M
0.3500 Lbr Plywood tebal 9 mm 140,000.00 49,000.00 49,000.00
3.0000 Btg Bambu Ø 8-10 cm/4m 10,000.00 30,000.00 30,000.00
4.0000 bh Formite/penjaga jarak bekisting/spacer 3,000.00 12,000.00
0.6600 Oh Pekerja 99,000.00 65,340.00 65,340.00
0.3300 Oh Tukang kayu 115,000.00 37,950.00 37,950.00
0.0330 Oh Kepala Tukang 120,000.00 3,960.00
0.0330 Oh Mandor 130,000.00 4,290.00
Total : 296,000.00 111,540.00 387,290.00
HARGA SATUAN HARGA HARGA HARGA
NO URAIAN
( Rp.) (BAHAN) (UPAH) JUMLAH
1 2 3 4 5 6
29 1 M2 Memasang 1 m2 bekisting untuk tangga
0.0300 M3 Kayu kelas III (albesia) 4,700,000.00 141,000.00 141,000.00
0.4000 Kg Paku 5 cm - 12 cm 30,000.00 12,000.00 12,000.00
0.1500 Ltr Minyak bekisting 40,000.00 6,000.00 6,000.00
0.0150 3 Balok kayu kelas II (kruwing) 3,700,000.00 55,500.00 55,500.00
M
0.3500 Lbr Plywood tebal 9 mm 140,000.00 49,000.00 49,000.00
2.0000 Btg Bambu Ø 8-10 cm, panjang 4 m 10,000.00 20,000.00 20,000.00
0.6600 Oh Pekerja 99,000.00 65,340.00 65,340.00
0.3300 Oh Tukang kayu 115,000.00 37,950.00 37,950.00
0.0330 Oh Kepala Tukang 120,000.00 3,960.00 3,960.00
0.0330 Oh Mandor 130,000.00 4,290.00 4,290.00
Total : 283,500.00 111,540.00 395,040.00
36 1 M3 Membuat 1 m3 dinding beton bertulang (150 Kg besi +
bekisting)
0.2400 M3 Kayu kelas III (Albesia) 3,700,000.00 888,000.00 888,000.00
3.2000 Kg Paku 5 cm - 12 cm 30,000.00 96,000.00 96,000.00
1.6000 Ltr Minyak bekisting 40,000.00 64,000.00 64,000.00
157.5000 Kg Besi beton polos 13,000.00 2,047,500.00 2,047,500.00
2.2500 Kg Kawat beton 90,000.00 202,500.00 202,500.00
336.0000 Kg Portland Cement 1,400.00 470,400.00 470,400.00
0.5400 3 Pasir beton 195,000.00 105,300.00 105,300.00
M
0.8100 3 Kerikil 320,000.00 259,200.00 259,200.00
M
0.1600 3 Kayu kelas II balok (kruwing) 3,700,000.00 592,000.00 592,000.00
M
2.8000 Lbr Plywood tebal 9 mm 140,000.00 392,000.00 392,000.00
24.0000 Btg Bambu Ø 8-10 cm, panjang 4 m 10,000.00 240,000.00
5.3000 Oh Pekerja 99,000.00 524,700.00
0.2750 Oh Tukang batu 115,000.00 31,625.00 31,625.00
1.3000 Oh Tukang kayu 115,000.00 149,500.00
1.0500 Oh Tukang besi 115,000.00 120,750.00
0.2620 Oh Kepala Tukang Batu 120,000.00 31,440.00
0.265 Oh Mandor 130,000.00 34,450.00
Total : 5,356,900.00 367,765.00 5,673,225.00
37 1 3 Membuat 1 m3 dinding beton bertulang (200 Kg besi +
M
bekisting)
0.2500 3 Kayu kelas III (Albesia) 3,700,000.00 925,000.00
M
3.0000 Kg Paku 5 cm - 12 cm 30,000.00 90,000.00 90,000.00
1.2000 Ltr Minyak bekisting 40,000.00 48,000.00 48,000.00
210.0000 Kg Besi beton polos 13,000.00 2,730,000.00 2,730,000.00
3.0000 Kg Kawat beton 90,000.00 270,000.00 270,000.00
336.0000 Kg Portland Cement 1,400.00 470,400.00 470,400.00
0.5400 M3 Pasir beton 195,000.00 105,300.00 105,300.00
0.8100 M3 Kerikil 320,000.00 259,200.00 259,200.00
0.1050 M3 Kayu kelas II balok (kruwing) 3,700,000.00 388,500.00
2.5000 Lbr Plywood tebal 9 mm 140,000.00 350,000.00 350,000.00
14.0000 Btg Bambu Ø 8-10 cm, panjang 4 m 10,000.00 140,000.00 140,000.00
5.6500 Oh Pekerja 99,000.00 559,350.00
0.2750 Oh Tukang batu 115,000.00 31,625.00
1.5600 Oh Tukang kayu 115,000.00 179,400.00
1.4000 Oh Tukang besi 115,000.00 161,000.00
0.3230 Oh Kepala Tukang Batu 120,000.00 38,760.00
0.2830 Oh Mandor 130,000.00 36,790.00
Total : 5,776,400.00 1,006,925.00 4,462,900.00
38 1 M' Membuat 1 m' kolom praktis beton bertulang (11 x 11)
Cm
0.0020 M3 Kayu kelas III (Albesia) 3,700,000.00 7,400.00 7,400.00
0.0100 Kg Paku 5 cm - 12 cm 30,000.00 300.00 300.00
3.0000 Kg Besi beton polos 13,000.00 39,000.00 39,000.00
0.4500 Kg Kawat beton 90,000.00 40,500.00 40,500.00
4.0000 Kg Portland Cement 1,400.00 5,600.00 5,600.00
0.0060 M3 Pasir beton 195,000.00 1,170.00 1,170.00
0.0090 M3 Kerikil 320,000.00 2,880.00 2,880.00
0.1800 Oh Pekerja 99,000.00 17,820.00
0.0200 Oh Tukang batu 115,000.00 2,300.00 2,300.00
0.0200 Oh Tukang kayu 115,000.00 2,300.00
0.0200 Oh Tukang besi 115,000.00 2,300.00
0.0060 Oh Kepala Tukang Batu 120,000.00 720.00
0.0090 Oh Mandor 130,000.00 1,170.00
Total : 96,850.00 26,610.00 99,150.00
HARGA SATUAN HARGA HARGA HARGA
NO URAIAN
( Rp.) (BAHAN) (UPAH) JUMLAH
1 2 3 4 5 6
39 M' Membuat 1 m' ring balok beton bertulang (10 x 15) cm
1
0.0030 3 Kayu kelas III (albesia ) 4,700,000.00 14,100.00 14,100.00
M
0.0200 Kg Paku 5 cm - 12 cm 30,000.00 600.00 600.00
3.6000 Kg Besi beton polos 13,000.00 46,800.00 46,800.00
0.0500 Kg Kawat beton 90,000.00 4,500.00 4,500.00
5.5000 Kg Portland Cement 1,400.00 7,700.00 7,700.00
0.0090 3 Pasir beton 195,000.00 1,755.00 1,755.00
M
0.0150 M3 Kerikil 320,000.00 4,800.00 4,800.00
0.2970 Oh Pekerja 99,000.00 29,403.00 29,403.00
0.0330 Oh Tukang batu 115,000.00 3,795.00 3,795.00
0.0330 Oh Tukang kayu 115,000.00 3,795.00 3,795.00
0.0330 Oh Tukang besi 115,000.00 3,795.00 3,795.00
0.0100 Oh Kepala Tukang Batu 120,000.00 1,200.00
0.0150 Oh Mandor 130,000.00 1,950.00
Total : 80,255.00 43,938.00 121,043.00
45 1 M
3 Membuat tangga beton bertulang (200 Kg besi +
bekesting)
3
0.2500 M Kayu terentang (albesia ) 3,700,000.00 925,000.00
3.0000 Kg Paku biasa 2' - 5' 30,000.00 90,000.00 90,000.00
1.2000 Ltr Minyak bekisting 40,000.00 48,000.00 48,000.00
200.0000 Kg Besi beton polos 13,000.00 2,600,000.00 2,600,000.00
3.0000 Kg Kawat beton 90,000.00 270,000.00 270,000.00
323.0000 Kg Semen portland 1,400.00 452,200.00 452,200.00
3
0.5200 M Pasir beton 195,000.00 101,400.00 101,400.00
3
0.7800 M Koral beton 412,000.00 321,360.00 321,360.00
0.1050 M3 Kayu balok (kruwing 6/12) 5,500,000.00 577,500.00 577,500.00
2.5000 Lbr Plywood tebal 9 mm 140,000.00 350,000.00 350,000.00
14.0000 Btg Bambu 8"/4m 10,000.00 140,000.00
5.6000 Oh Pekerja 99,000.00 554,400.00 554,400.00
0.3500 Oh Tukang batu 115,000.00 40,250.00
2.3000 Oh Tukang kayu 115,000.00 264,500.00 264,500.00
1.4000 Oh Tukang besi 115,000.00 161,000.00
0.4050 Oh Kepala Tukang Batu 120,000.00 48,600.00
0.2020 Oh Mandor 130,000.00 26,260.00
Total : 5,875,460.00 1,095,010.00 5,629,360.00
V PEKERJAAN DINDING
16 1 M2 Memasang 1M² dinding Batako, campuran spesi 1 PC : 3
PP
12.5000 Bh Hollow Block 10 2,700.00 33,750.00 33,750.00
15.1600 Kg Portland Cement 1,400.00 21,224.00 21,224.00
0.3640 M3 Pasir Pasang 150,000.00 54,600.00 54,600.00
0.2800 Kg Besi angkur ø=8 mm 0.00 0.00
0.3000 Oh Pekerja 99,000.00 29,700.00 29,700.00
0.1000 Oh Tukang batu 115,000.00 11,500.00 11,500.00
0.0100 Oh Kepala Tukang batu 120,000.00 1,200.00 1,200.00
0.0150 Oh Mandor 130,000.00 1,950.00 1,950.00
Total : 109,574.00 44,350.00 153,924.00
VI PEKERJAAN PLESTERAN
1 M2 Memasang 1 M2 plesteran 1 Pc : 5 PP, tebal 15 mm
5.184 Kg Portland Cement 1,400.00 7,257.60 7,257.60
0.026 M3 Pasir pasang 150,000.00 3,900.00 3,900.00
0.300 Oh Pekerja 99,000.00 29,700.00 29,700.00
0.150 Oh Tukang batu 115,000.00 17,250.00 17,250.00
0.015 Oh Kepala Tukang 120,000.00 1,800.00 1,800.00
0.015 Oh Mandor 130,000.00 1,950.00 1,950.00
Total : 11,157.60 50,700.00 61,857.60
PEKERJAAN PERSIAPAN
PEKERJAAN PENGECATAN
1. 1 m2 Pekerjaan Coating Natural
Jumlah
Harga Satuan
No Uraian Kode Satuan Koefisien Harga
(Rp)
(Rp)
A TENAGA
Pekerja L.01 OH 0.020 99,000.00 1,980.00
Tukang cat L.02 OH 0.063 115,000.00 7,245.00
Kepala tukang L.03 OH 0.060 120,000.00 7,200.00
Mandor L.04 OH 0.030 130,000.00 3,900.00
JUMLAH TENAGA KERJA 20,325.00
B BAHAN
Coating Natural kg 0.350 30,000.000 10,500.00
Kuas kg 0.100 4,000.000 400.00
JUMLAH HARGA BAHAN 10,900.00
C PERALATAN
PEKERJAAN SANITAIR
1. Pemasangan 1 buah closet duduk/monoblock
Jumlah
Harga Satuan
No Uraian Kode Satuan Koefisien Harga
(Rp)
(Rp)
A TENAGA
Pekerja L.01 OH 3.300 99,000.00 326,700.00
Tukang batu L.02 OH 1.100 115,000.00 126,500.00
Kepala tukang L.03 OH 0.010 120,000.00 1,200.00
Mandor L.04 OH 0.160 130,000.00 20,800.00
JUMLAH TENAGA KERJA 475,200.00
B BAHAN
Closet duduk unit 1.000 - -
Perlengkapan ls 0.060 - -
JUMLAH HARGA BAHAN -
C PERALATAN
2. 1 Outdoor Playground 03
NO URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga
(Rp)
A TENAGA
Pekerja L.01 Oh 0.045 Rp 99,000.00 4,455.00
Mandor L.04 Oh 0.0025 Rp 130,000.00 325.00
JUMLAH TENAGA KERJA Rp 4,780.00
B BAHAN
Outdoor Playground 03 set 1 Rp 500,000.00 500,000.00
JUMLAH HARGA BAHAN Rp 500,000.00
C PERALATAN
JUMLAH HARGA ALAT Rp -
D Jumlah (A+B+C) 504,780.00
E Overhead & Profit 10% 50,478.00
F Harga Satuan Pekerjaan (D+E) Rp 555,258.00
2. 1 set Swing
NO URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga
(Rp)
A TENAGA
Pekerja L.01 Oh 0.045 Rp 99,000.00 4,455.00
Mandor L.04 Oh 0.0025 Rp 130,000.00 325.00
JUMLAH TENAGA KERJA Rp 4,780.00
B BAHAN
Swing set 1 Rp 11,500,000.00 11,500,000.00
JUMLAH HARGA BAHAN Rp 11,500,000.00
C PERALATAN
JUMLAH HARGA ALAT Rp -
D Jumlah (A+B+C) 11,504,780.00
E Overhead & Profit 10% 1,150,478.00
F Harga Satuan Pekerjaan (D+E) Rp 12,655,258.00
2. 1 set Jungkat - Jungkit
NO URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga
(Rp)
A TENAGA
Pekerja L.01 Oh 0.045 Rp 99,000.00 4,455.00
Mandor L.04 Oh 0.0025 Rp 130,000.00 325.00
JUMLAH TENAGA KERJA Rp 4,780.00
B BAHAN
Jungkat - Jungkit set 1 Rp 10,800,000.00 10,800,000.00
JUMLAH HARGA BAHAN Rp 10,800,000.00
C PERALATAN
JUMLAH HARGA ALAT Rp -
D Jumlah (A+B+C) 10,804,780.00
E Overhead & Profit 10% 1,080,478.00
F Harga Satuan Pekerjaan (D+E) Rp 11,885,258.00
2. 1 set Gym 01
NO URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga
(Rp)
A TENAGA
Pekerja L.01 Oh 0.045 Rp 99,000.00 4,455.00
Mandor L.04 Oh 0.0025 Rp 130,000.00 325.00
JUMLAH TENAGA KERJA Rp 4,780.00
B BAHAN
Gym 01 set 1 Rp 10,000,000.00 10,000,000.00
JUMLAH HARGA BAHAN Rp 10,000,000.00
C PERALATAN
JUMLAH HARGA ALAT Rp -
D Jumlah (A+B+C) 10,004,780.00
E Overhead & Profit 10% 1,000,478.00
F Harga Satuan Pekerjaan (D+E) Rp 11,005,258.00
2. 1 set Gym 08
NO URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga
(Rp)
A TENAGA
Pekerja L.01 Oh 0.045 Rp 99,000.00 4,455.00
Mandor L.04 Oh 0.0025 Rp 130,000.00 325.00
JUMLAH TENAGA KERJA Rp 4,780.00
B BAHAN
Gym 08 set 1 Rp 17,000,000.00 17,000,000.00
JUMLAH HARGA BAHAN Rp 17,000,000.00
C PERALATAN
JUMLAH HARGA ALAT Rp -
D Jumlah (A+B+C) 17,004,780.00
E Overhead & Profit 10% 1,700,478.00
F Harga Satuan Pekerjaan (D+E) Rp 18,705,258.00
2. 1 set Gym 16
NO URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga
(Rp)
A TENAGA
Pekerja L.01 Oh 0.045 Rp 99,000.00 4,455.00
Mandor L.04 Oh 0.0025 Rp 130,000.00 325.00
JUMLAH TENAGA KERJA Rp 4,780.00
B BAHAN
Gym 16 set 1 Rp 10,000,000.00 10,000,000.00
JUMLAH HARGA BAHAN Rp 10,000,000.00
C PERALATAN
JUMLAH HARGA ALAT Rp -
D Jumlah (A+B+C) 10,004,780.00
E Overhead & Profit 10% 1,000,478.00
F Harga Satuan Pekerjaan (D+E) Rp 11,005,258.00
2. 1 set Gym 16
NO URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga
(Rp)
A TENAGA
Pekerja L.01 Oh 0.045 Rp 99,000.00 4,455.00
Mandor L.04 Oh 0.0025 Rp 130,000.00 325.00
JUMLAH TENAGA KERJA Rp 4,780.00
B BAHAN
Gym 16 set 1 Rp - -
JUMLAH HARGA BAHAN Rp -
C PERALATAN
JUMLAH HARGA ALAT Rp -
D Jumlah (A+B+C) 4,780.00
E Overhead & Profit 10% 478.00
F Harga Satuan Pekerjaan (D+E) Rp 5,258.00
2. 1 m2 Pekerjaan Tangga
NO URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga
(Rp)
A TENAGA
Pekerja L.01 Oh 0.045 Rp 99,000.00 4,455.00
Mandor L.04 Oh 0.0025 Rp 130,000.00 325.00
JUMLAH TENAGA KERJA Rp 4,780.00
B BAHAN
Pekerjaan Tangga m2 1 Rp 500,000.00 500,000.00
JUMLAH HARGA BAHAN Rp 500,000.00
C PERALATAN
JUMLAH HARGA ALAT Rp -
D Jumlah (A+B+C) 504,780.00
E Overhead & Profit 10% 50,478.00
F Harga Satuan Pekerjaan (D+E) Rp 555,258.00
2. 1 m2 Plastic Sheet
NO URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga
(Rp)
A TENAGA
Pekerja L.01 Oh 0.045 Rp 99,000.00 4,455.00
Mandor L.04 Oh 0.0025 Rp 130,000.00 325.00
JUMLAH TENAGA KERJA Rp 4,780.00
B BAHAN
Plastic Sheet m2 1 Rp 3,500.00 3,500.00
JUMLAH HARGA BAHAN Rp 3,500.00
C PERALATAN
JUMLAH HARGA ALAT Rp -
D Jumlah (A+B+C) 8,280.00
E Overhead & Profit 10% 828.00
F Harga Satuan Pekerjaan (D+E) Rp 9,108.00
2. 1 m3 Pek. Kayu 20 x 20 cm
NO URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga
(Rp)
A TENAGA
Pekerja L.01 Oh 0.045 Rp 99,000.00 4,455.00
Mandor L.04 Oh 0.0025 Rp 130,000.00 325.00
JUMLAH TENAGA KERJA Rp 4,780.00
B BAHAN
Pek. Kayu 20 x 20 cm m3 1 Rp 18,800,000.00 18,800,000.00
JUMLAH HARGA BAHAN Rp 18,800,000.00
C PERALATAN
JUMLAH HARGA ALAT Rp -
D Jumlah (A+B+C) 18,804,780.00
E Overhead & Profit 10% 1,880,478.00
F Harga Satuan Pekerjaan (D+E) Rp 20,685,258.00
LAMPU
Philips GENIE 11W (DOWNLIGHT 11W)
1 No Lampu Philips Genie 11W Putih Rp 144,925.00 = Rp. Rp 144,925.00
1 Downlight Panasonic 4" Rp -
1 Ls Labor cost Rp 33,198.75 = Rp. Rp 33,198.75
Sub total = Rp. Rp 178,123.75
Profit & Overhead 1.1 Rp 195,936.12
A. BAHAN PASANGAN
1 Kerikil M3 320,000.00
2 Kerikil Koral M3 300,000.00
3 Semen PC (50 Kg) setara gresik Kg 1,400.00
4 Semen warna Kg 16,000.00
5 Pasir beton M3 195,000.00
6 Pasir pasang M3 150,000.00
7 Pasir urug M3 165,000.00
8 Tanah Urug M3 80,000.00
9 Koral beton M3 412,000.00
10 Sirtu M3 1,000.00
11 Buis Beton dia 100 cm M' 235,000.00
13 Buis Beton dia 50 cm M' 95,000.00
17 Pasir Beton Kg 110.71
19 Kerikil Beton Kg 148.15
21 Air Ltr 100.00
22 Spacer bh 3,000.00
23 Filler M3 40,000.00
24 Aspal Kg 15,600.00
25 Minyak tanah Liter 14,500.00
26 Bensin industri Liter 9,150.00
27 Oli/Pelumas Liter 35,000.00
28 Solar industri Liter 9,662.50
B. BAHAN PONDASI
1 Batu kali (Lokasi Pekerjaan) M3 300,000.00
2 Batu kali (Base Camp) M3 345,000.00
3 Batu belah 15-20 cm M3 110,000.00
C. BAHAN LANTAI
1 Keramik 20 x 20 polos kelas I m2 68,000.00
3 Keramik 20 x 25 polos kelas I m2 70,000.00
4 Keramik 30 x 30 polos kelas I m2 62,000.00
5 Keramik 40 x 40 polos kelas I m2 71,000.00
7 Keramik 60 x 60 polos kelas I m2 149,000.00
9 Keramik non slyp 20/20 (Keramik kamar mandi) m2 68,000.00
11 Keramik non slyp 30/30 (Keramik kamar mandi) m2 76,000.00
12 Keramik non slyp 40/40 (Keramik kamar mandi) m2 71,000.00
13 Tegel pc 20/20 Buah 95,000.00
14 Tegel plynt 15/30 keramik m2 95,000.00
15 Tegel plynt 15/20 keramik m2 95,000.00
16 Keramik 20 x 20 klas I setara asia tile Buah 24,000.00
30 Ubin keramik 30 x 30 cm anti slip M2 93,000.00
31 Granit m2 495,000.00
32 Granit 60/60 m2 495,000.00
33 Granit 40/40 m2 495,000.00
34 Platinum m2 149,000.00
35 Ubin abu-abu (40 x 40 ) cm Buah 6,700.00
36 Ubin abu-abu (30 x 30 ) cm Buah 6,700.00
37 Ubin abu-abu (20 x 20 ) cm Buah 6,700.00
38 Ubin warna (40 x 40 ) cm Buah 6,700.00
39 Ubin warna (30 x 30 ) cm Buah 6,700.00
40 Ubin warna (20 x 20 ) cm Buah 6,700.00
41 plint ubin PC abu-abu (15x20) cm Buah 6,700.00
42 plint ubin PC abu-abu (10x30) cm Buah 6,700.00
43 plint ubin PC abu-abu (10x40) cm Buah 6,700.00
44 plint ubin PC warna (10x20) cm Buah 6,700.00
45 plint ubin PC warna (10x30) cm Buah 6,700.00
NO URAIAN SATUAN HARGA SATUAN 2021 KET
D BAHAN DINDING
1 Keramik dinding 20 x 20 klas I setara asia tile m2 68,000.00
2 Keramik dinding 20 x 25 klas I setara asia tile m2 70,000.00
3 Keramik dinding 20 x 30 klas I setara asia tile m2 55,000.00
4 Keramik dinding 15 x 15 klas I setara asia tile m2 71,000.00
5 Keramik dinding 25 x 40 klas I setara asia tile m2 76,000.00
6 Keramik dinding 25 x 33 klas I setara asia tile m2 70,000.00
7 Bata merah 5x11x22 Cm Buah 800.00
8 Bata berongga ekspose Buah 4,000.00
9 Batako UK. 20 X 40 X 10 Buah 2,700.00
10 Hollow Block 15/Batako Buah 2,800.00
11 Hollow Block 20/batako Buah 2,800.00
12 Glassblock (mulia) Buah 30,000.00
13 Roster/kerawang (12x11x24)cm Buah 55,000.00
14 Roster ukir paras 25 x 25 Buah 55,000.00
15 Roster ukir paras 30 x 30 Buah 55,000.00
16 Roster ukir paras 30 x 60 Buah 55,000.00
21 Batu palimanan putih 30 x 30 tebal 2cm M2 75,000.00
22 Batu palimanan putih 30 x 30 tebal 3 cm M2 115,000.00
24 Batu palimanan putih 30 x 30 tebal 5cm M2 170,000.00
25 Batu Candi 30 x 30 tebal 2cm M2 88,000.00
26 Batu Candi 30 x 30 tebal 3cm M2 132,000.00
28 Batu Candi 30 x 30 tebal 5cm M2 190,000.00
31 Paras / padas bh 317,000.00
32 - Paras pondasi bh 317,000.00
33 - Paras malem 50 x 20 x 12 bh 317,000.00
34 - Paras ukir silakarang bh 317,000.00
35 - Paras batik 20 x 40 bh 317,000.00
36 - Paras kerobokan 50 x 20 x 12 bh 317,000.00
G. BAHAN KAYU
10 Kayu usuk 5/7 (kruwing) M3 4,250,000.00
13 Kayu (kruwing) M3 5,500,000.00
15 Kayu balok (kruwing) 8/12 M3 3,700,000.00
23 Kayu albesia M3 4,700,000.00
24 Papan albesia M3 3,700,000.00
NO URAIAN SATUAN HARGA SATUAN 2021 KET
H. BAHAN BESI
32 Kawat beton Kg 90,000.00
40 Paku uk. 5 cm - 12 cm Kg 30,000.00
46 Paku biasa 2"-5" Kg 30,000.00
53 Kunci tanam biasa Buah 60,000.00
62 Besi angkur ø=8 mm Kg 68,000.00
63 Besi tulangan beton polos Kg 13,000.00
AQ BAHAN STILBALI
2 Padmasari batu hitam 70x70x250 Unit 3,000,000.00
A B C
CAT/MINYAK/FINISHING
1 Kuas star 4" bh Rp 4,000.00
2 Coating natural propan kg Rp 30,000.00
4 Plamur Tembok kg Rp 25,000.00
5 Cat dasar kg Rp 50,000.00
6 Cat tembok Dulux 2,5lt (setara watershield) kg Rp 110,000.00
7 Cat tembok Dulux 2,5 lt interior kg Rp 80,000.00
8 Cat Zinchromate Ltr Rp 1,500.00
11 Membrane Waterproofing m2 Rp 105,000.00
KERAMIK
1 Terazo Cor, Warna Merah m3 Rp 1,700,000.00
2 Terazo Cor, Warna Kuning Jeruk m3 Rp 1,900,000.00
3 Terazo Cor, Warna Putih m3 Rp 1,850,000.00
PENUTUP ATAP
1 Penutup Atap Solartuff m2 Rp 270,000.00
PAKU
1 Sekrup kg Rp 20,000.00
A B C
TANAMAN
1 Pupuk Kandang m3 Rp 210,000.00
2 Rumput jepang m2 Rp 37,000.00
5 Pohon Song of India / Dracaena reflaxa phn Rp 4,000.00
6 Pohon Sente / Alocasia phn Rp 4,000.00
10 Pohon Pucuk Merah / Oleina Syzygium phn Rp 220,000.00
13 Pohon Asam Bonsai batang besar / Tamarindus Indica phn Rp 8,200,000.00
14 Pohon Bonsai Dolar / Ficus pumila phn Rp 8,000,000.00
20 Pohon Jepun Bunga merah fanta / Plumeria rubra bunga merah fanta (renteng) phn Rp 4,000,000.00
21 Pohon Ketapang Kencana Daun Kecil / Terminalia mantaly phn Rp 1,400,000.00
23 Semak Spyder lili daun besar/ Hymenocalis litoralis. Buah/Polibag Rp 4,000.00
24 Semak Pacing/ Costus sp. Buah/Polibag Rp 4,000.00
25 Semak Taiwan beauty/ Cuphea hyssopifolia. Buah/Polibag Rp 4,000.00
26 Semak Kembang sepatu (pucuk bang)/ Hibiscus rosa sinensis. Buah/Polibag Rp 8,000.00
27 Semak Spathiphilum/Spathiphyllum sp Buah/Polibag Rp 4,000.00
30 Semak Ararea/ Osmoxilom liniare yellow Buah/Polibag Rp 4,000.00
32 Semak Bromelia / Bromelia sp. (merah, kuning, hijau) Buah/Polibag Rp 110,000.00
33 Semak Anturium bunga / Anthurium andraeanum Buah/Polibag Rp 4,000.00
42 Semak Daun philo/ Philodenron cellum Buah/Polibag Rp 4,000.00
43 Semak Paku-pakuan/ Nephrolepis Cordifolia Buah/Polibag Rp 4,000.00
44 Semak Kenanga / Conanga Odorata Buah/Polibag Rp 4,000.00
45 Semak Analis/ Aerva sangulinolenta Buah/Polibag Rp 4,000.00
46 Semak Jaburan hijau / Ophiopogon jaburan Buah/Polibag Rp 4,000.00
47 Semak Pisang-pisangan / Heliconia jamaica dwarf Buah/Polibag Rp 8,000.00
48 Semak Alang-alang ekor kuda/ Pennisetum purpureum Buah/Polibag Rp 4,000.00
49 Semak Walisongo / Schefflera arboricola Buah/Polibag Rp 13,000.00
50 Semak Bougenville/Bougenville sp Buah/Polibag Rp 35,000.00
51 Semak Melati belanda/quisqualis indica Buah/Polibag Rp 4,000.00
52 Kacang-kacangan/Arachis pintoi Buah/Polibag Rp 4,000.00
53 Palem sadeng /Saribus rotundifolius phn Rp 4,000.00
54 Semak Melati perancis/Pseuderanthemum reticulatum Buah/Polibag Rp 4,000.00
55 Semak Yolanda/Turnera ulmifolia Buah/Polibag Rp 4,000.00
56 Semak Adam hawa besar/Rhoeo discolor'giant' Buah/Polibag Rp 4,000.00
57 Semak Sambang darah / Excoecaria cochinchinensis Buah/Polibag Rp 4,000.00
71 Rumput Mutiara m2 Rp 38,000.00
NO NAMA BARANG SATUAN HARGA SATUAN
A B C
LAIN-LAIN
1 Ijuk Halus kg Rp 115,000.00
2 Plastic Sheet m2 Rp 3,500.00
3 Batu Hias kg Rp 400,000.00
4 Batu Hias m2 m2
5 Karpet Talang m2 Rp 180,000.00
6 Lem kg Rp 30,000.00
7 U-Ditch 50x50x120 cm unit Rp 260,000.00
8 Cover U-Ditch unit Rp 280,000.00
9 Gutter bh
10 Box Culvert 50x50x100 cm Unit Rp 1,270,000.00
11 Phenolic Cubicle Toilet m2 Rp 1,900,000.00
12 Daun Pintu Aluminium Warna (tanpa kaca dan accesoris) m2 Rp 1,100,000.00
13 Tiang Bendera Unit Rp 29,000,000.00
14 Outdoor Playground 03 Set Rp 413,000,000.00
15 Sring Raider Set Rp 5,800,000.00
16 Swing Set Rp 11,500,000.00
17 Jungkat - Jungkit Set Rp 10,800,000.00
18 Equitmen Monkey Bar Set Rp 20,000,000.00
19 Gym 01 Set Rp 10,000,000.00
20 Gym 08 Set Rp 17,000,000.00
21 Gym 16 Set Rp 10,000,000.00
22 Kanstein m'
23 Sign Letter 2,3 m Unit Rp 5,000,000.00
24 Sign Letter 1 m Unit Rp 1,900,000.00
25 Kusen Aluminium 3" m1 Rp 70,000.00
27 sealent tube Rp 50,000.00
28 Main Hole unit Rp 500,000.00
29 Tembok Penyengker m' Rp 4,200,000.00
30 Penunggun Karang dan Penggian unit Rp 9,500,000.00
31 Pipa AW 4" + biaya pasang m' Rp 181,141.68
32 Panel + MCB ls Rp 4,836,943.80
33 Pekerjaan Tiang Titik Rp 4,452,300.00
34 Instalasi Kabel m' Rp 36,759.12
35 Pekerjaan Lampu Titik Rp 8,984,194.32
SKATEBOARD
1 Tangga m2 Rp 500,000.00
2 Tali air coping m' Rp 10,000.00
3 Besi Ornamen Rail & Coping m' Rp 270,000.00
4 Pagar besi 4x6 + 4x4 m' Rp 500,000.00
5 Coating Arca Doff m2 Rp 30,000.00
6 Drainase Porus 4" titik Rp 1,205,132.79
LAPANGAN
Jaring Pembatas Lapangan m2 Rp 180,000.00
Pipa Galvanis m' Rp 290,000.00
Pintu pipa galvanis m2 Rp 3,100,000.00
Garis Permainan Voli Set Rp 5,000,000.00
Net Voli Set Rp 3,300,000.00
kursi wasit voli unit Rp 2,200,000.00
Pelapisan lem + pasir khusus (kasar) system tuang/tarik m2 Rp 22,000.00
Pelapisan lem + pasir khusus (halus) system tuang/tarik m2 Rp 22,000.00
NO NAMA BARANG SATUAN HARGA SATUAN
A B C
Pelapisan cat flexi pave + pasir khusus (halus) system tuang/tarik m2 Rp 31,000.00
Pelapisan top coat system roll ke 1 m2 Rp 22,000.00
Pelapisan top coat system roll ke 2 m2 Rp 22,000.00
Pek. Ring Basket Set Rp 17,000,000.00
Pek. Garis Permainan Set Rp 5,000,000.00
Pek Net Tenis set Rp 5,700,000.00
Pek kursi wasit tennis unit Rp 4,300,000.00
1 Kabel NYY 3x2,5mm2 m1
2 Kabel NYM 3x2,5mm2 Supreme m1
3 Philips Genie 11W Putih Buah
6 Saklar Tunggal Schneider Vivace Buah
7 Saklar Seri Schneider Vivace Buah
8 Stop Kontak Vivace Buah
9 NYFGBy 4x4mm2 Supreme m1
10 NYFGBy 4x16mm2 m1
11 NYFGBy 4x25mm2 m1
12 NYFGBy 4x6mm2 m1
14 NYY 4 x 35mm2 m1
15 Grounding Panel lot
16 Sambungan PLN 33kva lot
Custom Intel Core i3-2120, 2GB DDR3, 500GB HDD,
DVD±RW, VGA Intel HD Graphics 256MB, Audio, NIC,
24 WiFi, 20" WXGA, Win10 64 bit Set
25 Switch Hub 16 Port Buah
27 Wireles Point/Router Ubiquity AC Mesh Buah
29 Sambungan PDAM lot
30 Sumur Bor Dengan Casing AW 6" kedalaman 60m dan Gravellot
31 Pipa PVC AW 1 1/4" Rucika m1
32 Pipa PVC AW 1 1/2" Rucika m1
33 Pipa PVC AW 2" Rucika m1
34 Pipa PVC Aw 3" Rucika m1
35 Pipa PVC Aw 4" Rucika m1
37 Kloset Toto CW 637 J Buah
38 Wastafel LW 247 CJ Buah
39 Urinoir Toto U57M Buah
41 Kran Toto TX 109 LD Buah
42 Jet Spray Toto THX 20 MCRB Buah
43 PPR PN 10 DN. 40 mm
44 PPR PN 10 DN. 32 mm m1
45 PPR PN 10 DN. 25 mm m1
46 PPR PN 10 DN. 20mm m1
47 Pompa Sumur Dalam Kap. 2 Mtr3/Hr, Head 50 mtr unit
48 Pompa Transfer Kap. 2 Mtr3/Hr, Head 30 mtr unit
49 Pompa Booster Kap. 3 Mtr3/Hr, Head 30 mtr unit
57 Pompa Air Mancur AP Series 3Phase 2,2HP unit
58 Pompa dan Filtrasi 1,5 HP unit
60 Nozzle single jet 0,75" - 6mm Chrome unit
61 led 5.5 2700 K MR 16 24 D unit
62 Lampu Bollard 120cm 15W unit
64 Stop Valve 1/2" unit
65 Fitting MR16 Water proof unit
66 BVP382 LED260/CW200W220V SWB GM unit
67 Tiang penyangga lampu 4" dan 2" set
68 MDP unit
69 SDP A unit
70 SDP B unit
71 SDP C unit
72 SDP D unit
73 SDP Pond unit
74 PP Tenis unit
75 PP Pump unit
76 PP Voley unit
77 TOA Player ZCD2011R unit
78 AMPLI ZA 2128M Q7 unit
79 SPEAKER GARDEN TOA ZGS 301 unit
80 Box control unit
81 Instalasi Peaker NYYHY 2x1,5mm2 in HIC 20mm2 m1
82 Lampu Taman, BDS480 LED76, Tiang 2,5mtr unit
Rp 21,000.00
Rp 15,470.00
Rp 144,925.00
Rp 25,981.12
Rp 40,781.84
Rp 38,971.68
Rp 62,800.00
Rp 162,855.00
Rp 252,450.00
Rp 82,000.00
Rp 288,585.00
Rp 5,214,266.04
Rp 49,344,288.00
Rp 43,556,880.00
Rp 43,556,880.00
Rp 5,191,440.00
Rp 24,741,821.04
Rp 52,367,812.92
Rp 15,507.75
Rp 17,813.25
Rp 26,794.00
Rp 46,806.00
Rp 99,560.50
Rp 2,484,574.97
Rp 1,227,059.44
Rp 2,757,076.74
Rp 644,386.54
Rp 342,230.16
Rp 46,372.50
Rp 27,385.55
Rp 19,763.80
Rp 14,140.33
Rp 41,940,177.12
Rp 49,745,355.84
Rp 59,571,145.44
Rp 9,661,479.36
Rp 9,438,876.00
Rp 422,881.20
Rp 383,150.00
Rp 3,239,237.40
Rp 242,240.04
Rp 75,000.00
Rp 7,981,160.00
Rp 2,750,000.00
Rp 114,154,678.92
Rp 6,933,459.12
Rp 9,389,534.04
Rp 9,062,077.56
Rp 9,062,077.56
Rp 6,521,950.20
Rp 4,836,943.80
Rp 10,021,562.76
Rp 4,836,943.80
Rp 6,156,582.24
Rp 5,414,159.76
Rp 1,150,870.08
Rp 422,310.84
Rp 401,335.56
Rp 11,710,282.32