KECAMATAN SIDUA'ORI
BACK UP DATA PERHITUNGAN VOLUME
DESA ULU IDANODUO MENUJU DESA ORAHUAHILI KEC. MAZO
DIBUAT OLEH :
ALIANI BUULOLO, ST
Tenaga Teknik
PEMERINTAH KABUPATEN NIAS SELATAN
KECAMATAN SIDUA'ORI
BACK UP DATA PERHITUNGAN VOLUME
DESA ULU IDANODUO MENUJU DESA ORAHUAHILI KEC. MAZO
0+800 0.30 0.50 0.50 0.62 0.60 0.22 0.20 1.20 0.40 0.20 0.60 0.93
100.00 0.93 92.80
0+900 0.30 0.50 0.50 0.62 0.60 0.22 0.20 1.20 0.40 0.20 0.60 0.93
1+000 0.30 0.50 0.50 0.62 0.60 0.22 0.20 1.20 0.40 0.20 0.60 0.93
150.00 0.93 139.20
1+150 0.30 0.50 0.50 0.62 0.60 0.22 0.20 1.20 0.40 0.20 0.60 0.93
1+200 0.30 0.50 0.50 1.00 1.00 1.00 0.40 0.20 0.80
247.00 0.80 197.60
1+447.00 0.30 0.50 0.50 1.00 1.00 1.00 0.40 0.20 0.80
497.00
TOTAL VOLUME KIRI 429.60 TOTAL VOLUME KANAN 0.00
TOTAL VOLUME = 429.60 M3
VOLUME DIBULATKAN = 429.60 M3
DIBUAT OLEH :
ALIANI BUULOLO, ST
Tenaga Teknik
PEMERINTAH KABUPATEN NIAS SELATAN
KECAMATAN SIDUA'ORI
BACK UP DATA PERHITUNGAN
VOLUME
DESA ULU IDANODUO MENUJU DESA ORAHUAHILI KEC. MAZO
1 0+000.00 s/d 0+050.00 50.00 2.25 0.20 112.50 22.50 0+000.00 s/d 0+050.00 50.00 2.25 0.20 112.50 22.50
2 0+050.00 s/d 0+100.00 50.00 2.25 0.20 112.50 22.50 0+050.00 s/d 0+100.00 50.00 2.25 0.20 112.50 22.50
3 0+100.00 s/d 0+150.00 50.00 2.25 0.20 112.50 22.50 0+100.00 s/d 0+150.00 50.00 2.25 0.20 112.50 22.50
4 0+150.00 s/d 0+200.00 50.00 2.25 0.20 112.50 22.50 0+150.00 s/d 0+200.00 50.00 2.25 0.20 112.50 22.50
5 0+200.00 s/d 0+250.00 50.00 2.25 0.20 112.50 22.50 0+200.00 s/d 0+250.00 50.00 2.25 0.20 112.50 22.50
6 0+250.00 s/d 0+300.00 50.00 2.25 0.20 112.50 22.50 0+250.00 s/d 0+300.00 50.00 2.25 0.20 112.50 22.50
7 0+300.00 s/d 0+350.00 50.00 2.25 0.20 112.50 22.50 0+300.00 s/d 0+350.00 50.00 2.25 0.20 112.50 22.50
8 0+350.00 s/d 0+400.00 50.00 2.25 0.20 112.50 22.50 0+350.00 s/d 0+400.00 50.00 2.25 0.20 112.50 22.50
9 0+400.00 s/d 0+450.00 50.00 2.25 0.20 112.50 22.50 0+400.00 s/d 0+450.00 50.00 2.25 0.20 112.50 22.50
10 0+450.00 s/d 0+500.00 50.00 2.25 0.20 112.50 22.50 0+450.00 s/d 0+500.00 50.00 2.25 0.20 112.50 22.50
11 0+500.00 s/d 0+550.00 50.00 2.25 0.20 112.50 22.50 0+500.00 s/d 0+550.00 50.00 2.25 0.20 112.50 22.50
12 0+550.00 s/d 0+600.00 50.00 2.25 0.20 112.50 22.50 0+550.00 s/d 0+600.00 50.00 2.25 0.20 112.50 22.50
13 0+600.00 s/d 0+650.00 50.00 2.25 0.20 112.50 22.50 0+600.00 s/d 0+650.00 50.00 2.25 0.20 112.50 22.50
14 0+650.00 s/d 0+700.00 50.00 2.25 0.20 112.50 22.50 0+650.00 s/d 0+700.00 50.00 2.25 0.20 112.50 22.50
15 0+700.00 s/d 0+750.00 50.00 2.25 0.20 112.50 22.50 0+700.00 s/d 0+750.00 50.00 2.25 0.20 112.50 22.50
16 0+750.00 s/d 0+800.00 50.00 2.25 0.20 112.50 22.50 0+750.00 s/d 0+800.00 50.00 2.25 0.20 112.50 22.50
17 0+800.00 s/d 0+850.00 50.00 2.25 0.20 112.50 22.50 0+800.00 s/d 0+850.00 50.00 2.25 0.20 112.50 22.50
18 0+850.00 s/d 0+900.00 50.00 2.25 0.20 112.50 22.50 0+850.00 s/d 0+900.00 50.00 2.25 0.20 112.50 22.50
19 0+900.00 s/d 0+950.00 50.00 2.25 0.20 112.50 22.50 0+900.00 s/d 0+950.00 50.00 2.25 0.20 112.50 22.50
20 0+950.00 s/d 1+000.00 50.00 2.25 0.20 112.50 22.50 0+950.00 s/d 1+000.00 50.00 2.25 0.20 112.50 22.50
21 1+000.00 s/d 1+050.00 50.00 2.25 0.20 112.50 22.50 1+000.00 s/d 1+050.00 50.00 2.25 0.20 112.50 22.50
22 1+050.00 s/d 1+100.00 50.00 2.25 0.20 112.50 22.50 1+050.00 s/d 1+100.00 50.00 2.25 0.20 112.50 22.50
23 1+100.00 s/d 1+150.00 50.00 2.25 0.20 112.50 22.50 1+100.00 s/d 1+150.00 50.00 2.25 0.20 112.50 22.50
24 1+150.00 s/d 1+200.00 50.00 2.25 0.20 112.50 22.50 1+150.00 s/d 1+200.00 50.00 2.25 0.20 112.50 22.50
25 1+200.00 s/d 1+250.00 50.00 2.25 0.20 112.50 22.50 1+200.00 s/d 1+250.00 50.00 2.25 0.20 112.50 22.50
26 1+250.00 s/d 1+300.00 50.00 2.25 0.20 112.50 22.50 1+250.00 s/d 1+300.00 50.00 2.25 0.20 112.50 22.50
27 1+300.00 s/d 1+350.00 50.00 2.25 0.20 112.50 22.50 1+300.00 s/d 1+350.00 50.00 2.25 0.20 112.50 22.50
28 1+350.00 s/d 1+400.00 50.00 2.25 0.20 112.50 22.50 1+350.00 s/d 1+400.00 50.00 2.25 0.20 112.50 22.50
29 1+400.00 s/d 1+450.00 50.00 2.25 0.20 112.50 22.50 1+400.00 s/d 1+450.00 50.00 2.25 0.20 112.50 22.50
30 1+450.00 s/d 1+500.00 50.00 2.25 0.20 112.50 22.50 1+450.00 s/d 1+500.00 50.00 2.25 0.20 112.50 22.50
31 1+500.00 s/d 1+550.00 50.00 2.25 0.20 112.50 22.50 1+500.00 s/d 1+550.00 50.00 2.25 0.20 112.50 22.50
32 1+550.00 s/d 1+600.00 50.00 2.25 0.20 112.50 22.50 1+550.00 s/d 1+600.00 50.00 2.25 0.20 112.50 22.50
33 1+600.00 s/d 1+650.00 50.00 2.25 0.20 112.50 22.50 1+600.00 s/d 1+650.00 50.00 2.25 0.20 112.50 22.50
34 1+650.00 s/d 1+700.00 50.00 2.25 0.20 112.50 22.50 1+650.00 s/d 1+700.00 50.00 2.25 0.20 112.50 22.50
35 1+700.00 s/d 1+900.00 200.00 2.25 0.20 450.00 90.00 1+700.00 s/d 1+900.00 200.00 2.25 0.20 450.00 90.00
DIBUAT OLEH :
ALIANI BUULOLO, ST
Tenaga Teknik
PEMERINTAH KABUPATEN NIAS SELATAN
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
BACK UP DATA
BIDANG BINA MARGA
Jalan Saonigeho KM. 3 Telukdalam
REKAPITULASI
#NAME?
#NAME?
PEMERINTAH KABUPATEN NIAS SELATAN
KECAMATAN SIDUA'ORI
BACK UP DATA PERHITUNGAN
VOLUME
DESA ULU IDANODUO MENUJU DESA ORAHUAHILI KEC. MAZO
PERKERASAN BERBUTIR
Pembangunan Jalan Dari Ulu Idanoduo Menuju Desa Orahuahili Kecamatan Mazo Kab.
5.1.(1)
Nias Selatan
LAPIS PONDASI AGREGAT KELAS - A
Kiri Kanan
Station Alat Volume Station Alat Volume
Panjang Lebar Tebal Luas Panjang Lebar Tebal Luas
NO. Ket
P l t A =(p*l) A*t P l t A =(p*l) A*t
(STA) (STA)
(m¹) (m¹) (m¹) (m2) (m3) (m¹) (m¹) (m¹) (m2) (m3)
1 0+000.00 s/d 0+050.00 50.00 1.75 0.15 87.50 13.13 0+000.00 s/d 0+050.00 50.00 1.75 0.15 87.50 13.13
2 0+050.00 s/d 0+100.00 50.00 1.75 0.15 87.50 13.13 0+050.00 s/d 0+100.00 50.00 1.75 0.15 87.50 13.13
2 0+100.00 s/d 0+150.00 50.00 1.75 0.15 87.50 13.13 0+100.00 s/d 0+150.00 50.00 1.75 0.15 87.50 13.13
2 0+150.00 s/d 0+200.00 50.00 1.75 0.15 87.50 13.13 0+150.00 s/d 0+200.00 50.00 1.75 0.15 87.50 13.13
2 0+200.00 s/d 0+250.00 50.00 1.75 0.15 87.50 13.13 0+200.00 s/d 0+250.00 50.00 1.75 0.15 87.50 13.13
2 0+250.00 s/d 0+300.00 50.00 1.75 0.15 87.50 13.13 0+250.00 s/d 0+300.00 50.00 1.75 0.15 87.50 13.13
2 0+300.00 s/d 0+350.00 50.00 1.75 0.15 87.50 13.13 0+300.00 s/d 0+350.00 50.00 1.75 0.15 87.50 13.13
2 0+350.00 s/d 0+400.00 50.00 1.75 0.15 87.50 13.13 0+350.00 s/d 0+400.00 50.00 1.75 0.15 87.50 13.13
2 0+400.00 s/d 0+450.00 50.00 1.75 0.15 87.50 13.13 0+400.00 s/d 0+450.00 50.00 1.75 0.15 87.50 13.13
2 0+450.00 s/d 0+500.00 50.00 1.75 0.15 87.50 13.13 0+450.00 s/d 0+500.00 50.00 1.75 0.15 87.50 13.13
2 0+500.00 s/d 0+550.00 50.00 1.75 0.15 87.50 13.13 0+500.00 s/d 0+550.00 50.00 1.75 0.15 87.50 13.13
2 0+550.00 s/d 0+600.00 50.00 1.75 0.15 87.50 13.13 0+550.00 s/d 0+600.00 50.00 1.75 0.15 87.50 13.13
2 0+600.00 s/d 0+650.00 50.00 1.75 0.15 87.50 13.13 0+600.00 s/d 0+650.00 50.00 1.75 0.15 87.50 13.13
2 0+650.00 s/d 0+700.00 50.00 1.75 0.15 87.50 13.13 0+650.00 s/d 0+700.00 50.00 1.75 0.15 87.50 13.13
2 0+700.00 s/d 0+750.00 50.00 1.75 0.15 87.50 13.13 0+700.00 s/d 0+750.00 50.00 1.75 0.15 87.50 13.13
2 0+750.00 s/d 0+800.00 50.00 1.75 0.15 87.50 13.13 0+750.00 s/d 0+800.00 50.00 1.75 0.15 87.50 13.13
2 0+800.00 s/d 0+850.00 50.00 1.75 0.15 87.50 13.13 0+800.00 s/d 0+850.00 50.00 1.75 0.15 87.50 13.13
2 0+850.00 s/d 0+900.00 50.00 1.75 0.15 87.50 13.13 0+850.00 s/d 0+900.00 50.00 1.75 0.15 87.50 13.13
2 0+900.00 s/d 0+950.00 50.00 1.75 0.15 87.50 13.13 0+900.00 s/d 0+950.00 50.00 1.75 0.15 87.50 13.13
2 0+950.00 s/d 1+000.00 50.00 1.75 0.15 87.50 13.13 0+950.00 s/d 1+000.00 50.00 1.75 0.15 87.50 13.13
2 1+000.00 s/d 1+050.00 50.00 1.75 0.15 87.50 13.13 1+000.00 s/d 1+050.00 50.00 1.75 0.15 87.50 13.13
2 1+050.00 s/d 1+100.00 50.00 1.75 0.15 87.50 13.13 1+050.00 s/d 1+100.00 50.00 1.75 0.15 87.50 13.13
2 1+100.00 s/d 1+150.00 50.00 1.75 0.15 87.50 13.13 1+100.00 s/d 1+150.00 50.00 1.75 0.15 87.50 13.13
2 1+150.00 s/d 1+200.00 50.00 1.75 0.15 87.50 13.13 1+150.00 s/d 1+200.00 50.00 1.75 0.15 87.50 13.13
2 1+200.00 s/d 1+250.00 50.00 1.75 0.15 87.50 13.13 1+200.00 s/d 1+250.00 50.00 1.75 0.15 87.50 13.13
2 1+250.00 s/d 1+300.00 50.00 1.75 0.15 87.50 13.13 1+250.00 s/d 1+300.00 50.00 1.75 0.15 87.50 13.13
2 1+300.00 s/d 1+350.00 50.00 1.75 0.15 87.50 13.13 1+300.00 s/d 1+350.00 50.00 1.75 0.15 87.50 13.13
2 1+350.00 s/d 1+400.00 50.00 1.75 0.15 87.50 13.13 1+350.00 s/d 1+400.00 50.00 1.75 0.15 87.50 13.13
2 1+400.00 s/d 1+450.00 50.00 1.75 0.15 87.50 13.13 1+400.00 s/d 1+450.00 50.00 1.75 0.15 87.50 13.13
2 1+450.00 s/d 1+500.00 50.00 1.75 0.15 87.50 13.13 1+450.00 s/d 1+500.00 50.00 1.75 0.15 87.50 13.13
2 1+500.00 s/d 1+550.00 50.00 1.75 0.15 87.50 13.13 1+500.00 s/d 1+550.00 50.00 1.75 0.15 87.50 13.13
2 1+550.00 s/d 1+600.00 50.00 1.75 0.15 87.50 13.13 1+550.00 s/d 1+600.00 50.00 1.75 0.15 87.50 13.13
2 1+600.00 s/d 1+650.00 50.00 1.75 0.15 87.50 13.13 1+600.00 s/d 1+650.00 50.00 1.75 0.15 87.50 13.13
2 1+650.00 s/d 1+700.00 50.00 1.75 0.15 87.50 13.13 1+650.00 s/d 1+700.00 50.00 1.75 0.15 87.50 13.13
2 1+700.00 s/d 1+750.00 50.00 1.75 0.15 87.50 13.13 1+700.00 s/d 1+750.00 50.00 1.75 0.15 87.50 13.13
2 1+750.00 s/d 1+900.00 150.00 1.75 0.15 262.50 39.38 1+750.00 s/d 1+900.00 150.00 1.75 0.15 262.50 39.38
1,900.00 498.75 1,900.00 498.75
DIBUAT OLEH :
ALIANI BUULOLO, ST
Tenaga Teknik
PEMERINTAH KABUPATEN NIAS SELATAN
KECAMATAN SIDUA'ORI
BACK UP DATA PERHITUNGAN
VOLUME
DESA ULU IDANODUO MENUJU DESA ORAHUAHILI KEC. MAZO
1 0+000.00 s/d 0+050.00 50.00 1.75 0.80 87.50 70.00 0+000.00 s/d 0+050.00 50.00 1.75 0.80 87.50 70.00
2 0+050.00 s/d 0+100.00 50.00 1.75 0.80 87.50 70.00 0+050.00 s/d 0+100.00 50.00 1.75 0.80 87.50 70.00
3 0+100.00 s/d 0+150.00 50.00 1.75 0.80 87.50 70.00 0+100.00 s/d 0+150.00 50.00 1.75 0.80 87.50 70.00
4 0+150.00 s/d 0+200.00 50.00 1.75 0.80 87.50 70.00 0+150.00 s/d 0+200.00 50.00 1.75 0.80 87.50 70.00
5 0+200.00 s/d 0+250.00 50.00 1.75 0.80 87.50 70.00 0+200.00 s/d 0+250.00 50.00 1.75 0.80 87.50 70.00
6 0+250.00 s/d 0+300.00 50.00 1.75 0.80 87.50 70.00 0+250.00 s/d 0+300.00 50.00 1.75 0.80 87.50 70.00
7 0+300.00 s/d 0+350.00 50.00 1.75 0.80 87.50 70.00 0+300.00 s/d 0+350.00 50.00 1.75 0.80 87.50 70.00
8 0+350.00 s/d 0+400.00 50.00 1.75 0.80 87.50 70.00 0+350.00 s/d 0+400.00 50.00 1.75 0.80 87.50 70.00
9 0+400.00 s/d 0+450.00 50.00 1.75 0.80 87.50 70.00 0+400.00 s/d 0+450.00 50.00 1.75 0.80 87.50 70.00
10 0+450.00 s/d 0+500.00 50.00 1.75 0.80 87.50 70.00 0+450.00 s/d 0+500.00 50.00 1.75 0.80 87.50 70.00
11 0+500.00 s/d 0+550.00 50.00 1.75 0.80 87.50 70.00 0+500.00 s/d 0+550.00 50.00 1.75 0.80 87.50 70.00
12 0+550.00 s/d 0+600.00 50.00 1.75 0.80 87.50 70.00 0+550.00 s/d 0+600.00 50.00 1.75 0.80 87.50 70.00
13 0+600.00 s/d 0+650.00 50.00 1.75 0.80 87.50 70.00 0+600.00 s/d 0+650.00 50.00 1.75 0.80 87.50 70.00
14 0+650.00 s/d 0+700.00 50.00 1.75 0.80 87.50 70.00 0+650.00 s/d 0+700.00 50.00 1.75 0.80 87.50 70.00
15 0+700.00 s/d 0+750.00 50.00 1.75 0.80 87.50 70.00 0+700.00 s/d 0+750.00 50.00 1.75 0.80 87.50 70.00
16 0+750.00 s/d 0+800.00 50.00 1.75 0.80 87.50 70.00 0+750.00 s/d 0+800.00 50.00 1.75 0.80 87.50 70.00
17 0+800.00 s/d 0+850.00 50.00 1.75 0.80 87.50 70.00 0+800.00 s/d 0+850.00 50.00 1.75 0.80 87.50 70.00
18 0+850.00 s/d 0+900.00 50.00 1.75 0.80 87.50 70.00 0+850.00 s/d 0+900.00 50.00 1.75 0.80 87.50 70.00
19 0+900.00 s/d 0+950.00 50.00 1.75 0.80 87.50 70.00 0+900.00 s/d 0+950.00 50.00 1.75 0.80 87.50 70.00
20 0+950.00 s/d 1+000.00 50.00 1.75 0.80 87.50 70.00 0+950.00 s/d 1+000.00 50.00 1.75 0.80 87.50 70.00
21 1+000.00 s/d 1+050.00 50.00 1.75 0.80 87.50 70.00 1+000.00 s/d 1+050.00 50.00 1.75 0.80 87.50 70.00
22 1+050.00 s/d 1+100.00 50.00 1.75 0.80 87.50 70.00 1+050.00 s/d 1+100.00 50.00 1.75 0.80 87.50 70.00
23 1+100.00 s/d 1+150.00 50.00 1.75 0.80 87.50 70.00 1+100.00 s/d 1+150.00 50.00 1.75 0.80 87.50 70.00
24 1+150.00 s/d 1+200.00 50.00 1.75 0.80 87.50 70.00 1+150.00 s/d 1+200.00 50.00 1.75 0.80 87.50 70.00
25 1+200.00 s/d 1+250.00 50.00 1.75 0.80 87.50 70.00 1+200.00 s/d 1+250.00 50.00 1.75 0.80 87.50 70.00
26 1+250.00 s/d 1+300.00 50.00 1.75 0.80 87.50 70.00 1+250.00 s/d 1+300.00 50.00 1.75 0.80 87.50 70.00
27 1+300.00 s/d 1+350.00 50.00 1.75 0.80 87.50 70.00 1+300.00 s/d 1+350.00 50.00 1.75 0.80 87.50 70.00
28 1+350.00 s/d 1+400.00 50.00 1.75 0.80 87.50 70.00 1+350.00 s/d 1+400.00 50.00 1.75 0.80 87.50 70.00
29 1+400.00 s/d 1+450.00 50.00 1.75 0.80 87.50 70.00 1+400.00 s/d 1+450.00 50.00 1.75 0.80 87.50 70.00
30 1+450.00 s/d 1+500.00 50.00 1.75 0.80 87.50 70.00 1+450.00 s/d 1+500.00 50.00 1.75 0.80 87.50 70.00
31 1+500.00 s/d 1+550.00 50.00 1.75 0.80 87.50 70.00 1+500.00 s/d 1+550.00 50.00 1.75 0.80 87.50 70.00
32 1+550.00 s/d 1+600.00 50.00 1.75 0.80 87.50 70.00 1+550.00 s/d 1+600.00 50.00 1.75 0.80 87.50 70.00
33 1+600.00 s/d 1+650.00 50.00 1.75 0.80 87.50 70.00 1+600.00 s/d 1+650.00 50.00 1.75 0.80 87.50 70.00
34 1+650.00 s/d 1+700.00 50.00 1.75 0.80 87.50 70.00 1+650.00 s/d 1+700.00 50.00 1.75 0.80 87.50 70.00
35 1+700.00 s/d 1+900.00 200.00 1.75 0.80 350.00 280.00 1+700.00 s/d 1+900.00 200.00 1.75 0.80 350.00 280.00
1,900.00 2660.00 1,900.00 2660.00
Volume ( Kiri + Kanan ) = 5320.00 Ltr
Volume Dibulatkan = 5320.00 Ltr
DIBUAT OLEH :
ALIANI BUULOLO, ST
Tenaga Teknik
PEMERINTAH KABUPATEN NIAS SELATAN
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
BACK UP DATA
BIDANG BINA MARGA
Jalan Saonigeho KM. 3 Telukdalam
PERKERASAN ASPAL
Pembangunan Jalan Dari Ulu Idanoduo Menuju Desa Orahuahili 6.1.(1)
Kecamatan Mazo Kab. Nias Selatan
LAPIS RESAP PENGIKAT - ELMUSI
REKAPITULASI
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
PEMERINTAH KABUPATEN NIAS SELATAN
KECAMATAN SIDUA'ORI
BACK UP DATA PERHITUNGAN
VOLUME
DESA ULU IDANODUO MENUJU DESA ORAHUAHILI KEC. MAZO
PERKERASAN ASPAL
Pembangunan Jalan Dari Ulu Idanoduo Menuju Desa Orahuahili Kecamatan Mazo Kab.
6.6.(1)
Nias Selatan
LAPIS PERMUKAAN PENTERASI MACADAM
1 0+000.00 s/d 0+050.00 50.00 1.75 0.05 87.50 4.38 0+000.00 s/d 0+050.00 50.00 1.75 0.05 87.50 4.38
2 0+050.00 s/d 0+100.00 50.00 1.75 0.05 87.50 4.38 0+050.00 s/d 0+100.00 50.00 1.75 0.05 87.50 4.38
3 0+100.00 s/d 0+150.00 50.00 1.75 0.05 87.50 4.38 0+100.00 s/d 0+150.00 50.00 1.75 0.05 87.50 4.38
4 0+150.00 s/d 0+200.00 50.00 1.75 0.05 87.50 4.38 0+150.00 s/d 0+200.00 50.00 1.75 0.05 87.50 4.38
5 0+200.00 s/d 0+250.00 50.00 1.75 0.05 87.50 4.38 0+200.00 s/d 0+250.00 50.00 1.75 0.05 87.50 4.38
6 0+250.00 s/d 0+300.00 50.00 1.75 0.05 87.50 4.38 0+250.00 s/d 0+300.00 50.00 1.75 0.05 87.50 4.38
7 0+300.00 s/d 0+350.00 50.00 1.75 0.05 87.50 4.38 0+300.00 s/d 0+350.00 50.00 1.75 0.05 87.50 4.38
8 0+350.00 s/d 0+400.00 50.00 1.75 0.05 87.50 4.38 0+350.00 s/d 0+400.00 50.00 1.75 0.05 87.50 4.38
9 0+400.00 s/d 0+450.00 50.00 1.75 0.05 87.50 4.38 0+400.00 s/d 0+450.00 50.00 1.75 0.05 87.50 4.38
10 0+450.00 s/d 0+500.00 50.00 1.75 0.05 87.50 4.38 0+450.00 s/d 0+500.00 50.00 1.75 0.05 87.50 4.38
11 0+500.00 s/d 0+550.00 50.00 1.75 0.05 87.50 4.38 0+500.00 s/d 0+550.00 50.00 1.75 0.05 87.50 4.38
12 0+550.00 s/d 0+600.00 50.00 1.75 0.05 87.50 4.38 0+550.00 s/d 0+600.00 50.00 1.75 0.05 87.50 4.38
13 0+600.00 s/d 0+650.00 50.00 1.75 0.05 87.50 4.38 0+600.00 s/d 0+650.00 50.00 1.75 0.05 87.50 4.38
14 0+650.00 s/d 0+700.00 50.00 1.75 0.05 87.50 4.38 0+650.00 s/d 0+700.00 50.00 1.75 0.05 87.50 4.38
15 0+700.00 s/d 0+750.00 50.00 1.75 0.05 87.50 4.38 0+700.00 s/d 0+750.00 50.00 1.75 0.05 87.50 4.38
16 0+750.00 s/d 0+800.00 50.00 1.75 0.05 87.50 4.38 0+750.00 s/d 0+800.00 50.00 1.75 0.05 87.50 4.38
17 0+800.00 s/d 0+850.00 50.00 1.75 0.05 87.50 4.38 0+800.00 s/d 0+850.00 50.00 1.75 0.05 87.50 4.38
18 0+850.00 s/d 0+900.00 50.00 1.75 0.05 87.50 4.38 0+850.00 s/d 0+900.00 50.00 1.75 0.05 87.50 4.38
19 0+900.00 s/d 0+950.00 50.00 1.75 0.05 87.50 4.38 0+900.00 s/d 0+950.00 50.00 1.75 0.05 87.50 4.38
20 0+950.00 s/d 1+000.00 50.00 1.75 0.05 87.50 4.38 0+950.00 s/d 1+000.00 50.00 1.75 0.05 87.50 4.38
21 1+000.00 s/d 1+050.00 50.00 1.75 0.05 87.50 4.38 1+000.00 s/d 1+050.00 50.00 1.75 0.05 87.50 4.38
22 1+050.00 s/d 1+100.00 50.00 1.75 0.05 87.50 4.38 1+050.00 s/d 1+100.00 50.00 1.75 0.05 87.50 4.38
23 1+100.00 s/d 1+150.00 50.00 1.75 0.05 87.50 4.38 1+100.00 s/d 1+150.00 50.00 1.75 0.05 87.50 4.38
24 1+150.00 s/d 1+200.00 50.00 1.75 0.05 87.50 4.38 1+150.00 s/d 1+200.00 50.00 1.75 0.05 87.50 4.38
25 1+200.00 s/d 1+250.00 50.00 1.75 0.05 87.50 4.38 1+200.00 s/d 1+250.00 50.00 1.75 0.05 87.50 4.38
26 1+250.00 s/d 1+300.00 50.00 1.75 0.05 87.50 4.38 1+250.00 s/d 1+300.00 50.00 1.75 0.05 87.50 4.38
27 1+300.00 s/d 1+350.00 50.00 1.75 0.05 87.50 4.38 1+300.00 s/d 1+350.00 50.00 1.75 0.05 87.50 4.38
28 1+350.00 s/d 1+400.00 50.00 1.75 0.05 87.50 4.38 1+350.00 s/d 1+400.00 50.00 1.75 0.05 87.50 4.38
29 1+400.00 s/d 1+450.00 50.00 1.75 0.05 87.50 4.38 1+400.00 s/d 1+450.00 50.00 1.75 0.05 87.50 4.38
30 1+450.00 s/d 1+500.00 50.00 1.75 0.05 87.50 4.38 1+450.00 s/d 1+500.00 50.00 1.75 0.05 87.50 4.38
31 1+500.00 s/d 1+550.00 50.00 1.75 0.05 87.50 4.38 1+500.00 s/d 1+550.00 50.00 1.75 0.05 87.50 4.38
32 1+550.00 s/d 1+600.00 50.00 1.75 0.05 87.50 4.38 1+550.00 s/d 1+600.00 50.00 1.75 0.05 87.50 4.38
33 1+600.00 s/d 1+650.00 50.00 1.75 0.05 87.50 4.38 1+600.00 s/d 1+650.00 50.00 1.75 0.05 87.50 4.38
34 1+650.00 s/d 1+700.00 50.00 1.75 0.05 87.50 4.38 1+650.00 s/d 1+700.00 50.00 1.75 0.05 87.50 4.38
35 1+700.00 s/d 1+900.00 200.00 1.75 0.05 350.00 17.50 1+700.00 s/d 1+900.00 200.00 1.75 0.05 350.00 17.50
DIBUAT OLEH :
ALIANI BUULOLO, ST
Tenaga Teknik
PEMERINTAH KABUPATEN NIAS SELATAN
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG BACK UP DATA PERHITUN
BIDANG BINA MARGA
Nama Paket : DIVISI 7. STRUK
Pembangunan Jalan Dari Ulu Idanoduo Menuju Desa Orahuahili Kecamatan Mazo Kab. 7.1 (7) a
Nias Selatan Beton mutu sedang fc’2
JUMLAH BETON
Dibuat Oleh:
KONSULTAN PERENCANA
CV. POLO CONSULTANT
HEMAN F H SIREGAR, ST
Cost & Quantity Engineer
BACK UP DATA PERHITUNGAN VOLUME
DIVISI 7. STRUKTUR
7.1 (7) a
Beton mutu sedang fc’20 Mpa
TOTAL VOLUME
KETERANGAN
(M)
1.90
1.90 M3
PEMERINTAH KABUPATEN NIAS SELATAN
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG BACK UP DATA PER
BIDANG BINA MARGA
Nama Paket : DIVISI 7. S
Pembangunan Jalan Dari Ulu Idanoduo Menuju Desa Orahuahili Kecamatan Mazo Kab. 7.1
Nias Selatan Beton, fc
JUMLAH BET
Dibuat Oleh:
KONSULTAN PERENCANA
CV. POLO CONSULTANT
HEMAN F H SIREGAR, ST
Cost & Quantity Engineer
CK UP DATA PERHITUNGAN VOLUME
DIVISI 7. STRUKTUR
7.1 (8)
Beton, fc’15 Mpa
TOTAL VOLUME
VOLUME M3 KETERANGAN
(M)
0.50 0.50
Pembangunan Jalan Dari Ulu Idanoduo Menuju Desa Orahuahili 7.1 (8a)
Kecamatan Mazo Kab. Nias Selatan
Beton Struktur Campuran 1 : 2 : 3
1 0+398.00 s/d 0+400.00 2.00 2.00 0.15 4.00 0.60 0+398.00 s/d 0+400.00 2.00 2.00 0.15 4.00 0.60
2 0+401.90 s/d 0+403.90 2.00 2.00 0.15 4.00 0.60 0+401.90 s/d 0+403.90 2.00 2.00 0.15 4.00 0.60
Dibuat Oleh:
KONSULTAN PERENCANA
CV. POLO CONSULTANT
HEMAN F. H. SIREGAR, ST
Cost & Quantity Engineer
PEMERINTAH KABUPATEN NIAS SELATAN
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG BACK UP DATA PE
7.3 (1
Pembangunan Jalan Dari Ulu Idanoduo Menuju Desa Orahuahili Kecamatan Mazo Kab. Nias Selatan
Baja Tulangan Po
Bentuk Batang Jlh Batang Panjang/BTG TTL PANJANG Ø Besi BERAT BESI/M'
A B C D=BxC E F
No.
PERHITUNGAN PENULANGAN PLAT DUIKER ( STA. 0 + 400 S/D STA. 0 + 401,90 )
Jumlah Kg
Dibuat Oleh
KONSULTAN PERENCANA
CV. POLO CONSULTANT
HEMAN F H SIREGAR, ST
Cost & Quantity Engineer
BACK UP DATA PERENCANAAN
DIVISI 7. STRUKTUR
7.3 (1)
G=dxf H I=hxg
7.9.(1)
Pembangunan Jalan Dari Ulu Idanoduo Menuju Desa Orahuahili Kecamatan Mazo Kab. Nias Selatan
Pasangan Batu
URAIAN
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
PASANGAN BATU UNTUK PLAT DUIKER STA. 0 + 400 S/D STA. 0 + 401.90
0+401 5.00 0.35 0.70 0.90 1.00 0.50 0.98 0.98 9.75
10.09 -
Volume ( Kiri + Kanan ) = 10.09 M3
Volume Dibulatkan = 10.09 M3
Dibuat Oleh:
KONSULTAN PERENCANA
CV. POLO CONSULTANT
HEMAN F H SIREGAR, ST
Cost & Quantity Engineer
PEMERINTAH KABUPATEN NIAS SELATAN
KECAMATAN SIDUA'ORI
BACK UP DATA PERHITUNGAN VOLUME
DESA ULU IDANODUO MENUJU DESA ORAHUAHILI KEC. MAZO
URAIAN
Kiri Kanan
Jarak Jarak Ket
Sta L.1 L.2 L.3 H.1 H.2 Luas Luas Rata- Sta L.1 L.2 L.3 H.1 H.2 Luas Luas Rata- Volume
(M) Volume (M³) (M)
(M) (M) (M) (M) (M) (M²) rata ( M²) (M) (M) (M) (M) (M) (M²) rata ( M²) (M³)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
DIBUAT OLEH :
ALIANI BUULOLO, ST
Tenaga Teknik
PEMERINTAH KABUPATEN NIAS SELATAN
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
BACK UP DATA
BIDANG BINA MARGA
Jalan Saonigeho KM. 3 Telukdalam
7.9.(1)
Pembangunan Jalan Dari Ulu Idanoduo Menuju Desa Orahuahili Pasangan Batu
Kecamatan Mazo Kab. Nias Selatan
REKAPITULASI
Dibuat Oleh:
KONSULTAN PERENCANA
CV. POLO CONSULTANT
0
0
PEMERINTAH KABUPATEN NIAS SELATAN
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG BACK UP DATA PERE
BIDANG BINA MARGA
Nama Paket : DIVISI 7. STRUK
Pembangunan Jalan Dari Ulu Idanoduo Menuju Desa Orahuahili Kecamatan Mazo Kab. 7.10.(2)
Nias Selatan Pasangan Batu Kos
0+398
2.00 4.00 0.20 0.80 1.60
0+400
Batu Kosong Posisi Dibawah Lantai Duiker Plat Sta. 0 + 400 s/d Sta. 0 + 401.90
0+402
2.00 4.00 0.20 0.80 1.60
0+404
JUMLAH BETON
Dibuat Oleh:
KONSULTAN PERENCANA
CV. POLO CONSULTANT
HEMAN F H SIREGAR, ST
Cost & Quantity Engineer
BACK UP DATA PERENCANAAN
DIVISI 7. STRUKTUR
7.10.(2)
Pasangan Batu Kosong
TOTAL VOLUME
KETERANGAN
(M)
1.60
1.00
1.60
4.20 M3
PEMERINTAH KABUPATEN NIAS SELATAN
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
BACK UP DATA
BIDANG BINA MARGA
Jalan Saonigeho KM. 3 Telukdalam
PERKERASAN ASPAL
Pembangunan Jalan Dari Ulu Idanoduo Menuju Desa Orahuahili 6.6.(1)
Kecamatan Mazo Kab. Nias Selatan
LAPIS PERMUKAAN PENTERASI MACADAM
REKAPITULASI
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?