DAFTAR KUANTITAS DAN HARGA

ME - PEKERJAAN FASADE GEDUNG HALIM II


KANTOR BKKBN PUSAT TA 2018

No Uraian Pekerjaan Vol Sat

A. Pekerjaan Instalasi & Armature


Penerangan & Saklar ( ex. SPLN, LMK & SNI )
1 Instalasi Penerangan Nym, 3x2,5 mm2 + Conduit 20 mm2 82.00 ttk
2 Instalasi Power AC Nym, 3x 4 mm2 + Conduit 25 mm2 20.00 ttk
3 Saklar Tunggal 2.00 bh
4 Saklar Double 2.00 bh
5 Outlet Stopkontak AC (1 Phasa) 20.00 bh
6 Lampu Sorot. 1 x 36 watt + Rantai (9 watt-led) 4.00 bh
7 Lampu Down Light + SL.7 wat (led) 66.00 bh
8 Lampu SL.11 wat (led) 12.00 bh
Sub Total I Rp.
B. Pekerjaan Tata Udara
1 Aircondition Wall Singel Split ( Bongkar Pasang ) 52.00 unit
2 Instalasi Drain AC. Pipa PVC.AW. dia. 3/4" 208.00 m1
Sub Total II Rp.

C. Pekerjaan Plumbing ( Pemipaan )


Pemipaan Air Hujan
2 Pipa PVC. dia. 3" 120.00 m1
3 Pipa PVC. dia. 2.5" 133.00 m1
4 Fitting Pipa 1.00 ls
5 Bak Kontrol 50 x 50 x 50 cm + Penutup 15.00 bh
Sub Total III Rp.

TOTAL M/E
PPN 10%
GRAND TOTAL M/E
Harga Satuan Jumlah Harga

399,610.00 32,768,020.00
512,480.00 10,249,600.00
94,050.00 188,100.00
94,050.00 188,100.00
90,750.00 1,815,000.00
860,000.00 3,440,000.00
522,600.00 34,491,600.00
634,600.00 7,615,200.00
Rp. 90,755,620.00

1,750,000.00 91,000,000.00
49,660.00 10,329,280.00
Rp. 101,329,280.00

141,650.00 16,998,000.00
127,800.00 16,997,400.00
7,890,000.00 7,890,000.00
2,780,000.00 41,700,000.00
Rp. 83,585,400.00

TAL M/E 275,670,300.00


N 10% 27,567,030.00
AND TOTAL M/E 303,237,330.00
DAFTAR KUANTITAS DAN HARGA
KEGIATAN : PENGADAAN JASA KONSTRUKSI PEKERJAAN FASADE
LOKASI : GEDUNG HALIM II KANTOR BKKBN PUSAT
TAHUN ANGGARAN : 2018

No Uraian Kegiatan Volume Satuan

I. PEKERJAAN PERSIAPAN
1 Pek. Papan Nama Proyek 1.00 ls
2 Foto Proyek 5 Phase (0, 25, 50, 75, 100) Colour uk. 3 R 3.00 set
3 Direksi Keet & Gudang Kerja Dengan Lantai Plesteran 34.56 m2
4 Pek. Pagar sementara dari seng gelombang tinggi 2 m 100.00 m1
5 Mobilisasi dan Demobilisasi 1.00 ls

II. PEKERJAAN BONGKARAN


A LANTAI DASAR
1 Bongkar genteng 160.00 m2
2 Bongkar rangka atap 160.00 m2
3 Bongkar lisplank 80.00 m1
4 Bongkar rangka dan penutup plafond 478.00 m2

B. LANTAI SATU
1 Bongkar genteng 160.00 m2
2 Bongkar rangka atap 160.00 m2
3 Bongkar lisplank kayu 80.00 m1
4 Bongkar rangka dan penutup plafond 478.00 m1

C. LANTAI DUA
1 Bongkar genteng 160.00 m2
2 Bongkar rangka atap 160.00 m2
3 Bongkar lisplank kayu 80.00 m1
4 Bongkar rangka dan penutup plafond 478.00 m2

D. LANTAI TIGA
1 Bongkar genteng 160.00 m2
2 Bongkar rangka atap 160.00 m2
3 Bongkar lisplank kayu 80.00 m1
4 Bongkar rangka dan penutup plafond 478.00 m1

III. PEKERJAAN PLAFOND LENGKAP DENGAN RANGKA HOLLOW


A LANTAI DASAR
1 Pek. Pasang Rangka Plafond besi Hollow Galvaniced 439.61 m2
No Uraian Kegiatan Volume Satuan

2 Pek. Pasangan Penutup Plafond gypsum board 9 mm 174.90 m2


3 Pek. Pasangan Penutup Plafond GRC 4 mm 264.71 m2
4 Pek. List profil gypsum finis cat 118.70 m1
5 Pek. List profil kayu finis cat 277.70 m1

B LANTAI.1
1 Pek. Pasang Rangka Plafond besi Hollow Galvaniced 261.65 m2
2 Pek. Pasangan Penutup Plafond GRC 4 mm 264.71 m2
3 Pek. List profil kayu finis cat 275.20 m1

C LANTAI.2
1 Pek. Pasang Rangka Plafond besi Hollow Galvaniced 261.65 m2
2 Pek. Pasangan Penutup Plafond GRC 4 mm 261.65 m2
3 Pek. List profil kayu finis cat 275.20 m1

D LANTAI 3
1 Pek. Pasang Rangka Plafond besi Hollow Galvaniced 404.36 m2
2 Pek. Pasangan Penutup Plafond gypsum board 9 mm 139.65 m2
3 Pek. Pasangan Penutup Plafond GRC 4 mm 264.71 m2
4 Pek. List profil gypsum finis cat 103.70 m1
5 Pek. List profil kayu finis cat 277.70 m1

IV PEKERJAAN PENGECATAN
A LANTAI DASAR
1 Kupas / kerok Cat dinding existing 863.66 m2
2 Cat dinding exsterior 863.66 m2
3 Cat plafond gypsum 174.90 m2
4 Cat plafond GRC 264.71 m2
5 Cat list profil 396.40 m1
6 Cat lisplank existing 185.70 m1

B LANTAI 1
1 Kupas / kerok Cat dinding existing 804.98 m2
2 Cat dinding exsterior 804.98 m2
3 Cat plafond GRC 264.71 m2
4 Cat list profil 275.20 m1
5 Cat lisplank existing 185.70 m1
SUB TO
C LANTAI 2
1 Kupas / kerok Cat dinding existing 804.98 m2
No Uraian Kegiatan Volume Satuan

2 Cat dinding exsterior 804.98 m2


3 Cat plafond GRC 261.65 m2
4 Cat list profil 275.20 m1
5 Cat lisplank existing 185.70 m1
SUB TO
D LANTAI 3
1 Kupas / kerok Cat dinding existing 804.98 m2
2 Cat dinding exsterior 804.98 m2
3 Cat plafond gypsum 139.65 m2
4 Cat plafond GRC 264.71 m1
5 Cat list profil 381.40 m1
6 Cat lisplank existing 221.70 m1

V. PEKERJAAN ALUMUNIUM COMPOSIT PANEL ( ACP ) ,


JENDELA KACA , LENGKAP DENGAN RANGKA & ASSESORIESNYA.
A LANTAI DASAR
1 Rangka utama ( jarak 50 s/d 75 cm dari dinding) baja siku 50 x 50 x 5 115.20 m2
2 Pasang ACP lengkap dengan rangka aluminium penunjang 984.25 m2
3 Pasang kusen dan jendela kaca uk 80 x 115 cm Type J1 4.00 bh

B LANTAI SATU
1 Rangka utama ( jarak 50 s/d 75 cm dari dinding) baja siku 50 x 50 x 5 164.16 m2
2 Pasang ACP lengkap dengan rangka aluminium penunjang 1,052.89 m2
3 Pasang ACP cutting lengkap dengan rangka uk 840 x 530 cm 42.00 m2
4 Pasang ACP Cutting lengkap dengan rangka uk 280 x 530 cm 30.80 bh
5 Pasang kusen dan jendela kaca uk 80 x 115 cm Type J1 4.00 bh
6 Kusen dan pintu double teakwood finish melamic 1.00 unit

C LANTAI DUA
1 Rangka utama ( jarak 50 s/d 75 cm dari dinding) baja siku 50 x 50 x 5 151.68 m2
2 Pasang ACP lengkap dengan rangka aluminium penunjang 920.28 m2
3 Pasang kusen dan jendela kaca uk 80 x 115 cm Type J1 4.00 bh

D. LANTAI TIGA
1 Rangka utama ( jarak 50 s/d 75 cm dari dinding) baja siku 50 x 50 x 5 133.20 m2
2 Pasang ACP lengkap dengan rangka aluminium penunjang 940.79 m2
3 Pasang kusen dan jendela kaca uk 90 x 115 cm Type J1 14.00 bh

E LANTAI ATAP
1 Rangka utama ( jarak 50 s/d 75 cm dari dinding) baja siku 50 x 50 x 5 123.17 m2
2 Pasang ACP lengkap dengan rangka aluminium penunjang 450.34 m2
No Uraian Kegiatan Volume Satuan

3 Pasang GRC 4 mm finis cat lengkap dengan rangka besi hollow 43.56 m2

VI PEKERJAAN CANOPY ENTRANCE


1 Bongkar penutup atap genteng keramik 104.13 m2
2 Bongkar rangka atap 104.13 m2
3 Bongkar lisplank 38.00 m1
4 Bongkar rangka dan penutup plafond 90.25 m2
5 Baja WF 200.100. 5.5 . 8 2,163.88 kg
6 Pasang chemical angkur 40.00 bh
7 Pasang kaca laminated 2 x 6 mm + rangka Alumunium 46.50 m2
8 Pasang ACP lengkap dengan rangka aluminium penunjang 169.62 m2
9 Pasangan rangka plafond besi hollow galvaniced 40x40 mm 32.00 m2
10 Pek. Pasangan Penutup Plafond GRC tebal 4 mm 32.00 m2
11 Pek. Pasang list aluminium 24.00 m1
12 Pek. Cat plafond 32.00 m2

VII PEKERJAAN LAIN - LAIN


1 Grill alumunium 5 x 10 cm uk 200 x 960 cm 6.00 unit
2 Buang puing bekas bongkaran 1.00 ls
3 Jaring pengaman proyek 1.00 ls
4 Tulisan GEDUNG HALIM II bahan dari stainless steel 1.00 ls
5 Pekerjaan Logo BKKBN bahan Acryilic 1.00 ls
6 Pekerjaan Railling Ramp bahan dari stainless steel 12.80 m'
7 Pekerjaan Guidding block 1.00 ls
8 Bak kontrol tertutup dari plat beton 19.00 unit
9 Perbaikan atap genteng yang bocor 1.00 ls

VIII PEKERJAAN LANDSCAPE


1 Pengolahan dan pembentukan tanah 449.30 m2
2 Tanaman perdu 150.00 m2
3 Tanaman rumput 280.00 m2
4 Pemupukan tanaman perdu 150.00 m2
5 Perawatan 150.00 m2
6 Pekerjaan tambahan taman Area Main Entrance meliputi :
Bongkar paving existing,Sculpture, taman dll 1.00 ls

TOTAL
PPN 10%
GRAND TOTAL
Kode Harga Satuan Jumlah
Harga
Satuan ( Rp. ) ( Rp. )

674,190.00 674,190.00
A.3 1,750,000.00 5,250,000.00
1.00 1,111,860.00 38,425,881.60
A.2 312,490.00 31,249,000.00
30,000,000.00 30,000,000.00
JUMLAH I 105,599,071.60

B.3 87,800.00 14,048,000.00


B.2 77,600.00 12,416,000.00
B.4 37,000.00 2,960,000.00
B.1 26,700.00 12,762,600.00
SUB TOTAL II.A 42,186,600.00

B.3 87,800.00 14,048,000.00


B.2 77,600.00 12,416,000.00
B.4 37,000.00 2,960,000.00
B.1 26,700.00 12,762,600.00
SUB TOTAL II.B 42,186,600.00

B.3 87,800.00 14,048,000.00


B.2 77,600.00 12,416,000.00
B.4 37,000.00 2,960,000.00
B.1 26,700.00 12,762,600.00
SUB TOTAL II.C 42,186,600.00

B.3 87,800.00 14,048,000.00


B.2 77,600.00 12,416,000.00
B.4 37,000.00 2,960,000.00
B.1 26,700.00 12,762,600.00
SUB TOTAL II.D 42,186,600.00
SUB TOTAL II 168,746,400.00

D.1 102,320.00 44,980,895.20


Kode Harga Satuan Jumlah
Harga
Satuan ( Rp. ) ( Rp. )
D.2 99,970.00 17,484,753.00
D.3 100,130.00 26,505,412.30
D.5 17,600.00 2,089,120.00
D.5 27,800.00 7,720,060.00
SUB TOTAL A 98,780,240.50

D.1 102,320.00 26,772,028.00


D.3 100,130.00 26,505,412.30
D.5 27,800.00 7,650,560.00
SUB TOTAL B 60,928,000.30

D.1 102,320.00 26,772,028.00


D.3 100,130.00 26,199,014.50
D.5 27,800.00 7,650,560.00
SUB TOTAL C 60,621,602.50

D.1 102,320.00 41,374,115.20


D.2 99,970.00 13,960,810.50
D.3 100,130.00 26,505,412.30
D.5 17,600.00 1,825,120.00
D.5 27,800.00 7,720,060.00
SUB TOTAL A 91,385,518.00
SUB TOTAL III 311,715,361.30

15,700.00 13,559,462.00
E.1 58,900.00 50,869,574.00
E.5 65,450.00 11,447,205.00
E.5 65,450.00 17,325,269.50
10,700.00 4,241,480.00
E.4 18,900.00 3,509,730.00
SUB TOTAL A 100,952,720.50

15,700.00 12,638,186.00
E.1 58,900.00 47,413,322.00
E.5 65,450.00 17,325,269.50
10,700.00 2,944,640.00
E.4 18,900.00 3,509,730.00
SUB TOTAL B 83,831,147.50

15,700.00 12,638,186.00
Kode Harga Satuan Jumlah
Harga
Satuan ( Rp. ) ( Rp. )
E.1 58,900.00 47,413,322.00
E.5 65,450.00 17,124,992.50
10,700.00 2,944,640.00
E.4 18,900.00 3,509,730.00
SUB TOTAL C 83,630,870.50

15,700.00 12,638,186.00
E.1 58,900.00 47,413,322.00
E.1 65,450.00 9,140,092.50
E.1 65,450.00 17,325,269.50
10,700.00 4,080,980.00
E.4 18,900.00 4,190,130.00
SUB TOTAL D 94,787,980.00
SUB TOTAL IV 363,202,718.50

C.2 410,740.00 47,317,248.00


C.1 663,740.00 653,286,095.00
H.9 5,670,000.00 22,680,000.00
SUB TOTAL A 723,283,343.00

C.2 410,740.00 67,427,078.40


C.1 663,740.00 698,845,208.60
879,000.00 36,918,000.00
879,000.00 27,073,200.00
H.9 5,670,000.00 22,680,000.00
4,560,000.00 4,560,000.00
SUB TOTAL B 857,503,487.00

C.2 410,740.00 62,301,043.20


C.1 663,740.00 610,826,647.20
H.9 5,670,000.00 22,680,000.00
SUB TOTAL C 695,807,690.40

C.2 410,740.00 54,710,568.00


C.1 663,740.00 624,439,954.60
H.9 5,670,000.00 79,380,000.00
SUB TOTAL D 758,530,522.60

C.2 410,740.00 50,590,845.80


C.1 663,740.00 298,908,671.60
Kode Harga Satuan Jumlah
Harga
Satuan ( Rp. ) ( Rp. )
202,450.00 8,818,722.00
SUB TOTAL E 358,318,239.40
SUB TOTAL VI 3,393,443,282.40

B.3 87,800.00 9,142,614.00


B.2 77,600.00 8,080,488.00
B.4 32,600.00 1,238,800.00
B.1 26,700.00 2,409,675.00
F.1 22,300.00 48,254,524.00
189,700.00 7,588,000.00
G.5 870,000.00 40,455,000.00
C.1 663,740.00 112,583,578.80
D.1 102,320.00 3,274,240.00
D.3 100,130.00 3,204,160.00
D.4 12,600.00 302,400.00
E.1 65,450.00 2,094,400.00
SUB TOTAL VI 238,627,879.80

H . 12 3,120,000.00 18,720,000.00
2,890,000.00 2,890,000.00
2,890,000.00 2,890,000.00
12,800,000.00 12,800,000.00
4,360,000.00 4,360,000.00
980,000.00 12,544,000.00
43,700,000.00 43,700,000.00
8,790,000.00 167,010,000.00
550,000.00 550,000.00
SUB TOTAL VII. 265,464,000.00

169,700.00 76,246,210.00
148,700.00 22,305,000.00
49,700.00 13,916,000.00
19,800.00 2,970,000.00
26,700.00 4,005,000.00

25,640,000.00 25,640,000.00
SUB TOTAL VIII 145,082,210.00

TOTAL 4,991,880,923.60
PPN 10% 499,188,092.36
GRAND TOTAL 5,491,069,015.96
FORMULIR PERHITUNGAN
ANALISA HARGA SATUAN PEKERJAAN
KAB / KODYA :
PROP :
ITEM PEMBAYARAN NO. : BOW A.05
JENIS PEKERJAAN : Papan Nama Proyek
SATUAN PEMBAYARAN : bh
NO. KOMPONEN
SATUAN
KODE URAIAN
A. TENAGA
1 L 002 @Pekerja / knek org/jam
2 L 014 @Tukang Kayu org/jam
3 L 020 @Tukang Cat / Pelitur org/jam
4 L 024 @Mandor / pengawas org/jam

B. BAHAN
1 M039.012 Triplek uk. 4 x 8 ft (120 x 240 cm), 6 mm lbr
2 M035.118 Cat Kayu/Besi Gloss - Warna Mengkilap kg
3 M073.095 Kayu Meranti m³

C. PERALATAN
1

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A+B+C)


E. OVERHEAD DAN PROFIT ( 10 % x D )
F. HARGA SATUAN PEKERJAAN (D+E)
G. DIBULATKAN

FORMULIR PERHITUNGAN
ANALISA HARGA SATUAN PEKERJAAN
KAB / KODYA :
PROP :
ITEM PEMBAYARAN NO. : BOW A.04
JENIS PEKERJAAN : Kantor Direksi, Lantai Plesteran, Meranti Jambi, Dinding Triplek 4 mm, Atap Asbes Gelombang 5 m
SATUAN PEMBAYARAN : m²

NO. KOMPONEN
SATUAN
KODE URAIAN
A. TENAGA
1 L 001 Pekerja / knek org/hr
2 L 009 Tukang Batu org/hr
3 L 013 Tukang Kayu org/hr
4 L 023 Mandor / pengawas org/hr
5 BOW A.10 Pembersihan Lokasi / Perataan Tanah m²

B. BAHAN
1 M085.003 Pasir Pasang m³
2 M085.001 Pasir Beton (luar Nunukan) m³
3 M027.003 Batu bata merah buah
4 M088.003 Semen zak
5 M073.095 Kayu Meranti m³
6 M039.010 Triplek uk. 4 x 8 ft (120 x 240 cm), 4 mm Lembar
7 M036.166 Engsel Pintu Kuningan uk. 3" (Aiwa) buah
8 M056.016 Kaca bening 5 mm m²
9 M084.204 Rangka Nako dan Besi Tralis Nako buah
10 M009.004 Asbes Gelombang Lembar
11 M072.001 Paku Kayu Segala uk. kg
12 M059.975 Kunci Gembok Kecil buah

C. PERALATAN
1

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A+B+C)


E. OVERHEAD DAN PROFIT ( 10 % x D )
F. HARGA SATUAN PEKERJAAN (D+E)
G. DIBULATKAN
FORMULIR PERHITUNGAN
ANALISA HARGA SATUAN PEKERJAAN
KAB / KODYA :
PROP :
ITEM PEMBAYARAN NO. : SNI A.02
Pagar Sementara Dari Seng Gelombang, t = 1.80 m, Kayu Meranti Jambi, seng gelombang, tebal
JENIS PEKERJAAN :
krl
SATUAN PEMBAYARAN : m¹

NO. KOMPONEN
SATUAN
KODE URAIAN
A. TENAGA
1 L 013 Tukang Kayu org/hr
2 L 001 Pekerja / knek org/hr
3 L 011 Kepala Tukang Kayu org/hr
4 L 023 Mandor / pengawas org/hr

B. BAHAN
1 M073.136 Dolken Ø 8-10 x 350-400 cm batang
2 M088.004 @Semen kg
3 M013.145 Seng Gelombang lebar 1,2 m m
4 M085.001 Pasir Beton (Luar Nunukan) m³
5 M025.012 Koral Kali / Koral Beton m³
6 M073.095 Kayu Meranti m³
7 M072.001 Paku Kayu Segala uk. kg
8 M035.238 Cat Dasar Kayu/Besi kg

C. PERALATAN
1

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A+B+C)


E. OVERHEAD DAN PROFIT ( 10 % x D )
F. HARGA SATUAN PEKERJAAN (D+E)
G. DIBULATKAN

FORMULIR PERHITUNGAN
ANALISA HARGA SATUAN PEKERJAAN
KAB / KODYA :
PROP :
ITEM PEMBAYARAN NO. : SNI J.25
JENIS PEKERJAAN : Memasang pipa PVC tipe AW Ø ½"
SATUAN PEMBAYARAN : m¹

NO. KOMPONEN
SATUAN
KODE URAIAN
A. TENAGA
1 L 001 Pekerja / knek org/hr
2 L 035 Tukang Pasang Pipa org/hr
3 L 007 Kepala Tukang Batu org/hr
4 L 023 Mandor / pengawas org/hr

B. BAHAN
1 M079.001 Pipa PVC, WAVIN, Standard, Ø ½" (Ø 22 mm), tebal 1.5 mm, kelas AW m'
2 Perlengkapan %

C. PERALATAN
1

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A+B+C)


E. OVERHEAD DAN PROFIT ( 10 % x D )
F. HARGA SATUAN PEKERJAAN (D+E)
G. DIBULATKAN
FORMULIR PERHITUNGAN
ANALISA HARGA SATUAN PEKERJAAN
KAB / KODYA :
PROP :
ITEM PEMBAYARAN NO. : SNI J.26
JENIS PEKERJAAN : Memasang pipa PVC tipe AW Ø ¾"
SATUAN PEMBAYARAN : m¹

NO. KOMPONEN
SATUAN
KODE URAIAN
A. TENAGA
1 L 001 Pekerja / knek org/hr
2 L 035 Tukang Pasang Pipa org/hr
3 L 007 Kepala Tukang Batu org/hr
4 L 023 Mandor / pengawas org/hr

B. BAHAN
1 M079.002 Pipa PVC, WAVIN, Standard, Ø ¾" (Ø 26 mm), tebal 1.8 mm, kelas AW m'
2 Perlengkapan %

C. PERALATAN
1

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A+B+C)


E. OVERHEAD DAN PROFIT ( 10 % x D )
F. HARGA SATUAN PEKERJAAN (D+E)
G. DIBULATKAN

FORMULIR PERHITUNGAN
ANALISA HARGA SATUAN PEKERJAAN
KAB / KODYA :
PROP :
ITEM PEMBAYARAN NO. : SNI J.27
JENIS PEKERJAAN : Memasang pipa PVC tipe AW Ø 1"
SATUAN PEMBAYARAN : m¹

NO. KOMPONEN
SATUAN
KODE URAIAN
A. TENAGA
1 L 001 Pekerja / knek org/hr
2 L 035 Tukang Pasang Pipa org/hr
3 L 007 Kepala Tukang Batu org/hr
4 L 023 Mandor / pengawas org/hr

B. BAHAN
1 M079.001 Pipa PVC, WAVIN, Standard, Ø 1" (Ø 32 mm), tebal 2 mm, kelas AW m'
2 Perlengkapan %

C. PERALATAN
1

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A+B+C)


E. OVERHEAD DAN PROFIT ( 10 % x D )
F. HARGA SATUAN PEKERJAAN (D+E)
G. DIBULATKAN
FORMULIR PERHITUNGAN
ANALISA HARGA SATUAN PEKERJAAN
KAB / KODYA :
PROP :
ITEM PEMBAYARAN NO. : SNI J.31
JENIS PEKERJAAN : Memasang pipa PVC tipe AW Ø 3"
SATUAN PEMBAYARAN : m¹

NO. KOMPONEN
SATUAN
KODE URAIAN
A. TENAGA
1 L 001 Pekerja / knek org/hr
2 L 035 Tukang Pasang Pipa org/hr
3 L 007 Kepala Tukang Batu org/hr
4 L 023 Mandor / pengawas org/hr

B. BAHAN
1 M079.001 Pipa PVC, WAVIN, Standard, Ø 3" (Ø 89 mm), tebal 3.1 mm, kelas AW m'
2 Perlengkapan %

C. PERALATAN
1

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A+B+C)


E. OVERHEAD DAN PROFIT ( 10 % x D )
F. HARGA SATUAN PEKERJAAN (D+E)
G. DIBULATKAN

FORMULIR PERHITUNGAN
ANALISA HARGA SATUAN PEKERJAAN
KAB / KODYA :
PROP :
ITEM PEMBAYARAN NO. : SNI J.32
JENIS PEKERJAAN : Memasang pipa PVC tipe AW Ø 4"
SATUAN PEMBAYARAN : m¹

NO. KOMPONEN
SATUAN
KODE URAIAN
A. TENAGA
1 L 001 Pekerja / knek org/hr
2 L 035 Tukang Pasang Pipa org/hr
3 L 007 Kepala Tukang Batu org/hr
4 L 023 Mandor / pengawas org/hr

B. BAHAN
1 M079.001 Pipa PVC, WAVIN, Standard, Ø 4" (Ø 114 mm), tebal 4.1 mm, kelas AW m'
2 Perlengkapan %

C. PERALATAN
1

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A+B+C)


E. OVERHEAD DAN PROFIT ( 10 % x D )
F. HARGA SATUAN PEKERJAAN (D+E)
G. DIBULATKAN
FORMULIR PERHITUNGAN
ANALISA HARGA SATUAN PEKERJAAN
KAB / KODYA :
PROP :
ITEM PEMBAYARAN NO. : Dihitung
JENIS PEKERJAAN : Saklar Dobel ex.Broco/Panasonic/setara
SATUAN PEMBAYARAN : bh

NO. KOMPONEN
SATUAN
KODE URAIAN
A. TENAGA
1 L 027 Instalator org/hr
2 L 029 Pembantu Instalator org/hr

B. BAHAN
1 Saklar Dobel ex.Broco/Panasonic/setara bh
2 Accecories ( 1 % alat ) %

C. PERALATAN
1

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A+B+C)


E. OVERHEAD DAN PROFIT ( 10 % x D )
F. HARGA SATUAN PEKERJAAN (D+E)
G. DIBULATKAN

FORMULIR PERHITUNGAN
ANALISA HARGA SATUAN PEKERJAAN
KAB / KODYA :
PROP :
ITEM PEMBAYARAN NO. : Dihitung
JENIS PEKERJAAN : Pasang Stop Kontak ex.BROCO/Panasonic/setara
SATUAN PEMBAYARAN : bh

NO. KOMPONEN
SATUAN
KODE URAIAN
A. TENAGA
1 L 027 Instalator org/hr
2 L 029 Pembantu Instalator org/hr

B. BAHAN
1 Stop Kontak ex.BROCO/Panasonic/setara bh
2 Accecories ( 1 % alat ) %

C. PERALATAN
1

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A+B+C)


E. OVERHEAD DAN PROFIT ( 10 % x D )
F. HARGA SATUAN PEKERJAAN (D+E)
G. DIBULATKAN

FORMULIR PERHITUNGAN
ANALISA HARGA SATUAN PEKERJAAN
KAB / KODYA :
PROP :
ITEM PEMBAYARAN NO. : BOW M.01
JENIS PEKERJAAN : Instalasi Penerangan kabel NYM 3 x 2,5 mm (tidak termasuk lampu)
SATUAN PEMBAYARAN : ttk

NO. KOMPONEN
SATUAN
KODE URAIAN
A. TENAGA
1 L 001 Pekerja / knek org/hr
2 L 027 Instalator org/hr
3 L 029 Pembantu Instalator org/hr

B. BAHAN
1 M037.004 Fitting Plafon Besar, ex.Panasonic/BROCO/setara buah
2 M061.035 Kabel Listrik NYM 3 X 2,5 mm² m
3 M061.317 Klem t = 4 mm buah
4 M079.001 Pipa PVC, WAVIN, Standard, Ø ½" (Ø 22 mm), tebal 1.5 mm, kelas AW m'

C. PERALATAN
1

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A+B+C)


E. OVERHEAD DAN PROFIT ( 10 % x D )
F. HARGA SATUAN PEKERJAAN (D+E)
G. DIBULATKAN
FORMULIR PERHITUNGAN
ANALISA HARGA SATUAN PEKERJAAN
KAB / KODYA :
PROP :
ITEM PEMBAYARAN NO. : BOW M.03
JENIS PEKERJAAN : Pasang instalasi listrik + outlet AC tiap 1 titik (tidak termasuk AC)
SATUAN PEMBAYARAN : ttk

NO. KOMPONEN
SATUAN
KODE URAIAN
A. TENAGA
1 L 001 Pekerja / knek org/hr
2 L 027 Instalator org/hr
3 L 029 Pembantu Instalator org/hr
4 L 023 Mandor / pengawas org/hr

B. BAHAN
1 M061.035 Kabel Listrik NYM 3 X 2,5 mm² m
2 M061.317 Klem t = 4 mm buah
3 Stop Kontak AC buah
4 M079.001 Pipa PVC, WAVIN, Standard, Ø ½" (Ø 22 mm), tebal 1.5 mm, kelas AW m'

C. PERALATAN
1

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A+B+C)


E. OVERHEAD DAN PROFIT ( 10 % x D )
F. HARGA SATUAN PEKERJAAN (D+E)
G. DIBULATKAN

FORMULIR PERHITUNGAN
ANALISA HARGA SATUAN PEKERJAAN
KAB / KODYA :
PROP :
ITEM PEMBAYARAN NO. : BOW M.01
JENIS PEKERJAAN : Instalasi Penerangan kabel NYM 2 x 2,5 mm (tidak termasuk lampu)
SATUAN PEMBAYARAN : ttk

NO. KOMPONEN
SATUAN
KODE URAIAN
A. TENAGA
1 L 001 Pekerja / knek org/hr
2 L 027 Instalator org/hr
3 L 029 Pembantu Instalator org/hr

B. BAHAN
1 M037.004 Fitting Plafon Besar, ex.Panasonic/BROCO/setara buah
2 M061.035 Kabel Listrik NYM 2 X 2,5 mm² m
3 M061.317 Klem t = 4 mm buah
4 M079.001 Pipa PVC, WAVIN, Standard, Ø ½" (Ø 22 mm), tebal 1.5 mm, kelas AW m'

C. PERALATAN
1

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A+B+C)


E. OVERHEAD DAN PROFIT ( 10 % x D )
F. HARGA SATUAN PEKERJAAN (D+E)
G. DIBULATKAN

FORMULIR PERHITUNGAN
ANALISA HARGA SATUAN PEKERJAAN
KAB / KODYA :
PROP :
ITEM PEMBAYARAN NO. : BOW M.03
JENIS PEKERJAAN : Instalasi Stop Kontak Dalam Tembok (BROCO) kabel NYM 3 x 2,5 mm
SATUAN PEMBAYARAN : ttk

NO. KOMPONEN
SATUAN
KODE URAIAN
A. TENAGA
1 L 001 Pekerja / knek org/hr
2 L 027 Instalator org/hr
3 L 029 Pembantu Instalator org/hr
4 L 023 Mandor / pengawas org/hr

B. BAHAN
1 M061.035 Kabel Listrik NYM 3 X 2,5 mm² m
2 M061.317 Klem t = 4 mm buah
3 M079.001 Pipa PVC, WAVIN, Standard, Ø ½" (Ø 22 mm), tebal 1.5 mm, kelas AW m'

C. PERALATAN
1

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A+B+C)


E. OVERHEAD DAN PROFIT ( 10 % x D )
F. HARGA SATUAN PEKERJAAN (D+E)
G. DIBULATKAN
FORMULIR PERHITUNGAN
ANALISA HARGA SATUAN PEKERJAAN
KAB / KODYA :
PROP :
ITEM PEMBAYARAN NO. : Dihitung
JENIS PEKERJAAN : Pasang Rangka Aluminium Composite Panel (ACP)
SATUAN PEMBAYARAN : m²

NO. KOMPONEN
SATUAN
KODE URAIAN
A. TENAGA
1 Pekerja / knek ls
2 Tukang alumunium ls

B. BAHAN
1 Rangka m2

C. PERALATAN
1

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A+B+C)


E. OVERHEAD DAN PROFIT ( 10 % x D )
F. HARGA SATUAN PEKERJAAN (D+E)
G. DIBULATKAN

FORMULIR PERHITUNGAN
ANALISA HARGA SATUAN PEKERJAAN
KAB / KODYA :
PROP :
ITEM PEMBAYARAN NO. : Dihitung
JENIS PEKERJAAN : Pasang Aluminium Composite Panel (ACP)
SATUAN PEMBAYARAN : m²

NO. KOMPONEN
SATUAN
KODE URAIAN
A. TENAGA
1 Pekerja / knek ls
2 Tukang alumunium ls

B. BAHAN
1 Aluminium Composite Panel m2

C. PERALATAN
1

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A+B+C)


E. OVERHEAD DAN PROFIT ( 10 % x D )
F. HARGA SATUAN PEKERJAAN (D+E)
G. DIBULATKAN

FORMULIR PERHITUNGAN
ANALISA HARGA SATUAN PEKERJAAN
KAB / KODYA :
PROP :
ITEM PEMBAYARAN NO. : SNI N.47 d
JENIS PEKERJAAN : Cat Dinding
SATUAN PEMBAYARAN : m²

NO. KOMPONEN
SATUAN
KODE URAIAN
A. TENAGA
1 L 001 Pekerja / knek org/hr
2 L 019 Tukang Cat / Pelitur org/hr
3 L 025 Kepala Tukang Cat / Pelitur org/hr
4 L 023 Mandor / pengawas org/hr

B. BAHAN
1 Plamur Tembok kg
2 Cat Tembok Dasar kg
3 Cat Tembok kg

C. PERALATAN
1

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A+B+C)


E. OVERHEAD DAN PROFIT ( 10 % x D )
F. HARGA SATUAN PEKERJAAN (D+E)
G. DIBULATKAN
FORMULIR PERHITUNGAN
ANALISA HARGA SATUAN PEKERJAAN
KAB / KODYA :
PROP :
ITEM PEMBAYARAN NO. : BOW J.06
JENIS PEKERJAAN : Cat Plafond
SATUAN PEMBAYARAN : m²

NO. KOMPONEN
SATUAN
KODE URAIAN
A. TENAGA
1 L 001 Pekerja / knek org/hr
2 L 019 Tukang Cat / Pelitur org/hr
3 L 025 Kepala Tukang Cat / Pelitur org/hr
4 L 023 Mandor / pengawas org/hr

B. BAHAN
1 M035.029 Cat Tembok kg
2 M035.349 Ampelas Kayu/Besi Halus lbr
3 M035.400 Roll Cat Tembok Lokal bh

C. PERALATAN
1

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A+B+C)


E. OVERHEAD DAN PROFIT ( 10 % x D )
F. HARGA SATUAN PEKERJAAN (D+E)
G. DIBULATKAN

FORMULIR PERHITUNGAN
ANALISA HARGA SATUAN PEKERJAAN
KAB / KODYA :
PROP :
ITEM PEMBAYARAN NO. : Dihitung
JENIS PEKERJAAN : Pas. Rangka Plafond besi hollow 40/40+20/40
SATUAN PEMBAYARAN : m²

NO. KOMPONEN
SATUAN
KODE URAIAN
A. TENAGA
1 Pekerja org/hr
2 Tukang alumunium org/hr
3 Tukang gypsum org/hr
4 Kepala tukang org/hr
5 Mandor org/hr

B. BAHAN
1 Paku peluru ramset bh
2 Hollow 4x4 cm tbl 0.6 mm btg
3 Hollow 2x4 cm tbl 0.6 mm btg
4 Paku beton kg
5 Sekrup 6x1-1,5 bh

C. PERALATAN
1
D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A+B+C)
E. OVERHEAD DAN PROFIT ( 10 % x D )
F. HARGA SATUAN PEKERJAAN (D+E)
G. DIBULATKAN

FORMULIR PERHITUNGAN
ANALISA HARGA SATUAN PEKERJAAN
KAB / KODYA :
PROP :
ITEM PEMBAYARAN NO. : Dihitung
JENIS PEKERJAAN : Pas. Gypsum Plafond t:9mm
SATUAN PEMBAYARAN : m²

NO. KOMPONEN
SATUAN
KODE URAIAN
A. TENAGA
1 Pekerja org/hr
2 Tukang alumunium org/hr
3 Tukang gypsum org/hr
4 Kepala tukang org/hr
5 Mandor org/hr

B. BAHAN
1 Gypsumboard 120x240 cm 9 mm lbr
2 Sekrup gypsum bh
3 Textile tape rol
4 Compound gypsum zak
5 Amplas lbr

C. PERALATAN
1

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A+B+C)


E. OVERHEAD DAN PROFIT ( 10 % x D )
F. HARGA SATUAN PEKERJAAN (D+E)
G. DIBULATKAN

FORMULIR PERHITUNGAN
ANALISA HARGA SATUAN PEKERJAAN
KAB / KODYA :
PROP :
ITEM PEMBAYARAN NO. : Dihitung
JENIS PEKERJAAN : Pas. Plafond GRC t:4mm
SATUAN PEMBAYARAN : m²

NO. KOMPONEN
SATUAN
KODE URAIAN
A. TENAGA
1 Pekerja org/hr
2 Tukang alumunium org/hr
3 Tukang gypsum org/hr
4 Kepala tukang org/hr
5 Mandor org/hr

B. BAHAN
1 GRC Board 120x240 cm 4 mm lbr
2 Sekrup gypsum bh
3 Textile tape rol
4 Compound gypsum zak
5 Amplas lbr

C. PERALATAN
1

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A+B+C)


E. OVERHEAD DAN PROFIT ( 10 % x D )
F. HARGA SATUAN PEKERJAAN (D+E)
G. DIBULATKAN
BOW A.05

PERKIRAAN HARGA SATUAN JUMLAH HARGA


KUANTITAS (Rp.) (Rp.)

1.1000 Rp 105,000.00 Rp 115,500.00


0.5000 Rp 110,000.00 Rp 55,000.00
1.0000 Rp 130,000.00 Rp 130,000.00
0.5000 Rp 150,000.00 Rp 75,000.00
JUMLAH HARGA TENAGA Rp 375,500.00

0.3500 Rp 98,900.00 Rp 34,615.00


1.1000 Rp 88,900.00 Rp 97,790.00
0.0300 Rp 3,500,000.00 Rp 105,000.00
JUMLAH HARGA BAHAN Rp 237,405.00

Rp -
JUMLAH HARGA PERALATAN Rp -
Rp 612,905.00
Rp 61,290.50
Rp 674,195.50
Rp 674,190.00

BOW A.04

Triplek 4 mm, Atap Asbes Gelombang 5 mm

PERKIRAAN HARGA SATUAN JUMLAH HARGA


KUANTITAS (Rp.) (Rp.)

0.4000 Rp 105,000.00 Rp 42,000.00


0.0834 Rp 110,000.00 Rp 9,174.00
0.3340 Rp 110,000.00 Rp 36,740.00
0.0200 Rp 150,000.00 Rp 3,000.00
1.0000 Rp 250,000.00 Rp 250,000.00
JUMLAH HARGA TENAGA Rp 340,914.00

0.3500 Rp 235,000.00 Rp 82,250.00


0.1517 Rp 235,000.00 Rp 35,649.50
25.0000 Rp 780.00 Rp 19,500.00
0.5500 Rp 59,600.00 Rp 32,780.00
0.0300 Rp 3,500,000.00 Rp 105,000.00
1.0000 Rp 85,700.00 Rp 85,700.00
0.1667 Rp 87,600.00 Rp 14,602.92
0.2917 Rp 123,600.00 Rp 36,054.12
0.2917 Rp 380,000.00 Rp 110,846.00
1.2000 Rp 104,700.00 Rp 125,640.00
0.5000 Rp 22,600.00 Rp 11,300.00
0.0833 Rp 126,700.00 Rp 10,554.11
JUMLAH HARGA BAHAN Rp 669,876.65

-
JUMLAH HARGA PERALATAN -
1,010,790.65
101,079.07
1,111,869.72
1,111,860.00
SNI A.02

yu Meranti Jambi, seng gelombang, tebal 0.25 mm, pondasi uk. 40x40x40 cm, adukan 1 PC : 3 psr : 5

PERKIRAAN HARGA SATUAN JUMLAH HARGA


KUANTITAS (Rp.) (Rp.)

0.2640 Rp 110,000.00 Rp 29,040.00


0.2400 Rp 105,000.00 Rp 25,200.00
0.1200 Rp 150,000.00 Rp 18,000.00
0.0100 Rp 150,000.00 Rp 1,500.00
JUMLAH HARGA TENAGA Rp 73,740.00

0.7000 Rp 22,600.00 Rp 15,820.00


6.8000 Rp 1,490.00 Rp 10,132.00
0.8200 Rp 97,600.00 Rp 80,032.00
0.0670 Rp 235,000.00 Rp 15,745.00
0.0670 Rp 207,600.00 Rp 13,909.20
0.0200 Rp 3,500,000.00 Rp 70,000.00
0.0100 Rp 22,600.00 Rp 226.00
0.0600 Rp 74,700.00 Rp 4,482.00
JUMLAH HARGA BAHAN Rp 210,346.20

-
JUMLAH HARGA PERALATAN -
284,086.20
28,408.62
312,494.82
312,490.00

SNI J.25

PERKIRAAN HARGA SATUAN JUMLAH HARGA


KUANTITAS (Rp.) (Rp.)

0.0360 Rp 105,000.00 Rp 3,780.00


0.0600 Rp 130,000.00 Rp 7,800.00
0.0060 Rp 150,000.00 Rp 900.00
0.0018 Rp 150,000.00 Rp 270.00
JUMLAH HARGA TENAGA Rp 12,750.00

1.2000 Rp 23,000.00 Rp 27,600.00


35.0000 Rp - Rp -
JUMLAH HARGA BAHAN Rp 27,600.00
Rp -
JUMLAH HARGA PERALATAN Rp -
Rp 40,350.00
Rp 4,035.00
Rp 44,385.00
Rp 44,380.00
SNI J.26

PERKIRAAN HARGA SATUAN JUMLAH HARGA


KUANTITAS (Rp.) (Rp.)

0.0360 Rp 105,000.00 Rp 3,780.00


0.0600 Rp 130,000.00 Rp 7,800.00
0.0060 Rp 150,000.00 Rp 900.00
0.0018 Rp 150,000.00 Rp 270.00
JUMLAH HARGA TENAGA Rp 12,750.00

1.2000 Rp 27,000.00 Rp 32,400.00


Rp -
JUMLAH HARGA BAHAN Rp 32,400.00

Rp -
JUMLAH HARGA PERALATAN Rp -
Rp 45,150.00
Rp 4,515.00
Rp 49,665.00
Rp 49,660.00

SNI J.27

PERKIRAAN HARGA SATUAN JUMLAH HARGA


KUANTITAS (Rp.) (Rp.)

0.0360 Rp 105,000.00 Rp 3,780.00


0.0600 Rp 130,000.00 Rp 7,800.00
0.0060 Rp 150,000.00 Rp 900.00
0.0018 Rp 150,000.00 Rp 270.00
JUMLAH HARGA TENAGA Rp 12,750.00

1.2000 Rp 39,000.00 Rp 46,800.00


35.0000 Rp -
JUMLAH HARGA BAHAN Rp 46,800.00

Rp -
JUMLAH HARGA PERALATAN Rp -
Rp 59,550.00
Rp 5,955.00
Rp 65,505.00
Rp 65,500.00
SNI J.31

PERKIRAAN HARGA SATUAN JUMLAH HARGA


KUANTITAS (Rp.) (Rp.)

0.0810 Rp 105,000.00 Rp 8,505.00


0.1350 Rp 130,000.00 Rp 17,550.00
0.0135 Rp 150,000.00 Rp 2,025.00
0.0041 Rp 150,000.00 Rp 615.00
JUMLAH HARGA TENAGA Rp 28,695.00

1.2000 Rp 83,400.00 Rp 100,080.00


35.0000 Rp -
JUMLAH HARGA BAHAN Rp 100,080.00

Rp -
JUMLAH HARGA PERALATAN Rp -
Rp 128,775.00
Rp 12,877.50
Rp 141,652.50
Rp 141,650.00

SNI J.32

PERKIRAAN HARGA SATUAN JUMLAH HARGA


KUANTITAS (Rp.) (Rp.)

0.0810 Rp 105,000.00 Rp 8,505.00


0.1350 Rp 130,000.00 Rp 17,550.00
0.0135 Rp 150,000.00 Rp 2,025.00
0.0041 Rp 150,000.00 Rp 615.00
JUMLAH HARGA TENAGA Rp 28,695.00

1.2000 Rp 138,900.00 Rp 166,680.00


35.0000 Rp -
JUMLAH HARGA BAHAN Rp 166,680.00

Rp -
JUMLAH HARGA PERALATAN Rp -
Rp 195,375.00
Rp 19,537.50
Rp 214,912.50
Rp 214,910.00
Dihitung

PERKIRAAN HARGA SATUAN JUMLAH HARGA


KUANTITAS (Rp.) (Rp.)

0.1000 Rp 150,000.00 Rp 15,000.00


0.0500 Rp 110,000.00 Rp 5,500.00
JUMLAH HARGA TENAGA Rp 20,500.00

1.0000 Rp 65,000.00 Rp 65,000.00


1.0000 Rp -
JUMLAH HARGA BAHAN Rp 65,000.00

JUMLAH HARGA PERALATAN


Rp 85,500.00
Rp 8,550.00
Rp 94,050.00
Rp 94,050.00

Dihitung

PERKIRAAN HARGA SATUAN JUMLAH HARGA


KUANTITAS (Rp.) (Rp.)

0.1000 Rp 150,000.00 Rp 15,000.00


0.0500 Rp 110,000.00 Rp 5,500.00
JUMLAH HARGA TENAGA Rp 20,500.00

1.0000 Rp 62,000.00 Rp 62,000.00


1.0000 Rp -
JUMLAH HARGA BAHAN Rp 62,000.00

JUMLAH HARGA PERALATAN


Rp 82,500.00
Rp 8,250.00
Rp 90,750.00
Rp 90,750.00

BOW M.01
PERKIRAAN HARGA SATUAN JUMLAH HARGA
KUANTITAS (Rp.) (Rp.)

0.1714 Rp 105,000.00 Rp 17,997.00


0.1065 Rp 150,000.00 Rp 15,975.00
0.1306 Rp 110,000.00 Rp 14,366.00
JUMLAH HARGA TENAGA Rp 48,338.00

0.0274 Rp - Rp -
15.0000 Rp 19,000.00 Rp 285,000.00
1.0000 Rp 1,200.00 Rp 1,200.00
5.0000 Rp 5,750.00 Rp 28,750.00
JUMLAH HARGA BAHAN Rp 314,950.00

JUMLAH HARGA PERALATAN Rp -


Rp 363,288.00
Rp 36,328.80
Rp 399,616.80
Rp 399,610.00
BOW M.03

PERKIRAAN HARGA SATUAN JUMLAH HARGA


KUANTITAS (Rp.) (Rp.)

0.3912 Rp 105,000.00 Rp 41,076.00


0.1050 Rp 150,000.00 Rp 15,750.00
0.2306 Rp 110,000.00 Rp 25,366.00
0.0050 Rp 150,000.00 Rp 750.00
JUMLAH HARGA TENAGA Rp 82,942.00

15.0000 Rp 19,000.00 Rp 285,000.00


1.0000 Rp 1,200.00 Rp 1,200.00
1.0000 Rp 68,000.00 Rp 68,000.00
5.0000 Rp 5,750.00 Rp 28,750.00
JUMLAH HARGA BAHAN Rp 382,950.00

JUMLAH HARGA PERALATAN Rp -


Rp 465,892.00
Rp 46,589.20
Rp 512,481.20
Rp 512,480.00

BOW M.01

PERKIRAAN HARGA SATUAN JUMLAH HARGA


KUANTITAS (Rp.) (Rp.)

0.3714 Rp 105,000.00 Rp 38,997.00


0.1065 Rp 150,000.00 Rp 15,975.00
0.2306 Rp 110,000.00 Rp 25,366.00
JUMLAH HARGA TENAGA Rp 80,338.00

0.0274 Rp - Rp -
15.0000 Rp 19,000.00 Rp 285,000.00
1.0000 Rp 1,200.00 Rp 1,200.00
5.0000 Rp 5,750.00 Rp 28,750.00
JUMLAH HARGA BAHAN Rp 314,950.00

JUMLAH HARGA PERALATAN Rp -


Rp 395,288.00
Rp 39,528.80
Rp 434,816.80
Rp 434,810.00

BOW M.03

YM 3 x 2,5 mm

PERKIRAAN HARGA SATUAN JUMLAH HARGA


KUANTITAS (Rp.) (Rp.)

0.3912 Rp 105,000.00 Rp 41,076.00


0.1050 Rp 150,000.00 Rp 15,750.00
0.2306 Rp 110,000.00 Rp 25,366.00
0.0050 Rp 150,000.00 Rp 750.00
JUMLAH HARGA TENAGA Rp 82,942.00

15.0000 Rp 19,000.00 Rp 285,000.00


1.0000 Rp 1,200.00 Rp 1,200.00
5.0000 Rp 5,750.00 Rp 28,750.00
JUMLAH HARGA BAHAN Rp 314,950.00

JUMLAH HARGA PERALATAN Rp -


Rp 397,892.00
Rp 39,789.20
Rp 437,681.20
Rp 437,680.00
Dihitung

PERKIRAAN HARGA SATUAN JUMLAH HARGA


KUANTITAS (Rp.) (Rp.)

0.5600 Rp 105,000.00 Rp 58,800.00


1.0000 Rp 114,600.00 Rp 114,600.00
JUMLAH HARGA TENAGA Rp 173,400.00

1.0000 Rp 200,000.00 Rp 200,000.00


JUMLAH HARGA BAHAN Rp 200,000.00

-
JUMLAH HARGA PERALATAN -
Rp 373,400.00
Rp 37,340.00
Rp 410,740.00
Rp 410,740.00

Dihitung

PERKIRAAN HARGA SATUAN JUMLAH HARGA


KUANTITAS (Rp.) (Rp.)

0.5600 Rp 105,000.00 Rp 58,800.00


1.0000 Rp 114,600.00 Rp 114,600.00
JUMLAH HARGA TENAGA Rp 173,400.00

1.0000 Rp 430,000.00 Rp 430,000.00


JUMLAH HARGA BAHAN Rp 430,000.00

-
JUMLAH HARGA PERALATAN -
Rp 603,400.00
Rp 60,340.00
Rp 663,740.00
Rp 663,740.00

SNI N.47 d
PERKIRAAN HARGA SATUAN JUMLAH HARGA
KUANTITAS (Rp.) (Rp.)

0.0200 Rp 105,000.00 Rp 2,100.00


0.0630 Rp 130,000.00 Rp 8,190.00
0.0063 Rp 150,000.00 Rp 945.00
0.0025 Rp 150,000.00 Rp 375.00
JUMLAH HARGA TENAGA Rp 11,610.00

0.1000 Rp 78,400.00 Rp 7,840.00


0.1000 Rp 137,800.00 Rp 13,780.00
0.2600 Rp 137,800.00 Rp 35,828.00
JUMLAH HARGA BAHAN Rp 57,448.00

Rp -
JUMLAH HARGA PERALATAN Rp -
Rp 69,058.00
Rp 6,905.80
Rp 75,963.80
Rp 75,960.00
BOW J.06

PERKIRAAN HARGA SATUAN JUMLAH HARGA


KUANTITAS (Rp.) (Rp.)

0.1040 Rp 105,000.00 Rp 10,920.00


0.1200 Rp 130,000.00 Rp 15,600.00
0.0190 Rp 150,000.00 Rp 2,850.00
0.0100 Rp 150,000.00 Rp 1,500.00
JUMLAH HARGA TENAGA Rp 30,870.00

0.2000 Rp 137,800.00 Rp 27,560.00


0.1500 Rp 4,600.00 Rp 690.00
0.0100 Rp 38,700.00 Rp 387.00
JUMLAH HARGA BAHAN Rp 28,637.00

Rp -
JUMLAH HARGA PERALATAN Rp -
Rp 59,507.00
Rp 5,950.70
Rp 65,457.70
Rp 65,450.00

Dihitung

PERKIRAAN HARGA SATUAN JUMLAH HARGA


KUANTITAS (Rp.) (Rp.)

0.0600 Rp 105,000.00 Rp 6,300.00


0.0600 Rp 130,000.00 Rp 7,800.00
0.0500 Rp 130,000.00 Rp 6,500.00
0.0310 Rp 150,000.00 Rp 4,650.00
0.0130 Rp 150,000.00 Rp 1,950.00
JUMLAH HARGA TENAGA Rp 27,200.00

0.3900 Rp 14,000.00 Rp 5,460.00


0.4590 Rp 62,100.00 Rp 28,503.90
0.4310 Rp 66,800.00 Rp 28,790.80
0.0100 Rp 82,600.00 Rp 826.00
14.0000 Rp 160.00 Rp 2,240.00
JUMLAH HARGA BAHAN Rp 65,820.70

JUMLAH HARGA PERALATAN Rp -


Rp 93,020.70
Rp 9,302.07
Rp 102,322.77
Rp 102,320.00

Dihitung

PERKIRAAN HARGA SATUAN JUMLAH HARGA


KUANTITAS (Rp.) (Rp.)

0.1200 Rp 105,000.00 Rp 12,600.00


0.1200 Rp 130,000.00 Rp 15,600.00
0.0500 Rp 130,000.00 Rp 6,500.00
0.0310 Rp 150,000.00 Rp 4,650.00
0.0130 Rp 150,000.00 Rp 1,950.00
JUMLAH HARGA TENAGA Rp 41,300.00

0.3640 Rp 106,700.00 Rp 38,838.80


21.0000 Rp 140.00 Rp 2,940.00
0.0240 Rp 22,900.00 Rp 549.60
0.0800 Rp 85,000.00 Rp 6,800.00
0.1000 Rp 4,600.00 Rp 460.00
JUMLAH HARGA BAHAN Rp 49,588.40

JUMLAH HARGA PERALATAN Rp -


Rp 90,888.40
Rp 9,088.84
Rp 99,977.24
Rp 99,970.00

Dihitung

PERKIRAAN HARGA SATUAN JUMLAH HARGA


KUANTITAS (Rp.) (Rp.)

0.2600 Rp 105,000.00 Rp 27,300.00


0.2600 Rp 140.00 Rp 36.40
0.0500 Rp 130,000.00 Rp 6,500.00
0.0310 Rp 22,900.00 Rp 709.90
0.0130 Rp 85,000.00 Rp 1,105.00
JUMLAH HARGA TENAGA Rp 35,651.30

0.3640 Rp 122,600.00 Rp 44,626.40


21.0000 Rp 140.00 Rp 2,940.00
0.0240 Rp 22,900.00 Rp 549.60
0.0800 Rp 85,000.00 Rp 6,800.00
0.1000 Rp 4,600.00 Rp 460.00
JUMLAH HARGA BAHAN Rp 55,376.00

JUMLAH HARGA PERALATAN Rp -


Rp 91,027.30
Rp 9,102.73
Rp 100,130.03
Rp 100,130.00
BAHAN DAN UPAH

KEGIATAN KONTRUKSI FISIK


DKI JAKARTA

NO JENIS BAHAN / UPAH SAT Harga Pasar 1

A BAHAN / MATERIAL
1 @Semen Putih 40 kg kg
2 @Semen Warna kg
3 @Semen Merah kg
4 @Semen kg Rp 1,490.00
5 @Semen Instan MU-380 kg
6 @Semen Instan MU-301 kg
7 @Semen Instan MU-250 kg
8 @Semen Instan MU-200 kg
9 @Semen Instan MU-400 kg
10 @Semen Instan MU-450 kg
11 Abu Batu m³
12 AC Split Plasma - SHARP 1/2 PK unit
13 AC Split Plasma - SHARP 3/4 PK unit
14 AC Split Plasma - SHARP 1 PK unit
15 Alumunium Foil Single Side m²
16 Amplas lbr Rp 4,600.00
17 Anti Rayap m²
18 Angkur Baut Ø 16 mm, L = 60 cm bh
19 Asbes Gelombang lbr Rp 104,700.00
20 Atap Baja Ringan m²
21 Atap Metal Roof m²
22 Atap Seng m²
23 Atap Nok Metal Roof m¹
24 Atap Nok Zincalume, t = 0,3 mm m¹
25 Atap Zincalume 40x100 cm, t = 0,4 mm m²
26 Baja IWF ex.DN SII kg
27 Bak Mandi fiber Glass Standar 0,3 m³ bh
28 Balok Bengkirai uk. 5 x 15 x 400 cm m³
29 Batako 10x20x40 cm bh
30 Batu bata merah bh Rp 780.00
31 Bata Ringan 10 x 20 x 60 cm m²
32 Batu Kali / Gunung m³
33 Batu Pecah 1x1 m³
34 Batu Pecah 2x1 m³
35 Batu Pecah 2x3 m³ Rp 207,600.00
36 Batu Pecah 3x5 m³
37 Batu Pecah 5x7 m³
38 Besi Beton bulat U-24 (polos) kg
39 Besi Beton Ulir U-32 kg
40 Buis Beton 1/2 Dia 20 cm m¹
41 Box MCB 8 group bh
42 Cat Dasar Kayu/Besi (Meni) kg Rp 74,700.00
43 Cat Kayu/Besi Gloss - Warna Mengkilap kg Rp 88,900.00
44 Cat Tembok setara dulux kg Rp 137,800.00
45 Closet Duduk ex. Lokal bh
46 Closet Jongkok/Squatting, ex.Lokal bh
47 Compound gypsum kg Rp 3,400.00
48 Conduit pipa PVC dia ⅝" C m¹
49 Connector BC bh
50 Dempul/Plamir Kayu kg
51 Dolken Ø 8-10 x 350-400 cm btg Rp 22,600.00
52 Door Closer bh
53 Elbow flexible bh
54 Engsel Jendela 3" SS ex.Lokal psg
55 Engsel Pintu 4" SS ex.Lokal psg
56 Engsel Pintu Kuningan uk. 3" (Aiwa) psg
57 Fisher Ø 2 s/d 3 cm bh
58 Fisher Ø 12 s/d 20 cm bh
59 Fitting Plafon Besar, ex.Panasonic/BROCO/setara bh
60 Floor Drain SS ex.Lokal bh
61 Floor Hardener PM-700 kg
62 Geotextile m²
63 Gravel m³
64 Grendel Jendela SS - Lokal bh
65 GRC Board 120x240 cm 4 mm lbr Rp 122,600.00
66 Gypsumboard 120x240 cm 9 mm lbr Rp 106,700.00
67 Haak Angin Jendela BV SS - Lokal bh Rp 120.00
68 Hollow 2x4 cm tbl 0.3 mm, galvanis btg Rp 66,800.00
69 Hollow 4x4 cm tbl 0.3 mm, galvanis btg Rp 62,100.00
70 Homogenous Tile Ukr. 60 x 60 cm bh
71 HPL lbr
72 Ijuk kg
73 Inbow doos bh
74 Joint compound zak Rp 73,400.00
75 Kabel antena TV m¹
76 Kabel BC 50 mm m¹
77 Kabel Listrik NYM 2 X 1,5 mm² m¹
78 Kabel Listrik NYM 2 X 2,5 mm² m¹
79 Kabel Listrik NYY 2 X 2,5 mm² m¹
80 Kabel NYM 3x2,5 mm² m¹ Rp 19,000.00
81 Kabel Listrik NYM 3 x 4 mm² m¹
82 Kabel telepon m¹
83 Kabel TR NYFGby 4 x 150 mm² m¹
84 Kaca bening 5 mm m²
85 Kaca Es 5 mm m²
86 Kaca bening 8 mm m²
87 Kanstin Beton 15.30.40, K-300 bh
88 Kawat Beton kg
89 Kawat Las harmonika kg
90 Kawat Duri 5 Kg ( P.37,5 M) - 1 ROLL kg
91 Kayu Meranti m³ Rp 3,500,000.00
92 Keramik Dinding 20 x 20 cm bh
93 Keramik Dinding 20 x 40 cm bh
94 Keramik Dinding 20 x 25 cm bh
95 Keramik Dinding 30 x 30 cm bh
96 Keramik Lantai, uk. 20 X 20 cm - Unpolished bh
97 Keramik Lantai, uk. 30 X 30 cm - Unpolished bh
98 Keramik Lantai, uk. 40 X 40 cm - Unpolished bh
99 Keramik Lantai, uk. 40 X 40 cm - polished bh
100 Keramik Lantai, uk. 60 X 60 cm bh
101 Kiychen Zinc 1 lubang, 1 sayap bh
102 Klem conduit bh
103 Klem pipa besi 3/4" bh
104 Klem pipa pvc 1" bh
105 Klem t = 4 mm bh
106 Koral Kali / Koral Beton m³
107 Kran Air Kitchen Sink Ø 1/2" ex.Lokal bh
108 Kran Air Ø 1/2" ex.Lokal bh
109 Kran Air Wastafel Ø 1/2" ex.Lokal bh
110 Kuas 2" bh
111 Kunci Gembok Kecil bh
112 Kunci Pintu Yale set
113 Kunci Sloot Pintu SS - Lokal bh
114 Kusen Aluminium 4" CA - Natural m¹
115 Lampu Downlight + SL 14 watt bh
116 Lampu Jalan Putih tipe Cobra 50 watt set
117 Lampu TKI RM 2x18 watt set
118 Lastdop bh
119 Lem kayu Putih kg
120 List Gypsum t = 12 cm m¹
121 List Profil Kamper 1 cm m¹
122 Listplank GRC L = 25 cm, t = 9 mm lbr
123 MCB 6 A bh
124 MCB 10 A bh
125 MCB 3 phase 6 A bh
126 MCB 3 phase 10 A bh
127 MCB 3 phase 16 A bh
128 MCB box isi 4 group bh
129 MCB box isi 8 group bh
130 Minyak pelumas / olie ltr
131 Pagar BRC Tinggi 190 Cm m¹
132 Paku asbes / seng (payung) kg
133 Paku beton kg Rp 82,600.00
134 Paku Gypsum / Sirap / Plywood kg
135 Paper Tape roll
136 Paku Kayu Segala uk. kg Rp 22,600.00
137 Paku peluru ramset bh Rp 14,000.00
138 Paku Genteng Metal kg
139 Papan Kayu Bengkirai uk. 3 x 20 x 400 cm m³
140 Pas. Kitchen Zinc, 1 lubang, 1 sayap bh
141 Pasir Beton m³ Rp 235,000.00
142 Pasir Pasang m³ Rp 235,000.00
143 Pasir urug m³
144 Paving Block t = 6 cm bh
145 Pelumas ltr
146 Penyambungan daya 2200 W unit
147 Pipa Galvanis dia 1/2" btg
148 Pipa galvanis dia 3/4" btg
149 Pipa Galvanis dia 1" btg
150 Pipa GIP dia.1 1/4" btg
151 Pipa Galvanis dia 1 1/2" btg
152 Pipa Galvanis dia 2" btg
153 Pipa galvanis dia 3" btg
154 Pipa Porous (komplit) btg
155 Pipa PVC, WAVIN, Standard, Ø ½" (Ø 22 mm), tebal 1.5 mm, kelas AW btg Rp 23,000.00
156 Pipa PVC, WAVIN, Standard, Ø 3/4" btg Rp 27,000.00
157 Pipa PVC, WAVIN, Standard, Ø 1" (Ø 32 mm), tebal 2 mm, kelas AW btg Rp 39,000.00
158 Pipa PVC, WAVIN, Standard, Ø 1¼" btg
159 Pipa PVC, WAVIN, Standard, Ø 1½" (Ø 48 mm), tebal 2.3 mm, kelas AW btg
160 Pipa PVC, WAVIN, Standard, Ø 2" btg
161 Pipa PVC, WAVIN, Standard, Ø 3" btg Rp 83,400.00
162 Pipa PVC, WAVIN, Standard, Ø 4" btg Rp 138,900.00
163 Pipa PVC, WAVIN, Standard, Ø 6" (Ø 165 mm), tebal 3.0 mm, kelas D btg
164 Plamur Kayu kg
165 Plamur Tembok kg Rp 78,400.00
166 Pompa air listrik 250 W ex. Panasonic/setara bh
167 Pondasi Trafo Tiang Ganda bh
168 Pondasi Trafo Tiang Tunggal bh
169 Pull Handle dan Kunci Pelor SS - Lokal psg
170 Rangka Aluminium Natural m¹
171 Rangka Nako dan Besi Tralis Nako unit
172 Residu kg
173 Roll Cat Tembok Lokal bh Rp 38,700.00
174 Roster (angin-angin Beton) bh
175 Saklar Tunggal ex.Broco/Panasonic/setara bh Rp 45,000.00
176 Saklar Dobel ex.Broco/Panasonic/setara bh Rp 65,000.00
177 Seal tape bh
178 Sealant bh
179 Sealant Gypsum m¹
180 Sekrup 6x1-1,5 bh Rp 160.00
181 Sekrup gypsum bh Rp 140.00
184 Seng Gelombang lbr Rp 97,600.00
185 Sirtu / Material Pilihan m³
186 Sloot Pintu SS bh
187 Sock PVC bh
188 Sock draad dalam besi 1 1/4" bh
189 Sock draad luar PVC 1 1/4" bh
190 Solar Industri ltr
191 Splitzen dia 1/2" bh
192 Step Nosing Keramik 10 x 30 cm bh
193 Stop KOntak AC bh Rp 68,000.00
194 Stop Kontak ex.BROCO/Panasonic/setara bh Rp 62,000.00
195 Stop Kontak Antena TV ex.BROCO/Panasonic/setara bh
196 Stop Kontak Telepon bh
197 Stop Kran Air Ø 1" ex.Lokal bh
198 Swing Handle dan Kunci SS - Lokal set
199 Tanah Urug / Tanah Merah mendatangkan m³
200 Tear Aspal kg
201 Tee dos bh
202 Textile tape roll Rp 22,900.00
Tiang Lampu Jalan ( Ø 4" + Ø 3 + Ø 2 ½" ) Galvanis t = 9 m termasuk
203 unit
base plat t = 16 mm
204 Tiang Pancang Beton Bulat D 40 m¹
205 Triplek uk. 4 x 8 ft (120 x 240 cm), 3 mm lbr
206 Triplek uk. 4 x 8 ft (120 x 240 cm), 4 mm lbr Rp 85,700.00
207 Triplek uk. 4 x 8 ft (120 x 240 cm), 6 mm lbr Rp 98,900.00
208 Triplek uk. 4 x 8 ft (120 x 240 cm), 9 mm lbr Rp 116,700.00
209 Triplek uk. 4 x 8 ft (120 x 240 cm), 12 mm lbr
210 Triplek uk. 4 x 8 ft (120 x 240 cm), 18 mm lbr
211 UNP 150.75.6,5 mm kg
212 Urinal Porselin ex. Lokal bh
213 Wall Track (U runner 100 mm pj 3 m) m1
214 Wall Stud (Metal Stud 100 mm pj 3 m) m1
215 Wastafel, ex.Lokal bh
216 Wiremesh M6 m²
217 Wiremesh M8 m²
218 Wiremesh M10 m²
ALAT BERAT DAN ALAT BANTU
219 Asphalt Finisher jam
220 Asphatl Sprayer jam
221 Bak penampung drum 200 ltr bh
222 Baby Walles, 2-4 T jam
223 Bor Listrik 560 Watt, 2000 rpm jam
224 Bore Pile Machine jam
225 Bulldozer jam
226 Concrete Mixer 0.3-0.6 m³, 15 HP, Kap. 500 Liter jam
227 Concrete Pump jam
228 Concrete Vibrator, 10 HP, Kap. - jam
229 Crane 10-15 TON, 150 HP, Kap. 15 ton jam
230 CRANE ON TRACK 35 TON jam
231 Dump Truck 3-4 m³, 100 HP, Kap. 6 ton jam
232 Excavator PC 200 - 6 jam
233 Generator Set, Kap.85 KVA jam
234 Jack Hammer jam
235 Motor Grader >100 HP, 125 HP, Kap. - jam
236 Pile Driver + Hammer, 25-35 ton jam
237 Pontoon Excavator jam
238 Pontoon Transport jam
239 Tamper, 5 HP, Kap. 0.17 ton jam
240 Theodolite Digital hr
241 Three Wheel Roller 6-8 T, 55 HP, Kap. 8 ton jam
242 Vibrating Roller 6-8 ton jam
243 Waterpass hr
244 Water Tanker 5000-8500 L., 100 HP, Kap. 4000 Liter jam
245 Welding Set jam
246 Wheel Loader 1.0-1.6 m³, 105 HP, Kap. 1.5 m³ jam

C UPAH TENAGA ( 8 jam / hari )


1 Pekerja / Knek org/hr Rp 105,000.00
2 Tukang Kayu org/hr Rp 110,000.00
3 Tukang Batu org/hr Rp 110,000.00
4 Tukang Besi org/hr Rp 115,000.00
5 Tukang Galian Tanah org/hr Rp 110,000.00
6 Tukang Cat org/hr Rp 130,000.00
7 Tukang Las org/hr Rp 115,000.00
8 Tukang Listrik org/hr Rp 115,000.00
9 Tukang Pipa org/hr Rp 130,000.00
10 Tukang Gypsum org/hr Rp 130,000.00
11 Tukang Pancang org/hr Rp 130,000.00
12 Juru Ukur org/hr Rp 115,000.00
13 Kepala Tukang org/hr Rp 150,000.00
14 Mandor / Pengawas org/hr Rp 150,000.00
15 Mekanik org/hr Rp 115,000.00
16 Operator org/hr Rp 150,000.00
17 Instalator org/hr Rp 150,000.00
18 Pembantu Instalator org/hr Rp 110,000.00
19 Pembantu Mekanik org/hr Rp 110,000.00
20 Pembantu Operator org/hr Rp 110,000.00
21 Pembantu Sopir org/hr Rp 105,000.00
22 Pemasak Aspal org/hr Rp 110,000.00
23 Sopir org/hr Rp 150,000.00
SCHEDULE PELAKSANAAN
KEGIATAN : PENGADAAN JASA KONSTRUKSI PEKERJAAN FASADE
LOKASI : GEDUNG HALIM II KANTOR BKKBN PUSAT
TAHUN ANGGARAN : 2018
No Uraian Kegiatan BOBOT
1 2

I. PEKERJAAN PERSIAPAN 2.00 0.17 0.17


II. PEKERJAAN BONGKARAN
A LANTAI DASAR 0.80 0.40
B. LANTAI SATU 0.80
C. LANTAI DUA 0.80
D. LANTAI TIGA 0.80
III. PEKERJAAN PLAFOND LENGKAP DENGAN RANGKA HOLLOW
A LANTAI DASAR 1.88
B LANTAI.1 1.16
C LANTAI.2 1.15
D LANTAI 3 1.73
IV PEKERJAAN PENGECATAN
A LANTAI DASAR 1.92
B LANTAI 1 1.59
C LANTAI 2 1.59
D LANTAI 3 1.80
V. PEKERJAAN ALUMUNIUM COMPOSIT PANEL ( ACP ) ,
JENDELA KACA , LENGKAP DENGAN RANGKA & ASSESORIESNYA.
A LANTAI DASAR 13.73
B LANTAI SATU 16.28
C LANTAI DUA 13.21
D. LANTAI TIGA 14.40
E LANTAI ATAP 6.80
VI PEKERJAAN CANOPY ENTRANCE 4.53
VIIPEKERJAAN LAIN - LAIN 5.04
VIII
PEKERJAAN LANDSCAPE 2.75
A. Pekerjaan Instalasi & Armature 1.72
Penerangan & Saklar ( ex. SPLN, LMK & SNI )
B. Pekerjaan Tata Udara 1.92
C. Pekerjaan Plumbing ( Pemipaan ) 1.59
Pemipaan Air Hujan

BOBOT TOTAL 100.00 0.17 0.57


BOBOT RENCANA - 0.17 0.73
REALISASI

Tangerang Selatan. 23 Maret 2018


Di Buat Oleh;
PT. Mudamitra Indonusa

J. Aminudin
Direktur Utama
MINGGU KE=
3 4 5 6 7 8 9 10 11 12

0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17

0.40
0.80
0.40 0.40
0.80

0.63 0.63 0.63


0.58 0.58
0.58 0.58
1.73

0.64 0.64 0.64


0.80 0.80
0.53 0.53 0.53
0.30 0.30 0.30 0.30 0.30 0.30

2.29 2.29 2.29 2.29 2.29 2.29


4.07 4.07 4.07 4.07
2.64 2.64 2.64 2.64 2.64
3.60 3.60 3.60 3.60
2.27 2.27 2.27
1.51 1.51 1.51
1.26 1.26 1.26 1.26
1.38 1.38
0.86 0.86

0.38 0.38 0.38 0.38 0.38


0.40 0.40 0.40 0.40

2.57 3.48 15.81 17.54 20.46 21.71 13.36 2.63 0.85 0.85
3.30 6.79 22.59 40.13 60.60 82.31 95.67 98.30 99.15 100.0
REKAPITULASI TINGKAT KOMPONEN DALAM
NAMA PENYEDIA BARANG/JASA : P.T. Mudamitra Indonusa
KEGIATAN : PENGADAAN JASA KONSTRUKSI PEKERJAAN FASA
LOKASI : GEDUNG HALIM II KANTOR BKKBN PUSAT
TAHUN ANGGARAN : 2018

NILAI GABUNGAN BARANG/JA


URAIAN PEKERJAAN
DN LN

(1) (2) (3)


BARANG
I Material Langsung (Barang Baku) 3,450,246,051.46
II Peralatan (Barang Jadi) 1,511,787,201.17
A. Sub Total Barang 4,962,033,252.63 -
JASA
III Manajemen Proyek dan Perekayasaan 110,618,575.70 -
IV Alat Kerja/Fasilitas Kerja 42,140,409.79 -
V Konstruksi dan Fabrikasi 110,618,575.70 -
VI Jasa Umum 42,140,409.79 -
B. Sub Total Jasa 305,517,970.97 -
C. Total Biaya (A+B) 5,267,551,223.60 -

Formulasi Perhitungan :
Nilai Baran
% TKDN (Gabungan Barang dan Jasa) 100.00
Nil

Nilai Jas
Nil

Tangerang Selatan, 07 September 2018


DI AJUKAN OLEH
P.T MUDAMITRA INDONUSA
J. Aminudin
Direktur Utama
KOMPONEN DALAM NEGERI (TKDN)

A KONSTRUKSI PEKERJAAN FASADE


KANTOR BKKBN PUSAT

NILAI GABUNGAN BARANG/JASA (Rp) TKDN


TOTAL BARANG/J GABUNGAN
RIBU (RP) % KDN ASA
(4) (5) (6) (7)

3,450,246,051.46 100% 69.53


1,511,787,201.17 100% 30.47
4,962,033,252.63 2.00 100.00

110,618,575.70 100% 36.21


42,140,409.79 100% 0.80
110,618,575.70 100% 36.21
42,140,409.79 100% 13.79
305,517,970.97 4.00 87.01
5,267,551,223.60 6.00 100.00

Nilai Barang Total (3C)-Nilai Barang Luar Negeri (3B)


Nilai Gabungan Barang dan Jasa (9C)

Nilai Jasa Total (8C)-Nilai Jasa Luar Negeri (8B)


Nilai Gabungan Barang dan Jasa (9C)