Anda di halaman 1dari 16

PT.

HERO SUPERMRAKET Tbk


PERBAIKAN PENURURUN TANAH DI GEDUNG GIANT ESKTRA KERTAKHANYAR BANJARMASIN

Item No. FINAL SUMMARY

at HERO SUPERMARKET

for PT. HERO SUPERMARKET Tbk

SUMMARY

A - PRELIMINARY

B - LANTAI 1

C - LANTAI 2

TOTAL CARRIED TO FORM OF TENDER (EXCL. PPN)

Contractor's Signature

Name :

Address :

Date :
Qty Unit Rate Rupiahs

Rp -

Rp -

Rp -

Rp -
Bill of Quantity
PT. HERO SUPERMRAKET Tbk
PERBAIKAN PENURURUN TANAH DIGEDUNG GIANT ESKTRA KERTAKHANYAR BANJARMASIN

NO ITEM PEKERJAAN

A PRELIMINARY

1 The Contractor should prepare the management project and cost of field administration. Include :
a. Site Management
b. Kontrak rumah
c. Biaya Keamanan
d. Mob Demob /Tiket Pesawat Tenaga Kerja
e. Over Time
2 Biaya PCR PP
3 Mobilitaton car debris @ 2 m3
4 Scafolding

A - PRELIMINARY
Carried to Summary at end of Section

B LANTAI 1

a Area Lobby Depan


1 Pek. Galian Tanah
2 Pas. Trucuk Kayu Galam Ø 8-10 cm, t : 4-7 m
3 Cor Beton K-225 Besi Ø 10 - Ø 6
4 Finishing Beton
5 Bongkar Pasang
6 Pas. Trap Pintu Lobby (cor beton + finishing)
7 Pas. Dinding penahan tanah
8 Plester aci
9 Pas. Paving kembali (gelar sirtu, abu batu)
10 Perapihan tanah ex Trucuk
JUMLAH
b Area Parkir
1 Bongkar paving
2 Galian tanah untuk saluran air hujan
3 Pas. dinding saluran
4 Plester + aci dinding saluran
5 Pas. Grill besi tutup saluran
Pas. Paving kembali (gelar sirtu, abu batu)
JUMLAH
c Area Samping Kanan Gedung
1 Pek. Galian Tanah
2 Pas. Trucuk Kayu Galam Ø 8-10 cm, t : 4-7 m
3 Cor Beton K-225 Besi Ø 10 - Ø 6
4 Finishing Beton
5 Perbaikan tiang kolom lobby samping yang miring (bongkar + pasang kembali)
6 Bongkar ornamen tiang samping pintu lobby
7 Bongkar lantai beton lobby samping yang miring
8 Pas. Trap tangga pintu masuk lobby (cor beton)
9 Pas. Granit lantai trap tangga pintu masuk lobby
10 Perapihan tiang ex ornamen
11 Pembuatan gutter samping kusen
12 Bongkar lantai selasar
13 Floor lantai selasar + finishing
14 Perbaikan kolom yang retak
15 Pengecatan kolom ex perbaikan
16 Penutupan lantai yang retak
17 Pas. Tutup bak kontrol yang rusak (grill besi)
18 Pengecatan plafond ex kebocoran
JUMLAH
d Area Samping Kiri Gedung
1 Pek. Galian Tanah
2 Pas. Trucuk Kayu Galam Ø 8-10 cm, P : 4-7 m
3 Cor Beton K-225 Besi Ø 10 - Ø 6
4 Finishing Beton
5 Perapihan tanah kembali
6 Penambahan tanah baru 20 cm
7 Pembuatan/perbaikan bak kontrol
8 Perbaikan dinding yang bocor (kerik, plester+aci, waterproofing)
9 Pas.Pondasi beton dudukan pipa hydrant uk. 80x80x100 (galian tanah, pembesian, begesting, beton)
10 Bongkar plafond
11 Pengecatan dak
JUMLAH
e Area Belakang Gedung
I. Area Loading Dock, Area Gas Room, dan Area Ruang Sensitif
1 Pek. Galian Tanah
2 Pas. Trucuk Kayu Galam Ø 8-10 cm, P : 4-7 m
3 Cor Beton K-225 Besi Ø 10 - Ø 6
4 Finishing Beton
5 Perbaikan dinding yang bocor (kerik, plester+aci, waterproofing)
6 Pengecoran untuk Pembuatan ramp di loading dock
6 Perapihan tanah ex Trucuk
7 Pengecatan dinding
JUMLAH
II. Area Panel Genset, Security, Cleaning Service, Property
1 Galian Tanah
2 Pas. Trucuk Kayu Galam Ø 8-10 cm, P : 4-7 m
3 Cor Beton K-225 Besi Ø 10 - Ø 6
4 Finishing Beton
5 Perbaikan dinding yang bocor (kerik, plester+aci, waterproofing)
6 Perapihan tanah ex Trucuk
7 Pengecatan dinding
8 Bongkar lantai beton area Security, Cleaning service, Property
9 Pembuatan trap tangga (cor beton)
10 Pas.Granit lantai uk. 60x60
JUMLAH

B - LANTAI 1
Carried to Summary at end of Section

C LANTAI 2

a Area Samping Kanan Gedung


1 Bongkar atap existing
2 Pas. Rangka atap besi hollow 4x4
3 Pas. Atap zincalum t: 0,35 mm
4 Perbaikan atap yang bocor
5 Pas. Plafond gypsum yang lepas terkena kebocoran
6 Pengecatan plafond
JUMLAH
b Area Façade dan Roof
1 Bongkar dinding façade GRC bagian luar samping kanan
2 Bongkar ornamen dinding/penebalan dinding
3 Penggantian rangka besi façade yang keropos bagian luar
4 Bongkar dinding façade GRC bagian dalam (Roof)
5 Penggantian rangka besi façade bagian dalam yang keropos (Roof)
6 Pas. Dinding façade cloading bagian luar samping kanan
7 Pas. Dinding façade cloading bagian dalam (Roof)
8 Pengecatan dinding façade cloading baru luar
9 Waterproofing dak roof yang bocor (Sikalatis 509)
JUMLAH

C - LANTAI 2
Carried to Summary at end of Section
Harga Satuan Tota Harga
Qty Sat
(Rp) (Rp)

1.00 Ls -

8.00 org -
25.00 rit -
25.00 set -

Rp. -

40.00 m1 -
1
40.00 m -
4.80 m3 -
1
40.00 m -
2
250.00 m -
1
16.00 m -
1
80.00 m -
2
320.00 m -
2
250.00 m -
2
40.00 m -
-

60.00 m1 -
1
60.00 m -
120.00 m1 -
1
120.00 m -
60.00 m1 -
2
60.00 m -
-

120.00 m1 -
1
120.00 m -
3
14.40 m -
1
120.00 m -
1.00 unit -
2.00 unit -
12.00 m2 -
1
24.00 m -
24.00 m1 -
2.00 unit -
112.00 m1 -
2
180.00 m -
2
180.00 m -
15.00 unit -
15.00 unit -
112.00 m1 -
15.00 unit -
180.00 m2 -
-

168.00 m1 -
168.00 m1 -
3
20.16 m -
1
168.00 m -
1
168.00 m -
40.00 m3 -
22.00 unit -
1.00 Ls -
16.00 unit -
280.00 m2 -
2
280.00 m -
-

40.00 m2 -
40.00 m2 -
3
4.80 m -
40.00 m1 -
1.00 Ls -
25.00 m3 -
2
72.00 m -
1.00 Ls -
-

80.00 m2 -
2
80.00 m -
9.60 m3 -
1
80.00 m -
1.00 Ls -
80.00 m2 -
1.00 Ls -
24.00 m1 -
1
32.00 m -
1
32.00 m -
-

Rp. -

96.00 m2 -
96.00 m2 -
2
96.00 m -
1.00 Ls -
112.00 m2 -
2
450.00 m -
-

720.00 m2 -
1.00 Ls -
216.00 m2 -
2
352.00 m -
2
116.00 m -
720.00 m2 -
2
352.00 m -
70.00 m2 -
2
150.00 m -
-

Rp. -
PT. HERO SUPERMRAKET Tbk
PERBAIKAN MEKANIKAL , ELEKTRIKAL & PLUMBING

Item No. FINAL SUMMARY

at HERO SUPERMARKET

for PT. HERO SUPERMARKET Tbk

SUMMARY

A - PRELIMINARY
B - AIR CONDITIONING
C - HYDRANT
D - PLUMBING
E - ELEKTRIKAL
F - LAIN -LAIN

TOTAL CARRIED TO FORM OF TENDER (EXCL. PPN)

Contractor's Signature

Name :

Address :

Date :
Qty Unit Rate Rupiahs

Rp
Rp
Rp
Rp
Rp
Rp

Rp
Bill of Quantity
PT. HERO SUPERMRAKET Tbk
PERBAIKAN MEP DI KERTAK HANYAR - BANJARMASIN
No Items Vol Satuan

A Preliminary
1 The contractor should prepare the management project 1 ls
and cost of field administration included
a. site management
b. Kontrak rumah
c. Biaya Keamanan
d. mobililasi & demobilisasi / Transportasi cost Pesawat
& local untuk tenaga kerja
e. Overtime
2 Biaya PCR tenaga kerja /PP 3 orang
3 Sewa peralatan Las & scafolding 1 ls

B Pekerjaan Air conditioning


1 Pembuatan nampan kondensasi AC & Saluran Pipa 6 unit
drain , BJLS with full isolation
2 Maitenance AC indoor & Outdoor AC 15 PK 17 unit
3 Pembuatan dan modifikasi Perkuatan Outdoor AC with 7 unit
C canal steel

C Instalasi Hydrant
1 Modifikasi dan perkuatan support Pipa hydrant w/C 8 titik
canal

Pemasangan double Flexible Joint 6 inch , 20 K


2 6 bh
w/flange connection & support kontrol adjustment

Pemasangan double Flexible Joint 4 inch , 20 K w/


3 4 bh
Flange connection & support kontrol adjustment

4 Pemasangan double Flexible Joint 2 inch , 20 K w/ 2 bh


flange connection & support kontrol adjustment

D Plumbing
1 Pembuatan Bucket drain pipa air hujan 9 titik
2 Pembuatan dan pemasangan pipa extensi 3 inch 9 titik
untuk drain air hujan
3 Pemasangan flexible joint pipa air bersih 2 inch 4 unit
4 Perbaikan kebocoran Pipa PDAM 1 titik
5 Pembuatan pipa drain cool room 1 lot
6 Cleaning Sumpit 4 bh
7 Cleaning pipa dan floor drain area toko 1 lot
8 Rekondisi STP - Perbaikan pipa bocor & General
cleaning 1 lot

E Elektrikal
1 Pemasangan external Panel Box untuk Lampu 1 set
penerangan parkir
2 1 lot
Penambahan kabel ekstensi lampu penerangan jalan

F Lain- lain
1 Isolasi ulang pipa pendingin 1 lot
2 Pembuatan nampan kondensasi pipa pendingin 1 lot
3 Pembuatan Grill bak kontrol 52 bh

Total
Harga satuan (Rp) Total Harga (Rp)

-
-

-
-
-
-
-
-

-
-
-