Anda di halaman 1dari 8

DAFTAR HADIR TENAGA

PEKERJAAN : PEMASANGAN JARINGAN PIPA SAMBUNGAN RUMAH AIR BERSIH PROGAM HIBAH AIR MINUM MINGGU : KE 1
LOKASI : UNIT GEYER TANGGAL : 31 AGUST s/d 5 SEPT
TAHUN ANGGARAN : 2020

HARI
NO NAMA KETERANGAN MINGGU SENIN SELASA RABU KAMIS JUMAT SABTU JUMLAH UPAH TENAGA JUMLAH TANDA TANGAN
HARI (RP) (RP)

1 BAIDUL ASHARI MANDOR 1 1 1 1 1 1 6 105,000.00 630,000.00 1


2 SAEKUL MANDOR 1 1 1 1 1 1 6 105,000.00 630,000.00 2
3 ZAENAL ABIDIN TUKANG 1 1 1 1 1 1 6 100,000.00 600,000.00 3
4 MUH. SLAMET TUKANG 1 1 1 1 1 1 6 100,000.00 600,000.00 4
5 MUSTAROM TUKANG 1 1 1 1 1 1 6 100,000.00 600,000.00 5
6 JOKO SUSANTO TUKANG 1 1 1 1 1 1 6 100,000.00 600,000.00 6
7 SUWIGNYO TUKANG 1 1 1 1 1 1 6 100,000.00 600,000.00 7
8 SUTIYO TUKANG 1 1 1 1 1 1 6 100,000.00 600,000.00 8
9 JOKO SUYATNO TUKANG 1 1 1 1 1 1 6 100,000.00 600,000.00 9
10 SUPARYADI TUKANG 1 1 1 1 1 1 6 100,000.00 600,000.00 10
11 SUPRAPTO TENAGA 1 1 1 1 1 1 6 90,000.00 540,000.00 11
12 MUH. KOSIM TENAGA 1 1 1 1 1 1 6 90,000.00 540,000.00 12
13 PRIYONO TENAGA 1 1 1 1 1 1 6 90,000.00 540,000.00 13
14 SUKARDI TENAGA 1 1 1 1 1 1 6 90,000.00 540,000.00 14
15 MUH. IRSYAD TENAGA 1 1 1 1 1 1 6 90,000.00 540,000.00 15
16 BUDI SANTOSO TENAGA 1 1 1 1 1 1 6 90,000.00 540,000.00 16

JUMLAH TOTAL 9,300,000.00


KWITANSI

Telah diterima dari : CV. ARDI CIPTA KARYA

Uang sebanyak : SEMBILAN JUTA TIGA RATUS RIBU RUPIAH

Guna Pembayaran : Upah Tenaga dengan Rincian Seperti terlampir


Tanggal 31-8-2020 Sampai 5-9-2020 Nomor:1
Rp 9,300,000

Lunas Dibayar Tanggal : 5 September 2020


Setuju Dibayar :

PENERIMA
 
 
 
 
 
BAIDUL ASHARI
DAFTAR HADIR TENAGA

PEKERJAAN : PEMASANGAN JARINGAN PIPA SAMBUNGAN RUMAH AIR BERSIH PROGAM HIBAH AIR MINUM MINGGU : KE 2
LOKASI : UNIT GEYER TANGGAL : 6 SEPT s/d 12 SEPT
TAHUN ANGGARAN : 2020

HARI
NO NAMA KETERANGAN MINGGU SENIN SELASA RABU KAMIS JUMAT SABTU JUMLAH UPAH TENAGA JUMLAH TANDA TANGAN
HARI (RP) (RP)

1 BAIDUL ASHARI MANDOR 1 1 1 1 1 1 1 7 105,000.00 735,000.00 1


2 SAEKUL MANDOR 1 1 1 1 1 1 1 7 105,000.00 735,000.00 2
3 ZAENAL ABIDIN TUKANG 1 1 1 1 1 1 1 7 100,000.00 700,000.00 3
4 MUH. SLAMET TUKANG 1 1 1 1 1 1 1 7 100,000.00 700,000.00 4
5 MUSTAROM TUKANG 1 1 1 1 1 1 1 7 100,000.00 700,000.00 5
6 JOKO SUSANTO TUKANG 1 1 1 1 1 1 1 7 100,000.00 700,000.00 6
7 SUWIGNYO TUKANG 1 1 1 1 1 1 1 7 100,000.00 700,000.00 7
8 SUTIYO TUKANG 1 1 1 1 1 1 1 7 100,000.00 700,000.00 8
9 JOKO SUYATNO TUKANG 1 1 1 1 1 1 1 7 100,000.00 700,000.00 9
10 SUPARYADI TUKANG 1 1 1 1 1 1 1 7 100,000.00 700,000.00 10
11 SUPRAPTO TENAGA 1 1 1 1 1 1 1 7 90,000.00 630,000.00 11
12 MUH. KOSIM TENAGA 1 1 1 1 1 1 1 7 90,000.00 630,000.00 12
13 PRIYONO TENAGA 1 1 1 1 1 1 1 7 90,000.00 630,000.00 13
14 SUKARDI TENAGA 1 1 1 1 1 1 1 7 90,000.00 630,000.00 14
15 MUH. IRSYAD TENAGA 1 1 1 1 1 1 1 7 90,000.00 630,000.00 15
16 BUDI SANTOSO TENAGA 1 1 1 1 1 1 1 7 90,000.00 630,000.00 16

JUMLAH TOTAL 10,850,000.00


KWITANSI

Telah diterima dari : CV. ARDI CIPTA KARYA

Uang sebanyak : SEPULUH JUTA DELAPAN RATUS LIMA PULUH RIBU RUPIAH

Guna Pembayaran : Upah Tenaga dengan Rincian Seperti terlampir


Tanggal 6-9-2020 Sampai 12-9-2020 Nomor: 2
Rp 10,850,000

Lunas Dibayar Tanggal : 12 September 2020


Setuju Dibayar :

PENERIMA
 
 
 
 
 
BAIDUL ASHARI
DAFTAR HADIR TENAGA

PEKERJAAN : PEMASANGAN JARINGAN PIPA SAMBUNGAN RUMAH AIR BERSIH PROGAM HIBAH AIR MINUM MINGGU : KE 3
LOKASI : UNIT GEYER TANGGAL : 13 SEPT s/d 19 SEPT
TAHUN ANGGARAN : 2020

HARI
NO NAMA KETERANGAN MINGGU SENIN SELASA RABU KAMIS JUMAT SABTU JUMLAH UPAH TENAGA JUMLAH TANDA TANGAN
HARI (RP) (RP)

1 BAIDUL ASHARI MANDOR 1 1 1 1 1 1 1 7 105,000.00 735,000.00 1


2 SAEKUL MANDOR 1 1 1 1 1 1 1 7 105,000.00 735,000.00 2
3 ZAENAL ABIDIN TUKANG 1 1 1 1 1 1 1 7 100,000.00 700,000.00 3
4 MUH. SLAMET TUKANG 1 1 1 1 1 1 1 7 100,000.00 700,000.00 4
5 MUSTAROM TUKANG 1 1 1 1 1 1 1 7 100,000.00 700,000.00 5
6 JOKO SUSANTO TUKANG 1 1 1 1 1 1 1 7 100,000.00 700,000.00 6
7 SUWIGNYO TUKANG 1 1 1 1 1 1 1 7 100,000.00 700,000.00 7
8 SUTIYO TUKANG 1 1 1 1 1 1 1 7 100,000.00 700,000.00 8
9 JOKO SUYATNO TUKANG 1 1 1 1 1 1 1 7 100,000.00 700,000.00 9
10 SUPARYADI TUKANG 1 1 1 1 1 1 1 7 100,000.00 700,000.00 10
11 SUPRAPTO TENAGA 1 1 1 1 1 1 1 7 90,000.00 630,000.00 11
12 MUH. KOSIM TENAGA 1 1 1 1 1 1 1 7 90,000.00 630,000.00 12
13 PRIYONO TENAGA 1 1 1 1 1 1 1 7 90,000.00 630,000.00 13
14 SUKARDI TENAGA 1 1 1 1 1 1 1 7 90,000.00 630,000.00 14
15 MUH. IRSYAD TENAGA 1 1 1 1 1 1 1 7 90,000.00 630,000.00 15
16 BUDI SANTOSO TENAGA 1 1 1 1 1 1 1 7 90,000.00 630,000.00 16

JUMLAH TOTAL 10,850,000.00


KWITANSI

Telah diterima dari : CV. ARDI CIPTA KARYA

Uang sebanyak : SEPULUH JUTA DELAPAN RATUS LIMA PULUH RIBU RUPIAH

Guna Pembayaran : Upah Tenaga dengan Rincian Seperti terlampir


Tanggal 13 SEPT s/d 19 SEPT 2020 Nomor: 3
Rp 10,850,000

Lunas Dibayar Tanggal : 19 September 2020


Setuju Dibayar :

PENERIMA
 
 
 
 
 
BAIDUL ASHARI
DAFTAR HADIR TENAGA

PEKERJAAN : PEMASANGAN JARINGAN PIPA SAMBUNGAN RUMAH AIR BERSIH PROGAM HIBAH AIR MINUM MINGGU : KE 4
LOKASI : UNIT GEYER TANGGAL : 20 SEPT s/d 25 SEPT
TAHUN ANGGARAN : 2020

HARI
NO NAMA KETERANGAN MINGGU SENIN SELASA RABU KAMIS JUMAT SABTU JUMLAH UPAH TENAGA JUMLAH TANDA TANGAN
HARI (RP) (RP)

1 BAIDUL ASHARI MANDOR 1 1 1 1 1 5 105,000.00 525,000.00 1


2 SAEKUL MANDOR 1 1 1 1 1 5 105,000.00 525,000.00 2
3 ZAENAL ABIDIN TUKANG 1 1 1 1 1 5 100,000.00 500,000.00 3
4 MUH. SLAMET TUKANG 1 1 1 1 1 5 100,000.00 500,000.00 4
5 MUSTAROM TUKANG 1 1 1 1 1 5 100,000.00 500,000.00 5
6 JOKO SUSANTO TUKANG 1 1 1 1 1 5 100,000.00 500,000.00 6
7 SUWIGNYO TUKANG 1 1 1 1 1 5 100,000.00 500,000.00 7
8 SUTIYO TUKANG 1 1 1 1 1 5 100,000.00 500,000.00 8
9 JOKO SUYATNO TUKANG 1 1 1 1 1 5 100,000.00 500,000.00 9
10 SUPARYADI TUKANG 1 1 1 1 1 5 100,000.00 500,000.00 10
11 SUPRAPTO TENAGA 1 1 1 1 1 5 90,000.00 450,000.00 11
12 MUH. KOSIM TENAGA 1 1 1 1 1 5 90,000.00 450,000.00 12
13 PRIYONO TENAGA 1 1 1 1 1 5 90,000.00 450,000.00 13
14 SUKARDI TENAGA 1 1 1 1 1 5 90,000.00 450,000.00 14
15 MUH. IRSYAD TENAGA 1 1 1 1 1 5 90,000.00 450,000.00 15
16 BUDI SANTOSO TENAGA 1 1 1 1 1 5 90,000.00 450,000.00 16

JUMLAH TOTAL 7,750,000.00


KWITANSI

Telah diterima dari : CV. ARDI CIPTA KARYA

Uang sebanyak : TUJUH JUTA TUJUH RATUS LIMA PULUH RIBU RUPIAH

Guna Pembayaran : Upah Tenaga dengan Rincian Seperti terlampir


Tanggal 20 SEPT s/d 25 SEPT 2020 Nomor: 4
Rp 7,750,000

Lunas Dibayar Tanggal : 25 September 2020


Setuju Dibayar :

PENERIMA
 
 
 
 
 
BAIDUL ASHARI