BULAN 1 2 3 4 5 6 7

JANUARI
FEBRUARI
MARET
APRIL
MEI
JUNI
JULI
AGUSTUS
SEPTEMBER 15 16 17 18 19 20 21
OKTOBER 45 46 47 48 49 50 51
NOPEMBER 76 77 78 79 80 81 82
DESEMBER 106 107 108 109 110 111 112

PROYEK :
NAMA PAKET :
LOKASI PROYEK :
PROVINSI :
KABUPATEN :
PANJANG PENANGANAN :
KONSULTAN PERENCANA :
TEEM LEADER :
HIGHWAY ENGINEER :
KABID BINA MARGA :
KASI PEMBANGUNAN JALAN DAN JEMBATAN :
KASI PERENCANAAN TEKNIS DAN EVALUASI :
KASI PRESERVASI JALAN DAN JEMBATAN :
TIM PERENCANA :
:
:
:
KPA :
Plt. KEPALA DINAS :
NO.KONTRAK :
TGL KONTRAK :
NILAI KONTRAK :
TAHUN ANGGARAN :
TANGGAL
8 9 10 11 12 13 14 15 16

22 23 24 25 26 27 28 29 30
52 53 54 55 56 57 58 59 60
83 84 85 86 87 88 89 90 91
113 114 115 116 117 118 119 120 121

DATA PERSONIL
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG KABUPATEN NIAS SELATAN
REHABILITASI JALAN DARI SMA MENUJU HILIONAHA
KECAMATAN TELUKDALAM
SUMATERA UTARA
NIAS SELATAN
10,000.00 meter
CV. SADA NIOGA KONSULTAN

ARSENNIUS HALU, ST NIP. 19700513 200502 1 002


FASRI B. J. DAELI,ST Nip. 19840612 200903 1 012 MASANUDIN NDRU
RELIVAN IFADAYAZARO DACHI, ST NIP. 19800512 200804 1 002
OSARA'O TAFONAO, ST NIP. 19770227 201001 1 006
BRUCELEE F. DACHI,ST Nip. 19870618 201402 1 001
BIMAWIJAYA LAIA NIP. 19891230 201402 1 003
ASALMAN LAIA, ST NIP. 19880823 201505 1 001
ERIMAN LAIA, SE NIP. 19780114 200502 1 001

YUSUF NACHE, ST, MM NIP. 19710418 200112 1 002 Penata Utama


GAL
17 18 19 20 21 22 23 24 25

1 2 3 4 5 6 7 8
31 32 33 34 35 36 37 38 39
61 62 63 64 65 66 67 68 69
92 93 94 95 96 97 98 99 100
122 123 124 125 126 127 128 129 130

MASANUDIN NDRURU NIP. 19720914 200701 1 034

Penata Utama
26 27 28 29 30 31

9 10 11 12 13 14
40 41 42 43 44
70 71 72 73 74 75
101 102 103 104 105
PEMERINTAH KABUPATEN NIAS SELATAN
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
KABUPATEN NIAS SELATAN

PEJABAT PEMBUAT KOMITMEN PPK


DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
BIDANG BINA MARGA TA. 2019
KABUPATEN NIAS SELATAN

ENGINEERING ESTIMATE
REHABILITASI JALAN DARI SMA MENUJU HILIONAHA

PT. MESTIKA AGUNG RAYA


Delapan Ratus Lima Puluh Dua Ribu Tiga Ratus Dua Puluh Satu Rupiah
MASA PELAKSANAAN : 180 (Seratus Delapan Puluh) Hari Kalender
PEMERINTAH KABUPATEN NIAS SELATAN
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
BACK UP DATA PERENCANAAN
BIDANG BINA MARGA
Jalan Saonigeho KM. 3 Telukdalam
Nama Pekerjaan DIVISI 2. DRAINASE
2.2.(1)
REHABILITASI JALAN DARI SMA MENUJU HILIONAHA
Selokan dan Saluran Air

Pasangan Batu Mortar


Luas Luas
KIRI Luas VOL KANAN Luas VOL
NO STA. Panjang Rata2 STA Panjang Rata2
L1 L2 H1 m 2
m2 m 3
L1 L2 L3 L4 L6 H1 H2 H3 H4 m m m2
1 2 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26

0+090 1.00 0.75 0.70 0.61


10.00 0.61 6.13
0+100 1.00 0.75 0.70 0.61
0+100 1.00 0.75 0.70 0.61
25.00 0.61 15.31
0+125 1.00 0.75 0.70 0.61
0+125 1.00 0.75 0.70 0.61
25.00 0.61 15.31
0+150 1.00 0.75 0.70 0.61
0+150 1.00 0.75 0.70 0.61
25.00 0.61 15.31
0+175 1.00 0.75 0.70 0.61
0+175 1.00 0.75 0.70 0.61
25.00 0.61 15.31
0+200 1.00 0.75 0.70 0.61
0+200 1.00 0.75 0.70 0.61
25.00 0.61 15.31
0+225 1.00 0.75 0.70 0.61
0+225 1.00 0.75 0.70 0.61
25.00 0.61 15.31
0+250 1.00 0.75 0.70 0.61
0+250 1.00 0.75 0.70 0.61
25.00 0.61 15.31
0+275 1.00 0.75 0.70 0.61
0+275 1.00 0.75 0.70 0.61
23.00 0.61 14.09
0+298 1.00 0.75 0.70 0.61

TOTAL VOLUME KIRI 127.40 TOTAL VOLUME KANAN 0.00


TOTAL VOLUME = 127.400 M3
VOLUME DIBULATKAN = 127.40 M3

Dibuat Oleh:
KONSULTAN PERENCANA
CV. POLO CONSULTANT

ALIANI BUULOLO, ST
Quantity Engineer
PEMERINTAH KABUPATEN NIAS SELATAN
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
BACK UP DATA PERENCANAAN
BIDANG BINA MARGA
Jalan Saonigeho KM. 3 Telukdalam
Nama Pekerjaan DIVISI 2. DRAINASE
2.2.(1)
REHABILITASI JALAN DARI SMA MENUJU HILIONAHA
Pasangan Batu Mortar

A. Pas. Batu Drainase


Luas Luas
KIRI Luas VOL KANAN Luas VOL
NO STA. Panjang Rata2 STA Panjang Rata2
L1 L2 L3 L4 H1 H2 m2 m2 m3 L1 L2 L3 L4 L5 H1 H2 H3 H4 m m m2
1 2 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26

0+090 1.00 0.60 0.40 0.75 0.50 0.20 0.36


10.00 0.36 3.63
0+100 1.00 0.60 0.40 0.75 0.50 0.20 0.36
0+100 1.00 0.60 0.40 0.75 0.50 0.20 0.36
25.00 0.36 9.06
0+125 1.00 0.60 0.40 0.75 0.50 0.20 0.36
0+125 1.00 0.60 0.40 0.75 0.50 0.20 0.36
25.00 0.36 9.06
0+150 1.00 0.60 0.40 0.75 0.50 0.20 0.36
0+150 1.00 0.60 0.40 0.75 0.50 0.20 0.36
25.00 0.36 9.06
0+175 1.00 0.60 0.40 0.75 0.50 0.20 0.36
0+175 1.00 0.60 0.40 0.75 0.50 0.20 0.36
25.00 0.36 9.06
0+200 1.00 0.60 0.40 0.75 0.50 0.20 0.36
0+200 1.00 0.60 0.40 0.75 0.50 0.20 0.36
25.00 0.36 9.06
0+225 1.00 0.60 0.40 0.75 0.50 0.20 0.36
0+225 1.00 0.60 0.40 0.75 0.50 0.20 0.36
25.00 0.36 9.06
0+250 1.00 0.60 0.40 0.75 0.50 0.20 0.36
0+250 1.00 0.60 0.40 0.75 0.50 0.20 0.36
25.00 0.36 9.06
0+275 1.00 0.60 0.40 0.75 0.50 0.20 0.36
0+275 1.00 0.60 0.40 0.75 0.50 0.20 0.36
23.00 0.36 8.34
0+298 1.00 0.60 0.40 0.75 0.50 0.20 0.36

TOTAL VOLUME KIRI 75.40 TOTAL VOLUME KANAN 0.00


TOTAL VOLUME = 75.400 M3
VOLUME DIBULATKAN = 75.40 M3

Dibuat Oleh:
KONSULTAN PERENCANA
CV. POLO CONSULTANT

ALIANI BUULOLO, ST
Quantity Engineer
PEMERINTAH KABUPATEN NIAS SELATAN
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
BACK UP DATA PERENCANAAN
BIDANG BINA MARGA
Jalan Saonigeho KM. 3 Telukdalam
Nama Pekerjaan DIVISI 3. PEKERJAAN TANAH
3.3.(1)
REHABILITASI JALAN DARI SMA MENUJU HILIONAHA
Penyiapan Badan Jalan

KIRI KANAN
Luas Volume Luas Volume
Panjang Lebar Bidang Panjang Lebar Tebal Bidang
NO. STA. Ket
P l A =(l*t) A*P P l t A =(l*t) A*P
(m) (m) (m2) (m3) (m) (m) (m) (m2) (m3)

1 0 + 225 s/d 0 + 300 75.00 1.50 112.5 75.00 1.50 112.5


0 + 300 0 + 400 100.00 1.50 150 100.00 1.50 150
0 + 400 0 + 500 100.00 1.50 150 100.00 1.50 150
0 + 500 0 + 600 100.00 1.50 150 100.00 1.50 150
0 + 600 0 + 700 100.00 1.50 150 100.00 1.50 150
0 + 700 0 + 800 100.00 1.50 150 100.00 1.50 150
0 + 800 0 + 900 100.00 1.50 150 100.00 1.50 150
0 + 900 1 + 000 100.00 1.50 150 100.00 1.50 150
1 + 000 1 + 100 100.00 1.50 150 100.00 1.50 150
1 + 100 1 + 200 100.00 1.50 150 100.00 1.50 150
1 + 200 1 + 300 100.00 1.50 150 100.00 1.50 150
1 + 300 1 + 400 100.00 1.50 150 100.00 1.50 150
1 + 400 Err:509 Err:509 1.50 Err:509 Err:509 1.50 Err:509

Err:509 Err:509 Err:509 Err:509


Volume ( Kiri + Kanan ) = Err:509 m3
Volume Dibulatkan = Err:509 m3
PEMERINTAH KABUPATEN NIAS SELATAN
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
BACK UP DATA PERENCANAAN
BIDANG BINA MARGA
Jalan Saonigeho KM. 3 Telukdalam
Nama Pekerjaan DIVISI 3. PEKERJAAN TANAH DAN GEOSINTETIK
3.2.(2a) i
REHABILITASI JALAN DARI SMA MENUJU HILIONAHA
Timbunan Sirtu dari sumber galian

KIRI KANAN
Volume Luas Volume
Luas Bidang
Panjang Lebar Tebal Panjang Lebar Tebal Bidang
NO. STA. Ket
P l t A =(l*t) A*P P l t A =(l*t) A*P
(m) (m) (m) (m2) (m3) (m) (m) (m) (m2) (m3)

0 + 027 s/d 0 + 042 15.00 2.00 0.10 0.20 3.00 15.00 2.00 0.10 0.20 3.00

0 + 080 s/d 0 + 085 5.00 2.00 0.10 0.20 1.00 5.00 2.00 0.10 0.20 1.00

0 + 125 s/d 0 + 145 20.00 2.00 0.10 0.20 4.00 20.00 2.00 0.10 0.20 4.00

0 + 320 s/d 0 + 338 18.00 1.75 0.10 0.18 3.15 18.00 1.75 0.10 0.18 3.15

58.00 11.15 58.00 11.15


Volume ( Kiri + Kanan ) = 22.30 m3
Volume Dibulatkan = 22.30 m3
Dibuat Oleh:
KONSULTAN PERENCANA
CV. POLO CONSULTANT

ALIANI BUULOLO, ST
Quantity Engineer
PEMERINTAH KABUPATEN NIAS SELATAN
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
BACK UP DATA PERENCANAAN
BIDANG BINA MARGA
Jalan Saonigeho KM. 3 Telukdalam
DIVISI 5. PERKERASAN BERBUTIR DAN PERKERASAN BETON
Nama Pekerjaan
SEMEN
5.1.( 1 )
REHABILITASI JALAN DARI SMA MENUJU HILIONAHA
Lapis pondasi agregat kelas A

300

150
? 150

KIRI KANAN
Volume Volume
Luas Bidang Luas Bidang
Panjang Lebar Tebal Panjang Lebar Tebal
NO. STA. Ket
P l t A =(l*t) A*P P l t A =(l*t) A*P
(m) (m) (m) (m2) (m3) (m) (m) (m) (m2) (m3)

1 0 + 000.00 s/d 0 + 025 25.00 2.00 0.150 0.30 7.5 25.00 2.00 0.150 0.30 7.5

2 0 + 027 s/d 0 + 050 23.00 2.00 0.150 0.30 6.9 23.00 2.00 0.150 0.30 6.9
3 0 + 050 s/d 0 + 075 25.00 2.00 0.150 0.30 7.5 25.00 2.00 0.150 0.30 7.5
4 0 + 075 s/d 0 + 090 15.00 2.00 0.150 0.30 4.5 15.00 2.00 0.150 0.30 4.5

5 0 + 092 s/d 0 + 100 8.00 2.00 0.150 0.30 2.4 8.00 2.00 0.150 0.30 2.4
6 0 + 100 s/d 0 + 125 25.00 2.00 0.150 0.30 7.5 25.00 2.00 0.150 0.30 7.5
7 0 + 125 s/d 0 + 150 25.00 2.00 0.150 0.30 7.5 25.00 2.00 0.150 0.30 7.5
8 0 + 150 s/d 0 + 175 25.00 2.00 0.150 0.30 7.5 25.00 2.00 0.150 0.30 7.5

9 0 + 175 s/d 0 + 200 25.00 1.75 0.150 0.26 6.5625 25.00 1.75 0.150 0.26 6.5625
10 0 + 200 s/d 0 + 225 25.00 1.75 0.150 0.26 6.5625 25.00 1.75 0.150 0.26 6.5625
11 0 + 225 s/d 0 + 250 25.00 1.75 0.150 0.26 6.5625 25.00 1.75 0.150 0.26 6.5625
12 0 + 250 s/d 0 + 275 25.00 1.75 0.150 0.26 6.5625 25.00 1.75 0.150 0.26 6.5625
13 0 + 275 s/d 0 + 300 25.00 1.75 0.150 0.26 6.5625 25.00 1.75 0.150 0.26 6.5625
14 0 + 300 s/d 0 + 338 38.00 1.75 0.150 0.26 9.975 38.00 1.75 0.150 0.26 9.975

334.00 94.09 334.00 94.09


Volume ( Kiri + Kanan ) = 188.18 m3
Volume Dibulatkan = 188.17 m3

Dibuat Oleh:
KONSULTAN PERENCANA
CV. POLO CONSULTANT

ALIANI BUULOLO, ST
Quantity Engineer
PEMERINTAH KABUPATEN NIAS SELATAN
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
BACK UP DATA PERENCANAAN
BIDANG BINA MARGA
Jalan Saonigeho KM. 3 Telukdalam
Nama Pekerjaan DIVISI 5. PERKERASAN BERBUTIR
5.1.( 2 )
PENINGKATAN JALAN GOMO MENUJU MAZO
Lapis pondasi agregat kelas B

300

150
? 150

KIRI KANAN
Luas Volume Luas Volume
Panjang Lebar Tebal Bidang Panjang Lebar Tebal Bidang
NO. STA. Ket
P l t A =(l*t) A*P P l t A =(l*t) A*P
(m) (m) (m) (m2) (m3) (m) (m) (m) (m2) (m3)

0 + 000 s/d 0 + 100 1.50 0.15 0.23 0 1.50 0.15 0.23 0


0 + 100 s/d 0 + 200 1.50 0.15 0.23 0 1.50 0.15 0.23 0
0 + 200 s/d 0 + 300 1.50 0.15 0.23 0 1.50 0.15 0.23 0
0 + 300 s/d 0 + 400 1.50 0.15 0.23 0 1.50 0.15 0.23 0
0 + 400 s/d 0 + 500 1.50 0.15 0.23 0 1.50 0.15 0.23 0
0 + 500 s/d 0 + 600 1.50 0.15 0.23 0 1.50 0.15 0.23 0
0 + 600 s/d 0 + 700 100.00 1.50 0.15 0.23 22.5 100.00 1.50 0.15 0.23 22.5
0 + 700 s/d 0 + 800 100.00 1.50 0.15 0.23 22.5 100.00 1.50 0.15 0.23 22.5
0 + 800 s/d 0 + 900 100.00 1.50 0.15 0.23 22.5 100.00 1.50 0.15 0.23 22.5
0 + 900 s/d 1 + 000 100.00 1.50 0.15 0.23 22.5 100.00 1.50 0.15 0.23 22.5
1 + 000 s/d 1 + 100 100.00 1.50 0.15 0.23 22.5 100.00 1.50 0.15 0.23 22.5
1 + 100 s/d 1 + 200 100.00 1.50 0.15 0.23 22.5 100.00 1.50 0.15 0.23 22.5
1 + 200 s/d 1 + 300 100.00 1.50 0.15 0.23 22.5 100.00 1.50 0.15 0.23 22.5
1 + 300 s/d 1 + 400 100.00 1.50 0.15 0.23 22.5 100.00 1.50 0.15 0.23 22.5
1 + 400 s/d 1 + 500 100.00 1.50 0.15 0.23 22.5 100.00 1.50 0.15 0.23 22.5
1 + 500 s/d 1 + 600 100.00 1.50 0.15 0.23 22.5 100.00 1.50 0.15 0.23 22.5
1 + 600 s/d 1 + 700 100.00 1.50 0.15 0.23 22.5 100.00 1.50 0.15 0.23 22.5
1 + 700 s/d 1 + 800 100.00 1.50 0.15 0.23 22.5 100.00 1.50 0.15 0.23 22.5
1 + 800 s/d 1 + 900 100.00 1.50 0.15 0.23 22.5 100.00 1.50 0.15 0.23 22.5
1 + 900 s/d 2 + 000 100.00 1.50 0.15 0.23 22.5 100.00 1.50 0.15 0.23 22.5
2 + 000 s/d 2 + 100 100.00 1.50 0.15 0.23 22.5 100.00 1.50 0.15 0.23 22.5
2 + 100 s/d 2 + 200 100.00 1.50 0.15 0.23 22.5 100.00 1.50 0.15 0.23 22.5
2 + 200 s/d 2 + 300 100.00 1.50 0.15 0.23 22.5 100.00 1.50 0.15 0.23 22.5
2 + 300 s/d 2 + 400 100.00 1.50 0.15 0.23 22.5 100.00 1.50 0.15 0.23 22.5

1,800.00 405.00 1,800.00 405.00


Volume ( Kiri + Kanan ) = 810.00 m3
Volume Dibulatkan = 810.00 m3
Diperiksa Oleh : Dibuat Oleh :
Tim Teknis Consultant Perencana
CV. Babo Consultant
Fasri b. B. J. Daeli, MT Brucelee F. Dakhi, ST Alexander Sembiring, ST
Nip. 19840612 200903 1 012 Nip. 19870618 201402 1 001 Quantity Engineer
PEMERINTAH KABUPATEN NIAS SELATAN
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
BACK UP DATA PERENCANAAN
BIDANG BINA MARGA
Jalan Saonigeho KM. 3 Telukdalam
DIVISI 5. PERKERASAN BERBUTIR DAN
Nama Pekerjaan
PERKERASAN BETON SEMEN
5.3.(3)
REHABILITASI JALAN DARI SMA MENUJU HILIONAHA
Lapis Fondasi Bawah Beton Kurus

Lapis Pondasi Bawah Beton Kurus ( T = 15 Cm )

KIRI Volume KANAN Volume


Luas Luas
Panjang Lebar Tebal Bidang Panjang Lebar Tebal Bidang
NO. STA. STA. Ket
P l t A =(l*t) A*P P l t A =(l*t) A*P
(m) (m) (m) (m2) (m3) (m) (m) (m) (m2) (m3)

0 + 000 s/d 0 + 010 10.00 0.50 0.15 0.08 0.75 0 + 000 s/d 0 + 010 10.00 0.50 0.15 0.08 0.75
0 + 010 s/d 0 + 020 10.00 0.50 0.15 0.08 0.75 0 + 010 s/d 0 + 020 10.00 0.50 0.15 0.08 0.75
0 + 020 s/d 0 + 030 10.00 0.50 0.15 0.08 0.75 0 + 020 s/d 0 + 030 10.00 0.50 0.15 0.08 0.75
0 + 030 s/d 0 + 040 10.00 0.50 0.15 0.08 0.75 0 + 030 s/d 0 + 040 10.00 0.50 0.15 0.08 0.75
0 + 040 s/d 0 + 050 10.00 0.50 0.15 0.08 0.75 0 + 040 s/d 0 + 050 10.00 0.50 0.15 0.08 0.75
0 + 050 s/d 0 + 060 10.00 0.50 0.15 0.08 0.75 0 + 050 s/d 0 + 060 10.00 0.50 0.15 0.08 0.75
0 + 060 s/d 0 + 070 10.00 0.50 0.15 0.08 0.75 0 + 060 s/d 0 + 070 10.00 0.50 0.15 0.08 0.75
0 + 070 s/d 0 + 080 10.00 0.50 0.15 0.08 0.75 0 + 070 s/d 0 + 080 10.00 0.50 0.15 0.08 0.75
0 + 080 s/d 0 + 090 10.00 0.50 0.15 0.08 0.75 0 + 080 s/d 0 + 090 10.00 0.50 0.15 0.08 0.75
0 + 090 s/d 0 + 100 10.00 0.50 0.15 0.08 0.75 0 + 090 s/d 0 + 100 10.00 0.50 0.15 0.08 0.75
0 + 100 s/d 0 + 110 10.00 0.50 0.15 0.08 0.75 0 + 100 s/d 0 + 110 10.00 0.50 0.15 0.08 0.75
0 + 110 s/d 0 + 120 10.00 0.50 0.15 0.08 0.75 0 + 110 s/d 0 + 120 10.00 0.50 0.15 0.08 0.75
0 + 120 s/d 0 + 130 10.00 0.50 0.15 0.08 0.75
0 + 130 s/d 0 + 140 10.00 0.50 0.15 0.08 0.75
0 + 140 s/d 0 + 150 10.00 0.50 0.15 0.08 0.75
0 + 150 s/d 0 + 160 10.00 0.50 0.15 0.08 0.75
0 + 160 s/d 0 + 170 10.00 0.50 0.15 0.08 0.75
0 + 170 s/d 0 + 180 10.00 0.50 0.15 0.08 0.75
0 + 180 s/d 0 + 190 10.00 0.50 0.15 0.08 0.75
0 + 190 s/d 0 + 200 10.00 0.50 0.15 0.08 0.75
0 + 200 s/d 0 + 210 10.00 0.50 0.15 0.08 0.75
0 + 210 s/d 0 + 220 10.00 0.50 0.15 0.08 0.75

220.00 16.50 120.00 9.00


Volume ( Kiri + Kanan ) = 25.50 m3
Volume Dibulatkan = 25.50 m3
0 Dibuat Oleh:
0 KONSULTAN PERENCANA
CV. POLO CONSULTANT

0 0 ALIANI BUULOLO, ST
0 0 Quantity Engineer
PEMERINTAH KABUPATEN NIAS SELATAN
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
BACK UP DATA PERENCANAAN
BIDANG BINA MARGA
Jalan Saonigeho KM. 3 Telukdalam
DIVISI 5. PERKERASAN BERBUTIR DAN PERKERASAN BETON
Nama Pekerjaan
SEMEN
5.3.(1)
REHABILITASI JALAN DARI SMA MENUJU HILIONAHA
Perkerasan Beton Semen ( Campuran 1:2:3 )

300

150
? 150

KIRI KANAN
Volume Volume
Luas Bidang Luas Bidang
Panjang Lebar Tebal Panjang Lebar Tebal
NO. STA. Ket
P l t A =(l*t) A*P P l t A =(l*t) A*P
(m) (m) (m) (m2) (m3) (m) (m) (m) (m2) (m3)

1 0 + 025 s/d 0 + 027 2.00 2.00 0.200 0.40 0.8 2.00 2.00 0.200 0.40 0.8

1 0 + 090 s/d 0 + 092 2.00 2.00 0.200 0.40 0.8 2.00 2.00 0.200 0.40 0.8

4.00 1.60 4.00 1.60


Volume ( Kiri + Kanan ) = 3.20 m3
Volume Dibulatkan = 3.20 m3

Dibuat Oleh:
KONSULTAN PERENCANA
CV. POLO CONSULTANT

ALIANI BUULOLO, ST
Quantity Engineer
PEMERINTAH KABUPATEN NIAS SELATAN BACK UP DATA RENCANA
DINAS PEKERJAAN UMUM DAN PENATAAN DIVISI
RUANG 5. PERKERASAN BERBUTIR DAN PERKERASAN BETON SEME
BIDANG BINA MARGA 5.3.(1)
Jl. Saonigeho KM. 3 Telukdalam Perkerasan Beton Semen ( Campuran 1:2:3 )

NAMA PAKET REHABILITASI JALAN DARI SMA MENUJU HILIONAHA

KONSULTAN PERENCANA

CV. POLO CONSULTANT

Total Volume
NO. ITEM PEKERJAAN Keterangan
(m³)

1 Perkerasan Beton Untuk Badan Jalan 3.200

2 Perkerasan Beton Untuk Bahu Jalan 25.500

TOTAL VOLUME PERKERASAN BETON 28.70

DIBULATKAN 28.70
PEMERINTAH KABUPATEN NIAS SELATAN
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
BACK UP DATA PERENCANAAN
BIDANG BINA MARGA
Jalan Saonigeho KM. 3 Telukdalam
Nama Pekerjaan DIVISI 6. PERKERASAN ASPAL
6.1 (1)(a)
REHABILITASI JALAN DARI SMA MENUJU HILIONAHA
Lapis Resap Pengikat - Aspal Cair

300
150 150

2% 2%

KIRI KANAN
Volume Volume
Luas Bidang Aspal Cair Luas Bidang Aspal Cair
Panjang Lebar Panjang Lebar
NO. STA. Ket
p l A =(p*l) AC A*Ac p l A =(p*l) AC A*Ac
(m) (m) (m2) Liter/(m2) Liter (m) (m) (m2) Liter/(m2) Liter

1 0 + 000 s/d 0 + 025 25.00 2.00 50.00 0.80 40 25.00 2.00 50.00 0.80 40
2 0 + 025 s/d 0 + 050 25.00 2.00 50.00 0.80 40 25.00 2.00 50.00 0.80 40
3 0 + 050 s/d 0 + 075 25.00 2.00 50.00 0.80 40 25.00 2.00 50.00 0.80 40
4 0 + 075 s/d 0 + 100 25.00 2.00 50.00 0.80 40 25.00 2.00 50.00 0.80 40
5 0 + 100 s/d 0 + 125 25.00 2.00 50.00 0.80 40 25.00 2.00 50.00 0.80 40
6 0 + 125 s/d 0 + 150 25.00 2.00 50.00 0.80 40 25.00 2.00 50.00 0.80 40
7 0 + 150 s/d 0 + 175 25.00 2.00 50.00 0.80 40 25.00 2.00 50.00 0.80 40
8 0 + 175 s/d 0 + 200 25.00 2.00 50.00 0.80 40 25.00 2.00 50.00 0.80 40

9 0 + 200 s/d 0 + 225 25.00 1.75 43.75 0.80 35 25.00 1.75 43.75 0.80 35
10 0 + 225 s/d 0 + 250 25.00 1.75 43.75 0.80 35 25.00 1.75 43.75 0.80 35
11 0 + 250 s/d 0 + 275 25.00 1.75 43.75 0.80 35 25.00 1.75 43.75 0.80 35
12 0 + 275 s/d 0 + 300 25.00 1.75 43.75 0.80 35 25.00 1.75 43.75 0.80 35
13 0 + 300 s/d 0 + 325 25.00 1.75 43.75 0.80 35 25.00 1.75 43.75 0.80 35
14 0 + 325 s/d 0 + 338 13.00 1.75 22.75 0.80 18.2 13.00 1.75 22.75 0.80 18.2

338.00 513.20 338.00 513.20


Volume ( Kiri + Kanan ) = 1026.40 Liter
Volume Dibulatkan = 1026.40 Liter
Dibuat Oleh:
KONSULTAN PERENCANA
CV. POLO CONSULTANT

ALIANI BUULOLO, ST
Quantity Engineer
DINAS PEKERJAAN UMUM DAN PENATAAN
BACK UP DATA PERENCANAAN KONSULTAN PERENCANA
RUANG

PAKET : DIVISI 6. PERKERASAN ASPAL


6.1 (2)(a)
REHABILITASI JALAN DARI SMA MENUJU HILIONAHA
LAPIS PEREKAT - ASPAL CAIR

URAIAN
Kiri Kanan Total Volume
Jarak Jarak Keterangan
Sta L AC Luas Volume Sta L AC Luas Volume (Liter)
(M) (M)
(M) (Liter) (M²) (Liter) (M) (Liter) (M²) (M³)
1 2 3 5 6 7 8 9 10 12 13 14 15 16

0+300 0+300
25.00 1.50 0.35 0.53 13.13 25.00 1.50 0.35 0.53 13.13 26.25
0+325 0+325
25.00 1.50 0.35 0.53 13.13 25.00 1.50 0.35 0.53 13.13 26.25
0+350 0+350
25.00 1.50 0.35 0.53 13.13 25.00 1.50 0.35 0.53 13.13 26.25
0+375 0+375
30.00 1.50 0.35 0.53 15.75 30.00 1.50 0.35 0.53 15.75 31.50
0+405 0+405

Jumlah 105.00 Jumlah 105.00 Total Seluruh Volume Prime Coat 110.25
Liter
KOMULATIF 110.25
PEMERINTAH KABUPATEN NIAS SELATAN
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
BACK UP DATA PERENCANAAN
BIDANG BINA MARGA
Jalan Saonigeho KM. 3 Telukdalam
Nama Pekerjaan DIVISI 6. PERKERASAN ASPAL
6.6.(1)
REHABILITASI JALAN DARI SMA MENUJU HILIONAHA
Lapis Penetrasi Permukaan Macadam

400
200 200

2% 2%

KIRI Volume KANAN Volume


Luas Bidang Luas Bidang
Panjang Lebar Tebal Panjang Lebar Tebal
NO. STA. Ket
P l t A =(l*t) A*P P l t A =(l*t) A*P
(m) (m) (m) (m )
2
(m )
3
(m) (m) (m) (m )
2
(m )
3

1 0 + 000 s/d 0 + 025 25.00 2.00 0.05 0.10 2.5 25.00 2.00 0.05 0.10 2.5
2 0 + 025 s/d 0 + 050 25.00 2.00 0.05 0.10 2.5 25.00 2.00 0.05 0.10 2.5
3 0 + 050 s/d 0 + 075 25.00 2.00 0.05 0.10 2.5 25.00 2.00 0.05 0.10 2.5
4 0 + 075 s/d 0 + 100 25.00 2.00 0.05 0.10 2.5 25.00 2.00 0.05 0.10 2.5
5 0 + 100 s/d 0 + 125 25.00 2.00 0.05 0.10 2.5 25.00 2.00 0.05 0.10 2.5
6 0 + 125 s/d 0 + 150 25.00 2.00 0.05 0.10 2.5 25.00 2.00 0.05 0.10 2.5
7 0 + 150 s/d 0 + 175 25.00 2.00 0.05 0.10 2.5 25.00 2.00 0.05 0.10 2.5
8 0 + 175 s/d 0 + 200 25.00 2.00 0.05 0.10 2.5 25.00 2.00 0.05 0.10 2.5

9 0 + 200 s/d 0 + 225 25.00 1.75 0.05 0.09 2.1875 25.00 1.75 0.05 0.09 2.1875
10 0 + 225 s/d 0 + 250 25.00 1.75 0.05 0.09 2.1875 25.00 1.75 0.05 0.09 2.1875
11 0 + 250 s/d 0 + 275 25.00 1.75 0.05 0.09 2.1875 25.00 1.75 0.05 0.09 2.1875
12 0 + 275 s/d 0 + 300 25.00 1.75 0.05 0.09 2.1875 25.00 1.75 0.05 0.09 2.1875
13 0 + 300 s/d 0 + 325 25.00 1.75 0.05 0.09 2.1875 25.00 1.75 0.05 0.09 2.1875
14 0 + 325 s/d 0 + 338 13.00 1.75 0.05 0.09 1.1375 13.00 1.75 0.05 0.09 1.1375

338.00 32.08 338.00 32.08


Volume ( Kiri + Kanan ) = 64.15 m3
Volume Dibulatkan = 64.15 m3

Dibuat Oleh:
KONSULTAN PERENCANA
CV. POLO CONSULTANT

ALIANI BUULOLO, ST
Quantity Engineer
PEMERINTAH KABUPATEN NIAS SELATAN
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG BACK UP DATA PERENCANAAN
BIDANG BINA MARGA
Nama Paket : DIVISI 7. STRUKTUR
7.1 (7) a
REHABILITASI JALAN DARI SMA MENUJU HILIONAHA
Beton mutu sedang fc’20 Mpa

TOTAL VOLUME
STA PANJANG (M) LEBAR ( M ) TEBAL (M) LUAS VOLUME M3 KETERANG
(M)

PERHITUNGAN BETON PLAT DUIKER ( f'c = 20 Mpa )


0+128
4.00 1.00 0.15 0.15 0.60 0.60
0+132

0+134
2.00 1.00 0.15 0.15 0.30 0.30
0+136

0+140
2.00 1.00 0.15 0.15 0.30 0.30
0+142

0+178
2.00 1.00 0.15 0.15 0.30 0.30
0+180

JUMLAH BETON 1.50 M3

Dibuat Oleh:
KONSULTAN PERENCANA
CV. POLO CONSULTANT

ALIANI BUULOLO, ST
Quantity Engineer
BACK UP DATA PERENCANAAN

DIVISI 7. STRUKTUR
7.1 (7) a
Beton mutu sedang fc’20 Mpa

KETERANGAN
PEMERINTAH KABUPATEN NIAS SELATAN
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG BACK UP DATA PERENCANAAN
BIDANG BINA MARGA
Nama Paket : DIVISI 7. STRUKTUR
7.1 (10)
REHABILITASI JALAN DARI SMA MENUJU HILIONAHA
Beton mutu rendah fc’10 Mpa

TOTAL VOLUME
STA PANJANG (M) LEBAR ( M ) TEBAL (M) LUAS VOLUME M3 KETERANG
(M)

PERHITUNGAN LANTAI PLAT DUIKER ( f'c = 10 Mpa )

0+006 0.60 5.00 0.10 0.50 0.30 0.30

JUMLAH BETON 0.30 M3

Dibuat Oleh:
KONSULTAN PERENCANA
CV. POLO CONSULTANT

ALIANI BUULOLO, ST
Quantity Engineer
BACK UP DATA PERENCANAAN

DIVISI 7. STRUKTUR
7.1 (10)
Beton mutu rendah fc’10 Mpa

KETERANGAN
PEMERINTAH KABUPATEN NIAS SELATAN
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG BACK UP DATA PERENCANAAN
BIDANG BINA MARGA
Nama Paket : DIVISI 7. STRUKTUR
7.3 (2)
REHABILITASI JALAN DARI SMA MENUJU HILIONAHA
Baja Tulangan U 24 Polos

Panjang/ TTL BERAT TTL


Bentuk Batang Jlh Batang Ø Besi
BTG PANJANG BESI/M' BERAT(Kg)

STA A B C D=BxC E F G=dxf

Tulagan Memanjang (A1) 27.00 1.92 51.84 12 0.888 46.021

0 + 025 0 + 027

Tulangan Melintang (A2) 13.00 3.92 50.96 12 0.888 45.240

Tulagan Memanjang (A1) 27.00 1.92 51.84 12 0.888 46.021

0 + 090 0 + 092

Tulangan Melintang (A2) 13.00 3.92 50.96 12 0.888 45.240

Jumlah Volume Tulangan Plat Duiker + 182.523 Kg


Total Berat Besi 182.523 Kg

Dibuat Oleh:
KONSULTAN PERENCANA
CV. POLO CONSULTANT

ALIANI BUULOLO, ST
Quantity Engineer
PEMERINTAH KABUPATEN NIAS SELATAN
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG BACK UP DATA PERENCANAAN
BIDANG BINA MARGA
Nama Paket : DIVISI 7. STRUKTUR
7.3 (2)
REHABILITASI JALAN DARI SMA MENUJU HILIONAHA
Baja Tulangan U 24 Polos

Panjang/ TTL BERAT TTL


Bentuk Batang Jlh Batang Ø Besi
BTG PANJANG BESI/M' BERAT(Kg)

STA A B C D=BxC E F G=dxf

Tulagan melintang (A1) 26.13 0.92 24.04 12 0.888 21.344

0 + 128 0 + 132

Tulangan Melintang (A2) 6.13 3.92 24.04 12 0.888 21.344

Tulagan melintang (A1) 12.80 0.92 11.78 12 0.888 10.454

0 + 134 0 + 136

Tulangan Melintang (A2) 6.13 1.92 11.78 12 0.888 10.454

Tulagan melintang (A1) 12.80 0.92 11.78 12 0.888 10.454

0 + 140 0 + 142

Tulangan Melintang (A2) 6.13 1.92 11.78 12 0.888 10.454

Tulagan melintang (A1) 12.80 0.92 11.78 12 0.888 10.454

0 + 178 0 + 180

Tulangan Melintang (A2) 6.13 1.92 11.78 12 0.888 10.454

Jumlah Volume Tulangan Plat Duiker + 105.414 Kg


Total Berat Besi 105.414 Kg

Dibuat Oleh:
KONSULTAN PERENCANA
CV. POLO CONSULTANT

ALIANI BUULOLO, ST
Quantity Engineer
PEMERINTAH KABUPATEN NIAS SELATAN
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
BACK UP DATA PERENCANAAN
BIDANG BINA MARGA
Jalan Saonigeho KM. 3 Telukdalam
Nama Pekerjaan DIVISI 7. STRUKTUR
7.9.(1)
REHABILITASI JALAN DARI SMA MENUJU HILIONAHA
Pasangan Batu

L1 L1

H1
H1
`
H2

H2
L2
L3
L2
L3

URAIAN
Kiri Kanan
Jarak Jarak Ket
Sta L.1 L.2 L.3 H.1 H.2 Luas Luas Rata- Volume Sta L.1 L.2 L.3 H.1 H.2 Luas Luas Rata- Volume
(M) (M)
(M) (M) (M) (M) (M) (M²) rata ( M²) (M³) (M) (M) (M) (M) (M) (M²) rata ( M²) (M³)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
PASANGAN BATU UNTUK PLAT DUIKER 1

0+476 5.00 0.35 0.60 0.80 1.00 0.50 0.88 0.88 4.38

4.375 -
Volume ( Kiri + Kanan ) = 4.375 M3
Volume Dibulatkan = 4.37 M3
PEMERINTAH KABUPATEN NIAS SELATAN
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG BACK UP DATA PERENCANAA
BIDANG BINA MARGA
Nama Paket : DIVISI 7. STRUKTUR
6.6.(1)
#REF!
Besi Tulangan
Bentuk Batang Jlh Batang Panjang/BTG TTL PANJANG Ø Besi BERAT BESI/M'

A B C D=BxC E F
No.
PERHITUNGAN PENULANGAN PLAT DUIKER STA. 1+088 S/D 1+090

1 Melintang A 1 58 5.3 307.4 16 1.578

2 Melintang A 2 58 4.9 284.2 16 1.578

3 Tulangan Memanjang B1 34 6.44 218.96 16 1.578

4 Tulangan Memanjang B2 34 6.04 205.36 16 1.578

5 Tulangan C 1 30 6.44 193.2 16 1.578

6 Tulangan C 2 30 6.04 181.2 16 1.578

7 Tulangan D 1 58 5.3 307.4 13 1.042

8 Tulangan D 2 58 4.9 284.2 16 1.578

10

11

12

13

14

15

16

17

18

19

20

21
Jumlah Volume Tulangan Plat Duiker + Jumlah Volume Tulangan Plat Par
Total Berat Besi
BACK UP DATA PERENCANAAN

DIVISI 7. STRUKTUR
6.6.(1)
Besi Tulangan
TTL BERAT(Kg)

G=dxf
N PLAT DUIKER STA. 1+088 S/D 1+090

485.151

448.536

345.571

324.107

304.916

285.977

320.275

448.536

2963.070 Kg
2963.070 Kg
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG KABUPATEN NIAS SELATAN BACK UP DATA RENCANA

NAMA PEKERJAAN DIVISI 7. STRUKTUR


7.3 (1) CV. POLO CONSULTANT
#REF!
Baja Tulangan U 24 Polos

Panjang Batang / Potong Kait Total Space Dia.


NAMA Jumlah Total Berat/ Total Berat
NO. Panjang Keterangan
BATANG Batang Panjang Meter (Kg)
a b c d e (5xØ)2 Potongan m' (mm)

1 A1 3.5 0.2 3.5 0.2 0.14 7.54 0.2 59 445.10 12 0.888 395.138

2 B2 1 1 1.89 0.28 0.28 4.45 0.5 23.60 105.02 16 1.578 165.747

3 B3 3.5 0.2 3.5 0.2 0.14 7.54 0.2 59 445.10 12 0.888 395.138

4 B4 1 1 1.89 0.28 0.28 4.45 0.5 23.60 105.02 16 1.578 165.747

5 B5 3.5 0.12 3.62 0.2 136 492.32 10 0.617 303.515

6 B6 0.8 0.12 0.92 0.2 118 108.56 10 0.617 66.927

7 B7 3.5 0.16 3.66 7.4 27.05 13 1.042 28.188

8 B8 0.20 0.74 0.2 0.74 0.12 2 0.2 35 70 10 0.617 43.155

9 B9 4.2 0.15 4.2 0.15 0.156 8.856 0.2 16 141.696 13 1.042 147.631

10 B10 0.7 0.15 0.7 0.15 0.156 1.856 0.2 30 55.68 13 1.042 58.012

11 B11 5.9 0.15 0.156 6.206 0.2 16 99.296 13 1.042 103.455

12 B12 0.7 0.15 0.7 0.13 1.68 0.2 68 114.24 13 1.042 119.025

TOTAL BERAT 1 UNIT BOX CULVERT 1,991.679

BERAT DIBULATKAN 1,991.67


DINAS PEKERJAAN UMUM DAN PENATAAN RUANG KABUPATEN NIAS SELATAN

NAMA PEKERJAAN DIVISI 7. STRUKTUR


7.1 (7) a
#REF!
Beton mutu sedang fc’20 MPa

L1 L2 L3 H1 H2 H3 Jlh P VOLUME
SKETSA GAMBAR Nama KETERANGAN
m' m' m' m' m' m' Sisi m' m³
L3 L2 BOX CULVERT

H1
V1 3.60 0.30 2 6.00 12.960 V1 = L1 x H1 x P x Jlh
BOX CULVERT H3

V2 0.30 3.00 2 6.00 10.800 V2 = L2 x H2 x P x Jlh


H2

V3 0.30 0.30 4 6.00 1.080 V3 = 0.5 x L3 x H3 x P x Jlh


H1

L1

DINDING PENAHAN BAWAH


DINDING PENAHAN BAWAH
15
15 V1 0.40 0.70 2 3.60 2.016 V1 = L1 x H1 x P x Jlh
10

40 H1
H1

10 DINDING SAYAP
L1
P
V1 0.30 0.50 4 1.20 0.720 V1 = L1 x H1 x P1 x Jlh

V2 0.30 4.30 4 1.20 6.192 V2 = L1 x H2 x P2 x Jlh


DINDING SAYAP
P1

H1 H 1

H2
H2

TOTAL VOLUME 1 UNIT BOX CULVERT = 33.768


10
10
L1
P2 Badan Box P2 Pot. C TOTAL VOLUME DIBULATKAN = 33.76
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG KABUPATEN NIAS SELATAN

NAMA PEKERJAAN DIVISI 7. STRUKTUR


7.1 (10)
#REF!
Beton mutu rendah fc’10 Mpa

L1 L2 L3 H1 H2 H3 Jlh P VOLUME
SKETSA GAMBAR Nama KETERANGAN
m' m' m' m' m' m' Sisi m' m³

DI BAWAH BOX CULVERT

V1 3.60 0.10 1 5.90 2.124 V1 = L1 x H1 x P x Jlh


BOX CULVERT

H1
L1

TOTAL VOLUME 1 UNIT BOX CULVERT = 2.12

Pot. C TOTAL VOLUME DIBULATKAN = 2.12


PEMERINTAH KABUPATEN NIAS SELATAN BACK UP DATA RENCANA
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG DEVISI.7. STRUKTUR
BIDANG BINA MARGA 7.3 (2)
Jl. Saonigeho KM. 3 Telukdalam Baja Tulangan U 24 Polos

NAMA PAKET REHABILITASI JALAN DARI SMA MENUJU HILIONAHA


KONSULTAN PERENCANA

CV. POLO CONSULTANT

Total Berat
NO. ITEM PEKERJAAN Keterangan
(Kg)

1 BESI TULANGAN BOX CULVERT 105.414

2 BESI TULANGAN 2 BUAH PLAT DUIKER 182.523

GRAND TOTAL BERAT BESI 287.94

DIBULATKAN 287.93
PEMERINTAH KABUPATEN NIAS SELATAN
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
BACK UP DATA PERENCANAAN
BIDANG BINA MARGA
Jalan Saonigeho KM. 3 Telukdalam
Nama Pekerjaan DIVISI 7. STRUKTUR
7.9.(1)
REHABILITASI JALAN DARI SMA MENUJU HILIONAHA
Pasangan Batu

L1 L1

H1
H1
`
H2

H2
L2
L3
L2
L3

URAIAN
Kiri Kanan
Jarak Jarak Ket
Sta L.1 L.2 L.3 H.1 H.2 Luas Luas Rata- Sta L.1 L.2 L.3 H.1 H.2 Luas Luas Rata- Volume
(M) Volume (M³) (M)
(M) (M) (M) (M) (M) (M²) rata ( M²) (M) (M) (M) (M) (M) (M²) rata ( M²) (M³)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21

0+000 0.30 0.60 0.70 1.50 0.50 1.03


4.00 1.03 4.10
0+004 0.30 0.60 0.70 1.50 0.50 1.03

0+375 0.30 0.40 0.50 0.70 0.20 0.35


25.00 0.35 8.63
0+400 0.30 0.40 0.50 0.70 0.20 0.35
0+400 0.30 0.40 0.50 0.70 0.20 0.35
25.00 0.35 8.63
0+425 0.30 0.40 0.50 0.70 0.20 0.35
0+425 0.30 0.40 0.50 0.70 0.20 0.35
25.00 0.35 8.63
0+450 0.30 0.40 0.50 0.70 0.20 0.35
0+450 0.30 0.40 0.50 0.70 0.20 0.35
50.00 0.35 17.25
0+500 0.30 0.40 0.50 0.70 0.20 0.35
0+500 0.30 0.40 0.50 0.70 0.20 0.35
25.00 0.35 8.63
0+525 0.30 0.40 0.50 0.70 0.20 0.35
0+525 0.30 0.40 0.50 0.70 0.20 0.35
21.00 0.35 7.25
0+546 0.30 0.40 0.50 0.70 0.20 0.35

- 63.095
Volume ( Kiri + Kanan ) = 63.095 M3
Volume Dibulatkan = 63.09 M3
Dibuat Oleh:
KONSULTAN PERENCANA
CV. POLO CONSULTANT
ALIANI BUULOLO, ST
Quantity Engineer
PEMERINTAH KABUPATEN NIAS SELATAN
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
BACK UP DATA PERENCANAAN
BIDANG BINA MARGA
Jalan Saonigeho KM. 3 Telukdalam
Nama Pekerjaan DIVISI 7. STRUKTUR
6.6.(1)
#REF!
Pasangan Batu

`
URAIAN
Kiri Kanan
Jarak Ket
Sta L.1 L.2 L.3 L.4 L.5 L.6 H.1 H.2 H.3 H.4 Luas Luas Rata- Volume
(M)
(M) (M) (M) (M) (M) (M) (M) (M) (M) (M) (M²) rata ( M²) (M³)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

PERHITUNGAN PASANGAN PLAT DUIKER STA. 0+006 S/D 0+007

0+358 5.00 0.30 0.50 0.70 0.80 0.30 0.53 5.30

PERHITUNGAN LONING PLAT DUIKER

0+358 2.00 0.30 0.30 0.30 0.1 0.36

TOTAL VOLUME 5.66


Volume ( Kiri + Kanan ) = 5.66 M3
Volume Dibulatkan = 5.66 M3

Dibuat Oleh:
KONSULTAN PERENCANA
CV. POLO CONSULTANT

ALIANI BUULOLO, ST
Quantity Engineer
PEMERINTAH KABUPATEN NIAS SELATAN BACK UP DATA RENCANA
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG DEVISI.7. STRUKTUR
BIDANG BINA MARGA 7.1 (7) a
Jl. Saonigeho KM. 3 Telukdalam Beton mutu sedang fc’20 Mpa

NAMA PAKET REHABILITASI JALAN DARI SMA MENUJU HILIONAHA REKAP

LOKASI :-
KECAMATAN LOLOWAU
T.A : 2019

Total Volume
NO. ITEM PEKERJAAN Keterangan
(m³)

1 PASANGAN BATU UNTUK PLAT DUIKER 1 5.660

2 Pasangan Batu 63.090

Total Pasangan Batu 68.75

DIBULATKAN 68.75

Dibuat Oleh:
KONSULTAN PERENCANA
CV. POLO CONSULTANT

ALIANI BUULOLO, ST
Quantity Engineer
PEMERINTAH KABUPATEN NIAS SELATAN
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
BACK UP DATA PERENCANAAN
BIDANG BINA MARGA
Jalan Saonigeho KM. 3 Telukdalam
Nama Pekerjaan DIVISI 10. PEKERJAAN PEMELIHARAAN KINERJA
10.1.(1)
REHABILITASI JALAN DARI SMA MENUJU HILIONAHA
Galian pada Saluran Air atau Lereng untuk Pemeliharaan

Pasangan Batu Mortar


Luas Luas
KIRI Luas VOL KANAN Luas VOL
NO STA. Panjang Rata2 STA Panjang Rata2
L1 L2 H1 m 2
m2 m 3
L1 L2 L3 L4 L6 H1 H2 H3 H4 m m m2
1 2 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26
0+000 0.60 0.40 0.60 0.30
25.00 0.30 7.50
0+025 0.60 0.40 0.60 0.30
0+030 0.60 0.40 0.60 0.30 0+025 0.60 0.40 0.60 0.30
20.00 0.30 6.00 25.00 0.30 7.50
0+050 0.60 0.40 0.60 0.30 0+050 0.60 0.40 0.60 0.30
0+050 0.60 0.40 0.60 0.30 0+050 0.60 0.40 0.60 0.30
25.00 0.30 7.50 25.00 0.30 7.50
0+075 0.60 0.40 0.60 0.30 0+075 0.60 0.40 0.60 0.30

TOTAL VOLUME KIRI 13.50 TOTAL VOLUME KANAN 22.50


TOTAL VOLUME = 36.000 M3
VOLUME DIBULATKAN = 36.00 M3

Dibuat Oleh:
KONSULTAN PERENCANA
CV. POLO CONSULTANT

ALIANI BUULOLO, ST
Quantity Engineer