1 8/19/2020 Mama Transfer Rp 50,000,000.00 2 8/22/2020 Pembayaran Tukang Rp 1,500,000.00 3 8/22/2020 Pembayaran Tukang Rp 1,200,000.00 4 8/22/2020 Tambahan Tukang Rp 200,000.00 5 8/23/2020 Fee Kontraktor + Sewa Bor Rp 2,119,100.00 6 8/23/2020 Toko Bangunan Maju Jaya Rp 11,676,000.00 7 8/23/2020 Devy Juniarty / Stros Rp 1,680,000.00 8 8/25/2020 Pembayaran Angkut Gragal Rp 320,000.00 Masuk Keluar Saldo Rp 50,000,000.00 Rp 50,000,000.00 Rp 1,500,000.00 Rp 48,500,000.00 Rp 1,200,000.00 Rp 47,300,000.00 Rp 200,000.00 Rp 47,100,000.00 Rp 2,119,100.00 Rp 44,980,900.00 Rp 11,676,000.00 Rp 33,304,900.00 Rp 1,680,000.00 Rp 31,624,900.00 Rp 320,000.00 Rp 31,304,900.00