GENSET 20 Kva
PEKERJAAN INSTALASI /
B
PERLENGKAPAN
JUMLAH B - 39,313,990.00
PPN 10% - 3,931,399.00
GRAND TOTAL - 43,245,389.00
JUMLAH A + B - 39,313,990.00
PPN 10% - 3,931,399.00
GRAND TOTAL - 43,245,389.00