Anda di halaman 1dari 1

DAFTAR PUSTAKA

Adisoma G, 1998, Perencanaan Berdasarkan Waktu, Teknik Pertambangan


Institut Teknologi Bandung.

Adisoma G dan Arif I, 2002, Perencanaan Tambang, Teknik Pertambangan


Institut Teknologi Bandung.

Crawford, D., 2001, Phase Planing For Open Pit Mines, No.19, Pincock, Allen
and Holt, Colorado, p. 2.

Hustrulid W and Kuchta M, 1995, Open Pit Mine Planning & Design Volume 1,
A.A. Balkema/Rotterdam/Brookfield.

Indonesianto, Y, 2010, Pemindahan Tanah Mekanis, Jurusan Teknik


Pertambangan, UPN Veteran Yogyakarta.

Indonesianto, Y, 2011, Pemindahan Tanah Mekanis, Jurusan Teknik


Pertambangan, UPN Veteran Yogyakarta.

Lambert, R., 2005, A Basic Primer on Mine Design, No.69, Pincock, Allen and
Holt, Colorado, p. 2-3.

Marston, R. and D., 2009, Exploration, Geological Modelling and Mine Planning
in a Competitive Market Place, World Coal, Colorado, p. 2.

Nurhakim, 2008, Perencanaan dan Permodelan Tambang, Teknik Pertambangan


Universitas Lambung Mangkurat Banjarbaru.

Prodjosoemarto, P., 1989, Tambang Terbuka, Teknik Pertambangan Institut


Teknologi Bandung.

Sulistyana, W, 2010, Perencanaan Dan Perancangan Tambang, Jurusan Teknik


Pertambangan, UPN Veteran Yogyakarta.

Sulistyana, W, 2007, Buku Praktikum Simulasi dan Komputasi, Laboratorium


Simulasi dan Komputasi Tambang UPN “Veteran”Yogyakarta.

………., 2007, AutoCAD. Autodesk + QuickSurf.

………., 2014, Data-data Eksplorasi CV.Kusuma Arga Mukti, Desa Jentir


Kecamatan Ngawen Kabupaten Gunung Kidul Provinsi Daerah Istimewa
Yogyakarta.

55

Anda mungkin juga menyukai