PEMERINTAH KABUPATEN NIAS SELATAN

KECAMATAN SIDUA'ORI
BACK UP DATA PERHITUNGAN VOLUME
DESA ULU IDANODUO MENUJU DESA ORAHUAHILI KEC. MAZO

Nama Pekerjaan DIVISI 2. DRAINASE


2.1.(1)
Pembangunan Jalan Dari Ulu Idanoduo Menuju Desa Orahuahili Kecamatan Mazo Kab. Nias Selatan
Galian untuk Selokan Drainase dan Saluran Air

Galian Pasangan Batu Mortar


Luas Luas
KIRI Luas VOL KANAN Luas VOL
NO STA. Panjang Rata2 STA Panjang Rata2
L1 L2 L3 H1 H2 m2 m2 m3 L4 L6 H1 H3 H4 m m m2
1 2 2 3 4 5 6 7 8 9 10 11 12 16 17 18 20 21 22 23 24

0+800 1.20 1.10 0.50 0.80 0.20 1.02


100.00 1.02 102.00
0+900 1.20 1.10 0.50 0.80 0.20 1.02

1+000 1.20 1.10 0.50 0.80 0.20 1.02


150.00 1.02 153.00
1+150 1.20 1.10 0.50 0.80 0.20 1.02

1+200 1.20 1.10 0.80 0.92


247.00 0.92 227.24
1+447 1.20 1.10 0.80 0.92

497.00 TOTAL VOLUME KIRI 482.24 TOTAL VOLUME KANAN 0.00


TOTAL VOLUME = 482.24 M3
VOLUME DIBULATKAN = 482.24 M3

DIBUAT OLEH :

ALIANI BUULOLO, ST
Tenaga Teknik
PEMERINTAH KABUPATEN NIAS SELATAN
KECAMATAN SIDUA'ORI
BACK UP DATA PERHITUNGAN VOLUME
DESA ULU IDANODUO MENUJU DESA ORAHUAHILI KEC. MAZO

Nama Pekerjaan DIVISI 2. DRAINASE


2.2.(1)
Pembangunan Jalan Dari Ulu Idanoduo Menuju Desa Orahuahili Kecamatan Mazo Kab. Nias Selatan
Pasangan Batu dengan Mortar

A. Pas. Batu Drainase


Luas Luas
KIRI Luas VOL KANAN Luas VOL
NO STA. Panjang Rata2 STA Panjang Rata2
L1 L2 L3 L4 L5 L6 L7 H1 H2 H3 H4 m2 m2 m3 L1 L4 L5 H2 H3 H4 m m m2
1 2 1 2 3 4 5 6 7 8 6 7 8 9 10 11 12 13 14 15 18 19 21 22 23 24 25 26

0+800 0.30 0.50 0.50 0.62 0.60 0.22 0.20 1.20 0.40 0.20 0.60 0.93
100.00 0.93 92.80
0+900 0.30 0.50 0.50 0.62 0.60 0.22 0.20 1.20 0.40 0.20 0.60 0.93

1+000 0.30 0.50 0.50 0.62 0.60 0.22 0.20 1.20 0.40 0.20 0.60 0.93
150.00 0.93 139.20
1+150 0.30 0.50 0.50 0.62 0.60 0.22 0.20 1.20 0.40 0.20 0.60 0.93

1+200 0.30 0.50 0.50 1.00 1.00 1.00 0.40 0.20 0.80
247.00 0.80 197.60
1+447.00 0.30 0.50 0.50 1.00 1.00 1.00 0.40 0.20 0.80

497.00
TOTAL VOLUME KIRI 429.60 TOTAL VOLUME KANAN 0.00
TOTAL VOLUME = 429.60 M3
VOLUME DIBULATKAN = 429.60 M3

DIBUAT OLEH :

ALIANI BUULOLO, ST
Tenaga Teknik
PEMERINTAH KABUPATEN NIAS SELATAN

KECAMATAN SIDUA'ORI
BACK UP DATA PERHITUNGAN
VOLUME
DESA ULU IDANODUO MENUJU DESA ORAHUAHILI KEC. MAZO

NAMA PEKERJAAN : DIVISI 3.


PEKERJAAN TANAH & GEOSINTETIK
Pembangunan Jalan Dari Ulu Idanoduo Menuju Desa Orahuahili Kecamatan Mazo Kab.
3.2.(2a)
Nias Selatan
TIMBUNAN PILIHAN DARI SUMBER GALIAN

Kiri Volume Kanan Volume


Station Alat Station Alat
Panjang Lebar Tebal Luas Panjang Lebar Tebal Luas
NO. Ket
P l t A =(p*l) A*t P l t A =(p*l) A*t
(STA) (STA)
(m¹) (m¹) (m¹) (m2) (m3) (m¹) (m¹) (m¹) (m2) (m3)

1 0+000.00 s/d 0+050.00 50.00 2.25 0.20 112.50 22.50 0+000.00 s/d 0+050.00 50.00 2.25 0.20 112.50 22.50
2 0+050.00 s/d 0+100.00 50.00 2.25 0.20 112.50 22.50 0+050.00 s/d 0+100.00 50.00 2.25 0.20 112.50 22.50
3 0+100.00 s/d 0+150.00 50.00 2.25 0.20 112.50 22.50 0+100.00 s/d 0+150.00 50.00 2.25 0.20 112.50 22.50
4 0+150.00 s/d 0+200.00 50.00 2.25 0.20 112.50 22.50 0+150.00 s/d 0+200.00 50.00 2.25 0.20 112.50 22.50
5 0+200.00 s/d 0+250.00 50.00 2.25 0.20 112.50 22.50 0+200.00 s/d 0+250.00 50.00 2.25 0.20 112.50 22.50
6 0+250.00 s/d 0+300.00 50.00 2.25 0.20 112.50 22.50 0+250.00 s/d 0+300.00 50.00 2.25 0.20 112.50 22.50
7 0+300.00 s/d 0+350.00 50.00 2.25 0.20 112.50 22.50 0+300.00 s/d 0+350.00 50.00 2.25 0.20 112.50 22.50
8 0+350.00 s/d 0+400.00 50.00 2.25 0.20 112.50 22.50 0+350.00 s/d 0+400.00 50.00 2.25 0.20 112.50 22.50
9 0+400.00 s/d 0+450.00 50.00 2.25 0.20 112.50 22.50 0+400.00 s/d 0+450.00 50.00 2.25 0.20 112.50 22.50
10 0+450.00 s/d 0+500.00 50.00 2.25 0.20 112.50 22.50 0+450.00 s/d 0+500.00 50.00 2.25 0.20 112.50 22.50
11 0+500.00 s/d 0+550.00 50.00 2.25 0.20 112.50 22.50 0+500.00 s/d 0+550.00 50.00 2.25 0.20 112.50 22.50
12 0+550.00 s/d 0+600.00 50.00 2.25 0.20 112.50 22.50 0+550.00 s/d 0+600.00 50.00 2.25 0.20 112.50 22.50
13 0+600.00 s/d 0+650.00 50.00 2.25 0.20 112.50 22.50 0+600.00 s/d 0+650.00 50.00 2.25 0.20 112.50 22.50
14 0+650.00 s/d 0+700.00 50.00 2.25 0.20 112.50 22.50 0+650.00 s/d 0+700.00 50.00 2.25 0.20 112.50 22.50
15 0+700.00 s/d 0+750.00 50.00 2.25 0.20 112.50 22.50 0+700.00 s/d 0+750.00 50.00 2.25 0.20 112.50 22.50
16 0+750.00 s/d 0+800.00 50.00 2.25 0.20 112.50 22.50 0+750.00 s/d 0+800.00 50.00 2.25 0.20 112.50 22.50
17 0+800.00 s/d 0+850.00 50.00 2.25 0.20 112.50 22.50 0+800.00 s/d 0+850.00 50.00 2.25 0.20 112.50 22.50
18 0+850.00 s/d 0+900.00 50.00 2.25 0.20 112.50 22.50 0+850.00 s/d 0+900.00 50.00 2.25 0.20 112.50 22.50
19 0+900.00 s/d 0+950.00 50.00 2.25 0.20 112.50 22.50 0+900.00 s/d 0+950.00 50.00 2.25 0.20 112.50 22.50
20 0+950.00 s/d 1+000.00 50.00 2.25 0.20 112.50 22.50 0+950.00 s/d 1+000.00 50.00 2.25 0.20 112.50 22.50
21 1+000.00 s/d 1+050.00 50.00 2.25 0.20 112.50 22.50 1+000.00 s/d 1+050.00 50.00 2.25 0.20 112.50 22.50
22 1+050.00 s/d 1+100.00 50.00 2.25 0.20 112.50 22.50 1+050.00 s/d 1+100.00 50.00 2.25 0.20 112.50 22.50
23 1+100.00 s/d 1+150.00 50.00 2.25 0.20 112.50 22.50 1+100.00 s/d 1+150.00 50.00 2.25 0.20 112.50 22.50
24 1+150.00 s/d 1+200.00 50.00 2.25 0.20 112.50 22.50 1+150.00 s/d 1+200.00 50.00 2.25 0.20 112.50 22.50
25 1+200.00 s/d 1+250.00 50.00 2.25 0.20 112.50 22.50 1+200.00 s/d 1+250.00 50.00 2.25 0.20 112.50 22.50
26 1+250.00 s/d 1+300.00 50.00 2.25 0.20 112.50 22.50 1+250.00 s/d 1+300.00 50.00 2.25 0.20 112.50 22.50
27 1+300.00 s/d 1+350.00 50.00 2.25 0.20 112.50 22.50 1+300.00 s/d 1+350.00 50.00 2.25 0.20 112.50 22.50
28 1+350.00 s/d 1+400.00 50.00 2.25 0.20 112.50 22.50 1+350.00 s/d 1+400.00 50.00 2.25 0.20 112.50 22.50
29 1+400.00 s/d 1+450.00 50.00 2.25 0.20 112.50 22.50 1+400.00 s/d 1+450.00 50.00 2.25 0.20 112.50 22.50
30 1+450.00 s/d 1+500.00 50.00 2.25 0.20 112.50 22.50 1+450.00 s/d 1+500.00 50.00 2.25 0.20 112.50 22.50
31 1+500.00 s/d 1+550.00 50.00 2.25 0.20 112.50 22.50 1+500.00 s/d 1+550.00 50.00 2.25 0.20 112.50 22.50
32 1+550.00 s/d 1+600.00 50.00 2.25 0.20 112.50 22.50 1+550.00 s/d 1+600.00 50.00 2.25 0.20 112.50 22.50
33 1+600.00 s/d 1+650.00 50.00 2.25 0.20 112.50 22.50 1+600.00 s/d 1+650.00 50.00 2.25 0.20 112.50 22.50
34 1+650.00 s/d 1+700.00 50.00 2.25 0.20 112.50 22.50 1+650.00 s/d 1+700.00 50.00 2.25 0.20 112.50 22.50
35 1+700.00 s/d 1+900.00 200.00 2.25 0.20 450.00 90.00 1+700.00 s/d 1+900.00 200.00 2.25 0.20 450.00 90.00

950.00 765.00 950.00 765.00


Volume ( Kiri + Kanan ) = 1530.00 m3
Volume Dibulatkan = 1530.00 m3

DIBUAT OLEH :

ALIANI BUULOLO, ST
Tenaga Teknik
PEMERINTAH KABUPATEN NIAS SELATAN
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
BACK UP DATA
BIDANG BINA MARGA
Jalan Saonigeho KM. 3 Telukdalam

NAMA PEKERJAAN : DIVISI 3.

PEKERJAAN TANAH & GEOSINTETIK


Pembangunan Jalan Dari Ulu Idanoduo Menuju Desa Orahuahili 3.2.(2a)
Kecamatan Mazo Kab. Nias Selatan
TIMBUNAN PILIHAN DARI SUMBER GALIAN

REKAPITULASI

ITEM PEKERJAAN TOTAL VOLUME KETERANGAN


NO.

( Uraian ) ( Vol. ) ( Ket. )

1 TIMBUNAN PILIHAN DARI SUMBER GALIAN 1530.00 Lembar - 1

2 TIMBUNAN PILIHAN DARI SUMBER GALIAN #NAME? Lembar - 2

TOTAL VOLUME = #NAME? m3


#NAME?
#NAME?
#NAME?

#NAME?
#NAME?
PEMERINTAH KABUPATEN NIAS SELATAN

KECAMATAN SIDUA'ORI
BACK UP DATA PERHITUNGAN
VOLUME
DESA ULU IDANODUO MENUJU DESA ORAHUAHILI KEC. MAZO

NAMA PEKERJAAN : DIVISI 5.

PERKERASAN BERBUTIR
Pembangunan Jalan Dari Ulu Idanoduo Menuju Desa Orahuahili Kecamatan Mazo Kab.
5.1.(1)
Nias Selatan
LAPIS PONDASI AGREGAT KELAS - A

Kiri Kanan
Station Alat Volume Station Alat Volume
Panjang Lebar Tebal Luas Panjang Lebar Tebal Luas
NO. Ket
P l t A =(p*l) A*t P l t A =(p*l) A*t
(STA) (STA)
(m¹) (m¹) (m¹) (m2) (m3) (m¹) (m¹) (m¹) (m2) (m3)

1 0+000.00 s/d 0+050.00 50.00 1.75 0.15 87.50 13.13 0+000.00 s/d 0+050.00 50.00 1.75 0.15 87.50 13.13
2 0+050.00 s/d 0+100.00 50.00 1.75 0.15 87.50 13.13 0+050.00 s/d 0+100.00 50.00 1.75 0.15 87.50 13.13
2 0+100.00 s/d 0+150.00 50.00 1.75 0.15 87.50 13.13 0+100.00 s/d 0+150.00 50.00 1.75 0.15 87.50 13.13
2 0+150.00 s/d 0+200.00 50.00 1.75 0.15 87.50 13.13 0+150.00 s/d 0+200.00 50.00 1.75 0.15 87.50 13.13
2 0+200.00 s/d 0+250.00 50.00 1.75 0.15 87.50 13.13 0+200.00 s/d 0+250.00 50.00 1.75 0.15 87.50 13.13
2 0+250.00 s/d 0+300.00 50.00 1.75 0.15 87.50 13.13 0+250.00 s/d 0+300.00 50.00 1.75 0.15 87.50 13.13
2 0+300.00 s/d 0+350.00 50.00 1.75 0.15 87.50 13.13 0+300.00 s/d 0+350.00 50.00 1.75 0.15 87.50 13.13
2 0+350.00 s/d 0+400.00 50.00 1.75 0.15 87.50 13.13 0+350.00 s/d 0+400.00 50.00 1.75 0.15 87.50 13.13
2 0+400.00 s/d 0+450.00 50.00 1.75 0.15 87.50 13.13 0+400.00 s/d 0+450.00 50.00 1.75 0.15 87.50 13.13
2 0+450.00 s/d 0+500.00 50.00 1.75 0.15 87.50 13.13 0+450.00 s/d 0+500.00 50.00 1.75 0.15 87.50 13.13
2 0+500.00 s/d 0+550.00 50.00 1.75 0.15 87.50 13.13 0+500.00 s/d 0+550.00 50.00 1.75 0.15 87.50 13.13
2 0+550.00 s/d 0+600.00 50.00 1.75 0.15 87.50 13.13 0+550.00 s/d 0+600.00 50.00 1.75 0.15 87.50 13.13
2 0+600.00 s/d 0+650.00 50.00 1.75 0.15 87.50 13.13 0+600.00 s/d 0+650.00 50.00 1.75 0.15 87.50 13.13
2 0+650.00 s/d 0+700.00 50.00 1.75 0.15 87.50 13.13 0+650.00 s/d 0+700.00 50.00 1.75 0.15 87.50 13.13
2 0+700.00 s/d 0+750.00 50.00 1.75 0.15 87.50 13.13 0+700.00 s/d 0+750.00 50.00 1.75 0.15 87.50 13.13
2 0+750.00 s/d 0+800.00 50.00 1.75 0.15 87.50 13.13 0+750.00 s/d 0+800.00 50.00 1.75 0.15 87.50 13.13
2 0+800.00 s/d 0+850.00 50.00 1.75 0.15 87.50 13.13 0+800.00 s/d 0+850.00 50.00 1.75 0.15 87.50 13.13
2 0+850.00 s/d 0+900.00 50.00 1.75 0.15 87.50 13.13 0+850.00 s/d 0+900.00 50.00 1.75 0.15 87.50 13.13
2 0+900.00 s/d 0+950.00 50.00 1.75 0.15 87.50 13.13 0+900.00 s/d 0+950.00 50.00 1.75 0.15 87.50 13.13
2 0+950.00 s/d 1+000.00 50.00 1.75 0.15 87.50 13.13 0+950.00 s/d 1+000.00 50.00 1.75 0.15 87.50 13.13
2 1+000.00 s/d 1+050.00 50.00 1.75 0.15 87.50 13.13 1+000.00 s/d 1+050.00 50.00 1.75 0.15 87.50 13.13
2 1+050.00 s/d 1+100.00 50.00 1.75 0.15 87.50 13.13 1+050.00 s/d 1+100.00 50.00 1.75 0.15 87.50 13.13
2 1+100.00 s/d 1+150.00 50.00 1.75 0.15 87.50 13.13 1+100.00 s/d 1+150.00 50.00 1.75 0.15 87.50 13.13
2 1+150.00 s/d 1+200.00 50.00 1.75 0.15 87.50 13.13 1+150.00 s/d 1+200.00 50.00 1.75 0.15 87.50 13.13
2 1+200.00 s/d 1+250.00 50.00 1.75 0.15 87.50 13.13 1+200.00 s/d 1+250.00 50.00 1.75 0.15 87.50 13.13
2 1+250.00 s/d 1+300.00 50.00 1.75 0.15 87.50 13.13 1+250.00 s/d 1+300.00 50.00 1.75 0.15 87.50 13.13
2 1+300.00 s/d 1+350.00 50.00 1.75 0.15 87.50 13.13 1+300.00 s/d 1+350.00 50.00 1.75 0.15 87.50 13.13
2 1+350.00 s/d 1+400.00 50.00 1.75 0.15 87.50 13.13 1+350.00 s/d 1+400.00 50.00 1.75 0.15 87.50 13.13
2 1+400.00 s/d 1+450.00 50.00 1.75 0.15 87.50 13.13 1+400.00 s/d 1+450.00 50.00 1.75 0.15 87.50 13.13
2 1+450.00 s/d 1+500.00 50.00 1.75 0.15 87.50 13.13 1+450.00 s/d 1+500.00 50.00 1.75 0.15 87.50 13.13
2 1+500.00 s/d 1+550.00 50.00 1.75 0.15 87.50 13.13 1+500.00 s/d 1+550.00 50.00 1.75 0.15 87.50 13.13
2 1+550.00 s/d 1+600.00 50.00 1.75 0.15 87.50 13.13 1+550.00 s/d 1+600.00 50.00 1.75 0.15 87.50 13.13
2 1+600.00 s/d 1+650.00 50.00 1.75 0.15 87.50 13.13 1+600.00 s/d 1+650.00 50.00 1.75 0.15 87.50 13.13
2 1+650.00 s/d 1+700.00 50.00 1.75 0.15 87.50 13.13 1+650.00 s/d 1+700.00 50.00 1.75 0.15 87.50 13.13
2 1+700.00 s/d 1+750.00 50.00 1.75 0.15 87.50 13.13 1+700.00 s/d 1+750.00 50.00 1.75 0.15 87.50 13.13
2 1+750.00 s/d 1+900.00 150.00 1.75 0.15 262.50 39.38 1+750.00 s/d 1+900.00 150.00 1.75 0.15 262.50 39.38
1,900.00 498.75 1,900.00 498.75

Volume ( Kiri + Kanan ) = 997.50 m3

Volume Dibulatkan = 997.50 m3

DIBUAT OLEH :

ALIANI BUULOLO, ST
Tenaga Teknik
PEMERINTAH KABUPATEN NIAS SELATAN

KECAMATAN SIDUA'ORI
BACK UP DATA PERHITUNGAN
VOLUME
DESA ULU IDANODUO MENUJU DESA ORAHUAHILI KEC. MAZO

NAMA PEKERJAAN : DIVISI 6.


PERKERASAN ASPAL
Pembangunan Jalan Dari Ulu Idanoduo Menuju Desa Orahuahili 6.1.(1)
Kecamatan Mazo Kab. Nias Selatan
LAPIS RESAP PENGIKAT - ELMUSI

Kiri Volume Kanan Volume


Station Alat Station Alat
Panjang Lebar Aspal Luas Panjang Lebar Aspal Luas
NO. Ket
P l t A =(p*l) A*t P l t A =(p*l) A*t
(STA) (STA)
(m¹) (m¹) (l¹) (m2) (Ltr) (m¹) (m¹) (l¹) (m2) (Ltr)

1 0+000.00 s/d 0+050.00 50.00 1.75 0.80 87.50 70.00 0+000.00 s/d 0+050.00 50.00 1.75 0.80 87.50 70.00
2 0+050.00 s/d 0+100.00 50.00 1.75 0.80 87.50 70.00 0+050.00 s/d 0+100.00 50.00 1.75 0.80 87.50 70.00
3 0+100.00 s/d 0+150.00 50.00 1.75 0.80 87.50 70.00 0+100.00 s/d 0+150.00 50.00 1.75 0.80 87.50 70.00
4 0+150.00 s/d 0+200.00 50.00 1.75 0.80 87.50 70.00 0+150.00 s/d 0+200.00 50.00 1.75 0.80 87.50 70.00
5 0+200.00 s/d 0+250.00 50.00 1.75 0.80 87.50 70.00 0+200.00 s/d 0+250.00 50.00 1.75 0.80 87.50 70.00
6 0+250.00 s/d 0+300.00 50.00 1.75 0.80 87.50 70.00 0+250.00 s/d 0+300.00 50.00 1.75 0.80 87.50 70.00
7 0+300.00 s/d 0+350.00 50.00 1.75 0.80 87.50 70.00 0+300.00 s/d 0+350.00 50.00 1.75 0.80 87.50 70.00
8 0+350.00 s/d 0+400.00 50.00 1.75 0.80 87.50 70.00 0+350.00 s/d 0+400.00 50.00 1.75 0.80 87.50 70.00
9 0+400.00 s/d 0+450.00 50.00 1.75 0.80 87.50 70.00 0+400.00 s/d 0+450.00 50.00 1.75 0.80 87.50 70.00
10 0+450.00 s/d 0+500.00 50.00 1.75 0.80 87.50 70.00 0+450.00 s/d 0+500.00 50.00 1.75 0.80 87.50 70.00
11 0+500.00 s/d 0+550.00 50.00 1.75 0.80 87.50 70.00 0+500.00 s/d 0+550.00 50.00 1.75 0.80 87.50 70.00
12 0+550.00 s/d 0+600.00 50.00 1.75 0.80 87.50 70.00 0+550.00 s/d 0+600.00 50.00 1.75 0.80 87.50 70.00
13 0+600.00 s/d 0+650.00 50.00 1.75 0.80 87.50 70.00 0+600.00 s/d 0+650.00 50.00 1.75 0.80 87.50 70.00
14 0+650.00 s/d 0+700.00 50.00 1.75 0.80 87.50 70.00 0+650.00 s/d 0+700.00 50.00 1.75 0.80 87.50 70.00
15 0+700.00 s/d 0+750.00 50.00 1.75 0.80 87.50 70.00 0+700.00 s/d 0+750.00 50.00 1.75 0.80 87.50 70.00
16 0+750.00 s/d 0+800.00 50.00 1.75 0.80 87.50 70.00 0+750.00 s/d 0+800.00 50.00 1.75 0.80 87.50 70.00
17 0+800.00 s/d 0+850.00 50.00 1.75 0.80 87.50 70.00 0+800.00 s/d 0+850.00 50.00 1.75 0.80 87.50 70.00
18 0+850.00 s/d 0+900.00 50.00 1.75 0.80 87.50 70.00 0+850.00 s/d 0+900.00 50.00 1.75 0.80 87.50 70.00
19 0+900.00 s/d 0+950.00 50.00 1.75 0.80 87.50 70.00 0+900.00 s/d 0+950.00 50.00 1.75 0.80 87.50 70.00
20 0+950.00 s/d 1+000.00 50.00 1.75 0.80 87.50 70.00 0+950.00 s/d 1+000.00 50.00 1.75 0.80 87.50 70.00
21 1+000.00 s/d 1+050.00 50.00 1.75 0.80 87.50 70.00 1+000.00 s/d 1+050.00 50.00 1.75 0.80 87.50 70.00
22 1+050.00 s/d 1+100.00 50.00 1.75 0.80 87.50 70.00 1+050.00 s/d 1+100.00 50.00 1.75 0.80 87.50 70.00
23 1+100.00 s/d 1+150.00 50.00 1.75 0.80 87.50 70.00 1+100.00 s/d 1+150.00 50.00 1.75 0.80 87.50 70.00
24 1+150.00 s/d 1+200.00 50.00 1.75 0.80 87.50 70.00 1+150.00 s/d 1+200.00 50.00 1.75 0.80 87.50 70.00
25 1+200.00 s/d 1+250.00 50.00 1.75 0.80 87.50 70.00 1+200.00 s/d 1+250.00 50.00 1.75 0.80 87.50 70.00
26 1+250.00 s/d 1+300.00 50.00 1.75 0.80 87.50 70.00 1+250.00 s/d 1+300.00 50.00 1.75 0.80 87.50 70.00
27 1+300.00 s/d 1+350.00 50.00 1.75 0.80 87.50 70.00 1+300.00 s/d 1+350.00 50.00 1.75 0.80 87.50 70.00
28 1+350.00 s/d 1+400.00 50.00 1.75 0.80 87.50 70.00 1+350.00 s/d 1+400.00 50.00 1.75 0.80 87.50 70.00
29 1+400.00 s/d 1+450.00 50.00 1.75 0.80 87.50 70.00 1+400.00 s/d 1+450.00 50.00 1.75 0.80 87.50 70.00
30 1+450.00 s/d 1+500.00 50.00 1.75 0.80 87.50 70.00 1+450.00 s/d 1+500.00 50.00 1.75 0.80 87.50 70.00
31 1+500.00 s/d 1+550.00 50.00 1.75 0.80 87.50 70.00 1+500.00 s/d 1+550.00 50.00 1.75 0.80 87.50 70.00
32 1+550.00 s/d 1+600.00 50.00 1.75 0.80 87.50 70.00 1+550.00 s/d 1+600.00 50.00 1.75 0.80 87.50 70.00
33 1+600.00 s/d 1+650.00 50.00 1.75 0.80 87.50 70.00 1+600.00 s/d 1+650.00 50.00 1.75 0.80 87.50 70.00
34 1+650.00 s/d 1+700.00 50.00 1.75 0.80 87.50 70.00 1+650.00 s/d 1+700.00 50.00 1.75 0.80 87.50 70.00
35 1+700.00 s/d 1+900.00 200.00 1.75 0.80 350.00 280.00 1+700.00 s/d 1+900.00 200.00 1.75 0.80 350.00 280.00
1,900.00 2660.00 1,900.00 2660.00
Volume ( Kiri + Kanan ) = 5320.00 Ltr
Volume Dibulatkan = 5320.00 Ltr

DIBUAT OLEH :

ALIANI BUULOLO, ST
Tenaga Teknik
PEMERINTAH KABUPATEN NIAS SELATAN
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
BACK UP DATA
BIDANG BINA MARGA
Jalan Saonigeho KM. 3 Telukdalam

NAMA PEKERJAAN : DIVISI 6.

PERKERASAN ASPAL
Pembangunan Jalan Dari Ulu Idanoduo Menuju Desa Orahuahili 6.1.(1)
Kecamatan Mazo Kab. Nias Selatan
LAPIS RESAP PENGIKAT - ELMUSI

REKAPITULASI

ITEM PEKERJAAN TOTAL VOLUME KETERANGAN


NO.

( Uraian ) ( Vol. ) ( Ket. )

1 LAPIS RESAP PENGIKAT - ELMUSI 5320.00 Lembar - 1

2 LAPIS RESAP PENGIKAT - ELMUSI Err:509 Lembar - 2

TOTAL VOLUME = Err:509 Liter


TOTAL VOLUME = Err:509 Liter

#NAME?
#NAME?
#NAME?

#NAME?
#NAME?
PEMERINTAH KABUPATEN NIAS SELATAN

KECAMATAN SIDUA'ORI
BACK UP DATA PERHITUNGAN
VOLUME
DESA ULU IDANODUO MENUJU DESA ORAHUAHILI KEC. MAZO

NAMA PEKERJAAN : DIVISI 6.

PERKERASAN ASPAL
Pembangunan Jalan Dari Ulu Idanoduo Menuju Desa Orahuahili Kecamatan Mazo Kab.
6.6.(1)
Nias Selatan
LAPIS PERMUKAAN PENTERASI MACADAM

Kiri Volume Kanan Volume


Station Alat Station Alat
Panjang Lebar Tebal Luas Panjang Lebar Tebal Luas
NO. Ket
P l t A =(p*l) A*t P l t A =(p*l) A*t
(STA) (STA)
(m¹) (m¹) (m¹) (m2) (m3) (m¹) (m¹) (m¹) (m2) (m3)

1 0+000.00 s/d 0+050.00 50.00 1.75 0.05 87.50 4.38 0+000.00 s/d 0+050.00 50.00 1.75 0.05 87.50 4.38
2 0+050.00 s/d 0+100.00 50.00 1.75 0.05 87.50 4.38 0+050.00 s/d 0+100.00 50.00 1.75 0.05 87.50 4.38
3 0+100.00 s/d 0+150.00 50.00 1.75 0.05 87.50 4.38 0+100.00 s/d 0+150.00 50.00 1.75 0.05 87.50 4.38
4 0+150.00 s/d 0+200.00 50.00 1.75 0.05 87.50 4.38 0+150.00 s/d 0+200.00 50.00 1.75 0.05 87.50 4.38
5 0+200.00 s/d 0+250.00 50.00 1.75 0.05 87.50 4.38 0+200.00 s/d 0+250.00 50.00 1.75 0.05 87.50 4.38
6 0+250.00 s/d 0+300.00 50.00 1.75 0.05 87.50 4.38 0+250.00 s/d 0+300.00 50.00 1.75 0.05 87.50 4.38
7 0+300.00 s/d 0+350.00 50.00 1.75 0.05 87.50 4.38 0+300.00 s/d 0+350.00 50.00 1.75 0.05 87.50 4.38
8 0+350.00 s/d 0+400.00 50.00 1.75 0.05 87.50 4.38 0+350.00 s/d 0+400.00 50.00 1.75 0.05 87.50 4.38
9 0+400.00 s/d 0+450.00 50.00 1.75 0.05 87.50 4.38 0+400.00 s/d 0+450.00 50.00 1.75 0.05 87.50 4.38
10 0+450.00 s/d 0+500.00 50.00 1.75 0.05 87.50 4.38 0+450.00 s/d 0+500.00 50.00 1.75 0.05 87.50 4.38
11 0+500.00 s/d 0+550.00 50.00 1.75 0.05 87.50 4.38 0+500.00 s/d 0+550.00 50.00 1.75 0.05 87.50 4.38
12 0+550.00 s/d 0+600.00 50.00 1.75 0.05 87.50 4.38 0+550.00 s/d 0+600.00 50.00 1.75 0.05 87.50 4.38
13 0+600.00 s/d 0+650.00 50.00 1.75 0.05 87.50 4.38 0+600.00 s/d 0+650.00 50.00 1.75 0.05 87.50 4.38
14 0+650.00 s/d 0+700.00 50.00 1.75 0.05 87.50 4.38 0+650.00 s/d 0+700.00 50.00 1.75 0.05 87.50 4.38
15 0+700.00 s/d 0+750.00 50.00 1.75 0.05 87.50 4.38 0+700.00 s/d 0+750.00 50.00 1.75 0.05 87.50 4.38
16 0+750.00 s/d 0+800.00 50.00 1.75 0.05 87.50 4.38 0+750.00 s/d 0+800.00 50.00 1.75 0.05 87.50 4.38
17 0+800.00 s/d 0+850.00 50.00 1.75 0.05 87.50 4.38 0+800.00 s/d 0+850.00 50.00 1.75 0.05 87.50 4.38
18 0+850.00 s/d 0+900.00 50.00 1.75 0.05 87.50 4.38 0+850.00 s/d 0+900.00 50.00 1.75 0.05 87.50 4.38
19 0+900.00 s/d 0+950.00 50.00 1.75 0.05 87.50 4.38 0+900.00 s/d 0+950.00 50.00 1.75 0.05 87.50 4.38
20 0+950.00 s/d 1+000.00 50.00 1.75 0.05 87.50 4.38 0+950.00 s/d 1+000.00 50.00 1.75 0.05 87.50 4.38
21 1+000.00 s/d 1+050.00 50.00 1.75 0.05 87.50 4.38 1+000.00 s/d 1+050.00 50.00 1.75 0.05 87.50 4.38
22 1+050.00 s/d 1+100.00 50.00 1.75 0.05 87.50 4.38 1+050.00 s/d 1+100.00 50.00 1.75 0.05 87.50 4.38
23 1+100.00 s/d 1+150.00 50.00 1.75 0.05 87.50 4.38 1+100.00 s/d 1+150.00 50.00 1.75 0.05 87.50 4.38
24 1+150.00 s/d 1+200.00 50.00 1.75 0.05 87.50 4.38 1+150.00 s/d 1+200.00 50.00 1.75 0.05 87.50 4.38
25 1+200.00 s/d 1+250.00 50.00 1.75 0.05 87.50 4.38 1+200.00 s/d 1+250.00 50.00 1.75 0.05 87.50 4.38
26 1+250.00 s/d 1+300.00 50.00 1.75 0.05 87.50 4.38 1+250.00 s/d 1+300.00 50.00 1.75 0.05 87.50 4.38
27 1+300.00 s/d 1+350.00 50.00 1.75 0.05 87.50 4.38 1+300.00 s/d 1+350.00 50.00 1.75 0.05 87.50 4.38
28 1+350.00 s/d 1+400.00 50.00 1.75 0.05 87.50 4.38 1+350.00 s/d 1+400.00 50.00 1.75 0.05 87.50 4.38
29 1+400.00 s/d 1+450.00 50.00 1.75 0.05 87.50 4.38 1+400.00 s/d 1+450.00 50.00 1.75 0.05 87.50 4.38
30 1+450.00 s/d 1+500.00 50.00 1.75 0.05 87.50 4.38 1+450.00 s/d 1+500.00 50.00 1.75 0.05 87.50 4.38
31 1+500.00 s/d 1+550.00 50.00 1.75 0.05 87.50 4.38 1+500.00 s/d 1+550.00 50.00 1.75 0.05 87.50 4.38
32 1+550.00 s/d 1+600.00 50.00 1.75 0.05 87.50 4.38 1+550.00 s/d 1+600.00 50.00 1.75 0.05 87.50 4.38
33 1+600.00 s/d 1+650.00 50.00 1.75 0.05 87.50 4.38 1+600.00 s/d 1+650.00 50.00 1.75 0.05 87.50 4.38
34 1+650.00 s/d 1+700.00 50.00 1.75 0.05 87.50 4.38 1+650.00 s/d 1+700.00 50.00 1.75 0.05 87.50 4.38
35 1+700.00 s/d 1+900.00 200.00 1.75 0.05 350.00 17.50 1+700.00 s/d 1+900.00 200.00 1.75 0.05 350.00 17.50

1,900.00 166.25 1,900.00 166.25


Volume ( Kiri + Kanan ) = 332.50 m3
Volume Dibulatkan = 332.50 m3

DIBUAT OLEH :

ALIANI BUULOLO, ST
Tenaga Teknik
PEMERINTAH KABUPATEN NIAS SELATAN
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG BACK UP DATA PERHITUN
BIDANG BINA MARGA
Nama Paket : DIVISI 7. STRUK
Pembangunan Jalan Dari Ulu Idanoduo Menuju Desa Orahuahili Kecamatan Mazo Kab. 7.1 (7) a
Nias Selatan Beton mutu sedang fc’2

STA PANJANG (M) LEBAR ( M ) TEBAL (M) LUAS VOLUME M3

PEKERJAAN BETON fc' 20 Mpa UNTUK DUIKER PLAT

0+400 1.90 5.00 0.20 1.00 1.90

JUMLAH BETON

Dibuat Oleh:
KONSULTAN PERENCANA
CV. POLO CONSULTANT

HEMAN F H SIREGAR, ST
Cost & Quantity Engineer
BACK UP DATA PERHITUNGAN VOLUME

DIVISI 7. STRUKTUR
7.1 (7) a
Beton mutu sedang fc’20 Mpa

TOTAL VOLUME
KETERANGAN
(M)

1.90

1.90 M3
PEMERINTAH KABUPATEN NIAS SELATAN
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG BACK UP DATA PER
BIDANG BINA MARGA
Nama Paket : DIVISI 7. S
Pembangunan Jalan Dari Ulu Idanoduo Menuju Desa Orahuahili Kecamatan Mazo Kab. 7.1
Nias Selatan Beton, fc

STA PANJANG (M) LEBAR ( M ) TEBAL (M) LUAS

PEKERJAAN BETON fc' 15 Mpa UNTUK DUIKER PLAT

0+400 1.00 5.00 0.10 0.50

JUMLAH BET

Dibuat Oleh:
KONSULTAN PERENCANA
CV. POLO CONSULTANT

HEMAN F H SIREGAR, ST
Cost & Quantity Engineer
CK UP DATA PERHITUNGAN VOLUME

DIVISI 7. STRUKTUR
7.1 (8)
Beton, fc’15 Mpa

TOTAL VOLUME
VOLUME M3 KETERANGAN
(M)

0.50 0.50

JUMLAH BETON 0.50 M3


PEMERINTAH KABUPATEN NIAS SELATAN
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
BACK UP DATA
BIDANG BINA MARGA
Jalan Saonigeho KM. 3 Telukdalam

NAMA PEKERJAAN : DIVISI 7. STRUKTUR

Pembangunan Jalan Dari Ulu Idanoduo Menuju Desa Orahuahili 7.1 (8a)
Kecamatan Mazo Kab. Nias Selatan
Beton Struktur Campuran 1 : 2 : 3

Kiri Volume Kanan Volume


Station Alat Station Alat
Panjang Lebar Tebal Luas Panjang Lebar Tebal Luas
NO. Ket
P l t A =(p*l) A*t P l t A =(p*l) A*t
(STA) (STA)
(m¹) (m¹) (m¹) (m2) (m3) (m¹) (m¹) (m¹) (m2) (m3)

1 0+398.00 s/d 0+400.00 2.00 2.00 0.15 4.00 0.60 0+398.00 s/d 0+400.00 2.00 2.00 0.15 4.00 0.60

2 0+401.90 s/d 0+403.90 2.00 2.00 0.15 4.00 0.60 0+401.90 s/d 0+403.90 2.00 2.00 0.15 4.00 0.60

4.00 1.20 4.00 1.20


Volume ( Kiri + Kanan ) = 2.40 m3
Volume Dibulatkan = 2.40 m3

Dibuat Oleh:
KONSULTAN PERENCANA
CV. POLO CONSULTANT

HEMAN F. H. SIREGAR, ST
Cost & Quantity Engineer
PEMERINTAH KABUPATEN NIAS SELATAN
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG BACK UP DATA PE

BIDANG BINA MARGA


Nama Paket : DIVISI 7. ST

7.3 (1
Pembangunan Jalan Dari Ulu Idanoduo Menuju Desa Orahuahili Kecamatan Mazo Kab. Nias Selatan
Baja Tulangan Po

Bentuk Batang Jlh Batang Panjang/BTG TTL PANJANG Ø Besi BERAT BESI/M'

A B C D=BxC E F
No.
PERHITUNGAN PENULANGAN PLAT DUIKER ( STA. 0 + 400 S/D STA. 0 + 401,90 )

Tulagan melintang (A1) 13.00 5.30 68.90 12 0.89


1
Tulangan Melintang (A2) 13.00 5.06 65.78 12 0.89

Tulangan Memanjang (B1) 34.00 2.00 68.00 12 0.89


2
Tulangan Memanjang (B2) 34.00 1.76 59.84 12 0.89

3 Angkur Beton 10.00 0.54 5.40 12 0.89

Jumlah Kg

Dibuat Oleh
KONSULTAN PERENCANA
CV. POLO CONSULTANT

HEMAN F H SIREGAR, ST
Cost & Quantity Engineer
BACK UP DATA PERENCANAAN

DIVISI 7. STRUKTUR

7.3 (1)

Baja Tulangan Polos-BjTP 280

TTL BERAT(Kg) Unit TTL BERAT(Kg)

G=dxf H I=hxg

PLAT DUIKER ( STA. 0 + 400 S/D STA. 0 + 401,90 )

61.17 1.00 61.17

58.40 1.00 58.40

60.37 1.00 60.37

53.12 1.00 53.12

4.79 1.00 4.79

Jumlah Kg Tiga Unit Tulangan Plat Duiker 237.85 Kg


Total Berat Besi 237.85 Kg
PEMERINTAH KABUPATEN NIAS SELATAN
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
BACK UP DATA PERENCANAAN
BIDANG BINA MARGA

Jalan Saonigeho KM. 3 Telukdalam


Nama Pekerjaan DIVISI 7. STRUKTUR

7.9.(1)
Pembangunan Jalan Dari Ulu Idanoduo Menuju Desa Orahuahili Kecamatan Mazo Kab. Nias Selatan
Pasangan Batu

URAIAN

Jarak Jarak Ket


Sta Sta
(M) L.1 L.2 L.3 H.1 H.2 Luas Luas Rata- Volume (M) L.1 L.2 L.3 H.1 H.2 Luas Luas Rata- Volume
(M) (M) (M) (M) (M) (M²) rata ( M²) (M³) (M) (M) (M) (M) (M) (M²) rata ( M²) (M³)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21

PASANGAN BATU UNTUK PLAT DUIKER STA. 0 + 400 S/D STA. 0 + 401.90
0+401 5.00 0.35 0.70 0.90 1.00 0.50 0.98 0.98 9.75

Pekerjaan Loning STA. 0 + 400 S/D STA. 0 + 401.90

0+401 1.90 0.30 0.30 0.30 0.09 0.09 0.34

10.09 -
Volume ( Kiri + Kanan ) = 10.09 M3
Volume Dibulatkan = 10.09 M3

Dibuat Oleh:
KONSULTAN PERENCANA
CV. POLO CONSULTANT

HEMAN F H SIREGAR, ST
Cost & Quantity Engineer
PEMERINTAH KABUPATEN NIAS SELATAN
KECAMATAN SIDUA'ORI
BACK UP DATA PERHITUNGAN VOLUME
DESA ULU IDANODUO MENUJU DESA ORAHUAHILI KEC. MAZO

Nama Pekerjaan DIVISI 7. STRUKTUR


7.9.(1)
Pembangunan Jalan Dari Ulu Idanoduo Menuju Desa Orahuahili Kecamatan Mazo Kab. Nias Selatan
Pasangan Batu

URAIAN
Kiri Kanan
Jarak Jarak Ket
Sta L.1 L.2 L.3 H.1 H.2 Luas Luas Rata- Sta L.1 L.2 L.3 H.1 H.2 Luas Luas Rata- Volume
(M) Volume (M³) (M)
(M) (M) (M) (M) (M) (M²) rata ( M²) (M) (M) (M) (M) (M) (M²) rata ( M²) (M³)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21

0+050 0.30 0.60 0.60 1.20 0.40 0.78


100.00 0.78 78.00
0+150 0.30 0.60 0.60 1.20 0.40 0.78

0+200 0.30 0.60 0.60 1.20 0.50 0.84


250.00 0.84 210.00
0+450 0.30 0.60 0.60 1.20 0.50 0.84

0+525 0.30 0.60 0.60 1.20 0.40 0.78


220.00 0.78 171.60
0+745 0.30 0.60 0.60 1.20 0.40 0.78

1+050 0.30 0.60 0.60 1.20 0.40 0.78


200.00 0.78 156.00
1+250 0.30 0.60 0.60 1.20 0.40 0.78

420.00 327.60 350.00 288.00


Volume ( Kiri + Kanan ) = 615.60 M3
Volume Dibulatkan = 615.60 M3

DIBUAT OLEH :

ALIANI BUULOLO, ST
Tenaga Teknik
PEMERINTAH KABUPATEN NIAS SELATAN
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
BACK UP DATA
BIDANG BINA MARGA
Jalan Saonigeho KM. 3 Telukdalam

NAMA PEKERJAAN : DIVISI 7. STRUKTUR

7.9.(1)
Pembangunan Jalan Dari Ulu Idanoduo Menuju Desa Orahuahili Pasangan Batu
Kecamatan Mazo Kab. Nias Selatan

REKAPITULASI

ITEM PEKERJAAN TOTAL VOLUME KETERANGAN


NO.

( Uraian ) ( Vol. ) ( Ket. )

1 Pasangan Batu Untuk Duiker 10.09 Lembar - 1

2 Pasangan Batu 615.60 Lembar - 2

TOTAL VOLUME = 625.69 m3

Dibuat Oleh:
KONSULTAN PERENCANA
CV. POLO CONSULTANT

0
0
PEMERINTAH KABUPATEN NIAS SELATAN
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG BACK UP DATA PERE
BIDANG BINA MARGA
Nama Paket : DIVISI 7. STRUK
Pembangunan Jalan Dari Ulu Idanoduo Menuju Desa Orahuahili Kecamatan Mazo Kab. 7.10.(2)
Nias Selatan Pasangan Batu Kos

STA PANJANG (M) LEBAR ( M ) TEBAL (M) LUAS VOLUME M3

0+398
2.00 4.00 0.20 0.80 1.60
0+400

Batu Kosong Posisi Dibawah Lantai Duiker Plat Sta. 0 + 400 s/d Sta. 0 + 401.90

0+401 1.00 5.00 0.20 1.00 1.00

0+402
2.00 4.00 0.20 0.80 1.60
0+404

JUMLAH BETON

Dibuat Oleh:
KONSULTAN PERENCANA
CV. POLO CONSULTANT

HEMAN F H SIREGAR, ST
Cost & Quantity Engineer
BACK UP DATA PERENCANAAN

DIVISI 7. STRUKTUR
7.10.(2)
Pasangan Batu Kosong

TOTAL VOLUME
KETERANGAN
(M)

1.60

1.00

1.60

4.20 M3
PEMERINTAH KABUPATEN NIAS SELATAN
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
BACK UP DATA
BIDANG BINA MARGA
Jalan Saonigeho KM. 3 Telukdalam

NAMA PEKERJAAN : DIVISI 6.

PERKERASAN ASPAL
Pembangunan Jalan Dari Ulu Idanoduo Menuju Desa Orahuahili 6.6.(1)
Kecamatan Mazo Kab. Nias Selatan
LAPIS PERMUKAAN PENTERASI MACADAM

REKAPITULASI

ITEM PEKERJAAN TOTAL VOLUME KETERANGAN


NO.

( Uraian ) ( Vol. ) ( Ket. )

1 LAPIS PERMUKAAN PENTERASI MACADAM 332.50 Lembar - 1

2 LAPIS PERMUKAAN PENTERASI MACADAM #NAME? Lembar - 2

TOTAL VOLUME = #NAME? m3