RUANG RADIOLOGI
RS.PADMA LALITA , MUNTILAN , MAGELANG
II PEKERJAAN BETON
1 Beton Kolom(KP),uk 15x15 cm standar 1:2:3 1.20
2 Beton Sloff 15x30 cm standar 1:2:3 1.65
3 Beton balk ,uk 15x15 cm cm standar 1:2:3 1.45
IV PEKERJAAN FINISHIG
1 Plaster 1 SP : 4 PP 20 mm 258.00
2 Acian 103.00
V PEKERJAAN CAT
2 Cat plafon ex.Avian 75.00
IX Pekerjaan Lain-Lain
1 Pengadaan Alat 2.00
2 Pengadaan Interior 2.00
3 Jasa Perencanaan Dan Gambar 50.00
YA RENOVASI
OGI
AN , MAGELANG
LUAS BANGUNAN 75
SAT HARGA SATUAN JUMLAH HARGA
m1 25,000.00 875,000
Total Harga 875,000
m3 3,500,000 4,200,000
m3 3,500,000 5,775,000
m3 3,500,000 5,075,000
Total Material Beton 15,050,000
m2 250,000 32,250,000
m2 230,000 17,250,000
m2 245,000 37,975,000
Total Material Pasangan 87,475,000
m2 125,000.00 32,250,000
m2 75,000.00 7,725,000
Total Material Finishing 39,975,000
m2 32,000.00 2,400,000
Total Material cat 2,400,000
m1 350,000.00 16,800,000
lbr 2,700,000.00 5,400,000
lbr 1,700,000.00 6,800,000
pcs 300,000.00 600,000
pcs 75,000.00 300,000
pcs 35,000.00 420,000
pcs 35,000.00 280,000
pcs 20,000.00 160,000
pcs 35,000.00 140,000
Total Harga 30,900,000
m2 550,000 53,350,000
m2 195,000 18,915,000
m1 180,000 2,340,000
m2 210,000 15,750,000
m2 95,000 7,125,000
m1 35,000 4,725,000
Total Harga 102,205,000