No. JABATAN SAT Basaran (Rp) KETERANGAN
1 Pekerja OH 80,000
2 Pekerja terlatih OH 120,000
3 Tukang Batu OH 120,000
4 Kepala Tukang Batu OH 125,000
5 Tukang Kayu OH 120,000
6 Kepala Tukang Kayu OH 125,000
7 Tukang Besi Beton OH 120,000
8 Kepala Tukang Besi Beton OH 130,000
9 Tukang Las OH 120,000
10 Mandor OH 130,000
4. Honorarium Tertinggi Pengelola Keuangan dan Barang Daerah
Besar Honorarium berdasarkan pagu dana (Rp)
No. JABATAN SAT > 5M s/d 10 > 10 M s/d
s/d 1 M > 1 M s/d 5M > 25 M
M 25 M
1 Pengguna Anggaran OB 240,000 190,000 340,000 390,000 440,000
2 Kuasa Pengguna Anggaran OB 220,000 270,000 320,000 370,000 420,000
3 Pejabat Penatausahaan Keuangan OB 210,000 260,000 310,000 360,000 410,000
Pembantu Pj. Penatausahaan
4 OB 130,000 180,000 230,000 280,000 330,000
Keuangan
5 Pejabat Pelaksana Teknis Kegiatan OB 195,000 245,000 295,000 345,000 395,000
6 Bendahara Pengeluaran OB 190,000 240,000 290,000 340,000 390,000
7 Pembantu Bendahara Pengeluaran OB 180,000 230,000 280,000 330,000 380,000
8 Bendahara penerimaan OB 190,000 240,000 290,000 340,000 390,000

9 Pembantu Bendahara penerimaan OB 180,000 230,000 280,000 330,000 380,000

10 Pengurus/Penyimpan Barang OB 170,000 220,000 270,000 320,000 370,000

11 Pencatat Pembukuan OB 120,000 140,000 190,000 240,000 290,000


12 Pembuat Dokumen OB 110,000 160,000 210,000 260,000 310,000
13 Pembuat Daftar Gaji OB 100,000 150,000 210,000 250,000 260,000

5. Honorarium Pengelola Keuangan Daerah


Besarnya
No. Jabatan SAT Keterangan
(Rp.)
Bupati dan
1 Pemegang Kekuasaan Pengelolaan Keuangan Daerah OB 20,000,000 ###
Wabup
2 Koordinator Pengelolaan Keuangan Daerah OB 10,000,000 Sekda ###

3 Pejabat Pengelolaan Keuangan Daerah / Bendahara Umum Daerah OB 7,500,000 Kepala BPKAD ###

Kabid.
4 Kuasa Bendahara Umum Daerah OB 3,000,000 Perbenda- ###
haraan

6. Honorarium Pengelola Aset Daerah


Besarnya
No. Jabatan SAT Keterangan
(Rp.)
A. Tim Penilai Penghapusan Aset Daerah

1 Ketua OK 500,000

2 Sekretaris OK 450,000
3 Anggota OK 400,000
B. Tim Lelang Aset Daerah

1 Ketua OK 750,000

2 Sekretaris OK 650,000
3 Anggota OK 500,000

I. TIM PENYUSUNAN RANPERDA APBD, PERUBAHAN APBD DAN PERHITUNGAN APBD :

A. TIM PEMBINA

1 Pembina OH 200,000

2 Pengarah OH 175,000

3 Ketua OH 160,000

4 Wakil Ketua OH 150,000

5 Sekretaris OH 140,000

6 Wakil Sekretaris OH 135,000

7 Anggota OH 130,000

8 Pembantu OH 120,000

B. TIM VERIFIKASI RKA-SKPD, RKA-PPKD, DPA-SKPD, RKPA-SKPD, RKPA-PPKD, DPPA-SKPD DAN DPPA-PPKD

1 Ketua OH 200,000

2 Wakil Ketua OH 180,000

3 Sekretaris OH 175,000

4 Koordinator OH 170,000

5 Sekretaris Koordinator OH 160,000


6 Anggota OH 150,000

7 Pembantu OH 130,000

II. TIM PENYUSUNAN DAN PEMBAHASAN RANPERBUP APBD, PERUBAHAN APBD DAN PERHITUNGAN APBD
Besarnya
No. Jabatan SAT Keterangan
(Rp.)
1 Pembina OH 200,000

2 Pengarah OH 175,000

3 Ketua OH 160,000

4 Wakil Ketua OH 150,000

5 Sekretaris OH 140,000

6 Anggota OH 130,000

7 Pembantu OH 120,000

III. TIM EVALUASI APB DES :

1 Ketua OH 180,000

2 Wakil Ketua OH 170,000

3 Sekretaris OH 160,000

4 Koordinator/Seksi-Seksi OH 150,000

5 Anggota OH 140,000

6 Pembantu OH 130,000

IV. TIM PENATAUSAHAAN APBD / TIM PENGELOLAAN HIBAH

1 Pembina OB 1,000,000

2 Pengarah OB 950,000
3 Ketua OB 900,000

4 Wakil Ketua OB 850,000

5 Sekretaris OB 800,000
6 Anggota OB 700,000

7 Pembantu OB 650,000

V. TIM PENGELOLAAN KAS DAERAH

1 Pembina OB 1,750,000

2 Pengarah OB 1,600,000

3 Ketua OB 1,500,000

4 Wakil Ketua OB 1,400,000

5 Sekretaris OB 1,300,000

6 Anggota OB 1,200,000

7 Pembantu OB 1,000,000

VI. HONOR PENGELOLA SISTIM INFORMASI PENGELOLA KEUANGAN DAERAH (SIPKD)

1 Koordinator Administrator SIPKD OB 1,000,000

2 Administrator Kesisteman / Database SIPKD OB 750,000

3 Administrator Jaringan SIPKD OB 750,000

4 Administrator Modul Penganggaran OB 600,000

5 Administrator Modul Penatausahaan OB 600,000

6 Administrator Modul Pertanggungjawaban OB 600,000

VII. HONOR PENGELOLA SISTIM INFORMASI MANAJEMEN BARANG MILIK DAERAH (SIMDA BMD)

1 Koordinator OB 700,000

2 Administrator OB 500,000

3 Operator OB 200,000
VIII. HONOR PENGELOLA SISTIM INFORMASI MANAJEMEN E-MONEV DAN E-REPORTING SPSE
Besarnya
No. Jabatan SAT Keterangan
(Rp.)
1 Administrator OB 500,000

2 Operator OB 200,000

IX. HONOR TENAGA OPERASIONAL LAYANAN APLIKASI KAS DAERAH (CMS)

1 User Pejabat Kas OB 925,000

2 User Pejabat Kas (tandem) OB 525,000

3 User Checker OB 875,000

4 User Checker 2 (tandem) OB 450,000

5 User Data Entry OB 875,000

6 User Data Entry 2 (tandem) OB 450,000


7. Honorarium Tim Pengelola Website
Besarnya
No. Jabatan SAT Keterangan
(Rp.)
1 Ketua OB 300,000

2 Sekretaris OB 250,000

3 Anggota OB 200,000

8. Honorarium Tim Redaksi Website


Besarnya
No. Jabatan SAT Keterangan
(Rp.)
1 Ketua OB 300,000

2 Sekretaris OB 250,000

3 Anggota OB 200,000

9. Honorarium Forum Komunikasi Pimpinan Daerah


Besarnya
No. Jabatan SAT Keterangan
(Rp.)
1 Unsur Pimpinan OB 5,000,000
2 Tim Advisor OB 2,500,000 Sekda

10. Honorarium Tim Kominda dan Tim Terpadu Penanganan Gangguan Keamanan Dalam Negeri
Besarnya
No. Jabatan SAT Keterangan
(Rp.)
1 Pembina OB 1,250,000
2 Pengarah OB 1,000,000
3 Ketua OB 900,000
4 Wakil Ketua OB 800,000
5 Sekretaris OB 700,000
6 Anggota OB 600,000

11. Honorarium Tim Pembina / Pengendali Kegiatan Pembangunan


Besarnya
No. Jabatan SAT Keterangan
(Rp.)
Hanya untuk
1 Pembina OB 2,000,000 Bupati/Wakil
Bupati
Hanya untuk
2 Pengarah OB 1,500,000 Sekretaris
Daerah
3 Ketua OB 1,250,000
4 Sekretaris OB 1,000,000
5 Koordinator OB 900,000
6 Anggota OB 850,000
sesuai dgn
7 Pembantu OB 300,000
kebutuhan

12. Honorarium Pejabat Pembuat Komitmen (PPK)


Basaran
NO Nilai Pagu Anggaran SAT Keterangan
(Rp)
1 s.d 500.000.000 OB 300,000
2 500.000.001 s.d 1.000.000.000 OB 700,000
3 1.000.000.001 s.d 10.000.000.000 OB 1,000,000
4 10.000.000.001 s.d 25.000.000.000 OB 1,250,000
5 25.000.000.001 s.d 50.000.000.000 OB 1,500,000
5 50.000.000.001 s.d 100.000.000.000 OB 1,750,000
5 100.000.000.001 s.d 150.000.000.000 OB 2,000,000
5 150.000.000.001 s.d 200.000.000.000 OB 2,500,000
5 diatas 200.000.000.000 OB 3,000,000

13. Honorarium Pengelola Teknis Proyek (PTP)


Basaran
NO Nilai Pagu Anggaran SAT Keterangan
(Rp)
1 0 s.d. 200 Jt. OB 400,000
2 > 200 Jt. s.d. 2.5 M. OB 600,000
3 > 2.5 M. s.d. 10 M. OB 850,000
4 > 10 M. s.d. 25 M. OB 1,200,000
5 > 25 M. OB 1,400,000
14. Honorarium Tim Koordinasi Pelaksanaan Program Modernisasi Pengadaan/ULP Percontohan
Besarnya
No. Jabatan SAT Keterangan
(Rp.)
1 Pembina OK 1,500,000
2 Pengarah OK 1,200,000
3 Penanggung Jawab OK 1,000,000
4 Koordinator
- Ketua OK 750,000
- Sekretaris OK 600,000
- Anggota OK 500,000

15. Honorarium Pejabat Pengadaan Barang/Jasa Pemerintah


Besarnya
No. Jabatan SAT Keterangan
(Rp.)
1 Pejabat Pengadaan B/J Kegiatan 700,000

16. Honorarium Panitia/Pejabat Penerima Hasil Pekerjaan (PPHP) Konstruksi


Besaran (Rp.)
NO Nilai Pagu Anggaran SAT Keterangan
KETUA SEK ANGGOTA
Per Paket
1 Pejabat Penerima Hasil Pekerjaan 250,000
Kegiatan
Per Paket
2 50 s.d. 500 jt 500,000 450,000 400,000
Kegiatan
Per Paket
3 > 500 jt s.d. 1 M 600,000 540,000 480,000
Kegiatan
Per Paket
4 > 1 M s.d. 5 M 700,000 630,000 660,000
Kegiatan
Per Paket
5 > 5 M s.d. 10 M 800,000 720,000 640,000
Kegiatan
Per Paket
6 > 10 M s.d. 25 M 900,000 810,000 720,000
Kegiatan
Per Paket
7 Diatas 25 M 1,500,000 1,350,000 1,200,000
Kegiatan

17. Honorarium Panitia/Pejabat Penerima Hasil Pekerjaan (PPHP) Barang


Besaran (Rp.)
NO Nilai Pagu Anggaran SAT Keterangan
KETUA SEK ANGGOTA
Per Paket
1 Pejabat Penerima Hasil Pekerjaan 150,000
Kegiatan
Per Paket
2 50 s.d. 500 jt 400,000 350,000 300,000
Kegiatan
Per Paket
3 > 500 jt s.d. 1 M 500,000 450,000 400,000
Kegiatan
Per Paket
4 > 1 M s.d. 5 M 600,000 550,000 500,000
Kegiatan
Per Paket
5 > 5 M s.d. 10 M 700,000 650,000 600,000
Kegiatan
Per Paket
6 > 10 M s.d. 25 M 800,000 750,000 700,000
Kegiatan
Per Paket
7 Diatas 25 M 900,000 850,000 800,000
Kegiatan
18. Biaya Honorarium Pelayanan Kependudukan dan Pencatatan Sipil
Besarnya
No. Jabatan SAT Keterangan
(Rp.)
1 Ketua OB 1,000,000
2 Sekretaris OB 850,000

3 Koordinator OB 500,000

4 Anggota OB 300,000

5 Pembantu (Non PNS) OB 200,000

19. Honorarium Dewan Pengupahan Kabupaten (DEPEKAB)


Besarnya
No. Jabatan SAT Keterangan
(Rp.)
I. TIM DEPEKAB :

1 Pembina OB 250,000

2 Pengarah OB 230,000

3 Ketua OB 200,000

4 Sekretaris OB 190,000

5 Anggota OB 180,000
Besarnya
No. Jabatan SAT Keterangan
(Rp.)
II. SEKRETARIAT DEPEKAB :

1 Ketua OB 180,000

2 Anggota OB 150,000

III. Unsur Pekerja dan Pengusaha :

1 APINDO OB 200,000

2 Serikat Pekerja OB 180,000

20. Honorarium Tim/Majelis Penyelesaian Tuntutan Ganti Rugi Keuangan Negara dan Daerah
Besarnya
No. Jabatan SAT Keterangan
(Rp.)
I. TIM / MAJELIS PTGR :

1 Pembina OB 750,000

2 Pengarah OB 650,000

3 Ketua OB 600,000

4 Sekretaris OB 500,000

5 Anggota OB 300,000

II. SEKRETARIAT TPTGR :

1 Ketua OB 350,000

2 Sekretaris OB 250,000

3 Anggota OB 200,000

4 Pembantu OB 175,000

21. Honorarium Penyusun Laporan Hasil Pemeriksaan/Laporan Hasil Tindak Lanjut


Besarnya
No. Jabatan SAT Keterangan
(Rp.)
1 Pembina OH 300,000

2 Pengarah OH 250,000

3 Ketua OH 200,000

4 Sekretaris OH 175,000

5 Anggota OH 150,000

6 Pembantu OH 140,000
22. Honorarium Pengelola Layanan Pengadaan Secara Elektronik (LPSE)
Besarnya
No. Jabatan SAT Keterangan
(Rp.)
1 Pembina OB 4,750,000

2 Pengarah OB 4,500,000
3 Ketua OB 4,000,000
4 Sekretaris OB 3,500,000
5 Administrator Sistem/PPE OB 2,500,000
6 Administrator Jaringan OB 2,000,000
7 Administrator Agency OB 2,000,000
8 Verifikator OB 2,000,000
9 Helpdesk OB 1,500,000
10 Staf Pendukung OB 800,000
11 Trainer OK 600,000

23. Honorarium Petugas Pengelola Perizinan/SIMTAP


Besarnya
No. Jabatan SAT Keterangan
(Rp.)
1 Super Administrator / Supervisor OB 300,000
2 Administrator Agency OB 250,000
3 Operator OB 200,000

24. Honorarium Pengelola Layanan Sistem Informasi Manajemen Lapor / Hasil Pengawasan
Besarnya
No. Jabatan SAT Keterangan
(Rp.)
1 Ketua OB 350,000
2 Wakil Ketua OB 330,000
3 Sekretaris OB 320,000
4 Admin Sistem OB 300,000
5 Admin Agency OB 300,000
6 Help Desk OB 250,000

25. Honorarium Tim Satgas SPIP


Besarnya
No. Jabatan SAT Keterangan
(Rp.)
1 Pembina OB 500,000
2 Pengarah OB 450,000
3 Quality Assurance OB 400,000
4 Ketua OB 350,000
5 Sekretariat OB 300,000

26. Honorarium Kelompok Kerja Satgas SPIP Kabupaten


Besarnya
No. Jabatan SAT Keterangan
(Rp.)
1 Ketua OB 250,000
2 Sekretaris OB 200,000
3 Anggota OB 150,000
27. Honorarium Satgas SPIP SKPD
Besarnya
No. Jabatan SAT Keterangan
(Rp.)
1 Ketua OB 300,000
2 Sekretaris OB 250,000
3 Ketua Pokja / Koordinator OB 250,000
4 Sekretaris Pokja OB 200,000
5 Anggota OB 150,000

28. Honorarium Tim Penyusun Laporan Reviu LKPD


Besarnya
No. Jabatan SAT Keterangan
(Rp.)
1 Penanggung Jawab OH 100,000
2 Pengendali Teknis OH 75,000
3 Ketua OH 65,000
4 Anggota OH 50,000
5 Pembantu BPK dalam rangka Pra Audit Dan Audit LKPJ OH 100,000

29. Honorarium Tim Satuan Tugas Sapu Bersih Pungutan Liar


Besarnya
No. Jabatan SAT Keterangan
(Rp.)
1 Penanggung Jawab OB 1,500,000
2 Forkopinda OB 1,250,000
3 Ketua OB 1,100,000
4 Wakil Ketua OB 1,000,000
5 Pokja Ahli OB 900,000
6 Sekretaris OB 900,000

30. Honorarium Tim Satuan Tugas Sapu Bersih Pungutan Liar Kelompok Kerja
Besarnya
No. Jabatan SAT Keterangan
(Rp.)
1 Ketua OB 750,000
2 Sekretaris OB 650,000
3 Anggota OB 500,000

31. Honorarium Tim Satuan Tugas Sapu Bersih Pungutan Liar Sekretariat Kerja
Besarnya
No. Jabatan SAT Keterangan
(Rp.)
1 Ketua OB 600,000
2 Sekretaris OB 500,000
3 Anggota OB 400,000

32. Honorarium Tim TP4D Kabupaten


Besarnya
No. Jabatan SAT Keterangan
(Rp.)
1 Penanggung Jawab OB 1,500,000
2 Ketua OB 1,100,000
3 Wakil Ketua OB 1,000,000
4 Tenaga Ahli OB 900,000
5 Sekretaris OB 900,000
6 Anggota OB 900,000

33. Honorarium Koordinasi Pengaturan Penjagaan Dan Patroli (KOTURJAWALI)


Besarnya
No. Jabatan SAT Keterangan
(Rp.)
1 Kepala Satuan OB 1,000,000
2 Sekretaris OB 850,000
3 Kepala Bidang OB 700,000
4 Kepala Seksie / Kepala Sub. Bagian OB 600,000
5 Danru OH 50,000
6 Anggota OH 40,000

34. Honorarium Petugas Pengelola Teknologi Informasi (TI) SKPD


Besarnya
No. Jabatan SAT Keterangan
(Rp.)
1 Pengelola Teknologi Informasi OB 300,000

35. Honorarium Petugas Pengelola Teknis Kearsipan SKPD


Besarnya
No. Jabatan SAT Keterangan
(Rp.)
1 Pengelola Teknis Kearsipan OB 300,000
36. Honorarium Tim Penyusunan Ranperda/Ranperbup
Besarnya
No. Jabatan SAT Keterangan
(Rp.)
I. TIM PENYUSUNAN RANPERDA/RANPERBUB UNTUK TIM SKPD :

1 Ketua OH 150,000

2 Sekretaris OH 130,000

3 Anggota OH 110,000

4 Pembantu OH 100,000

II. TIM ASISTENSI RANCANGAN PERDA

1 Pembina OK 750,000

2 Pengarah OK 650,000

3 Ketua OK 600,000

4 Wakil Ketua OK 550,000

5 Sekretaris OK 500,000

6 Anggota OK 450,000

37. Biaya Lembur


Besarnya
No. Jabatan SAT Keterangan
(Rp.)
1 Golongan IV OJ 15,000

2 Golongan III OJ 12,500

3 Golongan II OJ 10,000

4 Golongan I OJ 7,500

38. Honorarium Penyusunan Dokumen KUA, PPAS Dan Neraca Daerah dan Nota Keuangan
Besarnya
No. Jabatan SAT Keterangan
(Rp.)
1 Pembina OH 250,000

2 Pengarah OH 225,000

3 Ketua OH 200,000

4 Wakil Ketua OH 190,000

5 Sekretaris OH 175,000

7 Anggota OH 150,000

8 Pembantu OH 140,000
39. Honorarium Penyusun Dokumen Perencanaan dan Pelaporan (RPJP/RPJM/RKPD/

Renstra/Renja/LAKIP/LKPJ/Indikator Makro/PDRB/Statistik Daerah dan Laporan Tahunan)


Besarnya
No. Jabatan SAT Keterangan
(Rp.)
A. TIM KABUPATEN :

1 Pembina OK 200,000

2 Pengarah OK 175,000

3 Ketua OK 150,000
Besarnya
No. Jabatan SAT Keterangan
(Rp.)
4 Wakil Ketua OK 125,000

5 Sekretaris OK 100,000

6 Koordinator/Seksi-Seksi OK 85,000

7 Anggota OK 75,000

8 Pembantu OK 50,000

B. TIM SKPD :

1 Pembina OK 125,000

2 Pengarah OK 115,000

3 Ketua OK 100,000

4 Sekretaris OK 85,000

5 Anggota OK 75,000

6 Pembantu OK 50,000

40. Honorarium Tim Pengumpulan dan Pengolahan Data


Rencana Besarnya
No. Uraian SAT Keterangan
Kegiatan (Rp.)
1 Identifikasi Kebutuhan Data Pelaksana OH 100,000

Kendali Tehnis OH 125,000

Kendali Mutu OH 150,000

2 Penyusunan Instrumen Pelaksana OH 110,000

Pengumpulan Data Kendali Tehnis OH 135,000

Kendali Mutu OH 160,000

3 Tabulasi Data Pelaksana OH 110,000

Kendali Tehnis OH 135,000

Kendali Mutu OH 160,000

4 Penyajian Data Pelaksana OH 110,000

Kendali Tehnis OH 135,000

Kendali Mutu OH 160,000

5. Analisa Data Pelaksana OH 150,000

Kendali Tehnis OH 175,000

Kendali Mutu OH 200,000

6 Penyusun Data Spasial/Pemetaan Tata Ruang Pelaksana OH 200,000

Wilayah/Tematik Kendali Mutu OH 250,000

Kendali Tehnis OH 300,000

7 Penyusun Dokumen Lingkungan/KLHS/ Pelaksana OH 200,000

UKL-UPL/AMDAL Kendali Mutu OH 250,000


Kendali Tehnis OH 300,000

41. Honorarium Kuasa Hukum Pemerintah Daerah

NO Jabatan SAT Besarnya (Rp.) Keterangan

1 Kuasa Hukum PNS OJ 200,000

2 Kuasa Hukum Non PNS OK 15,000,000

3 Penyusun Jawaban / Duplik / Kesimpulan OK 250,000 Naskah

4 Memori Banding / Kasasi / PK OK 250,000 Naskah

42. Honorarium Tim Penilai Lomba


Besarnya
No. Jabatan SAT Keterangan
(Rp.)
1 Pembina OK 550,000

2 Pengarah OK 525,000

3 Ketua OK 500,000

4 Sekretaris OK 450,000

5 Anggota OK 200,000

43. Honorarium Tim Penilai Angka Kredit


Besarnya
No. Jabatan SAT Keterangan
(Rp.)
1 Pembina OK 1,000,000

2 Pengarah OK 850,000

3 Ketua merangkap Anggota OK 750,000

4 Sekretaris merangkap Anggota OK 650,000

5 Anggota OK 600,000

44. Honorarium Tim Sekretariat Penilaian Angka Kredit


Besarnya
No. Jabatan SAT Keterangan
(Rp.)
1 Sekretaris merangkap Anggota OK 400,000

2 Anggota OK 350,000

45. Honorarium Panitia Seleksi Jabatan Pimpinan Tinggi Pratama/Evaluasi Kinerja JPT
Besarnya
No. Jabatan SAT Keterangan
(Rp.)
1 Ketua 1 Paket 7,000,000 ###

2 Sekretaris 1 Paket 6,500,000 ###

3 Anggota 1 Paket 6,000,000 ###

5 Assessor 1 Paket 2,500,000 ###

46. Honorarium Panitia Seleksi CPNS


Besarnya
No. Jabatan SAT Keterangan
(Rp.)
1 Pembina OK 500,000 ###

2 Pengarah OK 450,000 ###

3 Ketua OK 300,000 ###

4 Sekretaris OK 250,000 ###

5 Anggota OK 200,000 ###


47. Honorarium Tim Seleksi Administrasi / Pemberkasan CPNS
Besarnya
No. Jabatan SAT Keterangan
(Rp.)
1 Ketua OH 100,000 ###

2 Sekretaris OH 90,000 ###

3 Anggota OH 80,000 ###

48. Honorarium Tenaga Pendamping Test CAT


Besarnya
No. Jabatan SAT Keterangan
(Rp.)
1 Pendamping dari BKD Provinsi OH 150,000 ###

2 Pendamping dari BKD Kabupaten OH 150,000 ###

49. Honorarium Sekretariat Panitia Seleksi Jabatan Pimpinan Tinggi Pratama/Evaluasi Kinerja JPT
Besarnya
No. Jabatan SAT Keterangan
(Rp.)
1 Ketua 1 Paket 1,500,000 3.500.000,-

2 Sekretaris 1 Paket 1,000,000 3.000.000,-

3 Anggota 1 Paket 750,000 2.500.000,-

4 Pembantu 1 Paket 500,000 1.500.000,-

5 Assessor 1 Paket 500,000

50. Honorarium Tim Ranperbup Seleksi Terbuka JPT


Besarnya
No. Jabatan SAT Keterangan
(Rp.)
1 Pembina OK 700,000

2 Pengarah OK 650,000

3 Ketua OK 600,000

4 Sekretaris OK 500,000

5 Anggota OK 450,000

51. Honorarium Tim Penyusun Ranperbup Seleksi Terbuka JPT


Besarnya
No. Jabatan SAT Keterangan
(Rp)
1 Ketua OK 450,000

2 Sekretaris OK 400,000

3 Anggota OK 350,000

52. Honorarium Panitia Penempatan/Penyumpahan PNS


Besarnya
No. Jabatan SAT Keterangan
(Rp)
1 Pembina OK 400,000

2 Pengarah OK 350,000

3 Ketua OK 300,000

4 Sekretaris OK 275,000

5 Anggota OK 250,000

53. Honorarium Rohaniawan


Besarnya
No. Jabatan SAT Keterangan
(Rp)
1 Rohaniawan OK 300,000

54. Honorarium Tim Penyelesaian Kenaikan Pangkat


Besarnya
No. Jabatan SAT Keterangan
(Rp)
1 Honorarium Tim Penyelesaian Kenaikan Pangkat OB 250,000

2 Sekretaris OB 200,000

3 Anggota OB 150,000

55. Honorarium Petugas Pemuktahiran Data Simpeg


Besarnya
No. Jabatan SAT Keterangan
(Rp)
1 Ketua OB 300,000

2 Sekretaris OB 275,000

3 Anggota OB 250,000

4 Pengelola TI Simpeg OB 300,000

5 Admin Website BKD OB 300,000

56. Honorarium Tim Pengelola Arsip Kepegawaian


Besarnya
No. Jabatan SAT Keterangan
(Rp)
1 Ketua OB 300,000

2 Sekretaris OB 275,000

3 Anggota OB 250,000

57. Honorarium Penyelesaian Surat Keputusan (SK) Pensiun


Besarnya
No. Jabatan SAT Keterangan
(Rp)
1 Ketua OB 300,000

2 Sekretaris OB 275,000

3 Anggota OB 250,000

58. Honorarium Tim Pemroses Jaminan Sosial PNS


Besarnya
No. Jabatan SAT Keterangan
(Rp)
1 Ketua OB 300,000

2 Sekretaris OB 275,000

3 Anggota OB 250,000

59. Honorarium Tim Pendamping Bantuan Hukum PNS


Besarnya
No. Jabatan SAT Keterangan
(Rp)
1 Ketua OB 300,000

2 Sekretaris OB 275,000

3 Anggota OB 250,000

60. Tim Ad Hooc Penyelesaian Kasus Pelanggaran Disiplin


Besarnya
No. Jabatan SAT Keterangan
(Rp)
1 Ketua OK 300,000

2 Sekretaris OK 275,000

3 Anggota OK 250,000

61. Sekretariat Tim Ad Hooc Penyelesaian Kasus Pelanggaran Disiplin


Besarnya
No. Jabatan SAT Keterangan
(Rp)
1 Ketua OK 300,000

2 Sekretaris OK 275,000

3 Anggota OK 250,000

62. Majelis Kode Etik ASN


Besarnya
No. Jabatan SAT Keterangan
(Rp)
1 Ketua OK 300,000

2 Sekretaris OK 275,000

3 Anggota OK 250,000

63. Sekretariat Majelis Kode Etik ASN


Besarnya
No. Jabatan SAT Keterangan
(Rp)
3 Anggota OB 250,000

64. Tim Penyelesaian Kasus Izin Perkawinan dan Perceraian


Besarnya
No. Jabatan SAT Keterangan
(Rp)
1 Ketua OK 250,000

2 Sekretaris OK 200,000

3 Anggota OK 150,000

65. Honorarium Tim Sekretariat Baperjakat


Besarnya
No. Jabatan SAT Keterangan
(Rp)
1 Ketua OB 200,000

2 Sekretaris OB 180,000

3 Anggota OB 150,000

66. Honorarium Petugas Entry Data


Besarnya
No. Jabatan SAT Keterangan
(Rp.)
1 SPJ OB 150,000

2 RKA/DPA OH 100,000

3 SiRUP OK 200,000

4 Laporan Bulanan/e-Monev OB 150,000

5 SIMDA - BMD OB 150,000

67. Honorarium Tim Peneliti Kontrak


Besarnya
No. Jabatan SAT Keterangan
(Rp.)
1 Ketua OK 1,500,000

2 Sekretaris OK 1,300,000

3 Anggota OK 1,000,000

68. Honorarium Tim Penatausahaan Aset Daerah


Besarnya
No. Jabatan SAT Keterangan
(Rp.)
1 Pembina OB 1,000,000

2 Pengarah OB 950,000

3 Ketua OB 900,000

4 Wakil Ketua OB 850,000


5 Sekretaris OB 800,000

6 Anggota OB 700,000

7 Pembantu OB 650,000

69. Honorarium Tim Penatausahaan Aset (SKPD)


Besarnya
No. Jabatan SAT Keterangan
(Rp.)
1 Ketua OB 300,000

2 Sekretaris OB 250,000

3 Anggota OB 225,000

4 Pembantu OB 200,000

70. Honorarium Tim Perlindungan Hukum


Besarnya
No. Jabatan SAT Keterangan
(Rp.)
1 Pembina OB 1,500,000

2 Pengarah OB 1,350,000

3 Ketua OB 1,250,000

4 Sekretaris OB 1,000,000

5 Anggota OB 850,000

71. Honorarium Tim Verifikasi Dokumen Rencana Pelaksanaan Pengadaan


Besarnya
No. Jabatan SAT Keterangan
(Rp.)
1 Ketua OB 250,000

2 Sekretaris OB 200,000

3 Anggota OB 150,000

72. Honorarium Tim Pendamping PA dan PPK


Besarnya
No. Jabatan SAT Keterangan
(Rp.)
1 Honorarium Tim Pendamping PA OK 300,000

2 Honorarium Tim Pendamping PPK OK 300,000

73. Honorarium Tim Asistensi Rancangan Produk Hukum


Besarnya
No. Jabatan SAT Keterangan
(Rp.)
1 Ketua OB 1,000,000

2 Sekretaris OB 750,000

3 Anggota OB 500,000

74. Honorarium Tim Penatausahaan Produk Hukum


Besarnya
No. Jabatan SAT Keterangan
(Rp.)
1 Pembina OB 350,000

2 Pengarah OB 300,000

3 Ketua OB 250,000

4 Sekretaris OB 200,000

5 Anggota OB 180,000

6 Pembantu OB 150,000

75. Honorarium Tim Klinik Hukum


Besarnya
No. Jabatan SAT Keterangan
(Rp.)
1 Pembina OB 1,000,000

2 Pengarah OB 750,000

3 Ketua OB 600,000
4 Sekretaris OB 500,000

5 Anggota OB 400,000

6 Pembantu OB 150,000

76. Honorarium Tim Kuasa Hukum Pemda Tingkat Pertama


Besarnya
No. Jabatan SAT Keterangan
(Rp.)
1 Kuasa Hukum Pemda Tingkat Pertama OJ 200,000

77. Honorarium Tim Kuasa Hukum Tingkat Banding / Kasasi / Peninjauan Kembali
Besarnya
No. Jabatan SAT Keterangan
(Rp.)
1 Kuasa Hukum Tingkat Banding / Kasasi / Peninjauan Kembali OK 3,000,000

78. Honorarium Penyusun Naskah Bidang


Besarnya
No. Jabatan SAT Keterangan
(Rp.)
1 Gugatan / Jawaban / Replik / Duplik / Kesimpulan / Memori / Kontra Memori OK 300,000

79. Honorarium Penyusun Naskah Bidang


Besarnya
No. Jabatan SAT Keterangan
(Rp.)
1 Advokat / Pengacara OK 15,000,000

2 Saksi OK 300,000

80. Honorarium Workshop Prolegda


Besarnya
No. Jabatan SAT Keterangan
(Rp.)
1 Penanggung Jawab OK 250,000

2 Ketua OK 200,000

3 Sekretaris OK 175,000

4 Anggota OK 100,000

81. Honorarium Panitia Ranham


Besarnya
No. Jabatan SAT Keterangan
(Rp.)
1 Ketua OB 300,000

2 Sekretaris OB 250,000

3 Anggota OB 200,000

4 Pembantu OB 180,000

82. Honorarium Tim Bimbingan Teknis Legal Drafting


Besarnya
No. Jabatan SAT Keterangan
(Rp.)
1 Ketua OK 250,000

2 Sekretaris OK 200,000

3 Anggota OK 180,000

83. Honorarium Pengelola Jaringan Dokumentasi Dan Informasi Hukum


Besarnya
No. Jabatan SAT Keterangan
(Rp.)
1 Ketua OK 300,000

2 Anggota OK 250,000

3 Operator OK 200,000
84. Honorarium Pengelola Jaringan Dokumentasi Dan Informasi Hukum
Besarnya
No. Jabatan SAT Keterangan
(Rp.)
1 Ketua OK 250,000

2 Sekretaris OK 200,000

3 Anggota OK 180,000

3 Pembantu OK 100,000

85. Honorarium Tim Persiapan Pengadaan Tanah, Tim Kajian Keberatan, Pelaksana
Pengadaan Tanah
Besarnya
No. Jabatan SAT Keterangan
(Rp.)
I Tim Persiapan Pengadaan Tanah / Pelaksana Pengadaan Tanah
Ganti Kerugian Tanah s.d Rp. 10 Miliar

1 Ketua merangkap Anggota OB/paket 1,600,000

2 Sekretaris merangkap Anggota OB/paket 1,300,000

3 Anggota OB/paket 1,100,000

4 Sekretariat OB/paket 800,000

Ganti Kerugian Tanah diatas Rp. 10 Miliar s.d Rp. 50 Miliar

1 Ketua merangkap Anggota OB/paket 2,400,000

2 Sekretaris merangkap Anggota OB/paket 1,900,000

3 Anggota OB/paket 1,600,000

4 Sekretariat OB/paket 900,000

Ganti Kerugian Tanah diatas Rp. 50 Miliar

1 Ketua merangkap Anggota OB/paket 3,700,000

2 Sekretaris merangkap Anggota OB/paket 2,900,000

3 Anggota OB/paket 2,400,000

4 Sekretariat OB/paket 1,000,000

II Tim Kajian

Per hasil
1 Ketua merangkap Anggota 1,100,000
kajian
Per hasil
2 Sekretaris merangkap Anggota 800,000
kajian
Per hasil
3 Anggota 750,000
kajian

86. Honorarium Tim Evaluasi Pelaksanaan Realisasi Anggaran (TEPRA)


Besarnya
No. Jabatan SAT Keterangan
(Rp.)
1 Pembina OB 1,000,000

2 Pengarah OB 950,000

3 Penanggung Jawab OB 900,000

4 Ketua OB 850,000

5 Wakil Ketua OB 800,000

6 Sekretaris OB 750,000

7 Wakil Sekretaris OB 750,000

8 Koordinator OB 700,000

9 Anggota OB 650,000
10 Pejabat Penghubung OB 250,000 SKPD

87. Honorarium Tim Survey Standar Harga


Besarnya
No. Jabatan SAT Keterangan
(Rp.)
1 Ketua OK 250,000 Melebihi 30
(tiga puluh)
2 Sekretaris OK 200,000 hari memakai
satuan OB
3 Anggota OK 175,000

4 Pembantu OK 125,000

88. Honorarium Tim Penyusun Standar Harga


Besarnya
No. Jabatan SAT Keterangan
(Rp.)
1 Ketua OK 250,000 Melebihi 30
(tiga puluh)
2 Sekretaris OK 200,000 hari memakai
satuan OB
3 Anggota OK 175,000

4 Pembantu OK 125,000

89. Honorarium Tim Pengurus Dewan Pendidikan


Besarnya
No. Jabatan SAT Keterangan
(Rp.)
1 Ketua OB 600,000

2 Wakil Ketua OB 550,000

2 Sekretaris OB 500,000

3 Bendahara OB 400,000

4 Anggota OB 350,000

90. Honorarium Tim Sekretariat Dewan Pendidikan


Besarnya
No. Jabatan SAT Keterangan
(Rp.)
1 Pembantu OB 300,000

91. Honorarium Tim Mediasi Penyelesaian Kasus Pelanggaran Disiplin PNS


Besarnya
No. Jabatan SAT Keterangan
(Rp.)
1 Ketua OB 150,000

2 Sekretaris OB 140,000

2 Anggota OB 130,000

92. Honorarium Tim Verifikasi Bantuan Sosial


Besarnya
No. Jabatan SAT Keterangan
(Rp.)
1 Ketua OB 150,000

2 Sekretaris OB 125,000

2 Anggota OB 100,000

93. Honorarium Tim Inventaris Barang


Besarnya
No. Jabatan SAT Keterangan
(Rp.)
1 Pengurus Barang Kabupaten OB 300,000

2 Penyimpanan dan Pencatatan Barang Kabupaten OB 200,000

3 Pengurus Barang UPT OB 100,000

4 Pengurus Barang Sekolah OB 100,000


94. Honorarium Tim Inventari Barang
Besarnya
No. Jabatan SAT Keterangan
(Rp.)
1 Pengurus Barang Kabupaten OB 300,000

2 Penyimpanan dan Pencatatan Barang Kabupaten OB 200,000

3 Pengurus Barang UPT OB 100,000

4 Pengurus Barang Sekolah OB 100,000

95. Biaya langsung personil untuk tenaga ahli Indonesia berpendidikan S1/S2/S3

dengan undangan nasional berdasarkan pengalaman profesi yang dipersyaratkan

(Related Experience)
BESARAN PER BULAN (Rp)
KELOM
No. POK GOL. Tahun Penga- Tahun Penga- Tahun
AHLI S1 S2 S3
laman laman Penga-laman

I-A 1 6,130,000

AHLI I-B 2 6,290,000


1. PERTAM
A I-C 3 6,290,000

I-D 4 6,990,000

II-A 5 7,320,000 1 8,020,000

II-B 6 7,690,000 2 8,430,000


AHLI
2.
MUDA
II-C 7 8,100,000 3 8,840,000

II-D 8 8,510,000 4 9,290,000

III-A 9 8,970,000 5 9,750,000 1 10,940,000

III-B 10 9,420,000 6 10,360,000 2 11,520,000


AHLI
3.
MADYA
III-C 11 9,910,000 7 10,780,000 3 12,090,000

III-D 12 10,450,000 8 11,350,000 4 12,670,000

KELOM BESARAN PER BULAN (Rp)


No. POK GOL.
Tahun Penga- Tahun Penga- Tahun
AHLI S1 S2 S3
laman laman Penga-laman
IV-A 13 10,950,000 9 11,930,000 5 13,290,000

IV-B 14 11,560,000 10 12,550,000 6 13,990,000


AHLI
4.
UTAMA
IV-C 15 12,180,000 11 13,200,000 7 14,640,000

IV-D 16 12,790,000 12 13,900,000 8 15,390,000

V-A 17 13,490,000 13 14,600,000 9 16,170,000

V-B 18 14,190,000 14 15,390,000 10 17,480,000


AHLI
5.
KEPALA
V-C 19 14,930,000 15 16,210,000 11 18,310,000

V-D 20 15,710,000 16 17,070,000 12 19,210,000

VI-A 21 16,540,000 17 17,980,000 13 20,160,000

VI-B 22 17,440,000 18 18,970,000 14 21,190,000


AHLI
PEMBIN
6. VI-C 23 18,350,000 19 19,950,000 15 22,260,000
A
KEPALA
VI-D 24 19,350,000 20 21,060,000 16 23,370,000

VI-E 25 20,360,000 21 22,220,000 17 24,560,000


96. Honorarium Tim Bidang Perpustakaan Dan Kearsipan
Besarnya
No. Jabatan SAT Keterangan
(Rp.)
1 Fumigasi Buku / Arsip eks 20,000

2 Pengolahan Buku eks 8,000

PENGEMBANGAN SDM KEARSIPAN

3 Peningkatan Asuransi Kesehatan Pegawai OB 30,000

PROGRAM PENINGKATAN AKUISISI ARSIP

4 Akuisisi arsip in aktif dan statis Berkas 3,000

7 Penataan dan Pemeliharaan Berkas 3,000

8 Penyusunan/pengetikan Daftar Pertelaahan Arsip (DPA) Hasil Diskripsi Lembar 2,000

PROGRAM PENGENDALIAN DAN PENGEMBANGAN KEARSIPAN

10 Penilaian Arsip Berkas 5,000

11 Tim Penyusun Dokumen Penyusutan / Pemusnahan Arsip OH 150,000

12 Tim Pengesahan / Saksi Penyusutan / Pemusnahan Arsip Daerah OK 500,000

13 Honorarium Petugas Arsiparis OB 1,000,000

14 Honorarium Petugas Pustakawan OB 750,000

15 Arsip Dinamis

Ketua OB 500,000

Sekretaris OB 400,000

Anggota OB 350,000

16 Arsip Statis

Ketua OB 750,000

Sekretaris OB 550,000

Anggota OB 450,000

97. Honorarium Tim Perencana Daerah pada Bappeda Kabupaten Lombok Tengah
Besarnya
No. Jabatan SAT Keterangan
(Rp.)
1 Bupati OB 2,750,000

2 Wakil Bupati OB 2,750,000

3 Kepala Bappeda OB 2,500,000

4 Sekretaris / Kepala Bidang pada Bappeda OB 1,800,000

5 Kasubbid / Kasubbag pada Bappeda OB 1,200,000

6 Staf Fungsional Umum Gol. III dan IV pada Bappeda OB 500,000

7 Staf Fungsional Umum Gol. II pada Bappeda OB 300,000

8 Staf Fungsional Umum Gol. I pada Bappeda OB 250,000

98. Biaya Honorarium Pengawasan pada Inspektorat Kabupaten Lombok Tengah


Besarnya
No. Jabatan SAT Keterangan
(Rp.)
1 Penanggung Jawab / Inspektur OB 2,000,000

2 Wakil Penanggung Jawab / Pengendali Teknis OB 1,500,000

3 Ketua Tim OB 1,250,000

4 Anggota Tim OB 1,000,000

5 Pembantu Teknis OB 750,000

99. Biaya Honorarium Tim Dialog/Audiensi dengan Tokoh Masy, Pimp./Organisasi Sosial dan Kemasyarakatan
Besarnya
No. Jabatan SAT Keterangan
(Rp.)
1 Pembina OB 9,500,000

2 Pengarah OB 8,500,000

3 Ketua OB 3,500,000

4 Sekretaris OB 2,500,000

5 Anggota OB 1,500,000

B. PELAKSANA KEGIATAN

1. Honorarium Tim Pelaksana Kegiatan/Tim Koordinasi/Tim Monitoring dan Evaluasi

Besar Honorarium berdasarkan pagu dana (Rp)


No. JABATAN SAT
s/d 1 M >1 M - 5 M > 5 M - 10 M >10M - 25M > 25 M

A. Kegiatan kurang atau sama dengan 1 bulan


1 Pembina OK 300,000 330,000 360,000 390,000 420,000

2 Pengarah OK 270,000 300,000 330,000 360,000 390,000

3 Ketua OK 250,000 280,000 310,000 340,000 370,000

4 Wakil Ketua OK 220,000 250,000 280,000 310,000 340,000

5 Sekretaris OK 200,000 230,000 260,000 290,000 320,000

6 Koordinator OK 190,000 220,000 250,000 280,000 310,000

7 Anggota OK 180,000 210,000 240,000 270,000 300,000

8 Pembantu OK 140,000 170,000 200,000 230,000 260,000

B Kegiatan lebih dari 1 bulan


1 Pembina OB 210,000 230,000 250,000 270,000 290,000

2 Pengarah OB 200,000 220,000 240,000 260,000 280,000

3 Ketua OB 195,000 215,000 235,000 255,000 275,000

4 Wakil Ketua OB 190,000 210,000 230,000 250,000 270,000

5 Sekretaris OB 185,000 205,000 225,000 245,000 265,000

6 Koordinator OB 195,000 215,000 235,000 255,000 275,000

7 Anggota OB 180,000 200,000 220,000 240,000 260,000

8 Pembantu OB 150,000 170,000 190,000 210,000 230,000

2. Honorarium Kegiatan Sosialisasi dan lain-lain

NO URAIAN SAT Besaran(Rp.) KETERANGAN

a. Honorarium

1 Pembina OK 200,000

2 Pengarah OK 175,000

3K e t u a OK 150,000

4 Wakil Ketua OK 125,000

5 Sekretaris OK 100,000

6 Koordinator / Seksi - seksi OK 85,000

7 Anggota OK 80,000

8 Pembantu OK 50,000

9 MC/Pembawa Acara OK 80,000

10 Pembaca Do'a OK 75,000

11 Petugas Perlengkapan OK 50,000

b. Biaya Kegiatan dan Bahan-Bahan

1 Dokumentasi dan Publikasi Kegiatan 500,000


2 Sewa ruang aula

Kapasitas < 200 Orang Hari 500,000

Kapasitas > 200 Orang Hari 600,000

3 Pembuatan Spanduk m2 100,000

c. Penulisan Laporan

1 Pengumpulan bahan/Materi OH 25,000

2 Pengolahan /Tabulasi Data OH 35,000

3 Penulisan OH 35,000

4 Penulisan
Pengetikan Dokumen RPJPD, RPJMD, Renstra OH 25,000
SKPD, RKPD, KUA/PPAS, RKA, DPA, LAKIP
d. Raperda/Rapergub, Naskah Kerjasama, LKPJ, OH 120,000
Neraca Daerah, Rancangan Standar SAT Harga,
e. DKBD/DKPBD
Nara Sumber : dan Laporan Tahunan.

a. Ahli Utama OJ 350,000

b. Ahli Madya OJ 300,000

c. A h l i OJ 250,000

d. Ahli Muda OJ 200,000

e. Asisten Ahli OJ 150,000

NO URAIAN SAT Besaran(Rp.) KETERANGAN

f. Penerjemahan

1 Bahasa Asing ke Bahasa Indonesia

- Bahasa Inggris ke Bahasa Indonesia lembar 35,000

- Bahasa Asing (Non Inggris) ke Bahasa Indonesia lembar 60,000

2 Bahasa Indonesia ke Bahasa Asing

- Bahasa Indonesia ke Bahasa Inggris lembar 60,000


- Bahasa Indonesia ke Bahasa Asing non Bahasa
lembar 96,500
Inggris

3. Honorarium Bupati/ Wakil Bupati dan Sekda untuk Rapat Teknis/Koordinasi

NO URAIAN SAT Besaran (Rp.) KETERANGAN

1. Bupati / Wakil Bupati OJ 750,000

2. Sekretaris Daerah OJ 500,000

4. Honorarium Bidang Kehumasan

NO URAIAN SAT BIAYA (Rp) KETERANGAN

a. Media Cetak

1. Artikel Naskah 250,000

b. Media Elektronik

1. Tim Pembuatan Video Dokumenter

- Pemimpin Produksi org/prod 1,500,000

- Sutradara org/prod 1,250,000

- Penyusun Naskah org/prod 1,000,000

- Penata Artistik org/prod 1,000,000

- Penata Suara org/prod 1,000,000

- Editor org/prod 1,000,000


- Dubber org/prod 750,000

2. Tim Teknis Kehumasan

- Kameramen OB 500,000

- Photografer OB 400,000

- Operator VTR OB 600,000

- Operator Internet OB 500,000

- Penulis Berita OB 500,000

- Editor OB 500,000

- Lightingman OB 500,000
Tim Penyusun Naskah Sambutan
c.
Bupati
- Penulis Sambutan OB 350,000

- Pembantu Penulisan Sambutan OB 200,000

- Penerjemah OB 175,000

- Peserta Jumpa Pers OB 100,000

d. Tim Penyusun Bulletin

- Pemimpin Umum OB 750,000

- Penanggung Jawab/Pemp. Redaksi OB 700,000

- Redaktur Pelaksana 600,000

- Koordinator Liputan 500,000

- Tim Liputan 400,000

- Lay Out 400,000

- Administrasi 400,000

- Penulis Naskah Buletin 200,000

e. Biaya Publikasi Melalui Media

1 Media Cetak

- Iklan/Advertorial Hitam-Putih

Media Cetak Nasional Ukuran 1/4 hal. per hari 31,000,000

2 Iklan Media Cetak:

- Ukuran 1/4 Halaman per hari 2,500,000

- Ukuran 1/2 Halaman per hari 5,000,000

- Ukuran 1 Halaman per hari 10,000,000

3 Post Kota

Pemberitaan:

- Berita Halaman Pertama Full Color 5,000,000

- Berita Halaman dlm full hitam putih 3,500,000

- Berita Halaman Belakang Full Color 4,000,000

Iklan:

- Iklan 1/2 Halaman Full Color 4,000,000

- Iklan 1/2 Halaman Hitam Putih 3,000,000

- Iklan Full Halaman Warna 6,000,000

- Iklan Full Halaman Hitam Putih 5,000,000

- Iklan 1/4 Full Halaman Full Color 2,500,000


- Iklan 1/4 Halaman Hitam Putih 2,000,000

4 Suara NTB

Seperempat Halaman

- Hitam Putih/BW 1,650,000

- Full Color/FC 2,750,000

Setengah Halaman

- Hitam Putih/BW 3,300,000

- Full Colour/FC 5,500,000

Satu Halaman

- Hitam Putih/BW 6,600,000

- Full Colour/FC 11,000,000

5 Tabloid Balevent

- Iklan Spot Ukuran Full Halaman 1 kali muat 5,000,000

- Iklan Produk Ukuran Full Halaman 1 kali muat 5,000,000


- Iklan Baris Ukuran 1000
1 kali muat 2,000,000
karakter/1/2
- Iklan Layanan/ADV Ukuran Full
1 kali muat 5,000,000
Halaman
6 Nurani Rakyat
- Pemberitaan (Advetorial) 1
3,000,000
Halaman
- Pemeberitaan (Advetorial) 1/2
1,500,000
Halaman
- Pemberitaan (Advertorial) 1/4
1,000,000
Halaman
- Iklan 1 Halaman 2,500,000

- Iklan 1/2 Halaman 2,000,000

7 Radar Lombok

Iklan/Advertorial Full Colours (FC)

- 1 Halaman 1 Edisi 6,000,000

- 1/2 Halaman 1 Edisi 3,000,000

- 1/4 halaman 1 Edisi 1,500,000

Iklan/Advertorial Hitam-Putih:

- 1 Halaman 1 Edisi 4,000,000

- 1/2 Halaman 1 Edisi 2,000,000

- 1/4 halaman 1 Edisi 1,000,000

8 Radar Mandalika

Advertorial Bulanan/Kontrak
- 1 Halaman Penuh Berwarna Berisi
25 kali 100,000,000
Foto dan Berita
- 1 Halaman Penuh Berwarna Berisi
20 kali 80,000,000
Foto dan Berita
- 1 Halaman Penuh Berwarna Berisi
15 kali 60,000,000
Foto dan Berita
- 1 Halaman Penuh Berwarna Berisi
10 kali 40,000,000
Foto dan Berita
Advertorial Insidentil
- 1 Halaman Penuh Berwarna
Sekali Tayang 15,000,000
Halaman Depan
- 1 Halaman Penuh Berwarna Sekali Tayang 5,000,000
- Halaman Depan Berita dan Foto
Sekali Tayang 5,000,000
Headline
-Halaman depan dibawah headline
Sekali Tayang 2,500,000
Berisi Berita dan Foto
- Satu Halaman Hitam-Putih Sekali Tayang 3,000,000

9 Radar Mandalika

Paket Iklan Bulanan

Iklan Kuping
- Halaman Depan Berwarna Ukuran 2
6,000,000
kolomx 35 mm
- Halaman Belakang Berwarna
4,000,000
Ukuran 2x 35 mm
- Halaman Dalam Berwarna Ukuran 2
3,000,000
Kolom x 35 mm
- Halaman Hitam-Putih Ukuran 2
2,500,000
Kolom x 35 mm
Iklan Kolom
- Halaman Depan Berwarna Ukuran 2
5,000,000
kolomx 100 mm
- Halaman Belakang Berwarna
4,000,000
Ukuran 2x 100 mm
- Halaman Dalam Berwarna Ukuran 2
3,000,000
Kolom x 100 mm
- Halaman Hitam Putih Ukuran 2
2,500,000
Kolom x 100 mm
Iklan Insidental

- Satu Halaman Penuh Berwarna Sekali Tayang 5,000,000

- Satu Halaman Penuh Hitam-Putih Sekali Tayang 3,500,000


- Halaman Depan Berwarna Ukuran 2
Sekali Tayang 400,000
kolomx 100 mm
- Halaman Belakang Berwarna
Sekali Tayang 300,000
Ukuran 2 kolomx 100 mm
- Halaman Dalam Berwarna Ukuran 2
Sekali Tayang 250,000
Kolom x 100 mm
- Halaman Hitam Putih Ukuran 2
Sekali Tayang 200,000
Kolom x 100 mm
10 Lombok Post

Advertorial:

- Advertorial 1 Halaman Full Warna 10,000,000

- Advertorial 1/2 Halaman Warna 5,000,000


- Advertorial 1/2 Halaman Hitam
4,000,000
Putih
- Advertorial 1 Halaman Full Hitam
8,000,000
Putih
Iklan:

- Iklan 1/4 Halaman Hitam Putih 3,000,000

- Iklan 1/2 Halaman Hitam Putih 6,000,000

- 1 Halaman Full Hitam Putih 12,000,000

- 1/4 Halaman Warna 6,000,000

- 1/2 Halaman Warna 12,000,000

- 1 Halaman Full Warna 24,000,000


- Iklan Lelang 1/2 Halaman Hitam
5,000,000
Putih
- 1/4 Halaman Hitam Putih 10,000,000

- 1/2 Halaman Hitam Putih 20,000,000

13 Media Pembaruan

Advertorial:

- 1 Paket Informasi 2,000,000

- Iklan Ucapan di Halaman 12 1,500,000

- Iklan Ucapan di Halaman Dalam 1,000,000

14 Lombok Today.co.id
Pemuatan Per 1 (satu) Berita /bulan 1,500,000
Portal NTB Untuk Indonesia dan
15
Dunia (www.Sasambonews.com)
- Halaman Depan Atas (Header) 800
/bulan 3,500,000
PxKali 90 PX
- Halaman Depan Side Bar Atas 350
/bulan 2,500,000
px kali 250 px
- Halaman Depan Badan Portal
/bulan 2,000,000
(Tengah) 800 px kali 90 px
- Halaman Depan Sidebar Kanan
/bulan 2,000,000
(Kanan Portal) 800 px kali 90 px
- Halaman Depan Galeri Photo 800
/bulan 4,500,000
px kali 90 px
- Halaman Depan Advertorial
/bulan 3,500,000
(bersponsor) Sekali muat

16 Lombokita.com

-Halaman Depan Letak Atas(Header)


/bulan 3,500,000
800 px90 px

-Halaman Depan Letak Sidebar Atas


2,500,000
250 px kali 210 px
-Halaman Depan Letak Tengah
/bulan 2,000,000
(badan portal) 800 pxkali 90px
-Halaman Depan Letak Sidebar
/bulan 2,000,000
(Kanan Portal) 800 pxkali 90 px
-Halaman Depan Letak JEPRET KITA /bulan 4,500,000

-Advertorial(Bersponsor) sekali muat 3,500,000

c Media Elektronik (Audio/Radio)


biaya tayang dapat diperhitungkan sesuai kebutuhan
1 - Pembuatan Drama, durasi 15 mnt Paket 750,000

- Pembuatan Drama, durasi 30 mnt Paket 875,000

- Pembuatan Drama, durasi 45 mnt Paket 1,100,000


- Pembuatan Feature, durasi 15
2 Paket 450,000
menit
- Pembuatan Feature, durasi 30
Paket 550,000
menit
- Pembuatan Feature, durasi 45
Paket 650,000
menit
- Pembuatan Majalah Udara, durasi
Paket 450,000
20 menit
- Pembuatan Majalah Udara, durasi
Paket 550,000
30 menit
Pembuatan Radio Spot maximum 1
3 Paket 250,000
menit
4 Pembuatan Slide Audio, Max 4 menit Paket 300,000
Pembuatan Obrolan/Dialog 7 - 10
5 Paket 280,000
menit
6 Pembuatan wawancara 15 menit Paket 225,000
Pembuatan variety/Mekanis, 30
7 Paket 465,000
menit
8 Pembuatan Fragmen 15 menit Paket 600,000

17 PT.Radio Gema Suara

Iklan Sport

-30 detik 1 kali 25,000

-45 detik 1 kali 40,000

-60 detik 1 kali 50,000

Sponsor Program /pendukung acar

-Program 30 menit 500,000

-Program 45 menit 750,000

-Program 60 Menit 1,000,000


Siaran Langsung

-Siaran 30 Menit 1,500,000

-Siaran 60 Menit 2,000,000

Paket dialog Interaktif Komersial


-Promo Dialog 3 hari Sebelum Acara
1x/jam
-Honor Narasumber perorang 250,000

-Air Time 60 Menit 2,000,000


Kompensasi Sponsor/Pendukung
Acara
-Penyebutan nama sponsor diawal,
tengah dan akhir acara

-Sponsor 30 menit mendapat promo


acara 3 hari sebelum penyiaran
dengan frekuensi 3 kali perhari
-sponsor 60 menit mendapat promo
acara 3 hari sebelum penyiaran
dengan frekuensi 6 kali sehari

18 Talenta

Paket dialog Interaktif Sosialisasi


-Promo dialog 7 hari sebelum acara
1x/jam
-Honor Narasumber perorang 250,000

-Air Time 60 menit 1,000,000

Sponsor Program /pendukung acar

-Program 30 Menit /bulan 500,000

-Program 45 Menit /bulan 750,000

-Program 60 Menit /bulan 1,000,000

Tarif Sport ILM per sekali siar

-30 detik/1 kali siar 25,000

-45 detik/1 kali siar 40,000

-60 detik/1 kali siar 50,000

Paket Sport ILM per Sekali Siar

-3 x tayang/jam selama 30 hari 1,000,000

Biaya Siaran Langsung :


-Laporan langsung saat acara
1,500,000
berlangsung dan siaran ulang

19 Tastura

Paket Dialog Interaktif Sosialisasi


-Promo dialog 7 hari sebelum acara
1x/jam
-Honor narasumber perorang 250,000

-Air time 60 menit 1,000,000

Sponsor Program /pendukung acar

-Program 30 Menit /bulan 500,000

-Program 45 Menit /bulan 750,000

-Program 60 Menit /bulan 1,000,000

Tarif Sport ILM per sekali siar


-30 detik/1 kali siar 25,000

-45 detik/1 kali siar 40,000

-60 detik/1kali siar 50,000

Paket Sport ILM per Sekali Siar

-3 x tayang/jam selama 30 hari 1,000,000

Biaya Siaran Langsung :


-laporan langsung saat acara
1,000,000
berlangsung dan siaran ulang
Paket Advedtorial Prime Time:

-Mini Pices Radio siaran 2 x tayang 2,500,000

Media Elektronik (Audio


d
Visual/Televisi)
1 Pembuatan Sinetron
biaya tayang dapat diperhitungkan sesuai kebutuhan
- Sinetron durasi 24 menit Paket 125,000

- Sinetron durasi 48 menit Paket 225,000

2 Pembuatan Film Dokumenter

- Film Dokumenter durasi 30 menit Paket 250,000

- Film Dokumenter durasi 45 menit Paket 300,000

- Film Semi Dokumenter durasi 30 me Paket 325,000

- Film Semi Dokumenter durasi 45 me Paket 375,000

3 Talk Show durasi 24 menit Paket 150,000

4 Iklan Layanan Masy. (Filler) max 30dt Paket 150,000

5 TV 9

Liputan Advertorial/Liputan Khusus

-Durasi 60 Menit 6,000,000

-Durasi 30 Menit 3,000,000

-Durasi 15 Menit 1,500,000

Iklan Layanan Masyarakat

-Durasi 15-30 second 3 x Tayang 1 bulan 3,000,000

Iklan TVC/Product

-Durasi 15-30 second 5 x tayang 1 bulan 5,000,000

Iklan Spot/Display Ucapan Duka Cita/Informasi

-Durasi 15-30 Second 3x tayang perha 5 hari tayang 2,500,000

Liputan Khusus

-Durasi 30 Menit 1 x tayang 3,000,000

Iklan Running Teks

-3 x tayang perhari 1 bulan 2,000,000

Iklan Teks Block/Informasi/Loker/Himbauan

-Durasi menyesuaikan 3xtayang Perhari 2,500,000

Program Spesial Televisi

-Durasi dan jumlah tayang menyesuaikan 15,000,000

6 Lombok TV

Running Teks (Durasi 35")


-Running Teks /hari 60,000

-Running Teks /bulan 2,500,000

TV Comersial

-TV Commersial (Durasi 30") /hari 200,000

-TV Commersial Bulanan /bulan 4,500,000

Iklan Lokal (Durasi 30 ")

- Slide/Text Block Durasi 30 " /hari 60,000

- Super Impose Durasi 30 " /hari 150,000

- Kredit Title /acara 200,000

- Adlips By Presenter /acara 350,000

Blocking Tme

- Blocking Time Live Studio Durasi 60" 5,000,000

- Blocking Time Live Out Studio Durasi 60 " 13,500,000

Advertorial (Min.3")

Liputan Khusus termasuk Master VCD /menit 650,000

7 SindoTV

Loose Spot 30 Second

- Public Rate National (include PPN 1 30 Detik 2,500,000

-Public Rate Lokal (Include PPN 10%) 30 Detik 100,000

Semi Block Time (60 Menit)

-Public Rate National (include PPN 10%) 120,000,000

-Public Rate Lokal (Include PPN 10%) 8,000,000

Semi Block Time (30 Menit)

-Public Rate National (include PPN 10%) 60,000,000

-Public Rate Lokal (Include PPN 10%) 4,000,000

Filler (3 Menit)

-Public Rate National (include PPN 10%) 17,000,000

-Public Rate Lokal (Include PPN 10%) 1,000,000

Other

OBB/CBB
-Logo gambar muncul 5" dlm 1 acara
(main sponsor) di opening & closing 550,000
program
Bumper In/Out
-Logo gambar muncul 2x awal &akhir
acara mengapit iklan prog.Spot 250,000
durasi 5"
Running Text
-Text berjalan muncul min 10x dlm
50,000
acara durasi 5-10 second
Telop
-Spot Logo brand/corporate (dlm
250,000
kuis) muncul di tengah prog 5"
Super Inpose
-Gbr muncul kecil di bawah max
150,000
10"(bisa moving di satu titik)
Adlips
-Penyebutan nama brand dan
150,000
deskripsi produk 5"
Credit Tittle
-Pencantuman Logo pada akhir
100,000
program berupa tulisan berjalan

5. Honorarium Tim Penyelenggaraan PILKADES (BPMD)


Besarnya
No. Jabatan SAT Keterangan
(Rp.)
I Honorarium TIM Pengawas

Pembina OB 500,000

Pengarah OB 450,000

Ketua OB 400,000

Sekretaris OB 350,000

Anggota OB 300,000

Pembantu OB 150,000

II Honorarium TIM Penyelesaian Sengketa

Pembina OB 500,000

Pengarah OB 450,000

Ketua OB 400,000

Sekretaris OB 350,000

Anggota OB 300,000

Pembantu OB 150,000

III Honorarium Sekretariat Kabupaten

Ketua OB 500,000

Sekretaris OB 450,000

Anggota OB 400,000

Pembantu OB 200,000

IV Honorarium Panitia Pemilihan Tingkat Desa

Ketua OB 400,000

Sekretaris OB 350,000

Anggota OB 300,000

V KPPS

Ketua OH 300,000

Sekretaris OH 250,000

Anggota OH 200,000

VI BARANG / JASA

1 Kelengkapan Pemungutan Dan Penghitungan Suara

a. Kotak Suara Buah 175,000

b. Perlengkapan TPS Paket 75,000

2 Jasa Pengamanan Gudang Dan Gedung Kantor serta pengawalan Pilkades OH 50,000

3 Jasa sortir dan pelipatan surat suara Lbr 200

4 Jasa pengepakan kotak suara Buah 20,000

5 Jasa verifikasi dan rekapitulasi calon perseorangan KTP 1,000

6 Jasa bongkar muat kotak suara Kotak 3,000


6 Honorarium Tim Pelaksana Kegiatan (PDE, Arsip dan Dokumentasi)

NO URAIAN SAT BIAYA (Rp) KET.

1 Honor Tim Penelusuran Situs Budaya

Ketua OK 150,000

Sekretaris OK 130,000

Budaya OK 110,000

2 Honor Tim Penyusutan Arsip

Ketua OK 150,000

Sekretaris OK 130,000

Anggota OK 110,000

3 Honor Tim Penyusutan Jadwal Retensi Arsip (JRA) Subtantif

Ketua OK 150,000

Sekretaris OK 130,000

Anggota OK 110,000

4 Honorarium Tim Ahli Penyusunan JRA da Penelusuran Situs Budaya

Narasumber OJ 250,000

B. BIAYA PEMELIHARAAN KENDARAAN DAN PERALATAN KANTOR

1. Biaya Pemeliharaan Kendaraan

BIAYA (Rp)

No. JENIS KENDARAAN SAT UMUR KENDARAAN KETERANGAN

s.d. 5 Th > 5 Th

1 Truck Unit/Th. 5,000,000 7,500,000

2 Bus Unit/Th. 7,500,000 12,000,000

3 Pick Up Unit/Th. 5,000,000 7,500,000

4 Jeep / Mini Bus Unit/Th. 5,800,000 8,000,000

5 Sedan Unit/Th. 4,500,000 5,000,000

6 Kendaraan Roda 2 (dua) Unit/Th. 1,000,000 1,750,000

7 Truk Bak Roda 6 (enam) Unit/Th. 2,700,000 3,750,000

8 Truk Dum Roda 6 (enam) Unit/Th. 3,500,000 4,000,000

9 Truk Pengangkut Sampah Unit/Th. 3,500,000 4,500,000

10 Mini Bus Puskel Unit/Th. 3,500,000 4,000,000

2. Rekondisi Kendaraan

NO URAIAN SAT Besaran (Rp.) KETERANGAN


Kendaraan yang akan direkondisi wajib mendapat persetujuan
1 Truck Unit/Th. 17,000,000
dari Sekretaris Daerah Kabupaten Lombok Tengah
2 Bus Unit/Th. 75,000,000

3 Pick Up Unit/Th. 10,000,000

4 Jeep / Mini Bus Unit/Th. 15,000,000

5 Sedan Unit/Th. 10,000,000

6 Kendaraan Roda 2 (dua) Unit/Th. 1,500,000

3. Peralatan Kantor

NO URAIAN SAT Besaran (Rp.) KETERANGAN


1. Mesin Tik Unit/Th. 500,000

2. AC Unit/Th. 1,000,000

3. Faximile Unit/Th. 1,000,000

4. Komputer Unit/Th. 2,000,000

5. Laptop/ Notebook Unit/Th. 2,000,000

6. LCD Projector Unit/Th. 2,500,000

7. OHP Unit/Th. 1,000,000

8. Sound System Unit/Th. 1,000,000

9. Peralatan Studio Unit/Th. 1,000,000

10 Mesin Fotocopy Unit/Th. 2,500,000

4. Harga Suku Cadang Kendaraan.

NO URAIAN SAT Besaran (Rp.) KETERANGAN

A. KENDARAAN RODA 2

1 Ban Luar Buah 275,000

2 Ban Dalam Buah 75,000

3 Kampas Kopling Set 275,000

4 Kampas Rem Buah 45,000

5 Kampas Kopling Ganda Buah 150,000

6 Klaher Roda Buah 30,000

7 Gir + Rantai Set 275,000

8 Velg Besi Buah 105,000

9 Velg Bintang Buah 400,000

10 Aki 12 V - 5 A Buah 250,000

11 Kiprok Buah 115,000

12 Busi Buah 25,000

13 Coil (Bobin) Buah 175,000

14 Kalbulator Buah 550,000

15 Kalbulatorkit Buah 50,000

16 Rantai Kamrat Buah 75,000

17 Stang Seker Buah 275,000

18 Ring Seker (Piston Kit) Buah 250,000

19 Klep Buah 100,000

20 Sepatu Klep Buah 275,000

21 Bos Klep Buah 150,000

22 Top Set Buah 125,000

23 Full Shet Buah 250,000

24 Knalpot Buah 300,000

25 Klakson Buah 100,000

26 Lapis Jok Buah 100,000

27 Dinamo Stater Buah 375,000

28 Magnet Kit Buah 400,000


29 Kabel Gas Buah 95,000

30 Kabel Kopling Buah 75,000

31 Kabel Rem Buah 75,000

32 Kabel Spedo Buah 75,000

33 Kaca Spion Buah 100,000

34 Lampu Depan Buah 225,000

35 Lampu Belakang Buah 175,000

36 Lampu Sein Buah 50,000

37 Bola Lampu Depan Buah 25,000

38 Bola Lampu Belakang Buah 20,000

39 Bola Lampu Sein Buah 10,000

40 Spakbor Depan Buah 85,000

41 Sapkbor Belakang Buah 200,000

42 Shock Breaker Depan Buah 550,000

43 Shock Breaker Belakang Buah 275,000

44 Kick Stater Buah 100,000

45 Pedal Perseneling Buah 75,000

46 Air Filter Buah 55,000

47 Spedo Meter Digital Buah 1,275,000

48 Flasher Buah 55,000

49 Switch Stater Buah 100,000

B. KENDARAAN RODA 4

1 Ban Luar BS 175/70 R 13 Buah 595,000 MERK HANKOOK, ACHILES

2 Ban Luar BS 185/70 R 14 Buah 685,000

3 Ban Luar BS 185/80 R 14 Buah 685,000

4 Ban Luar BS 235/70 R 15 Buah 990,000

5 Ban Luar Mal 13 Buah 595,000

6 Ban Luar BS 750 R 16 Buah 1,450,000 MERK GOOD

7 Ban Luar 195/60 R15 BS Buah 950,000 MERK HANKOOK, ACHILES

8 Ban Luar 215/65 R16 BS Buah 895,000

9 Ban Luar 205/60 R15 BS Buah 1,250,000

10 Ban Luar 265/70 R16 BS Buah 1,850,000

11 Ban Luar 195/55 R16 BS Buah 825,000

12 Ban Dalam 750 x 16 BS Buah 275,000

13 Ban Dalam Mal 13 BS Buah 175,000

14 Accu N 5 40 (32 A) Buah 680,000

15 Accu N 5 60 (45 A) Buah 750,000

16 Accu N 50 (50 A) Buah 996,000

17 Accu N 70 (70 A) Buah 1,190,000

18 Accu NIDO (100 A) Buah 1,585,000

19 Accu NIZO (120 A) Buah 1,900,000

20 Accu 12 Volt Honda GS Buah 275,000


34 Platina Buah 85,000

35 Kondensor Buah 55,000

36 Busi Buah 80,000

37 Bubin Buah 50,000

38 Dongkrak 5 Ton Buah 525,000

39 Knalpot Buah 550,000

40 Kampas Rem Buah 275,000

41 Auto Matic Minyak Buah 450,000

42 Filter Solar Buah 150,000

43 Filter Oil Buah 185,000

44 Saringan Udara Buah 275,000

45 Terot Roda Buah 325,000

46 Join As Panjang Buah 185,000

47 Radiator Buah 1,750,000

48 Lampu Depan Buah 375,000

49 Benpar Depan Buah 1,250,000

50 kabel Busi Set 350,000

51 Sok Depan Buah 550,000

52 Sok Belakang Buah 350,000

53 Klaher Roda Buah 185,000

54 Klakson Buah 300,000

55 Teanul Roda Buah 275,000

56 Pak Seet Buah 750,000

57 Rantai Kamrat Buah 350,000

58 Bol Join Roda Depan Atas Set 300,000

59 Bol Join Roda Depan Bawah Set 350,000

60 Metal Jalan Set 450,000

61 Metal Duduk Set 425,000

62 Lampu Weser Depan Buah 150,000

63 Lampu Weser Belakang Buah 175,000

64 Lampu Besar Buah 350,000

65 Pak Koop Buah 650,000

66 Kangkek Udang Buah 450,000

67 Pir Buah 750,000

68 Delko Set 450,000

69 Dinamo Stater Buah 1,500,000

70 Dinamo Isi Buah 1,850,000

71 Keet Out Buah 275,000

72 Kastrim Atas Buah 250,000

73 Kastrim bawah Buah 550,000 master rem assy

74 Kas Kopling Atas Buah 225,000 master kopling atas, 225.000, bawah 250.000

75 Kas Kopling Bawah Buah 150,000


76 Pak Keem Buah 1,750,000

Harga tersebut di atas Sudah Termasuk Pajak + PPN

C. PENDIDIKAN DAN LATIHAN

1. Seminar, Simposium, Lokakarya, Pertemuan

NO URAIAN SAT Besaran (Rp.) KETERANGAN


Tenaga dari Luar Kabupaten Lombok Tengah
1. Honor Panitia Penyelenggara
ditambah transportasi dan akomodasi
- Penanggung Jawab OK 200,000

- Ketua OK 150,000

- Sekretaris OK 125,000

- Koordinator / Seksi-seksi OK 90,000

- Anggota OK 80,000

- Pembantu OK 75,000

2. Penceramah/Pembicara (Pejabat & Tenaga Ahli)

a. Eselon II dan Sederajat OA 400,000

b. Eselon III dan Sederajat OA 250,000

c. Eselon IV dan Sederajat OA 150,000

3 Nara Sumber

a. Eselon II dan Sederajat OA 350,000

b. Eselon III dan Sederajat OA 175,000

c. Eselon IV dan Sederajat OA 125,000

4 Moderator

a.Eselon II dan Sederajat OA 250,000

b. Eselon III dan Sederajat OA 200,000

c. Eselon IV dan Sederajat OA 150,000

5. Pengajar/Instruktur/Pembicara OJ 150,000

6 Notulen OJ 100,000

7 Uang Saku Peserta (Dalam Daerah) OH 50,000

8 Uang Saku Peserta (Luar Daerah) OH 100,000

9 Penulis Kertas Kerja Judul 150,000

10 Transport Lokal Panitia OK 50,000

11 Dokumentasi Kegiatan 250,000

12 Pembawa Acara (MC) OK 75,000

13 Persiapan Gedung Tanpa Sewa Angkatan 100,000

14 Biaya Dekorasi Kali 750,000

2. Kursus, Penataran, Diklat

NO URAIAN SAT Besaran (Rp.) KETERANGAN

HONOR PANITIA PENYELENGGARA

1. Penanggung Jawab OK 200,000

2. Ketua OK 195,000

3. Sekretaris OK 185,000
4. Koordinator/Seksi-Seksi OK 180,000

5. Anggota OK 150,000

6. Tenaga Sekretariat OK 100,000

7. Tenaga Dosen/Instruktur/Pengajar

- DIKLATPIM IV Jam Pel. 100,000

- DIKLATPIM III Jam Pel. 100,000

- DIKLATPIM II Jam Pel. 60,000

- Diklat Prajabatan Gol III Jam Pel. 90,000

- Diklat Prajabatan Gol. I dan Gol. II Jam Pel. 50,000

- Diklat Teknis Fungsional/Mp Jam Pel. 60,000

- Diklat Teknis Fung./Mp untuk tamu Jam Pel. 200,000

- Diklat Legislatif Jam Pel. 600,000

8. Penyusunan Naskah

- DIKLATPIM IV Naskah 100,000

- DIKLATPIM III Naskah 100,000

- DIKLATPIM II Naskah 150,000

- Teknis Fungsional/ Manajemen Pemerintahan Naskah 100,000

9. Pengawas Ujian OH 25,000

10. Pemeriksa Hasil Ujian Materi 25,000

11. Uang Saku Peserta/Siswa

- DIKLATPIM IV OH 30,000

- DIKLATPIM III OH 42,000

- DIKLATPIM II OH 54,000

- Teknis Fungsional/ Mp OH 54,000

12. Obat-obatan/Olah Raga Angkatan 250,000

13. Piagam/ Sertifikat & Tanda peserta OA 25,000

14. Dokumentasi dan Publikasi Angkatan 250,000

15. Spanduk m2 50,000

16. Transport :

- Dosen OH 25,000

- Pengamat OH 25,000

- Piket OH 25,000

- Lokal Panitia Angkatan 250,000

17. Persiapan Gedung Tanpa Sewa Angkatan 100,000

19. Pengamat OH 20,000

20. Pakaian Olah Raga Prajabatan set 125,000

21. Pakaian Pol PP set 250,000

3. Diklat Legislatif dan fungsional

NO URAIAN SAT Besaran (Rp.) KETERANGAN

1 Honorarium Pengajar Diklat Legislatif Jam Pel. 780,000 Pakar nasional

2 Tas untuk peserta Diklat Legislatif orang/buah 100,000


3 Tas untuk Diklatpim dan Teknis/Fungsional orang/buah 100,000

4 Kodal peserta Diklat Legislatif angkatan 2,500,000

5 Kodal Diklatpim dan Teknis/Fungsional angkatan 1,500,000

6 Modul Teknis/Fungsional/ MP orang/set 100,000

7 Modul Prajabatan Gol. III orang/set 150,000 LAN RI

8 Modul Prajabatan Gol. I dan Gol. II orang/set 150,000 LAN RI

9 Modul Diklatpim Tk. IV orang/set 160,000 LAN RI

10 Modul Diklatpim Tk. III / II orang/set 160,000 LAN RI

4. Garapan Pentas Seni (tari, teater, musik)

NO URAIAN SAT Besaran (Rp.) KETERANGAN

1 Upah

a Artis

- Latihan OH 54,250

- Pentas OH 203,400

b Pelatih

- Latihan OH 108,500

- Pentas OH 339,000

c Rias dan busana artis OK 169,500

d Nara sumber OK 135,600

e Penyusun skenario OK 2,034,000

f Stage Manager OH 203,500

g Penata Artistik OH 203,500

h Penata Cahaya OH 203,500

i Penata Tari, teater dan musik OK 4,068,000

2. Juri lomba OH 203,500

D. KONSUMSI DAN AKOMODASI

1. Prasmanan

NO URAIAN Besaran (Rp.) KETERANGAN

1 Tamu Bupati/Wakil Bupati 97,000 ###

2 Rapat Paripurna DPRD 65,000

3 Rapat Teknis di DPRD 52,000

4 Rapat Teknis di SKPD 45,000

5 Pendidikan dan Latihan 45,000

2. Konsumsi dan Akomodasi


Konsumsi
No URAIAN AULA Akomodasi (OH) KETERANGAN
(OH)
I. Jamuan Makan (Prasmanan) dan Snack (Prasmanan) Kegiatan Bupati/Wakil Bupati

a. Kegiatan di Pendopo Bupati/Wakil Bupati

1. Makan (Prasmanan)
- Tamu VVIP 175,000 175,000 ###

- Tamu VIP 130,000 130,000 ###

- Tamu Undangan 100,000 100,000 ###

2. Snack (Prasmanan) 20,000 20,000 ###

b. Kegiatan di ruang kerja Bupati/Wakil Bupati

1. Makan (Prasmanan)

- Tamu VIP 100,000 100,000 ###

- Tamu Undangan 65,000 65,000 ###

2. Snack (Prasmanan) 20,000 20,000 ###

c. Kegiatan di ruang VIP Bandara Internasional Lombok (BIL)

1. Makan (Prasmanan)

- Tamu VVIP 175,000 175,000 ###

- Tamu VIP 130,000 130,000 ###

- Tamu Undangan 100,000 100,000 ###

2. Snack (Prasmanan) 15,000 ###

d. Kegiatan Pemda Lombok Tengah pada acara hari-hari Besar Nasional dan Keagamaan

1. Jamuan Makan (Prasmanan)

- Tamu VVIP 130,000 100,000 ###

- Tamu VIP 100,000 75,000 ###

- Tamu Undangan 65,000 50,000 ###

2. Jamuan Makan (Nasi Kotak)

- Tamu VIP/ Undangan 65,000 50,000 ###

3. Snack (Prasmanan) 20,000 15,000 ###

II. Balai Diklat 325,000 20,000

1 x makan 46,000

1 x Snack 13,000

Snack (Prasmanan) 20,000

III. Hotel Melati 1 350,000 100,000 ###

3 x makan + 2 x snack 82,000 ###

2 x makan + 2 x snack 130,000 ###

1 x makan + 2 x snack 78,000

1 x makan + 1 x snack 65,000

IV. Hotel Melati 2 400,000 200,000 ###

3 x makan + 2 x snack 150,000

2 x makan + 2 x snack 162,500 125,000

1 x makan + 1 x snack 78,000 60,000

V. Hotel Melati 3 (AC) 650,000 300,000 390,000 ###

Hotel Melati 3 (Non AC) 390,000 250,000 325,000 ###

3 x makan + 2 x snack 260,000 200,000 ###

2 x makan + 2 x snack 227,500 175,000

1 x makan + 2 x snack 195,000 150,000

1 x makan + 1 x snack 125,000 ###


VI. Hotel Bintang 1 780,000 300,000 390,000

3 x makan + 2 x snack 260,000

2 x makan + 1 x snack 240,500

1 x makan + 2 x snack 149,500

1 x makan + 1 x snack 130,000

VII. Hotel Bintang 2 910,000 300,000 390,000

3 x makan + 2 x snack 325,000

2 x makan + 2 x snack 227,500

1 x makan + 2 x snack 162,500

1 x makan + 1 x snack 162,500

VIII. Hotel Bintang 3 2,210,000 600,000 780,000

3 x makan + 2 x snack 390,000

2 x makan + 2 x snack 260,000

1 x makan + 2 x snack 195,000

1 x makan + 1 x snack 162,500

IX. Hotel Bintang 4 3,250,000 800,000 1,040,000 D'MAX ###

3 x makan + 2 x snack 487,500 ###

2 x makan + 2 x snack 455,000 ###

1 x makan + 2 x snack 357,500 ###

1 x makan + 1 x snack 325,000 ###

X. Hotel Bintang 5 5,850,000 950,000 1,235,000

3 x makan + 2 x snack 845,000

2 x makan + 2 x snack 455,000

1 x makan + 2 x snack 390,000

1 x makan + 1 x snack 325,000

3. Konsumsi

NO URAIAN SAT Besaran (Rp.) KETERANGAN

1 Snack Kotak 13,000

2 Makan Kotak 45,000

3 Makan Bungkus 32,000

14. Honorarium Kegiatan Khusus Bagian Pengadaan Barang dan Jasa (ULP)

Besarnya
No. Jabatan SAT Keterangan
(Rp.)

1 Pembina OB 4,750,000

2 Pengarah OB 4,600,000

3 Ketua OB 4,500,000
4 Wakil Ketua OB 4,300,000
5 Koordinator OB 4,150,000
6 Sekretaris OB 4,000,000
7 Kelompok Kerja OB 3,750,000
8 Anggota OB 1,500,000
9 Pembantu OB 750,000

14. Honorarium Tim Pelayanan Rumah Tangga Pejabat Dan Dinas Pada Bagian Umum Sekretariat Daerah Kab. Lombok
Tengah
Besarnya
No. Jabatan SAT Keterangan
(Rp.)
1 Ketua OB 1,250,000
2 Sekretaris OB 1,000,000
3 Koordinator OB 750,000
4 Anggota (PNS) OB 600,000
5 Anggota (Non PNS / PP31 / Jasa Tukang) OB 500,000
E. BIDANG PEKERJAAN UMUM
( Sudah termasuk ongkos angkut )

1. BAHAN PASANGAN

No. Uraian SAT Harga Keterangan SAT Harga Keterangan

1 Batu Quari/kali alam/gunung m³ 232,083 m³ 183,465

2 Batu Belah / Pondasi m³ 232,083 m³ 183,465

3 Batu Kali Tempel/Keping m² 232,083 m² 183,465

4 Kerikil Sungai - Royalti m³ 232,083 m³ 183,465

5 Harga Batu Pecah Crusher

- Batu Pecah 3 - 5 m³ 577,823 m³ 456,777

- Batu Pecah 2 - 3 m³ 609,938 m³ 482,164

- Batu Pecah 1 - 2 m³ 642,053 m³ 507,552

- Batu Jagungan Crusher m³ 674,168 m³ 532,939

- Batu Pecah Manual

- Batu Pecah 2 - 3 m³ 481,477 m³ 380,614

- Batu Pecah 3 - 5 m³ 404,451 m³ 319,724

- Batu Pecah 5 - 7 m³ 449,362 m³ 355,227

- Sirtu (Kerikil Alam Berpasir) m³ 195,702 m³ 154,705

- Sirtu - Royalty m³ 288,911 m³ 228,388

- Agregat Kasar (Stone Crusher) m³ 321,152 m³ 253,875

- Agregat Halus (Stone Crusher) m³ 545,708 m³ 431,390

6 Harga Kerikil Alam

- Kerikil Alam 5 - 7 m³ 208,623 m³ 164,919

- Kerikil Alam 3 - 5 m³ 200,720 m³ 158,672

- Kerikil Alam 2 - 3 m³ 321,152 m³ 253,875

- Kerikil Alam Jagungan m³ 321,152 m³ 253,875


m³ 288,535
8 Pasir Cor/Pasir Ayak untuk beton mutu diatas K ˃ 400 m³ 228,091

9 Pasir Cor/Beton dari kali m³ 219,538 m³ 173,548

11 Pasir Pasang m³ 188,175 m³ 148,755

12 Pasir Urug m³ 111,651 m³ 88,262

13 Tanah Urug m³ 94,088 m³ 74,378

14 Sirtu / Kerikil Alam m³ 156,813 m³ 123,963

15 Tanah Urug Pilihan m³ 146,777 m³ 116,029

16 Bata Kelas I Bh 1,066 Bh 881

17 Bata Kelas II Bh 1,035 Bh 855

18 Batu Alam Palimanan m² 182,279 m² 144,094

19 Batu Alam m² 205,738 m² 162,639

20 Batu Alam Pilah Sukabumi m² 205,362 m² 162,342

21 Batu Alam Marmo (5 x 20) m² 205,738 m² 162,639

22 Batu Alam Marmo (10 x 20) m² 205,738 m² 162,639

23 Kapur Gamping / Labur Kg 7,527 Kg 5,950

24 Kapur Biasa Kg 3,011 Kg 2,380

25 Semen Warna Kg 18,818 Kg 14,876

30 Batu Sikat Kg 3,764 Kg 2,975

31 Semen PC Tiga Roda Zak (50 Kg) 75,270 Zak (50 Kg) 59,502

32 Semen PC Gresik Zak (50 Kg) 74,016 Zak (50 Kg) 58,511

33 Semen PC Tonasa Zak (50 Kg) 72,761 Zak (50 Kg) 57,519

34 Semen PC Bosowa Zak (50 Kg) 71,507 Zak (50 Kg) 56,527

35 Semen Putih Tiga Roda Zak (50 Kg) 156,813 Zak (50 Kg) 123,963

36 Semen Merah Putih Zak (50 Kg) 74,016 Zak (50 Kg) 58,511
37 Pagar Beton m²
192,566 m² 152,226
41 Kanstein
/Bj 70,252 /Bj 55,535
44 Tiang Pancang
/m' 247,137 /m' 195,365
2. BAHAN ATAP

No. Uraian SAT Harga Keterangan SAT Harga Keterangan

2 Atap Multiroof m² 62,725 m² 49,585

3 Genteng Lokal /Bh 1,232 /Bh 974

4 Bubungan Genteng Lokal /Bh 1,541 /Bh 1,218

5 Genteng Beton Pres Ukuran Besar /Bh 9,660 /Bh 7,636

6 Bubungan Genteng Beton Pres Ukuran Besar /Bh 22,581 /Bh 17,851

7 Genteng Beton Pres Ukuran Menengah /Bh 6,523 /Bh 5,157

8 Bubungan Genteng Beton Pres Ukuran Menengah /Bh 15,054 /Bh 11,900

7 Genteng Flat Motif Garis /Bh 12,420 /Bh 9,818

8 Genteng Flat Motif Urat Batu /Bh 12,420 /Bh 9,818

7 Genteng Flat Vertikal /Bh 12,420 /Bh 9,818

9 Genteng Silang Kodok Palembang /Bh 6,273 /Bh 4,959

10 Bubungan Silang Kodok Palembang /Bh 18,818 /Bh 14,876

9 Genteng Mantili Besar /Bh 5,771 /Bh 4,562

10 Bubungan Mantili Besar /Bh 10,036 /Bh 7,934

11 Genteng Mantili Kecil /Bh 4,391 /Bh 3,471

12 Bubungan Mantili Kecil /Bh 10,036 /Bh 7,934

13 Genteng Pejaten Bali Besar /Bh 32,617 /Bh 25,784

14 Bubungan Pejaten Bali Besar /Bh 7,527 /Bh 5,950

15 Genteng Pejaten Mini Bali /Bh 3,136 /Bh 2,479

16 Bubungan Pejaten Mini Bali /Bh 6,273 /Bh 4,959

17 Genteng Pres Manual /Bh 1,255 /Bh 992

18 Bubungan Pres Manual /Bh 3,136 /Bh 2,479

21 Genteng Karang Pilang /Bh 8,782 /Bh 6,942

22 Bubungan Karang Pilang /Bh 31,363 /Bh 24,793

25 Genteng Kaca /Bh 25,090 /Bh 19,834

27 Genteng Pejaten Lokal /Bh 1,882 /Bh 1,488

28 Bubungan Pejaten Lokal /Bh 5,018 /Bh 3,967

29 Genteng Keramik /Bh 21,954 /Bh 17,355

30 Bubungan Genteng Keramik /Bh 23,836 /Bh 18,843

41 Bubungan Tepi /Bh 11,667 /Bh 9,223

42 Bubungan Ujung /Bh 50,494 /Bh 39,916

43 Bubungan Metal Polos Warna 0,22 1x5 m 101,615 m 80,328

44 Genteng Metal Berpasir Warna Tebal 0,35 1x5 m² 137,995 m² 109,087

45 Genteng Metal Berpasir 0,35 m Minimalis 2 x 2 m² 125,450 m² 99,170

46 Genteng Metal Berpasir 0,30 m Minimalis 2 x 2 m² 116,041 m² 91,732

47 Genteng Metal Berpasir Warna 0,25 2 x 2 m² 119,178 m² 94,212

54 Asbes Bubungan Gelombang Besar /Lembar 35,126 /Lembar 27,768

55 Seng Gelombang Besar BJLS 20 /Lembar 66,489 /Lembar 52,560

56 Seng Gelombang Besar BJLS 25 /Lembar 81,543 /Lembar 64,461

57 Seng Gelombang Besar BJLS 30 /Lembar 74,016 /Lembar 58,511

58 Seng Plat BJLS 10 /Lembar 43,908 /Lembar 34,710

59 Seng Plat BJLS 20 /Lembar 50,180 /Lembar 39,668

60 Seng Plat BJLS 25 /Lembar 62,725 /Lembar 49,585

61 Seng Plat BJLS 30 /Lembar 75,270 /Lembar 59,502

62 Genteng Multitup 0,25 /Lembar 45,789 /Lembar 36,197

63 Genteng Multitup 0,35 /Lembar 56,453 /Lembar 44,627

64 Sepandek Warna 0,35 x 1 m /m' 75,270 /m' 59,502

65 Sepandek Warna 0,25 x 1 m /m' 46,417 /m' 36,693

66 Sepandek Warna 0,20 x 1 m /m' 90,324 /m' 71,402

67 Sepandek Polos 0,35 x 1 m /m' 45,162 /m' 35,701

68 Sepandek Polos 0,25 x 1 m /m' 38,890 /m' 30,743

69 Sepandek Polos 0,20 x 1 m /m' 25,090 /m' 19,834

70 Bubungan Sepandek Warna /m' 43,908 /m' 34,710

71 Sepandek Tebal 0,4 mm x 1 m /m' 100,360 /m' 79,336


74 Canal 0,70 BMT/0,75 TCT Ljr 100,360 Ljr 79,336

75 Canal 0,60 BMT/0,65 TCT Ljr 94,088 Ljr 74,378

76 Reng 0,40 BMT/0,45 TCT Ljr 48,298 Ljr 38,180

82 Talang PVC Kotak /m' 68,998 /m' 54,544

83 Seng Talang L = 60 cm BJLS 20 /m' 43,908 /m' 34,710

84 Seng Talang L = 50 cm BJLS 20 /m' 37,635 /m' 29,751

85 Seng Talang L = 40 cm BJLS 20 /m' 31,363 /m' 24,793

86 Seng Talang L = 30 cm BJLS 20 /m' 25,090 /m' 19,834

3. HARGA BAJA RINGAN

No. Uraian SAT Harga Keterangan SAT Harga Keterangan

RANGKA C75, RENG B30 & TALANG GALVALUM

Polos (colour)

1 Reng B-30 T=0,45 Galv (P=6 m') btg 47,671 btg 37,685

2 Reng B-30 T=0,4 Galv (P=6 m') btg 41,399 btg 32,726

3 Rangka C-7575 Galv P=7 m' btg 97,851 btg 77,353

4 Rangka C-7565 Galv P=6 m' btg 87,815 btg 69,419

5 Rangka C-75100 Galv P=7 m' btg 175,630 btg 138,838

BAUT-BAUT BAJA RINGAN

1 Skrew # 12 (Baut Kuda-kuda) @ 800 Pc Pc 376 Pc 297

2 Skrew # 10 (Baut Reng) @ 1000 Pc Pc 251 Pc 198

3 Baut Lisplank 12 # T 1 x 1/2 @ 200 Pc 502 Pc 397

4 Fisher ( S10 ) Pc 125 Pc 99

5 Taping (Pasangan Fisher S 10) @ 400 Pc 125 Pc 99

6 Dinabolt 10 x 65 @ 150 Pc 6,273 Pc 4,959

7 Baut SDS 12 x 50 (Baut Spandek) @ 200 Pc 753 Pc 595

8 Ripet 440 Pc 55,198 Pc 43,635

9 Ripet 550 Pc 27,599 Pc 21,817

ALAT KERJA BAJA RINGAN

1 Bor Maktek Type 601 Unit 514,345 Unit 406,597

2 Bor Beton Merk Makta Type HR 2020 Unit 482,983 Unit 381,805

3 Srew Driver M10 Buah 25,090 Buah 19,834

4 Mata Bor Beton Ø 10 mm SDS Unit 37,635 Unit 29,751

5 Gunting Baja Ringan (Domax) Buah 137,995 Buah 109,087

RANGKA C85, RENG B41 GALVALUM (Eceran Khusus)

1 Rangka C 8585 Panjang @ 9 M" btg 288,535 btg 228,091

2 Rangka C 8565 Panjang @ 9 M" btg 265,327 btg 209,745

3 Reng B41 Panjang @ 6 M" btg 59,290 btg 46,870

4. HARGA BAHAN KAYU

No. Uraian SAT Harga Keterangan SAT Harga Keterangan

1 Papan Kayu Klas I m³ 15,054,000 m³ 11,900,395

2 Balok Kayu Klas I m³ 15,054,000 m³ 11,900,395

3 Papan Kayu Klas II m³ 13,172,250 m³ 10,412,846

4 Balok Kayu Klas II m³ 13,172,250 m³ 10,412,846

5 Papan Kayu Klas III m³ 5,645,250 m³ 4,462,648

6 Balok Kayu Klas III m³ 5,645,250 m³ 4,462,648

7 Kayu untuk Bagisting m³ 2,258,100 m³ 1,785,059

8 Lys Plapond ( 1 x 3 x 4 ) m' 15,054 m' 11,900

9 Lys Plapond ( 1 x 5 x 4 ) m' 22,581 m' 17,851

10 Lys Plapond ( 3 x 3 x 4 ) m' 22,581 m' 17,851

11 Lys Plapond ( 4 x 4 x 4 ) m' 44,911 m' 35,503

12 Kayu Dolken / Perancah 8 - 10 cm m' 44,409 m' 35,106

13 Kayu Bakar m³ 156,813 m³ 123,963


5. BAHAN BAMBU

No. Uraian SAT Harga Keterangan SAT Harga Keterangan

1 Bambu Besar ( p= 4 m, 08 - 12 cm ) Batang 38,513 Batang 30,445

2 Bambu Sedang ( p= 4 m, 06 - 8 cm ) Batang 32,115 Batang 25,387

3 Bambu Kecil ( p= 4 m, 03 - 5 cm ) Batang 29,481 Batang 23,305

4 Bedek Kulitan m² 44,911 m² 35,503

5 Bedek Pagar m² 147,278 m² 116,425

6 kampu m² 12,796 m² 10,115

6. BAHAN CETAKAN

No. Uraian SAT Harga Keterangan SAT Harga Keterangan

1 Loster Jogja 25 x 25 cm Bh 56,453 Bh 44,627

2 Loster Jogja 30 x 30 cm Bh 66,739 Bh 52,758

3 Loster Jogja 20 x 20 cm Bh 47,546 Bh 37,586

4 Loster Jogja 40 x 40 cm Bh 99,858 Bh 78,939

5 Loster Jogja 40 x 20 cm Bh 68,998 Bh 54,544

6 Loster Jogja 30 x 20 cm Bh 56,453 Bh 44,627

7 Loster Bali 30 x 30 cm Bh 50,180 Bh 39,668

8 Loster Bali 25 x 25 cm Bh 56,453 Bh 44,627

9 Loster Bali 50 x 25 cm Bh 112,905 Bh 89,253

10 Loster Bali 40 x 40 cm Bh 87,815 Bh 69,419

11 Loster Jawa 23 x 23 cm Bh 51,435 Bh 40,660

12 Loster Jawa 23 x 12 cm Bh 68,998 Bh 54,544

13 Loster Keramik 30 x 30 cm Bh 68,998 Bh 54,544

14 Lubang Angin 10 x 20 cm Bh 5,018 Bh 3,967

15 Lubang Angin 20 x 20 cm Bh 8,782 Bh 6,942

16 Lubang Angin 30 x 30 cm Bh 24,463 Bh 19,338

17 Deuker Ø 40, p= 0,50 cm Bh 100,360 Bh 79,336

18 Deuker Ø 30, p= 0,50 cm Bh 43,908 Bh 34,710

19 Deuker Ø 20, p= 1 m Bh 62,725 Bh 49,585

20 Deuker Ø 30, p= 1 m Bh 100,360 Bh 79,336

21 Buis Ø 80, p= 0,50 cm Bh 137,995 Bh 109,087

22 Buis Ø 60, p= 0,50 cm Bh 100,360 Bh 79,336

23 Buis Sigaran Ø 25, p= 0,50 cm Bh 18,818 Bh 14,876

24 Buis Sigaran Ø 20, p= 1 m Bh 43,908 Bh 34,710

25 Buis Sigaran Ø 15, p= 1 m Bh 31,363 Bh 24,793

26 Buis Sigaran Ø 30, p= 1 m Bh 56,453 Bh 44,627

27 Loster Beton Biasa 25 x 25 cm Bh 8,782 Bh 6,942

28 Loster Beton Biasa 20 x 20 cm Bh 6,273 Bh 4,959

29 Loster Beton Biasa 30 x 30 cm Bh 18,818 Bh 14,876

30 Sigaran U 40 cm (K175) Biji 148,031 Biji 117,021

31 Sigaran U 45 cm (k175) Biji 154,304 Biji 121,979

32 Sigaran U 55 cm (k175) Biji 160,576 Biji 126,938

33 Buis Ødalam = 25, Øluar = 40, p = 50 cm, tebal 7,5 cm Biji 25,090 Biji 19,834

36 Bataco 40 x 20 x 10 cm Manual Bh 2,007 Bh 1,587

37 Bataco 37 x 20 x 10 cm Manual Bh 1,882 Bh 1,488

38 Bataco 37 x 20 x 9 cm Manual Bh 3,136 Bh 2,479

39 Bataco 40 x 20 x 10 cm pres Bh 2,258 Bh 1,785

40 Bataco 37 x 20 x 10 cm Pres Bh 3,387 Bh 2,677

41 Bataco 37 x 20 x 9 cm Pres Bh 1,882 Bh 1,488

42 Paving Blok Segi Enam Manual m² 56,453 m² 44,627

43 Paving Blok Bata Manual m² 56,453 m² 44,627

44 Kansteen 20x40 (K200) bj 51,058 bj 40,362

45 Kansteen 30x50 (K200) bj 57,707 bj 45,618

46 Kansteen 30x60 (K300) bj 90,951 bj 71,898

47 Paving Blok Tebal 8 cm K 100 m² 107,887 m² 85,286


44 Paving Blok Tebal 8 cm K 200 m² 123,568 m² 97,682

45 Paving Blok Tebal 8 cm K 300 m² 132,977 m² 105,120

46 Paving Blok Tebal 8 cm K 400 m² 154,304 m² 121,979

47 Paving Blok Tebal 6 cm K 200 m² 104,751 m² 82,807

48 Paving Blok Tebal 6 cm K 300 m² 117,296 m² 92,724

49 Paving Blok Tebal 6 cm K 400 m² 132,977 m² 105,120


7. BAHAN LANTAI

No. Uraian SAT Harga Keterangan SAT Harga Keterangan

1 Keramik Dinding Kamar mandi Kw. I 20x25 cm m2 74,016 m2 58,511

2 Keramik Lantai Kamar mandi 20x20 cm m2 68,998 m2 54,544

2 Marmer B1 40 x 60 m2 326,170 m2 257,842

3 Marmer B1 60 x 60 m2 439,075 m2 347,095

4 Marmer B1 40 x 40 m2 313,625 m2 247,925

5 lantai Geranit kristal Black kw 40 x 40 m2 355,024 m2 280,651

6 Lantai Geranit Mirror siena 40 x 40 m2 288,535 m2 228,091

7 Lantai Geranit Mirror 40 x 40 m2 288,535 m2 228,091

8 Marmer Tulung Agung m2 253,409 m2 200,323

9 Batu Candi m2 169,358 m2 133,880

10 Batu Endesit m2 200,720 m2 158,672

11 Batu Paras Putih m2 163,085 m2 128,921

12 Batu Marmo m2 169,358 m2 133,880

13 Batu Granit m2 589,615 m2 466,099

14 Batu Paras m2 163,085 m2 128,921

15 Granit Niko m2 233,337 m2 184,456

16 Granit Sandi Mas m2 210,756 m2 166,606

17 Granit Granito m2 244,628 m2 193,382

18 Lantai Granit Kw I Megolite GSM 03 30 x60 m2 317,389 m2 250,900


8. BAHAN BESI

No. Uraian SAT Harga Keterangan SAT Harga Keterangan

1 Besi Ulir /Kg 33,872 /Kg 26,776

2 Besi Polos /Kg 11,541 /Kg 9,123

3 Besi Siku 4 x 4 /Kg 94,088 /Kg 74,378

4 Baja Plat 1. 22 x 2. 42 x 1,2 mm Lembar 329,306 Lembar 260,321

5 Kawat Ikat Beton Kg 31,363 Kg 24,793

6 Kawat Nyamuk Besi m² 43,908 m² 34,710

7 Kawat Nyamuk Plastik m² 31,363 m² 24,793

8 Kawat Saringan Pasir m² 37,635 m² 29,751

9 Kawat Duri Rool 94,088 Rool 74,378

10 Kawat Talang 90.60 m' 37,635 m' 29,751

11 Angker Ø 22 mm p = 50 cm Bh 15,681 Bh 12,396

12 Angker Ø 16 mm p = 50 cm Bh 19,445 Bh 15,372

13 Baut/Mur Ø 25 mm Bh 12,545 Bh 9,917

14 Baut/Mur Ø 20 mm Bh 10,036 Bh 7,934

15 Baut/Mur Ø 15 mm Bh 8,782 Bh 6,942

16 Baut/Mur Ø 12 mm Bh 7,527 Bh 5,950

17 Baut / Mur 30 cm Bh 15,054 Bh 11,900

18 Baut / Mur 25 cm Bh 15,054 Bh 11,900

19 Baut / Mur 20 cm Bh 12,545 Bh 9,917

20 Baut / Mur 15 cm Bh 7,527 Bh 5,950

21 Blugel Komplit Bh 37,635 Bh 29,751

22 Angker kuda-kuda Ø 16 mm p= 40 cm Bh 37,635 Bh 29,751

23 Angker kuda-kuda Ø 12 mm p= 30 cm Bh 33,872 Bh 26,776

25 Baja Profil Siku Kg 23,836 Kg 18,843

26 Baja Pelat Kg 27,599 Kg 21,817

27 Baja Pelat 1,22 x 2,42 x 1,2 mm Lembar 627,250 Lembar 495,850

28 Kawat Las Kotak 181,903 Kotak 143,797

29 Besi Siku 30, 30, 3 m' 62,725 m' 49,585

30 Besi Siku 40, 40, 4 m' 125,450 m' 99,170

31 Besi Siku 50, 50, 5 m' 376,350 m' 297,510

32 Besi Siku 60, 60, 6 m' 439,075 m' 347,095

33 Besi Siku 70, 70, 7 m' 629,759 m' 497,833

34 Pintu Roling Door Klas I m2 878,150 m2 694,190

37 Pintu Roling Door Harmonika Klas I m2 1,254,500 m2 991,700

9. BAHAN LANGIT-LANGIT / PLAPOND

No. Uraian SAT Harga Keterangan SAT Harga Keterangan

1 Eternit 100 x 100 cm Lembar 22,581 Lembar 17,851

2 Triplek 120 x 240 x 2 mm Lembar 60,216 Lembar 47,602

3 Triplek 120 x 240 x 3 mm Lembar 62,725 Lembar 49,585

4 Triplek 120 x 240 x 4 mm Lembar 75,270 Lembar 59,502

5 Triplek 120 x 240 x 6 mm Lembar 87,815 Lembar 69,419

6 Triplek 120 x 240 x 9 mm Lembar 125,450 Lembar 99,170

7 Triplek 120 x 240 x 12 mm Lembar 206,993 Lembar 163,631

8 Triplek 120 x 240 x 18 mm Lembar 326,170 Lembar 257,842

9 Triplek Lapis Aluminium Lembar 137,995 Lembar 109,087

10 Triplek 3 x 7 Lembar 50,180 Lembar 39,668

11 Polidor 3 x 7 Lembar 94,088 Lembar 74,378

12 Calsiboard 120 x 240 x 3,5 mm Lembar 71,507 Lembar 56,527

13 Calsiboard 120 x 240 x 6 mm Lembar 83,299 Lembar 65,849

14 Plywood 120 x 240 x 3 mm Lembar 102,869 Lembar 81,319

15 Blockwood Lembar 288,535 Lembar 228,091

16 Teakblock Lembar 338,715 Lembar 267,759

17 Teakwood 120 x 240 x 3 mm Lembar 121,687 Lembar 96,195


18 Formika Warna 120 x 240 cm Lembar 76,525 Lembar 60,494

19 Lys Gypsum 3 cm m' 13,800 m' 10,909

20 Lys Gypsum 5 cm m' 23,459 m' 18,545

21 Lys Gypsum 8 cm m' 24,705 m' 19,530

22 Lys Gypsum 10 cm m' 32,115 m' 25,387

23 Lys Gypsum 15 cm m' 35,126 m' 27,768

24 Lys Gypsum 25 cm m' 38,890 m' 30,743

25 GRC ( 6 mm ) Gypsum Lembar 76,525 Lembar 60,494

26 GRC ( 9 mm ) Gypsum Lembar 112,905 Lembar 89,253

27 GRC ( 12 mm ) Gypsum Lembar 122,941 Lembar 97,187

28 Melamin 2 mm Lembar 82,797 Lembar 65,452

29 Melamin 3 mm Lembar 115,414 Lembar 91,236

30 Partikel 18 mm Lembar 233,337 Lembar 184,456


31 Pintu Fiber Bh 294,808 Bh 233,050
10. HARGA BAHAN PIPA

No. Uraian SAT HARGA (Rp) KETERANGAN SAT HARGA (Rp) KETERANGAN

Pipa PVC Type S - 10 : - SCJ : Solvent Cement Joint SCJ : Solvent Cement
Joint

1 PVC SCJ Ø 1/2" (20 mm) WP m 4,265 RRJ : Rubber Ring Joint m 3,372
RRJ : Rubber Ring Joint
2 PVC SCJ Ø 3/4" ( 25 m) WP m 6,398 m 5,058

3 PVC SCJ Ø 1" (32 m) WP m 11,165 m 8,826

4 PVC SCJ Ø 1 1/4" (40 mm) WP m 16,559 m 13,090

5 PVC SCJ Ø 1 1/2" (50 mm) m 26,345 m 20,826

6 PVC SCJ Ø 2" ( 63 mm) m 41,241 m 32,602

7 PVC SCJ Ø 2 1/2" ( 75 mm) m 58,632 m 46,349

8 PVC SCJ Ø 3" ( 90 mm) m 84,470 m 66,775

9 PVC SCJ Ø 4" (110 mm) m 127,199 m 100,553

10 PVC SCJ Ø 6" (160 mm) m 269,292 m 212,879

11 PVC SCJ Ø 8" (200 mm) m 448,961 m 354,910

12 PVC SCJ Ø 10" ( 250 mm) m 700,459 m 553,723

13 PVC SCJ Ø 12" (315 mm) m 1,115,499 m 881,817

14 PVC RRJ Ø 2" ( 63 mm) m 46,529 m 36,782

15 PVC RRJ Ø 2 1/2" (75 mm) m 65,190 m 51,534

16 PVC RRJ Ø 3" ( 90 mm) m 91,754 m 72,533

17 PVC RRJ Ø 4" (110 mm) m 135,439 m 107,066

18 PVC RRJ Ø 6" (160 mm) m 280,949 m 222,094

19 PVC RRJ Ø 8" ( 200 mm) m 467,963 m 369,931

20 PVC RRJ Ø 10" ( 250 mm) m 724,931 m 573,068

21 PVC RRJ Ø 12" (315 mm) m 1,146,910 m 906,648

22 PVC RRJ Ø 14" (355 mm) m 1,637,864 m 1,294,754

23 PVC RRJ Ø 16"- ( 400 mm) m 2,078,517 m 1,643,096

Pipa PVC Type S - 12,5 : 0 0

1 PVC SCJ Ø 1/2" (20 mm) m 4,129 m 3,264

2 PVC SCJ Ø 3/4" (25 mm) m 6,203 m 4,904

3 PVC SCJ Ø 1" ( 32 mm) m 9,849 m 7,786

4 PVC SCJ Ø 1 1/4" (40 mm) m 15,126 m 11,957

5 PVC SCJ Ø 1 1/2" - (50 mm) m 23,191 m 18,333

6 PVC SCJ Ø 2" (63 mm) m 32,622 m 25,788

7 PVC SCJ Ø 2 1/2" (75 mm) m 47,940 m 37,897

8 PVC SCJ Ø 3" (90 mm) m 69,398 m 54,860

9 PVC SCJ Ø 4" (110 mm) m 102,680 m 81,170

10 PVC SCJ Ø 6" (160 mm) m 219,724 m 173,695

11 PVC SCJ Ø 8" (200 mm ) m 364,444 m 288,098

12 PVC SCJ Ø 10" - ( 250 mm ) m 571,427 m 451,721

13 PVC SCJ Ø 12" (315 mm) m 90,950 m 71,897

14 PVC RRJ Ø 2" (63 mm) m 38,576 m 30,495

15 PVC RRJ Ø 2 1/2" (75 mm) m 54,355 m 42,968

16 PVC RRJ Ø 3" (90 mm) m 76,512 m 60,484

17 PVC RRJ Ø 4" (110 mm) m 110,669 m 87,485

18 PVC RRJ Ø 6" (160 mm) m 231,068 m 182,662

19 PVC RRJ Ø 8" (200 mm) m 382,079 m 302,039

20 PVC RRJ Ø 10" (250 mm) m 595,028 m 470,378

21 PVC RRJ Ø 12" (315 mm) m 939,926 m 743,025

22 PVC RRJ Ø 14" (355 mm) m 1,214,522 m 960,096

23 PVC RRJ Ø 16" - (400 mm) m 1,593,842 m 1,259,954

24 Band PVC RRJ 45° dia 8" Buah 648,025 Buah 512,273

25 Band PVC RRJ 45° dia 6" Buah 363,146 Buah 287,072

26 Band PVC RRJ 45° dia 4" Buah 175,386 Buah 138,645

27 Band PVC RRJ 45° dia 3" Buah 117,178 Buah 92,631

28 Band PVC RRJ 90° dia 2,5" Buah 106,382 Buah 84,096
29 Band PVC RRJ 90° dia 2" Buah 71,931 Buah 56,862

30 Band PVC RRJ 90° dia 1,5" Buah 33,219 Buah 26,260

31 Band PVC RRJ 90° d ia 3'' Buah 752,956 Buah 595,222

32 Band PVC RRJ 90° ddia 3'' Buah 413,974 Buah 327,252

33 Band PVC RRJ 90° dia 4" Buah 193,885 Buah 153,269

34 Band PVC RRJ 90° dia 3" Buah 136,631 Buah 108,009

35 Band PVC RRJ 90° dia 2,5" Buah 121,584 Buah 96,114

36 Band PVC RRJ 90° dia 2" Buah 82,169 Buah 64,956

37 Band PVC RRJ 90° dia 1,5" Buah 37,648 Buah 29,761

38 Packing dia 8" Buah 43,423 Buah 34,326

39 Packing dia 6" Buah 30,396 Buah 24,028

40 Packing dia 5" Buah 27,139 Buah 21,454

41 Packing dia 4" Buah 20,626 Buah 16,305

42 Packing dia 3" Buah 18,455 Buah 14,589

43 Packing dia 2" Buah 14,112 Buah 11,156

44 Pipa Gl Medium A dia 8" m 1,120,642 m 885,883

45 Pipa Gl Medium A dia 6" m 524,013 m 414,240

46 Pipa GI Medium A dia 4" m 354,267 m 280,053

47 Pipa Gl Medium A dia 3" m 262,085 m 207,182

48 Pipa GI Medium A dia 2,5" m 178,941 m 141,455

49 Pipa Gl Medium A dia 2" m 137,368 m 108,591

50 Pipa Gl Medium A dia 1,5 m 97,604 m 77,157

51 Pipa Gl Medium A dia 1" m 70,492 m 55,725

52 Pipa Gl Medium A dia 3/4" m 36,228 m 28,639

53 Pipa Gl Medium A dia 1/2" m 34,342 m 27,148

54 Pipa Gl Medium B dia 8" m 1,084,492 m 857,306

55 Pipa Gl Medium B dia 6" m 397,646 m 314,345

56 Pipa Gl Medium B dia 4" m 240,395 m 190,036

57 Pipa Gl Medium B dia 3" m 177,135 m 140,028

58 Pipa Gl Medium B dia 2,5" m 142,762 m 112,855

59 Pipa Gl Medium B dia 2" m 313,625 m 247,925

60 Pipa Gl Medium B dia 1,5" m 188,175 m 148,755

61 Pipa Gl Medium B dia 1" m 112,905 m 89,253

62 Pipa Gl Medium B dia 3/4" m 87,815 m 69,419

63 Pipa Gl Medium B dia 1/2" m 81,543 m 64,461

64 Band Gl All - Flange 90° dia 8" Buah 1,411,251 Buah 1,115,613

65 Band Gl All - Flange 90° dia 6" Buah 1,031,297 Buah 815,255

66 Band Gl All - Flange 90° dia 4" Buah 597,067 Buah 471,990

67 Band Gl All - Flange 90° dia 3" Buah 531,933 Buah 420,500

68 Band Gl All - Flange 90° dia 2,5" Buah 466,797 Buah 369,009

69 Band Gl All - Flange 90° dia 2" Buah 369,097 Buah 291,776

70 Band Gl All - Flange 45° dia 8" Buah 1,356,971 Buah 1,072,704

71 Band Gl All - Flange 45° dia 6" Buah 977,020 Buah 772,348

72 Band Gl All - Flange 45° dia 4" Buah 564,500 Buah 446,245

73 Band Gl All - Flange 45° dia 3" Buah 499,366 Buah 394,756

74 Band Gl All - Flange 45° dia 2,5" Buah 445,087 Buah 351,847

75 Band Gl All - Flange 45° dia 2" Buah 347,385 Buah 274,613

76 Socket Gl dia 6" Buah 390,808 Buah 308,939

77 Socket Gl dia 4" Buah 143,296 Buah 113,277

78 Socket Gl dia 3" Buah 86,846 Buah 68,653

79 Socket Gl dia 2,5" Buah 58,621 Buah 46,341

80 Socket Gl dia 2" Buah 32,567 Buah 25,745

81 Socket Gl dia 1,5" Buah 20,626 Buah 16,305

82 Socket Gl dia 1" Buah 11,941 Buah 9,440

83 Socket Gl dia 3/4" Buah 18,818 Buah 14,876


84 Socket Gl dia 1/2" Buah 12,545 Buah 9,917

85 Screen dia 8" Buah 3,148,173 Buah 2,488,674

86 Screen dia 6" Buah 2,605,384 Buah 2,059,592

87 Screen dia 4" Buah 911,884 Buah 720,857

88 Screen dia 2,5" Buah 542,789 Buah 429,082

89 Screen dia 2" Buah 349,196 Buah 276,044

90 Pipa PVC klas AW-4m dia 4" Batang 401,440 Batang 317,344

91 Pipa PVC klas AW-4m dia 3" Batang 244,628 Batang 193,382

92 Pipa PVC klas AW-4m dia 2,5" Batang 175,630 Batang 138,838

93 Pipa PVC klas AW-4m dia 2" Batang 119,178 Batang 94,212

94 Pipa PVC klas AW-4m dia 1,5" Batang 94,088 Batang 74,378
No. Uraian SAT HARGA (Rp) KETERANGAN SAT HARGA (Rp) KETERANGAN

95 Pipa PVC klas AW-4m dia 1" Batang 56,453 Batang 44,627

96 Pipa PVC klas AW-4m dia 3/4" Batang 43,908 Batang 34,710

97 Pipa PVC klas AW-4m dia 1/2" Batang 31,363 Batang 24,793

98 Pipa PVC klas D -4m dia 4" Batang 219,538 Batang 173,548

99 Pipa PVC klas D -4m dia 3" Batang 208,749 Batang 165,019

100 Pipa PVC klas D -4m dia 2,5" Batang 125,450 Batang 99,170

101 Pipa PVC klas D -4m dia 2" Batang 81,543 Batang 64,461

102 Pipa PVC klas D -4m dia 1,5" Batang 71,507 Batang 56,527

103 Pipa PVC klas C - 4m dia 4" Batang 107,385 Batang 84,889

104 Pipa PVC klas C - 4m dia 3" Batang 82,797 Batang 65,452

105 Pipa PVC klas C - 4m dia 2,5" Batang 66,739 Batang 52,758

106 Pipa PVC klas C - 4m dia 2" Batang 56,453 Batang 44,627

107 Pipa PVC klas C - 4m dia 1,2" Batang 47,671 Batang 37,685

108 Pipa PVC klas C - 4m dia 1" Batang 37,635 Batang 29,751

109 Pipa PVC klas C - 4m dia 3/4" Batang 25,090 Batang 19,834

110 Pipa PVC klas C - 4m dia 1/2" Batang 22,581 Batang 17,851

111 Fauket Socket PVC dia 4" Buah 60,969 Buah 48,197

112 Fauket Socket PVC dia 3" Buah 41,273 Buah 32,627

113 Fauket Socket PVC dia 2,5" Buah 56,202 Buah 44,428

114 Fauket Socket PVC dia 2" Buah 23,459 Buah 18,545

115 Fauket Socket PVC dia 1,5" Buah 24,086 Buah 19,040

116 Fauket Socket PVC dia 1" Buah 8,029 Buah 6,347

117 Fauket Socket PVC dia 3/4" Buah 4,767 Buah 3,768

118 Fauket Socket PVC dia 1/2" Buah 2,509 Buah 1,983

119 Flange Socket dia 4" Buah 12,545 Buah 9,917

120 Flange Socket dia 3" Buah 8,782 Buah 6,942

121 Flange Socket dia 2,5" Buah 7,527 Buah 5,950

122 Flange Socket dia 2" Buah 152,498 Buah 120,552

123 Flange Socket dia 1,5" Buah 152,498 Buah 120,552

124 Flange Spigot dia 4" Buah 217,310 Buah 171,787

125 Flange Spigot dia 3" Buah 173,468 Buah 137,129

No. Uraian SAT HARGA (Rp) KETERANGAN SAT HARGA (Rp) KETERANGAN

126 Flange Spigot dia 2,5" Buah 144,873 Buah 114,524

127 Flange Spigot dia 2" Buah 127,590 Buah 100,862

128 Flange Spigot dia 1,5" Buah 127,717 Buah 100,962

129 Valve Socket PVC dia 4" Buah 61,951 Buah 48,973

130 Valve Socket PVC dia 3" Buah 41,937 Buah 33,152

131 Valve Socket PVC dia 2,5" Buah 38,125 Buah 30,138

132 Valve Socket PVC dia 2" Buah 23,828 Buah 18,836

133 Valve Socket PVC dia 1,5" Buah 23,836 Buah 18,843

134 Valve Socket PVC dia 1" Buah 5,018 Buah 3,967

135 Valve Socket PVC dia 3/4" Buah 3,764 Buah 2,975

136 Valve Socket PVC dia 1/2" Buah 2,509 Buah 1,983

137 Stop Kran dia 4" Buah 564,525 Buah 446,265

138 Stop Kran dia 3" Buah 439,075 Buah 347,095

139 Stop Kran dia 2,5" Plastik Buah 250,900 Buah 198,340

140 Stop Kran dia 2" Plastik Buah 125,450 Buah 99,170

141 Stop Kran dia 1,5" Plastik Buah 81,543 Buah 64,461

142 Stop Kran dia 1" Plastik Buah 43,908 Buah 34,710

143 Stop Kran dia 3/4" Buah 100,360 Buah 79,336

144 Stop Kran dia 1/2" Buah 87,815 Buah 69,419

145 Doble Niple dia 4" Buah 108,656 Buah 85,894


146 Doble Niple dia 3" Buah 68,624 Buah 54,248

147 Doble Niple dia 2,5" Buah 40,031 Buah 31,645

148 Doble Niple dia 2" Buah 22,875 Buah 18,083

149 Doble Niple dia 1,5" Buah 18,109 Buah 14,315

150 Doble Niple dia 1" Buah 8,768 Buah 6,931

151 Doble Niple dia 3/4" Buah 6,101 Buah 4,823

152 Doble Niple dia 1/2" Buah 18,818 Buah 14,876

153 Water Mour dia 4" Buah 400,310 Buah 316,451

154 Water Mour dia 3" Buah 217,310 Buah 171,787

No. Uraian SAT HARGA (Rp) KETERANGAN SAT HARGA (Rp) KETERANGAN

155 Water Mour dia 2,5" Buah 137,250 Buah 108,498

156 Water Mour dia 2" Buah 78,155 Buah 61,783

157 Water Mour dia 1,5" Buah 106,005 Buah 83,798

158 Water Mour dia 1" Buah 43,908 Buah 34,710

159 Water Mour dia 3/4" Buah 31,363 Buah 24,793

160 Water Mour dia 1/2" Buah 18,818 Buah 14,876

161 Keni Gl dia 4" Buah 200,155 Buah 158,225

162 Keni Gl dia 3" Buah 114,374 Buah 90,414

163 Keni Gl dia 2,5" Buah 74,343 Buah 58,769

164 Keni Gl dia 2" Buah 41,937 Buah 33,152

165 Keni Gl dia 1,5" Buah 27,640 Buah 21,850

166 Keni Gl dia 1" Buah 29,355 Buah 23,206

167 Keni Gl dia 3/4" Buah 18,818 Buah 14,876

168 Keni Gl dia 1/2" Buah 12,545 Buah 9,917

169 Atap Kran Ø 3/4" Buah 56,453 Buah 44,627

170 Atap Kran Ø 1/2" Buah 31,363 Buah 24,793

171 Pelampung dia 2" Buah 1,524,988 Buah 1,205,524

172 Pelampung dia 1,5" Buah 667,184 Buah 527,418

173 Pelampung dia 1" Buah 372,587 Buah 294,535

174 Pelampung dia 3/4" Buah 100,360 Buah 79,336

175 Pelampung dia 1/2" Buah 81,543 Buah 64,461

176 Flange Las dia 8" Buah 333,590 Buah 263,708

177 Flange Las dia 6" Buah 228,749 Buah 180,829

178 Flange Las dia 4" Buah 133,437 Buah 105,484

179 Flange Las dia 3" Buah 114,374 Buah 90,414

180 Flange Las dia 2,5" Buah 95,313 Buah 75,346

181 Flange Las dia 2" Buah 85,780 Buah 67,810

182 Tee PVC dia 8"x8" Buah 1,744,204 Buah 1,378,817

183 Tee PVC dia 8"x6" Buah 1,563,114 Buah 1,235,663

No. Uraian SAT HARGA (Rp) KETERANGAN SAT HARGA (Rp) KETERANGAN

184 Tee PVC dia 8"x4" Buah 1,296,239 Buah 1,024,695

185 Tee PVC dia 8"x3" Buah 1,334,365 Buah 1,054,834

186 Tee PVC dia 6"x6" Buah 743,433 Buah 587,694

187 Tee PVC dia 6"x4" Buah 648,120 Buah 512,348

188 Tee PVC dia 6"x3" Buah 581,402 Buah 459,606

189 Tee PVC dia 4"x4" Buah 388,895 Buah 307,427

190 Tee PVC dia 4"x3" Buah 369,810 Buah 292,340

191 Tee PVC dia 4"x2" Buah 339,192 Buah 268,136

192 Tee PVC dia 3"x3" Buah 244,628 Buah 193,382

193 Tee PVC dia 3"x2" Buah 213,499 Buah 168,774

194 Tee PVC dia 3"x1,5" Buah 257,341 Buah 203,432

195 Tee PVC dia 2"x2" Buah 148,687 Buah 117,539

196 Tee PVC dia 2"x1,5" Buah 152,498 Buah 120,552


197 Tee PVC dia 2"x1" Buah 152,498 Buah 120,552

198 Tee PVC dia 1"x1" Buah 5,018 Buah 3,967

199 Tee PVC dia 1"x3/4" Buah 11,437 Buah 9,041

200 Tee PVC dia 1"x1/2" Buah 6,273 Buah 4,959

201 Dop Flange dia 8" Buah 667,184 Buah 527,418

202 Dop Flange dia 6" Buah 438,435 Buah 346,589

203 Dop PVC dia 4" Buah 18,818 Buah 14,876

204 Dop PVC dia 3" Buah 12,545 Buah 9,917

205 Dop PVC dia 2,5" Buah 10,036 Buah 7,934

206 Dop PVC dia 2" Buah 7,527 Buah 5,950

207 Dop PVC dia 1,5" Buah 12,545 Buah 9,917

208 Dop PVC dia 1" Buah 5,018 Buah 3,967

209 Dop PVC dia 3/4" Buah 4,391 Buah 3,471

210 Dop PVC dia 1/2" Buah 3,136 Buah 2,479

211 Air Valve Singel dia 1,5" Buah 953,118 Buah 753,453

212 Air Valve Singel dia 1" Buah 333,590 Buah 263,708

No. Uraian SAT HARGA (Rp) KETERANGAN SAT HARGA (Rp) KETERANGAN

213 Air Valve Singel dia 3/4" Buah 333,590 Buah 263,708

214 Air Valve Singel dia 1/2" Buah 333,590 Buah 263,708

215 Gante Valve All - Flange dia 8" Buah 4,289,031 Buah 3,390,538

216 Gante Valve All - Flange dia 6" Buah 2,954,666 Buah 2,335,704

217 Gante Valve All - Flange dia 4" Buah 1,620,301 Buah 1,280,870

218 Gante Valve All - Flange dia 3" Buah 1,448,948 Buah 1,145,413

219 Gante Valve All - Flange dia 2,5" Buah 1,143,741 Buah 904,143

220 Gante Valve All - Flange dia 2" Buah 810,151 Buah 640,436

221 Gante Valve All - Flange dia 1,5" Buah 762,494 Buah 602,762

222 Cleam Sandel dia 8" x 1" Buah 333,590 Buah 263,708

223 Cleam Sandel dia 6" x 1" Buah 162,031 Buah 128,088

224 Cleam Sandel dia 4" x 1" Buah 66,718 Buah 52,742

225 Cleam Sandel dia 4" x 3/4" Buah 66,718 Buah 52,742

226 Cleam Sandel dia 4" x 1/2" Buah 66,718 Buah 52,742

227 Cleam Sandel dia 3" x 1" Buah 57,188 Buah 45,208

228 Cleam Sandel dia 3" x 3/4" Buah 57,188 Buah 45,208

229 Cleam Sandel dia 3" x 1/2" Buah 57,188 Buah 45,208

230 Gibould Joint PVC dia 8" Buah 905,461 Buah 715,779

231 Gibould Joint PVC dia 6" Buah 524,214 Buah 414,398

232 Gibould Joint PVC dia 4" Buah 333,590 Buah 263,708

233 Gibould Joint PVC dia 3" Buah 266,873 Buah 210,967

234 Gibould Joint Foor ACP dia 8" Buah 1,086,555 Buah 858,937

235 Gibould Joint Foor ACP dia 6" Buah 629,058 Buah 497,279

236 Reducer PVC dia 8"x6" Buah 667,184 Buah 527,418

237 Reducer PVC dia 6"x4" Buah 362,186 Buah 286,313

238 Reducer PVC dia 4"x3" Buah 15,054 Buah 11,900

239 Reducer PVC dia 3"x2,5" Buah 10,036 Buah 7,934

240 Reducer PVC dia 2,5"x2" Buah 8,782 Buah 6,942

241 Reducer PVC dia 2"x1,5" Buah 7,527 Buah 5,950

No. Uraian SAT HARGA (Rp) KETERANGAN SAT HARGA (Rp) KETERANGAN

242 Reducer PVC dia 2"x1" Buah 18,818 Buah 14,876

243 Water Meter dia 3/4" Buah 410,598 Buah 324,583

244 Water Meter dia 1/2" Buah 217,279 Buah 171,762

245 Box Meter Buah 62,976 Buah 49,783

246 Hu Fiber Glass (2m3) Buah 3,449,875 Buah 2,727,174

11. BAHAN KACA


No. Uraian SAT Harga Keterangan SAT Harga Keterangan

1 Kaca Polos 3 mm m² 156,813 m² 123,963

2 Kaca Polos 5 mm /m² 288,535 /m² 228,091

3 Kaca Raybend 3 mm /m² 169,358 /m² 133,880

4 Kaca Raybend 5 mm /m² 294,808 /m² 233,050

5 Lys kaca /m' 6,273 /m' 4,959

6 Kerangka Nako 5 mm Bh 31,363 Bh 24,793

7 Glass Blok Bh 31,363 Bh 24,793

12 FINISHING

No. Uraian SAT Harga Keterangan SAT Harga Keterangan

1 Amplas Kayu /Meter 15,054 /Meter 11,900

2 Amplas Air /Lembar 6,273 /Lembar 4,959

3 Selang Air 1" roll 439,075 roll 347,095

4 Selang Air 3/4" roll 313,625 roll 247,925

5 Selang Air 1/2" roll 188,175 roll 148,755

9 Cat Besi Kg 75,270 Kg 59,502

10 Plamir Tembok Kg 62,725 Kg 49,585

11 Minyak Cat Ltr 43,908 Ltr 34,710

12 Minyak Cat Spesial Ltr 50,180 Ltr 39,668

No. Uraian SAT Harga Keterangan SAT Harga Keterangan

13 Aqua Proff Kg 75,270 Kg 59,502

14 Cat Marka Jalan Strada Kg 98,604 Kg 77,948

15 Cat Marka Jalan Scalato Kg 81,919 Kg 64,758

16 FASILITAS LALU LINTAS 0 0

a Pagar Pengaman Jalan (Guard rail ) M 1,503,895 M 1,188,850

b Rambu Jalan : 0 0

-Ukuran 60 x 60 cm + Tiang 3 M P.lombok Buah 1,372,674 Buah 1,085,118

-Ukuran 60 x 60 cm + Tiang 3 M P.sumbawa Buah 796,357 Buah 629,531

c Penunjuk Jalan : 0 0

-RPPJ 90 x 120 cm + 2 Tiang Buah 2,191,862 Buah 1,732,697

-RPPJ 120 x 160 cm + 2 Tiang Buah 5,161,515 Buah 4,080,249

-RPPJ 105 x 104 cm + 2 Tiang Buah 4,443,941 Buah 3,512,997

d Lampu lalu Lintas : 0 0

Trafic Light Simpang 4 (m 8 titik Lampu) Unit 240,228,721 Unit 189,904,127

Trafic Light Simpang 3 (tiga) Unit 255,290,750 Unit 201,810,870

Warning Light Unit 86,613,691 Unit 68,469,321

f Marka Jalan 0 0

-kelas A ( Jalan Nasional ) Tebal 3 mm M2 308,105 M2 243,561

-kelas B ( Jalan Nasional ) Tebal 2 mm M2 341,224 M2 269,742

g Delinator / Patok Pengaman jalan Buah 589,113 Buah 465,702

Patok Tikungan Pipa Plastik Buah 1,139,713 Buah 900,959

Patok Tikungan Pipa Besi Buah 382,623 Buah 302,469

h Lampu penerang Jalan Umum ( Tenaga Surya ) Unit 54,646,020 Unit 43,198,435

i paku Marka : 0 0

-Paku Marka ukuran 10 x 10 x 2 cm Buah 306,098 Buah 241,975

-Paku Marka Ukuran 10 x 12 x 2 cm Buah 315,130 Buah 249,115

-Paku Marka Bulat Buah 331,188 Buah 261,809

17 PENINGKATAN ANGKUTAN PENYEBRANGAN 0 0

a Pengerukan alur pelayaran m3 25,090 m3 19,834

No. Uraian SAT Harga Keterangan SAT Harga Keterangan

b Pengerukan Kolam pelabuhan m3 23,710 m3 18,743

18 DERMAGA 0 0

a Dermaga beton tiang pancang beton 0 0


- Diameter 50 cm ,Tebal 9 cm , Kedalam 36 M m2 10,441,204 m2 8,253,916

- Diameter 45 cm , Tebal 9 cm , Kedalam 36 M m2 9,356,563 m2 7,396,492

b Dermaga beton tiang pancang baja 0 0

- Diameter 50 cm , tebal 9 cm , Kedalam 36 M m 2


17,067,222 m2 13,491,875

- Diameter 45 cm , tebal 9 cm , Kedalam 36 M m2 15,293,860 m2 12,090,008

c Causeway m 2
4,315,480 m2 3,411,447

d Jalan Pelabuhan m2 315,130 m2 249,115

e lapangan parkir m2 311,283 m2 246,074

f Lapangan Penumpukan m 2
277,997 m2 219,760

19 MEDIA ELEKTRONIK (AUDIO VISUAL) DAN GAMBAR(PICTURE) 0 0

a Pembuatan Drama durasi maksimum 60 menit Paket 25,090,000 Paket 19,833,992

b pembuatan feature durasi maksimum 60 menit Paket 15,054,000 Paket 11,900,395

c Pembuatan Majalah Udara durasi maksimum 60 menit Paket 30,108,000 Paket 23,800,791

d Pembuatan TV Spot maksimum 5 menit Paket 5,018,000 Paket 3,966,798

e Pembuatan slide audio visual maksimum 5 menit Paket 3,010,800 Paket 2,380,079

f Pembuatan dialog durasi maksimum 60 menit Paket 10,036,000 Paket 7,933,597

g pembuatan wawancara maksimum 15 menit Paket 7,527,000 Paket 5,950,198

h pembuatan variety show durasi maksimum 60 menit Paket 30,108,000 Paket 23,800,791

16 Teer Blk 62,725 Blk 49,585

17 Meni Besi Kg 43,908 Kg 34,710

18 Meni Kayu Kg 43,908 Kg 34,710

19 Teak Oil Kg 69,123 Kg 54,643

20 Resido Ltr 27,097 Ltr 21,421

21 Plamir Kayu Kg 43,908 Kg 34,710

22 Cat Genteng Mutu Tinggi Galon 206,993 Galon 163,631

23 Cat Genteng Mutu Rendah Galon 156,813 Galon 123,963


No. Uraian SAT Harga Keterangan SAT Harga Keterangan

24 Politur Air Ltr 106,633 Ltr 84,295

25 Politur I Pager Ltr 50,180 Ltr 39,668

26 Politur kayu warna Ltr 75,270 Ltr 59,502

27 Kuas Cat 5" Bh 18,818 Bh 14,876

28 Kuas Cat 4" Bh 12,545 Bh 9,917

29 Kuas Cat 3" Bh 10,036 Bh 7,934

30 Kuas Cat 2,5" Bh 7,527 Bh 5,950

31 Kuas Cat 2" Bh 6,273 Bh 4,959

32 Kuas Cat 1,5" Bh 5,018 Bh 3,967

33 Rol Cat Besar Bh 31,363 Bh 24,793

34 Rol Cat Kecil Bh 18,818 Bh 14,876

35 Solar Ltr 6,900 Ltr 5,455

36 Oli Minyak Pelumas Ltr 40,771 Ltr 32,230

37 Soda Api Ltr 31,363 Ltr 24,793

38 Build Kg 2,509 Kg 1,983

40 Cat Tembok Mutu Sedang Kg 376,350 Kg 297,510

41 Cat Tembok Mutu Tinggi (interior) Kg 702,520 Kg 555,352

42 Cat Tembok Mutu Tinggi (exterior) kg 137,995 kg 109,087

43 Spiritus Ltr 31,363 Ltr 24,793

44 Cairan Pengupas Cat Ltr 56,453 Ltr 44,627

45 Minyak Bekisting Ltr 33,370 Ltr 26,379

46 Cat Genteng Taka Kg 33,370 Kg 26,379

47 Cat Batu Alam Arca Kg 112,905 Kg 89,253

48 Lem Kayu Kg 60,216 Kg 47,602

49 Cat Kayu Mutu Menengah Kg 87,815 Kg 69,419

50 Cat Kayu Mutu Tingggi Kg 106,633 Kg 84,295

No. Uraian SAT Harga Keterangan SAT Harga Keterangan

59 Air Cat Spesial Ltr 46,417 Ltr 36,693

60 Cat Meni Kg 46,417 Kg 36,693

62 Plamir Kayu Kg 37,635 Kg 29,751

13. BAHAN PENGUNCI

No. Uraian SAT Harga Keterangan SAT Harga Keterangan

1 Kunci Pintu Kuda Terbang Unit 100,360 Unit 79,336

2 Kunci Pintu Handal 1 Set Unit 376,350 Unit 297,510

3 Kunci Fauri Besar Unit 219,538 Unit 173,548

4 Kunci Imperial Besar Unit 156,813 Unit 123,963

5 Kunci Misin Unit 161,831 Unit 127,930

6 Kunci Jangkar Unit 106,633 Unit 84,295

7 Kunci Falor Unit 125,450 Unit 99,170

8 Kunci Pintu Tanggung Faori Unit 169,358 Unit 133,880

9 Union 2 Slag Unit 1,019,909 Unit 806,252

10 Kunci Pintu Yale 2 Slag Unit 138,999 Unit 109,881

11 Kunci Pintu Jangkar Buah 114,160 Buah 90,245

12 Kunci Tanam Biasa Bagus Buah 114,160 Buah 90,245

13 Kunci Pintu Merk Erdoz Buah 145,522 Buah 115,037

14 Kunci Silinder I set Buah 254,538 Buah 201,216

15 Kunci Kodai Buah 125,450 Buah 99,170

16 Kunci Fauri Buah 188,175 Buah 148,755

17 Kunci Crocodile Buah 100,360 Buah 79,336

18 Kunci Gembok Besar Buah 56,453 Buah 44,627

19 Hak Angin Besar Pasang 37,635 Pasang 29,751

20 Hak Angin Menengah Pasang 25,090 Pasang 19,834

21 Hak Angin Kecil Pasang 6,273 Pasang 4,959


No. Uraian SAT Harga Keterangan SAT Harga Keterangan

22 Grendel Besar Klas Biasa Buah 31,363 Buah 24,793

23 Grendel Besar Klas Menengah Buah 18,818 Buah 14,876

24 Grendel Besar Klas Tinggi Buah 55,574 Buah 43,932

25 Grendel Tanam Buah 94,088 Buah 74,378

26 Ensel H Pasang 12,545 Pasang 9,917

27 Beugel Komplit Buah 43,908 Buah 34,710

14. BAHAN SANITAIRE

No. Uraian SAT Harga Keterangan SAT Harga Keterangan

1 Klosed Duduk Merk TOTO Unit 4,861,188 Unit 3,842,836

2 Klosed Duduk American Standar Unit 1,881,750 Unit 1,487,549

3 Klosed Jongkok Unit 137,995 Unit 109,087

4 Wastafel dan Accesoris set 627,250 set 495,850

5 Bak Air Sudut Fiber Unit 282,263 Unit 223,133

6 Bak Cuci Piring Stainles Buah 219,538 Buah 173,548

7 Kran ½ Klas Biasa Buah 18,818 Buah 14,876

8 Kran ½ Klas Menengah Buah 37,635 Buah 29,751

9 Kran ½ Klas Tinggi Buah 75,270 Buah 59,502

10 Kran ¾ Klas Biasa Buah 25,090 Buah 19,834

11 Kran ¾ Klas Menengah Buah 37,635 Buah 29,751

12 Kran ¾ Klas Tinggi Buah 100,360 Buah 79,336

13 Stop Kran ½ Buah 87,815 Buah 69,419

14 Stop Kran ¾ Buah 37,635 Buah 29,751

15 Hand Shower Unit 188,175 Unit 148,755

15. HARGA BAHAN PAKU

No. Uraian SAT Harga Keterangan SAT Harga Keterangan

1 Paku Panjang 1 - 3 cm Kg 25,090 Kg 19,834

2 Paku Panjang 3 - 5 cm Kg 25,090 Kg 19,834

3 Paku Panjang 5 - 7 cm Kg 25,090 Kg 19,834

4 Paku Panjang 4 - 6 cm Kg 25,090 Kg 19,834

5 Paku Panjang 7 - 12 cm Kg 25,090 Kg 19,834

6 Paku Asbes Kg 50,180 Kg 39,668

7 Skrup / Diks 1,5 cm Kotak 123,443 Kotak 97,583

8 Skrup / Diks 2,0 cm Kotak 188,928 Kotak 149,350

9 Paku Beton Kotak 31,363 Kotak 24,793

10 Paku Seng Ulir Kg 56,453 Kg 44,627

11 Paku Kasiboard Kotak 37,635 Kotak 29,751

12 Paku Gypsum Kg 37,635 Kg 29,751

13 Baugel / Kuda-kuda 8 x 40 cm Bh 37,635 Bh 29,751

14 Baugel / Kuda-kuda 8 x 50 cm Bh 52,689 Bh 41,651

15 Baut/Mur Ø 12 ( 5 - 20 cm ) Bh 52,689 Bh 41,651

16 Baut/Mur Ø 14 ( 15 cm ) Bh 7,527 Bh 5,950

17 Baut/Mur Ø 14 ( 20 cm ) Bh 8,782 Bh 6,942

18 Baut Kuda-kuda Baja Ø 17 mm (25 cm) Bh 10,036 Bh 7,934

19 Baut Kuda-kuda Baja Ø 17 mm (30 cm) Bh 11,291 Bh 8,926

16. BAHAN INSTALASI LISTRIK

No. Uraian SAT Harga Keterangan SAT Harga Keterangan

1 Titik Lampu /titik 13,800 /titik 10,909

2 Stop Kontak Tanam Double /buah 24,463 /buah 19,338

3 Stop Kontak Tanam Engkel /buah 17,563 /buah 13,884

4 Stop Kontak Luar /buah 18,818 /buah 14,876

5 Zekering Box 1 Group /unit 13,800 /unit 10,909

6 Zekering Box 2 Group /unit 18,818 /unit 14,876

7 Zekering Box 3 Group /unit 92,645 /unit 73,237

8 NYA 1,5 mm Visicom (1 Roll) 100 m 275,990 100 m 218,174


No. Uraian SAT Harga Keterangan SAT Harga Keterangan

9 NYA 2,5 mm Visicom (1 Roll) 100 m 451,620 100 m 357,012

10 NYA 4 mm /m' 12,545 /m' 9,917

11 NYM 2x1,5 mm Visicom /m' 9,409 /m' 7,438

12 NYM 3x1,5 mm Visicom /m' 12,545 /m' 9,917

13 YM 3x4 mm Visicom /m' 31,363 /m' 24,793

14 YM 3x4,5 mm /m' 40,771 /m' 32,230

15 YM 4X1,5 mm Visicom /m' 24,714 /m' 19,537

16 YM 4X2,5 mm Visicom /m' 38,262 /m' 30,247

17 YM 4x4 mm Visicom (NYY) /m' 67,931 /m' 53,700

18 YM 4x6 mm Visicom /m' 81,417 /m' 64,361

19 YM 4x10 mm Visicom ( NYY) /m' 166,849 /m' 131,896

20 YM 4x16 mm Visicom (NYY) /m' 213,014 /m' 168,391

21 YY 2x1,5 mm Visicom /m' 21,577 /m' 17,057

22 YY 2x2,5 mm Visicom /m' 13,172 /m' 10,413

23 YY 3x1,5 mm Visicom /m' 16,936 /m' 13,388


17. BAHAN PENGAIRAN/PU. PENGAIRAN
Besarnya Besarnya
No. URAIAN SAT Keterangan SAT Keterangan
(Rp.) (Rp.)
1 Pintu Air Lebar b = 50 cm 0 0

a b = 50 cm, h=50 cm, H=70 cm, T=130 cm buah 7,338,825 buah 5,801,443

b b = 50 cm, h=50 cm, H=80 cm, T=140 cm buah 7,664,995 buah 6,059,285

c b = 50 cm, h=50 cm, H=90 cm, T=150 cm buah 7,828,080 buah 6,188,206

0 0

2 Pintu Air lebar b = 80 cm 0 0

a b = 80 cm, h=80 cm,H=150 cm, T=230 cm buah 12,074,563 buah 9,545,109

b b = 80 cm, h=80 cm,H=160 cm, T=290 cm buah 14,364,025 buah 11,354,960

c b = 80 cm, h=80 cm,H=240 cm, T=320 cm buah 15,430,350 buah 12,197,905

d b = 80 cm, h=80 cm,H=300 cm, T=380 cm buah 19,131,125 buah 15,123,419

e b = 80 cm, h=80 cm,H=400 cm, T=480 cm buah 21,753,030 buah 17,196,071

No. Uraian SAT Harga Keterangan SAT Harga Keterangan

f b = 80 cm, h=80 cm,H=500 cm, T=580 cm buah 25,968,150 buah 20,528,182

g b = 80 cm, h=80 cm,H=600 cm, T=680 cm buah 28,226,250 buah 22,313,241

0 0

3 Pintu Air lebar b = 100 cm 0 0

a b = 100 cm, h=120 cm, H=200 cm, T=320 cm buah 28,853,500 buah 22,809,091

b b = 100 cm, h=120 cm, H=300 cm, T=420 cm buah 30,233,450 buah 23,899,960

c b = 100 cm, h=120 cm, H=400 cm, T=520 cm buah 32,617,000 buah 25,784,190

d b = 100 cm, h=120 cm, H=500 cm, T=620 cm buah 33,244,250 buah 26,280,040

e b = 100 cm, h=120 cm, H=580 cm, T=700 cm buah 33,495,150 buah 26,478,379

0 0

4 Pintu Air lebar b = 150 cm 0 0

a b = 150 cm, h=200 cm, H=300 cm, T= 500 cm buah 59,362,940 buah 46,927,225

b b = 150 cm, h=200 cm, H=400 cm, T= 600 cm buah 64,983,100 buah 51,370,040

c b = 150 cm, h=200 cm, H=500 cm, T= 700 cm buah 69,122,950 buah 54,642,648

d b = 150 cm, h=200 cm, H=600 cm, T= 800 cm buah 72,510,100 buah 57,320,237

e b = 150 cm, h=200 cm, H=700 cm, T= 900 cm buah 76,775,400 buah 60,692,016

f b = 150 cm, h=200 cm, H=800 cm, T= 1000 cm buah 79,033,500 buah 62,477,075

18. Suku Cadang Laboratorium Pengujian

No. Uraian SAT HARGA (Rp) KETERANGAN SAT HARGA (Rp) KETERANGAN
1 Cutter ( alat potong aspal ) set
17,193,989 set 13,592,086
2 Reflux ( kapasitas 2 -3 liter ) set
1,205,556 set 953,009
3 Oven capasitas 53 liter buah
31,111,600 buah 24,594,150
4 Sample Vessel / Tube, 50 pcs per box box
3,201,609 box 2,530,916
5 Impinger Cap-For use with RA-31 xx series pcs
1,778,630 pcs 1,406,032
6 CPRO P04 03 ROPAK RO System Double-Sides Petretment Pack pak
10,079,230 pak 7,967,771
7 CPMO K05 D2 QPAK 2 Purification Pack Kit Delorized (D1) pak
14,229,417 pak 11,248,551
8 Pompa APG 2900 RPM bh
220,165 bh 174,043
9 Micropipette, 20 to 200 uL ( w/100 tips ) set
8,154,250 set 6,446,047

No. Uraian SAT Harga Keterangan SAT Harga Keterangan

10 Sample Spliter set 2,258,100 set 1,785,059

11 Pan Stainless Steel bh 1,056,289 bh 835,011

12 Slump test set 3,888,950 set 3,074,269

13 Proving ring CBR bh 4,265,300 bh 3,371,779

14 Load Gauge 1500 KN bh 11,917,750 bh 9,421,146

15 Becker glass 250 cc bh 294,808 bh 233,050

16 Becker glass 500 cc bh 313,625 bh 247,925

17 Becker glass 1000 cc bh 326,170 bh 257,842

18 Check Pish pasang 3,198,975 pasang 2,528,834

19 Check Bolt + Kunci L (3/4") set 7,125,309 set 5,632,655

20 Mata Bor Chassing 82 mm ( chasing shoe ) buah 848,544 buah 670,786


21 Head Chassing 82 mm buah 815,425 buah 644,605

22 Core Barrel Singgle 1.80 m ( 74 mm ) buah 2,207,920 buah 1,745,391

23 Core Barrel Singgle 1.00 m ( 74 mm ) buah 1,442,675 buah 1,140,455

24 Mata Bor Singgle 74 mm buah 740,155 buah 585,103

25 Mata Bor Diamond Core 74 mm buah 10,098,725 buah 7,983,182

26 Metal Tip ( mata bor baja ) biji 752,700 biji 595,020

27 Crown Singgle 74 mm buah 1,379,950 buah 1,090,870

28 Bay Pass Uji Air buah 2,132,650 buah 1,685,889

29 Pemotongan / Buat Drat Cassing 84 (30 drat) buah 225,810 buah 178,506

30 Water Swifel buah 439,075 buah 347,095

31 Pemotongan / Buat Drat Cassing 84 (30 drat) buah 9,408,750 buah 7,437,747

32 Lampu Catoda Mercury ( Hg ) buah 9,283,300 buah 7,338,577

33 Lampu Catoda Natrium Kalium ( Na/K ) buah 9,189,213 buah 7,264,200

34 Lampu Catoda Arsen ( As ) buah 8,844,225 buah 6,991,482

35 Lampu Catoda Calsium Magnesium (Ca/Mg) buah 9,346,025 buah 7,388,162

36 Filter Aquadem Millipore Polygard CR 10" JMAS 2292 buah 5,039,577 buah 3,983,855

37 Reflux ( kapasitas 2 -3 liter ) set 11,976,461 set 9,467,558

38 Thermal Paper For Printe, 10 roll per box box 747,042 box 590,547

No. Uraian SAT Harga Keterangan SAT Harga Keterangan


39 Activated Carbon for Exhaust Filter, 400g per bottel btl
915,032 btl 723,345
40 Slang Tubing Polyetileme Carbon mtr
164,026 mtr 129,665
41 Tabung COD lusin
164,026 lusin 129,665
42 Beker glass 250 ml bh
16,810 bh 13,289
43 Load Gauge 1500 KN bh
9,960,605 bh 7,873,996
44 Becker glass 250 cc bh
237,101 bh 187,432
45 Becker glass 500 cc bh
245,757 bh 194,274
46 Becker glass 1000 cc bh
254,914 bh 201,513
47 Gelas Refflux bh
2,371,582 bh 1,874,768

19. HARGA PER KM PENANGANAN JALAN

No. Asumsi 3,0 M 3,5 M 4M 4,5 M

a Peningkatan Jalan LAPEN

1 LPB = 20 Cm, LPA = 15 Cm, Asesoris (35%) 2,140,188,000.00 2,362,428,000.00 2,584,140,000.00

2 LPB = 20 Cm 35%, LPA = 15 Cm, Asesoris (35%) 1,752,527,000.00 1,930,647,000.00 2,107,946,000.00

3 LPA = 15 Cm, LAPEN, Asesoris (35%) 1,544,180,000.00 1,697,857,000.00 1,851,534,000.00

b Peningkatan Jalan HOTMIX

1 LPB = 20 Cm, LPA = 15 Cm, ATB 5 Cm, Asesoris (35%) 2,243,254,000.00 2,497,179,000.00 2,714,811,000.00

2 LPB = 20 Cm 30%, LPA = 15 Cm, ATB 5 Cm, Asesoris (35%) 1,855,593,000.00 2,019,091,000.00 2,201,987,000.00

3 LPA = 15 Cm, ATB 5 Cm, Asesoris (35%) 1,647,009,000.00 1,814,607,000.00 1,982,205,000.00

c Pemeliharaan Berkala Jalan LAPEN

1 LPA = 15 Cm + LAPEN + Asesoris (35%) 1,544,180,000.00 1,697,857,000.00 1,851,534,000.00

2 LPA = 15 Cm 70%, + LAPEN + Asesoris (30%) 1,355,272,000.00 4,192,478,000.00 1,630,449,000.00

3 LPA = 15 Cm 30%, Lapen 50%, Burda 30%, Buras 20%, Asesoris 35% 1,071,725,000.00 1,159,099,000.00 1,246,474,000.00

d Pemeliharaan Berkala Jalan HOTMIX

1 LPA = 15 Cm + Asesoris (35%) 1,647,009,000.00 1,814,607,000.00 1,982,205,000.00

2 LPA = 15 Cm 70%, Asesoris (35%) 1,519,028,000.00 1,693,939,000.00 1,822,281,000.00

3 Overlay + Asesoris (35%) 1,207,500,000.00 1,319,021,000.00 1,435,435,000.00

20. HARGA SATUAN TERTINGGI BANGUNAN


A. GEDUNG

No. Uraian SATUAN HARGA (Rp) KETERANGAN SATUAN HARGA (Rp) KETERANGAN

a. Gedung Negara

1 Tidak Sederhana M2 6,040,000 M2 4,774,704

2 Sederhana M2 4,660,000 M2 3,683,794


b. Rumah Negara

Type A M2 5,510,000 M2 4,355,731

Type B M 2
5,480,000 M2 4,332,016

Type C, D, E M2 4,660,000 M2 3,683,794

B. PAGAR

No. JENIS SATUAN HARGA (Rp) KETERANGAN SATUAN HARGA (Rp) KETERANGAN

a. Pagar Gedung Negara

1 Depan BT; T.1,50 M M 2,490,000 M 1,968,379

Belakang T. 3 M M 2,030,000 M 1,604,743

Samping T. 2 M M 1,960,000 M 1,549,407

b. Pagar Rumah Negara

1 Depan BT; T. 4,50 M M 2,320,000 M 1,833,992

Belakang T. 2,5 M M 1,280,000 M 1,011,858

Samping T. 2 M M 1,220,000 M 964,427

Catatan : Untuk Harga Per-M² Bangunan Bertingkat/Lebih dari satu lantai, mengikuti harga sesuai dengan tabel berikut :
No. Uraian SATUAN HARGA (Rp) KETERANGAN SATUAN HARGA (Rp) KETERANGAN

1 Bangunan 2 Lantai 1.09 x Harga Perm² Bangunan Bertingkat

2 Bangunan 3 Lantai 1.12 x Harga Perm² Bangunan Bertingkat

3 Bangunan 4 Lantai 1.35 x Harga Perm² Bangunan Bertingkat

4 Bangunan 5 Lantai 1.162 x Harga Perm² Bangunan Bertingkat

5 Bangunan 6 Lantai 1.197 x Harga Perm² Bangunan Bertingkat

6 Bangunan 7 Lantai 1.236 x Harga Perm² Bangunan Bertingkat

7 Bangunan 8 Lantai 1.265 x Harga Perm² Bangunan Bertingkat

Untuk Bangunan yang lebih dari 8 lantai, koefisien/faktor pengaliannya dikonsultasikan dengan Instansi Teknis

Catatan : Untuk Harga Per-M² Bangunan dengan fungsi khusus seperti Rumah Sakit dan lain-lain

No. JENIS SATUAN HARGA (Rp) KETERANGAN SATUAN HARGA (Rp) KETERANGAN

1 ICU/ICCU/UGD/CMU 1.50 x Standar Harga Bangunan

2 Ruang Operasi 2.00 x Standar Harga Bangunan

3 Ruang Radiology 1.25 x Standar Harga Bangunan

4 Rawat Inap 1.10 x Standar Harga Bangunan

5 Laboratorium 1.10 x Standar Harga Bangunan

6 Ruang Kebidanan Dan Kandungan 1.20 x Standar Harga Bangunan

7 Ruang Gawat Darurat 1.10 x Standar Harga Bangunan

8 Power House 1.25 x Standar Harga Bangunan

9 Ruang Rawat Jalan 1.10 x Standar Harga Bangunan

10 Dapur Dan Laundry 1.10 x Standar Harga Bangunan

11 Bengkel 1.00 x Standar Harga Bangunan

12 Lab. SLTP/SMA/SMK 1.15 x Standar Harga Bangunan

13 Selasar Luar Beratap Bangunan 0.50 x Standar Harga Bangunan

21. BAHAN PAGAR JADI, ALUMINIUM DAN KAWAT BRONJONG

No. Uraian SAT Harga Keterangan SAT Harga Keterangan

1 Jaringan Pagar BRCT T = 150 cm /m2 179,000 /m2 141,502

2 Tiang Pagar T = 150 diameter 1.5 inc /buah 100,200 /buah 79,209

Keterangan :
Harga di atas merupakan Harga Tertinggi Konstruksi Bangunan Gedung Negara
Harga diatas sudah termasuk : Harga diatas belum termasuk :
• Biaya Nyata Bangunan • Biaya Jasa Perencanaan
• Biaya Jasa Kontraktor & Overhead 10% • Biaya Jasa Pengawasan
• Pajak-pajak (PPn 10% dan PPh pasal 21 & 23) • Biaya Jasa Manajemen Konstruksi
• Asuransi (All Risk, ASTEK & Pihak III) • Biaya Pengelolaan Kegiatan
• Perizinan (IMB & Sertifikat Laik Fungsi)
• Tingkat Inflasi (Bahan 5%)
• Keselamatan dan Kesehatan Kerja

22. MESIN LAS

No. Uraian SAT Harga Keterangan SAT Harga Keterangan

1 Mesin Las /jam 31,363 /jam 24,793

23. BAHAN TAMBAHAN

No. Uraian SAT Harga Keterangan SAT Harga Keterangan

1 Aspal Curah Kw 60/70 Pertamina kg 14,176 kg 11,206

2 Aspal Emulsi kg 18,065 kg 14,281

3 Aspal Buton kg 22,205 kg 17,553

4 Alat Bantu Bina Marga set 207,871 set 164,325

5 Sambungan Rumah 1/2" /unit 944,889 /unit 746,948

6 Sambungan Rumah 3/4" /unit 1,045,714 /unit 826,651

7 Sambungan Rumah 1" /unit 1,385,846 /unit 1,095,530

8 Minyak Tanah ltr 14,929 ltr 11,802

9 Minyak Diesel Industri ltr 6,774 ltr 5,355

10 Solar ltr 8,531 ltr 6,744

11 Solar Subsidi ltr 6,774 ltr 5,355

12 Solar Sektor Industri ltr 6,774 ltr 5,355


13 Kehutanan, Perkebunan ltr 6,774 ltr 5,355

14 Solar Usaha Transportasi Konst. Jln. ltr 8,029 ltr 6,347

15 Premium Subsidi ltr 7,527 ltr 5,950

16 Premium Sektor Industri ltr 8,029 ltr 6,347

17 Premium Sektor Pertambangan ltr 8,029 ltr 6,347

18 Premium Usaha Transportasi, Konst. Jln. ltr 8,029 ltr 6,347

19 Minyak Bakar kg 14,803 kg 11,702

20 Minyak Aspal kg 67,931 kg 53,700

21 Cat Besi Jembatan Kls. Menengah kg 62,976 kg 49,783

22 Kawat Bronjong HC Fabrikasi Lembar 479,809 Lembar 379,296

23 Kawat Bronjong Digalvanisir Manual kg 30,359 kg 23,999

24 Baut Mur Baja dia, 12mm (20-30cm) bh 12,545 bh 9,917

25 Baut Mur Baja dia, 12mm (50cm) bh 10,488 bh 8,291

26 Baja Konstruksi kg 18,818 kg 14,876

27 Paku Jembatan kg 22,042 kg 17,425

28 Cat Marka Jalan Skalato/Cat Kanstin kg 92,582 kg 73,187

29 Perletakan Elestomeric bh 592,877 bh 468,677

No. Uraian SAT Harga Keterangan SAT Harga Keterangan

30 HCL liter 31,363 liter 24,793

31 Gareng Garpu/Garpu Tarik bh 169,358 bh 133,880

32 Gareng Plat/Garpu Tanah Besar bh 93,837 bh 74,179

33 Linggis Besar dia, 25 mm bh 81,543 bh 64,461

34 Cepak Bertangkai bh 154,053 bh 121,781

35 Pacok/Ganco bh 106,633 bh 84,295

36 Tangkai Pacok/Ganco/Cangkol/Gareng bh 43,908 bh 34,710

37 Kikir Besar bh 31,363 bh 24,793

38 Sabit bh 37,635 bh 29,751

39 Hammer 10 LB bh 188,175 bh 148,755

40 Hammer 14 LB bh 224,556 bh 177,515

41 Konci Pembengkok Besi dia. 6 mm bh 18,818 bh 14,876

42 Konci Pembengkok Besi dia. 8 mm bh 31,363 bh 24,793

43 Konci Pembengkok Besi dia. 10 mm bh 56,453 bh 44,627

44 Konci Pembengkok Besi dia. 12 mm bh 81,543 bh 64,461

45 Konci Pembengkok Besi dia. 16 mm bh 81,543 bh 64,461

46 Ember untuk Adukan Campuran bh 12,545 bh 9,917

47 Mata Gergaji Besi bh 25,090 bh 19,834

48 Kasut bh 31,363 bh 24,793

49 Cepang bh 31,363 bh 24,793

50 Kabel Baja dia, 32 mm m 203,919 m 161,201

51 Angker Besi Beton dia. 25 mm m 136,364 m 107,798

52 Buldoggrip dia. 32 mm bh 24,714 bh 19,537

53 Tekukan dia. 32 mm bh 16,058 bh 12,694

54 Ompreng bh 45,664 bh 36,098

55 Kompor Aspal bh 67,868 bh 53,651

56 Gembor dan Tangkai bh 62,976 bh 49,783

57 Kayu Bakar m3 154,304 m3 121,979

58 Oli mesran Super 08 Liter ltr 33,872 ltr 26,776

No. Uraian SAT Harga Keterangan SAT Harga Keterangan

59 Oli Mesran Super 1 Liter ltr 44,535 ltr 35,206

60 Oli Mesran super 4 liter ltr 159,949 ltr 126,442

61 Oli Merk Mesran 540 1 liter ltr 41,085 ltr 32,478

62 Oli Merk mesran 540 5 liter ltr 219,538 ltr 173,548

63 Oli mesran 540 10 liter ltr 439,075 ltr 347,095


64 oli Raud 90 4 liter ltr 200,720 ltr 158,672

65 oli Raud140 4 liter ltr 213,265 ltr 168,589

66 Oli farma YP 1 Liter ltr 56,453 ltr 44,627

67 Oli 2 T super diatas 1 liter ltr 48,926 ltr 38,677

68 Oli prima YP 4 liter ltr 206,993 ltr 163,631

69 Oli Mesran 40 liter ltr 107,887 ltr 85,286

70 Oli Raud 90 ltr 43,908 ltr 34,710

71 Oli Raud 140 ltr 43,908 ltr 34,710


72 Oli Merk Panjoil ltr 52,689 ltr 41,651

73 Gemuk ktk 32,617 ktk 25,784

74 Accu 12 V 40 Amp bh 688,721 bh 544,443

75 Accu 12 V 50 Amp bh 1,090,161 bh 861,787

76 Accu 12 V 60 Amp bh 740,155 bh 585,103

77 Accu 12 V 70 Amp bh 926,386 bh 732,321

78 Grinda Merk Bos /unit 629,947 /unit 497,982

79 Kompresor 2 HP Komplit /unit 6,397,950 /unit 5,057,668

80 Kawat Las RB 2,6 ktk 250,900 ktk 198,340

81 Mesin Air Komplit /unit 1,881,750 /unit 1,487,549

82 Dinamo Air Sanyo /unit 2,258,100 /unit 1,785,059

83 Genset 1000 Watt /unit 4,390,750 /unit 3,470,949

84 Pintu viber kaca /unit 1,505,400 /unit 1,190,040

85 Pintu viber oval /unit 940,875 /unit 743,775

86 Pintu viber polos /unit 815,425 /unit 644,605

87 Bak Mandi Traso /unit 564,525 /unit 446,265

No. Uraian SAT Harga Keterangan SAT Harga Keterangan

88 Hand Traktor Yanmar /unit 13,924,950 /unit 11,007,866

89 Hand Traktor Kurota /unit 37,321,375 /unit 29,503,063

90 Genset Km. 7600 Honda /unit 15,054,000 /unit 11,900,395

91 Genset Km. 3600 Honda /unit 5,143,450 /unit 4,065,968

92 Genset 150 V /unit 4,390,750 /unit 3,470,949

93 Pompa Air Honda 3' /unit 2,797,535 /unit 2,211,490

94 Pompa Air Honda 2' /unit 2,383,550 /unit 1,884,229

95 Pintu Besi Harmonika Lipat Klas I m² 1,379,950 m² 1,090,870

96 Pintu Besi Harmonika Lipat Klas II m² 940,875 m² 743,775

97 Pintu Besi Harmonika Lipat Klas III m² 702,520 m² 555,352

98 Hand Sprayer Stainles Steel /unit 539,435 /unit 426,431

99 Hand Sprayer Plastik /unit 313,625 /unit 247,925

24. HARGA IPAL KOMUNAL

No. Uraian SAT Harga Keterangan SAT Harga Keterangan

1 Kapasitas 5 M 3 / hari /unit 112,903,555 /unit 89,251,822

25. HARGA TANGKI BIO FILTER

No. Uraian SAT Harga Keterangan SAT Harga Keterangan

1 Tangki Bio Filter :

- Kapasitas 1 m3 /buah 6,586,125 /buah 5,206,423

- Kapasitas 2 m3 /buah 12,231,375 /buah 9,669,071

- Kapasitas 3 m3 /buah 16,057,600 /buah 12,693,755

- Kapasitas 5 m3 /buah 20,699,250 /buah 16,363,043


26. HARGA PERALATAN KEBINA MARGAAN
Hourse Power
No. Uraian SAT Harga Umur (TH) SAT Harga Umur (TH)
(HP)

1 Bolldozer 110 HP 150 unit 1,552,707,195 9 unit 1,227,436,518

2 Grader 110 HP 110 unit 1,864,594,211 9 unit 1,473,987,519

No. Uraian SAT Harga Keterangan SAT Harga Keterangan

3 Excvator Hidraulic 90 unit 2,124,544,048 9 unit 1,679,481,461

4 Crusher 185 hp 140 unit 1,877,504,019 11 unit 1,484,192,900

5 Mesin penyaring (Screen Plant) 80 hp 80 unit 55,584,010 9 unit 43,939,929

6 Wheel Loader 115 hp 80 unit 1,640,329,504 9 unit 1,296,703,165

7 Tractor Wheeled 60 hp 60 unit 1,152,936,809 11 unit 911,412,497

8 Roller 3 Whell 8-10 Ton 37 HP 37 unit 827,583,990 11 unit 654,216,593

9 Tandem Roller 40 hp 40 unit 1,419,896,918 11 unit 1,122,448,157

10 Self Vibrator Roller 10 Ton/35 hp 35 unit 679,360,048 9 unit 537,043,516

11 Pneumatic Roller 8-15 Ton / 95 hp 95 unit 1,574,879,981 9 unit 1,244,964,412

12 Vibrator Roller 1 T 7 hp 7 unit 1,381,505,580 7 unit 1,092,099,273

13 Tamper Vibrating Plate 4 hp 4 unit 31,991,632 7 unit 25,289,828

14 Concrete Vibrator 4 hp 4 unit 15,440,010 6 unit 12,205,542

15 Chip Spraider 4 hp 4 unit 67,935,942 7 unit 53,704,302

16 Asphalt Propeled / 38 hp 7 unit 113,188,768 7 unit 89,477,287

17 Asphalt Sprayer Towed 100 L / 7 Hp 7 unit 155,141,130 7 unit 122,641,209

18 Pemanas Asphalt Sprayer 400 L / 7 Hp 7 unit 53,731,239 7 unit 42,475,288

19 Asphalt Mixing Plant 150 Hp 150 unit 3,211,520,000 12 unit 2,538,750,988

20 Asphalt Finisher 30 unit 988,159,990 8 unit 781,154,142

21 Water Tank Truck, 3000 L - 4500 L 115 Hp 68 unit 770,764,800 7 unit 609,300,237

22 Trailer 1 T 80 unit 1,574,879,981 12 unit 1,244,964,412

23 Dump Truck 3 - 4 Ton 115 hp 44 unit 401,440,000 7 unit 317,343,874

24 Dump Truck 5 Ton 145 Hp 68 unit 637,980,742 7 unit 504,332,602

25 Flat Bed Truck 3 - 4 Ton 80 unit 282,860,771 7 unit 223,605,353

26 Concrette Mixer 0,125 M3 6 unit 98,383,661 6 unit 77,773,645

27 Concrette Mixer 0,125 M3 10 hp 10 unit 28,409,407 6 unit 22,458,029

28 Concrette Mixer 0,5 M3 20 hp 10 unit 56,819,190 6 unit 44,916,356

29 Compressor 35 hp 35 unit 191,455,894 9 unit 151,348,533

30 Generator Set 10 hp 10 unit 163,189,124 9 unit 129,003,260

31 Water Pump dia. 50 mm 8 hp 8 unit 9,263,981 7 unit 7,323,305

32 Tractor Equipment, Etc 15 Hp 15 unit 92,814,162,428 7 unit 73,370,879,390

33 Diesel Hammer 40 Hp 40 unit 43,231,325 12 unit 34,174,960


T.15 BIAYA ANGKUTAN MATERIAL SECARA MANUAL
(Informatif )

A. JIKA BIAYA ANGKUTAN DIMASUKAN DALAM HSD - BAHAN


(Maka dihitung Tanpa Overhead+Keuntungan)
Contoh perhitungan konversi berbagai jenis material dengan jarak angkut,
Kode pekerjaan T.15a.1) s.d T.15a.11 untuk mengangkut 1 m3 berbagai je
termasuk juga pelandaian turun < 20° serta pelandaian naik
Kode pekerjaan T.15b.1) s.d T.15b.11 untuk mengangkut 1 m3 berbagai je
Kode pekerjaan T.15c.1) s.d T.15c.11 untuk mengangkut 1 m3 berbagai je
Material dengan tingkat kemudahan seperti besi beton > GIP > pipa PVC >
horizontal datar, vertikal turun dan naik, dikalikan lagi koefisien AHSP-nya
dan pasir/koral/tanah/plastik x 1,0. Cara perhitungan dapat dilihat pada Info

Tabel B.1 - Contoh Konversi HSP untuk berbagai jenis material


Asumsi Berat Isi
Tingkat kemudahan
Kode Deskripsi

T.15a.1) Mengangkut 1 m3 material dengan jarak angkut 3m


T.15a.2) Mengangkut 1 m3 material dengan jarak angkut 5 m
T.15a.3) Mengangkut 1 m3 material dengan jarak angkut 10 m
T.15a.4) Mengangkut 1 m3 material dengan jarak angkut 30 m
T.15a.5) Mengangkut 1 m3 material dengan jarak angkut 50 m
T.15a.6) Mengangkut 1 m3 material dengan jarak angkut 100 m
T.15a.7) Mengangkut 1 m3 material dengan jarak angkut 200 m
T.15a.8) Mengangkut 1 m3 material dengan jarak angkut 300 m
T.15a.9) Mengangkut 1 m3 material dengan jarak angkut 400 m
T.15a.10) Mengangkut 1 m3 material dengan jarak angkut 500 m
T.15a.11) Mengangkut 1 m3 material > 500m untuk setiap penambahan jarak angkut 100 m

T.15b.1) Menurunkan 1 m3 material sampai beda tinggi 1 m


T.15b.2) Menurunkan 1 m3 material sampai beda tinggi 2 m
T.15b.3) Menurunkan 1 m3 material sampai beda tinggi 3 m
T.15b.4) Menurunkan 1 m3 material sampai beda tinggi 4 m
T.15b.5) Menurunkan 1 m3 material sampai beda tinggi 5 m
T.15b.6) Menurunkan 1 m3 material sampai beda tinggi 6 m
T.15b.7) Menurunkan 1 m3 material sampai beda tinggi 7 m
T.15b.8) Menurunkan 1 m3 material sampai beda tinggi 8 m
T.15b.9) Menurunkan 1 m3 material sampai beda tinggi 9 m
T.15b.10) Menurunkan 1 m3 material sampai beda tinggi 10 m
T.15b.11) Menurunkan 1 m3 material sampai beda tinggi > 10 m untuk setiap penambahan 1 m
T.15c.1) Menaikan 1 m3 material sampai beda tinggi 1 m
T.15c.2) Menaikan 1 m3 material sampai beda tinggi 2 m
T.15c.3) Menaikan 1 m3 material sampai beda tinggi 3 m
T.15c.4) Menaikan 1 m3 material sampai beda tinggi 4 m
T.15c.5) Menaikan 1 m3 material sampai beda tinggi 5 m
T.15c.6) Menaikan 1 m3 material sampai beda tinggi 6 m
T.15c.7) Menaikan 1 m3 material sampai beda tinggi 7 m
T.15c.8) Menaikan 1 m3 material sampai beda tinggi 8 m
T.15c.9) Menaikan 1 m3 material sampai beda tinggi 9 m
T.15c.10) Menaikan 1 m3 material sampai beda tinggi 10 m
T.15c.11) Menaikan 1 m3 material sampai beda tinggi > 10 m untuk setiap penambahan 1 m

B. JIKA BIAYA ANGKUTAN DIPISAHKAN DARI HSP KOMPONEN PEKERJAAN K


Maka ditulis Biaya konstruksi dan Biaya Angkut (masing-masing termasuk O

Tabel B.2 - Contoh Konversi HSP untuk berbagai jenis material


Asumsi Berat Isi
Tingkat kemudahan
Kode Deskripsi

T.15a.1) Mengangkut 1 m3 material dengan jarak angkut 3m


T.15a.2) Mengangkut 1 m3 material dengan jarak angkut 5 m
T.15a.3) Mengangkut 1 m3 material dengan jarak angkut 10 m
T.15a.4) Mengangkut 1 m3 material dengan jarak angkut 30 m
T.15a.5) Mengangkut 1 m3 material dengan jarak angkut 50 m
T.15a.6) Mengangkut 1 m3 material dengan jarak angkut 100 m
T.15a.7) Mengangkut 1 m3 material dengan jarak angkut 200 m
T.15a.8) Mengangkut 1 m3 material dengan jarak angkut 300 m
T.15a.9) Mengangkut 1 m3 material dengan jarak angkut 400 m
T.15a.10) Mengangkut 1 m3 material dengan jarak angkut 500 m
T.15a.11) Mengangkut 1 m3 material > 500m untuk setiap penambahan jarak angkut 100 m

T.15b.1) Menurunkan 1 m3 material sampai beda tinggi 1 m


T.15b.2) Menurunkan 1 m3 material sampai beda tinggi 2 m
T.15b.3) Menurunkan 1 m3 material sampai beda tinggi 3 m
T.15b.4) Menurunkan 1 m3 material sampai beda tinggi 4 m
T.15b.5) Menurunkan 1 m3 material sampai beda tinggi 5 m
T.15b.6) Menurunkan 1 m3 material sampai beda tinggi 6 m
T.15b.7) Menurunkan 1 m3 material sampai beda tinggi 7 m
T.15b.8) Menurunkan 1 m3 material sampai beda tinggi 8 m
T.15b.9) Menurunkan 1 m3 material sampai beda tinggi 9 m
T.15b.10) Menurunkan 1 m3 material sampai beda tinggi 10 m
T.15b.11) Menurunkan 1 m3 material sampai beda tinggi > 10 m untuk setiap penambahan 1 m

T.15c.1) Menaikan 1 m3 material sampai beda tinggi 1 m


T.15c.2) Menaikan 1 m3 material sampai beda tinggi 2 m
T.15c.3) Menaikan 1 m3 material sampai beda tinggi 3 m
T.15c.4) Menaikan 1 m3 material sampai beda tinggi 4 m
T.15c.5) Menaikan 1 m3 material sampai beda tinggi 5 m
T.15c.6) Menaikan 1 m3 material sampai beda tinggi 6 m
T.15c.7) Menaikan 1 m3 material sampai beda tinggi 7 m
T.15c.8) Menaikan 1 m3 material sampai beda tinggi 8 m
T.15c.9) Menaikan 1 m3 material sampai beda tinggi 9 m
T.15c.10) Menaikan 1 m3 material sampai beda tinggi 10 m
T.15c.11) Menaikan 1 m3 material sampai beda tinggi > 10 m untuk setiap penambahan 1 m

INFORMASI PERHITUNGAN AHSP ANGKUTAN BERBAGAI JENIS MATERI

c. Pekerjaan angkutan hasil galian/material


T.15a Angkutan Material dan/atau Hasil Galian untuk Jarak Horizontal (Datar)
AHSP T.15a ini berlaku pada angkutan material untuk jarak horizontal (datar) dan termasuk juga
dengan pelandaian menurun < 20° dan pelandaian naik < 15° yang dihitung sebagai panjang lint
Bentuk dan kekuatan material akan mempengaruhi tingkat kemudahan pelaksanaan pengangkutannya, m
dengan tingkat kemudahan seperti besi beton > GIP > pipa PVC> pasir/koral/tanah, maka koefisien AHSP
besi beton x 0,7; GIP x 0,8; pipa PVC x 0,9 dan pasir/koral/tanah/plastik x 1,0 terhadap koefisien pada AH

T.15a.1)Mengangkut 1 m3 material dengan jarak angkut 3m

No Uraian Kode Satuan Koefisien Harga Satuan


1 2 3 4 5 6
A Tenaga Kerja
1 Pekerja L.01 OH 0.2480 70,000.00
2 Mandor L.04 OH 0.0124 120,000.00
Jumlah Harga Tenaga Kerja
B Bahan
Jumlah Harga Bahan
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)
T.15a.2) Mengangkut 1 m3 material dengan jarak angkut 5 m

No Uraian Kode Satuan Koefisien Harga Satuan


1 2 3 4 5 6
A Tenaga Kerja
1 Pekerja L.01 OH 0.2680 70,000.00
2 Mandor L.04 OH 0.0134 120,000.00
Jumlah Harga Tenaga Kerja
B Bahan
Jumlah Harga Bahan
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)

T.15a.3) Mengangkut 1 m3 material dengan jarak angkut 10 m

No Uraian Kode Satuan Koefisien Harga Satuan


1 2 3 4 5 6
A Tenaga Kerja
1 Pekerja L.01 OH 0.2860 70,000.00
2 Mandor L.04 OH 0.0143 120,000.00
Jumlah Harga Tenaga Kerja
B Bahan
Jumlah Harga Bahan
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)

T.15a.4) Mengangkut 1 m3 material dengan jarak angkut 30 m

No Uraian Kode Satuan Koefisien Harga Satuan


1 2 3 4 5 6
A Tenaga Kerja
1 Pekerja L.01 OH 0.3560 70,000.00
2 Mandor L.04 OH 0.0178 120,000.00
Jumlah Harga Tenaga Kerja
B Bahan
Jumlah Harga Bahan
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)

T.15a.5) Mengangkut 1 m3 material dengan jarak angkut 50 m

No Uraian Kode Satuan Koefisien Harga Satuan


1 2 3 4 5 6
A Tenaga Kerja
1 Pekerja L.01 OH 0.4220 70,000.00
2 Mandor L.04 OH 0.0211 120,000.00
Jumlah Harga Tenaga Kerja
B Bahan
Jumlah Harga Bahan
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)

T.15a.6) Mengangkut 1 m3 material dengan jarak angkut 100 m

No Uraian Kode Satuan Koefisien Harga Satuan


1 2 3 4 5 6
A Tenaga Kerja
1 Pekerja L.01 OH 0.6000 70,000.00
2 Mandor L.04 OH 0.0300 120,000.00
Jumlah Harga Tenaga Kerja
B Bahan
Jumlah Harga Bahan
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)

T.15a.7) Mengangkut 1 m3 material dengan jarak angkut 200 m

No Uraian Kode Satuan Koefisien Harga Satuan


1 2 3 4 5 6
A Tenaga Kerja
1 Pekerja L.01 OH 0.9500 70,000.00
2 Mandor L.04 OH 0.0475 120,000.00
Jumlah Harga Tenaga Kerja
B Bahan
Jumlah Harga Bahan
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)

T.15a.8) Mengangkut 1 m3 material dengan jarak angkut 300 m

No Uraian Kode Satuan Koefisien Harga Satuan


1 2 3 4 5 6
A Tenaga Kerja
1 Pekerja L.01 OH 1.3000 70,000.00
2 Mandor L.04 OH 0.0650 120,000.00
Jumlah Harga Tenaga Kerja
B Bahan
Jumlah Harga Bahan
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)

T.15a.9) Mengangkut 1 m3 material dengan jarak angkut 400 m

No Uraian Kode Satuan Koefisien Harga Satuan


1 2 3 4 5 6
A Tenaga Kerja
1 Pekerja L.01 OH 1.6500 70,000.00
2 Mandor L.04 OH 0.0825 120,000.00
Jumlah Harga Tenaga Kerja
B Bahan
Jumlah Harga Bahan
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)
T.15a.10) Mengangkut 1 m3 material dengan jarak angkut 500 m

No Uraian Kode Satuan Koefisien Harga Satuan


1 2 3 4 5 6
A Tenaga Kerja
1 Pekerja L.01 OH 1.9500 70,000.00
2 Mandor L.04 OH 0.0975 120,000.00
Jumlah Harga Tenaga Kerja
B Bahan
Jumlah Harga Bahan
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)

T.15a.11) Mengangkut 1 m3 material > 500m untuk setiap penambahan jarak angkut 100 m

No Uraian Kode Satuan Koefisien Harga Satuan


1 2 3 4 5 6
A Tenaga Kerja
1 Pekerja L.01 OH 0.3520 70,000.00
2 Mandor L.04 OH 0.0176 120,000.00
Jumlah Harga Tenaga Kerja
B Bahan
Jumlah Harga Bahan
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)

T.15b Angkutan Material dan/untuk Jarak Vertikal Menurun


AHSP T.15b hanya berlaku untuk pelandaian menurun yang > 20°. Material dengan tingkat kemudahan s
besi beton > GIP > pipa PVC > pasir/koral/tanah, maka angkutan jarak vertikal turun koefisien AHSPnya u
besi beton x 0,7; GIP x 0,8; pipa PVC x 0,9 dan pasir/koral/tanah/plastik x 1,0 terhadap koefisien pada AH

T.15b.1) Menurunkan 1 m3 material sampai beda tinggi 1 m

No Uraian Kode Satuan Koefisien Harga Satuan


1 2 3 4 5 6
A Tenaga Kerja
1 Pekerja L.01 OH 0.1760 70,000.00
2 Mandor L.04 OH 0.0088 120,000.00
Jumlah Harga Tenaga Kerja
B Bahan
Jumlah Harga Bahan
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)

T.15b.2) Menurunkan 1 m3 material sampai beda tinggi 2 m

No Uraian Kode Satuan Koefisien Harga Satuan


1 2 3 4 5 6
A Tenaga Kerja
1 Pekerja L.01 OH 0.2640 70,000.00
2 Mandor L.04 OH 0.0132 120,000.00
Jumlah Harga Tenaga Kerja
B Bahan
Jumlah Harga Bahan
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)

T.15b.3) Menurunkan 1 m3 material sampai beda tinggi 3 m

No Uraian Kode Satuan Koefisien Harga Satuan


1 2 3 4 5 6
A Tenaga Kerja
1 Pekerja L.01 OH 0.3440 70,000.00
2 Mandor L.04 OH 0.0172 120,000.00
Jumlah Harga Tenaga Kerja
B Bahan
Jumlah Harga Bahan
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)
T.15b.4) Menurunkan 1 m3 material sampai beda tinggi 4 m

No Uraian Kode Satuan Koefisien Harga Satuan


1 2 3 4 5 6
A Tenaga Kerja
1 Pekerja L.01 OH 0.4140 70,000.00
2 Mandor L.04 OH 0.0207 120,000.00
Jumlah Harga Tenaga Kerja
B Bahan
Jumlah Harga Bahan
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)

T.15b.5) Menurunkan 1 m3 material sampai beda tinggi 5 m

No Uraian Kode Satuan Koefisien Harga Satuan


1 2 3 4 5 6
A Tenaga Kerja
1 Pekerja L.01 OH 0.4780 70,000.00
2 Mandor L.04 OH 0.0239 120,000.00
Jumlah Harga Tenaga Kerja
B Bahan
Jumlah Harga Bahan
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)

T.15b.6) Menurunkan 1 m3 material sampai beda tinggi 6 m

No Uraian Kode Satuan Koefisien Harga Satuan


1 2 3 4 5 6
A Tenaga Kerja
1 Pekerja L.01 OH 0.5380 70,000.00
2 Mandor L.04 OH 0.0269 120,000.00
Jumlah Harga Tenaga Kerja
B Bahan
Jumlah Harga Bahan
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)

T.15b.7) Menurunkan 1 m3 material sampai beda tinggi 7 m

No Uraian Kode Satuan Koefisien Harga Satuan


1 2 3 4 5 6
A Tenaga Kerja
1 Pekerja L.01 OH 0.5880 70,000.00
2 Mandor L.04 OH 0.0294 120,000.00
Jumlah Harga Tenaga Kerja
B Bahan
Jumlah Harga Bahan
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)

T.15b.8) Menurunkan 1 m3 material sampai beda tinggi 8 m

No Uraian Kode Satuan Koefisien Harga Satuan


1 2 3 4 5 6
A Tenaga Kerja
1 Pekerja L.01 OH 0.6360 70,000.00
2 Mandor L.04 OH 0.0318 120,000.00
Jumlah Harga Tenaga Kerja
B Bahan
Jumlah Harga Bahan
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)

T.15b.9) Menurunkan 1 m3 material sampai beda tinggi 9 m

No Uraian Kode Satuan Koefisien Harga Satuan


No Uraian Kode Satuan Koefisien Harga Satuan
1 2 3 4 5 6
A Tenaga Kerja
1 Pekerja L.01 OH 0.6780 70,000.00
2 Mandor L.04 OH 0.0339 120,000.00
Jumlah Harga Tenaga Kerja
B Bahan
Jumlah Harga Bahan
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)

T.15b.10) Menurunkan 1 m3 material sampai beda tinggi 10 m

No Uraian Kode Satuan Koefisien Harga Satuan


1 2 3 4 5 6
A Tenaga Kerja
1 Pekerja L.01 OH 0.7160 70,000.00
2 Mandor L.04 OH 0.0358 120,000.00
Jumlah Harga Tenaga Kerja
B Bahan
Jumlah Harga Bahan
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)

T.15b.11) Menurunkan 1 m3 material sampai beda tinggi > 10 m untuk setiap penambahan 1 m

No Uraian Kode Satuan Koefisien Harga Satuan


1 2 3 4 5 6
A Tenaga Kerja
1 Pekerja L.01 OH 0.0340 70,000.00
2 Mandor L.04 OH 0.0017 120,000.00
Jumlah Harga Tenaga Kerja
B Bahan
Jumlah Harga Bahan
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)

T.15c Angkutan Material dan/untuk Jarak Vertikal Naik


AHSP T.15c hanya berlaku untuk pelandaian naik yang > 15°. Material dengan tingkat kemudahan seper
besi beton > GIP > pipa PVC > pasir/koral/tanah, maka angkutan jarak vertikal turun koefisien AHSPnya u
besi beton x 0,7; GIP x 0,8; pipa PVC x 0,9 dan pasir/koral/tanah/plastik x 1,0 terhadap koefisien pada AH

T.15c.1) Menaikan 1 m3 material sampai beda tinggi 1 m

No Uraian Kode Satuan Koefisien Harga Satuan


1 2 3 4 5 6
A Tenaga Kerja
1 Pekerja L.01 OH 0.3640 70,000.00
2 Mandor L.04 OH 0.0182 120,000.00
Jumlah Harga Tenaga Kerja
B Bahan
Jumlah Harga Bahan
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)

T.15c.2) Menaikan 1 m3 material sampai beda tinggi 2 m

No Uraian Kode Satuan Koefisien Harga Satuan


1 2 3 4 5 6
A Tenaga Kerja
1 Pekerja L.01 OH 0.5460 70,000.00
2 Mandor L.04 OH 0.0273 120,000.00
Jumlah Harga Tenaga Kerja
B Bahan
Jumlah Harga Bahan
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)
T.15c.3) Menaikan 1 m3 material sampai beda tinggi 3 m

No Uraian Kode Satuan Koefisien Harga Satuan


1 2 3 4 5 6
A Tenaga Kerja
1 Pekerja L.01 OH 0.720 70,000.00
2 Mandor L.04 OH 0.036 120,000.00
Jumlah Harga Tenaga Kerja
B Bahan
Jumlah Harga Bahan
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)

T.15c.4) Menaikan 1 m3 material sampai beda tinggi 4 m

No Uraian Kode Satuan Koefisien Harga Satuan


1 2 3 4 5 6
A Tenaga Kerja
1 Pekerja L.01 OH 0.8940 70,000.00
2 Mandor L.04 OH 0.0447 120,000.00
Jumlah Harga Tenaga Kerja
B Bahan
Jumlah Harga Bahan
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)

T.15c.5) Menaikan 1 m3 material sampai beda tinggi 5 m

No Uraian Kode Satuan Koefisien Harga Satuan


1 2 3 4 5 6
A Tenaga Kerja
1 Pekerja L.01 OH 1.060 70,000.00
2 Mandor L.04 OH 0.053 120,000.00
Jumlah Harga Tenaga Kerja
B Bahan
Jumlah Harga Bahan
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)

T.15c.6) Menaikan 1 m3 material sampai beda tinggi 6 m

No Uraian Kode Satuan Koefisien Harga Satuan


1 2 3 4 5 6
A Tenaga Kerja
1 Pekerja L.01 OH 1.220 70,000.00
2 Mandor L.04 OH 0.061 120,000.00
Jumlah Harga Tenaga Kerja
B Bahan
Jumlah Harga Bahan
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)

T.15c.7) Menaikan 1 m3 material sampai beda tinggi 7 m

No Uraian Kode Satuan Koefisien Harga Satuan


1 2 3 4 5 6
A Tenaga Kerja
1 Pekerja L.01 OH 1.378 70,000.00
2 Mandor L.04 OH 0.069 120,000.00
Jumlah Harga Tenaga Kerja
B Bahan
Jumlah Harga Bahan
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)

T.15c.8) Menaikan 1 m3 material sampai beda tinggi 8 m

No Uraian Kode Satuan Koefisien Harga Satuan


1 2 3 4 5 6
A Tenaga Kerja
1 Pekerja L.01 OH 1.528 70,000.00
2 Mandor L.04 OH 0.076 120,000.00
Jumlah Harga Tenaga Kerja
B Bahan
Jumlah Harga Bahan
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)

T.15c.9) Menaikan 1 m3 material sampai beda tinggi 9 m

No Uraian Kode Satuan Koefisien Harga Satuan


1 2 3 4 5 6
A Tenaga Kerja
1 Pekerja L.01 OH 1.676 70,000.00
2 Mandor L.04 OH 0.084 120,000.00
Jumlah Harga Tenaga Kerja
B Bahan
Jumlah Harga Bahan
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)

T.15c.10) Menaikan 1 m3 material sampai beda tinggi 10 m

No Uraian Kode Satuan Koefisien Harga Satuan


1 2 3 4 5 6
A Tenaga Kerja
1 Pekerja L.01 OH 1.818 70,000.00
2 Mandor L.04 OH 0.091 120,000.00
Jumlah Harga Tenaga Kerja
B Bahan
Jumlah Harga Bahan
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)
T.15c.11) Menaikan 1 m3 material sampai beda tinggi > 10 m untuk setiap penambahan 1 m

No Uraian Kode Satuan Koefisien Harga Satuan


1 2 3 4 5 6
A Tenaga Kerja
1 Pekerja L.01 OH 0.138 70,000.00
2 Mandor L.04 OH 0.007 120,000.00
Jumlah Harga Tenaga Kerja
B Bahan
Jumlah Harga Bahan
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)

T.15d Konversi Berat Material Tanah Biasa kepada Jenis Material Lain

Angkutan material pada T.15a.1) - T.15a.11) adalah untuk material tanah lepas, maka konversi angkutan 1m3 mate

Tabel A.4 Berat isi Material


Rentang Berat isi material Berat isi Contoh Hitungan Tingkat
No. Jenis Material (ton/m3) (ton/m3) Kemudahan
(1) (2) (3) (4) (5)
1. Tanah biasa * 1,00 – 1,20 1,10 1
2. Tanah gambut * 0,60 – 0,85 0,72 1
3. Agregat kasar * 1,236** – 1,283 1,26 1
4. Agregat halus * 1,255 – 1,363 1,31 1
5. Split/Koral/Kerikil* 1,232 – 1,273 1,25 1
6. Batu kali * 0,960 – 0,971 0,97 1
7. Batu belah * 0,914 – 0,960 0,94 1
8. Pasir pasang * 1,243 – 1,316 1,28 1
9. Kayu 0,65 – 0,95 0,80 1
10. Plastik 0,60 – 0,75 0,68 1
11. PVC 0,50 – 1,20 0,85 0,9
12. HDPE 0,50 – 1,00 0,80 0,9
13. GIP 7,55 – 8,45 8,00 0,8
14. DCIP 7,50 – 8,65 8,00 0,8
15. Baja Profil 7,45 – 8,20 7,80 0,8
16. Besi beton 7,45 – 8,20 7,80 0,7
3
Keterangan: * Berat isi lepas; ** Hasil pemecah batu mulai dari 1,20 ton/m
14. DCIP 7,50 – 8,65 8,00 0,8
15. Baja Profil 7,45 – 8,20 7,80 0,8
16. Besi beton 7,45 – 8,20 7,80 0,7
3
Keterangan: * Berat isi lepas; ** Hasil pemecah batu mulai dari 1,20 ton/m

A. JIKA BIAYA ANGKUTAN DIMASUKAN DALAM HSD - BAHAN


(Maka dihitung Tanpa Overhead+Keuntungan)

Contoh perhitungan konversi berbagai jenis material dengan jarak angkut, naik dan
Kode pekerjaan T.15a.1) s.d T.15a.11 untuk mengangkut 1 m3 berbagai jenis mate
termasuk juga pelandaian turun < 20° serta pelandaian naik < 15° yang dih
Kode pekerjaan T.15b.1) s.d T.15b.11 untuk mengangkut 1 m3 berbagai jenis mate
Kode pekerjaan T.15c.1) s.d T.15c.11 untuk mengangkut 1 m3 berbagai jenis mate
Material dengan tingkat kemudahan seperti besi beton > GIP > pipa PVC > pasir/ko
horizontal datar, vertikal turun dan naik, dikalikan lagi koefisien AHSP-nya besi bet
dan pasir/koral/tanag/plastik x 1,0

B. JIKA BIAYA ANGKUTAN DIPISAHKAN DARI HSP KOMPONEN PEKERJAAN K


Maka ditulis Biaya konstruksi dan Biaya Angkut (masing-masing termasuk O

Contoh perhitungan konversi jenis material dan jarak angkut naik dan turun
a. Untuk jarak angkut horizontal 100 m
T.15a.6) Mengangkut 1 m3 material atau hasil galian dengan jarak angkut 100 m
Harga Satuan Jumlah
No Uraian Kode Satuan Koefisien
(Rp) (Rp)

1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0,6000 50.000,00 30.000,00
2 Mandor L.04 OH 0,0300 75.000,00 2.250,00
Jumlah Harga Tenaga Kerja 32.250,00
B Bahan
Jumlah Harga Bahan -
C Peralatan
Jumlah Harga Peralatan -
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C) 32.250,00
E Overhead + Profit (Contoh 15%) 15% x D 4.837,50
3
F Harga Satuan Pekerjaan per - m (D+E) 37.087,50

1). 1 m3 koral/kerikil jarak horizontal 100 m


1,26
HSP angkut 1𝑚3agregat kasar atau koral/kerikil alami = 1,10 x HSP angkut 1m3 tanah lepas
1,26
= x Rp 37.087,50 = Rp 42.482,00
1,10

2). 1zak semen 50 kg jarak horizontal 100 m


0,05
HSP angkut 1 zak semen 50 kg = x HSP angkut 1m3 tanah lepas
1,10
0,05
1). 1 m3 koral/kerikil jarak horizontal 100 m
1,26
HSP angkut 1𝑚3agregat kasar atau koral/kerikil alami = 1,10 x HSP angkut 1m3 tanah lepas
1,26
= x Rp 37.087,50 = Rp 42.482,00
1,10

2). 1zak semen 50 kg jarak horizontal 100 m


0,05
HSP angkut 1 zak semen 50 kg = x HSP angkut 1m3 tanah lepas
1,10
0,05
= x Rp 37.087,50 = Rp 1.685,80
1,10

3). 100 kg besi beton jarak horizontal 100 m


0,10
HSP angkut 100 kg besi beton = 0,70 𝑥 x HSP angkut 1m3 tanah lepas
1,10
0,10
= 0,70 x x Rp 37.087,50 = Rp 2.360,11
1,10

4). 100 kg GIP jarak horizontal 100 m


0,10
HSP angkut 100 kg GIP = 0,80 𝑥 x HSP angkut 1m3 tanah lepas
1,10
0,10
= 0,80 x x Rp 37.087,50 = Rp 2.697,27
1,10

5). 100 kg pipa PVC jarak horizontal 100 m


0,10
HSP angkut 100 kg pipa PVC = 0,90 𝑥 1,10 x HSP angkut 1m3 tanah lepas
0,10
= 0,90 x x Rp 37.087,50 = Rp 3.034,43
1,10

b. Untuk jarak angkut vertikal turun 3 m


T.15b.3) Menurunkan 1 m3 material atau hasil galian tanah sampai beda tinggi 3 m
Harga Satuan Jumlah
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0,3440 50.000,00 17.200,00
2 Mandor L.04 OH 0,0172 75.000,00 1.290,00
Jumlah Harga Tenaga Kerja 18.490,00
B Bahan
Jumlah Harga Bahan -
C Peralatan
Jumlah Harga Peralatan -
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C) 18.490,00
E Overhead + Profit (Contoh 15%) 15% x D 2.773,50
3
F Harga Satuan Pekerjaan per - m (D+E) 21.263,50

1). 1 m3 koral/kerikil jarak vertikal turun 3 m


1,26
HSP angkut 1𝑚3agregat kasar atau koral /kerikil alami = 1,10 x HSP angkut 1m3 tanah lepas
1,26
= x Rp 21.263,50 = Rp 24.356,37
1,10

2). 1 zak semen 50 kg jarak vertikal turun 3 m


0,05
HSP angkut 1 𝑧𝑎𝑘 𝑠𝑒𝑚𝑒𝑛 50 𝑘𝑔 = 1,10 x HSP angkut 1m3 tanah lepas
0,05
= x Rp 21.263,50 = Rp 966,52
1,10

3). 100 kg besi beton jarak vertikal turun 3 m


0,10
HSP angkut 100 kg besi beton = 0,70 𝑥 1,10 x HSP angkut 1m3 tanah lepas
0,10
= 0,70 x x Rp 21.263,50 = Rp 1.549,95
0,05
HSP angkut 1 𝑧𝑎𝑘 𝑠𝑒𝑚𝑒𝑛 50 𝑘𝑔 = 1,10 x HSP angkut 1m3 tanah lepas
0,05
= x Rp 21.263,50 = Rp 966,52
1,10

3). 100 kg besi beton jarak vertikal turun 3 m


0,10
HSP angkut 100 kg besi beton = 0,70 𝑥 1,10 x HSP angkut 1m3 tanah lepas
0,10
= 0,70 x x Rp 21.263,50 = Rp 1.549,95
1,10

4). 100 kg GIP jarak vertikal turun 3 m


0,10
HSP angkut 100 kg GIP = 0,80 𝑥 1,10 x HSP angkut 1m3 tanah lepas
0,10
= 0,80 x x Rp 21.263,50 = Rp 1.771,37
1,10

5). 100 kg pipa PVC jarak vertikal turun 3 m


0,10
HSP angkut 100 kg pipa PVC = 0,90 𝑥 1,10 x HSP angkut 1m3 tanah lepas
0,10
= 0,90 x x Rp 21.263,50 = Rp 1.992,79
1,10

c. Untuk jarak angkut vertikal naik 3 m

T.15c.3) Menaikan 1 m3 material atau hasil galian tanah sampai beda tinggi 3 m
Harga Satuan Jumlah
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0,720 50.000,00 36.000,00
2 Mandor L.04 OH 0,036 75.000,00 2.700,00
Jumlah Harga Tenaga Kerja 38.700,00
B Bahan
Jumlah Harga Bahan -
C Peralatan
Jumlah Harga Peralatan -
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C) 38.700,00
E Overhead + Profit (Contoh 15%) 15% x D 5.805,00
F Harga Satuan Pekerjaan per - m3 (D+E) 44.505,00

1). 1 m3 koral/kerikil jarak vertikal naik 3 m


1,26
HSP angkut 1𝑚3agregat kasar atau koral /kerikil alami = 1,10 x HSP angkut 1m3 tanah lepas
1,26
= x Rp 44.505,00 = Rp 50.978,45
1,10

2). 1 zak semen 50 kg jarak vertikal naik 3 m


0,05
HSP angkut 1 𝑧𝑎𝑘 𝑠𝑒𝑚𝑒𝑛 50 𝑘𝑔 = x HSP angkut 1m3 tanah lepas
1,10
0,05
= x Rp 44.505,00 = Rp 2.022,96
1,10

3). 100 kg besi beton jarak vertikal naik 3 m


0,10
HSP angkut 100 kg besi beton = 0,70 𝑥 x HSP angkut 1m3 tanah lepas
1,10
0,10
= 0,70 x x Rp 44.505,00 = Rp 3.244,08
1,10

4). 100 kg GIP jarak vertikal naik 3 m


0,10
HSP angkut 100 kg GIP = 0,80 𝑥 x HSP angkut 1m3 tanah lepas
3). 100 kg besi beton jarak vertikal naik 3 m
0,10
HSP angkut 100 kg besi beton = 0,70 𝑥 x HSP angkut 1m3 tanah lepas
1,10
0,10
= 0,70 x x Rp 44.505,00 = Rp 3.244,08
1,10

4). 100 kg GIP jarak vertikal naik 3 m


0,10
HSP angkut 100 kg GIP = 0,80 𝑥 1,10 x HSP angkut 1m3 tanah lepas
0,10
= 0,80 x x Rp 44.505,00 = Rp 3.707,52
1,10

5). 100 kg Pipa PVC jarak vertikal naik 3 m


0,10
HSP angkut 100 pipa PVC = 0,90 𝑥 1,10 x HSP angkut 1m3 tanah lepas
0,10
= 0,90 x x Rp 44.505,00 = Rp 4.170,96
1,10

Dengan cara yang sama, dapat dihitung pula berbagai jenis material yang lainnya.

A.1.2 Pekerjaan Tanah Secara Mekanis, Lihat Alat Berat:


2.1_Galian Situ/Waduk
2.2_Galian Sungai diangkut Dump Truck
2.3_Angkutan Material/hasil galian Lintas Pulau
2.4_Gali, Angkut dan Pemadatan
2.5_Irigasi
2.6_Muara
2.7_Airtanah
BAHAN

ngan jarak angkut, naik dan turun; seperti pada Tabel B di atas.
ut 1 m3 berbagai jenis material dengan jarak horizontal (Datar)
rta pelandaian naik < 15° yang dihitung sebagai panjang lintasannya
ut 1 m3 berbagai jenis material dengan pelandaian turun > 20°
ut 1 m3 berbagai jenis material dengan pelandaian naik > 15°
> GIP > pipa PVC > pasir/koral/tanah/plastik, maka angkutan jarak
efisien AHSP-nya besi beton x 0,7; GIP x 0,8; pipa PVC x 0,9;
pat dilihat pada Informasi AHSP Berbagai Jenis Material di bawah ini

1.1 0.97 0.94 1.2 1.5 1.28 1.26 1.2


1 1 1 1 1 1 1 1
Tanah lepas Batu Kali Batu Belah
Bt Merah Bt.
biasa Pasir Pasang
Merah KW1/2 Koral/SplitPs. Beton/Agg. Kasar
(m3) (m3) (m3) (bh) (bh) (m3) (m3) (m3)
18,848.00 16,620.00 16,106.00 20.50 25.70 21,932.00 21,589.00 20,561.00
20,368.00 17,960.00 17,405.00 22.20 27.70 23,700.00 23,330.00 22,219.00
21,736.00 19,167.00 18,574.00 23.70 29.60 25,292.00 24,897.00 23,712.00
27,056.00 23,858.00 23,120.00 29.50 36.80 31,483.00 30,991.00 29,515.00
32,072.00 28,281.00 27,406.00 34.90 43.70 37,320.00 36,737.00 34,987.00
45,600.00 40,210.00 38,967.00 49.70 62.10 53,061.00 52,232.00 49,745.00
72,200.00 63,667.00 61,698.00 78.70 98.40 84,014.00 82,701.00 78,763.00
98,800.00 87,123.00 84,429.00 107.70 134.70 114,967.00 113,170.00 107,781.00
125,400.00 110,580.00 107,160.00 136.80 171.00 145,920.00 143,640.00 136,800.00
148,200.00 130,685.00 126,643.00 161.60 202.00 172,450.00 169,756.00 161,672.00
26,752.00 23,590.00 22,860.00 29.10 36.40 31,129.00 30,643.00 29,184.00

13,376.00 11,795.00 11,430.00 14.50 18.20 15,564.00 15,321.00 14,592.00


20,064.00 17,692.00 17,145.00 21.80 27.30 23,347.00 22,982.00 21,888.00
26,144.00 23,054.00 22,341.00 28.50 35.60 30,422.00 29,946.00 28,520.00
31,464.00 27,745.00 26,887.00 34.30 42.90 36,612.00 36,040.00 34,324.00
36,328.00 32,034.00 31,043.00 39.60 49.50 42,272.00 41,612.00 39,630.00
40,888.00 36,055.00 34,940.00 44.60 55.70 47,578.00 46,835.00 44,605.00
44,688.00 39,406.00 38,187.00 48.70 60.90 52,000.00 51,188.00 48,750.00
48,336.00 42,623.00 41,305.00 52.70 65.90 56,245.00 55,366.00 52,730.00
51,528.00 45,438.00 44,033.00 56.20 70.20 59,959.00 59,022.00 56,212.00
54,416.00 47,985.00 46,500.00 59.30 74.20 63,320.00 62,331.00 59,362.00
2,584.00 2,278.00 2,208.00 2.80 3.50 3,006.00 2,959.00 2,818.00
27,664.00 24,394.00 23,640.00 30.10 37.70 32,190.00 31,687.00 30,178.00
41,496.00 36,591.00 35,460.00 45.20 56.50 48,286.00 47,531.00 45,268.00
54,720.00 48,253.00 46,760.00 59.60 74.60 63,674.00 62,679.00 59,694.00
67,944.00 59,914.00 58,061.00 74.10 92.60 79,062.00 77,826.00 74,120.00
80,560.00 71,039.00 68,842.00 87.80 109.80 93,742.00 92,277.00 87,883.00
92,720.00 81,762.00 79,233.00 101.10 126.40 107,892.00 106,206.00 101,149.00
104,740.00 92,361.00 89,505.00 114.20 142.80 121,879.00 119,974.00 114,261.00
116,080.00 102,361.00 99,195.00 126.60 158.20 135,074.00 132,964.00 126,632.00
127,400.00 112,343.00 108,869.00 138.90 173.70 148,247.00 145,930.00 138,981.00
138,180.00 121,849.00 118,081.00 150.70 188.40 160,791.00 158,278.00 150,741.00
10,500.00 9,259.00 8,972.00 11.40 14.30 12,218.00 12,027.00 11,454.00

EN PEKERJAAN KONSTRUKSI
asing termasuk Overhead + Keuntungan)

1.1 0.97 0.94 1.2 1.5 1.28 1.26 1.2


1 1 1 1 1 1 1 1
Tanah lepas Batu Kali Batu Belah
Bt Merah Bt.
biasa Pasir Pasang
Merah KW1/2 Koral/SplitPs. Beton/Agg. Kasar
(m3) (m3) (m3) (bh) (bh) (m3) (m3) (m3)
21,675.20 19,113.00 18,522.00 23.60 29.50 25,222.00 24,827.00 23,645.00
23,423.20 20,655.00 20,016.00 25.50 31.90 27,256.00 26,830.00 25,552.00
24,996.40 22,042.00 21,360.00 27.20 34.00 29,086.00 28,632.00 27,268.00
31,114.40 27,437.00 26,588.00 33.90 42.40 36,205.00 35,640.00 33,942.00
36,882.80 32,523.00 31,518.00 40.20 50.20 42,918.00 42,247.00 40,235.00
52,440.00 46,242.00 44,812.00 57.20 71.50 61,021.00 60,067.00 57,207.00
83,030.00 73,217.00 70,952.00 90.50 113.20 96,616.00 95,107.00 90,578.00
113,620.00 100,192.00 97,093.00 123.90 154.90 132,212.00 130,146.00 123,949.00
144,210.00 127,167.00 123,234.00 157.30 196.60 167,808.00 165,186.00 157,320.00
170,430.00 150,288.00 145,640.00 185.90 232.40 198,318.00 195,219.00 185,923.00
30,764.80 27,128.00 26,289.00 33.50 41.90 35,799.00 35,239.00 33,561.00

15,382.40 13,564.00 13,144.00 16.70 20.90 17,899.00 17,619.00 16,780.00


23,073.60 20,346.00 19,717.00 25.10 31.40 26,849.00 26,429.00 25,171.00
30,065.60 26,512.00 25,692.00 32.70 40.90 34,985.00 34,438.00 32,798.00
36,183.60 31,907.00 30,920.00 39.40 49.30 42,104.00 41,446.00 39,473.00
41,777.20 36,839.00 35,700.00 45.50 56.90 48,613.00 47,853.00 45,575.00
47,021.20 41,464.00 40,181.00 51.20 64.10 54,715.00 53,860.00 51,295.00
51,391.20 45,317.00 43,916.00 56.00 70.00 59,800.00 58,866.00 56,063.00
55,586.40 49,017.00 47,501.00 60.60 75.70 64,682.00 63,671.00 60,639.00
59,257.20 52,254.00 50,637.00 64.60 80.80 68,953.00 67,876.00 64,644.00
62,578.40 55,182.00 53,476.00 68.20 85.30 72,818.00 71,680.00 68,267.00
2,971.60 2,620.00 2,539.00 3.20 4.00 3,457.00 3,403.00 3,241.00

31,813.60 28,053.00 27,186.00 34.70 43.30 37,019.00 36,441.00 34,705.00


47,720.40 42,080.00 40,779.00 52.00 65.00 55,529.00 54,661.00 52,058.00
62,928.00 55,491.00 53,774.00 68.60 85.80 73,225.00 72,081.00 68,648.00
78,135.60 68,901.00 66,770.00 85.20 106.50 90,921.00 89,500.00 85,238.00
92,644.00 81,695.00 79,168.00 101.00 126.30 107,803.00 106,119.00 101,066.00
106,628.00 94,026.00 91,118.00 116.30 145.40 124,076.00 122,137.00 116,321.00
120,451.00 106,215.00 102,930.00 131.40 164.20 140,161.00 137,971.00 131,401.00
133,492.00 117,715.00 114,074.00 145.60 182.00 155,336.00 152,909.00 145,627.00
146,510.00 129,195.00 125,199.00 159.80 199.70 170,484.00 167,820.00 159,829.00
158,907.00 140,127.00 135,793.00 173.30 216.60 184,909.00 182,020.00 173,353.00
12,075.00 10,647.00 10,318.00 13.10 16.40 14,050.00 13,831.00 13,172.00

JENIS MATERIAL

ar) dan termasuk juga medan


g sebagai panjang lintasannya.
an pengangkutannya, material
h, maka koefisien AHSPnya
adap koefisien pada AHSP berikut.

Jumlah
7

17,360.00
1,488.00
18,848.00

-
18,848.00

21,675.20
7

18,760.00
1,608.00
20,368.00

-
20,368.00

23,423.20

Jumlah
7

20,020.00
1,716.00
21,736.00

-
21,736.00

24,996.40

Jumlah
7

24,920.00
2,136.00
27,056.00

-
-
27,056.00

31,114.40

Jumlah
7

29,540.00
2,532.00
32,072.00

-
32,072.00

36,882.80 04 '======================

Jumlah
7

42,000.00
3,600.00
45,600.00

-
45,600.00

52,440.00

Jumlah
7
66,500.00
5,700.00
72,200.00

-
72,200.00

83,030.00

Jumlah
7

91,000.00
7,800.00
98,800.00

-
98,800.00

113,620.00

Jumlah
7

115,500.00
9,900.00
125,400.00

-
125,400.00

144,210.00
Jumlah
7

136,500.00
11,700.00
148,200.00

-
148,200.00

170,430.00

Jumlah
7

24,640.00
2,112.00
26,752.00

-
26,752.00

30,764.80

an tingkat kemudahan seperti


un koefisien AHSPnya untuk
adap koefisien pada AHSP berikut.

Jumlah
7 05 '======================

12,320.00
1,056.00
13,376.00

-
13,376.00

15,382.40

Jumlah
7

18,480.00
1,584.00
20,064.00

-
20,064.00

23,073.60

Jumlah
7

24,080.00
2,064.00
26,144.00

-
26,144.00
30,065.60

Jumlah
7

28,980.00
2,484.00
31,464.00

-
31,464.00

36,183.60

Jumlah
7

33,460.00
2,868.00
36,328.00

-
36,328.00

41,777.20

Jumlah
7

37,660.00
3,228.00
40,888.00

-
40,888.00

47,021.20

Jumlah
7

41,160.00
3,528.00
44,688.00

-
44,688.00

Jumlah
7

44,520.00
3,816.00
48,336.00

-
48,336.00

Jumlah
Jumlah
7

47,460.00
4,068.00
51,528.00

-
51,528.00

Jumlah
7

50,120.00
4,296.00
54,416.00

-
54,416.00

Jumlah
7

2,380.00
204.00
2,584.00

-
2,584.00

ngkat kemudahan seperti


un koefisien AHSPnya untuk
adap koefisien pada AHSP berikut.

Jumlah
7

25,480.00
2,184.00
27,664.00

-
27,664.00

Jumlah
7

38,220.00
3,276.00
41,496.00

-
41,496.00
Jumlah
7

50,400.00
4,320.00
54,720.00

-
54,720.00

Jumlah
7

62,580.00
5,364.00
67,944.00

-
67,944.00

Jumlah
7

74,200.00
6,360.00
80,560.00

-
-
80,560.00

Jumlah
7

85,400.00
7,320.00
92,720.00

-
92,720.00

Jumlah
7

96,460.00
8,280.00
104,740.00

-
104,740.00

Jumlah
7
106,960.00
9,120.00
116,080.00

-
116,080.00

Jumlah
7

117,320.00
10,080.00
127,400.00

-
127,400.00

Jumlah
7

127,260.00
10,920.00
138,180.00

-
138,180.00
Jumlah
7

9,660.00
840.00
10,500.00

-
10,500.00

nversi angkutan 1m3 material t


ak angkut, naik dan turun; seperti pada Tabel B di atas.
berbagai jenis material dengan jarak horizontal (Datar)
naik < 15° yang dihitung sebagai panjang lintasannya
berbagai jenis material dengan pelandaian turun > 20°
berbagai jenis material dengan pelandaian naik > 15°
pipa PVC > pasir/koral/tanah/plastik, maka angkutan jarak
AHSP-nya besi beton x 0,7; GIP x 0,8; pipa PVC x 0,9;

EN PEKERJAAN KONSTRUKSI
asing termasuk Overhead + Keuntungan)
0.05 0.1 0.1 0.1 0.1 0.65 0.8 0.95
1 0.7 0.8 0.8 0.9 1 1 1
Semen Besi beton GIP Besi Profil Pipa PVC Kayu Kelas III Kayu Kelas II Kayu Kelas I
(zak 50 kg) (100 kg) (100 kg) (100 kg) (100 kg) (m3) (m3) (m3)
856.00 1,199.00 1,370.00 1,370.00 1,542.00 11,137.00 13,707.00 16,277.00
925.00 1,296.00 1,481.00 1,481.00 1,666.00 12,035.00 14,813.00 17,590.00
988.00 1,383.00 1,580.00 1,580.00 1,778.00 12,844.00 15,808.00 18,772.00
1,229.00 1,721.00 1,967.00 1,967.00 2,213.00 15,987.00 19,677.00 23,366.00
1,457.00 2,040.00 2,332.00 2,332.00 2,624.00 18,951.00 23,325.00 27,698.00
2,072.00 2,901.00 3,316.00 3,316.00 3,730.00 26,945.00 33,163.00 39,381.00
3,281.00 4,594.00 5,250.00 5,250.00 5,907.00 42,663.00 52,509.00 62,354.00
4,490.00 6,287.00 7,185.00 7,185.00 8,083.00 58,381.00 71,854.00 85,327.00
5,700.00 7,980.00 9,120.00 9,120.00 10,260.00 74,100.00 91,200.00 108,300.00
6,736.00 9,430.00 10,778.00 10,778.00 12,125.00 87,572.00 107,781.00 127,990.00
1,216.00 1,702.00 1,945.00 1,945.00 2,188.00 15,808.00 19,456.00 23,104.00

608.00 851.00 972.00 972.00 1,094.00 7,904.00 9,728.00 11,552.00


912.00 1,276.00 1,459.00 1,459.00 1,641.00 11,856.00 14,592.00 17,328.00
1,188.00 1,663.00 1,901.00 1,901.00 2,139.00 15,448.00 19,013.00 22,578.00
1,430.00 2,002.00 2,288.00 2,288.00 2,574.00 18,592.00 22,882.00 27,173.00
1,651.00 2,311.00 2,642.00 2,642.00 2,972.00 21,466.00 26,420.00 31,374.00
1,858.00 2,601.00 2,973.00 2,973.00 3,345.00 24,161.00 29,736.00 35,312.00
2,031.00 2,843.00 3,250.00 3,250.00 3,656.00 26,406.00 32,500.00 38,594.00
2,197.00 3,075.00 3,515.00 3,515.00 3,954.00 28,562.00 35,153.00 41,744.00
2,342.00 3,279.00 3,747.00 3,747.00 4,215.00 30,448.00 37,474.00 44,501.00
2,473.00 3,462.00 3,957.00 3,957.00 4,452.00 32,154.00 39,575.00 46,995.00
117.00 164.00 187.00 187.00 211.00 1,526.00 1,879.00 2,231.00
1,257.00 1,760.00 2,011.00 2,011.00 2,263.00 16,346.00 20,119.00 23,891.00
1,886.00 2,640.00 3,017.00 3,017.00 3,395.00 24,520.00 30,178.00 35,837.00
2,487.00 3,482.00 3,979.00 3,979.00 4,477.00 32,334.00 39,796.00 47,258.00
3,088.00 4,323.00 4,941.00 4,941.00 5,559.00 40,148.00 49,413.00 58,678.00
3,661.00 5,126.00 5,858.00 5,858.00 6,591.00 47,603.00 58,589.00 69,574.00
4,214.00 5,900.00 6,743.00 6,743.00 7,586.00 54,789.00 67,432.00 80,076.00
4,760.00 6,665.00 7,617.00 7,617.00 8,569.00 61,891.00 76,174.00 90,457.00
5,276.00 7,386.00 8,442.00 8,442.00 9,497.00 68,592.00 84,421.00 100,250.00
5,790.00 8,107.00 9,265.00 9,265.00 10,423.00 75,281.00 92,654.00 110,027.00
6,280.00 8,793.00 10,049.00 10,049.00 11,305.00 81,651.00 100,494.00 119,337.00
477.00 668.00 763.00 763.00 859.00 6,204.00 7,636.00 9,068.00

0.05 0.1 0.1 0.1 0.1 0.65 0.8 0.95


1 0.7 0.8 0.8 0.9 1 1 1
Semen Besi beton GIP Besi Profil Pipa PVC Kayu Kelas III Kayu Kelas II Kayu Kelas I
(zak 50 kg) (100 kg) (100 kg) (100 kg) (100 kg) (m3) (m3) (m3)
985.00 1,379.00 1,576.00 1,576.00 1,773.00 12,808.00 15,763.00 18,719.00
1,064.00 1,490.00 1,703.00 1,703.00 1,916.00 13,840.00 17,035.00 20,229.00
1,136.00 1,590.00 1,817.00 1,817.00 2,045.00 14,770.00 18,179.00 21,587.00
1,414.00 1,980.00 2,262.00 2,262.00 2,545.00 18,385.00 22,628.00 26,871.00
1,676.00 2,347.00 2,682.00 2,682.00 3,017.00 21,794.00 26,823.00 31,853.00
2,383.00 3,337.00 3,813.00 3,813.00 4,290.00 30,987.00 38,138.00 45,289.00
3,774.00 5,283.00 6,038.00 6,038.00 6,793.00 49,063.00 60,385.00 71,707.00
5,164.00 7,230.00 8,263.00 8,263.00 9,296.00 67,139.00 82,632.00 98,126.00
6,555.00 9,177.00 10,488.00 10,488.00 11,799.00 85,215.00 104,880.00 124,545.00
7,746.00 10,845.00 12,394.00 12,394.00 13,944.00 100,708.00 123,949.00 147,189.00
1,398.00 1,957.00 2,237.00 2,237.00 2,517.00 18,179.00 22,374.00 26,569.00

699.00 978.00 1,118.00 1,118.00 1,258.00 9,089.00 11,187.00 13,284.00


1,048.00 1,468.00 1,678.00 1,678.00 1,887.00 13,634.00 16,780.00 19,927.00
1,366.00 1,913.00 2,186.00 2,186.00 2,459.00 17,766.00 21,865.00 25,965.00
1,644.00 2,302.00 2,631.00 2,631.00 2,960.00 21,381.00 26,315.00 31,249.00
1,898.00 2,658.00 3,038.00 3,038.00 3,418.00 24,686.00 30,383.00 36,080.00
2,137.00 2,992.00 3,419.00 3,419.00 3,847.00 27,785.00 34,197.00 40,609.00
2,335.00 3,270.00 3,737.00 3,737.00 4,204.00 30,367.00 37,375.00 44,383.00
2,526.00 3,537.00 4,042.00 4,042.00 4,547.00 32,846.00 40,426.00 48,006.00
2,693.00 3,770.00 4,309.00 4,309.00 4,848.00 35,015.00 43,096.00 51,176.00
2,844.00 3,982.00 4,551.00 4,551.00 5,120.00 36,978.00 45,511.00 54,044.00
135.00 189.00 216.00 216.00 243.00 1,755.00 2,161.00 2,566.00

1,446.00 2,024.00 2,313.00 2,313.00 2,602.00 18,798.00 23,137.00 27,475.00


2,169.00 3,036.00 3,470.00 3,470.00 3,904.00 28,198.00 34,705.00 41,213.00
2,860.00 4,004.00 4,576.00 4,576.00 5,148.00 37,184.00 45,765.00 54,346.00
3,551.00 4,972.00 5,682.00 5,682.00 6,392.00 46,171.00 56,825.00 67,480.00
4,211.00 5,895.00 6,737.00 6,737.00 7,579.00 54,744.00 67,377.00 80,010.00
4,846.00 6,785.00 7,754.00 7,754.00 8,724.00 63,007.00 77,547.00 92,087.00
5,475.00 7,665.00 8,760.00 8,760.00 9,855.00 71,175.00 87,600.00 104,025.00
6,067.00 8,494.00 9,708.00 9,708.00 10,922.00 78,881.00 97,085.00 115,288.00
6,659.00 9,323.00 10,655.00 10,655.00 11,987.00 86,574.00 106,552.00 126,531.00
7,223.00 10,112.00 11,556.00 11,556.00 13,001.00 93,899.00 115,568.00 137,237.00
548.00 768.00 878.00 878.00 987.00 7,135.00 8,781.00 10,428.00
PEMERINTAH
ANALISA BIAYA PEKERJAAN
KABUPATEN LOMBOK TENGAH
MEMBENTUK BADAN JALAN / SUBGRADE
DENGAN GALIAN TANAH BIASA (MENGGUNAKAN ALAT)
PROPINSI KODE KABUPATEN/KOTA KODE
NUSA TENGARA BARAT [ 52 ] LOMBOK TENGAH
URAIAN ANGGAPAN / ASUMSI
1. Digali dengan buldozer 1. Menggunakan tenaga manusia ( 200m3/hari)
2. Permukaan tanah dibentuk dan diratakan 2. 100% dibuang kelokasi tampa diangkut dengan truk
dengan grader
3. Dimuat ke truk dengan loader

JUMLAH JUMLAH UPAH


KOMPONEN HARI KODE
ORANG OH Rp/Org/Hr
Mandor 1 1 L.061 1 130,000.00
Operator Alat Berat 3 1 L.081 3 120,000.00
Buruh tak terampil 6 1 L.101 6 80,000.00

JUMLAH HARGA
MATERIAL SAT KODE
VOLUME SATUAN
Alat bantu 0.24 Set M.170 11,250.00

JUMLAH JAM HARGA


PERALATAN HARI KODE
ALAT KERJA Rp/Jam
Buldozer 1 1 E.001 5 397,533.19
Motor Grader 100HP 1 1 E.010 5 465,903.20
Wheel Loader 1 1 E.052 5 606,134.22

VOLUME QUANTITY 200 M3 HARGA SATUAN Rp. 41,602.77


JENIS PEKERJAAN : Galian untuk Selokan Drainase dan Saluran Air
SATUAN PEMBAYARAN : M3
Analisa EI-211
PERKIRAAN HARGA
NO. KOMPONEN SATUAN KUANTITAS SATUAN
(Rp.)

A. TENAGA

1. Pekerja (L01) jam 0.1036 10,000


2. Mandor (L03) jam 0.0259 17,143

JUMLAH HARGA TENAGA

B. BAHAN

JUMLAH HARGA BAHAN

C. PERALATAN

1. Excavator E10 jam 0.0259 377,677


2. Dump Truck E08 jam 0.0601 242,983
3. Alat Bantu Ls 1 200

JUMLAH HARGA PERALATAN

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )


E. OVERHEAD & PROFIT 10 % x D
F. HARGA SATUAN PEKERJAAN ( D + E )

JENIS PEKERJAAN : Timbunan Pilihan


SATUAN PEMBAYARAN : M3
Analisa EI-321
PERKIRAAN HARGA
NO. KOMPONEN SATUAN KUANTITAS SATUAN
(Rp.)

A. TENAGA

1. Pekerja (L01) Jam 0.2432 10,000


2. Mandor (L03) Jam 0.0608 17,143

JUMLAH HARGA TENAGA

B. BAHAN

1. Tanah Urug Pilihan M09 M3 1.2 118,181

JUMLAH HARGA BAHAN

C. PERALATAN
1. Wheel Loader E15 Jam 0.0085 336,725
2. Dump Truck E09 Jam 0.0608 242,983
3. Motor Grader E13 Jam 0.0010 510,848
3. Tandem E17 Jam 0.0145 426,958
4. Water Tanker E23 Jam 0.0070 287,854
5. Alat Bantu Ls 1 100

JUMLAH HARGA PERALATAN

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )


E. OVERHEAD & PROFIT 10 % x D
F. HARGA SATUAN PEKERJAAN ( D + E )

JENIS PEKERJAAN : Lapis Pondasi Agregat Kelas C


SATUAN PEMBAYARAN : M3
Analisa EI-422b
PERKIRAAN HARGA
NO. KOMPONEN SATUAN KUANTITAS SATUAN
(Rp.)

A. TENAGA

1. Pekerja (L01) Jam 0.0594665 10,000


2. Mandor (L03) Jam 0.0084952 17,143

JUMLAH HARGA TENAGA

B. BAHAN

1. - Sirtu - Royalty M09 M3 1.2586093 166,996

JUMLAH HARGA BAHAN

C. PERALATAN
1. Wheel Loader E15 Jam 0.0084952 336,725
2. Dump Truck E08 Jam 0.5958612 242,983
3. Motor Grader E13 Jam 0.0066934 510,848
3. Vibratory Roller E19 Jam 0.0053548 426,958
4. Water Tanker E23 Jam 0.0140562 287,854
5. Alat Bantu Ls 1 100

JUMLAH HARGA PERALATAN

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )


E. OVERHEAD & PROFIT 10 % x D
F. HARGA SATUAN PEKERJAAN ( D + E )

6.6.1 Lapis Permukaan Penetrasi Macadam (m3)


No Uraian Kode Satuan Koefesien Harga Satuan
(Rp)
A TENAGA
Pekerja L.01 Jam 0.1417 0
Mandor L.04 Jam 0.0142 10,000

Jumlah Harga Tenaga Kerja


B BAHAN
Agregat Kasar m3 1.2478 231,225
Agregat Halus m3 0.1479 303,162
Aspal kg 96.563 12,952

Jumlah Harga bahan


C PERALATAN
Wheel Loader Jam 0.0071 606,134.22
Dump Truck Jam 0.3121 185,403.38
3-Wheel Roller Jam 0.0609 349,191.04
Asp. Spayer Jam 0.3788 74,990.95
Jumlah Harga Peralatan
D Jumlah (A+B+C)
E Overhead & Profit 10 %
F Harga Satuan Pekerjaan (D + E)
KERJAAN
KODE
AN / SUBGRADE K.321
MENGGUNAKAN ALAT)
DISIAPKAN TANGGAL

ngkut dengan truk

SUB TOTAL
BIAYA (Rp)
(Rp)
130,000.00
360,000.00
480,000.00

970,000
SUB TOTAL
BIAYA (Rp)
(Rp)
2,700

2,700
SUB TOTAL
BIAYA (Rp)
(Rp)
1,987,666
2,329,516
3,030,671

7,347,853
TOTAL (Rp) 8,320,553

PER M3
inase dan Saluran Air

JUMLAH
HARGA
(Rp.)

1,036
444

1,481

9,786
14,611
200

24,597

26,077
2,608
28,685

JUMLAH
HARGA
(Rp.)

2,432
1,042

3,475

141,817

141,817

2,864
14,776
507
6,179
2,023
100

26,449

171,741
17,174
188,915

JUMLAH
HARGA
(Rp.)

595
146

740

210,183

210,183

2,861
144,784
3,419
2,286
4,046
100

157,497

368,420
36,842
405,262

Jumlah Harga (Rp.)

-
142

142

288,523
44,838
1,250,656

1,584,017

4,296
57,862
21,257
28,406
111,821
1,695,979
169,598
1,865,577
ANALISA HARGA SATUAN PEKERJAAN (AHSP)

A.2.2.1 HARGA SATUAN PEKERJAAN PERSIAPAN


A.2.2.1.9. (K3) Pembersihan 1 m2 lapangan dan perataan
Harga Satuan
No Uraian Kode Satuan Koefesien (Rp) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.1 80,000.00 8,000
Mandor L.04 OH 0.05 130,000.00 6,500
Jumlah Harga Tenaga Kerja 14,500
B BAHAN
Jumlah Harga bahan
C PERALATAN
Jumlah Harga Peralatan

D Jumlah (A+B+C) 14,500


E Overhead & Profit 10 % 1,450
F Harga Satuan Pekerjaan (D + E) 15,950

A.2.2.1.10. (K3) Pembuatan 1 m2 steger/perancah dari kayu


Harga Satuan
No Uraian Kode Satuan Koefesien Jumlah Harga (Rp.)
(Rp)
A TENAGA
Pekerja L.01 OH 1 70,000.00 70,000
Tukang Kayu L.02 OH 2 110,000.00 220,000
Kepala Tukang L.03 OH 0.2 115,000.00 23,000
Mandor L.04 OH 0.05 120,000.00 6,000

Jumlah Harga Tenaga Kerja 319,000


B BAHAN
Kayu Papan klas III M3 0.036 4,505,928.85 162,213
Kayu Balok 5/7 Klas III M3 0.014 3,952,569.17 55,336
Paku Biasa Kg 0.08 19,833.99 1,587

Jumlah Harga bahan 219,136


C PERALATAN
Jumlah Harga Peralatan

D Jumlah (A+B+C) 538,136


E Overhead & Profit 10 % 53,814
F Harga Satuan Pekerjaan (D + E) 591,950

A.2.2.1.13. Pembongkaran 1m3 Beton Bertulang


Harga Satuan
No Uraian Kode Satuan Koefesien (Rp) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 13.334 70,000.00 933,380
Mandor L.04 OH 0.666 120,000.00 79,920
Jumlah Harga Tenaga Kerja 1,013,300
B BAHAN
Jumlah Harga bahan
C PERALATAN
Jumlah Harga Peralatan

D Jumlah (A+B+C) 1,013,300


E Overhead & Profit 10 % 101,330
F Harga Satuan Pekerjaan (D + E) 1,114,630

A.2.2.1.14. Pembongkaran 1m3 dinding tembok bata


Harga Satuan
No Uraian Kode Satuan Koefesien (Rp) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 6.667 70,000.00 466,690
Tukang L.02 OH 0.333 110,000.00 36,630

Jumlah Harga Tenaga Kerja 503,320


B BAHAN
Jumlah Harga bahan
C PERALATAN
Jumlah Harga Peralatan

D Jumlah (A+B+C) 503,320


E Overhead & Profit 10 % 50,332
F Harga Satuan Pekerjaan (D + E) 553,652

A.2.2.1.16. Pemasangan 1 m2 panel beton pracetak 5x50x240


No Uraian Kode Satuan Koefesien Harga Satuan Jumlah Harga (Rp.)
(Rp)
A TENAGA
Pekerja L.01 OH 0.375 70,000.00 26,250
Tukang L.02 OH 0.125 110,000.00 13,750
Kepala Tukang L.03 OH 0.012 115,000.00 1,380
Mandor L.04 OH 0.019 120,000.00 2,280

Jumlah Harga Tenaga Kerja 43,660


B BAHAN
Panel Beton Pracetak Lbr 0.986 80,000.00 78,880
Kolom Beton Pracetak Batang 0.525 25,000.00 13,125
Semen PC Kg 45 1,233.20 55,494
Pasir Beton M3 0.074 218,379.45 16,160
Koral M3 0.146 159,288.54 23,256

Jumlah Harga bahan 186,915


C PERALATAN
Jumlah Harga Peralatan

D Jumlah (A+B+C) 230,575


E Overhead & Profit 10 % 23,058
F Harga Satuan Pekerjaan (D + E) 253,633

A.2.3.1 HARGA SATUAN PEKERJAAN TANAH


A.2.3.1.1. Penggalian 1m3 tanah biasa sedalam 1 m
Harga Satuan
No Uraian Kode Satuan Koefesien Jumlah Harga (Rp.)
(Rp)
A TENAGA
Pekerja L.01 OH 0.75 80,000.00 60,000
Mandor L.04 OH 0.025 130,000.00 3,250

Jumlah Harga Tenaga Kerja 63,250


B BAHAN
Jumlah Harga bahan
C PERALATAN
Jumlah Harga Peralatan

D Jumlah (A+B+C) 63,250


E Overhead & Profit 12,5 % 7,906
F Harga Satuan Pekerjaan (D + E) 71,156

A.2.3.1.4. Penggalian 1m3 tanah keras sedalam 1 m


Harga Satuan
No Uraian Kode Satuan Koefesien Jumlah Harga (Rp.)
(Rp)
A TENAGA
Pekerja L.01 OH 1.000 80,000.00 80,000
Mandor L.04 OH 0.032 130,000.00 4,160

Jumlah Harga Tenaga Kerja 84,160


B BAHAN
Jumlah Harga bahan
C PERALATAN
Jumlah Harga Peralatan

D Jumlah (A+B+C) 84,160


E Overhead & Profit 10 % 8,416
F Harga Satuan Pekerjaan (D + E) 92,576
A.2.3.1.5. Penggalian 1m3 tanah cadas sedalam 1 m
No Uraian Kode Satuan Koefesien Harga Satuan Jumlah Harga (Rp.)
(Rp)
A TENAGA
Pekerja L.01 OH 1.500 80,000.00 120,000
Mandor L.04 OH 0.060 130,000.00 7,800

Jumlah Harga Tenaga Kerja 127,800


B BAHAN
Jumlah Harga bahan
C PERALATAN
Jumlah Harga Peralatan

D Jumlah (A+B+C) 127,800


E Overhead & Profit 10 % 12,780
F Harga Satuan Pekerjaan (D + E) 140,580

A.2.3.1.7. Pengerjaan stripping 1 m2 tanah tebing setinggi 1 meter


Harga Satuan
No Uraian Kode Satuan Koefesien (Rp) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.050 70,000.00 3,500
Mandor L.04 OH 0.005 120,000.00 600

Jumlah Harga Tenaga Kerja 4,100


B BAHAN
Jumlah Harga bahan
C PERALATAN
Jumlah Harga Peralatan

D Jumlah (A+B+C) 4,100


E Overhead & Profit 10 % 410
F Harga Satuan Pekerjaan (D + E) 4,510

A.2.3.1.8. (K3) Pembuangan 1 m3 tanah sejauh 30 m


No Uraian Kode Satuan Koefesien Harga Satuan Jumlah Harga (Rp.)
(Rp)
A TENAGA
Pekerja L.01 OH 0.330 70,000.00 23,100
Mandor L.04 OH 0.010 120,000.00 1,200

Jumlah Harga Tenaga Kerja 24,300


B BAHAN
Jumlah Harga bahan
C PERALATAN
Jumlah Harga Peralatan

D Jumlah (A+B+C) 24,300


E Overhead & Profit 10 % 2,430
F Harga Satuan Pekerjaan (D + E) 26,730

A.2.3.1.9. Pengurugan kembali 1 m3 galian tanah


Harga Satuan
No Uraian Kode Satuan Koefesien Jumlah Harga (Rp.)
(Rp)
A TENAGA
Pekerja L.01 OH 0.500 80,000.00 40,000
Mandor L.04 OH 0.050 130,000.00 6,500

Jumlah Harga Tenaga Kerja 46,500


B BAHAN
Jumlah Harga bahan
C PERALATAN
Jumlah Harga Peralatan

D Jumlah (A+B+C) 46,500


E Overhead & Profit 10 % 4,650
F Harga Satuan Pekerjaan (D + E) 51,150
A.2.3.1.10. (K3) Pemadatan tanah 1 m3 tanah (per 20cm)
Harga Satuan
No Uraian Kode Satuan Koefesien (Rp) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.500 80,000.00 40,000
Mandor L.04 OH 0.050 130,000.00 6,500

Jumlah Harga Tenaga Kerja 46,500


B BAHAN
Jumlah Harga bahan
C PERALATAN
Jumlah Harga Peralatan

D Jumlah (A+B+C) 46,500


E Overhead & Profit 10 % 4,650
F Harga Satuan Pekerjaan (D + E) 51,150

A.2.3.1.11. Pengurugan 1m3 dengan pasir urug


Harga Satuan
No Uraian Kode Satuan Koefesien Jumlah Harga (Rp.)
(Rp)
A TENAGA
Pekerja L.01 OH 0.300 80,000.00 24,000
Mandor L.04 OH 0.010 130,000.00 1,300

Jumlah Harga Tenaga Kerja 25,300


B BAHAN
Pasir urug m3 1.2 89,920.95 107,905
Jumlah Harga bahan 107,905
C PERALATAN
Jumlah Harga Peralatan

D Jumlah (A+B+C) 133,205


E Overhead & Profit 12,5 % 16,651
F Harga Satuan Pekerjaan (D + E) 149,856
A.2.3.1.11(a). Pengurugan 1m3 dengan Tanah urug
No Uraian Kode Satuan Koefesien Harga Satuan Jumlah Harga (Rp.)
(Rp)
A TENAGA
Pekerja L.01 OH 0.300 80,000.00 24,000
Mandor L.04 OH 0.010 130,000.00 1,300

Jumlah Harga Tenaga Kerja 25,300


B BAHAN
Tanah Urug m3 1.2 74,377.87 89,253
Jumlah Harga bahan 89,253
C PERALATAN
Jumlah Harga Peralatan

D Jumlah (A+B+C) 114,553


E Overhead & Profit 10 % 11,455
F Harga Satuan Pekerjaan (D + E) 126,009

A.2.3.1.11(b). Pengurugan 1m3 dengan Timbunan Pilihan


Harga Satuan
No Uraian Kode Satuan Koefesien Jumlah Harga (Rp.)
(Rp)
A TENAGA
Pekerja L.01 OH 0.300 80,000.00 24,000
Mandor L.04 OH 0.010 130,000.00 1,300

Jumlah Harga Tenaga Kerja 25,300


B BAHAN
Tanah urug pilihan m3 1.2 116,029.25 139,235
Jumlah Harga bahan 139,235
C PERALATAN
Jumlah Harga Peralatan

D Jumlah (A+B+C) 164,535


E Overhead & Profit 10 % 16,454
F Harga Satuan Pekerjaan (D + E) 180,989

A.2.3.1.13. Pemasangan 1 m2 lapisan ijuk tebal 10cm untuk bidang resapan


Harga Satuan
No Uraian Kode Satuan Koefesien Jumlah Harga (Rp.)
(Rp)
A TENAGA
Pekerja L.01 OH 0.150 70,000.00 10,500
Mandor L.04 OH 0.015 120,000.00 1,800

Jumlah Harga Tenaga Kerja 12,300


B BAHAN
Ijuk m3 6.00 -
Jumlah Harga bahan -
C PERALATAN
Jumlah Harga Peralatan

D Jumlah (A+B+C) 12,300


E Overhead & Profit 10 % 1,230
F Harga Satuan Pekerjaan (D + E) 13,530

A.2.3.1.14. Pengurugan 1 m3 Sirtu Padat


Harga Satuan
No Uraian Kode Satuan Koefesien Jumlah Harga (Rp.)
(Rp)
A TENAGA
Pekerja L.01 OH 0.250 80,000.00 20,000
Mandor L.04 OH 0.025 130,000.00 3,250

Jumlah Harga Tenaga Kerja 23,250


B BAHAN
Sirtu m3 1.20 154,705.14 185,646
Jumlah Harga bahan 185,646
C PERALATAN
Jumlah Harga Peralatan
D Jumlah (A+B+C) 208,896
E Overhead & Profit 10 % 20,890
F Harga Satuan Pekerjaan (D + E) 229,786
A.3.2.1 HARGA SATUAN PEKERJAAN PONDASI
A.3.2.1.1. Pemasangan 1 m3 pondasi batu belah campuran 1SP : 3 PP
Harga Satuan
No Uraian Kode Satuan Koefesien (Rp) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 1.500 80,000.00 120,000
Tukang Batu L.02 OH 0.750 120,000.00 90,000
Kepala Tukang Baatu L.03 OH 0.075 125,000.00 9,375
Mandor L.04 OH 0.075 130,000.00 9,750

Jumlah Harga Tenaga Kerja 229,125


B BAHAN
Batu Belah m3 1.200 183,464.82 220,158
Semen Portland kg 202.0 1,190.04 240,388
Pasir Pasang m3 0.485 148,754.94 72,146
Jumlah Harga bahan 532,692
C PERALATAN
Jumlah Harga Peralatan

D Jumlah (A+B+C) 761,817


E Overhead & Profit 10 % 76,182
F Harga Satuan Pekerjaan (D + E) 837,999

A.3.2.1.2. Pemasangan 1 m3 pondasi batu belah campuran 1SP : 4 PP


No Uraian Kode Satuan Koefesien Harga Satuan Jumlah Harga (Rp.)
(Rp)
A TENAGA
Pekerja L.01 OH 1.500 80,000.00 120,000
Tukang Batu L.02 OH 0.750 120,000.00 90,000
Kepala Tukang Batu L.03 OH 0.075 125,000.00 9,375
Mandor L.04 OH 0.075 120,000.00 9,000

Jumlah Harga Tenaga Kerja 228,375


B BAHAN
Batu Belah m3 1.200 183,464.82 220,158
Semen Portland kg 163.0 1,190.04 193,976
Pasir Pasang m3 0.520 148,754.94 77,353
Jumlah Harga bahan 491,487
C PERALATAN
Jumlah Harga Peralatan

D Jumlah (A+B+C) 719,862


E Overhead & Profit 10 % 71,986
F Harga Satuan Pekerjaan (D + E) 791,848

A.3.2.1.3. Pemasangan 1 m3 pondasi batu belah campuran 1SP : 5 PP


Harga Satuan
No Uraian Kode Satuan Koefesien Jumlah Harga (Rp.)
(Rp)
A TENAGA
Pekerja L.01 OH 1.500 80,000.00 120,000
Tukang Batu L.02 OH 0.750 120,000.00 90,000
Kepala Tukang Batu L.03 OH 0.075 125,000.00 9,375
Mandor L.04 OH 0.075 130,000.00 9,750

Jumlah Harga Tenaga Kerja 229,125


B BAHAN
Batu Belah m3 1.200 183,464.82 220,158
Semen Portland kg 136.0 1,190.04 161,845
Pasir Pasang m3 0.544 148,754.94 80,923
Jumlah Harga bahan 462,926
C PERALATAN
Jumlah Harga Peralatan

D Jumlah (A+B+C) 692,051


E Overhead & Profit 12,5 % 86,506
F Harga Satuan Pekerjaan (D + E) 778,557
A.3.2.1.3.a Pemasangan 1 m3 pondasi batu belah campuran 1SP : 5 PP dengan batu yang ada
No Uraian Kode Satuan Koefesien Harga Satuan Jumlah Harga (Rp.)
(Rp)
A TENAGA
Pekerja L.01 OH 0.500 70,000.00 35,000
Tukang Batu L.02 OH 0.500 120,000.00 60,000
Kepala Tukang Baatu L.03 OH 0.050 125,000.00 6,250
Mandor L.04 OH 0.050 120,000.00 6,000

Jumlah Harga Tenaga Kerja 107,250


B BAHAN
Batu Belah m3 183,464.82 -
Semen Portland kg 136.0 1,190.04 161,845
Pasir Pasang m3 0.544 148,754.94 80,923
Jumlah Harga bahan 242,768
C PERALATAN
Jumlah Harga Peralatan

D Jumlah (A+B+C) 350,018


E Overhead & Profit 10 % 35,002
F Harga Satuan Pekerjaan (D + E) 385,020

A.3.2.1.9. (K3) Pemasangan 1 m3 batu kosong (anstamping)


No Uraian Kode Satuan Koefesien Harga Satuan Jumlah Harga (Rp.)
(Rp)
A TENAGA
Pekerja L.01 OH 0.780 70,000.00 54,600
Tukang Batu L.02 OH 0.390 120,000.00 46,800
Kepala Tukang Baatu L.03 OH 0.039 125,000.00 4,875
Mandor L.04 OH 0.039 120,000.00 4,680

Jumlah Harga Tenaga Kerja 110,955


B BAHAN
Batu Belah m3 1.200 183,464.82 220,158
Pasir urug m3 0.432 89,920.95 38,846
Jumlah Harga bahan 259,004
C PERALATAN
Jumlah Harga Peralatan

D Jumlah (A+B+C) 369,959


E Overhead & Profit 10 % 36,996
F Harga Satuan Pekerjaan (D + E) 406,955

P.03.b Siaran dengan Mortar tipe S (Setara Camp. 1 PC : 3PP)


No Uraian Kode Satuan Koefesien Harga Satuan Jumlah Harga (Rp.)
(Rp)
A TENAGA
Pekerja L.01 OH 0.300 80,000.00 24,000
Tukang Batu L.02 OH 0.150 120,000.00 18,000
Kepala Tukang Baatu L.03 OH 0.015 125,000.00 1,875
Mandor L.04 OH 0.030 130,000.00 3,900

Jumlah Harga Tenaga Kerja 47,775


B BAHAN
Pasir pasang m3 0.018 148,754.94 2,678
Portland cement kg 4.840 1,190.04 5,760
Jumlah Harga bahan 8,437
C PERALATAN
Jumlah Harga Peralatan

D Jumlah (A+B+C) 56,212


E Overhead & Profit 10 % 5,621
F Harga Satuan Pekerjaan (D + E) 61,834

P.04.b Plesteran tebal 1 cm, dengan Mortar tipe S (Setara Camp. 1 PC : 3PP)
No Uraian Kode Satuan Koefesien Harga Satuan Jumlah Harga (Rp.)
(Rp)
A TENAGA
Pekerja L.01 OH 0.300 80,000.00 24,000
Tukang Batu L.02 OH 0.150 120,000.00 18,000
Kepala Tukang Baatu L.03 OH 0.015 125,000.00 1,875
Mandor L.04 OH 0.030 130,000.00 3,900

Jumlah Harga Tenaga Kerja 47,775


B BAHAN
Pasir pasang m3 0.016 148,754.94 2,380
Portland cement kg 5.840 1,190.04 6,950
Jumlah Harga bahan 9,330
C PERALATAN
Jumlah Harga Peralatan

D Jumlah (A+B+C) 57,105


E Overhead & Profit 10 % 5,710
F Harga Satuan Pekerjaan (D + E) 62,815
P.04.g 1 m2 Pekerjaan Acian
No Uraian Kode Satuan Koefesien Harga Satuan Jumlah Harga (Rp.)
(Rp)
A TENAGA
Pekerja L.01 OH 0.200 80,000.00 16,000
Tukang Batu L.02 OH 0.100 120,000.00 12,000
Kepala Tukang Baatu L.03 OH 0.010 125,000.00 1,250
Mandor L.04 OH 0.020 130,000.00 2,600

Jumlah Harga Tenaga Kerja 31,850


B BAHAN
Pasir pasang m3 0.000 148,754.94 -
Portland cement kg 3.250 1,190.04 3,868
Jumlah Harga bahan 3,868
C PERALATAN
Jumlah Harga Peralatan

D Jumlah (A+B+C) 35,718


E Overhead & Profit 10 % 3,572
F Harga Satuan Pekerjaan (D + E) 39,289

A.4.1.1 HARGA SATUAN PEKERJAAN BETON


A.4.1.1.2 Membuat 1 m3 beton mutu f'c = 9.8 Mpa (ek = K125)
No Uraian Kode Satuan Koefesien Harga Satuan Jumlah Harga (Rp.)
(Rp)
A TENAGA
Pekerja L.01 OH 1.650 80,000.00 132,000
Tukang Batu L.02 OH 0.275 120,000.00 33,000
Kepala Tukang Baatu L.03 OH 0.028 125,000.00 3,500
Mandor L.04 OH 0.083 130,000.00 10,790

Jumlah Harga Tenaga Kerja 179,290


B BAHAN
Semen Portland kg 276.000 1,190.04 328,451
Pasir beton kg 828.000 135.58 112,264
Kerikil (makx 30 mm) kg 1012.000 211.56 214,101
Air liter 215.000 100.00 21,500
Jumlah Harga bahan 676,316
C PERALATAN
Jumlah Harga Peralatan

D Jumlah (A+B+C) 855,606


E Overhead & Profit 12,5 % 106,951
F Harga Satuan Pekerjaan (D + E) 962,557

A.4.1.1.3 Membuat 1 m3 beton mutu f'c = 12.2 Mpa (ek = K144)


Harga Satuan
No Uraian Kode Satuan Koefesien Jumlah Harga (Rp.)
(Rp)
A TENAGA
Pekerja L.01 OH 1.650 80,000.00 132,000
Tukang Batu L.02 OH 0.275 120,000.00 33,000
Kepala Tukang Baatu L.03 OH 0.028 125,000.00 3,500
Mandor L.04 OH 0.083 130,000.00 10,790

Jumlah Harga Tenaga Kerja 179,290


B BAHAN
Semen Portland kg 299.000 1,190.04 355,822
Pasir beton kg 799.000 135.58 108,332
Kerikil (makx 30 mm) kg 1017.000 211.56 215,159
Air liter 215.000 100.00 21,500
Jumlah Harga bahan 700,813
C PERALATAN
Jumlah Harga Peralatan

D Jumlah (A+B+C) 880,103


E Overhead & Profit 10 % 88,010
F Harga Satuan Pekerjaan (D + E) 968,113
A.4.1.1.5 Membuat 1 m3 beton mutu f'c = 14.5 Mpa (ek = K 175)
Harga Satuan
No Uraian Kode Satuan Koefesien (Rp) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 1.650 70,000.00 115,500
Tukang Batu L.02 OH 0.275 120,000.00 33,000
Kepala Tukang Baatu L.03 OH 0.028 125,000.00 3,500
Mandor L.04 OH 0.083 120,000.00 9,960

Jumlah Harga Tenaga Kerja 161,960


B BAHAN
Semen Portland kg 326.000 1,233.20 402,024
Pasir beton kg 760.000 135.58 103,044
Kerikil (max 30 mm) kg 1029.000 211.56 217,698
Air liter 215.000 100.00 21,500
Jumlah Harga bahan 744,266
C PERALATAN
Jumlah Harga Peralatan

D Jumlah (A+B+C) 906,226


E Overhead & Profit 10 % 90,623
F Harga Satuan Pekerjaan (D + E) 996,848
A.4.1.1.7 Membuat 1 m3 beton mutu f'c = 19.3 Mpa (ek = K 225)
No Uraian Kode Satuan Koefesien Harga Satuan Jumlah Harga (Rp.)
(Rp)
A TENAGA
Pekerja L.01 OH 1.650 80,000.00 132,000
Tukang Batu L.02 OH 0.275 120,000.00 33,000
Kepala Tukang Baatu L.03 OH 0.028 125,000.00 3,500
Mandor L.04 OH 0.083 130,000.00 10,790

Jumlah Harga Tenaga Kerja 179,290


B BAHAN
Semen Portland kg 371.000 1,190.04 441,505
Pasir beton kg 698.000 135.58 94,638
Kerikil (max 30 mm) kg 1047.000 211.56 221,506
Air liter 215.000 100.00 21,500
Jumlah Harga bahan 779,148
C PERALATAN
Jumlah Harga Peralatan

D Jumlah (A+B+C) 958,438


E Overhead & Profit 10 % 95,844
F Harga Satuan Pekerjaan (D + E) 1,054,282

A.4.1.1.17 Pembesian 10 kg dengan besi polos atau besi ulir


No Uraian Kode Satuan Koefesien Harga Satuan Jumlah Harga (Rp.)
(Rp)
A TENAGA
Pekerja L.01 OH 0.070 80,000.00 5,600
Tukang Besi L.02 OH 0.070 120,000.00 8,400
Kepala Tukang Besi L.03 OH 0.007 125,000.00 875
Mandor L.04 OH 0.004 130,000.00 520

Jumlah Harga Tenaga Kerja 15,395


B BAHAN
Besi beton (polos/ulir) kg 10.500 9,123.32 95,795
Kawat Beton kg 0.150 24,792.89 3,719

Jumlah Harga bahan 99,514


C PERALATAN
Jumlah Harga Peralatan

D Jumlah (A+B+C) 114,909


E Overhead & Profit 10 % 11,491
F Harga Satuan Pekerjaan (D + E) 126,400

A.4.1.1.20 (K3) Pemasangan 1 m2 bekisting untuk pondasi


Harga Satuan
No Uraian Kode Satuan Koefesien Jumlah Harga (Rp.)
(Rp)
A TENAGA
Pekerja L.01 OH 0.520 80,000.00 41,600
Tukang Kayu L.02 OH 0.260 120,000.00 31,200
Kepala Tukang Kayu L.03 OH 0.026 125,000.00 3,250
Mandor L.04 OH 0.026 130,000.00 3,380

Jumlah Harga Tenaga Kerja 79,430


B BAHAN
Kayu begesting m3 0.040 1,785,059.29 71,402
Paku 5-10 cm kg 0.300 19,833.99 5,950
Minyak bekisting liter 0.100 26,379.45 2,638
Jumlah Harga bahan 79,991
C PERALATAN
Jumlah Harga Peralatan

D Jumlah (A+B+C) 159,421


E Overhead & Profit 10 % 15,942
F Harga Satuan Pekerjaan (D + E) 175,363
A.4.1.1.21 (K3) Pemasangan 1 m2 bekisting
No Uraian Kode Satuan Koefesien Harga Satuan Jumlah Harga (Rp.)
(Rp)
A TENAGA
Pekerja L.01 OH 0.520 80,000.00 41,600
Tukang Kayu L.02 OH 0.260 120,000.00 31,200
Kepala Tukang Kayu L.03 OH 0.026 125,000.00 3,250
Mandor L.04 OH 0.026 130,000.00 3,380

Jumlah Harga Tenaga Kerja 79,430


B BAHAN
Kayu begesting m3 0.045 1,785,059.29 80,328
Paku 5-10 cm kg 0.300 19,833.99 5,950
Minyak bekisting liter 0.100 26,379.45 2,638
Jumlah Harga bahan 88,916
C PERALATAN
Jumlah Harga Peralatan

D Jumlah (A+B+C) 168,346


E Overhead & Profit 10 % 16,835
F Harga Satuan Pekerjaan (D + E) 185,180

A.4.1.1.22 (K3) Pemasangan 1 m2 bekisting untuk kolom


No Uraian Kode Satuan Koefesien Harga Satuan Jumlah Harga (Rp.)
(Rp)
A TENAGA
Pekerja L.01 OH 0.660 80,000.00 52,800
Tukang Kayu L.02 OH 0.330 120,000.00 39,600
Kepala Tukang Kayu L.03 OH 0.033 125,000.00 4,125
Mandor L.04 OH 0.033 130,000.00 4,290

Jumlah Harga Tenaga Kerja 100,815


B BAHAN
Kayu begesting m3 0.040 1,785,059.29 71,402
Paku 5-10 cm kg 0.400 19,833.99 7,934
Minyak bekisting liter 0.200 26,379.45 5,276
Balok Kayu Klas III m3 0.015 4,462,648.22 66,940
Playwood Tebal 9 mm Lembar 0.350 99,169.96 34,709
Dolken Kayu D8-10 p 4 m Batang 2.000 35,105.93 70,212

Jumlah Harga bahan 256,473


C PERALATAN
Jumlah Harga Peralatan

D Jumlah (A+B+C) 357,288


E Overhead & Profit 10 % 35,729
F Harga Satuan Pekerjaan (D + E) 393,017

A.4.1.1.23 (K3) Pemasangan 1 m2 bekisting untuk balok


No Uraian Kode Satuan Koefesien Harga Satuan Jumlah Harga (Rp.)
(Rp)
A TENAGA
Pekerja L.01 OH 0.660 80,000.00 52,800
Tukang Kayu L.02 OH 0.330 120,000.00 39,600
Kepala Tukang Kayu L.03 OH 0.033 125,000.00 4,125
Mandor L.04 OH 0.033 130,000.00 4,290

Jumlah Harga Tenaga Kerja 100,815


B BAHAN
Kayu begesting m3 0.040 1,785,059.29 71,402
Paku 5-10 cm kg 0.400 19,833.99 7,934
Minyak bekisting liter 0.200 26,379.45 5,276
Balok Kayu Klas III m3 0.018 4,462,648.22 80,328
Playwood Tebal 9 mm Lembar 0.350 99,169.96 34,709
Dolken Kayu D8-10 p 4 m Batang 2.000 35,105.93 70,212

Jumlah Harga bahan 269,861


C PERALATAN
Jumlah Harga Peralatan

D Jumlah (A+B+C) 370,676


E Overhead & Profit 10 % 37,068
F Harga Satuan Pekerjaan (D + E) 407,743

A.4.1.1.24 (K3) Pemasangan 1 m2 bekisting untuk lantai


Harga Satuan
No Uraian Kode Satuan Koefesien Jumlah Harga (Rp.)
(Rp)
A TENAGA
Pekerja L.01 OH 0.660 80,000.00 52,800
Tukang Kayu L.02 OH 0.330 120,000.00 39,600
Kepala Tukang Kayu L.03 OH 0.033 125,000.00 4,125
Mandor L.04 OH 0.033 130,000.00 4,290

Jumlah Harga Tenaga Kerja 100,815


B BAHAN
Kayu begesting m3 0.040 1,785,059.29 71,402
Paku 5-10 cm kg 0.400 19,833.99 7,934
Minyak bekisting liter 0.200 26,379.45 5,276
Balok Kayu Klas III m3 0.015 4,462,648.22 66,940
Playwood Tebal 9 mm Lembar 0.350 99,169.96 34,709
Dolken Kayu D8-10 p 4 m Batang 6.000 35,105.93 210,636

Jumlah Harga bahan 396,897


C PERALATAN
Jumlah Harga Peralatan

D Jumlah (A+B+C) 497,712


E Overhead & Profit 10 % 49,771
F Harga Satuan Pekerjaan (D + E) 547,483

A.4.1.1.27 Pemasangan 1 m2 jembatan untuk pengecoran beton


No Uraian Kode Satuan Koefesien Harga Satuan Jumlah Harga (Rp.)
(Rp)
A TENAGA
Pekerja L.01 OH 0.150 80,000.00 12,000
Tukang Kayu L.02 OH 0.050 120,000.00 6,000
Kepala Tukang Kayu L.03 OH 0.005 125,000.00 625
Mandor L.04 OH 0.008 130,000.00 1,040

Jumlah Harga Tenaga Kerja 19,665


B BAHAN
Kayu begesting m3 0.026 1,785,059.29 47,126
Paku 5-12 cm kg 0.400 19,833.99 7,934
Dolken Kayu D8-10 p 4 m Batang 0.500 35,105.93 17,553

Jumlah Harga bahan 72,612


C PERALATAN
Jumlah Harga Peralatan

D Jumlah (A+B+C) 92,277


E Overhead & Profit 10 % 9,228
F Harga Satuan Pekerjaan (D + E) 101,505

A.4.1.1.35. Membuat 1m' kolom praktis beton bertulang (11 x 11 ) cm


No Uraian Kode Satuan Koefesien Harga Satuan Jumlah Harga (Rp.)
(Rp)
A TENAGA
Pekerja L.01 OH 0.180 80,000.00 14,400
Tukang Batu L.02 OH 0.020 120,000.00 2,400
Tukang Kayu L.02 OH 0.020 120,000.00 2,400
Tukang Besi L.02 OH 0.020 120,000.00 2,400
Kepala Tukang L.03 OH 0.006 125,000.00 750
Mandor L.04 OH 0.009 130,000.00 1,170
Jumlah Harga Tenaga Kerja 23,520
B BAHAN
Kayu begesting m3 0.002 1,785,059.29 3,570
Paku 5-12 cm kg 0.010 19,833.99 198
Minyak bekisting liter 0.200 26,379.45 5,276
Besi beton polos kg 3.000 9,123.32 27,370
Kawat Beton kg 0.450 24,792.89 11,157
Semen Portland kg 4.000 1,130.55 4,522
Pasir Beton m3 0.006 173,547.83 1,041
Kerikil m3 0.009 253,875.10 2,285
Jumlah Harga bahan 55,419
C PERALATAN
Jumlah Harga Peralatan

D Jumlah (A+B+C) 78,939


E Overhead & Profit 10 % 7,894
F Harga Satuan Pekerjaan (D + E) 86,833

A.4.1.1.36. Membuat 1m' ring balok beton bertulang (10 x 15 ) cm


Harga Satuan
No Uraian Kode Satuan Koefesien (Rp) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.297 80,000.00 23,760
Tukang Batu L.02 OH 0.033 120,000.00 3,960
Tukang Kayu L.02 OH 0.033 120,000.00 3,960
Tukang Besi L.02 OH 0.033 120,000.00 3,960
Kepala Tukang L.03 OH 0.010 125,000.00 1,250
Mandor L.04 OH 0.150 130,000.00 19,500

Jumlah Harga Tenaga Kerja 56,390


B BAHAN
Kayu begesting m3 0.003 1,785,059.29 5,355
Paku 5-12 cm kg 0.020 19,833.99 397
Minyak bekisting liter 0.200 26,379.45 5,276
Besi beton polos kg 3.600 9,123.32 32,844
Kawat Beton kg 0.050 24,792.89 1,240
Semen Portland kg 5.500 1,190.04 6,545
Pasir Beton m3 0.009 173,547.83 1,562
Kerikil m3 0.015 253,875.10 3,808
Jumlah Harga bahan 57,027
C PERALATAN
Jumlah Harga Peralatan

D Jumlah (A+B+C) 113,417


E Overhead & Profit 10 % 11,342
F Harga Satuan Pekerjaan (D + E) 124,758

A.4.2.1 HARGA SATUAN PEKERJAAN BESI DAN ALUMINIUM


A.4.2.1.11. Pemasangan 1 m kusen pintu aluminium
No Uraian Kode Satuan Koefesien Harga Satuan Jumlah Harga (Rp.)
(Rp)
A TENAGA
Pekerja L.01 OH 0.043 80,000.00 3,440
Tukang khusus aluminium L.03 OH 0.043 120,000.00 5,160
Kepala tukang L.03 OH 0.004 125,000.00 538
Mandor L.04 OH 0.002 130,000.00 273

Jumlah Harga Tenaga Kerja 9,411


B BAHAN
Profile aluminium m' 1.100 100,000.00 110,000
Skrup fixer buah 2.000 1,000.00 2,000
Sealant Tube 0.060 35,000.00 2,100

Jumlah Harga bahan 114,100


C PERALATAN
Jumlah Harga Peralatan

D Jumlah (A+B+C) 123,511


E Overhead & Profit 10 % 12,351
F Harga Satuan Pekerjaan (D + E) 135,862

A.4.2.1.13. Pemasangan 1 m2 pintu kaca rangka aluminium


No Uraian Kode Satuan Koefesien Harga Satuan Jumlah Harga (Rp.)
(Rp)
A TENAGA
Pekerja L.01 OH 0.085 80,000.00 6,800
Tukang khusus aluminium L.03 OH 0.085 120,000.00 10,200
Kepala tukang L.03 OH 0.009 125,000.00 1,125
Mandor L.04 OH 0.005 130,000.00 650

Jumlah Harga Tenaga Kerja 18,775


B BAHAN
Pintu aluminium m' 4.400 100,000.00 440,000
Profile Kaca m' 1.100 228,090.91 250,900
Sealant Tube 0.060 35,000.00 2,100

Jumlah Harga bahan 693,000


C PERALATAN
Jumlah Harga Peralatan

D Jumlah (A+B+C) 711,775


E Overhead & Profit 10 % 71,178
F Harga Satuan Pekerjaan (D + E) 782,953

A.4.4.1 HARGA SATUAN PEKERJAAN PASANGAN DINDING


A.4.4.1.8 Pemasangan 1 m2 didnding bata merah (5x11x22) cm tebal 1/2 bata campuran 1 SP: 3PP
Harga Satuan
No Uraian Kode Satuan Koefesien (Rp) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.300 80,000.00 24,000
Tukang Batu L.02 OH 0.100 120,000.00 12,000
Kepala Tukang L.03 OH 0.010 125,000.00 1,250
Mandor L.04 OH 0.015 130,000.00 1,950

Jumlah Harga Tenaga Kerja 39,200


B BAHAN
Bata merah buah 70.000 855.37 59,876
Semen Portland kg 14.370 1,190.04 17,101
Pasir Pasang m3 0.040 148,754.94 5,950

Jumlah Harga bahan 82,927


C PERALATAN
Jumlah Harga Peralatan

D Jumlah (A+B+C) 122,127


E Overhead & Profit 10 % 12,213
F Harga Satuan Pekerjaan (D + E) 134,340

A.4.4.1.10 Pemasangan 1 m2 didnding bata merah (5x11x22) cm tebal 1/2 bata campuran 1 SP: 5PP
Harga Satuan
No Uraian Kode Satuan Koefesien Jumlah Harga (Rp.)
(Rp)
A TENAGA
Pekerja L.01 OH 0.300 80,000.00 24,000
Tukang Batu L.02 OH 0.100 120,000.00 12,000
Kepala Tukang L.03 OH 0.010 125,000.00 1,250
Mandor L.04 OH 0.015 130,000.00 1,950

Jumlah Harga Tenaga Kerja 39,200


B BAHAN
Bata merah buah 70.000 855.37 59,876
Semen Portland kg 9.680 1,190.04 11,520
Pasir Pasang m3 0.045 148,754.94 6,694

Jumlah Harga bahan 78,090


C PERALATAN
Jumlah Harga Peralatan

D Jumlah (A+B+C) 117,290


E Overhead & Profit 10 % 11,729
F Harga Satuan Pekerjaan (D + E) 129,019

A.4.4.2 HARGA SATUAN PLESTERAN


A.4.4.2.3. Pemasangan 1 m2 PLESTERAN 1 SP : 3 PP TEBAL 15mm
Harga Satuan
No Uraian Kode Satuan Koefesien Jumlah Harga (Rp.)
(Rp)
A TENAGA
Pekerja L.01 OH 0.300 80,000.00 24,000
Tukang Batu L.02 OH 0.150 120,000.00 18,000
Kepala Tukang L.03 OH 0.015 125,000.00 1,875
Mandor L.04 OH 0.015 130,000.00 1,950

Jumlah Harga Tenaga Kerja 45,825


B BAHAN
PC kg 7.776 1,190.04 9,254
PP m3 0.023 148,754.94 3,421

Jumlah Harga bahan 12,675


C PERALATAN
Jumlah Harga Peralatan

D Jumlah (A+B+C) 58,500


E Overhead & Profit 12,5 % 7,313
F Harga Satuan Pekerjaan (D + E) 65,813

A.4.4.2.5. Pemasangan 1 m2 PLESTERAN 1 SP : 4 PP TEBAL 15 mm


No Uraian Kode Satuan Koefesien Harga Satuan Jumlah Harga (Rp.)
(Rp)
A TENAGA
Pekerja L.01 OH 0.300 80,000.00 24,000
Tukang Batu L.02 OH 0.150 120,000.00 18,000
Kepala Tukang L.03 OH 0.015 125,000.00 1,875
Mandor L.04 OH 0.015 130,000.00 1,950

Jumlah Harga Tenaga Kerja 45,825


B BAHAN
PC kg 6.240 1,190.04 7,426
PP m3 0.024 148,754.94 3,570

Jumlah Harga bahan 10,996


C PERALATAN
Jumlah Harga Peralatan

D Jumlah (A+B+C) 56,821


E Overhead & Profit 10 % 5,682
F Harga Satuan Pekerjaan (D + E) 62,503

A.4.4.2.23. Pemasangan 1 m2 plesteran ciprat 1 SP : 2PP


No Uraian Kode Satuan Koefesien Harga Satuan Jumlah Harga (Rp.)
(Rp)
A TENAGA
Pekerja L.01 OH 0.300 80,000.00 24,000
Tukang Batu L.02 OH 0.100 120,000.00 12,000
Kepala Tukang L.03 OH 0.010 125,000.00 1,250
Mandor L.04 OH 0.015 130,000.00 1,950
Jumlah Harga Tenaga Kerja 39,200
B BAHAN
SEMEN PC kg 4.320 1,190.04 5,141
Pasir pasang m3 0.006 148,754.94 893

Jumlah Harga bahan 6,034


C PERALATAN
Jumlah Harga Peralatan

D Jumlah (A+B+C) 45,234


E Overhead & Profit 10 % 4,523
F Harga Satuan Pekerjaan (D + E) 49,757

A.4.4.2.26. Pemasangan 1 m2 finishing siar pasangan batu kali campuran 1 SP : 2 PP


Harga Satuan
No Uraian Kode Satuan Koefesien Jumlah Harga (Rp.)
(Rp)
A TENAGA
Pekerja L.01 OH 0.300 80,000.00 24,000
Tukang Batu L.02 OH 0.150 120,000.00 18,000
Kepala Tukang L.03 OH 0.015 125,000.00 1,875
Mandor L.04 OH 0.015 130,000.00 1,950

Jumlah Harga Tenaga Kerja 45,825


B BAHAN
SEMEN PC kg 6.340 1,190.04 7,545
Pasir pasang m3 0.012 148,754.94 1,785

Jumlah Harga bahan 9,330


C PERALATAN
Jumlah Harga Peralatan

D Jumlah (A+B+C) 55,155


E Overhead & Profit 12,5 % 6,894
F Harga Satuan Pekerjaan (D + E) 62,049

A.4.4.2.27. Pemasangan 1 m2 acian


Harga Satuan
No Uraian Kode Satuan Koefesien Jumlah Harga (Rp.)
(Rp)
A TENAGA
Pekerja L.01 OH 0.200 80,000.00 16,000
Tukang Batu L.02 OH 0.100 120,000.00 12,000
Kepala Tukang L.03 OH 0.010 125,000.00 1,250
Mandor L.04 OH 0.010 130,000.00 1,300

Jumlah Harga Tenaga Kerja 30,550


B BAHAN
SEMEN PC kg 3.250 1,190.04 3,868

Jumlah Harga bahan 3,868


C PERALATAN
Jumlah Harga Peralatan

D Jumlah (A+B+C) 34,418


E Overhead & Profit 12,5 % 4,302
F Harga Satuan Pekerjaan (D + E) 38,720

A.4.4.3. HARGA SATUAN PEKERJAAN PENUTUP LANTAI


A.4.4.3.9. Pemasangan 1 m2 lantai ubin granit ukuran 40 x 40 cm
Harga Satuan
No Uraian Kode Satuan Koefesien (Rp) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.250 80,000.00 20,000
Tukang Batu L.02 OH 0.125 120,000.00 15,000
Kepala Tukang L.03 OH 0.013 125,000.00 1,625
Mandor L.04 OH 0.013 130,000.00 1,690
Jumlah Harga Tenaga Kerja 38,315
B BAHAN
Ubin Granit bh 6.630 32,379.45 214,676
Semen portland kg 9.800 1,233.20 12,085
semen warna kg 1.300 15,106.72 19,639
Pasir pasang m3 0.045 205,533.60 9,249

Jumlah Harga bahan 255,649


C PERALATAN
Jumlah Harga Peralatan

D Jumlah (A+B+C) 293,964


E Overhead & Profit 10 % 29,396
F Harga Satuan Pekerjaan (D + E) 323,360

A.4.4.3.10. Pemasangan 1 m2 lantai ubin granit ukuran 30 x 30 cm


Harga Satuan
No Uraian Kode Satuan Koefesien (Rp) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.260 80,000.00 20,800
Tukang Batu L.02 OH 0.130 120,000.00 15,600
Kepala Tukang L.03 OH 0.013 125,000.00 1,625
Mandor L.04 OH 0.013 130,000.00 1,690

Jumlah Harga Tenaga Kerja 39,715


B BAHAN
Ubin Granit bh 11.870 18,213.44 216,194
Semen portland kg 10.000 1,233.20 12,332
semen warna kg 1.500 15,106.72 22,660
Pasir pasang m3 0.045 205,533.60 9,249

Jumlah Harga bahan 260,435


C PERALATAN
Jumlah Harga Peralatan

D Jumlah (A+B+C) 300,150


E Overhead & Profit 10 % 30,015
F Harga Satuan Pekerjaan (D + E) 330,165

A.4.4.3.35. Pemasangan 1 m2 lantai keramik ukuran 30 x 30 cm


Harga Satuan
No Uraian Kode Satuan Koefesien Jumlah Harga (Rp.)
(Rp)
A TENAGA
Pekerja L.01 OH 0.700 80,000.00 56,000
Tukang Batu L.02 OH 0.350 120,000.00 42,000
Kepala Tukang L.03 OH 0.035 125,000.00 4,375
Mandor L.04 OH 0.035 130,000.00 4,550

Jumlah Harga Tenaga Kerja 106,925


B BAHAN
Ubin keramik doos 1.050 92,490.12 97,115
Semen portland kg 10.000 1,233.20 12,332
semen warna kg 0.500 15,106.72 7,553
Pasir pasang m3 0.045 205,533.60 9,249

Jumlah Harga bahan 126,249


C PERALATAN
Jumlah Harga Peralatan

D Jumlah (A+B+C) 233,174


E Overhead & Profit 10 % 23,317
F Harga Satuan Pekerjaan (D + E) 256,491

A.4.4.3.54. Pemasangan 1 m2 dinding keramik ukuran 20 x 20 cm


No Uraian Kode Satuan Koefesien Harga Satuan Jumlah Harga (Rp.)
(Rp)
A TENAGA
Pekerja L.01 OH 0.900 80,000.00 72,000
Tukang Batu L.02 OH 0.450 120,000.00 54,000
Kepala Tukang L.03 OH 0.045 125,000.00 5,625
Mandor L.04 OH 0.045 130,000.00 5,850

Jumlah Harga Tenaga Kerja 137,475


B BAHAN
Ubin keramik doos 1.050 92,490.12 97,115
Semen portland kg 9.300 1,233.20 11,469
semen warna kg 1.940 15,106.72 29,307
Pasir pasang m3 0.018 205,533.60 3,700

Jumlah Harga bahan 141,590


C PERALATAN
Jumlah Harga Peralatan

D Jumlah (A+B+C) 279,065


E Overhead & Profit 10 % 27,907
F Harga Satuan Pekerjaan (D + E) 306,972

A.4.4.3.57. Pemasangan 1 m2 dinding batu paras


No Uraian Kode Satuan Koefesien Harga Satuan Jumlah Harga (Rp.)
(Rp)
A TENAGA
Pekerja L.01 OH 0.700 80,000.00 56,000
Tukang Batu L.02 OH 0.350 120,000.00 42,000
Kepala Tukang L.03 OH 0.035 125,000.00 4,375
Mandor L.04 OH 0.035 130,000.00 4,550

Jumlah Harga Tenaga Kerja 106,925


B BAHAN
Batu paras m2 1.100 128,920.95 141,813
Semen portland kg 11.750 1,233.20 14,490
Pasir pasang m3 0.035 205,533.60 7,194

Jumlah Harga bahan 163,497


C PERALATAN
Jumlah Harga Peralatan

D Jumlah (A+B+C) 270,422


E Overhead & Profit 10 % 27,042
F Harga Satuan Pekerjaan (D + E) 297,464

A.4.4.3.58. Pemasangan 1 m2 dinding batu tempel hitam


No Uraian Kode Satuan Koefesien Harga Satuan Jumlah Harga (Rp.)
(Rp)
A TENAGA
Pekerja L.01 OH 0.700 80,000.00 56,000
Tukang Batu L.02 OH 0.350 120,000.00 42,000
Kepala Tukang L.03 OH 0.035 125,000.00 4,375
Mandor L.04 OH 0.035 130,000.00 4,550

Jumlah Harga Tenaga Kerja 106,925


B BAHAN
Batu tempel hitam m2 1.100 101,185.77 111,304
Semen portland kg 11.750 1,233.20 14,490
Pasir pasang m3 0.035 205,533.60 7,194

Jumlah Harga bahan 132,988


C PERALATAN
Jumlah Harga Peralatan

D Jumlah (A+B+C) 239,913


E Overhead & Profit 10 % 23,991
F Harga Satuan Pekerjaan (D + E) 263,904
A.4.4.3.63. Pemasangan 1 m' plint kayu tebal 2 cm lebar 10 cm
No Uraian Kode Satuan Koefesien Harga Satuan Jumlah Harga (Rp.)
(Rp)
A TENAGA
Pekerja L.01 OH 0.120 80,000.00 9,600
Tukang kayu L.02 OH 0.120 120,000.00 14,400
Kepala Tukang L.03 OH 0.012 125,000.00 1,500
Mandor L.04 OH 0.012 130,000.00 1,560

Jumlah Harga Tenaga Kerja 27,060


B BAHAN
Papan kayu klas 1 M3 0.003 11,900,395.26 35,701
Paku / Skrup 5 cm kg 0.050 20,237.15 1,012

Jumlah Harga bahan 36,713


C PERALATAN
Jumlah Harga Peralatan

D Jumlah (A+B+C) 63,773


E Overhead & Profit 10 % 6,377
F Harga Satuan Pekerjaan (D + E) 70,150
A.4.4.3. HARGA SATUAN PEKERJAAN PENUTUP LANTAI
A.4.4.3.64. Pemasangan 1 m2 paving block natural 6 cm
Harga Satuan
No Uraian Kode Satuan Koefesien (Rp) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.250 80,000.00 20,000
Tukang batu L.02 OH 0.500 120,000.00 60,000
Kepala Tukang L.03 OH 0.050 125,000.00 6,250
Mandor L.04 OH 0.0013 130,000.00 169

Jumlah Harga Tenaga Kerja 86,419


B BAHAN
Paving block 6 cm m2 1.010 82,807.11 83,635
Pasir beton m3 0.050 148,754.94 7,438

Jumlah Harga bahan 91,073


C PERALATAN
% 10 910.73 9,107
Jumlah Harga Peralatan 9,107

D Jumlah (A+B+C) 186,599


E Overhead & Profit 10 % 18,660
F Harga Satuan Pekerjaan (D + E) 205,259

A.4.4.3.65. Pemasangan 1 m2 paving block natural 8 cm


Harga Satuan
No Uraian Kode Satuan Koefesien Jumlah Harga (Rp.)
(Rp)
A TENAGA
Pekerja L.01 OH 0.500 80,000.00 40,000
Tukang batu L.02 OH 0.500 120,000.00 60,000
Kepala Tukang L.03 OH 0.050 125,000.00 6,250
Mandor L.04 OH 0.0013 130,000.00 169

Jumlah Harga Tenaga Kerja 106,419


B BAHAN
Paving block 8 cm natural m2 1.010 97,682.21 98,659
Pasir beton m3 0.050 148,754.94 7,438

Jumlah Harga bahan 106,097


C PERALATAN
% 10 1,060.97 10,610
Jumlah Harga Peralatan 10,610

D Jumlah (A+B+C) 223,125


E Overhead & Profit 10 % 22,313
F Harga Satuan Pekerjaan (D + E) 245,438
A.4.5.1. HARGA SATUAN PEKERJAAN LANGIT-LANGIT (PLAFOND)
A.4.5.1.1. Pemasangan 1 m2 langit-langit gypsum board ukuran (120 x 240 ) cm tebal 9 mm
Harga Satuan
No Uraian Kode Satuan Koefesien (Rp) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.100 80,000.00 8,000
Tukang batu L.02 OH 0.050 120,000.00 6,000
Kepala Tukang L.03 OH 0.005 125,000.00 625
Mandor L.04 OH 0.0050 130,000.00 650

Jumlah Harga Tenaga Kerja 15,275


B BAHAN
Gypsum Board Lembar 0.364 56,521.74 20,574
Paku skrup Kg 0.110 25,296.44 2,783

Jumlah Harga bahan 23,357


C PERALATAN

Jumlah Harga Peralatan -

D Jumlah (A+B+C) 38,632


E Overhead & Profit 10 % 3,863
F Harga Satuan Pekerjaan (D + E) 42,495

PERKERASAN DAN LAPIS PERMUKAAN


6.6.1 Lapis Permukaan Penetrasi Macadam (m3)
Harga Satuan
No Uraian Kode Satuan Koefesien Jumlah Harga (Rp.)
(Rp)
A TENAGA
Pekerja Terampil L.01 Jam 0.1417 17,142.86 2,429
Mandor L.04 Jam 0.0142 18,571.43 263

Jumlah Harga Tenaga Kerja 2,692


B BAHAN
Agregat Kasar m3 1.6690 158,671.94 264,826
Agregat Halus m3 0.1479 253,875.10 37,545
Aspal kg 98.586 17,553.36 1,730,511

Jumlah Harga bahan 2,032,881


C PERALATAN
Wheel Loader Jam 0.0071 606,134.22 4,296
Dump Truck Jam 0.2189 185,403.38 40,585
3-Wheel Roller Jam 0.0435 349,191.04 15,184
Asp. Spayer Jam 0.3788 74,990.95 28,406
Jumlah Harga Peralatan 88,470

D Jumlah (A+B+C) 2,124,043


E Overhead & Profit 10 % 212,404
F Harga Satuan Pekerjaan (D + E) 2,336,448

A.4.4.3.38.a.Pemasangan 1 m2 koral sikat


Harga Satuan
No Uraian Kode Satuan Koefesien Jumlah Harga (Rp.)
(Rp)
A TENAGA
Pekerja L.01 OH 0.620 80,000.00 49,600
Tukang batu L.02 OH 0.350 120,000.00 42,000
Kepala Tukang L.03 OH 0.035 125,000.00 4,375
Mandor L.04 OH 0.0300 130,000.00 3,900

Jumlah Harga Tenaga Kerja 99,875


B BAHAN
Semen portland Kg 1.010 1,190.04 1,202
Pasir pasang m3 0.050 148,754.94 7,438
Koral sikat Kg 16.667 2,975.49 49,593
HCL Liter 0.500 24,792.89 12,396
Jumlah Harga bahan 70,629
C PERALATAN
% 10 706.29 7,063
Jumlah Harga Peralatan 7,063

D Jumlah (A+B+C) 177,567


E Overhead & Profit 10 % 17,757
F Harga Satuan Pekerjaan (D + E) 195,323

5.1.(2).a.Mengurug 1 m3 dengan Urugan pilihan menggunakan alat (M3)


Harga Satuan
No Uraian Kode Satuan Koefesien Jumlah Harga (Rp.)
(Rp)
A TENAGA
Pekerja L.01 Jam 0.0595 11,428.57 680
Mandor L.04 Jam 0.0085 18,571.43 158

Jumlah Harga Tenaga Kerja 838


B BAHAN
Urug pilihan m3 1.2478 116,029.25 144,781

Jumlah Harga bahan 144,781


C PERALATAN
Wheel Loader Jam 606,134.22 -
Dump Truck Jam 185,403.38 -
Motor Grader Jam 0.0043 716,459.00 3,052
Tandem Roller Jam 0.0134 546,094.00 7,310
Water tanker Jam 0.0141 309,695.00 4,353
Jumlah Harga Peralatan 14,715

D Jumlah (A+B+C) 160,335


E Overhead & Profit 10 % 16,033
F Harga Satuan Pekerjaan (D + E) 176,368
5.1.(2).c. Perkerasan dengan Lapis Pondasi Agregat kelas C menggunakan alat (M3)
No Uraian Kode Satuan Koefesien Harga Satuan Jumlah Harga (Rp.)
(Rp)
A TENAGA
Pekerja L.01 Jam 0.0595 11,428.57 680
Mandor L.04 Jam 0.0085 18,571.43 158

Jumlah Harga Tenaga Kerja 838


B BAHAN
LPA C m3 1.2478 228,388.14 284,983

Jumlah Harga bahan 284,983


C PERALATAN
Wheel Loader Jam 606,134.22 -
Dump Truck Jam 185,403.38 -
Motor Grader Jam 0.0043 716,459.00 3,052
Tandem Roller Jam 0.0134 546,094.00 7,310
Water tanker Jam 0.0141 309,695.00 4,353
Jumlah Harga Peralatan 14,715

D Jumlah (A+B+C) 300,536


E Overhead & Profit 10 % 30,054
F Harga Satuan Pekerjaan (D + E) 330,590

5.1.(2).b. Perkerasan dengan Sirtu menggunakan alat (M3)


Harga Satuan
No Uraian Kode Satuan Koefesien Jumlah Harga (Rp.)
(Rp)
A TENAGA
Pekerja L.01 Jam 0.0595 11,428.57 680
Mandor L.04 Jam 0.0085 18,571.43 158

Jumlah Harga Tenaga Kerja 838


B BAHAN
Kerikil alam berpasir m3 1.2478 154,705.14 193,041

Jumlah Harga bahan 193,041


C PERALATAN
Wheel Loader Jam 606,134.22 -
Dump Truck Jam 185,403.38 -
Motor Grader Jam 0.0043 716,459.00 3,052
Tandem Roller Jam 0.0134 546,094.00 7,310
Water tanker Jam 0.0141 309,695.00 4,353
Jumlah Harga Peralatan 14,715

D Jumlah (A+B+C) 208,594


E Overhead & Profit 10 % 20,859
F Harga Satuan Pekerjaan (D + E) 229,454
T.15 ANGKUTAN MATERIAL DAN ATAU HASIL GALIAN
T.15.a.5 Mengangkut 1 m3 material atau hasil galian dengan jarak angkut 50 m (datar)
Harga Satuan
No Uraian Kode Satuan Koefesien (Rp) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 Jam 0.4220 80,000.00 33,760
Mandor L.04 Jam 0.0211 130,000.00 2,743

Jumlah Harga Tenaga Kerja 36,503


B BAHAN
Jumlah Harga bahan
C PERALATAN
Jumlah Harga Peralatan

D Jumlah (A+B+C) 36,503


E Overhead & Profit 10 % 3,650
F Harga Satuan Pekerjaan (D + E) 40,153

T.15.a.6 Mengangkut 1 m3 material atau hasil galian dengan jarak angkut 100 m (datar)
Harga Satuan
No Uraian Kode Satuan Koefesien Jumlah Harga (Rp.)
(Rp)
A TENAGA
Pekerja L.01 Jam 0.6000 80,000.00 48,000
Mandor L.04 Jam 0.0300 130,000.00 3,900

Jumlah Harga Tenaga Kerja 51,900


B BAHAN
Jumlah Harga bahan
C PERALATAN
Jumlah Harga Peralatan

D Jumlah (A+B+C) 51,900


E Overhead & Profit 10 % 5,190
F Harga Satuan Pekerjaan (D + E) 57,090
T.15.a.7 Mengangkut 1 m3 material atau hasil galian dengan jarak angkut 200 m (datar)
No Uraian Kode Satuan Koefesien Harga Satuan Jumlah Harga (Rp.)
(Rp)
A TENAGA
Pekerja L.01 Jam 0.9500 80,000.00 76,000
Mandor L.04 Jam 0.0475 130,000.00 6,175

Jumlah Harga Tenaga Kerja 82,175


B BAHAN
Jumlah Harga bahan
C PERALATAN
Jumlah Harga Peralatan

D Jumlah (A+B+C) 82,175


E Overhead & Profit 10 % 8,218
F Harga Satuan Pekerjaan (D + E) 90,393

Pemasangan Kanstein 20x40 (m1)


Harga Satuan
No Uraian Kode Satuan Koefesien Jumlah Harga (Rp.)
(Rp)
A TENAGA
Pekerja L.01 OH 0.1500 80,000.00 12,000
Tukang Batu L.02 OH 0.2000 120,000.00 24,000
Kepala Tukang L.03 OH 0.0200 125,000.00 2,500
Mandor L.04 OH 0.0100 130,000.00 1,300

Jumlah Harga Tenaga Kerja 39,800


B BAHAN
Kansteen bj 2.50 40,362.06 100,905
semen Zak 0.12 56,527.27 6,783
Pasir Pasang m3 0.008 148,754.94 1,190

Jumlah Harga bahan 108,878


C PERALATAN
Jumlah Harga Peralatan

D Jumlah (A+B+C) 148,678


E Overhead & Profit 10 % 14,868
F Harga Satuan Pekerjaan (D + E) 163,546

Pemasangan buis Sigaran Ø 20 cm (M')


Harga Satuan
No Uraian Kode Satuan Koefesien (Rp) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.1500 80,000.00 12,000
Tukang Batu L.02 OH 0.2000 120,000.00 24,000
Kepala Tukang L.03 OH 0.0200 125,000.00 2,500
Mandor L.04 OH 0.0100 130,000.00 1,300

Jumlah Harga Tenaga Kerja 39,800


B BAHAN
Buis sigaran bj 1.00 34,709.88 34,710
semen Zak 0.12 56,527.27 6,783
Pasir Pasang m3 0.008 148,754.94 1,190

Jumlah Harga bahan 42,683


C PERALATAN
Jumlah Harga Peralatan

D Jumlah (A+B+C) 82,483


E Overhead & Profit 10 % 8,248
F Harga Satuan Pekerjaan (D + E) 90,732

A.4.4.1.10 Pemasangan 1 m2 didnding Bata Kelas I (5x11x22) cm tebal 1/2 bata campuran 1 SP: 5Pasir Pasang
Harga Satuan
No Uraian Kode Satuan Koefesien Jumlah Harga (Rp.)
(Rp)
A TENAGA
Pekerja L.01 OH 0.300 80,000.00 24,000
Tukang Batu L.02 OH 0.100 120,000.00 12,000
Kepala Tukang L.03 OH 0.010 125,000.00 1,250
Mandor L.04 OH 0.015 130,000.00 1,950

Jumlah Harga Tenaga Kerja 39,200


B BAHAN
Bata Kelas I buah 70.000 880.99 61,669
Semen PC kg 0.194 1,130.55 219
Pasir Pasang m3 0.045 148,754.94 6,694

Jumlah Harga bahan 68,582


C PERALATAN
Jumlah Harga Peralatan

D Jumlah (A+B+C) 107,782


E Overhead & Profit 10 % 10,778
F Harga Satuan Pekerjaan (D + E) 118,560
REKAPITULASI
ANALISA HARGA SATUAN PEKERJAAN TAHUN 2020

KEGIATAN :
PEKERJAAN :
LOKASI : KABUPATEN LOMBOK TENGAH
TAHUN ANGGARAN : 2020

HARGA
NO KODE JENIS PEKERJAAN SATUAN
(Rp)
A.2.2.1 HARGA SATUAN PEKERJAAN PERSIAPAN
1 A.2.2.1.9. (K3) PEMBERSIHAN 1 M2 LAPANGAN DAN PERATAAN Rp 15,950
2 A.2.2.1.10. (K3) PEMBUATAN 1 M2 STEGER/PERANCAH DARI BAMBU Rp 591,950
3 A.2.2.1.13. PEMBONGKARAN 1M3 BETON BERTULANG Rp 1,114,630
A.2.3.1 HARGA SATUAN PEKERJAAN TANAH
1 A.2.3.1.1. PENGGALIAN 1M3 TANAH BIASA SEDALAM 1 M Rp 69,575
2 A.2.3.1.10. (K3) PEMADATAN TANAH 1 M3 TANAH (PER 20CM) Rp 51,150
3 A.2.3.1.11. PENGURUGAN 1M3 DENGAN PASIR URUG Rp 146,526
4 A.2.3.1.11(a). PENGURUGAN 1M3 DENGAN TANAH URUG Rp 126,009
5 A.2.3.1.11(b). PENGURUGAN 1M3 DENGAN TIMBUNAN PILIHAN Rp 180,989
6 5.1.(2).a PENGURUGAN 1M3 DENGAN TIMBUNAN PILIHAN MENGGUNAKAN ALAT Rp 176,368
7 5.1.(2).c PENGURUGAN 1M3 DENGAN TIMBUNAN LPC MENGGUNAKAN ALAT Rp 330,590
8 5.1.(2).b PENGURUGAN 1M3 DENGAN TIMBUNAN SIRTU MENGGUNAKAN ALAT Rp 229,454
9 A.2.3.1.14. PENGURUGAN 1 M3 SIRTU PADAT Rp 229,786
A.3.2.1 HARGA SATUAN PEKERJAAN PONDASI DAN DRAINASE
1 A.3.2.1.1. PEMASANGAN 1 M3 PONDASI BATU BELAH CAMPURAN 1SP : 3 PP Rp 837,999
2 A.3.2.1.2. PEMASANGAN 1 M3 PONDASI BATU BELAH CAMPURAN 1SP : 4 PP Rp 791,848
3 A.3.2.1.3. PEMASANGAN 1 M3 PONDASI BATU BELAH CAMPURAN 1SP : 5 PP Rp 761,256
4 A.3.2.1.3.a PEMASANGAN 1 M3 PONDASI BATU BELAH CAMPURAN 1SP : 5 PP DENGAN BATU YANG ADA Rp 385,020
A.4.1.1 HARGA SATUAN PEKERJAAN BETON
1 A.4.1.1.2 MEMBUAT 1 M3 BETON MUTU f’c = 9.8 MPa (K-125) Rp 941,167
A.4.1.1.3 MEMBUAT 1 M3 BETON MUTU f’c = 12.2 MPa (K-144) Rp 968,113
2 A.4.1.1.7 MEMBUAT 1 M3 BETON MUTU f’c = 19.3 MPa (K-225) Rp 1,054,282
3 A.4.1.1.17 PEMBESIAN 1 KG DENGAN BESI POLOS ATAU ULIR Rp 12,640
4 A.4.1.1.21 (K3) PEMASANGAN 1 M2 BEKISTING Rp 185,180
5 A.4.1.1.22 (K3) PEMASANGAN 1 M2 BEKISTING UNTUK KOLOM Rp 393,017
6 A.4.1.1.23 (K3) PEMASANGAN 1 M2 BEKISTING UNTUK BALOK Rp 407,743
7 A.4.1.1.24 (K3) PEMASANGAN 1 M2 BEKISTING UNTUK LANTAI Rp 547,483
8 A.4.4.1.10 PEMASANGAN 1 M2 PASANGAN 1/2 BATA Rp 118,560
9 LS PEMASANGAN KANSTIN PRECAST 20 X 40 1 M' Rp 163,546
A.4.4.2 HARGA SATUAN PLESTERAN
1 A.4.4.2.3. PEMASANGAN 1 M2 PLESTERAN 1 SP : 3 PP TEBAL 15MM Rp 64,350
2 A.4.4.2.5. PEMASANGAN 1 M2 PLESTERAN 1 SP : 4 PP TEBAL 15 MM Rp 62,503
3 A.4.4.2.26. PEMASANGAN 1 M2 FINISHING SIAR PASANGAN BATU KALI CAMPURAN 1 SP : 2 PP Rp 60,670
4 A.4.4.2.27. PEMASANGAN 1 M2 ACIAN Rp 37,859
HARGA SATUAN PEKERJAAN LAPIS PERMUKAAN
1 A.4.4.3.64. PEMASANGAN 1 M2 PAVING BLOCK NATURAL 6 CM PRES Rp 205,259
2 A.4.4.3.65. PEMASANGAN 1 M2 PAVING BLOCK NATURAL 8 CM PRES Rp 245,438
3 5.1.(2).c LAPIS PONDASI AGGREGAT KELS C MENGGUNAKAN ALAT (M3) ) Rp 330,590
4 6.6.1 LAPIS PERMUKAAN PENETRASI MACADAM (M3) Rp 2,336,448
5 A.4.4.38.a PEMASANGAN 1 M2 KORAL SIKAT Rp 195,323
T.15 HARGA SATUAN ANGKUTAN MATERIAL DAN ATAU HASIL GALIAN
1 T.15.a.5 MENGANGKUT 1 M3 MATERIAL ATAU HASIL GALIAN DENGAN JARAK ANGKUT 50 M (DATAR) Rp 40,153
2 T.15.a.6 MENGANGKUT 1 M3 MATERIAL ATAU HASIL GALIAN DENGAN JARAK ANGKUT 100 M (DATAR) Rp 57,090
3 T.15.a.7 MENGANGKUT 1 M3 MATERIAL ATAU HASIL GALIAN DENGAN JARAK ANGKUT 200 M (DATAR) Rp 90,393
LEMBAR PERHITUNGAN

PROGRAM : LINGKUNGAN SEHAT PERUMAHAN


KEGIATAN : PENINGKATAN PRASARANA SARANA UTILITAS
PEKERJAAN : PENATAAN LINGKUNGAN KWANGRUNDUN BARAT KEL. GONJAK
LOKASI : KECAMATAN PRAYA
T.A. : 2020
PENGURUGAN 1m3 DENGAN PASIR URUG
SKETSA

POSISI LUAS
NO STA LUAS
A B C RATA-RATA

1 0+00 0+050 3.00 0.05 0.15 0.15

2 0+50 0+100 3.00 0.05 0.15 0.15

3 0+100 0+150 3.00 0.05 0.15 0.15


VOLUME
PANJANG
M3

50.00 7.53

50.00 7.53

30.32 4.57

130.32 19.63 81000000