WORK BREAKDOWN STRUCTURE (WBS)

RENCANA ANGGARAN BIAYA


CANDRA PRAWITA SARI K1518021

NO. KODE URAIAN PEKERJAAN VOLUME

I A. 2.2.1 HARGA SATUAN PEKERJAAN PERSIAPAN


1 A.2.2.1.4 Pengukuran dan Pemasangan Bouwplank 44
2 A.2.2.1.9 Membersihkan Lapangan dan Perataan 72
3 A.2.2.1.11 Pembuatan Kotak Adukan ukuran 40cmx50cmx25cm 1
4 A.2.2.1.10 Pembuatan Steger/Perancah dari Bambu 1

II A.2.3.1 HARGA SATUAN PEKERJAAN TANAH


1 A.2.3.1.2 Menggali Tanah Biasa Sedalam 2 m 62.73
3 A.2.3.1.9 Pengurugan Kembali 20.7
5 A.2.3.1.11 Urugan Pasir 15.3

III A.3.2.1. HARGA SATUAN PEKERJAAN PONDASI


1 A.3.2.1.7 Pemasangan Pondasi Batu Belah, 1 SP : 3 KP : 10 PP 18.743
2 A.3.2.1.9 Pemasang Batu Kosong/Anstamping 2.55

IV A.4.1.1 HARGA SATUAN PEKERJAAN B E T O N


1 A.4.1.1.5 Membuat Beton mutu f'c=16,9 MPa (K200), slum (12±2)cm, w/c = 0, 4.765
2 A.4.1.1.17 Pembesian dg Besi Polos atau Besi Ulir 768.73
3 A.4.1.1.21 Memasang Bekisting untuk Sloof 12.762
4 A.4.1.1.22 Memasang Bekisting untuk Kolom 41.637
5 A.4.1.1.23 Memasang Bekisting untuk Balok 11.1
6 A.4.1.1.36 Membuat Ring Balok Beton Bertulang (10 x 15) cm 0.68
7 A.4.1.1.37 Membuat Beton 1Pc : 2Ps : 3Kr 1.987

V A.4.4.1 HARGA SATUAN PEKERJAAN PASANGAN DINDING


1 A.4.4.1.2 Pemasangan Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1 Bata 69.502

VI A.4.4.2 HARGA SATUAN PEKERJAAN PLESTERAN


1 A,4,4,2.4 Pemasangan Plesteran 1 Pc : 3 Pp Tebal 20 mm 139.003
2 A,4,4,2.27 Pemasangan Acian 139.003

VII A.4.4.3 HARGA SATUAN PEKERJAAN PENUTUP LANTAI dan DINDING


1 A.4.4.3.35c Pemasangan Lantai Keramik 40 x 40 cm warna pola 60.75
2 A.4.4.3.41 Pemasangan Lis Keramik Ukuran 5x20 cm 15.76
3 A.4.4.3.54 Pemasangan Dinding Keramik 20x20 cm, 20.54

VIII A.4.5.1 HARGA SATUAN PEKERJAAN LANGIT-LANGIT


1 A.4.5.1.1 Pemasangan Langit-langit GRC (1,00x1,00) m 76.4

IX A.4.5.2 HARGA SATUAN PEKERJAAN PENUTUP ATAP


1 A.4.5.2.1b Pemasangan Atap Genteng Press Mantili Mojolaban 178.6
2 A.4.5.2.4c Pemasangan Nok Genteng 2

X A.4.6.1 HARGA SATUAN PEKERJAAN K A Y U


1 A.4.6.1.2a Pembuatan & Pemasangan Kosen Pintu & Jendela Kayu Jati Kelas II 8.02
2 A.4.6.1.5a Pembuatan & Pemasangan Daun Pintu Panel, Kayu Jati Kelas II 0.83
3 A.4.6.1.37 Pembuatan&Memasang Konstruksi Kuda-kuda Kayu Jati Kelas II 0.971
4 A.4.6.1.15a Pemasangan konstruksi Gording, Kayu Klas Jati Kelas II 0.87
5 A.4.6.1.19a Pemasangan Usuk jarak 35 cm Reng 25 cm, Kayu Kruing 178.6
6 A.4.6.1.21a Pemasangan Listplank Uk. (3x20)cm Kayu Jati Kelas II 0.2952

XI A.4.6.2 HARGA SATUAN PEKERJAAN KUNCI dan KACA


1 A.4.6.2.2 Pemasangan Kunci Tanam Biasa 4
2 A.4.6.2.3 Pemasangan Kunci Kamar Mandi 1
3 A.4.6.2.5 Pemasangan Kunci Silinder 5
4 A.4.6.2.5 Pemasangan Engsel Pintu 5
5 A.4.6.2.6 Pemasangan Engsel Jendela Kupu-kupu 8
6 A.4.6.2.9 Pemasangan Kait Angin 5
7 A.4.6.2.16 Pemasangan Kaca bening tebal 3 mm 3.98

XII A.4.7.1 HARGA SATUAN PEKERJAAN PENGECATAN


1 A.4.7.1.4 Pengecatan Bidang Kayu Baru (1 lp Plamur, 1 lp Cat dasar, 2 Lp Cat P 139.003

XIII A.5.1.1 HARGA SATUAN PEKERJAAN SANITASI DALAM GEDUNG


1 A.5.1.1.1 Memasang Closet Duduk / Mono Blok 1
2 A.5.1.1.5 Memasang Wastafel 1
3 A.5.1.1.7a Pemasangan Bak Fibreglass vol.0,4 m3 1
4 A.5.1.1.13 Pemasangan Bak Cuci Piring 1
5 A.5.1.1.16 Pemasangan Bak Kontrol Pas.Batu Bata 30 x 30 tinggi 35 cm 2
7 A.5.1.1.19 Pemasangan Kran Ø ½" atau Ø ¾" 5
8 A.5.1.1.26 Pemasangan Pipa PVC tipe AW Ø ¾" 30.277
9 A.5.1.1.25 Pemasangan Pipa PVC tipe AW Ø ½" 1
10 A.5.1.1.23 Pemasangan Pipa Galvanis Ø 3" 16.7307
11 A.5.1.1.22 Pemasangan Pipa Galvanis Ø 1½ " 7.3876
12 A.5.1.1.29 Pemasangan Pipa PVC tipe AW Ø 2" 11.3658
13 A.5.1.1.36 Pemasangan Floor Drain 2
14 Tandon 1
SATUAN

m'
m2
bh
m2

m3
m3
m3

m3
m3

m3
Kg
m2
m2
m2
m3
m3

m2

m2
m2

m2
m1
m2

m2
m2
bh

m3
m2
m3
m3
m2
m1

Buah
Buah
Buah
Buah
Buah
Buah
m2

m2

Unit
Unit
Unit
buah
bh
bh
m'
m'
m'
m'
m'
buah
buah
RENCANA ANGGARAN BIAYA

NO. KODE URAIAN PEKERJAAN VOLUME

I A. 2.2.1 HARGA SATUAN PEKERJAAN PERSIAPAN


1 A.2.2.1.4 Pengukuran dan Pemasangan Bouwplank 44
2 A.2.2.1.9 Membersihkan Lapangan dan Perataan 76
3 A.2.2.1.11 Pembuatan Kotak Adukan ukuran 40cmx50cmx25cm 1
4 A.2.2.1.10 Pembuatan Steger/Perancah dari Bambu 1

II A.2.3.1 HARGA SATUAN PEKERJAAN TANAH


1 A.2.3.1.2 Menggali Tanah Biasa Sedalam 2 m 62.73
3 A.2.3.1.9 Pengurugan Kembali 20.7009
5 A.2.3.1.11 Urugan Pasir 15.3

III A.3.2.1. HARGA SATUAN PEKERJAAN PONDASI


1 A.3.2.1.7 Pemasangan Pondasi Batu Belah, 1 SP : 3 KP : 10 PP 18.7425
2 A.3.2.1.9 Pemasang Batu Kosong/Anstamping 2.55

IV A.4.1.1 HARGA SATUAN PEKERJAAN B E T O N


1 A.4.1.1.5 Membuat Beton mutu f'c=16,9 MPa (K200), slum (12±2)cm, w/c = 0,61 4.765
2 A.4.1.1.17 Pembesian dg Besi Polos atau Besi Ulir 768.73
3 A.4.1.1.21 Memasang Bekisting untuk Sloof 12.762
4 A.4.1.1.22 Memasang Bekisting untuk Kolom 41.637
5 A.4.1.1.23 Memasang Bekisting untuk Balok 11.1
6 A.4.1.1.36 Membuat Ring Balok Beton Bertulang (10 x 15) cm 0.68
7 A.4.1.1.37 Membuat Beton 1Pc : 2Ps : 3Kr 1.987

V A.4.4.1 HARGA SATUAN PEKERJAAN PASANGAN DINDING


1 A.4.4.1.2 Pemasangan Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1 Bata Camp. 1S 69.502

VI A.4.4.2 HARGA SATUAN PEKERJAAN PLESTERAN


1 A,4,4,2.4 Pemasangan Plesteran 1 Pc : 3 Pp Tebal 20 mm 139.003
2 A,4,4,2.27 Pemasangan Acian 139.003

VII A.4.4.3 HARGA SATUAN PEKERJAAN PENUTUP LANTAI dan DINDING


1 A.4.4.3.35c Pemasangan Lantai Keramik 40 x 40 cm warna pola 60.75
2 A.4.4.3.41 Pemasangan Lis Keramik Ukuran 5x20 cm 15.76
3 A.4.4.3.54 Pemasangan Dinding Keramik 20x20 cm, 20.54

VIII A.4.5.1 HARGA SATUAN PEKERJAAN LANGIT-LANGIT


1 A.4.5.1.1 Pemasangan Langit-langit GRC (1,00x1,00) m 76.4

IX A.4.5.2 HARGA SATUAN PEKERJAAN PENUTUP ATAP


1 A.4.5.2.1b Pemasangan Atap Genteng Press Mantili Mojolaban 178.6
2 A.4.5.2.4c Pemasangan Nok Genteng 2

X A.4.6.1 HARGA SATUAN PEKERJAAN KAYU


1 A.4.6.1.2a Pembuatan & Pemasangan Kosen Pintu & Jendela Kayu Jati Kelas II 8.02
2 A.4.6.1.5a Pembuatan & Pemasangan Daun Pintu Panel, Kayu Jati Kelas II 0.83
3 A.4.6.1.37 Pembuatan&Memasang Konstruksi Kuda-kuda Kayu Jati Kelas II 0.971
4 A.4.6.1.15a Pemasangan konstruksi Gording, Kayu Klas Jati Kelas II 0.87
5 A.4.6.1.19a Pemasangan Usuk jarak 35 cm Reng 25 cm, Kayu Kruing 178.6
6 A.4.6.1.21a Pemasangan Listplank Uk. (3x20)cm Kayu Jati Kelas II 0.2952

XI A.4.6.2 HARGA SATUAN PEKERJAAN KUNCI dan KACA


1 A.4.6.2.2 Pemasangan Kunci Tanam Biasa 4
2 A.4.6.2.3 Pemasangan Kunci Kamar Mandi 1
3 A.4.6.2.5 Pemasangan Kunci Silinder 5
4 A.4.6.2.5 Pemasangan Engsel Pintu 5
5 A.4.6.2.6 Pemasangan Engsel Jendela Kupu-kupu 8
6 A.4.6.2.9 Pemasangan Kait Angin 5
7 A.4.6.2.16 Pemasangan Kaca bening tebal 3 mm 3.98

XII A.4.7.1 HARGA SATUAN PEKERJAAN PENGECATAN


1 A.4.7.1.4 Pengecatan Bidang Kayu Baru (1 lp Plamur, 1 lp Cat dasar, 2 Lp Cat Penutup) 139.003

XIII A.5.1.1 HARGA SATUAN PEKERJAAN SANITASI DALAM GEDUNG


1 A.5.1.1.1 Memasang Closet Duduk / Mono Blok 1
2 A.5.1.1.5 Memasang Wastafel 1
3 A.5.1.1.7a Pemasangan Bak Fibreglass vol.0,4 m3 1
4 A.5.1.1.13 Pemasangan Bak Cuci Piring 1
5 A.5.1.1.16 Pemasangan Bak Kontrol Pas.Batu Bata 30 x 30 tinggi 35 cm 2
7 A.5.1.1.19 Pemasangan Kran Ø ½" atau Ø ¾" 5
8 A.5.1.1.26 Pemasangan Pipa PVC tipe AW Ø ¾" 30.277
9 A.5.1.1.25 Pemasangan Pipa PVC tipe AW Ø ½" 1
10 A.5.1.1.23 Pemasangan Pipa Galvanis Ø 3" 16.7307
11 A.5.1.1.22 Pemasangan Pipa Galvanis Ø 1½ " 7.3876
12 A.5.1.1.29 Pemasangan Pipa PVC tipe AW Ø 2" 11.3658
13 A.5.1.1.36 Pemasangan Floor Drain 2
14 Tandon 1
A

HARGA SATUAN JUMLAH HARGA


SATUAN
(Rp) (Rp)

m' 162,831.90 7,164,603.60


m2 11,000.00 836,000.00
bh 319,079.20 319,079.20
m2 271,968.40 271,968.40
TOTAL 8,591,651.20

m3 63,360.00 3,974,572.80
m3 37,400.00 774,213.66
m3 218,680.00 3,345,804.00
TOTAL 8,094,590.46

m3 719,169.00 13,479,024.98
m3 458,799.00 1,169,937.45
TOTAL 14,648,962.43

m3 942,717.36 4,492,048.22
Kg 12,999.80 9,993,336.25
m2 165,506.00 2,112,187.57
m2 307,807.50 12,816,180.88
m2 950,125.00 10,546,387.50
m3 90,733.50 61,698.78
m3 950,125.00 1,887,898.38
TOTAL 41,909,737.58

m2 108,948.40 7,572,131.70
TOTAL 7,572,131.70

m2 57,751.76 8,027,667.90
m2 27,500.00 3,822,582.50
TOTAL 11,850,250.40

m2 195,203.25 11,858,597.44
m1 94,806.14 1,494,144.77
m2 187,882.20 3,859,100.39
TOTAL 17,211,842.59

m2 34,276.00 2,618,686.40
TOTAL 2,618,686.40

m2 70,251.50 12,546,917.90
bh 92,235.00 184,470.00
TOTAL 12,731,387.90

m3 23,726,175.00 190,283,923.50
m2 1,130,910.00 938,655.30
m3 24,189,990.00 23,488,480.29
m3 22,351,010.00 19,445,378.70
m2 111,399.99 19,896,038.21
m1 236,293.20 69,753.75
TOTAL 254,122,229.76

Buah 191,290.00 765,160.00


Buah 100,694.00 100,694.00
Buah 190,784.00 953,920.00
Buah 23,775.40 118,877.00
Buah 18,854.00 150,832.00
Buah 18,689.00 93,445.00
m2 102,755.40 408,966.49
TOTAL 2,591,894.49

m2 17,301.90 2,405,016.01
TOTAL 2,405,016.01

Unit 1,664,410.00 1,664,410.00


Unit 550,305.80 550,305.80
Unit 930,050.00 930,050.00
buah 339,240.00 339,240.00
bh 362,714.00 725,428.00
bh 59,490.75 297,453.75
m' 9,050.00 274,006.85
m' 7,375.00 7,375.00
m' 52,450.00 877,525.22
m' 22,400.00 165,482.24
m' 64,100.00 728,547.78
buah 14,630.00 29,260.00
buah 2,003,400.00 2,003,400.00
TOTAL 8,592,484.64
JUMLAH HAR 392,940,865.54
NO. KODE URAIAN PEKERJAAN VOLUME SATUAN

I A. 2.2.1 HARGA SATUAN PEKERJAAN PERSIAPAN


1 A.2.2.1.4 Pengukuran dan Pemasangan Bouwplank 44 m'
2 A.2.2.1.9 Membersihkan Lapangan dan Perataan 76 m2
3 A.2.2.1.11 Pembuatan Kotak Adukan ukuran 40cmx50cmx25cm 1 bh
4 A.2.2.1.10 Pembuatan Steger/Perancah dari Bambu 1 m2

II A.2.3.1 HARGA SATUAN PEKERJAAN TANAH


1 A.2.3.1.2 Menggali Tanah Biasa Sedalam 2 m 62.73 m3
3 A.2.3.1.9 Pengurugan Kembali 20.7009 m3
5 A.2.3.1.11 Urugan Pasir 15.3 m3

III A.3.2.1. HARGA SATUAN PEKERJAAN PONDASI


1 A.3.2.1.7 Pemasangan Pondasi Batu Belah, 1 SP : 3 KP : 10 PP 18.7425 m3
2 A.3.2.1.9 Pemasang Batu Kosong/Anstamping 2.55 m3

IV A.4.1.1 HARGA SATUAN PEKERJAAN B E T O N


1 A.4.1.1.5 Membuat Beton mutu f'c=16,9 MPa (K200), slum (12±2)cm, w/ 4.765 m3
2 A.4.1.1.17Pembesian dg Besi Polos atau Besi Ulir 768.73 Kg
3 A.4.1.1.21Memasang Bekisting untuk Sloof 12.762 m2
4 A.4.1.1.22Memasang Bekisting untuk Kolom 41.637 m2
5 A.4.1.1.23Memasang Bekisting untuk Balok 11.1 m2
6 A.4.1.1.36Membuat Ring Balok Beton Bertulang (10 x 15) cm 0.68 m3
7 A.4.1.1.37Membuat Beton 1Pc : 2Ps : 3Kr 1.987 m3

V A.4.4.1 HARGA SATUAN PEKERJAAN PASANGAN DINDING


1 A.4.4.1.2 Pemasangan Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1 69.502 m2

VI A.4.4.2 HARGA SATUAN PEKERJAAN PLESTERAN


1 A,4,4,2.4 Pemasangan Plesteran 1 Pc : 3 Pp Tebal 20 mm 139.003 m2
2 A,4,4,2.27 Pemasangan Acian 139.003 m2

VII A.4.4.3 HARGA SATUAN PEKERJAAN PENUTUP LANTAI dan DINDING


1 A.4.4.3.35cPemasangan Lantai Keramik 40 x 40 cm warna pola 60.75 m2
2 A.4.4.3.41 Pemasangan Lis Keramik Ukuran 5x20 cm 15.76 m1
3 A.4.4.3.54 Pemasangan Dinding Keramik 20x20 cm, 20.54 m2

VIII A.4.5.1 HARGA SATUAN PEKERJAAN LANGIT-LANGIT


1 A.4.5.1.1 Pemasangan Langit-langit GRC (1,00x1,00) m 76.4 m2

IX A.4.5.2 HARGA SATUAN PEKERJAAN PENUTUP ATAP


1 A.4.5.2.1b Pemasangan Atap Genteng Press Mantili Mojolaban 178.6 m2
2 A.4.5.2.4c Pemasangan Nok Genteng 2 bh

X A.4.6.1 HARGA SATUAN PEKERJAAN KAYU


1 A.4.6.1.2a Pembuatan & Pemasangan Kosen Pintu & Jendela Kayu Jati Kel 8.02 m3
2 A.4.6.1.5a Pembuatan & Pemasangan Daun Pintu Panel, Kayu Jati Kelas II 0.83 m2
3 A.4.6.1.37 Pembuatan&Memasang Konstruksi Kuda-kuda Kayu Jati Kelas I 0.971 m3
4 A.4.6.1.15 Pemasangan konstruksi Gording, Kayu Klas Jati Kelas II 0.87 m3
5 A.4.6.1.19 Pemasangan Usuk jarak 35 cm Reng 25 cm, Kayu Kruing 178.6 m2
6 A.4.6.1.21 Pemasangan Listplank Uk. (3x20)cm Kayu Jati Kelas II 0.2952 m1

XI A.4.6.2 HARGA SATUAN PEKERJAAN KUNCI dan KACA


1 A.4.6.2.2 Pemasangan Kunci Tanam Biasa 4 Buah
2 A.4.6.2.3 Pemasangan Kunci Kamar Mandi 1 Buah
3 A.4.6.2.5 Pemasangan Kunci Silinder 5 Buah
4 A.4.6.2.5 Pemasangan Engsel Pintu 5 Buah
5 A.4.6.2.6 Pemasangan Engsel Jendela Kupu-kupu 8 Buah
6 A.4.6.2.9 Pemasangan Kait Angin 5 Buah
7 A.4.6.2.16 Pemasangan Kaca bening tebal 3 mm 3.98 m2

XII A.4.7.1 HARGA SATUAN PEKERJAAN PENGECATAN


1 A.4.7.1.4 Pengecatan Bidang Kayu Baru (1 lp Plamur, 1 lp Cat dasar, 2 L 139.003 m2

XIII A.5.1.1 HARGA SATUAN PEKERJAAN SANITASI DALAM GEDUNG


1 A.5.1.1.1 Memasang Closet Duduk / Mono Blok 1 Unit
2 A.5.1.1.5 Memasang Wastafel 1 Unit
3 A.5.1.1.7a Pemasangan Bak Fibreglass vol.0,4 m3 1 Unit
4 A.5.1.1.13 Pemasangan Bak Cuci Piring 1 buah
5 A.5.1.1.16 Pemasangan Bak Kontrol Pas.Batu Bata 30 x 30 tinggi 35 cm 2 bh
7 A.5.1.1.19 Pemasangan Kran Ø ½" atau Ø ¾" 5 bh
8 A.5.1.1.26 Pemasangan Pipa PVC tipe AW Ø ¾" 30.277 m'
9 A.5.1.1.25 Pemasangan Pipa PVC tipe AW Ø ½" 1 m'
10 A.5.1.1.23 Pemasangan Pipa Galvanis Ø 3" 16.7307 m'
11 A.5.1.1.22 Pemasangan Pipa Galvanis Ø 1½ " 7.3876 m'
12 A.5.1.1.29 Pemasangan Pipa PVC tipe AW Ø 2" 11.3658 m'
13 A.5.1.1.36 Pemasangan Floor Drain 2 buah
14 Tandon 1 buah
HARGA SATUAN JUMLAH HARGA BOBOT WA
(Rp) (Rp) (%) 1 2 3

162,831.90 7,164,603.60 83.38


11,000.00 836,000.00 9.73
319,079.20 319,079.20 3.71
271,968.40 271,968.40 3.17
TOTAL 8,591,651.20

63,360.00 3,974,572.80 46.26


37,400.00 774,213.66 9.01
218,680.00 3,345,804.00 38.94
TOTAL 8,094,590.46

719,169.00 13,479,024.98 156.87


458,799.00 1,169,937.45 13.62
TOTAL 14,648,962.43

942,717.36 4,492,048.22 52.28


12,999.80 9,993,336.25 116.30
165,506.00 2,112,187.57 24.58
307,807.50 12,816,180.88 149.16
950,125.00 10,546,387.50 122.74
90,733.50 61,698.78 0.72
950,125.00 1,887,898.38 21.97
TOTAL 41,909,737.58

108,948.40 7,572,131.70 88.13


TOTAL 7,572,131.70

57,751.76 8,027,667.90 93.43


27,500.00 3,822,582.50 44.49
TOTAL 11,850,250.40

195,203.25 11,858,597.44 138.01


94,806.14 1,494,144.77 17.39
187,882.20 3,859,100.39 44.91
TOTAL 17,211,842.59

34,276.00 2,618,686.40 30.48


TOTAL 2,618,686.40

70,251.50 12,546,917.90 146.02


92,235.00 184,470.00 2.15
TOTAL 12,731,387.90

23,726,175.00 190,283,923.50 2214.54


1,130,910.00 938,655.30 10.92
24,189,990.00 23,488,480.29 273.36
22,351,010.00 19,445,378.70 226.31
111,399.99 19,896,038.21 231.55
236,293.20 69,753.75 0.81
TOTAL 254,122,229.76

191,290.00 765,160.00 8.90


100,694.00 100,694.00 1.17
190,784.00 953,920.00 11.10
23,775.40 118,877.00 1.38
18,854.00 150,832.00 1.76
18,689.00 93,445.00 1.09
102,755.40 408,966.49 4.76
TOTAL 2,591,894.49

17,301.90 2,405,016.01 27.99


TOTAL 2,405,016.01

1,664,410.00 1,664,410.00 19.37


550,305.80 550,305.80 6.40
930,050.00 930,050.00 10.82
339,240.00 339,240.00 3.95
362,714.00 725,428.00 8.44
59,490.75 297,453.75 3.46
9,050.00 274,006.85 3.19
7,375.00 7,375.00 0.09
52,450.00 877,525.22 10.21
22,400.00 165,482.24 1.93
64,100.00 728,547.78 8.48
14,630.00 29,260.00 0.34
2,003,400.00 2,003,400.00 23.32
TOTAL 8,592,484.64 4573.07615010615
JUMLAH HARGA 392,940,865.54
WAKTU PELAKSANAAN MINGGU KE-
4 5 6 7 8 9 10 11 12
NO JAM
1 2 3 4 5 6 7

1 08.00 S/D 09.00


2 09.00 S/D 10.00
3 10.00 S/D 11.00
4 11.00 S/D 12.00
5 12.00 S/D 13.00
6 13.00 S/D 14.00
7 14.00 S/D 15.00
8 15.00 S/D 16.00
9 16.00 S/D 17.00
10 17.00 S/D 18.00
11 18.00 S/D 19.00
12 19.00 S/D 20.00
13 20.00 S/D 21.00
14 21.00 S/D 22.00
LAPORAN CUACA

TANGGAL
8 9 10 11 12 13 14 15 16 17
ORAN CUACA

L
18 19 20 21 22 23 24 25 26 27
KETERANGAN
28 29 30 31

CERAH

GERIMIS

HUJAN
BAHAN BANGUNAN Pekerjaan yang
ALAT-ALAT Terselenggara pada hari ini
Bahan datang Diterima Ditolak
ri ini

Anda mungkin juga menyukai