JANUARI
FEBRUARI
MARET
APRIL
MEI
JUNI
JULI
AGUSTUS
SEPTEMBER 15 16 17 18 19 20 21
OKTOBER 45 46 47 48 49 50 51
NOPEMBER 76 77 78 79 80 81 82
DESEMBER 106 107 108 109 110 111 112
PROYEK :
NAMA PAKET :
LOKASI PROYEK :
PROVINSI :
KABUPATEN :
PANJANG PENANGANAN :
KONSULTAN PERENCANA :
TEEM LEADER :
HIGHWAY ENGINEER :
KABID BINA MARGA :
KASI PEMBANGUNAN JALAN DAN JEMBATAN :
KASI PERENCANAAN TEKNIS DAN EVALUASI :
KASI PRESERVASI JALAN DAN JEMBATAN :
TIM PERENCANA :
:
:
:
KPA :
Plt. KEPALA DINAS :
NO.KONTRAK :
TGL KONTRAK :
NILAI KONTRAK :
TAHUN ANGGARAN :
TANGGAL
8 9 10 11 12 13 14 15 16
22 23 24 25 26 27 28 29 30
52 53 54 55 56 57 58 59 60
83 84 85 86 87 88 89 90 91
113 114 115 116 117 118 119 120 121
DATA PERSONIL
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG KABUPATEN NIAS SELATAN
REHABILITASI JALAN DARI SMA MENUJU HILIONAHA
KECAMATAN TELUKDALAM
SUMATERA UTARA
NIAS SELATAN
10,000.00 meter
CV. SADA NIOGA KONSULTAN
1 2 3 4 5 6 7 8
31 32 33 34 35 36 37 38 39
61 62 63 64 65 66 67 68 69
92 93 94 95 96 97 98 99 100
122 123 124 125 126 127 128 129 130
Penata Utama
26 27 28 29 30 31
9 10 11 12 13 14
40 41 42 43 44
70 71 72 73 74 75
101 102 103 104 105
PEMERINTAH KABUPATEN NIAS SELATAN
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
KABUPATEN NIAS SELATAN
ENGINEERING ESTIMATE
REHABILITASI JALAN DARI SMA MENUJU HILIONAHA
Dibuat Oleh:
KONSULTAN PERENCANA
CV. POLO CONSULTANT
ALIANI BUULOLO, ST
Quantity Engineer
PEMERINTAH KABUPATEN NIAS SELATAN
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
BACK UP DATA PERENCANAAN
BIDANG BINA MARGA
Jalan Saonigeho KM. 3 Telukdalam
Nama Pekerjaan DIVISI 2. DRAINASE
2.2.(1)
REHABILITASI JALAN DARI SMA MENUJU HILIONAHA
Pasangan Batu Mortar
Dibuat Oleh:
KONSULTAN PERENCANA
CV. POLO CONSULTANT
ALIANI BUULOLO, ST
Quantity Engineer
PEMERINTAH KABUPATEN NIAS SELATAN
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
BACK UP DATA PERENCANAAN
BIDANG BINA MARGA
Jalan Saonigeho KM. 3 Telukdalam
Nama Pekerjaan DIVISI 3. PEKERJAAN TANAH
3.3.(1)
REHABILITASI JALAN DARI SMA MENUJU HILIONAHA
Penyiapan Badan Jalan
KIRI KANAN
Luas Volume Luas Volume
Panjang Lebar Bidang Panjang Lebar Tebal Bidang
NO. STA. Ket
P l A =(l*t) A*P P l t A =(l*t) A*P
(m) (m) (m2) (m3) (m) (m) (m) (m2) (m3)
KIRI KANAN
Volume Luas Volume
Luas Bidang
Panjang Lebar Tebal Panjang Lebar Tebal Bidang
NO. STA. Ket
P l t A =(l*t) A*P P l t A =(l*t) A*P
(m) (m) (m) (m2) (m3) (m) (m) (m) (m2) (m3)
0 + 027 s/d 0 + 042 15.00 2.00 0.10 0.20 3.00 15.00 2.00 0.10 0.20 3.00
0 + 080 s/d 0 + 085 5.00 2.00 0.10 0.20 1.00 5.00 2.00 0.10 0.20 1.00
0 + 125 s/d 0 + 145 20.00 2.00 0.10 0.20 4.00 20.00 2.00 0.10 0.20 4.00
0 + 320 s/d 0 + 338 18.00 1.75 0.10 0.18 3.15 18.00 1.75 0.10 0.18 3.15
ALIANI BUULOLO, ST
Quantity Engineer
PEMERINTAH KABUPATEN NIAS SELATAN
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
BACK UP DATA PERENCANAAN
BIDANG BINA MARGA
Jalan Saonigeho KM. 3 Telukdalam
DIVISI 5. PERKERASAN BERBUTIR DAN PERKERASAN BETON
Nama Pekerjaan
SEMEN
5.1.( 1 )
REHABILITASI JALAN DARI SMA MENUJU HILIONAHA
Lapis pondasi agregat kelas A
300
150
? 150
KIRI KANAN
Volume Volume
Luas Bidang Luas Bidang
Panjang Lebar Tebal Panjang Lebar Tebal
NO. STA. Ket
P l t A =(l*t) A*P P l t A =(l*t) A*P
(m) (m) (m) (m2) (m3) (m) (m) (m) (m2) (m3)
1 0 + 000.00 s/d 0 + 025 25.00 2.00 0.150 0.30 7.5 25.00 2.00 0.150 0.30 7.5
2 0 + 027 s/d 0 + 050 23.00 2.00 0.150 0.30 6.9 23.00 2.00 0.150 0.30 6.9
3 0 + 050 s/d 0 + 075 25.00 2.00 0.150 0.30 7.5 25.00 2.00 0.150 0.30 7.5
4 0 + 075 s/d 0 + 090 15.00 2.00 0.150 0.30 4.5 15.00 2.00 0.150 0.30 4.5
5 0 + 092 s/d 0 + 100 8.00 2.00 0.150 0.30 2.4 8.00 2.00 0.150 0.30 2.4
6 0 + 100 s/d 0 + 125 25.00 2.00 0.150 0.30 7.5 25.00 2.00 0.150 0.30 7.5
7 0 + 125 s/d 0 + 150 25.00 2.00 0.150 0.30 7.5 25.00 2.00 0.150 0.30 7.5
8 0 + 150 s/d 0 + 175 25.00 2.00 0.150 0.30 7.5 25.00 2.00 0.150 0.30 7.5
9 0 + 175 s/d 0 + 200 25.00 1.75 0.150 0.26 6.5625 25.00 1.75 0.150 0.26 6.5625
10 0 + 200 s/d 0 + 225 25.00 1.75 0.150 0.26 6.5625 25.00 1.75 0.150 0.26 6.5625
11 0 + 225 s/d 0 + 250 25.00 1.75 0.150 0.26 6.5625 25.00 1.75 0.150 0.26 6.5625
12 0 + 250 s/d 0 + 275 25.00 1.75 0.150 0.26 6.5625 25.00 1.75 0.150 0.26 6.5625
13 0 + 275 s/d 0 + 300 25.00 1.75 0.150 0.26 6.5625 25.00 1.75 0.150 0.26 6.5625
14 0 + 300 s/d 0 + 338 38.00 1.75 0.150 0.26 9.975 38.00 1.75 0.150 0.26 9.975
Dibuat Oleh:
KONSULTAN PERENCANA
CV. POLO CONSULTANT
ALIANI BUULOLO, ST
Quantity Engineer
PEMERINTAH KABUPATEN NIAS SELATAN
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
BACK UP DATA PERENCANAAN
BIDANG BINA MARGA
Jalan Saonigeho KM. 3 Telukdalam
Nama Pekerjaan DIVISI 5. PERKERASAN BERBUTIR
5.1.( 2 )
PENINGKATAN JALAN GOMO MENUJU MAZO
Lapis pondasi agregat kelas B
300
150
? 150
KIRI KANAN
Luas Volume Luas Volume
Panjang Lebar Tebal Bidang Panjang Lebar Tebal Bidang
NO. STA. Ket
P l t A =(l*t) A*P P l t A =(l*t) A*P
(m) (m) (m) (m2) (m3) (m) (m) (m) (m2) (m3)
0 + 000 s/d 0 + 010 10.00 0.50 0.15 0.08 0.75 0 + 000 s/d 0 + 010 10.00 0.50 0.15 0.08 0.75
0 + 010 s/d 0 + 020 10.00 0.50 0.15 0.08 0.75 0 + 010 s/d 0 + 020 10.00 0.50 0.15 0.08 0.75
0 + 020 s/d 0 + 030 10.00 0.50 0.15 0.08 0.75 0 + 020 s/d 0 + 030 10.00 0.50 0.15 0.08 0.75
0 + 030 s/d 0 + 040 10.00 0.50 0.15 0.08 0.75 0 + 030 s/d 0 + 040 10.00 0.50 0.15 0.08 0.75
0 + 040 s/d 0 + 050 10.00 0.50 0.15 0.08 0.75 0 + 040 s/d 0 + 050 10.00 0.50 0.15 0.08 0.75
0 + 050 s/d 0 + 060 10.00 0.50 0.15 0.08 0.75 0 + 050 s/d 0 + 060 10.00 0.50 0.15 0.08 0.75
0 + 060 s/d 0 + 070 10.00 0.50 0.15 0.08 0.75 0 + 060 s/d 0 + 070 10.00 0.50 0.15 0.08 0.75
0 + 070 s/d 0 + 080 10.00 0.50 0.15 0.08 0.75 0 + 070 s/d 0 + 080 10.00 0.50 0.15 0.08 0.75
0 + 080 s/d 0 + 090 10.00 0.50 0.15 0.08 0.75 0 + 080 s/d 0 + 090 10.00 0.50 0.15 0.08 0.75
0 + 090 s/d 0 + 100 10.00 0.50 0.15 0.08 0.75 0 + 090 s/d 0 + 100 10.00 0.50 0.15 0.08 0.75
0 + 100 s/d 0 + 110 10.00 0.50 0.15 0.08 0.75 0 + 100 s/d 0 + 110 10.00 0.50 0.15 0.08 0.75
0 + 110 s/d 0 + 120 10.00 0.50 0.15 0.08 0.75 0 + 110 s/d 0 + 120 10.00 0.50 0.15 0.08 0.75
0 + 120 s/d 0 + 130 10.00 0.50 0.15 0.08 0.75
0 + 130 s/d 0 + 140 10.00 0.50 0.15 0.08 0.75
0 + 140 s/d 0 + 150 10.00 0.50 0.15 0.08 0.75
0 + 150 s/d 0 + 160 10.00 0.50 0.15 0.08 0.75
0 + 160 s/d 0 + 170 10.00 0.50 0.15 0.08 0.75
0 + 170 s/d 0 + 180 10.00 0.50 0.15 0.08 0.75
0 + 180 s/d 0 + 190 10.00 0.50 0.15 0.08 0.75
0 + 190 s/d 0 + 200 10.00 0.50 0.15 0.08 0.75
0 + 200 s/d 0 + 210 10.00 0.50 0.15 0.08 0.75
0 + 210 s/d 0 + 220 10.00 0.50 0.15 0.08 0.75
0 0 ALIANI BUULOLO, ST
0 0 Quantity Engineer
PEMERINTAH KABUPATEN NIAS SELATAN
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
BACK UP DATA PERENCANAAN
BIDANG BINA MARGA
Jalan Saonigeho KM. 3 Telukdalam
DIVISI 5. PERKERASAN BERBUTIR DAN PERKERASAN BETON
Nama Pekerjaan
SEMEN
5.3.(1)
REHABILITASI JALAN DARI SMA MENUJU HILIONAHA
Perkerasan Beton Semen ( Campuran 1:2:3 )
300
150
? 150
KIRI KANAN
Volume Volume
Luas Bidang Luas Bidang
Panjang Lebar Tebal Panjang Lebar Tebal
NO. STA. Ket
P l t A =(l*t) A*P P l t A =(l*t) A*P
(m) (m) (m) (m2) (m3) (m) (m) (m) (m2) (m3)
1 0 + 025 s/d 0 + 027 2.00 2.00 0.200 0.40 0.8 2.00 2.00 0.200 0.40 0.8
1 0 + 090 s/d 0 + 092 2.00 2.00 0.200 0.40 0.8 2.00 2.00 0.200 0.40 0.8
Dibuat Oleh:
KONSULTAN PERENCANA
CV. POLO CONSULTANT
ALIANI BUULOLO, ST
Quantity Engineer
PEMERINTAH KABUPATEN NIAS SELATAN BACK UP DATA RENCANA
DINAS PEKERJAAN UMUM DAN PENATAAN DIVISI
RUANG 5. PERKERASAN BERBUTIR DAN PERKERASAN BETON SEME
BIDANG BINA MARGA 5.3.(1)
Jl. Saonigeho KM. 3 Telukdalam Perkerasan Beton Semen ( Campuran 1:2:3 )
KONSULTAN PERENCANA
Total Volume
NO. ITEM PEKERJAAN Keterangan
(m³)
DIBULATKAN 28.70
PEMERINTAH KABUPATEN NIAS SELATAN
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
BACK UP DATA PERENCANAAN
BIDANG BINA MARGA
Jalan Saonigeho KM. 3 Telukdalam
Nama Pekerjaan DIVISI 6. PERKERASAN ASPAL
6.1 (1)(a)
REHABILITASI JALAN DARI SMA MENUJU HILIONAHA
Lapis Resap Pengikat - Aspal Cair
300
150 150
2% 2%
KIRI KANAN
Volume Volume
Luas Bidang Aspal Cair Luas Bidang Aspal Cair
Panjang Lebar Panjang Lebar
NO. STA. Ket
p l A =(p*l) AC A*Ac p l A =(p*l) AC A*Ac
(m) (m) (m2) Liter/(m2) Liter (m) (m) (m2) Liter/(m2) Liter
1 0 + 000 s/d 0 + 025 25.00 2.00 50.00 0.80 40 25.00 2.00 50.00 0.80 40
2 0 + 025 s/d 0 + 050 25.00 2.00 50.00 0.80 40 25.00 2.00 50.00 0.80 40
3 0 + 050 s/d 0 + 075 25.00 2.00 50.00 0.80 40 25.00 2.00 50.00 0.80 40
4 0 + 075 s/d 0 + 100 25.00 2.00 50.00 0.80 40 25.00 2.00 50.00 0.80 40
5 0 + 100 s/d 0 + 125 25.00 2.00 50.00 0.80 40 25.00 2.00 50.00 0.80 40
6 0 + 125 s/d 0 + 150 25.00 2.00 50.00 0.80 40 25.00 2.00 50.00 0.80 40
7 0 + 150 s/d 0 + 175 25.00 2.00 50.00 0.80 40 25.00 2.00 50.00 0.80 40
8 0 + 175 s/d 0 + 200 25.00 2.00 50.00 0.80 40 25.00 2.00 50.00 0.80 40
9 0 + 200 s/d 0 + 225 25.00 1.75 43.75 0.80 35 25.00 1.75 43.75 0.80 35
10 0 + 225 s/d 0 + 250 25.00 1.75 43.75 0.80 35 25.00 1.75 43.75 0.80 35
11 0 + 250 s/d 0 + 275 25.00 1.75 43.75 0.80 35 25.00 1.75 43.75 0.80 35
12 0 + 275 s/d 0 + 300 25.00 1.75 43.75 0.80 35 25.00 1.75 43.75 0.80 35
13 0 + 300 s/d 0 + 325 25.00 1.75 43.75 0.80 35 25.00 1.75 43.75 0.80 35
14 0 + 325 s/d 0 + 338 13.00 1.75 22.75 0.80 18.2 13.00 1.75 22.75 0.80 18.2
ALIANI BUULOLO, ST
Quantity Engineer
DINAS PEKERJAAN UMUM DAN PENATAAN
BACK UP DATA PERENCANAAN KONSULTAN PERENCANA
RUANG
URAIAN
Kiri Kanan Total Volume
Jarak Jarak Keterangan
Sta L AC Luas Volume Sta L AC Luas Volume (Liter)
(M) (M)
(M) (Liter) (M²) (Liter) (M) (Liter) (M²) (M³)
1 2 3 5 6 7 8 9 10 12 13 14 15 16
0+300 0+300
25.00 1.50 0.35 0.53 13.13 25.00 1.50 0.35 0.53 13.13 26.25
0+325 0+325
25.00 1.50 0.35 0.53 13.13 25.00 1.50 0.35 0.53 13.13 26.25
0+350 0+350
25.00 1.50 0.35 0.53 13.13 25.00 1.50 0.35 0.53 13.13 26.25
0+375 0+375
30.00 1.50 0.35 0.53 15.75 30.00 1.50 0.35 0.53 15.75 31.50
0+405 0+405
Jumlah 105.00 Jumlah 105.00 Total Seluruh Volume Prime Coat 110.25
Liter
KOMULATIF 110.25
PEMERINTAH KABUPATEN NIAS SELATAN
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
BACK UP DATA PERENCANAAN
BIDANG BINA MARGA
Jalan Saonigeho KM. 3 Telukdalam
Nama Pekerjaan DIVISI 6. PERKERASAN ASPAL
6.6.(1)
REHABILITASI JALAN DARI SMA MENUJU HILIONAHA
Lapis Penetrasi Permukaan Macadam
400
200 200
2% 2%
1 0 + 000 s/d 0 + 025 25.00 2.00 0.05 0.10 2.5 25.00 2.00 0.05 0.10 2.5
2 0 + 025 s/d 0 + 050 25.00 2.00 0.05 0.10 2.5 25.00 2.00 0.05 0.10 2.5
3 0 + 050 s/d 0 + 075 25.00 2.00 0.05 0.10 2.5 25.00 2.00 0.05 0.10 2.5
4 0 + 075 s/d 0 + 100 25.00 2.00 0.05 0.10 2.5 25.00 2.00 0.05 0.10 2.5
5 0 + 100 s/d 0 + 125 25.00 2.00 0.05 0.10 2.5 25.00 2.00 0.05 0.10 2.5
6 0 + 125 s/d 0 + 150 25.00 2.00 0.05 0.10 2.5 25.00 2.00 0.05 0.10 2.5
7 0 + 150 s/d 0 + 175 25.00 2.00 0.05 0.10 2.5 25.00 2.00 0.05 0.10 2.5
8 0 + 175 s/d 0 + 200 25.00 2.00 0.05 0.10 2.5 25.00 2.00 0.05 0.10 2.5
9 0 + 200 s/d 0 + 225 25.00 1.75 0.05 0.09 2.1875 25.00 1.75 0.05 0.09 2.1875
10 0 + 225 s/d 0 + 250 25.00 1.75 0.05 0.09 2.1875 25.00 1.75 0.05 0.09 2.1875
11 0 + 250 s/d 0 + 275 25.00 1.75 0.05 0.09 2.1875 25.00 1.75 0.05 0.09 2.1875
12 0 + 275 s/d 0 + 300 25.00 1.75 0.05 0.09 2.1875 25.00 1.75 0.05 0.09 2.1875
13 0 + 300 s/d 0 + 325 25.00 1.75 0.05 0.09 2.1875 25.00 1.75 0.05 0.09 2.1875
14 0 + 325 s/d 0 + 338 13.00 1.75 0.05 0.09 1.1375 13.00 1.75 0.05 0.09 1.1375
Dibuat Oleh:
KONSULTAN PERENCANA
CV. POLO CONSULTANT
ALIANI BUULOLO, ST
Quantity Engineer
PEMERINTAH KABUPATEN NIAS SELATAN
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG BACK UP DATA PERENCANAAN
BIDANG BINA MARGA
Nama Paket : DIVISI 7. STRUKTUR
7.1 (7) a
REHABILITASI JALAN DARI SMA MENUJU HILIONAHA
Beton mutu sedang fc’20 Mpa
TOTAL VOLUME
STA PANJANG (M) LEBAR ( M ) TEBAL (M) LUAS VOLUME M3 KETERANG
(M)
0+134
2.00 1.00 0.15 0.15 0.30 0.30
0+136
0+140
2.00 1.00 0.15 0.15 0.30 0.30
0+142
0+178
2.00 1.00 0.15 0.15 0.30 0.30
0+180
Dibuat Oleh:
KONSULTAN PERENCANA
CV. POLO CONSULTANT
ALIANI BUULOLO, ST
Quantity Engineer
BACK UP DATA PERENCANAAN
DIVISI 7. STRUKTUR
7.1 (7) a
Beton mutu sedang fc’20 Mpa
KETERANGAN
PEMERINTAH KABUPATEN NIAS SELATAN
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG BACK UP DATA PERENCANAAN
BIDANG BINA MARGA
Nama Paket : DIVISI 7. STRUKTUR
7.1 (10)
REHABILITASI JALAN DARI SMA MENUJU HILIONAHA
Beton mutu rendah fc’10 Mpa
TOTAL VOLUME
STA PANJANG (M) LEBAR ( M ) TEBAL (M) LUAS VOLUME M3 KETERANG
(M)
Dibuat Oleh:
KONSULTAN PERENCANA
CV. POLO CONSULTANT
ALIANI BUULOLO, ST
Quantity Engineer
BACK UP DATA PERENCANAAN
DIVISI 7. STRUKTUR
7.1 (10)
Beton mutu rendah fc’10 Mpa
KETERANGAN
PEMERINTAH KABUPATEN NIAS SELATAN
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG BACK UP DATA PERENCANAAN
BIDANG BINA MARGA
Nama Paket : DIVISI 7. STRUKTUR
7.3 (2)
REHABILITASI JALAN DARI SMA MENUJU HILIONAHA
Baja Tulangan U 24 Polos
0 + 025 0 + 027
0 + 090 0 + 092
Dibuat Oleh:
KONSULTAN PERENCANA
CV. POLO CONSULTANT
ALIANI BUULOLO, ST
Quantity Engineer
PEMERINTAH KABUPATEN NIAS SELATAN
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG BACK UP DATA PERENCANAAN
BIDANG BINA MARGA
Nama Paket : DIVISI 7. STRUKTUR
7.3 (2)
REHABILITASI JALAN DARI SMA MENUJU HILIONAHA
Baja Tulangan U 24 Polos
0 + 128 0 + 132
0 + 134 0 + 136
0 + 140 0 + 142
0 + 178 0 + 180
Dibuat Oleh:
KONSULTAN PERENCANA
CV. POLO CONSULTANT
ALIANI BUULOLO, ST
Quantity Engineer
PEMERINTAH KABUPATEN NIAS SELATAN
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
BACK UP DATA PERENCANAAN
BIDANG BINA MARGA
Jalan Saonigeho KM. 3 Telukdalam
Nama Pekerjaan DIVISI 7. STRUKTUR
7.9.(1)
REHABILITASI JALAN DARI SMA MENUJU HILIONAHA
Pasangan Batu
L1 L1
H1
H1
`
H2
H2
L2
L3
L2
L3
URAIAN
Kiri Kanan
Jarak Jarak Ket
Sta L.1 L.2 L.3 H.1 H.2 Luas Luas Rata- Volume Sta L.1 L.2 L.3 H.1 H.2 Luas Luas Rata- Volume
(M) (M)
(M) (M) (M) (M) (M) (M²) rata ( M²) (M³) (M) (M) (M) (M) (M) (M²) rata ( M²) (M³)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
PASANGAN BATU UNTUK PLAT DUIKER 1
0+476 5.00 0.35 0.60 0.80 1.00 0.50 0.88 0.88 4.38
4.375 -
Volume ( Kiri + Kanan ) = 4.375 M3
Volume Dibulatkan = 4.37 M3
PEMERINTAH KABUPATEN NIAS SELATAN
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG BACK UP DATA PERENCANAA
BIDANG BINA MARGA
Nama Paket : DIVISI 7. STRUKTUR
6.6.(1)
#REF!
Besi Tulangan
Bentuk Batang Jlh Batang Panjang/BTG TTL PANJANG Ø Besi BERAT BESI/M'
A B C D=BxC E F
No.
PERHITUNGAN PENULANGAN PLAT DUIKER STA. 1+088 S/D 1+090
10
11
12
13
14
15
16
17
18
19
20
21
Jumlah Volume Tulangan Plat Duiker + Jumlah Volume Tulangan Plat Par
Total Berat Besi
BACK UP DATA PERENCANAAN
DIVISI 7. STRUKTUR
6.6.(1)
Besi Tulangan
TTL BERAT(Kg)
G=dxf
N PLAT DUIKER STA. 1+088 S/D 1+090
485.151
448.536
345.571
324.107
304.916
285.977
320.275
448.536
2963.070 Kg
2963.070 Kg
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG KABUPATEN NIAS SELATAN BACK UP DATA RENCANA
1 A1 3.5 0.2 3.5 0.2 0.14 7.54 0.2 59 445.10 12 0.888 395.138
3 B3 3.5 0.2 3.5 0.2 0.14 7.54 0.2 59 445.10 12 0.888 395.138
9 B9 4.2 0.15 4.2 0.15 0.156 8.856 0.2 16 141.696 13 1.042 147.631
10 B10 0.7 0.15 0.7 0.15 0.156 1.856 0.2 30 55.68 13 1.042 58.012
12 B12 0.7 0.15 0.7 0.13 1.68 0.2 68 114.24 13 1.042 119.025
L1 L2 L3 H1 H2 H3 Jlh P VOLUME
SKETSA GAMBAR Nama KETERANGAN
m' m' m' m' m' m' Sisi m' m³
L3 L2 BOX CULVERT
H1
V1 3.60 0.30 2 6.00 12.960 V1 = L1 x H1 x P x Jlh
BOX CULVERT H3
L1
40 H1
H1
10 DINDING SAYAP
L1
P
V1 0.30 0.50 4 1.20 0.720 V1 = L1 x H1 x P1 x Jlh
H1 H 1
H2
H2
L1 L2 L3 H1 H2 H3 Jlh P VOLUME
SKETSA GAMBAR Nama KETERANGAN
m' m' m' m' m' m' Sisi m' m³
H1
L1
Total Berat
NO. ITEM PEKERJAAN Keterangan
(Kg)
DIBULATKAN 287.93
PEMERINTAH KABUPATEN NIAS SELATAN
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
BACK UP DATA PERENCANAAN
BIDANG BINA MARGA
Jalan Saonigeho KM. 3 Telukdalam
Nama Pekerjaan DIVISI 7. STRUKTUR
7.9.(1)
REHABILITASI JALAN DARI SMA MENUJU HILIONAHA
Pasangan Batu
L1 L1
H1
H1
`
H2
H2
L2
L3
L2
L3
URAIAN
Kiri Kanan
Jarak Jarak Ket
Sta L.1 L.2 L.3 H.1 H.2 Luas Luas Rata- Sta L.1 L.2 L.3 H.1 H.2 Luas Luas Rata- Volume
(M) Volume (M³) (M)
(M) (M) (M) (M) (M) (M²) rata ( M²) (M) (M) (M) (M) (M) (M²) rata ( M²) (M³)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
- 63.095
Volume ( Kiri + Kanan ) = 63.095 M3
Volume Dibulatkan = 63.09 M3
Dibuat Oleh:
KONSULTAN PERENCANA
CV. POLO CONSULTANT
ALIANI BUULOLO, ST
Quantity Engineer
PEMERINTAH KABUPATEN NIAS SELATAN
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
BACK UP DATA PERENCANAAN
BIDANG BINA MARGA
Jalan Saonigeho KM. 3 Telukdalam
Nama Pekerjaan DIVISI 7. STRUKTUR
6.6.(1)
#REF!
Pasangan Batu
`
URAIAN
Kiri Kanan
Jarak Ket
Sta L.1 L.2 L.3 L.4 L.5 L.6 H.1 H.2 H.3 H.4 Luas Luas Rata- Volume
(M)
(M) (M) (M) (M) (M) (M) (M) (M) (M) (M) (M²) rata ( M²) (M³)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
Dibuat Oleh:
KONSULTAN PERENCANA
CV. POLO CONSULTANT
ALIANI BUULOLO, ST
Quantity Engineer
PEMERINTAH KABUPATEN NIAS SELATAN BACK UP DATA RENCANA
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG DEVISI.7. STRUKTUR
BIDANG BINA MARGA 7.1 (7) a
Jl. Saonigeho KM. 3 Telukdalam Beton mutu sedang fc’20 Mpa
LOKASI :-
KECAMATAN LOLOWAU
T.A : 2019
Total Volume
NO. ITEM PEKERJAAN Keterangan
(m³)
DIBULATKAN 68.75
Dibuat Oleh:
KONSULTAN PERENCANA
CV. POLO CONSULTANT
ALIANI BUULOLO, ST
Quantity Engineer
PEMERINTAH KABUPATEN NIAS SELATAN
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
BACK UP DATA PERENCANAAN
BIDANG BINA MARGA
Jalan Saonigeho KM. 3 Telukdalam
Nama Pekerjaan DIVISI 10. PEKERJAAN PEMELIHARAAN KINERJA
10.1.(1)
REHABILITASI JALAN DARI SMA MENUJU HILIONAHA
Galian pada Saluran Air atau Lereng untuk Pemeliharaan
Dibuat Oleh:
KONSULTAN PERENCANA
CV. POLO CONSULTANT
ALIANI BUULOLO, ST
Quantity Engineer