NO. URAIAN KEGIATAN VOLUME INTENSITAS WAKTU SATUAN BIAYA SATUAN TOTAL BIAYA
A PERALATAN KANTOR
1 Sewa Komputer 2 1 1 unit 1,000,000 2,000,000
2 Sewa Printer 1 1 1 unit 1,000,000 1,000,000
3 Sewa Plotter 1 1 1 bulan 4,000,000 4,000,000
JUMLAH A 7,000,000
B OPERASIONAL KANTOR
1 Alat Tulis Kantor 1 1 1 bulan 2,400,000 2,400,000
2 Sewa Kendaraan 1 1 3 hari 3,400,000 10,200,000
3 Telekomunikasi 1 1 1 bulan 2,300,000 2,300,000
JUMLAH B 14,900,000
C DOKUMEN
1 Dokumen Pra Rencana 5 set 150,000 750,000
2 Dokumen Pengembangan Rencana 5 set 200,000 1,000,000
3 Dokumen Pelelangan
3.1 Gambar 5 set 500,000 2,500,000
3.2 RKS 5 set 500,000 2,500,000
3.3 BoQ 5 set 500,000 2,500,000
3.4 Flashdisk 1 buah 160,000 160,000
JUMLAH C 9,410,000
JUMLAH A+B+C 31,310,000
ANALISA BIAYA PERSONIL
PENDIDIKAN/ JUMLAH MAN-MONTH BIAYA
NO. URAIAN KEGIATAN JAM HARI
PENGALAMAN TENAGA (OB)/HOUE (OJ) SATUAN
A. TENAGA AHLI
A.1 Masa Perencanaan
1 Ketua Tim S1/12 1.00 8.00 30 1 OB 26,850,000
2 Tenaga Ahli Elektrikal S1/8 1.00 8.00 30 1 OB 20,850,000
3 Tenaga Ahli Mekanikal S1/8 1.00 8.00 30 1 OB 20,850,000
4 Tenaga Ahli Struktur S1/8 1.00 8.00 30 1 OB 20,850,000
5 Tenaga Ahli Estimator S1/8 1.00 8.00 30 1 OB 20,850,000
A.2 Masa Pengawasan Berkala
1 Ketua Tim S1/12 1.00 1.00 30 30 OJ 6,555,000
2 Tenaga Ahli Elektrikal S1/8 1.00 1.00 30 30 OJ 5,100,000
3 Tenaga Ahli Mekanikal S1/8 1.00 1.00 30 30 OJ 5,100,000
4 Tenaga Ahli Struktur S1/8 1.00 1.00 30 30 OJ 5,100,000
B. TENAGA SUB PROFESIONAL
1 Drafter CAD D3/7 1.00 8.00 30 1 OB 7,200,000
2 Tekhnisi D3/7 1.00 8.00 30 1 OB 7,200,000
C. TENAGA PENDUKUNG
1 Sekretaris SMA 1.00 8.00 30 1 OB 4,650,000
2 Driver SMA 1.00 8.00 30 1 OB 2,600,000
3 Office Boy SMA 1.00 8.00 30 1 OB 1,750,000
ANALISA BIAYA NON-PERSONIL
WAKTU/ BIAYA
NO. URAIAN KEGIATAN VOLUME INTENSITAS SATUAN
BULAN SATUAN
A PERALATAN KANTOR
1 Sewa Komputer 1 1 1 unit 1,000,000
2 Sewa Printer 1 1 1 unit 1,000,000
3 Sewa Plotter 1 1 1 bulan 4,000,000
B OPERASIONAL KANTOR
1 ATK 1 1 1 bulan 2,400,000
2 Sewa Kendaraan 1 1 1 hari 3,400,000
3 Telekomunikasi 1 1 1 bulan 2,300,000
C DOKUMEN
1 Dokumen Prarencana 1 set 150,000
2 Dokumen Pengembangan Rencana 1 set 200,000
3 Dokumen Pelelangan
a. Gambar 1 set 500,000
b. RKS 1 set 500,000
c. BQ 1 set 500,000
d. Flashdisk 1 buah 160,000