Anda di halaman 1dari 27

RENCANA ANGGARAN BIAYA

Propinsi : Jawa Timur No. RAB :


Kabupaten : Malang Program
Kecamatan : Tajinan Jenis Kegiatan : Pemb.TPT RT 04
Desa : Tajinan Ukuran / Dimensi : 185 m / 41 m3
Volume Harga Total dana Swadaya Jumlah

……...
Uraian Total Swaday Dana Satuan Satuan Swdy + ... Pajak(Rp)
(
a Desa (Rp ) (Rp) Rp )
BAHAN
1 Batu Gunung 45.0 45.0 m3 250,000 1,176,300 11,250,000
2 Pasir Pasang 24.0 24.0 m3 165,000 414,000 3,960,000
3 Semen (PC)-40 kg 147.0 147.0 zak 47,000 722,400 6,909,000
PERALATAN Sub Total 1) 0 2,312,700 22,119,000

1 Selang Timbang 20.0 20.0 m 3,500 70,000


2 Benang 5.0 5.0 Roll 7,500 37,500
3 Cangkul 1.0 1.0 bh 60,000 60,000
4 Sekop 2.0 2.0 bh 60,000 120,000
5 Ember 12.0 12.0 bh 10,000 120,000
6 Papan Proyek 1.0 1.0 kg 150,000 150,000
7 Prasasti 1.0 1.0 kg 350,000 350,000
UPAH Sub Total 2) 0 0 907,500
84.0
1 Pekerja 84.0 OH 60,000 5,040,000
2 Tukang 36.0 36.0 OH 75,000 2,700,000
OPERASIONAL PK 0 0 7,740,000

1 Transport Pelaksana 3.0 0.0 3.0 Org 250,000 750,000


2 Transport Pengawas 1.0 0.0 1.0 Org 250,000 250,000
3 FC + Penggandaan 1.0 0.0 1.0 Ls 47,394 47,394
Sub Total 4) - - 1,047,394
TOTAL BIAYA 31,813,894
Biaya 31,813,894

Sumber Dana Biaya Pajak 2,312,700


Total Biaya + Pajak 34,126,594
Tajinan, 2018

Disetujui/Mengesahkan
KEPALA DESA PELAKSANA KEGIATAN
( H.ISBANDI ) ( M.ULYAH )
RENCANA

Propinsi : Jawa Timur


Kabupaten : Malang
Kecamatan : Tajinan
Desa : Tajinan

VOLUME Harga Satuan


URAIAN Total Dari Dari Satuan
Swadaya DD ( Rp. )
BAHAN
1 Batu Gunung 45.00 M2 250,000
2 Pasir Pasang 24.00 m3 165,000
3 Semen (40 kg) 147.00 m3 47,000
Sub Total 1)
ALAT
1 Gerobak Dorong 1.00 bh 500,000
2 Benang 2.00 roll 7,000
3 Ember 1.00 bh 60,000
4 Cikrak 1.00 bh 25,000
5 Meteran 5m 1.00 m
6 Sekop 2.00 bh 60,000
7 Selang Timbang 5.00 bh 3,500
8 Palu 1.00 bh
9 Papan Proyek 1.00 bh -
10 Prasasti 1.00 bh -
11 Rambu Tonase 0.00 bh Sub Total 2)
UPAH

1 Tukang 36.00 HOK 75,000


2 Pembantu Tukang 84.00 HOK 60,000
OPERASIONAL PK Sub Total 3)

1 Transport TPK 3.00 Org 250,000


2 Pengawas 1.00 Org 250,000
JUMLAH TOTAL Sub Total 4)

Disetuju
KEPALA DESA TAJINAN
ANGGARAN BIAYA

No. RAB :
Sumber Dana : Dana Desa
Jenis Kegiatan : TPT
Ukuran/Dimensi : 83 X 0,5 X 0,3 M
Jumlah

( Rp. ) DPP PPN PPH Psl 22 PPH psl 23 JUMLAH TOTAL

11,250,000 10,227,200 1,022,800 153,500 12,426,300

3,960,000 3,600,000 360,000 54,000 4,374,000


6,909,000 6,280,900 628,100 94,300 7,631,400
22,119,000 20,108,100 2,010,900 301,800 - 24,431,700
500,000 454,500 - - 500,000

14,000 12,700 - - 14,000


60,000 54,500 - - 60,000
25,000 22,700 - - 25,000
- - - - -
120,000 109,000 - - 120,000
17,500 15,900 - - 17,500
- - - - -
- - - - -
- - - - -
- - - - -
736,500 669,300 - - - 736,500
2,700,000 - - - 2,700,000

5,040,000 - - - 5,040,000
7,740,000 - - - - 7,740,000
750,000 - - - 750,000

250,000 - - - 250,000
1,000,000 - - - - 1,000,000
31,595,500 20,777,400 2,010,900 301,800 - 33,908,200

Tajinan, 10 Pebruari 2018


ui / mengesahkan
KETUA PELAKSANA
1,176,300
414,000
722,400
2,312,700

-
-
-
-
-
-
-
-
-
-
-
TAKE OF SHEET

Desa : Tajinan
Kecamatan : Tajinan
Kabupaten : Malang
Sub Kegiatan : Pembangunan TPT RT 08 ( TPS Sawah )

Sketsa Perhitungan

Talud Pasangan Batu, Panjang 185 M


Perhitungan volume Pas. Batu
0.30
2.00 V1 = (1) x ( 0.30 + 0.50 ) / 2 x 0.30 x 185.0
1 x 0.40 x 0.30 x 185 = 22.2 m3
V2 = (1) x ( 0.50 x 0.20 ) x 185.0

0.30 1 x 0.50 x 0.20 x 185 = 18.5 m3


VT = ( V1 + V2 )

22.2 + 18.5 = 40.7 m3


0.20 Perhitungan Volume Plesteran

A = (1) x ( 0.08 + 0.30 + 0.05 ) x 185.0


1 x 0.43 x 185.0 = 79.6 m2
0.50
Volume Galian Tanah

V = 0.20 x 0.50 x 185


Sketsa = 18.50 m3
U PETA LOKASI Masjid Perhitungan Strikan / Siaran - 2.00 )x 185.0

Jl.Masjid A = 1/4 x ( 0.30


RT. 05 0.25 x -1.70 x 185.0 = (78.6) m2
RT.06

RT .04 k
a
l

a
S
.
l
J

JL.Klengkeng
Ke

Puwroeskar
Lokasi TPT Rumah Warga
RT.04

An. SNI 6.6.1 Pekerjaan Pasangan Batu Belah 15/20 (1 : 5)


An. SNI 024 Batu 15/20 1.10 x 40.7 x 1.0 = 44.8 m3
Pasir Pasang 0.54 x 40.7 x 1.0 = 22.1 m3
Semen (40 Kg) 3.40 x 40.7 x 1.0 = 138.4 zak
Pekerja 1.50 x 40.7 x 1.0 = 61.1 OH
Tukang 0.60 x 40.7 x 1.0 = 24.4 OH

An. SNI 6.5.1 Pekerjaan Plesteran tebal 1,5 cm (1 : 5)


An. SNI 028 Pasir Pasang 0.02 x 79.6 x 1.0 = 1.8 m3
Semen (40 Kg) 0.11 x 79.6 x 1.0 = 8.6 zak
Pekerja 0.20 x 79.6 x 1.0 = 15.9 OH
Tukang 0.15 x 79.6 x 1.0 = 11.9 OH

An. SNI 6.5.1 Pekerjaan Setrikan (1 : 5)


An. SNI 028 Pasir Pasang 0.02 x (78.6) x 1.0 = -1.7 m3
Semen (40Kg) 0.11 x (78.6) x 1.0 = -8.5 zak
Pekerja 0.20 x (78.6) x 1.0 = -15.7 OH
Tukang 0.15 x (78.6) x 1.0 = -11.8 OH

An. SNI 6.1.1 Pekerjaan Galian Tanah( Analisa SNI )


An. SNI 010 Pekerja 0.40 x 18.5 = 7.4 HOK
Rekapitulasi kebutuhan bahan dan tenaga kerja pembulatan selisih

Link ke RAB
Batu 15/20 = 44.77 45.00 -0.23
Pasir Pasang = 23.89 24.00 -0.11
Semen (40 Kg) = 146.97 147.00 -0.03
Pekerja = 84.36 84.00 0.36
Tukang = 36.35 36.00 0.35
RENCANA ANGGARAN BIAYA

Propinsi : Jawa Timur No. RAB :


Kabupaten : Malang Program : P3MD Kemendesa PDTT
Kecamatan : Tajinan Kegiatan : TPT RT 24
Desa : Tajinan Volume : 43 m
Volume Harga Total dana Jumlah Jumlah

Uraian Total Swaday Dana Satuan Satuan Swdy + ... Pajak Dana Desa
a Desa (Rp) (Rp) (Rp) (Rp)
BAHAN
1 Batu Gunung 7.0 7.0 m3 250,000 159,100 1,750,000
2 Pasir Pasang 4.0 4.0 m3 165,000 0 660,000
3 Semen (PC)-40 kg 22.0 22.0 zak 47,000 0 1,034,000
Sub Total 1) 0 159,100 3,444,000
PERALATAN
1 Selang Timbang 20.0 20.0 m 3,500 70,000
2 Benang 2.0 2.0 Roll 7,500 15,000
3 Cangkul 1.0 1.0 bh 60,000 60,000
4 Sekop 2.0 2.0 bh 60,000 120,000
5 Ember 10.0 10.0 bh 10,000 100,000
6 Papan Proyek 1.0 1.0 Ls 150,000 150,000
Sub Total 2) 0 0 515,000
UPAH
1 Pekerja 13.0 13.0 OH 60,000 780,000
2 Tukang 5.0 5.0 OH 75,000 375,000
0 0 1,155,000
OPERASIONAL PK
1 Transport TPK 3.0 0.0 3.0 Org 250,000 750,000
2 Transport Pengawas 1.0 0.0 1.0 Org 250,000 250,000
3 FC + Penggandaan 1.0 0.0 1.0 Ls 47,000 47,000
Sub Total 4) 0 0 1,047,000
TOTAL BIAYA 0 159,100 6,161,000
Sumber Dana dari Biaya 6,161,000

Biaya Pajak 159,100


Dana Desa
Total Biaya (Dana Desa + Pajak) 6,320,100
Tajinan, .... Juli 2018

Mengetahui / Menyetujui : Dibuat Oleh :

KEPALA DESA Tim Penyusun RKP Desa


Ketua

H. ISBANDI NGATENO
→ OK..!
→ OK..!
→ OK..!15,187,400 RAB Lama
8,867,300 Sisa
RENCANA ANGGARAN BIAYA
Propinsi : Jawa Timur No. RAB
Kabupaten : Malang Program
Kecamatan : Tajinan Kegiatan
Desa : Tajinan Volume
URAIAN VOLUME Satuan Harga Satuan Jumlah DPP PPN PPH Psl 22

Total Swadya DD (Rp) (Rp)


BAHAN
1 Batu Gunung 7.00 7.00 m3 250,000 1,750,000 1,590,900 159,100 -
2 Pasir Pasang 4.00 4.00 m3 165,000 660,000 600,000 - -
3 Semen (40 kg) 22.00 22.00 zak 47,000 1,034,000 940,000 - -
ALAT Sub Total 1) 3,444,000 3,130,900 159,100 -

1 Selang Timbang 20.00 20.00 m 3,500 70,000 63,600 - -


2 Benang 2.00 2.00 Roll 7,500 15,000 13,600 - -
3 Cangkul 1.00 1.00 bh 60,000 60,000 54,500 - -
4 Sekop 2.00 2.00 bh 60,000 120,000 109,000 - -
5 Ember 10.00 10.00 bh 10,000 100,000 90,900 - -
6 Papan Proyek 1.00 1.00 Ls 150,000 150,000 136,300 - -
Sub Total 2) 515,000 467,900 - -
UPAH
1 Pekerja 13.00 13.00 OH 60,000 780,000 - - -
2 Tukang 5.00 5.00 OH 75,000 375,000 - - -
Sub Total 3) 1,155,000 - - -
OPERASIONAL PK
1 Transport TPK 3.00 3.00 Org 250,000 750,000 - - -
2 Transport Pengawas 1.00 1.00 Org 250,000 250,000 - - -
3 FC + Penggandaan 1.00 1.00 Ls 47,000 47,000 - - -
Sub Total 4) 1,047,000 - - -
JUMLAH TOTAL 6,161,000 3,598,800 159,100 -
T

Mengetahui / Menyetujui :

KEPALA DESA Tim

H. ISBANDI
:
: P3MD Kemendesa PDTT
: TPT RT 24
: 43 m

PPH psl 23 JUMLAH TOTAL

1,909,100 159,100
660,000 -
1,034,000 -
- 3,603,100 159,100
70,000 -

15,000 -
60,000 -
120,000 -
100,000 -
150,000 -
- 515,000 -
780,000 -

375,000 -
- 1,155,000 -
750,000 -

250,000 -
47,000 -
- 1,047,000 -
- 6,320,100 159,100

ajinan, .... Juli 2018

Dibuat Oleh :
m Penyusun RKP Desa
Ketua

NGATENO
TAKE OF SHEET

Desa : Tajinan
Kecamatan : Tajinan
Kabupaten : Malang
Sub Kegiatan : Pembangunan TPT RT 08 ( TPS Sawah )

Sketsa Perhitungan

Talud Pasangan Batu, Panjang 43 M


Perhitungan volume Pas. Batu
0.25
0.08 V1 = (1) x ( 0.25 + 0.30 ) / 2 x 0.30 x 43.0
1 x 0.28 x 0.30 x 43 = 3.5 m3
V2 = (1) x ( 0.30 x 0.20 ) x 43.0

0.30 1 x 0.30 x 0.20 x 43 = 2.6 m3


VT = ( V1 + V2 )

3.5 + 2.6 = 6.1 m3


Perhitungan Volume Plesteran
0.20
A = (1) x ( 0.08 + 0.25 + 0.00 ) x 43.0
1 x 0.33 x 43.0 =14.2 m2
0.30
Sketsa
Volume Galian Tanah
V = 0.20 x 0.30 x 43
= 2.58 m3
U PETA LOKASI Perhitungan Strikan / Siaran
Lokasi TPT
KeBaran

A = 1/4 x ( 0.30 - 0.08 ) x 43.0


RT.24 RT. 23 0.25 x 0.22 x 43.0 = 2.4 m2

JL.NANGKA

Rumah Warga
s
i

g
g
n
a
M
.
l
J
RT.24

An. SNI 6.6.1 Pekerjaan Pasangan Batu Belah 15/20 (1 : 5)


An. SNI 024 Batu 15/20 1.10 x 6.1 x 1.0 = 6.7 m3
Pasir Pasang 0.54 x 6.1 x 1.0 = 3.3 m3
Semen (40 Kg) 3.40 x 6.1 x 1.0 = 20.8 zak
Pekerja 1.50 x 6.1 x 1.0 = 9.2 OH
Tukang 0.60 x 6.1 x 1.0 = 3.7 OH
Pekerjaan Plesteran tebal 1,5 cm (1 : 5)
An. SNI 6.5.1
An. SNI 028 Pasir Pasang 0.02 x 14.2 x 1.0 = 0.3 m3
Semen (40 Kg) 0.11 x 14.2 x 1.0 = 1.5 zak
Pekerja 0.20 x 14.2 x 1.0 = 2.8 OH
Tukang 0.15 x 14.2 x 1.0 = 2.1 OH
Pekerjaan Setrikan (1 : 5)
An. SNI 6.5.1
An. SNI 028 Pasir Pasang 0.02 x 2.4 x 1.0 = 0.1 m3
Semen (40Kg) 0.11 x 2.4 x 1.0 = 0.3 zak
Pekerja 0.20 x 2.4 x 1.0 = 0.5 OH
Tukang 0.15 x 2.4 x 1.0 = 0.4 OH
Pekerjaan Galian Tanah( Analisa SNI )
An. SNI 6.1.1
An. SNI 010 Pekerja 0.40 x 2.6 = 1.0 OH

Rekapitulasi kebutuhan bahan dan tenaga kerja pembulatan selisih

Link ke RAB
Batu 15/20 = 6.74 7.00 -0.26
Pasir Pasang = 3.65 4.00 -0.35
Semen (40 Kg) = 22.37 22.00 0.37
Pekerja = 13.06 13.00 0.06
Tukang = 5.81 5.00 0.81
RENCANA ANGGARAN BIAYA

Propinsi : Jawa Timur No. RAB :


Kabupaten : Malang Program : P3MD Kemendesa PDTT
Kecamatan : Tajinan Kegiatan : TPT RT. 08 (TPS Sawah)
Desa : Tajinan Volume : 65 m
Volume Harga Total Jumlah Pajak Jumlah

Uraian Swada Dana Satuan Satuan Swdya+.. Dana Desa


Total (Rp)
ya Desa (Rp) (Rp) (Rp)
BAHAN
1 Batu Gunung 36.0 36.0 m3 250,000 941,000 9,000,000
2 Batu Pecah 2/3 1.0 1.0 m3 250,000 0 250,000
3 Batako 588.0 588.0 bh 4,000 246,000 2,352,000
4 Pasir Pasang 21.0 21.0 m3 165,000 362,300 3,465,000
5 Semen (40 Kg) 134.0 134.0 zak 65,000 910,700 8,710,000
6 Besi Ø6 27.0 27.0 btg 29,000 0 783,000
7 Besi Ø8 56.0 56.0 btg 49,000 287,000 2,744,000
8 Kawat bendrat 6.0 6.0 kg 47,000 0 282,000
Sub Total 1) 0 2,747,000 27,586,000
PERALATAN
1 Selang Timbang 20.0 20.0 m 3,500 70,000
2 Kereta Dorong 1.0 1.0 bh 500,000 500,000
3 Benang 2.0 2.0 Roll 7,500 15,000
4 Ganco 1.0 1.0 bh 75,000 75,000
5 Cangkul 2.0 2.0 bh 60,000 120,000
6 Sekop 2.0 2.0 bh 60,000 120,000
7 Ember 10.0 10.0 bh 10,000 100,000
8 Kuas 4" 1.0 1.0 bh 25,000 25,000
9 Prasasti 1.0 1.0 Ls 350,000 350,000
10 Papan Proyek 1.0 1.0 Ls 150,000 150,000
Sub Total 2) 0 0 1,525,000
UPAH
1 Pekerja 78.0 78.0 OH 65,000 5,070,000
2 Tukang 33.0 33.0 OH 80,000 2,640,000
0 0 7,710,000
OPERASIONAL PK
1 Transport TPK 3.0 0.0 3.0 Org 250,000 750,000
2 Transport Pengawas 1.0 0.0 1.0 Org 250,000 250,000
3 FC + Penggandaan 1.0 0.0 1.0 Ls 73,700 73,700
Sub Total 4) 0 0 1,073,700
TOTAL BIAYA 0 2,747,000 37,894,700
Biaya 37,894,700

Sumber Dana dari Dana Desa Biaya Pajak 2,747,000


Total Biaya (Dana Desa + Pajak) 40,641,700

Tajinan, 2018

Mengetahui / Menyetujui : Dibuat Oleh :


KEPALA DESA Tim Penyusun RKP Desa
Ketua

H. ISBANDI NGATENO
RENCANA ANGGARAN BIAYA
Propinsi : Jawa Timur No. RAB
Kabupaten : Malang Program
Kecamatan : Tajinan Kegiatan
Desa : Tajinan Volume
URAIAN VOLUME Satu Harga Satuan Jumlah DPP PPN PPH Psl 22
Total Swadya DD an (Rp) (Rp)
BAHAN
1 Batu Gunung 36.00 36.00 m3 250,000 9,000,000 8,181,800 818,200 122,800
2 Batu Pecah 2/3 1.00 1.00 m3 250,000 250,000 227,200 - -
3 Batako 588.00 588.00 bh 4,000 2,352,000 2,138,100 213,900 32,100
4 Pasir Pasang 21.00 21.00 m3 165,000 3,465,000 3,150,000 315,000 47,300
5 Semen (40 Kg) 134.00 134.00 zak 65,000 8,710,000 7,918,100 791,900 118,800
6 Besi Ø6 27.00 27.00 btg 29,000 783,000 711,800 - -
7 Besi Ø8 56.00 56.00 btg 49,000 2,744,000 2,494,500 249,500 37,500
8 Kawat bendrat 6.00 6.00 kg 47,000 282,000 256,300 - -
Sub Total 1) 27,586,000 25,077,800 2,388,500 358,500
ALAT
1 Selang Timbang 20.00 20.00 m 3,500 70,000 63,600 - -
2 Kereta Dorong 1.00 1.00 bh 500,000 500,000 454,500 - -
3 Benang 2.00 2.00 Roll 7,500 15,000 13,600 - -
4 Ganco 1.00 1.00 bh 75,000 75,000 68,100 - -
5 Cangkul 2.00 2.00 bh 60,000 120,000 109,000 - -
6 Sekop 2.00 2.00 bh 60,000 120,000 109,000 - -
7 Ember 10.00 10.00 bh 10,000 100,000 90,900 - -
8 Kuas 4" 1.00 1.00 bh 25,000 25,000 22,700 - -
9 Prasasti 1.00 1.00 Ls 350,000 350,000 318,100 - -
10 Papan Proyek 1.00 1.00 Ls 150,000 150,000 136,300 - -
UPAH Sub Total 2) 1,525,000 1,385,800 - -

1 Pekerja 78.00 OH 65,000 5,070,000 - - -


2 Tukang 33.00 OH 80,000 2,640,000 - - -
OPERASIONAL PK Sub Total 3) 7,710,000 - - -

1 Transport TPK 3.00 Org 250,000 750,000 - - -


2 Transport Pengawas 1.00 Org 250,000 250,000 - - -
3 FC + Penggandaan 1.00 Ls 73,700 73,700 - - -
Sub Total 4) 1,073,700 - - -
JUMLAH TOTAL 37,894,700 26,463,600 2,388,500 358,500

Mengetahui / Menyetujui :
KEPALA DESA
H. ISBANDI
:
: P3MD Kemendesa PDTT
: TPT RT. 08 (TPS Sawah)
: 65 m

PPH psl 23 JUMLAH TOTAL


9,941,000 941,000

250,000 -
2,598,000 246,000
3,827,300 362,300
9,620,700 910,700
783,000 -
3,031,000 287,000
282,000 -
0 30,333,000 2,747,000
70,000 -

500,000 -
15,000 -
75,000 -
120,000 -
120,000 -
100,000 -
25,000 -
350,000 -
150,000 -
- 1,525,000 -
5,070,000 -

2,640,000 -
- 7,710,000 -
750,000 -

250,000 -
73,700 -
- 1,073,700 -
- 40,641,700 2,747,000
Tajinan, 2018

Dibuat Oleh :
Tim Penyusun RKP Desa
Ketua
NGATENO
TAKE OF SHEET
Desa : Tajinan

Kecamatan : Tajinan
Kabupaten : Malang
Sub Kegiatan : Pembangunan TPT RT 08 ( TPS Sawah )
Sketsa Perhitungan

balok 0.1 0.1 Talud Pasangan Batu, Panjang 65 M


Catatan:
Batako 0.75 1.00 Tiap jarak 3 meter Perhitungan volume Pas. Batu
Sloof 0.15 diberi kolom uk. 10 x 15 cm
0.08 = 65 / 3 V1 = (1) x ( 0.30 + 0.40 )/2x 1.00 x 65.0
0.30 = 22 + 1 1 x 0.35 x 1.00 x 65 = 22.8 m3
1.00 = 23 kolom V2 = (1) x ( 0.40 x 0.40 ) x 65.0

0.1 0.1 1 x 0.40 x 0.40 x 65 = 10.4 m3


0.15 0.10 VT = ( V1 + V2 ) 33.2
0.40 22.8 + 10.4 = m3
Kolom & sloof balok Perhitungan Volume Plesteran
0.40 A = (1) x ( 0.08 + 0.20 + 0.00 ) x 65.0
Jarak antar begel = 0.20 m 1 x 0.38 x 65.0 = 24.7 m2
Jumlah begel kolom & sloof = 440 bh besi Volume Galian Tanah
Jumlah begel balok = 325 bh pokok Ø8 V = 0.40 x 0.40 x 65 = 10.40 m3
panjang 1 begel kolom & sloof = 0.46 m Perhitungan Strikan / Siaran
panjang 1 begel balok = 0.36 m besi A = 1/4 x ( 1.00 - 0.08 ) x 65.0
Panjang total begel = 319 m begel Ø6 0.25 x 0.92 x 65.0 = 15.0 m2
Sketsa Perhitungan Batako
PETA LOKASI A batako = 65 x 0.75 = 48.8 m2
U
A kolom = 0.1 x 0.75 x 23.00 = 1.73 m2
Lokasi TPT
RT.08 A total = 47.0 m2
RT .08
Jl.

RT.04 Perhitungan Cor Beton


V sloof = 0.10 x 0.15 x 65.00 = 0.98 m3
V balok = 0.10 x 0.10 x 65.00 = 0.65 m3
ke Gading
Lapanga

Purwos

V Kolom = 0.10 x 0.15 x 1.00 x 23 = 0.35 m3


ekar

sawah Rumah Warga


Perhitungan Besi
n

Besi begel Ø6 = 319 m = 26.62 ≈ 27.00 btg


RT.07 = 319 x 0.222 = 70.91 kg
ke

Besi pokok Ø8 = 666 m = 55.50 ≈ 56.00 btg


= 666 x 0.395 = 263.1 kg

An. SNI 6.6.1 Pekerjaan Pasangan Batu Belah 15/20 (1 : 5)


An. SNI 024 Batu 15/20 1.100 x 33.2 x 1.0 = 36.5 m3
Pasir Pasang 0.544 x 33.2 x 1.0 = 18.0 m3
Semen (40 Kg) 3.400 x 33.2 x 1.0 = 112.7 zak
Pekerja 1.500 x 33.2 x 1.0 = 49.7 OH
Tukang 0.600 x 33.2 x 1.0 = 19.9 OH
An. SNI 6.5.1 Pekerjaan Plesteran tebal 1,5 cm (1 : 5)
An. SNI 028 Pasir Pasang 0.022 x 24.7 x 1.0 = 0.5 m3
Semen (40 Kg) 0.108 x 24.7 x 1.0 = 2.7 zak
Pekerja 0.200 x 24.7 x 1.0 = 4.9 OH
Tukang 0.150 x 24.7 x 1.0 = 3.7 OH
An. SNI 6.5.1 Pekerjaan Setrikan (1 : 5)
An. SNI 028 Pasir Pasang 0.022 x 15.0 x 1.0 = 0.3 m3
Semen (40Kg) 0.108 x 15.0 x 1.0 = 1.6 zak
Pekerja 0.200 x 15.0 x 1.0 = 3.0 OH
Tukang 0.150 x 15.0 x 1.0 = 2.2 OH
An. SNI 6.1.1 Pekerjaan Galian Tanah( Analisa SNI )
An. SNI 010 Pekerja 0.400 x 10.4 = 4.2 OH
An. SNI 6.20.1 1 m2 Batako 1/2 Bata uk. 10 x 20 x 40
Batako 12.500 x 47.0 x 1.0 = 587.8 bh
Semen (40Kg) 0.188 x 47.0 x 1.0 = 8.8 zak
Pasir Pasang 0.027 x 47.0 x 1.0 = 1.3 m3
Pekerja 0.320 x 47.0 x 1.0 = 15.0 OH
Tukang 0.100 x 47.0 x 1.0 = 4.7 OH
An. SNI 6.5.1 Pekerjaan Beton Bertulang (1 : 2 : 3)
An. SNI 028 Pasir Pasang 0.520 x 1.32 x 1.0 = 0.69 m3
Semen (40 Kg) 5.800 x 1.32 x 1.0 = 7.66 zak
Batu Pecah 2/3 0.870 x 1.32 x 1.0 = 1.15 m3
Pekerja 1.650 x 1.32 x 1.0 = 2.18 OH
Tukang 0.250 x 1.32 x 1.0 = 0.33 OH
An. SNI 6.25.1 Pembesian
Besi Ø6 mm 1.000 x 27.00 x 1.0 = 27.00 btg
Besi Ø8 mm 1.000 x 56.00 x 1.0 = 56.00 btg
Kawat bendrat 0.015 x 333.98 x 1.0 = 5.01 kg
Pekerja 0.007 x 333.98 x 1.0 = 2.34 OH
Tukang 0.007 x 333.98 x 1.0 = 2.34 OH
Rekapitulasi kebutuhan bahan dan tenaga kerja 36.00
Batu Gunung = 36.47 ≈ m3 selisih → 0.47
Batu Pecah 2/3 = 1.15 ≈ 1.00 m3 selisih → 0.15
Batako = 587.81 ≈ 588.00 bh selisih → (0.19)
Pasir Pasang = 20.86 ≈ 21.00 m3 selisih → (0.14)
Semen (40 Kg) = 133.47 ≈ 134.00 zak selisih → (0.53)
Besi Ø6 = 27.00 ≈ 27.00 btg selisih → -
Besi Ø8 = 56.00 ≈ 56.00 btg selisih → -
Kawat bendrat = 5.01 ≈ 6.00 kg selisih → (0.99)
Pekerja = 78.39 ≈ 78.00 OH selisih → 0.39
Tukang = 33.21 ≈ 33.00 OH selisih → 0.21
TAKE OF SHEET

Desa : Tajinan
Kecamatan : Tajinan
Kabupaten : Malang
Sub Kegiatan : Pembangunan Tembok Penahan Tanah ( TPT )

Sketsa Perhitungan
0.25 0.50 0.25 Panjang Saluran : 83 m

Perhitungan volume Pas. Batu


0.1 0.1
V1 = (2) x 0.25 + 0.40 ) / 2 x 0.50 x 83.0
0.05 2 x 0.33 x 0.50 x 83 = 27 m3
0.50 V2 = (2) x 0.30 x 0.40 ) x 83.0

2 x 0.30 x 0.40 x 83 = 20 m3
V3 = (1) x 0.15 x 0.30 ) x 83.0

0.3 0.15 1 x 0.15 x 0.30 x 83 = 4 m3


VT = V1 + V2 + V3 )

27.0 + 19.9 + 3.7


0.4 0.3 0.40 VT 50.6 m2
Perhitungan Volume Plesteran

A = (2) x ( 0.10 + 0.25 + 0.05 ) x 83.0


2 x 0.40 x 83.0 = 66.4 m2

Sketsa Perhitungan
Perhitungan Strikan / Siaran

A = (2) x 1/4 x ( 0.50 - 0.10 ) x 83.0


2 x 0.25 x 0.40 x 83 = 17 m2
Perhitungan Galian Pondasi Saluran

V 20
2 x 0.30 x 0.40 x 83 = m3
Analisa Kebutuhan Bahan, Alat dan Tenaga Kerja

An. SNI 6.1.1 Pekerjaan Galian Tanah Biasa, maksimal Kedalaman 1 M

An. SNI 010 Pekerja 0.400 x 19.9 x 1.3 = 10.6 HOK


An. SNI 6.6.1 Pekerjaan Pasangan Batu Belah 15/20 (1 : 5)

An. SNI 024 Batu 15/20 1.100 x 50.6 x 1.0 = 55.7 m3


Pasir Pasang 0.544 x 50.6 x 1.0 = 27.5 m3
Semen (40 Kg) 3.400 x 50.6 x 1.0 = 172.1 zak
Pekerja 1.500 x 50.6 x 1.3 = 101.3 HOK
Tukang 0.600 x 50.6 x 1.3 = 40.5 HOK
An. SNI 6.5.1 Pekerjaan Plesteran tebal 1,5 cm (1 : 5)

An. SNI 028 Pasir Pasang 0.022 x 66.4 x 1.0 = 1.5 m3


Semen (40 Kg) 0.108 x 66.4 x 1.0 = 7.2 zak
Pekerja 0.200 x 66.4 x 1.3 = 17.7 HOK
Tukang 0.150 x 66.4 x 1.3 = 13.3 HOK
An. SNI 6.35.1 Pekerjaan Setrikan (1 : 2)

An. SNI 056 Pasir Pasang 0.016 x 16.6 x 1.0 = 0.3 m3


Semen (40Kg) 0.108 x 16.6 x 1.0 = 1.8 zak
Pekerja 0.150 x 16.6 x 1.3 = 3.3 HOK
Tukang 0.070 x 16.6 x 1.3 = 1.5 HOK
Rekapitulasi kebutuhan bahan dan tenaga kerja

Link dari
perhitungan selisih pembulatan
volume
di atas tot. volume
Batu 15/20 = 55.69 -0.31 56.00

Pasir Pasang = 29.27 0.27 29.00


Semen (40 Kg) = 181.11 0.11 181.00
Pekerja = 132.91 -0.09 133.00
Tukang = 55.33 0.33 55.00
###

RENCANA ANGGARAN BIAYA

Propinsi No. RAB


Kabupaten Program
Kecamatan Jenis Kegiatan
Desa Ukuran / Dimensi
Volume Harga Total dana Swadaya Jumlah

Uraian Total Swada Dana Satuan Satuan Swdy+ ….. Uang(Rp) ……...
ya ……. (Rp ) (Rp) ( Rp )
BAHAN
1 Batu Gunung 56.0 56.0 m3
2 Pasir Pasang 8.0 8.0 m3
3 Semen (PC)-40 kg 47.0 47.0 zak
PERALATAN Sub Total 1) 0 0 0

1 Meteran 50 m 1.0 1.0 bh 0


2 Meteran 5 m 1.0 1.0 bh 0
3 Selang Timbang 10.0 10.0 m 0
4 Kereta Dorong 1.0 1.0 bh 0
5 Benang 1.0 1.0 Roll 0
6 Cetok 2.0 2.0 bh 0
7 Ganco 2.0 2.0 bh 0
8 Cangkul 2.0 2.0 bh 0
9 Sekop 2.0 2.0 bh 0
10 Amer 5 kg 1.0 1.0 bh 0
11 Palu 2 kg 1.0 1.0 bh 0
12 Kuas 4" 4.0 4.0 bh 0
13 Kawat bendrat 1.0 1.0 kg 0
14 Ember 10.0 10.0 bh 0
UPAH Sub Total 2) 0 0 0

1 Pekerja 133.0 133.0 HOK 0


2 Tukang 55.0 55.0 HOK 0
LAIN LAIN 0 0 0

Sub Total 4) - - -

TOTAL BIAYA -
Total Biaya (……….. dan Swadaya)

Sumber Dana Dari ………..


Swadaya
REKAPITULASI ANGGARAN BIAYA
Jenis Prasarana : TPT dan Saluran
Propinsi Jawa Timur Kecamatan
Kabupaten Malang Desa
Jenis Kegiatan TPT Jenis Keg. Saluran Drainase

Dimensi / Ukuran (0,6 x 200 ) Bobot Dimensi / Ukuran Bobot JUMLAH TOTAL Bobot
NO URAIAN Jumlah 1 unit % Jumlah % %
No. RAB - No. RAB
……. SWADAYA ……. SWADAYA ……. SWADAYA
I BAHAN 6,426,000 - 6,426,000 -

Hasil Tenaga Manusia (!a) 4,405,000 4,405,000 -


Hasil Industri (Ib) 2,021,000 2,021,000 -
II PERALATAN 370,000 - 370,000 -

Alat Tangan (II a) - - - -


Beli / Sewa Alat Mesin (II b) 370,000 370,000 -
III UPAH 2,325,000 - 2,325,000 -

Untuk Konstruksi ( IIIa) 2,325,000 2,325,000 -


Untuk Pengumpulan Bahan (IIIb) - - -
IV Lain-lain 1,000,000 - 1,000,000 -

750,000 750,000 -
250,000 250,000 -
Jumlah 10,121,000 - - 10,121,000 -
Jumlah Total (………..+SWADAYA) 10,121,000 - - 10,121,000 -

Jumlah Biaya Upah Konstruksi 2,325,000 - - - 2,325,000 -


Jumlah Biaya Upah Pengumpulan Bahan - - - - -
Jumlah Biaya Upah Total 2,325,000 - HOK - - HOK 2,325,000 -
Jumlah HOK Total - - HOK HOK - - HOK
RENCANA ANGGARAN BIAYA

Propinsi : Jawa Timur No. RAB :


Kabupaten : Malang Program
Kecamatan : Tajinan Jenis Kegiatan : Pemb.TPT RT 06 ( Punden )
Desa : Tajinan Ukuran / Dimensi : 83 m / 12 m3
Volume Harga Total dana Swadaya Jumlah

Swaday Dana Biaya


Uraian Total Satuan Satuan Swdy + ... Pajak(Rp) (
a Desa (Rp ) (Rp) Rp )
BAHAN
1 Batu Gunung 13.0 13.0 m3 250,000 339,900 3,250,000
2 Pasir Pasang 7.0 7.0 m3 165,000 105,000 1,155,000
3 Semen (PC)-40 kg 43.0 43.0 zak 47,000 2,021,000
PERALATAN Sub Total 1) 0 444,900 6,426,000

1 Selang Timbang 10.0 10.0 m 3,500 35,000


2 Sekop 1.0 1.0 bh 60,000 60,000
3 Ember 10.0 10.0 bh 10,000 100,000
4 Kuas 4" 1.0 1.0 bh 25,000 25,000
5 Papan Proyek 1.0 1.0 kg 150,000 150,000
UPAH Sub Total 2) 0 0 370,000

1 Pekerja 25.0 25.0 OH 60,000 1,500,000


2 Tukang 11.0 11.0 OH 75,000 825,000
OPERASIONAL PK 0 0 2,325,000

1 Transport Pelaksana 3.0 0.0 3.0 Org 250,000 750,000


2 Transport Pengawas 1.0 0.0 1.0 Org 250,000 250,000
3 FC + Penggandaan 1.0 0.0 1.0 Ls 62,100 62,100
Sub Total 4) - - 1,062,100
TOTAL BIAYA 10,183,100
Biaya 10,183,100

Sumber Dana Biaya Pajak 444,900


Total Biaya + Pajak 10,628,000
Tajinan, 2018

Disetujui/Mengesahkan
KEPALA DESA PELAKSANA KEGIATAN
( H.ISBANDI ) ( M.ULYAH )
RENCANA

Propinsi : Jawa Timur


Kabupaten : Malang
Kecamatan : Tajinan
Desa : Tajinan

VOLUME Harga Satuan


URAIAN Total Dari Dari Satuan
Swadaya DD ( Rp. )
BAHAN
1 Batu Gunung 13.00 M2 250,000
2 Pasir Pasang 7.00 m3 165,000
3 Semen (40 kg) 43.00 m3 47,000
Sub Total 1)
ALAT
1 Gerobak Dorong 1.00 bh 500,000
2 Benang 2.00 roll 7,000
3 Ember 1.00 bh 60,000
4 Cikrak 1.00 bh 25,000
5 Meteran 5m 1.00 m
6 Sekop 2.00 bh 60,000
7 Selang Timbang 5.00 bh 3,500
8 Palu 1.00 bh
9 Papan Proyek 1.00 bh -
10 Prasasti 1.00 bh -
11 Rambu Tonase 0.00 bh Sub Total 2)
UPAH

1 Tukang 4.00 HOK 75,000


2 Pembantu Tukang 9.00 HOK 60,000
OPERASIONAL PK Sub Total 3)

1 Transport TPK 3.00 Org 250,000


2 Pengawas 1.00 Org 250,000
JUMLAH TOTAL Sub Total 4)

Disetuju
KEPALA DESA TAJINAN
ANGGARAN BIAYA

No. RAB :
Sumber Dana : Dana Desa
Jenis Kegiatan : TPT
Ukuran/Dimensi : 83 X 0,5 X 0,3 M
Jumlah

( Rp. ) DPP PPN PPH Psl 22 PPH psl 23 JUMLAH TOTAL

3,250,000 2,954,500 295,500 44,400 3,589,900

1,155,000 1,050,000 105,000 - 1,260,000


2,021,000 1,837,200 - - 2,021,000
6,426,000 5,841,700 400,500 44,400 - 6,870,900
500,000 454,500 - - 500,000

14,000 12,700 - - 14,000


60,000 54,500 - - 60,000
25,000 22,700 - - 25,000
- - - - -
120,000 109,000 - - 120,000
17,500 15,900 - - 17,500
- - - - -
- - - - -
- - - - -
- - - - -
736,500 669,300 - - - 736,500
300,000 - - - 300,000

540,000 - - - 540,000
840,000 - - - - 840,000
750,000 - - - 750,000

250,000 - - - 250,000
1,000,000 - - - - 1,000,000
9,002,500 6,511,000 400,500 44,400 - 9,447,400
Tajinan, 10 Pebruari 2018

ui / mengesahkan
KETUA PELAKSANA
339,900
105,000
-
444,900

-
-
-
-
-
-
-
-
-
-
-
TAKE OF SHEET

Desa : Tajinan
Kecamatan : Tajinan
Kabupaten : Malang
Sub Kegiatan : Pembangunan TPT RT 04 ( Punden )

Sketsa Perhitungan

Talud Pasangan Batu, Panjang 83 M


Perhitungan volume Pas. Batu
0.25
0.08 V1 = (1) x ( 0.25 + 0.30 ) / 2 x 0.30 x 83.0
1 x 0.28 x 0.30 x 83 = 6.8 m3
V2 = (1) x ( 0.30 x 0.20 ) x 83.0

0.30 1 x 0.30 x 0.20 x 83 = 5.0 m3


VT = ( V1 + V2 )

6.8 + 5.0 = 11.8 m3


Perhitungan Volume Plesteran
0.20
0.30 A = (1) x ( 0.08 + 0.25 + 0.00 ) x 83.0
1 x 0.33 x 83.0 =27.4 m2
Sketsa
Volume Galian Tanah (swadaya murni)
V = 0.20 x 0.30 x 83
= 4.98 m3
U PETA LOKASI Perhitungan Strikan / Siaran
RT .09 RT. 05
A = 1/4 x ( 0.30 - 0.08 ) x 83.0
GARUDA

0.25 x 0.22 x 83.0 = 4.6 m2


JL.MASJID

Lokasi TPT

RT.06
PUNDEN
JL.KLENGKENG
KeWajak
Rumah Warga
RT.04
An. SNI 6.6.1
An. SNI 024

Pekerjaan Pasangan Batu Belah 15/20 (1 : 5)


Batu 15/20 1.10 x 11.8 x 1.0 = 13.0 m3
Pasir Pasang 0.54 x 11.8 x 1.0 = 6.4 m3
Semen (40 Kg) 3.40 x 11.8 x 1.0 = 40.2 zak
An. SNI 6.5.1 Pekerja 1.50 x 11.8 x 1.0 = 17.7 OH
An. SNI 028 Tukang 0.60 x 11.8 x 1.0 = 7.1 OH
Pekerjaan Plesteran tebal 1,5 cm (1 : 5)

Pasir Pasang 0.02 x 27.4 x 1.0 = 0.6 m3


Semen (40 Kg) 0.11 x 27.4 x 1.0 = 3.0 zak
Pekerja 0.20 x 27.4 x 1.0 = 5.5 OH
Tukang 0.15 x 27.4 x 1.0 = 4.1 OH

An. SNI 6.5.1 Pekerjaan Setrikan (1 : 5)


An. SNI 028 Pasir Pasang 0.02 x 4.6 x 1.0 = 0.1 m3
Semen (40Kg) 0.11 x 4.6 x 1.0 = 0.5 zak
Pekerja 0.20 x 4.6 x 1.0 = 0.9 OH
Tukang 0.15 x 4.6 x 1.0 = 0.7 OH

An. SNI 6.1.1 Pekerjaan Galian Tanah( Analisa SNI )


An. SNI 010 Pekerja 0.40 x 5.0 = 2.0 HOK
Rekapitulasi kebutuhan bahan dan tenaga kerja pembulatan selisih

Link ke RAB
Batu 15/20 = 13.01 13.00 0.01
Pasir Pasang = 7.04 7.00 0.04
Semen (40 Kg) = 43.17 43.00 0.17
Pekerja = 25.21 25.00 0.21
Tukang = 11.21 11.00 0.21