DAFTAR HARGA SATUAN

LOKASI : PANCUR BATU


PROYEK : RENOVASI TOKO
LINGKUP PEKERJAAN : PEKERJAAN SIPIL
LUAS BANGUNAN :
LUAS AREA SALES :
WAKTU PELAKSANAAN : 21 HARI

Harga Satuan Total Harga TOT HARGA


Volume
NO. JENIS PEKERJAAN Satuan Material Upah Material Upah (Rp)
a b c d=axb e=axc f=d+e
PEKERJAAN AREA BANGUNAN
I PEKERJAAN PERSIAPAN
1 Pembersihan lokasi + pembuangan puing + koordinasi lingkungan termasuk ormas Ls 1,000,000 3,000,000 - - -
2 Geser barang dan equipment toko Ls 500,000 500,000 - - -
3 Pengadaan terpal dan multiplek untuk pengamanan pekerjaan LS 1,000,000 - - -
4 Mobilisasi LS 2,000,000 - - -
Sub Total - - -
II PEKERJAAN BONGKARAN
1 Bongkar bangunan existing Ls 1,000,000 3,000,000 - - -
Bongkar partisI chiller sesuai gambar
Bongkar pintu P1
Bongkar keramik teras yang rusak
Bongkar kaca pecah
Bongkar pintu P2
Bongkar dinding gudang
Bongkar kanstin existing
Bongkar keramik area tenan dan teras
Bongkar canopy existing

Sub Total - - -
III PEKERJAAN PONDASI DAN BETON
1 Galian tanah m3 120,000 - - -
2 Cor pondasi dudukan besi m3 2,850,000 600,000 - - -
3 Tiang kolom dudukan besi m3 2,850,000 600,000 - - -
Sub Total - - -
IV PEKERJAAN BULKHEAD
1 Pasang Multiplek 9 mm + rangka hollow 35x35x0,23 m2 250,000 100,000 - - -
2 Pasang HPL Taco TH 20 RE Charter Oak m2 350,000 150,000 - - -
3 Pipa besi 1,5 inci fin cat Glotex warna hitam dudukan Bulkhead + Dynabolt 10+ plat m' 150,000 120,000 - - -
4 Pasang Plafond gypsum ex.Knauf 9 mm + rangka hollow 35x35 galvanis m2 100,000 35,000 - - -
5 Pasang Multiplek 9 mm + rangka hollow 35x35x0,23 + triplek Melaminto 3 mm u/dudukan sticker m2 335,000 160,000 - - -
6 Pasang Sticker Wall Image bermotif bata di area belakang RTE m2 250,000 50,000 - - -
7 Instalasi air bersih pipa 1/2" ex. Rucika m' 35,000 10,000 - - -
8 Instalasi air kotor pipa 1 1/2" ex. Rucika m' 45,000 15,000 - - -
Sub Total - - -
V PEKERJAAN RUMAH CHILLER
1 Pasang Multiplek 9 mm + rangka hollow 35x35x0,23 m2 300,000 100,000 - - -
2 Pasang HPL Taco Red Gloss TH 004 G Drop ceiling m2 400,000 150,000 - - -
3 Pasang Flip tutup rumah Chiller HPL TACO RED GLOSS TH 004 G m' 150,000 80,000 - - -
4 Pasang sticker List kuning (CO-M16-Y100-KO) m1 40,000 25,000 - - -
Sub Total - - -
VI PEKERJAAN FASADE DEPAN
1 Tapak Plat 20x20 t=9mm Untuk Tapak Tiang + Baut Dinabolt kg 23,000 11,000 - - -
2 Pek Tiang Besi hollo 75*75 # 1.8'' (Tiang dan rangka shop sign ) kg 23,000 11,000 - - -
3 Pek Tiang Besi hollo 100*100 # 1.8'' (Tiang dan rangka shop sign ) bh 50,000 10,000 - - -
4 Pemasangan besi Siku 35x35x4 mm u/Fasade Bagian Depan kg 23,000 11,000 - - -
5 Pas rangka besi hollo 90*30 .1.8 frame m2 200,000 90,000 - - -
6 Pas Spandex T = 0.35 mm fasade depan kg 23,000 11,000 - - -
7 Cat ex avian warna putih fasade depan + Dasar Meni kg 50,000 10,000 - - -
8 Sarana Promosi uk. 75cm x 120cm m2 65,000 35,000 - - -
Sub Total - - -
VII PEKERJAAN SEATTING AREA 4X2.5 m
1 Tapak Tiang + Baut Dinabolt kg 23,000 11,000 - - -
2 Pek tiang besi hollo 40*60 # 1.8'' finishing cat hitam dof (Tiang Sarana Promosi dan Tiang Pagar ) bh 50,000 10,000 - - -
3 Pek besi hollo 40*40 #1.8" frame Pagar kg 23,000 11,000 - - -
4 Plafond gypsum 9 mm ex knauf/gyprooc/aplus + rangka hollow 35x35 Area Bulk Head kg 50,000 10,000 - - -
5 Pas Partisi Grc bord finishing Cat Abu Abu Avitex Exterior dof + rangka ( Posisi promo Belakang ) kg 23,000 11,000 - - -
6 Ps. Keramik 40 x 40 Lantai Seating Area m2 100,000 35,000 - - -
7 Pas. Bata dinding baru utk peninggian lantai m2 115,000 35,000 - - -
8 Urugan tanah timbun + pemadatan (h= 25 cm ) m2 200,000 75,000 - - -
Sub Total - - -
VIII PEKERJAAN PASANGAN
1 Pek. Perapihan bekas bongkaran dinding ( Plester + aci ) LS 250,000 500,000 - - -
2 Partisi gypsum 9 mm double + hollow galvanis 35x35x0.5 untuk chiller dan di atas pintu ex. Jayaboard/ knauf m2 130,000 40,000 - - -
3 Partisi gypsum 9 mm satu sisi U/panel, chiller, koridor area gudang m2 100,000 35,000 - - -
4 Plafond gypsum 9 mm + rangka hollow galvanis 20x35/35x35x0.5 chiller dan tenant ex. knauf/gyprooc/aplus m2 100,000 35,000 - - -
5 Pek. Perapihan Bekas Bobokan Listrik dan AC Ls 1,000,000 750,000 - - -
6 Bak kontrol pembuangan AC + Alinco unit 450,000 50,000 - - -
Sub Total - - -
IX PEKERJAAN KERAMIK
1 Ps. Keramik Lt.40x40 ex ikad/asia tile untuk area teras, dan tenan m2 105,000 40,000 - - -
Sub Total - - -
X PEKERJAAN SANITARY & ACECORIES
Sumur bor /Pengadaan PAM/Instalasi air bersih
1 Cleaning kamar mandi + pembersihan saluran air kotor bh 250,000 500,000 - - -
2 Mesin pompa air shimizu 135 watt otomatis Unit 1,500,000 300,000 - - -
Sub Total - - -
XI PEKERJAAN KUSEN, PINTU & KACA
1 Bongkar pasang Kusen dan Pintu (P1) + cat unit 500,000 450,000 - - -
2 Kusen besi hollow 40x60 & daun multyplek 9 mm rangka hollow 40x60 + kunci/handle ex solid/dexon + cat avian white P1 unit 1,500,000 500,000 - - -
2 Servis pintu folding gate Ls 500,000 1,500,000 - - -
3 Bongkar Pasang accesories pintu kaca frameless double swing + ganti kunci + accesories Ls 2,000,000 500,000 - - -
4 Pasang partisi kaca pengganti kaca pecah Ls 250,000 150,000 - - -
5 Gembok 60 mm ex. Soligen unit 150,000 30,000 - - -
Sub Total - - -
XII PEKERJAAN FINISHING.
1 Cat dinding luar tampak depan ex. Avitex exterioir super white + pembatas+ plafond canopy m2 25,000 15,000 - - -
2 Cat dinding dalam ex. Avitex super white m2 15,000 10,000 - - -
3 Cat plafond ex. Avitex super white m2 15,000 10,000 - - -
4 Cat spray pintu folding gate dan harmonika m2 65,000 35,000 - - -
Sub Total - - -
XIII PEKERJAAN AREA TERBUKA
1 Kanstin beton untuk area parkir fin cat hitam kuning Unit 150,000 50,000 - - -
2 Cat Jotun / Nippon warna Kuning untuk area Paving block L: 10 cm dan L: 20 cm m1 24,000 7,500 - - -
3 Cor dudukan dan rumahan brankas Ls 3,000,000 1,000,000 - - -
5 Las kupingan gembok Ls 200,000 150,000 - - -
6 Hanger spanduk m' 60,000 30,000 - - -
7 Atap canopy rangka hollow 35 x 35 + cat putih L = 3 meter m2 275,000 100,000 - - -
9 Cat tiang lampu parkir unit 100,000 50,000 - - -
11 Pek. Talang atap BJLS 90 cm + sambungan dipatri m1 190,000 75,000 - - -
12 Pek.pipa vertikal untuk area teras depan 2 titik h= 4 m, pipa PVC 4" Wavin D m1 100,000 50,000 - - -
13 Tanggulan pintu belakang Ls 150,000 100,000 - - -
Sub Total - - -
TOTAL -
Pembulatan -
PPn 10 % -
GRAND TOTAL -
37.68
168 18000 3024000

21.51 23,000 494730

28.26 23,000 649980


10.17 23,000 233910

163200 195840

26.38 23,000 606740


10.00 23,000 230000
14.48 23,000 333040

13 23,000 299000

13.00

plafond
2.8

20300000

1.200
3.405
3.394 7.999
1.200

9.199

3.66
1.6
0.2
5.46
BOQ
LOKASI : PANCUR BATU
PROYEK : PT.SUMBER ALFARIA TRIJAYA, Tbk
LINGKUP PEKERJAAN : PEKERJAAN SIPIL
LUAS BANGUNAN : M2
LUAS AREA SALES :
LUAS GUDANG :
LUAS AREA TERBUKA / PARKIRAN :
TANGGAL RAB :
LUAS AREA TERBANGUN :-
TANGGAL RAB REVISI :
WAKTU PELAKSANAAN : 21 HARI

TANGGAL UKUR :
DIUKUR OLEH :
JENIS BANGUNAN EXISTING :
RENCANA BANGUN :
KONDISI BANGUNAN :-
TYPE TOKO :

Total Harga
NO. JENIS PEKERJAAN Material Upah
a b
A SIPIL
I PEKERJAAN PERSIAPAN - -
II PEKERJAAN BONGKARAN - -
III PEKERJAAN PONDASI DAN BETON - -
IV PEKERJAAN BULKHEAD - -
V PEKERJAAN RUMAH CHILLER - -
VI PEKERJAAN FASADE DEPAN - -
VII PEKERJAAN SEATTING AREA 4X2.5 m - -
VIII PEKERJAAN PASANGAN - -
IX PEKERJAAN KERAMIK - -
X PEKERJAAN SANITARY & ACECORIES
Sumur bor /Pengadaan PAM/Instalasi air bersih - -
XI PEKERJAAN KUSEN, PINTU & KACA - -
XII PEKERJAAN FINISHING. - -
XIII PEKERJAAN AREA TERBUKA - -
SUB TOTAL (Rp).............................. - -
PEMBULATAN
PPN 10%
GRAND TOTAL

Estimasi waktu pelaksanaan 21 hari, terhitung sejak SPK dikeluarkan


FARIA TRIJAYA, Tbk

Total Harga
(Rp)
c=a+b

-
-
-
-
-
-
-
-
-

-
-
-
-
-
-
-
-
DAFTAR HARGA SATUAN

LOKASI : PANCUR BATU


PROYEK : RENOVASI TOKO
LINGKUP PEKERJAAN : PEKERJAAN SIPIL
LUAS BANGUNAN :
LUAS AREA SALES :
WAKTU PELAKSANAAN : 21 HARI

NO. JENIS PEKERJAAN Satuan

PEKERJAAN AREA BANGUNAN


I PEKERJAAN PERSIAPAN
1 Pembersihan lokasi + pembuangan puing + koordinasi lingkungan termasuk ormas Ls
2 Geser barang dan equipment toko Ls
3 Pengadaan terpal dan multiplek untuk pengamanan pekerjaan LS
4 Mobilisasi LS
Sub Total
II PEKERJAAN BONGKARAN
1 Bongkar bangunan existing Ls
Bongkar partisI chiller sesuai gambar
Bongkar pintu P1
Bongkar keramik teras yang rusak
Bongkar kaca pecah
Bongkar pintu P2
Bongkar dinding gudang
Bongkar kanstin existing
Bongkar keramik area tenan dan teras
Bongkar canopy existing

Sub Total
III PEKERJAAN PONDASI DAN BETON
1 Galian tanah m3
2 Cor pondasi dudukan besi m3
3 Tiang kolom dudukan besi m3
Sub Total
IV PEKERJAAN BULKHEAD
1 Pasang Multiplek 9 mm + rangka hollow 35x35x0,23 m2
2 Pasang HPL Taco TH 20 RE Charter Oak m2
3 Pipa besi 1,5 inci fin cat Glotex warna hitam dudukan Bulkhead + Dynabolt 10+ plat m'
4 Pasang Plafond gypsum ex.Knauf 9 mm + rangka hollow 35x35 galvanis m2
5 Pasang Multiplek 9 mm + rangka hollow 35x35x0,23 + triplek Melaminto 3 mm u/dudukan sticker m2
6 Pasang Sticker Wall Image bermotif bata di area belakang RTE m2
7 Instalasi air bersih pipa 1/2" ex. Rucika m'
8 Instalasi air bersih pipa 1 1/2" ex. Rucika m'
Sub Total
V PEKERJAAN RUMAH CHILLER
1 Pasang Multiplek 9 mm + rangka hollow 35x35x0,23 m2
2 Pasang HPL Taco Red Gloss TH 004 G Drop ceiling m2
3 Pasang Flip tutup rumah Chiller HPL TACO RED GLOSS TH 004 G m'
4 Pasang sticker List kuning (CO-M16-Y100-KO) m1
Sub Total
VI PEKERJAAN FASADE DEPAN
1 Pek. Tiang besi hollow 100x100#1,8' finishing car hitam doff kg
2 Pek. Base Plat Tebal 12 mm ( Ukuran 25x25 cm ) sbyk 2 plat kg
3 Pek. Angkur + Baut d 16 mm Panjang 60 Cm sbyk 24 angkur bh
4 Pasang rangka besi hollow 90 x 30 # 1,8 mm frame + cremona kg
5 Pasang bondex 0,75 mm m2
6 Pasang besi hollow 10 x 3 cm kg
7 Cat Avian warna putih fasade depan m2
8 Instalasi pararel lampu hidden LED 18 watt fasade depan ( kabel NYM ex. Eterna 2 x 1,5 mm2) ttk
9 Pasang lampu hidden 18 watt fasade depan ( ketinggian di atas 3 m ) unit
10 Saklar tunggal ex. Broco unit
Sub Total
VII PEKERJAAN SEATTING AREA
1 Pek. Base Plat Tebal 12 mm ( Ukuran 25x25 cm ) sbyk 6 plat kg
2 Pek. Angkur + Baut d 16 mm Panjang 60 Cm sbyk 24 angkur bh
3 Pek. Tiang besi hollow 100x100 #1,8' finishing car hitam doff kg
4 Pek. besi hollow 40x60 #0,8' finishing car hitam doff kg
5 Pek. besi hollow 30x60 #0,8' finishing car hitam doff kg
6 Pek. besi hollow 40x40 #0,8' frame extended metal kg
7 Pasang besi plat expanded metal finishing cat hitam doff m2
8 Pasang Plafond gypsum ex.Knauf 9 mm + rangka hollow 35x35 galvanis m2
9 Pasang GRC Board Frame siku 20 x20 finishing cat Avitex Exterior ( 670 Artic Silver ) m2
10 Pasang list strup kayu reng 3x4 + cat Ls
11 Pasang GRC Board Frame siku 20 x20 finishing cat Avitex Exterior Doff + rangka ( posisi Promo Belakang) m2
12 Pasang Multiplek 9 mm + rangka hollow 35x35x0,23 ( posisi Promo Belakang ) m2
13 Pasang HPL Taco Summer Land OAK ( TH 993 J) ( Posisi Promo Belakang ) m2
14 Pek. besi hollow 20x40 #1,8' untuk frame sticker Bake ( Posisi Promo Belakang ) kg
15 Pasang keramik lantai Sandimas Romano Silver uk. 60 x60 cm m2
16 Saklar tunggal ex. Broco bh
17 Lampu LED bh
18 Instalasi lampu ( Hidden Lamp ) dan Lampu Plafond bh
19 Lampu BALLACK LED 19 watt + Bohlam Philips u/lampu canopy (SBO) bh
Sub Total
VIII PEKERJAAN PASANGAN
1 Pek. Perapihan bekas bongkaran dinding ( Plester + aci ) LS
2 Partisi gypsum 9 mm double + hollow galvanis 35x35x0.5 untuk chiller dan di atas pintu ex. Jayaboard/ knauf m2
3 Partisi gypsum 9 mm satu sisi U/panel, chiller, koridor area gudang m2
4 Plafond gypsum 9 mm + rangka hollow galvanis 20x35/35x35x0.5 chiller dan tenant ex. knauf/gyprooc/aplus m2
5 Pek. Perapihan Bekas Bobokan Listrik dan AC Ls
6 Bak kontrol pembuangan AC + Alinco unit
Sub Total
IX PEKERJAAN KERAMIK
1 Ps. Keramik Lt.40x40 ex ikad/asia tile untuk area teras, dan tenan m2
Sub Total
X PEKERJAAN SANITARY & ACECORIES
Sumur bor /Pengadaan PAM/Instalasi air bersih
1 Cleaning kamar mandi + pembersihan saluran air kotor bh
2 Mesin pompa air shimizu 135 watt otomatis Unit
Sub Total
XI PEKERJAAN KUSEN, PINTU & KACA
1 Bongkar pasang Kusen dan Pintu (P1) + cat unit
2 Servis pintu folding gate Ls
3 Bongkar Pasang accesories pintu kaca frameless double swing + ganti kunci + accesories Ls
4 Pasang partisi kaca pengganti kaca pecah Ls
5 Gembok 60 mm ex. Soligen unit
Sub Total
XII PEKERJAAN FINISHING.
1 Cat dinding luar tampak depan ex. Avitex exterioir super white + pembatas+ plafond canopy m2
2 Cat dinding dalam ex. Avitex super white m2
3 Cat plafond ex. Avitex super white m2
4 Cat spray pintu folding gate dan harmonika m2
Sub Total
XIII PEKERJAAN AREA TERBUKA
1 Kanstin beton untuk area parkir fin cat hitam kuning Unit
2 Cat Jotun / Nippon warna Kuning untuk area Paving block L: 10 cm dan L: 20 cm m1
3 Cor dudukan dan rumahan brankas Ls
4 Pasang Flip untuk ruang Chiller (atas bawah) m'
5 Las kupingan gembok Ls
6 Hanger spanduk m'
7 Atap canopy rangka hollow 35 x 35 + cat putih L = 3 meter m2
9 Cat tiang lampu parkir unit
10 Hanger genset + rantai + Gembok Ls
11 Pek. Talang atap BJLS 90 cm + sambungan dipatri m1
12 Pek.pipa vertikal untuk area teras depan 2 titik h= 4 m, pipa PVC 4" Wavin D m1
13 Tanggulan pintu belakang Ls
Sub Total
TOTAL
Pembulatan
PPn 10 %
GRAND TOTAL
A SATUAN

: PANCUR BATU
: RENOVASI TOKO
: PEKERJAAN SIPIL

Harga Satuan Total Harga TOT HARGA


Volume
Material Upah Material Upah (Rp)
a b c d=axb e=axc f=d+e

1.00 1,000,000 3,000,000 1,000,000 3,000,000 4,000,000


1.00 1,000,000 1,000,000 1,000,000 1,000,000 2,000,000
1.00 1,000,000 1,000,000 - 1,000,000
1.00 3,000,000 3,000,000 - 3,000,000
6,000,000 4,000,000 10,000,000

1.00 1,000,000 5,000,000 1,000,000 5,000,000 6,000,000

1,000,000 5,000,000 6,000,000

2.16 120,000 - 259,200 259,200


0.43 2,850,000 600,000 1,231,200 259,200 1,490,400
0.29 2,850,000 600,000 820,800 172,800 993,600
2,052,000 691,200 2,743,200

7.38 335,000 160,000 2,472,300 1,180,800 3,653,100


7.38 520,000 175,000 3,837,600 1,291,500 5,129,100
5.00 150,000 120,000 750,000 600,000 1,350,000
10.04 120,000 35,000 1,204,800 351,400 1,556,200
11.20 335,000 160,000 3,752,000 1,792,000 5,544,000
11.20 295,000 80,000 3,304,000 896,000 4,200,000
20.00 40,000 15,000 800,000 300,000 1,100,000
20.00 50,000 15,000 1,000,000 300,000 1,300,000
17,120,700 6,711,700 23,832,400

16.06 335,000 160,000 5,380,100 2,569,600 7,949,700


16.06 520,000 175,000 8,351,200 2,810,500 11,161,700
13.00 150,000 80,000 1,950,000 1,040,000 2,990,000
9.18 40,000 25,000 367,200 229,500 596,700
16,048,500 6,649,600 22,698,100

75.36 19,000 11,000 1,431,840 828,960 2,260,800 37.68


7.78 19,000 11,000 147,778 85,556 233,333
8.00 50,000 10,000 400,000 80,000 480,000
301.40 19,000 11,000 5,726,570 3,315,382 9,041,952 19.42
26.55 225,000 90,000 5,973,075 2,389,230 8,362,305
253.49 19,000 11,000 4,816,352 2,788,414 7,604,766 28.26
19.74 65,000 35,000 1,282,905 690,795 1,973,700
1.00 100,000 50,000 100,000 50,000 150,000
8.00 190,000 75,000 1,520,000 600,000 2,120,000
1.00 50,000 30,000 50,000 30,000 80,000
21,448,519 10,858,337 32,306,856

15.56 19,000 11,000 295,556 171,111 466,667


16.00 50,000 10,000 800,000 160,000 960,000
75.36 19,000 11,000 1,431,840 828,960 2,260,800
52.76 50,000 10,000 2,638,000 527,600 3,165,600 26.38
15.83 19,000 11,000 300,833 174,167 475,000 10.00
38.61 50,000 10,000 1,930,667 386,133 2,316,800 14.48
3.07 350,000 150,000 1,072,960 459,840 1,532,800
13.50 100,000 35,000 1,350,000 472,500 1,822,500
9.00 250,000 125,000 2,250,000 1,125,000 3,375,000
1.00 1,750,000 500,000 1,750,000 500,000 2,250,000
9.00 250,000 125,000 2,250,000 1,125,000 3,375,000
9.00 335,000 160,000 3,015,000 1,440,000 4,455,000
1.25 520,000 175,000 650,000 218,750 868,750
27.08 19,000 11,000 514,583 297,917 812,500 13.00
15.00 250,000 75,000 3,750,000 1,125,000 4,875,000
3.00 50,000 30,000 150,000 90,000 240,000
6.00 190,000 75,000 1,140,000 450,000 1,590,000
3.00 100,000 50,000 300,000 150,000 450,000
6.00 - 15,000 - 90,000 90,000
25,589,439 9,791,978 35,381,417

1.00 250,000 500,000 250,000 500,000 750,000 plafond


35.42 130,000 40,000 4,604,600 1,416,800 6,021,400 2.8
16.67 100,000 35,000 1,667,400 583,590 2,250,990
20.42 100,000 35,000 2,042,000 714,700 2,756,700
1.00 1,000,000 750,000 1,000,000 750,000 1,750,000
2.00 450,000 50,000 900,000 100,000 1,000,000
10,464,000 4,065,090 14,529,090

29.84 105,000 40,000 3,133,200 1,193,600 4,326,800 20300000


3,133,200 1,193,600 4,326,800

1.00 250,000 500,000 250,000 500,000 750,000


1.00 1,500,000 300,000 1,500,000 300,000 1,800,000
1,750,000 800,000 2,550,000
2.00 500,000 450,000 1,000,000 900,000 1,900,000
1.00 500,000 1,500,000 500,000 1,500,000 2,000,000
1.00 3,000,000 1,000,000 3,000,000 1,000,000 4,000,000
1.00 1,500,000 1,000,000 1,500,000 1,000,000 2,500,000
5.00 170,000 30,000 850,000 150,000 1,000,000
6,850,000 4,550,000 11,400,000

54.76 25,000 15,000 1,369,000 821,400 2,190,400


238.12 15,000 10,000 3,571,830 2,381,220 5,953,050
213.34 15,000 10,000 3,200,148 2,133,432 5,333,580
46.20 65,000 35,000 3,003,000 1,617,000 4,620,000
11,143,978 6,953,052 18,097,030

6.00 150,000 50,000 900,000 300,000 1,200,000 1.200


15.00 24,000 7,500 360,000 112,500 472,500 3.405
1.00 3,000,000 1,000,000 3,000,000 1,000,000 4,000,000 3.394
13.00 70,000 30,000 910,000 390,000 1,300,000 1.200
1.00 200,000 150,000 200,000 150,000 350,000
9.18 60,000 30,000 550,800 275,400 826,200 9.199
27.54 275,000 100,000 7,573,500 2,754,000 10,327,500
2.00 150,000 100,000 300,000 200,000 500,000
1.00 350,000 175,000 350,000 175,000 525,000
9.18 190,000 75,000 1,744,200 688,500 2,432,700
12.00 150,000 100,000 1,800,000 1,200,000 3,000,000
1.00 150,000 100,000 150,000 100,000 250,000
17,838,500 7,345,400 25,183,900 3.66
TOTAL 209,048,793 1.6
Pembulatan 209,048,000 0.2
PPn 10 % 20,904,800 5.46
GRAND TOTAL 229,952,800
7.999
DAFTAR HARGA SATU

LOKASI
PROYEK
LINGKUP PEKERJAAN
LUAS BANGUNAN
LUAS AREA SALES
WAKTU PELAKSANAAN

NO.

I
1
2
3
4

II
1

III
1
2
3

IV
1
2
3
4
5
6
7
8

V
1
2
3
4

VI
4
5
6
7
8
9
10

VII
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15

VIII
1
2
3
4
5
7

IX
1

1
2

XI
1
2
2
3
4
5
XII
1
2
3
4

XIII
1
2
3
5
6
7
9
11
12
13
DAFTAR HARGA SATUAN

LOKASI
PROYEK
LINGKUP PEKERJAAN
LUAS BANGUNAN
LUAS AREA SALES
WAKTU PELAKSANAAN

JENIS PEKERJAAN

PEKERJAAN AREA BANGUNAN


PEKERJAAN PERSIAPAN
Pembersihan lokasi + pembuangan puing + koordinasi lingkungan termasuk ormas
Geser barang dan equipment toko
Pengadaan terpal dan multiplek untuk pengamanan pekerjaan
Mobilisasi
Sub Total
PEKERJAAN BONGKARAN
Bongkar bangunan existing
Bongkar partisI chiller sesuai gambar
Bongkar pintu P1
Bongkar keramik teras yang rusak
Bongkar kaca pecah
Bongkar pintu P2
Bongkar dinding gudang
Bongkar kanstin existing
Bongkar keramik area tenan dan teras
Bongkar canopy existing

Sub Total
PEKERJAAN PONDASI DAN BETON
Galian tanah
Cor pondasi dudukan besi
Tiang kolom dudukan besi
Sub Total
PEKERJAAN BULKHEAD
Pasang Multiplek 9 mm + rangka hollow 35x35x0,23
Pasang HPL Taco TH 20 RE Charter Oak
Pipa besi 1,5 inci fin cat Glotex warna hitam dudukan Bulkhead + Dynabolt 10+ plat
Pasang Plafond gypsum ex.Knauf 9 mm + rangka hollow 35x35 galvanis
Pasang Multiplek 9 mm + rangka hollow 35x35x0,23 + triplek Melaminto 3 mm u/dudukan sticker
Pasang Sticker Wall Image bermotif bata di area belakang RTE
Instalasi air bersih pipa 1/2" ex. Rucika
Instalasi air kotor pipa 1 1/2" ex. Rucika
Sub Total
PEKERJAAN RUMAH CHILLER
Pasang Multiplek 9 mm + rangka hollow 35x35x0,23
Pasang HPL Taco Red Gloss TH 004 G Drop ceiling
Pasang Flip tutup rumah Chiller HPL TACO RED GLOSS TH 004 G
Pasang sticker List kuning (CO-M16-Y100-KO)
Sub Total
PEKERJAAN FASADE DEPAN
Pek. Tiang besi WF 100x100#1,8' finishing car hitam doff
Pek. Base Plat Tebal 12 mm ( Ukuran 25x25 cm ) sbyk 2 plat
Pek. Angkur + Baut d 16 mm Panjang 60 Cm sbyk 24 angkur
Pasang rangka besi hollow 90 x 30 # 1,8 mm frame + cremona
Pasang bondex 0,75 mm
Pasang besi hollow 10 x 3 cm
Cat Avian warna putih fasade depan
Sub Total
PEKERJAAN SEATTING AREA
Pek. Base Plat Tebal 12 mm ( Ukuran 25x25 cm ) sbyk 6 plat
Pek. Angkur + Baut d 16 mm Panjang 60 Cm sbyk 24 angkur
Pek. Tiang besi hollow 100x100 #1,8' finishing car hitam doff
Pek. besi hollow 40x60 #0,8' finishing car hitam doff
Pek. besi hollow 30x60 #0,8' finishing car hitam doff
Pek. besi hollow 40x40 #0,8' frame extended metal
Pasang besi plat expanded metal finishing cat hitam doff
Pasang Plafond gypsum ex.Knauf 9 mm + rangka hollow 35x35 galvanis
Pasang GRC Board Frame siku 20 x20 finishing cat Avitex Exterior ( 670 Artic Silver )
Pasang list strup kayu reng 3x4 + cat
Pasang GRC Board Frame siku 20 x20 finishing cat Avitex Exterior Doff + rangka ( posisi Promo Belakang)
Pasang Multiplek 9 mm + rangka hollow 35x35x0,23 ( posisi Promo Belakang )
Pasang HPL Taco Summer Land OAK ( TH 993 J) ( Posisi Promo Belakang )
Pek. besi hollow 20x40 #1,8' untuk frame sticker Bake ( Posisi Promo Belakang )
Pasang keramik lantai Sandimas Romano Silver uk. 60 x60 cm
Sub Total
PEKERJAAN PASANGAN
Pek. Perapihan bekas bongkaran dinding ( Plester + aci )
Partisi gypsum 9 mm double + hollow galvanis 35x35x0.5 untuk chiller dan di atas pintu ex. Jayaboard/ knauf
Partisi gypsum 9 mm satu sisi U/panel, chiller, koridor area gudang
Plafond gypsum 9 mm + rangka hollow galvanis 20x35/35x35x0.5 chiller dan tenant ex. knauf/gyprooc/aplus
Pek. Perapihan Bekas Bobokan Listrik dan AC
Bak kontrol pembuangan AC + Alinco
Sub Total
PEKERJAAN KERAMIK
Ps. Keramik Lt.40x40 ex ikad/asia tile untuk area teras, dan tenan
Sub Total
PEKERJAAN SANITARY & ACECORIES
Sumur bor /Pengadaan PAM/Instalasi air bersih
Cleaning kamar mandi + pembersihan saluran air kotor
Mesin pompa air shimizu 135 watt otomatis
Sub Total
PEKERJAAN KUSEN, PINTU & KACA
Bongkar pasang Kusen dan Pintu (P1) + cat
Kusen besi hollow 40x60 & daun multyplek 9 mm rangka hollow 40x60 + kunci/handle ex solid/dexon + cat avian white P1
Servis pintu folding gate
Bongkar Pasang accesories pintu kaca frameless double swing + ganti kunci + accesories
Pasang partisi kaca pengganti kaca pecah
Gembok 60 mm ex. Soligen
Sub Total
PEKERJAAN FINISHING.
Cat dinding luar tampak depan ex. Avitex exterioir super white + pembatas+ plafond canopy
Cat dinding dalam ex. Avitex super white
Cat plafond ex. Avitex super white
Cat spray pintu folding gate dan harmonika
Sub Total
PEKERJAAN AREA TERBUKA
Kanstin beton untuk area parkir fin cat hitam kuning
Cat Jotun / Nippon warna Kuning untuk area Paving block L: 10 cm dan L: 20 cm
Cor dudukan dan rumahan brankas
Las kupingan gembok
Hanger spanduk
Atap canopy rangka hollow 35 x 35 + cat putih L = 3 meter
Cat tiang lampu parkir
Pek. Talang atap BJLS 90 cm + sambungan dipatri
Pek.pipa vertikal untuk area teras depan 2 titik h= 4 m, pipa PVC 4" Wavin D
Tanggulan pintu belakang
Sub Total
A SATUAN

: PANCUR BATU
: RENOVASI TOKO
: PEKERJAAN SIPIL
:
:
: 21 HARI

Harga Satuan Total Harga TOT HARGA


Volume
Satuan Material Upah Material Upah (Rp)
a b c d=axb e=axc f=d+e

Ls 1.00 1.00 1,000,000 3,000,000 1,000,000 3,000,000 4,000,000


Ls 1.00 1.00 1,000,000 1,000,000 1,000,000 1,000,000 2,000,000
LS 1.00 1.00 1,000,000 1,000,000 - 1,000,000
LS 1.00 1.00 3,000,000 3,000,000 - 3,000,000
6,000,000 4,000,000 10,000,000

Ls 1.00 1.00 1,000,000 4,000,000 1,000,000 4,000,000 5,000,000

1,000,000 4,000,000 5,000,000

m3 2.16 2.16 120,000 - 259,200 259,200


m3 0.43 0.43 2,850,000 600,000 1,231,200 259,200 1,490,400
m3 0.29 0.29 2,850,000 600,000 820,800 172,800 993,600
2,052,000 691,200 2,743,200

m2 7.38 7.38 300,000 100,000 2,214,000 738,000 2,952,000


m2 7.38 7.38 400,000 150,000 2,952,000 1,107,000 4,059,000
m' 5.00 5.00 150,000 120,000 750,000 600,000 1,350,000
m2 10.04 10.04 100,000 35,000 1,004,000 351,400 1,355,400
m2 11.20 11.20 335,000 160,000 3,752,000 1,792,000 5,544,000
m2 11.20 11.20 250,000 50,000 2,800,000 560,000 3,360,000
m' 20.00 20.00 35,000 10,000 700,000 200,000 900,000
m' 20.00 20.00 45,000 15,000 900,000 300,000 1,200,000
15,072,000 5,648,400 20,720,400

m2 16.06 4.55 300,000 100,000 1,365,000 455,000 1,820,000


m2 16.06 14.38 350,000 150,000 5,033,000 2,157,000 7,190,000
m' 13.00 13.00 150,000 80,000 1,950,000 1,040,000 2,990,000
m1 9.18 9.18 40,000 25,000 367,200 229,500 596,700
8,715,200 3,881,500 12,596,700

kg 75.36 75.36 18,000 11,000 1,356,480 828,960 2,185,440


kg 7.78 7.78 18,000 11,000 140,000 85,556 225,556
bh 8.00 8.00 50,000 10,000 400,000 80,000 480,000
kg 301.40 74.37 18,000 11,000 1,338,642 818,059 2,156,701
m2 26.55 24.25 200,000 50,000 4,850,400 1,212,600 6,063,000
kg 253.49 101.21 18,000 11,000 1,821,753 1,113,293 2,935,046
m2 19.74 19.74 65,000 35,000 1,282,905 690,795 1,973,700
11,190,180 4,829,263 16,019,443

kg 15.56 15.56 18,000 11,000 280,000 171,111 451,111


bh 16.00 16.00 50,000 10,000 800,000 160,000 960,000
kg 75.36 22.61 18,000 11,000 406,944 248,688 655,632
kg 116.07 20.10 50,000 10,000 1,004,800 200,960 1,205,760
kg 42.50 23.31 18,000 11,000 419,587 256,414 676,002
kg 38.61 38.61 50,000 10,000 1,930,667 386,133 2,316,800
m2 3.07 3.07 300,000 100,000 919,680 306,560 1,226,240
m2 13.50 13.50 100,000 35,000 1,350,000 472,500 1,822,500
m2 9.00 9.66 115,000 35,000 1,110,900 338,100 1,449,000
Ls 1.00 1.00 1,500,000 500,000 1,500,000 500,000 2,000,000
m2 9.00 9.66 115,000 35,000 1,110,900 338,100 1,449,000
m2 9.00 9.00 300,000 100,000 2,700,000 900,000 3,600,000
m2 1.25 1.25 400,000 150,000 500,000 187,500 687,500
kg 27.08 26.98 18,000 11,000 485,568 296,736 782,304
m2 15.00 15.00 250,000 75,000 3,750,000 1,125,000 4,875,000
18,269,046 5,887,803 24,156,849

LS 1.00 1.00 250,000 500,000 250,000 500,000 750,000


m2 35.42 14.98 130,000 40,000 1,947,400 599,200 2,546,600
m2 16.67 28.71 100,000 35,000 2,871,400 1,004,990 3,876,390
m2 20.42 16.37 100,000 35,000 1,637,000 572,950 2,209,950
Ls 1.00 1.00 1,000,000 750,000 1,000,000 750,000 1,750,000
unit 2.00 2.00 400,000 50,000 800,000 100,000 900,000
8,505,800 3,527,140 12,032,940

m2 29.84 29.84 105,000 40,000 3,133,200 1,193,600 4,326,800


3,133,200 1,193,600 4,326,800

bh 1.00 1.00 250,000 500,000 250,000 500,000 750,000


Unit 1.00 1.00 1,500,000 300,000 1,500,000 300,000 1,800,000
1,750,000 800,000 2,550,000

unit 2.00 2.00 500,000 450,000 1,000,000 900,000 1,900,000


unit 1.00 1.00 1,500,000 500,000 1,500,000 500,000 2,000,000
Ls 1.00 1.00 500,000 1,500,000 500,000 1,500,000 2,000,000
Ls 1.00 1.00 1,500,000 500,000 1,500,000 500,000 2,000,000
Ls 1.00 1.00 135,000 30,000 135,000 30,000 165,000
unit 5.00 5.00 150,000 30,000 750,000 150,000 900,000
5,385,000 3,580,000 8,965,000
m2 54.76 46.18 25,000 15,000 1,154,475 692,685 1,847,160
m2 238.12 217.34 15,000 10,000 3,260,040 2,173,360 5,433,400
m2 213.34 126.68 15,000 10,000 1,900,260 1,266,840 3,167,100
m2 46.20 46.20 65,000 35,000 3,003,000 1,617,000 4,620,000
9,317,775 5,749,885 15,067,660

Unit 6.00 6.00 150,000 50,000 900,000 300,000 1,200,000


m1 15.00 15.00 24,000 7,500 360,000 112,500 472,500
Ls 1.00 1.00 3,000,000 1,000,000 3,000,000 1,000,000 4,000,000
Ls 1.00 1.00 200,000 150,000 200,000 150,000 350,000
m' 9.18 9.18 60,000 30,000 550,800 275,400 826,200
m2 27.54 27.54 275,000 100,000 7,573,500 2,754,000 10,327,500
unit 2.00 2.00 150,000 100,000 300,000 200,000 500,000
m1 9.18 9.18 190,000 75,000 1,744,200 688,500 2,432,700
m1 12.00 12.00 150,000 100,000 1,800,000 1,200,000 3,000,000
Ls 1.00 1.00 150,000 100,000 150,000 100,000 250,000
16,578,500 6,780,400 23,358,900
TOTAL 157,537,892
Pembulatan 157,537,000
PPn 10 % 15,753,700
GRAND TOTAL 173,290,700
37.68

19.42

28.26

26.38
10.00
14.48

13.00

plafond
2.8

20300000
1.200
3.405
3.394 7.999
1.200

9.199

3.66
1.6
0.2
5.46