B Kompensasi Tim XL
Kompensasi untuk Tim XL bln 2.00 9,500,000
sub total B
E
PEKERJAAN PEMBUATAN DESIGN POLE, APD DAN SOIL TEST
1 Pembuatan Design Pole 9 Meter ex Roof Top ls 1.00
2 Pembuatan APD Site ls 1.00 1,500,000
3 Soil Test ls 1.00 2,500,000
subtotal E
2 PEKERJAAN MONOPOLE 20 M
a Erection Tower kg 1,500 include
- termasuk sewa crane jika menggunakan crane
Painting Tower
b Sortir tower ls include
c Ekspedisi Pengambilan Pole ls include
4 PEKERJAAN ME
Including:
- Bak Kontrol dan Asesoriesnya set Include
- Splitsen dan asesoriesnya set Include
- Stick Rod btg Include
- AAC m Include
- Busbar Aluminium 30x30x10 3 Include
- Lampu taman 1 Include
sub total
Sub total F
G OPERASIONAL TIM EWU
a Operasional ( BBM Mobil + Tol) ls 1 1,500,000
b TA Tim EWU ls 1 2,000,000
c Pendampingan Tim di Lapangan By Pak Kabul ls 4 950,000
sub total G
H ATP
a Entertaint ls 1 300,000
b BBM Tim Ericsson ls 1 300,000
c Retribusi Site Jalan Kiwi ls 1 1,000,000
d Entertaint Pak Davy ls 1 9,500,000
e Biaya Notaris Site Bangka 9 ls 1 2,500,000
Jumlah Total
Koef tahun
130,000,000
130,000,000
40,000,000
-
-
-
-
-
2,000,000
-
-
42,000,000
-
1,500,000
2,500,000
4,000,000
33,000,000
33,000,000
4,000,000
7,500,000
7,500,000
19,000,000
-
-
-
-
52,000,000
1,500,000
2,000,000
3,800,000
3,500,000
300,000
300,000
1,000,000
9,500,000
2,500,000
346,200,000
3.04
Disetujui Oleh