JANUARI
FEBRUARI
MARET
APRIL
MEI
JUNI
JULI
AGUSTUS
SEPTEMBER 15 16 17 18 19 20 21
OKTOBER 45 46 47 48 49 50 51
NOPEMBER 76 77 78 79 80 81 82
DESEMBER 106 107 108 109 110 111 112
PROYEK :
NAMA PAKET
LOKASI PROYEK :
PROVINSI :
KABUPATEN :
PANJANG PENANGANAN :
KONSULTAN PERENCANA :
TEEM LEADER :
HIGHWAY ENGINEER :
KABID BINA MARGA :
KASI PEMBANGUNAN JALAN DAN JEMBATAN :
KASI PERENCANAAN TEKNIS DAN EVALUASI :
KASI PRESERVASI JALAN DAN JEMBATAN :
TIM PERENCANA :
:
:
:
KPA :
Plt. KEPALA DINAS :
NO.KONTRAK :
TGL KONTRAK :
NILAI KONTRAK :
TAHUN ANGGARAN :
TANGGAL
8 9 10 11 12 13 14 15 16
22 23 24 25 26 27 28 29 30
52 53 54 55 56 57 58 59 60
83 84 85 86 87 88 89 90 91
113 114 115 116 117 118 119 120 121
DATA PERSONIL
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG KABUPATEN NIAS SELATAN
1 2 3 4 5 6 7 8
31 32 33 34 35 36 37 38 39
61 62 63 64 65 66 67 68 69
92 93 94 95 96 97 98 99 100
122 123 124 125 126 127 128 129 130
Penata Utama
26 27 28 29 30 31
9 10 11 12 13 14
40 41 42 43 44
70 71 72 73 74 75
101 102 103 104 105
Pasangan Batu Mortar
Luas Luas
KIRI Luas VOL KANAN Luas VOL
Rata2 Rata2
NO STA. Panjang STA Panjang
A
L1 L2 H1 m2 AxP L1 L2 L3 L4 L6 H1 H2 H3 H4 m m m2
=(L1+L2/2XH1)
1 2 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26
Dibuat Oleh:
KONSULTAN PERENCANA
CV. POLO CONSULTANT
HEMAN F H SIREGAR, ST
Cost & Quantity Engineer
PEMERINTAH KABUPATEN NIAS SELATAN
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
BACK UP DATA PERENCANAAN
BIDANG BINA MARGA
Jalan Saonigeho KM. 3 Telukdalam
Nama Pekerjaan DIVISI 2. DRAINASE
1 2 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26
Dibuat Oleh:
KONSULTAN PERENCANA
CV. POLO CONSULTANT
HEMAN F H SIREGAR, ST
Cost & Quantity Engineer
PEMERINTAH KABUPATEN NIAS SELATAN
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
BACK UP DATA PERENCANAAN
BIDANG BINA MARGA
Jalan Saonigeho KM. 3 Telukdalam
DIVISI 3. PEKERJAAN TANAH DAN
Nama Pekerjaan
GEOSINTETIK
PEMBANGUNAN JALAN SIMENISASI DARI DESA EHO MENUJU HILISIMAETANO
3.1.(2)
KEC. MANIAMOLO
Galian Batu Lunak
Dibuat Oleh:
KONSULTAN PERENCANA
CV. POLO CONSULTANT
HEMAN F H SIREGAR, ST
Cost & Quantity Engineer
PEMERINTAH KABUPATEN NIAS SELATAN
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
BACK UP DATA PERENCANAAN
BIDANG BINA MARGA
Jalan Saonigeho KM. 3 Telukdalam
0 + 359 s/d 0 + 375 0 + 359 s/d 0 + 375 16.00 1.00 1.00 1.00 16.00
HEMAN F H SIREGAR, ST
Cost & Quantity Engineer
PEMERINTAH KABUPATEN NIAS SELATAN
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
BACK UP DATA PERENCANAAN
BIDANG BINA MARGA
Jalan Saonigeho KM. 3 Telukdalam
Nama Pekerjaan DIVISI 3. PEKERJAAN TANAH
PEMBANGUNAN JALAN SIMENISASI DARI DESA EHO MENUJU HILISIMAETANO 3.3.(1)
KEC. MANIAMOLO
Penyiapan Badan Jalan
KIRI KANAN
Luas Volume Luas Volume
Panjang Lebar Bidang Panjang Lebar Tebal Bidang
NO. STA. Ket
P l A =(l*t) A*P P l t A =(l*t) A*P
(m) (m) (m2) (m3) (m) (m) (m) (m2) (m3)
HEMAN F H SIREGAR, ST
Cost & Quantity Engineer
PEMERINTAH KABUPATEN NIAS SELATAN
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
BACK UP DATA PERENCANAAN
BIDANG BINA MARGA
Jalan Saonigeho KM. 3 Telukdalam
Nama Pekerjaan DIVISI 3. PEKERJAAN TANAH DAN GEOSINTETIK
PEMBANGUNAN JALAN SIMENISASI DARI DESA EHO MENUJU HILISIMAETANO 3.4.(1)
KEC. MANIAMOLO
Pembersihan dan Pengupasan Lahan
KIRI KANAN
Volume Luas Volume
Luas Bidang
Panjang Lebar Tebal Panjang Lebar Tebal Bidang
NO. STA. Ket
P l t A =(l*t) A*P P l t A =(l*t) A*P
(m) (m) (m) (m2) (m3) (m) (m) (m) (m2) (m3)
0 + 000 s/d 0 + 100 100.00 2.50 250.00 250.00 100.00 2.50 250.00 250.00
0 + 100 s/d 0 + 200 100.00 2.50 250.00 250.00 100.00 2.50 250.00 250.00
0 + 200 s/d 0 + 300 100.00 2.50 250.00 250.00 100.00 2.50 250.00 250.00
0 + 300 s/d 0 + 450 150.00 2.50 375.00 375.00 150.00 2.50 375.00 375.00
HEMAN F H SIREGAR, ST
Cost & Quantity Engineer
PEMERINTAH KABUPATEN NIAS SELATAN
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
BACK UP DATA PERENCANAAN
BIDANG BINA MARGA
Jalan Saonigeho KM. 3 Telukdalam
KIRI KANAN
Volume Volume
Luas Bidang Luas Bidang
Panjang Lebar Tebal Panjang Lebar Tebal
NO. STA. Ket
P l t A =(l*t) A*P P l t A =(l*t) A*P
(m) (m) (m) (m2) (m3) (m) (m) (m) (m2) (m3)
1 0 + 000.00 s/d 0 + 025 25.00 2.00 0.150 0.30 7.5 25.00 2.00 0.150 0.30 7.5
2 0 + 025 s/d 0 + 050 25.00 2.00 0.150 0.30 7.5 25.00 2.00 0.150 0.30 7.5
3 0 + 050 s/d 0 + 075 25.00 2.00 0.150 0.30 7.5 25.00 2.00 0.150 0.30 7.5
4 0 + 075 s/d 0 + 100 25.00 2.00 0.150 0.30 7.5 25.00 2.00 0.150 0.30 7.5
5 0 + 100 s/d 0 + 125 25.00 2.00 0.150 0.30 7.5 25.00 2.00 0.150 0.30 7.5
6 0 + 125 s/d 0 + 150 25.00 2.00 0.150 0.30 7.5 25.00 2.00 0.150 0.30 7.5
7 0 + 150 s/d 0 + 175 25.00 2.00 0.150 0.30 7.5 25.00 2.00 0.150 0.30 7.5
8 0 + 175 s/d 0 + 200 25.00 2.00 0.150 0.30 7.5 25.00 2.00 0.150 0.30 7.5
9 0 + 200 s/d 0 + 225 25.00 1.75 0.150 0.26 6.5625 25.00 1.75 0.150 0.26 6.5625
10 0 + 225 s/d 0 + 250 25.00 1.75 0.150 0.26 6.5625 25.00 1.75 0.150 0.26 6.5625
11 0 + 250 s/d 0 + 275 25.00 1.75 0.150 0.26 6.5625 25.00 1.75 0.150 0.26 6.5625
12 0 + 275 s/d 0 + 300 25.00 1.75 0.150 0.26 6.5625 25.00 1.75 0.150 0.26 6.5625
13 0 + 300 s/d 0 + 325 25.00 1.75 0.150 0.26 6.5625 25.00 1.75 0.150 0.26 6.5625
14 0 + 325 s/d 0 + 350 25.00 1.75 0.150 0.26 6.5625 25.00 1.75 0.150 0.26 6.5625
Dibuat Oleh:
KONSULTAN PERENCANA
CV. POLO CONSULTANT
HEMAN F H SIREGAR, ST
Cost & Quantity Engineer
PEMERINTAH KABUPATEN NIAS SELATAN
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG BACK UP DATA PERE
BIDANG BINA MARGA
Nama Paket : DIVISI 7. STRUK
PEMBANGUNAN JALAN SIMENISASI DARI DESA EHO MENUJU HILISIMAETANO 7.1 (7) a
KEC. MANIAMOLO
Beton mutu sedang fc’2
JUMLAH BETON
Dibuat Oleh:
KONSULTAN PERENCANA
CV. POLO CONSULTANT
HEMAN F H SIREGAR, ST
Cost & Quantity Engineer
BACK UP DATA PERENCANAAN
DIVISI 7. STRUKTUR
7.1 (7) a
Beton mutu sedang fc’20 Mpa
TOTAL VOLUME
KETERANGAN
(M)
1.40
1.40 M3
PEMERINTAH KABUPATEN NIAS SELATAN
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG BACK UP DATA
BIDANG BINA MARGA
Nama Paket : DIVISI 7. S
PEMBANGUNAN JALAN SIMENISASI DARI DESA EHO MENUJU HILISIMAETANO 7.1
KEC. MANIAMOLO
Beton, fc
JUMLAH BET
Dibuat Oleh:
KONSULTAN PERENCANA
CV. POLO CONSULTANT
HEMAN F H SIREGAR, ST
Cost & Quantity Engineer
BACK UP DATA PERENCANAAN
DIVISI 7. STRUKTUR
7.1 (8)
0.40 0.40
KIRI KANAN
Volume Volume
Luas Bidang Luas Bidang
Panjang Lebar Tebal Panjang Lebar Tebal
NO. STA. Ket
P l t A =(l*t) A*P P l t A =(l*t) A*P
(m) (m) (m) (m2) (m3) (m) (m) (m) (m2) (m3)
1 0 + 034 s/d 0 + 050 16.00 1.50 0.15 0.23 3.60 16.00 1.50 0.15 0.23 3.60
2 0 + 052 s/d 0 + 077 25.00 1.50 0.15 0.23 5.63 25.00 1.50 0.15 0.23 5.63
3 0 + 359 s/d 0 + 375 16.00 1.50 0.15 0.23 3.60 16.00 1.50 0.15 0.23 3.60
4 0 + 378 s/d 0 + 410 32.00 1.50 0.15 0.23 7.20 32.00 1.50 0.15 0.23 7.20
Dibuat Oleh:
KONSULTAN PERENCANA
CV. POLO CONSULTANT
HEMAN F H SIREGAR, ST
Cost & Quantity Engineer
PEMERINTAH KABUPATEN NIAS SELATAN
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
BIDANG BINA MARGA
Nama Paket :
PEMBANGUNAN JALAN SIMENISASI DARI DESA EHO MENUJU HILISIMAETANO
KEC. MANIAMOLO
A B C D=BxC
No.
PERHITUNGAN PENULANGAN PLAT DUIKER ( STA. 0 + 050 S/D STA. 0 + 051.90 )
Dibuat Oleh
KONSULTAN PERENCANA
CV. POLO CONSULTANT
HEMAN F H SIREGAR, ST
Cost & Quantity Engineer
BACK UP DATA PERENCANAAN
DIVISI 7. STRUKTUR
6.6.(1)
E F G=dxf
12 0.89 183.50
12 0.89 175.19
12 0.89 199.21
12 0.89 177.48
12 0.89 14.38
Dibuat Oleh
ONSULTAN PERENCANA
V. POLO CONSULTANT
EMAN F H SIREGAR, ST
Cost & Quantity Engineer
PEMERINTAH KABUPATEN NIAS SELATAN
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
BACK UP DATA PERENCANAAN
BIDANG BINA MARGA
URAIAN
PASANGAN BATU UNTUK PLAT DUIKER STA. 0 + 050 S/D STA. 0 + 051.90
0+051 3.00 0.35 0.40 0.60 0.75 0.30 0.46 0.46 2.77
0+051 2.00 0.35 0.80 1.00 2.20 0.80 2.07 2.07 8.26
11.37 -
Volume ( Kiri + Kanan ) = 11.37 M3
Volume Dibulatkan = 11.37 M3
Dibuat Oleh:
KONSULTAN PERENCANA
CV. POLO CONSULTANT
HEMAN F H SIREGAR, ST
Cost & Quantity Engineer
PEMERINTAH KABUPATEN NIAS SELATAN
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
BACK UP DATA PERENCANAAN
BIDANG BINA MARGA
Jalan Saonigeho KM. 3 Telukdalam
Nama Pekerjaan DIVISI 7. STRUKTUR
PEMBANGUNAN JALAN SIMENISASI DARI DESA EHO MENUJU HILISIMAETANO 7.9.(1)
KEC. MANIAMOLO
Pasangan Batu
URAIAN
Kiri Kanan
Jarak A Jarak A Ket
Sta L.1 L.2 L.3 H.1 H.2 Luas Rata- Volume Sta L.1 L.2 L.3 H.1 H.2 Luas Rata- Volume
(M) =(L1+L2/2xH1) (M) =(L1+L2/2xH1)
(M) (M) (M) (M) (M) rata ( M²) (M³) (M) (M) (M) (M) (M) rata ( M²) (M³)
+(H2xL3) +(H2xL3)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
HEMAN F H SIREGAR, ST
Cost & Quantity Engineer
PEMERINTAH KABUPATEN NIAS SELATAN BACK UP DATA RENCANA
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG DEVISI.7. STRUKTUR
BIDANG BINA MARGA 7.1 (7) a
Jl. Saonigeho KM. 3 Telukdalam Beton mutu sedang fc’20 Mpa
LOKASI
KECAMATAN
T.A
Total Volume
NO. ITEM PEKERJAAN Keterangan
(m³)
DIBULATKAN 195.80
Dibuat Oleh:
KONSULTAN PERENCANA
CV. POLO CONSULTANT
HEMAN F H SIREGAR, ST
Cost & Quantity Engineer
PEMERINTAH KABUPATEN NIAS SELATAN
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
BACK UP DATA PERENCANAAN
BIDANG BINA MARGA
Jalan Saonigeho KM. 3 Telukdalam
KIRI KANAN
Volume Luas Volume
Luas Bidang
Panjang Lebar Tebal Panjang Lebar Tebal Bidang
NO. STA. Ket
P l t A =(l*t) A*P P l t A =(l*t) A*P
(m) (m) (m) (m2) (m3) (m) (m) (m) (m2) (m3)
1 0 + 359 s/d 0 + 375 16.00 2.25 0.20 0.45 7.20 16.00 2.25 0.20 0.45 7.20
HEMAN F H SIREGAR, ST
Cost & Quantity Engineer
PEMERINTAH KABUPATEN NIAS SELATAN
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
BACK UP DATA PERENCANAAN
BIDANG BINA MARGA
Jalan Saonigeho KM. 3 Telukdalam
Nama Pekerjaan DIVISI 3. PEKERJAAN TANAH DAN GEOSINTETIK
PEMBANGUNAN JALAN SIMENISASI DARI DESA EHO MENUJU HILISIMAETANO 3.2.(2a)
KEC. MANIAMOLO
Timbunan Pilihan dari sumber galian
300
150
? 150
KIRI KANAN
Luas Volume Luas Volume
Panjang Lebar Tebal Bidang Panjang Lebar Tebal Bidang
NO. STA. Ket
P l t A =(l*t) A*P P l t A =(l*t) A*P
(m) (m) (m) (m2) (m3) (m) (m) (m) (m2) (m3)
0 + 000 s/d 0 + 010 10.00 2.00 0.30 0.60 6 10.00 2.00 0.30 0.60 6
0 + 010 s/d Err:509 Err:509 2.00 0.10 0.20 Err:509 Err:509 2.00 0.10 0.20 Err:509
300
150 150
2% 2%
1 0 + 000 s/d 0 + 025 25.00 2.00 50.00 1.00 50 25.00 2.00 50.00 1.00 50
2 0 + 025 s/d 0 + 050 25.00 2.00 50.00 1.00 50 25.00 2.00 50.00 1.00 50
3 0 + 050 s/d 0 + 075 25.00 2.00 50.00 1.00 50 25.00 2.00 50.00 1.00 50
4 0 + 075 s/d 0 + 100 25.00 2.00 50.00 1.00 50 25.00 2.00 50.00 1.00 50
5 0 + 100 s/d 0 + 125 25.00 2.00 50.00 1.00 50 25.00 2.00 50.00 1.00 50
6 0 + 125 s/d 0 + 150 25.00 2.00 50.00 1.00 50 25.00 2.00 50.00 1.00 50
7 0 + 150 s/d 0 + 175 25.00 2.00 50.00 1.00 50 25.00 2.00 50.00 1.00 50
8 0 + 175 s/d 0 + 200 25.00 2.00 50.00 1.00 50 25.00 2.00 50.00 1.00 50
9 0 + 200 s/d 0 + 225 25.00 1.75 43.75 1.00 43.75 25.00 1.75 43.75 1.00 43.75
10 0 + 225 s/d 0 + 250 25.00 1.75 43.75 1.00 43.75 25.00 1.75 43.75 1.00 43.75
11 0 + 250 s/d 0 + 275 25.00 1.75 43.75 1.00 43.75 25.00 1.75 43.75 1.00 43.75
12 0 + 275 s/d 0 + 300 25.00 1.75 43.75 1.00 43.75 25.00 1.75 43.75 1.00 43.75
13 0 + 300 s/d 0 + 325 25.00 1.75 43.75 1.00 43.75 25.00 1.75 43.75 1.00 43.75
14 0 + 325 s/d 0 + 350 25.00 1.75 43.75 1.00 43.75 25.00 1.75 43.75 1.00 43.75
HEMAN F H SIREGAR, ST
Cost & Quantity Engineer
DINAS PEKERJAAN UMUM DAN PENATAAN
BACK UP DATA PERENCANAAN KONSULTAN PERENCANA
RUANG
URAIAN
Kiri Kanan Total Volume
Jarak Jarak Keterangan
Sta L AC Luas Volume Sta L AC Luas Volume (Liter)
(M) (M)
(M) (Liter) (M²) (Liter) (M) (Liter) (M²) (M³)
1 2 3 5 6 7 8 9 10 12 13 14 15 16
0+000 0+000
50.00 2.00 0.35 0.70 35.00 50.00 2.00 0.35 0.70 35.00 70.00
0+050 0+050
25.00 2.00 0.35 0.70 17.50 25.00 2.00 0.35 0.70 17.50 35.00
0+075 0+075
25.00 2.00 0.35 0.70 17.50 25.00 2.00 0.35 0.70 17.50 35.00
0+100 0+100
(100.00) 2.00 0.35 0.70 (70.00) - 100.00 2.00 0.35 0.70 - 70.00 (140.00)
0+000 0+000
Dibuat Oleh:
KONSULTAN PERENCANA
CV. POLO CONSULTANT
DINAS PEKERJAAN UMUM DAN PENATAAN
BACK UP DATA PERENCANAAN KONSULTAN PERENCANA
RUANG
URAIAN
Kiri Kanan Total Volume
Jarak Jarak Keterangan
Sta L AC Luas Volume Sta L AC Luas Volume (Liter)
(M) (M)
(M) (Liter) (M²) (Liter) (M) (Liter) (M²) (M³)
1 2 3 5 6 7 8 9 10 12 13 14 15 16
HEMAN F H SIREGAR, ST
Cost & Quantity Engineer
PEMERINTAH KABUPATEN NIAS SELATAN
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
BACK UP DATA PERENCANAAN
BIDANG BINA MARGA
Jalan Saonigeho KM. 3 Telukdalam
Nama Pekerjaan DIVISI 6. PERKERASAN ASPAL
PEMBANGUNAN JALAN SIMENISASI DARI DESA EHO MENUJU HILISIMAETANO 6.6.(1)
KEC. MANIAMOLO
Lapis Penetrasi Permukaan Macadam
400
200 200
2% 2%
1 0 + 000 s/d 0 + 025 25.00 2.00 0.05 0.10 2.5 25.00 2.00 0.05 0.10 2.5
2 0 + 025 s/d 0 + 050 25.00 2.00 0.05 0.10 2.5 25.00 2.00 0.05 0.10 2.5
3 0 + 050 s/d 0 + 075 25.00 2.00 0.05 0.10 2.5 25.00 2.00 0.05 0.10 2.5
4 0 + 075 s/d 0 + 100 25.00 2.00 0.05 0.10 2.5 25.00 2.00 0.05 0.10 2.5
5 0 + 100 s/d 0 + 125 25.00 2.00 0.05 0.10 2.5 25.00 2.00 0.05 0.10 2.5
6 0 + 125 s/d 0 + 150 25.00 2.00 0.05 0.10 2.5 25.00 2.00 0.05 0.10 2.5
7 0 + 150 s/d 0 + 175 25.00 2.00 0.05 0.10 2.5 25.00 2.00 0.05 0.10 2.5
8 0 + 175 s/d 0 + 200 25.00 2.00 0.05 0.10 2.5 25.00 2.00 0.05 0.10 2.5
9 0 + 200 s/d 0 + 225 25.00 1.75 0.05 0.09 2.1875 25.00 1.75 0.05 0.09 2.1875
10 0 + 225 s/d 0 + 250 25.00 1.75 0.05 0.09 2.1875 25.00 1.75 0.05 0.09 2.1875
11 0 + 250 s/d 0 + 275 25.00 1.75 0.05 0.09 2.1875 25.00 1.75 0.05 0.09 2.1875
12 0 + 275 s/d 0 + 300 25.00 1.75 0.05 0.09 2.1875 25.00 1.75 0.05 0.09 2.1875
13 0 + 300 s/d 0 + 325 25.00 1.75 0.05 0.09 2.1875 25.00 1.75 0.05 0.09 2.1875
14 0 + 325 s/d 0 + 350 25.00 1.75 0.05 0.09 2.1875 25.00 1.75 0.05 0.09 2.1875
Dibuat Oleh:
KONSULTAN PERENCANA
CV. POLO CONSULTANT
HEMAN F H SIREGAR, ST
Cost & Quantity Engineer
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG KABUPATEN NIAS SELATAN
L1 L2 L3 H1 H2 H3 Jlh P VOLUME
SKETSA GAMBAR Nama KETERANGAN
m' m' m' m' m' m' Sisi m' m³
L3 L2 BOX CULVERT
H1
L1
DINDING PENAHAN BAWAH
DINDING PENAHAN BAWAH
15
15 V1 0.30 0.80 2 3.00 1.440 V1 = L1 x H1 x P x Jlh
10
H1 H 1
H 2
H2
LOKASI
KECAMATAN
T.A
Total Volume
NO. ITEM PEKERJAAN Keterangan
(m³)
DIBULATKAN 21.04
Dibuat Oleh:
KONSULTAN PERENCANA
CV. POLO CONSULTANT
HEMAN F H SIREGAR, ST
Cost & Quantity Engineer
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
BACK UP DATA
BIDANG BINA MARGA KABUPATEN NIAS SELATAN
DIVISI 7. STRUKTUR
NAMA PAKET :
7.10.(3a)
Dibuat Oleh:
KONSULTAN PERENCANA
CV. POLO CONSULTANT
HEMAN F H SIREGAR, ST
Cost & Quantity Engineer
PEMERINTAH KABUPATEN NIAS SELATAN BACK UP DATA RENCANA
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG DEVISI.7. STRUKTUR
BIDANG BINA MARGA 7.1 (7) a
Jl. Saonigeho KM. 3 Telukdalam Beton mutu sedang fc’20 Mpa
PEMBANGUNAN JALAN SIMENISASI DARI DESA EHO MENUJU
HILISIMAETANO
NAMA PAKET
KEC. MANIAMOLO
Total Volume
NO. ITEM PEKERJAAN Keterangan
(m³)
DIBULATKAN 2.52
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG KABUPATEN NIAS SELATAN
L1 L2 L3 H1 H2 H3 Jlh P VOLUME
SKETSA GAMBAR Nama KETERANGAN
m' m' m' m' m' m' Sisi m' m³
H1
L1
40
DI BAWAH DINDING SAYAP
H1
10 H1
P L1
V1 0.20 0.10 4 0.50 0.040 V1 = L1 x H1 x P1 x Jlh
DINDING SAYAP
H1
H1
L1
P1 Badan Box P1
LOKASI
KECAMATAN
T.A
Total Volume
NO. ITEM PEKERJAAN Keterangan
(m³)
DIBULATKAN 1.39
Dibuat Oleh:
KONSULTAN PERENCANA
CV. POLO CONSULTANT
HEMAN F H SIREGAR, ST
Cost & Quantity Engineer
PEMERINTAH KABUPATEN NIAS SELATAN
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG BACK UP DATA PERENCANAAN
BIDANG BINA MARGA
Nama Paket : DIVISI 7. STRUKTUR
PEMBANGUNAN JALAN SIMENISASI DARI DESA EHO MENUJU HILISIMAETANO 7.3 (2)
KEC. MANIAMOLO
Baja Tulangan U 24 Polos
0 + 128 0 + 132
Dibuat Oleh:
KONSULTAN PERENCANA
CV. POLO CONSULTANT
HEMAN F H SIREGAR, ST
Cost & Quantity Engineer
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG KABUPATEN NIAS SELATAN
NAMA Panjang Batang / Potong Kait Total Panjang Space Dia. Total Berat
NO. Jumlah Batang Total Panjang Berat/ Meter Keterangan
BATANG Potongan (mm) (Kg)
a b c d e (5xØ)2 m'
2 B2 2.92 0.12 2.92 0.12 0.14 6.22 0.2 50 311 12 0.888 276.093
3 B1 2.42 0.12 2.42 0.12 0.14 5.22 0.4 50 261 12 0.888 231.705
7 E1 2.92 0.12 2.92 0.12 0.14 6.22 0.2 8 49.76 10 0.617 30.677
9 K1 2.92 0.12 2.92 0.12 0.14 6.22 0.2 10 62.2 12 0.888 55.219
10 L1 0.62 0.12 0.62 0.12 0.14 1.62 0.2 32 51.84 12 0.888 46.021
Total Berat
NO. ITEM PEKERJAAN Keterangan
(Kg)
DIBULATKAN 749.77
Dibuat Oleh:
KONSULTAN PERENCANA
CV. POLO CONSULTANT
HEMAN F H SIREGAR, ST
Cost & Quantity Engineer
PEMERINTAH KABUPATEN NIAS SELATAN
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG BACK UP DATA PERENCANAA
BIDANG BINA MARGA
Nama Paket : DIVISI 7. STRUKTUR
6.6.(1)
#REF!
Besi Tulangan
Bentuk Batang Jlh Batang Panjang/BTG TTL PANJANG Ø Besi BERAT BESI/M'
A B C D=BxC E F
No.
PERHITUNGAN PENULANGAN PLAT DUIKER STA. 1+088 S/D 1+090
10
11
12
13
14
15
16
17
18
19
20
21
Jumlah Volume Tulangan Plat Duiker + Jumlah Volume Tulangan Plat Par
Total Berat Besi
BACK UP DATA PERENCANAAN
DIVISI 7. STRUKTUR
6.6.(1)
Besi Tulangan
TTL BERAT(Kg)
G=dxf
N PLAT DUIKER STA. 1+088 S/D 1+090
485.151
448.536
345.571
324.107
304.916
285.977
320.275
448.536
2963.070 Kg
2963.070 Kg
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG KABUPATEN NIAS SELATAN BACK UP DATA RENCANA
1 A1 3.5 0.2 3.5 0.2 0.14 7.54 0.2 59 445.10 12 0.888 395.138
3 B3 3.5 0.2 3.5 0.2 0.14 7.54 0.2 59 445.10 12 0.888 395.138
9 B9 4.2 0.15 4.2 0.15 0.156 8.856 0.2 16 141.696 13 1.042 147.631
10 B10 0.7 0.15 0.7 0.15 0.156 1.856 0.2 30 55.68 13 1.042 58.012
12 B12 0.7 0.15 0.7 0.13 1.68 0.2 68 114.24 13 1.042 119.025
L1 L2 L3 H1 H2 H3 Jlh P VOLUME
SKETSA GAMBAR Nama KETERANGAN
m' m' m' m' m' m' Sisi m' m³
L3 L2 BOX CULVERT
H1
V1 3.60 0.30 2 6.00 12.960 V1 = L1 x H1 x P x Jlh
BOX CULVERT H3
L1
40 H1
H1
10 DINDING SAYAP
L1
P
V1 0.30 0.50 4 1.20 0.720 V1 = L1 x H1 x P1 x Jlh
H1 H 1
H2
H2
L1 L2 L3 H1 H2 H3 Jlh P VOLUME
SKETSA GAMBAR Nama KETERANGAN
m' m' m' m' m' m' Sisi m' m³
H1
L1
LOKASI
KECAMATAN : SIMAMBAWA
T.A : 2019 CV. POLO CONSULTANT
Total Berat
NO. ITEM PEKERJAAN Keterangan
(Kg)
DIBULATKAN 2,044.81
PEMERINTAH KABUPATEN NIAS SELATAN
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
BACK UP DATA PERENCANAAN
BIDANG BINA MARGA
Jalan Saonigeho KM. 3 Telukdalam
Nama Pekerjaan DIVISI 7. STRUKTUR
6.6.(1)
#REF!
Pasangan Batu
`
URAIAN
Kiri Kanan
Jarak Ket
Sta L.1 L.2 L.3 L.4 L.5 L.6 H.1 H.2 H.3 H.4 Luas Luas Rata- Volume
(M)
(M) (M) (M) (M) (M) (M) (M) (M) (M) (M) (M²) rata ( M²) (M³)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
Dibuat Oleh:
KONSULTAN PERENCANA
CV. POLO CONSULTANT
HEMAN F H SIREGAR, ST
Cost & Quantity Engineer
PEMERINTAH KABUPATEN NIAS SELATAN
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
BACK UP DATA PERENCANAAN
BIDANG BINA MARGA
Jalan Saonigeho KM. 3 Telukdalam
Nama Pekerjaan DIVISI 10. PEKERJAAN PEMELIHARAAN KINERJA
PEMBANGUNAN JALAN SIMENISASI DARI DESA EHO MENUJU HILISIMAETANO 10.1.(1)
KEC. MANIAMOLO
Galian pada Saluran Air atau Lereng untuk Pemeliharaan
Dibuat Oleh:
KONSULTAN PERENCANA
CV. POLO CONSULTANT
HEMAN F H SIREGAR, ST
Cost & Quantity Engineer
PERHITUNGAN VOLUME DAN HARGA SATUAN
Volume Satuan Harga Satuan Total Harga Satuan
1. Volume Pas. Batu Arah Telukdalam Kiri
Volume : 100.80 M3
2. Volume Pas. Batu Arah Lolowau Kiri
Panjang 2 M + Bax Kontrol + Tambahan : 16.70 M3
3. Volume Pas. Tangga Pembuangan :