Anda di halaman 1dari 2

LAPORAN PEMASUKAN

No. PERIHAL No.


PERIKIRAAN REALISASI
1 Tondolan Suppak 9 Resort @250.000 Rp 2,250,000 Rp 2,250,000 1
2 Tondolan Suppak Sinode Rp 500,000 Rp 500,000 2
3 Tondolan Suppak Distrik IV Rp 300,000 Rp 300,000 3
4 Galangan Rp 400,000 Rp 697,000 4
5 Tondolan Suppak Pengurus Resort N. Baru Rp 300,000 Rp 300,000 5
6 BNU/Take in List Rp 4,750,000 Rp 4,980,000 6
7
8
9
10
11
12
13
14
15
16

17

Jumlah Rp 8,500,000 Rp 9,027,000

SISA SALDO Rp 857,000


LAPORAN PENGELUARAN
ANGGARAN
PERIHAL
PERIKIRAAN REALISASI
Pengkobah Rp 300,000 Rp 300,000
Paragenda Rp 200,000 Rp 200,000
Konsumsi 150x@10.000 Rp 1,500,000 Rp 1,580,000
Snack + TehManis Rp 500,000 _
Tatib 100 Lembar Rp 50,000 Rp 48,000
Sound System Rp 1,000,000 Rp 1,100,000
Pemain Musik _ Rp 200,000
Live Streaming Rp 2,500,000 Rp 2,300,000
Aqua Sedang 1kotak + aqua gelas 5 kotak Rp 130,000 Rp 120,000
Hadiah Uang Tunai Rp 1,500,000 Rp 1,300,000
Give Away Rp 200,000 Rp 60,000
Sertifikat Rp 130,000 Rp 100,000
Konsumsi Pemusik, Sound, Live Streaming Rp 100,000
Kebersihan Gereja Rp 100,000 _
Cetak Proposal + Tatib Print _ Rp 27,000
Rp 180,000
Galangan _
Rp 247,000
Biaya Tak Terduga Rp 390,000 Rp 308,000

Jumlah Rp 8,500,000 Rp 8,170,000

Anda mungkin juga menyukai